MISO Electricity Demand and Generation Mix
MISO demand was 89,429 MW in the hour starting 15 Sept 2026, 11:00 EDT (UTC-04:00). Gas was the largest source in the hour starting 14 Sept 2026, 23:00 EDT (UTC-04:00), at 39% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- MISO is a regional transmission organization and balancing authority in the United States, part of the EIA Midwest region.
- In the hour starting 15 Sept 2026, 11:00 EDT (UTC-04:00), demand in MISO was 89,429 MW, against a day-ahead forecast of 87,888 MW.
- Gas supplied 38.7% of MISO's generation in the hour starting 14 Sept 2026, 23:00 EDT (UTC-04:00).
- Demand in MISO totalled 666 TWh in 2025.
- Gas supplied 35.4% of MISO's generation in 2025.
- The highest daily demand in MISO from 2019 onward was 2.49 TWh, on 2026-06-30 (30 June 2026).
- The highest hourly demand in MISO since 2026-06-16 (16 June 2026) was 121.5 GW, in the hour starting 30 Jun 2026, 17:00 EDT (UTC-04:00).
- Solar's highest share of MISO's daily generation from 2019 onward was 12.5%, on 2026-05-14 (14 May 2026).
- Wind's highest share of MISO's daily generation from 2019 onward was 35.6%, on 2025-03-15 (15 March 2025).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 15 Sept 2026, 11:00 EDT (UTC-04:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T15:00:00Z.
Generation by Source
Latest hour with generation by source: 14 Sept 2026, 23:00 EDT (UTC-04:00)| Source | Output | Share |
|---|---|---|
| Gas | 30,600 MW | 38.7% |
| Coal | 18,511 MW | 23.4% |
| Wind | 17,316 MW | 21.9% |
| Nuclear | 11,527 MW | 14.6% |
| Hydro | 637 MW | 0.8% |
| Other | 440 MW | 0.6% |
| Storage | 17 MW | 0.0% |
| Solar | 15 MW | 0.0% |
| Total from these sources | 79,063 MW | |
| Net interchange | -665 MW | net imports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when MISO exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T03:00:00Z.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-16T17:00Z | 97,197 MW |
| 2026-08-16T18:00Z | 100.8 GW |
| 2026-08-16T19:00Z | 103.5 GW |
| 2026-08-16T20:00Z | 105.7 GW |
| 2026-08-16T21:00Z | 107.2 GW |
| 2026-08-16T22:00Z | 107.8 GW |
| 2026-08-16T23:00Z | 106.2 GW |
| 2026-08-17T00:00Z | 103.3 GW |
| 2026-08-17T01:00Z | 100.2 GW |
| 2026-08-17T02:00Z | 95,409 MW |
| 2026-08-17T03:00Z | 89,296 MW |
| 2026-08-17T04:00Z | 85,042 MW |
| 2026-08-17T05:00Z | 81,698 MW |
| 2026-08-17T06:00Z | 78,552 MW |
| 2026-08-17T07:00Z | 76,507 MW |
| 2026-08-17T08:00Z | 75,443 MW |
| 2026-08-17T09:00Z | 75,505 MW |
| 2026-08-17T10:00Z | 77,507 MW |
| 2026-08-17T11:00Z | 80,415 MW |
| 2026-08-17T12:00Z | 82,224 MW |
| 2026-08-17T13:00Z | 84,491 MW |
| 2026-08-17T14:00Z | 88,235 MW |
| 2026-08-17T15:00Z | 92,575 MW |
| 2026-08-17T16:00Z | 97,108 MW |
| 2026-08-17T17:00Z | 100.6 GW |
| 2026-08-17T18:00Z | 103.4 GW |
| 2026-08-17T19:00Z | 105.1 GW |
| 2026-08-17T20:00Z | 106.4 GW |
| 2026-08-17T21:00Z | 107.6 GW |
| 2026-08-17T22:00Z | 107.7 GW |
| 2026-08-17T23:00Z | 106.3 GW |
| 2026-08-18T00:00Z | 102.7 GW |
| 2026-08-18T01:00Z | 99,120 MW |
| 2026-08-18T02:00Z | 94,169 MW |
| 2026-08-18T03:00Z | 87,993 MW |
| 2026-08-18T04:00Z | 82,599 MW |
| 2026-08-18T05:00Z | 79,524 MW |
| 2026-08-18T06:00Z | 76,835 MW |
| 2026-08-18T07:00Z | 74,698 MW |
| 2026-08-18T08:00Z | 73,688 MW |
| 2026-08-18T09:00Z | 74,121 MW |
| 2026-08-18T10:00Z | 76,426 MW |
| 2026-08-18T11:00Z | 78,565 MW |
| 2026-08-18T12:00Z | 80,504 MW |
| 2026-08-18T13:00Z | 83,269 MW |
| 2026-08-18T14:00Z | 86,898 MW |
| 2026-08-18T15:00Z | 91,055 MW |
| 2026-08-18T16:00Z | 94,858 MW |
| 2026-08-18T17:00Z | 98,865 MW |
| 2026-08-18T18:00Z | 101.4 GW |
| 2026-08-18T19:00Z | 105.3 GW |
| 2026-08-18T20:00Z | 106.9 GW |
| 2026-08-18T21:00Z | 107.6 GW |
| 2026-08-18T22:00Z | 107.4 GW |
| 2026-08-18T23:00Z | 105.7 GW |
| 2026-08-19T00:00Z | 102.7 GW |
| 2026-08-19T01:00Z | 99,955 MW |
| 2026-08-19T02:00Z | 95,148 MW |
| 2026-08-19T03:00Z | 88,934 MW |
| 2026-08-19T04:00Z | 84,570 MW |
| 2026-08-19T05:00Z | 81,060 MW |
| 2026-08-19T06:00Z | 78,170 MW |
| 2026-08-19T07:00Z | 75,949 MW |
| 2026-08-19T08:00Z | 74,603 MW |
| 2026-08-19T09:00Z | 74,373 MW |
| 2026-08-19T10:00Z | 76,573 MW |
| 2026-08-19T11:00Z | 78,652 MW |
| 2026-08-19T12:00Z | 80,826 MW |
| 2026-08-19T13:00Z | 83,453 MW |
| 2026-08-19T14:00Z | 86,407 MW |
| 2026-08-19T15:00Z | 90,300 MW |
| 2026-08-19T16:00Z | 93,943 MW |
| 2026-08-19T17:00Z | 97,430 MW |
| 2026-08-19T18:00Z | 100.3 GW |
| 2026-08-19T19:00Z | 102.5 GW |
| 2026-08-19T20:00Z | 104.0 GW |
| 2026-08-19T21:00Z | 105.0 GW |
| 2026-08-19T22:00Z | 104.9 GW |
| 2026-08-19T23:00Z | 103.6 GW |
| 2026-08-20T00:00Z | 100.8 GW |
| 2026-08-20T01:00Z | 98,327 MW |
| 2026-08-20T02:00Z | 93,739 MW |
| 2026-08-20T03:00Z | 87,973 MW |
| 2026-08-20T04:00Z | 82,826 MW |
| 2026-08-20T05:00Z | 80,186 MW |
| 2026-08-20T06:00Z | 77,138 MW |
| 2026-08-20T07:00Z | 74,981 MW |
| 2026-08-20T08:00Z | 74,118 MW |
| 2026-08-20T09:00Z | 74,068 MW |
| 2026-08-20T10:00Z | 76,340 MW |
| 2026-08-20T11:00Z | 78,506 MW |
| 2026-08-20T12:00Z | 80,085 MW |
| 2026-08-20T13:00Z | 82,722 MW |
| 2026-08-20T14:00Z | 86,166 MW |
| 2026-08-20T15:00Z | 90,106 MW |
| 2026-08-20T16:00Z | 94,073 MW |
| 2026-08-20T17:00Z | 97,858 MW |
| 2026-08-20T18:00Z | 101.4 GW |
| 2026-08-20T19:00Z | 103.7 GW |
| 2026-08-20T20:00Z | 105.6 GW |
| 2026-08-20T21:00Z | 106.7 GW |
| 2026-08-20T22:00Z | 106.7 GW |
| 2026-08-20T23:00Z | 105.1 GW |
| 2026-08-21T00:00Z | 101.7 GW |
| 2026-08-21T01:00Z | 98,755 MW |
| 2026-08-21T02:00Z | 94,036 MW |
| 2026-08-21T03:00Z | 88,006 MW |
| 2026-08-21T04:00Z | 83,496 MW |
| 2026-08-21T05:00Z | 80,127 MW |
| 2026-08-21T06:00Z | 77,050 MW |
| 2026-08-21T07:00Z | 76,249 MW |
| 2026-08-21T08:00Z | 73,791 MW |
| 2026-08-21T09:00Z | 73,749 MW |
| 2026-08-21T10:00Z | 75,578 MW |
| 2026-08-21T11:00Z | 77,838 MW |
| 2026-08-21T12:00Z | 79,952 MW |
| 2026-08-21T13:00Z | 82,855 MW |
| 2026-08-21T14:00Z | 86,754 MW |
| 2026-08-21T15:00Z | 90,864 MW |
| 2026-08-21T16:00Z | 94,994 MW |
| 2026-08-21T17:00Z | 98,841 MW |
| 2026-08-21T18:00Z | 102.0 GW |
| 2026-08-21T19:00Z | 104.2 GW |
| 2026-08-21T20:00Z | 105.3 GW |
| 2026-08-21T21:00Z | 105.5 GW |
| 2026-08-21T22:00Z | 104.3 GW |
| 2026-08-21T23:00Z | 102.0 GW |
| 2026-08-22T00:00Z | 98,226 MW |
| 2026-08-22T01:00Z | 94,710 MW |
| 2026-08-22T02:00Z | 90,702 MW |
| 2026-08-22T03:00Z | 85,433 MW |
| 2026-08-22T04:00Z | 80,228 MW |
| 2026-08-22T05:00Z | 76,404 MW |
| 2026-08-22T06:00Z | 73,752 MW |
| 2026-08-22T07:00Z | 72,124 MW |
| 2026-08-22T08:00Z | 70,885 MW |
| 2026-08-22T09:00Z | 70,308 MW |
| 2026-08-22T10:00Z | 70,571 MW |
| 2026-08-22T11:00Z | 71,003 MW |
| 2026-08-22T12:00Z | 72,409 MW |
| 2026-08-22T13:00Z | 75,326 MW |
| 2026-08-22T14:00Z | 79,367 MW |
| 2026-08-22T15:00Z | 83,535 MW |
| 2026-08-22T16:00Z | 87,129 MW |
| 2026-08-22T17:00Z | 90,546 MW |
| 2026-08-22T18:00Z | 93,685 MW |
| 2026-08-22T19:00Z | 95,321 MW |
| 2026-08-22T20:00Z | 96,772 MW |
| 2026-08-22T21:00Z | 97,488 MW |
| 2026-08-22T22:00Z | 97,550 MW |
| 2026-08-22T23:00Z | 95,778 MW |
| 2026-08-23T00:00Z | 92,450 MW |
| 2026-08-23T01:00Z | 89,143 MW |
| 2026-08-23T02:00Z | 85,017 MW |
| 2026-08-23T03:00Z | 80,460 MW |
| 2026-08-23T04:00Z | 76,239 MW |
| 2026-08-23T05:00Z | 73,071 MW |
| 2026-08-23T06:00Z | 70,783 MW |
| 2026-08-23T07:00Z | 69,071 MW |
| 2026-08-23T08:00Z | 67,083 MW |
| 2026-08-23T09:00Z | 66,025 MW |
| 2026-08-23T10:00Z | 65,613 MW |
| 2026-08-23T11:00Z | 65,566 MW |
| 2026-08-23T12:00Z | 66,647 MW |
| 2026-08-23T13:00Z | 69,546 MW |
| 2026-08-23T14:00Z | 72,369 MW |
| 2026-08-23T15:00Z | 76,006 MW |
| 2026-08-23T16:00Z | 80,115 MW |
| 2026-08-23T17:00Z | 83,911 MW |
| 2026-08-23T18:00Z | 87,145 MW |
| 2026-08-23T19:00Z | 89,705 MW |
| 2026-08-23T20:00Z | 91,389 MW |
| 2026-08-23T21:00Z | 93,098 MW |
| 2026-08-23T22:00Z | 93,911 MW |
| 2026-08-23T23:00Z | 93,248 MW |
| 2026-08-24T00:00Z | 90,793 MW |
| 2026-08-24T01:00Z | 88,618 MW |
| 2026-08-24T02:00Z | 84,405 MW |
| 2026-08-24T03:00Z | 79,360 MW |
| 2026-08-24T04:00Z | 75,435 MW |
| 2026-08-24T05:00Z | 72,524 MW |
| 2026-08-24T06:00Z | 69,750 MW |
| 2026-08-24T07:00Z | 68,283 MW |
| 2026-08-24T08:00Z | 67,611 MW |
| 2026-08-24T09:00Z | 68,418 MW |
| 2026-08-24T10:00Z | 70,886 MW |
| 2026-08-24T11:00Z | 73,727 MW |
| 2026-08-24T12:00Z | 75,888 MW |
| 2026-08-24T13:00Z | 78,030 MW |
| 2026-08-24T14:00Z | 80,796 MW |
| 2026-08-24T15:00Z | 83,552 MW |
| 2026-08-24T16:00Z | 85,795 MW |
| 2026-08-24T17:00Z | 88,419 MW |
| 2026-08-24T18:00Z | 90,976 MW |
| 2026-08-24T19:00Z | 92,332 MW |
| 2026-08-24T20:00Z | 93,274 MW |
| 2026-08-24T21:00Z | 93,978 MW |
| 2026-08-24T22:00Z | 94,270 MW |
| 2026-08-24T23:00Z | 93,593 MW |
| 2026-08-25T00:00Z | 91,827 MW |
| 2026-08-25T01:00Z | 90,591 MW |
| 2026-08-25T02:00Z | 86,226 MW |
| 2026-08-25T03:00Z | 80,695 MW |
| 2026-08-25T04:00Z | 76,392 MW |
| 2026-08-25T05:00Z | 73,611 MW |
| 2026-08-25T06:00Z | 71,926 MW |
| 2026-08-25T07:00Z | 70,134 MW |
| 2026-08-25T08:00Z | 68,689 MW |
| 2026-08-25T09:00Z | 69,323 MW |
| 2026-08-25T10:00Z | 71,730 MW |
| 2026-08-25T11:00Z | 75,109 MW |
| 2026-08-25T12:00Z | 76,857 MW |
| 2026-08-25T13:00Z | 78,878 MW |
| 2026-08-25T14:00Z | 81,570 MW |
| 2026-08-25T15:00Z | 85,016 MW |
| 2026-08-25T16:00Z | 88,748 MW |
| 2026-08-25T17:00Z | 92,422 MW |
| 2026-08-25T18:00Z | 96,090 MW |
| 2026-08-25T19:00Z | 98,667 MW |
| 2026-08-25T20:00Z | 101.0 GW |
| 2026-08-25T21:00Z | 102.6 GW |
| 2026-08-25T22:00Z | 102.9 GW |
| 2026-08-25T23:00Z | 101.7 GW |
| 2026-08-26T00:00Z | 98,675 MW |
| 2026-08-26T01:00Z | 96,369 MW |
| 2026-08-26T02:00Z | 91,598 MW |
| 2026-08-26T03:00Z | 86,160 MW |
| 2026-08-26T04:00Z | 81,732 MW |
| 2026-08-26T05:00Z | 78,428 MW |
| 2026-08-26T06:00Z | 75,314 MW |
| 2026-08-26T07:00Z | 73,448 MW |
| 2026-08-26T08:00Z | 72,376 MW |
| 2026-08-26T09:00Z | 72,411 MW |
| 2026-08-26T10:00Z | 74,297 MW |
| 2026-08-26T11:00Z | 77,619 MW |
| 2026-08-26T12:00Z | 79,825 MW |
| 2026-08-26T13:00Z | 81,999 MW |
| 2026-08-26T14:00Z | 85,369 MW |
| 2026-08-26T15:00Z | 89,611 MW |
| 2026-08-26T16:00Z | 94,203 MW |
| 2026-08-26T17:00Z | 98,323 MW |
| 2026-08-26T18:00Z | 101.7 GW |
| 2026-08-26T19:00Z | 104.4 GW |
| 2026-08-26T20:00Z | 106.4 GW |
| 2026-08-26T21:00Z | 107.3 GW |
| 2026-08-26T22:00Z | 106.9 GW |
| 2026-08-26T23:00Z | 105.2 GW |
| 2026-08-27T00:00Z | 101.6 GW |
| 2026-08-27T01:00Z | 98,793 MW |
| 2026-08-27T02:00Z | 93,724 MW |
| 2026-08-27T03:00Z | 87,464 MW |
| 2026-08-27T04:00Z | 82,827 MW |
| 2026-08-27T05:00Z | 79,650 MW |
| 2026-08-27T06:00Z | 76,591 MW |
| 2026-08-27T07:00Z | 74,620 MW |
| 2026-08-27T08:00Z | 72,908 MW |
| 2026-08-27T09:00Z | 73,262 MW |
| 2026-08-27T10:00Z | 74,499 MW |
| 2026-08-27T11:00Z | 77,309 MW |
| 2026-08-27T12:00Z | 79,168 MW |
| 2026-08-27T13:00Z | 81,047 MW |
| 2026-08-27T14:00Z | 83,339 MW |
| 2026-08-27T15:00Z | 86,588 MW |
| 2026-08-27T16:00Z | 90,218 MW |
| 2026-08-27T17:00Z | 94,002 MW |
| 2026-08-27T18:00Z | 97,520 MW |
| 2026-08-27T19:00Z | 99,902 MW |
| 2026-08-27T20:00Z | 101.9 GW |
| 2026-08-27T21:00Z | 103.1 GW |
| 2026-08-27T22:00Z | 102.9 GW |
| 2026-08-27T23:00Z | 101.6 GW |
| 2026-08-28T00:00Z | 98,350 MW |
| 2026-08-28T01:00Z | 95,419 MW |
| 2026-08-28T02:00Z | 90,561 MW |
| 2026-08-28T03:00Z | 84,574 MW |
| 2026-08-28T04:00Z | 79,681 MW |
| 2026-08-28T05:00Z | 76,483 MW |
| 2026-08-28T06:00Z | 73,721 MW |
| 2026-08-28T07:00Z | 71,694 MW |
| 2026-08-28T08:00Z | 70,727 MW |
| 2026-08-28T09:00Z | 70,988 MW |
| 2026-08-28T10:00Z | 73,425 MW |
| 2026-08-28T11:00Z | 75,677 MW |
| 2026-08-28T12:00Z | 77,502 MW |
| 2026-08-28T13:00Z | 79,793 MW |
| 2026-08-28T14:00Z | 82,650 MW |
| 2026-08-28T15:00Z | 86,658 MW |
| 2026-08-28T16:00Z | 90,623 MW |
| 2026-08-28T17:00Z | 94,774 MW |
| 2026-08-28T18:00Z | 98,082 MW |
| 2026-08-28T19:00Z | 100.4 GW |
| 2026-08-28T20:00Z | 101.9 GW |
| 2026-08-28T21:00Z | 102.6 GW |
| 2026-08-28T22:00Z | 101.7 GW |
| 2026-08-28T23:00Z | 99,359 MW |
| 2026-08-29T00:00Z | 95,456 MW |
| 2026-08-29T01:00Z | 92,367 MW |
| 2026-08-29T02:00Z | 87,957 MW |
| 2026-08-29T03:00Z | 82,726 MW |
| 2026-08-29T04:00Z | 78,025 MW |
| 2026-08-29T05:00Z | 74,655 MW |
| 2026-08-29T06:00Z | 71,667 MW |
| 2026-08-29T07:00Z | 69,930 MW |
| 2026-08-29T08:00Z | 68,922 MW |
| 2026-08-29T09:00Z | 68,069 MW |
| 2026-08-29T10:00Z | 68,538 MW |
| 2026-08-29T11:00Z | 69,329 MW |
| 2026-08-29T12:00Z | 70,301 MW |
| 2026-08-29T13:00Z | 73,798 MW |
| 2026-08-29T14:00Z | 78,124 MW |
| 2026-08-29T15:00Z | 81,846 MW |
| 2026-08-29T16:00Z | 85,369 MW |
| 2026-08-29T17:00Z | 88,951 MW |
| 2026-08-29T18:00Z | 92,376 MW |
| 2026-08-29T19:00Z | 94,254 MW |
| 2026-08-29T20:00Z | 95,425 MW |
| 2026-08-29T21:00Z | 96,361 MW |
| 2026-08-29T22:00Z | 96,537 MW |
| 2026-08-29T23:00Z | 95,166 MW |
| 2026-08-30T00:00Z | 92,827 MW |
| 2026-08-30T01:00Z | 90,584 MW |
| 2026-08-30T02:00Z | 86,536 MW |
| 2026-08-30T03:00Z | 82,097 MW |
| 2026-08-30T04:00Z | 78,086 MW |
| 2026-08-30T05:00Z | 75,394 MW |
| 2026-08-30T06:00Z | 73,157 MW |
| 2026-08-30T07:00Z | 70,829 MW |
| 2026-08-30T08:00Z | 69,570 MW |
| 2026-08-30T09:00Z | 68,916 MW |
| 2026-08-30T10:00Z | 68,268 MW |
| 2026-08-30T11:00Z | 68,596 MW |
| 2026-08-30T12:00Z | 70,214 MW |
| 2026-08-30T13:00Z | 74,091 MW |
| 2026-08-30T14:00Z | 78,248 MW |
| 2026-08-30T15:00Z | 82,679 MW |
| 2026-08-30T16:00Z | 87,040 MW |
| 2026-08-30T17:00Z | 91,185 MW |
| 2026-08-30T18:00Z | 94,616 MW |
| 2026-08-30T19:00Z | 96,995 MW |
| 2026-08-30T20:00Z | 99,438 MW |
| 2026-08-30T21:00Z | 101.2 GW |
| 2026-08-30T22:00Z | 101.9 GW |
| 2026-08-30T23:00Z | 101.0 GW |
| 2026-08-31T00:00Z | 98,898 MW |
| 2026-08-31T01:00Z | 96,666 MW |
| 2026-08-31T02:00Z | 92,145 MW |
| 2026-08-31T03:00Z | 86,709 MW |
| 2026-08-31T04:00Z | 82,189 MW |
| 2026-08-31T05:00Z | 79,168 MW |
| 2026-08-31T06:00Z | 76,788 MW |
| 2026-08-31T07:00Z | 74,967 MW |
| 2026-08-31T08:00Z | 73,420 MW |
| 2026-08-31T09:00Z | 73,817 MW |
| 2026-08-31T10:00Z | 76,847 MW |
| 2026-08-31T11:00Z | 80,641 MW |
| 2026-08-31T12:00Z | 83,346 MW |
| 2026-08-31T13:00Z | 86,801 MW |
| 2026-08-31T14:00Z | 91,173 MW |
| 2026-08-31T15:00Z | 95,727 MW |
| 2026-08-31T16:00Z | 100.7 GW |
| 2026-08-31T17:00Z | 105.2 GW |
| 2026-08-31T18:00Z | 109.3 GW |
| 2026-08-31T19:00Z | 111.7 GW |
| 2026-08-31T20:00Z | 113.5 GW |
| 2026-08-31T21:00Z | 114.4 GW |
| 2026-08-31T22:00Z | 114.4 GW |
| 2026-08-31T23:00Z | 112.9 GW |
| 2026-09-01T00:00Z | 109.8 GW |
| 2026-09-01T01:00Z | 106.7 GW |
| 2026-09-01T02:00Z | 101.1 GW |
| 2026-09-01T03:00Z | 94,988 MW |
| 2026-09-01T04:00Z | 89,835 MW |
| 2026-09-01T05:00Z | 86,071 MW |
| 2026-09-01T06:00Z | 82,615 MW |
| 2026-09-01T07:00Z | 80,203 MW |
| 2026-09-01T08:00Z | 78,508 MW |
| 2026-09-01T09:00Z | 78,230 MW |
| 2026-09-01T10:00Z | 80,554 MW |
| 2026-09-01T11:00Z | 84,011 MW |
| 2026-09-01T12:00Z | 85,757 MW |
| 2026-09-01T13:00Z | 88,708 MW |
| 2026-09-01T14:00Z | 93,337 MW |
| 2026-09-01T15:00Z | 99,245 MW |
| 2026-09-01T16:00Z | 104.7 GW |
| 2026-09-01T17:00Z | 109.6 GW |
| 2026-09-01T18:00Z | 113.5 GW |
| 2026-09-01T19:00Z | 115.5 GW |
| 2026-09-01T20:00Z | 116.7 GW |
| 2026-09-01T21:00Z | 117.1 GW |
| 2026-09-01T22:00Z | 116.3 GW |
| 2026-09-01T23:00Z | 113.9 GW |
| 2026-09-02T00:00Z | 110.8 GW |
| 2026-09-02T01:00Z | 108.4 GW |
| 2026-09-02T02:00Z | 103.1 GW |
| 2026-09-02T03:00Z | 96,984 MW |
| 2026-09-02T04:00Z | 92,163 MW |
| 2026-09-02T05:00Z | 88,051 MW |
| 2026-09-02T06:00Z | 84,505 MW |
| 2026-09-02T07:00Z | 82,166 MW |
| 2026-09-02T08:00Z | 80,757 MW |
| 2026-09-02T09:00Z | 81,153 MW |
| 2026-09-02T10:00Z | 82,953 MW |
| 2026-09-02T11:00Z | 85,876 MW |
| 2026-09-02T12:00Z | 88,094 MW |
| 2026-09-02T13:00Z | 91,187 MW |
| 2026-09-02T14:00Z | 95,593 MW |
| 2026-09-02T15:00Z | 101.0 GW |
| 2026-09-02T16:00Z | 106.5 GW |
| 2026-09-02T17:00Z | 111.1 GW |
| 2026-09-02T18:00Z | 114.9 GW |
| 2026-09-02T19:00Z | 117.4 GW |
| 2026-09-02T20:00Z | 118.9 GW |
| 2026-09-02T21:00Z | 119.2 GW |
| 2026-09-02T22:00Z | 119.0 GW |
| 2026-09-02T23:00Z | 117.1 GW |
| 2026-09-03T00:00Z | 113.2 GW |
| 2026-09-03T01:00Z | 109.9 GW |
| 2026-09-03T02:00Z | 105.1 GW |
| 2026-09-03T03:00Z | 98,577 MW |
| 2026-09-03T04:00Z | 93,334 MW |
| 2026-09-03T05:00Z | 89,670 MW |
| 2026-09-03T06:00Z | 85,952 MW |
| 2026-09-03T07:00Z | 83,204 MW |
| 2026-09-03T08:00Z | 81,872 MW |
| 2026-09-03T09:00Z | 81,330 MW |
| 2026-09-03T10:00Z | 83,218 MW |
| 2026-09-03T11:00Z | 86,631 MW |
| 2026-09-03T12:00Z | 89,424 MW |
| 2026-09-03T13:00Z | 92,819 MW |
| 2026-09-03T14:00Z | 96,364 MW |
| 2026-09-03T15:00Z | 100.4 GW |
| 2026-09-03T16:00Z | 104.6 GW |
| 2026-09-03T17:00Z | 108.3 GW |
| 2026-09-03T18:00Z | 111.4 GW |
| 2026-09-03T19:00Z | 112.5 GW |
| 2026-09-03T20:00Z | 112.4 GW |
| 2026-09-03T21:00Z | 112.8 GW |
| 2026-09-03T22:00Z | 112.2 GW |
| 2026-09-03T23:00Z | 110.7 GW |
| 2026-09-04T00:00Z | 108.3 GW |
| 2026-09-04T01:00Z | 105.6 GW |
| 2026-09-04T02:00Z | 100.5 GW |
| 2026-09-04T03:00Z | 95,052 MW |
| 2026-09-04T04:00Z | 90,545 MW |
| 2026-09-04T05:00Z | 86,953 MW |
| 2026-09-04T06:00Z | 83,612 MW |
| 2026-09-04T07:00Z | 81,016 MW |
| 2026-09-04T08:00Z | 79,817 MW |
| 2026-09-04T09:00Z | 79,735 MW |
| 2026-09-04T10:00Z | 81,564 MW |
| 2026-09-04T11:00Z | 84,371 MW |
| 2026-09-04T12:00Z | 86,619 MW |
| 2026-09-04T13:00Z | 89,718 MW |
| 2026-09-04T14:00Z | 93,597 MW |
| 2026-09-04T15:00Z | 97,399 MW |
| 2026-09-04T16:00Z | 101.8 GW |
| 2026-09-04T17:00Z | 105.1 GW |
| 2026-09-04T18:00Z | 107.9 GW |
| 2026-09-04T19:00Z | 109.9 GW |
| 2026-09-04T20:00Z | 111.5 GW |
| 2026-09-04T21:00Z | 112.6 GW |
| 2026-09-04T22:00Z | 112.0 GW |
| 2026-09-04T23:00Z | 109.9 GW |
| 2026-09-05T00:00Z | 106.6 GW |
| 2026-09-05T01:00Z | 103.6 GW |
| 2026-09-05T02:00Z | 98,488 MW |
| 2026-09-05T03:00Z | 93,301 MW |
| 2026-09-05T04:00Z | 88,379 MW |
| 2026-09-05T05:00Z | 84,717 MW |
| 2026-09-05T06:00Z | 81,635 MW |
| 2026-09-05T07:00Z | 78,818 MW |
| 2026-09-05T08:00Z | 77,025 MW |
| 2026-09-05T09:00Z | 75,756 MW |
| 2026-09-05T10:00Z | 75,419 MW |
| 2026-09-05T11:00Z | 75,585 MW |
| 2026-09-05T12:00Z | 76,798 MW |
| 2026-09-05T13:00Z | 80,156 MW |
| 2026-09-05T14:00Z | 84,917 MW |
| 2026-09-05T15:00Z | 90,016 MW |
| 2026-09-05T16:00Z | 94,130 MW |
| 2026-09-05T17:00Z | 97,832 MW |
| 2026-09-05T18:00Z | 100.7 GW |
| 2026-09-05T19:00Z | 102.9 GW |
| 2026-09-05T20:00Z | 104.3 GW |
| 2026-09-05T21:00Z | 104.5 GW |
| 2026-09-05T22:00Z | 103.5 GW |
| 2026-09-05T23:00Z | 101.2 GW |
| 2026-09-06T00:00Z | 97,945 MW |
| 2026-09-06T01:00Z | 95,225 MW |
| 2026-09-06T02:00Z | 90,617 MW |
| 2026-09-06T03:00Z | 85,983 MW |
| 2026-09-06T04:00Z | 82,081 MW |
| 2026-09-06T05:00Z | 78,818 MW |
| 2026-09-06T06:00Z | 75,719 MW |
| 2026-09-06T07:00Z | 73,369 MW |
| 2026-09-06T08:00Z | 71,946 MW |
| 2026-09-06T09:00Z | 70,303 MW |
| 2026-09-06T10:00Z | 69,802 MW |
| 2026-09-06T11:00Z | 69,926 MW |
| 2026-09-06T12:00Z | 71,307 MW |
| 2026-09-06T13:00Z | 74,205 MW |
| 2026-09-06T14:00Z | 78,207 MW |
| 2026-09-06T15:00Z | 82,469 MW |
| 2026-09-06T16:00Z | 86,570 MW |
| 2026-09-06T17:00Z | 90,619 MW |
| 2026-09-06T18:00Z | 94,060 MW |
| 2026-09-06T19:00Z | 96,323 MW |
| 2026-09-06T20:00Z | 97,761 MW |
| 2026-09-06T21:00Z | 98,339 MW |
| 2026-09-06T22:00Z | 98,045 MW |
| 2026-09-06T23:00Z | 95,447 MW |
| 2026-09-07T00:00Z | 92,249 MW |
| 2026-09-07T01:00Z | 89,427 MW |
| 2026-09-07T02:00Z | 85,120 MW |
| 2026-09-07T03:00Z | 80,577 MW |
| 2026-09-07T04:00Z | 76,578 MW |
| 2026-09-07T05:00Z | 73,482 MW |
| 2026-09-07T06:00Z | 71,540 MW |
| 2026-09-07T07:00Z | 69,783 MW |
| 2026-09-07T08:00Z | 68,457 MW |
| 2026-09-07T09:00Z | 67,960 MW |
| 2026-09-07T10:00Z | 67,979 MW |
| 2026-09-07T11:00Z | 67,814 MW |
| 2026-09-07T12:00Z | 68,615 MW |
| 2026-09-07T13:00Z | 71,531 MW |
| 2026-09-07T14:00Z | 76,212 MW |
| 2026-09-07T15:00Z | 80,794 MW |
| 2026-09-07T16:00Z | 85,127 MW |
| 2026-09-07T17:00Z | 89,281 MW |
| 2026-09-07T18:00Z | 92,498 MW |
| 2026-09-07T19:00Z | 95,113 MW |
| 2026-09-07T20:00Z | 97,118 MW |
| 2026-09-07T21:00Z | 98,753 MW |
| 2026-09-07T22:00Z | 99,078 MW |
| 2026-09-07T23:00Z | 97,005 MW |
| 2026-09-08T00:00Z | 94,150 MW |
| 2026-09-08T01:00Z | 91,139 MW |
| 2026-09-08T02:00Z | 85,859 MW |
| 2026-09-08T03:00Z | 80,432 MW |
| 2026-09-08T04:00Z | 75,821 MW |
| 2026-09-08T05:00Z | 73,460 MW |
| 2026-09-08T06:00Z | 71,244 MW |
| 2026-09-08T07:00Z | 69,529 MW |
| 2026-09-08T08:00Z | 68,816 MW |
| 2026-09-08T09:00Z | 68,951 MW |
| 2026-09-08T10:00Z | 71,853 MW |
| 2026-09-08T11:00Z | 75,918 MW |
| 2026-09-08T12:00Z | 78,443 MW |
| 2026-09-08T13:00Z | 80,927 MW |
| 2026-09-08T14:00Z | 84,738 MW |
| 2026-09-08T15:00Z | 88,989 MW |
| 2026-09-08T16:00Z | 93,520 MW |
| 2026-09-08T17:00Z | 97,788 MW |
| 2026-09-08T18:00Z | 101.4 GW |
| 2026-09-08T19:00Z | 103.8 GW |
| 2026-09-08T20:00Z | 105.7 GW |
| 2026-09-08T21:00Z | 106.5 GW |
| 2026-09-08T22:00Z | 106.0 GW |
| 2026-09-08T23:00Z | 104.1 GW |
| 2026-09-09T00:00Z | 102.0 GW |
| 2026-09-09T01:00Z | 99,004 MW |
| 2026-09-09T02:00Z | 93,904 MW |
| 2026-09-09T03:00Z | 88,310 MW |
| 2026-09-09T04:00Z | 83,236 MW |
| 2026-09-09T05:00Z | 80,230 MW |
| 2026-09-09T06:00Z | 77,697 MW |
| 2026-09-09T07:00Z | 75,711 MW |
| 2026-09-09T08:00Z | 74,928 MW |
| 2026-09-09T09:00Z | 75,507 MW |
| 2026-09-09T10:00Z | 77,517 MW |
| 2026-09-09T11:00Z | 81,385 MW |
| 2026-09-09T12:00Z | 83,448 MW |
| 2026-09-09T13:00Z | 85,734 MW |
| 2026-09-09T14:00Z | 88,539 MW |
| 2026-09-09T15:00Z | 92,544 MW |
| 2026-09-09T16:00Z | 95,763 MW |
| 2026-09-09T17:00Z | 99,110 MW |
| 2026-09-09T18:00Z | 101.8 GW |
| 2026-09-09T19:00Z | 103.2 GW |
| 2026-09-09T20:00Z | 104.5 GW |
| 2026-09-09T21:00Z | 105.5 GW |
| 2026-09-09T22:00Z | 105.6 GW |
| 2026-09-09T23:00Z | 104.1 GW |
| 2026-09-10T00:00Z | 101.3 GW |
| 2026-09-10T01:00Z | 98,287 MW |
| 2026-09-10T02:00Z | 93,064 MW |
| 2026-09-10T03:00Z | 87,789 MW |
| 2026-09-10T04:00Z | 82,473 MW |
| 2026-09-10T05:00Z | 79,137 MW |
| 2026-09-10T06:00Z | 76,447 MW |
| 2026-09-10T07:00Z | 74,268 MW |
| 2026-09-10T08:00Z | 73,199 MW |
| 2026-09-10T09:00Z | 73,292 MW |
| 2026-09-10T10:00Z | 75,800 MW |
| 2026-09-10T11:00Z | 79,177 MW |
| 2026-09-10T12:00Z | 80,883 MW |
| 2026-09-10T13:00Z | 82,714 MW |
| 2026-09-10T14:00Z | 85,337 MW |
| 2026-09-10T15:00Z | 88,036 MW |
| 2026-09-10T16:00Z | 90,625 MW |
| 2026-09-10T17:00Z | 92,914 MW |
| 2026-09-10T18:00Z | 94,852 MW |
| 2026-09-10T19:00Z | 95,753 MW |
| 2026-09-10T20:00Z | 95,831 MW |
| 2026-09-10T21:00Z | 96,370 MW |
| 2026-09-10T22:00Z | 96,206 MW |
| 2026-09-10T23:00Z | 95,326 MW |
| 2026-09-11T00:00Z | 93,886 MW |
| 2026-09-11T01:00Z | 91,365 MW |
| 2026-09-11T02:00Z | 87,013 MW |
| 2026-09-11T03:00Z | 81,986 MW |
| 2026-09-11T04:00Z | 77,399 MW |
| 2026-09-11T05:00Z | 74,402 MW |
| 2026-09-11T06:00Z | 72,656 MW |
| 2026-09-11T07:00Z | 70,971 MW |
| 2026-09-11T08:00Z | 70,376 MW |
| 2026-09-11T09:00Z | 71,002 MW |
| 2026-09-11T10:00Z | 73,169 MW |
| 2026-09-11T11:00Z | 76,129 MW |
| 2026-09-11T12:00Z | 77,932 MW |
| 2026-09-11T13:00Z | 79,651 MW |
| 2026-09-11T14:00Z | 81,727 MW |
| 2026-09-11T15:00Z | 84,701 MW |
| 2026-09-11T16:00Z | 87,940 MW |
| 2026-09-11T17:00Z | 91,197 MW |
| 2026-09-11T18:00Z | 93,936 MW |
| 2026-09-11T19:00Z | 95,631 MW |
| 2026-09-11T20:00Z | 96,634 MW |
| 2026-09-11T21:00Z | 97,735 MW |
| 2026-09-11T22:00Z | 97,438 MW |
| 2026-09-11T23:00Z | 95,219 MW |
| 2026-09-12T00:00Z | 92,576 MW |
| 2026-09-12T01:00Z | 89,906 MW |
| 2026-09-12T02:00Z | 85,807 MW |
| 2026-09-12T03:00Z | 81,436 MW |
| 2026-09-12T04:00Z | 77,070 MW |
| 2026-09-12T05:00Z | 74,162 MW |
| 2026-09-12T06:00Z | 71,909 MW |
| 2026-09-12T07:00Z | 70,099 MW |
| 2026-09-12T08:00Z | 68,686 MW |
| 2026-09-12T09:00Z | 68,537 MW |
| 2026-09-12T10:00Z | 69,353 MW |
| 2026-09-12T11:00Z | 70,559 MW |
| 2026-09-12T12:00Z | 71,810 MW |
| 2026-09-12T13:00Z | 74,858 MW |
| 2026-09-12T14:00Z | 78,510 MW |
| 2026-09-12T15:00Z | 82,335 MW |
| 2026-09-12T16:00Z | 86,244 MW |
| 2026-09-12T17:00Z | 89,242 MW |
| 2026-09-12T18:00Z | 92,283 MW |
| 2026-09-12T19:00Z | 94,138 MW |
| 2026-09-12T20:00Z | 95,945 MW |
| 2026-09-12T21:00Z | 96,846 MW |
| 2026-09-12T22:00Z | 96,447 MW |
| 2026-09-12T23:00Z | 94,091 MW |
| 2026-09-13T00:00Z | 91,642 MW |
| 2026-09-13T01:00Z | 88,745 MW |
| 2026-09-13T02:00Z | 84,575 MW |
| 2026-09-13T03:00Z | 79,952 MW |
| 2026-09-13T04:00Z | 75,785 MW |
| 2026-09-13T05:00Z | 73,097 MW |
| 2026-09-13T06:00Z | 70,924 MW |
| 2026-09-13T07:00Z | 69,160 MW |
| 2026-09-13T08:00Z | 67,593 MW |
| 2026-09-13T09:00Z | 66,899 MW |
| 2026-09-13T10:00Z | 67,028 MW |
| 2026-09-13T11:00Z | 67,299 MW |
| 2026-09-13T12:00Z | 67,821 MW |
| 2026-09-13T13:00Z | 70,955 MW |
| 2026-09-13T14:00Z | 74,776 MW |
| 2026-09-13T15:00Z | 78,367 MW |
| 2026-09-13T16:00Z | 82,125 MW |
| 2026-09-13T17:00Z | 85,473 MW |
| 2026-09-13T18:00Z | 87,143 MW |
| 2026-09-13T19:00Z | 88,608 MW |
| 2026-09-13T20:00Z | 89,233 MW |
| 2026-09-13T21:00Z | 89,692 MW |
| 2026-09-13T22:00Z | 89,470 MW |
| 2026-09-13T23:00Z | 87,900 MW |
| 2026-09-14T00:00Z | 86,112 MW |
| 2026-09-14T01:00Z | 83,617 MW |
| 2026-09-14T02:00Z | 79,634 MW |
| 2026-09-14T03:00Z | 75,030 MW |
| 2026-09-14T04:00Z | 71,805 MW |
| 2026-09-14T05:00Z | 69,165 MW |
| 2026-09-14T06:00Z | 67,915 MW |
| 2026-09-14T07:00Z | 66,740 MW |
| 2026-09-14T08:00Z | 65,856 MW |
| 2026-09-14T09:00Z | 66,444 MW |
| 2026-09-14T10:00Z | 69,310 MW |
| 2026-09-14T11:00Z | 72,857 MW |
| 2026-09-14T12:00Z | 74,207 MW |
| 2026-09-14T13:00Z | 75,980 MW |
| 2026-09-14T14:00Z | 78,647 MW |
| 2026-09-14T15:00Z | 81,153 MW |
| 2026-09-14T16:00Z | 84,327 MW |
| 2026-09-14T17:00Z | 87,105 MW |
| 2026-09-14T18:00Z | 89,437 MW |
| 2026-09-14T19:00Z | 90,553 MW |
| 2026-09-14T20:00Z | 91,735 MW |
| 2026-09-14T21:00Z | 92,067 MW |
| 2026-09-14T22:00Z | 91,703 MW |
| 2026-09-14T23:00Z | 90,151 MW |
| 2026-09-15T00:00Z | 88,981 MW |
| 2026-09-15T01:00Z | 86,577 MW |
| 2026-09-15T02:00Z | 82,756 MW |
| 2026-09-15T03:00Z | 78,235 MW |
| 2026-09-15T04:00Z | 74,451 MW |
| 2026-09-15T05:00Z | 74,354 MW |
| 2026-09-15T06:00Z | 72,486 MW |
| 2026-09-15T07:00Z | 71,074 MW |
| 2026-09-15T08:00Z | 70,849 MW |
| 2026-09-15T09:00Z | 71,906 MW |
| 2026-09-15T10:00Z | 75,117 MW |
| 2026-09-15T11:00Z | 78,837 MW |
| 2026-09-15T12:00Z | 80,677 MW |
| 2026-09-15T13:00Z | 82,491 MW |
| 2026-09-15T14:00Z | 85,477 MW |
| 2026-09-15T15:00Z | 89,429 MW |
| 2026-09-15T16:00Z | n/a |
| Hour starting (UTC) | Gas | Coal | Nuclear | Wind | Solar |
|---|---|---|---|---|---|
| 2026-08-16T17:00Z | 37,002 MW | 26,520 MW | 11,013 MW | 6,894 MW | 15,469 MW |
| 2026-08-16T18:00Z | 39,730 MW | 27,709 MW | 11,010 MW | 7,077 MW | 15,515 MW |
| 2026-08-16T19:00Z | 41,335 MW | 28,494 MW | 11,001 MW | 6,661 MW | 15,978 MW |
| 2026-08-16T20:00Z | 42,925 MW | 28,899 MW | 11,001 MW | 6,139 MW | 15,639 MW |
| 2026-08-16T21:00Z | 44,644 MW | 29,547 MW | 11,000 MW | 5,589 MW | 14,277 MW |
| 2026-08-16T22:00Z | 46,479 MW | 29,868 MW | 10,999 MW | 5,491 MW | 11,794 MW |
| 2026-08-16T23:00Z | 47,505 MW | 30,558 MW | 10,998 MW | 4,825 MW | 6,827 MW |
| 2026-08-17T00:00Z | 48,968 MW | 30,968 MW | 11,001 MW | 3,845 MW | 1,196 MW |
| 2026-08-17T01:00Z | 47,879 MW | 31,032 MW | 11,007 MW | 4,250 MW | 109 MW |
| 2026-08-17T02:00Z | 45,054 MW | 30,553 MW | 10,985 MW | 4,468 MW | 101 MW |
| 2026-08-17T03:00Z | 41,364 MW | 29,256 MW | 11,016 MW | 4,573 MW | 103 MW |
| 2026-08-17T04:00Z | 38,865 MW | 27,931 MW | 11,023 MW | 4,296 MW | 103 MW |
| 2026-08-17T05:00Z | 36,834 MW | 27,058 MW | 11,025 MW | 3,581 MW | 104 MW |
| 2026-08-17T06:00Z | 35,223 MW | 25,275 MW | 11,030 MW | 3,565 MW | 108 MW |
| 2026-08-17T07:00Z | 34,148 MW | 23,886 MW | 11,034 MW | 3,509 MW | 109 MW |
| 2026-08-17T08:00Z | 33,558 MW | 23,211 MW | 11,033 MW | 3,716 MW | 107 MW |
| 2026-08-17T09:00Z | 33,631 MW | 23,336 MW | 11,037 MW | 3,484 MW | 106 MW |
| 2026-08-17T10:00Z | 34,903 MW | 24,636 MW | 11,038 MW | 3,344 MW | 91 MW |
| 2026-08-17T11:00Z | 35,935 MW | 25,895 MW | 11,042 MW | 3,510 MW | 400 MW |
| 2026-08-17T12:00Z | 35,296 MW | 25,321 MW | 11,046 MW | 3,469 MW | 4,665 MW |
| 2026-08-17T13:00Z | 34,319 MW | 24,028 MW | 11,045 MW | 2,332 MW | 11,763 MW |
| 2026-08-17T14:00Z | 35,389 MW | 25,344 MW | 11,043 MW | 1,553 MW | 15,257 MW |
| 2026-08-17T15:00Z | 37,257 MW | 26,954 MW | 11,035 MW | 1,785 MW | 16,473 MW |
| 2026-08-17T16:00Z | 39,873 MW | 27,672 MW | 11,033 MW | 2,514 MW | 17,169 MW |
| 2026-08-17T17:00Z | 42,088 MW | 27,827 MW | 11,033 MW | 3,112 MW | 17,396 MW |
| 2026-08-17T18:00Z | 43,910 MW | 28,389 MW | 11,037 MW | 3,776 MW | 17,280 MW |
| 2026-08-17T19:00Z | 44,064 MW | 28,251 MW | 11,036 MW | 4,108 MW | 17,150 MW |
| 2026-08-17T20:00Z | 46,151 MW | 28,238 MW | 11,035 MW | 4,220 MW | 16,493 MW |
| 2026-08-17T21:00Z | 47,017 MW | 28,425 MW | 11,029 MW | 4,270 MW | 15,171 MW |
| 2026-08-17T22:00Z | 48,252 MW | 28,759 MW | 11,025 MW | 3,977 MW | 13,340 MW |
| 2026-08-17T23:00Z | 49,530 MW | 29,846 MW | 11,021 MW | 3,536 MW | 8,125 MW |
| 2026-08-18T00:00Z | 50,105 MW | 30,205 MW | 11,026 MW | 3,791 MW | 1,382 MW |
| 2026-08-18T01:00Z | 48,353 MW | 30,107 MW | 11,028 MW | 4,107 MW | 21 MW |
| 2026-08-18T02:00Z | 45,158 MW | 29,213 MW | 11,035 MW | 5,338 MW | 3 MW |
| 2026-08-18T03:00Z | 41,254 MW | 27,755 MW | 11,043 MW | 6,662 MW | 6 MW |
| 2026-08-18T04:00Z | 36,622 MW | 25,800 MW | 11,047 MW | 7,494 MW | 4 MW |
| 2026-08-18T05:00Z | 34,058 MW | 24,669 MW | 11,047 MW | 7,830 MW | 6 MW |
| 2026-08-18T06:00Z | 32,628 MW | 22,634 MW | 11,051 MW | 8,466 MW | 7 MW |
| 2026-08-18T07:00Z | 31,176 MW | 20,993 MW | 11,052 MW | 8,874 MW | 11 MW |
| 2026-08-18T08:00Z | 30,617 MW | 19,713 MW | 11,057 MW | 9,603 MW | 8 MW |
| 2026-08-18T09:00Z | 30,977 MW | 19,819 MW | 11,054 MW | 9,259 MW | 5 MW |
| 2026-08-18T10:00Z | 32,275 MW | 21,049 MW | 11,060 MW | 8,647 MW | 5 MW |
| 2026-08-18T11:00Z | 34,008 MW | 22,955 MW | 11,063 MW | 7,191 MW | 536 MW |
| 2026-08-18T12:00Z | 32,583 MW | 22,813 MW | 11,065 MW | 6,671 MW | 5,325 MW |
| 2026-08-18T13:00Z | 31,908 MW | 23,003 MW | 11,063 MW | 4,748 MW | 11,697 MW |
| 2026-08-18T14:00Z | 32,884 MW | 24,069 MW | 11,054 MW | 3,214 MW | 15,376 MW |
| 2026-08-18T15:00Z | 34,627 MW | 26,130 MW | 11,053 MW | 2,713 MW | 16,692 MW |
| 2026-08-18T16:00Z | 37,395 MW | 27,238 MW | 11,043 MW | 2,933 MW | 17,161 MW |
| 2026-08-18T17:00Z | 40,315 MW | 27,288 MW | 11,040 MW | 3,942 MW | 17,691 MW |
| 2026-08-18T18:00Z | 42,261 MW | 27,874 MW | 11,031 MW | 4,086 MW | 17,439 MW |
| 2026-08-18T19:00Z | 45,500 MW | 29,027 MW | 11,023 MW | 3,664 MW | 16,516 MW |
| 2026-08-18T20:00Z | 46,931 MW | 29,373 MW | 11,022 MW | 3,793 MW | 15,290 MW |
| 2026-08-18T21:00Z | 47,728 MW | 29,427 MW | 11,017 MW | 3,979 MW | 13,557 MW |
| 2026-08-18T22:00Z | 48,196 MW | 29,398 MW | 11,012 MW | 4,061 MW | 11,645 MW |
| 2026-08-18T23:00Z | 48,888 MW | 29,515 MW | 11,005 MW | 3,975 MW | 6,721 MW |
| 2026-08-19T00:00Z | 49,031 MW | 29,672 MW | 11,008 MW | 3,848 MW | 1,136 MW |
| 2026-08-19T01:00Z | 47,644 MW | 29,695 MW | 11,016 MW | 4,422 MW | 46 MW |
| 2026-08-19T02:00Z | 44,726 MW | 29,352 MW | 11,016 MW | 4,523 MW | 42 MW |
| 2026-08-19T03:00Z | 41,442 MW | 28,722 MW | 11,019 MW | 3,942 MW | 41 MW |
| 2026-08-19T04:00Z | 38,335 MW | 27,789 MW | 11,024 MW | 3,869 MW | 42 MW |
| 2026-08-19T05:00Z | 35,994 MW | 26,327 MW | 11,030 MW | 3,509 MW | 41 MW |
| 2026-08-19T06:00Z | 34,196 MW | 24,336 MW | 11,028 MW | 3,750 MW | 41 MW |
| 2026-08-19T07:00Z | 33,343 MW | 22,559 MW | 11,031 MW | 3,654 MW | 37 MW |
| 2026-08-19T08:00Z | 32,685 MW | 21,303 MW | 11,032 MW | 4,089 MW | 3 MW |
| 2026-08-19T09:00Z | 32,532 MW | 21,497 MW | 11,037 MW | 4,673 MW | 2 MW |
| 2026-08-19T10:00Z | 33,403 MW | 23,677 MW | 11,044 MW | 4,643 MW | 3 MW |
| 2026-08-19T11:00Z | 34,989 MW | 25,408 MW | 11,050 MW | 4,238 MW | 202 MW |
| 2026-08-19T12:00Z | 35,103 MW | 25,300 MW | 11,046 MW | 4,030 MW | 3,020 MW |
| 2026-08-19T13:00Z | 34,893 MW | 24,893 MW | 11,047 MW | 3,001 MW | 8,024 MW |
| 2026-08-19T14:00Z | 35,685 MW | 24,980 MW | 11,039 MW | 1,619 MW | 11,902 MW |
| 2026-08-19T15:00Z | 37,660 MW | 26,122 MW | 11,033 MW | 1,445 MW | 13,400 MW |
| 2026-08-19T16:00Z | 40,515 MW | 26,646 MW | 11,028 MW | 1,371 MW | 14,776 MW |
| 2026-08-19T17:00Z | 43,510 MW | 27,510 MW | 11,026 MW | 1,390 MW | 14,878 MW |
| 2026-08-19T18:00Z | 44,785 MW | 27,863 MW | 11,015 MW | 1,659 MW | 14,979 MW |
| 2026-08-19T19:00Z | 47,078 MW | 28,498 MW | 11,013 MW | 1,391 MW | 14,113 MW |
| 2026-08-19T20:00Z | 47,945 MW | 29,277 MW | 11,004 MW | 1,496 MW | 13,250 MW |
| 2026-08-19T21:00Z | 49,024 MW | 29,357 MW | 11,001 MW | 1,618 MW | 12,463 MW |
| 2026-08-19T22:00Z | 49,359 MW | 29,797 MW | 11,002 MW | 1,921 MW | 10,633 MW |
| 2026-08-19T23:00Z | 50,704 MW | 29,969 MW | 11,006 MW | 1,807 MW | 5,647 MW |
| 2026-08-20T00:00Z | 49,999 MW | 29,900 MW | 11,006 MW | 1,905 MW | 855 MW |
| 2026-08-20T01:00Z | 48,282 MW | 29,576 MW | 11,012 MW | 2,949 MW | 7 MW |
| 2026-08-20T02:00Z | 45,782 MW | 29,331 MW | 11,017 MW | 3,490 MW | 4 MW |
| 2026-08-20T03:00Z | 41,622 MW | 28,606 MW | 11,026 MW | 3,805 MW | 4 MW |
| 2026-08-20T04:00Z | 37,345 MW | 27,614 MW | 11,029 MW | 3,834 MW | 4 MW |
| 2026-08-20T05:00Z | 35,370 MW | 26,419 MW | 11,038 MW | 4,103 MW | 3 MW |
| 2026-08-20T06:00Z | 33,454 MW | 24,142 MW | 11,040 MW | 4,648 MW | 7 MW |
| 2026-08-20T07:00Z | 32,818 MW | 22,498 MW | 11,042 MW | 4,903 MW | 2 MW |
| 2026-08-20T08:00Z | 32,469 MW | 21,453 MW | 11,045 MW | 5,255 MW | 3 MW |
| 2026-08-20T09:00Z | 32,241 MW | 21,495 MW | 11,040 MW | 5,219 MW | 2 MW |
| 2026-08-20T10:00Z | 32,986 MW | 23,185 MW | 11,039 MW | 5,183 MW | 5 MW |
| 2026-08-20T11:00Z | 33,979 MW | 25,006 MW | 11,043 MW | 5,387 MW | 186 MW |
| 2026-08-20T12:00Z | 32,899 MW | 24,306 MW | 11,045 MW | 5,743 MW | 4,160 MW |
| 2026-08-20T13:00Z | 32,397 MW | 23,530 MW | 11,050 MW | 4,514 MW | 10,575 MW |
| 2026-08-20T14:00Z | 32,657 MW | 25,176 MW | 11,045 MW | 2,676 MW | 14,262 MW |
| 2026-08-20T15:00Z | 33,899 MW | 26,435 MW | 11,037 MW | 2,825 MW | 16,207 MW |
| 2026-08-20T16:00Z | 35,881 MW | 27,118 MW | 11,026 MW | 3,418 MW | 17,234 MW |
| 2026-08-20T17:00Z | 38,708 MW | 27,629 MW | 11,018 MW | 4,410 MW | 17,352 MW |
| 2026-08-20T18:00Z | 40,674 MW | 27,917 MW | 11,013 MW | 5,368 MW | 17,623 MW |
| 2026-08-20T19:00Z | 41,726 MW | 27,665 MW | 11,016 MW | 6,532 MW | 17,516 MW |
| 2026-08-20T20:00Z | 43,753 MW | 27,462 MW | 11,022 MW | 7,313 MW | 17,102 MW |
| 2026-08-20T21:00Z | 44,199 MW | 27,494 MW | 11,019 MW | 7,734 MW | 16,621 MW |
| 2026-08-20T22:00Z | 45,484 MW | 27,532 MW | 11,017 MW | 7,139 MW | 14,454 MW |
| 2026-08-20T23:00Z | 47,602 MW | 28,667 MW | 11,011 MW | 5,526 MW | 7,587 MW |
| 2026-08-21T00:00Z | 48,376 MW | 29,446 MW | 11,019 MW | 4,696 MW | 1,025 MW |
| 2026-08-21T01:00Z | 46,433 MW | 29,352 MW | 11,033 MW | 6,297 MW | 24 MW |
| 2026-08-21T02:00Z | 42,969 MW | 28,784 MW | 11,040 MW | 7,681 MW | 4 MW |
| 2026-08-21T03:00Z | 38,351 MW | 28,111 MW | 11,044 MW | 7,681 MW | 5 MW |
| 2026-08-21T04:00Z | 34,812 MW | 27,111 MW | 11,051 MW | 7,592 MW | 3 MW |
| 2026-08-21T05:00Z | 32,999 MW | 24,168 MW | 11,056 MW | 8,302 MW | 4 MW |
| 2026-08-21T06:00Z | 31,930 MW | 21,886 MW | 11,058 MW | 8,610 MW | 26 MW |
| 2026-08-21T07:00Z | 31,816 MW | 21,287 MW | 11,054 MW | 8,744 MW | 52 MW |
| 2026-08-21T08:00Z | 29,928 MW | 19,270 MW | 11,067 MW | 8,666 MW | 15 MW |
| 2026-08-21T09:00Z | 30,855 MW | 18,568 MW | 11,067 MW | 8,479 MW | 11 MW |
| 2026-08-21T10:00Z | 31,891 MW | 19,962 MW | 11,068 MW | 8,087 MW | 27 MW |
| 2026-08-21T11:00Z | 32,633 MW | 21,752 MW | 11,062 MW | 7,796 MW | 355 MW |
| 2026-08-21T12:00Z | 31,553 MW | 21,074 MW | 11,060 MW | 7,902 MW | 5,203 MW |
| 2026-08-21T13:00Z | 30,963 MW | 19,624 MW | 11,060 MW | 5,803 MW | 12,917 MW |
| 2026-08-21T14:00Z | 31,818 MW | 21,537 MW | 11,050 MW | 4,322 MW | 16,535 MW |
| 2026-08-21T15:00Z | 33,535 MW | 23,518 MW | 11,044 MW | 4,187 MW | 17,670 MW |
| 2026-08-21T16:00Z | 36,396 MW | 25,441 MW | 11,038 MW | 4,040 MW | 17,359 MW |
| 2026-08-21T17:00Z | 38,685 MW | 27,174 MW | 11,022 MW | 4,100 MW | 17,388 MW |
| 2026-08-21T18:00Z | 41,083 MW | 26,966 MW | 11,023 MW | 4,388 MW | 17,182 MW |
| 2026-08-21T19:00Z | 43,283 MW | 27,285 MW | 11,024 MW | 4,551 MW | 16,959 MW |
| 2026-08-21T20:00Z | 44,003 MW | 27,222 MW | 11,026 MW | 4,989 MW | 16,489 MW |
| 2026-08-21T21:00Z | 45,105 MW | 27,862 MW | 11,036 MW | 4,883 MW | 15,396 MW |
| 2026-08-21T22:00Z | 45,546 MW | 28,123 MW | 11,040 MW | 4,746 MW | 12,719 MW |
| 2026-08-21T23:00Z | 46,320 MW | 28,300 MW | 11,052 MW | 4,566 MW | 6,462 MW |
| 2026-08-22T00:00Z | 45,903 MW | 28,395 MW | 11,056 MW | 4,507 MW | 925 MW |
| 2026-08-22T01:00Z | 44,025 MW | 28,207 MW | 11,060 MW | 5,778 MW | 90 MW |
| 2026-08-22T02:00Z | 41,497 MW | 27,683 MW | 11,059 MW | 6,992 MW | 82 MW |
| 2026-08-22T03:00Z | 37,467 MW | 26,591 MW | 11,056 MW | 7,694 MW | 82 MW |
| 2026-08-22T04:00Z | 34,059 MW | 24,655 MW | 11,056 MW | 7,507 MW | 83 MW |
| 2026-08-22T05:00Z | 31,659 MW | 21,885 MW | 11,057 MW | 7,806 MW | 84 MW |
| 2026-08-22T06:00Z | 30,524 MW | 19,690 MW | 11,060 MW | 7,765 MW | 83 MW |
| 2026-08-22T07:00Z | 29,560 MW | 18,675 MW | 11,060 MW | 7,281 MW | 85 MW |
| 2026-08-22T08:00Z | 29,426 MW | 17,930 MW | 11,062 MW | 6,981 MW | 82 MW |
| 2026-08-22T09:00Z | 28,820 MW | 17,428 MW | 11,064 MW | 7,290 MW | 84 MW |
| 2026-08-22T10:00Z | 28,710 MW | 17,156 MW | 11,070 MW | 7,815 MW | 89 MW |
| 2026-08-22T11:00Z | 29,082 MW | 17,075 MW | 11,080 MW | 7,999 MW | 326 MW |
| 2026-08-22T12:00Z | 28,134 MW | 17,108 MW | 11,086 MW | 6,507 MW | 5,192 MW |
| 2026-08-22T13:00Z | 27,111 MW | 17,359 MW | 11,077 MW | 3,715 MW | 12,839 MW |
| 2026-08-22T14:00Z | 28,307 MW | 19,222 MW | 11,063 MW | 2,240 MW | 16,081 MW |
| 2026-08-22T15:00Z | 29,554 MW | 20,672 MW | 11,054 MW | 2,454 MW | 17,876 MW |
| 2026-08-22T16:00Z | 30,429 MW | 21,953 MW | 11,039 MW | 3,602 MW | 18,869 MW |
| 2026-08-22T17:00Z | 31,816 MW | 23,297 MW | 11,035 MW | 4,841 MW | 18,509 MW |
| 2026-08-22T18:00Z | 33,325 MW | 24,901 MW | 11,035 MW | 6,010 MW | 18,542 MW |
| 2026-08-22T19:00Z | 34,687 MW | 25,803 MW | 11,035 MW | 6,721 MW | 18,016 MW |
| 2026-08-22T20:00Z | 36,063 MW | 25,875 MW | 11,039 MW | 7,561 MW | 16,753 MW |
| 2026-08-22T21:00Z | 36,922 MW | 26,058 MW | 11,037 MW | 7,770 MW | 14,841 MW |
| 2026-08-22T22:00Z | 38,193 MW | 25,154 MW | 11,042 MW | 7,398 MW | 12,034 MW |
| 2026-08-22T23:00Z | 39,326 MW | 25,575 MW | 11,050 MW | 6,601 MW | 6,429 MW |
| 2026-08-23T00:00Z | 39,670 MW | 26,730 MW | 11,054 MW | 6,032 MW | 895 MW |
| 2026-08-23T01:00Z | 38,399 MW | 26,838 MW | 11,060 MW | 6,423 MW | 81 MW |
| 2026-08-23T02:00Z | 36,404 MW | 25,883 MW | 11,061 MW | 6,973 MW | 82 MW |
| 2026-08-23T03:00Z | 33,280 MW | 24,514 MW | 11,063 MW | 7,294 MW | 82 MW |
| 2026-08-23T04:00Z | 31,111 MW | 22,065 MW | 11,067 MW | 7,937 MW | 88 MW |
| 2026-08-23T05:00Z | 29,124 MW | 20,601 MW | 11,071 MW | 7,629 MW | 84 MW |
| 2026-08-23T06:00Z | 27,821 MW | 19,508 MW | 11,070 MW | 6,940 MW | 82 MW |
| 2026-08-23T07:00Z | 27,404 MW | 18,366 MW | 11,078 MW | 6,353 MW | 81 MW |
| 2026-08-23T08:00Z | 27,098 MW | 17,201 MW | 11,081 MW | 5,936 MW | 81 MW |
| 2026-08-23T09:00Z | 26,738 MW | 16,584 MW | 11,088 MW | 5,636 MW | 81 MW |
| 2026-08-23T10:00Z | 26,729 MW | 16,493 MW | 11,088 MW | 5,451 MW | 81 MW |
| 2026-08-23T11:00Z | 26,231 MW | 16,427 MW | 11,097 MW | 5,575 MW | 425 MW |
| 2026-08-23T12:00Z | 23,597 MW | 15,719 MW | 11,096 MW | 5,409 MW | 6,147 MW |
| 2026-08-23T13:00Z | 20,494 MW | 14,723 MW | 11,089 MW | 4,484 MW | 14,973 MW |
| 2026-08-23T14:00Z | 21,432 MW | 14,442 MW | 11,084 MW | 3,818 MW | 18,614 MW |
| 2026-08-23T15:00Z | 23,864 MW | 14,995 MW | 11,077 MW | 4,215 MW | 19,367 MW |
| 2026-08-23T16:00Z | 27,167 MW | 16,133 MW | 11,073 MW | 4,515 MW | 19,099 MW |
| 2026-08-23T17:00Z | 29,314 MW | 17,879 MW | 11,066 MW | 5,006 MW | 18,923 MW |
| 2026-08-23T18:00Z | 31,279 MW | 19,897 MW | 11,055 MW | 5,169 MW | 18,350 MW |
| 2026-08-23T19:00Z | 32,487 MW | 21,969 MW | 11,056 MW | 5,381 MW | 18,074 MW |
| 2026-08-23T20:00Z | 33,731 MW | 23,810 MW | 11,046 MW | 5,604 MW | 16,629 MW |
| 2026-08-23T21:00Z | 35,632 MW | 24,657 MW | 11,045 MW | 5,606 MW | 15,072 MW |
| 2026-08-23T22:00Z | 37,970 MW | 24,601 MW | 11,047 MW | 5,391 MW | 12,398 MW |
| 2026-08-23T23:00Z | 39,493 MW | 25,847 MW | 11,049 MW | 5,093 MW | 6,744 MW |
| 2026-08-24T00:00Z | 40,237 MW | 26,966 MW | 11,053 MW | 5,108 MW | 756 MW |
| 2026-08-24T01:00Z | 39,510 MW | 26,890 MW | 11,059 MW | 5,296 MW | 82 MW |
| 2026-08-24T02:00Z | 36,537 MW | 26,221 MW | 11,059 MW | 5,203 MW | 68 MW |
| 2026-08-24T03:00Z | 33,289 MW | 24,682 MW | 11,062 MW | 5,534 MW | 1 MW |
| 2026-08-24T04:00Z | 31,536 MW | 22,417 MW | 11,071 MW | 5,461 MW | 1 MW |
| 2026-08-24T05:00Z | 29,930 MW | 20,067 MW | 11,074 MW | 5,438 MW | 1 MW |
| 2026-08-24T06:00Z | 28,190 MW | 17,883 MW | 11,082 MW | 6,159 MW | 7 MW |
| 2026-08-24T07:00Z | 27,879 MW | 16,646 MW | 11,085 MW | 6,597 MW | 2 MW |
| 2026-08-24T08:00Z | 27,593 MW | 15,944 MW | 11,084 MW | 6,851 MW | 4 MW |
| 2026-08-24T09:00Z | 28,328 MW | 16,406 MW | 11,087 MW | 7,057 MW | 1 MW |
| 2026-08-24T10:00Z | 29,452 MW | 18,653 MW | 11,085 MW | 7,207 MW | 1 MW |
| 2026-08-24T11:00Z | 30,262 MW | 20,802 MW | 11,086 MW | 6,698 MW | 381 MW |
| 2026-08-24T12:00Z | 28,758 MW | 19,731 MW | 11,086 MW | 6,766 MW | 5,711 MW |
| 2026-08-24T13:00Z | 26,792 MW | 17,396 MW | 11,086 MW | 5,855 MW | 13,262 MW |
| 2026-08-24T14:00Z | 28,093 MW | 17,170 MW | 11,077 MW | 5,456 MW | 15,798 MW |
| 2026-08-24T15:00Z | 29,496 MW | 17,887 MW | 11,072 MW | 5,992 MW | 16,408 MW |
| 2026-08-24T16:00Z | 30,950 MW | 18,433 MW | 11,072 MW | 6,222 MW | 16,375 MW |
| 2026-08-24T17:00Z | 32,990 MW | 18,956 MW | 11,077 MW | 6,624 MW | 16,618 MW |
| 2026-08-24T18:00Z | 34,921 MW | 19,949 MW | 11,067 MW | 6,478 MW | 16,722 MW |
| 2026-08-24T19:00Z | 36,659 MW | 21,343 MW | 11,066 MW | 5,751 MW | 16,063 MW |
| 2026-08-24T20:00Z | 37,633 MW | 23,471 MW | 11,067 MW | 5,059 MW | 14,625 MW |
| 2026-08-24T21:00Z | 38,236 MW | 24,910 MW | 11,066 MW | 4,725 MW | 13,362 MW |
| 2026-08-24T22:00Z | 39,859 MW | 25,477 MW | 11,065 MW | 4,369 MW | 10,245 MW |
| 2026-08-24T23:00Z | 41,052 MW | 26,692 MW | 11,062 MW | 4,414 MW | 5,049 MW |
| 2026-08-25T00:00Z | 41,248 MW | 27,079 MW | 11,062 MW | 4,770 MW | 710 MW |
| 2026-08-25T01:00Z | 40,711 MW | 26,806 MW | 11,072 MW | 5,949 MW | 133 MW |
| 2026-08-25T02:00Z | 37,958 MW | 25,829 MW | 11,076 MW | 7,327 MW | 134 MW |
| 2026-08-25T03:00Z | 34,377 MW | 23,754 MW | 11,082 MW | 7,623 MW | 100 MW |
| 2026-08-25T04:00Z | 32,252 MW | 23,116 MW | 11,082 MW | 6,721 MW | 2 MW |
| 2026-08-25T05:00Z | 30,585 MW | 21,448 MW | 11,084 MW | 6,371 MW | 1 MW |
| 2026-08-25T06:00Z | 29,435 MW | 19,473 MW | 11,083 MW | 6,414 MW | 1 MW |
| 2026-08-25T07:00Z | 28,701 MW | 17,855 MW | 11,061 MW | 6,565 MW | 1 MW |
| 2026-08-25T08:00Z | 27,824 MW | 16,565 MW | 11,055 MW | 7,427 MW | 1 MW |
| 2026-08-25T09:00Z | 28,278 MW | 16,775 MW | 11,054 MW | 7,779 MW | 2 MW |
| 2026-08-25T10:00Z | 29,378 MW | 18,450 MW | 11,057 MW | 7,353 MW | 1 MW |
| 2026-08-25T11:00Z | 29,886 MW | 20,298 MW | 11,061 MW | 8,618 MW | 326 MW |
| 2026-08-25T12:00Z | 28,247 MW | 19,285 MW | 11,083 MW | 9,250 MW | 5,005 MW |
| 2026-08-25T13:00Z | 26,641 MW | 17,992 MW | 11,089 MW | 7,171 MW | 12,028 MW |
| 2026-08-25T14:00Z | 27,429 MW | 18,378 MW | 11,082 MW | 5,718 MW | 15,698 MW |
| 2026-08-25T15:00Z | 29,191 MW | 20,008 MW | 11,072 MW | 4,769 MW | 17,521 MW |
| 2026-08-25T16:00Z | 30,951 MW | 22,252 MW | 11,060 MW | 4,430 MW | 18,275 MW |
| 2026-08-25T17:00Z | 32,765 MW | 23,888 MW | 11,054 MW | 4,838 MW | 18,524 MW |
| 2026-08-25T18:00Z | 34,867 MW | 25,138 MW | 11,050 MW | 5,632 MW | 18,654 MW |
| 2026-08-25T19:00Z | 36,155 MW | 25,781 MW | 11,042 MW | 6,149 MW | 18,448 MW |
| 2026-08-25T20:00Z | 38,203 MW | 26,492 MW | 11,043 MW | 6,723 MW | 17,745 MW |
| 2026-08-25T21:00Z | 39,341 MW | 26,501 MW | 11,037 MW | 7,513 MW | 16,023 MW |
| 2026-08-25T22:00Z | 41,286 MW | 26,950 MW | 11,037 MW | 7,452 MW | 12,331 MW |
| 2026-08-25T23:00Z | 43,398 MW | 27,595 MW | 11,039 MW | 6,745 MW | 5,577 MW |
| 2026-08-26T00:00Z | 43,699 MW | 28,237 MW | 11,038 MW | 6,005 MW | 535 MW |
| 2026-08-26T01:00Z | 42,955 MW | 28,690 MW | 11,038 MW | 6,482 MW | 1 MW |
| 2026-08-26T02:00Z | 39,323 MW | 28,347 MW | 11,035 MW | 7,644 MW | 1 MW |
| 2026-08-26T03:00Z | 35,140 MW | 26,696 MW | 11,042 MW | 8,653 MW | 1 MW |
| 2026-08-26T04:00Z | 33,200 MW | 25,071 MW | 11,045 MW | 8,979 MW | 1 MW |
| 2026-08-26T05:00Z | 30,930 MW | 22,448 MW | 11,043 MW | 9,362 MW | 2 MW |
| 2026-08-26T06:00Z | 29,344 MW | 20,440 MW | 11,048 MW | 9,051 MW | 4 MW |
| 2026-08-26T07:00Z | 28,549 MW | 19,005 MW | 11,053 MW | 9,200 MW | 1 MW |
| 2026-08-26T08:00Z | 27,743 MW | 17,788 MW | 11,053 MW | 9,627 MW | 1 MW |
| 2026-08-26T09:00Z | 27,990 MW | 18,347 MW | 11,054 MW | 9,331 MW | 1 MW |
| 2026-08-26T10:00Z | 28,181 MW | 19,337 MW | 11,063 MW | 9,688 MW | 1 MW |
| 2026-08-26T11:00Z | 29,151 MW | 21,520 MW | 11,067 MW | 9,650 MW | 174 MW |
| 2026-08-26T12:00Z | 28,584 MW | 21,653 MW | 11,073 MW | 9,624 MW | 3,324 MW |
| 2026-08-26T13:00Z | 28,630 MW | 21,681 MW | 11,069 MW | 7,310 MW | 8,488 MW |
| 2026-08-26T14:00Z | 29,180 MW | 22,341 MW | 11,056 MW | 5,194 MW | 12,938 MW |
| 2026-08-26T15:00Z | 29,797 MW | 23,053 MW | 11,043 MW | 6,782 MW | 15,426 MW |
| 2026-08-26T16:00Z | 30,750 MW | 23,735 MW | 11,036 MW | 9,895 MW | 16,806 MW |
| 2026-08-26T17:00Z | 32,637 MW | 24,105 MW | 11,033 MW | 11,986 MW | 17,155 MW |
| 2026-08-26T18:00Z | 35,293 MW | 25,008 MW | 11,028 MW | 12,769 MW | 16,675 MW |
| 2026-08-26T19:00Z | 37,537 MW | 25,865 MW | 11,031 MW | 12,541 MW | 16,159 MW |
| 2026-08-26T20:00Z | 39,593 MW | 27,043 MW | 11,025 MW | 11,350 MW | 15,488 MW |
| 2026-08-26T21:00Z | 41,739 MW | 27,755 MW | 11,023 MW | 10,342 MW | 14,454 MW |
| 2026-08-26T22:00Z | 43,559 MW | 28,187 MW | 11,020 MW | 9,259 MW | 11,452 MW |
| 2026-08-26T23:00Z | 45,492 MW | 28,896 MW | 11,023 MW | 7,157 MW | 5,506 MW |
| 2026-08-27T00:00Z | 45,539 MW | 29,157 MW | 11,028 MW | 5,525 MW | 557 MW |
| 2026-08-27T01:00Z | 44,889 MW | 29,105 MW | 11,036 MW | 5,560 MW | 2 MW |
| 2026-08-27T02:00Z | 42,669 MW | 28,594 MW | 11,045 MW | 5,380 MW | 3 MW |
| 2026-08-27T03:00Z | 39,381 MW | 27,729 MW | 11,046 MW | 4,819 MW | 3 MW |
| 2026-08-27T04:00Z | 35,613 MW | 26,897 MW | 11,053 MW | 4,979 MW | 4 MW |
| 2026-08-27T05:00Z | 33,101 MW | 25,607 MW | 11,054 MW | 4,721 MW | 8 MW |
| 2026-08-27T06:00Z | 31,914 MW | 23,679 MW | 11,066 MW | 4,298 MW | 4 MW |
| 2026-08-27T07:00Z | 31,404 MW | 22,195 MW | 11,067 MW | 3,983 MW | 4 MW |
| 2026-08-27T08:00Z | 30,953 MW | 21,377 MW | 11,071 MW | 3,899 MW | 5 MW |
| 2026-08-27T09:00Z | 31,344 MW | 21,943 MW | 11,076 MW | 3,654 MW | 4 MW |
| 2026-08-27T10:00Z | 31,812 MW | 23,027 MW | 11,084 MW | 3,554 MW | 4 MW |
| 2026-08-27T11:00Z | 33,290 MW | 24,113 MW | 11,086 MW | 3,521 MW | 239 MW |
| 2026-08-27T12:00Z | 32,040 MW | 23,555 MW | 11,094 MW | 3,269 MW | 5,170 MW |
| 2026-08-27T13:00Z | 30,292 MW | 21,333 MW | 11,091 MW | 2,093 MW | 13,457 MW |
| 2026-08-27T14:00Z | 30,138 MW | 21,506 MW | 11,084 MW | 844 MW | 17,220 MW |
| 2026-08-27T15:00Z | 30,995 MW | 23,747 MW | 11,076 MW | 801 MW | 18,422 MW |
| 2026-08-27T16:00Z | 33,130 MW | 25,332 MW | 11,071 MW | 1,262 MW | 18,521 MW |
| 2026-08-27T17:00Z | 35,688 MW | 26,521 MW | 11,064 MW | 1,824 MW | 18,013 MW |
| 2026-08-27T18:00Z | 38,105 MW | 26,977 MW | 11,057 MW | 2,097 MW | 18,099 MW |
| 2026-08-27T19:00Z | 40,078 MW | 27,333 MW | 11,051 MW | 1,963 MW | 18,085 MW |
| 2026-08-27T20:00Z | 42,009 MW | 27,607 MW | 11,048 MW | 1,845 MW | 17,839 MW |
| 2026-08-27T21:00Z | 43,748 MW | 27,907 MW | 11,043 MW | 1,715 MW | 17,092 MW |
| 2026-08-27T22:00Z | 45,077 MW | 28,173 MW | 11,040 MW | 1,516 MW | 14,521 MW |
| 2026-08-27T23:00Z | 47,203 MW | 28,743 MW | 11,040 MW | 1,481 MW | 6,755 MW |
| 2026-08-28T00:00Z | 47,488 MW | 29,003 MW | 11,045 MW | 2,132 MW | 610 MW |
| 2026-08-28T01:00Z | 45,967 MW | 28,971 MW | 11,046 MW | 2,840 MW | 4 MW |
| 2026-08-28T02:00Z | 42,904 MW | 28,874 MW | 11,051 MW | 3,203 MW | 2 MW |
| 2026-08-28T03:00Z | 38,224 MW | 27,587 MW | 11,054 MW | 3,385 MW | 3 MW |
| 2026-08-28T04:00Z | 34,950 MW | 25,946 MW | 11,059 MW | 3,465 MW | 3 MW |
| 2026-08-28T05:00Z | 32,208 MW | 23,955 MW | 11,060 MW | 3,568 MW | 3 MW |
| 2026-08-28T06:00Z | 30,148 MW | 22,460 MW | 11,063 MW | 3,595 MW | 4 MW |
| 2026-08-28T07:00Z | 29,577 MW | 21,213 MW | 11,082 MW | 3,402 MW | 4 MW |
| 2026-08-28T08:00Z | 29,427 MW | 20,480 MW | 11,163 MW | 3,219 MW | 3 MW |
| 2026-08-28T09:00Z | 29,409 MW | 20,441 MW | 11,209 MW | 3,316 MW | 3 MW |
| 2026-08-28T10:00Z | 30,404 MW | 21,756 MW | 11,271 MW | 3,322 MW | 3 MW |
| 2026-08-28T11:00Z | 31,343 MW | 22,988 MW | 11,277 MW | 3,835 MW | 217 MW |
| 2026-08-28T12:00Z | 30,081 MW | 22,174 MW | 11,275 MW | 4,054 MW | 5,479 MW |
| 2026-08-28T13:00Z | 27,092 MW | 19,137 MW | 11,268 MW | 3,743 MW | 14,967 MW |
| 2026-08-28T14:00Z | 27,240 MW | 18,211 MW | 11,257 MW | 2,751 MW | 18,890 MW |
| 2026-08-28T15:00Z | 29,409 MW | 20,661 MW | 11,244 MW | 2,593 MW | 19,703 MW |
| 2026-08-28T16:00Z | 30,899 MW | 22,556 MW | 11,234 MW | 3,825 MW | 19,671 MW |
| 2026-08-28T17:00Z | 33,257 MW | 24,138 MW | 11,229 MW | 4,621 MW | 19,379 MW |
| 2026-08-28T18:00Z | 35,909 MW | 25,457 MW | 11,229 MW | 4,685 MW | 18,771 MW |
| 2026-08-28T19:00Z | 37,928 MW | 25,553 MW | 11,226 MW | 4,704 MW | 17,934 MW |
| 2026-08-28T20:00Z | 38,707 MW | 25,988 MW | 11,223 MW | 4,992 MW | 17,511 MW |
| 2026-08-28T21:00Z | 39,090 MW | 26,531 MW | 11,221 MW | 5,638 MW | 16,395 MW |
| 2026-08-28T22:00Z | 39,892 MW | 25,966 MW | 11,223 MW | 6,173 MW | 13,996 MW |
| 2026-08-28T23:00Z | 41,681 MW | 26,058 MW | 11,221 MW | 6,480 MW | 6,340 MW |
| 2026-08-29T00:00Z | 41,686 MW | 26,580 MW | 11,226 MW | 7,581 MW | 469 MW |
| 2026-08-29T01:00Z | 39,090 MW | 26,080 MW | 11,251 MW | 9,700 MW | 3 MW |
| 2026-08-29T02:00Z | 34,625 MW | 24,933 MW | 11,245 MW | 12,488 MW | 6 MW |
| 2026-08-29T03:00Z | 30,889 MW | 23,903 MW | 11,254 MW | 14,282 MW | 6 MW |
| 2026-08-29T04:00Z | 28,394 MW | 21,726 MW | 11,313 MW | 14,816 MW | 9 MW |
| 2026-08-29T05:00Z | 25,254 MW | 19,982 MW | 11,347 MW | 15,214 MW | 5 MW |
| 2026-08-29T06:00Z | 23,058 MW | 18,347 MW | 11,434 MW | 15,440 MW | 5 MW |
| 2026-08-29T07:00Z | 22,313 MW | 16,364 MW | 11,432 MW | 16,094 MW | 5 MW |
| 2026-08-29T08:00Z | 21,927 MW | 15,600 MW | 11,448 MW | 16,418 MW | 4 MW |
| 2026-08-29T09:00Z | 21,800 MW | 15,011 MW | 11,610 MW | 16,164 MW | 7 MW |
| 2026-08-29T10:00Z | 22,460 MW | 14,862 MW | 11,694 MW | 15,996 MW | 6 MW |
| 2026-08-29T11:00Z | 22,814 MW | 15,003 MW | 11,728 MW | 16,358 MW | 208 MW |
| 2026-08-29T12:00Z | 20,705 MW | 14,438 MW | 11,727 MW | 15,734 MW | 4,774 MW |
| 2026-08-29T13:00Z | 18,634 MW | 13,871 MW | 11,713 MW | 14,914 MW | 12,217 MW |
| 2026-08-29T14:00Z | 21,022 MW | 14,602 MW | 11,696 MW | 13,982 MW | 15,364 MW |
| 2026-08-29T15:00Z | 23,398 MW | 15,262 MW | 11,680 MW | 13,561 MW | 16,373 MW |
| 2026-08-29T16:00Z | 26,095 MW | 16,675 MW | 11,665 MW | 13,551 MW | 16,747 MW |
| 2026-08-29T17:00Z | 28,467 MW | 18,601 MW | 11,652 MW | 13,257 MW | 16,409 MW |
| 2026-08-29T18:00Z | 30,875 MW | 21,476 MW | 11,634 MW | 12,962 MW | 15,505 MW |
| 2026-08-29T19:00Z | 32,491 MW | 22,290 MW | 11,617 MW | 12,821 MW | 14,964 MW |
| 2026-08-29T20:00Z | 34,241 MW | 23,521 MW | 11,611 MW | 12,145 MW | 14,037 MW |
| 2026-08-29T21:00Z | 35,907 MW | 24,242 MW | 11,607 MW | 11,191 MW | 12,347 MW |
| 2026-08-29T22:00Z | 37,283 MW | 24,742 MW | 11,605 MW | 10,403 MW | 9,889 MW |
| 2026-08-29T23:00Z | 37,547 MW | 25,553 MW | 11,600 MW | 10,086 MW | 4,516 MW |
| 2026-08-30T00:00Z | 37,414 MW | 26,163 MW | 11,592 MW | 10,457 MW | 382 MW |
| 2026-08-30T01:00Z | 35,813 MW | 26,419 MW | 11,646 MW | 11,361 MW | 5 MW |
| 2026-08-30T02:00Z | 32,996 MW | 25,376 MW | 11,696 MW | 13,029 MW | 7 MW |
| 2026-08-30T03:00Z | 29,565 MW | 23,288 MW | 11,705 MW | 13,945 MW | 7 MW |
| 2026-08-30T04:00Z | 27,793 MW | 20,110 MW | 11,707 MW | 14,325 MW | 7 MW |
| 2026-08-30T05:00Z | 25,818 MW | 18,059 MW | 11,703 MW | 14,439 MW | 7 MW |
| 2026-08-30T06:00Z | 23,500 MW | 16,135 MW | 11,712 MW | 15,221 MW | 10 MW |
| 2026-08-30T07:00Z | 22,332 MW | 15,144 MW | 11,720 MW | 15,123 MW | 9 MW |
| 2026-08-30T08:00Z | 22,204 MW | 14,743 MW | 11,728 MW | 14,376 MW | 8 MW |
| 2026-08-30T09:00Z | 21,781 MW | 14,986 MW | 11,735 MW | 13,765 MW | 8 MW |
| 2026-08-30T10:00Z | 21,646 MW | 15,388 MW | 11,737 MW | 13,115 MW | 7 MW |
| 2026-08-30T11:00Z | 21,983 MW | 15,403 MW | 11,738 MW | 13,553 MW | 69 MW |
| 2026-08-30T12:00Z | 21,863 MW | 15,414 MW | 11,732 MW | 13,518 MW | 3,284 MW |
| 2026-08-30T13:00Z | 21,747 MW | 15,733 MW | 11,722 MW | 11,657 MW | 10,194 MW |
| 2026-08-30T14:00Z | 23,676 MW | 16,369 MW | 11,710 MW | 9,832 MW | 13,827 MW |
| 2026-08-30T15:00Z | 27,010 MW | 17,984 MW | 11,698 MW | 8,902 MW | 14,833 MW |
| 2026-08-30T16:00Z | 29,827 MW | 20,815 MW | 11,690 MW | 8,124 MW | 15,445 MW |
| 2026-08-30T17:00Z | 31,652 MW | 23,501 MW | 11,675 MW | 8,454 MW | 15,865 MW |
| 2026-08-30T18:00Z | 34,189 MW | 24,778 MW | 11,672 MW | 8,970 MW | 15,880 MW |
| 2026-08-30T19:00Z | 35,984 MW | 24,905 MW | 11,661 MW | 9,645 MW | 16,029 MW |
| 2026-08-30T20:00Z | 38,032 MW | 25,459 MW | 11,664 MW | 9,332 MW | 15,519 MW |
| 2026-08-30T21:00Z | 40,148 MW | 26,052 MW | 11,670 MW | 9,233 MW | 13,919 MW |
| 2026-08-30T22:00Z | 41,618 MW | 25,876 MW | 11,680 MW | 9,972 MW | 11,266 MW |
| 2026-08-30T23:00Z | 42,117 MW | 26,863 MW | 11,681 MW | 10,286 MW | 5,096 MW |
| 2026-08-31T00:00Z | 41,893 MW | 27,742 MW | 11,682 MW | 10,607 MW | 400 MW |
| 2026-08-31T01:00Z | 40,336 MW | 26,842 MW | 11,687 MW | 12,353 MW | 12 MW |
| 2026-08-31T02:00Z | 36,458 MW | 25,186 MW | 11,692 MW | 14,887 MW | 8 MW |
| 2026-08-31T03:00Z | 33,098 MW | 23,646 MW | 11,695 MW | 15,193 MW | 9 MW |
| 2026-08-31T04:00Z | 30,941 MW | 21,165 MW | 11,700 MW | 15,260 MW | 8 MW |
| 2026-08-31T05:00Z | 29,181 MW | 19,124 MW | 11,708 MW | 15,294 MW | 8 MW |
| 2026-08-31T06:00Z | 27,197 MW | 16,983 MW | 11,713 MW | 15,628 MW | 9 MW |
| 2026-08-31T07:00Z | 26,466 MW | 15,787 MW | 11,719 MW | 15,219 MW | 9 MW |
| 2026-08-31T08:00Z | 26,361 MW | 15,372 MW | 11,721 MW | 14,464 MW | 9 MW |
| 2026-08-31T09:00Z | 27,258 MW | 15,838 MW | 11,719 MW | 13,734 MW | 8 MW |
| 2026-08-31T10:00Z | 29,208 MW | 17,352 MW | 11,720 MW | 13,557 MW | 7 MW |
| 2026-08-31T11:00Z | 31,017 MW | 19,898 MW | 11,727 MW | 12,818 MW | 75 MW |
| 2026-08-31T12:00Z | 30,538 MW | 20,910 MW | 11,724 MW | 11,887 MW | 3,700 MW |
| 2026-08-31T13:00Z | 29,629 MW | 20,337 MW | 11,716 MW | 9,737 MW | 11,312 MW |
| 2026-08-31T14:00Z | 31,963 MW | 22,412 MW | 11,709 MW | 6,675 MW | 14,929 MW |
| 2026-08-31T15:00Z | 35,514 MW | 24,512 MW | 11,702 MW | 4,545 MW | 16,838 MW |
| 2026-08-31T16:00Z | 39,336 MW | 25,687 MW | 11,697 MW | 4,070 MW | 17,435 MW |
| 2026-08-31T17:00Z | 43,399 MW | 26,916 MW | 11,687 MW | 4,433 MW | 17,523 MW |
| 2026-08-31T18:00Z | 45,237 MW | 27,550 MW | 11,678 MW | 5,013 MW | 17,841 MW |
| 2026-08-31T19:00Z | 47,060 MW | 27,847 MW | 11,675 MW | 5,053 MW | 17,362 MW |
| 2026-08-31T20:00Z | 48,224 MW | 28,521 MW | 11,670 MW | 6,240 MW | 16,368 MW |
| 2026-08-31T21:00Z | 49,053 MW | 28,702 MW | 11,666 MW | 6,615 MW | 15,548 MW |
| 2026-08-31T22:00Z | 50,330 MW | 28,747 MW | 11,664 MW | 6,827 MW | 12,938 MW |
| 2026-08-31T23:00Z | 52,174 MW | 29,297 MW | 11,661 MW | 6,134 MW | 5,685 MW |
| 2026-09-01T00:00Z | 52,388 MW | 29,726 MW | 11,659 MW | 5,548 MW | 434 MW |
| 2026-09-01T01:00Z | 50,720 MW | 29,614 MW | 11,658 MW | 5,589 MW | 48 MW |
| 2026-09-01T02:00Z | 46,759 MW | 29,328 MW | 11,663 MW | 6,003 MW | 5 MW |
| 2026-09-01T03:00Z | 42,195 MW | 28,734 MW | 11,668 MW | 6,626 MW | 7 MW |
| 2026-09-01T04:00Z | 38,732 MW | 27,657 MW | 11,675 MW | 6,638 MW | 7 MW |
| 2026-09-01T05:00Z | 35,493 MW | 26,699 MW | 11,684 MW | 6,299 MW | 12 MW |
| 2026-09-01T06:00Z | 33,026 MW | 24,477 MW | 11,685 MW | 6,068 MW | 14 MW |
| 2026-09-01T07:00Z | 32,165 MW | 22,517 MW | 11,690 MW | 6,119 MW | 13 MW |
| 2026-09-01T08:00Z | 31,934 MW | 21,885 MW | 11,695 MW | 5,750 MW | 12 MW |
| 2026-09-01T09:00Z | 31,874 MW | 22,117 MW | 11,703 MW | 5,273 MW | 9 MW |
| 2026-09-01T10:00Z | 33,187 MW | 24,344 MW | 11,702 MW | 4,818 MW | 6 MW |
| 2026-09-01T11:00Z | 35,373 MW | 26,622 MW | 11,703 MW | 4,288 MW | 116 MW |
| 2026-09-01T12:00Z | 34,763 MW | 26,535 MW | 11,707 MW | 3,663 MW | 4,402 MW |
| 2026-09-01T13:00Z | 33,218 MW | 24,444 MW | 11,707 MW | 2,972 MW | 12,830 MW |
| 2026-09-01T14:00Z | 35,150 MW | 25,025 MW | 11,699 MW | 2,135 MW | 16,877 MW |
| 2026-09-01T15:00Z | 39,382 MW | 27,032 MW | 11,696 MW | 1,626 MW | 17,948 MW |
| 2026-09-01T16:00Z | 43,199 MW | 28,362 MW | 11,685 MW | 1,607 MW | 18,299 MW |
| 2026-09-01T17:00Z | 46,657 MW | 29,053 MW | 11,681 MW | 1,863 MW | 17,898 MW |
| 2026-09-01T18:00Z | 49,428 MW | 29,638 MW | 11,673 MW | 2,330 MW | 16,963 MW |
| 2026-09-01T19:00Z | 50,157 MW | 29,874 MW | 11,667 MW | 2,870 MW | 16,505 MW |
| 2026-09-01T20:00Z | 50,460 MW | 29,861 MW | 11,659 MW | 3,468 MW | 15,724 MW |
| 2026-09-01T21:00Z | 50,877 MW | 29,910 MW | 11,654 MW | 3,355 MW | 14,824 MW |
| 2026-09-01T22:00Z | 50,882 MW | 29,922 MW | 11,648 MW | 3,335 MW | 11,771 MW |
| 2026-09-01T23:00Z | 52,139 MW | 30,296 MW | 11,651 MW | 3,810 MW | 4,941 MW |
| 2026-09-02T00:00Z | 51,771 MW | 30,550 MW | 11,656 MW | 4,837 MW | 228 MW |
| 2026-09-02T01:00Z | 50,282 MW | 30,637 MW | 11,661 MW | 6,616 MW | 2 MW |
| 2026-09-02T02:00Z | 46,120 MW | 30,121 MW | 11,669 MW | 8,264 MW | 4 MW |
| 2026-09-02T03:00Z | 41,133 MW | 28,753 MW | 11,671 MW | 10,371 MW | 5 MW |
| 2026-09-02T04:00Z | 37,529 MW | 27,378 MW | 11,674 MW | 12,289 MW | 6 MW |
| 2026-09-02T05:00Z | 34,440 MW | 26,656 MW | 11,675 MW | 12,337 MW | 6 MW |
| 2026-09-02T06:00Z | 31,455 MW | 24,182 MW | 11,681 MW | 13,320 MW | 7 MW |
| 2026-09-02T07:00Z | 30,735 MW | 22,453 MW | 11,679 MW | 12,810 MW | 9 MW |
| 2026-09-02T08:00Z | 31,131 MW | 22,099 MW | 11,679 MW | 11,286 MW | 6 MW |
| 2026-09-02T09:00Z | 31,337 MW | 22,168 MW | 11,679 MW | 10,470 MW | 5 MW |
| 2026-09-02T10:00Z | 32,406 MW | 24,193 MW | 11,680 MW | 8,567 MW | 5 MW |
| 2026-09-02T11:00Z | 34,283 MW | 26,593 MW | 11,690 MW | 7,230 MW | 106 MW |
| 2026-09-02T12:00Z | 33,806 MW | 26,999 MW | 11,691 MW | 6,769 MW | 4,278 MW |
| 2026-09-02T13:00Z | 32,868 MW | 24,642 MW | 11,690 MW | 5,772 MW | 12,912 MW |
| 2026-09-02T14:00Z | 34,901 MW | 25,571 MW | 11,681 MW | 4,005 MW | 16,935 MW |
| 2026-09-02T15:00Z | 38,719 MW | 28,145 MW | 11,669 MW | 3,505 MW | 18,047 MW |
| 2026-09-02T16:00Z | 42,090 MW | 29,247 MW | 11,661 MW | 3,959 MW | 18,310 MW |
| 2026-09-02T17:00Z | 44,961 MW | 29,939 MW | 11,656 MW | 4,901 MW | 18,113 MW |
| 2026-09-02T18:00Z | 47,137 MW | 30,337 MW | 11,647 MW | 5,376 MW | 17,757 MW |
| 2026-09-02T19:00Z | 47,943 MW | 30,647 MW | 11,639 MW | 6,352 MW | 17,254 MW |
| 2026-09-02T20:00Z | 49,103 MW | 30,832 MW | 11,634 MW | 6,529 MW | 16,422 MW |
| 2026-09-02T21:00Z | 49,667 MW | 30,800 MW | 11,632 MW | 6,640 MW | 14,862 MW |
| 2026-09-02T22:00Z | 49,506 MW | 30,480 MW | 11,629 MW | 6,166 MW | 12,144 MW |
| 2026-09-02T23:00Z | 51,452 MW | 30,785 MW | 11,629 MW | 5,908 MW | 5,069 MW |
| 2026-09-03T00:00Z | 53,655 MW | 31,275 MW | 11,635 MW | 6,616 MW | 259 MW |
| 2026-09-03T01:00Z | 49,097 MW | 30,086 MW | 11,642 MW | 8,543 MW | 3 MW |
| 2026-09-03T02:00Z | 44,504 MW | 28,930 MW | 11,640 MW | 11,099 MW | 4 MW |
| 2026-09-03T03:00Z | 40,231 MW | 27,693 MW | 11,637 MW | 12,666 MW | 5 MW |
| 2026-09-03T04:00Z | 37,286 MW | 26,671 MW | 11,642 MW | 13,399 MW | 7 MW |
| 2026-09-03T05:00Z | 35,141 MW | 25,969 MW | 11,660 MW | 14,030 MW | 7 MW |
| 2026-09-03T06:00Z | 32,661 MW | 24,359 MW | 11,670 MW | 14,748 MW | 7 MW |
| 2026-09-03T07:00Z | 31,826 MW | 22,112 MW | 11,670 MW | 14,894 MW | 7 MW |
| 2026-09-03T08:00Z | 31,486 MW | 21,440 MW | 11,675 MW | 14,544 MW | 7 MW |
| 2026-09-03T09:00Z | 31,075 MW | 22,096 MW | 11,677 MW | 14,089 MW | 6 MW |
| 2026-09-03T10:00Z | 32,258 MW | 23,422 MW | 11,679 MW | 12,964 MW | 6 MW |
| 2026-09-03T11:00Z | 34,178 MW | 25,950 MW | 11,684 MW | 11,679 MW | 114 MW |
| 2026-09-03T12:00Z | 33,771 MW | 26,630 MW | 11,687 MW | 11,516 MW | 3,897 MW |
| 2026-09-03T13:00Z | 32,515 MW | 25,777 MW | 11,677 MW | 10,679 MW | 11,255 MW |
| 2026-09-03T14:00Z | 33,461 MW | 26,226 MW | 11,665 MW | 9,450 MW | 15,401 MW |
| 2026-09-03T15:00Z | 36,392 MW | 27,656 MW | 11,661 MW | 8,851 MW | 16,316 MW |
| 2026-09-03T16:00Z | 39,444 MW | 28,179 MW | 11,653 MW | 9,150 MW | 17,039 MW |
| 2026-09-03T17:00Z | 42,410 MW | 29,098 MW | 11,649 MW | 9,846 MW | 16,395 MW |
| 2026-09-03T18:00Z | 43,695 MW | 29,263 MW | 11,648 MW | 10,915 MW | 15,986 MW |
| 2026-09-03T19:00Z | 45,380 MW | 29,481 MW | 11,638 MW | 11,542 MW | 15,237 MW |
| 2026-09-03T20:00Z | 45,764 MW | 29,332 MW | 11,635 MW | 11,056 MW | 14,793 MW |
| 2026-09-03T21:00Z | 46,641 MW | 29,166 MW | 11,640 MW | 11,087 MW | 13,530 MW |
| 2026-09-03T22:00Z | 46,860 MW | 29,757 MW | 11,647 MW | 9,824 MW | 11,125 MW |
| 2026-09-03T23:00Z | 49,741 MW | 30,563 MW | 11,647 MW | 8,381 MW | 4,591 MW |
| 2026-09-04T00:00Z | 50,213 MW | 30,776 MW | 11,654 MW | 8,091 MW | 244 MW |
| 2026-09-04T01:00Z | 48,420 MW | 30,583 MW | 11,659 MW | 10,293 MW | 3 MW |
| 2026-09-04T02:00Z | 45,187 MW | 29,896 MW | 11,659 MW | 11,992 MW | 4 MW |
| 2026-09-04T03:00Z | 40,907 MW | 28,778 MW | 11,660 MW | 13,159 MW | 5 MW |
| 2026-09-04T04:00Z | 37,310 MW | 27,425 MW | 11,666 MW | 13,450 MW | 6 MW |
| 2026-09-04T05:00Z | 34,199 MW | 25,757 MW | 11,668 MW | 13,553 MW | 7 MW |
| 2026-09-04T06:00Z | 32,398 MW | 23,925 MW | 11,673 MW | 13,543 MW | 7 MW |
| 2026-09-04T07:00Z | 31,220 MW | 22,392 MW | 11,677 MW | 13,174 MW | 7 MW |
| 2026-09-04T08:00Z | 30,913 MW | 21,621 MW | 11,672 MW | 12,230 MW | 7 MW |
| 2026-09-04T09:00Z | 31,008 MW | 21,947 MW | 11,672 MW | 11,287 MW | 7 MW |
| 2026-09-04T10:00Z | 32,260 MW | 23,456 MW | 11,677 MW | 10,710 MW | 7 MW |
| 2026-09-04T11:00Z | 33,628 MW | 25,004 MW | 11,677 MW | 10,541 MW | 43 MW |
| 2026-09-04T12:00Z | 33,990 MW | 25,980 MW | 11,679 MW | 9,783 MW | 2,980 MW |
| 2026-09-04T13:00Z | 32,938 MW | 26,269 MW | 11,682 MW | 7,331 MW | 9,958 MW |
| 2026-09-04T14:00Z | 34,948 MW | 27,493 MW | 11,679 MW | 4,912 MW | 13,611 MW |
| 2026-09-04T15:00Z | 37,173 MW | 28,639 MW | 11,670 MW | 4,288 MW | 14,853 MW |
| 2026-09-04T16:00Z | 40,989 MW | 29,151 MW | 11,664 MW | 3,763 MW | 15,651 MW |
| 2026-09-04T17:00Z | 43,549 MW | 29,527 MW | 11,656 MW | 3,629 MW | 15,843 MW |
| 2026-09-04T18:00Z | 44,843 MW | 29,974 MW | 11,651 MW | 3,683 MW | 15,720 MW |
| 2026-09-04T19:00Z | 46,050 MW | 30,421 MW | 11,653 MW | 3,989 MW | 15,977 MW |
| 2026-09-04T20:00Z | 47,008 MW | 30,475 MW | 11,645 MW | 4,470 MW | 15,927 MW |
| 2026-09-04T21:00Z | 49,409 MW | 30,182 MW | 11,641 MW | 4,194 MW | 14,526 MW |
| 2026-09-04T22:00Z | 49,375 MW | 30,167 MW | 11,648 MW | 3,975 MW | 11,387 MW |
| 2026-09-04T23:00Z | 50,239 MW | 30,209 MW | 11,652 MW | 3,742 MW | 4,337 MW |
| 2026-09-05T00:00Z | 50,308 MW | 30,385 MW | 11,651 MW | 3,592 MW | 198 MW |
| 2026-09-05T01:00Z | 48,389 MW | 30,185 MW | 11,648 MW | 4,315 MW | 3 MW |
| 2026-09-05T02:00Z | 45,564 MW | 30,088 MW | 11,654 MW | 4,942 MW | 7 MW |
| 2026-09-05T03:00Z | 42,478 MW | 29,814 MW | 11,651 MW | 5,264 MW | 4 MW |
| 2026-09-05T04:00Z | 38,601 MW | 29,147 MW | 11,653 MW | 5,506 MW | 8 MW |
| 2026-09-05T05:00Z | 35,159 MW | 27,270 MW | 11,656 MW | 5,364 MW | 3 MW |
| 2026-09-05T06:00Z | 32,303 MW | 26,689 MW | 11,660 MW | 5,145 MW | 5 MW |
| 2026-09-05T07:00Z | 31,070 MW | 24,989 MW | 11,661 MW | 5,164 MW | 6 MW |
| 2026-09-05T08:00Z | 30,440 MW | 24,136 MW | 11,666 MW | 5,150 MW | 6 MW |
| 2026-09-05T09:00Z | 29,375 MW | 24,253 MW | 11,668 MW | 4,746 MW | 5 MW |
| 2026-09-05T10:00Z | 29,431 MW | 24,423 MW | 11,677 MW | 4,018 MW | 2 MW |
| 2026-09-05T11:00Z | 29,452 MW | 24,377 MW | 11,682 MW | 4,576 MW | 32 MW |
| 2026-09-05T12:00Z | 28,902 MW | 23,373 MW | 11,680 MW | 5,714 MW | 2,863 MW |
| 2026-09-05T13:00Z | 27,607 MW | 21,800 MW | 11,680 MW | 6,587 MW | 9,932 MW |
| 2026-09-05T14:00Z | 28,545 MW | 22,178 MW | 11,672 MW | 7,274 MW | 13,839 MW |
| 2026-09-05T15:00Z | 31,036 MW | 23,936 MW | 11,662 MW | 7,114 MW | 15,471 MW |
| 2026-09-05T16:00Z | 33,909 MW | 25,807 MW | 11,655 MW | 6,666 MW | 15,936 MW |
| 2026-09-05T17:00Z | 36,801 MW | 27,651 MW | 11,650 MW | 5,826 MW | 16,056 MW |
| 2026-09-05T18:00Z | 39,581 MW | 28,653 MW | 11,642 MW | 5,275 MW | 15,494 MW |
| 2026-09-05T19:00Z | 39,738 MW | 28,405 MW | 11,637 MW | 5,847 MW | 15,588 MW |
| 2026-09-05T20:00Z | 40,445 MW | 28,226 MW | 11,635 MW | 7,021 MW | 14,350 MW |
| 2026-09-05T21:00Z | 40,745 MW | 28,100 MW | 11,629 MW | 7,791 MW | 12,420 MW |
| 2026-09-05T22:00Z | 41,094 MW | 27,796 MW | 11,633 MW | 7,646 MW | 10,164 MW |
| 2026-09-05T23:00Z | 42,841 MW | 28,803 MW | 11,639 MW | 7,128 MW | 3,802 MW |
| 2026-09-06T00:00Z | 42,534 MW | 29,078 MW | 11,650 MW | 7,264 MW | 138 MW |
| 2026-09-06T01:00Z | 40,438 MW | 28,771 MW | 11,651 MW | 8,359 MW | 2 MW |
| 2026-09-06T02:00Z | 36,676 MW | 28,233 MW | 11,655 MW | 9,745 MW | 4 MW |
| 2026-09-06T03:00Z | 33,288 MW | 27,609 MW | 11,664 MW | 10,028 MW | 4 MW |
| 2026-09-06T04:00Z | 31,295 MW | 26,671 MW | 11,672 MW | 9,596 MW | 7 MW |
| 2026-09-06T05:00Z | 28,930 MW | 25,112 MW | 11,674 MW | 9,250 MW | 4 MW |
| 2026-09-06T06:00Z | 27,077 MW | 22,949 MW | 11,683 MW | 9,139 MW | 4 MW |
| 2026-09-06T07:00Z | 26,180 MW | 21,386 MW | 11,682 MW | 8,669 MW | 4 MW |
| 2026-09-06T08:00Z | 26,061 MW | 21,154 MW | 11,684 MW | 7,895 MW | 3 MW |
| 2026-09-06T09:00Z | 25,310 MW | 21,002 MW | 11,684 MW | 7,146 MW | 3 MW |
| 2026-09-06T10:00Z | 25,463 MW | 20,957 MW | 11,685 MW | 6,852 MW | 3 MW |
| 2026-09-06T11:00Z | 25,936 MW | 21,677 MW | 11,694 MW | 6,200 MW | 95 MW |
| 2026-09-06T12:00Z | 25,026 MW | 20,811 MW | 11,700 MW | 6,083 MW | 3,612 MW |
| 2026-09-06T13:00Z | 24,083 MW | 19,106 MW | 11,699 MW | 5,141 MW | 11,063 MW |
| 2026-09-06T14:00Z | 25,355 MW | 19,425 MW | 11,689 MW | 4,388 MW | 15,082 MW |
| 2026-09-06T15:00Z | 26,054 MW | 21,063 MW | 11,676 MW | 4,791 MW | 16,630 MW |
| 2026-09-06T16:00Z | 27,700 MW | 21,907 MW | 11,658 MW | 6,379 MW | 17,716 MW |
| 2026-09-06T17:00Z | 29,793 MW | 24,134 MW | 11,651 MW | 6,341 MW | 18,113 MW |
| 2026-09-06T18:00Z | 31,480 MW | 25,004 MW | 11,646 MW | 7,632 MW | 17,781 MW |
| 2026-09-06T19:00Z | 32,409 MW | 25,660 MW | 11,650 MW | 8,235 MW | 17,667 MW |
| 2026-09-06T20:00Z | 33,256 MW | 26,447 MW | 11,648 MW | 8,601 MW | 16,875 MW |
| 2026-09-06T21:00Z | 34,951 MW | 26,389 MW | 11,646 MW | 8,930 MW | 15,623 MW |
| 2026-09-06T22:00Z | 36,285 MW | 26,409 MW | 11,647 MW | 8,514 MW | 11,643 MW |
| 2026-09-06T23:00Z | 37,441 MW | 26,951 MW | 11,648 MW | 9,470 MW | 3,602 MW |
| 2026-09-07T00:00Z | 37,252 MW | 26,399 MW | 11,652 MW | 9,953 MW | 105 MW |
| 2026-09-07T01:00Z | 35,307 MW | 24,638 MW | 11,658 MW | 11,653 MW | 48 MW |
| 2026-09-07T02:00Z | 32,574 MW | 23,645 MW | 11,660 MW | 11,670 MW | 49 MW |
| 2026-09-07T03:00Z | 30,322 MW | 23,184 MW | 11,668 MW | 10,644 MW | 49 MW |
| 2026-09-07T04:00Z | 28,212 MW | 21,761 MW | 11,674 MW | 10,181 MW | 48 MW |
| 2026-09-07T05:00Z | 25,449 MW | 20,050 MW | 11,679 MW | 10,542 MW | 12 MW |
| 2026-09-07T06:00Z | 24,295 MW | 20,208 MW | 11,684 MW | 9,478 MW | 5 MW |
| 2026-09-07T07:00Z | 23,117 MW | 18,750 MW | 11,690 MW | 9,843 MW | 5 MW |
| 2026-09-07T08:00Z | 22,762 MW | 17,310 MW | 11,696 MW | 10,349 MW | 5 MW |
| 2026-09-07T09:00Z | 22,331 MW | 16,542 MW | 11,696 MW | 11,257 MW | 5 MW |
| 2026-09-07T10:00Z | 22,477 MW | 16,868 MW | 11,703 MW | 11,638 MW | 5 MW |
| 2026-09-07T11:00Z | 22,366 MW | 17,624 MW | 11,706 MW | 11,524 MW | 141 MW |
| 2026-09-07T12:00Z | 19,902 MW | 16,364 MW | 11,711 MW | 11,713 MW | 4,724 MW |
| 2026-09-07T13:00Z | 18,224 MW | 14,548 MW | 11,706 MW | 11,022 MW | 12,817 MW |
| 2026-09-07T14:00Z | 18,828 MW | 14,406 MW | 11,697 MW | 10,849 MW | 18,285 MW |
| 2026-09-07T15:00Z | 20,364 MW | 15,341 MW | 11,690 MW | 12,225 MW | 19,296 MW |
| 2026-09-07T16:00Z | 23,232 MW | 16,906 MW | 11,686 MW | 12,659 MW | 19,171 MW |
| 2026-09-07T17:00Z | 25,148 MW | 19,687 MW | 11,672 MW | 12,440 MW | 19,222 MW |
| 2026-09-07T18:00Z | 26,646 MW | 21,831 MW | 11,664 MW | 12,937 MW | 19,001 MW |
| 2026-09-07T19:00Z | 28,516 MW | 22,849 MW | 11,662 MW | 13,366 MW | 18,950 MW |
| 2026-09-07T20:00Z | 29,592 MW | 22,801 MW | 11,659 MW | 13,877 MW | 18,422 MW |
| 2026-09-07T21:00Z | 31,138 MW | 23,341 MW | 11,668 MW | 14,172 MW | 17,116 MW |
| 2026-09-07T22:00Z | 33,698 MW | 23,743 MW | 11,676 MW | 14,446 MW | 12,728 MW |
| 2026-09-07T23:00Z | 36,892 MW | 25,481 MW | 11,680 MW | 13,780 MW | 4,077 MW |
| 2026-09-08T00:00Z | 36,880 MW | 25,989 MW | 11,678 MW | 13,944 MW | 89 MW |
| 2026-09-08T01:00Z | 34,290 MW | 25,072 MW | 11,685 MW | 15,511 MW | 2 MW |
| 2026-09-08T02:00Z | 30,030 MW | 23,781 MW | 11,695 MW | 17,169 MW | 4 MW |
| 2026-09-08T03:00Z | 27,260 MW | 21,713 MW | 11,703 MW | 17,900 MW | 6 MW |
| 2026-09-08T04:00Z | 24,609 MW | 19,191 MW | 11,703 MW | 17,946 MW | 8 MW |
| 2026-09-08T05:00Z | 23,625 MW | 17,614 MW | 11,705 MW | 17,757 MW | 6 MW |
| 2026-09-08T06:00Z | 22,817 MW | 16,332 MW | 11,712 MW | 17,536 MW | 9 MW |
| 2026-09-08T07:00Z | 22,558 MW | 15,313 MW | 11,713 MW | 16,863 MW | 6 MW |
| 2026-09-08T08:00Z | 23,249 MW | 14,730 MW | 11,716 MW | 15,784 MW | 5 MW |
| 2026-09-08T09:00Z | 23,756 MW | 15,440 MW | 11,720 MW | 14,348 MW | 6 MW |
| 2026-09-08T10:00Z | 24,677 MW | 18,950 MW | 11,725 MW | 12,776 MW | 6 MW |
| 2026-09-08T11:00Z | 25,506 MW | 21,935 MW | 11,728 MW | 11,803 MW | 121 MW |
| 2026-09-08T12:00Z | 25,177 MW | 22,427 MW | 11,734 MW | 11,170 MW | 3,616 MW |
| 2026-09-08T13:00Z | 23,715 MW | 21,018 MW | 11,725 MW | 10,481 MW | 10,462 MW |
| 2026-09-08T14:00Z | 25,103 MW | 20,229 MW | 11,716 MW | 9,933 MW | 14,271 MW |
| 2026-09-08T15:00Z | 28,213 MW | 21,316 MW | 11,702 MW | 9,625 MW | 15,937 MW |
| 2026-09-08T16:00Z | 32,454 MW | 22,532 MW | 11,687 MW | 8,751 MW | 16,822 MW |
| 2026-09-08T17:00Z | 36,593 MW | 23,800 MW | 11,671 MW | 8,129 MW | 16,979 MW |
| 2026-09-08T18:00Z | 40,062 MW | 25,251 MW | 11,663 MW | 7,341 MW | 16,256 MW |
| 2026-09-08T19:00Z | 41,945 MW | 26,047 MW | 11,657 MW | 7,313 MW | 15,682 MW |
| 2026-09-08T20:00Z | 43,467 MW | 26,056 MW | 11,648 MW | 7,763 MW | 14,778 MW |
| 2026-09-08T21:00Z | 44,107 MW | 25,824 MW | 11,648 MW | 8,936 MW | 13,124 MW |
| 2026-09-08T22:00Z | 45,111 MW | 25,375 MW | 11,651 MW | 9,766 MW | 9,818 MW |
| 2026-09-08T23:00Z | 46,372 MW | 25,789 MW | 11,656 MW | 9,934 MW | 3,650 MW |
| 2026-09-09T00:00Z | 46,913 MW | 26,287 MW | 11,656 MW | 9,851 MW | 104 MW |
| 2026-09-09T01:00Z | 45,480 MW | 25,926 MW | 11,608 MW | 10,097 MW | 6 MW |
| 2026-09-09T02:00Z | 42,301 MW | 25,590 MW | 11,540 MW | 10,541 MW | 7 MW |
| 2026-09-09T03:00Z | 38,095 MW | 25,137 MW | 11,583 MW | 9,844 MW | 7 MW |
| 2026-09-09T04:00Z | 34,137 MW | 24,362 MW | 11,543 MW | 9,677 MW | 7 MW |
| 2026-09-09T05:00Z | 30,646 MW | 23,268 MW | 11,594 MW | 9,780 MW | 7 MW |
| 2026-09-09T06:00Z | 28,848 MW | 20,449 MW | 11,608 MW | 9,868 MW | 7 MW |
| 2026-09-09T07:00Z | 28,667 MW | 18,938 MW | 11,613 MW | 9,472 MW | 6 MW |
| 2026-09-09T08:00Z | 27,914 MW | 19,192 MW | 11,613 MW | 9,505 MW | 5 MW |
| 2026-09-09T09:00Z | 28,481 MW | 19,547 MW | 11,460 MW | 10,063 MW | 3 MW |
| 2026-09-09T10:00Z | 30,067 MW | 21,205 MW | 11,320 MW | 9,254 MW | 7 MW |
| 2026-09-09T11:00Z | 32,096 MW | 22,873 MW | 11,269 MW | 8,760 MW | 35 MW |
| 2026-09-09T12:00Z | 31,658 MW | 24,281 MW | 11,244 MW | 8,519 MW | 2,222 MW |
| 2026-09-09T13:00Z | 29,991 MW | 23,516 MW | 11,242 MW | 8,036 MW | 8,441 MW |
| 2026-09-09T14:00Z | 30,733 MW | 23,734 MW | 11,247 MW | 7,118 MW | 11,787 MW |
| 2026-09-09T15:00Z | 32,896 MW | 23,798 MW | 11,308 MW | 7,125 MW | 13,745 MW |
| 2026-09-09T16:00Z | 35,999 MW | 24,394 MW | 11,402 MW | 7,071 MW | 14,112 MW |
| 2026-09-09T17:00Z | 39,127 MW | 25,301 MW | 11,475 MW | 6,864 MW | 14,267 MW |
| 2026-09-09T18:00Z | 42,348 MW | 25,926 MW | 11,522 MW | 6,875 MW | 13,585 MW |
| 2026-09-09T19:00Z | 43,258 MW | 26,192 MW | 11,551 MW | 7,197 MW | 13,043 MW |
| 2026-09-09T20:00Z | 43,349 MW | 26,231 MW | 11,559 MW | 7,829 MW | 12,796 MW |
| 2026-09-09T21:00Z | 44,831 MW | 26,393 MW | 11,568 MW | 7,727 MW | 11,655 MW |
| 2026-09-09T22:00Z | 46,348 MW | 26,853 MW | 11,576 MW | 7,317 MW | 8,899 MW |
| 2026-09-09T23:00Z | 48,426 MW | 27,900 MW | 11,584 MW | 5,769 MW | 3,157 MW |
| 2026-09-10T00:00Z | 48,332 MW | 28,372 MW | 11,604 MW | 5,108 MW | 82 MW |
| 2026-09-10T01:00Z | 47,143 MW | 28,205 MW | 11,615 MW | 5,126 MW | 13 MW |
| 2026-09-10T02:00Z | 43,633 MW | 27,761 MW | 11,625 MW | 5,199 MW | 12 MW |
| 2026-09-10T03:00Z | 39,695 MW | 26,889 MW | 11,646 MW | 5,537 MW | 14 MW |
| 2026-09-10T04:00Z | 35,836 MW | 25,627 MW | 11,664 MW | 5,911 MW | 14 MW |
| 2026-09-10T05:00Z | 33,934 MW | 24,452 MW | 11,678 MW | 5,179 MW | 5 MW |
| 2026-09-10T06:00Z | 32,313 MW | 22,820 MW | 11,680 MW | 4,241 MW | 4 MW |
| 2026-09-10T07:00Z | 31,484 MW | 21,629 MW | 11,683 MW | 3,826 MW | 5 MW |
| 2026-09-10T08:00Z | 31,525 MW | 20,805 MW | 11,685 MW | 3,613 MW | 6 MW |
| 2026-09-10T09:00Z | 31,734 MW | 21,227 MW | 11,690 MW | 3,278 MW | 5 MW |
| 2026-09-10T10:00Z | 33,037 MW | 22,151 MW | 11,692 MW | 3,015 MW | 4 MW |
| 2026-09-10T11:00Z | 34,701 MW | 23,704 MW | 11,700 MW | 2,648 MW | 36 MW |
| 2026-09-10T12:00Z | 34,832 MW | 24,333 MW | 11,705 MW | 2,627 MW | 2,194 MW |
| 2026-09-10T13:00Z | 33,188 MW | 23,854 MW | 11,714 MW | 2,305 MW | 7,787 MW |
| 2026-09-10T14:00Z | 34,702 MW | 24,291 MW | 11,707 MW | 1,650 MW | 10,528 MW |
| 2026-09-10T15:00Z | 35,428 MW | 25,283 MW | 11,695 MW | 1,361 MW | 11,535 MW |
| 2026-09-10T16:00Z | 36,832 MW | 25,866 MW | 11,690 MW | 2,177 MW | 11,493 MW |
| 2026-09-10T17:00Z | 37,571 MW | 26,303 MW | 11,681 MW | 3,266 MW | 11,509 MW |
| 2026-09-10T18:00Z | 38,557 MW | 26,205 MW | 11,678 MW | 3,927 MW | 12,176 MW |
| 2026-09-10T19:00Z | 39,391 MW | 26,202 MW | 11,677 MW | 4,445 MW | 11,885 MW |
| 2026-09-10T20:00Z | 39,907 MW | 26,322 MW | 11,669 MW | 4,754 MW | 10,522 MW |
| 2026-09-10T21:00Z | 40,541 MW | 27,051 MW | 11,668 MW | 5,034 MW | 9,636 MW |
| 2026-09-10T22:00Z | 41,587 MW | 26,856 MW | 11,669 MW | 5,257 MW | 7,404 MW |
| 2026-09-10T23:00Z | 42,291 MW | 27,413 MW | 11,674 MW | 5,183 MW | 2,530 MW |
| 2026-09-11T00:00Z | 42,088 MW | 27,829 MW | 11,679 MW | 5,598 MW | 80 MW |
| 2026-09-11T01:00Z | 40,007 MW | 27,528 MW | 11,689 MW | 7,780 MW | 4 MW |
| 2026-09-11T02:00Z | 37,146 MW | 26,317 MW | 11,702 MW | 9,389 MW | 3 MW |
| 2026-09-11T03:00Z | 33,740 MW | 24,588 MW | 11,706 MW | 10,430 MW | 4 MW |
| 2026-09-11T04:00Z | 31,193 MW | 22,443 MW | 11,708 MW | 11,323 MW | 5 MW |
| 2026-09-11T05:00Z | 29,144 MW | 20,410 MW | 11,723 MW | 12,568 MW | 4 MW |
| 2026-09-11T06:00Z | 27,996 MW | 18,680 MW | 11,731 MW | 13,284 MW | 4 MW |
| 2026-09-11T07:00Z | 27,158 MW | 17,294 MW | 11,738 MW | 13,515 MW | 4 MW |
| 2026-09-11T08:00Z | 27,098 MW | 16,286 MW | 11,722 MW | 14,228 MW | 5 MW |
| 2026-09-11T09:00Z | 27,415 MW | 16,738 MW | 11,695 MW | 14,145 MW | 5 MW |
| 2026-09-11T10:00Z | 28,025 MW | 17,895 MW | 11,691 MW | 14,442 MW | 5 MW |
| 2026-09-11T11:00Z | 29,053 MW | 18,505 MW | 11,702 MW | 14,491 MW | 68 MW |
| 2026-09-11T12:00Z | 28,509 MW | 18,528 MW | 11,706 MW | 14,300 MW | 2,777 MW |
| 2026-09-11T13:00Z | 27,407 MW | 17,712 MW | 11,707 MW | 13,215 MW | 9,033 MW |
| 2026-09-11T14:00Z | 26,982 MW | 18,375 MW | 11,695 MW | 11,860 MW | 13,227 MW |
| 2026-09-11T15:00Z | 27,828 MW | 18,365 MW | 11,691 MW | 12,459 MW | 15,234 MW |
| 2026-09-11T16:00Z | 29,736 MW | 19,328 MW | 11,687 MW | 13,524 MW | 15,425 MW |
| 2026-09-11T17:00Z | 31,529 MW | 20,761 MW | 11,703 MW | 13,635 MW | 15,433 MW |
| 2026-09-11T18:00Z | 32,602 MW | 21,314 MW | 11,721 MW | 13,916 MW | 15,696 MW |
| 2026-09-11T19:00Z | 34,752 MW | 21,527 MW | 11,720 MW | 14,205 MW | 14,228 MW |
| 2026-09-11T20:00Z | 35,703 MW | 21,497 MW | 11,726 MW | 14,443 MW | 13,972 MW |
| 2026-09-11T21:00Z | 37,029 MW | 21,653 MW | 11,722 MW | 14,633 MW | 12,522 MW |
| 2026-09-11T22:00Z | 38,673 MW | 22,042 MW | 11,716 MW | 14,521 MW | 9,336 MW |
| 2026-09-11T23:00Z | 39,921 MW | 22,821 MW | 11,720 MW | 13,797 MW | 3,071 MW |
| 2026-09-12T00:00Z | 39,590 MW | 23,010 MW | 11,686 MW | 14,679 MW | 72 MW |
| 2026-09-12T01:00Z | 37,490 MW | 22,190 MW | 11,597 MW | 16,318 MW | 8 MW |
| 2026-09-12T02:00Z | 34,285 MW | 21,264 MW | 11,591 MW | 18,080 MW | 7 MW |
| 2026-09-12T03:00Z | 31,356 MW | 19,768 MW | 11,599 MW | 19,068 MW | 6 MW |
| 2026-09-12T04:00Z | 29,160 MW | 18,141 MW | 11,543 MW | 19,263 MW | 9 MW |
| 2026-09-12T05:00Z | 27,619 MW | 16,825 MW | 11,427 MW | 18,865 MW | 9 MW |
| 2026-09-12T06:00Z | 26,832 MW | 16,404 MW | 11,275 MW | 17,463 MW | 6 MW |
| 2026-09-12T07:00Z | 25,891 MW | 16,082 MW | 11,231 MW | 16,091 MW | 7 MW |
| 2026-09-12T08:00Z | 25,115 MW | 15,108 MW | 11,166 MW | 15,595 MW | 5 MW |
| 2026-09-12T09:00Z | 25,621 MW | 15,503 MW | 11,114 MW | 14,558 MW | 5 MW |
| 2026-09-12T10:00Z | 25,956 MW | 16,570 MW | 11,158 MW | 13,866 MW | 6 MW |
| 2026-09-12T11:00Z | 25,903 MW | 16,934 MW | 11,178 MW | 14,345 MW | 45 MW |
| 2026-09-12T12:00Z | 26,073 MW | 17,175 MW | 11,128 MW | 14,062 MW | 2,329 MW |
| 2026-09-12T13:00Z | 24,772 MW | 16,838 MW | 11,142 MW | 12,648 MW | 9,346 MW |
| 2026-09-12T14:00Z | 25,278 MW | 16,715 MW | 11,162 MW | 12,159 MW | 13,816 MW |
| 2026-09-12T15:00Z | 27,437 MW | 17,710 MW | 11,185 MW | 12,285 MW | 15,469 MW |
| 2026-09-12T16:00Z | 29,688 MW | 18,952 MW | 11,216 MW | 11,683 MW | 15,829 MW |
| 2026-09-12T17:00Z | 31,858 MW | 19,526 MW | 11,287 MW | 10,554 MW | 15,803 MW |
| 2026-09-12T18:00Z | 35,096 MW | 20,765 MW | 11,345 MW | 8,666 MW | 15,950 MW |
| 2026-09-12T19:00Z | 37,142 MW | 21,425 MW | 11,362 MW | 7,936 MW | 15,609 MW |
| 2026-09-12T20:00Z | 39,119 MW | 21,791 MW | 11,371 MW | 7,231 MW | 14,586 MW |
| 2026-09-12T21:00Z | 40,054 MW | 21,505 MW | 11,382 MW | 7,124 MW | 13,833 MW |
| 2026-09-12T22:00Z | 42,701 MW | 22,061 MW | 11,392 MW | 5,863 MW | 9,785 MW |
| 2026-09-12T23:00Z | 44,177 MW | 22,707 MW | 11,395 MW | 4,355 MW | 2,874 MW |
| 2026-09-13T00:00Z | 44,321 MW | 22,974 MW | 11,408 MW | 3,405 MW | 78 MW |
| 2026-09-13T01:00Z | 42,471 MW | 23,203 MW | 11,414 MW | 4,137 MW | 3 MW |
| 2026-09-13T02:00Z | 40,282 MW | 23,114 MW | 11,423 MW | 4,880 MW | 4 MW |
| 2026-09-13T03:00Z | 36,721 MW | 22,354 MW | 11,434 MW | 5,543 MW | 4 MW |
| 2026-09-13T04:00Z | 33,897 MW | 21,361 MW | 11,446 MW | 5,876 MW | 4 MW |
| 2026-09-13T05:00Z | 32,213 MW | 20,741 MW | 11,429 MW | 5,226 MW | 5 MW |
| 2026-09-13T06:00Z | 30,862 MW | 20,168 MW | 11,418 MW | 5,059 MW | 5 MW |
| 2026-09-13T07:00Z | 29,798 MW | 19,233 MW | 11,428 MW | 5,363 MW | 7 MW |
| 2026-09-13T08:00Z | 29,076 MW | 18,253 MW | 11,438 MW | 5,065 MW | 5 MW |
| 2026-09-13T09:00Z | 28,663 MW | 18,363 MW | 11,451 MW | 4,534 MW | 6 MW |
| 2026-09-13T10:00Z | 28,754 MW | 18,347 MW | 11,455 MW | 4,082 MW | 4 MW |
| 2026-09-13T11:00Z | 28,933 MW | 18,599 MW | 11,459 MW | 3,638 MW | 62 MW |
| 2026-09-13T12:00Z | 28,211 MW | 17,809 MW | 11,463 MW | 3,585 MW | 2,778 MW |
| 2026-09-13T13:00Z | 27,042 MW | 16,721 MW | 11,459 MW | 2,626 MW | 10,015 MW |
| 2026-09-13T14:00Z | 27,335 MW | 16,262 MW | 11,469 MW | 3,308 MW | 14,756 MW |
| 2026-09-13T15:00Z | 29,504 MW | 17,306 MW | 11,426 MW | 2,949 MW | 16,261 MW |
| 2026-09-13T16:00Z | 31,298 MW | 19,105 MW | 11,413 MW | 3,094 MW | 16,631 MW |
| 2026-09-13T17:00Z | 32,937 MW | 19,848 MW | 11,406 MW | 4,091 MW | 16,666 MW |
| 2026-09-13T18:00Z | 34,468 MW | 19,999 MW | 11,369 MW | 5,272 MW | 15,437 MW |
| 2026-09-13T19:00Z | 36,029 MW | 19,786 MW | 11,322 MW | 5,942 MW | 13,965 MW |
| 2026-09-13T20:00Z | 37,370 MW | 19,990 MW | 11,269 MW | 5,383 MW | 13,146 MW |
| 2026-09-13T21:00Z | 38,364 MW | 20,006 MW | 11,309 MW | 4,763 MW | 11,367 MW |
| 2026-09-13T22:00Z | 39,432 MW | 20,300 MW | 11,332 MW | 4,270 MW | 8,462 MW |
| 2026-09-13T23:00Z | 40,929 MW | 21,000 MW | 11,334 MW | 4,417 MW | 2,602 MW |
| 2026-09-14T00:00Z | 41,010 MW | 21,772 MW | 11,338 MW | 4,920 MW | 69 MW |
| 2026-09-14T01:00Z | 39,259 MW | 21,940 MW | 11,349 MW | 5,393 MW | 4 MW |
| 2026-09-14T02:00Z | 36,524 MW | 21,930 MW | 11,358 MW | 5,779 MW | 7 MW |
| 2026-09-14T03:00Z | 33,521 MW | 21,756 MW | 11,370 MW | 5,974 MW | 4 MW |
| 2026-09-14T04:00Z | 31,088 MW | 21,211 MW | 11,376 MW | 6,256 MW | 4 MW |
| 2026-09-14T05:00Z | 28,900 MW | 19,936 MW | 11,385 MW | 6,727 MW | 3 MW |
| 2026-09-14T06:00Z | 27,780 MW | 19,443 MW | 11,387 MW | 7,267 MW | 3 MW |
| 2026-09-14T07:00Z | 26,375 MW | 18,975 MW | 11,392 MW | 8,279 MW | 4 MW |
| 2026-09-14T08:00Z | 24,790 MW | 17,273 MW | 11,394 MW | 10,998 MW | 11 MW |
| 2026-09-14T09:00Z | 24,703 MW | 16,650 MW | 11,397 MW | 13,032 MW | 11 MW |
| 2026-09-14T10:00Z | 25,710 MW | 16,580 MW | 11,401 MW | 15,239 MW | 5 MW |
| 2026-09-14T11:00Z | 27,505 MW | 17,488 MW | 11,401 MW | 16,206 MW | 55 MW |
| 2026-09-14T12:00Z | 25,613 MW | 16,329 MW | 11,405 MW | 17,332 MW | 3,858 MW |
| 2026-09-14T13:00Z | 22,655 MW | 13,787 MW | 11,401 MW | 17,098 MW | 12,049 MW |
| 2026-09-14T14:00Z | 23,147 MW | 12,981 MW | 11,393 MW | 17,591 MW | 15,392 MW |
| 2026-09-14T15:00Z | 24,341 MW | 14,076 MW | 11,389 MW | 17,629 MW | 16,477 MW |
| 2026-09-14T16:00Z | 26,533 MW | 15,477 MW | 11,380 MW | 17,307 MW | 16,556 MW |
| 2026-09-14T17:00Z | 29,323 MW | 16,973 MW | 11,354 MW | 16,475 MW | 15,855 MW |
| 2026-09-14T18:00Z | 31,483 MW | 17,628 MW | 11,430 MW | 16,651 MW | 14,632 MW |
| 2026-09-14T19:00Z | 33,022 MW | 17,902 MW | 11,524 MW | 16,630 MW | 12,927 MW |
| 2026-09-14T20:00Z | 34,376 MW | 17,855 MW | 11,524 MW | 16,020 MW | 11,945 MW |
| 2026-09-14T21:00Z | 35,241 MW | 17,505 MW | 11,528 MW | 15,567 MW | 10,945 MW |
| 2026-09-14T22:00Z | 36,844 MW | 17,751 MW | 11,519 MW | 15,515 MW | 7,230 MW |
| 2026-09-14T23:00Z | 38,475 MW | 18,621 MW | 11,513 MW | 15,689 MW | 1,884 MW |
| 2026-09-15T00:00Z | 38,900 MW | 19,023 MW | 11,516 MW | 15,776 MW | 33 MW |
| 2026-09-15T01:00Z | 36,864 MW | 19,265 MW | 11,521 MW | 15,883 MW | 15 MW |
| 2026-09-15T02:00Z | 33,194 MW | 19,406 MW | 11,524 MW | 16,597 MW | 16 MW |
| 2026-09-15T03:00Z | 30,600 MW | 18,511 MW | 11,527 MW | 17,316 MW | 15 MW |
| 2026-09-15T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T16:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T16:00Z.
Day by Day
Daily totals, Eastern time dates, through 2026-09-13| Date (Eastern time) | Demand |
|---|---|
| 2025-08-11 | 2.25 TWh |
| 2025-08-12 | 2.24 TWh |
| 2025-08-13 | 2.19 TWh |
| 2025-08-14 | 2.19 TWh |
| 2025-08-15 | 2.24 TWh |
| 2025-08-16 | 2.18 TWh |
| 2025-08-17 | 2.13 TWh |
| 2025-08-18 | 2.21 TWh |
| 2025-08-19 | 2.20 TWh |
| 2025-08-20 | 2.11 TWh |
| 2025-08-21 | 2.04 TWh |
| 2025-08-22 | 2.00 TWh |
| 2025-08-23 | 1.87 TWh |
| 2025-08-24 | 1.76 TWh |
| 2025-08-25 | 1.80 TWh |
| 2025-08-26 | 1.80 TWh |
| 2025-08-27 | 1.81 TWh |
| 2025-08-28 | 1.86 TWh |
| 2025-08-29 | 1.80 TWh |
| 2025-08-30 | 1.70 TWh |
| 2025-08-31 | 1.67 TWh |
| 2025-09-01 | 1.71 TWh |
| 2025-09-02 | 1.86 TWh |
| 2025-09-03 | 1.85 TWh |
| 2025-09-04 | 1.79 TWh |
| 2025-09-05 | 1.75 TWh |
| 2025-09-06 | 1.61 TWh |
| 2025-09-07 | 1.57 TWh |
| 2025-09-08 | 1.67 TWh |
| 2025-09-09 | 1.74 TWh |
| 2025-09-10 | 1.84 TWh |
| 2025-09-11 | 1.90 TWh |
| 2025-09-12 | 1.92 TWh |
| 2025-09-13 | 1.87 TWh |
| 2025-09-14 | 1.91 TWh |
| 2025-09-15 | 2.03 TWh |
| 2025-09-16 | 2.03 TWh |
| 2025-09-17 | 1.99 TWh |
| 2025-09-18 | 1.99 TWh |
| 2025-09-19 | 1.94 TWh |
| 2025-09-20 | 1.79 TWh |
| 2025-09-21 | 1.78 TWh |
| 2025-09-22 | 1.89 TWh |
| 2025-09-23 | 1.89 TWh |
| 2025-09-24 | 1.85 TWh |
| 2025-09-25 | 1.82 TWh |
| 2025-09-26 | 1.79 TWh |
| 2025-09-27 | 1.71 TWh |
| 2025-09-28 | 1.70 TWh |
| 2025-09-29 | 1.87 TWh |
| 2025-09-30 | 1.89 TWh |
| 2025-10-01 | 1.86 TWh |
| 2025-10-02 | 1.87 TWh |
| 2025-10-03 | 1.88 TWh |
| 2025-10-04 | 1.81 TWh |
| 2025-10-05 | 1.75 TWh |
| 2025-10-06 | 1.83 TWh |
| 2025-10-07 | 1.79 TWh |
| 2025-10-08 | 1.71 TWh |
| 2025-10-09 | 1.69 TWh |
| 2025-10-10 | 1.64 TWh |
| 2025-10-11 | 1.54 TWh |
| 2025-10-12 | 1.53 TWh |
| 2025-10-13 | 1.67 TWh |
| 2025-10-14 | 1.70 TWh |
| 2025-10-15 | 1.68 TWh |
| 2025-10-16 | 1.70 TWh |
| 2025-10-17 | 1.69 TWh |
| 2025-10-18 | 1.61 TWh |
| 2025-10-19 | 1.52 TWh |
| 2025-10-20 | 1.59 TWh |
| 2025-10-21 | 1.64 TWh |
| 2025-10-22 | 1.63 TWh |
| 2025-10-23 | 1.63 TWh |
| 2025-10-24 | 1.62 TWh |
| 2025-10-25 | 1.52 TWh |
| 2025-10-26 | 1.50 TWh |
| 2025-10-27 | 1.61 TWh |
| 2025-10-28 | 1.62 TWh |
| 2025-10-29 | 1.60 TWh |
| 2025-10-30 | 1.62 TWh |
| 2025-10-31 | 1.60 TWh |
| 2025-11-01 | 1.53 TWh |
| 2025-11-02 | 1.59 TWh |
| 2025-11-03 | 1.63 TWh |
| 2025-11-04 | 1.63 TWh |
| 2025-11-05 | 1.61 TWh |
| 2025-11-06 | 1.71 TWh |
| 2025-11-07 | 1.69 TWh |
| 2025-11-08 | 1.62 TWh |
| 2025-11-09 | 1.67 TWh |
| 2025-11-10 | 1.88 TWh |
| 2025-11-11 | 1.88 TWh |
| 2025-11-12 | 1.75 TWh |
| 2025-11-13 | 1.73 TWh |
| 2025-11-14 | 1.69 TWh |
| 2025-11-15 | 1.57 TWh |
| 2025-11-16 | 1.58 TWh |
| 2025-11-17 | 1.75 TWh |
| 2025-11-18 | 1.77 TWh |
| 2025-11-19 | 1.77 TWh |
| 2025-11-20 | 1.76 TWh |
| 2025-11-21 | 1.74 TWh |
| 2025-11-22 | 1.64 TWh |
| 2025-11-23 | 1.59 TWh |
| 2025-11-24 | 1.74 TWh |
| 2025-11-25 | 1.75 TWh |
| 2025-11-26 | 1.80 TWh |
| 2025-11-27 | 1.70 TWh |
| 2025-11-28 | 1.74 TWh |
| 2025-11-29 | 1.77 TWh |
| 2025-11-30 | 1.80 TWh |
| 2025-12-01 | 2.00 TWh |
| 2025-12-02 | 2.05 TWh |
| 2025-12-03 | 2.07 TWh |
| 2025-12-04 | 2.08 TWh |
| 2025-12-05 | 2.05 TWh |
| 2025-12-06 | 1.88 TWh |
| 2025-12-07 | 1.84 TWh |
| 2025-12-08 | 2.02 TWh |
| 2025-12-09 | 2.00 TWh |
| 2025-12-10 | 1.97 TWh |
| 2025-12-11 | 1.95 TWh |
| 2025-12-12 | 1.92 TWh |
| 2025-12-13 | 1.90 TWh |
| 2025-12-14 | 2.04 TWh |
| 2025-12-15 | 2.16 TWh |
| 2025-12-16 | 1.99 TWh |
| 2025-12-17 | 1.82 TWh |
| 2025-12-18 | 1.81 TWh |
| 2025-12-19 | 1.93 TWh |
| 2025-12-20 | 1.79 TWh |
| 2025-12-21 | 1.80 TWh |
| 2025-12-22 | 1.87 TWh |
| 2025-12-23 | 1.77 TWh |
| 2025-12-24 | 1.66 TWh |
| 2025-12-25 | 1.56 TWh |
| 2025-12-26 | 1.64 TWh |
| 2025-12-27 | 1.65 TWh |
| 2025-12-28 | 1.67 TWh |
| 2025-12-29 | 1.99 TWh |
| 2025-12-30 | 2.05 TWh |
| 2025-12-31 | 1.94 TWh |
| 2026-01-01 | 1.77 TWh |
| 2026-01-02 | 1.81 TWh |
| 2026-01-03 | 1.78 TWh |
| 2026-01-04 | 1.76 TWh |
| 2026-01-05 | 1.80 TWh |
| 2026-01-06 | 1.75 TWh |
| 2026-01-07 | 1.74 TWh |
| 2026-01-08 | 1.74 TWh |
| 2026-01-09 | 1.70 TWh |
| 2026-01-10 | 1.69 TWh |
| 2026-01-11 | 1.77 TWh |
| 2026-01-12 | 1.87 TWh |
| 2026-01-13 | 1.82 TWh |
| 2026-01-14 | 1.86 TWh |
| 2026-01-15 | 1.99 TWh |
| 2026-01-16 | 1.93 TWh |
| 2026-01-17 | 1.91 TWh |
| 2026-01-18 | 2.00 TWh |
| 2026-01-19 | 2.10 TWh |
| 2026-01-20 | 2.10 TWh |
| 2026-01-21 | 1.95 TWh |
| 2026-01-22 | 1.97 TWh |
| 2026-01-23 | 2.11 TWh |
| 2026-01-24 | 2.19 TWh |
| 2026-01-25 | 2.15 TWh |
| 2026-01-26 | 2.28 TWh |
| 2026-01-27 | 2.22 TWh |
| 2026-01-28 | 2.17 TWh |
| 2026-01-29 | 2.13 TWh |
| 2026-01-30 | 2.12 TWh |
| 2026-01-31 | 2.15 TWh |
| 2026-02-01 | 2.10 TWh |
| 2026-02-02 | 2.04 TWh |
| 2026-02-03 | 1.95 TWh |
| 2026-02-04 | 1.97 TWh |
| 2026-02-05 | 2.02 TWh |
| 2026-02-06 | 1.88 TWh |
| 2026-02-07 | 1.81 TWh |
| 2026-02-08 | 1.79 TWh |
| 2026-02-09 | 1.83 TWh |
| 2026-02-10 | 1.75 TWh |
| 2026-02-11 | 1.78 TWh |
| 2026-02-12 | 1.79 TWh |
| 2026-02-13 | 1.73 TWh |
| 2026-02-14 | 1.62 TWh |
| 2026-02-15 | 1.56 TWh |
| 2026-02-16 | 1.68 TWh |
| 2026-02-17 | 1.70 TWh |
| 2026-02-18 | 1.66 TWh |
| 2026-02-19 | 1.71 TWh |
| 2026-02-20 | 1.77 TWh |
| 2026-02-21 | 1.74 TWh |
| 2026-02-22 | 1.79 TWh |
| 2026-02-23 | 1.97 TWh |
| 2026-02-24 | 1.95 TWh |
| 2026-02-25 | 1.80 TWh |
| 2026-02-26 | 1.76 TWh |
| 2026-02-27 | 1.68 TWh |
| 2026-02-28 | 1.63 TWh |
| 2026-03-01 | 1.65 TWh |
| 2026-03-02 | 1.78 TWh |
| 2026-03-03 | 1.76 TWh |
| 2026-03-04 | 1.72 TWh |
| 2026-03-05 | 1.73 TWh |
| 2026-03-06 | 1.70 TWh |
| 2026-03-07 | 1.60 TWh |
| 2026-03-08 | 1.46 TWh |
| 2026-03-09 | 1.64 TWh |
| 2026-03-10 | 1.69 TWh |
| 2026-03-11 | 1.72 TWh |
| 2026-03-12 | 1.70 TWh |
| 2026-03-13 | 1.68 TWh |
| 2026-03-14 | 1.61 TWh |
| 2026-03-15 | 1.60 TWh |
| 2026-03-16 | 1.82 TWh |
| 2026-03-17 | 1.93 TWh |
| 2026-03-18 | 1.80 TWh |
| 2026-03-19 | 1.71 TWh |
| 2026-03-20 | 1.61 TWh |
| 2026-03-21 | 1.55 TWh |
| 2026-03-22 | 1.56 TWh |
| 2026-03-23 | 1.66 TWh |
| 2026-03-24 | 1.68 TWh |
| 2026-03-25 | 1.67 TWh |
| 2026-03-26 | 1.70 TWh |
| 2026-03-27 | 1.68 TWh |
| 2026-03-28 | 1.57 TWh |
| 2026-03-29 | 1.53 TWh |
| 2026-03-30 | 1.65 TWh |
| 2026-03-31 | 1.70 TWh |
| 2026-04-01 | 1.70 TWh |
| 2026-04-02 | 1.72 TWh |
| 2026-04-03 | 1.66 TWh |
| 2026-04-04 | 1.59 TWh |
| 2026-04-05 | 1.49 TWh |
| 2026-04-06 | 1.62 TWh |
| 2026-04-07 | 1.67 TWh |
| 2026-04-08 | 1.65 TWh |
| 2026-04-09 | 1.64 TWh |
| 2026-04-10 | 1.63 TWh |
| 2026-04-11 | 1.56 TWh |
| 2026-04-12 | 1.55 TWh |
| 2026-04-13 | 1.73 TWh |
| 2026-04-14 | 1.77 TWh |
| 2026-04-15 | 1.73 TWh |
| 2026-04-16 | 1.72 TWh |
| 2026-04-17 | 1.72 TWh |
| 2026-04-18 | 1.56 TWh |
| 2026-04-19 | 1.49 TWh |
| 2026-04-20 | 1.61 TWh |
| 2026-04-21 | 1.63 TWh |
| 2026-04-22 | 1.67 TWh |
| 2026-04-23 | 1.73 TWh |
| 2026-04-24 | 1.67 TWh |
| 2026-04-25 | 1.56 TWh |
| 2026-04-26 | 1.56 TWh |
| 2026-04-27 | 1.73 TWh |
| 2026-04-28 | 1.71 TWh |
| 2026-04-29 | 1.68 TWh |
| 2026-04-30 | 1.64 TWh |
| 2026-05-01 | 1.59 TWh |
| 2026-05-02 | 1.49 TWh |
| 2026-05-03 | 1.48 TWh |
| 2026-05-04 | 1.62 TWh |
| 2026-05-05 | 1.64 TWh |
| 2026-05-06 | 1.67 TWh |
| 2026-05-07 | 1.64 TWh |
| 2026-05-08 | 1.61 TWh |
| 2026-05-09 | 1.52 TWh |
| 2026-05-10 | 1.51 TWh |
| 2026-05-11 | 1.63 TWh |
| 2026-05-12 | 1.68 TWh |
| 2026-05-13 | 1.67 TWh |
| 2026-05-14 | 1.68 TWh |
| 2026-05-15 | 1.72 TWh |
| 2026-05-16 | 1.68 TWh |
| 2026-05-17 | 1.73 TWh |
| 2026-05-18 | 1.89 TWh |
| 2026-05-19 | 1.88 TWh |
| 2026-05-20 | 1.70 TWh |
| 2026-05-21 | 1.68 TWh |
| 2026-05-22 | 1.68 TWh |
| 2026-05-23 | 1.56 TWh |
| 2026-05-24 | 1.58 TWh |
| 2026-05-25 | 1.67 TWh |
| 2026-05-26 | 1.88 TWh |
| 2026-05-27 | 1.95 TWh |
| 2026-05-28 | 1.92 TWh |
| 2026-05-29 | 1.90 TWh |
| 2026-05-30 | 1.80 TWh |
| 2026-05-31 | 1.75 TWh |
| 2026-06-01 | 1.92 TWh |
| 2026-06-02 | 1.88 TWh |
| 2026-06-03 | 1.87 TWh |
| 2026-06-04 | 1.94 TWh |
| 2026-06-05 | 1.96 TWh |
| 2026-06-06 | 1.96 TWh |
| 2026-06-07 | 1.94 TWh |
| 2026-06-08 | 2.06 TWh |
| 2026-06-09 | 2.21 TWh |
| 2026-06-10 | 2.25 TWh |
| 2026-06-11 | 2.16 TWh |
| 2026-06-12 | 2.02 TWh |
| 2026-06-13 | 1.91 TWh |
| 2026-06-14 | 1.78 TWh |
| 2026-06-15 | 1.82 TWh |
| 2026-06-16 | 1.82 TWh |
| 2026-06-17 | 1.88 TWh |
| 2026-06-18 | 1.90 TWh |
| 2026-06-19 | 1.87 TWh |
| 2026-06-20 | 1.76 TWh |
| 2026-06-21 | 1.73 TWh |
| 2026-06-22 | 1.87 TWh |
| 2026-06-23 | 1.92 TWh |
| 2026-06-24 | 1.93 TWh |
| 2026-06-25 | 1.98 TWh |
| 2026-06-26 | 1.94 TWh |
| 2026-06-27 | 1.91 TWh |
| 2026-06-28 | 2.03 TWh |
| 2026-06-29 | 2.38 TWh |
| 2026-06-30 | 2.49 TWh |
| 2026-07-01 | 2.47 TWh |
| 2026-07-02 | 2.40 TWh |
| 2026-07-03 | 2.25 TWh |
| 2026-07-04 | 2.06 TWh |
| 2026-07-05 | 1.98 TWh |
| 2026-07-06 | 2.17 TWh |
| 2026-07-07 | 2.20 TWh |
| 2026-07-08 | 2.25 TWh |
| 2026-07-09 | 2.27 TWh |
| 2026-07-10 | 2.24 TWh |
| 2026-07-11 | 2.10 TWh |
| 2026-07-12 | 2.09 TWh |
| 2026-07-13 | 2.26 TWh |
| 2026-07-14 | 2.37 TWh |
| 2026-07-15 | 2.40 TWh |
| 2026-07-16 | 2.36 TWh |
| 2026-07-17 | 2.38 TWh |
| 2026-07-18 | 2.30 TWh |
| 2026-07-19 | 2.14 TWh |
| 2026-07-20 | 2.29 TWh |
| 2026-07-21 | 2.32 TWh |
| 2026-07-22 | 2.06 TWh |
| 2026-07-23 | 2.02 TWh |
| 2026-07-24 | 2.04 TWh |
| 2026-07-25 | 2.05 TWh |
| 2026-07-26 | 2.26 TWh |
| 2026-07-27 | 2.45 TWh |
| 2026-07-28 | 2.35 TWh |
| 2026-07-29 | 2.26 TWh |
| 2026-07-30 | 2.28 TWh |
| 2026-07-31 | 2.18 TWh |
| 2026-08-01 | 2.05 TWh |
| 2026-08-02 | 1.94 TWh |
| 2026-08-03 | 2.12 TWh |
| 2026-08-04 | 2.15 TWh |
| 2026-08-05 | 2.19 TWh |
| 2026-08-06 | 2.14 TWh |
| 2026-08-07 | 2.20 TWh |
| 2026-08-08 | 2.10 TWh |
| 2026-08-09 | 2.07 TWh |
| 2026-08-10 | 2.29 TWh |
| 2026-08-11 | 2.30 TWh |
| 2026-08-12 | 2.26 TWh |
| 2026-08-13 | 2.26 TWh |
| 2026-08-14 | 2.23 TWh |
| 2026-08-15 | 2.14 TWh |
| 2026-08-16 | 2.17 TWh |
| 2026-08-17 | 2.20 TWh |
| 2026-08-18 | 2.17 TWh |
| 2026-08-19 | 2.16 TWh |
| 2026-08-20 | 2.16 TWh |
| 2026-08-21 | 2.14 TWh |
| 2026-08-22 | 2.00 TWh |
| 2026-08-23 | 1.89 TWh |
| 2026-08-24 | 1.97 TWh |
| 2026-08-25 | 2.06 TWh |
| 2026-08-26 | 2.15 TWh |
| 2026-08-27 | 2.10 TWh |
| 2026-08-28 | 2.07 TWh |
| 2026-08-29 | 1.97 TWh |
| 2026-08-30 | 2.03 TWh |
| 2026-08-31 | 2.27 TWh |
| 2026-09-01 | 2.35 TWh |
| 2026-09-02 | 2.40 TWh |
| 2026-09-03 | 2.36 TWh |
| 2026-09-04 | 2.31 TWh |
| 2026-09-05 | 2.15 TWh |
| 2026-09-06 | 2.00 TWh |
| 2026-09-07 | 1.97 TWh |
| 2026-09-08 | 2.11 TWh |
| 2026-09-09 | 2.18 TWh |
| 2026-09-10 | 2.06 TWh |
| 2026-09-11 | 2.02 TWh |
| 2026-09-12 | 1.97 TWh |
| 2026-09-13 | 1.87 TWh |
| 2026-09-14 | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 486 TWh | 483 TWh | Gas 37.8% | 256 |
| 2025 | 666 TWh | 659 TWh | Gas 35.4% | 365 |
| 2024 | 647 TWh | 638 TWh | Gas 39.6% | 366 |
| 2023 | 641 TWh | 617 TWh | Gas 39.1% | 365 |
| 2022 | 653 TWh | 640 TWh | Coal 33.9% | 365 |
| 2021 | 642 TWh | 617 TWh | Coal 38.7% | 365 |
| 2020 | 624 TWh | 576 TWh | Gas 34.3% | 366 |
| 2019 | 650 TWh | 608 TWh | Coal 39.3% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 2.49 TWh | 2026-06-30 (30 June 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 121.5 GW | 30 Jun 2026, 17:00 EDT (UTC-04:00) |
| Highest solar share of a day's generation, 2019 onward | 12.5% | 2026-05-14 (14 May 2026) |
| Highest wind share of a day's generation, 2019 onward | 35.6% | 2025-03-15 (15 March 2025) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Power Flows With Neighbours
Net totals, 2026-08-16 (16 August 2026) to 2026-09-14 (14 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| PJM | MISO imports | 2.39 TWh |
| TVA | MISO exports | 1.74 TWh |
| MHEB | MISO imports | 1.20 TWh |
| IESO | MISO imports | 378 GWh |
| SOCO | MISO imports | 327 GWh |
| LGEE | MISO exports | 180 GWh |
| SPP | MISO imports | 123 GWh |
| AECI | MISO exports | 106 GWh |
| SPA | MISO imports | 53.9 GWh |
| SIKE | MISO imports | 20.2 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-14.