SPP Electricity Demand and Generation Mix
SPP demand was 40,177 MW in the hour starting 15 Sept 2026, 10:00 CDT (UTC-05:00). Wind was the largest source in the hour starting 14 Sept 2026, 22:00 CDT (UTC-05:00), at 50% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- SPP is a regional transmission organization and balancing authority in the United States, part of the EIA Central region.
- In the hour starting 15 Sept 2026, 10:00 CDT (UTC-05:00), demand in SPP was 40,177 MW, against a day-ahead forecast of 42,369 MW.
- Wind supplied 50.1% of SPP's generation in the hour starting 14 Sept 2026, 22:00 CDT (UTC-05:00).
- Demand in SPP totalled 300 TWh in 2025.
- Wind supplied 36.7% of SPP's generation in 2025.
- The highest daily demand in SPP from 2019 onward was 1.18 TWh, on 2026-07-27 (27 July 2026).
- The highest hourly demand in SPP since 2026-06-16 (16 June 2026) was 57,964 MW, in the hour starting 27 Jul 2026, 16:00 CDT (UTC-05:00).
- Solar's highest share of SPP's daily generation from 2019 onward was 4.4%, on 2026-06-03 (3 June 2026).
- Wind's highest share of SPP's daily generation from 2019 onward was 72.4%, on 2022-11-02 (2 November 2022).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 15 Sept 2026, 10:00 CDT (UTC-05:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T15:00:00Z.
Generation by Source
Latest hour with generation by source: 14 Sept 2026, 22:00 CDT (UTC-05:00)| Source | Output | Share |
|---|---|---|
| Wind | 20,595 MW | 50.1% |
| Gas | 8,195 MW | 19.9% |
| Coal | 7,269 MW | 17.7% |
| Solar | 2,196 MW | 5.3% |
| Nuclear | 1,859 MW | 4.5% |
| Hydro | 963 MW | 2.3% |
| Other | 58 MW | 0.1% |
| Oil | 0 MW | 0.0% |
| Storage | 0 MW | 0.0% |
| Total from these sources | 41,135 MW | |
| Net interchange | 1,023 MW | net exports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when SPP exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T03:00:00Z.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-16T17:00Z | 45,903 MW |
| 2026-08-16T18:00Z | 47,987 MW |
| 2026-08-16T19:00Z | 49,566 MW |
| 2026-08-16T20:00Z | 50,658 MW |
| 2026-08-16T21:00Z | 51,357 MW |
| 2026-08-16T22:00Z | 51,533 MW |
| 2026-08-16T23:00Z | 50,819 MW |
| 2026-08-17T00:00Z | 49,256 MW |
| 2026-08-17T01:00Z | 47,395 MW |
| 2026-08-17T02:00Z | 45,362 MW |
| 2026-08-17T03:00Z | 42,700 MW |
| 2026-08-17T04:00Z | 40,111 MW |
| 2026-08-17T05:00Z | 38,010 MW |
| 2026-08-17T06:00Z | 36,468 MW |
| 2026-08-17T07:00Z | 35,273 MW |
| 2026-08-17T08:00Z | 34,466 MW |
| 2026-08-17T09:00Z | 34,251 MW |
| 2026-08-17T10:00Z | 34,849 MW |
| 2026-08-17T11:00Z | 36,109 MW |
| 2026-08-17T12:00Z | 36,934 MW |
| 2026-08-17T13:00Z | 38,108 MW |
| 2026-08-17T14:00Z | 39,594 MW |
| 2026-08-17T15:00Z | 41,444 MW |
| 2026-08-17T16:00Z | 43,337 MW |
| 2026-08-17T17:00Z | 45,231 MW |
| 2026-08-17T18:00Z | 47,081 MW |
| 2026-08-17T19:00Z | 48,627 MW |
| 2026-08-17T20:00Z | 49,976 MW |
| 2026-08-17T21:00Z | 50,819 MW |
| 2026-08-17T22:00Z | 50,977 MW |
| 2026-08-17T23:00Z | 50,372 MW |
| 2026-08-18T00:00Z | 48,792 MW |
| 2026-08-18T01:00Z | 46,918 MW |
| 2026-08-18T02:00Z | 44,803 MW |
| 2026-08-18T03:00Z | 41,963 MW |
| 2026-08-18T04:00Z | 39,367 MW |
| 2026-08-18T05:00Z | 37,348 MW |
| 2026-08-18T06:00Z | 35,802 MW |
| 2026-08-18T07:00Z | 34,675 MW |
| 2026-08-18T08:00Z | 33,908 MW |
| 2026-08-18T09:00Z | 33,664 MW |
| 2026-08-18T10:00Z | 34,208 MW |
| 2026-08-18T11:00Z | 35,433 MW |
| 2026-08-18T12:00Z | 36,320 MW |
| 2026-08-18T13:00Z | 37,697 MW |
| 2026-08-18T14:00Z | 39,746 MW |
| 2026-08-18T15:00Z | 42,174 MW |
| 2026-08-18T16:00Z | 44,797 MW |
| 2026-08-18T17:00Z | 47,268 MW |
| 2026-08-18T18:00Z | 49,410 MW |
| 2026-08-18T19:00Z | 51,032 MW |
| 2026-08-18T20:00Z | 52,231 MW |
| 2026-08-18T21:00Z | 53,226 MW |
| 2026-08-18T22:00Z | 53,505 MW |
| 2026-08-18T23:00Z | 52,982 MW |
| 2026-08-19T00:00Z | 51,452 MW |
| 2026-08-19T01:00Z | 49,640 MW |
| 2026-08-19T02:00Z | 47,482 MW |
| 2026-08-19T03:00Z | 44,831 MW |
| 2026-08-19T04:00Z | 42,044 MW |
| 2026-08-19T05:00Z | 39,841 MW |
| 2026-08-19T06:00Z | 38,224 MW |
| 2026-08-19T07:00Z | 37,019 MW |
| 2026-08-19T08:00Z | 36,304 MW |
| 2026-08-19T09:00Z | 35,900 MW |
| 2026-08-19T10:00Z | 36,347 MW |
| 2026-08-19T11:00Z | 37,413 MW |
| 2026-08-19T12:00Z | 38,173 MW |
| 2026-08-19T13:00Z | 39,391 MW |
| 2026-08-19T14:00Z | 41,164 MW |
| 2026-08-19T15:00Z | 43,152 MW |
| 2026-08-19T16:00Z | 45,334 MW |
| 2026-08-19T17:00Z | 47,385 MW |
| 2026-08-19T18:00Z | 49,017 MW |
| 2026-08-19T19:00Z | 50,186 MW |
| 2026-08-19T20:00Z | 51,383 MW |
| 2026-08-19T21:00Z | 52,428 MW |
| 2026-08-19T22:00Z | 52,743 MW |
| 2026-08-19T23:00Z | 52,246 MW |
| 2026-08-20T00:00Z | 50,770 MW |
| 2026-08-20T01:00Z | 48,719 MW |
| 2026-08-20T02:00Z | 46,505 MW |
| 2026-08-20T03:00Z | 43,671 MW |
| 2026-08-20T04:00Z | 40,886 MW |
| 2026-08-20T05:00Z | 38,797 MW |
| 2026-08-20T06:00Z | 37,164 MW |
| 2026-08-20T07:00Z | 35,924 MW |
| 2026-08-20T08:00Z | 35,092 MW |
| 2026-08-20T09:00Z | 34,801 MW |
| 2026-08-20T10:00Z | 35,180 MW |
| 2026-08-20T11:00Z | 36,242 MW |
| 2026-08-20T12:00Z | 37,281 MW |
| 2026-08-20T13:00Z | 38,683 MW |
| 2026-08-20T14:00Z | 40,670 MW |
| 2026-08-20T15:00Z | 43,204 MW |
| 2026-08-20T16:00Z | 45,899 MW |
| 2026-08-20T17:00Z | 48,589 MW |
| 2026-08-20T18:00Z | 51,011 MW |
| 2026-08-20T19:00Z | 52,621 MW |
| 2026-08-20T20:00Z | 53,872 MW |
| 2026-08-20T21:00Z | 54,420 MW |
| 2026-08-20T22:00Z | 54,206 MW |
| 2026-08-20T23:00Z | 53,315 MW |
| 2026-08-21T00:00Z | 51,544 MW |
| 2026-08-21T01:00Z | 49,614 MW |
| 2026-08-21T02:00Z | 47,436 MW |
| 2026-08-21T03:00Z | 44,581 MW |
| 2026-08-21T04:00Z | 41,840 MW |
| 2026-08-21T05:00Z | 39,663 MW |
| 2026-08-21T06:00Z | 37,943 MW |
| 2026-08-21T07:00Z | 36,573 MW |
| 2026-08-21T08:00Z | 35,635 MW |
| 2026-08-21T09:00Z | 35,256 MW |
| 2026-08-21T10:00Z | 35,699 MW |
| 2026-08-21T11:00Z | 36,838 MW |
| 2026-08-21T12:00Z | 37,630 MW |
| 2026-08-21T13:00Z | 38,943 MW |
| 2026-08-21T14:00Z | 40,696 MW |
| 2026-08-21T15:00Z | 42,868 MW |
| 2026-08-21T16:00Z | 45,183 MW |
| 2026-08-21T17:00Z | 47,309 MW |
| 2026-08-21T18:00Z | 49,291 MW |
| 2026-08-21T19:00Z | 50,737 MW |
| 2026-08-21T20:00Z | 51,900 MW |
| 2026-08-21T21:00Z | 52,602 MW |
| 2026-08-21T22:00Z | 52,335 MW |
| 2026-08-21T23:00Z | 51,256 MW |
| 2026-08-22T00:00Z | 49,556 MW |
| 2026-08-22T01:00Z | 47,541 MW |
| 2026-08-22T02:00Z | 45,463 MW |
| 2026-08-22T03:00Z | 43,042 MW |
| 2026-08-22T04:00Z | 40,580 MW |
| 2026-08-22T05:00Z | 38,464 MW |
| 2026-08-22T06:00Z | 36,680 MW |
| 2026-08-22T07:00Z | 35,428 MW |
| 2026-08-22T08:00Z | 34,635 MW |
| 2026-08-22T09:00Z | 34,148 MW |
| 2026-08-22T10:00Z | 34,031 MW |
| 2026-08-22T11:00Z | 34,158 MW |
| 2026-08-22T12:00Z | 34,593 MW |
| 2026-08-22T13:00Z | 35,910 MW |
| 2026-08-22T14:00Z | 37,848 MW |
| 2026-08-22T15:00Z | 40,020 MW |
| 2026-08-22T16:00Z | 42,165 MW |
| 2026-08-22T17:00Z | 43,852 MW |
| 2026-08-22T18:00Z | 45,285 MW |
| 2026-08-22T19:00Z | 46,317 MW |
| 2026-08-22T20:00Z | 47,449 MW |
| 2026-08-22T21:00Z | 48,235 MW |
| 2026-08-22T22:00Z | 48,629 MW |
| 2026-08-22T23:00Z | 48,182 MW |
| 2026-08-23T00:00Z | 46,519 MW |
| 2026-08-23T01:00Z | 44,529 MW |
| 2026-08-23T02:00Z | 42,638 MW |
| 2026-08-23T03:00Z | 40,459 MW |
| 2026-08-23T04:00Z | 38,260 MW |
| 2026-08-23T05:00Z | 36,334 MW |
| 2026-08-23T06:00Z | 34,800 MW |
| 2026-08-23T07:00Z | 33,636 MW |
| 2026-08-23T08:00Z | 32,809 MW |
| 2026-08-23T09:00Z | 32,241 MW |
| 2026-08-23T10:00Z | 31,950 MW |
| 2026-08-23T11:00Z | 31,911 MW |
| 2026-08-23T12:00Z | 32,242 MW |
| 2026-08-23T13:00Z | 33,863 MW |
| 2026-08-23T14:00Z | 35,887 MW |
| 2026-08-23T15:00Z | 38,103 MW |
| 2026-08-23T16:00Z | 40,434 MW |
| 2026-08-23T17:00Z | 42,618 MW |
| 2026-08-23T18:00Z | 44,410 MW |
| 2026-08-23T19:00Z | 45,823 MW |
| 2026-08-23T20:00Z | 46,878 MW |
| 2026-08-23T21:00Z | 47,558 MW |
| 2026-08-23T22:00Z | 47,877 MW |
| 2026-08-23T23:00Z | 47,385 MW |
| 2026-08-24T00:00Z | 46,248 MW |
| 2026-08-24T01:00Z | 44,998 MW |
| 2026-08-24T02:00Z | 43,240 MW |
| 2026-08-24T03:00Z | 40,819 MW |
| 2026-08-24T04:00Z | 38,351 MW |
| 2026-08-24T05:00Z | 36,523 MW |
| 2026-08-24T06:00Z | 35,173 MW |
| 2026-08-24T07:00Z | 34,323 MW |
| 2026-08-24T08:00Z | 33,717 MW |
| 2026-08-24T09:00Z | 33,688 MW |
| 2026-08-24T10:00Z | 34,359 MW |
| 2026-08-24T11:00Z | 35,785 MW |
| 2026-08-24T12:00Z | 36,729 MW |
| 2026-08-24T13:00Z | 37,625 MW |
| 2026-08-24T14:00Z | 38,907 MW |
| 2026-08-24T15:00Z | 40,735 MW |
| 2026-08-24T16:00Z | 42,663 MW |
| 2026-08-24T17:00Z | 44,665 MW |
| 2026-08-24T18:00Z | 46,623 MW |
| 2026-08-24T19:00Z | 48,055 MW |
| 2026-08-24T20:00Z | 49,241 MW |
| 2026-08-24T21:00Z | 50,102 MW |
| 2026-08-24T22:00Z | 50,204 MW |
| 2026-08-24T23:00Z | 49,477 MW |
| 2026-08-25T00:00Z | 48,139 MW |
| 2026-08-25T01:00Z | 46,792 MW |
| 2026-08-25T02:00Z | 44,891 MW |
| 2026-08-25T03:00Z | 42,170 MW |
| 2026-08-25T04:00Z | 39,608 MW |
| 2026-08-25T05:00Z | 37,493 MW |
| 2026-08-25T06:00Z | 36,051 MW |
| 2026-08-25T07:00Z | 34,964 MW |
| 2026-08-25T08:00Z | 34,283 MW |
| 2026-08-25T09:00Z | 34,056 MW |
| 2026-08-25T10:00Z | 34,719 MW |
| 2026-08-25T11:00Z | 36,222 MW |
| 2026-08-25T12:00Z | 36,994 MW |
| 2026-08-25T13:00Z | 38,161 MW |
| 2026-08-25T14:00Z | 39,802 MW |
| 2026-08-25T15:00Z | 42,105 MW |
| 2026-08-25T16:00Z | 44,525 MW |
| 2026-08-25T17:00Z | 46,962 MW |
| 2026-08-25T18:00Z | 49,162 MW |
| 2026-08-25T19:00Z | 50,620 MW |
| 2026-08-25T20:00Z | 51,548 MW |
| 2026-08-25T21:00Z | 52,024 MW |
| 2026-08-25T22:00Z | 51,809 MW |
| 2026-08-25T23:00Z | 51,068 MW |
| 2026-08-26T00:00Z | 49,509 MW |
| 2026-08-26T01:00Z | 47,868 MW |
| 2026-08-26T02:00Z | 45,687 MW |
| 2026-08-26T03:00Z | 42,949 MW |
| 2026-08-26T04:00Z | 40,391 MW |
| 2026-08-26T05:00Z | 38,338 MW |
| 2026-08-26T06:00Z | 36,818 MW |
| 2026-08-26T07:00Z | 35,590 MW |
| 2026-08-26T08:00Z | 34,955 MW |
| 2026-08-26T09:00Z | 34,729 MW |
| 2026-08-26T10:00Z | 35,366 MW |
| 2026-08-26T11:00Z | 36,699 MW |
| 2026-08-26T12:00Z | 37,611 MW |
| 2026-08-26T13:00Z | 38,930 MW |
| 2026-08-26T14:00Z | 40,736 MW |
| 2026-08-26T15:00Z | 42,755 MW |
| 2026-08-26T16:00Z | 45,159 MW |
| 2026-08-26T17:00Z | 47,454 MW |
| 2026-08-26T18:00Z | 49,375 MW |
| 2026-08-26T19:00Z | 50,829 MW |
| 2026-08-26T20:00Z | 51,969 MW |
| 2026-08-26T21:00Z | 52,502 MW |
| 2026-08-26T22:00Z | 52,348 MW |
| 2026-08-26T23:00Z | 51,314 MW |
| 2026-08-27T00:00Z | 49,536 MW |
| 2026-08-27T01:00Z | 47,577 MW |
| 2026-08-27T02:00Z | 45,057 MW |
| 2026-08-27T03:00Z | 42,140 MW |
| 2026-08-27T04:00Z | 39,454 MW |
| 2026-08-27T05:00Z | 37,133 MW |
| 2026-08-27T06:00Z | 35,376 MW |
| 2026-08-27T07:00Z | 34,028 MW |
| 2026-08-27T08:00Z | 33,304 MW |
| 2026-08-27T09:00Z | 33,082 MW |
| 2026-08-27T10:00Z | 33,641 MW |
| 2026-08-27T11:00Z | 34,950 MW |
| 2026-08-27T12:00Z | 35,792 MW |
| 2026-08-27T13:00Z | 36,942 MW |
| 2026-08-27T14:00Z | 38,713 MW |
| 2026-08-27T15:00Z | 40,863 MW |
| 2026-08-27T16:00Z | 43,132 MW |
| 2026-08-27T17:00Z | 45,454 MW |
| 2026-08-27T18:00Z | 47,600 MW |
| 2026-08-27T19:00Z | 49,075 MW |
| 2026-08-27T20:00Z | 50,122 MW |
| 2026-08-27T21:00Z | 50,523 MW |
| 2026-08-27T22:00Z | 50,450 MW |
| 2026-08-27T23:00Z | 49,660 MW |
| 2026-08-28T00:00Z | 47,720 MW |
| 2026-08-28T01:00Z | 45,792 MW |
| 2026-08-28T02:00Z | 43,513 MW |
| 2026-08-28T03:00Z | 40,653 MW |
| 2026-08-28T04:00Z | 38,044 MW |
| 2026-08-28T05:00Z | 35,975 MW |
| 2026-08-28T06:00Z | 34,449 MW |
| 2026-08-28T07:00Z | 33,334 MW |
| 2026-08-28T08:00Z | 32,541 MW |
| 2026-08-28T09:00Z | 32,324 MW |
| 2026-08-28T10:00Z | 32,898 MW |
| 2026-08-28T11:00Z | 34,156 MW |
| 2026-08-28T12:00Z | 35,127 MW |
| 2026-08-28T13:00Z | 36,407 MW |
| 2026-08-28T14:00Z | 38,328 MW |
| 2026-08-28T15:00Z | 40,793 MW |
| 2026-08-28T16:00Z | 43,307 MW |
| 2026-08-28T17:00Z | 45,766 MW |
| 2026-08-28T18:00Z | 47,914 MW |
| 2026-08-28T19:00Z | 49,484 MW |
| 2026-08-28T20:00Z | 50,636 MW |
| 2026-08-28T21:00Z | 51,391 MW |
| 2026-08-28T22:00Z | 51,279 MW |
| 2026-08-28T23:00Z | 50,218 MW |
| 2026-08-29T00:00Z | 48,008 MW |
| 2026-08-29T01:00Z | 45,874 MW |
| 2026-08-29T02:00Z | 43,796 MW |
| 2026-08-29T03:00Z | 41,461 MW |
| 2026-08-29T04:00Z | 39,133 MW |
| 2026-08-29T05:00Z | 37,083 MW |
| 2026-08-29T06:00Z | 35,516 MW |
| 2026-08-29T07:00Z | 34,349 MW |
| 2026-08-29T08:00Z | 33,498 MW |
| 2026-08-29T09:00Z | 33,023 MW |
| 2026-08-29T10:00Z | 32,921 MW |
| 2026-08-29T11:00Z | 33,071 MW |
| 2026-08-29T12:00Z | 33,463 MW |
| 2026-08-29T13:00Z | 35,101 MW |
| 2026-08-29T14:00Z | 37,360 MW |
| 2026-08-29T15:00Z | 40,095 MW |
| 2026-08-29T16:00Z | 43,175 MW |
| 2026-08-29T17:00Z | 45,936 MW |
| 2026-08-29T18:00Z | 48,274 MW |
| 2026-08-29T19:00Z | 50,111 MW |
| 2026-08-29T20:00Z | 51,510 MW |
| 2026-08-29T21:00Z | 52,427 MW |
| 2026-08-29T22:00Z | 52,670 MW |
| 2026-08-29T23:00Z | 51,892 MW |
| 2026-08-30T00:00Z | 50,050 MW |
| 2026-08-30T01:00Z | 48,109 MW |
| 2026-08-30T02:00Z | 45,894 MW |
| 2026-08-30T03:00Z | 43,474 MW |
| 2026-08-30T04:00Z | 41,112 MW |
| 2026-08-30T05:00Z | 39,024 MW |
| 2026-08-30T06:00Z | 37,362 MW |
| 2026-08-30T07:00Z | 36,082 MW |
| 2026-08-30T08:00Z | 35,153 MW |
| 2026-08-30T09:00Z | 34,462 MW |
| 2026-08-30T10:00Z | 34,238 MW |
| 2026-08-30T11:00Z | 34,224 MW |
| 2026-08-30T12:00Z | 34,452 MW |
| 2026-08-30T13:00Z | 36,282 MW |
| 2026-08-30T14:00Z | 38,908 MW |
| 2026-08-30T15:00Z | 41,746 MW |
| 2026-08-30T16:00Z | 44,803 MW |
| 2026-08-30T17:00Z | 47,610 MW |
| 2026-08-30T18:00Z | 49,894 MW |
| 2026-08-30T19:00Z | 51,593 MW |
| 2026-08-30T20:00Z | 52,902 MW |
| 2026-08-30T21:00Z | 53,774 MW |
| 2026-08-30T22:00Z | 54,159 MW |
| 2026-08-30T23:00Z | 53,498 MW |
| 2026-08-31T00:00Z | 51,621 MW |
| 2026-08-31T01:00Z | 49,742 MW |
| 2026-08-31T02:00Z | 47,521 MW |
| 2026-08-31T03:00Z | 44,735 MW |
| 2026-08-31T04:00Z | 42,146 MW |
| 2026-08-31T05:00Z | 40,062 MW |
| 2026-08-31T06:00Z | 38,342 MW |
| 2026-08-31T07:00Z | 37,012 MW |
| 2026-08-31T08:00Z | 36,195 MW |
| 2026-08-31T09:00Z | 35,876 MW |
| 2026-08-31T10:00Z | 36,433 MW |
| 2026-08-31T11:00Z | 37,656 MW |
| 2026-08-31T12:00Z | 38,497 MW |
| 2026-08-31T13:00Z | 39,725 MW |
| 2026-08-31T14:00Z | 41,917 MW |
| 2026-08-31T15:00Z | 44,969 MW |
| 2026-08-31T16:00Z | 47,999 MW |
| 2026-08-31T17:00Z | 50,761 MW |
| 2026-08-31T18:00Z | 52,974 MW |
| 2026-08-31T19:00Z | 54,389 MW |
| 2026-08-31T20:00Z | 55,477 MW |
| 2026-08-31T21:00Z | 55,925 MW |
| 2026-08-31T22:00Z | 55,862 MW |
| 2026-08-31T23:00Z | 55,005 MW |
| 2026-09-01T00:00Z | 53,102 MW |
| 2026-09-01T01:00Z | 51,236 MW |
| 2026-09-01T02:00Z | 48,816 MW |
| 2026-09-01T03:00Z | 45,811 MW |
| 2026-09-01T04:00Z | 42,936 MW |
| 2026-09-01T05:00Z | 40,549 MW |
| 2026-09-01T06:00Z | 38,760 MW |
| 2026-09-01T07:00Z | 37,465 MW |
| 2026-09-01T08:00Z | 36,601 MW |
| 2026-09-01T09:00Z | 36,277 MW |
| 2026-09-01T10:00Z | 36,702 MW |
| 2026-09-01T11:00Z | 37,823 MW |
| 2026-09-01T12:00Z | 38,620 MW |
| 2026-09-01T13:00Z | 40,209 MW |
| 2026-09-01T14:00Z | 42,658 MW |
| 2026-09-01T15:00Z | 45,593 MW |
| 2026-09-01T16:00Z | 48,556 MW |
| 2026-09-01T17:00Z | 51,181 MW |
| 2026-09-01T18:00Z | 53,279 MW |
| 2026-09-01T19:00Z | 54,513 MW |
| 2026-09-01T20:00Z | 55,327 MW |
| 2026-09-01T21:00Z | 55,782 MW |
| 2026-09-01T22:00Z | 55,682 MW |
| 2026-09-01T23:00Z | 54,812 MW |
| 2026-09-02T00:00Z | 52,949 MW |
| 2026-09-02T01:00Z | 50,999 MW |
| 2026-09-02T02:00Z | 48,601 MW |
| 2026-09-02T03:00Z | 45,831 MW |
| 2026-09-02T04:00Z | 43,111 MW |
| 2026-09-02T05:00Z | 40,993 MW |
| 2026-09-02T06:00Z | 39,238 MW |
| 2026-09-02T07:00Z | 37,883 MW |
| 2026-09-02T08:00Z | 37,171 MW |
| 2026-09-02T09:00Z | 36,952 MW |
| 2026-09-02T10:00Z | 37,463 MW |
| 2026-09-02T11:00Z | 38,740 MW |
| 2026-09-02T12:00Z | 39,575 MW |
| 2026-09-02T13:00Z | 40,982 MW |
| 2026-09-02T14:00Z | 43,423 MW |
| 2026-09-02T15:00Z | 46,312 MW |
| 2026-09-02T16:00Z | 49,083 MW |
| 2026-09-02T17:00Z | 51,626 MW |
| 2026-09-02T18:00Z | 53,758 MW |
| 2026-09-02T19:00Z | 55,073 MW |
| 2026-09-02T20:00Z | 55,974 MW |
| 2026-09-02T21:00Z | 56,297 MW |
| 2026-09-02T22:00Z | 56,200 MW |
| 2026-09-02T23:00Z | 55,472 MW |
| 2026-09-03T00:00Z | 53,589 MW |
| 2026-09-03T01:00Z | 51,636 MW |
| 2026-09-03T02:00Z | 49,331 MW |
| 2026-09-03T03:00Z | 46,555 MW |
| 2026-09-03T04:00Z | 43,834 MW |
| 2026-09-03T05:00Z | 41,669 MW |
| 2026-09-03T06:00Z | 40,030 MW |
| 2026-09-03T07:00Z | 38,698 MW |
| 2026-09-03T08:00Z | 37,809 MW |
| 2026-09-03T09:00Z | 37,477 MW |
| 2026-09-03T10:00Z | 37,899 MW |
| 2026-09-03T11:00Z | 39,196 MW |
| 2026-09-03T12:00Z | 40,053 MW |
| 2026-09-03T13:00Z | 41,508 MW |
| 2026-09-03T14:00Z | 43,524 MW |
| 2026-09-03T15:00Z | 45,879 MW |
| 2026-09-03T16:00Z | 48,477 MW |
| 2026-09-03T17:00Z | 50,961 MW |
| 2026-09-03T18:00Z | 53,060 MW |
| 2026-09-03T19:00Z | 54,471 MW |
| 2026-09-03T20:00Z | 55,465 MW |
| 2026-09-03T21:00Z | 55,970 MW |
| 2026-09-03T22:00Z | 55,726 MW |
| 2026-09-03T23:00Z | 54,865 MW |
| 2026-09-04T00:00Z | 53,139 MW |
| 2026-09-04T01:00Z | 51,503 MW |
| 2026-09-04T02:00Z | 49,270 MW |
| 2026-09-04T03:00Z | 46,614 MW |
| 2026-09-04T04:00Z | 43,857 MW |
| 2026-09-04T05:00Z | 41,669 MW |
| 2026-09-04T06:00Z | 39,945 MW |
| 2026-09-04T07:00Z | 38,595 MW |
| 2026-09-04T08:00Z | 37,588 MW |
| 2026-09-04T09:00Z | 37,124 MW |
| 2026-09-04T10:00Z | 37,406 MW |
| 2026-09-04T11:00Z | 38,479 MW |
| 2026-09-04T12:00Z | 39,220 MW |
| 2026-09-04T13:00Z | 40,939 MW |
| 2026-09-04T14:00Z | 43,400 MW |
| 2026-09-04T15:00Z | 46,316 MW |
| 2026-09-04T16:00Z | 49,185 MW |
| 2026-09-04T17:00Z | 51,605 MW |
| 2026-09-04T18:00Z | 53,776 MW |
| 2026-09-04T19:00Z | 55,202 MW |
| 2026-09-04T20:00Z | 56,065 MW |
| 2026-09-04T21:00Z | 56,486 MW |
| 2026-09-04T22:00Z | 56,159 MW |
| 2026-09-04T23:00Z | 55,114 MW |
| 2026-09-05T00:00Z | 53,021 MW |
| 2026-09-05T01:00Z | 50,924 MW |
| 2026-09-05T02:00Z | 48,683 MW |
| 2026-09-05T03:00Z | 46,392 MW |
| 2026-09-05T04:00Z | 43,914 MW |
| 2026-09-05T05:00Z | 41,668 MW |
| 2026-09-05T06:00Z | 39,905 MW |
| 2026-09-05T07:00Z | 38,339 MW |
| 2026-09-05T08:00Z | 37,135 MW |
| 2026-09-05T09:00Z | 36,309 MW |
| 2026-09-05T10:00Z | 35,934 MW |
| 2026-09-05T11:00Z | 35,849 MW |
| 2026-09-05T12:00Z | 36,011 MW |
| 2026-09-05T13:00Z | 37,856 MW |
| 2026-09-05T14:00Z | 40,805 MW |
| 2026-09-05T15:00Z | 44,015 MW |
| 2026-09-05T16:00Z | 47,206 MW |
| 2026-09-05T17:00Z | 49,730 MW |
| 2026-09-05T18:00Z | 51,525 MW |
| 2026-09-05T19:00Z | 52,743 MW |
| 2026-09-05T20:00Z | 53,605 MW |
| 2026-09-05T21:00Z | 54,003 MW |
| 2026-09-05T22:00Z | 53,854 MW |
| 2026-09-05T23:00Z | 52,784 MW |
| 2026-09-06T00:00Z | 50,850 MW |
| 2026-09-06T01:00Z | 48,995 MW |
| 2026-09-06T02:00Z | 46,849 MW |
| 2026-09-06T03:00Z | 44,597 MW |
| 2026-09-06T04:00Z | 42,194 MW |
| 2026-09-06T05:00Z | 40,156 MW |
| 2026-09-06T06:00Z | 38,357 MW |
| 2026-09-06T07:00Z | 36,925 MW |
| 2026-09-06T08:00Z | 35,890 MW |
| 2026-09-06T09:00Z | 35,154 MW |
| 2026-09-06T10:00Z | 34,801 MW |
| 2026-09-06T11:00Z | 34,708 MW |
| 2026-09-06T12:00Z | 34,887 MW |
| 2026-09-06T13:00Z | 36,657 MW |
| 2026-09-06T14:00Z | 39,320 MW |
| 2026-09-06T15:00Z | 42,247 MW |
| 2026-09-06T16:00Z | 45,257 MW |
| 2026-09-06T17:00Z | 47,961 MW |
| 2026-09-06T18:00Z | 49,822 MW |
| 2026-09-06T19:00Z | 51,004 MW |
| 2026-09-06T20:00Z | 51,645 MW |
| 2026-09-06T21:00Z | 51,918 MW |
| 2026-09-06T22:00Z | 51,676 MW |
| 2026-09-06T23:00Z | 50,459 MW |
| 2026-09-07T00:00Z | 48,451 MW |
| 2026-09-07T01:00Z | 46,409 MW |
| 2026-09-07T02:00Z | 44,180 MW |
| 2026-09-07T03:00Z | 42,053 MW |
| 2026-09-07T04:00Z | 39,928 MW |
| 2026-09-07T05:00Z | 38,068 MW |
| 2026-09-07T06:00Z | 36,559 MW |
| 2026-09-07T07:00Z | 35,420 MW |
| 2026-09-07T08:00Z | 34,672 MW |
| 2026-09-07T09:00Z | 34,298 MW |
| 2026-09-07T10:00Z | 34,227 MW |
| 2026-09-07T11:00Z | 34,258 MW |
| 2026-09-07T12:00Z | 34,298 MW |
| 2026-09-07T13:00Z | 35,744 MW |
| 2026-09-07T14:00Z | 38,363 MW |
| 2026-09-07T15:00Z | 41,616 MW |
| 2026-09-07T16:00Z | 44,803 MW |
| 2026-09-07T17:00Z | 47,571 MW |
| 2026-09-07T18:00Z | 49,784 MW |
| 2026-09-07T19:00Z | 51,397 MW |
| 2026-09-07T20:00Z | 52,514 MW |
| 2026-09-07T21:00Z | 53,195 MW |
| 2026-09-07T22:00Z | 53,216 MW |
| 2026-09-07T23:00Z | 52,308 MW |
| 2026-09-08T00:00Z | 50,631 MW |
| 2026-09-08T01:00Z | 48,996 MW |
| 2026-09-08T02:00Z | 46,647 MW |
| 2026-09-08T03:00Z | 43,897 MW |
| 2026-09-08T04:00Z | 41,331 MW |
| 2026-09-08T05:00Z | 39,396 MW |
| 2026-09-08T06:00Z | 37,920 MW |
| 2026-09-08T07:00Z | 36,724 MW |
| 2026-09-08T08:00Z | 35,979 MW |
| 2026-09-08T09:00Z | 35,790 MW |
| 2026-09-08T10:00Z | 36,430 MW |
| 2026-09-08T11:00Z | 37,795 MW |
| 2026-09-08T12:00Z | 38,727 MW |
| 2026-09-08T13:00Z | 40,149 MW |
| 2026-09-08T14:00Z | 42,452 MW |
| 2026-09-08T15:00Z | 45,524 MW |
| 2026-09-08T16:00Z | 48,600 MW |
| 2026-09-08T17:00Z | 51,341 MW |
| 2026-09-08T18:00Z | 53,521 MW |
| 2026-09-08T19:00Z | 54,777 MW |
| 2026-09-08T20:00Z | 55,359 MW |
| 2026-09-08T21:00Z | 55,256 MW |
| 2026-09-08T22:00Z | 54,892 MW |
| 2026-09-08T23:00Z | 53,927 MW |
| 2026-09-09T00:00Z | 52,014 MW |
| 2026-09-09T01:00Z | 50,344 MW |
| 2026-09-09T02:00Z | 48,054 MW |
| 2026-09-09T03:00Z | 45,368 MW |
| 2026-09-09T04:00Z | 42,799 MW |
| 2026-09-09T05:00Z | 40,717 MW |
| 2026-09-09T06:00Z | 39,034 MW |
| 2026-09-09T07:00Z | 37,844 MW |
| 2026-09-09T08:00Z | 37,152 MW |
| 2026-09-09T09:00Z | 36,945 MW |
| 2026-09-09T10:00Z | 37,353 MW |
| 2026-09-09T11:00Z | 38,624 MW |
| 2026-09-09T12:00Z | 39,323 MW |
| 2026-09-09T13:00Z | 40,358 MW |
| 2026-09-09T14:00Z | 42,167 MW |
| 2026-09-09T15:00Z | 44,366 MW |
| 2026-09-09T16:00Z | 46,575 MW |
| 2026-09-09T17:00Z | 48,699 MW |
| 2026-09-09T18:00Z | 50,381 MW |
| 2026-09-09T19:00Z | 51,339 MW |
| 2026-09-09T20:00Z | 51,701 MW |
| 2026-09-09T21:00Z | 51,804 MW |
| 2026-09-09T22:00Z | 51,334 MW |
| 2026-09-09T23:00Z | 50,183 MW |
| 2026-09-10T00:00Z | 48,513 MW |
| 2026-09-10T01:00Z | 46,890 MW |
| 2026-09-10T02:00Z | 44,703 MW |
| 2026-09-10T03:00Z | 42,159 MW |
| 2026-09-10T04:00Z | 39,758 MW |
| 2026-09-10T05:00Z | 37,956 MW |
| 2026-09-10T06:00Z | 36,504 MW |
| 2026-09-10T07:00Z | 35,580 MW |
| 2026-09-10T08:00Z | 34,913 MW |
| 2026-09-10T09:00Z | 34,776 MW |
| 2026-09-10T10:00Z | 35,366 MW |
| 2026-09-10T11:00Z | 36,694 MW |
| 2026-09-10T12:00Z | 37,437 MW |
| 2026-09-10T13:00Z | 37,946 MW |
| 2026-09-10T14:00Z | 38,766 MW |
| 2026-09-10T15:00Z | 39,708 MW |
| 2026-09-10T16:00Z | 40,804 MW |
| 2026-09-10T17:00Z | 41,873 MW |
| 2026-09-10T18:00Z | 42,966 MW |
| 2026-09-10T19:00Z | 43,951 MW |
| 2026-09-10T20:00Z | 44,909 MW |
| 2026-09-10T21:00Z | 45,532 MW |
| 2026-09-10T22:00Z | 45,488 MW |
| 2026-09-10T23:00Z | 44,727 MW |
| 2026-09-11T00:00Z | 43,407 MW |
| 2026-09-11T01:00Z | 42,366 MW |
| 2026-09-11T02:00Z | 40,727 MW |
| 2026-09-11T03:00Z | 38,557 MW |
| 2026-09-11T04:00Z | 36,338 MW |
| 2026-09-11T05:00Z | 34,560 MW |
| 2026-09-11T06:00Z | 33,352 MW |
| 2026-09-11T07:00Z | 32,497 MW |
| 2026-09-11T08:00Z | 32,003 MW |
| 2026-09-11T09:00Z | 31,964 MW |
| 2026-09-11T10:00Z | 32,614 MW |
| 2026-09-11T11:00Z | 34,088 MW |
| 2026-09-11T12:00Z | 34,992 MW |
| 2026-09-11T13:00Z | 35,977 MW |
| 2026-09-11T14:00Z | 37,448 MW |
| 2026-09-11T15:00Z | 39,605 MW |
| 2026-09-11T16:00Z | 41,762 MW |
| 2026-09-11T17:00Z | 44,219 MW |
| 2026-09-11T18:00Z | 46,336 MW |
| 2026-09-11T19:00Z | 47,906 MW |
| 2026-09-11T20:00Z | 49,101 MW |
| 2026-09-11T21:00Z | 49,745 MW |
| 2026-09-11T22:00Z | 49,561 MW |
| 2026-09-11T23:00Z | 48,496 MW |
| 2026-09-12T00:00Z | 46,363 MW |
| 2026-09-12T01:00Z | 44,343 MW |
| 2026-09-12T02:00Z | 42,435 MW |
| 2026-09-12T03:00Z | 40,469 MW |
| 2026-09-12T04:00Z | 38,363 MW |
| 2026-09-12T05:00Z | 36,581 MW |
| 2026-09-12T06:00Z | 35,022 MW |
| 2026-09-12T07:00Z | 33,889 MW |
| 2026-09-12T08:00Z | 33,070 MW |
| 2026-09-12T09:00Z | 32,560 MW |
| 2026-09-12T10:00Z | 32,512 MW |
| 2026-09-12T11:00Z | 32,864 MW |
| 2026-09-12T12:00Z | 33,154 MW |
| 2026-09-12T13:00Z | 34,359 MW |
| 2026-09-12T14:00Z | 36,121 MW |
| 2026-09-12T15:00Z | 38,154 MW |
| 2026-09-12T16:00Z | 40,286 MW |
| 2026-09-12T17:00Z | 42,180 MW |
| 2026-09-12T18:00Z | 43,600 MW |
| 2026-09-12T19:00Z | 44,726 MW |
| 2026-09-12T20:00Z | 45,676 MW |
| 2026-09-12T21:00Z | 45,720 MW |
| 2026-09-12T22:00Z | 45,324 MW |
| 2026-09-12T23:00Z | 44,181 MW |
| 2026-09-13T00:00Z | 42,508 MW |
| 2026-09-13T01:00Z | 41,301 MW |
| 2026-09-13T02:00Z | 39,540 MW |
| 2026-09-13T03:00Z | 37,742 MW |
| 2026-09-13T04:00Z | 36,037 MW |
| 2026-09-13T05:00Z | 34,517 MW |
| 2026-09-13T06:00Z | 33,290 MW |
| 2026-09-13T07:00Z | 32,384 MW |
| 2026-09-13T08:00Z | 31,674 MW |
| 2026-09-13T09:00Z | 31,307 MW |
| 2026-09-13T10:00Z | 31,288 MW |
| 2026-09-13T11:00Z | 31,505 MW |
| 2026-09-13T12:00Z | 31,729 MW |
| 2026-09-13T13:00Z | 32,768 MW |
| 2026-09-13T14:00Z | 34,318 MW |
| 2026-09-13T15:00Z | 36,057 MW |
| 2026-09-13T16:00Z | 38,097 MW |
| 2026-09-13T17:00Z | 40,036 MW |
| 2026-09-13T18:00Z | 41,640 MW |
| 2026-09-13T19:00Z | 43,048 MW |
| 2026-09-13T20:00Z | 44,340 MW |
| 2026-09-13T21:00Z | 45,355 MW |
| 2026-09-13T22:00Z | 45,879 MW |
| 2026-09-13T23:00Z | 45,264 MW |
| 2026-09-14T00:00Z | 43,894 MW |
| 2026-09-14T01:00Z | 42,795 MW |
| 2026-09-14T02:00Z | 40,875 MW |
| 2026-09-14T03:00Z | 38,665 MW |
| 2026-09-14T04:00Z | 36,531 MW |
| 2026-09-14T05:00Z | 34,926 MW |
| 2026-09-14T06:00Z | 33,726 MW |
| 2026-09-14T07:00Z | 32,954 MW |
| 2026-09-14T08:00Z | 32,624 MW |
| 2026-09-14T09:00Z | 32,747 MW |
| 2026-09-14T10:00Z | 33,551 MW |
| 2026-09-14T11:00Z | 35,111 MW |
| 2026-09-14T12:00Z | 36,059 MW |
| 2026-09-14T13:00Z | 37,150 MW |
| 2026-09-14T14:00Z | 38,962 MW |
| 2026-09-14T15:00Z | 40,166 MW |
| 2026-09-14T16:00Z | 40,177 MW |
| 2026-09-14T17:00Z | 40,177 MW |
| 2026-09-14T18:00Z | 40,177 MW |
| 2026-09-14T19:00Z | 40,177 MW |
| 2026-09-14T20:00Z | 40,177 MW |
| 2026-09-14T21:00Z | 40,177 MW |
| 2026-09-14T22:00Z | 40,177 MW |
| 2026-09-14T23:00Z | 40,177 MW |
| 2026-09-15T00:00Z | 40,177 MW |
| 2026-09-15T01:00Z | 40,177 MW |
| 2026-09-15T02:00Z | 40,177 MW |
| 2026-09-15T03:00Z | 40,177 MW |
| 2026-09-15T04:00Z | 40,177 MW |
| 2026-09-15T05:00Z | 40,177 MW |
| 2026-09-15T06:00Z | 40,177 MW |
| 2026-09-15T07:00Z | 40,177 MW |
| 2026-09-15T08:00Z | 40,177 MW |
| 2026-09-15T09:00Z | 40,177 MW |
| 2026-09-15T10:00Z | 40,177 MW |
| 2026-09-15T11:00Z | 40,177 MW |
| 2026-09-15T12:00Z | 40,177 MW |
| 2026-09-15T13:00Z | 40,177 MW |
| 2026-09-15T14:00Z | 40,177 MW |
| 2026-09-15T15:00Z | 40,177 MW |
| 2026-09-15T16:00Z | n/a |
| Hour starting (UTC) | Gas | Coal | Wind | Nuclear | Hydro |
|---|---|---|---|---|---|
| 2026-08-16T17:00Z | 21,076 MW | 14,913 MW | 3,004 MW | 1,926 MW | 1,292 MW |
| 2026-08-16T18:00Z | 23,148 MW | 15,318 MW | 2,529 MW | 1,925 MW | 1,378 MW |
| 2026-08-16T19:00Z | 23,902 MW | 15,645 MW | 2,474 MW | 1,924 MW | 1,645 MW |
| 2026-08-16T20:00Z | 24,177 MW | 16,030 MW | 2,836 MW | 1,924 MW | 1,734 MW |
| 2026-08-16T21:00Z | 24,602 MW | 16,179 MW | 3,455 MW | 1,923 MW | 1,839 MW |
| 2026-08-16T22:00Z | 24,974 MW | 16,355 MW | 3,823 MW | 1,923 MW | 2,003 MW |
| 2026-08-16T23:00Z | 25,182 MW | 16,441 MW | 3,785 MW | 1,923 MW | 1,996 MW |
| 2026-08-17T00:00Z | 24,574 MW | 16,444 MW | 4,795 MW | 1,923 MW | 1,717 MW |
| 2026-08-17T01:00Z | 22,690 MW | 16,484 MW | 6,430 MW | 1,923 MW | 1,562 MW |
| 2026-08-17T02:00Z | 19,730 MW | 16,253 MW | 8,163 MW | 1,923 MW | 1,324 MW |
| 2026-08-17T03:00Z | 16,889 MW | 15,645 MW | 9,238 MW | 1,923 MW | 714 MW |
| 2026-08-17T04:00Z | 14,702 MW | 14,768 MW | 9,819 MW | 1,923 MW | 522 MW |
| 2026-08-17T05:00Z | 13,541 MW | 14,271 MW | 9,424 MW | 1,924 MW | 477 MW |
| 2026-08-17T06:00Z | 12,944 MW | 14,404 MW | 8,323 MW | 1,925 MW | 476 MW |
| 2026-08-17T07:00Z | 12,211 MW | 13,484 MW | 8,891 MW | 1,926 MW | 474 MW |
| 2026-08-17T08:00Z | 12,003 MW | 12,624 MW | 9,117 MW | 1,926 MW | 477 MW |
| 2026-08-17T09:00Z | 11,648 MW | 12,132 MW | 9,450 MW | 1,926 MW | 491 MW |
| 2026-08-17T10:00Z | 12,018 MW | 12,118 MW | 9,507 MW | 1,927 MW | 493 MW |
| 2026-08-17T11:00Z | 12,429 MW | 12,281 MW | 10,192 MW | 1,928 MW | 500 MW |
| 2026-08-17T12:00Z | 12,843 MW | 12,732 MW | 9,651 MW | 1,928 MW | 504 MW |
| 2026-08-17T13:00Z | 13,829 MW | 13,048 MW | 7,658 MW | 1,928 MW | 963 MW |
| 2026-08-17T14:00Z | 15,330 MW | 13,877 MW | 5,645 MW | 1,928 MW | 1,156 MW |
| 2026-08-17T15:00Z | 17,196 MW | 14,547 MW | 4,548 MW | 1,928 MW | 1,260 MW |
| 2026-08-17T16:00Z | 19,120 MW | 15,200 MW | 3,581 MW | 1,927 MW | 1,369 MW |
| 2026-08-17T17:00Z | 21,100 MW | 15,809 MW | 2,668 MW | 1,926 MW | 1,478 MW |
| 2026-08-17T18:00Z | 22,747 MW | 15,778 MW | 2,429 MW | 1,926 MW | 1,574 MW |
| 2026-08-17T19:00Z | 24,204 MW | 15,819 MW | 2,260 MW | 1,925 MW | 1,922 MW |
| 2026-08-17T20:00Z | 24,845 MW | 16,629 MW | 2,194 MW | 1,924 MW | 2,057 MW |
| 2026-08-17T21:00Z | 25,136 MW | 16,841 MW | 2,188 MW | 1,923 MW | 2,143 MW |
| 2026-08-17T22:00Z | 25,846 MW | 16,902 MW | 2,509 MW | 1,922 MW | 2,182 MW |
| 2026-08-17T23:00Z | 25,231 MW | 16,827 MW | 3,332 MW | 1,921 MW | 2,081 MW |
| 2026-08-18T00:00Z | 24,215 MW | 16,625 MW | 5,112 MW | 1,921 MW | 1,929 MW |
| 2026-08-18T01:00Z | 21,740 MW | 16,251 MW | 8,007 MW | 1,921 MW | 1,670 MW |
| 2026-08-18T02:00Z | 17,945 MW | 14,762 MW | 10,988 MW | 1,921 MW | 1,452 MW |
| 2026-08-18T03:00Z | 15,416 MW | 12,967 MW | 12,846 MW | 1,922 MW | 594 MW |
| 2026-08-18T04:00Z | 13,480 MW | 12,189 MW | 13,247 MW | 1,921 MW | 481 MW |
| 2026-08-18T05:00Z | 10,610 MW | 11,080 MW | 14,686 MW | 1,922 MW | 466 MW |
| 2026-08-18T06:00Z | 9,046 MW | 10,183 MW | 15,547 MW | 1,922 MW | 458 MW |
| 2026-08-18T07:00Z | 8,625 MW | 9,061 MW | 16,189 MW | 1,923 MW | 466 MW |
| 2026-08-18T08:00Z | 8,843 MW | 8,584 MW | 15,774 MW | 1,923 MW | 472 MW |
| 2026-08-18T09:00Z | 8,368 MW | 8,697 MW | 16,061 MW | 1,923 MW | 469 MW |
| 2026-08-18T10:00Z | 8,910 MW | 8,872 MW | 15,599 MW | 1,923 MW | 470 MW |
| 2026-08-18T11:00Z | 9,500 MW | 9,790 MW | 15,026 MW | 1,924 MW | 497 MW |
| 2026-08-18T12:00Z | 10,214 MW | 9,744 MW | 14,984 MW | 1,924 MW | 523 MW |
| 2026-08-18T13:00Z | 11,829 MW | 9,573 MW | 12,636 MW | 1,923 MW | 790 MW |
| 2026-08-18T14:00Z | 14,590 MW | 10,605 MW | 10,251 MW | 1,923 MW | 803 MW |
| 2026-08-18T15:00Z | 15,282 MW | 11,378 MW | 10,472 MW | 1,922 MW | 1,166 MW |
| 2026-08-18T16:00Z | 16,391 MW | 12,009 MW | 10,920 MW | 1,920 MW | 1,467 MW |
| 2026-08-18T17:00Z | 17,302 MW | 13,304 MW | 10,816 MW | 1,919 MW | 1,497 MW |
| 2026-08-18T18:00Z | 19,283 MW | 14,576 MW | 9,603 MW | 1,920 MW | 1,727 MW |
| 2026-08-18T19:00Z | 20,847 MW | 14,857 MW | 8,636 MW | 1,919 MW | 1,986 MW |
| 2026-08-18T20:00Z | 22,435 MW | 15,034 MW | 7,992 MW | 1,917 MW | 2,097 MW |
| 2026-08-18T21:00Z | 23,461 MW | 15,571 MW | 7,775 MW | 1,915 MW | 2,145 MW |
| 2026-08-18T22:00Z | 23,922 MW | 15,844 MW | 8,006 MW | 1,915 MW | 1,990 MW |
| 2026-08-18T23:00Z | 24,108 MW | 15,947 MW | 8,037 MW | 1,915 MW | 1,985 MW |
| 2026-08-19T00:00Z | 24,102 MW | 15,977 MW | 8,468 MW | 1,915 MW | 1,885 MW |
| 2026-08-19T01:00Z | 21,595 MW | 15,501 MW | 11,452 MW | 1,915 MW | 1,747 MW |
| 2026-08-19T02:00Z | 17,018 MW | 13,866 MW | 15,860 MW | 1,916 MW | 1,411 MW |
| 2026-08-19T03:00Z | 14,142 MW | 12,031 MW | 18,528 MW | 1,917 MW | 592 MW |
| 2026-08-19T04:00Z | 12,086 MW | 11,095 MW | 18,610 MW | 1,917 MW | 467 MW |
| 2026-08-19T05:00Z | 10,566 MW | 10,351 MW | 18,690 MW | 1,917 MW | 456 MW |
| 2026-08-19T06:00Z | 9,618 MW | 9,540 MW | 18,731 MW | 1,917 MW | 455 MW |
| 2026-08-19T07:00Z | 9,240 MW | 9,454 MW | 18,134 MW | 1,919 MW | 463 MW |
| 2026-08-19T08:00Z | 9,270 MW | 9,203 MW | 17,757 MW | 1,919 MW | 464 MW |
| 2026-08-19T09:00Z | 9,646 MW | 9,293 MW | 16,537 MW | 1,919 MW | 462 MW |
| 2026-08-19T10:00Z | 9,975 MW | 9,901 MW | 15,920 MW | 1,920 MW | 462 MW |
| 2026-08-19T11:00Z | 10,973 MW | 10,757 MW | 14,797 MW | 1,920 MW | 483 MW |
| 2026-08-19T12:00Z | 10,846 MW | 11,367 MW | 14,989 MW | 1,920 MW | 482 MW |
| 2026-08-19T13:00Z | 12,613 MW | 11,725 MW | 12,574 MW | 1,921 MW | 487 MW |
| 2026-08-19T14:00Z | 14,943 MW | 12,442 MW | 10,267 MW | 1,920 MW | 490 MW |
| 2026-08-19T15:00Z | 16,418 MW | 13,046 MW | 9,165 MW | 1,920 MW | 928 MW |
| 2026-08-19T16:00Z | 17,456 MW | 13,914 MW | 8,488 MW | 1,919 MW | 1,368 MW |
| 2026-08-19T17:00Z | 19,666 MW | 14,266 MW | 7,279 MW | 1,918 MW | 1,492 MW |
| 2026-08-19T18:00Z | 21,890 MW | 14,806 MW | 5,392 MW | 1,917 MW | 1,698 MW |
| 2026-08-19T19:00Z | 24,279 MW | 15,242 MW | 3,567 MW | 1,916 MW | 1,912 MW |
| 2026-08-19T20:00Z | 26,148 MW | 15,792 MW | 2,266 MW | 1,915 MW | 2,027 MW |
| 2026-08-19T21:00Z | 26,239 MW | 16,280 MW | 1,893 MW | 1,915 MW | 2,170 MW |
| 2026-08-19T22:00Z | 26,373 MW | 16,391 MW | 2,505 MW | 1,914 MW | 2,175 MW |
| 2026-08-19T23:00Z | 26,178 MW | 16,513 MW | 3,379 MW | 1,914 MW | 1,959 MW |
| 2026-08-20T00:00Z | 25,702 MW | 16,509 MW | 4,897 MW | 1,915 MW | 1,846 MW |
| 2026-08-20T01:00Z | 23,446 MW | 16,287 MW | 6,647 MW | 1,916 MW | 1,731 MW |
| 2026-08-20T02:00Z | 19,588 MW | 15,950 MW | 9,057 MW | 1,915 MW | 1,666 MW |
| 2026-08-20T03:00Z | 16,462 MW | 15,886 MW | 9,979 MW | 1,914 MW | 1,105 MW |
| 2026-08-20T04:00Z | 14,649 MW | 15,659 MW | 9,863 MW | 1,914 MW | 537 MW |
| 2026-08-20T05:00Z | 13,287 MW | 15,019 MW | 9,725 MW | 1,914 MW | 454 MW |
| 2026-08-20T06:00Z | 12,411 MW | 14,377 MW | 9,516 MW | 1,914 MW | 452 MW |
| 2026-08-20T07:00Z | 12,002 MW | 13,626 MW | 9,422 MW | 1,915 MW | 460 MW |
| 2026-08-20T08:00Z | 11,776 MW | 12,682 MW | 9,648 MW | 1,915 MW | 461 MW |
| 2026-08-20T09:00Z | 11,964 MW | 12,733 MW | 8,702 MW | 1,915 MW | 475 MW |
| 2026-08-20T10:00Z | 12,557 MW | 13,618 MW | 7,606 MW | 1,916 MW | 470 MW |
| 2026-08-20T11:00Z | 13,345 MW | 14,210 MW | 7,215 MW | 1,916 MW | 484 MW |
| 2026-08-20T12:00Z | 13,871 MW | 14,526 MW | 6,788 MW | 1,917 MW | 697 MW |
| 2026-08-20T13:00Z | 15,284 MW | 14,789 MW | 5,002 MW | 1,917 MW | 773 MW |
| 2026-08-20T14:00Z | 17,075 MW | 15,276 MW | 3,124 MW | 1,917 MW | 951 MW |
| 2026-08-20T15:00Z | 18,523 MW | 15,585 MW | 3,703 MW | 1,916 MW | 1,137 MW |
| 2026-08-20T16:00Z | 19,644 MW | 15,735 MW | 4,861 MW | 1,915 MW | 1,249 MW |
| 2026-08-20T17:00Z | 21,653 MW | 16,041 MW | 4,979 MW | 1,913 MW | 1,373 MW |
| 2026-08-20T18:00Z | 23,054 MW | 16,196 MW | 5,255 MW | 1,911 MW | 1,516 MW |
| 2026-08-20T19:00Z | 23,848 MW | 16,228 MW | 5,799 MW | 1,910 MW | 1,803 MW |
| 2026-08-20T20:00Z | 24,692 MW | 16,215 MW | 5,745 MW | 1,908 MW | 1,913 MW |
| 2026-08-20T21:00Z | 25,109 MW | 16,247 MW | 5,938 MW | 1,907 MW | 1,957 MW |
| 2026-08-20T22:00Z | 24,751 MW | 16,368 MW | 6,533 MW | 1,906 MW | 1,982 MW |
| 2026-08-20T23:00Z | 24,789 MW | 16,447 MW | 7,170 MW | 1,905 MW | 1,915 MW |
| 2026-08-21T00:00Z | 24,841 MW | 15,850 MW | 8,407 MW | 1,906 MW | 1,831 MW |
| 2026-08-21T01:00Z | 21,997 MW | 15,204 MW | 11,107 MW | 1,905 MW | 1,519 MW |
| 2026-08-21T02:00Z | 18,759 MW | 13,880 MW | 14,066 MW | 1,904 MW | 1,189 MW |
| 2026-08-21T03:00Z | 15,794 MW | 12,997 MW | 15,449 MW | 1,905 MW | 771 MW |
| 2026-08-21T04:00Z | 13,438 MW | 11,487 MW | 16,273 MW | 1,905 MW | 499 MW |
| 2026-08-21T05:00Z | 12,328 MW | 11,430 MW | 15,393 MW | 1,906 MW | 463 MW |
| 2026-08-21T06:00Z | 11,939 MW | 10,704 MW | 14,540 MW | 1,907 MW | 455 MW |
| 2026-08-21T07:00Z | 11,865 MW | 10,595 MW | 13,410 MW | 1,908 MW | 460 MW |
| 2026-08-21T08:00Z | 11,180 MW | 11,005 MW | 12,970 MW | 1,908 MW | 471 MW |
| 2026-08-21T09:00Z | 10,975 MW | 10,793 MW | 12,575 MW | 1,908 MW | 469 MW |
| 2026-08-21T10:00Z | 11,451 MW | 11,335 MW | 12,101 MW | 1,909 MW | 465 MW |
| 2026-08-21T11:00Z | 11,950 MW | 11,972 MW | 11,744 MW | 1,910 MW | 480 MW |
| 2026-08-21T12:00Z | 12,432 MW | 13,184 MW | 10,336 MW | 1,910 MW | 487 MW |
| 2026-08-21T13:00Z | 13,575 MW | 13,505 MW | 8,279 MW | 1,911 MW | 951 MW |
| 2026-08-21T14:00Z | 15,571 MW | 13,753 MW | 6,819 MW | 1,911 MW | 1,048 MW |
| 2026-08-21T15:00Z | 16,631 MW | 13,864 MW | 7,268 MW | 1,910 MW | 1,218 MW |
| 2026-08-21T16:00Z | 17,907 MW | 14,059 MW | 7,865 MW | 1,908 MW | 1,365 MW |
| 2026-08-21T17:00Z | 19,156 MW | 14,277 MW | 8,475 MW | 1,907 MW | 1,463 MW |
| 2026-08-21T18:00Z | 21,355 MW | 14,451 MW | 7,727 MW | 1,905 MW | 1,538 MW |
| 2026-08-21T19:00Z | 22,747 MW | 14,478 MW | 7,358 MW | 1,904 MW | 1,785 MW |
| 2026-08-21T20:00Z | 23,061 MW | 14,584 MW | 7,587 MW | 1,904 MW | 1,828 MW |
| 2026-08-21T21:00Z | 23,198 MW | 14,706 MW | 7,730 MW | 1,904 MW | 1,878 MW |
| 2026-08-21T22:00Z | 24,030 MW | 14,935 MW | 6,778 MW | 1,903 MW | 1,878 MW |
| 2026-08-21T23:00Z | 24,439 MW | 15,232 MW | 6,491 MW | 1,904 MW | 1,799 MW |
| 2026-08-22T00:00Z | 24,274 MW | 15,359 MW | 6,733 MW | 1,895 MW | 1,790 MW |
| 2026-08-22T01:00Z | 21,554 MW | 15,132 MW | 8,846 MW | 1,893 MW | 1,590 MW |
| 2026-08-22T02:00Z | 17,780 MW | 14,979 MW | 11,477 MW | 1,880 MW | 1,226 MW |
| 2026-08-22T03:00Z | 14,937 MW | 14,739 MW | 12,970 MW | 1,853 MW | 557 MW |
| 2026-08-22T04:00Z | 12,585 MW | 14,172 MW | 13,070 MW | 1,781 MW | 487 MW |
| 2026-08-22T05:00Z | 11,488 MW | 13,159 MW | 13,133 MW | 1,697 MW | 485 MW |
| 2026-08-22T06:00Z | 10,385 MW | 12,172 MW | 13,353 MW | 1,694 MW | 474 MW |
| 2026-08-22T07:00Z | 9,626 MW | 11,545 MW | 13,526 MW | 1,703 MW | 481 MW |
| 2026-08-22T08:00Z | 9,032 MW | 10,790 MW | 14,259 MW | 1,702 MW | 480 MW |
| 2026-08-22T09:00Z | 8,594 MW | 10,130 MW | 14,799 MW | 1,704 MW | 480 MW |
| 2026-08-22T10:00Z | 9,070 MW | 9,838 MW | 14,705 MW | 1,707 MW | 484 MW |
| 2026-08-22T11:00Z | 9,536 MW | 10,345 MW | 13,645 MW | 1,717 MW | 485 MW |
| 2026-08-22T12:00Z | 10,045 MW | 10,248 MW | 13,064 MW | 1,743 MW | 486 MW |
| 2026-08-22T13:00Z | 11,644 MW | 10,688 MW | 11,001 MW | 1,781 MW | 507 MW |
| 2026-08-22T14:00Z | 12,753 MW | 11,139 MW | 10,231 MW | 1,820 MW | 660 MW |
| 2026-08-22T15:00Z | 13,312 MW | 10,888 MW | 11,553 MW | 1,867 MW | 950 MW |
| 2026-08-22T16:00Z | 14,552 MW | 10,609 MW | 12,075 MW | 1,904 MW | 1,114 MW |
| 2026-08-22T17:00Z | 16,209 MW | 11,508 MW | 10,486 MW | 1,930 MW | 1,367 MW |
| 2026-08-22T18:00Z | 18,651 MW | 12,868 MW | 7,662 MW | 1,944 MW | 1,411 MW |
| 2026-08-22T19:00Z | 18,748 MW | 13,387 MW | 7,020 MW | 1,948 MW | 1,690 MW |
| 2026-08-22T20:00Z | 20,118 MW | 14,142 MW | 5,626 MW | 1,948 MW | 1,725 MW |
| 2026-08-22T21:00Z | 20,908 MW | 14,410 MW | 5,502 MW | 1,948 MW | 1,729 MW |
| 2026-08-22T22:00Z | 22,230 MW | 14,782 MW | 5,486 MW | 1,946 MW | 1,724 MW |
| 2026-08-22T23:00Z | 22,604 MW | 15,191 MW | 6,444 MW | 1,944 MW | 1,736 MW |
| 2026-08-23T00:00Z | 21,205 MW | 15,083 MW | 7,636 MW | 1,943 MW | 1,737 MW |
| 2026-08-23T01:00Z | 18,773 MW | 14,896 MW | 9,103 MW | 1,939 MW | 1,590 MW |
| 2026-08-23T02:00Z | 15,145 MW | 14,057 MW | 12,286 MW | 1,935 MW | 1,045 MW |
| 2026-08-23T03:00Z | 12,643 MW | 12,813 MW | 14,243 MW | 1,933 MW | 538 MW |
| 2026-08-23T04:00Z | 11,209 MW | 11,996 MW | 14,343 MW | 1,931 MW | 468 MW |
| 2026-08-23T05:00Z | 10,798 MW | 11,925 MW | 13,221 MW | 1,929 MW | 468 MW |
| 2026-08-23T06:00Z | 9,978 MW | 11,237 MW | 13,181 MW | 1,928 MW | 458 MW |
| 2026-08-23T07:00Z | 9,151 MW | 10,668 MW | 13,246 MW | 1,927 MW | 472 MW |
| 2026-08-23T08:00Z | 8,645 MW | 10,535 MW | 13,018 MW | 1,926 MW | 480 MW |
| 2026-08-23T09:00Z | 8,388 MW | 10,351 MW | 12,807 MW | 1,926 MW | 480 MW |
| 2026-08-23T10:00Z | 8,310 MW | 10,186 MW | 12,559 MW | 1,926 MW | 494 MW |
| 2026-08-23T11:00Z | 8,247 MW | 9,616 MW | 12,723 MW | 1,925 MW | 494 MW |
| 2026-08-23T12:00Z | 9,218 MW | 9,073 MW | 12,064 MW | 1,924 MW | 507 MW |
| 2026-08-23T13:00Z | 10,845 MW | 10,194 MW | 9,656 MW | 1,923 MW | 505 MW |
| 2026-08-23T14:00Z | 11,549 MW | 11,100 MW | 9,073 MW | 1,922 MW | 508 MW |
| 2026-08-23T15:00Z | 12,445 MW | 11,300 MW | 9,567 MW | 1,921 MW | 826 MW |
| 2026-08-23T16:00Z | 13,890 MW | 12,010 MW | 9,148 MW | 1,919 MW | 1,196 MW |
| 2026-08-23T17:00Z | 16,171 MW | 12,924 MW | 8,289 MW | 1,918 MW | 1,251 MW |
| 2026-08-23T18:00Z | 18,025 MW | 13,361 MW | 7,656 MW | 1,918 MW | 1,388 MW |
| 2026-08-23T19:00Z | 19,360 MW | 13,621 MW | 7,014 MW | 1,916 MW | 1,635 MW |
| 2026-08-23T20:00Z | 19,694 MW | 13,834 MW | 7,226 MW | 1,916 MW | 1,654 MW |
| 2026-08-23T21:00Z | 19,701 MW | 14,072 MW | 7,482 MW | 1,915 MW | 1,673 MW |
| 2026-08-23T22:00Z | 20,054 MW | 14,080 MW | 8,018 MW | 1,915 MW | 1,676 MW |
| 2026-08-23T23:00Z | 19,939 MW | 13,988 MW | 10,118 MW | 1,915 MW | 1,691 MW |
| 2026-08-24T00:00Z | 18,633 MW | 13,602 MW | 12,057 MW | 1,915 MW | 1,703 MW |
| 2026-08-24T01:00Z | 15,537 MW | 12,478 MW | 15,633 MW | 1,915 MW | 1,554 MW |
| 2026-08-24T02:00Z | 12,629 MW | 11,212 MW | 18,993 MW | 1,915 MW | 889 MW |
| 2026-08-24T03:00Z | 10,676 MW | 9,905 MW | 20,195 MW | 1,915 MW | 509 MW |
| 2026-08-24T04:00Z | 9,322 MW | 9,236 MW | 19,850 MW | 1,916 MW | 484 MW |
| 2026-08-24T05:00Z | 8,815 MW | 8,580 MW | 18,826 MW | 1,916 MW | 483 MW |
| 2026-08-24T06:00Z | 9,235 MW | 8,288 MW | 17,035 MW | 1,916 MW | 482 MW |
| 2026-08-24T07:00Z | 9,222 MW | 8,621 MW | 15,520 MW | 1,917 MW | 483 MW |
| 2026-08-24T08:00Z | 8,651 MW | 8,529 MW | 15,169 MW | 1,917 MW | 484 MW |
| 2026-08-24T09:00Z | 9,477 MW | 8,802 MW | 13,865 MW | 1,917 MW | 493 MW |
| 2026-08-24T10:00Z | 9,211 MW | 9,234 MW | 14,362 MW | 1,918 MW | 495 MW |
| 2026-08-24T11:00Z | 9,297 MW | 9,460 MW | 15,360 MW | 1,919 MW | 513 MW |
| 2026-08-24T12:00Z | 10,444 MW | 10,080 MW | 14,106 MW | 1,919 MW | 563 MW |
| 2026-08-24T13:00Z | 12,050 MW | 10,490 MW | 11,678 MW | 1,919 MW | 818 MW |
| 2026-08-24T14:00Z | 13,309 MW | 11,205 MW | 9,782 MW | 1,920 MW | 1,026 MW |
| 2026-08-24T15:00Z | 14,724 MW | 12,007 MW | 8,767 MW | 1,920 MW | 1,080 MW |
| 2026-08-24T16:00Z | 16,970 MW | 12,377 MW | 7,694 MW | 1,919 MW | 1,122 MW |
| 2026-08-24T17:00Z | 19,533 MW | 12,728 MW | 6,453 MW | 1,918 MW | 1,223 MW |
| 2026-08-24T18:00Z | 21,916 MW | 13,130 MW | 5,312 MW | 1,916 MW | 1,349 MW |
| 2026-08-24T19:00Z | 23,657 MW | 13,639 MW | 4,559 MW | 1,913 MW | 1,618 MW |
| 2026-08-24T20:00Z | 24,430 MW | 13,805 MW | 4,159 MW | 1,913 MW | 1,672 MW |
| 2026-08-24T21:00Z | 24,956 MW | 13,933 MW | 3,883 MW | 1,911 MW | 1,747 MW |
| 2026-08-24T22:00Z | 25,853 MW | 14,089 MW | 4,124 MW | 1,910 MW | 1,748 MW |
| 2026-08-24T23:00Z | 25,441 MW | 14,132 MW | 4,892 MW | 1,909 MW | 1,697 MW |
| 2026-08-25T00:00Z | 24,286 MW | 13,998 MW | 6,621 MW | 1,910 MW | 1,699 MW |
| 2026-08-25T01:00Z | 21,653 MW | 13,580 MW | 9,412 MW | 1,910 MW | 1,549 MW |
| 2026-08-25T02:00Z | 18,592 MW | 13,006 MW | 11,737 MW | 1,910 MW | 1,380 MW |
| 2026-08-25T03:00Z | 15,957 MW | 12,705 MW | 12,242 MW | 1,911 MW | 1,015 MW |
| 2026-08-25T04:00Z | 14,230 MW | 12,062 MW | 12,044 MW | 1,912 MW | 822 MW |
| 2026-08-25T05:00Z | 12,791 MW | 11,700 MW | 11,652 MW | 1,912 MW | 496 MW |
| 2026-08-25T06:00Z | 12,560 MW | 11,747 MW | 10,633 MW | 1,912 MW | 474 MW |
| 2026-08-25T07:00Z | 12,298 MW | 11,454 MW | 9,986 MW | 1,913 MW | 473 MW |
| 2026-08-25T08:00Z | 12,635 MW | 11,623 MW | 8,894 MW | 1,913 MW | 484 MW |
| 2026-08-25T09:00Z | 12,523 MW | 11,883 MW | 8,044 MW | 1,914 MW | 488 MW |
| 2026-08-25T10:00Z | 13,513 MW | 12,386 MW | 7,194 MW | 1,914 MW | 489 MW |
| 2026-08-25T11:00Z | 14,723 MW | 12,819 MW | 6,813 MW | 1,915 MW | 506 MW |
| 2026-08-25T12:00Z | 15,609 MW | 12,819 MW | 6,488 MW | 1,916 MW | 515 MW |
| 2026-08-25T13:00Z | 16,290 MW | 12,573 MW | 5,845 MW | 1,915 MW | 552 MW |
| 2026-08-25T14:00Z | 17,520 MW | 13,053 MW | 5,149 MW | 1,915 MW | 555 MW |
| 2026-08-25T15:00Z | 18,414 MW | 13,388 MW | 5,928 MW | 1,915 MW | 549 MW |
| 2026-08-25T16:00Z | 18,396 MW | 13,273 MW | 7,672 MW | 1,914 MW | 1,034 MW |
| 2026-08-25T17:00Z | 18,794 MW | 13,480 MW | 9,169 MW | 1,913 MW | 1,276 MW |
| 2026-08-25T18:00Z | 19,860 MW | 13,620 MW | 9,805 MW | 1,914 MW | 1,437 MW |
| 2026-08-25T19:00Z | 19,298 MW | 13,834 MW | 11,168 MW | 1,911 MW | 1,787 MW |
| 2026-08-25T20:00Z | 19,732 MW | 13,372 MW | 11,627 MW | 1,910 MW | 1,842 MW |
| 2026-08-25T21:00Z | 20,211 MW | 13,413 MW | 11,167 MW | 1,909 MW | 1,973 MW |
| 2026-08-25T22:00Z | 21,858 MW | 13,846 MW | 9,445 MW | 1,910 MW | 2,024 MW |
| 2026-08-25T23:00Z | 23,568 MW | 14,450 MW | 7,843 MW | 1,910 MW | 1,909 MW |
| 2026-08-26T00:00Z | 23,727 MW | 14,978 MW | 7,333 MW | 1,909 MW | 1,856 MW |
| 2026-08-26T01:00Z | 22,363 MW | 15,096 MW | 7,922 MW | 1,908 MW | 1,853 MW |
| 2026-08-26T02:00Z | 20,259 MW | 15,008 MW | 8,640 MW | 1,908 MW | 1,430 MW |
| 2026-08-26T03:00Z | 18,268 MW | 14,808 MW | 8,520 MW | 1,909 MW | 953 MW |
| 2026-08-26T04:00Z | 16,154 MW | 14,455 MW | 8,673 MW | 1,909 MW | 757 MW |
| 2026-08-26T05:00Z | 14,338 MW | 13,959 MW | 8,671 MW | 1,910 MW | 460 MW |
| 2026-08-26T06:00Z | 13,945 MW | 13,888 MW | 7,429 MW | 1,910 MW | 446 MW |
| 2026-08-26T07:00Z | 14,527 MW | 13,808 MW | 5,998 MW | 1,910 MW | 437 MW |
| 2026-08-26T08:00Z | 14,929 MW | 13,783 MW | 5,195 MW | 1,911 MW | 436 MW |
| 2026-08-26T09:00Z | 14,818 MW | 13,861 MW | 4,955 MW | 1,911 MW | 450 MW |
| 2026-08-26T10:00Z | 15,421 MW | 14,151 MW | 4,810 MW | 1,911 MW | 463 MW |
| 2026-08-26T11:00Z | 16,530 MW | 14,467 MW | 4,639 MW | 1,912 MW | 474 MW |
| 2026-08-26T12:00Z | 16,937 MW | 14,536 MW | 4,898 MW | 1,912 MW | 471 MW |
| 2026-08-26T13:00Z | 17,630 MW | 14,682 MW | 3,948 MW | 1,909 MW | 476 MW |
| 2026-08-26T14:00Z | 19,177 MW | 14,961 MW | 2,367 MW | 1,908 MW | 814 MW |
| 2026-08-26T15:00Z | 20,610 MW | 15,013 MW | 1,917 MW | 1,908 MW | 1,094 MW |
| 2026-08-26T16:00Z | 22,513 MW | 15,372 MW | 1,790 MW | 1,906 MW | 1,101 MW |
| 2026-08-26T17:00Z | 23,864 MW | 15,424 MW | 2,100 MW | 1,907 MW | 1,396 MW |
| 2026-08-26T18:00Z | 24,802 MW | 15,740 MW | 2,202 MW | 1,908 MW | 1,736 MW |
| 2026-08-26T19:00Z | 25,794 MW | 15,942 MW | 2,198 MW | 1,906 MW | 1,786 MW |
| 2026-08-26T20:00Z | 26,728 MW | 16,063 MW | 2,270 MW | 1,905 MW | 1,866 MW |
| 2026-08-26T21:00Z | 27,092 MW | 16,101 MW | 2,148 MW | 1,904 MW | 2,016 MW |
| 2026-08-26T22:00Z | 27,198 MW | 16,139 MW | 2,085 MW | 1,903 MW | 2,031 MW |
| 2026-08-26T23:00Z | 27,400 MW | 16,237 MW | 2,385 MW | 1,902 MW | 1,914 MW |
| 2026-08-27T00:00Z | 26,774 MW | 16,229 MW | 3,011 MW | 1,902 MW | 1,880 MW |
| 2026-08-27T01:00Z | 24,941 MW | 16,120 MW | 3,907 MW | 1,902 MW | 1,787 MW |
| 2026-08-27T02:00Z | 22,590 MW | 16,043 MW | 5,057 MW | 1,902 MW | 1,063 MW |
| 2026-08-27T03:00Z | 19,499 MW | 15,854 MW | 5,638 MW | 1,903 MW | 638 MW |
| 2026-08-27T04:00Z | 16,704 MW | 15,128 MW | 6,556 MW | 1,902 MW | 587 MW |
| 2026-08-27T05:00Z | 15,057 MW | 14,563 MW | 6,923 MW | 1,903 MW | 439 MW |
| 2026-08-27T06:00Z | 14,354 MW | 13,825 MW | 6,748 MW | 1,903 MW | 424 MW |
| 2026-08-27T07:00Z | 13,493 MW | 13,214 MW | 6,860 MW | 1,904 MW | 423 MW |
| 2026-08-27T08:00Z | 13,567 MW | 12,815 MW | 6,505 MW | 1,904 MW | 429 MW |
| 2026-08-27T09:00Z | 13,866 MW | 12,906 MW | 5,729 MW | 1,904 MW | 456 MW |
| 2026-08-27T10:00Z | 14,862 MW | 13,485 MW | 4,712 MW | 1,904 MW | 457 MW |
| 2026-08-27T11:00Z | 15,767 MW | 14,323 MW | 4,164 MW | 1,905 MW | 466 MW |
| 2026-08-27T12:00Z | 15,777 MW | 14,489 MW | 4,600 MW | 1,906 MW | 464 MW |
| 2026-08-27T13:00Z | 15,625 MW | 14,085 MW | 4,372 MW | 1,906 MW | 569 MW |
| 2026-08-27T14:00Z | 16,990 MW | 13,895 MW | 3,014 MW | 1,906 MW | 803 MW |
| 2026-08-27T15:00Z | 17,890 MW | 14,379 MW | 2,414 MW | 1,906 MW | 964 MW |
| 2026-08-27T16:00Z | 19,417 MW | 15,032 MW | 2,400 MW | 1,904 MW | 1,101 MW |
| 2026-08-27T17:00Z | 20,684 MW | 15,468 MW | 2,549 MW | 1,903 MW | 1,396 MW |
| 2026-08-27T18:00Z | 22,391 MW | 15,740 MW | 2,481 MW | 1,903 MW | 1,765 MW |
| 2026-08-27T19:00Z | 23,832 MW | 15,875 MW | 2,382 MW | 1,902 MW | 1,824 MW |
| 2026-08-27T20:00Z | 24,737 MW | 15,989 MW | 2,425 MW | 1,901 MW | 1,835 MW |
| 2026-08-27T21:00Z | 24,760 MW | 16,088 MW | 2,487 MW | 1,901 MW | 1,991 MW |
| 2026-08-27T22:00Z | 25,003 MW | 16,187 MW | 2,920 MW | 1,900 MW | 2,082 MW |
| 2026-08-27T23:00Z | 24,786 MW | 16,199 MW | 4,013 MW | 1,899 MW | 1,975 MW |
| 2026-08-28T00:00Z | 22,855 MW | 16,025 MW | 5,564 MW | 1,899 MW | 1,848 MW |
| 2026-08-28T01:00Z | 19,603 MW | 15,476 MW | 8,214 MW | 1,899 MW | 1,771 MW |
| 2026-08-28T02:00Z | 16,093 MW | 14,698 MW | 11,460 MW | 1,899 MW | 1,057 MW |
| 2026-08-28T03:00Z | 12,875 MW | 13,265 MW | 13,931 MW | 1,900 MW | 709 MW |
| 2026-08-28T04:00Z | 10,695 MW | 11,853 MW | 15,279 MW | 1,900 MW | 455 MW |
| 2026-08-28T05:00Z | 9,112 MW | 10,756 MW | 15,977 MW | 1,900 MW | 427 MW |
| 2026-08-28T06:00Z | 8,365 MW | 10,309 MW | 15,776 MW | 1,900 MW | 418 MW |
| 2026-08-28T07:00Z | 8,020 MW | 9,502 MW | 15,662 MW | 1,901 MW | 424 MW |
| 2026-08-28T08:00Z | 8,266 MW | 9,465 MW | 14,587 MW | 1,902 MW | 431 MW |
| 2026-08-28T09:00Z | 8,670 MW | 10,166 MW | 13,261 MW | 1,902 MW | 444 MW |
| 2026-08-28T10:00Z | 9,559 MW | 11,300 MW | 11,660 MW | 1,903 MW | 460 MW |
| 2026-08-28T11:00Z | 9,853 MW | 12,336 MW | 11,491 MW | 1,904 MW | 470 MW |
| 2026-08-28T12:00Z | 10,616 MW | 12,819 MW | 10,804 MW | 1,904 MW | 481 MW |
| 2026-08-28T13:00Z | 11,174 MW | 12,948 MW | 8,786 MW | 1,904 MW | 824 MW |
| 2026-08-28T14:00Z | 12,683 MW | 13,404 MW | 7,071 MW | 1,903 MW | 1,132 MW |
| 2026-08-28T15:00Z | 13,559 MW | 14,308 MW | 7,325 MW | 1,903 MW | 1,238 MW |
| 2026-08-28T16:00Z | 14,246 MW | 15,121 MW | 8,445 MW | 1,903 MW | 1,316 MW |
| 2026-08-28T17:00Z | 15,366 MW | 15,787 MW | 9,154 MW | 1,901 MW | 1,407 MW |
| 2026-08-28T18:00Z | 17,127 MW | 16,182 MW | 8,970 MW | 1,897 MW | 1,694 MW |
| 2026-08-28T19:00Z | 18,917 MW | 16,449 MW | 8,722 MW | 1,896 MW | 1,711 MW |
| 2026-08-28T20:00Z | 19,422 MW | 16,471 MW | 9,216 MW | 1,895 MW | 1,749 MW |
| 2026-08-28T21:00Z | 18,953 MW | 16,583 MW | 10,021 MW | 1,895 MW | 1,864 MW |
| 2026-08-28T22:00Z | 18,040 MW | 16,518 MW | 11,083 MW | 1,894 MW | 1,891 MW |
| 2026-08-28T23:00Z | 17,225 MW | 16,426 MW | 12,685 MW | 1,892 MW | 1,783 MW |
| 2026-08-29T00:00Z | 15,959 MW | 16,074 MW | 14,203 MW | 1,891 MW | 1,754 MW |
| 2026-08-29T01:00Z | 12,846 MW | 14,106 MW | 17,981 MW | 1,891 MW | 1,429 MW |
| 2026-08-29T02:00Z | 10,224 MW | 12,052 MW | 20,958 MW | 1,892 MW | 976 MW |
| 2026-08-29T03:00Z | 8,168 MW | 9,975 MW | 22,287 MW | 1,892 MW | 656 MW |
| 2026-08-29T04:00Z | 7,263 MW | 8,652 MW | 22,394 MW | 1,892 MW | 438 MW |
| 2026-08-29T05:00Z | 6,096 MW | 7,820 MW | 21,742 MW | 1,893 MW | 425 MW |
| 2026-08-29T06:00Z | 5,435 MW | 7,380 MW | 21,803 MW | 1,894 MW | 422 MW |
| 2026-08-29T07:00Z | 5,077 MW | 6,907 MW | 21,087 MW | 1,895 MW | 422 MW |
| 2026-08-29T08:00Z | 4,989 MW | 6,638 MW | 20,478 MW | 1,896 MW | 420 MW |
| 2026-08-29T09:00Z | 4,965 MW | 6,521 MW | 20,252 MW | 1,898 MW | 418 MW |
| 2026-08-29T10:00Z | 5,178 MW | 6,514 MW | 20,274 MW | 1,899 MW | 440 MW |
| 2026-08-29T11:00Z | 5,357 MW | 6,534 MW | 20,103 MW | 1,900 MW | 558 MW |
| 2026-08-29T12:00Z | 5,648 MW | 6,636 MW | 19,730 MW | 1,900 MW | 613 MW |
| 2026-08-29T13:00Z | 6,417 MW | 6,847 MW | 18,845 MW | 1,901 MW | 632 MW |
| 2026-08-29T14:00Z | 7,977 MW | 7,598 MW | 17,686 MW | 1,901 MW | 809 MW |
| 2026-08-29T15:00Z | 9,378 MW | 8,420 MW | 17,363 MW | 1,901 MW | 899 MW |
| 2026-08-29T16:00Z | 10,925 MW | 9,283 MW | 18,077 MW | 1,900 MW | 1,091 MW |
| 2026-08-29T17:00Z | 12,412 MW | 10,669 MW | 17,795 MW | 1,900 MW | 1,170 MW |
| 2026-08-29T18:00Z | 13,936 MW | 11,864 MW | 16,737 MW | 1,899 MW | 1,453 MW |
| 2026-08-29T19:00Z | 15,519 MW | 12,823 MW | 16,070 MW | 1,897 MW | 1,542 MW |
| 2026-08-29T20:00Z | 15,874 MW | 12,712 MW | 16,265 MW | 1,897 MW | 1,638 MW |
| 2026-08-29T21:00Z | 16,441 MW | 13,018 MW | 16,536 MW | 1,896 MW | 1,688 MW |
| 2026-08-29T22:00Z | 16,991 MW | 13,558 MW | 16,727 MW | 1,895 MW | 1,779 MW |
| 2026-08-29T23:00Z | 16,793 MW | 13,673 MW | 17,625 MW | 1,896 MW | 1,748 MW |
| 2026-08-30T00:00Z | 15,315 MW | 13,106 MW | 19,448 MW | 1,895 MW | 1,605 MW |
| 2026-08-30T01:00Z | 13,040 MW | 11,545 MW | 21,614 MW | 1,895 MW | 1,600 MW |
| 2026-08-30T02:00Z | 10,784 MW | 10,252 MW | 23,270 MW | 1,896 MW | 1,012 MW |
| 2026-08-30T03:00Z | 9,342 MW | 9,493 MW | 23,436 MW | 1,896 MW | 606 MW |
| 2026-08-30T04:00Z | 8,013 MW | 8,666 MW | 23,337 MW | 1,896 MW | 440 MW |
| 2026-08-30T05:00Z | 7,155 MW | 7,981 MW | 23,008 MW | 1,896 MW | 461 MW |
| 2026-08-30T06:00Z | 6,737 MW | 7,502 MW | 22,343 MW | 1,897 MW | 460 MW |
| 2026-08-30T07:00Z | 6,240 MW | 7,053 MW | 22,078 MW | 1,898 MW | 456 MW |
| 2026-08-30T08:00Z | 6,157 MW | 6,717 MW | 21,558 MW | 1,898 MW | 456 MW |
| 2026-08-30T09:00Z | 6,179 MW | 6,618 MW | 20,791 MW | 1,898 MW | 455 MW |
| 2026-08-30T10:00Z | 6,110 MW | 6,492 MW | 21,054 MW | 1,899 MW | 455 MW |
| 2026-08-30T11:00Z | 6,038 MW | 6,496 MW | 20,819 MW | 1,899 MW | 567 MW |
| 2026-08-30T12:00Z | 6,250 MW | 6,501 MW | 20,392 MW | 1,899 MW | 581 MW |
| 2026-08-30T13:00Z | 7,521 MW | 6,494 MW | 19,295 MW | 1,900 MW | 615 MW |
| 2026-08-30T14:00Z | 8,568 MW | 7,096 MW | 19,119 MW | 1,900 MW | 778 MW |
| 2026-08-30T15:00Z | 9,890 MW | 8,003 MW | 19,158 MW | 1,899 MW | 884 MW |
| 2026-08-30T16:00Z | 12,450 MW | 9,120 MW | 18,127 MW | 1,898 MW | 963 MW |
| 2026-08-30T17:00Z | 14,464 MW | 10,465 MW | 16,983 MW | 1,897 MW | 1,063 MW |
| 2026-08-30T18:00Z | 15,598 MW | 12,314 MW | 15,763 MW | 1,897 MW | 1,315 MW |
| 2026-08-30T19:00Z | 17,104 MW | 13,794 MW | 14,388 MW | 1,896 MW | 1,379 MW |
| 2026-08-30T20:00Z | 17,268 MW | 14,232 MW | 14,391 MW | 1,895 MW | 1,486 MW |
| 2026-08-30T21:00Z | 18,350 MW | 14,680 MW | 14,182 MW | 1,894 MW | 1,642 MW |
| 2026-08-30T22:00Z | 18,715 MW | 14,766 MW | 14,598 MW | 1,894 MW | 1,767 MW |
| 2026-08-30T23:00Z | 19,159 MW | 14,693 MW | 15,506 MW | 1,894 MW | 1,666 MW |
| 2026-08-31T00:00Z | 18,545 MW | 14,339 MW | 16,688 MW | 1,894 MW | 1,597 MW |
| 2026-08-31T01:00Z | 16,004 MW | 13,580 MW | 19,005 MW | 1,893 MW | 1,438 MW |
| 2026-08-31T02:00Z | 13,479 MW | 12,077 MW | 21,442 MW | 1,893 MW | 910 MW |
| 2026-08-31T03:00Z | 11,230 MW | 10,511 MW | 22,693 MW | 1,894 MW | 507 MW |
| 2026-08-31T04:00Z | 9,359 MW | 8,913 MW | 23,142 MW | 1,894 MW | 455 MW |
| 2026-08-31T05:00Z | 8,351 MW | 7,677 MW | 22,858 MW | 1,894 MW | 491 MW |
| 2026-08-31T06:00Z | 8,037 MW | 7,400 MW | 21,810 MW | 1,895 MW | 484 MW |
| 2026-08-31T07:00Z | 7,621 MW | 7,052 MW | 21,166 MW | 1,895 MW | 480 MW |
| 2026-08-31T08:00Z | 7,381 MW | 6,607 MW | 20,667 MW | 1,895 MW | 491 MW |
| 2026-08-31T09:00Z | 7,577 MW | 6,520 MW | 20,742 MW | 1,896 MW | 489 MW |
| 2026-08-31T10:00Z | 8,452 MW | 7,769 MW | 19,168 MW | 1,896 MW | 494 MW |
| 2026-08-31T11:00Z | 9,672 MW | 9,811 MW | 16,888 MW | 1,896 MW | 490 MW |
| 2026-08-31T12:00Z | 10,244 MW | 11,487 MW | 15,278 MW | 1,897 MW | 517 MW |
| 2026-08-31T13:00Z | 11,720 MW | 12,613 MW | 12,371 MW | 1,897 MW | 519 MW |
| 2026-08-31T14:00Z | 12,929 MW | 13,325 MW | 11,440 MW | 1,897 MW | 525 MW |
| 2026-08-31T15:00Z | 13,897 MW | 13,851 MW | 12,253 MW | 1,898 MW | 789 MW |
| 2026-08-31T16:00Z | 16,895 MW | 14,574 MW | 11,683 MW | 1,899 MW | 1,002 MW |
| 2026-08-31T17:00Z | 19,867 MW | 15,134 MW | 10,372 MW | 1,898 MW | 1,236 MW |
| 2026-08-31T18:00Z | 22,623 MW | 15,606 MW | 8,644 MW | 1,896 MW | 1,610 MW |
| 2026-08-31T19:00Z | 23,451 MW | 15,642 MW | 8,434 MW | 1,894 MW | 1,706 MW |
| 2026-08-31T20:00Z | 24,691 MW | 15,520 MW | 8,636 MW | 1,890 MW | 1,802 MW |
| 2026-08-31T21:00Z | 24,971 MW | 15,222 MW | 8,960 MW | 1,889 MW | 1,929 MW |
| 2026-08-31T22:00Z | 24,736 MW | 14,808 MW | 10,057 MW | 1,888 MW | 1,948 MW |
| 2026-08-31T23:00Z | 23,927 MW | 14,830 MW | 11,690 MW | 1,887 MW | 1,834 MW |
| 2026-09-01T00:00Z | 22,507 MW | 14,699 MW | 13,595 MW | 1,887 MW | 1,820 MW |
| 2026-09-01T01:00Z | 19,443 MW | 13,885 MW | 16,398 MW | 1,887 MW | 1,632 MW |
| 2026-09-01T02:00Z | 15,568 MW | 12,524 MW | 19,258 MW | 1,887 MW | 1,290 MW |
| 2026-09-01T03:00Z | 13,076 MW | 11,504 MW | 20,033 MW | 1,887 MW | 822 MW |
| 2026-09-01T04:00Z | 10,785 MW | 10,458 MW | 20,586 MW | 1,887 MW | 582 MW |
| 2026-09-01T05:00Z | 9,175 MW | 10,173 MW | 20,479 MW | 1,887 MW | 486 MW |
| 2026-09-01T06:00Z | 8,603 MW | 9,409 MW | 20,320 MW | 1,889 MW | 486 MW |
| 2026-09-01T07:00Z | 8,417 MW | 8,703 MW | 19,947 MW | 1,889 MW | 487 MW |
| 2026-09-01T08:00Z | 8,504 MW | 8,216 MW | 19,396 MW | 1,888 MW | 488 MW |
| 2026-09-01T09:00Z | 8,786 MW | 8,282 MW | 18,738 MW | 1,889 MW | 503 MW |
| 2026-09-01T10:00Z | 10,029 MW | 9,019 MW | 16,964 MW | 1,890 MW | 528 MW |
| 2026-09-01T11:00Z | 11,352 MW | 9,856 MW | 15,390 MW | 1,890 MW | 492 MW |
| 2026-09-01T12:00Z | 12,292 MW | 10,254 MW | 14,282 MW | 1,890 MW | 518 MW |
| 2026-09-01T13:00Z | 14,255 MW | 10,831 MW | 11,506 MW | 1,891 MW | 543 MW |
| 2026-09-01T14:00Z | 16,250 MW | 12,318 MW | 8,974 MW | 1,890 MW | 782 MW |
| 2026-09-01T15:00Z | 16,727 MW | 13,133 MW | 10,129 MW | 1,889 MW | 1,139 MW |
| 2026-09-01T16:00Z | 18,259 MW | 14,238 MW | 10,178 MW | 1,888 MW | 1,378 MW |
| 2026-09-01T17:00Z | 21,040 MW | 15,488 MW | 8,577 MW | 1,887 MW | 1,513 MW |
| 2026-09-01T18:00Z | 22,024 MW | 15,999 MW | 8,517 MW | 1,886 MW | 1,767 MW |
| 2026-09-01T19:00Z | 23,030 MW | 15,965 MW | 8,864 MW | 1,885 MW | 1,770 MW |
| 2026-09-01T20:00Z | 23,928 MW | 15,908 MW | 9,103 MW | 1,884 MW | 1,821 MW |
| 2026-09-01T21:00Z | 24,292 MW | 15,755 MW | 9,384 MW | 1,883 MW | 1,960 MW |
| 2026-09-01T22:00Z | 25,157 MW | 15,622 MW | 10,033 MW | 1,882 MW | 2,016 MW |
| 2026-09-01T23:00Z | 25,390 MW | 15,476 MW | 11,299 MW | 1,882 MW | 1,907 MW |
| 2026-09-02T00:00Z | 24,124 MW | 15,724 MW | 11,943 MW | 1,882 MW | 1,875 MW |
| 2026-09-02T01:00Z | 19,715 MW | 14,747 MW | 15,003 MW | 1,882 MW | 1,700 MW |
| 2026-09-02T02:00Z | 15,815 MW | 13,084 MW | 18,444 MW | 1,882 MW | 901 MW |
| 2026-09-02T03:00Z | 13,352 MW | 11,861 MW | 19,823 MW | 1,882 MW | 586 MW |
| 2026-09-02T04:00Z | 10,616 MW | 10,567 MW | 20,972 MW | 1,882 MW | 535 MW |
| 2026-09-02T05:00Z | 9,348 MW | 9,422 MW | 21,607 MW | 1,882 MW | 459 MW |
| 2026-09-02T06:00Z | 8,675 MW | 9,167 MW | 21,230 MW | 1,883 MW | 447 MW |
| 2026-09-02T07:00Z | 7,967 MW | 8,399 MW | 21,146 MW | 1,883 MW | 448 MW |
| 2026-09-02T08:00Z | 7,919 MW | 7,700 MW | 21,444 MW | 1,883 MW | 455 MW |
| 2026-09-02T09:00Z | 7,857 MW | 7,572 MW | 21,164 MW | 1,884 MW | 458 MW |
| 2026-09-02T10:00Z | 8,127 MW | 7,754 MW | 21,269 MW | 1,884 MW | 459 MW |
| 2026-09-02T11:00Z | 8,759 MW | 8,647 MW | 20,777 MW | 1,885 MW | 537 MW |
| 2026-09-02T12:00Z | 9,104 MW | 9,376 MW | 20,088 MW | 1,885 MW | 584 MW |
| 2026-09-02T13:00Z | 11,150 MW | 10,353 MW | 16,772 MW | 1,885 MW | 600 MW |
| 2026-09-02T14:00Z | 12,658 MW | 12,113 MW | 14,382 MW | 1,885 MW | 825 MW |
| 2026-09-02T15:00Z | 14,207 MW | 13,204 MW | 14,512 MW | 1,885 MW | 1,121 MW |
| 2026-09-02T16:00Z | 16,147 MW | 14,195 MW | 13,659 MW | 1,884 MW | 1,406 MW |
| 2026-09-02T17:00Z | 18,714 MW | 14,765 MW | 12,503 MW | 1,883 MW | 1,467 MW |
| 2026-09-02T18:00Z | 20,468 MW | 15,233 MW | 11,786 MW | 1,881 MW | 1,720 MW |
| 2026-09-02T19:00Z | 21,474 MW | 15,228 MW | 11,806 MW | 1,880 MW | 1,759 MW |
| 2026-09-02T20:00Z | 22,206 MW | 14,891 MW | 12,357 MW | 1,879 MW | 1,801 MW |
| 2026-09-02T21:00Z | 22,426 MW | 14,722 MW | 13,431 MW | 1,878 MW | 1,962 MW |
| 2026-09-02T22:00Z | 22,493 MW | 15,010 MW | 14,662 MW | 1,877 MW | 2,032 MW |
| 2026-09-02T23:00Z | 22,832 MW | 15,126 MW | 15,512 MW | 1,876 MW | 2,090 MW |
| 2026-09-03T00:00Z | 22,293 MW | 14,775 MW | 15,903 MW | 1,876 MW | 1,991 MW |
| 2026-09-03T01:00Z | 18,590 MW | 14,006 MW | 19,187 MW | 1,876 MW | 1,656 MW |
| 2026-09-03T02:00Z | 14,248 MW | 12,699 MW | 22,736 MW | 1,876 MW | 859 MW |
| 2026-09-03T03:00Z | 11,438 MW | 10,960 MW | 24,367 MW | 1,877 MW | 579 MW |
| 2026-09-03T04:00Z | 9,182 MW | 9,754 MW | 24,775 MW | 1,877 MW | 474 MW |
| 2026-09-03T05:00Z | 7,694 MW | 8,717 MW | 24,779 MW | 1,877 MW | 445 MW |
| 2026-09-03T06:00Z | 7,283 MW | 7,799 MW | 24,462 MW | 1,877 MW | 446 MW |
| 2026-09-03T07:00Z | 6,751 MW | 7,364 MW | 23,699 MW | 1,877 MW | 447 MW |
| 2026-09-03T08:00Z | 6,687 MW | 7,221 MW | 22,781 MW | 1,878 MW | 456 MW |
| 2026-09-03T09:00Z | 6,844 MW | 7,119 MW | 22,704 MW | 1,878 MW | 457 MW |
| 2026-09-03T10:00Z | 7,520 MW | 7,461 MW | 22,426 MW | 1,878 MW | 462 MW |
| 2026-09-03T11:00Z | 7,983 MW | 8,642 MW | 21,747 MW | 1,879 MW | 542 MW |
| 2026-09-03T12:00Z | 8,365 MW | 9,782 MW | 20,721 MW | 1,879 MW | 584 MW |
| 2026-09-03T13:00Z | 9,640 MW | 10,863 MW | 18,116 MW | 1,879 MW | 592 MW |
| 2026-09-03T14:00Z | 10,860 MW | 12,146 MW | 15,939 MW | 1,879 MW | 820 MW |
| 2026-09-03T15:00Z | 13,131 MW | 13,389 MW | 13,883 MW | 1,878 MW | 1,193 MW |
| 2026-09-03T16:00Z | 16,085 MW | 14,549 MW | 12,452 MW | 1,877 MW | 1,459 MW |
| 2026-09-03T17:00Z | 19,177 MW | 15,301 MW | 10,908 MW | 1,875 MW | 1,479 MW |
| 2026-09-03T18:00Z | 21,635 MW | 15,577 MW | 9,566 MW | 1,875 MW | 1,755 MW |
| 2026-09-03T19:00Z | 23,154 MW | 15,442 MW | 9,328 MW | 1,874 MW | 1,782 MW |
| 2026-09-03T20:00Z | 22,989 MW | 15,350 MW | 10,227 MW | 1,872 MW | 1,793 MW |
| 2026-09-03T21:00Z | 22,981 MW | 15,351 MW | 11,296 MW | 1,871 MW | 1,931 MW |
| 2026-09-03T22:00Z | 23,189 MW | 15,229 MW | 12,195 MW | 1,871 MW | 2,065 MW |
| 2026-09-03T23:00Z | 22,024 MW | 14,997 MW | 14,566 MW | 1,871 MW | 1,961 MW |
| 2026-09-04T00:00Z | 19,649 MW | 14,461 MW | 17,131 MW | 1,871 MW | 1,809 MW |
| 2026-09-04T01:00Z | 16,911 MW | 13,797 MW | 18,707 MW | 1,871 MW | 1,597 MW |
| 2026-09-04T02:00Z | 14,768 MW | 12,862 MW | 20,270 MW | 1,871 MW | 883 MW |
| 2026-09-04T03:00Z | 12,723 MW | 11,914 MW | 20,911 MW | 1,871 MW | 562 MW |
| 2026-09-04T04:00Z | 10,488 MW | 11,082 MW | 21,233 MW | 1,871 MW | 466 MW |
| 2026-09-04T05:00Z | 9,360 MW | 10,320 MW | 21,207 MW | 1,871 MW | 421 MW |
| 2026-09-04T06:00Z | 8,718 MW | 9,530 MW | 20,591 MW | 1,872 MW | 418 MW |
| 2026-09-04T07:00Z | 8,727 MW | 8,897 MW | 19,481 MW | 1,873 MW | 463 MW |
| 2026-09-04T08:00Z | 8,893 MW | 9,059 MW | 18,374 MW | 1,873 MW | 487 MW |
| 2026-09-04T09:00Z | 8,892 MW | 9,665 MW | 17,345 MW | 1,873 MW | 515 MW |
| 2026-09-04T10:00Z | 9,168 MW | 10,039 MW | 16,899 MW | 1,873 MW | 533 MW |
| 2026-09-04T11:00Z | 10,207 MW | 10,866 MW | 15,941 MW | 1,874 MW | 578 MW |
| 2026-09-04T12:00Z | 10,911 MW | 11,775 MW | 14,847 MW | 1,874 MW | 572 MW |
| 2026-09-04T13:00Z | 13,267 MW | 12,771 MW | 11,645 MW | 1,874 MW | 581 MW |
| 2026-09-04T14:00Z | 14,284 MW | 13,859 MW | 10,197 MW | 1,874 MW | 866 MW |
| 2026-09-04T15:00Z | 16,746 MW | 15,427 MW | 8,513 MW | 1,874 MW | 1,198 MW |
| 2026-09-04T16:00Z | 19,533 MW | 16,254 MW | 7,127 MW | 1,873 MW | 1,456 MW |
| 2026-09-04T17:00Z | 21,346 MW | 16,682 MW | 7,071 MW | 1,872 MW | 1,470 MW |
| 2026-09-04T18:00Z | 22,301 MW | 16,661 MW | 7,674 MW | 1,871 MW | 1,762 MW |
| 2026-09-04T19:00Z | 22,860 MW | 16,535 MW | 8,818 MW | 1,869 MW | 1,785 MW |
| 2026-09-04T20:00Z | 23,628 MW | 16,352 MW | 9,780 MW | 1,868 MW | 1,785 MW |
| 2026-09-04T21:00Z | 23,822 MW | 15,921 MW | 11,067 MW | 1,867 MW | 1,970 MW |
| 2026-09-04T22:00Z | 23,203 MW | 15,795 MW | 12,275 MW | 1,866 MW | 2,057 MW |
| 2026-09-04T23:00Z | 23,450 MW | 15,869 MW | 13,049 MW | 1,865 MW | 1,941 MW |
| 2026-09-05T00:00Z | 21,987 MW | 15,664 MW | 13,969 MW | 1,866 MW | 1,851 MW |
| 2026-09-05T01:00Z | 18,694 MW | 14,978 MW | 16,376 MW | 1,866 MW | 1,541 MW |
| 2026-09-05T02:00Z | 15,157 MW | 14,099 MW | 18,503 MW | 1,865 MW | 840 MW |
| 2026-09-05T03:00Z | 12,872 MW | 13,285 MW | 19,911 MW | 1,866 MW | 540 MW |
| 2026-09-05T04:00Z | 10,743 MW | 12,864 MW | 19,896 MW | 1,867 MW | 530 MW |
| 2026-09-05T05:00Z | 9,470 MW | 12,483 MW | 19,802 MW | 1,866 MW | 460 MW |
| 2026-09-05T06:00Z | 8,773 MW | 11,640 MW | 19,477 MW | 1,867 MW | 455 MW |
| 2026-09-05T07:00Z | 8,537 MW | 11,101 MW | 18,618 MW | 1,867 MW | 456 MW |
| 2026-09-05T08:00Z | 8,677 MW | 10,989 MW | 17,223 MW | 1,868 MW | 456 MW |
| 2026-09-05T09:00Z | 9,173 MW | 11,235 MW | 15,328 MW | 1,868 MW | 567 MW |
| 2026-09-05T10:00Z | 9,469 MW | 11,669 MW | 14,079 MW | 1,868 MW | 570 MW |
| 2026-09-05T11:00Z | 9,637 MW | 11,822 MW | 13,456 MW | 1,868 MW | 568 MW |
| 2026-09-05T12:00Z | 9,598 MW | 10,930 MW | 13,607 MW | 1,868 MW | 575 MW |
| 2026-09-05T13:00Z | 11,942 MW | 10,552 MW | 11,629 MW | 1,868 MW | 588 MW |
| 2026-09-05T14:00Z | 13,990 MW | 12,070 MW | 9,620 MW | 1,868 MW | 591 MW |
| 2026-09-05T15:00Z | 16,385 MW | 13,447 MW | 8,425 MW | 1,867 MW | 754 MW |
| 2026-09-05T16:00Z | 18,846 MW | 14,443 MW | 7,568 MW | 1,865 MW | 910 MW |
| 2026-09-05T17:00Z | 20,933 MW | 14,903 MW | 7,128 MW | 1,863 MW | 1,231 MW |
| 2026-09-05T18:00Z | 22,893 MW | 14,794 MW | 6,904 MW | 1,861 MW | 1,529 MW |
| 2026-09-05T19:00Z | 23,800 MW | 14,741 MW | 7,312 MW | 1,860 MW | 1,600 MW |
| 2026-09-05T20:00Z | 23,566 MW | 14,858 MW | 8,219 MW | 1,859 MW | 1,729 MW |
| 2026-09-05T21:00Z | 23,210 MW | 14,979 MW | 9,021 MW | 1,858 MW | 1,746 MW |
| 2026-09-05T22:00Z | 23,571 MW | 15,012 MW | 9,203 MW | 1,858 MW | 1,701 MW |
| 2026-09-05T23:00Z | 23,702 MW | 15,080 MW | 9,151 MW | 1,858 MW | 1,701 MW |
| 2026-09-06T00:00Z | 22,763 MW | 15,148 MW | 9,898 MW | 1,857 MW | 1,620 MW |
| 2026-09-06T01:00Z | 20,401 MW | 15,157 MW | 11,561 MW | 1,857 MW | 1,492 MW |
| 2026-09-06T02:00Z | 17,200 MW | 14,921 MW | 13,222 MW | 1,857 MW | 1,108 MW |
| 2026-09-06T03:00Z | 14,044 MW | 13,783 MW | 15,586 MW | 1,858 MW | 630 MW |
| 2026-09-06T04:00Z | 12,040 MW | 12,384 MW | 16,435 MW | 1,857 MW | 560 MW |
| 2026-09-06T05:00Z | 10,507 MW | 11,446 MW | 17,110 MW | 1,858 MW | 459 MW |
| 2026-09-06T06:00Z | 9,653 MW | 11,565 MW | 16,080 MW | 1,858 MW | 456 MW |
| 2026-09-06T07:00Z | 10,017 MW | 11,750 MW | 14,071 MW | 1,858 MW | 461 MW |
| 2026-09-06T08:00Z | 10,051 MW | 12,217 MW | 12,451 MW | 1,858 MW | 448 MW |
| 2026-09-06T09:00Z | 10,229 MW | 12,134 MW | 11,332 MW | 1,859 MW | 567 MW |
| 2026-09-06T10:00Z | 10,976 MW | 13,136 MW | 9,626 MW | 1,859 MW | 571 MW |
| 2026-09-06T11:00Z | 11,389 MW | 13,827 MW | 8,264 MW | 1,860 MW | 584 MW |
| 2026-09-06T12:00Z | 11,999 MW | 13,928 MW | 7,432 MW | 1,861 MW | 593 MW |
| 2026-09-06T13:00Z | 13,689 MW | 14,121 MW | 5,462 MW | 1,861 MW | 589 MW |
| 2026-09-06T14:00Z | 15,344 MW | 14,430 MW | 4,379 MW | 1,860 MW | 596 MW |
| 2026-09-06T15:00Z | 17,444 MW | 14,884 MW | 4,534 MW | 1,860 MW | 595 MW |
| 2026-09-06T16:00Z | 19,105 MW | 15,130 MW | 5,422 MW | 1,859 MW | 617 MW |
| 2026-09-06T17:00Z | 19,743 MW | 15,293 MW | 6,398 MW | 1,858 MW | 1,051 MW |
| 2026-09-06T18:00Z | 20,277 MW | 15,258 MW | 7,079 MW | 1,857 MW | 1,386 MW |
| 2026-09-06T19:00Z | 20,343 MW | 15,250 MW | 7,912 MW | 1,857 MW | 1,509 MW |
| 2026-09-06T20:00Z | 20,314 MW | 15,110 MW | 8,375 MW | 1,856 MW | 1,751 MW |
| 2026-09-06T21:00Z | 20,190 MW | 14,801 MW | 9,320 MW | 1,855 MW | 1,777 MW |
| 2026-09-06T22:00Z | 19,898 MW | 14,629 MW | 10,363 MW | 1,854 MW | 1,723 MW |
| 2026-09-06T23:00Z | 19,725 MW | 14,694 MW | 10,895 MW | 1,854 MW | 1,709 MW |
| 2026-09-07T00:00Z | 19,468 MW | 15,158 MW | 10,650 MW | 1,855 MW | 1,639 MW |
| 2026-09-07T01:00Z | 17,253 MW | 14,181 MW | 12,722 MW | 1,855 MW | 1,556 MW |
| 2026-09-07T02:00Z | 13,652 MW | 13,173 MW | 15,595 MW | 1,856 MW | 1,162 MW |
| 2026-09-07T03:00Z | 11,016 MW | 11,779 MW | 18,203 MW | 1,856 MW | 620 MW |
| 2026-09-07T04:00Z | 8,851 MW | 10,124 MW | 19,859 MW | 1,856 MW | 527 MW |
| 2026-09-07T05:00Z | 8,851 MW | 10,124 MW | 19,859 MW | 1,856 MW | 527 MW |
| 2026-09-07T06:00Z | 9,653 MW | 11,565 MW | 16,080 MW | 1,858 MW | 456 MW |
| 2026-09-07T07:00Z | 10,017 MW | 11,750 MW | 14,071 MW | 1,858 MW | 461 MW |
| 2026-09-07T08:00Z | 10,051 MW | 12,217 MW | 12,451 MW | 1,858 MW | 448 MW |
| 2026-09-07T09:00Z | 10,229 MW | 12,134 MW | 11,332 MW | 1,859 MW | 567 MW |
| 2026-09-07T10:00Z | 10,976 MW | 13,136 MW | 9,626 MW | 1,859 MW | 571 MW |
| 2026-09-07T11:00Z | 11,389 MW | 13,827 MW | 8,264 MW | 1,860 MW | 584 MW |
| 2026-09-07T12:00Z | 11,999 MW | 13,928 MW | 7,432 MW | 1,861 MW | 593 MW |
| 2026-09-07T13:00Z | 13,689 MW | 14,121 MW | 5,462 MW | 1,861 MW | 589 MW |
| 2026-09-07T14:00Z | 15,344 MW | 14,430 MW | 4,379 MW | 1,860 MW | 596 MW |
| 2026-09-07T15:00Z | 17,444 MW | 14,884 MW | 4,534 MW | 1,860 MW | 595 MW |
| 2026-09-07T16:00Z | 19,105 MW | 15,130 MW | 5,422 MW | 1,859 MW | 617 MW |
| 2026-09-07T17:00Z | 19,743 MW | 15,293 MW | 6,398 MW | 1,858 MW | 1,051 MW |
| 2026-09-07T18:00Z | 20,277 MW | 15,258 MW | 7,079 MW | 1,857 MW | 1,386 MW |
| 2026-09-07T19:00Z | 20,343 MW | 15,250 MW | 7,912 MW | 1,857 MW | 1,509 MW |
| 2026-09-07T20:00Z | 20,314 MW | 15,110 MW | 8,375 MW | 1,856 MW | 1,751 MW |
| 2026-09-07T21:00Z | 20,190 MW | 14,801 MW | 9,320 MW | 1,855 MW | 1,777 MW |
| 2026-09-07T22:00Z | 19,898 MW | 14,629 MW | 10,363 MW | 1,854 MW | 1,723 MW |
| 2026-09-07T23:00Z | 19,725 MW | 14,694 MW | 10,895 MW | 1,854 MW | 1,709 MW |
| 2026-09-08T00:00Z | 19,468 MW | 15,158 MW | 10,650 MW | 1,855 MW | 1,639 MW |
| 2026-09-08T01:00Z | 17,253 MW | 14,181 MW | 12,722 MW | 1,855 MW | 1,556 MW |
| 2026-09-08T02:00Z | 13,652 MW | 13,173 MW | 15,595 MW | 1,856 MW | 1,162 MW |
| 2026-09-08T03:00Z | 11,016 MW | 11,779 MW | 18,203 MW | 1,856 MW | 620 MW |
| 2026-09-08T04:00Z | 8,851 MW | 10,124 MW | 19,859 MW | 1,856 MW | 527 MW |
| 2026-09-08T05:00Z | 8,301 MW | 8,573 MW | 21,792 MW | 1,853 MW | 566 MW |
| 2026-09-08T06:00Z | 7,783 MW | 7,982 MW | 21,396 MW | 1,855 MW | 566 MW |
| 2026-09-08T07:00Z | 7,402 MW | 7,716 MW | 21,164 MW | 1,855 MW | 567 MW |
| 2026-09-08T08:00Z | 7,187 MW | 7,376 MW | 20,955 MW | 1,855 MW | 568 MW |
| 2026-09-08T09:00Z | 7,440 MW | 7,172 MW | 20,544 MW | 1,856 MW | 579 MW |
| 2026-09-08T10:00Z | 7,976 MW | 7,899 MW | 19,927 MW | 1,856 MW | 583 MW |
| 2026-09-08T11:00Z | 8,361 MW | 9,092 MW | 19,397 MW | 1,857 MW | 509 MW |
| 2026-09-08T12:00Z | 8,526 MW | 9,916 MW | 18,989 MW | 1,858 MW | 509 MW |
| 2026-09-08T13:00Z | 9,915 MW | 10,801 MW | 16,056 MW | 1,859 MW | 799 MW |
| 2026-09-08T14:00Z | 11,279 MW | 12,029 MW | 14,245 MW | 1,861 MW | 1,052 MW |
| 2026-09-08T15:00Z | 12,361 MW | 12,827 MW | 15,095 MW | 1,862 MW | 1,217 MW |
| 2026-09-08T16:00Z | 13,641 MW | 13,318 MW | 16,205 MW | 1,861 MW | 1,284 MW |
| 2026-09-08T17:00Z | 15,562 MW | 13,046 MW | 16,714 MW | 1,859 MW | 1,453 MW |
| 2026-09-08T18:00Z | 18,423 MW | 13,394 MW | 15,572 MW | 1,855 MW | 1,759 MW |
| 2026-09-08T19:00Z | 19,799 MW | 14,142 MW | 14,509 MW | 1,853 MW | 1,802 MW |
| 2026-09-08T20:00Z | 20,767 MW | 14,378 MW | 13,993 MW | 1,852 MW | 1,839 MW |
| 2026-09-08T21:00Z | 20,640 MW | 14,761 MW | 13,315 MW | 1,852 MW | 1,846 MW |
| 2026-09-08T22:00Z | 20,797 MW | 14,753 MW | 13,306 MW | 1,852 MW | 1,853 MW |
| 2026-09-08T23:00Z | 20,960 MW | 15,003 MW | 13,662 MW | 1,851 MW | 1,846 MW |
| 2026-09-09T00:00Z | 19,900 MW | 15,589 MW | 14,019 MW | 1,851 MW | 1,804 MW |
| 2026-09-09T01:00Z | 17,520 MW | 15,292 MW | 16,109 MW | 1,851 MW | 1,599 MW |
| 2026-09-09T02:00Z | 14,870 MW | 13,440 MW | 19,062 MW | 1,851 MW | 876 MW |
| 2026-09-09T03:00Z | 13,065 MW | 11,947 MW | 20,200 MW | 1,851 MW | 634 MW |
| 2026-09-09T04:00Z | 11,433 MW | 10,859 MW | 20,032 MW | 1,852 MW | 617 MW |
| 2026-09-09T05:00Z | 9,798 MW | 11,056 MW | 19,533 MW | 1,852 MW | 500 MW |
| 2026-09-09T06:00Z | 8,676 MW | 10,360 MW | 19,570 MW | 1,852 MW | 494 MW |
| 2026-09-09T07:00Z | 8,464 MW | 9,763 MW | 18,981 MW | 1,853 MW | 494 MW |
| 2026-09-09T08:00Z | 8,256 MW | 9,538 MW | 18,658 MW | 1,854 MW | 479 MW |
| 2026-09-09T09:00Z | 9,000 MW | 10,189 MW | 17,106 MW | 1,854 MW | 470 MW |
| 2026-09-09T10:00Z | 10,281 MW | 11,586 MW | 15,016 MW | 1,855 MW | 484 MW |
| 2026-09-09T11:00Z | 10,412 MW | 12,408 MW | 15,036 MW | 1,856 MW | 557 MW |
| 2026-09-09T12:00Z | 10,496 MW | 12,430 MW | 15,440 MW | 1,857 MW | 557 MW |
| 2026-09-09T13:00Z | 11,418 MW | 12,255 MW | 13,508 MW | 1,857 MW | 808 MW |
| 2026-09-09T14:00Z | 12,578 MW | 13,009 MW | 11,575 MW | 1,857 MW | 966 MW |
| 2026-09-09T15:00Z | 14,425 MW | 14,097 MW | 10,306 MW | 1,857 MW | 1,067 MW |
| 2026-09-09T16:00Z | 17,138 MW | 15,213 MW | 8,312 MW | 1,856 MW | 1,386 MW |
| 2026-09-09T17:00Z | 19,479 MW | 15,926 MW | 7,131 MW | 1,855 MW | 1,681 MW |
| 2026-09-09T18:00Z | 21,939 MW | 16,300 MW | 6,231 MW | 1,854 MW | 1,734 MW |
| 2026-09-09T19:00Z | 22,723 MW | 16,592 MW | 5,804 MW | 1,853 MW | 1,794 MW |
| 2026-09-09T20:00Z | 22,915 MW | 16,180 MW | 6,338 MW | 1,855 MW | 1,815 MW |
| 2026-09-09T21:00Z | 22,487 MW | 15,940 MW | 7,006 MW | 1,855 MW | 1,948 MW |
| 2026-09-09T22:00Z | 22,510 MW | 15,912 MW | 7,513 MW | 1,856 MW | 1,988 MW |
| 2026-09-09T23:00Z | 23,284 MW | 16,017 MW | 7,190 MW | 1,855 MW | 1,867 MW |
| 2026-09-10T00:00Z | 22,872 MW | 16,157 MW | 7,348 MW | 1,855 MW | 1,789 MW |
| 2026-09-10T01:00Z | 21,518 MW | 16,224 MW | 7,769 MW | 1,855 MW | 1,408 MW |
| 2026-09-10T02:00Z | 20,040 MW | 16,166 MW | 8,085 MW | 1,855 MW | 679 MW |
| 2026-09-10T03:00Z | 17,041 MW | 15,649 MW | 9,088 MW | 1,856 MW | 583 MW |
| 2026-09-10T04:00Z | 13,967 MW | 14,559 MW | 10,537 MW | 1,856 MW | 569 MW |
| 2026-09-10T05:00Z | 12,706 MW | 14,296 MW | 10,047 MW | 1,856 MW | 508 MW |
| 2026-09-10T06:00Z | 12,171 MW | 14,038 MW | 9,388 MW | 1,856 MW | 545 MW |
| 2026-09-10T07:00Z | 12,299 MW | 13,791 MW | 8,582 MW | 1,858 MW | 545 MW |
| 2026-09-10T08:00Z | 12,387 MW | 13,778 MW | 8,015 MW | 1,858 MW | 547 MW |
| 2026-09-10T09:00Z | 11,957 MW | 13,181 MW | 8,820 MW | 1,858 MW | 603 MW |
| 2026-09-10T10:00Z | 12,016 MW | 12,099 MW | 10,581 MW | 1,859 MW | 610 MW |
| 2026-09-10T11:00Z | 12,811 MW | 11,810 MW | 11,146 MW | 1,860 MW | 776 MW |
| 2026-09-10T12:00Z | 12,829 MW | 12,302 MW | 11,057 MW | 1,860 MW | 797 MW |
| 2026-09-10T13:00Z | 13,199 MW | 12,942 MW | 9,316 MW | 1,859 MW | 810 MW |
| 2026-09-10T14:00Z | 13,604 MW | 13,535 MW | 7,827 MW | 1,858 MW | 981 MW |
| 2026-09-10T15:00Z | 13,307 MW | 13,695 MW | 8,486 MW | 1,857 MW | 1,239 MW |
| 2026-09-10T16:00Z | 13,783 MW | 13,410 MW | 9,092 MW | 1,857 MW | 1,484 MW |
| 2026-09-10T17:00Z | 14,728 MW | 12,941 MW | 9,221 MW | 1,858 MW | 1,630 MW |
| 2026-09-10T18:00Z | 16,737 MW | 13,125 MW | 8,058 MW | 1,858 MW | 1,657 MW |
| 2026-09-10T19:00Z | 17,949 MW | 13,957 MW | 6,974 MW | 1,858 MW | 1,661 MW |
| 2026-09-10T20:00Z | 19,648 MW | 14,449 MW | 6,115 MW | 1,857 MW | 1,677 MW |
| 2026-09-10T21:00Z | 20,585 MW | 14,760 MW | 5,416 MW | 1,858 MW | 1,810 MW |
| 2026-09-10T22:00Z | 20,400 MW | 14,768 MW | 5,329 MW | 1,859 MW | 1,872 MW |
| 2026-09-10T23:00Z | 20,358 MW | 15,019 MW | 5,693 MW | 1,858 MW | 1,712 MW |
| 2026-09-11T00:00Z | 19,247 MW | 15,117 MW | 6,749 MW | 1,858 MW | 1,561 MW |
| 2026-09-11T01:00Z | 17,115 MW | 14,709 MW | 9,307 MW | 1,859 MW | 1,069 MW |
| 2026-09-11T02:00Z | 14,022 MW | 14,324 MW | 11,415 MW | 1,858 MW | 856 MW |
| 2026-09-11T03:00Z | 11,601 MW | 13,737 MW | 12,217 MW | 1,859 MW | 604 MW |
| 2026-09-11T04:00Z | 10,675 MW | 11,901 MW | 12,483 MW | 1,859 MW | 511 MW |
| 2026-09-11T05:00Z | 9,725 MW | 10,574 MW | 12,536 MW | 1,860 MW | 509 MW |
| 2026-09-11T06:00Z | 9,080 MW | 10,745 MW | 12,171 MW | 1,860 MW | 511 MW |
| 2026-09-11T07:00Z | 8,930 MW | 10,630 MW | 11,494 MW | 1,861 MW | 511 MW |
| 2026-09-11T08:00Z | 9,173 MW | 10,537 MW | 10,731 MW | 1,861 MW | 511 MW |
| 2026-09-11T09:00Z | 9,190 MW | 10,700 MW | 10,513 MW | 1,862 MW | 507 MW |
| 2026-09-11T10:00Z | 9,545 MW | 10,966 MW | 10,553 MW | 1,862 MW | 511 MW |
| 2026-09-11T11:00Z | 10,293 MW | 11,560 MW | 10,330 MW | 1,863 MW | 806 MW |
| 2026-09-11T12:00Z | 10,395 MW | 11,948 MW | 10,727 MW | 1,863 MW | 821 MW |
| 2026-09-11T13:00Z | 10,653 MW | 12,181 MW | 10,010 MW | 1,863 MW | 824 MW |
| 2026-09-11T14:00Z | 11,288 MW | 12,389 MW | 9,179 MW | 1,862 MW | 1,010 MW |
| 2026-09-11T15:00Z | 12,199 MW | 12,359 MW | 9,943 MW | 1,861 MW | 1,180 MW |
| 2026-09-11T16:00Z | 13,390 MW | 12,596 MW | 10,169 MW | 1,861 MW | 1,485 MW |
| 2026-09-11T17:00Z | 15,071 MW | 12,962 MW | 10,203 MW | 1,859 MW | 1,590 MW |
| 2026-09-11T18:00Z | 16,667 MW | 12,893 MW | 10,417 MW | 1,858 MW | 1,677 MW |
| 2026-09-11T19:00Z | 17,827 MW | 12,908 MW | 10,731 MW | 1,857 MW | 1,700 MW |
| 2026-09-11T20:00Z | 18,408 MW | 12,881 MW | 11,196 MW | 1,856 MW | 1,701 MW |
| 2026-09-11T21:00Z | 19,022 MW | 13,294 MW | 11,323 MW | 1,855 MW | 1,725 MW |
| 2026-09-11T22:00Z | 19,616 MW | 13,565 MW | 10,680 MW | 1,854 MW | 1,730 MW |
| 2026-09-11T23:00Z | 20,214 MW | 13,666 MW | 10,124 MW | 1,853 MW | 1,757 MW |
| 2026-09-12T00:00Z | 19,509 MW | 13,349 MW | 10,424 MW | 1,853 MW | 1,689 MW |
| 2026-09-12T01:00Z | 15,594 MW | 12,121 MW | 14,675 MW | 1,853 MW | 874 MW |
| 2026-09-12T02:00Z | 10,951 MW | 10,577 MW | 19,419 MW | 1,852 MW | 725 MW |
| 2026-09-12T03:00Z | 8,355 MW | 9,183 MW | 21,509 MW | 1,854 MW | 511 MW |
| 2026-09-12T04:00Z | 6,893 MW | 8,060 MW | 21,852 MW | 1,854 MW | 498 MW |
| 2026-09-12T05:00Z | 6,893 MW | 8,060 MW | 21,852 MW | 1,854 MW | 498 MW |
| 2026-09-12T06:00Z | 9,080 MW | 10,745 MW | 12,171 MW | 1,860 MW | 511 MW |
| 2026-09-12T07:00Z | 8,930 MW | 10,630 MW | 11,494 MW | 1,861 MW | 511 MW |
| 2026-09-12T08:00Z | 9,173 MW | 10,537 MW | 10,731 MW | 1,861 MW | 511 MW |
| 2026-09-12T09:00Z | 9,190 MW | 10,700 MW | 10,513 MW | 1,862 MW | 507 MW |
| 2026-09-12T10:00Z | 9,545 MW | 10,966 MW | 10,553 MW | 1,862 MW | 511 MW |
| 2026-09-12T11:00Z | 10,293 MW | 11,560 MW | 10,330 MW | 1,863 MW | 806 MW |
| 2026-09-12T12:00Z | 10,395 MW | 11,948 MW | 10,727 MW | 1,863 MW | 821 MW |
| 2026-09-12T13:00Z | 10,653 MW | 12,181 MW | 10,010 MW | 1,863 MW | 824 MW |
| 2026-09-12T14:00Z | 11,288 MW | 12,389 MW | 9,179 MW | 1,862 MW | 1,010 MW |
| 2026-09-12T15:00Z | 12,199 MW | 12,359 MW | 9,943 MW | 1,861 MW | 1,180 MW |
| 2026-09-12T16:00Z | 13,390 MW | 12,596 MW | 10,169 MW | 1,861 MW | 1,485 MW |
| 2026-09-12T17:00Z | 15,071 MW | 12,962 MW | 10,203 MW | 1,859 MW | 1,590 MW |
| 2026-09-12T18:00Z | 16,667 MW | 12,893 MW | 10,417 MW | 1,858 MW | 1,677 MW |
| 2026-09-12T19:00Z | 17,827 MW | 12,908 MW | 10,731 MW | 1,857 MW | 1,700 MW |
| 2026-09-12T20:00Z | 18,408 MW | 12,881 MW | 11,196 MW | 1,856 MW | 1,701 MW |
| 2026-09-12T21:00Z | 19,022 MW | 13,294 MW | 11,323 MW | 1,855 MW | 1,725 MW |
| 2026-09-12T22:00Z | 19,616 MW | 13,565 MW | 10,680 MW | 1,854 MW | 1,730 MW |
| 2026-09-12T23:00Z | 20,214 MW | 13,666 MW | 10,124 MW | 1,853 MW | 1,757 MW |
| 2026-09-13T00:00Z | 19,509 MW | 13,349 MW | 10,424 MW | 1,853 MW | 1,689 MW |
| 2026-09-13T01:00Z | 15,594 MW | 12,121 MW | 14,675 MW | 1,853 MW | 874 MW |
| 2026-09-13T02:00Z | 10,951 MW | 10,577 MW | 19,419 MW | 1,852 MW | 725 MW |
| 2026-09-13T03:00Z | 8,355 MW | 9,183 MW | 21,509 MW | 1,854 MW | 511 MW |
| 2026-09-13T04:00Z | 6,893 MW | 8,060 MW | 21,852 MW | 1,854 MW | 498 MW |
| 2026-09-13T05:00Z | 9,025 MW | 11,183 MW | 12,808 MW | 1,854 MW | 506 MW |
| 2026-09-13T06:00Z | 8,544 MW | 10,110 MW | 13,012 MW | 1,849 MW | 506 MW |
| 2026-09-13T07:00Z | 7,794 MW | 9,544 MW | 13,389 MW | 1,856 MW | 506 MW |
| 2026-09-13T08:00Z | 8,269 MW | 9,485 MW | 12,294 MW | 1,857 MW | 507 MW |
| 2026-09-13T09:00Z | 8,126 MW | 9,949 MW | 11,550 MW | 1,859 MW | 497 MW |
| 2026-09-13T10:00Z | 7,770 MW | 9,911 MW | 11,908 MW | 1,859 MW | 499 MW |
| 2026-09-13T11:00Z | 7,709 MW | 9,514 MW | 12,522 MW | 1,860 MW | 752 MW |
| 2026-09-13T12:00Z | 8,689 MW | 9,590 MW | 11,742 MW | 1,860 MW | 934 MW |
| 2026-09-13T13:00Z | 8,868 MW | 9,829 MW | 11,197 MW | 1,860 MW | 956 MW |
| 2026-09-13T14:00Z | 9,694 MW | 9,638 MW | 10,869 MW | 1,860 MW | 996 MW |
| 2026-09-13T15:00Z | 10,793 MW | 9,654 MW | 11,158 MW | 1,860 MW | 1,049 MW |
| 2026-09-13T16:00Z | 11,681 MW | 9,888 MW | 11,867 MW | 1,860 MW | 1,183 MW |
| 2026-09-13T17:00Z | 12,091 MW | 9,876 MW | 13,218 MW | 1,860 MW | 1,304 MW |
| 2026-09-13T18:00Z | 12,630 MW | 10,222 MW | 13,766 MW | 1,860 MW | 1,325 MW |
| 2026-09-13T19:00Z | 12,996 MW | 10,960 MW | 14,672 MW | 1,859 MW | 1,327 MW |
| 2026-09-13T20:00Z | 14,083 MW | 11,507 MW | 14,639 MW | 1,859 MW | 1,378 MW |
| 2026-09-13T21:00Z | 15,162 MW | 12,042 MW | 14,547 MW | 1,859 MW | 1,381 MW |
| 2026-09-13T22:00Z | 15,425 MW | 12,297 MW | 15,209 MW | 1,858 MW | 1,474 MW |
| 2026-09-13T23:00Z | 15,276 MW | 11,972 MW | 16,196 MW | 1,859 MW | 1,440 MW |
| 2026-09-14T00:00Z | 14,064 MW | 11,398 MW | 17,561 MW | 1,859 MW | 1,310 MW |
| 2026-09-14T01:00Z | 11,673 MW | 10,557 MW | 20,067 MW | 1,859 MW | 1,014 MW |
| 2026-09-14T02:00Z | 9,221 MW | 9,350 MW | 21,813 MW | 1,859 MW | 781 MW |
| 2026-09-14T03:00Z | 7,431 MW | 8,275 MW | 22,588 MW | 1,860 MW | 530 MW |
| 2026-09-14T04:00Z | 6,194 MW | 7,343 MW | 22,640 MW | 1,860 MW | 508 MW |
| 2026-09-14T05:00Z | 5,571 MW | 6,629 MW | 22,332 MW | 1,860 MW | 838 MW |
| 2026-09-14T06:00Z | 5,097 MW | 6,061 MW | 22,259 MW | 1,860 MW | 760 MW |
| 2026-09-14T07:00Z | 4,956 MW | 5,780 MW | 21,872 MW | 1,861 MW | 759 MW |
| 2026-09-14T08:00Z | 5,058 MW | 5,723 MW | 21,595 MW | 1,861 MW | 759 MW |
| 2026-09-14T09:00Z | 5,038 MW | 5,685 MW | 21,534 MW | 1,861 MW | 753 MW |
| 2026-09-14T10:00Z | 5,380 MW | 5,751 MW | 22,141 MW | 1,861 MW | 756 MW |
| 2026-09-14T11:00Z | 5,920 MW | 5,745 MW | 22,688 MW | 1,862 MW | 799 MW |
| 2026-09-14T12:00Z | 6,360 MW | 6,231 MW | 22,541 MW | 1,862 MW | 844 MW |
| 2026-09-14T13:00Z | 7,164 MW | 6,470 MW | 21,213 MW | 1,862 MW | 855 MW |
| 2026-09-14T14:00Z | 7,729 MW | 7,163 MW | 20,154 MW | 1,861 MW | 914 MW |
| 2026-09-14T15:00Z | 8,182 MW | 7,272 MW | 20,590 MW | 1,859 MW | 961 MW |
| 2026-09-14T16:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-14T17:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-14T18:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-14T19:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-14T20:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-14T21:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-14T22:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-14T23:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-15T00:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-15T01:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-15T02:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-15T03:00Z | 8,195 MW | 7,269 MW | 20,595 MW | 1,859 MW | 963 MW |
| 2026-09-15T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T16:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T16:00Z.
Day by Day
Daily totals, Central time dates, through 2026-09-13| Date (Central time) | Demand |
|---|---|
| 2025-08-11 | 943 GWh |
| 2025-08-12 | 948 GWh |
| 2025-08-13 | 984 GWh |
| 2025-08-14 | 1.02 TWh |
| 2025-08-15 | 1.07 TWh |
| 2025-08-16 | 1.05 TWh |
| 2025-08-17 | 1.04 TWh |
| 2025-08-18 | 1.07 TWh |
| 2025-08-19 | 1.05 TWh |
| 2025-08-20 | 1.03 TWh |
| 2025-08-21 | 1.04 TWh |
| 2025-08-22 | 973 GWh |
| 2025-08-23 | 901 GWh |
| 2025-08-24 | 853 GWh |
| 2025-08-25 | 822 GWh |
| 2025-08-26 | 815 GWh |
| 2025-08-27 | 832 GWh |
| 2025-08-28 | 843 GWh |
| 2025-08-29 | 824 GWh |
| 2025-08-30 | 783 GWh |
| 2025-08-31 | 767 GWh |
| 2025-09-01 | 772 GWh |
| 2025-09-02 | 818 GWh |
| 2025-09-03 | 841 GWh |
| 2025-09-04 | 827 GWh |
| 2025-09-05 | 775 GWh |
| 2025-09-06 | 718 GWh |
| 2025-09-07 | 737 GWh |
| 2025-09-08 | 788 GWh |
| 2025-09-09 | 816 GWh |
| 2025-09-10 | 849 GWh |
| 2025-09-11 | 901 GWh |
| 2025-09-12 | 932 GWh |
| 2025-09-13 | 901 GWh |
| 2025-09-14 | 873 GWh |
| 2025-09-15 | 903 GWh |
| 2025-09-16 | 914 GWh |
| 2025-09-17 | 875 GWh |
| 2025-09-18 | 825 GWh |
| 2025-09-19 | 820 GWh |
| 2025-09-20 | 796 GWh |
| 2025-09-21 | 775 GWh |
| 2025-09-22 | 857 GWh |
| 2025-09-23 | 833 GWh |
| 2025-09-24 | 792 GWh |
| 2025-09-25 | 795 GWh |
| 2025-09-26 | 794 GWh |
| 2025-09-27 | 772 GWh |
| 2025-09-28 | 780 GWh |
| 2025-09-29 | 816 GWh |
| 2025-09-30 | 810 GWh |
| 2025-10-01 | 828 GWh |
| 2025-10-02 | 851 GWh |
| 2025-10-03 | 860 GWh |
| 2025-10-04 | 810 GWh |
| 2025-10-05 | 799 GWh |
| 2025-10-06 | 802 GWh |
| 2025-10-07 | 761 GWh |
| 2025-10-08 | 814 GWh |
| 2025-10-09 | 814 GWh |
| 2025-10-10 | 814 GWh |
| 2025-10-11 | 738 GWh |
| 2025-10-12 | 814 GWh |
| 2025-10-13 | 760 GWh |
| 2025-10-14 | 781 GWh |
| 2025-10-15 | 792 GWh |
| 2025-10-16 | 788 GWh |
| 2025-10-17 | 788 GWh |
| 2025-10-18 | 721 GWh |
| 2025-10-19 | 666 GWh |
| 2025-10-20 | 726 GWh |
| 2025-10-21 | 721 GWh |
| 2025-10-22 | 722 GWh |
| 2025-10-23 | 725 GWh |
| 2025-10-24 | 710 GWh |
| 2025-10-25 | 681 GWh |
| 2025-10-26 | 677 GWh |
| 2025-10-27 | 716 GWh |
| 2025-10-28 | 725 GWh |
| 2025-10-29 | 744 GWh |
| 2025-10-30 | 736 GWh |
| 2025-10-31 | 728 GWh |
| 2025-11-01 | 700 GWh |
| 2025-11-02 | 740 GWh |
| 2025-11-03 | 731 GWh |
| 2025-11-04 | 729 GWh |
| 2025-11-05 | 724 GWh |
| 2025-11-06 | 738 GWh |
| 2025-11-07 | 729 GWh |
| 2025-11-08 | 711 GWh |
| 2025-11-09 | 752 GWh |
| 2025-11-10 | 818 GWh |
| 2025-11-11 | 775 GWh |
| 2025-11-12 | 747 GWh |
| 2025-11-13 | 751 GWh |
| 2025-11-14 | 742 GWh |
| 2025-11-15 | 718 GWh |
| 2025-11-16 | 707 GWh |
| 2025-11-17 | 759 GWh |
| 2025-11-18 | 753 GWh |
| 2025-11-19 | 743 GWh |
| 2025-11-20 | 753 GWh |
| 2025-11-21 | 740 GWh |
| 2025-11-22 | 719 GWh |
| 2025-11-23 | 723 GWh |
| 2025-11-24 | 747 GWh |
| 2025-11-25 | 762 GWh |
| 2025-11-26 | 806 GWh |
| 2025-11-27 | 761 GWh |
| 2025-11-28 | 791 GWh |
| 2025-11-29 | 810 GWh |
| 2025-11-30 | 874 GWh |
| 2025-12-01 | 923 GWh |
| 2025-12-02 | 897 GWh |
| 2025-12-03 | 897 GWh |
| 2025-12-04 | 924 GWh |
| 2025-12-05 | 888 GWh |
| 2025-12-06 | 845 GWh |
| 2025-12-07 | 847 GWh |
| 2025-12-08 | 898 GWh |
| 2025-12-09 | 847 GWh |
| 2025-12-10 | 842 GWh |
| 2025-12-11 | 831 GWh |
| 2025-12-12 | 832 GWh |
| 2025-12-13 | 859 GWh |
| 2025-12-14 | 913 GWh |
| 2025-12-15 | 916 GWh |
| 2025-12-16 | 899 GWh |
| 2025-12-17 | 899 GWh |
| 2025-12-18 | 899 GWh |
| 2025-12-19 | 899 GWh |
| 2025-12-20 | 899 GWh |
| 2025-12-21 | 896 GWh |
| 2025-12-22 | 799 GWh |
| 2025-12-23 | 765 GWh |
| 2025-12-24 | 738 GWh |
| 2025-12-25 | 710 GWh |
| 2025-12-26 | 714 GWh |
| 2025-12-27 | 717 GWh |
| 2025-12-28 | 786 GWh |
| 2025-12-29 | 928 GWh |
| 2025-12-30 | 881 GWh |
| 2025-12-31 | 820 GWh |
| 2026-01-01 | 758 GWh |
| 2026-01-02 | 780 GWh |
| 2026-01-03 | 773 GWh |
| 2026-01-04 | 782 GWh |
| 2026-01-05 | 778 GWh |
| 2026-01-06 | 750 GWh |
| 2026-01-07 | 749 GWh |
| 2026-01-08 | 749 GWh |
| 2026-01-09 | 749 GWh |
| 2026-01-10 | 749 GWh |
| 2026-01-11 | 749 GWh |
| 2026-01-12 | 749 GWh |
| 2026-01-13 | 749 GWh |
| 2026-01-14 | 749 GWh |
| 2026-01-15 | 794 GWh |
| 2026-01-16 | 773 GWh |
| 2026-01-17 | 906 GWh |
| 2026-01-18 | 888 GWh |
| 2026-01-19 | 926 GWh |
| 2026-01-20 | 963 GWh |
| 2026-01-21 | 840 GWh |
| 2026-01-22 | 870 GWh |
| 2026-01-23 | 992 GWh |
| 2026-01-24 | 1.04 TWh |
| 2026-01-25 | 1.01 TWh |
| 2026-01-26 | 1.02 TWh |
| 2026-01-27 | 959 GWh |
| 2026-01-28 | 930 GWh |
| 2026-01-29 | 917 GWh |
| 2026-01-30 | 958 GWh |
| 2026-01-31 | 999 GWh |
| 2026-02-01 | 900 GWh |
| 2026-02-02 | 860 GWh |
| 2026-02-03 | 828 GWh |
| 2026-02-04 | 854 GWh |
| 2026-02-05 | 829 GWh |
| 2026-02-06 | 780 GWh |
| 2026-02-07 | 765 GWh |
| 2026-02-08 | 736 GWh |
| 2026-02-09 | 763 GWh |
| 2026-02-10 | 753 GWh |
| 2026-02-11 | 772 GWh |
| 2026-02-12 | 770 GWh |
| 2026-02-13 | 751 GWh |
| 2026-02-14 | 712 GWh |
| 2026-02-15 | 706 GWh |
| 2026-02-16 | 770 GWh |
| 2026-02-17 | 795 GWh |
| 2026-02-18 | 741 GWh |
| 2026-02-19 | 783 GWh |
| 2026-02-20 | 819 GWh |
| 2026-02-21 | 795 GWh |
| 2026-02-22 | 824 GWh |
| 2026-02-23 | 867 GWh |
| 2026-02-24 | 810 GWh |
| 2026-02-25 | 757 GWh |
| 2026-02-26 | 742 GWh |
| 2026-02-27 | 735 GWh |
| 2026-02-28 | 715 GWh |
| 2026-03-01 | 740 GWh |
| 2026-03-02 | 773 GWh |
| 2026-03-03 | 764 GWh |
| 2026-03-04 | 757 GWh |
| 2026-03-05 | 765 GWh |
| 2026-03-06 | 789 GWh |
| 2026-03-07 | 789 GWh |
| 2026-03-08 | 756 GWh |
| 2026-03-09 | 789 GWh |
| 2026-03-10 | 789 GWh |
| 2026-03-11 | 789 GWh |
| 2026-03-12 | 789 GWh |
| 2026-03-13 | 789 GWh |
| 2026-03-14 | 789 GWh |
| 2026-03-15 | 789 GWh |
| 2026-03-16 | 789 GWh |
| 2026-03-17 | 854 GWh |
| 2026-03-18 | 766 GWh |
| 2026-03-19 | 753 GWh |
| 2026-03-20 | 762 GWh |
| 2026-03-21 | 766 GWh |
| 2026-03-22 | 733 GWh |
| 2026-03-23 | 739 GWh |
| 2026-03-24 | 743 GWh |
| 2026-03-25 | 785 GWh |
| 2026-03-26 | 825 GWh |
| 2026-03-27 | 745 GWh |
| 2026-03-28 | 713 GWh |
| 2026-03-29 | 715 GWh |
| 2026-03-30 | 792 GWh |
| 2026-03-31 | 797 GWh |
| 2026-04-01 | 770 GWh |
| 2026-04-02 | 782 GWh |
| 2026-04-03 | 772 GWh |
| 2026-04-04 | 703 GWh |
| 2026-04-05 | 682 GWh |
| 2026-04-06 | 730 GWh |
| 2026-04-07 | 744 GWh |
| 2026-04-08 | 743 GWh |
| 2026-04-09 | 763 GWh |
| 2026-04-10 | 748 GWh |
| 2026-04-11 | 731 GWh |
| 2026-04-12 | 730 GWh |
| 2026-04-13 | 810 GWh |
| 2026-04-14 | 819 GWh |
| 2026-04-15 | 776 GWh |
| 2026-04-16 | 789 GWh |
| 2026-04-17 | 791 GWh |
| 2026-04-18 | 685 GWh |
| 2026-04-19 | 689 GWh |
| 2026-04-20 | 733 GWh |
| 2026-04-21 | 753 GWh |
| 2026-04-22 | 759 GWh |
| 2026-04-23 | 788 GWh |
| 2026-04-24 | 754 GWh |
| 2026-04-25 | 724 GWh |
| 2026-04-26 | 741 GWh |
| 2026-04-27 | 809 GWh |
| 2026-04-28 | 752 GWh |
| 2026-04-29 | 727 GWh |
| 2026-04-30 | 716 GWh |
| 2026-05-01 | 706 GWh |
| 2026-05-02 | 688 GWh |
| 2026-05-03 | 715 GWh |
| 2026-05-04 | 774 GWh |
| 2026-05-05 | 741 GWh |
| 2026-05-06 | 724 GWh |
| 2026-05-07 | 729 GWh |
| 2026-05-08 | 751 GWh |
| 2026-05-09 | 750 GWh |
| 2026-05-10 | 703 GWh |
| 2026-05-11 | 762 GWh |
| 2026-05-12 | 801 GWh |
| 2026-05-13 | 816 GWh |
| 2026-05-14 | 826 GWh |
| 2026-05-15 | 863 GWh |
| 2026-05-16 | 864 GWh |
| 2026-05-17 | 853 GWh |
| 2026-05-18 | 827 GWh |
| 2026-05-19 | 758 GWh |
| 2026-05-20 | 731 GWh |
| 2026-05-21 | 743 GWh |
| 2026-05-22 | 767 GWh |
| 2026-05-23 | 733 GWh |
| 2026-05-24 | 759 GWh |
| 2026-05-25 | 812 GWh |
| 2026-05-26 | 839 GWh |
| 2026-05-27 | 841 GWh |
| 2026-05-28 | 837 GWh |
| 2026-05-29 | 859 GWh |
| 2026-05-30 | 862 GWh |
| 2026-05-31 | 881 GWh |
| 2026-06-01 | 953 GWh |
| 2026-06-02 | 892 GWh |
| 2026-06-03 | 806 GWh |
| 2026-06-04 | 855 GWh |
| 2026-06-05 | 855 GWh |
| 2026-06-06 | 845 GWh |
| 2026-06-07 | 847 GWh |
| 2026-06-08 | 955 GWh |
| 2026-06-09 | 985 GWh |
| 2026-06-10 | 1.00 TWh |
| 2026-06-11 | 977 GWh |
| 2026-06-12 | 914 GWh |
| 2026-06-13 | 907 GWh |
| 2026-06-14 | 793 GWh |
| 2026-06-15 | 843 GWh |
| 2026-06-16 | 896 GWh |
| 2026-06-17 | 987 GWh |
| 2026-06-18 | 885 GWh |
| 2026-06-19 | 849 GWh |
| 2026-06-20 | 868 GWh |
| 2026-06-21 | 865 GWh |
| 2026-06-22 | 801 GWh |
| 2026-06-23 | 866 GWh |
| 2026-06-24 | 885 GWh |
| 2026-06-25 | 894 GWh |
| 2026-06-26 | 913 GWh |
| 2026-06-27 | 925 GWh |
| 2026-06-28 | 995 GWh |
| 2026-06-29 | 1.06 TWh |
| 2026-06-30 | 1.06 TWh |
| 2026-07-01 | 1.04 TWh |
| 2026-07-02 | 1.04 TWh |
| 2026-07-03 | 1.00 TWh |
| 2026-07-04 | 928 GWh |
| 2026-07-05 | 916 GWh |
| 2026-07-06 | 1.01 TWh |
| 2026-07-07 | 1.02 TWh |
| 2026-07-08 | 1.06 TWh |
| 2026-07-09 | 1.06 TWh |
| 2026-07-10 | 1.04 TWh |
| 2026-07-11 | 1.01 TWh |
| 2026-07-12 | 964 GWh |
| 2026-07-13 | 1.01 TWh |
| 2026-07-14 | 1.03 TWh |
| 2026-07-15 | 1.03 TWh |
| 2026-07-16 | 1.01 TWh |
| 2026-07-17 | 1.03 TWh |
| 2026-07-18 | 1.03 TWh |
| 2026-07-19 | 1.06 TWh |
| 2026-07-20 | 1.02 TWh |
| 2026-07-21 | 1.12 TWh |
| 2026-07-22 | 1.04 TWh |
| 2026-07-23 | 992 GWh |
| 2026-07-24 | 990 GWh |
| 2026-07-25 | 1.09 TWh |
| 2026-07-26 | 1.14 TWh |
| 2026-07-27 | 1.18 TWh |
| 2026-07-28 | 1.14 TWh |
| 2026-07-29 | 1.12 TWh |
| 2026-07-30 | 1.08 TWh |
| 2026-07-31 | 1.05 TWh |
| 2026-08-01 | 930 GWh |
| 2026-08-02 | 941 GWh |
| 2026-08-03 | 1.02 TWh |
| 2026-08-04 | 1.03 TWh |
| 2026-08-05 | 1.02 TWh |
| 2026-08-06 | 1.04 TWh |
| 2026-08-07 | 1.03 TWh |
| 2026-08-08 | 1.01 TWh |
| 2026-08-09 | 1.05 TWh |
| 2026-08-10 | 1.11 TWh |
| 2026-08-11 | 1.14 TWh |
| 2026-08-12 | 1.15 TWh |
| 2026-08-13 | 1.14 TWh |
| 2026-08-14 | 1.10 TWh |
| 2026-08-15 | 1.05 TWh |
| 2026-08-16 | 1.02 TWh |
| 2026-08-17 | 1.01 TWh |
| 2026-08-18 | 1.04 TWh |
| 2026-08-19 | 1.05 TWh |
| 2026-08-20 | 1.06 TWh |
| 2026-08-21 | 1.04 TWh |
| 2026-08-22 | 978 GWh |
| 2026-08-23 | 950 GWh |
| 2026-08-24 | 1.00 TWh |
| 2026-08-25 | 1.03 TWh |
| 2026-08-26 | 1.04 TWh |
| 2026-08-27 | 996 GWh |
| 2026-08-28 | 995 GWh |
| 2026-08-29 | 1.01 TWh |
| 2026-08-30 | 1.05 TWh |
| 2026-08-31 | 1.10 TWh |
| 2026-09-01 | 1.10 TWh |
| 2026-09-02 | 1.12 TWh |
| 2026-09-03 | 1.12 TWh |
| 2026-09-04 | 1.12 TWh |
| 2026-09-05 | 1.07 TWh |
| 2026-09-06 | 1.03 TWh |
| 2026-09-07 | 1.03 TWh |
| 2026-09-08 | 1.09 TWh |
| 2026-09-09 | 1.06 TWh |
| 2026-09-10 | 957 GWh |
| 2026-09-11 | 968 GWh |
| 2026-09-12 | 927 GWh |
| 2026-09-13 | 907 GWh |
| 2026-09-14 | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 224 TWh | 226 TWh | Wind 36.8% | 256 |
| 2025 | 300 TWh | 302 TWh | Wind 36.7% | 365 |
| 2024 | 290 TWh | 292 TWh | Wind 37.6% | 366 |
| 2023 | 281 TWh | 285 TWh | Wind 36.2% | 365 |
| 2022 | 282 TWh | 288 TWh | Wind 37.3% | 365 |
| 2021 | 268 TWh | 270 TWh | Coal 35.9% | 365 |
| 2020 | 262 TWh | 263 TWh | Coal 31.3% | 366 |
| 2019 | 269 TWh | 272 TWh | Coal 34.5% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 1.18 TWh | 2026-07-27 (27 July 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 57,964 MW | 27 Jul 2026, 16:00 CDT (UTC-05:00) |
| Highest solar share of a day's generation, 2019 onward | 4.4% | 2026-06-03 (3 June 2026) |
| Highest wind share of a day's generation, 2019 onward | 72.4% | 2022-11-02 (2 November 2022) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Power Flows With Neighbours
Net totals, 2026-08-16 (16 August 2026) to 2026-09-14 (14 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| AECI | SPP exports | 294 GWh |
| ERCOT | SPP exports | 136 GWh |
| MISO | SPP exports | 132 GWh |
| PSCO | SPP exports | 30.2 GWh |
| EPE | SPP exports | 6 MWh |
| PNM | SPP exports | 0 MWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-14.