SOCO Electricity Demand and Generation Mix
SOCO demand was 35,671 MW in the hour starting 15 Sept 2026, 10:00 CDT (UTC-05:00). Gas was the largest source in the hour starting 14 Sept 2026, 22:00 CDT (UTC-05:00), at 53% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- SOCO is a balancing authority in the United States, part of the EIA Southeast region.
- In the hour starting 15 Sept 2026, 10:00 CDT (UTC-05:00), demand in SOCO was 35,671 MW, against a day-ahead forecast of 35,877 MW.
- Gas supplied 53.3% of SOCO's generation in the hour starting 14 Sept 2026, 22:00 CDT (UTC-05:00).
- Demand in SOCO totalled 239 TWh in 2025.
- Gas supplied 49.8% of SOCO's generation in 2025.
- The highest daily demand in SOCO from 2019 onward was 991 GWh, on 2025-01-21 (21 January 2025).
- The highest hourly demand in SOCO since 2026-06-16 (16 June 2026) was 47,656 MW, in the hour starting 17 Aug 2026, 15:00 CDT (UTC-05:00).
- Solar's highest share of SOCO's daily generation from 2019 onward was 10.9%, on 2026-05-03 (3 May 2026).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 15 Sept 2026, 10:00 CDT (UTC-05:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T15:00:00Z.
Generation by Source
Latest hour with generation by source: 14 Sept 2026, 22:00 CDT (UTC-05:00)| Source | Output | Share |
|---|---|---|
| Gas | 17,318 MW | 53.3% |
| Coal | 8,067 MW | 24.8% |
| Nuclear | 6,892 MW | 21.2% |
| Hydro | 171 MW | 0.5% |
| Other | 52 MW | 0.2% |
| Solar | 1 MW | 0.0% |
| Oil | 0 MW | 0.0% |
| Wind | 0 MW | 0.0% |
| Storage | -354 MW | charging |
| Total from these sources | 32,501 MW | |
| Net interchange | 769 MW | net exports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when SOCO exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T03:00:00Z.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-16T17:00Z | 39,196 MW |
| 2026-08-16T18:00Z | 40,747 MW |
| 2026-08-16T19:00Z | 41,465 MW |
| 2026-08-16T20:00Z | 41,979 MW |
| 2026-08-16T21:00Z | 42,163 MW |
| 2026-08-16T22:00Z | 41,814 MW |
| 2026-08-16T23:00Z | 41,102 MW |
| 2026-08-17T00:00Z | 39,879 MW |
| 2026-08-17T01:00Z | 36,327 MW |
| 2026-08-17T02:00Z | 35,853 MW |
| 2026-08-17T03:00Z | 33,270 MW |
| 2026-08-17T04:00Z | 31,265 MW |
| 2026-08-17T05:00Z | 29,890 MW |
| 2026-08-17T06:00Z | 28,588 MW |
| 2026-08-17T07:00Z | 27,784 MW |
| 2026-08-17T08:00Z | 27,475 MW |
| 2026-08-17T09:00Z | 27,979 MW |
| 2026-08-17T10:00Z | 29,231 MW |
| 2026-08-17T11:00Z | 29,933 MW |
| 2026-08-17T12:00Z | 31,230 MW |
| 2026-08-17T13:00Z | 33,856 MW |
| 2026-08-17T14:00Z | 37,230 MW |
| 2026-08-17T15:00Z | 40,527 MW |
| 2026-08-17T16:00Z | 43,532 MW |
| 2026-08-17T17:00Z | 45,714 MW |
| 2026-08-17T18:00Z | 46,853 MW |
| 2026-08-17T19:00Z | 47,349 MW |
| 2026-08-17T20:00Z | 47,656 MW |
| 2026-08-17T21:00Z | 47,274 MW |
| 2026-08-17T22:00Z | 46,596 MW |
| 2026-08-17T23:00Z | 45,097 MW |
| 2026-08-18T00:00Z | 43,663 MW |
| 2026-08-18T01:00Z | 41,537 MW |
| 2026-08-18T02:00Z | 38,455 MW |
| 2026-08-18T03:00Z | 35,268 MW |
| 2026-08-18T04:00Z | 32,382 MW |
| 2026-08-18T05:00Z | 31,154 MW |
| 2026-08-18T06:00Z | 29,785 MW |
| 2026-08-18T07:00Z | 28,674 MW |
| 2026-08-18T08:00Z | 28,372 MW |
| 2026-08-18T09:00Z | 28,558 MW |
| 2026-08-18T10:00Z | 29,632 MW |
| 2026-08-18T11:00Z | 30,270 MW |
| 2026-08-18T12:00Z | 31,303 MW |
| 2026-08-18T13:00Z | 33,188 MW |
| 2026-08-18T14:00Z | 35,683 MW |
| 2026-08-18T15:00Z | 38,583 MW |
| 2026-08-18T16:00Z | 41,229 MW |
| 2026-08-18T17:00Z | 43,172 MW |
| 2026-08-18T18:00Z | 44,407 MW |
| 2026-08-18T19:00Z | 45,605 MW |
| 2026-08-18T20:00Z | 45,246 MW |
| 2026-08-18T21:00Z | 45,116 MW |
| 2026-08-18T22:00Z | 44,129 MW |
| 2026-08-18T23:00Z | 42,275 MW |
| 2026-08-19T00:00Z | 41,589 MW |
| 2026-08-19T01:00Z | 39,703 MW |
| 2026-08-19T02:00Z | 36,881 MW |
| 2026-08-19T03:00Z | 33,923 MW |
| 2026-08-19T04:00Z | 31,786 MW |
| 2026-08-19T05:00Z | 30,028 MW |
| 2026-08-19T06:00Z | 28,628 MW |
| 2026-08-19T07:00Z | 27,651 MW |
| 2026-08-19T08:00Z | 27,121 MW |
| 2026-08-19T09:00Z | 27,364 MW |
| 2026-08-19T10:00Z | 28,487 MW |
| 2026-08-19T11:00Z | 29,115 MW |
| 2026-08-19T12:00Z | 30,066 MW |
| 2026-08-19T13:00Z | 32,016 MW |
| 2026-08-19T14:00Z | 34,694 MW |
| 2026-08-19T15:00Z | 37,621 MW |
| 2026-08-19T16:00Z | 40,403 MW |
| 2026-08-19T17:00Z | 42,373 MW |
| 2026-08-19T18:00Z | 44,032 MW |
| 2026-08-19T19:00Z | 45,145 MW |
| 2026-08-19T20:00Z | 45,657 MW |
| 2026-08-19T21:00Z | 45,330 MW |
| 2026-08-19T22:00Z | 44,348 MW |
| 2026-08-19T23:00Z | 42,696 MW |
| 2026-08-20T00:00Z | 40,728 MW |
| 2026-08-20T01:00Z | 39,208 MW |
| 2026-08-20T02:00Z | 36,396 MW |
| 2026-08-20T03:00Z | 33,719 MW |
| 2026-08-20T04:00Z | 31,676 MW |
| 2026-08-20T05:00Z | 29,686 MW |
| 2026-08-20T06:00Z | 28,379 MW |
| 2026-08-20T07:00Z | 27,292 MW |
| 2026-08-20T08:00Z | 26,926 MW |
| 2026-08-20T09:00Z | 27,348 MW |
| 2026-08-20T10:00Z | 28,535 MW |
| 2026-08-20T11:00Z | 29,269 MW |
| 2026-08-20T12:00Z | 30,161 MW |
| 2026-08-20T13:00Z | 32,028 MW |
| 2026-08-20T14:00Z | 34,851 MW |
| 2026-08-20T15:00Z | 38,053 MW |
| 2026-08-20T16:00Z | 40,927 MW |
| 2026-08-20T17:00Z | 43,264 MW |
| 2026-08-20T18:00Z | 44,879 MW |
| 2026-08-20T19:00Z | 45,951 MW |
| 2026-08-20T20:00Z | 46,471 MW |
| 2026-08-20T21:00Z | 46,132 MW |
| 2026-08-20T22:00Z | 45,229 MW |
| 2026-08-20T23:00Z | 43,760 MW |
| 2026-08-21T00:00Z | 42,373 MW |
| 2026-08-21T01:00Z | 40,649 MW |
| 2026-08-21T02:00Z | 37,936 MW |
| 2026-08-21T03:00Z | 35,386 MW |
| 2026-08-21T04:00Z | 33,283 MW |
| 2026-08-21T05:00Z | 31,382 MW |
| 2026-08-21T06:00Z | 29,988 MW |
| 2026-08-21T07:00Z | 28,884 MW |
| 2026-08-21T08:00Z | 28,194 MW |
| 2026-08-21T09:00Z | 28,149 MW |
| 2026-08-21T10:00Z | 29,150 MW |
| 2026-08-21T11:00Z | 29,541 MW |
| 2026-08-21T12:00Z | 30,093 MW |
| 2026-08-21T13:00Z | 31,600 MW |
| 2026-08-21T14:00Z | 33,805 MW |
| 2026-08-21T15:00Z | 36,420 MW |
| 2026-08-21T16:00Z | 39,285 MW |
| 2026-08-21T17:00Z | 41,679 MW |
| 2026-08-21T18:00Z | 43,235 MW |
| 2026-08-21T19:00Z | 43,993 MW |
| 2026-08-21T20:00Z | 44,002 MW |
| 2026-08-21T21:00Z | 42,893 MW |
| 2026-08-21T22:00Z | 41,071 MW |
| 2026-08-21T23:00Z | 39,358 MW |
| 2026-08-22T00:00Z | 37,655 MW |
| 2026-08-22T01:00Z | 36,053 MW |
| 2026-08-22T02:00Z | 33,952 MW |
| 2026-08-22T03:00Z | 31,860 MW |
| 2026-08-22T04:00Z | 29,854 MW |
| 2026-08-22T05:00Z | 28,122 MW |
| 2026-08-22T06:00Z | 26,804 MW |
| 2026-08-22T07:00Z | 25,842 MW |
| 2026-08-22T08:00Z | 25,279 MW |
| 2026-08-22T09:00Z | 25,040 MW |
| 2026-08-22T10:00Z | 25,049 MW |
| 2026-08-22T11:00Z | 25,174 MW |
| 2026-08-22T12:00Z | 26,378 MW |
| 2026-08-22T13:00Z | 28,536 MW |
| 2026-08-22T14:00Z | 31,061 MW |
| 2026-08-22T15:00Z | 34,086 MW |
| 2026-08-22T16:00Z | 37,157 MW |
| 2026-08-22T17:00Z | 39,489 MW |
| 2026-08-22T18:00Z | 41,222 MW |
| 2026-08-22T19:00Z | 42,282 MW |
| 2026-08-22T20:00Z | 42,871 MW |
| 2026-08-22T21:00Z | 42,897 MW |
| 2026-08-22T22:00Z | 42,124 MW |
| 2026-08-22T23:00Z | 40,212 MW |
| 2026-08-23T00:00Z | 38,335 MW |
| 2026-08-23T01:00Z | 36,337 MW |
| 2026-08-23T02:00Z | 33,863 MW |
| 2026-08-23T03:00Z | 31,682 MW |
| 2026-08-23T04:00Z | 29,458 MW |
| 2026-08-23T05:00Z | 27,697 MW |
| 2026-08-23T06:00Z | 26,323 MW |
| 2026-08-23T07:00Z | 25,336 MW |
| 2026-08-23T08:00Z | 24,812 MW |
| 2026-08-23T09:00Z | 24,368 MW |
| 2026-08-23T10:00Z | 24,433 MW |
| 2026-08-23T11:00Z | 24,535 MW |
| 2026-08-23T12:00Z | 25,816 MW |
| 2026-08-23T13:00Z | 28,342 MW |
| 2026-08-23T14:00Z | 31,083 MW |
| 2026-08-23T15:00Z | 34,188 MW |
| 2026-08-23T16:00Z | 37,024 MW |
| 2026-08-23T17:00Z | 39,623 MW |
| 2026-08-23T18:00Z | 41,423 MW |
| 2026-08-23T19:00Z | 42,400 MW |
| 2026-08-23T20:00Z | 42,979 MW |
| 2026-08-23T21:00Z | 43,241 MW |
| 2026-08-23T22:00Z | 42,680 MW |
| 2026-08-23T23:00Z | 40,829 MW |
| 2026-08-24T00:00Z | 39,050 MW |
| 2026-08-24T01:00Z | 37,028 MW |
| 2026-08-24T02:00Z | 34,150 MW |
| 2026-08-24T03:00Z | 31,424 MW |
| 2026-08-24T04:00Z | 29,062 MW |
| 2026-08-24T05:00Z | 27,295 MW |
| 2026-08-24T06:00Z | 26,125 MW |
| 2026-08-24T07:00Z | 25,298 MW |
| 2026-08-24T08:00Z | 25,095 MW |
| 2026-08-24T09:00Z | 25,494 MW |
| 2026-08-24T10:00Z | 26,547 MW |
| 2026-08-24T11:00Z | 27,360 MW |
| 2026-08-24T12:00Z | 28,375 MW |
| 2026-08-24T13:00Z | 30,346 MW |
| 2026-08-24T14:00Z | 32,793 MW |
| 2026-08-24T15:00Z | 35,712 MW |
| 2026-08-24T16:00Z | 38,318 MW |
| 2026-08-24T17:00Z | 40,600 MW |
| 2026-08-24T18:00Z | 41,748 MW |
| 2026-08-24T19:00Z | 42,147 MW |
| 2026-08-24T20:00Z | 42,341 MW |
| 2026-08-24T21:00Z | 42,256 MW |
| 2026-08-24T22:00Z | 41,501 MW |
| 2026-08-24T23:00Z | 40,005 MW |
| 2026-08-25T00:00Z | 38,338 MW |
| 2026-08-25T01:00Z | 36,201 MW |
| 2026-08-25T02:00Z | 33,508 MW |
| 2026-08-25T03:00Z | 30,823 MW |
| 2026-08-25T04:00Z | 28,656 MW |
| 2026-08-25T05:00Z | 26,781 MW |
| 2026-08-25T06:00Z | 25,628 MW |
| 2026-08-25T07:00Z | 24,873 MW |
| 2026-08-25T08:00Z | 24,540 MW |
| 2026-08-25T09:00Z | 25,142 MW |
| 2026-08-25T10:00Z | 26,279 MW |
| 2026-08-25T11:00Z | 27,056 MW |
| 2026-08-25T12:00Z | 27,936 MW |
| 2026-08-25T13:00Z | 29,438 MW |
| 2026-08-25T14:00Z | 31,774 MW |
| 2026-08-25T15:00Z | 34,392 MW |
| 2026-08-25T16:00Z | 37,263 MW |
| 2026-08-25T17:00Z | 39,726 MW |
| 2026-08-25T18:00Z | 41,318 MW |
| 2026-08-25T19:00Z | 42,400 MW |
| 2026-08-25T20:00Z | 43,032 MW |
| 2026-08-25T21:00Z | 42,853 MW |
| 2026-08-25T22:00Z | 41,934 MW |
| 2026-08-25T23:00Z | 40,298 MW |
| 2026-08-26T00:00Z | 38,788 MW |
| 2026-08-26T01:00Z | 36,604 MW |
| 2026-08-26T02:00Z | 34,050 MW |
| 2026-08-26T03:00Z | 31,417 MW |
| 2026-08-26T04:00Z | 29,218 MW |
| 2026-08-26T05:00Z | 27,525 MW |
| 2026-08-26T06:00Z | 26,227 MW |
| 2026-08-26T07:00Z | 25,504 MW |
| 2026-08-26T08:00Z | 25,205 MW |
| 2026-08-26T09:00Z | 25,564 MW |
| 2026-08-26T10:00Z | 26,773 MW |
| 2026-08-26T11:00Z | 27,649 MW |
| 2026-08-26T12:00Z | 28,528 MW |
| 2026-08-26T13:00Z | 30,170 MW |
| 2026-08-26T14:00Z | 32,533 MW |
| 2026-08-26T15:00Z | 35,076 MW |
| 2026-08-26T16:00Z | 37,764 MW |
| 2026-08-26T17:00Z | 39,960 MW |
| 2026-08-26T18:00Z | 41,372 MW |
| 2026-08-26T19:00Z | 42,231 MW |
| 2026-08-26T20:00Z | 42,400 MW |
| 2026-08-26T21:00Z | 41,670 MW |
| 2026-08-26T22:00Z | 40,240 MW |
| 2026-08-26T23:00Z | 38,598 MW |
| 2026-08-27T00:00Z | 37,498 MW |
| 2026-08-27T01:00Z | 35,688 MW |
| 2026-08-27T02:00Z | 33,342 MW |
| 2026-08-27T03:00Z | 30,941 MW |
| 2026-08-27T04:00Z | 29,058 MW |
| 2026-08-27T05:00Z | 27,516 MW |
| 2026-08-27T06:00Z | 26,404 MW |
| 2026-08-27T07:00Z | 25,723 MW |
| 2026-08-27T08:00Z | 25,558 MW |
| 2026-08-27T09:00Z | 26,021 MW |
| 2026-08-27T10:00Z | 27,374 MW |
| 2026-08-27T11:00Z | 28,255 MW |
| 2026-08-27T12:00Z | 28,969 MW |
| 2026-08-27T13:00Z | 30,159 MW |
| 2026-08-27T14:00Z | 31,396 MW |
| 2026-08-27T15:00Z | 32,903 MW |
| 2026-08-27T16:00Z | 34,518 MW |
| 2026-08-27T17:00Z | 33,307 MW |
| 2026-08-27T18:00Z | 35,284 MW |
| 2026-08-27T19:00Z | 36,612 MW |
| 2026-08-27T20:00Z | 37,296 MW |
| 2026-08-27T21:00Z | 38,136 MW |
| 2026-08-27T22:00Z | 36,898 MW |
| 2026-08-27T23:00Z | 36,269 MW |
| 2026-08-28T00:00Z | 35,452 MW |
| 2026-08-28T01:00Z | 34,106 MW |
| 2026-08-28T02:00Z | 31,930 MW |
| 2026-08-28T03:00Z | 29,757 MW |
| 2026-08-28T04:00Z | 28,050 MW |
| 2026-08-28T05:00Z | 27,040 MW |
| 2026-08-28T06:00Z | 25,945 MW |
| 2026-08-28T07:00Z | 25,316 MW |
| 2026-08-28T08:00Z | 25,161 MW |
| 2026-08-28T09:00Z | 25,658 MW |
| 2026-08-28T10:00Z | 26,960 MW |
| 2026-08-28T11:00Z | 27,862 MW |
| 2026-08-28T12:00Z | 28,556 MW |
| 2026-08-28T13:00Z | 30,067 MW |
| 2026-08-28T14:00Z | 32,284 MW |
| 2026-08-28T15:00Z | 35,001 MW |
| 2026-08-28T16:00Z | 37,274 MW |
| 2026-08-28T17:00Z | 38,834 MW |
| 2026-08-28T18:00Z | 40,065 MW |
| 2026-08-28T19:00Z | 40,603 MW |
| 2026-08-28T20:00Z | 40,274 MW |
| 2026-08-28T21:00Z | 39,532 MW |
| 2026-08-28T22:00Z | 38,474 MW |
| 2026-08-28T23:00Z | 36,722 MW |
| 2026-08-29T00:00Z | 35,538 MW |
| 2026-08-29T01:00Z | 33,968 MW |
| 2026-08-29T02:00Z | 31,971 MW |
| 2026-08-29T03:00Z | 30,166 MW |
| 2026-08-29T04:00Z | 28,275 MW |
| 2026-08-29T05:00Z | 26,845 MW |
| 2026-08-29T06:00Z | 25,691 MW |
| 2026-08-29T07:00Z | 24,886 MW |
| 2026-08-29T08:00Z | 24,431 MW |
| 2026-08-29T09:00Z | 24,330 MW |
| 2026-08-29T10:00Z | 24,494 MW |
| 2026-08-29T11:00Z | 24,817 MW |
| 2026-08-29T12:00Z | 25,876 MW |
| 2026-08-29T13:00Z | 27,693 MW |
| 2026-08-29T14:00Z | 29,957 MW |
| 2026-08-29T15:00Z | 32,149 MW |
| 2026-08-29T16:00Z | 34,421 MW |
| 2026-08-29T17:00Z | 36,306 MW |
| 2026-08-29T18:00Z | 37,901 MW |
| 2026-08-29T19:00Z | 38,679 MW |
| 2026-08-29T20:00Z | 39,076 MW |
| 2026-08-29T21:00Z | 39,330 MW |
| 2026-08-29T22:00Z | 38,590 MW |
| 2026-08-29T23:00Z | 37,086 MW |
| 2026-08-30T00:00Z | 35,641 MW |
| 2026-08-30T01:00Z | 34,177 MW |
| 2026-08-30T02:00Z | 32,390 MW |
| 2026-08-30T03:00Z | 30,466 MW |
| 2026-08-30T04:00Z | 28,480 MW |
| 2026-08-30T05:00Z | 26,858 MW |
| 2026-08-30T06:00Z | 25,751 MW |
| 2026-08-30T07:00Z | 24,817 MW |
| 2026-08-30T08:00Z | 24,112 MW |
| 2026-08-30T09:00Z | 23,879 MW |
| 2026-08-30T10:00Z | 24,016 MW |
| 2026-08-30T11:00Z | 24,215 MW |
| 2026-08-30T12:00Z | 25,532 MW |
| 2026-08-30T13:00Z | 27,787 MW |
| 2026-08-30T14:00Z | 30,276 MW |
| 2026-08-30T15:00Z | 32,803 MW |
| 2026-08-30T16:00Z | 35,126 MW |
| 2026-08-30T17:00Z | 37,123 MW |
| 2026-08-30T18:00Z | 38,844 MW |
| 2026-08-30T19:00Z | 39,836 MW |
| 2026-08-30T20:00Z | 40,673 MW |
| 2026-08-30T21:00Z | 41,166 MW |
| 2026-08-30T22:00Z | 40,541 MW |
| 2026-08-30T23:00Z | 39,144 MW |
| 2026-08-31T00:00Z | 37,670 MW |
| 2026-08-31T01:00Z | 35,915 MW |
| 2026-08-31T02:00Z | 33,490 MW |
| 2026-08-31T03:00Z | 30,970 MW |
| 2026-08-31T04:00Z | 28,780 MW |
| 2026-08-31T05:00Z | 27,230 MW |
| 2026-08-31T06:00Z | 26,023 MW |
| 2026-08-31T07:00Z | 25,317 MW |
| 2026-08-31T08:00Z | 25,106 MW |
| 2026-08-31T09:00Z | 25,784 MW |
| 2026-08-31T10:00Z | 27,140 MW |
| 2026-08-31T11:00Z | 28,005 MW |
| 2026-08-31T12:00Z | 29,135 MW |
| 2026-08-31T13:00Z | 31,247 MW |
| 2026-08-31T14:00Z | 33,920 MW |
| 2026-08-31T15:00Z | 36,576 MW |
| 2026-08-31T16:00Z | 38,996 MW |
| 2026-08-31T17:00Z | 40,944 MW |
| 2026-08-31T18:00Z | 42,276 MW |
| 2026-08-31T19:00Z | 43,456 MW |
| 2026-08-31T20:00Z | 44,151 MW |
| 2026-08-31T21:00Z | 44,222 MW |
| 2026-08-31T22:00Z | 43,565 MW |
| 2026-08-31T23:00Z | 41,869 MW |
| 2026-09-01T00:00Z | 40,302 MW |
| 2026-09-01T01:00Z | 38,239 MW |
| 2026-09-01T02:00Z | 35,519 MW |
| 2026-09-01T03:00Z | 32,783 MW |
| 2026-09-01T04:00Z | 30,363 MW |
| 2026-09-01T05:00Z | 28,639 MW |
| 2026-09-01T06:00Z | 27,135 MW |
| 2026-09-01T07:00Z | 26,273 MW |
| 2026-09-01T08:00Z | 26,060 MW |
| 2026-09-01T09:00Z | 26,442 MW |
| 2026-09-01T10:00Z | 27,570 MW |
| 2026-09-01T11:00Z | 28,341 MW |
| 2026-09-01T12:00Z | 29,418 MW |
| 2026-09-01T13:00Z | 31,680 MW |
| 2026-09-01T14:00Z | 34,623 MW |
| 2026-09-01T15:00Z | 37,742 MW |
| 2026-09-01T16:00Z | 40,343 MW |
| 2026-09-01T17:00Z | 42,498 MW |
| 2026-09-01T18:00Z | 43,750 MW |
| 2026-09-01T19:00Z | 44,766 MW |
| 2026-09-01T20:00Z | 45,234 MW |
| 2026-09-01T21:00Z | 45,064 MW |
| 2026-09-01T22:00Z | 44,367 MW |
| 2026-09-01T23:00Z | 42,623 MW |
| 2026-09-02T00:00Z | 40,988 MW |
| 2026-09-02T01:00Z | 38,896 MW |
| 2026-09-02T02:00Z | 36,279 MW |
| 2026-09-02T03:00Z | 33,568 MW |
| 2026-09-02T04:00Z | 31,353 MW |
| 2026-09-02T05:00Z | 29,459 MW |
| 2026-09-02T06:00Z | 27,991 MW |
| 2026-09-02T07:00Z | 27,001 MW |
| 2026-09-02T08:00Z | 26,701 MW |
| 2026-09-02T09:00Z | 27,077 MW |
| 2026-09-02T10:00Z | 28,122 MW |
| 2026-09-02T11:00Z | 28,847 MW |
| 2026-09-02T12:00Z | 29,848 MW |
| 2026-09-02T13:00Z | 32,131 MW |
| 2026-09-02T14:00Z | 35,389 MW |
| 2026-09-02T15:00Z | 38,692 MW |
| 2026-09-02T16:00Z | 41,603 MW |
| 2026-09-02T17:00Z | 43,521 MW |
| 2026-09-02T18:00Z | 44,669 MW |
| 2026-09-02T19:00Z | 45,362 MW |
| 2026-09-02T20:00Z | 45,861 MW |
| 2026-09-02T21:00Z | 45,932 MW |
| 2026-09-02T22:00Z | 45,045 MW |
| 2026-09-02T23:00Z | 43,525 MW |
| 2026-09-03T00:00Z | 42,071 MW |
| 2026-09-03T01:00Z | 39,804 MW |
| 2026-09-03T02:00Z | 36,937 MW |
| 2026-09-03T03:00Z | 34,387 MW |
| 2026-09-03T04:00Z | 32,056 MW |
| 2026-09-03T05:00Z | 30,328 MW |
| 2026-09-03T06:00Z | 28,969 MW |
| 2026-09-03T07:00Z | 27,984 MW |
| 2026-09-03T08:00Z | 27,494 MW |
| 2026-09-03T09:00Z | 27,754 MW |
| 2026-09-03T10:00Z | 28,846 MW |
| 2026-09-03T11:00Z | 29,593 MW |
| 2026-09-03T12:00Z | 30,648 MW |
| 2026-09-03T13:00Z | 32,875 MW |
| 2026-09-03T14:00Z | 36,076 MW |
| 2026-09-03T15:00Z | 39,346 MW |
| 2026-09-03T16:00Z | 42,190 MW |
| 2026-09-03T17:00Z | 44,045 MW |
| 2026-09-03T18:00Z | 45,083 MW |
| 2026-09-03T19:00Z | 45,711 MW |
| 2026-09-03T20:00Z | 45,895 MW |
| 2026-09-03T21:00Z | 45,363 MW |
| 2026-09-03T22:00Z | 43,912 MW |
| 2026-09-03T23:00Z | 42,320 MW |
| 2026-09-04T00:00Z | 41,140 MW |
| 2026-09-04T01:00Z | 39,194 MW |
| 2026-09-04T02:00Z | 36,615 MW |
| 2026-09-04T03:00Z | 34,243 MW |
| 2026-09-04T04:00Z | 32,135 MW |
| 2026-09-04T05:00Z | 30,331 MW |
| 2026-09-04T06:00Z | 29,025 MW |
| 2026-09-04T07:00Z | 28,041 MW |
| 2026-09-04T08:00Z | 27,558 MW |
| 2026-09-04T09:00Z | 27,808 MW |
| 2026-09-04T10:00Z | 28,662 MW |
| 2026-09-04T11:00Z | 29,237 MW |
| 2026-09-04T12:00Z | 30,353 MW |
| 2026-09-04T13:00Z | 32,464 MW |
| 2026-09-04T14:00Z | 34,937 MW |
| 2026-09-04T15:00Z | 37,651 MW |
| 2026-09-04T16:00Z | 40,118 MW |
| 2026-09-04T17:00Z | 41,903 MW |
| 2026-09-04T18:00Z | 43,217 MW |
| 2026-09-04T19:00Z | 43,787 MW |
| 2026-09-04T20:00Z | 44,189 MW |
| 2026-09-04T21:00Z | 43,732 MW |
| 2026-09-04T22:00Z | 42,950 MW |
| 2026-09-04T23:00Z | 41,059 MW |
| 2026-09-05T00:00Z | 39,335 MW |
| 2026-09-05T01:00Z | 37,583 MW |
| 2026-09-05T02:00Z | 35,334 MW |
| 2026-09-05T03:00Z | 33,059 MW |
| 2026-09-05T04:00Z | 30,976 MW |
| 2026-09-05T05:00Z | 29,245 MW |
| 2026-09-05T06:00Z | 27,918 MW |
| 2026-09-05T07:00Z | 26,871 MW |
| 2026-09-05T08:00Z | 26,183 MW |
| 2026-09-05T09:00Z | 25,863 MW |
| 2026-09-05T10:00Z | 25,857 MW |
| 2026-09-05T11:00Z | 25,924 MW |
| 2026-09-05T12:00Z | 27,247 MW |
| 2026-09-05T13:00Z | 29,737 MW |
| 2026-09-05T14:00Z | 32,927 MW |
| 2026-09-05T15:00Z | 36,263 MW |
| 2026-09-05T16:00Z | 39,194 MW |
| 2026-09-05T17:00Z | 41,060 MW |
| 2026-09-05T18:00Z | 42,198 MW |
| 2026-09-05T19:00Z | 43,029 MW |
| 2026-09-05T20:00Z | 43,293 MW |
| 2026-09-05T21:00Z | 42,701 MW |
| 2026-09-05T22:00Z | 40,716 MW |
| 2026-09-05T23:00Z | 38,184 MW |
| 2026-09-06T00:00Z | 36,787 MW |
| 2026-09-06T01:00Z | 35,065 MW |
| 2026-09-06T02:00Z | 33,075 MW |
| 2026-09-06T03:00Z | 31,208 MW |
| 2026-09-06T04:00Z | 29,344 MW |
| 2026-09-06T05:00Z | 27,742 MW |
| 2026-09-06T06:00Z | 26,470 MW |
| 2026-09-06T07:00Z | 25,460 MW |
| 2026-09-06T08:00Z | 25,100 MW |
| 2026-09-06T09:00Z | 24,817 MW |
| 2026-09-06T10:00Z | 24,813 MW |
| 2026-09-06T11:00Z | 24,972 MW |
| 2026-09-06T12:00Z | 26,115 MW |
| 2026-09-06T13:00Z | 28,502 MW |
| 2026-09-06T14:00Z | 31,384 MW |
| 2026-09-06T15:00Z | 34,384 MW |
| 2026-09-06T16:00Z | 37,708 MW |
| 2026-09-06T17:00Z | 40,304 MW |
| 2026-09-06T18:00Z | 42,053 MW |
| 2026-09-06T19:00Z | 42,706 MW |
| 2026-09-06T20:00Z | 42,580 MW |
| 2026-09-06T21:00Z | 41,981 MW |
| 2026-09-06T22:00Z | 40,774 MW |
| 2026-09-06T23:00Z | 38,791 MW |
| 2026-09-07T00:00Z | 37,135 MW |
| 2026-09-07T01:00Z | 35,331 MW |
| 2026-09-07T02:00Z | 33,157 MW |
| 2026-09-07T03:00Z | 31,042 MW |
| 2026-09-07T04:00Z | 29,093 MW |
| 2026-09-07T05:00Z | 26,887 MW |
| 2026-09-07T06:00Z | 25,680 MW |
| 2026-09-07T07:00Z | 24,759 MW |
| 2026-09-07T08:00Z | 24,262 MW |
| 2026-09-07T09:00Z | 24,167 MW |
| 2026-09-07T10:00Z | 24,212 MW |
| 2026-09-07T11:00Z | 24,159 MW |
| 2026-09-07T12:00Z | 24,207 MW |
| 2026-09-07T13:00Z | 25,314 MW |
| 2026-09-07T14:00Z | 27,075 MW |
| 2026-09-07T15:00Z | 29,526 MW |
| 2026-09-07T16:00Z | 31,678 MW |
| 2026-09-07T17:00Z | 33,350 MW |
| 2026-09-07T18:00Z | 34,237 MW |
| 2026-09-07T19:00Z | 34,793 MW |
| 2026-09-07T20:00Z | 35,137 MW |
| 2026-09-07T21:00Z | 35,639 MW |
| 2026-09-07T22:00Z | 35,469 MW |
| 2026-09-07T23:00Z | 35,233 MW |
| 2026-09-08T00:00Z | 34,745 MW |
| 2026-09-08T01:00Z | 33,197 MW |
| 2026-09-08T02:00Z | 31,026 MW |
| 2026-09-08T03:00Z | 28,872 MW |
| 2026-09-08T04:00Z | 27,253 MW |
| 2026-09-08T05:00Z | 25,821 MW |
| 2026-09-08T06:00Z | 24,765 MW |
| 2026-09-08T07:00Z | 24,148 MW |
| 2026-09-08T08:00Z | 24,137 MW |
| 2026-09-08T09:00Z | 24,719 MW |
| 2026-09-08T10:00Z | 25,935 MW |
| 2026-09-08T11:00Z | 26,724 MW |
| 2026-09-08T12:00Z | 26,643 MW |
| 2026-09-08T13:00Z | 27,220 MW |
| 2026-09-08T14:00Z | 29,001 MW |
| 2026-09-08T15:00Z | 31,432 MW |
| 2026-09-08T16:00Z | 33,531 MW |
| 2026-09-08T17:00Z | 35,426 MW |
| 2026-09-08T18:00Z | 36,855 MW |
| 2026-09-08T19:00Z | 37,946 MW |
| 2026-09-08T20:00Z | 38,242 MW |
| 2026-09-08T21:00Z | 38,512 MW |
| 2026-09-08T22:00Z | 38,534 MW |
| 2026-09-08T23:00Z | 38,051 MW |
| 2026-09-09T00:00Z | 36,966 MW |
| 2026-09-09T01:00Z | 35,442 MW |
| 2026-09-09T02:00Z | 32,381 MW |
| 2026-09-09T03:00Z | 30,187 MW |
| 2026-09-09T04:00Z | 27,739 MW |
| 2026-09-09T05:00Z | 26,085 MW |
| 2026-09-09T06:00Z | 24,958 MW |
| 2026-09-09T07:00Z | 24,144 MW |
| 2026-09-09T08:00Z | 23,895 MW |
| 2026-09-09T09:00Z | 24,322 MW |
| 2026-09-09T10:00Z | 25,482 MW |
| 2026-09-09T11:00Z | 26,165 MW |
| 2026-09-09T12:00Z | 26,319 MW |
| 2026-09-09T13:00Z | 27,321 MW |
| 2026-09-09T14:00Z | 29,169 MW |
| 2026-09-09T15:00Z | 31,313 MW |
| 2026-09-09T16:00Z | 33,669 MW |
| 2026-09-09T17:00Z | 35,842 MW |
| 2026-09-09T18:00Z | 37,535 MW |
| 2026-09-09T19:00Z | 39,028 MW |
| 2026-09-09T20:00Z | 39,842 MW |
| 2026-09-09T21:00Z | 39,497 MW |
| 2026-09-09T22:00Z | 39,584 MW |
| 2026-09-09T23:00Z | 38,661 MW |
| 2026-09-10T00:00Z | 37,202 MW |
| 2026-09-10T01:00Z | 35,175 MW |
| 2026-09-10T02:00Z | 33,151 MW |
| 2026-09-10T03:00Z | 30,634 MW |
| 2026-09-10T04:00Z | 28,614 MW |
| 2026-09-10T05:00Z | 26,865 MW |
| 2026-09-10T06:00Z | 25,690 MW |
| 2026-09-10T07:00Z | 24,969 MW |
| 2026-09-10T08:00Z | 24,643 MW |
| 2026-09-10T09:00Z | 25,179 MW |
| 2026-09-10T10:00Z | 26,453 MW |
| 2026-09-10T11:00Z | 27,404 MW |
| 2026-09-10T12:00Z | 27,790 MW |
| 2026-09-10T13:00Z | 28,797 MW |
| 2026-09-10T14:00Z | 30,581 MW |
| 2026-09-10T15:00Z | 32,646 MW |
| 2026-09-10T16:00Z | 34,889 MW |
| 2026-09-10T17:00Z | 34,527 MW |
| 2026-09-10T18:00Z | 37,832 MW |
| 2026-09-10T19:00Z | 39,378 MW |
| 2026-09-10T20:00Z | 40,739 MW |
| 2026-09-10T21:00Z | 40,394 MW |
| 2026-09-10T22:00Z | 40,307 MW |
| 2026-09-10T23:00Z | 38,631 MW |
| 2026-09-11T00:00Z | 38,319 MW |
| 2026-09-11T01:00Z | 36,364 MW |
| 2026-09-11T02:00Z | 33,689 MW |
| 2026-09-11T03:00Z | 31,466 MW |
| 2026-09-11T04:00Z | 29,305 MW |
| 2026-09-11T05:00Z | 27,776 MW |
| 2026-09-11T06:00Z | 26,631 MW |
| 2026-09-11T07:00Z | 25,845 MW |
| 2026-09-11T08:00Z | 25,735 MW |
| 2026-09-11T09:00Z | 26,121 MW |
| 2026-09-11T10:00Z | 27,342 MW |
| 2026-09-11T11:00Z | 28,102 MW |
| 2026-09-11T12:00Z | 28,080 MW |
| 2026-09-11T13:00Z | 28,521 MW |
| 2026-09-11T14:00Z | 30,489 MW |
| 2026-09-11T15:00Z | 33,308 MW |
| 2026-09-11T16:00Z | 35,639 MW |
| 2026-09-11T17:00Z | 37,821 MW |
| 2026-09-11T18:00Z | 38,924 MW |
| 2026-09-11T19:00Z | 38,574 MW |
| 2026-09-11T20:00Z | 36,825 MW |
| 2026-09-11T21:00Z | 35,199 MW |
| 2026-09-11T22:00Z | 34,325 MW |
| 2026-09-11T23:00Z | 33,307 MW |
| 2026-09-12T00:00Z | 31,600 MW |
| 2026-09-12T01:00Z | 30,969 MW |
| 2026-09-12T02:00Z | 29,587 MW |
| 2026-09-12T03:00Z | 28,502 MW |
| 2026-09-12T04:00Z | 27,083 MW |
| 2026-09-12T05:00Z | 25,851 MW |
| 2026-09-12T06:00Z | 24,871 MW |
| 2026-09-12T07:00Z | 24,239 MW |
| 2026-09-12T08:00Z | 24,023 MW |
| 2026-09-12T09:00Z | 24,065 MW |
| 2026-09-12T10:00Z | 24,543 MW |
| 2026-09-12T11:00Z | 24,937 MW |
| 2026-09-12T12:00Z | 25,745 MW |
| 2026-09-12T13:00Z | 27,163 MW |
| 2026-09-12T14:00Z | 28,686 MW |
| 2026-09-12T15:00Z | 30,278 MW |
| 2026-09-12T16:00Z | 32,110 MW |
| 2026-09-12T17:00Z | 33,797 MW |
| 2026-09-12T18:00Z | 35,393 MW |
| 2026-09-12T19:00Z | 36,569 MW |
| 2026-09-12T20:00Z | 37,343 MW |
| 2026-09-12T21:00Z | 37,361 MW |
| 2026-09-12T22:00Z | 36,589 MW |
| 2026-09-12T23:00Z | 35,125 MW |
| 2026-09-13T00:00Z | 34,026 MW |
| 2026-09-13T01:00Z | 32,396 MW |
| 2026-09-13T02:00Z | 30,782 MW |
| 2026-09-13T03:00Z | 29,083 MW |
| 2026-09-13T04:00Z | 27,446 MW |
| 2026-09-13T05:00Z | 25,696 MW |
| 2026-09-13T06:00Z | 24,555 MW |
| 2026-09-13T07:00Z | 23,931 MW |
| 2026-09-13T08:00Z | 23,292 MW |
| 2026-09-13T09:00Z | 23,195 MW |
| 2026-09-13T10:00Z | 23,259 MW |
| 2026-09-13T11:00Z | 23,334 MW |
| 2026-09-13T12:00Z | 23,910 MW |
| 2026-09-13T13:00Z | 25,017 MW |
| 2026-09-13T14:00Z | 27,204 MW |
| 2026-09-13T15:00Z | 30,157 MW |
| 2026-09-13T16:00Z | 33,041 MW |
| 2026-09-13T17:00Z | 34,738 MW |
| 2026-09-13T18:00Z | 36,214 MW |
| 2026-09-13T19:00Z | 37,487 MW |
| 2026-09-13T20:00Z | 38,694 MW |
| 2026-09-13T21:00Z | 38,854 MW |
| 2026-09-13T22:00Z | 38,086 MW |
| 2026-09-13T23:00Z | 36,718 MW |
| 2026-09-14T00:00Z | 36,381 MW |
| 2026-09-14T01:00Z | 33,771 MW |
| 2026-09-14T02:00Z | 31,748 MW |
| 2026-09-14T03:00Z | 29,549 MW |
| 2026-09-14T04:00Z | 27,621 MW |
| 2026-09-14T05:00Z | 25,766 MW |
| 2026-09-14T06:00Z | 24,527 MW |
| 2026-09-14T07:00Z | 23,793 MW |
| 2026-09-14T08:00Z | 23,733 MW |
| 2026-09-14T09:00Z | 24,301 MW |
| 2026-09-14T10:00Z | 25,651 MW |
| 2026-09-14T11:00Z | 26,304 MW |
| 2026-09-14T12:00Z | 26,200 MW |
| 2026-09-14T13:00Z | 27,010 MW |
| 2026-09-14T14:00Z | 29,426 MW |
| 2026-09-14T15:00Z | 32,536 MW |
| 2026-09-14T16:00Z | 35,295 MW |
| 2026-09-14T17:00Z | 37,826 MW |
| 2026-09-14T18:00Z | 39,459 MW |
| 2026-09-14T19:00Z | 40,381 MW |
| 2026-09-14T20:00Z | 41,167 MW |
| 2026-09-14T21:00Z | 41,140 MW |
| 2026-09-14T22:00Z | 41,090 MW |
| 2026-09-14T23:00Z | 40,142 MW |
| 2026-09-15T00:00Z | 38,813 MW |
| 2026-09-15T01:00Z | 36,386 MW |
| 2026-09-15T02:00Z | 33,732 MW |
| 2026-09-15T03:00Z | 31,378 MW |
| 2026-09-15T04:00Z | 29,121 MW |
| 2026-09-15T05:00Z | 27,888 MW |
| 2026-09-15T06:00Z | 26,527 MW |
| 2026-09-15T07:00Z | 25,759 MW |
| 2026-09-15T08:00Z | 25,392 MW |
| 2026-09-15T09:00Z | 25,713 MW |
| 2026-09-15T10:00Z | 26,924 MW |
| 2026-09-15T11:00Z | 27,874 MW |
| 2026-09-15T12:00Z | 28,626 MW |
| 2026-09-15T13:00Z | 30,556 MW |
| 2026-09-15T14:00Z | 33,065 MW |
| 2026-09-15T15:00Z | 35,671 MW |
| 2026-09-15T16:00Z | n/a |
| Hour starting (UTC) | Gas | Nuclear | Coal | Solar | Storage |
|---|---|---|---|---|---|
| 2026-08-16T17:00Z | 21,905 MW | 8,043 MW | 8,023 MW | 2,355 MW | 90 MW |
| 2026-08-16T18:00Z | 23,724 MW | 8,041 MW | 8,083 MW | 2,226 MW | 236 MW |
| 2026-08-16T19:00Z | 24,675 MW | 8,046 MW | 8,068 MW | 1,930 MW | 401 MW |
| 2026-08-16T20:00Z | 24,928 MW | 8,061 MW | 8,023 MW | 1,539 MW | 907 MW |
| 2026-08-16T21:00Z | 25,161 MW | 8,066 MW | 8,225 MW | 1,380 MW | 965 MW |
| 2026-08-16T22:00Z | 25,370 MW | 8,062 MW | 8,191 MW | 1,054 MW | 1,023 MW |
| 2026-08-16T23:00Z | 25,301 MW | 8,070 MW | 8,352 MW | 380 MW | 954 MW |
| 2026-08-17T00:00Z | 24,974 MW | 8,069 MW | 8,185 MW | 39 MW | 607 MW |
| 2026-08-17T01:00Z | 22,195 MW | 8,079 MW | 8,253 MW | 4 MW | 119 MW |
| 2026-08-17T02:00Z | 21,584 MW | 8,072 MW | 8,214 MW | 0 MW | 6 MW |
| 2026-08-17T03:00Z | 18,288 MW | 8,080 MW | 8,097 MW | -2 MW | -3 MW |
| 2026-08-17T04:00Z | 16,879 MW | 8,067 MW | 7,476 MW | -1 MW | -35 MW |
| 2026-08-17T05:00Z | 16,302 MW | 8,074 MW | 6,763 MW | -1 MW | -714 MW |
| 2026-08-17T06:00Z | 16,110 MW | 8,084 MW | 5,975 MW | -1 MW | -1,214 MW |
| 2026-08-17T07:00Z | 15,933 MW | 8,083 MW | 5,700 MW | -1 MW | -1,572 MW |
| 2026-08-17T08:00Z | 15,839 MW | 8,083 MW | 5,512 MW | 0 MW | -1,567 MW |
| 2026-08-17T09:00Z | 16,024 MW | 8,097 MW | 5,758 MW | -3 MW | -1,533 MW |
| 2026-08-17T10:00Z | 16,360 MW | 8,086 MW | 6,282 MW | 0 MW | -988 MW |
| 2026-08-17T11:00Z | 16,628 MW | 8,091 MW | 6,469 MW | 122 MW | -394 MW |
| 2026-08-17T12:00Z | 16,409 MW | 8,080 MW | 5,877 MW | 1,063 MW | -379 MW |
| 2026-08-17T13:00Z | 16,674 MW | 8,061 MW | 6,159 MW | 1,990 MW | -52 MW |
| 2026-08-17T14:00Z | 18,430 MW | 8,058 MW | 6,812 MW | 2,393 MW | -78 MW |
| 2026-08-17T15:00Z | 20,816 MW | 8,040 MW | 7,442 MW | 2,535 MW | -165 MW |
| 2026-08-17T16:00Z | 22,923 MW | 8,029 MW | 8,048 MW | 2,633 MW | 79 MW |
| 2026-08-17T17:00Z | 24,844 MW | 8,031 MW | 8,267 MW | 2,498 MW | 213 MW |
| 2026-08-17T18:00Z | 25,622 MW | 8,032 MW | 8,143 MW | 2,293 MW | 905 MW |
| 2026-08-17T19:00Z | 25,597 MW | 8,043 MW | 8,246 MW | 2,103 MW | 1,359 MW |
| 2026-08-17T20:00Z | 25,461 MW | 8,058 MW | 8,349 MW | 2,158 MW | 1,439 MW |
| 2026-08-17T21:00Z | 25,601 MW | 8,036 MW | 8,204 MW | 2,088 MW | 1,435 MW |
| 2026-08-17T22:00Z | 26,135 MW | 8,037 MW | 8,333 MW | 1,524 MW | 1,364 MW |
| 2026-08-17T23:00Z | 26,775 MW | 8,041 MW | 8,467 MW | 466 MW | 1,462 MW |
| 2026-08-18T00:00Z | 26,590 MW | 8,034 MW | 8,413 MW | 44 MW | 1,217 MW |
| 2026-08-18T01:00Z | 25,611 MW | 8,039 MW | 8,065 MW | 12 MW | 671 MW |
| 2026-08-18T02:00Z | 22,978 MW | 8,044 MW | 7,944 MW | -4 MW | 181 MW |
| 2026-08-18T03:00Z | 19,495 MW | 8,046 MW | 7,787 MW | -1 MW | -275 MW |
| 2026-08-18T04:00Z | 17,794 MW | 8,058 MW | 7,741 MW | -1 MW | -315 MW |
| 2026-08-18T05:00Z | 16,874 MW | 8,061 MW | 6,730 MW | -1 MW | -540 MW |
| 2026-08-18T06:00Z | 16,560 MW | 8,069 MW | 6,498 MW | -3 MW | -1,211 MW |
| 2026-08-18T07:00Z | 16,310 MW | 8,080 MW | 6,083 MW | 0 MW | -1,712 MW |
| 2026-08-18T08:00Z | 16,151 MW | 8,094 MW | 5,908 MW | -1 MW | -1,648 MW |
| 2026-08-18T09:00Z | 16,165 MW | 8,098 MW | 5,805 MW | 0 MW | -1,638 MW |
| 2026-08-18T10:00Z | 16,604 MW | 8,103 MW | 6,568 MW | -1 MW | -1,796 MW |
| 2026-08-18T11:00Z | 16,842 MW | 8,113 MW | 6,682 MW | 174 MW | -1,076 MW |
| 2026-08-18T12:00Z | 16,971 MW | 8,106 MW | 5,627 MW | 1,147 MW | -950 MW |
| 2026-08-18T13:00Z | 16,985 MW | 8,101 MW | 5,309 MW | 1,981 MW | -584 MW |
| 2026-08-18T14:00Z | 18,349 MW | 8,070 MW | 5,612 MW | 2,395 MW | -516 MW |
| 2026-08-18T15:00Z | 19,916 MW | 8,069 MW | 6,324 MW | 2,596 MW | -272 MW |
| 2026-08-18T16:00Z | 22,209 MW | 8,055 MW | 6,662 MW | 2,573 MW | -264 MW |
| 2026-08-18T17:00Z | 23,738 MW | 8,033 MW | 6,951 MW | 2,675 MW | 52 MW |
| 2026-08-18T18:00Z | 24,187 MW | 8,009 MW | 7,429 MW | 2,634 MW | 800 MW |
| 2026-08-18T19:00Z | 24,481 MW | 8,014 MW | 7,847 MW | 2,612 MW | 1,276 MW |
| 2026-08-18T20:00Z | 24,638 MW | 7,112 MW | 8,052 MW | 2,360 MW | 1,341 MW |
| 2026-08-18T21:00Z | 25,217 MW | 7,114 MW | 8,405 MW | 1,917 MW | 1,544 MW |
| 2026-08-18T22:00Z | 25,631 MW | 7,119 MW | 8,445 MW | 1,243 MW | 1,435 MW |
| 2026-08-18T23:00Z | 25,364 MW | 7,131 MW | 8,412 MW | 320 MW | 1,459 MW |
| 2026-08-19T00:00Z | 26,590 MW | 8,031 MW | 8,380 MW | 16 MW | 1,337 MW |
| 2026-08-19T01:00Z | 23,692 MW | 8,031 MW | 7,907 MW | 0 MW | 863 MW |
| 2026-08-19T02:00Z | 21,649 MW | 8,046 MW | 7,781 MW | -3 MW | 240 MW |
| 2026-08-19T03:00Z | 18,574 MW | 8,059 MW | 7,386 MW | -1 MW | -278 MW |
| 2026-08-19T04:00Z | 17,242 MW | 8,072 MW | 6,696 MW | -1 MW | -385 MW |
| 2026-08-19T05:00Z | 17,270 MW | 8,076 MW | 6,049 MW | -3 MW | -1,235 MW |
| 2026-08-19T06:00Z | 16,503 MW | 8,094 MW | 5,398 MW | -3 MW | -1,342 MW |
| 2026-08-19T07:00Z | 16,054 MW | 8,097 MW | 4,916 MW | -4 MW | -1,342 MW |
| 2026-08-19T08:00Z | 15,919 MW | 8,101 MW | 4,509 MW | -2 MW | -1,336 MW |
| 2026-08-19T09:00Z | 16,084 MW | 8,109 MW | 4,776 MW | -2 MW | -1,281 MW |
| 2026-08-19T10:00Z | 16,738 MW | 8,116 MW | 5,528 MW | -2 MW | -1,482 MW |
| 2026-08-19T11:00Z | 17,043 MW | 8,119 MW | 5,559 MW | 421 MW | -1,063 MW |
| 2026-08-19T12:00Z | 16,552 MW | 8,115 MW | 4,889 MW | 2,421 MW | -983 MW |
| 2026-08-19T13:00Z | 16,720 MW | 8,101 MW | 4,953 MW | 4,267 MW | -766 MW |
| 2026-08-19T14:00Z | 17,658 MW | 8,078 MW | 5,414 MW | 5,129 MW | -431 MW |
| 2026-08-19T15:00Z | 19,013 MW | 8,069 MW | 6,340 MW | 5,416 MW | -278 MW |
| 2026-08-19T16:00Z | 20,782 MW | 8,063 MW | 7,620 MW | 5,499 MW | -198 MW |
| 2026-08-19T17:00Z | 22,465 MW | 8,058 MW | 8,125 MW | 5,288 MW | 177 MW |
| 2026-08-19T18:00Z | 23,892 MW | 8,042 MW | 7,991 MW | 5,404 MW | 734 MW |
| 2026-08-19T19:00Z | 24,315 MW | 8,044 MW | 8,311 MW | 5,315 MW | 1,077 MW |
| 2026-08-19T20:00Z | 24,911 MW | 8,045 MW | 8,298 MW | 4,874 MW | 1,286 MW |
| 2026-08-19T21:00Z | 25,032 MW | 8,059 MW | 8,330 MW | 3,992 MW | 1,499 MW |
| 2026-08-19T22:00Z | 25,307 MW | 8,059 MW | 8,416 MW | 2,547 MW | 1,497 MW |
| 2026-08-19T23:00Z | 25,746 MW | 8,061 MW | 8,274 MW | 552 MW | 1,474 MW |
| 2026-08-20T00:00Z | 24,739 MW | 8,064 MW | 7,986 MW | 0 MW | 1,274 MW |
| 2026-08-20T01:00Z | 23,912 MW | 8,063 MW | 8,077 MW | -3 MW | 499 MW |
| 2026-08-20T02:00Z | 21,845 MW | 8,065 MW | 7,944 MW | -3 MW | 258 MW |
| 2026-08-20T03:00Z | 18,707 MW | 8,075 MW | 7,826 MW | -3 MW | -282 MW |
| 2026-08-20T04:00Z | 17,275 MW | 8,087 MW | 7,244 MW | -2 MW | -288 MW |
| 2026-08-20T05:00Z | 16,774 MW | 8,083 MW | 6,349 MW | -2 MW | -911 MW |
| 2026-08-20T06:00Z | 16,539 MW | 8,093 MW | 5,606 MW | -4 MW | -1,379 MW |
| 2026-08-20T07:00Z | 15,796 MW | 8,090 MW | 5,429 MW | -2 MW | -1,403 MW |
| 2026-08-20T08:00Z | 15,519 MW | 8,101 MW | 5,381 MW | -2 MW | -1,498 MW |
| 2026-08-20T09:00Z | 16,106 MW | 8,099 MW | 5,482 MW | -2 MW | -1,652 MW |
| 2026-08-20T10:00Z | 16,642 MW | 8,095 MW | 6,156 MW | -4 MW | -1,624 MW |
| 2026-08-20T11:00Z | 16,879 MW | 8,107 MW | 6,012 MW | 430 MW | -921 MW |
| 2026-08-20T12:00Z | 16,325 MW | 8,103 MW | 5,498 MW | 2,526 MW | -855 MW |
| 2026-08-20T13:00Z | 16,016 MW | 8,086 MW | 5,674 MW | 4,304 MW | -575 MW |
| 2026-08-20T14:00Z | 17,514 MW | 8,060 MW | 6,031 MW | 4,862 MW | -328 MW |
| 2026-08-20T15:00Z | 18,746 MW | 8,049 MW | 7,641 MW | 5,352 MW | -270 MW |
| 2026-08-20T16:00Z | 21,269 MW | 8,043 MW | 8,267 MW | 5,346 MW | -311 MW |
| 2026-08-20T17:00Z | 23,110 MW | 8,044 MW | 8,494 MW | 5,263 MW | -194 MW |
| 2026-08-20T18:00Z | 24,038 MW | 8,032 MW | 8,474 MW | 5,101 MW | 463 MW |
| 2026-08-20T19:00Z | 24,486 MW | 8,034 MW | 8,504 MW | 4,921 MW | 1,068 MW |
| 2026-08-20T20:00Z | 24,941 MW | 8,029 MW | 8,407 MW | 4,425 MW | 1,368 MW |
| 2026-08-20T21:00Z | 25,233 MW | 8,026 MW | 8,457 MW | 4,013 MW | 1,384 MW |
| 2026-08-20T22:00Z | 25,366 MW | 8,021 MW | 8,501 MW | 2,612 MW | 1,532 MW |
| 2026-08-20T23:00Z | 25,957 MW | 8,023 MW | 8,491 MW | 506 MW | 1,595 MW |
| 2026-08-21T00:00Z | 25,456 MW | 8,023 MW | 8,362 MW | 0 MW | 1,336 MW |
| 2026-08-21T01:00Z | 24,152 MW | 8,059 MW | 8,406 MW | 6 MW | 917 MW |
| 2026-08-21T02:00Z | 22,719 MW | 8,065 MW | 8,212 MW | 0 MW | 388 MW |
| 2026-08-21T03:00Z | 19,984 MW | 8,063 MW | 7,839 MW | -2 MW | -258 MW |
| 2026-08-21T04:00Z | 18,056 MW | 8,074 MW | 7,536 MW | -1 MW | -284 MW |
| 2026-08-21T05:00Z | 16,581 MW | 8,077 MW | 6,952 MW | -4 MW | -640 MW |
| 2026-08-21T06:00Z | 16,194 MW | 8,078 MW | 6,415 MW | -4 MW | -1,500 MW |
| 2026-08-21T07:00Z | 15,815 MW | 8,079 MW | 6,117 MW | -2 MW | -1,719 MW |
| 2026-08-21T08:00Z | 15,386 MW | 8,083 MW | 5,693 MW | -2 MW | -1,711 MW |
| 2026-08-21T09:00Z | 15,276 MW | 8,097 MW | 5,796 MW | -4 MW | -1,690 MW |
| 2026-08-21T10:00Z | 16,095 MW | 8,099 MW | 6,150 MW | -3 MW | -1,865 MW |
| 2026-08-21T11:00Z | 16,217 MW | 8,100 MW | 5,932 MW | 157 MW | -1,173 MW |
| 2026-08-21T12:00Z | 15,894 MW | 8,101 MW | 5,200 MW | 1,541 MW | -762 MW |
| 2026-08-21T13:00Z | 15,436 MW | 8,096 MW | 5,008 MW | 3,577 MW | -559 MW |
| 2026-08-21T14:00Z | 16,574 MW | 8,067 MW | 5,310 MW | 4,425 MW | -370 MW |
| 2026-08-21T15:00Z | 17,523 MW | 8,056 MW | 6,495 MW | 4,738 MW | -5 MW |
| 2026-08-21T16:00Z | 19,060 MW | 8,017 MW | 7,406 MW | 5,106 MW | -4 MW |
| 2026-08-21T17:00Z | 20,522 MW | 8,023 MW | 7,774 MW | 5,262 MW | 100 MW |
| 2026-08-21T18:00Z | 21,567 MW | 8,013 MW | 8,464 MW | 4,896 MW | 589 MW |
| 2026-08-21T19:00Z | 22,456 MW | 7,959 MW | 8,784 MW | 3,963 MW | 1,157 MW |
| 2026-08-21T20:00Z | 23,051 MW | 7,972 MW | 8,928 MW | 2,626 MW | 1,481 MW |
| 2026-08-21T21:00Z | 22,821 MW | 7,988 MW | 8,827 MW | 1,535 MW | 1,543 MW |
| 2026-08-21T22:00Z | 22,161 MW | 8,049 MW | 8,888 MW | 560 MW | 1,472 MW |
| 2026-08-21T23:00Z | 21,278 MW | 8,055 MW | 8,837 MW | 178 MW | 1,191 MW |
| 2026-08-22T00:00Z | 20,530 MW | 8,062 MW | 8,963 MW | 1 MW | 636 MW |
| 2026-08-22T01:00Z | 19,133 MW | 8,066 MW | 8,893 MW | -2 MW | 167 MW |
| 2026-08-22T02:00Z | 17,539 MW | 8,089 MW | 8,527 MW | -4 MW | -8 MW |
| 2026-08-22T03:00Z | 16,516 MW | 8,096 MW | 7,211 MW | -2 MW | -275 MW |
| 2026-08-22T04:00Z | 15,131 MW | 8,101 MW | 6,350 MW | -4 MW | -315 MW |
| 2026-08-22T05:00Z | 14,683 MW | 8,117 MW | 5,535 MW | -4 MW | -501 MW |
| 2026-08-22T06:00Z | 13,912 MW | 8,124 MW | 5,197 MW | -1 MW | -658 MW |
| 2026-08-22T07:00Z | 13,917 MW | 8,122 MW | 4,841 MW | -2 MW | -1,084 MW |
| 2026-08-22T08:00Z | 13,693 MW | 8,125 MW | 4,619 MW | -3 MW | -1,054 MW |
| 2026-08-22T09:00Z | 13,761 MW | 8,124 MW | 4,487 MW | -3 MW | -1,362 MW |
| 2026-08-22T10:00Z | 13,577 MW | 8,133 MW | 4,353 MW | -4 MW | -1,027 MW |
| 2026-08-22T11:00Z | 13,505 MW | 8,129 MW | 4,180 MW | 256 MW | -930 MW |
| 2026-08-22T12:00Z | 13,163 MW | 8,131 MW | 4,049 MW | 1,888 MW | -756 MW |
| 2026-08-22T13:00Z | 13,487 MW | 8,111 MW | 4,111 MW | 3,710 MW | -771 MW |
| 2026-08-22T14:00Z | 14,355 MW | 8,103 MW | 4,849 MW | 4,518 MW | -660 MW |
| 2026-08-22T15:00Z | 15,477 MW | 8,086 MW | 5,596 MW | 4,999 MW | -6 MW |
| 2026-08-22T16:00Z | 17,370 MW | 8,063 MW | 6,487 MW | 5,243 MW | -3 MW |
| 2026-08-22T17:00Z | 18,794 MW | 8,053 MW | 7,699 MW | 5,099 MW | -5 MW |
| 2026-08-22T18:00Z | 20,443 MW | 8,037 MW | 7,651 MW | 4,904 MW | 182 MW |
| 2026-08-22T19:00Z | 21,074 MW | 8,028 MW | 7,992 MW | 4,482 MW | 401 MW |
| 2026-08-22T20:00Z | 21,968 MW | 8,021 MW | 8,463 MW | 3,676 MW | 801 MW |
| 2026-08-22T21:00Z | 22,146 MW | 8,034 MW | 8,264 MW | 3,536 MW | 831 MW |
| 2026-08-22T22:00Z | 21,976 MW | 8,069 MW | 8,040 MW | 2,785 MW | 966 MW |
| 2026-08-22T23:00Z | 21,524 MW | 8,070 MW | 8,179 MW | 827 MW | 1,013 MW |
| 2026-08-23T00:00Z | 20,860 MW | 8,072 MW | 8,128 MW | 78 MW | 876 MW |
| 2026-08-23T01:00Z | 20,072 MW | 8,068 MW | 7,822 MW | -5 MW | 444 MW |
| 2026-08-23T02:00Z | 18,895 MW | 8,075 MW | 6,685 MW | -3 MW | -3 MW |
| 2026-08-23T03:00Z | 16,982 MW | 8,055 MW | 6,557 MW | -3 MW | -142 MW |
| 2026-08-23T04:00Z | 15,085 MW | 8,062 MW | 6,286 MW | -3 MW | -162 MW |
| 2026-08-23T05:00Z | 14,010 MW | 8,077 MW | 5,985 MW | -2 MW | -649 MW |
| 2026-08-23T06:00Z | 13,667 MW | 8,094 MW | 5,618 MW | -4 MW | -1,139 MW |
| 2026-08-23T07:00Z | 13,116 MW | 8,094 MW | 5,322 MW | -2 MW | -1,123 MW |
| 2026-08-23T08:00Z | 13,016 MW | 8,104 MW | 4,965 MW | -2 MW | -1,114 MW |
| 2026-08-23T09:00Z | 13,311 MW | 8,107 MW | 4,507 MW | -2 MW | -1,488 MW |
| 2026-08-23T10:00Z | 13,309 MW | 8,099 MW | 4,577 MW | -2 MW | -1,430 MW |
| 2026-08-23T11:00Z | 13,287 MW | 8,109 MW | 4,091 MW | 256 MW | -989 MW |
| 2026-08-23T12:00Z | 12,668 MW | 8,099 MW | 3,940 MW | 1,864 MW | -540 MW |
| 2026-08-23T13:00Z | 12,735 MW | 8,078 MW | 4,192 MW | 3,754 MW | -502 MW |
| 2026-08-23T14:00Z | 13,497 MW | 8,068 MW | 4,656 MW | 4,653 MW | -138 MW |
| 2026-08-23T15:00Z | 15,000 MW | 8,051 MW | 5,659 MW | 5,174 MW | 29 MW |
| 2026-08-23T16:00Z | 17,000 MW | 8,045 MW | 6,288 MW | 5,483 MW | -4 MW |
| 2026-08-23T17:00Z | 18,861 MW | 8,033 MW | 6,785 MW | 5,522 MW | 78 MW |
| 2026-08-23T18:00Z | 20,164 MW | 8,030 MW | 7,122 MW | 5,501 MW | 156 MW |
| 2026-08-23T19:00Z | 21,065 MW | 8,018 MW | 7,266 MW | 5,296 MW | 260 MW |
| 2026-08-23T20:00Z | 21,479 MW | 8,021 MW | 7,350 MW | 5,058 MW | 524 MW |
| 2026-08-23T21:00Z | 21,742 MW | 8,013 MW | 7,971 MW | 4,474 MW | 831 MW |
| 2026-08-23T22:00Z | 22,160 MW | 8,023 MW | 8,220 MW | 3,072 MW | 1,077 MW |
| 2026-08-23T23:00Z | 22,399 MW | 8,016 MW | 8,089 MW | 779 MW | 1,116 MW |
| 2026-08-24T00:00Z | 21,827 MW | 8,018 MW | 7,988 MW | 22 MW | 550 MW |
| 2026-08-24T01:00Z | 20,342 MW | 8,024 MW | 7,811 MW | -4 MW | 232 MW |
| 2026-08-24T02:00Z | 18,718 MW | 8,034 MW | 6,910 MW | -3 MW | 131 MW |
| 2026-08-24T03:00Z | 16,402 MW | 8,038 MW | 6,748 MW | -4 MW | -2 MW |
| 2026-08-24T04:00Z | 14,744 MW | 8,046 MW | 6,315 MW | -2 MW | -7 MW |
| 2026-08-24T05:00Z | 14,124 MW | 8,053 MW | 5,892 MW | -3 MW | -472 MW |
| 2026-08-24T06:00Z | 13,749 MW | 8,056 MW | 5,601 MW | -2 MW | -926 MW |
| 2026-08-24T07:00Z | 13,831 MW | 8,063 MW | 4,934 MW | -3 MW | -1,305 MW |
| 2026-08-24T08:00Z | 13,777 MW | 8,070 MW | 4,708 MW | -3 MW | -1,293 MW |
| 2026-08-24T09:00Z | 13,723 MW | 8,077 MW | 4,898 MW | -2 MW | -1,135 MW |
| 2026-08-24T10:00Z | 13,853 MW | 8,083 MW | 5,431 MW | -4 MW | -855 MW |
| 2026-08-24T11:00Z | 13,927 MW | 8,096 MW | 5,509 MW | 308 MW | -375 MW |
| 2026-08-24T12:00Z | 13,238 MW | 8,085 MW | 4,843 MW | 2,347 MW | -194 MW |
| 2026-08-24T13:00Z | 13,018 MW | 8,078 MW | 4,765 MW | 4,316 MW | -1 MW |
| 2026-08-24T14:00Z | 14,106 MW | 8,060 MW | 5,573 MW | 5,078 MW | 2 MW |
| 2026-08-24T15:00Z | 16,136 MW | 8,054 MW | 6,359 MW | 5,301 MW | -42 MW |
| 2026-08-24T16:00Z | 17,975 MW | 8,043 MW | 7,240 MW | 5,331 MW | -3 MW |
| 2026-08-24T17:00Z | 19,815 MW | 8,029 MW | 7,785 MW | 5,051 MW | 65 MW |
| 2026-08-24T18:00Z | 20,574 MW | 8,026 MW | 7,856 MW | 4,753 MW | 537 MW |
| 2026-08-24T19:00Z | 20,741 MW | 8,033 MW | 7,944 MW | 4,548 MW | 748 MW |
| 2026-08-24T20:00Z | 20,841 MW | 8,038 MW | 7,769 MW | 4,400 MW | 756 MW |
| 2026-08-24T21:00Z | 21,144 MW | 8,041 MW | 7,550 MW | 3,947 MW | 1,057 MW |
| 2026-08-24T22:00Z | 21,479 MW | 8,031 MW | 7,877 MW | 2,393 MW | 1,149 MW |
| 2026-08-24T23:00Z | 21,475 MW | 8,034 MW | 8,060 MW | 573 MW | 1,289 MW |
| 2026-08-25T00:00Z | 21,086 MW | 8,038 MW | 7,406 MW | 0 MW | 1,440 MW |
| 2026-08-25T01:00Z | 20,128 MW | 8,033 MW | 7,174 MW | -2 MW | 590 MW |
| 2026-08-25T02:00Z | 18,435 MW | 8,040 MW | 7,500 MW | -3 MW | 116 MW |
| 2026-08-25T03:00Z | 16,711 MW | 8,056 MW | 6,682 MW | -2 MW | -144 MW |
| 2026-08-25T04:00Z | 15,067 MW | 8,060 MW | 6,108 MW | -1 MW | -362 MW |
| 2026-08-25T05:00Z | 14,354 MW | 8,072 MW | 5,336 MW | -2 MW | -1,021 MW |
| 2026-08-25T06:00Z | 14,053 MW | 8,069 MW | 4,481 MW | -1 MW | -1,055 MW |
| 2026-08-25T07:00Z | 13,714 MW | 8,070 MW | 4,080 MW | -1 MW | -1,031 MW |
| 2026-08-25T08:00Z | 13,434 MW | 8,082 MW | 3,941 MW | -3 MW | -929 MW |
| 2026-08-25T09:00Z | 13,877 MW | 8,082 MW | 4,052 MW | -1 MW | -859 MW |
| 2026-08-25T10:00Z | 14,191 MW | 8,086 MW | 4,730 MW | -3 MW | -867 MW |
| 2026-08-25T11:00Z | 13,948 MW | 8,080 MW | 5,424 MW | 187 MW | -502 MW |
| 2026-08-25T12:00Z | 13,760 MW | 8,087 MW | 5,419 MW | 1,552 MW | -515 MW |
| 2026-08-25T13:00Z | 13,788 MW | 8,089 MW | 5,338 MW | 3,367 MW | -523 MW |
| 2026-08-25T14:00Z | 14,483 MW | 8,063 MW | 5,753 MW | 4,124 MW | -290 MW |
| 2026-08-25T15:00Z | 16,061 MW | 8,051 MW | 6,201 MW | 4,731 MW | -186 MW |
| 2026-08-25T16:00Z | 17,743 MW | 8,035 MW | 6,690 MW | 5,238 MW | -200 MW |
| 2026-08-25T17:00Z | 18,816 MW | 8,020 MW | 7,697 MW | 5,085 MW | -40 MW |
| 2026-08-25T18:00Z | 20,129 MW | 8,018 MW | 7,827 MW | 4,888 MW | 460 MW |
| 2026-08-25T19:00Z | 21,005 MW | 8,017 MW | 7,866 MW | 4,606 MW | 908 MW |
| 2026-08-25T20:00Z | 21,425 MW | 8,017 MW | 7,953 MW | 4,232 MW | 1,094 MW |
| 2026-08-25T21:00Z | 21,694 MW | 8,011 MW | 8,207 MW | 3,295 MW | 1,377 MW |
| 2026-08-25T22:00Z | 21,928 MW | 8,013 MW | 8,475 MW | 1,984 MW | 1,496 MW |
| 2026-08-25T23:00Z | 22,219 MW | 8,023 MW | 8,396 MW | 455 MW | 1,409 MW |
| 2026-08-26T00:00Z | 22,017 MW | 8,017 MW | 8,098 MW | 27 MW | 769 MW |
| 2026-08-26T01:00Z | 20,853 MW | 8,045 MW | 7,869 MW | 2 MW | 392 MW |
| 2026-08-26T02:00Z | 18,810 MW | 8,048 MW | 7,612 MW | -3 MW | 59 MW |
| 2026-08-26T03:00Z | 16,640 MW | 8,058 MW | 6,922 MW | -3 MW | -148 MW |
| 2026-08-26T04:00Z | 15,628 MW | 8,054 MW | 5,920 MW | -2 MW | -190 MW |
| 2026-08-26T05:00Z | 15,092 MW | 8,068 MW | 5,228 MW | -1 MW | -677 MW |
| 2026-08-26T06:00Z | 14,658 MW | 8,071 MW | 4,732 MW | -4 MW | -1,105 MW |
| 2026-08-26T07:00Z | 14,700 MW | 8,061 MW | 4,316 MW | -4 MW | -1,507 MW |
| 2026-08-26T08:00Z | 14,675 MW | 8,072 MW | 4,162 MW | -2 MW | -1,477 MW |
| 2026-08-26T09:00Z | 14,669 MW | 8,069 MW | 4,213 MW | -2 MW | -1,378 MW |
| 2026-08-26T10:00Z | 15,001 MW | 8,070 MW | 4,707 MW | -4 MW | -846 MW |
| 2026-08-26T11:00Z | 15,114 MW | 8,083 MW | 5,426 MW | 141 MW | -490 MW |
| 2026-08-26T12:00Z | 15,033 MW | 8,071 MW | 5,153 MW | 1,064 MW | -144 MW |
| 2026-08-26T13:00Z | 15,395 MW | 8,057 MW | 5,597 MW | 2,163 MW | -289 MW |
| 2026-08-26T14:00Z | 16,311 MW | 8,053 MW | 5,999 MW | 3,054 MW | -164 MW |
| 2026-08-26T15:00Z | 17,638 MW | 8,033 MW | 6,446 MW | 3,827 MW | -144 MW |
| 2026-08-26T16:00Z | 18,971 MW | 8,027 MW | 7,255 MW | 4,457 MW | -144 MW |
| 2026-08-26T17:00Z | 20,424 MW | 8,018 MW | 7,381 MW | 4,744 MW | 62 MW |
| 2026-08-26T18:00Z | 22,118 MW | 8,002 MW | 7,592 MW | 4,560 MW | 681 MW |
| 2026-08-26T19:00Z | 23,174 MW | 7,989 MW | 7,692 MW | 4,175 MW | 882 MW |
| 2026-08-26T20:00Z | 23,310 MW | 7,998 MW | 7,629 MW | 3,840 MW | 985 MW |
| 2026-08-26T21:00Z | 23,139 MW | 7,994 MW | 7,460 MW | 3,629 MW | 1,078 MW |
| 2026-08-26T22:00Z | 22,753 MW | 8,020 MW | 7,423 MW | 2,265 MW | 1,298 MW |
| 2026-08-26T23:00Z | 22,541 MW | 8,010 MW | 7,626 MW | 547 MW | 1,216 MW |
| 2026-08-27T00:00Z | 22,319 MW | 8,014 MW | 7,677 MW | 58 MW | 1,142 MW |
| 2026-08-27T01:00Z | 20,987 MW | 8,023 MW | 7,615 MW | -3 MW | 493 MW |
| 2026-08-27T02:00Z | 19,150 MW | 8,025 MW | 7,244 MW | -3 MW | 239 MW |
| 2026-08-27T03:00Z | 16,961 MW | 8,028 MW | 6,605 MW | -3 MW | -152 MW |
| 2026-08-27T04:00Z | 15,756 MW | 8,036 MW | 5,799 MW | -2 MW | -169 MW |
| 2026-08-27T05:00Z | 15,072 MW | 8,030 MW | 5,178 MW | 209 MW | -923 MW |
| 2026-08-27T06:00Z | 15,026 MW | 8,035 MW | 4,925 MW | 212 MW | -1,488 MW |
| 2026-08-27T07:00Z | 14,784 MW | 8,035 MW | 4,496 MW | 210 MW | -1,505 MW |
| 2026-08-27T08:00Z | 14,725 MW | 8,033 MW | 4,320 MW | 210 MW | -1,499 MW |
| 2026-08-27T09:00Z | 14,782 MW | 8,043 MW | 4,570 MW | 209 MW | -1,434 MW |
| 2026-08-27T10:00Z | 15,110 MW | 8,046 MW | 5,144 MW | 212 MW | -1,029 MW |
| 2026-08-27T11:00Z | 15,167 MW | 8,056 MW | 5,428 MW | 280 MW | -362 MW |
| 2026-08-27T12:00Z | 14,959 MW | 8,046 MW | 4,900 MW | 826 MW | -248 MW |
| 2026-08-27T13:00Z | 14,950 MW | 8,039 MW | 4,560 MW | 1,478 MW | -162 MW |
| 2026-08-27T14:00Z | 15,386 MW | 8,030 MW | 5,071 MW | 1,537 MW | -194 MW |
| 2026-08-27T15:00Z | 16,048 MW | 8,005 MW | 5,932 MW | 1,791 MW | -239 MW |
| 2026-08-27T16:00Z | 17,167 MW | 7,994 MW | 6,377 MW | 2,039 MW | -101 MW |
| 2026-08-27T17:00Z | 18,581 MW | 7,989 MW | 6,881 MW | 1,963 MW | 128 MW |
| 2026-08-27T18:00Z | 19,605 MW | 7,982 MW | 7,565 MW | 1,675 MW | 646 MW |
| 2026-08-27T19:00Z | 20,463 MW | 7,989 MW | 8,098 MW | 1,215 MW | 920 MW |
| 2026-08-27T20:00Z | 21,122 MW | 8,012 MW | 7,954 MW | 809 MW | 1,323 MW |
| 2026-08-27T21:00Z | 21,262 MW | 8,013 MW | 7,895 MW | 475 MW | 1,274 MW |
| 2026-08-27T22:00Z | 21,086 MW | 8,009 MW | 7,874 MW | 297 MW | 1,423 MW |
| 2026-08-27T23:00Z | 20,426 MW | 8,028 MW | 7,742 MW | 111 MW | 1,188 MW |
| 2026-08-28T00:00Z | 19,784 MW | 8,032 MW | 7,762 MW | 2 MW | 819 MW |
| 2026-08-28T01:00Z | 19,134 MW | 8,029 MW | 7,640 MW | -1 MW | 456 MW |
| 2026-08-28T02:00Z | 17,646 MW | 8,040 MW | 7,367 MW | -3 MW | -7 MW |
| 2026-08-28T03:00Z | 16,033 MW | 8,038 MW | 6,597 MW | 1 MW | -365 MW |
| 2026-08-28T04:00Z | 14,976 MW | 8,042 MW | 5,601 MW | -1 MW | -401 MW |
| 2026-08-28T05:00Z | 15,127 MW | 8,032 MW | 4,895 MW | -4 MW | -1,158 MW |
| 2026-08-28T06:00Z | 14,756 MW | 8,024 MW | 4,560 MW | -5 MW | -1,546 MW |
| 2026-08-28T07:00Z | 14,788 MW | 8,035 MW | 4,062 MW | -2 MW | -1,753 MW |
| 2026-08-28T08:00Z | 14,745 MW | 8,036 MW | 4,006 MW | -3 MW | -1,742 MW |
| 2026-08-28T09:00Z | 14,741 MW | 8,037 MW | 4,226 MW | -4 MW | -1,645 MW |
| 2026-08-28T10:00Z | 14,984 MW | 8,033 MW | 4,643 MW | -2 MW | -1,104 MW |
| 2026-08-28T11:00Z | 15,108 MW | 8,044 MW | 5,329 MW | 80 MW | -728 MW |
| 2026-08-28T12:00Z | 15,084 MW | 8,039 MW | 5,356 MW | 598 MW | -282 MW |
| 2026-08-28T13:00Z | 16,108 MW | 8,036 MW | 5,460 MW | 1,429 MW | -410 MW |
| 2026-08-28T14:00Z | 16,738 MW | 8,023 MW | 6,444 MW | 2,160 MW | -428 MW |
| 2026-08-28T15:00Z | 17,877 MW | 8,014 MW | 7,488 MW | 2,481 MW | -293 MW |
| 2026-08-28T16:00Z | 20,005 MW | 8,006 MW | 7,539 MW | 2,522 MW | -134 MW |
| 2026-08-28T17:00Z | 21,221 MW | 8,005 MW | 7,270 MW | 3,062 MW | 127 MW |
| 2026-08-28T18:00Z | 21,453 MW | 7,999 MW | 7,233 MW | 3,678 MW | 572 MW |
| 2026-08-28T19:00Z | 21,760 MW | 8,001 MW | 7,347 MW | 3,225 MW | 692 MW |
| 2026-08-28T20:00Z | 21,947 MW | 7,995 MW | 7,340 MW | 2,362 MW | 1,060 MW |
| 2026-08-28T21:00Z | 22,072 MW | 7,992 MW | 7,283 MW | 1,801 MW | 1,146 MW |
| 2026-08-28T22:00Z | 22,110 MW | 8,004 MW | 7,192 MW | 1,122 MW | 1,277 MW |
| 2026-08-28T23:00Z | 21,800 MW | 8,015 MW | 6,838 MW | 284 MW | 1,162 MW |
| 2026-08-29T00:00Z | 21,144 MW | 8,031 MW | 6,238 MW | 7 MW | 871 MW |
| 2026-08-29T01:00Z | 19,631 MW | 8,024 MW | 6,480 MW | 4 MW | 288 MW |
| 2026-08-29T02:00Z | 18,145 MW | 8,025 MW | 6,065 MW | -4 MW | 124 MW |
| 2026-08-29T03:00Z | 16,768 MW | 8,031 MW | 5,570 MW | -2 MW | -294 MW |
| 2026-08-29T04:00Z | 15,746 MW | 8,025 MW | 5,038 MW | -3 MW | -678 MW |
| 2026-08-29T05:00Z | 14,825 MW | 8,032 MW | 4,393 MW | -4 MW | -791 MW |
| 2026-08-29T06:00Z | 14,604 MW | 8,034 MW | 3,631 MW | -2 MW | -1,178 MW |
| 2026-08-29T07:00Z | 14,146 MW | 8,034 MW | 3,434 MW | -2 MW | -1,199 MW |
| 2026-08-29T08:00Z | 13,612 MW | 8,035 MW | 3,426 MW | -5 MW | -1,200 MW |
| 2026-08-29T09:00Z | 13,465 MW | 8,039 MW | 3,431 MW | -4 MW | -1,160 MW |
| 2026-08-29T10:00Z | 13,641 MW | 8,032 MW | 3,428 MW | -2 MW | -990 MW |
| 2026-08-29T11:00Z | 13,692 MW | 8,045 MW | 3,531 MW | 71 MW | -495 MW |
| 2026-08-29T12:00Z | 13,731 MW | 8,027 MW | 3,899 MW | 748 MW | -494 MW |
| 2026-08-29T13:00Z | 14,489 MW | 8,018 MW | 3,933 MW | 1,952 MW | -450 MW |
| 2026-08-29T14:00Z | 14,983 MW | 8,014 MW | 4,670 MW | 2,801 MW | -6 MW |
| 2026-08-29T15:00Z | 16,037 MW | 7,992 MW | 5,647 MW | 3,113 MW | -2 MW |
| 2026-08-29T16:00Z | 17,357 MW | 7,980 MW | 6,212 MW | 3,582 MW | -1 MW |
| 2026-08-29T17:00Z | 18,025 MW | 7,966 MW | 6,747 MW | 3,894 MW | 11 MW |
| 2026-08-29T18:00Z | 19,043 MW | 7,969 MW | 7,290 MW | 4,058 MW | 290 MW |
| 2026-08-29T19:00Z | 19,727 MW | 7,991 MW | 7,491 MW | 3,795 MW | 433 MW |
| 2026-08-29T20:00Z | 20,571 MW | 7,977 MW | 7,629 MW | 3,087 MW | 760 MW |
| 2026-08-29T21:00Z | 21,338 MW | 7,973 MW | 7,893 MW | 2,352 MW | 804 MW |
| 2026-08-29T22:00Z | 21,381 MW | 7,968 MW | 7,793 MW | 1,545 MW | 767 MW |
| 2026-08-29T23:00Z | 20,943 MW | 7,973 MW | 7,686 MW | 409 MW | 599 MW |
| 2026-08-30T00:00Z | 20,441 MW | 7,969 MW | 7,491 MW | 1 MW | 342 MW |
| 2026-08-30T01:00Z | 19,500 MW | 7,982 MW | 7,355 MW | -4 MW | 61 MW |
| 2026-08-30T02:00Z | 18,517 MW | 7,987 MW | 6,971 MW | -4 MW | -4 MW |
| 2026-08-30T03:00Z | 16,757 MW | 7,995 MW | 5,825 MW | -3 MW | -2 MW |
| 2026-08-30T04:00Z | 15,268 MW | 7,991 MW | 5,270 MW | -3 MW | 2 MW |
| 2026-08-30T05:00Z | 14,266 MW | 8,006 MW | 4,765 MW | -6 MW | -552 MW |
| 2026-08-30T06:00Z | 13,309 MW | 8,014 MW | 4,847 MW | -2 MW | -933 MW |
| 2026-08-30T07:00Z | 12,506 MW | 8,018 MW | 4,798 MW | -3 MW | -928 MW |
| 2026-08-30T08:00Z | 12,303 MW | 8,023 MW | 4,525 MW | -7 MW | -937 MW |
| 2026-08-30T09:00Z | 12,553 MW | 8,014 MW | 4,350 MW | -5 MW | -1,245 MW |
| 2026-08-30T10:00Z | 12,647 MW | 8,023 MW | 4,256 MW | -1 MW | -1,136 MW |
| 2026-08-30T11:00Z | 12,669 MW | 8,020 MW | 4,181 MW | 139 MW | -785 MW |
| 2026-08-30T12:00Z | 12,711 MW | 8,011 MW | 4,407 MW | 1,086 MW | -391 MW |
| 2026-08-30T13:00Z | 13,492 MW | 7,997 MW | 4,924 MW | 2,429 MW | -1 MW |
| 2026-08-30T14:00Z | 14,893 MW | 7,980 MW | 5,214 MW | 3,457 MW | 11 MW |
| 2026-08-30T15:00Z | 16,058 MW | 7,968 MW | 5,783 MW | 4,280 MW | -4 MW |
| 2026-08-30T16:00Z | 17,107 MW | 7,961 MW | 6,659 MW | 4,431 MW | -2 MW |
| 2026-08-30T17:00Z | 18,299 MW | 7,958 MW | 7,543 MW | 4,399 MW | 129 MW |
| 2026-08-30T18:00Z | 19,459 MW | 7,958 MW | 7,447 MW | 4,720 MW | 263 MW |
| 2026-08-30T19:00Z | 20,367 MW | 7,957 MW | 7,666 MW | 4,374 MW | 347 MW |
| 2026-08-30T20:00Z | 21,626 MW | 7,955 MW | 7,886 MW | 3,854 MW | 732 MW |
| 2026-08-30T21:00Z | 22,485 MW | 7,954 MW | 7,892 MW | 3,325 MW | 837 MW |
| 2026-08-30T22:00Z | 23,010 MW | 7,949 MW | 7,962 MW | 2,166 MW | 941 MW |
| 2026-08-30T23:00Z | 22,994 MW | 7,955 MW | 7,983 MW | 480 MW | 927 MW |
| 2026-08-31T00:00Z | 22,534 MW | 7,963 MW | 7,909 MW | 5 MW | 481 MW |
| 2026-08-31T01:00Z | 21,542 MW | 7,972 MW | 7,511 MW | -4 MW | 61 MW |
| 2026-08-31T02:00Z | 19,261 MW | 7,978 MW | 7,444 MW | -2 MW | -278 MW |
| 2026-08-31T03:00Z | 17,267 MW | 7,977 MW | 6,362 MW | -2 MW | -280 MW |
| 2026-08-31T04:00Z | 16,014 MW | 7,975 MW | 5,715 MW | -1 MW | -700 MW |
| 2026-08-31T05:00Z | 15,084 MW | 7,986 MW | 5,525 MW | -4 MW | -953 MW |
| 2026-08-31T06:00Z | 14,553 MW | 7,995 MW | 5,130 MW | 0 MW | -982 MW |
| 2026-08-31T07:00Z | 14,125 MW | 7,998 MW | 4,830 MW | -2 MW | -987 MW |
| 2026-08-31T08:00Z | 14,231 MW | 7,996 MW | 4,769 MW | -2 MW | -1,305 MW |
| 2026-08-31T09:00Z | 14,565 MW | 8,000 MW | 4,864 MW | -3 MW | -1,259 MW |
| 2026-08-31T10:00Z | 15,289 MW | 7,996 MW | 5,051 MW | 0 MW | -789 MW |
| 2026-08-31T11:00Z | 16,421 MW | 8,005 MW | 5,406 MW | 245 MW | -538 MW |
| 2026-08-31T12:00Z | 16,303 MW | 8,001 MW | 5,029 MW | 1,984 MW | -448 MW |
| 2026-08-31T13:00Z | 16,039 MW | 7,976 MW | 5,121 MW | 3,991 MW | -9 MW |
| 2026-08-31T14:00Z | 17,141 MW | 7,961 MW | 6,169 MW | 4,610 MW | -4 MW |
| 2026-08-31T15:00Z | 18,743 MW | 7,955 MW | 6,944 MW | 4,911 MW | -4 MW |
| 2026-08-31T16:00Z | 20,818 MW | 7,945 MW | 7,517 MW | 4,888 MW | 0 MW |
| 2026-08-31T17:00Z | 21,912 MW | 7,938 MW | 8,045 MW | 4,971 MW | 178 MW |
| 2026-08-31T18:00Z | 22,706 MW | 7,945 MW | 8,101 MW | 4,962 MW | 253 MW |
| 2026-08-31T19:00Z | 23,285 MW | 7,938 MW | 8,286 MW | 4,922 MW | 534 MW |
| 2026-08-31T20:00Z | 23,805 MW | 7,938 MW | 8,328 MW | 4,972 MW | 758 MW |
| 2026-08-31T21:00Z | 24,154 MW | 7,927 MW | 8,525 MW | 4,475 MW | 869 MW |
| 2026-08-31T22:00Z | 24,798 MW | 7,924 MW | 8,599 MW | 2,985 MW | 976 MW |
| 2026-08-31T23:00Z | 25,177 MW | 7,929 MW | 8,601 MW | 786 MW | 907 MW |
| 2026-09-01T00:00Z | 24,692 MW | 7,925 MW | 8,512 MW | 56 MW | 644 MW |
| 2026-09-01T01:00Z | 23,116 MW | 7,929 MW | 8,420 MW | -2 MW | 485 MW |
| 2026-09-01T02:00Z | 20,926 MW | 7,903 MW | 8,187 MW | -4 MW | 139 MW |
| 2026-09-01T03:00Z | 17,325 MW | 7,824 MW | 8,300 MW | 0 MW | -2 MW |
| 2026-09-01T04:00Z | 15,953 MW | 7,765 MW | 7,363 MW | -2 MW | -3 MW |
| 2026-09-01T05:00Z | 15,196 MW | 7,694 MW | 6,072 MW | 1 MW | -412 MW |
| 2026-09-01T06:00Z | 14,962 MW | 7,593 MW | 5,524 MW | -1 MW | -1,128 MW |
| 2026-09-01T07:00Z | 14,318 MW | 7,472 MW | 5,706 MW | 1 MW | -1,369 MW |
| 2026-09-01T08:00Z | 14,169 MW | 7,354 MW | 5,709 MW | 0 MW | -1,364 MW |
| 2026-09-01T09:00Z | 14,655 MW | 7,218 MW | 5,622 MW | 1 MW | -1,296 MW |
| 2026-09-01T10:00Z | 14,795 MW | 7,148 MW | 6,463 MW | -1 MW | -929 MW |
| 2026-09-01T11:00Z | 14,936 MW | 7,146 MW | 7,122 MW | 111 MW | -556 MW |
| 2026-09-01T12:00Z | 15,015 MW | 7,151 MW | 5,899 MW | 1,141 MW | -513 MW |
| 2026-09-01T13:00Z | 15,215 MW | 7,123 MW | 5,732 MW | 2,153 MW | -490 MW |
| 2026-09-01T14:00Z | 15,577 MW | 7,116 MW | 7,352 MW | 2,499 MW | -29 MW |
| 2026-09-01T15:00Z | 17,839 MW | 7,107 MW | 8,166 MW | 2,490 MW | -127 MW |
| 2026-09-01T16:00Z | 18,833 MW | 7,095 MW | 8,449 MW | 2,341 MW | -1 MW |
| 2026-09-01T17:00Z | 22,595 MW | 7,086 MW | 8,477 MW | 2,320 MW | 124 MW |
| 2026-09-01T18:00Z | 23,249 MW | 7,087 MW | 8,508 MW | 2,382 MW | 331 MW |
| 2026-09-01T19:00Z | 23,950 MW | 7,086 MW | 8,531 MW | 2,448 MW | 666 MW |
| 2026-09-01T20:00Z | 24,240 MW | 7,095 MW | 8,498 MW | 2,448 MW | 1,056 MW |
| 2026-09-01T21:00Z | 24,262 MW | 7,093 MW | 8,539 MW | 2,208 MW | 1,213 MW |
| 2026-09-01T22:00Z | 24,477 MW | 7,085 MW | 8,528 MW | 1,509 MW | 1,468 MW |
| 2026-09-01T23:00Z | 24,248 MW | 7,086 MW | 8,533 MW | 335 MW | 1,332 MW |
| 2026-09-02T00:00Z | 24,480 MW | 7,150 MW | 8,353 MW | -1 MW | 1,217 MW |
| 2026-09-02T01:00Z | 23,194 MW | 7,229 MW | 8,290 MW | 0 MW | 388 MW |
| 2026-09-02T02:00Z | 21,232 MW | 7,241 MW | 8,440 MW | 25 MW | -47 MW |
| 2026-09-02T03:00Z | 18,009 MW | 7,259 MW | 7,705 MW | 0 MW | -142 MW |
| 2026-09-02T04:00Z | 15,632 MW | 7,263 MW | 7,744 MW | 0 MW | -176 MW |
| 2026-09-02T05:00Z | 14,599 MW | 7,303 MW | 8,028 MW | -2 MW | -847 MW |
| 2026-09-02T06:00Z | 13,475 MW | 7,446 MW | 7,830 MW | -2 MW | -1,319 MW |
| 2026-09-02T07:00Z | 13,389 MW | 7,604 MW | 7,154 MW | -1 MW | -1,644 MW |
| 2026-09-02T08:00Z | 13,392 MW | 7,752 MW | 6,828 MW | -2 MW | -1,635 MW |
| 2026-09-02T09:00Z | 13,395 MW | 7,901 MW | 7,242 MW | -3 MW | -1,567 MW |
| 2026-09-02T10:00Z | 13,471 MW | 7,951 MW | 7,865 MW | -3 MW | -1,314 MW |
| 2026-09-02T11:00Z | 13,889 MW | 7,959 MW | 8,182 MW | 180 MW | -640 MW |
| 2026-09-02T12:00Z | 13,861 MW | 7,962 MW | 7,484 MW | 1,871 MW | -371 MW |
| 2026-09-02T13:00Z | 13,943 MW | 7,930 MW | 7,578 MW | 4,016 MW | -277 MW |
| 2026-09-02T14:00Z | 15,710 MW | 7,919 MW | 8,271 MW | 4,810 MW | -272 MW |
| 2026-09-02T15:00Z | 18,508 MW | 7,904 MW | 8,227 MW | 5,021 MW | 9 MW |
| 2026-09-02T16:00Z | 21,547 MW | 7,888 MW | 8,429 MW | 5,064 MW | 4 MW |
| 2026-09-02T17:00Z | 23,668 MW | 7,893 MW | 8,452 MW | 4,966 MW | 35 MW |
| 2026-09-02T18:00Z | 24,639 MW | 7,883 MW | 8,263 MW | 4,732 MW | 570 MW |
| 2026-09-02T19:00Z | 24,812 MW | 7,875 MW | 8,425 MW | 4,616 MW | 939 MW |
| 2026-09-02T20:00Z | 24,941 MW | 7,868 MW | 8,513 MW | 4,706 MW | 1,077 MW |
| 2026-09-02T21:00Z | 25,382 MW | 7,879 MW | 8,535 MW | 4,331 MW | 1,261 MW |
| 2026-09-02T22:00Z | 25,721 MW | 7,880 MW | 8,453 MW | 2,817 MW | 1,586 MW |
| 2026-09-02T23:00Z | 26,009 MW | 7,882 MW | 8,467 MW | 674 MW | 1,631 MW |
| 2026-09-03T00:00Z | 25,742 MW | 7,885 MW | 8,342 MW | 101 MW | 1,252 MW |
| 2026-09-03T01:00Z | 24,590 MW | 7,889 MW | 8,428 MW | 3 MW | 465 MW |
| 2026-09-03T02:00Z | 22,440 MW | 7,895 MW | 8,396 MW | -2 MW | 1 MW |
| 2026-09-03T03:00Z | 18,423 MW | 7,901 MW | 8,359 MW | -1 MW | -284 MW |
| 2026-09-03T04:00Z | 16,109 MW | 7,909 MW | 8,210 MW | -3 MW | -290 MW |
| 2026-09-03T05:00Z | 15,579 MW | 7,912 MW | 6,793 MW | -2 MW | -596 MW |
| 2026-09-03T06:00Z | 15,458 MW | 7,927 MW | 6,068 MW | -2 MW | -1,228 MW |
| 2026-09-03T07:00Z | 15,147 MW | 7,941 MW | 5,787 MW | -1 MW | -1,641 MW |
| 2026-09-03T08:00Z | 14,939 MW | 7,949 MW | 5,616 MW | -1 MW | -1,643 MW |
| 2026-09-03T09:00Z | 14,976 MW | 7,947 MW | 5,583 MW | -4 MW | -1,449 MW |
| 2026-09-03T10:00Z | 15,237 MW | 7,946 MW | 5,817 MW | 0 MW | -1,010 MW |
| 2026-09-03T11:00Z | 15,800 MW | 7,949 MW | 6,151 MW | 219 MW | -644 MW |
| 2026-09-03T12:00Z | 15,798 MW | 7,950 MW | 6,046 MW | 1,863 MW | -655 MW |
| 2026-09-03T13:00Z | 16,186 MW | 7,920 MW | 6,512 MW | 3,844 MW | -658 MW |
| 2026-09-03T14:00Z | 17,040 MW | 7,919 MW | 7,820 MW | 4,662 MW | -323 MW |
| 2026-09-03T15:00Z | 19,485 MW | 7,909 MW | 8,452 MW | 5,033 MW | -55 MW |
| 2026-09-03T16:00Z | 22,420 MW | 7,893 MW | 8,633 MW | 5,061 MW | -68 MW |
| 2026-09-03T17:00Z | 24,022 MW | 7,882 MW | 8,531 MW | 4,900 MW | 250 MW |
| 2026-09-03T18:00Z | 24,799 MW | 7,876 MW | 8,284 MW | 4,766 MW | 984 MW |
| 2026-09-03T19:00Z | 25,018 MW | 7,870 MW | 8,374 MW | 4,760 MW | 1,204 MW |
| 2026-09-03T20:00Z | 25,083 MW | 7,864 MW | 8,429 MW | 4,502 MW | 1,272 MW |
| 2026-09-03T21:00Z | 25,453 MW | 7,873 MW | 8,355 MW | 3,682 MW | 1,383 MW |
| 2026-09-03T22:00Z | 25,545 MW | 7,873 MW | 8,217 MW | 2,050 MW | 1,542 MW |
| 2026-09-03T23:00Z | 25,282 MW | 7,880 MW | 8,269 MW | 375 MW | 1,419 MW |
| 2026-09-04T00:00Z | 24,811 MW | 7,879 MW | 8,330 MW | 2 MW | 1,238 MW |
| 2026-09-04T01:00Z | 23,225 MW | 7,882 MW | 8,453 MW | -1 MW | 630 MW |
| 2026-09-04T02:00Z | 21,378 MW | 7,896 MW | 8,471 MW | -3 MW | 200 MW |
| 2026-09-04T03:00Z | 18,303 MW | 7,903 MW | 8,321 MW | 0 MW | -146 MW |
| 2026-09-04T04:00Z | 16,363 MW | 7,907 MW | 8,345 MW | -1 MW | -397 MW |
| 2026-09-04T05:00Z | 15,941 MW | 7,905 MW | 7,462 MW | -2 MW | -999 MW |
| 2026-09-04T06:00Z | 15,609 MW | 7,915 MW | 6,569 MW | -1 MW | -1,484 MW |
| 2026-09-04T07:00Z | 15,263 MW | 7,915 MW | 6,313 MW | -3 MW | -1,809 MW |
| 2026-09-04T08:00Z | 15,157 MW | 7,919 MW | 6,081 MW | -4 MW | -1,890 MW |
| 2026-09-04T09:00Z | 15,103 MW | 7,930 MW | 6,136 MW | -2 MW | -1,739 MW |
| 2026-09-04T10:00Z | 15,323 MW | 7,917 MW | 6,474 MW | -1 MW | -1,184 MW |
| 2026-09-04T11:00Z | 15,661 MW | 7,933 MW | 6,702 MW | 114 MW | -708 MW |
| 2026-09-04T12:00Z | 15,885 MW | 7,923 MW | 6,605 MW | 1,179 MW | -659 MW |
| 2026-09-04T13:00Z | 16,120 MW | 7,922 MW | 7,334 MW | 2,416 MW | -559 MW |
| 2026-09-04T14:00Z | 16,863 MW | 7,903 MW | 7,964 MW | 3,615 MW | -384 MW |
| 2026-09-04T15:00Z | 18,590 MW | 7,899 MW | 8,409 MW | 4,170 MW | -434 MW |
| 2026-09-04T16:00Z | 21,354 MW | 7,894 MW | 8,401 MW | 4,160 MW | -292 MW |
| 2026-09-04T17:00Z | 22,868 MW | 7,890 MW | 8,424 MW | 4,078 MW | 228 MW |
| 2026-09-04T18:00Z | 23,317 MW | 7,884 MW | 8,424 MW | 4,340 MW | 522 MW |
| 2026-09-04T19:00Z | 23,819 MW | 7,873 MW | 8,453 MW | 3,909 MW | 946 MW |
| 2026-09-04T20:00Z | 24,173 MW | 7,862 MW | 8,533 MW | 3,108 MW | 1,455 MW |
| 2026-09-04T21:00Z | 24,158 MW | 7,870 MW | 8,486 MW | 2,390 MW | 1,806 MW |
| 2026-09-04T22:00Z | 24,759 MW | 7,864 MW | 8,612 MW | 1,294 MW | 1,515 MW |
| 2026-09-04T23:00Z | 24,226 MW | 7,886 MW | 8,498 MW | 224 MW | 1,195 MW |
| 2026-09-05T00:00Z | 23,291 MW | 7,878 MW | 8,474 MW | -1 MW | 1,008 MW |
| 2026-09-05T01:00Z | 21,953 MW | 7,888 MW | 8,254 MW | 0 MW | 393 MW |
| 2026-09-05T02:00Z | 19,678 MW | 7,905 MW | 8,270 MW | -2 MW | 905 MW |
| 2026-09-05T03:00Z | 17,131 MW | 7,916 MW | 7,872 MW | -3 MW | 259 MW |
| 2026-09-05T04:00Z | 15,475 MW | 7,916 MW | 8,120 MW | -1 MW | -173 MW |
| 2026-09-05T05:00Z | 14,687 MW | 7,920 MW | 7,448 MW | -1 MW | -724 MW |
| 2026-09-05T06:00Z | 13,784 MW | 7,918 MW | 7,378 MW | 1 MW | -997 MW |
| 2026-09-05T07:00Z | 13,490 MW | 7,927 MW | 6,773 MW | -1 MW | -1,706 MW |
| 2026-09-05T08:00Z | 13,496 MW | 7,932 MW | 6,364 MW | 1 MW | -2,051 MW |
| 2026-09-05T09:00Z | 13,492 MW | 7,923 MW | 6,009 MW | 0 MW | -2,046 MW |
| 2026-09-05T10:00Z | 13,460 MW | 7,925 MW | 6,051 MW | 1 MW | -1,973 MW |
| 2026-09-05T11:00Z | 13,412 MW | 7,925 MW | 5,837 MW | 17 MW | -1,272 MW |
| 2026-09-05T12:00Z | 13,529 MW | 7,926 MW | 6,422 MW | 252 MW | -1,247 MW |
| 2026-09-05T13:00Z | 13,566 MW | 7,919 MW | 7,095 MW | 827 MW | -351 MW |
| 2026-09-05T14:00Z | 14,757 MW | 7,922 MW | 7,472 MW | 1,214 MW | -54 MW |
| 2026-09-05T15:00Z | 17,296 MW | 7,907 MW | 7,455 MW | 1,596 MW | 33 MW |
| 2026-09-05T16:00Z | 19,431 MW | 7,893 MW | 7,655 MW | 1,928 MW | -46 MW |
| 2026-09-05T17:00Z | 21,459 MW | 7,886 MW | 7,600 MW | 2,093 MW | 90 MW |
| 2026-09-05T18:00Z | 22,171 MW | 7,873 MW | 7,614 MW | 2,065 MW | 508 MW |
| 2026-09-05T19:00Z | 22,949 MW | 7,875 MW | 7,595 MW | 1,813 MW | 767 MW |
| 2026-09-05T20:00Z | 23,033 MW | 7,870 MW | 7,666 MW | 1,617 MW | 1,210 MW |
| 2026-09-05T21:00Z | 23,059 MW | 7,869 MW | 7,459 MW | 1,563 MW | 1,271 MW |
| 2026-09-05T22:00Z | 22,962 MW | 7,862 MW | 7,421 MW | 837 MW | 1,287 MW |
| 2026-09-05T23:00Z | 21,816 MW | 7,874 MW | 7,538 MW | 210 MW | 1,176 MW |
| 2026-09-06T00:00Z | 20,616 MW | 7,904 MW | 7,609 MW | 1 MW | 1,160 MW |
| 2026-09-06T01:00Z | 19,136 MW | 7,906 MW | 7,108 MW | -3 MW | 979 MW |
| 2026-09-06T02:00Z | 17,691 MW | 7,900 MW | 7,175 MW | 0 MW | 898 MW |
| 2026-09-06T03:00Z | 16,317 MW | 7,906 MW | 6,553 MW | 39 MW | 265 MW |
| 2026-09-06T04:00Z | 15,377 MW | 7,904 MW | 6,085 MW | 8 MW | -279 MW |
| 2026-09-06T05:00Z | 14,708 MW | 7,902 MW | 5,435 MW | -4 MW | -763 MW |
| 2026-09-06T06:00Z | 14,041 MW | 7,896 MW | 5,116 MW | -1 MW | -934 MW |
| 2026-09-06T07:00Z | 13,856 MW | 7,905 MW | 5,105 MW | -3 MW | -1,670 MW |
| 2026-09-06T08:00Z | 13,808 MW | 7,913 MW | 5,177 MW | -3 MW | -2,048 MW |
| 2026-09-06T09:00Z | 13,709 MW | 7,914 MW | 5,125 MW | -4 MW | -2,044 MW |
| 2026-09-06T10:00Z | 13,424 MW | 7,908 MW | 5,144 MW | -1 MW | -1,852 MW |
| 2026-09-06T11:00Z | 13,029 MW | 7,922 MW | 5,253 MW | 169 MW | -998 MW |
| 2026-09-06T12:00Z | 12,589 MW | 7,909 MW | 5,272 MW | 1,967 MW | -1,036 MW |
| 2026-09-06T13:00Z | 12,610 MW | 7,910 MW | 4,906 MW | 4,036 MW | -398 MW |
| 2026-09-06T14:00Z | 14,332 MW | 7,888 MW | 5,360 MW | 4,704 MW | 82 MW |
| 2026-09-06T15:00Z | 16,068 MW | 7,882 MW | 6,099 MW | 4,967 MW | -16 MW |
| 2026-09-06T16:00Z | 18,102 MW | 7,860 MW | 6,864 MW | 5,186 MW | -8 MW |
| 2026-09-06T17:00Z | 20,087 MW | 7,856 MW | 7,558 MW | 5,097 MW | 277 MW |
| 2026-09-06T18:00Z | 22,271 MW | 7,852 MW | 7,510 MW | 4,820 MW | 274 MW |
| 2026-09-06T19:00Z | 23,112 MW | 7,844 MW | 7,372 MW | 4,281 MW | 317 MW |
| 2026-09-06T20:00Z | 23,081 MW | 7,887 MW | 7,410 MW | 3,534 MW | 865 MW |
| 2026-09-06T21:00Z | 22,585 MW | 7,878 MW | 7,686 MW | 2,660 MW | 1,393 MW |
| 2026-09-06T22:00Z | 22,597 MW | 7,886 MW | 7,665 MW | 1,228 MW | 1,649 MW |
| 2026-09-06T23:00Z | 22,136 MW | 7,898 MW | 7,657 MW | 189 MW | 1,310 MW |
| 2026-09-07T00:00Z | 21,424 MW | 7,919 MW | 7,373 MW | -2 MW | 1,040 MW |
| 2026-09-07T01:00Z | 20,021 MW | 7,944 MW | 7,146 MW | -3 MW | 963 MW |
| 2026-09-07T02:00Z | 17,988 MW | 7,936 MW | 6,896 MW | -3 MW | 691 MW |
| 2026-09-07T03:00Z | 16,155 MW | 7,941 MW | 6,934 MW | 14 MW | -267 MW |
| 2026-09-07T04:00Z | 14,830 MW | 7,945 MW | 5,959 MW | 2 MW | -382 MW |
| 2026-09-07T05:00Z | 14,024 MW | 7,889 MW | 5,316 MW | 0 MW | -682 MW |
| 2026-09-07T06:00Z | 13,608 MW | 7,877 MW | 5,149 MW | 1 MW | -1,440 MW |
| 2026-09-07T07:00Z | 13,084 MW | 7,920 MW | 5,105 MW | 0 MW | -1,801 MW |
| 2026-09-07T08:00Z | 12,968 MW | 7,931 MW | 5,114 MW | -1 MW | -1,794 MW |
| 2026-09-07T09:00Z | 12,880 MW | 7,943 MW | 5,106 MW | 1 MW | -1,744 MW |
| 2026-09-07T10:00Z | 12,793 MW | 7,945 MW | 5,111 MW | 0 MW | -1,689 MW |
| 2026-09-07T11:00Z | 12,498 MW | 7,946 MW | 5,135 MW | 56 MW | -1,248 MW |
| 2026-09-07T12:00Z | 12,017 MW | 7,938 MW | 4,935 MW | 731 MW | -972 MW |
| 2026-09-07T13:00Z | 11,925 MW | 7,924 MW | 4,759 MW | 1,522 MW | -320 MW |
| 2026-09-07T14:00Z | 12,577 MW | 7,910 MW | 5,268 MW | 1,906 MW | -217 MW |
| 2026-09-07T15:00Z | 14,384 MW | 7,894 MW | 5,521 MW | 2,175 MW | -279 MW |
| 2026-09-07T16:00Z | 15,588 MW | 7,881 MW | 6,195 MW | 2,346 MW | -283 MW |
| 2026-09-07T17:00Z | 16,231 MW | 7,880 MW | 7,159 MW | 2,329 MW | -267 MW |
| 2026-09-07T18:00Z | 17,598 MW | 7,859 MW | 7,143 MW | 2,266 MW | -18 MW |
| 2026-09-07T19:00Z | 18,495 MW | 7,861 MW | 7,304 MW | 2,164 MW | -18 MW |
| 2026-09-07T20:00Z | 18,878 MW | 7,859 MW | 7,418 MW | 1,967 MW | 301 MW |
| 2026-09-07T21:00Z | 18,924 MW | 7,863 MW | 7,594 MW | 1,758 MW | 780 MW |
| 2026-09-07T22:00Z | 19,083 MW | 7,871 MW | 7,896 MW | 894 MW | 1,030 MW |
| 2026-09-07T23:00Z | 18,954 MW | 7,874 MW | 8,120 MW | 188 MW | 1,304 MW |
| 2026-09-08T00:00Z | 18,760 MW | 7,883 MW | 8,195 MW | 127 MW | 1,231 MW |
| 2026-09-08T01:00Z | 18,182 MW | 7,892 MW | 7,830 MW | -1 MW | 544 MW |
| 2026-09-08T02:00Z | 16,507 MW | 7,883 MW | 7,330 MW | -1 MW | 137 MW |
| 2026-09-08T03:00Z | 14,990 MW | 7,894 MW | 6,628 MW | -1 MW | -9 MW |
| 2026-09-08T04:00Z | 13,896 MW | 7,933 MW | 5,417 MW | -2 MW | -37 MW |
| 2026-09-08T05:00Z | 13,436 MW | 7,896 MW | 5,117 MW | -1 MW | -789 MW |
| 2026-09-08T06:00Z | 13,168 MW | 7,905 MW | 5,132 MW | 0 MW | -1,567 MW |
| 2026-09-08T07:00Z | 12,745 MW | 7,916 MW | 5,098 MW | -1 MW | -1,677 MW |
| 2026-09-08T08:00Z | 12,684 MW | 7,915 MW | 5,151 MW | 1 MW | -1,646 MW |
| 2026-09-08T09:00Z | 12,575 MW | 7,914 MW | 5,466 MW | -1 MW | -1,196 MW |
| 2026-09-08T10:00Z | 13,174 MW | 7,923 MW | 5,533 MW | 1 MW | -771 MW |
| 2026-09-08T11:00Z | 13,414 MW | 7,926 MW | 5,831 MW | 95 MW | -319 MW |
| 2026-09-08T12:00Z | 12,365 MW | 7,883 MW | 5,638 MW | 1,088 MW | 25 MW |
| 2026-09-08T13:00Z | 12,326 MW | 7,772 MW | 5,688 MW | 2,133 MW | -195 MW |
| 2026-09-08T14:00Z | 13,804 MW | 7,787 MW | 6,117 MW | 2,396 MW | -163 MW |
| 2026-09-08T15:00Z | 15,010 MW | 7,858 MW | 6,780 MW | 2,607 MW | -15 MW |
| 2026-09-08T16:00Z | 16,486 MW | 7,870 MW | 7,340 MW | 2,647 MW | 279 MW |
| 2026-09-08T17:00Z | 17,624 MW | 7,868 MW | 8,078 MW | 2,513 MW | 618 MW |
| 2026-09-08T18:00Z | 19,310 MW | 7,864 MW | 8,263 MW | 2,639 MW | 297 MW |
| 2026-09-08T19:00Z | 20,047 MW | 7,860 MW | 8,390 MW | 2,616 MW | 705 MW |
| 2026-09-08T20:00Z | 20,250 MW | 7,855 MW | 8,335 MW | 2,220 MW | 987 MW |
| 2026-09-08T21:00Z | 20,236 MW | 7,866 MW | 8,398 MW | 2,131 MW | 1,059 MW |
| 2026-09-08T22:00Z | 20,698 MW | 7,859 MW | 8,453 MW | 1,296 MW | 1,548 MW |
| 2026-09-08T23:00Z | 21,035 MW | 7,871 MW | 8,477 MW | 218 MW | 1,759 MW |
| 2026-09-09T00:00Z | 20,958 MW | 7,874 MW | 8,327 MW | 58 MW | 903 MW |
| 2026-09-09T01:00Z | 19,539 MW | 7,882 MW | 8,206 MW | 0 MW | 457 MW |
| 2026-09-09T02:00Z | 17,658 MW | 7,880 MW | 8,110 MW | 1 MW | 179 MW |
| 2026-09-09T03:00Z | 15,289 MW | 7,881 MW | 7,624 MW | -3 MW | -304 MW |
| 2026-09-09T04:00Z | 13,968 MW | 7,867 MW | 6,657 MW | -1 MW | -287 MW |
| 2026-09-09T05:00Z | 13,300 MW | 7,892 MW | 6,131 MW | 0 MW | -1,014 MW |
| 2026-09-09T06:00Z | 13,169 MW | 7,885 MW | 5,803 MW | 1 MW | -1,649 MW |
| 2026-09-09T07:00Z | 12,874 MW | 7,894 MW | 5,646 MW | -2 MW | -2,103 MW |
| 2026-09-09T08:00Z | 12,762 MW | 7,890 MW | 5,506 MW | -1 MW | -2,055 MW |
| 2026-09-09T09:00Z | 12,590 MW | 7,901 MW | 5,500 MW | 1 MW | -1,659 MW |
| 2026-09-09T10:00Z | 13,152 MW | 7,900 MW | 5,611 MW | 0 MW | -913 MW |
| 2026-09-09T11:00Z | 13,822 MW | 7,905 MW | 5,777 MW | 62 MW | -704 MW |
| 2026-09-09T12:00Z | 13,464 MW | 7,897 MW | 5,571 MW | 765 MW | -542 MW |
| 2026-09-09T13:00Z | 13,636 MW | 7,888 MW | 5,843 MW | 1,579 MW | -309 MW |
| 2026-09-09T14:00Z | 14,417 MW | 7,879 MW | 6,400 MW | 1,862 MW | 36 MW |
| 2026-09-09T15:00Z | 15,367 MW | 7,871 MW | 7,226 MW | 2,008 MW | 101 MW |
| 2026-09-09T16:00Z | 16,892 MW | 7,855 MW | 8,019 MW | 2,152 MW | -28 MW |
| 2026-09-09T17:00Z | 18,378 MW | 7,852 MW | 8,374 MW | 2,161 MW | 292 MW |
| 2026-09-09T18:00Z | 19,707 MW | 7,850 MW | 8,361 MW | 2,242 MW | 478 MW |
| 2026-09-09T19:00Z | 21,064 MW | 7,839 MW | 8,297 MW | 2,228 MW | 689 MW |
| 2026-09-09T20:00Z | 21,579 MW | 7,837 MW | 8,211 MW | 2,036 MW | 1,204 MW |
| 2026-09-09T21:00Z | 21,803 MW | 7,835 MW | 8,314 MW | 1,908 MW | 1,414 MW |
| 2026-09-09T22:00Z | 22,297 MW | 7,828 MW | 8,396 MW | 1,083 MW | 1,896 MW |
| 2026-09-09T23:00Z | 22,596 MW | 7,835 MW | 8,317 MW | 189 MW | 1,778 MW |
| 2026-09-10T00:00Z | 21,446 MW | 7,838 MW | 8,273 MW | -1 MW | 1,340 MW |
| 2026-09-10T01:00Z | 19,855 MW | 7,835 MW | 8,242 MW | 1 MW | 817 MW |
| 2026-09-10T02:00Z | 18,883 MW | 7,841 MW | 8,131 MW | 2 MW | 214 MW |
| 2026-09-10T03:00Z | 16,272 MW | 7,847 MW | 7,658 MW | -2 MW | -306 MW |
| 2026-09-10T04:00Z | 15,357 MW | 7,845 MW | 6,701 MW | -1 MW | -285 MW |
| 2026-09-10T05:00Z | 14,835 MW | 7,845 MW | 5,777 MW | 0 MW | -1,138 MW |
| 2026-09-10T06:00Z | 13,896 MW | 7,850 MW | 5,545 MW | -1 MW | -1,285 MW |
| 2026-09-10T07:00Z | 13,707 MW | 7,855 MW | 5,608 MW | -3 MW | -1,970 MW |
| 2026-09-10T08:00Z | 13,279 MW | 7,852 MW | 5,597 MW | 1 MW | -2,040 MW |
| 2026-09-10T09:00Z | 13,653 MW | 7,855 MW | 5,714 MW | 1 MW | -1,933 MW |
| 2026-09-10T10:00Z | 14,397 MW | 7,862 MW | 6,012 MW | 0 MW | -1,634 MW |
| 2026-09-10T11:00Z | 15,067 MW | 7,861 MW | 6,347 MW | 14 MW | -1,260 MW |
| 2026-09-10T12:00Z | 15,205 MW | 7,859 MW | 6,086 MW | 339 MW | -866 MW |
| 2026-09-10T13:00Z | 15,490 MW | 7,845 MW | 6,271 MW | 791 MW | -625 MW |
| 2026-09-10T14:00Z | 16,102 MW | 7,841 MW | 7,521 MW | 1,379 MW | -481 MW |
| 2026-09-10T15:00Z | 16,934 MW | 7,824 MW | 8,036 MW | 1,800 MW | -59 MW |
| 2026-09-10T16:00Z | 18,528 MW | 7,824 MW | 8,133 MW | 1,977 MW | 172 MW |
| 2026-09-10T17:00Z | 18,622 MW | 7,813 MW | 8,332 MW | 1,953 MW | 146 MW |
| 2026-09-10T18:00Z | 21,025 MW | 7,819 MW | 8,394 MW | 1,934 MW | 405 MW |
| 2026-09-10T19:00Z | 22,114 MW | 7,816 MW | 8,404 MW | 1,681 MW | 991 MW |
| 2026-09-10T20:00Z | 23,061 MW | 7,808 MW | 8,398 MW | 1,316 MW | 1,507 MW |
| 2026-09-10T21:00Z | 23,533 MW | 7,811 MW | 8,250 MW | 1,260 MW | 1,828 MW |
| 2026-09-10T22:00Z | 23,215 MW | 7,809 MW | 8,342 MW | 544 MW | 2,035 MW |
| 2026-09-10T23:00Z | 23,256 MW | 7,810 MW | 8,369 MW | 77 MW | 1,666 MW |
| 2026-09-11T00:00Z | 22,510 MW | 7,788 MW | 8,274 MW | 11 MW | 1,654 MW |
| 2026-09-11T01:00Z | 21,153 MW | 7,788 MW | 8,262 MW | 1 MW | 617 MW |
| 2026-09-11T02:00Z | 19,533 MW | 7,798 MW | 8,256 MW | -1 MW | 8 MW |
| 2026-09-11T03:00Z | 16,776 MW | 7,796 MW | 8,077 MW | -1 MW | -531 MW |
| 2026-09-11T04:00Z | 15,629 MW | 7,804 MW | 6,711 MW | 0 MW | -494 MW |
| 2026-09-11T05:00Z | 15,174 MW | 7,833 MW | 6,292 MW | -1 MW | -1,237 MW |
| 2026-09-11T06:00Z | 14,965 MW | 7,841 MW | 6,063 MW | -3 MW | -1,723 MW |
| 2026-09-11T07:00Z | 14,827 MW | 7,841 MW | 5,799 MW | 1 MW | -1,936 MW |
| 2026-09-11T08:00Z | 14,846 MW | 7,853 MW | 5,758 MW | 0 MW | -2,002 MW |
| 2026-09-11T09:00Z | 14,851 MW | 7,848 MW | 5,889 MW | 0 MW | -1,704 MW |
| 2026-09-11T10:00Z | 15,182 MW | 7,850 MW | 6,653 MW | -1 MW | -1,632 MW |
| 2026-09-11T11:00Z | 15,420 MW | 7,851 MW | 7,093 MW | 22 MW | -1,228 MW |
| 2026-09-11T12:00Z | 15,243 MW | 7,843 MW | 6,553 MW | 390 MW | -620 MW |
| 2026-09-11T13:00Z | 15,285 MW | 7,845 MW | 6,169 MW | 1,215 MW | -565 MW |
| 2026-09-11T14:00Z | 16,121 MW | 7,831 MW | 6,635 MW | 1,505 MW | -305 MW |
| 2026-09-11T15:00Z | 17,333 MW | 7,822 MW | 7,755 MW | 1,460 MW | 185 MW |
| 2026-09-11T16:00Z | 19,985 MW | 7,811 MW | 7,951 MW | 1,468 MW | 42 MW |
| 2026-09-11T17:00Z | 21,291 MW | 7,814 MW | 8,190 MW | 1,408 MW | 262 MW |
| 2026-09-11T18:00Z | 21,025 MW | 7,806 MW | 8,260 MW | 1,300 MW | 1,023 MW |
| 2026-09-11T19:00Z | 21,316 MW | 7,802 MW | 8,160 MW | 1,115 MW | 1,345 MW |
| 2026-09-11T20:00Z | 20,387 MW | 7,801 MW | 8,059 MW | 923 MW | 1,206 MW |
| 2026-09-11T21:00Z | 19,220 MW | 7,813 MW | 7,532 MW | 936 MW | 1,371 MW |
| 2026-09-11T22:00Z | 18,507 MW | 7,824 MW | 7,390 MW | 597 MW | 1,404 MW |
| 2026-09-11T23:00Z | 17,893 MW | 7,844 MW | 7,831 MW | 85 MW | 1,239 MW |
| 2026-09-12T00:00Z | 17,667 MW | 7,846 MW | 7,631 MW | 0 MW | 828 MW |
| 2026-09-12T01:00Z | 17,158 MW | 7,846 MW | 7,789 MW | 7 MW | 80 MW |
| 2026-09-12T02:00Z | 16,130 MW | 7,843 MW | 7,614 MW | -1 MW | -17 MW |
| 2026-09-12T03:00Z | 14,705 MW | 7,845 MW | 6,773 MW | -1 MW | -324 MW |
| 2026-09-12T04:00Z | 13,512 MW | 7,846 MW | 6,127 MW | 0 MW | -440 MW |
| 2026-09-12T05:00Z | 13,512 MW | 7,846 MW | 6,127 MW | 0 MW | -440 MW |
| 2026-09-12T06:00Z | 14,965 MW | 7,841 MW | 6,063 MW | -3 MW | -1,723 MW |
| 2026-09-12T07:00Z | 14,827 MW | 7,841 MW | 5,799 MW | 1 MW | -1,936 MW |
| 2026-09-12T08:00Z | 14,846 MW | 7,853 MW | 5,758 MW | 0 MW | -2,002 MW |
| 2026-09-12T09:00Z | 14,851 MW | 7,848 MW | 5,889 MW | 0 MW | -1,704 MW |
| 2026-09-12T10:00Z | 15,182 MW | 7,850 MW | 6,653 MW | -1 MW | -1,632 MW |
| 2026-09-12T11:00Z | 15,420 MW | 7,851 MW | 7,093 MW | 22 MW | -1,228 MW |
| 2026-09-12T12:00Z | 15,243 MW | 7,843 MW | 6,553 MW | 390 MW | -620 MW |
| 2026-09-12T13:00Z | 15,285 MW | 7,845 MW | 6,169 MW | 1,215 MW | -565 MW |
| 2026-09-12T14:00Z | 16,121 MW | 7,831 MW | 6,635 MW | 1,505 MW | -305 MW |
| 2026-09-12T15:00Z | 17,333 MW | 7,822 MW | 7,755 MW | 1,460 MW | 185 MW |
| 2026-09-12T16:00Z | 19,985 MW | 7,811 MW | 7,951 MW | 1,468 MW | 42 MW |
| 2026-09-12T17:00Z | 21,291 MW | 7,814 MW | 8,190 MW | 1,408 MW | 262 MW |
| 2026-09-12T18:00Z | n/a | 7,806 MW | 8,260 MW | 1,300 MW | 1,023 MW |
| 2026-09-12T19:00Z | 21,316 MW | 7,802 MW | 8,160 MW | 1,115 MW | 1,345 MW |
| 2026-09-12T20:00Z | 20,387 MW | 7,801 MW | 8,059 MW | 923 MW | 1,206 MW |
| 2026-09-12T21:00Z | 19,220 MW | 7,813 MW | 7,532 MW | 936 MW | 1,371 MW |
| 2026-09-12T22:00Z | 18,507 MW | 7,824 MW | 7,390 MW | 597 MW | 1,404 MW |
| 2026-09-12T23:00Z | 17,893 MW | 7,844 MW | 7,831 MW | 85 MW | 1,239 MW |
| 2026-09-13T00:00Z | 17,667 MW | 7,846 MW | 7,631 MW | 0 MW | 828 MW |
| 2026-09-13T01:00Z | 17,158 MW | 7,846 MW | 7,789 MW | 7 MW | 80 MW |
| 2026-09-13T02:00Z | 16,130 MW | 7,843 MW | 7,614 MW | -1 MW | -17 MW |
| 2026-09-13T03:00Z | 14,705 MW | 7,845 MW | 6,773 MW | -1 MW | -324 MW |
| 2026-09-13T04:00Z | 13,512 MW | 7,846 MW | 6,127 MW | 0 MW | -440 MW |
| 2026-09-13T05:00Z | 14,025 MW | 6,590 MW | 6,536 MW | -1 MW | -595 MW |
| 2026-09-13T06:00Z | 13,829 MW | 6,637 MW | 6,005 MW | 1 MW | -1,099 MW |
| 2026-09-13T07:00Z | 13,731 MW | 6,659 MW | 5,795 MW | 0 MW | -1,497 MW |
| 2026-09-13T08:00Z | 13,444 MW | 6,667 MW | 5,640 MW | 1 MW | -1,695 MW |
| 2026-09-13T09:00Z | 13,293 MW | 6,683 MW | 5,554 MW | 0 MW | -1,646 MW |
| 2026-09-13T10:00Z | 12,907 MW | 6,685 MW | 5,554 MW | 0 MW | -1,174 MW |
| 2026-09-13T11:00Z | 12,483 MW | 6,708 MW | 5,773 MW | 50 MW | -784 MW |
| 2026-09-13T12:00Z | 12,156 MW | 6,722 MW | 5,568 MW | 836 MW | -525 MW |
| 2026-09-13T13:00Z | 12,213 MW | 6,723 MW | 5,589 MW | 1,773 MW | -425 MW |
| 2026-09-13T14:00Z | 13,526 MW | 6,720 MW | 5,755 MW | 2,286 MW | 55 MW |
| 2026-09-13T15:00Z | 15,550 MW | 6,711 MW | 6,552 MW | 2,306 MW | 169 MW |
| 2026-09-13T16:00Z | 18,002 MW | 6,715 MW | 7,860 MW | 2,335 MW | 106 MW |
| 2026-09-13T17:00Z | 19,458 MW | 6,717 MW | 8,270 MW | 2,295 MW | 188 MW |
| 2026-09-13T18:00Z | 20,395 MW | 6,712 MW | 8,065 MW | 2,455 MW | 375 MW |
| 2026-09-13T19:00Z | 21,146 MW | 6,718 MW | 8,129 MW | 2,146 MW | 749 MW |
| 2026-09-13T20:00Z | 21,766 MW | 6,725 MW | 8,368 MW | 2,195 MW | 738 MW |
| 2026-09-13T21:00Z | 22,251 MW | 6,734 MW | 8,281 MW | 1,909 MW | 1,169 MW |
| 2026-09-13T22:00Z | 22,954 MW | 6,790 MW | 8,479 MW | 1,174 MW | 1,077 MW |
| 2026-09-13T23:00Z | 22,745 MW | 6,692 MW | 8,226 MW | 133 MW | 710 MW |
| 2026-09-14T00:00Z | 22,189 MW | 6,805 MW | 8,208 MW | -1 MW | 487 MW |
| 2026-09-14T01:00Z | 21,013 MW | 6,768 MW | 7,613 MW | -1 MW | 200 MW |
| 2026-09-14T02:00Z | 18,781 MW | 6,714 MW | 7,534 MW | -3 MW | -201 MW |
| 2026-09-14T03:00Z | 16,546 MW | 6,825 MW | 7,173 MW | -1 MW | -279 MW |
| 2026-09-14T04:00Z | 15,817 MW | 6,730 MW | 6,140 MW | -1 MW | -370 MW |
| 2026-09-14T05:00Z | 14,644 MW | 6,781 MW | 5,649 MW | 0 MW | -1,074 MW |
| 2026-09-14T06:00Z | 13,879 MW | 6,796 MW | 5,649 MW | -1 MW | -1,639 MW |
| 2026-09-14T07:00Z | 13,349 MW | 6,792 MW | 5,515 MW | -1 MW | -1,635 MW |
| 2026-09-14T08:00Z | 13,133 MW | 6,812 MW | 5,557 MW | 0 MW | -1,625 MW |
| 2026-09-14T09:00Z | 13,402 MW | 6,811 MW | 5,550 MW | 0 MW | -1,249 MW |
| 2026-09-14T10:00Z | 14,081 MW | 6,808 MW | 5,664 MW | -1 MW | -772 MW |
| 2026-09-14T11:00Z | 14,621 MW | 6,823 MW | 5,754 MW | 75 MW | -364 MW |
| 2026-09-14T12:00Z | 13,284 MW | 6,831 MW | 5,780 MW | 1,025 MW | -75 MW |
| 2026-09-14T13:00Z | 13,248 MW | 6,829 MW | 5,591 MW | 2,081 MW | -15 MW |
| 2026-09-14T14:00Z | 15,396 MW | 6,825 MW | 6,124 MW | 2,386 MW | -73 MW |
| 2026-09-14T15:00Z | 17,257 MW | 6,817 MW | 6,919 MW | 2,669 MW | -168 MW |
| 2026-09-14T16:00Z | 19,333 MW | 6,826 MW | 7,226 MW | 2,665 MW | -140 MW |
| 2026-09-14T17:00Z | 20,840 MW | 6,843 MW | 8,162 MW | 2,530 MW | 27 MW |
| 2026-09-14T18:00Z | 22,268 MW | 6,845 MW | 8,255 MW | 2,503 MW | 314 MW |
| 2026-09-14T19:00Z | 23,092 MW | 6,852 MW | 8,418 MW | 2,405 MW | 703 MW |
| 2026-09-14T20:00Z | 23,639 MW | 6,855 MW | 8,289 MW | 2,400 MW | 981 MW |
| 2026-09-14T21:00Z | 23,467 MW | 6,857 MW | 8,388 MW | 1,917 MW | 1,564 MW |
| 2026-09-14T22:00Z | 23,785 MW | 6,862 MW | 8,359 MW | 1,175 MW | 1,883 MW |
| 2026-09-14T23:00Z | 24,029 MW | 6,871 MW | 8,288 MW | 193 MW | 2,031 MW |
| 2026-09-15T00:00Z | 23,285 MW | 6,871 MW | 8,205 MW | 22 MW | 1,548 MW |
| 2026-09-15T01:00Z | 21,431 MW | 6,876 MW | 8,139 MW | 67 MW | 1,011 MW |
| 2026-09-15T02:00Z | 19,739 MW | 6,891 MW | 8,168 MW | 69 MW | 165 MW |
| 2026-09-15T03:00Z | 17,318 MW | 6,892 MW | 8,067 MW | 1 MW | -354 MW |
| 2026-09-15T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T16:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T16:00Z.
Day by Day
Daily totals, Central time dates, through 2026-09-13| Date (Central time) | Demand |
|---|---|
| 2025-08-10 | 681 GWh |
| 2025-08-11 | 743 GWh |
| 2025-08-12 | 775 GWh |
| 2025-08-13 | 777 GWh |
| 2025-08-14 | 802 GWh |
| 2025-08-15 | 782 GWh |
| 2025-08-16 | 759 GWh |
| 2025-08-17 | 765 GWh |
| 2025-08-18 | 818 GWh |
| 2025-08-19 | 805 GWh |
| 2025-08-20 | 807 GWh |
| 2025-08-21 | 775 GWh |
| 2025-08-22 | 733 GWh |
| 2025-08-23 | 679 GWh |
| 2025-08-24 | 700 GWh |
| 2025-08-25 | 726 GWh |
| 2025-08-26 | 671 GWh |
| 2025-08-27 | 658 GWh |
| 2025-08-28 | 658 GWh |
| 2025-08-29 | 655 GWh |
| 2025-08-30 | 638 GWh |
| 2025-08-31 | 632 GWh |
| 2025-09-01 | 624 GWh |
| 2025-09-02 | 619 GWh |
| 2025-09-03 | 650 GWh |
| 2025-09-04 | 727 GWh |
| 2025-09-05 | 756 GWh |
| 2025-09-06 | 660 GWh |
| 2025-09-07 | 632 GWh |
| 2025-09-08 | 628 GWh |
| 2025-09-09 | 633 GWh |
| 2025-09-10 | 659 GWh |
| 2025-09-11 | 648 GWh |
| 2025-09-12 | 656 GWh |
| 2025-09-13 | 613 GWh |
| 2025-09-14 | 602 GWh |
| 2025-09-15 | 682 GWh |
| 2025-09-16 | 691 GWh |
| 2025-09-17 | 688 GWh |
| 2025-09-18 | 690 GWh |
| 2025-09-19 | 681 GWh |
| 2025-09-20 | 688 GWh |
| 2025-09-21 | 677 GWh |
| 2025-09-22 | 713 GWh |
| 2025-09-23 | 718 GWh |
| 2025-09-24 | 716 GWh |
| 2025-09-25 | 718 GWh |
| 2025-09-26 | 679 GWh |
| 2025-09-27 | 649 GWh |
| 2025-09-28 | 649 GWh |
| 2025-09-29 | 663 GWh |
| 2025-09-30 | 653 GWh |
| 2025-10-01 | 654 GWh |
| 2025-10-02 | 614 GWh |
| 2025-10-03 | 588 GWh |
| 2025-10-04 | 559 GWh |
| 2025-10-05 | 568 GWh |
| 2025-10-06 | 633 GWh |
| 2025-10-07 | 664 GWh |
| 2025-10-08 | 684 GWh |
| 2025-10-09 | 608 GWh |
| 2025-10-10 | 551 GWh |
| 2025-10-11 | 507 GWh |
| 2025-10-12 | 523 GWh |
| 2025-10-13 | 577 GWh |
| 2025-10-14 | 595 GWh |
| 2025-10-15 | 606 GWh |
| 2025-10-16 | 607 GWh |
| 2025-10-17 | 596 GWh |
| 2025-10-18 | 571 GWh |
| 2025-10-19 | 543 GWh |
| 2025-10-20 | 544 GWh |
| 2025-10-21 | 562 GWh |
| 2025-10-22 | 555 GWh |
| 2025-10-23 | 516 GWh |
| 2025-10-24 | 518 GWh |
| 2025-10-25 | 490 GWh |
| 2025-10-26 | 495 GWh |
| 2025-10-27 | 555 GWh |
| 2025-10-28 | 574 GWh |
| 2025-10-29 | 576 GWh |
| 2025-10-30 | 594 GWh |
| 2025-10-31 | 583 GWh |
| 2025-11-01 | 530 GWh |
| 2025-11-02 | 543 GWh |
| 2025-11-03 | 570 GWh |
| 2025-11-04 | 568 GWh |
| 2025-11-05 | 559 GWh |
| 2025-11-06 | 567 GWh |
| 2025-11-07 | 555 GWh |
| 2025-11-08 | 534 GWh |
| 2025-11-09 | 524 GWh |
| 2025-11-10 | 687 GWh |
| 2025-11-11 | 745 GWh |
| 2025-11-12 | 658 GWh |
| 2025-11-13 | 591 GWh |
| 2025-11-14 | 577 GWh |
| 2025-11-15 | 544 GWh |
| 2025-11-16 | 520 GWh |
| 2025-11-17 | 570 GWh |
| 2025-11-18 | 594 GWh |
| 2025-11-19 | 572 GWh |
| 2025-11-20 | 571 GWh |
| 2025-11-21 | 559 GWh |
| 2025-11-22 | 546 GWh |
| 2025-11-23 | 521 GWh |
| 2025-11-24 | 559 GWh |
| 2025-11-25 | 564 GWh |
| 2025-11-26 | 557 GWh |
| 2025-11-27 | 571 GWh |
| 2025-11-28 | 638 GWh |
| 2025-11-29 | 641 GWh |
| 2025-11-30 | 596 GWh |
| 2025-12-01 | 636 GWh |
| 2025-12-02 | 662 GWh |
| 2025-12-03 | 704 GWh |
| 2025-12-04 | 720 GWh |
| 2025-12-05 | 663 GWh |
| 2025-12-06 | 634 GWh |
| 2025-12-07 | 654 GWh |
| 2025-12-08 | 680 GWh |
| 2025-12-09 | 729 GWh |
| 2025-12-10 | 724 GWh |
| 2025-12-11 | 679 GWh |
| 2025-12-12 | 696 GWh |
| 2025-12-13 | 600 GWh |
| 2025-12-14 | 665 GWh |
| 2025-12-15 | 868 GWh |
| 2025-12-16 | 811 GWh |
| 2025-12-17 | 706 GWh |
| 2025-12-18 | 620 GWh |
| 2025-12-19 | 630 GWh |
| 2025-12-20 | 666 GWh |
| 2025-12-21 | 592 GWh |
| 2025-12-22 | 598 GWh |
| 2025-12-23 | 571 GWh |
| 2025-12-24 | 522 GWh |
| 2025-12-25 | 486 GWh |
| 2025-12-26 | 503 GWh |
| 2025-12-27 | 505 GWh |
| 2025-12-28 | 504 GWh |
| 2025-12-29 | 593 GWh |
| 2025-12-30 | 779 GWh |
| 2025-12-31 | 746 GWh |
| 2026-01-01 | 639 GWh |
| 2026-01-02 | 609 GWh |
| 2026-01-03 | 553 GWh |
| 2026-01-04 | 571 GWh |
| 2026-01-05 | 621 GWh |
| 2026-01-06 | 600 GWh |
| 2026-01-07 | 571 GWh |
| 2026-01-08 | 579 GWh |
| 2026-01-09 | 565 GWh |
| 2026-01-10 | 536 GWh |
| 2026-01-11 | 578 GWh |
| 2026-01-12 | 761 GWh |
| 2026-01-13 | 745 GWh |
| 2026-01-14 | 692 GWh |
| 2026-01-15 | 789 GWh |
| 2026-01-16 | 788 GWh |
| 2026-01-17 | 633 GWh |
| 2026-01-18 | 740 GWh |
| 2026-01-19 | 789 GWh |
| 2026-01-20 | 813 GWh |
| 2026-01-21 | 775 GWh |
| 2026-01-22 | 667 GWh |
| 2026-01-23 | 648 GWh |
| 2026-01-24 | 667 GWh |
| 2026-01-25 | 717 GWh |
| 2026-01-26 | 866 GWh |
| 2026-01-27 | 914 GWh |
| 2026-01-28 | 821 GWh |
| 2026-01-29 | 781 GWh |
| 2026-01-30 | 760 GWh |
| 2026-01-31 | 924 GWh |
| 2026-02-01 | 939 GWh |
| 2026-02-02 | 827 GWh |
| 2026-02-03 | 743 GWh |
| 2026-02-04 | 677 GWh |
| 2026-02-05 | 796 GWh |
| 2026-02-06 | 738 GWh |
| 2026-02-07 | 661 GWh |
| 2026-02-08 | 683 GWh |
| 2026-02-09 | 640 GWh |
| 2026-02-10 | 609 GWh |
| 2026-02-11 | 585 GWh |
| 2026-02-12 | 628 GWh |
| 2026-02-13 | 638 GWh |
| 2026-02-14 | 605 GWh |
| 2026-02-15 | 557 GWh |
| 2026-02-16 | 582 GWh |
| 2026-02-17 | 603 GWh |
| 2026-02-18 | 581 GWh |
| 2026-02-19 | 574 GWh |
| 2026-02-20 | 573 GWh |
| 2026-02-21 | 541 GWh |
| 2026-02-22 | 594 GWh |
| 2026-02-23 | 793 GWh |
| 2026-02-24 | 783 GWh |
| 2026-02-25 | 660 GWh |
| 2026-02-26 | 583 GWh |
| 2026-02-27 | 562 GWh |
| 2026-02-28 | 541 GWh |
| 2026-03-01 | 541 GWh |
| 2026-03-02 | 567 GWh |
| 2026-03-03 | 577 GWh |
| 2026-03-04 | 578 GWh |
| 2026-03-05 | 579 GWh |
| 2026-03-06 | 584 GWh |
| 2026-03-07 | 562 GWh |
| 2026-03-08 | 509 GWh |
| 2026-03-09 | 584 GWh |
| 2026-03-10 | 610 GWh |
| 2026-03-11 | 625 GWh |
| 2026-03-12 | 561 GWh |
| 2026-03-13 | 587 GWh |
| 2026-03-14 | 539 GWh |
| 2026-03-15 | 531 GWh |
| 2026-03-16 | 612 GWh |
| 2026-03-17 | 726 GWh |
| 2026-03-18 | 694 GWh |
| 2026-03-19 | 635 GWh |
| 2026-03-20 | 584 GWh |
| 2026-03-21 | 553 GWh |
| 2026-03-22 | 569 GWh |
| 2026-03-23 | 602 GWh |
| 2026-03-24 | 561 GWh |
| 2026-03-25 | 567 GWh |
| 2026-03-26 | 592 GWh |
| 2026-03-27 | 604 GWh |
| 2026-03-28 | 522 GWh |
| 2026-03-29 | 524 GWh |
| 2026-03-30 | 571 GWh |
| 2026-03-31 | 604 GWh |
| 2026-04-01 | 616 GWh |
| 2026-04-02 | 619 GWh |
| 2026-04-03 | 605 GWh |
| 2026-04-04 | 596 GWh |
| 2026-04-05 | 533 GWh |
| 2026-04-06 | 541 GWh |
| 2026-04-07 | 565 GWh |
| 2026-04-08 | 555 GWh |
| 2026-04-09 | 563 GWh |
| 2026-04-10 | 568 GWh |
| 2026-04-11 | 557 GWh |
| 2026-04-12 | 565 GWh |
| 2026-04-13 | 608 GWh |
| 2026-04-14 | 621 GWh |
| 2026-04-15 | 639 GWh |
| 2026-04-16 | 646 GWh |
| 2026-04-17 | 660 GWh |
| 2026-04-18 | 617 GWh |
| 2026-04-19 | 522 GWh |
| 2026-04-20 | 568 GWh |
| 2026-04-21 | 581 GWh |
| 2026-04-22 | 597 GWh |
| 2026-04-23 | 614 GWh |
| 2026-04-24 | 617 GWh |
| 2026-04-25 | 574 GWh |
| 2026-04-26 | 596 GWh |
| 2026-04-27 | 617 GWh |
| 2026-04-28 | 593 GWh |
| 2026-04-29 | 643 GWh |
| 2026-04-30 | 605 GWh |
| 2026-05-01 | 549 GWh |
| 2026-05-02 | 515 GWh |
| 2026-05-03 | 519 GWh |
| 2026-05-04 | 577 GWh |
| 2026-05-05 | 600 GWh |
| 2026-05-06 | 634 GWh |
| 2026-05-07 | 606 GWh |
| 2026-05-08 | 559 GWh |
| 2026-05-09 | 529 GWh |
| 2026-05-10 | 581 GWh |
| 2026-05-11 | 632 GWh |
| 2026-05-12 | 588 GWh |
| 2026-05-13 | 612 GWh |
| 2026-05-14 | 603 GWh |
| 2026-05-15 | 583 GWh |
| 2026-05-16 | 603 GWh |
| 2026-05-17 | 662 GWh |
| 2026-05-18 | 719 GWh |
| 2026-05-19 | 738 GWh |
| 2026-05-20 | 741 GWh |
| 2026-05-21 | 727 GWh |
| 2026-05-22 | 688 GWh |
| 2026-05-23 | 636 GWh |
| 2026-05-24 | 618 GWh |
| 2026-05-25 | 623 GWh |
| 2026-05-26 | 686 GWh |
| 2026-05-27 | 713 GWh |
| 2026-05-28 | 733 GWh |
| 2026-05-29 | 704 GWh |
| 2026-05-30 | 692 GWh |
| 2026-05-31 | 636 GWh |
| 2026-06-01 | 692 GWh |
| 2026-06-02 | 685 GWh |
| 2026-06-03 | 636 GWh |
| 2026-06-04 | 645 GWh |
| 2026-06-05 | 669 GWh |
| 2026-06-06 | 666 GWh |
| 2026-06-07 | 665 GWh |
| 2026-06-08 | 716 GWh |
| 2026-06-09 | 750 GWh |
| 2026-06-10 | 793 GWh |
| 2026-06-11 | 831 GWh |
| 2026-06-12 | 833 GWh |
| 2026-06-13 | 810 GWh |
| 2026-06-14 | 774 GWh |
| 2026-06-15 | 738 GWh |
| 2026-06-16 | 658 GWh |
| 2026-06-17 | 732 GWh |
| 2026-06-18 | 740 GWh |
| 2026-06-19 | 734 GWh |
| 2026-06-20 | 677 GWh |
| 2026-06-21 | 695 GWh |
| 2026-06-22 | 781 GWh |
| 2026-06-23 | 725 GWh |
| 2026-06-24 | 723 GWh |
| 2026-06-25 | 730 GWh |
| 2026-06-26 | 780 GWh |
| 2026-06-27 | 775 GWh |
| 2026-06-28 | 809 GWh |
| 2026-06-29 | 863 GWh |
| 2026-06-30 | 879 GWh |
| 2026-07-01 | 870 GWh |
| 2026-07-02 | 870 GWh |
| 2026-07-03 | 811 GWh |
| 2026-07-04 | 789 GWh |
| 2026-07-05 | 780 GWh |
| 2026-07-06 | 806 GWh |
| 2026-07-07 | 836 GWh |
| 2026-07-08 | 855 GWh |
| 2026-07-09 | 837 GWh |
| 2026-07-10 | 820 GWh |
| 2026-07-11 | 754 GWh |
| 2026-07-12 | 766 GWh |
| 2026-07-13 | 747 GWh |
| 2026-07-14 | 741 GWh |
| 2026-07-15 | 778 GWh |
| 2026-07-16 | 812 GWh |
| 2026-07-17 | 824 GWh |
| 2026-07-18 | 805 GWh |
| 2026-07-19 | 780 GWh |
| 2026-07-20 | 843 GWh |
| 2026-07-21 | 843 GWh |
| 2026-07-22 | 837 GWh |
| 2026-07-23 | 841 GWh |
| 2026-07-24 | 786 GWh |
| 2026-07-25 | 771 GWh |
| 2026-07-26 | 797 GWh |
| 2026-07-27 | 855 GWh |
| 2026-07-28 | 847 GWh |
| 2026-07-29 | 864 GWh |
| 2026-07-30 | 832 GWh |
| 2026-07-31 | 805 GWh |
| 2026-08-01 | 778 GWh |
| 2026-08-02 | 769 GWh |
| 2026-08-03 | 768 GWh |
| 2026-08-04 | 780 GWh |
| 2026-08-05 | 789 GWh |
| 2026-08-06 | 788 GWh |
| 2026-08-07 | 787 GWh |
| 2026-08-08 | 784 GWh |
| 2026-08-09 | 779 GWh |
| 2026-08-10 | 794 GWh |
| 2026-08-11 | 844 GWh |
| 2026-08-12 | 845 GWh |
| 2026-08-13 | 877 GWh |
| 2026-08-14 | 861 GWh |
| 2026-08-15 | 817 GWh |
| 2026-08-16 | 815 GWh |
| 2026-08-17 | 905 GWh |
| 2026-08-18 | 880 GWh |
| 2026-08-19 | 865 GWh |
| 2026-08-20 | 879 GWh |
| 2026-08-21 | 842 GWh |
| 2026-08-22 | 799 GWh |
| 2026-08-23 | 798 GWh |
| 2026-08-24 | 807 GWh |
| 2026-08-25 | 803 GWh |
| 2026-08-26 | 802 GWh |
| 2026-08-27 | 758 GWh |
| 2026-08-28 | 782 GWh |
| 2026-08-29 | 754 GWh |
| 2026-08-30 | 769 GWh |
| 2026-08-31 | 832 GWh |
| 2026-09-01 | 854 GWh |
| 2026-09-02 | 872 GWh |
| 2026-09-03 | 878 GWh |
| 2026-09-04 | 853 GWh |
| 2026-09-05 | 810 GWh |
| 2026-09-06 | 753 GWh |
| 2026-09-07 | 711 GWh |
| 2026-09-08 | 750 GWh |
| 2026-09-09 | 758 GWh |
| 2026-09-10 | 777 GWh |
| 2026-09-11 | 746 GWh |
| 2026-09-12 | 722 GWh |
| 2026-09-13 | 757 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 178 TWh | 184 TWh | Gas 49.9% | 256 |
| 2025 | 239 TWh | 249 TWh | Gas 49.8% | 365 |
| 2024 | 239 TWh | 250 TWh | Gas 50.6% | 366 |
| 2023 | 229 TWh | 240 TWh | Gas 54.1% | 365 |
| 2022 | 241 TWh | 245 TWh | Gas 53.4% | 365 |
| 2021 | 233 TWh | 239 TWh | Gas 50.5% | 365 |
| 2020 | 227 TWh | 232 TWh | Gas 54.2% | 366 |
| 2019 | 238 TWh | 245 TWh | Gas 51.1% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 991 GWh | 2025-01-21 (21 January 2025) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 47,656 MW | 17 Aug 2026, 15:00 CDT (UTC-05:00) |
| Highest solar share of a day's generation, 2019 onward | 10.9% | 2026-05-03 (3 May 2026) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Power Flows With Neighbours
Net totals, 2026-08-15 (15 August 2026) to 2026-09-13 (13 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| SCEG | SOCO exports | 775 GWh |
| TVA | SOCO imports | 504 GWh |
| SC | SOCO exports | 432 GWh |
| FPL | SOCO exports | 345 GWh |
| DUK | SOCO imports | 311 GWh |
| MISO | SOCO exports | 208 GWh |
| SEPA | SOCO imports | 190 GWh |
| TAL | SOCO exports | 65.4 GWh |
| FPC | SOCO imports | 39.0 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.