MISO Electricity Demand and Generation Mix
MISO demand was 75,132 MW in the hour starting 5 Nov 2026, 08:00 EST (UTC-05:00). Gas was the largest source in the hour starting 4 Nov 2026, 22:00 EST (UTC-05:00), at 41% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- MISO is a regional transmission organization and balancing authority in the United States, part of the EIA Midwest region.
- In the hour starting 5 Nov 2026, 08:00 EST (UTC-05:00), demand in MISO was 75,132 MW, against a day-ahead forecast of 75,132 MW.
- Gas supplied 41.3% of MISO's generation in the hour starting 4 Nov 2026, 22:00 EST (UTC-05:00).
- Demand in MISO totalled 666 TWh in 2025.
- Gas supplied 35.4% of MISO's generation in 2025.
- The highest daily demand in MISO from 2019 onward was 2.49 TWh, on 2026-06-30 (30 June 2026).
- The highest hourly demand in MISO since 2026-06-16 (16 June 2026) was 121.5 GW, in the hour starting 30 Jun 2026, 17:00 EDT (UTC-04:00).
- Solar's highest share of MISO's daily generation from 2019 onward was 12.5%, on 2026-05-14 (14 May 2026).
- Wind's highest share of MISO's daily generation from 2019 onward was 35.6%, on 2025-03-15 (15 March 2025).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 5 Nov 2026, 08:00 EST (UTC-05:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T13:00:00Z.
Generation by Source
Latest hour with generation by source: 4 Nov 2026, 22:00 EST (UTC-05:00)| Source | Output | Share |
|---|---|---|
| Gas | 28,567 MW | 41.3% |
| Wind | 19,030 MW | 27.5% |
| Coal | 13,379 MW | 19.3% |
| Nuclear | 6,957 MW | 10.1% |
| Hydro | 638 MW | 0.9% |
| Other | 519 MW | 0.8% |
| Storage | 64 MW | 0.1% |
| Solar | 4 MW | 0.0% |
| Total from these sources | 69,158 MW | |
| Net interchange | -2,764 MW | net imports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when MISO exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T03:00:00Z.
Last 30 Days, Hourly
Times in UTCShow the data table (720 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-06T15:00Z | 73,473 MW |
| 2026-10-06T16:00Z | 74,848 MW |
| 2026-10-06T17:00Z | 76,716 MW |
| 2026-10-06T18:00Z | 78,529 MW |
| 2026-10-06T19:00Z | 80,021 MW |
| 2026-10-06T20:00Z | 81,345 MW |
| 2026-10-06T21:00Z | 82,315 MW |
| 2026-10-06T22:00Z | 83,110 MW |
| 2026-10-06T23:00Z | 82,463 MW |
| 2026-10-07T00:00Z | 81,979 MW |
| 2026-10-07T01:00Z | 79,220 MW |
| 2026-10-07T02:00Z | 75,607 MW |
| 2026-10-07T03:00Z | 71,693 MW |
| 2026-10-07T04:00Z | 68,711 MW |
| 2026-10-07T05:00Z | 66,657 MW |
| 2026-10-07T06:00Z | 64,851 MW |
| 2026-10-07T07:00Z | 63,724 MW |
| 2026-10-07T08:00Z | 63,138 MW |
| 2026-10-07T09:00Z | 62,956 MW |
| 2026-10-07T10:00Z | 65,357 MW |
| 2026-10-07T11:00Z | 69,527 MW |
| 2026-10-07T12:00Z | 71,436 MW |
| 2026-10-07T13:00Z | 72,044 MW |
| 2026-10-07T14:00Z | 72,954 MW |
| 2026-10-07T15:00Z | 74,622 MW |
| 2026-10-07T16:00Z | 77,407 MW |
| 2026-10-07T17:00Z | 79,610 MW |
| 2026-10-07T18:00Z | 82,017 MW |
| 2026-10-07T19:00Z | 83,688 MW |
| 2026-10-07T20:00Z | 85,119 MW |
| 2026-10-07T21:00Z | 86,355 MW |
| 2026-10-07T22:00Z | 86,733 MW |
| 2026-10-07T23:00Z | 85,502 MW |
| 2026-10-08T00:00Z | 84,269 MW |
| 2026-10-08T01:00Z | 81,153 MW |
| 2026-10-08T02:00Z | 77,152 MW |
| 2026-10-08T03:00Z | 72,866 MW |
| 2026-10-08T04:00Z | 69,658 MW |
| 2026-10-08T05:00Z | 67,244 MW |
| 2026-10-08T06:00Z | 65,619 MW |
| 2026-10-08T07:00Z | 64,345 MW |
| 2026-10-08T08:00Z | 63,474 MW |
| 2026-10-08T09:00Z | 63,439 MW |
| 2026-10-08T10:00Z | 65,685 MW |
| 2026-10-08T11:00Z | 69,755 MW |
| 2026-10-08T12:00Z | 71,659 MW |
| 2026-10-08T13:00Z | 72,167 MW |
| 2026-10-08T14:00Z | 73,292 MW |
| 2026-10-08T15:00Z | 74,941 MW |
| 2026-10-08T16:00Z | 76,974 MW |
| 2026-10-08T17:00Z | 79,186 MW |
| 2026-10-08T18:00Z | 81,232 MW |
| 2026-10-08T19:00Z | 82,681 MW |
| 2026-10-08T20:00Z | 83,565 MW |
| 2026-10-08T21:00Z | 84,638 MW |
| 2026-10-08T22:00Z | 84,480 MW |
| 2026-10-08T23:00Z | 82,805 MW |
| 2026-10-09T00:00Z | 81,459 MW |
| 2026-10-09T01:00Z | 78,991 MW |
| 2026-10-09T02:00Z | 75,378 MW |
| 2026-10-09T03:00Z | 71,397 MW |
| 2026-10-09T04:00Z | 68,007 MW |
| 2026-10-09T05:00Z | 66,077 MW |
| 2026-10-09T06:00Z | 64,915 MW |
| 2026-10-09T07:00Z | 63,737 MW |
| 2026-10-09T08:00Z | 63,546 MW |
| 2026-10-09T09:00Z | 63,417 MW |
| 2026-10-09T10:00Z | 65,215 MW |
| 2026-10-09T11:00Z | 68,931 MW |
| 2026-10-09T12:00Z | 70,973 MW |
| 2026-10-09T13:00Z | 71,729 MW |
| 2026-10-09T14:00Z | 72,883 MW |
| 2026-10-09T15:00Z | 74,662 MW |
| 2026-10-09T16:00Z | 76,198 MW |
| 2026-10-09T17:00Z | 78,200 MW |
| 2026-10-09T18:00Z | 80,195 MW |
| 2026-10-09T19:00Z | 81,255 MW |
| 2026-10-09T20:00Z | 82,332 MW |
| 2026-10-09T21:00Z | 83,296 MW |
| 2026-10-09T22:00Z | 82,779 MW |
| 2026-10-09T23:00Z | 81,249 MW |
| 2026-10-10T00:00Z | 79,793 MW |
| 2026-10-10T01:00Z | 76,809 MW |
| 2026-10-10T02:00Z | 73,426 MW |
| 2026-10-10T03:00Z | 70,079 MW |
| 2026-10-10T04:00Z | 66,815 MW |
| 2026-10-10T05:00Z | 65,142 MW |
| 2026-10-10T06:00Z | 63,862 MW |
| 2026-10-10T07:00Z | 62,659 MW |
| 2026-10-10T08:00Z | 61,744 MW |
| 2026-10-10T09:00Z | 61,292 MW |
| 2026-10-10T10:00Z | 61,913 MW |
| 2026-10-10T11:00Z | 63,414 MW |
| 2026-10-10T12:00Z | 64,862 MW |
| 2026-10-10T13:00Z | 65,783 MW |
| 2026-10-10T14:00Z | 66,973 MW |
| 2026-10-10T15:00Z | 68,687 MW |
| 2026-10-10T16:00Z | 70,329 MW |
| 2026-10-10T17:00Z | 72,151 MW |
| 2026-10-10T18:00Z | 73,899 MW |
| 2026-10-10T19:00Z | 75,176 MW |
| 2026-10-10T20:00Z | 76,712 MW |
| 2026-10-10T21:00Z | 77,858 MW |
| 2026-10-10T22:00Z | 78,248 MW |
| 2026-10-10T23:00Z | 77,634 MW |
| 2026-10-11T00:00Z | 76,357 MW |
| 2026-10-11T01:00Z | 73,935 MW |
| 2026-10-11T02:00Z | 71,361 MW |
| 2026-10-11T03:00Z | 68,427 MW |
| 2026-10-11T04:00Z | 65,161 MW |
| 2026-10-11T05:00Z | 62,731 MW |
| 2026-10-11T06:00Z | 61,595 MW |
| 2026-10-11T07:00Z | 60,980 MW |
| 2026-10-11T08:00Z | 60,122 MW |
| 2026-10-11T09:00Z | 59,776 MW |
| 2026-10-11T10:00Z | 59,651 MW |
| 2026-10-11T11:00Z | 60,781 MW |
| 2026-10-11T12:00Z | 62,095 MW |
| 2026-10-11T13:00Z | 63,738 MW |
| 2026-10-11T14:00Z | 65,573 MW |
| 2026-10-11T15:00Z | 67,600 MW |
| 2026-10-11T16:00Z | 70,442 MW |
| 2026-10-11T17:00Z | 73,424 MW |
| 2026-10-11T18:00Z | 76,279 MW |
| 2026-10-11T19:00Z | 78,865 MW |
| 2026-10-11T20:00Z | 81,528 MW |
| 2026-10-11T21:00Z | 83,813 MW |
| 2026-10-11T22:00Z | 84,527 MW |
| 2026-10-11T23:00Z | 83,241 MW |
| 2026-10-12T00:00Z | 81,947 MW |
| 2026-10-12T01:00Z | 78,957 MW |
| 2026-10-12T02:00Z | 75,318 MW |
| 2026-10-12T03:00Z | 71,730 MW |
| 2026-10-12T04:00Z | 68,721 MW |
| 2026-10-12T05:00Z | 66,858 MW |
| 2026-10-12T06:00Z | 65,256 MW |
| 2026-10-12T07:00Z | 63,367 MW |
| 2026-10-12T08:00Z | 62,798 MW |
| 2026-10-12T09:00Z | 63,539 MW |
| 2026-10-12T10:00Z | 66,536 MW |
| 2026-10-12T11:00Z | 70,117 MW |
| 2026-10-12T12:00Z | 72,547 MW |
| 2026-10-12T13:00Z | 74,156 MW |
| 2026-10-12T14:00Z | 76,063 MW |
| 2026-10-12T15:00Z | 78,588 MW |
| 2026-10-12T16:00Z | 82,160 MW |
| 2026-10-12T17:00Z | 85,558 MW |
| 2026-10-12T18:00Z | 89,136 MW |
| 2026-10-12T19:00Z | 92,094 MW |
| 2026-10-12T20:00Z | 94,117 MW |
| 2026-10-12T21:00Z | 95,171 MW |
| 2026-10-12T22:00Z | 94,852 MW |
| 2026-10-12T23:00Z | 92,822 MW |
| 2026-10-13T00:00Z | 90,961 MW |
| 2026-10-13T01:00Z | 87,328 MW |
| 2026-10-13T02:00Z | 82,877 MW |
| 2026-10-13T03:00Z | 78,263 MW |
| 2026-10-13T04:00Z | 74,448 MW |
| 2026-10-13T05:00Z | 71,672 MW |
| 2026-10-13T06:00Z | 69,436 MW |
| 2026-10-13T07:00Z | 67,997 MW |
| 2026-10-13T08:00Z | 66,934 MW |
| 2026-10-13T09:00Z | 67,720 MW |
| 2026-10-13T10:00Z | 69,751 MW |
| 2026-10-13T11:00Z | 73,768 MW |
| 2026-10-13T12:00Z | 75,856 MW |
| 2026-10-13T13:00Z | 77,106 MW |
| 2026-10-13T14:00Z | 79,133 MW |
| 2026-10-13T15:00Z | 81,990 MW |
| 2026-10-13T16:00Z | 85,141 MW |
| 2026-10-13T17:00Z | 88,423 MW |
| 2026-10-13T18:00Z | 90,942 MW |
| 2026-10-13T19:00Z | 93,084 MW |
| 2026-10-13T20:00Z | 94,365 MW |
| 2026-10-13T21:00Z | 94,555 MW |
| 2026-10-13T22:00Z | 93,560 MW |
| 2026-10-13T23:00Z | 91,752 MW |
| 2026-10-14T00:00Z | 89,928 MW |
| 2026-10-14T01:00Z | 86,824 MW |
| 2026-10-14T02:00Z | 83,323 MW |
| 2026-10-14T03:00Z | 79,131 MW |
| 2026-10-14T04:00Z | 75,269 MW |
| 2026-10-14T05:00Z | 73,085 MW |
| 2026-10-14T06:00Z | 71,638 MW |
| 2026-10-14T07:00Z | 69,648 MW |
| 2026-10-14T08:00Z | 68,823 MW |
| 2026-10-14T09:00Z | 69,681 MW |
| 2026-10-14T10:00Z | 70,379 MW |
| 2026-10-14T11:00Z | 75,309 MW |
| 2026-10-14T12:00Z | 76,868 MW |
| 2026-10-14T13:00Z | 77,960 MW |
| 2026-10-14T14:00Z | 79,237 MW |
| 2026-10-14T15:00Z | 80,593 MW |
| 2026-10-14T16:00Z | 81,822 MW |
| 2026-10-14T17:00Z | 83,037 MW |
| 2026-10-14T18:00Z | 84,488 MW |
| 2026-10-14T19:00Z | 84,967 MW |
| 2026-10-14T20:00Z | 85,306 MW |
| 2026-10-14T21:00Z | 85,228 MW |
| 2026-10-14T22:00Z | 84,697 MW |
| 2026-10-14T23:00Z | 84,026 MW |
| 2026-10-15T00:00Z | 82,985 MW |
| 2026-10-15T01:00Z | 80,624 MW |
| 2026-10-15T02:00Z | 77,288 MW |
| 2026-10-15T03:00Z | 73,194 MW |
| 2026-10-15T04:00Z | 69,464 MW |
| 2026-10-15T05:00Z | 67,052 MW |
| 2026-10-15T06:00Z | 65,268 MW |
| 2026-10-15T07:00Z | 64,147 MW |
| 2026-10-15T08:00Z | 63,797 MW |
| 2026-10-15T09:00Z | 64,515 MW |
| 2026-10-15T10:00Z | 67,419 MW |
| 2026-10-15T11:00Z | 71,461 MW |
| 2026-10-15T12:00Z | 73,659 MW |
| 2026-10-15T13:00Z | 74,950 MW |
| 2026-10-15T14:00Z | 76,758 MW |
| 2026-10-15T15:00Z | 78,680 MW |
| 2026-10-15T16:00Z | 80,528 MW |
| 2026-10-15T17:00Z | 82,882 MW |
| 2026-10-15T18:00Z | 84,306 MW |
| 2026-10-15T19:00Z | 84,861 MW |
| 2026-10-15T20:00Z | 85,344 MW |
| 2026-10-15T21:00Z | 85,292 MW |
| 2026-10-15T22:00Z | 84,907 MW |
| 2026-10-15T23:00Z | 84,401 MW |
| 2026-10-16T00:00Z | 82,942 MW |
| 2026-10-16T01:00Z | 80,388 MW |
| 2026-10-16T02:00Z | 77,233 MW |
| 2026-10-16T03:00Z | 73,471 MW |
| 2026-10-16T04:00Z | 69,761 MW |
| 2026-10-16T05:00Z | 67,171 MW |
| 2026-10-16T06:00Z | 65,039 MW |
| 2026-10-16T07:00Z | 63,763 MW |
| 2026-10-16T08:00Z | 63,141 MW |
| 2026-10-16T09:00Z | 63,704 MW |
| 2026-10-16T10:00Z | 66,136 MW |
| 2026-10-16T11:00Z | 69,743 MW |
| 2026-10-16T12:00Z | 71,985 MW |
| 2026-10-16T13:00Z | 72,936 MW |
| 2026-10-16T14:00Z | 73,647 MW |
| 2026-10-16T15:00Z | 74,409 MW |
| 2026-10-16T16:00Z | 74,544 MW |
| 2026-10-16T17:00Z | 74,733 MW |
| 2026-10-16T18:00Z | 74,467 MW |
| 2026-10-16T19:00Z | 74,026 MW |
| 2026-10-16T20:00Z | 73,398 MW |
| 2026-10-16T21:00Z | 73,073 MW |
| 2026-10-16T22:00Z | 73,199 MW |
| 2026-10-16T23:00Z | 73,348 MW |
| 2026-10-17T00:00Z | 72,867 MW |
| 2026-10-17T01:00Z | 71,400 MW |
| 2026-10-17T02:00Z | 69,191 MW |
| 2026-10-17T03:00Z | 66,373 MW |
| 2026-10-17T04:00Z | 63,675 MW |
| 2026-10-17T05:00Z | 61,634 MW |
| 2026-10-17T06:00Z | 60,651 MW |
| 2026-10-17T07:00Z | 59,750 MW |
| 2026-10-17T08:00Z | 59,469 MW |
| 2026-10-17T09:00Z | 59,750 MW |
| 2026-10-17T10:00Z | 60,889 MW |
| 2026-10-17T11:00Z | 62,823 MW |
| 2026-10-17T12:00Z | 64,645 MW |
| 2026-10-17T13:00Z | 65,413 MW |
| 2026-10-17T14:00Z | 64,763 MW |
| 2026-10-17T15:00Z | 64,285 MW |
| 2026-10-17T16:00Z | 63,770 MW |
| 2026-10-17T17:00Z | 63,173 MW |
| 2026-10-17T18:00Z | 62,983 MW |
| 2026-10-17T19:00Z | 63,048 MW |
| 2026-10-17T20:00Z | 63,654 MW |
| 2026-10-17T21:00Z | 64,937 MW |
| 2026-10-17T22:00Z | 66,803 MW |
| 2026-10-17T23:00Z | 68,163 MW |
| 2026-10-18T00:00Z | 68,552 MW |
| 2026-10-18T01:00Z | 67,540 MW |
| 2026-10-18T02:00Z | 65,717 MW |
| 2026-10-18T03:00Z | 63,871 MW |
| 2026-10-18T04:00Z | 61,769 MW |
| 2026-10-18T05:00Z | 59,899 MW |
| 2026-10-18T06:00Z | 58,833 MW |
| 2026-10-18T07:00Z | 58,225 MW |
| 2026-10-18T08:00Z | 57,964 MW |
| 2026-10-18T09:00Z | 58,252 MW |
| 2026-10-18T10:00Z | 59,154 MW |
| 2026-10-18T11:00Z | 60,993 MW |
| 2026-10-18T12:00Z | 62,694 MW |
| 2026-10-18T13:00Z | 63,483 MW |
| 2026-10-18T14:00Z | 63,105 MW |
| 2026-10-18T15:00Z | 62,841 MW |
| 2026-10-18T16:00Z | 62,769 MW |
| 2026-10-18T17:00Z | 63,187 MW |
| 2026-10-18T18:00Z | 63,347 MW |
| 2026-10-18T19:00Z | 63,840 MW |
| 2026-10-18T20:00Z | 64,815 MW |
| 2026-10-18T21:00Z | 66,655 MW |
| 2026-10-18T22:00Z | 69,036 MW |
| 2026-10-18T23:00Z | 70,468 MW |
| 2026-10-19T00:00Z | 71,115 MW |
| 2026-10-19T01:00Z | 69,323 MW |
| 2026-10-19T02:00Z | 67,051 MW |
| 2026-10-19T03:00Z | 64,069 MW |
| 2026-10-19T04:00Z | 61,712 MW |
| 2026-10-19T05:00Z | 60,176 MW |
| 2026-10-19T06:00Z | 59,337 MW |
| 2026-10-19T07:00Z | 59,032 MW |
| 2026-10-19T08:00Z | 59,627 MW |
| 2026-10-19T09:00Z | 61,263 MW |
| 2026-10-19T10:00Z | 64,815 MW |
| 2026-10-19T11:00Z | 69,789 MW |
| 2026-10-19T12:00Z | 72,616 MW |
| 2026-10-19T13:00Z | 72,371 MW |
| 2026-10-19T14:00Z | 71,235 MW |
| 2026-10-19T15:00Z | 70,985 MW |
| 2026-10-19T16:00Z | 70,915 MW |
| 2026-10-19T17:00Z | 71,308 MW |
| 2026-10-19T18:00Z | 71,600 MW |
| 2026-10-19T19:00Z | 71,865 MW |
| 2026-10-19T20:00Z | 72,102 MW |
| 2026-10-19T21:00Z | 72,892 MW |
| 2026-10-19T22:00Z | 74,029 MW |
| 2026-10-19T23:00Z | 74,962 MW |
| 2026-10-20T00:00Z | 75,101 MW |
| 2026-10-20T01:00Z | 73,133 MW |
| 2026-10-20T02:00Z | 70,279 MW |
| 2026-10-20T03:00Z | 67,147 MW |
| 2026-10-20T04:00Z | 64,148 MW |
| 2026-10-20T05:00Z | 62,069 MW |
| 2026-10-20T06:00Z | 60,884 MW |
| 2026-10-20T07:00Z | 60,172 MW |
| 2026-10-20T08:00Z | 60,346 MW |
| 2026-10-20T09:00Z | 61,710 MW |
| 2026-10-20T10:00Z | 64,882 MW |
| 2026-10-20T11:00Z | 69,696 MW |
| 2026-10-20T12:00Z | 71,985 MW |
| 2026-10-20T13:00Z | 71,809 MW |
| 2026-10-20T14:00Z | 70,756 MW |
| 2026-10-20T15:00Z | 70,524 MW |
| 2026-10-20T16:00Z | 70,983 MW |
| 2026-10-20T17:00Z | 71,407 MW |
| 2026-10-20T18:00Z | 71,951 MW |
| 2026-10-20T19:00Z | 72,377 MW |
| 2026-10-20T20:00Z | 72,989 MW |
| 2026-10-20T21:00Z | 74,066 MW |
| 2026-10-20T22:00Z | 75,175 MW |
| 2026-10-20T23:00Z | 75,953 MW |
| 2026-10-21T00:00Z | 75,660 MW |
| 2026-10-21T01:00Z | 73,368 MW |
| 2026-10-21T02:00Z | 70,411 MW |
| 2026-10-21T03:00Z | 66,800 MW |
| 2026-10-21T04:00Z | 63,689 MW |
| 2026-10-21T05:00Z | 61,833 MW |
| 2026-10-21T06:00Z | 60,605 MW |
| 2026-10-21T07:00Z | 59,766 MW |
| 2026-10-21T08:00Z | 60,033 MW |
| 2026-10-21T09:00Z | 61,221 MW |
| 2026-10-21T10:00Z | 64,390 MW |
| 2026-10-21T11:00Z | 69,179 MW |
| 2026-10-21T12:00Z | 71,706 MW |
| 2026-10-21T13:00Z | 71,143 MW |
| 2026-10-21T14:00Z | 70,490 MW |
| 2026-10-21T15:00Z | 70,465 MW |
| 2026-10-21T16:00Z | 70,934 MW |
| 2026-10-21T17:00Z | 71,841 MW |
| 2026-10-21T18:00Z | 72,954 MW |
| 2026-10-21T19:00Z | 73,743 MW |
| 2026-10-21T20:00Z | 74,577 MW |
| 2026-10-21T21:00Z | 75,657 MW |
| 2026-10-21T22:00Z | 76,421 MW |
| 2026-10-21T23:00Z | 76,710 MW |
| 2026-10-22T00:00Z | 75,971 MW |
| 2026-10-22T01:00Z | 73,896 MW |
| 2026-10-22T02:00Z | 70,652 MW |
| 2026-10-22T03:00Z | 67,262 MW |
| 2026-10-22T04:00Z | 64,140 MW |
| 2026-10-22T05:00Z | 62,081 MW |
| 2026-10-22T06:00Z | 60,806 MW |
| 2026-10-22T07:00Z | 60,083 MW |
| 2026-10-22T08:00Z | 60,218 MW |
| 2026-10-22T09:00Z | 61,592 MW |
| 2026-10-22T10:00Z | 64,846 MW |
| 2026-10-22T11:00Z | 69,288 MW |
| 2026-10-22T12:00Z | 71,678 MW |
| 2026-10-22T13:00Z | 71,705 MW |
| 2026-10-22T14:00Z | 71,351 MW |
| 2026-10-22T15:00Z | 71,655 MW |
| 2026-10-22T16:00Z | 72,485 MW |
| 2026-10-22T17:00Z | 73,308 MW |
| 2026-10-22T18:00Z | 74,124 MW |
| 2026-10-22T19:00Z | 74,904 MW |
| 2026-10-22T20:00Z | 75,954 MW |
| 2026-10-22T21:00Z | 76,935 MW |
| 2026-10-22T22:00Z | 77,245 MW |
| 2026-10-22T23:00Z | 77,486 MW |
| 2026-10-23T00:00Z | 76,913 MW |
| 2026-10-23T01:00Z | 74,724 MW |
| 2026-10-23T02:00Z | 71,571 MW |
| 2026-10-23T03:00Z | 67,897 MW |
| 2026-10-23T04:00Z | 64,985 MW |
| 2026-10-23T05:00Z | 62,572 MW |
| 2026-10-23T06:00Z | 61,173 MW |
| 2026-10-23T07:00Z | 60,225 MW |
| 2026-10-23T08:00Z | 60,165 MW |
| 2026-10-23T09:00Z | 61,228 MW |
| 2026-10-23T10:00Z | 64,176 MW |
| 2026-10-23T11:00Z | 68,658 MW |
| 2026-10-23T12:00Z | 71,103 MW |
| 2026-10-23T13:00Z | 71,550 MW |
| 2026-10-23T14:00Z | 71,300 MW |
| 2026-10-23T15:00Z | 71,395 MW |
| 2026-10-23T16:00Z | 72,117 MW |
| 2026-10-23T17:00Z | 72,869 MW |
| 2026-10-23T18:00Z | 73,542 MW |
| 2026-10-23T19:00Z | 74,530 MW |
| 2026-10-23T20:00Z | 75,428 MW |
| 2026-10-23T21:00Z | 76,138 MW |
| 2026-10-23T22:00Z | 76,016 MW |
| 2026-10-23T23:00Z | 75,718 MW |
| 2026-10-24T00:00Z | 74,256 MW |
| 2026-10-24T01:00Z | 71,916 MW |
| 2026-10-24T02:00Z | 69,319 MW |
| 2026-10-24T03:00Z | 66,570 MW |
| 2026-10-24T04:00Z | 63,556 MW |
| 2026-10-24T05:00Z | 61,262 MW |
| 2026-10-24T06:00Z | 59,638 MW |
| 2026-10-24T07:00Z | 58,584 MW |
| 2026-10-24T08:00Z | 58,232 MW |
| 2026-10-24T09:00Z | 58,345 MW |
| 2026-10-24T10:00Z | 59,830 MW |
| 2026-10-24T11:00Z | 61,706 MW |
| 2026-10-24T12:00Z | 63,396 MW |
| 2026-10-24T13:00Z | 64,871 MW |
| 2026-10-24T14:00Z | 65,411 MW |
| 2026-10-24T15:00Z | 65,781 MW |
| 2026-10-24T16:00Z | 66,490 MW |
| 2026-10-24T17:00Z | 67,198 MW |
| 2026-10-24T18:00Z | 68,191 MW |
| 2026-10-24T19:00Z | 69,203 MW |
| 2026-10-24T20:00Z | 70,576 MW |
| 2026-10-24T21:00Z | 71,409 MW |
| 2026-10-24T22:00Z | 72,001 MW |
| 2026-10-24T23:00Z | 72,058 MW |
| 2026-10-25T00:00Z | 70,813 MW |
| 2026-10-25T01:00Z | 68,793 MW |
| 2026-10-25T02:00Z | 66,798 MW |
| 2026-10-25T03:00Z | 64,381 MW |
| 2026-10-25T04:00Z | 61,694 MW |
| 2026-10-25T05:00Z | 59,617 MW |
| 2026-10-25T06:00Z | 58,128 MW |
| 2026-10-25T07:00Z | 57,381 MW |
| 2026-10-25T08:00Z | 57,045 MW |
| 2026-10-25T09:00Z | 57,183 MW |
| 2026-10-25T10:00Z | 58,004 MW |
| 2026-10-25T11:00Z | 59,567 MW |
| 2026-10-25T12:00Z | 61,392 MW |
| 2026-10-25T13:00Z | 62,643 MW |
| 2026-10-25T14:00Z | 63,095 MW |
| 2026-10-25T15:00Z | 64,091 MW |
| 2026-10-25T16:00Z | 64,890 MW |
| 2026-10-25T17:00Z | 66,037 MW |
| 2026-10-25T18:00Z | 67,277 MW |
| 2026-10-25T19:00Z | 68,334 MW |
| 2026-10-25T20:00Z | 69,913 MW |
| 2026-10-25T21:00Z | 70,993 MW |
| 2026-10-25T22:00Z | 72,151 MW |
| 2026-10-25T23:00Z | 73,161 MW |
| 2026-10-26T00:00Z | 72,670 MW |
| 2026-10-26T01:00Z | 70,716 MW |
| 2026-10-26T02:00Z | 67,971 MW |
| 2026-10-26T03:00Z | 64,528 MW |
| 2026-10-26T04:00Z | 61,915 MW |
| 2026-10-26T05:00Z | 60,295 MW |
| 2026-10-26T06:00Z | 59,105 MW |
| 2026-10-26T07:00Z | 58,466 MW |
| 2026-10-26T08:00Z | 58,619 MW |
| 2026-10-26T09:00Z | 60,053 MW |
| 2026-10-26T10:00Z | 63,570 MW |
| 2026-10-26T11:00Z | 68,528 MW |
| 2026-10-26T12:00Z | 71,457 MW |
| 2026-10-26T13:00Z | 72,140 MW |
| 2026-10-26T14:00Z | 72,374 MW |
| 2026-10-26T15:00Z | 72,897 MW |
| 2026-10-26T16:00Z | 73,330 MW |
| 2026-10-26T17:00Z | 74,096 MW |
| 2026-10-26T18:00Z | 74,950 MW |
| 2026-10-26T19:00Z | 75,322 MW |
| 2026-10-26T20:00Z | 75,474 MW |
| 2026-10-26T21:00Z | 76,379 MW |
| 2026-10-26T22:00Z | 77,140 MW |
| 2026-10-26T23:00Z | 77,725 MW |
| 2026-10-27T00:00Z | 76,856 MW |
| 2026-10-27T01:00Z | 74,680 MW |
| 2026-10-27T02:00Z | 71,764 MW |
| 2026-10-27T03:00Z | 68,102 MW |
| 2026-10-27T04:00Z | 65,251 MW |
| 2026-10-27T05:00Z | 63,062 MW |
| 2026-10-27T06:00Z | 61,690 MW |
| 2026-10-27T07:00Z | 60,806 MW |
| 2026-10-27T08:00Z | 61,071 MW |
| 2026-10-27T09:00Z | 62,115 MW |
| 2026-10-27T10:00Z | 65,465 MW |
| 2026-10-27T11:00Z | 70,040 MW |
| 2026-10-27T12:00Z | 72,452 MW |
| 2026-10-27T13:00Z | 72,951 MW |
| 2026-10-27T14:00Z | 73,002 MW |
| 2026-10-27T15:00Z | 73,483 MW |
| 2026-10-27T16:00Z | 74,127 MW |
| 2026-10-27T17:00Z | 74,668 MW |
| 2026-10-27T18:00Z | 75,400 MW |
| 2026-10-27T19:00Z | 75,513 MW |
| 2026-10-27T20:00Z | 75,636 MW |
| 2026-10-27T21:00Z | 76,016 MW |
| 2026-10-27T22:00Z | 76,216 MW |
| 2026-10-27T23:00Z | 77,042 MW |
| 2026-10-28T00:00Z | 76,603 MW |
| 2026-10-28T01:00Z | 74,739 MW |
| 2026-10-28T02:00Z | 71,840 MW |
| 2026-10-28T03:00Z | 68,516 MW |
| 2026-10-28T04:00Z | 65,658 MW |
| 2026-10-28T05:00Z | 63,440 MW |
| 2026-10-28T06:00Z | 61,651 MW |
| 2026-10-28T07:00Z | 60,723 MW |
| 2026-10-28T08:00Z | 60,392 MW |
| 2026-10-28T09:00Z | 61,637 MW |
| 2026-10-28T10:00Z | 65,036 MW |
| 2026-10-28T11:00Z | 69,604 MW |
| 2026-10-28T12:00Z | 72,361 MW |
| 2026-10-28T13:00Z | 72,332 MW |
| 2026-10-28T14:00Z | 71,961 MW |
| 2026-10-28T15:00Z | 72,609 MW |
| 2026-10-28T16:00Z | 73,394 MW |
| 2026-10-28T17:00Z | 74,666 MW |
| 2026-10-28T18:00Z | 75,675 MW |
| 2026-10-28T19:00Z | 76,629 MW |
| 2026-10-28T20:00Z | 77,454 MW |
| 2026-10-28T21:00Z | 78,490 MW |
| 2026-10-28T22:00Z | 78,835 MW |
| 2026-10-28T23:00Z | 79,098 MW |
| 2026-10-29T00:00Z | 77,858 MW |
| 2026-10-29T01:00Z | 75,535 MW |
| 2026-10-29T02:00Z | 72,135 MW |
| 2026-10-29T03:00Z | 68,638 MW |
| 2026-10-29T04:00Z | 65,373 MW |
| 2026-10-29T05:00Z | 63,039 MW |
| 2026-10-29T06:00Z | 61,438 MW |
| 2026-10-29T07:00Z | 60,721 MW |
| 2026-10-29T08:00Z | 60,626 MW |
| 2026-10-29T09:00Z | 61,909 MW |
| 2026-10-29T10:00Z | 64,975 MW |
| 2026-10-29T11:00Z | 69,669 MW |
| 2026-10-29T12:00Z | 72,390 MW |
| 2026-10-29T13:00Z | 72,350 MW |
| 2026-10-29T14:00Z | 71,962 MW |
| 2026-10-29T15:00Z | 72,370 MW |
| 2026-10-29T16:00Z | 73,012 MW |
| 2026-10-29T17:00Z | 74,051 MW |
| 2026-10-29T18:00Z | 75,183 MW |
| 2026-10-29T19:00Z | 75,744 MW |
| 2026-10-29T20:00Z | 76,279 MW |
| 2026-10-29T21:00Z | 77,616 MW |
| 2026-10-29T22:00Z | 78,017 MW |
| 2026-10-29T23:00Z | 78,481 MW |
| 2026-10-30T00:00Z | 77,709 MW |
| 2026-10-30T01:00Z | 75,483 MW |
| 2026-10-30T02:00Z | 72,989 MW |
| 2026-10-30T03:00Z | 69,415 MW |
| 2026-10-30T04:00Z | 65,953 MW |
| 2026-10-30T05:00Z | 64,085 MW |
| 2026-10-30T06:00Z | 62,833 MW |
| 2026-10-30T07:00Z | 61,823 MW |
| 2026-10-30T08:00Z | 61,630 MW |
| 2026-10-30T09:00Z | 62,714 MW |
| 2026-10-30T10:00Z | 64,789 MW |
| 2026-10-30T11:00Z | 68,757 MW |
| 2026-10-30T12:00Z | 71,435 MW |
| 2026-10-30T13:00Z | 71,922 MW |
| 2026-10-30T14:00Z | 72,154 MW |
| 2026-10-30T15:00Z | 72,150 MW |
| 2026-10-30T16:00Z | 72,731 MW |
| 2026-10-30T17:00Z | 73,484 MW |
| 2026-10-30T18:00Z | 73,916 MW |
| 2026-10-30T19:00Z | 73,943 MW |
| 2026-10-30T20:00Z | 73,868 MW |
| 2026-10-30T21:00Z | 74,178 MW |
| 2026-10-30T22:00Z | 74,494 MW |
| 2026-10-30T23:00Z | 74,894 MW |
| 2026-10-31T00:00Z | 73,827 MW |
| 2026-10-31T01:00Z | 72,137 MW |
| 2026-10-31T02:00Z | 69,833 MW |
| 2026-10-31T03:00Z | 67,327 MW |
| 2026-10-31T04:00Z | 64,980 MW |
| 2026-10-31T05:00Z | 62,769 MW |
| 2026-10-31T06:00Z | 61,231 MW |
| 2026-10-31T07:00Z | 59,934 MW |
| 2026-10-31T08:00Z | 59,212 MW |
| 2026-10-31T09:00Z | 59,391 MW |
| 2026-10-31T10:00Z | 60,542 MW |
| 2026-10-31T11:00Z | 61,999 MW |
| 2026-10-31T12:00Z | 64,025 MW |
| 2026-10-31T13:00Z | 66,114 MW |
| 2026-10-31T14:00Z | 68,144 MW |
| 2026-10-31T15:00Z | 69,377 MW |
| 2026-10-31T16:00Z | 70,020 MW |
| 2026-10-31T17:00Z | 70,497 MW |
| 2026-10-31T18:00Z | 70,904 MW |
| 2026-10-31T19:00Z | 71,322 MW |
| 2026-10-31T20:00Z | 71,322 MW |
| 2026-10-31T21:00Z | 70,415 MW |
| 2026-10-31T22:00Z | 70,046 MW |
| 2026-10-31T23:00Z | 69,926 MW |
| 2026-11-01T00:00Z | 69,143 MW |
| 2026-11-01T01:00Z | 68,105 MW |
| 2026-11-01T02:00Z | 66,741 MW |
| 2026-11-01T03:00Z | 65,068 MW |
| 2026-11-01T04:00Z | 63,147 MW |
| 2026-11-01T05:00Z | 61,488 MW |
| 2026-11-01T06:00Z | 60,080 MW |
| 2026-11-01T07:00Z | 59,201 MW |
| 2026-11-01T08:00Z | 58,690 MW |
| 2026-11-01T09:00Z | 58,677 MW |
| 2026-11-01T10:00Z | 58,906 MW |
| 2026-11-01T11:00Z | 59,636 MW |
| 2026-11-01T12:00Z | 61,230 MW |
| 2026-11-01T13:00Z | 63,714 MW |
| 2026-11-01T14:00Z | 65,874 MW |
| 2026-11-01T15:00Z | 67,112 MW |
| 2026-11-01T16:00Z | 67,845 MW |
| 2026-11-01T17:00Z | 68,863 MW |
| 2026-11-01T18:00Z | 69,910 MW |
| 2026-11-01T19:00Z | 70,439 MW |
| 2026-11-01T20:00Z | 70,403 MW |
| 2026-11-01T21:00Z | 71,246 MW |
| 2026-11-01T22:00Z | 72,675 MW |
| 2026-11-01T23:00Z | 74,472 MW |
| 2026-11-02T00:00Z | 74,102 MW |
| 2026-11-02T01:00Z | 72,365 MW |
| 2026-11-02T02:00Z | 70,083 MW |
| 2026-11-02T03:00Z | 67,932 MW |
| 2026-11-02T04:00Z | 65,616 MW |
| 2026-11-02T05:00Z | 63,731 MW |
| 2026-11-02T06:00Z | 61,895 MW |
| 2026-11-02T07:00Z | 60,889 MW |
| 2026-11-02T08:00Z | 60,155 MW |
| 2026-11-02T09:00Z | 60,334 MW |
| 2026-11-02T10:00Z | 61,686 MW |
| 2026-11-02T11:00Z | 65,120 MW |
| 2026-11-02T12:00Z | 69,789 MW |
| 2026-11-02T13:00Z | 72,392 MW |
| 2026-11-02T14:00Z | 73,906 MW |
| 2026-11-02T15:00Z | 75,260 MW |
| 2026-11-02T16:00Z | 76,046 MW |
| 2026-11-02T17:00Z | 76,679 MW |
| 2026-11-02T18:00Z | 77,295 MW |
| 2026-11-02T19:00Z | 77,330 MW |
| 2026-11-02T20:00Z | 77,215 MW |
| 2026-11-02T21:00Z | 77,104 MW |
| 2026-11-02T22:00Z | 77,435 MW |
| 2026-11-02T23:00Z | 78,624 MW |
| 2026-11-03T00:00Z | 78,077 MW |
| 2026-11-03T01:00Z | 76,372 MW |
| 2026-11-03T02:00Z | 74,578 MW |
| 2026-11-03T03:00Z | 72,657 MW |
| 2026-11-03T04:00Z | 70,157 MW |
| 2026-11-03T05:00Z | 67,496 MW |
| 2026-11-03T06:00Z | 65,612 MW |
| 2026-11-03T07:00Z | 63,814 MW |
| 2026-11-03T08:00Z | 62,575 MW |
| 2026-11-03T09:00Z | 62,345 MW |
| 2026-11-03T10:00Z | 62,980 MW |
| 2026-11-03T11:00Z | 66,139 MW |
| 2026-11-03T12:00Z | 70,485 MW |
| 2026-11-03T13:00Z | 72,976 MW |
| 2026-11-03T14:00Z | 74,050 MW |
| 2026-11-03T15:00Z | 75,018 MW |
| 2026-11-03T16:00Z | 75,795 MW |
| 2026-11-03T17:00Z | 76,658 MW |
| 2026-11-03T18:00Z | 77,300 MW |
| 2026-11-03T19:00Z | 77,806 MW |
| 2026-11-03T20:00Z | 77,876 MW |
| 2026-11-03T21:00Z | 77,498 MW |
| 2026-11-03T22:00Z | 78,093 MW |
| 2026-11-03T23:00Z | 79,412 MW |
| 2026-11-04T00:00Z | 78,919 MW |
| 2026-11-04T01:00Z | 77,652 MW |
| 2026-11-04T02:00Z | 75,514 MW |
| 2026-11-04T03:00Z | 73,034 MW |
| 2026-11-04T04:00Z | 70,417 MW |
| 2026-11-04T05:00Z | 67,494 MW |
| 2026-11-04T06:00Z | 65,383 MW |
| 2026-11-04T07:00Z | 63,382 MW |
| 2026-11-04T08:00Z | 62,347 MW |
| 2026-11-04T09:00Z | 62,092 MW |
| 2026-11-04T10:00Z | 62,490 MW |
| 2026-11-04T11:00Z | 65,456 MW |
| 2026-11-04T12:00Z | 69,528 MW |
| 2026-11-04T13:00Z | 71,620 MW |
| 2026-11-04T14:00Z | 72,551 MW |
| 2026-11-04T15:00Z | 73,433 MW |
| 2026-11-04T16:00Z | 74,146 MW |
| 2026-11-04T17:00Z | 74,856 MW |
| 2026-11-04T18:00Z | 75,112 MW |
| 2026-11-04T19:00Z | 75,551 MW |
| 2026-11-04T20:00Z | 75,450 MW |
| 2026-11-04T21:00Z | 75,769 MW |
| 2026-11-04T22:00Z | 76,149 MW |
| 2026-11-04T23:00Z | 77,180 MW |
| 2026-11-05T00:00Z | 76,771 MW |
| 2026-11-05T01:00Z | 74,947 MW |
| 2026-11-05T02:00Z | 72,866 MW |
| 2026-11-05T03:00Z | 70,325 MW |
| 2026-11-05T04:00Z | 67,699 MW |
| 2026-11-05T05:00Z | 68,181 MW |
| 2026-11-05T06:00Z | 66,205 MW |
| 2026-11-05T07:00Z | 65,148 MW |
| 2026-11-05T08:00Z | 64,650 MW |
| 2026-11-05T09:00Z | 65,062 MW |
| 2026-11-05T10:00Z | 66,464 MW |
| 2026-11-05T11:00Z | 70,049 MW |
| 2026-11-05T12:00Z | 74,133 MW |
| 2026-11-05T13:00Z | 75,132 MW |
| 2026-11-05T14:00Z | n/a |
Show the data table (720 rows)
| Hour starting (UTC) | Gas | Coal | Wind | Nuclear | Solar |
|---|---|---|---|---|---|
| 2026-10-06T15:00Z | 19,375 MW | 13,466 MW | 12,404 MW | 9,988 MW | 18,515 MW |
| 2026-10-06T16:00Z | 20,580 MW | 14,051 MW | 11,887 MW | 9,979 MW | 18,523 MW |
| 2026-10-06T17:00Z | 22,222 MW | 14,998 MW | 10,987 MW | 9,981 MW | 18,380 MW |
| 2026-10-06T18:00Z | 23,249 MW | 15,606 MW | 10,831 MW | 9,977 MW | 18,588 MW |
| 2026-10-06T19:00Z | 24,163 MW | 15,455 MW | 10,779 MW | 9,974 MW | 18,838 MW |
| 2026-10-06T20:00Z | 25,494 MW | 15,689 MW | 10,877 MW | 9,975 MW | 18,894 MW |
| 2026-10-06T21:00Z | 28,267 MW | 15,843 MW | 10,979 MW | 9,964 MW | 16,771 MW |
| 2026-10-06T22:00Z | 33,861 MW | 18,004 MW | 9,772 MW | 9,966 MW | 8,229 MW |
| 2026-10-06T23:00Z | 35,421 MW | 22,008 MW | 8,795 MW | 9,970 MW | 687 MW |
| 2026-10-07T00:00Z | 34,601 MW | 22,457 MW | 10,653 MW | 9,968 MW | 1 MW |
| 2026-10-07T01:00Z | 32,128 MW | 21,593 MW | 13,070 MW | 9,970 MW | 3 MW |
| 2026-10-07T02:00Z | 28,950 MW | 20,366 MW | 14,797 MW | 9,973 MW | 6 MW |
| 2026-10-07T03:00Z | 26,298 MW | 18,681 MW | 15,814 MW | 9,973 MW | 7 MW |
| 2026-10-07T04:00Z | 24,985 MW | 16,881 MW | 15,879 MW | 9,968 MW | 7 MW |
| 2026-10-07T05:00Z | 22,868 MW | 16,137 MW | 15,624 MW | 9,967 MW | 8 MW |
| 2026-10-07T06:00Z | 21,847 MW | 15,778 MW | 15,028 MW | 9,968 MW | 6 MW |
| 2026-10-07T07:00Z | 21,239 MW | 15,257 MW | 14,620 MW | 9,958 MW | 9 MW |
| 2026-10-07T08:00Z | 21,162 MW | 15,075 MW | 14,120 MW | 9,963 MW | 5 MW |
| 2026-10-07T09:00Z | 21,905 MW | 15,106 MW | 13,250 MW | 9,938 MW | 6 MW |
| 2026-10-07T10:00Z | 23,682 MW | 16,590 MW | 12,988 MW | 9,948 MW | 4 MW |
| 2026-10-07T11:00Z | 25,461 MW | 17,833 MW | 12,812 MW | 9,986 MW | 4 MW |
| 2026-10-07T12:00Z | 25,690 MW | 18,273 MW | 12,933 MW | 9,990 MW | 1,665 MW |
| 2026-10-07T13:00Z | 22,695 MW | 15,294 MW | 10,721 MW | 9,990 MW | 11,383 MW |
| 2026-10-07T14:00Z | 22,342 MW | 14,414 MW | 6,317 MW | 9,982 MW | 18,363 MW |
| 2026-10-07T15:00Z | 24,010 MW | 15,341 MW | 4,636 MW | 9,972 MW | 19,051 MW |
| 2026-10-07T16:00Z | 25,498 MW | 16,867 MW | 5,077 MW | 9,965 MW | 18,849 MW |
| 2026-10-07T17:00Z | 25,833 MW | 17,614 MW | 6,550 MW | 9,958 MW | 18,533 MW |
| 2026-10-07T18:00Z | 26,411 MW | 18,294 MW | 8,241 MW | 9,955 MW | 18,332 MW |
| 2026-10-07T19:00Z | 26,773 MW | 17,357 MW | 10,356 MW | 9,953 MW | 18,494 MW |
| 2026-10-07T20:00Z | 27,784 MW | 16,935 MW | 11,522 MW | 9,949 MW | 18,360 MW |
| 2026-10-07T21:00Z | 30,690 MW | 17,249 MW | 11,427 MW | 9,954 MW | 16,189 MW |
| 2026-10-07T22:00Z | 35,388 MW | 19,320 MW | 9,861 MW | 9,953 MW | 7,802 MW |
| 2026-10-07T23:00Z | 38,412 MW | 22,428 MW | 7,263 MW | 9,958 MW | 593 MW |
| 2026-10-08T00:00Z | 38,132 MW | 23,995 MW | 7,067 MW | 9,963 MW | 3 MW |
| 2026-10-08T01:00Z | 35,642 MW | 24,008 MW | 7,833 MW | 9,968 MW | 0 MW |
| 2026-10-08T02:00Z | 33,045 MW | 23,478 MW | 7,727 MW | 9,972 MW | 2 MW |
| 2026-10-08T03:00Z | 30,678 MW | 23,363 MW | 6,595 MW | 9,979 MW | 3 MW |
| 2026-10-08T04:00Z | 28,075 MW | 23,220 MW | 5,886 MW | 9,983 MW | 3 MW |
| 2026-10-08T05:00Z | 26,485 MW | 22,207 MW | 5,309 MW | 9,985 MW | 0 MW |
| 2026-10-08T06:00Z | 25,833 MW | 21,850 MW | 5,015 MW | 9,973 MW | 0 MW |
| 2026-10-08T07:00Z | 25,038 MW | 21,251 MW | 4,611 MW | 9,968 MW | 0 MW |
| 2026-10-08T08:00Z | 25,121 MW | 21,183 MW | 4,455 MW | 9,983 MW | 0 MW |
| 2026-10-08T09:00Z | 25,632 MW | 21,217 MW | 4,525 MW | 9,992 MW | 0 MW |
| 2026-10-08T10:00Z | 27,729 MW | 21,647 MW | 4,180 MW | 9,999 MW | 0 MW |
| 2026-10-08T11:00Z | 30,433 MW | 22,438 MW | 3,633 MW | 10,008 MW | 1 MW |
| 2026-10-08T12:00Z | 30,788 MW | 22,760 MW | 3,603 MW | 10,009 MW | 1,660 MW |
| 2026-10-08T13:00Z | 26,936 MW | 20,160 MW | 3,160 MW | 10,011 MW | 11,238 MW |
| 2026-10-08T14:00Z | 25,355 MW | 17,276 MW | 2,638 MW | 10,003 MW | 17,715 MW |
| 2026-10-08T15:00Z | 26,579 MW | 17,244 MW | 2,415 MW | 9,994 MW | 18,484 MW |
| 2026-10-08T16:00Z | 27,126 MW | 18,935 MW | 2,775 MW | 9,982 MW | 18,170 MW |
| 2026-10-08T17:00Z | 28,219 MW | 19,969 MW | 3,254 MW | 9,975 MW | 17,697 MW |
| 2026-10-08T18:00Z | 28,834 MW | 21,208 MW | 3,547 MW | 9,965 MW | 17,819 MW |
| 2026-10-08T19:00Z | 29,577 MW | 21,756 MW | 3,708 MW | 9,968 MW | 17,969 MW |
| 2026-10-08T20:00Z | 30,513 MW | 21,979 MW | 3,541 MW | 9,965 MW | 17,668 MW |
| 2026-10-08T21:00Z | 33,759 MW | 22,823 MW | 3,246 MW | 9,966 MW | 15,099 MW |
| 2026-10-08T22:00Z | 37,552 MW | 24,015 MW | 2,753 MW | 9,968 MW | 7,041 MW |
| 2026-10-08T23:00Z | 38,889 MW | 24,956 MW | 2,973 MW | 9,977 MW | 510 MW |
| 2026-10-09T00:00Z | 37,294 MW | 24,761 MW | 5,193 MW | 9,983 MW | 2 MW |
| 2026-10-09T01:00Z | 35,569 MW | 24,157 MW | 7,047 MW | 9,987 MW | 2 MW |
| 2026-10-09T02:00Z | 32,304 MW | 23,607 MW | 8,647 MW | 9,988 MW | 1 MW |
| 2026-10-09T03:00Z | 29,186 MW | 22,292 MW | 9,914 MW | 9,993 MW | 2 MW |
| 2026-10-09T04:00Z | 27,222 MW | 19,605 MW | 10,575 MW | 9,995 MW | 3 MW |
| 2026-10-09T05:00Z | 25,648 MW | 17,308 MW | 12,047 MW | 9,996 MW | 2 MW |
| 2026-10-09T06:00Z | 24,478 MW | 16,846 MW | 13,136 MW | 9,999 MW | 5 MW |
| 2026-10-09T07:00Z | 24,931 MW | 16,632 MW | 12,898 MW | 10,000 MW | 3 MW |
| 2026-10-09T08:00Z | 24,384 MW | 16,651 MW | 12,962 MW | 10,005 MW | 2 MW |
| 2026-10-09T09:00Z | 24,024 MW | 16,824 MW | 13,263 MW | 10,007 MW | 2 MW |
| 2026-10-09T10:00Z | 24,666 MW | 17,027 MW | 14,153 MW | 10,005 MW | 4 MW |
| 2026-10-09T11:00Z | 25,693 MW | 17,608 MW | 15,152 MW | 10,007 MW | 4 MW |
| 2026-10-09T12:00Z | 26,407 MW | 18,838 MW | 15,064 MW | 10,010 MW | 1,218 MW |
| 2026-10-09T13:00Z | 24,326 MW | 17,108 MW | 13,492 MW | 10,008 MW | 8,408 MW |
| 2026-10-09T14:00Z | 23,939 MW | 15,539 MW | 10,568 MW | 9,998 MW | 14,174 MW |
| 2026-10-09T15:00Z | 24,634 MW | 15,872 MW | 9,872 MW | 9,988 MW | 15,429 MW |
| 2026-10-09T16:00Z | 25,058 MW | 16,794 MW | 10,136 MW | 9,979 MW | 15,833 MW |
| 2026-10-09T17:00Z | 25,500 MW | 17,082 MW | 10,826 MW | 9,970 MW | 15,784 MW |
| 2026-10-09T18:00Z | 26,061 MW | 18,063 MW | 11,554 MW | 9,965 MW | 16,140 MW |
| 2026-10-09T19:00Z | 26,657 MW | 18,100 MW | 11,714 MW | 9,966 MW | 16,840 MW |
| 2026-10-09T20:00Z | 28,468 MW | 18,250 MW | 11,502 MW | 9,963 MW | 16,383 MW |
| 2026-10-09T21:00Z | 29,798 MW | 18,686 MW | 11,496 MW | 9,965 MW | 14,101 MW |
| 2026-10-09T22:00Z | 32,774 MW | 19,538 MW | 10,824 MW | 9,961 MW | 6,466 MW |
| 2026-10-09T23:00Z | 34,868 MW | 21,061 MW | 10,902 MW | 9,965 MW | 464 MW |
| 2026-10-10T00:00Z | 31,824 MW | 19,904 MW | 16,082 MW | 9,967 MW | 3 MW |
| 2026-10-10T01:00Z | 28,996 MW | 18,467 MW | 19,652 MW | 9,970 MW | 5 MW |
| 2026-10-10T02:00Z | 26,260 MW | 17,924 MW | 20,927 MW | 9,869 MW | 5 MW |
| 2026-10-10T03:00Z | 24,219 MW | 16,945 MW | 21,262 MW | 9,687 MW | 6 MW |
| 2026-10-10T04:00Z | 22,074 MW | 15,492 MW | 21,157 MW | 9,514 MW | 6 MW |
| 2026-10-10T05:00Z | 20,134 MW | 15,120 MW | 21,485 MW | 9,453 MW | 6 MW |
| 2026-10-10T06:00Z | 19,345 MW | 14,890 MW | 21,119 MW | 9,418 MW | 6 MW |
| 2026-10-10T07:00Z | 19,028 MW | 14,265 MW | 20,703 MW | 9,331 MW | 6 MW |
| 2026-10-10T08:00Z | 18,715 MW | 13,546 MW | 20,493 MW | 9,322 MW | 6 MW |
| 2026-10-10T09:00Z | 18,862 MW | 13,484 MW | 19,940 MW | 9,319 MW | 7 MW |
| 2026-10-10T10:00Z | 19,368 MW | 14,065 MW | 19,716 MW | 9,318 MW | 7 MW |
| 2026-10-10T11:00Z | 19,498 MW | 15,346 MW | 19,780 MW | 9,317 MW | 7 MW |
| 2026-10-10T12:00Z | 19,446 MW | 15,702 MW | 20,005 MW | 9,315 MW | 554 MW |
| 2026-10-10T13:00Z | 18,454 MW | 14,322 MW | 19,388 MW | 9,318 MW | 5,238 MW |
| 2026-10-10T14:00Z | 17,738 MW | 13,495 MW | 17,382 MW | 9,317 MW | 10,403 MW |
| 2026-10-10T15:00Z | 18,471 MW | 14,003 MW | 16,079 MW | 9,315 MW | 12,086 MW |
| 2026-10-10T16:00Z | 19,262 MW | 14,008 MW | 16,606 MW | 9,317 MW | 12,704 MW |
| 2026-10-10T17:00Z | 19,927 MW | 14,335 MW | 17,254 MW | 9,320 MW | 13,049 MW |
| 2026-10-10T18:00Z | 20,492 MW | 14,500 MW | 18,105 MW | 9,314 MW | 12,896 MW |
| 2026-10-10T19:00Z | 21,575 MW | 14,793 MW | 18,913 MW | 9,315 MW | 11,695 MW |
| 2026-10-10T20:00Z | 23,072 MW | 16,287 MW | 18,992 MW | 9,314 MW | 10,498 MW |
| 2026-10-10T21:00Z | 24,482 MW | 16,099 MW | 19,216 MW | 9,315 MW | 8,584 MW |
| 2026-10-10T22:00Z | 25,485 MW | 17,981 MW | 19,230 MW | 9,319 MW | 4,113 MW |
| 2026-10-10T23:00Z | 26,004 MW | 19,018 MW | 20,208 MW | 9,324 MW | 392 MW |
| 2026-10-11T00:00Z | 25,149 MW | 18,285 MW | 21,151 MW | 9,328 MW | 3 MW |
| 2026-10-11T01:00Z | 23,803 MW | 17,336 MW | 21,802 MW | 9,334 MW | 4 MW |
| 2026-10-11T02:00Z | 22,541 MW | 16,876 MW | 21,981 MW | 9,336 MW | 4 MW |
| 2026-10-11T03:00Z | 21,147 MW | 16,648 MW | 21,286 MW | 9,348 MW | 5 MW |
| 2026-10-11T04:00Z | 19,494 MW | 16,001 MW | 20,941 MW | 9,401 MW | 4 MW |
| 2026-10-11T05:00Z | 18,633 MW | 14,773 MW | 20,398 MW | 9,439 MW | 5 MW |
| 2026-10-11T06:00Z | 18,508 MW | 13,879 MW | 19,469 MW | 9,449 MW | 5 MW |
| 2026-10-11T07:00Z | 18,391 MW | 13,208 MW | 18,737 MW | 9,443 MW | 5 MW |
| 2026-10-11T08:00Z | 18,250 MW | 13,695 MW | 17,590 MW | 9,445 MW | 4 MW |
| 2026-10-11T09:00Z | 18,211 MW | 13,973 MW | 17,303 MW | 9,444 MW | 4 MW |
| 2026-10-11T10:00Z | 18,450 MW | 13,738 MW | 16,755 MW | 9,446 MW | 14 MW |
| 2026-10-11T11:00Z | 19,262 MW | 14,447 MW | 15,776 MW | 9,447 MW | 3 MW |
| 2026-10-11T12:00Z | 19,157 MW | 14,863 MW | 15,977 MW | 9,449 MW | 826 MW |
| 2026-10-11T13:00Z | 18,262 MW | 14,277 MW | 14,712 MW | 9,443 MW | 7,749 MW |
| 2026-10-11T14:00Z | 17,537 MW | 13,079 MW | 12,566 MW | 9,435 MW | 13,920 MW |
| 2026-10-11T15:00Z | 19,227 MW | 14,086 MW | 10,581 MW | 9,428 MW | 15,605 MW |
| 2026-10-11T16:00Z | 21,176 MW | 15,494 MW | 9,479 MW | 9,422 MW | 16,093 MW |
| 2026-10-11T17:00Z | 22,373 MW | 17,394 MW | 9,805 MW | 9,411 MW | 15,999 MW |
| 2026-10-11T18:00Z | 22,886 MW | 17,608 MW | 11,606 MW | 9,412 MW | 16,370 MW |
| 2026-10-11T19:00Z | 23,610 MW | 17,421 MW | 13,215 MW | 9,420 MW | 16,797 MW |
| 2026-10-11T20:00Z | 24,952 MW | 17,492 MW | 14,197 MW | 9,417 MW | 16,833 MW |
| 2026-10-11T21:00Z | 27,187 MW | 17,675 MW | 14,509 MW | 9,414 MW | 14,714 MW |
| 2026-10-11T22:00Z | 31,211 MW | 19,534 MW | 13,584 MW | 9,416 MW | 6,352 MW |
| 2026-10-11T23:00Z | 33,017 MW | 21,780 MW | 13,271 MW | 9,422 MW | 300 MW |
| 2026-10-12T00:00Z | 32,385 MW | 22,178 MW | 14,459 MW | 9,422 MW | 3 MW |
| 2026-10-12T01:00Z | 29,523 MW | 21,706 MW | 15,843 MW | 9,423 MW | 4 MW |
| 2026-10-12T02:00Z | 26,375 MW | 20,856 MW | 16,967 MW | 9,423 MW | 6 MW |
| 2026-10-12T03:00Z | 24,121 MW | 19,700 MW | 17,298 MW | 9,414 MW | 5 MW |
| 2026-10-12T04:00Z | 22,492 MW | 18,303 MW | 17,247 MW | 9,368 MW | 7 MW |
| 2026-10-12T05:00Z | 21,670 MW | 16,706 MW | 17,232 MW | 9,343 MW | 6 MW |
| 2026-10-12T06:00Z | 20,821 MW | 15,467 MW | 17,379 MW | 9,344 MW | 8 MW |
| 2026-10-12T07:00Z | 20,289 MW | 14,714 MW | 17,015 MW | 9,350 MW | 6 MW |
| 2026-10-12T08:00Z | 20,150 MW | 14,498 MW | 16,493 MW | 9,349 MW | 5 MW |
| 2026-10-12T09:00Z | 20,502 MW | 15,058 MW | 16,443 MW | 9,355 MW | 5 MW |
| 2026-10-12T10:00Z | 21,861 MW | 16,532 MW | 16,530 MW | 9,359 MW | 5 MW |
| 2026-10-12T11:00Z | 23,488 MW | 17,517 MW | 16,126 MW | 9,370 MW | 6 MW |
| 2026-10-12T12:00Z | 24,305 MW | 19,299 MW | 16,193 MW | 9,371 MW | 971 MW |
| 2026-10-12T13:00Z | 22,784 MW | 17,669 MW | 14,568 MW | 9,371 MW | 8,176 MW |
| 2026-10-12T14:00Z | 21,954 MW | 15,836 MW | 12,425 MW | 9,363 MW | 15,145 MW |
| 2026-10-12T15:00Z | 22,555 MW | 15,304 MW | 11,972 MW | 9,353 MW | 17,615 MW |
| 2026-10-12T16:00Z | 25,731 MW | 16,306 MW | 11,625 MW | 9,345 MW | 17,506 MW |
| 2026-10-12T17:00Z | 27,827 MW | 17,880 MW | 11,426 MW | 9,339 MW | 17,297 MW |
| 2026-10-12T18:00Z | 28,790 MW | 19,222 MW | 13,047 MW | 9,345 MW | 17,045 MW |
| 2026-10-12T19:00Z | 29,416 MW | 18,736 MW | 15,584 MW | 9,337 MW | 16,974 MW |
| 2026-10-12T20:00Z | 30,010 MW | 18,153 MW | 18,146 MW | 9,329 MW | 16,094 MW |
| 2026-10-12T21:00Z | 32,322 MW | 18,125 MW | 18,966 MW | 9,327 MW | 13,534 MW |
| 2026-10-12T22:00Z | 36,170 MW | 20,969 MW | 17,954 MW | 9,326 MW | 5,440 MW |
| 2026-10-12T23:00Z | 36,911 MW | 22,627 MW | 16,882 MW | 9,329 MW | 302 MW |
| 2026-10-13T00:00Z | 35,746 MW | 22,727 MW | 17,813 MW | 9,332 MW | 5 MW |
| 2026-10-13T01:00Z | 33,379 MW | 22,109 MW | 18,659 MW | 9,329 MW | 6 MW |
| 2026-10-13T02:00Z | 30,785 MW | 21,547 MW | 18,703 MW | 9,334 MW | 7 MW |
| 2026-10-13T03:00Z | 27,773 MW | 21,448 MW | 18,300 MW | 9,340 MW | 7 MW |
| 2026-10-13T04:00Z | 25,766 MW | 20,486 MW | 17,537 MW | 9,336 MW | 8 MW |
| 2026-10-13T05:00Z | 24,588 MW | 19,936 MW | 16,264 MW | 9,335 MW | 8 MW |
| 2026-10-13T06:00Z | 24,313 MW | 19,351 MW | 14,208 MW | 9,336 MW | 8 MW |
| 2026-10-13T07:00Z | 24,235 MW | 19,195 MW | 12,657 MW | 9,336 MW | 7 MW |
| 2026-10-13T08:00Z | 24,306 MW | 19,136 MW | 11,083 MW | 9,341 MW | 7 MW |
| 2026-10-13T09:00Z | 24,949 MW | 19,828 MW | 10,136 MW | 9,343 MW | 6 MW |
| 2026-10-13T10:00Z | 26,720 MW | 21,009 MW | 9,254 MW | 9,343 MW | 5 MW |
| 2026-10-13T11:00Z | 29,444 MW | 21,718 MW | 9,174 MW | 9,346 MW | 5 MW |
| 2026-10-13T12:00Z | 30,729 MW | 22,430 MW | 8,287 MW | 9,349 MW | 948 MW |
| 2026-10-13T13:00Z | 28,578 MW | 20,627 MW | 7,304 MW | 9,351 MW | 7,823 MW |
| 2026-10-13T14:00Z | 27,811 MW | 18,470 MW | 6,681 MW | 9,342 MW | 13,106 MW |
| 2026-10-13T15:00Z | 29,048 MW | 19,769 MW | 5,788 MW | 9,324 MW | 15,233 MW |
| 2026-10-13T16:00Z | 30,439 MW | 21,424 MW | 5,376 MW | 9,314 MW | 15,811 MW |
| 2026-10-13T17:00Z | 32,924 MW | 22,922 MW | 4,716 MW | 9,307 MW | 15,592 MW |
| 2026-10-13T18:00Z | 35,324 MW | 23,640 MW | 4,620 MW | 9,307 MW | 15,107 MW |
| 2026-10-13T19:00Z | 36,211 MW | 24,069 MW | 4,977 MW | 9,304 MW | 15,503 MW |
| 2026-10-13T20:00Z | 36,801 MW | 24,005 MW | 5,520 MW | 9,306 MW | 14,975 MW |
| 2026-10-13T21:00Z | 37,905 MW | 23,963 MW | 5,777 MW | 9,301 MW | 12,014 MW |
| 2026-10-13T22:00Z | 40,829 MW | 24,476 MW | 5,512 MW | 9,301 MW | 4,507 MW |
| 2026-10-13T23:00Z | 41,803 MW | 24,901 MW | 5,316 MW | 9,310 MW | 179 MW |
| 2026-10-14T00:00Z | 40,545 MW | 24,735 MW | 6,600 MW | 9,315 MW | 4 MW |
| 2026-10-14T01:00Z | 39,016 MW | 24,569 MW | 6,933 MW | 9,323 MW | 3 MW |
| 2026-10-14T02:00Z | 36,450 MW | 23,908 MW | 8,157 MW | 9,331 MW | 5 MW |
| 2026-10-14T03:00Z | 33,855 MW | 23,180 MW | 9,054 MW | 9,334 MW | 6 MW |
| 2026-10-14T04:00Z | 31,259 MW | 22,386 MW | 9,668 MW | 9,340 MW | 6 MW |
| 2026-10-14T05:00Z | 29,975 MW | 21,898 MW | 9,732 MW | 9,342 MW | 6 MW |
| 2026-10-14T06:00Z | 29,666 MW | 22,023 MW | 7,883 MW | 9,339 MW | 5 MW |
| 2026-10-14T07:00Z | 28,597 MW | 21,341 MW | 7,436 MW | 9,343 MW | 3 MW |
| 2026-10-14T08:00Z | 28,516 MW | 20,853 MW | 7,703 MW | 9,345 MW | 5 MW |
| 2026-10-14T09:00Z | 29,161 MW | 21,628 MW | 6,824 MW | 9,349 MW | 6 MW |
| 2026-10-14T10:00Z | 29,784 MW | 22,176 MW | 6,045 MW | 9,347 MW | 4 MW |
| 2026-10-14T11:00Z | 33,625 MW | 23,344 MW | 5,357 MW | 9,354 MW | 5 MW |
| 2026-10-14T12:00Z | 34,200 MW | 23,760 MW | 5,396 MW | 9,358 MW | 323 MW |
| 2026-10-14T13:00Z | 33,955 MW | 23,468 MW | 5,264 MW | 9,361 MW | 2,284 MW |
| 2026-10-14T14:00Z | 34,033 MW | 23,491 MW | 4,443 MW | 9,351 MW | 4,190 MW |
| 2026-10-14T15:00Z | 34,258 MW | 23,642 MW | 4,131 MW | 9,344 MW | 6,041 MW |
| 2026-10-14T16:00Z | 35,183 MW | 23,823 MW | 3,376 MW | 9,346 MW | 6,985 MW |
| 2026-10-14T17:00Z | 35,835 MW | 23,595 MW | 2,869 MW | 9,351 MW | 8,447 MW |
| 2026-10-14T18:00Z | 38,032 MW | 23,337 MW | 2,508 MW | 9,354 MW | 8,537 MW |
| 2026-10-14T19:00Z | 38,795 MW | 23,498 MW | 1,843 MW | 9,353 MW | 8,253 MW |
| 2026-10-14T20:00Z | 40,265 MW | 23,585 MW | 2,157 MW | 9,347 MW | 6,691 MW |
| 2026-10-14T21:00Z | 39,358 MW | 23,762 MW | 2,475 MW | 9,345 MW | 5,641 MW |
| 2026-10-14T22:00Z | 38,365 MW | 23,906 MW | 2,879 MW | 9,349 MW | 2,395 MW |
| 2026-10-14T23:00Z | 39,183 MW | 23,850 MW | 2,881 MW | 9,352 MW | 154 MW |
| 2026-10-15T00:00Z | 37,922 MW | 24,056 MW | 3,595 MW | 9,355 MW | 3 MW |
| 2026-10-15T01:00Z | 36,376 MW | 23,758 MW | 4,850 MW | 9,358 MW | 4 MW |
| 2026-10-15T02:00Z | 34,708 MW | 23,452 MW | 5,686 MW | 9,357 MW | 3 MW |
| 2026-10-15T03:00Z | 32,344 MW | 23,339 MW | 5,581 MW | 9,357 MW | 3 MW |
| 2026-10-15T04:00Z | 29,988 MW | 22,680 MW | 4,799 MW | 9,355 MW | 3 MW |
| 2026-10-15T05:00Z | 28,550 MW | 22,430 MW | 4,517 MW | 9,358 MW | 3 MW |
| 2026-10-15T06:00Z | 27,933 MW | 21,487 MW | 4,025 MW | 9,360 MW | 3 MW |
| 2026-10-15T07:00Z | 27,871 MW | 21,293 MW | 3,675 MW | 9,359 MW | 3 MW |
| 2026-10-15T08:00Z | 27,327 MW | 21,014 MW | 3,487 MW | 9,361 MW | 2 MW |
| 2026-10-15T09:00Z | 27,392 MW | 21,066 MW | 4,075 MW | 9,360 MW | 5 MW |
| 2026-10-15T10:00Z | 28,551 MW | 21,532 MW | 4,524 MW | 9,365 MW | 5 MW |
| 2026-10-15T11:00Z | 30,715 MW | 22,324 MW | 4,775 MW | 9,370 MW | 2 MW |
| 2026-10-15T12:00Z | 31,728 MW | 22,619 MW | 5,180 MW | 9,377 MW | 266 MW |
| 2026-10-15T13:00Z | 30,896 MW | 22,179 MW | 5,482 MW | 9,372 MW | 2,819 MW |
| 2026-10-15T14:00Z | 30,694 MW | 21,470 MW | 5,676 MW | 9,370 MW | 5,961 MW |
| 2026-10-15T15:00Z | 30,591 MW | 21,606 MW | 6,286 MW | 9,362 MW | 7,674 MW |
| 2026-10-15T16:00Z | 30,556 MW | 21,560 MW | 7,472 MW | 9,355 MW | 8,213 MW |
| 2026-10-15T17:00Z | 30,770 MW | 21,856 MW | 9,341 MW | 9,352 MW | 8,186 MW |
| 2026-10-15T18:00Z | 32,302 MW | 21,477 MW | 11,395 MW | 9,350 MW | 7,984 MW |
| 2026-10-15T19:00Z | 33,190 MW | 20,670 MW | 12,920 MW | 9,349 MW | 7,833 MW |
| 2026-10-15T20:00Z | 33,004 MW | 19,835 MW | 15,301 MW | 9,354 MW | 7,351 MW |
| 2026-10-15T21:00Z | 32,781 MW | 18,938 MW | 17,638 MW | 9,349 MW | 6,253 MW |
| 2026-10-15T22:00Z | 32,957 MW | 18,311 MW | 18,315 MW | 9,351 MW | 2,994 MW |
| 2026-10-15T23:00Z | 34,201 MW | 18,162 MW | 19,332 MW | 9,354 MW | 142 MW |
| 2026-10-16T00:00Z | 31,553 MW | 17,783 MW | 21,276 MW | 9,351 MW | 5 MW |
| 2026-10-16T01:00Z | 29,938 MW | 17,963 MW | 21,684 MW | 9,352 MW | 6 MW |
| 2026-10-16T02:00Z | 27,932 MW | 17,945 MW | 22,035 MW | 9,352 MW | 6 MW |
| 2026-10-16T03:00Z | 25,980 MW | 17,027 MW | 22,457 MW | 9,351 MW | 9 MW |
| 2026-10-16T04:00Z | 24,316 MW | 16,084 MW | 21,899 MW | 9,353 MW | 8 MW |
| 2026-10-16T05:00Z | 21,840 MW | 14,764 MW | 21,480 MW | 9,350 MW | 9 MW |
| 2026-10-16T06:00Z | 20,103 MW | 13,329 MW | 21,936 MW | 9,350 MW | 8 MW |
| 2026-10-16T07:00Z | 19,826 MW | 12,860 MW | 22,134 MW | 9,352 MW | 10 MW |
| 2026-10-16T08:00Z | 19,346 MW | 12,510 MW | 22,606 MW | 9,357 MW | 6 MW |
| 2026-10-16T09:00Z | 19,105 MW | 12,543 MW | 22,911 MW | 9,361 MW | 8 MW |
| 2026-10-16T10:00Z | 20,289 MW | 13,627 MW | 22,773 MW | 9,362 MW | 8 MW |
| 2026-10-16T11:00Z | 21,672 MW | 15,407 MW | 22,604 MW | 9,366 MW | 7 MW |
| 2026-10-16T12:00Z | 22,636 MW | 16,971 MW | 22,317 MW | 9,377 MW | 177 MW |
| 2026-10-16T13:00Z | 22,750 MW | 16,865 MW | 21,921 MW | 9,381 MW | 2,771 MW |
| 2026-10-16T14:00Z | 22,650 MW | 16,283 MW | 21,685 MW | 9,379 MW | 5,376 MW |
| 2026-10-16T15:00Z | 23,138 MW | 15,826 MW | 21,552 MW | 9,380 MW | 6,106 MW |
| 2026-10-16T16:00Z | 22,355 MW | 14,938 MW | 21,817 MW | 9,382 MW | 6,898 MW |
| 2026-10-16T17:00Z | 22,285 MW | 13,871 MW | 21,716 MW | 9,378 MW | 8,038 MW |
| 2026-10-16T18:00Z | 22,444 MW | 13,122 MW | 21,789 MW | 9,382 MW | 8,415 MW |
| 2026-10-16T19:00Z | 22,836 MW | 12,791 MW | 21,808 MW | 9,383 MW | 7,818 MW |
| 2026-10-16T20:00Z | 23,200 MW | 12,658 MW | 21,906 MW | 9,382 MW | 7,215 MW |
| 2026-10-16T21:00Z | 24,070 MW | 13,094 MW | 20,841 MW | 9,389 MW | 5,915 MW |
| 2026-10-16T22:00Z | 25,251 MW | 14,081 MW | 19,436 MW | 9,395 MW | 3,032 MW |
| 2026-10-16T23:00Z | 26,994 MW | 17,012 MW | 16,228 MW | 9,400 MW | 159 MW |
| 2026-10-17T00:00Z | 26,896 MW | 18,052 MW | 15,500 MW | 9,407 MW | 4 MW |
| 2026-10-17T01:00Z | 26,193 MW | 18,043 MW | 15,704 MW | 9,412 MW | 4 MW |
| 2026-10-17T02:00Z | 25,227 MW | 17,722 MW | 15,109 MW | 9,417 MW | 3 MW |
| 2026-10-17T03:00Z | 24,008 MW | 17,802 MW | 13,957 MW | 9,274 MW | 4 MW |
| 2026-10-17T04:00Z | 23,846 MW | 18,107 MW | 11,928 MW | 8,330 MW | 4 MW |
| 2026-10-17T05:00Z | 23,212 MW | 17,587 MW | 10,395 MW | 8,335 MW | 4 MW |
| 2026-10-17T06:00Z | 22,810 MW | 17,549 MW | 9,697 MW | 8,336 MW | 4 MW |
| 2026-10-17T07:00Z | 22,836 MW | 16,894 MW | 9,860 MW | 8,339 MW | 3 MW |
| 2026-10-17T08:00Z | 22,893 MW | 16,881 MW | 10,064 MW | 8,340 MW | 3 MW |
| 2026-10-17T09:00Z | 23,309 MW | 17,148 MW | 9,995 MW | 8,344 MW | 3 MW |
| 2026-10-17T10:00Z | 23,609 MW | 17,536 MW | 10,358 MW | 8,346 MW | 3 MW |
| 2026-10-17T11:00Z | 23,639 MW | 17,694 MW | 11,416 MW | 8,345 MW | 3 MW |
| 2026-10-17T12:00Z | 23,469 MW | 17,469 MW | 12,804 MW | 8,349 MW | 1,071 MW |
| 2026-10-17T13:00Z | 19,332 MW | 14,770 MW | 13,372 MW | 8,345 MW | 10,213 MW |
| 2026-10-17T14:00Z | 15,772 MW | 11,690 MW | 12,353 MW | 8,344 MW | 18,166 MW |
| 2026-10-17T15:00Z | 15,578 MW | 10,954 MW | 13,114 MW | 8,343 MW | 19,109 MW |
| 2026-10-17T16:00Z | 15,496 MW | 10,804 MW | 14,228 MW | 8,338 MW | 18,456 MW |
| 2026-10-17T17:00Z | 15,372 MW | 10,775 MW | 13,953 MW | 8,338 MW | 18,416 MW |
| 2026-10-17T18:00Z | 14,844 MW | 10,441 MW | 14,322 MW | 8,334 MW | 18,672 MW |
| 2026-10-17T19:00Z | 13,991 MW | 9,690 MW | 15,206 MW | 8,333 MW | 18,897 MW |
| 2026-10-17T20:00Z | 13,775 MW | 9,520 MW | 16,024 MW | 8,326 MW | 19,095 MW |
| 2026-10-17T21:00Z | 16,203 MW | 9,793 MW | 16,815 MW | 8,322 MW | 16,322 MW |
| 2026-10-17T22:00Z | 22,725 MW | 11,986 MW | 16,313 MW | 8,325 MW | 6,497 MW |
| 2026-10-17T23:00Z | 25,007 MW | 15,494 MW | 16,510 MW | 8,331 MW | 236 MW |
| 2026-10-18T00:00Z | 24,598 MW | 16,365 MW | 18,158 MW | 8,336 MW | 2 MW |
| 2026-10-18T01:00Z | 23,837 MW | 16,274 MW | 19,157 MW | 8,337 MW | 3 MW |
| 2026-10-18T02:00Z | 22,586 MW | 15,920 MW | 19,679 MW | 8,337 MW | 3 MW |
| 2026-10-18T03:00Z | 21,513 MW | 15,757 MW | 20,027 MW | 8,341 MW | 4 MW |
| 2026-10-18T04:00Z | 20,087 MW | 15,408 MW | 20,274 MW | 8,342 MW | 4 MW |
| 2026-10-18T05:00Z | 18,716 MW | 14,626 MW | 20,874 MW | 8,346 MW | 6 MW |
| 2026-10-18T06:00Z | 18,013 MW | 14,076 MW | 21,286 MW | 8,346 MW | 7 MW |
| 2026-10-18T07:00Z | 17,055 MW | 13,418 MW | 21,244 MW | 8,345 MW | 7 MW |
| 2026-10-18T08:00Z | 17,091 MW | 13,236 MW | 21,068 MW | 8,346 MW | 7 MW |
| 2026-10-18T09:00Z | 16,817 MW | 13,070 MW | 21,171 MW | 8,348 MW | 7 MW |
| 2026-10-18T10:00Z | 17,350 MW | 13,035 MW | 21,667 MW | 8,351 MW | 7 MW |
| 2026-10-18T11:00Z | 17,863 MW | 13,442 MW | 22,114 MW | 8,349 MW | 7 MW |
| 2026-10-18T12:00Z | 17,948 MW | 13,938 MW | 22,372 MW | 8,354 MW | 1,052 MW |
| 2026-10-18T13:00Z | 13,885 MW | 11,852 MW | 21,767 MW | 8,352 MW | 9,820 MW |
| 2026-10-18T14:00Z | 11,698 MW | 9,687 MW | 19,336 MW | 8,348 MW | 17,137 MW |
| 2026-10-18T15:00Z | 11,432 MW | 9,025 MW | 19,482 MW | 8,344 MW | 18,852 MW |
| 2026-10-18T16:00Z | 11,554 MW | 8,786 MW | 19,127 MW | 8,339 MW | 18,498 MW |
| 2026-10-18T17:00Z | 12,012 MW | 8,799 MW | 18,437 MW | 8,334 MW | 18,327 MW |
| 2026-10-18T18:00Z | 11,898 MW | 9,019 MW | 18,510 MW | 8,327 MW | 18,251 MW |
| 2026-10-18T19:00Z | 12,213 MW | 8,932 MW | 17,955 MW | 8,319 MW | 18,758 MW |
| 2026-10-18T20:00Z | 13,681 MW | 8,966 MW | 17,237 MW | 8,314 MW | 18,798 MW |
| 2026-10-18T21:00Z | 17,152 MW | 9,507 MW | 17,220 MW | 8,313 MW | 16,034 MW |
| 2026-10-18T22:00Z | 24,075 MW | 12,325 MW | 15,801 MW | 8,315 MW | 6,087 MW |
| 2026-10-18T23:00Z | 26,629 MW | 16,478 MW | 14,898 MW | 8,319 MW | 180 MW |
| 2026-10-19T00:00Z | 26,481 MW | 17,615 MW | 16,767 MW | 8,325 MW | 3 MW |
| 2026-10-19T01:00Z | 24,768 MW | 17,056 MW | 18,092 MW | 8,328 MW | 6 MW |
| 2026-10-19T02:00Z | 22,815 MW | 17,084 MW | 18,332 MW | 8,326 MW | 8 MW |
| 2026-10-19T03:00Z | 20,970 MW | 16,146 MW | 18,383 MW | 8,329 MW | 8 MW |
| 2026-10-19T04:00Z | 19,860 MW | 14,449 MW | 18,281 MW | 8,332 MW | 8 MW |
| 2026-10-19T05:00Z | 20,352 MW | 13,523 MW | 17,659 MW | 8,333 MW | 8 MW |
| 2026-10-19T06:00Z | 20,742 MW | 13,554 MW | 16,624 MW | 8,329 MW | 10 MW |
| 2026-10-19T07:00Z | 21,668 MW | 13,908 MW | 14,699 MW | 8,335 MW | 7 MW |
| 2026-10-19T08:00Z | 22,851 MW | 15,046 MW | 12,370 MW | 8,332 MW | 6 MW |
| 2026-10-19T09:00Z | 24,828 MW | 15,837 MW | 10,678 MW | 8,336 MW | 5 MW |
| 2026-10-19T10:00Z | 29,158 MW | 16,701 MW | 9,333 MW | 8,340 MW | 4 MW |
| 2026-10-19T11:00Z | 32,247 MW | 18,101 MW | 8,502 MW | 8,344 MW | 4 MW |
| 2026-10-19T12:00Z | 33,613 MW | 19,066 MW | 7,766 MW | 8,349 MW | 888 MW |
| 2026-10-19T13:00Z | 27,837 MW | 17,948 MW | 6,945 MW | 8,346 MW | 9,964 MW |
| 2026-10-19T14:00Z | 23,831 MW | 15,595 MW | 4,881 MW | 8,336 MW | 18,080 MW |
| 2026-10-19T15:00Z | 24,482 MW | 16,031 MW | 2,698 MW | 8,331 MW | 19,089 MW |
| 2026-10-19T16:00Z | 24,774 MW | 16,379 MW | 2,100 MW | 8,328 MW | 18,598 MW |
| 2026-10-19T17:00Z | 25,310 MW | 16,553 MW | 2,613 MW | 8,326 MW | 17,943 MW |
| 2026-10-19T18:00Z | 25,140 MW | 16,448 MW | 3,640 MW | 8,319 MW | 17,822 MW |
| 2026-10-19T19:00Z | 25,662 MW | 16,197 MW | 3,977 MW | 8,317 MW | 18,085 MW |
| 2026-10-19T20:00Z | 26,414 MW | 16,205 MW | 3,700 MW | 8,313 MW | 17,828 MW |
| 2026-10-19T21:00Z | 29,134 MW | 16,610 MW | 3,415 MW | 8,310 MW | 14,026 MW |
| 2026-10-19T22:00Z | 33,767 MW | 17,534 MW | 3,559 MW | 8,311 MW | 4,853 MW |
| 2026-10-19T23:00Z | 35,766 MW | 18,729 MW | 4,033 MW | 8,315 MW | 97 MW |
| 2026-10-20T00:00Z | 35,276 MW | 19,690 MW | 5,807 MW | 8,317 MW | 2 MW |
| 2026-10-20T01:00Z | 34,271 MW | 20,245 MW | 7,160 MW | 8,317 MW | 2 MW |
| 2026-10-20T02:00Z | 31,825 MW | 20,605 MW | 8,021 MW | 8,318 MW | 2 MW |
| 2026-10-20T03:00Z | 28,490 MW | 20,332 MW | 8,829 MW | 8,323 MW | 2 MW |
| 2026-10-20T04:00Z | 26,410 MW | 19,545 MW | 9,249 MW | 8,323 MW | 2 MW |
| 2026-10-20T05:00Z | 24,987 MW | 18,268 MW | 9,220 MW | 8,329 MW | 2 MW |
| 2026-10-20T06:00Z | 24,315 MW | 17,497 MW | 9,016 MW | 8,327 MW | 2 MW |
| 2026-10-20T07:00Z | 23,757 MW | 17,192 MW | 8,718 MW | 8,331 MW | 3 MW |
| 2026-10-20T08:00Z | 24,072 MW | 17,344 MW | 8,294 MW | 8,333 MW | 2 MW |
| 2026-10-20T09:00Z | 25,294 MW | 18,186 MW | 7,628 MW | 8,332 MW | 4 MW |
| 2026-10-20T10:00Z | 27,484 MW | 18,420 MW | 7,213 MW | 8,335 MW | 3 MW |
| 2026-10-20T11:00Z | 30,153 MW | 18,905 MW | 6,633 MW | 8,336 MW | 3 MW |
| 2026-10-20T12:00Z | 30,660 MW | 19,277 MW | 7,271 MW | 8,343 MW | 660 MW |
| 2026-10-20T13:00Z | 26,391 MW | 18,198 MW | 7,782 MW | 8,339 MW | 8,753 MW |
| 2026-10-20T14:00Z | 22,885 MW | 15,995 MW | 6,229 MW | 8,335 MW | 16,630 MW |
| 2026-10-20T15:00Z | 23,289 MW | 16,095 MW | 3,880 MW | 8,329 MW | 17,714 MW |
| 2026-10-20T16:00Z | 22,937 MW | 16,109 MW | 4,889 MW | 8,322 MW | 17,854 MW |
| 2026-10-20T17:00Z | 22,612 MW | 16,157 MW | 7,128 MW | 8,315 MW | 17,062 MW |
| 2026-10-20T18:00Z | 21,846 MW | 15,351 MW | 8,522 MW | 8,312 MW | 16,746 MW |
| 2026-10-20T19:00Z | 22,232 MW | 13,862 MW | 8,789 MW | 8,309 MW | 18,141 MW |
| 2026-10-20T20:00Z | 23,605 MW | 13,843 MW | 8,292 MW | 8,306 MW | 17,847 MW |
| 2026-10-20T21:00Z | 26,636 MW | 15,081 MW | 7,520 MW | 8,302 MW | 13,164 MW |
| 2026-10-20T22:00Z | 30,785 MW | 17,462 MW | 6,310 MW | 8,309 MW | 4,073 MW |
| 2026-10-20T23:00Z | 32,468 MW | 19,114 MW | 6,312 MW | 8,310 MW | 97 MW |
| 2026-10-21T00:00Z | 30,840 MW | 19,807 MW | 8,655 MW | 8,311 MW | 1 MW |
| 2026-10-21T01:00Z | 28,626 MW | 19,316 MW | 11,304 MW | 8,317 MW | 1 MW |
| 2026-10-21T02:00Z | 26,989 MW | 17,986 MW | 13,043 MW | 8,324 MW | 1 MW |
| 2026-10-21T03:00Z | 25,559 MW | 17,063 MW | 14,243 MW | 8,323 MW | 1 MW |
| 2026-10-21T04:00Z | 24,326 MW | 16,199 MW | 14,330 MW | 8,326 MW | 1 MW |
| 2026-10-21T05:00Z | 24,262 MW | 15,686 MW | 13,674 MW | 8,327 MW | 1 MW |
| 2026-10-21T06:00Z | 23,352 MW | 15,337 MW | 13,733 MW | 8,327 MW | 3 MW |
| 2026-10-21T07:00Z | 23,296 MW | 14,337 MW | 13,622 MW | 8,332 MW | 1 MW |
| 2026-10-21T08:00Z | 23,566 MW | 14,452 MW | 13,261 MW | 8,325 MW | 2 MW |
| 2026-10-21T09:00Z | 24,256 MW | 15,758 MW | 12,014 MW | 8,328 MW | 1 MW |
| 2026-10-21T10:00Z | 27,100 MW | 17,245 MW | 10,070 MW | 8,329 MW | 1 MW |
| 2026-10-21T11:00Z | 29,575 MW | 18,333 MW | 8,540 MW | 8,331 MW | 1 MW |
| 2026-10-21T12:00Z | 30,550 MW | 18,802 MW | 7,399 MW | 8,336 MW | 572 MW |
| 2026-10-21T13:00Z | 27,433 MW | 17,137 MW | 6,604 MW | 8,330 MW | 7,702 MW |
| 2026-10-21T14:00Z | 24,875 MW | 14,810 MW | 4,186 MW | 8,328 MW | 15,811 MW |
| 2026-10-21T15:00Z | 25,993 MW | 15,130 MW | 2,314 MW | 8,317 MW | 16,895 MW |
| 2026-10-21T16:00Z | 26,033 MW | 16,314 MW | 1,788 MW | 8,311 MW | 16,588 MW |
| 2026-10-21T17:00Z | 26,423 MW | 17,378 MW | 1,526 MW | 8,307 MW | 16,345 MW |
| 2026-10-21T18:00Z | 26,838 MW | 17,348 MW | 1,530 MW | 8,302 MW | 16,643 MW |
| 2026-10-21T19:00Z | 27,239 MW | 16,844 MW | 1,704 MW | 8,297 MW | 17,191 MW |
| 2026-10-21T20:00Z | 28,311 MW | 16,906 MW | 1,780 MW | 8,292 MW | 16,638 MW |
| 2026-10-21T21:00Z | 31,081 MW | 17,593 MW | 1,523 MW | 8,294 MW | 12,151 MW |
| 2026-10-21T22:00Z | 34,872 MW | 18,574 MW | 1,342 MW | 8,296 MW | 4,251 MW |
| 2026-10-21T23:00Z | 36,256 MW | 19,752 MW | 1,632 MW | 8,303 MW | 108 MW |
| 2026-10-22T00:00Z | 35,585 MW | 20,106 MW | 2,828 MW | 8,304 MW | 1 MW |
| 2026-10-22T01:00Z | 34,484 MW | 20,159 MW | 4,110 MW | 8,316 MW | 1 MW |
| 2026-10-22T02:00Z | 32,476 MW | 19,753 MW | 4,975 MW | 8,320 MW | 1 MW |
| 2026-10-22T03:00Z | 30,372 MW | 19,200 MW | 5,494 MW | 8,321 MW | 1 MW |
| 2026-10-22T04:00Z | 28,515 MW | 18,679 MW | 5,574 MW | 8,322 MW | 1 MW |
| 2026-10-22T05:00Z | 27,548 MW | 17,515 MW | 5,639 MW | 8,323 MW | 1 MW |
| 2026-10-22T06:00Z | 26,941 MW | 16,776 MW | 5,765 MW | 8,329 MW | 1 MW |
| 2026-10-22T07:00Z | 27,099 MW | 16,293 MW | 5,580 MW | 8,334 MW | 1 MW |
| 2026-10-22T08:00Z | 27,549 MW | 16,454 MW | 5,230 MW | 8,332 MW | 1 MW |
| 2026-10-22T09:00Z | 28,852 MW | 17,408 MW | 4,756 MW | 8,338 MW | 2 MW |
| 2026-10-22T10:00Z | 31,176 MW | 18,195 MW | 4,467 MW | 8,341 MW | 1 MW |
| 2026-10-22T11:00Z | 33,265 MW | 18,857 MW | 4,108 MW | 8,341 MW | 1 MW |
| 2026-10-22T12:00Z | 33,704 MW | 19,178 MW | 3,866 MW | 8,345 MW | 597 MW |
| 2026-10-22T13:00Z | 29,418 MW | 17,863 MW | 3,640 MW | 8,340 MW | 8,533 MW |
| 2026-10-22T14:00Z | 25,014 MW | 15,300 MW | 3,264 MW | 8,334 MW | 16,389 MW |
| 2026-10-22T15:00Z | 25,703 MW | 15,223 MW | 2,098 MW | 8,327 MW | 17,430 MW |
| 2026-10-22T16:00Z | 26,167 MW | 16,465 MW | 2,035 MW | 8,315 MW | 16,963 MW |
| 2026-10-22T17:00Z | 26,003 MW | 17,484 MW | 2,581 MW | 8,306 MW | 16,084 MW |
| 2026-10-22T18:00Z | 25,477 MW | 17,636 MW | 4,153 MW | 8,300 MW | 15,884 MW |
| 2026-10-22T19:00Z | 25,445 MW | 16,306 MW | 5,201 MW | 8,297 MW | 17,037 MW |
| 2026-10-22T20:00Z | 27,895 MW | 15,316 MW | 4,930 MW | 8,297 MW | 17,302 MW |
| 2026-10-22T21:00Z | 31,539 MW | 15,377 MW | 4,851 MW | 8,298 MW | 13,976 MW |
| 2026-10-22T22:00Z | 34,917 MW | 17,936 MW | 4,927 MW | 8,299 MW | 4,526 MW |
| 2026-10-22T23:00Z | 35,682 MW | 19,489 MW | 6,487 MW | 8,303 MW | 94 MW |
| 2026-10-23T00:00Z | 33,396 MW | 19,592 MW | 9,925 MW | 8,308 MW | 2 MW |
| 2026-10-23T01:00Z | 30,925 MW | 18,753 MW | 13,678 MW | 8,308 MW | 2 MW |
| 2026-10-23T02:00Z | 28,545 MW | 17,348 MW | 15,499 MW | 8,310 MW | 2 MW |
| 2026-10-23T03:00Z | 26,618 MW | 16,148 MW | 15,894 MW | 8,312 MW | 2 MW |
| 2026-10-23T04:00Z | 25,640 MW | 15,013 MW | 15,914 MW | 8,317 MW | 2 MW |
| 2026-10-23T05:00Z | 23,989 MW | 14,817 MW | 16,270 MW | 8,317 MW | 2 MW |
| 2026-10-23T06:00Z | 23,353 MW | 14,497 MW | 15,930 MW | 8,320 MW | 1 MW |
| 2026-10-23T07:00Z | 22,927 MW | 13,654 MW | 15,596 MW | 8,321 MW | 2 MW |
| 2026-10-23T08:00Z | 22,943 MW | 13,955 MW | 15,676 MW | 8,326 MW | 2 MW |
| 2026-10-23T09:00Z | 23,766 MW | 14,603 MW | 15,504 MW | 8,328 MW | 2 MW |
| 2026-10-23T10:00Z | 24,974 MW | 15,275 MW | 15,249 MW | 8,325 MW | 1 MW |
| 2026-10-23T11:00Z | 26,382 MW | 16,436 MW | 15,521 MW | 8,327 MW | 1 MW |
| 2026-10-23T12:00Z | 26,387 MW | 16,816 MW | 16,194 MW | 8,330 MW | 468 MW |
| 2026-10-23T13:00Z | 22,892 MW | 15,093 MW | 16,212 MW | 8,327 MW | 7,732 MW |
| 2026-10-23T14:00Z | 20,479 MW | 12,817 MW | 13,930 MW | 8,323 MW | 15,466 MW |
| 2026-10-23T15:00Z | 21,317 MW | 12,068 MW | 12,244 MW | 8,313 MW | 17,540 MW |
| 2026-10-23T16:00Z | 21,678 MW | 11,849 MW | 13,037 MW | 8,308 MW | 17,671 MW |
| 2026-10-23T17:00Z | 22,154 MW | 12,171 MW | 13,965 MW | 8,299 MW | 17,078 MW |
| 2026-10-23T18:00Z | 22,242 MW | 12,095 MW | 14,768 MW | 8,296 MW | 17,352 MW |
| 2026-10-23T19:00Z | 23,043 MW | 12,313 MW | 15,218 MW | 8,291 MW | 17,546 MW |
| 2026-10-23T20:00Z | 24,159 MW | 12,377 MW | 15,540 MW | 8,292 MW | 16,968 MW |
| 2026-10-23T21:00Z | 27,213 MW | 12,958 MW | 15,895 MW | 8,293 MW | 12,826 MW |
| 2026-10-23T22:00Z | 29,393 MW | 14,764 MW | 15,430 MW | 8,292 MW | 3,976 MW |
| 2026-10-23T23:00Z | 30,257 MW | 16,519 MW | 16,357 MW | 8,293 MW | 70 MW |
| 2026-10-24T00:00Z | 29,243 MW | 16,616 MW | 18,189 MW | 8,301 MW | 1 MW |
| 2026-10-24T01:00Z | 27,424 MW | 16,316 MW | 19,615 MW | 8,303 MW | 1 MW |
| 2026-10-24T02:00Z | 25,850 MW | 15,559 MW | 20,206 MW | 8,306 MW | 1 MW |
| 2026-10-24T03:00Z | 24,101 MW | 14,566 MW | 20,442 MW | 8,310 MW | 1 MW |
| 2026-10-24T04:00Z | 23,253 MW | 13,727 MW | 19,583 MW | 8,316 MW | 2 MW |
| 2026-10-24T05:00Z | 21,423 MW | 13,261 MW | 19,722 MW | 8,319 MW | 2 MW |
| 2026-10-24T06:00Z | 20,245 MW | 12,824 MW | 19,404 MW | 8,315 MW | 2 MW |
| 2026-10-24T07:00Z | 19,971 MW | 11,688 MW | 19,271 MW | 8,322 MW | 2 MW |
| 2026-10-24T08:00Z | 20,112 MW | 11,657 MW | 19,375 MW | 8,321 MW | 2 MW |
| 2026-10-24T09:00Z | 20,350 MW | 11,958 MW | 18,832 MW | 8,324 MW | 2 MW |
| 2026-10-24T10:00Z | 21,125 MW | 12,915 MW | 18,401 MW | 8,325 MW | 2 MW |
| 2026-10-24T11:00Z | 21,478 MW | 13,708 MW | 18,033 MW | 8,326 MW | 2 MW |
| 2026-10-24T12:00Z | 21,419 MW | 14,098 MW | 18,007 MW | 8,331 MW | 484 MW |
| 2026-10-24T13:00Z | 19,366 MW | 12,595 MW | 17,808 MW | 8,328 MW | 7,043 MW |
| 2026-10-24T14:00Z | 17,292 MW | 10,728 MW | 15,520 MW | 8,317 MW | 14,723 MW |
| 2026-10-24T15:00Z | 18,055 MW | 10,672 MW | 13,216 MW | 8,314 MW | 16,540 MW |
| 2026-10-24T16:00Z | 18,845 MW | 10,949 MW | 12,657 MW | 8,303 MW | 16,785 MW |
| 2026-10-24T17:00Z | 19,901 MW | 11,203 MW | 11,845 MW | 8,302 MW | 16,409 MW |
| 2026-10-24T18:00Z | 20,978 MW | 11,967 MW | 10,874 MW | 8,293 MW | 16,125 MW |
| 2026-10-24T19:00Z | 22,000 MW | 12,062 MW | 10,516 MW | 8,287 MW | 15,955 MW |
| 2026-10-24T20:00Z | 23,267 MW | 12,222 MW | 10,632 MW | 8,291 MW | 14,997 MW |
| 2026-10-24T21:00Z | 27,267 MW | 13,087 MW | 9,879 MW | 8,293 MW | 11,183 MW |
| 2026-10-24T22:00Z | 30,251 MW | 15,191 MW | 9,071 MW | 8,295 MW | 3,682 MW |
| 2026-10-24T23:00Z | 31,339 MW | 17,153 MW | 9,059 MW | 8,301 MW | 62 MW |
| 2026-10-25T00:00Z | 30,866 MW | 17,342 MW | 9,696 MW | 8,306 MW | 1 MW |
| 2026-10-25T01:00Z | 29,744 MW | 17,083 MW | 10,364 MW | 8,307 MW | 2 MW |
| 2026-10-25T02:00Z | 28,187 MW | 17,547 MW | 10,397 MW | 8,307 MW | 2 MW |
| 2026-10-25T03:00Z | 26,570 MW | 17,449 MW | 9,709 MW | 8,309 MW | 2 MW |
| 2026-10-25T04:00Z | 25,109 MW | 16,909 MW | 8,595 MW | 8,311 MW | 2 MW |
| 2026-10-25T05:00Z | 24,401 MW | 16,052 MW | 8,374 MW | 8,316 MW | 1 MW |
| 2026-10-25T06:00Z | 23,957 MW | 14,820 MW | 8,039 MW | 8,317 MW | 2 MW |
| 2026-10-25T07:00Z | 23,643 MW | 14,681 MW | 7,994 MW | 8,322 MW | 2 MW |
| 2026-10-25T08:00Z | 23,208 MW | 14,557 MW | 7,702 MW | 8,323 MW | 2 MW |
| 2026-10-25T09:00Z | 23,393 MW | 15,384 MW | 7,093 MW | 8,324 MW | 1 MW |
| 2026-10-25T10:00Z | 23,928 MW | 15,612 MW | 6,647 MW | 8,333 MW | 1 MW |
| 2026-10-25T11:00Z | 25,365 MW | 16,302 MW | 6,097 MW | 8,334 MW | 1 MW |
| 2026-10-25T12:00Z | 26,351 MW | 16,607 MW | 6,062 MW | 8,338 MW | 473 MW |
| 2026-10-25T13:00Z | 23,840 MW | 15,187 MW | 5,812 MW | 8,335 MW | 6,958 MW |
| 2026-10-25T14:00Z | 20,696 MW | 13,128 MW | 4,490 MW | 8,326 MW | 14,392 MW |
| 2026-10-25T15:00Z | 21,570 MW | 12,660 MW | 2,964 MW | 8,321 MW | 16,198 MW |
| 2026-10-25T16:00Z | 22,531 MW | 13,538 MW | 2,067 MW | 8,313 MW | 16,273 MW |
| 2026-10-25T17:00Z | 23,283 MW | 13,922 MW | 2,133 MW | 8,309 MW | 16,182 MW |
| 2026-10-25T18:00Z | 24,300 MW | 14,813 MW | 2,260 MW | 8,307 MW | 15,673 MW |
| 2026-10-25T19:00Z | 25,322 MW | 15,397 MW | 2,811 MW | 8,303 MW | 14,824 MW |
| 2026-10-25T20:00Z | 26,277 MW | 15,762 MW | 4,245 MW | 8,303 MW | 13,867 MW |
| 2026-10-25T21:00Z | 29,607 MW | 15,679 MW | 5,702 MW | 8,302 MW | 9,820 MW |
| 2026-10-25T22:00Z | 33,333 MW | 17,197 MW | 6,316 MW | 8,309 MW | 2,517 MW |
| 2026-10-25T23:00Z | 34,322 MW | 18,622 MW | 7,346 MW | 8,308 MW | 20 MW |
| 2026-10-26T00:00Z | 34,019 MW | 18,835 MW | 8,396 MW | 8,310 MW | 1 MW |
| 2026-10-26T01:00Z | 31,629 MW | 18,904 MW | 9,888 MW | 8,312 MW | 1 MW |
| 2026-10-26T02:00Z | 28,688 MW | 18,736 MW | 11,518 MW | 8,311 MW | 1 MW |
| 2026-10-26T03:00Z | 26,156 MW | 17,217 MW | 12,236 MW | 8,312 MW | 1 MW |
| 2026-10-26T04:00Z | 24,621 MW | 16,335 MW | 12,710 MW | 8,315 MW | 1 MW |
| 2026-10-26T05:00Z | 24,176 MW | 15,512 MW | 12,076 MW | 8,318 MW | 1 MW |
| 2026-10-26T06:00Z | 24,126 MW | 15,494 MW | 11,225 MW | 8,319 MW | 1 MW |
| 2026-10-26T07:00Z | 24,143 MW | 15,679 MW | 10,433 MW | 8,322 MW | 2 MW |
| 2026-10-26T08:00Z | 24,608 MW | 16,010 MW | 9,760 MW | 8,322 MW | 2 MW |
| 2026-10-26T09:00Z | 25,427 MW | 16,308 MW | 9,955 MW | 8,322 MW | 2 MW |
| 2026-10-26T10:00Z | 27,954 MW | 16,957 MW | 10,361 MW | 8,322 MW | 1 MW |
| 2026-10-26T11:00Z | 29,990 MW | 17,767 MW | 10,774 MW | 8,325 MW | 1 MW |
| 2026-10-26T12:00Z | 31,326 MW | 18,219 MW | 10,782 MW | 8,328 MW | 298 MW |
| 2026-10-26T13:00Z | 31,085 MW | 17,934 MW | 9,810 MW | 8,334 MW | 3,855 MW |
| 2026-10-26T14:00Z | 29,515 MW | 16,529 MW | 8,887 MW | 8,331 MW | 9,154 MW |
| 2026-10-26T15:00Z | 28,800 MW | 15,636 MW | 8,332 MW | 8,323 MW | 11,857 MW |
| 2026-10-26T16:00Z | 28,629 MW | 16,246 MW | 7,895 MW | 8,316 MW | 12,847 MW |
| 2026-10-26T17:00Z | 29,582 MW | 16,989 MW | 6,799 MW | 8,313 MW | 12,907 MW |
| 2026-10-26T18:00Z | 30,387 MW | 16,966 MW | 6,140 MW | 8,302 MW | 13,225 MW |
| 2026-10-26T19:00Z | 30,643 MW | 16,740 MW | 6,650 MW | 8,303 MW | 13,031 MW |
| 2026-10-26T20:00Z | 31,099 MW | 16,017 MW | 7,578 MW | 8,303 MW | 12,082 MW |
| 2026-10-26T21:00Z | 33,122 MW | 16,122 MW | 8,790 MW | 8,303 MW | 9,316 MW |
| 2026-10-26T22:00Z | 35,679 MW | 17,568 MW | 9,437 MW | 8,303 MW | 2,825 MW |
| 2026-10-26T23:00Z | 36,918 MW | 18,015 MW | 10,344 MW | 8,309 MW | 52 MW |
| 2026-10-27T00:00Z | 35,487 MW | 18,031 MW | 11,768 MW | 8,314 MW | 3 MW |
| 2026-10-27T01:00Z | 33,928 MW | 17,872 MW | 12,829 MW | 8,315 MW | 2 MW |
| 2026-10-27T02:00Z | 31,571 MW | 17,504 MW | 13,474 MW | 8,315 MW | 2 MW |
| 2026-10-27T03:00Z | 28,924 MW | 16,841 MW | 14,272 MW | 8,318 MW | 1 MW |
| 2026-10-27T04:00Z | 27,098 MW | 15,309 MW | 14,438 MW | 8,322 MW | 1 MW |
| 2026-10-27T05:00Z | 26,602 MW | 14,997 MW | 13,525 MW | 8,324 MW | 1 MW |
| 2026-10-27T06:00Z | 26,148 MW | 15,065 MW | 12,113 MW | 8,324 MW | 1 MW |
| 2026-10-27T07:00Z | 26,611 MW | 15,004 MW | 10,686 MW | 8,327 MW | 1 MW |
| 2026-10-27T08:00Z | 27,293 MW | 15,916 MW | 9,192 MW | 8,327 MW | 1 MW |
| 2026-10-27T09:00Z | 28,059 MW | 16,949 MW | 8,399 MW | 8,332 MW | 1 MW |
| 2026-10-27T10:00Z | 30,752 MW | 17,223 MW | 7,956 MW | 8,332 MW | 1 MW |
| 2026-10-27T11:00Z | 33,300 MW | 18,091 MW | 7,351 MW | 8,332 MW | 1 MW |
| 2026-10-27T12:00Z | 34,184 MW | 18,119 MW | 6,985 MW | 8,333 MW | 304 MW |
| 2026-10-27T13:00Z | 32,294 MW | 17,893 MW | 6,355 MW | 8,333 MW | 4,718 MW |
| 2026-10-27T14:00Z | 29,593 MW | 16,792 MW | 5,673 MW | 8,327 MW | 10,359 MW |
| 2026-10-27T15:00Z | 29,969 MW | 16,275 MW | 4,721 MW | 8,324 MW | 11,682 MW |
| 2026-10-27T16:00Z | 30,948 MW | 16,949 MW | 4,277 MW | 8,319 MW | 12,135 MW |
| 2026-10-27T17:00Z | 31,300 MW | 17,724 MW | 4,492 MW | 8,312 MW | 11,819 MW |
| 2026-10-27T18:00Z | 31,876 MW | 18,108 MW | 5,211 MW | 8,308 MW | 10,947 MW |
| 2026-10-27T19:00Z | 32,160 MW | 18,022 MW | 6,187 MW | 8,306 MW | 9,952 MW |
| 2026-10-27T20:00Z | 33,386 MW | 17,773 MW | 7,028 MW | 8,311 MW | 7,690 MW |
| 2026-10-27T21:00Z | 35,457 MW | 18,715 MW | 7,281 MW | 8,307 MW | 4,458 MW |
| 2026-10-27T22:00Z | 36,326 MW | 19,287 MW | 7,833 MW | 8,308 MW | 1,334 MW |
| 2026-10-27T23:00Z | 36,390 MW | 19,971 MW | 8,568 MW | 8,307 MW | 41 MW |
| 2026-10-28T00:00Z | 36,289 MW | 20,059 MW | 9,574 MW | 8,310 MW | 1 MW |
| 2026-10-28T01:00Z | 34,255 MW | 19,759 MW | 11,126 MW | 8,310 MW | 1 MW |
| 2026-10-28T02:00Z | 31,867 MW | 19,233 MW | 12,018 MW | 8,311 MW | 2 MW |
| 2026-10-28T03:00Z | 29,221 MW | 18,688 MW | 12,090 MW | 8,312 MW | 3 MW |
| 2026-10-28T04:00Z | 26,955 MW | 17,787 MW | 12,264 MW | 8,315 MW | 3 MW |
| 2026-10-28T05:00Z | 26,025 MW | 16,931 MW | 12,112 MW | 8,318 MW | 3 MW |
| 2026-10-28T06:00Z | 25,614 MW | 15,712 MW | 11,433 MW | 8,312 MW | 3 MW |
| 2026-10-28T07:00Z | 25,345 MW | 15,306 MW | 11,520 MW | 8,313 MW | 3 MW |
| 2026-10-28T08:00Z | 25,075 MW | 14,485 MW | 11,832 MW | 8,315 MW | 3 MW |
| 2026-10-28T09:00Z | 25,761 MW | 14,892 MW | 11,805 MW | 8,317 MW | 3 MW |
| 2026-10-28T10:00Z | 27,886 MW | 16,108 MW | 11,665 MW | 8,320 MW | 3 MW |
| 2026-10-28T11:00Z | 29,686 MW | 17,029 MW | 11,783 MW | 8,320 MW | 2 MW |
| 2026-10-28T12:00Z | 30,757 MW | 17,697 MW | 12,447 MW | 8,325 MW | 220 MW |
| 2026-10-28T13:00Z | 27,729 MW | 16,978 MW | 12,776 MW | 8,325 MW | 5,530 MW |
| 2026-10-28T14:00Z | 24,493 MW | 14,723 MW | 11,450 MW | 8,320 MW | 12,941 MW |
| 2026-10-28T15:00Z | 25,311 MW | 13,841 MW | 10,021 MW | 8,315 MW | 14,863 MW |
| 2026-10-28T16:00Z | 25,469 MW | 14,246 MW | 10,836 MW | 8,308 MW | 15,026 MW |
| 2026-10-28T17:00Z | 24,737 MW | 14,394 MW | 13,021 MW | 8,307 MW | 14,785 MW |
| 2026-10-28T18:00Z | 24,331 MW | 13,705 MW | 15,520 MW | 8,303 MW | 14,779 MW |
| 2026-10-28T19:00Z | 24,756 MW | 13,283 MW | 17,036 MW | 8,298 MW | 15,145 MW |
| 2026-10-28T20:00Z | 25,858 MW | 13,315 MW | 16,969 MW | 8,297 MW | 14,849 MW |
| 2026-10-28T21:00Z | 29,691 MW | 13,955 MW | 16,849 MW | 8,293 MW | 10,644 MW |
| 2026-10-28T22:00Z | 33,814 MW | 16,231 MW | 16,248 MW | 8,300 MW | 2,624 MW |
| 2026-10-28T23:00Z | 34,619 MW | 18,165 MW | 15,531 MW | 8,299 MW | 68 MW |
| 2026-10-29T00:00Z | 33,851 MW | 19,037 MW | 15,489 MW | 8,307 MW | 47 MW |
| 2026-10-29T01:00Z | 31,998 MW | 18,847 MW | 15,960 MW | 8,309 MW | 47 MW |
| 2026-10-29T02:00Z | 29,920 MW | 18,311 MW | 15,264 MW | 8,312 MW | 49 MW |
| 2026-10-29T03:00Z | 28,146 MW | 17,151 MW | 14,648 MW | 8,313 MW | 50 MW |
| 2026-10-29T04:00Z | 26,676 MW | 15,545 MW | 13,594 MW | 8,318 MW | 50 MW |
| 2026-10-29T05:00Z | 25,388 MW | 14,444 MW | 13,495 MW | 8,318 MW | 51 MW |
| 2026-10-29T06:00Z | 23,355 MW | 13,210 MW | 14,385 MW | 8,319 MW | 51 MW |
| 2026-10-29T07:00Z | 23,329 MW | 12,689 MW | 14,376 MW | 8,323 MW | 51 MW |
| 2026-10-29T08:00Z | 23,736 MW | 12,869 MW | 14,000 MW | 8,323 MW | 51 MW |
| 2026-10-29T09:00Z | 24,686 MW | 13,954 MW | 13,854 MW | 8,326 MW | 35 MW |
| 2026-10-29T10:00Z | 25,859 MW | 15,073 MW | 13,498 MW | 8,327 MW | 8 MW |
| 2026-10-29T11:00Z | 28,600 MW | 16,151 MW | 13,386 MW | 8,332 MW | 3 MW |
| 2026-10-29T12:00Z | 29,896 MW | 17,664 MW | 12,844 MW | 8,334 MW | 216 MW |
| 2026-10-29T13:00Z | 27,599 MW | 16,891 MW | 11,557 MW | 8,328 MW | 5,555 MW |
| 2026-10-29T14:00Z | 25,469 MW | 14,799 MW | 8,674 MW | 8,318 MW | 13,373 MW |
| 2026-10-29T15:00Z | 25,737 MW | 14,446 MW | 7,021 MW | 8,308 MW | 15,634 MW |
| 2026-10-29T16:00Z | 26,142 MW | 14,678 MW | 7,169 MW | 8,300 MW | 15,329 MW |
| 2026-10-29T17:00Z | 27,265 MW | 15,508 MW | 6,697 MW | 8,301 MW | 14,736 MW |
| 2026-10-29T18:00Z | 28,491 MW | 17,244 MW | 6,310 MW | 8,292 MW | 14,134 MW |
| 2026-10-29T19:00Z | 28,913 MW | 17,546 MW | 6,060 MW | 8,289 MW | 14,011 MW |
| 2026-10-29T20:00Z | 29,923 MW | 17,414 MW | 6,120 MW | 8,304 MW | 13,407 MW |
| 2026-10-29T21:00Z | 34,696 MW | 18,478 MW | 5,414 MW | 8,290 MW | 8,307 MW |
| 2026-10-29T22:00Z | 37,372 MW | 20,337 MW | 5,376 MW | 8,293 MW | 2,003 MW |
| 2026-10-29T23:00Z | 38,078 MW | 21,008 MW | 5,966 MW | 8,300 MW | 80 MW |
| 2026-10-30T00:00Z | 36,597 MW | 21,284 MW | 6,967 MW | 8,304 MW | 68 MW |
| 2026-10-30T01:00Z | 34,667 MW | 21,170 MW | 7,784 MW | 8,305 MW | 68 MW |
| 2026-10-30T02:00Z | 32,877 MW | 20,911 MW | 7,939 MW | 8,309 MW | 68 MW |
| 2026-10-30T03:00Z | 30,377 MW | 20,350 MW | 8,172 MW | 8,315 MW | 69 MW |
| 2026-10-30T04:00Z | 28,392 MW | 18,734 MW | 8,218 MW | 8,319 MW | 70 MW |
| 2026-10-30T05:00Z | 27,401 MW | 17,885 MW | 8,590 MW | 8,321 MW | 70 MW |
| 2026-10-30T06:00Z | 26,161 MW | 16,521 MW | 10,103 MW | 8,326 MW | 70 MW |
| 2026-10-30T07:00Z | 25,606 MW | 14,827 MW | 11,652 MW | 8,331 MW | 70 MW |
| 2026-10-30T08:00Z | 25,470 MW | 14,247 MW | 12,459 MW | 8,331 MW | 70 MW |
| 2026-10-30T09:00Z | 26,090 MW | 15,270 MW | 12,233 MW | 8,332 MW | 48 MW |
| 2026-10-30T10:00Z | 27,106 MW | 15,752 MW | 13,198 MW | 8,333 MW | 3 MW |
| 2026-10-30T11:00Z | 28,172 MW | 16,216 MW | 13,687 MW | 8,333 MW | 2 MW |
| 2026-10-30T12:00Z | 28,545 MW | 17,134 MW | 14,136 MW | 8,338 MW | 236 MW |
| 2026-10-30T13:00Z | 27,428 MW | 16,965 MW | 13,842 MW | 8,298 MW | 4,264 MW |
| 2026-10-30T14:00Z | 26,104 MW | 15,210 MW | 12,652 MW | 8,118 MW | 9,678 MW |
| 2026-10-30T15:00Z | 26,622 MW | 14,907 MW | 10,657 MW | 8,060 MW | 11,796 MW |
| 2026-10-30T16:00Z | 27,207 MW | 15,494 MW | 9,564 MW | 8,053 MW | 12,432 MW |
| 2026-10-30T17:00Z | 27,791 MW | 16,414 MW | 8,487 MW | 8,042 MW | 12,688 MW |
| 2026-10-30T18:00Z | 28,565 MW | 17,268 MW | 7,889 MW | 8,046 MW | 11,950 MW |
| 2026-10-30T19:00Z | 29,216 MW | 17,545 MW | 7,410 MW | 8,060 MW | 10,724 MW |
| 2026-10-30T20:00Z | 30,935 MW | 17,523 MW | 7,681 MW | 7,966 MW | 8,775 MW |
| 2026-10-30T21:00Z | 32,619 MW | 18,691 MW | 8,297 MW | 7,860 MW | 5,180 MW |
| 2026-10-30T22:00Z | 33,064 MW | 20,206 MW | 8,616 MW | 7,886 MW | 1,080 MW |
| 2026-10-30T23:00Z | 32,773 MW | 20,221 MW | 10,084 MW | 7,860 MW | 7 MW |
| 2026-10-31T00:00Z | 31,756 MW | 19,643 MW | 12,100 MW | 7,922 MW | 3 MW |
| 2026-10-31T01:00Z | 30,933 MW | 18,454 MW | 13,118 MW | 7,869 MW | 3 MW |
| 2026-10-31T02:00Z | 29,850 MW | 18,176 MW | 13,064 MW | 7,795 MW | 4 MW |
| 2026-10-31T03:00Z | 28,577 MW | 17,172 MW | 12,827 MW | 7,827 MW | 4 MW |
| 2026-10-31T04:00Z | 28,611 MW | 16,196 MW | 11,723 MW | 7,806 MW | 3 MW |
| 2026-10-31T05:00Z | 26,964 MW | 15,105 MW | 11,084 MW | 7,889 MW | 3 MW |
| 2026-10-31T06:00Z | 26,135 MW | 14,557 MW | 10,074 MW | 7,999 MW | 3 MW |
| 2026-10-31T07:00Z | 25,806 MW | 14,321 MW | 9,434 MW | 8,125 MW | 2 MW |
| 2026-10-31T08:00Z | 25,586 MW | 14,479 MW | 8,891 MW | 8,187 MW | 1 MW |
| 2026-10-31T09:00Z | 25,387 MW | 14,737 MW | 8,788 MW | 8,205 MW | 1 MW |
| 2026-10-31T10:00Z | 25,804 MW | 15,160 MW | 8,546 MW | 8,212 MW | 2 MW |
| 2026-10-31T11:00Z | 26,328 MW | 15,381 MW | 8,486 MW | 8,209 MW | 2 MW |
| 2026-10-31T12:00Z | 27,324 MW | 16,180 MW | 8,392 MW | 8,211 MW | 45 MW |
| 2026-10-31T13:00Z | 28,044 MW | 17,297 MW | 8,238 MW | 8,214 MW | 1,157 MW |
| 2026-10-31T14:00Z | 28,394 MW | 17,201 MW | 8,231 MW | 8,207 MW | 3,314 MW |
| 2026-10-31T15:00Z | 28,661 MW | 16,623 MW | 8,035 MW | 8,208 MW | 5,317 MW |
| 2026-10-31T16:00Z | 28,633 MW | 16,687 MW | 7,169 MW | 8,200 MW | 7,034 MW |
| 2026-10-31T17:00Z | 28,529 MW | 16,533 MW | 6,486 MW | 8,202 MW | 7,919 MW |
| 2026-10-31T18:00Z | 29,526 MW | 17,950 MW | 5,550 MW | 8,212 MW | 6,952 MW |
| 2026-10-31T19:00Z | 30,851 MW | 18,879 MW | 5,031 MW | 8,226 MW | 5,209 MW |
| 2026-10-31T20:00Z | 31,951 MW | 19,621 MW | 4,302 MW | 8,238 MW | 3,495 MW |
| 2026-10-31T21:00Z | 31,847 MW | 19,206 MW | 4,028 MW | 8,245 MW | 2,060 MW |
| 2026-10-31T22:00Z | 31,713 MW | 19,476 MW | 4,099 MW | 8,261 MW | 608 MW |
| 2026-10-31T23:00Z | 31,709 MW | 19,652 MW | 5,290 MW | 8,282 MW | 12 MW |
| 2026-11-01T00:00Z | 31,265 MW | 19,528 MW | 7,053 MW | 8,292 MW | 1 MW |
| 2026-11-01T01:00Z | 29,763 MW | 18,958 MW | 9,040 MW | 8,297 MW | 2 MW |
| 2026-11-01T02:00Z | 28,373 MW | 18,132 MW | 10,500 MW | 8,299 MW | 3 MW |
| 2026-11-01T03:00Z | 27,614 MW | 17,211 MW | 10,828 MW | 8,306 MW | 2 MW |
| 2026-11-01T04:00Z | 26,814 MW | 16,329 MW | 10,563 MW | 8,308 MW | 3 MW |
| 2026-11-01T05:00Z | 26,233 MW | 15,642 MW | 10,047 MW | 8,308 MW | 3 MW |
| 2026-11-01T06:00Z | 25,763 MW | 14,935 MW | 9,679 MW | 8,306 MW | 3 MW |
| 2026-11-01T07:00Z | 25,348 MW | 14,809 MW | 9,045 MW | 8,303 MW | 3 MW |
| 2026-11-01T08:00Z | 25,067 MW | 15,173 MW | 8,464 MW | 8,295 MW | 3 MW |
| 2026-11-01T09:00Z | 25,007 MW | 15,456 MW | 8,417 MW | 8,294 MW | 2 MW |
| 2026-11-01T10:00Z | 24,911 MW | 15,323 MW | 8,529 MW | 8,300 MW | 2 MW |
| 2026-11-01T11:00Z | 25,328 MW | 15,496 MW | 8,603 MW | 8,302 MW | 2 MW |
| 2026-11-01T12:00Z | 26,338 MW | 16,465 MW | 7,922 MW | 8,302 MW | 25 MW |
| 2026-11-01T13:00Z | 26,877 MW | 17,269 MW | 7,806 MW | 8,301 MW | 1,012 MW |
| 2026-11-01T14:00Z | 27,316 MW | 16,950 MW | 7,560 MW | 8,302 MW | 3,050 MW |
| 2026-11-01T15:00Z | 28,117 MW | 16,679 MW | 6,664 MW | 8,297 MW | 5,099 MW |
| 2026-11-01T16:00Z | 28,424 MW | 16,518 MW | 6,397 MW | 8,294 MW | 6,382 MW |
| 2026-11-01T17:00Z | 28,541 MW | 16,357 MW | 6,654 MW | 8,294 MW | 6,853 MW |
| 2026-11-01T18:00Z | 28,791 MW | 16,610 MW | 7,195 MW | 8,294 MW | 6,745 MW |
| 2026-11-01T19:00Z | 29,484 MW | 16,747 MW | 8,302 MW | 8,287 MW | 5,413 MW |
| 2026-11-01T20:00Z | 30,043 MW | 16,340 MW | 9,596 MW | 8,291 MW | 3,979 MW |
| 2026-11-01T21:00Z | 31,062 MW | 16,676 MW | 10,073 MW | 8,294 MW | 2,612 MW |
| 2026-11-01T22:00Z | 31,577 MW | 17,814 MW | 10,261 MW | 8,280 MW | 580 MW |
| 2026-11-01T23:00Z | 31,569 MW | 18,965 MW | 11,247 MW | 8,272 MW | 15 MW |
| 2026-11-02T00:00Z | 31,001 MW | 18,670 MW | 12,457 MW | 8,291 MW | 3 MW |
| 2026-11-02T01:00Z | 30,284 MW | 18,253 MW | 13,512 MW | 8,268 MW | 3 MW |
| 2026-11-02T02:00Z | 29,040 MW | 17,845 MW | 14,055 MW | 8,201 MW | 3 MW |
| 2026-11-02T03:00Z | 27,615 MW | 16,844 MW | 14,454 MW | 8,113 MW | 4 MW |
| 2026-11-02T04:00Z | 26,444 MW | 15,088 MW | 15,766 MW | 8,114 MW | 3 MW |
| 2026-11-02T05:00Z | 25,162 MW | 13,895 MW | 16,441 MW | 8,117 MW | 4 MW |
| 2026-11-02T06:00Z | 23,874 MW | 13,272 MW | 16,494 MW | 8,123 MW | 3 MW |
| 2026-11-02T07:00Z | 22,833 MW | 12,301 MW | 16,740 MW | 8,121 MW | 3 MW |
| 2026-11-02T08:00Z | 22,422 MW | 12,243 MW | 17,197 MW | 8,117 MW | 4 MW |
| 2026-11-02T09:00Z | 22,304 MW | 12,312 MW | 17,432 MW | 8,117 MW | 4 MW |
| 2026-11-02T10:00Z | 23,348 MW | 12,602 MW | 17,619 MW | 8,022 MW | 5 MW |
| 2026-11-02T11:00Z | 24,601 MW | 13,127 MW | 18,313 MW | 7,912 MW | 4 MW |
| 2026-11-02T12:00Z | 26,433 MW | 13,865 MW | 19,145 MW | 7,895 MW | 38 MW |
| 2026-11-02T13:00Z | 27,329 MW | 14,897 MW | 19,740 MW | 7,896 MW | 708 MW |
| 2026-11-02T14:00Z | 27,632 MW | 15,386 MW | 20,062 MW | 7,894 MW | 1,793 MW |
| 2026-11-02T15:00Z | 27,881 MW | 15,644 MW | 20,209 MW | 7,893 MW | 2,752 MW |
| 2026-11-02T16:00Z | 27,625 MW | 15,542 MW | 20,598 MW | 7,892 MW | 3,672 MW |
| 2026-11-02T17:00Z | 28,136 MW | 15,603 MW | 20,920 MW | 7,890 MW | 4,095 MW |
| 2026-11-02T18:00Z | 28,694 MW | 15,326 MW | 20,793 MW | 7,887 MW | 3,970 MW |
| 2026-11-02T19:00Z | 29,117 MW | 15,138 MW | 20,932 MW | 7,882 MW | 3,389 MW |
| 2026-11-02T20:00Z | 29,321 MW | 15,714 MW | 20,883 MW | 7,883 MW | 2,983 MW |
| 2026-11-02T21:00Z | 28,468 MW | 15,576 MW | 21,108 MW | 7,876 MW | 2,218 MW |
| 2026-11-02T22:00Z | 29,071 MW | 15,976 MW | 21,471 MW | 7,876 MW | 681 MW |
| 2026-11-02T23:00Z | 29,755 MW | 16,810 MW | 22,011 MW | 7,881 MW | 16 MW |
| 2026-11-03T00:00Z | 29,657 MW | 16,798 MW | 21,932 MW | 7,880 MW | 4 MW |
| 2026-11-03T01:00Z | 29,393 MW | 16,915 MW | 21,079 MW | 7,882 MW | 5 MW |
| 2026-11-03T02:00Z | 28,846 MW | 17,163 MW | 20,202 MW | 7,881 MW | 4 MW |
| 2026-11-03T03:00Z | 27,759 MW | 16,613 MW | 19,774 MW | 7,882 MW | 4 MW |
| 2026-11-03T04:00Z | 26,621 MW | 15,635 MW | 19,165 MW | 7,887 MW | 4 MW |
| 2026-11-03T05:00Z | 25,399 MW | 14,622 MW | 18,742 MW | 7,891 MW | 4 MW |
| 2026-11-03T06:00Z | 24,509 MW | 12,548 MW | 18,929 MW | 7,889 MW | 4 MW |
| 2026-11-03T07:00Z | 23,992 MW | 11,881 MW | 18,668 MW | 7,885 MW | 4 MW |
| 2026-11-03T08:00Z | 23,637 MW | 11,510 MW | 18,167 MW | 7,888 MW | 4 MW |
| 2026-11-03T09:00Z | 23,820 MW | 11,473 MW | 17,798 MW | 7,885 MW | 4 MW |
| 2026-11-03T10:00Z | 23,668 MW | 11,307 MW | 17,942 MW | 7,887 MW | 4 MW |
| 2026-11-03T11:00Z | 25,558 MW | 11,830 MW | 18,720 MW | 7,887 MW | 4 MW |
| 2026-11-03T12:00Z | 27,090 MW | 12,570 MW | 18,711 MW | 7,889 MW | 57 MW |
| 2026-11-03T13:00Z | 27,224 MW | 12,306 MW | 19,408 MW | 7,885 MW | 1,960 MW |
| 2026-11-03T14:00Z | 26,710 MW | 12,382 MW | 19,136 MW | 7,633 MW | 4,290 MW |
| 2026-11-03T15:00Z | 26,478 MW | 12,526 MW | 19,273 MW | 6,892 MW | 5,605 MW |
| 2026-11-03T16:00Z | 27,441 MW | 12,481 MW | 19,658 MW | 6,885 MW | 6,972 MW |
| 2026-11-03T17:00Z | 27,175 MW | 12,510 MW | 19,758 MW | 6,882 MW | 7,784 MW |
| 2026-11-03T18:00Z | 28,581 MW | 12,167 MW | 20,156 MW | 6,881 MW | 7,476 MW |
| 2026-11-03T19:00Z | 29,666 MW | 12,646 MW | 20,592 MW | 6,882 MW | 6,295 MW |
| 2026-11-03T20:00Z | 30,220 MW | 12,345 MW | 21,003 MW | 6,879 MW | 4,696 MW |
| 2026-11-03T21:00Z | 31,370 MW | 13,441 MW | 20,542 MW | 6,880 MW | 2,165 MW |
| 2026-11-03T22:00Z | 32,241 MW | 14,250 MW | 20,185 MW | 6,877 MW | 380 MW |
| 2026-11-03T23:00Z | 32,633 MW | 15,821 MW | 20,084 MW | 6,873 MW | 14 MW |
| 2026-11-04T00:00Z | 32,426 MW | 15,766 MW | 20,080 MW | 6,872 MW | 10 MW |
| 2026-11-04T01:00Z | 31,576 MW | 16,107 MW | 19,931 MW | 6,873 MW | 11 MW |
| 2026-11-04T02:00Z | 30,181 MW | 15,421 MW | 19,504 MW | 6,875 MW | 13 MW |
| 2026-11-04T03:00Z | 28,140 MW | 14,990 MW | 19,903 MW | 6,876 MW | 15 MW |
| 2026-11-04T04:00Z | 26,942 MW | 13,768 MW | 19,969 MW | 6,876 MW | 12 MW |
| 2026-11-04T05:00Z | 25,283 MW | 12,899 MW | 19,549 MW | 6,878 MW | 9 MW |
| 2026-11-04T06:00Z | 23,853 MW | 11,370 MW | 19,663 MW | 6,882 MW | 8 MW |
| 2026-11-04T07:00Z | 23,275 MW | 10,962 MW | 19,343 MW | 6,880 MW | 8 MW |
| 2026-11-04T08:00Z | 22,191 MW | 10,246 MW | 19,366 MW | 6,885 MW | 8 MW |
| 2026-11-04T09:00Z | 22,541 MW | 10,359 MW | 19,035 MW | 6,891 MW | 9 MW |
| 2026-11-04T10:00Z | 22,554 MW | 10,851 MW | 18,986 MW | 6,893 MW | 14 MW |
| 2026-11-04T11:00Z | 25,023 MW | 11,619 MW | 18,606 MW | 6,896 MW | 14 MW |
| 2026-11-04T12:00Z | 26,656 MW | 12,698 MW | 19,361 MW | 6,899 MW | 36 MW |
| 2026-11-04T13:00Z | 26,781 MW | 12,851 MW | 19,836 MW | 6,896 MW | 2,140 MW |
| 2026-11-04T14:00Z | 26,281 MW | 12,079 MW | 18,127 MW | 6,898 MW | 5,771 MW |
| 2026-11-04T15:00Z | 26,485 MW | 12,220 MW | 18,413 MW | 6,898 MW | 6,927 MW |
| 2026-11-04T16:00Z | 26,704 MW | 11,807 MW | 19,689 MW | 6,898 MW | 7,681 MW |
| 2026-11-04T17:00Z | 26,981 MW | 12,004 MW | 20,371 MW | 6,895 MW | 7,806 MW |
| 2026-11-04T18:00Z | 27,307 MW | 12,598 MW | 20,581 MW | 6,892 MW | 7,560 MW |
| 2026-11-04T19:00Z | 27,075 MW | 11,880 MW | 20,534 MW | 6,893 MW | 7,509 MW |
| 2026-11-04T20:00Z | 28,032 MW | 12,275 MW | 20,274 MW | 6,911 MW | 6,925 MW |
| 2026-11-04T21:00Z | 29,209 MW | 12,466 MW | 20,178 MW | 6,934 MW | 5,901 MW |
| 2026-11-04T22:00Z | 30,833 MW | 13,386 MW | 19,970 MW | 6,959 MW | 1,819 MW |
| 2026-11-04T23:00Z | 31,778 MW | 14,639 MW | 19,688 MW | 6,985 MW | 22 MW |
| 2026-11-05T00:00Z | 31,573 MW | 14,760 MW | 19,795 MW | 7,005 MW | 4 MW |
| 2026-11-05T01:00Z | 31,192 MW | 14,206 MW | 19,309 MW | 6,960 MW | 5 MW |
| 2026-11-05T02:00Z | 30,131 MW | 13,971 MW | 18,994 MW | 6,952 MW | 5 MW |
| 2026-11-05T03:00Z | 28,567 MW | 13,379 MW | 19,030 MW | 6,957 MW | 4 MW |
| 2026-11-05T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T14:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T14:00Z.
Day by Day
Daily totals, Eastern time dates, through 2026-11-04Show the data table (400 rows)
| Date (Eastern time) | Demand |
|---|---|
| 2025-10-01 | 1.86 TWh |
| 2025-10-02 | 1.87 TWh |
| 2025-10-03 | 1.88 TWh |
| 2025-10-04 | 1.81 TWh |
| 2025-10-05 | 1.75 TWh |
| 2025-10-06 | 1.83 TWh |
| 2025-10-07 | 1.79 TWh |
| 2025-10-08 | 1.71 TWh |
| 2025-10-09 | 1.69 TWh |
| 2025-10-10 | 1.64 TWh |
| 2025-10-11 | 1.54 TWh |
| 2025-10-12 | 1.53 TWh |
| 2025-10-13 | 1.67 TWh |
| 2025-10-14 | 1.70 TWh |
| 2025-10-15 | 1.68 TWh |
| 2025-10-16 | 1.70 TWh |
| 2025-10-17 | 1.69 TWh |
| 2025-10-18 | 1.61 TWh |
| 2025-10-19 | 1.52 TWh |
| 2025-10-20 | 1.59 TWh |
| 2025-10-21 | 1.64 TWh |
| 2025-10-22 | 1.63 TWh |
| 2025-10-23 | 1.63 TWh |
| 2025-10-24 | 1.62 TWh |
| 2025-10-25 | 1.52 TWh |
| 2025-10-26 | 1.50 TWh |
| 2025-10-27 | 1.61 TWh |
| 2025-10-28 | 1.62 TWh |
| 2025-10-29 | 1.60 TWh |
| 2025-10-30 | 1.62 TWh |
| 2025-10-31 | 1.60 TWh |
| 2025-11-01 | 1.53 TWh |
| 2025-11-02 | 1.59 TWh |
| 2025-11-03 | 1.63 TWh |
| 2025-11-04 | 1.63 TWh |
| 2025-11-05 | 1.61 TWh |
| 2025-11-06 | 1.71 TWh |
| 2025-11-07 | 1.69 TWh |
| 2025-11-08 | 1.62 TWh |
| 2025-11-09 | 1.67 TWh |
| 2025-11-10 | 1.88 TWh |
| 2025-11-11 | 1.88 TWh |
| 2025-11-12 | 1.75 TWh |
| 2025-11-13 | 1.73 TWh |
| 2025-11-14 | 1.69 TWh |
| 2025-11-15 | 1.57 TWh |
| 2025-11-16 | 1.58 TWh |
| 2025-11-17 | 1.75 TWh |
| 2025-11-18 | 1.77 TWh |
| 2025-11-19 | 1.77 TWh |
| 2025-11-20 | 1.76 TWh |
| 2025-11-21 | 1.74 TWh |
| 2025-11-22 | 1.64 TWh |
| 2025-11-23 | 1.59 TWh |
| 2025-11-24 | 1.74 TWh |
| 2025-11-25 | 1.75 TWh |
| 2025-11-26 | 1.80 TWh |
| 2025-11-27 | 1.70 TWh |
| 2025-11-28 | 1.74 TWh |
| 2025-11-29 | 1.77 TWh |
| 2025-11-30 | 1.80 TWh |
| 2025-12-01 | 2.00 TWh |
| 2025-12-02 | 2.05 TWh |
| 2025-12-03 | 2.07 TWh |
| 2025-12-04 | 2.08 TWh |
| 2025-12-05 | 2.05 TWh |
| 2025-12-06 | 1.88 TWh |
| 2025-12-07 | 1.84 TWh |
| 2025-12-08 | 2.02 TWh |
| 2025-12-09 | 2.00 TWh |
| 2025-12-10 | 1.97 TWh |
| 2025-12-11 | 1.95 TWh |
| 2025-12-12 | 1.92 TWh |
| 2025-12-13 | 1.90 TWh |
| 2025-12-14 | 2.04 TWh |
| 2025-12-15 | 2.16 TWh |
| 2025-12-16 | 1.99 TWh |
| 2025-12-17 | 1.82 TWh |
| 2025-12-18 | 1.81 TWh |
| 2025-12-19 | 1.93 TWh |
| 2025-12-20 | 1.79 TWh |
| 2025-12-21 | 1.80 TWh |
| 2025-12-22 | 1.87 TWh |
| 2025-12-23 | 1.77 TWh |
| 2025-12-24 | 1.66 TWh |
| 2025-12-25 | 1.56 TWh |
| 2025-12-26 | 1.64 TWh |
| 2025-12-27 | 1.65 TWh |
| 2025-12-28 | 1.67 TWh |
| 2025-12-29 | 1.99 TWh |
| 2025-12-30 | 2.05 TWh |
| 2025-12-31 | 1.94 TWh |
| 2026-01-01 | 1.77 TWh |
| 2026-01-02 | 1.81 TWh |
| 2026-01-03 | 1.78 TWh |
| 2026-01-04 | 1.76 TWh |
| 2026-01-05 | 1.80 TWh |
| 2026-01-06 | 1.75 TWh |
| 2026-01-07 | 1.74 TWh |
| 2026-01-08 | 1.74 TWh |
| 2026-01-09 | 1.70 TWh |
| 2026-01-10 | 1.69 TWh |
| 2026-01-11 | 1.77 TWh |
| 2026-01-12 | 1.87 TWh |
| 2026-01-13 | 1.82 TWh |
| 2026-01-14 | 1.86 TWh |
| 2026-01-15 | 1.99 TWh |
| 2026-01-16 | 1.93 TWh |
| 2026-01-17 | 1.91 TWh |
| 2026-01-18 | 2.00 TWh |
| 2026-01-19 | 2.10 TWh |
| 2026-01-20 | 2.10 TWh |
| 2026-01-21 | 1.95 TWh |
| 2026-01-22 | 1.97 TWh |
| 2026-01-23 | 2.11 TWh |
| 2026-01-24 | 2.19 TWh |
| 2026-01-25 | 2.15 TWh |
| 2026-01-26 | 2.28 TWh |
| 2026-01-27 | 2.22 TWh |
| 2026-01-28 | 2.17 TWh |
| 2026-01-29 | 2.13 TWh |
| 2026-01-30 | 2.12 TWh |
| 2026-01-31 | 2.15 TWh |
| 2026-02-01 | 2.10 TWh |
| 2026-02-02 | 2.04 TWh |
| 2026-02-03 | 1.95 TWh |
| 2026-02-04 | 1.97 TWh |
| 2026-02-05 | 2.02 TWh |
| 2026-02-06 | 1.88 TWh |
| 2026-02-07 | 1.81 TWh |
| 2026-02-08 | 1.79 TWh |
| 2026-02-09 | 1.83 TWh |
| 2026-02-10 | 1.75 TWh |
| 2026-02-11 | 1.78 TWh |
| 2026-02-12 | 1.79 TWh |
| 2026-02-13 | 1.73 TWh |
| 2026-02-14 | 1.62 TWh |
| 2026-02-15 | 1.56 TWh |
| 2026-02-16 | 1.68 TWh |
| 2026-02-17 | 1.70 TWh |
| 2026-02-18 | 1.66 TWh |
| 2026-02-19 | 1.71 TWh |
| 2026-02-20 | 1.77 TWh |
| 2026-02-21 | 1.74 TWh |
| 2026-02-22 | 1.79 TWh |
| 2026-02-23 | 1.97 TWh |
| 2026-02-24 | 1.95 TWh |
| 2026-02-25 | 1.80 TWh |
| 2026-02-26 | 1.76 TWh |
| 2026-02-27 | 1.68 TWh |
| 2026-02-28 | 1.63 TWh |
| 2026-03-01 | 1.65 TWh |
| 2026-03-02 | 1.78 TWh |
| 2026-03-03 | 1.76 TWh |
| 2026-03-04 | 1.72 TWh |
| 2026-03-05 | 1.73 TWh |
| 2026-03-06 | 1.70 TWh |
| 2026-03-07 | 1.60 TWh |
| 2026-03-08 | 1.46 TWh |
| 2026-03-09 | 1.64 TWh |
| 2026-03-10 | 1.69 TWh |
| 2026-03-11 | 1.72 TWh |
| 2026-03-12 | 1.70 TWh |
| 2026-03-13 | 1.68 TWh |
| 2026-03-14 | 1.61 TWh |
| 2026-03-15 | 1.60 TWh |
| 2026-03-16 | 1.82 TWh |
| 2026-03-17 | 1.93 TWh |
| 2026-03-18 | 1.80 TWh |
| 2026-03-19 | 1.71 TWh |
| 2026-03-20 | 1.61 TWh |
| 2026-03-21 | 1.55 TWh |
| 2026-03-22 | 1.56 TWh |
| 2026-03-23 | 1.66 TWh |
| 2026-03-24 | 1.68 TWh |
| 2026-03-25 | 1.67 TWh |
| 2026-03-26 | 1.70 TWh |
| 2026-03-27 | 1.68 TWh |
| 2026-03-28 | 1.57 TWh |
| 2026-03-29 | 1.53 TWh |
| 2026-03-30 | 1.65 TWh |
| 2026-03-31 | 1.70 TWh |
| 2026-04-01 | 1.70 TWh |
| 2026-04-02 | 1.72 TWh |
| 2026-04-03 | 1.66 TWh |
| 2026-04-04 | 1.59 TWh |
| 2026-04-05 | 1.49 TWh |
| 2026-04-06 | 1.62 TWh |
| 2026-04-07 | 1.67 TWh |
| 2026-04-08 | 1.65 TWh |
| 2026-04-09 | 1.64 TWh |
| 2026-04-10 | 1.63 TWh |
| 2026-04-11 | 1.56 TWh |
| 2026-04-12 | 1.55 TWh |
| 2026-04-13 | 1.73 TWh |
| 2026-04-14 | 1.77 TWh |
| 2026-04-15 | 1.73 TWh |
| 2026-04-16 | 1.72 TWh |
| 2026-04-17 | 1.72 TWh |
| 2026-04-18 | 1.56 TWh |
| 2026-04-19 | 1.49 TWh |
| 2026-04-20 | 1.61 TWh |
| 2026-04-21 | 1.63 TWh |
| 2026-04-22 | 1.67 TWh |
| 2026-04-23 | 1.73 TWh |
| 2026-04-24 | 1.67 TWh |
| 2026-04-25 | 1.56 TWh |
| 2026-04-26 | 1.56 TWh |
| 2026-04-27 | 1.73 TWh |
| 2026-04-28 | 1.71 TWh |
| 2026-04-29 | 1.68 TWh |
| 2026-04-30 | 1.64 TWh |
| 2026-05-01 | 1.59 TWh |
| 2026-05-02 | 1.49 TWh |
| 2026-05-03 | 1.48 TWh |
| 2026-05-04 | 1.62 TWh |
| 2026-05-05 | 1.64 TWh |
| 2026-05-06 | 1.67 TWh |
| 2026-05-07 | 1.64 TWh |
| 2026-05-08 | 1.61 TWh |
| 2026-05-09 | 1.52 TWh |
| 2026-05-10 | 1.51 TWh |
| 2026-05-11 | 1.63 TWh |
| 2026-05-12 | 1.68 TWh |
| 2026-05-13 | 1.67 TWh |
| 2026-05-14 | 1.68 TWh |
| 2026-05-15 | 1.72 TWh |
| 2026-05-16 | 1.68 TWh |
| 2026-05-17 | 1.73 TWh |
| 2026-05-18 | 1.89 TWh |
| 2026-05-19 | 1.88 TWh |
| 2026-05-20 | 1.70 TWh |
| 2026-05-21 | 1.68 TWh |
| 2026-05-22 | 1.68 TWh |
| 2026-05-23 | 1.56 TWh |
| 2026-05-24 | 1.58 TWh |
| 2026-05-25 | 1.67 TWh |
| 2026-05-26 | 1.88 TWh |
| 2026-05-27 | 1.95 TWh |
| 2026-05-28 | 1.92 TWh |
| 2026-05-29 | 1.90 TWh |
| 2026-05-30 | 1.80 TWh |
| 2026-05-31 | 1.75 TWh |
| 2026-06-01 | 1.92 TWh |
| 2026-06-02 | 1.88 TWh |
| 2026-06-03 | 1.87 TWh |
| 2026-06-04 | 1.94 TWh |
| 2026-06-05 | 1.96 TWh |
| 2026-06-06 | 1.96 TWh |
| 2026-06-07 | 1.94 TWh |
| 2026-06-08 | 2.06 TWh |
| 2026-06-09 | 2.21 TWh |
| 2026-06-10 | 2.25 TWh |
| 2026-06-11 | 2.16 TWh |
| 2026-06-12 | 2.02 TWh |
| 2026-06-13 | 1.91 TWh |
| 2026-06-14 | 1.78 TWh |
| 2026-06-15 | 1.82 TWh |
| 2026-06-16 | 1.82 TWh |
| 2026-06-17 | 1.88 TWh |
| 2026-06-18 | 1.90 TWh |
| 2026-06-19 | 1.87 TWh |
| 2026-06-20 | 1.76 TWh |
| 2026-06-21 | 1.73 TWh |
| 2026-06-22 | 1.87 TWh |
| 2026-06-23 | 1.92 TWh |
| 2026-06-24 | 1.93 TWh |
| 2026-06-25 | 1.98 TWh |
| 2026-06-26 | 1.94 TWh |
| 2026-06-27 | 1.91 TWh |
| 2026-06-28 | 2.03 TWh |
| 2026-06-29 | 2.38 TWh |
| 2026-06-30 | 2.49 TWh |
| 2026-07-01 | 2.47 TWh |
| 2026-07-02 | 2.40 TWh |
| 2026-07-03 | 2.25 TWh |
| 2026-07-04 | 2.06 TWh |
| 2026-07-05 | 1.98 TWh |
| 2026-07-06 | 2.17 TWh |
| 2026-07-07 | 2.20 TWh |
| 2026-07-08 | 2.25 TWh |
| 2026-07-09 | 2.27 TWh |
| 2026-07-10 | 2.24 TWh |
| 2026-07-11 | 2.10 TWh |
| 2026-07-12 | 2.09 TWh |
| 2026-07-13 | 2.26 TWh |
| 2026-07-14 | 2.37 TWh |
| 2026-07-15 | 2.40 TWh |
| 2026-07-16 | 2.36 TWh |
| 2026-07-17 | 2.38 TWh |
| 2026-07-18 | 2.30 TWh |
| 2026-07-19 | 2.14 TWh |
| 2026-07-20 | 2.29 TWh |
| 2026-07-21 | 2.32 TWh |
| 2026-07-22 | 2.06 TWh |
| 2026-07-23 | 2.02 TWh |
| 2026-07-24 | 2.04 TWh |
| 2026-07-25 | 2.05 TWh |
| 2026-07-26 | 2.26 TWh |
| 2026-07-27 | 2.45 TWh |
| 2026-07-28 | 2.35 TWh |
| 2026-07-29 | 2.26 TWh |
| 2026-07-30 | 2.28 TWh |
| 2026-07-31 | 2.18 TWh |
| 2026-08-01 | 2.05 TWh |
| 2026-08-02 | 1.94 TWh |
| 2026-08-03 | 2.12 TWh |
| 2026-08-04 | 2.15 TWh |
| 2026-08-05 | 2.19 TWh |
| 2026-08-06 | 2.14 TWh |
| 2026-08-07 | 2.20 TWh |
| 2026-08-08 | 2.10 TWh |
| 2026-08-09 | 2.07 TWh |
| 2026-08-10 | 2.29 TWh |
| 2026-08-11 | 2.30 TWh |
| 2026-08-12 | 2.26 TWh |
| 2026-08-13 | 2.26 TWh |
| 2026-08-14 | 2.23 TWh |
| 2026-08-15 | 2.14 TWh |
| 2026-08-16 | 2.17 TWh |
| 2026-08-17 | 2.20 TWh |
| 2026-08-18 | 2.17 TWh |
| 2026-08-19 | 2.16 TWh |
| 2026-08-20 | 2.16 TWh |
| 2026-08-21 | 2.14 TWh |
| 2026-08-22 | 2.00 TWh |
| 2026-08-23 | 1.89 TWh |
| 2026-08-24 | 1.97 TWh |
| 2026-08-25 | 2.06 TWh |
| 2026-08-26 | 2.15 TWh |
| 2026-08-27 | 2.10 TWh |
| 2026-08-28 | 2.07 TWh |
| 2026-08-29 | 1.97 TWh |
| 2026-08-30 | 2.03 TWh |
| 2026-08-31 | 2.27 TWh |
| 2026-09-01 | 2.35 TWh |
| 2026-09-02 | 2.40 TWh |
| 2026-09-03 | 2.36 TWh |
| 2026-09-04 | 2.31 TWh |
| 2026-09-05 | 2.15 TWh |
| 2026-09-06 | 2.00 TWh |
| 2026-09-07 | 1.97 TWh |
| 2026-09-08 | 2.11 TWh |
| 2026-09-09 | 2.18 TWh |
| 2026-09-10 | 2.06 TWh |
| 2026-09-11 | 2.02 TWh |
| 2026-09-12 | 1.97 TWh |
| 2026-09-13 | 1.87 TWh |
| 2026-09-14 | 1.91 TWh |
| 2026-09-15 | 2.04 TWh |
| 2026-09-16 | 2.07 TWh |
| 2026-09-17 | 2.08 TWh |
| 2026-09-18 | 2.03 TWh |
| 2026-09-19 | 1.91 TWh |
| 2026-09-20 | 1.88 TWh |
| 2026-09-21 | 1.90 TWh |
| 2026-09-22 | 1.84 TWh |
| 2026-09-23 | 1.82 TWh |
| 2026-09-24 | 1.82 TWh |
| 2026-09-25 | 1.79 TWh |
| 2026-09-26 | 1.68 TWh |
| 2026-09-27 | 1.68 TWh |
| 2026-09-28 | 1.83 TWh |
| 2026-09-29 | 1.87 TWh |
| 2026-09-30 | 1.93 TWh |
| 2026-10-01 | 1.95 TWh |
| 2026-10-02 | 1.81 TWh |
| 2026-10-03 | 1.66 TWh |
| 2026-10-04 | 1.62 TWh |
| 2026-10-05 | 1.73 TWh |
| 2026-10-06 | 1.76 TWh |
| 2026-10-07 | 1.80 TWh |
| 2026-10-08 | 1.78 TWh |
| 2026-10-09 | 1.76 TWh |
| 2026-10-10 | 1.67 TWh |
| 2026-10-11 | 1.69 TWh |
| 2026-10-12 | 1.89 TWh |
| 2026-10-13 | 1.95 TWh |
| 2026-10-14 | 1.88 TWh |
| 2026-10-15 | 1.82 TWh |
| 2026-10-16 | 1.69 TWh |
| 2026-10-17 | 1.53 TWh |
| 2026-10-18 | 1.52 TWh |
| 2026-10-19 | 1.65 TWh |
| 2026-10-20 | 1.66 TWh |
| 2026-10-21 | 1.67 TWh |
| 2026-10-22 | 1.68 TWh |
| 2026-10-23 | 1.67 TWh |
| 2026-10-24 | 1.57 TWh |
| 2026-10-25 | 1.55 TWh |
| 2026-10-26 | 1.68 TWh |
| 2026-10-27 | 1.70 TWh |
| 2026-10-28 | 1.71 TWh |
| 2026-10-29 | 1.70 TWh |
| 2026-10-30 | 1.67 TWh |
| 2026-10-31 | 1.59 TWh |
| 2026-11-01 | 1.65 TWh |
| 2026-11-02 | 1.71 TWh |
| 2026-11-03 | 1.74 TWh |
| 2026-11-04 | 1.70 TWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 578 TWh | 574 TWh | Gas 37.9% | 308 |
| 2025 | 666 TWh | 659 TWh | Gas 35.4% | 365 |
| 2024 | 647 TWh | 638 TWh | Gas 39.6% | 366 |
| 2023 | 641 TWh | 617 TWh | Gas 39.1% | 365 |
| 2022 | 653 TWh | 640 TWh | Coal 33.9% | 365 |
| 2021 | 642 TWh | 617 TWh | Coal 38.7% | 365 |
| 2020 | 624 TWh | 576 TWh | Gas 34.3% | 366 |
| 2019 | 650 TWh | 608 TWh | Coal 39.3% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 2.49 TWh | 2026-06-30 (30 June 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 121.5 GW | 30 Jun 2026, 17:00 EDT (UTC-04:00) |
| Highest solar share of a day's generation, 2019 onward | 12.5% | 2026-05-14 (14 May 2026) |
| Highest wind share of a day's generation, 2019 onward | 35.6% | 2025-03-15 (15 March 2025) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Power Flows With Neighbours
Net totals, 2026-10-06 (6 October 2026) to 2026-11-04 (4 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| TVA | MISO exports | 1.46 TWh |
| PJM | MISO imports | 1.28 TWh |
| MHEB | MISO imports | 685 GWh |
| AECI | MISO imports | 440 GWh |
| IESO | MISO imports | 438 GWh |
| LGEE | MISO exports | 261 GWh |
| SPP | MISO imports | 77.2 GWh |
| SPA | MISO imports | 30.7 GWh |
| SIKE | MISO imports | 28.9 GWh |
| SOCO | MISO exports | 6.95 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Share and Embed
Figures as of 2026-11-05 (5 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for MISO, credited to EIA. The image is rebuilt with the page. More about grid widgets.
Embed this widget
Free to use on your own site. Keep the source line in the frame; it carries the data licence and a link back here.
The frame reports its height to the page with postMessage type wpm-embed-height if you want it to resize.
Related
Cite this page
World Power Monitor. (2026). MISO Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/miso/
World Power Monitor. MISO Electricity Demand and Generation Mix. Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/zones/miso/
@misc{wpm_zones_miso_2026,
title = {{MISO Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/zones/miso/}
} Permalink: https://worldpowermonitor.com/zones/miso/
The Copy buttons add today's date as the access date.