PJM Electricity Demand and Generation Mix
PJM demand was 90,540 MW in the hour starting 5 Nov 2026, 08:00 EST (UTC-05:00). Gas was the largest source in the hour starting 4 Nov 2026, 22:00 EST (UTC-05:00), at 40% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- PJM is a regional transmission organization and balancing authority in the United States, part of the EIA Mid-Atlantic region.
- In the hour starting 5 Nov 2026, 08:00 EST (UTC-05:00), demand in PJM was 90,540 MW, against a day-ahead forecast of 89,567 MW.
- Gas supplied 40.1% of PJM's generation in the hour starting 4 Nov 2026, 22:00 EST (UTC-05:00).
- Demand in PJM totalled 843 TWh in 2025.
- Gas supplied 42.0% of PJM's generation in 2025.
- The highest daily demand in PJM from 2019 onward was 3.34 TWh, on 2026-07-02 (2 July 2026).
- The highest hourly demand in PJM since 2026-06-16 (16 June 2026) was 162.6 GW, in the hour starting 2 Jul 2026, 17:00 EDT (UTC-04:00).
- Solar's highest share of PJM's daily generation from 2019 onward was 7.3%, on 2026-05-31 (31 May 2026).
- Wind's highest share of PJM's daily generation from 2019 onward was 10.6%, on 2024-04-12 (12 April 2024).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 5 Nov 2026, 08:00 EST (UTC-05:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T13:00:00Z.
Generation by Source
Latest hour with generation by source: 4 Nov 2026, 22:00 EST (UTC-05:00)| Source | Output | Share |
|---|---|---|
| Gas | 35,350 MW | 40.1% |
| Nuclear | 29,254 MW | 33.2% |
| Coal | 13,533 MW | 15.4% |
| Wind | 5,993 MW | 6.8% |
| Other | 3,110 MW | 3.5% |
| Hydro | 424 MW | 0.5% |
| Oil | 373 MW | 0.4% |
| Solar | 90 MW | 0.1% |
| Total from these sources | 88,127 MW | |
| Net interchange | 809 MW | net exports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when PJM exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T03:00:00Z.
Last 30 Days, Hourly
Times in UTCShow the data table (720 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-06T15:00Z | 84,771 MW |
| 2026-10-06T16:00Z | 84,938 MW |
| 2026-10-06T17:00Z | 85,570 MW |
| 2026-10-06T18:00Z | 86,108 MW |
| 2026-10-06T19:00Z | 87,062 MW |
| 2026-10-06T20:00Z | 88,232 MW |
| 2026-10-06T21:00Z | 90,673 MW |
| 2026-10-06T22:00Z | 92,178 MW |
| 2026-10-06T23:00Z | 93,166 MW |
| 2026-10-07T00:00Z | 91,858 MW |
| 2026-10-07T01:00Z | 88,710 MW |
| 2026-10-07T02:00Z | 84,576 MW |
| 2026-10-07T03:00Z | 81,015 MW |
| 2026-10-07T04:00Z | 78,280 MW |
| 2026-10-07T05:00Z | 76,503 MW |
| 2026-10-07T06:00Z | 75,372 MW |
| 2026-10-07T07:00Z | 74,723 MW |
| 2026-10-07T08:00Z | 75,473 MW |
| 2026-10-07T09:00Z | 77,632 MW |
| 2026-10-07T10:00Z | 83,670 MW |
| 2026-10-07T11:00Z | 87,902 MW |
| 2026-10-07T12:00Z | 87,705 MW |
| 2026-10-07T13:00Z | 86,563 MW |
| 2026-10-07T14:00Z | 86,070 MW |
| 2026-10-07T15:00Z | 86,037 MW |
| 2026-10-07T16:00Z | 86,503 MW |
| 2026-10-07T17:00Z | 87,086 MW |
| 2026-10-07T18:00Z | 88,468 MW |
| 2026-10-07T19:00Z | 90,016 MW |
| 2026-10-07T20:00Z | 91,929 MW |
| 2026-10-07T21:00Z | 94,274 MW |
| 2026-10-07T22:00Z | 95,021 MW |
| 2026-10-07T23:00Z | 95,755 MW |
| 2026-10-08T00:00Z | 94,269 MW |
| 2026-10-08T01:00Z | 90,712 MW |
| 2026-10-08T02:00Z | 86,016 MW |
| 2026-10-08T03:00Z | 81,333 MW |
| 2026-10-08T04:00Z | 78,089 MW |
| 2026-10-08T05:00Z | 76,731 MW |
| 2026-10-08T06:00Z | 75,203 MW |
| 2026-10-08T07:00Z | 74,578 MW |
| 2026-10-08T08:00Z | 75,034 MW |
| 2026-10-08T09:00Z | 76,939 MW |
| 2026-10-08T10:00Z | 82,316 MW |
| 2026-10-08T11:00Z | 86,371 MW |
| 2026-10-08T12:00Z | 86,471 MW |
| 2026-10-08T13:00Z | 87,014 MW |
| 2026-10-08T14:00Z | 88,057 MW |
| 2026-10-08T15:00Z | 88,131 MW |
| 2026-10-08T16:00Z | 89,023 MW |
| 2026-10-08T17:00Z | 90,683 MW |
| 2026-10-08T18:00Z | 92,038 MW |
| 2026-10-08T19:00Z | 93,442 MW |
| 2026-10-08T20:00Z | 94,941 MW |
| 2026-10-08T21:00Z | 96,389 MW |
| 2026-10-08T22:00Z | 96,294 MW |
| 2026-10-08T23:00Z | 96,325 MW |
| 2026-10-09T00:00Z | 93,965 MW |
| 2026-10-09T01:00Z | 90,168 MW |
| 2026-10-09T02:00Z | 85,525 MW |
| 2026-10-09T03:00Z | 81,028 MW |
| 2026-10-09T04:00Z | 77,775 MW |
| 2026-10-09T05:00Z | 76,010 MW |
| 2026-10-09T06:00Z | 75,601 MW |
| 2026-10-09T07:00Z | 74,619 MW |
| 2026-10-09T08:00Z | 75,143 MW |
| 2026-10-09T09:00Z | 76,194 MW |
| 2026-10-09T10:00Z | 81,631 MW |
| 2026-10-09T11:00Z | 85,726 MW |
| 2026-10-09T12:00Z | 86,701 MW |
| 2026-10-09T13:00Z | 87,536 MW |
| 2026-10-09T14:00Z | 88,047 MW |
| 2026-10-09T15:00Z | 88,527 MW |
| 2026-10-09T16:00Z | 88,793 MW |
| 2026-10-09T17:00Z | 89,652 MW |
| 2026-10-09T18:00Z | 90,284 MW |
| 2026-10-09T19:00Z | 90,876 MW |
| 2026-10-09T20:00Z | 91,581 MW |
| 2026-10-09T21:00Z | 92,323 MW |
| 2026-10-09T22:00Z | 92,199 MW |
| 2026-10-09T23:00Z | 92,331 MW |
| 2026-10-10T00:00Z | 90,561 MW |
| 2026-10-10T01:00Z | 87,622 MW |
| 2026-10-10T02:00Z | 84,219 MW |
| 2026-10-10T03:00Z | 80,423 MW |
| 2026-10-10T04:00Z | 77,651 MW |
| 2026-10-10T05:00Z | 76,567 MW |
| 2026-10-10T06:00Z | 75,642 MW |
| 2026-10-10T07:00Z | 74,578 MW |
| 2026-10-10T08:00Z | 74,049 MW |
| 2026-10-10T09:00Z | 74,883 MW |
| 2026-10-10T10:00Z | 76,542 MW |
| 2026-10-10T11:00Z | 78,303 MW |
| 2026-10-10T12:00Z | 80,185 MW |
| 2026-10-10T13:00Z | 81,256 MW |
| 2026-10-10T14:00Z | 81,885 MW |
| 2026-10-10T15:00Z | 81,926 MW |
| 2026-10-10T16:00Z | 82,274 MW |
| 2026-10-10T17:00Z | 81,872 MW |
| 2026-10-10T18:00Z | 82,133 MW |
| 2026-10-10T19:00Z | 82,790 MW |
| 2026-10-10T20:00Z | 84,319 MW |
| 2026-10-10T21:00Z | 85,267 MW |
| 2026-10-10T22:00Z | 86,530 MW |
| 2026-10-10T23:00Z | 87,558 MW |
| 2026-10-11T00:00Z | 86,487 MW |
| 2026-10-11T01:00Z | 84,317 MW |
| 2026-10-11T02:00Z | 81,435 MW |
| 2026-10-11T03:00Z | 78,922 MW |
| 2026-10-11T04:00Z | 77,182 MW |
| 2026-10-11T05:00Z | 75,489 MW |
| 2026-10-11T06:00Z | 74,145 MW |
| 2026-10-11T07:00Z | 73,165 MW |
| 2026-10-11T08:00Z | 72,760 MW |
| 2026-10-11T09:00Z | 73,346 MW |
| 2026-10-11T10:00Z | 75,066 MW |
| 2026-10-11T11:00Z | 77,125 MW |
| 2026-10-11T12:00Z | 78,694 MW |
| 2026-10-11T13:00Z | 81,220 MW |
| 2026-10-11T14:00Z | 83,175 MW |
| 2026-10-11T15:00Z | 85,076 MW |
| 2026-10-11T16:00Z | 86,396 MW |
| 2026-10-11T17:00Z | 86,850 MW |
| 2026-10-11T18:00Z | 86,978 MW |
| 2026-10-11T19:00Z | 87,490 MW |
| 2026-10-11T20:00Z | 88,596 MW |
| 2026-10-11T21:00Z | 90,246 MW |
| 2026-10-11T22:00Z | 91,171 MW |
| 2026-10-11T23:00Z | 91,870 MW |
| 2026-10-12T00:00Z | 90,299 MW |
| 2026-10-12T01:00Z | 87,284 MW |
| 2026-10-12T02:00Z | 83,792 MW |
| 2026-10-12T03:00Z | 80,556 MW |
| 2026-10-12T04:00Z | 78,430 MW |
| 2026-10-12T05:00Z | 77,062 MW |
| 2026-10-12T06:00Z | 75,686 MW |
| 2026-10-12T07:00Z | 75,048 MW |
| 2026-10-12T08:00Z | 75,748 MW |
| 2026-10-12T09:00Z | 78,383 MW |
| 2026-10-12T10:00Z | 82,700 MW |
| 2026-10-12T11:00Z | 85,956 MW |
| 2026-10-12T12:00Z | 87,837 MW |
| 2026-10-12T13:00Z | 89,378 MW |
| 2026-10-12T14:00Z | 90,242 MW |
| 2026-10-12T15:00Z | 91,125 MW |
| 2026-10-12T16:00Z | 91,934 MW |
| 2026-10-12T17:00Z | 93,498 MW |
| 2026-10-12T18:00Z | 95,489 MW |
| 2026-10-12T19:00Z | 98,012 MW |
| 2026-10-12T20:00Z | 100.3 GW |
| 2026-10-12T21:00Z | 102.7 GW |
| 2026-10-12T22:00Z | 102.9 GW |
| 2026-10-12T23:00Z | 102.7 GW |
| 2026-10-13T00:00Z | 100.3 GW |
| 2026-10-13T01:00Z | 96,164 MW |
| 2026-10-13T02:00Z | 90,825 MW |
| 2026-10-13T03:00Z | 86,263 MW |
| 2026-10-13T04:00Z | 83,930 MW |
| 2026-10-13T05:00Z | 81,587 MW |
| 2026-10-13T06:00Z | 79,531 MW |
| 2026-10-13T07:00Z | 78,565 MW |
| 2026-10-13T08:00Z | 79,050 MW |
| 2026-10-13T09:00Z | 82,063 MW |
| 2026-10-13T10:00Z | 86,796 MW |
| 2026-10-13T11:00Z | 90,893 MW |
| 2026-10-13T12:00Z | 91,751 MW |
| 2026-10-13T13:00Z | 92,079 MW |
| 2026-10-13T14:00Z | 92,881 MW |
| 2026-10-13T15:00Z | 94,026 MW |
| 2026-10-13T16:00Z | 96,368 MW |
| 2026-10-13T17:00Z | 100.0 GW |
| 2026-10-13T18:00Z | 102.7 GW |
| 2026-10-13T19:00Z | 105.1 GW |
| 2026-10-13T20:00Z | 107.3 GW |
| 2026-10-13T21:00Z | 108.1 GW |
| 2026-10-13T22:00Z | 107.4 GW |
| 2026-10-13T23:00Z | 106.6 GW |
| 2026-10-14T00:00Z | 103.8 GW |
| 2026-10-14T01:00Z | 100.5 GW |
| 2026-10-14T02:00Z | 95,242 MW |
| 2026-10-14T03:00Z | 90,147 MW |
| 2026-10-14T04:00Z | 86,863 MW |
| 2026-10-14T05:00Z | 84,346 MW |
| 2026-10-14T06:00Z | 81,981 MW |
| 2026-10-14T07:00Z | 80,779 MW |
| 2026-10-14T08:00Z | 81,006 MW |
| 2026-10-14T09:00Z | 84,203 MW |
| 2026-10-14T10:00Z | 88,637 MW |
| 2026-10-14T11:00Z | 92,109 MW |
| 2026-10-14T12:00Z | 93,250 MW |
| 2026-10-14T13:00Z | 95,317 MW |
| 2026-10-14T14:00Z | 97,596 MW |
| 2026-10-14T15:00Z | 100.3 GW |
| 2026-10-14T16:00Z | 103.1 GW |
| 2026-10-14T17:00Z | 105.0 GW |
| 2026-10-14T18:00Z | 106.1 GW |
| 2026-10-14T19:00Z | 106.9 GW |
| 2026-10-14T20:00Z | 107.6 GW |
| 2026-10-14T21:00Z | 107.7 GW |
| 2026-10-14T22:00Z | 107.0 GW |
| 2026-10-14T23:00Z | 106.6 GW |
| 2026-10-15T00:00Z | 104.9 GW |
| 2026-10-15T01:00Z | 101.1 GW |
| 2026-10-15T02:00Z | 95,386 MW |
| 2026-10-15T03:00Z | 90,566 MW |
| 2026-10-15T04:00Z | 86,240 MW |
| 2026-10-15T05:00Z | 83,518 MW |
| 2026-10-15T06:00Z | 81,766 MW |
| 2026-10-15T07:00Z | 80,237 MW |
| 2026-10-15T08:00Z | 80,270 MW |
| 2026-10-15T09:00Z | 82,581 MW |
| 2026-10-15T10:00Z | 86,879 MW |
| 2026-10-15T11:00Z | 89,672 MW |
| 2026-10-15T12:00Z | 90,253 MW |
| 2026-10-15T13:00Z | 90,656 MW |
| 2026-10-15T14:00Z | 91,375 MW |
| 2026-10-15T15:00Z | 91,553 MW |
| 2026-10-15T16:00Z | 91,527 MW |
| 2026-10-15T17:00Z | 91,858 MW |
| 2026-10-15T18:00Z | 92,447 MW |
| 2026-10-15T19:00Z | 93,358 MW |
| 2026-10-15T20:00Z | 94,588 MW |
| 2026-10-15T21:00Z | 95,884 MW |
| 2026-10-15T22:00Z | 96,719 MW |
| 2026-10-15T23:00Z | 97,270 MW |
| 2026-10-16T00:00Z | 95,755 MW |
| 2026-10-16T01:00Z | 92,778 MW |
| 2026-10-16T02:00Z | 88,811 MW |
| 2026-10-16T03:00Z | 85,237 MW |
| 2026-10-16T04:00Z | 83,303 MW |
| 2026-10-16T05:00Z | 81,103 MW |
| 2026-10-16T06:00Z | 79,477 MW |
| 2026-10-16T07:00Z | 78,685 MW |
| 2026-10-16T08:00Z | 79,202 MW |
| 2026-10-16T09:00Z | 80,258 MW |
| 2026-10-16T10:00Z | 85,190 MW |
| 2026-10-16T11:00Z | 89,851 MW |
| 2026-10-16T12:00Z | 91,751 MW |
| 2026-10-16T13:00Z | 93,577 MW |
| 2026-10-16T14:00Z | 95,403 MW |
| 2026-10-16T15:00Z | 95,977 MW |
| 2026-10-16T16:00Z | 95,976 MW |
| 2026-10-16T17:00Z | 95,461 MW |
| 2026-10-16T18:00Z | 94,909 MW |
| 2026-10-16T19:00Z | 96,134 MW |
| 2026-10-16T20:00Z | 97,663 MW |
| 2026-10-16T21:00Z | 98,681 MW |
| 2026-10-16T22:00Z | 98,040 MW |
| 2026-10-16T23:00Z | 96,414 MW |
| 2026-10-17T00:00Z | 93,559 MW |
| 2026-10-17T01:00Z | 90,295 MW |
| 2026-10-17T02:00Z | 86,578 MW |
| 2026-10-17T03:00Z | 83,141 MW |
| 2026-10-17T04:00Z | 79,914 MW |
| 2026-10-17T05:00Z | 77,923 MW |
| 2026-10-17T06:00Z | 76,283 MW |
| 2026-10-17T07:00Z | 75,329 MW |
| 2026-10-17T08:00Z | 75,166 MW |
| 2026-10-17T09:00Z | 75,857 MW |
| 2026-10-17T10:00Z | 76,689 MW |
| 2026-10-17T11:00Z | 78,745 MW |
| 2026-10-17T12:00Z | 81,306 MW |
| 2026-10-17T13:00Z | 82,473 MW |
| 2026-10-17T14:00Z | 83,497 MW |
| 2026-10-17T15:00Z | 84,315 MW |
| 2026-10-17T16:00Z | 83,151 MW |
| 2026-10-17T17:00Z | 82,000 MW |
| 2026-10-17T18:00Z | 80,670 MW |
| 2026-10-17T19:00Z | 80,036 MW |
| 2026-10-17T20:00Z | 80,782 MW |
| 2026-10-17T21:00Z | 81,855 MW |
| 2026-10-17T22:00Z | 84,168 MW |
| 2026-10-17T23:00Z | 86,290 MW |
| 2026-10-18T00:00Z | 85,657 MW |
| 2026-10-18T01:00Z | 84,170 MW |
| 2026-10-18T02:00Z | 82,017 MW |
| 2026-10-18T03:00Z | 79,992 MW |
| 2026-10-18T04:00Z | 77,799 MW |
| 2026-10-18T05:00Z | 76,363 MW |
| 2026-10-18T06:00Z | 75,690 MW |
| 2026-10-18T07:00Z | 75,717 MW |
| 2026-10-18T08:00Z | 75,631 MW |
| 2026-10-18T09:00Z | 75,868 MW |
| 2026-10-18T10:00Z | 78,242 MW |
| 2026-10-18T11:00Z | 81,058 MW |
| 2026-10-18T12:00Z | 83,010 MW |
| 2026-10-18T13:00Z | 82,875 MW |
| 2026-10-18T14:00Z | 81,599 MW |
| 2026-10-18T15:00Z | 80,219 MW |
| 2026-10-18T16:00Z | 79,207 MW |
| 2026-10-18T17:00Z | 78,631 MW |
| 2026-10-18T18:00Z | 78,774 MW |
| 2026-10-18T19:00Z | 79,069 MW |
| 2026-10-18T20:00Z | 81,466 MW |
| 2026-10-18T21:00Z | 83,774 MW |
| 2026-10-18T22:00Z | 86,619 MW |
| 2026-10-18T23:00Z | 88,924 MW |
| 2026-10-19T00:00Z | 88,024 MW |
| 2026-10-19T01:00Z | 85,720 MW |
| 2026-10-19T02:00Z | 82,728 MW |
| 2026-10-19T03:00Z | 80,295 MW |
| 2026-10-19T04:00Z | 78,703 MW |
| 2026-10-19T05:00Z | 78,311 MW |
| 2026-10-19T06:00Z | 78,311 MW |
| 2026-10-19T07:00Z | 77,505 MW |
| 2026-10-19T08:00Z | 78,860 MW |
| 2026-10-19T09:00Z | 82,712 MW |
| 2026-10-19T10:00Z | 89,958 MW |
| 2026-10-19T11:00Z | 94,983 MW |
| 2026-10-19T12:00Z | 95,268 MW |
| 2026-10-19T13:00Z | 92,171 MW |
| 2026-10-19T14:00Z | 90,754 MW |
| 2026-10-19T15:00Z | 89,321 MW |
| 2026-10-19T16:00Z | 88,789 MW |
| 2026-10-19T17:00Z | 88,364 MW |
| 2026-10-19T18:00Z | 87,829 MW |
| 2026-10-19T19:00Z | 88,396 MW |
| 2026-10-19T20:00Z | 89,092 MW |
| 2026-10-19T21:00Z | 91,124 MW |
| 2026-10-19T22:00Z | 93,108 MW |
| 2026-10-19T23:00Z | 94,364 MW |
| 2026-10-20T00:00Z | 92,825 MW |
| 2026-10-20T01:00Z | 89,718 MW |
| 2026-10-20T02:00Z | 85,494 MW |
| 2026-10-20T03:00Z | 82,171 MW |
| 2026-10-20T04:00Z | 79,735 MW |
| 2026-10-20T05:00Z | 78,503 MW |
| 2026-10-20T06:00Z | 77,716 MW |
| 2026-10-20T07:00Z | 77,702 MW |
| 2026-10-20T08:00Z | 78,879 MW |
| 2026-10-20T09:00Z | 81,959 MW |
| 2026-10-20T10:00Z | 88,605 MW |
| 2026-10-20T11:00Z | 93,266 MW |
| 2026-10-20T12:00Z | 92,821 MW |
| 2026-10-20T13:00Z | 89,795 MW |
| 2026-10-20T14:00Z | 88,424 MW |
| 2026-10-20T15:00Z | 87,855 MW |
| 2026-10-20T16:00Z | 87,655 MW |
| 2026-10-20T17:00Z | 87,848 MW |
| 2026-10-20T18:00Z | 87,642 MW |
| 2026-10-20T19:00Z | 88,367 MW |
| 2026-10-20T20:00Z | 90,383 MW |
| 2026-10-20T21:00Z | 91,782 MW |
| 2026-10-20T22:00Z | 93,038 MW |
| 2026-10-20T23:00Z | 94,045 MW |
| 2026-10-21T00:00Z | 92,281 MW |
| 2026-10-21T01:00Z | 88,966 MW |
| 2026-10-21T02:00Z | 84,849 MW |
| 2026-10-21T03:00Z | 81,449 MW |
| 2026-10-21T04:00Z | 79,776 MW |
| 2026-10-21T05:00Z | 78,948 MW |
| 2026-10-21T06:00Z | 78,227 MW |
| 2026-10-21T07:00Z | 78,153 MW |
| 2026-10-21T08:00Z | 79,562 MW |
| 2026-10-21T09:00Z | 81,491 MW |
| 2026-10-21T10:00Z | 87,722 MW |
| 2026-10-21T11:00Z | 92,346 MW |
| 2026-10-21T12:00Z | 92,120 MW |
| 2026-10-21T13:00Z | 89,125 MW |
| 2026-10-21T14:00Z | 88,048 MW |
| 2026-10-21T15:00Z | 87,793 MW |
| 2026-10-21T16:00Z | 86,763 MW |
| 2026-10-21T17:00Z | 86,536 MW |
| 2026-10-21T18:00Z | 86,984 MW |
| 2026-10-21T19:00Z | 87,334 MW |
| 2026-10-21T20:00Z | 88,662 MW |
| 2026-10-21T21:00Z | 90,584 MW |
| 2026-10-21T22:00Z | 92,494 MW |
| 2026-10-21T23:00Z | 93,776 MW |
| 2026-10-22T00:00Z | 92,348 MW |
| 2026-10-22T01:00Z | 89,336 MW |
| 2026-10-22T02:00Z | 85,367 MW |
| 2026-10-22T03:00Z | 81,831 MW |
| 2026-10-22T04:00Z | 80,151 MW |
| 2026-10-22T05:00Z | 79,754 MW |
| 2026-10-22T06:00Z | 78,958 MW |
| 2026-10-22T07:00Z | 79,082 MW |
| 2026-10-22T08:00Z | 79,768 MW |
| 2026-10-22T09:00Z | 82,992 MW |
| 2026-10-22T10:00Z | 89,269 MW |
| 2026-10-22T11:00Z | 93,956 MW |
| 2026-10-22T12:00Z | 93,500 MW |
| 2026-10-22T13:00Z | 90,297 MW |
| 2026-10-22T14:00Z | 88,526 MW |
| 2026-10-22T15:00Z | 88,441 MW |
| 2026-10-22T16:00Z | 87,998 MW |
| 2026-10-22T17:00Z | 87,898 MW |
| 2026-10-22T18:00Z | 87,870 MW |
| 2026-10-22T19:00Z | 88,572 MW |
| 2026-10-22T20:00Z | 89,379 MW |
| 2026-10-22T21:00Z | 91,119 MW |
| 2026-10-22T22:00Z | 92,921 MW |
| 2026-10-22T23:00Z | 93,737 MW |
| 2026-10-23T00:00Z | 92,420 MW |
| 2026-10-23T01:00Z | 89,498 MW |
| 2026-10-23T02:00Z | 86,226 MW |
| 2026-10-23T03:00Z | 83,316 MW |
| 2026-10-23T04:00Z | 80,520 MW |
| 2026-10-23T05:00Z | 78,741 MW |
| 2026-10-23T06:00Z | 77,767 MW |
| 2026-10-23T07:00Z | 77,247 MW |
| 2026-10-23T08:00Z | 78,404 MW |
| 2026-10-23T09:00Z | 81,549 MW |
| 2026-10-23T10:00Z | 87,511 MW |
| 2026-10-23T11:00Z | 91,912 MW |
| 2026-10-23T12:00Z | 91,934 MW |
| 2026-10-23T13:00Z | 89,478 MW |
| 2026-10-23T14:00Z | 88,505 MW |
| 2026-10-23T15:00Z | 88,553 MW |
| 2026-10-23T16:00Z | 87,764 MW |
| 2026-10-23T17:00Z | 87,258 MW |
| 2026-10-23T18:00Z | 87,307 MW |
| 2026-10-23T19:00Z | 87,886 MW |
| 2026-10-23T20:00Z | 87,805 MW |
| 2026-10-23T21:00Z | 89,063 MW |
| 2026-10-23T22:00Z | 90,232 MW |
| 2026-10-23T23:00Z | 90,603 MW |
| 2026-10-24T00:00Z | 89,374 MW |
| 2026-10-24T01:00Z | 87,293 MW |
| 2026-10-24T02:00Z | 84,625 MW |
| 2026-10-24T03:00Z | 81,286 MW |
| 2026-10-24T04:00Z | 78,938 MW |
| 2026-10-24T05:00Z | 77,336 MW |
| 2026-10-24T06:00Z | 76,402 MW |
| 2026-10-24T07:00Z | 76,276 MW |
| 2026-10-24T08:00Z | 76,969 MW |
| 2026-10-24T09:00Z | 78,558 MW |
| 2026-10-24T10:00Z | 81,189 MW |
| 2026-10-24T11:00Z | 84,575 MW |
| 2026-10-24T12:00Z | 85,981 MW |
| 2026-10-24T13:00Z | 85,906 MW |
| 2026-10-24T14:00Z | 85,535 MW |
| 2026-10-24T15:00Z | 83,882 MW |
| 2026-10-24T16:00Z | 82,834 MW |
| 2026-10-24T17:00Z | 81,852 MW |
| 2026-10-24T18:00Z | 81,780 MW |
| 2026-10-24T19:00Z | 82,368 MW |
| 2026-10-24T20:00Z | 82,718 MW |
| 2026-10-24T21:00Z | 84,058 MW |
| 2026-10-24T22:00Z | 86,038 MW |
| 2026-10-24T23:00Z | 87,063 MW |
| 2026-10-25T00:00Z | 86,076 MW |
| 2026-10-25T01:00Z | 84,499 MW |
| 2026-10-25T02:00Z | 82,059 MW |
| 2026-10-25T03:00Z | 79,779 MW |
| 2026-10-25T04:00Z | 77,794 MW |
| 2026-10-25T05:00Z | 76,216 MW |
| 2026-10-25T06:00Z | 75,496 MW |
| 2026-10-25T07:00Z | 75,913 MW |
| 2026-10-25T08:00Z | 76,552 MW |
| 2026-10-25T09:00Z | 77,009 MW |
| 2026-10-25T10:00Z | 78,578 MW |
| 2026-10-25T11:00Z | 81,395 MW |
| 2026-10-25T12:00Z | 82,733 MW |
| 2026-10-25T13:00Z | 82,883 MW |
| 2026-10-25T14:00Z | 82,163 MW |
| 2026-10-25T15:00Z | 81,166 MW |
| 2026-10-25T16:00Z | 80,918 MW |
| 2026-10-25T17:00Z | 80,847 MW |
| 2026-10-25T18:00Z | 81,591 MW |
| 2026-10-25T19:00Z | 82,737 MW |
| 2026-10-25T20:00Z | 83,725 MW |
| 2026-10-25T21:00Z | 85,814 MW |
| 2026-10-25T22:00Z | 88,272 MW |
| 2026-10-25T23:00Z | 89,917 MW |
| 2026-10-26T00:00Z | 88,614 MW |
| 2026-10-26T01:00Z | 86,010 MW |
| 2026-10-26T02:00Z | 82,590 MW |
| 2026-10-26T03:00Z | 80,512 MW |
| 2026-10-26T04:00Z | 79,130 MW |
| 2026-10-26T05:00Z | 77,770 MW |
| 2026-10-26T06:00Z | 77,369 MW |
| 2026-10-26T07:00Z | 77,730 MW |
| 2026-10-26T08:00Z | 79,243 MW |
| 2026-10-26T09:00Z | 82,456 MW |
| 2026-10-26T10:00Z | 88,719 MW |
| 2026-10-26T11:00Z | 93,593 MW |
| 2026-10-26T12:00Z | 93,636 MW |
| 2026-10-26T13:00Z | 91,278 MW |
| 2026-10-26T14:00Z | 89,651 MW |
| 2026-10-26T15:00Z | 89,634 MW |
| 2026-10-26T16:00Z | 89,392 MW |
| 2026-10-26T17:00Z | 89,512 MW |
| 2026-10-26T18:00Z | 89,805 MW |
| 2026-10-26T19:00Z | 90,069 MW |
| 2026-10-26T20:00Z | 90,518 MW |
| 2026-10-26T21:00Z | 92,591 MW |
| 2026-10-26T22:00Z | 94,169 MW |
| 2026-10-26T23:00Z | 94,460 MW |
| 2026-10-27T00:00Z | 92,490 MW |
| 2026-10-27T01:00Z | 89,484 MW |
| 2026-10-27T02:00Z | 85,381 MW |
| 2026-10-27T03:00Z | 82,054 MW |
| 2026-10-27T04:00Z | 80,152 MW |
| 2026-10-27T05:00Z | 78,764 MW |
| 2026-10-27T06:00Z | 78,269 MW |
| 2026-10-27T07:00Z | 77,824 MW |
| 2026-10-27T08:00Z | 79,026 MW |
| 2026-10-27T09:00Z | 80,931 MW |
| 2026-10-27T10:00Z | 87,348 MW |
| 2026-10-27T11:00Z | 91,751 MW |
| 2026-10-27T12:00Z | 91,876 MW |
| 2026-10-27T13:00Z | 89,820 MW |
| 2026-10-27T14:00Z | 89,439 MW |
| 2026-10-27T15:00Z | 89,545 MW |
| 2026-10-27T16:00Z | 89,330 MW |
| 2026-10-27T17:00Z | 89,386 MW |
| 2026-10-27T18:00Z | 89,898 MW |
| 2026-10-27T19:00Z | 90,553 MW |
| 2026-10-27T20:00Z | 91,168 MW |
| 2026-10-27T21:00Z | 92,441 MW |
| 2026-10-27T22:00Z | 94,287 MW |
| 2026-10-27T23:00Z | 94,717 MW |
| 2026-10-28T00:00Z | 92,938 MW |
| 2026-10-28T01:00Z | 89,835 MW |
| 2026-10-28T02:00Z | 85,286 MW |
| 2026-10-28T03:00Z | 81,771 MW |
| 2026-10-28T04:00Z | 79,858 MW |
| 2026-10-28T05:00Z | 78,949 MW |
| 2026-10-28T06:00Z | 77,863 MW |
| 2026-10-28T07:00Z | 77,713 MW |
| 2026-10-28T08:00Z | 78,527 MW |
| 2026-10-28T09:00Z | 80,593 MW |
| 2026-10-28T10:00Z | 86,630 MW |
| 2026-10-28T11:00Z | 91,035 MW |
| 2026-10-28T12:00Z | 91,476 MW |
| 2026-10-28T13:00Z | 89,985 MW |
| 2026-10-28T14:00Z | 89,936 MW |
| 2026-10-28T15:00Z | 89,948 MW |
| 2026-10-28T16:00Z | 89,878 MW |
| 2026-10-28T17:00Z | 89,948 MW |
| 2026-10-28T18:00Z | 89,993 MW |
| 2026-10-28T19:00Z | 91,185 MW |
| 2026-10-28T20:00Z | 92,369 MW |
| 2026-10-28T21:00Z | 93,397 MW |
| 2026-10-28T22:00Z | 95,378 MW |
| 2026-10-28T23:00Z | 95,167 MW |
| 2026-10-29T00:00Z | 93,496 MW |
| 2026-10-29T01:00Z | 90,252 MW |
| 2026-10-29T02:00Z | 85,945 MW |
| 2026-10-29T03:00Z | 82,592 MW |
| 2026-10-29T04:00Z | 80,560 MW |
| 2026-10-29T05:00Z | 79,286 MW |
| 2026-10-29T06:00Z | 78,289 MW |
| 2026-10-29T07:00Z | 77,885 MW |
| 2026-10-29T08:00Z | 78,980 MW |
| 2026-10-29T09:00Z | 80,813 MW |
| 2026-10-29T10:00Z | 86,661 MW |
| 2026-10-29T11:00Z | 91,308 MW |
| 2026-10-29T12:00Z | 91,508 MW |
| 2026-10-29T13:00Z | 90,133 MW |
| 2026-10-29T14:00Z | 89,360 MW |
| 2026-10-29T15:00Z | 89,890 MW |
| 2026-10-29T16:00Z | 90,483 MW |
| 2026-10-29T17:00Z | 90,892 MW |
| 2026-10-29T18:00Z | 91,183 MW |
| 2026-10-29T19:00Z | 91,542 MW |
| 2026-10-29T20:00Z | 92,261 MW |
| 2026-10-29T21:00Z | 93,471 MW |
| 2026-10-29T22:00Z | 94,522 MW |
| 2026-10-29T23:00Z | 94,711 MW |
| 2026-10-30T00:00Z | 92,895 MW |
| 2026-10-30T01:00Z | 90,025 MW |
| 2026-10-30T02:00Z | 85,550 MW |
| 2026-10-30T03:00Z | 81,892 MW |
| 2026-10-30T04:00Z | 79,352 MW |
| 2026-10-30T05:00Z | 78,169 MW |
| 2026-10-30T06:00Z | 76,847 MW |
| 2026-10-30T07:00Z | 76,278 MW |
| 2026-10-30T08:00Z | 76,429 MW |
| 2026-10-30T09:00Z | 78,388 MW |
| 2026-10-30T10:00Z | 84,274 MW |
| 2026-10-30T11:00Z | 88,725 MW |
| 2026-10-30T12:00Z | 89,422 MW |
| 2026-10-30T13:00Z | 88,301 MW |
| 2026-10-30T14:00Z | 89,131 MW |
| 2026-10-30T15:00Z | 89,769 MW |
| 2026-10-30T16:00Z | 89,406 MW |
| 2026-10-30T17:00Z | 89,474 MW |
| 2026-10-30T18:00Z | 89,753 MW |
| 2026-10-30T19:00Z | 90,241 MW |
| 2026-10-30T20:00Z | 90,588 MW |
| 2026-10-30T21:00Z | 90,915 MW |
| 2026-10-30T22:00Z | 91,043 MW |
| 2026-10-30T23:00Z | 90,463 MW |
| 2026-10-31T00:00Z | 88,404 MW |
| 2026-10-31T01:00Z | 86,123 MW |
| 2026-10-31T02:00Z | 82,946 MW |
| 2026-10-31T03:00Z | 79,397 MW |
| 2026-10-31T04:00Z | 77,459 MW |
| 2026-10-31T05:00Z | 76,623 MW |
| 2026-10-31T06:00Z | 76,511 MW |
| 2026-10-31T07:00Z | 76,403 MW |
| 2026-10-31T08:00Z | 76,416 MW |
| 2026-10-31T09:00Z | 76,616 MW |
| 2026-10-31T10:00Z | 77,355 MW |
| 2026-10-31T11:00Z | 80,724 MW |
| 2026-10-31T12:00Z | 82,732 MW |
| 2026-10-31T13:00Z | 83,535 MW |
| 2026-10-31T14:00Z | 84,233 MW |
| 2026-10-31T15:00Z | 83,895 MW |
| 2026-10-31T16:00Z | 83,097 MW |
| 2026-10-31T17:00Z | 82,961 MW |
| 2026-10-31T18:00Z | 83,078 MW |
| 2026-10-31T19:00Z | 81,978 MW |
| 2026-10-31T20:00Z | 82,656 MW |
| 2026-10-31T21:00Z | 83,068 MW |
| 2026-10-31T22:00Z | 83,937 MW |
| 2026-10-31T23:00Z | 83,778 MW |
| 2026-11-01T00:00Z | 83,334 MW |
| 2026-11-01T01:00Z | 82,402 MW |
| 2026-11-01T02:00Z | 80,341 MW |
| 2026-11-01T03:00Z | 77,978 MW |
| 2026-11-01T04:00Z | 76,696 MW |
| 2026-11-01T05:00Z | 75,403 MW |
| 2026-11-01T06:00Z | 75,940 MW |
| 2026-11-01T07:00Z | 76,127 MW |
| 2026-11-01T08:00Z | 75,776 MW |
| 2026-11-01T09:00Z | 76,266 MW |
| 2026-11-01T10:00Z | 77,348 MW |
| 2026-11-01T11:00Z | 78,748 MW |
| 2026-11-01T12:00Z | 79,853 MW |
| 2026-11-01T13:00Z | 81,033 MW |
| 2026-11-01T14:00Z | 81,790 MW |
| 2026-11-01T15:00Z | 81,893 MW |
| 2026-11-01T16:00Z | 81,705 MW |
| 2026-11-01T17:00Z | 81,649 MW |
| 2026-11-01T18:00Z | 81,718 MW |
| 2026-11-01T19:00Z | 82,633 MW |
| 2026-11-01T20:00Z | 84,759 MW |
| 2026-11-01T21:00Z | 88,741 MW |
| 2026-11-01T22:00Z | 89,689 MW |
| 2026-11-01T23:00Z | 88,384 MW |
| 2026-11-02T00:00Z | 86,634 MW |
| 2026-11-02T01:00Z | 83,881 MW |
| 2026-11-02T02:00Z | 82,047 MW |
| 2026-11-02T03:00Z | 80,176 MW |
| 2026-11-02T04:00Z | 80,176 MW |
| 2026-11-02T05:00Z | 78,412 MW |
| 2026-11-02T06:00Z | 77,116 MW |
| 2026-11-02T07:00Z | 77,252 MW |
| 2026-11-02T08:00Z | 77,447 MW |
| 2026-11-02T09:00Z | 78,632 MW |
| 2026-11-02T10:00Z | 80,815 MW |
| 2026-11-02T11:00Z | 86,752 MW |
| 2026-11-02T12:00Z | 90,090 MW |
| 2026-11-02T13:00Z | 90,207 MW |
| 2026-11-02T14:00Z | 89,507 MW |
| 2026-11-02T15:00Z | 89,642 MW |
| 2026-11-02T16:00Z | 89,687 MW |
| 2026-11-02T17:00Z | 89,905 MW |
| 2026-11-02T18:00Z | 90,213 MW |
| 2026-11-02T19:00Z | 91,070 MW |
| 2026-11-02T20:00Z | 90,951 MW |
| 2026-11-02T21:00Z | 92,497 MW |
| 2026-11-02T22:00Z | 95,516 MW |
| 2026-11-02T23:00Z | 95,673 MW |
| 2026-11-03T00:00Z | 94,194 MW |
| 2026-11-03T01:00Z | 91,850 MW |
| 2026-11-03T02:00Z | 89,603 MW |
| 2026-11-03T03:00Z | 86,661 MW |
| 2026-11-03T04:00Z | 83,331 MW |
| 2026-11-03T05:00Z | 81,153 MW |
| 2026-11-03T06:00Z | 79,998 MW |
| 2026-11-03T07:00Z | 79,062 MW |
| 2026-11-03T08:00Z | 78,959 MW |
| 2026-11-03T09:00Z | 79,721 MW |
| 2026-11-03T10:00Z | 81,762 MW |
| 2026-11-03T11:00Z | 86,761 MW |
| 2026-11-03T12:00Z | 89,542 MW |
| 2026-11-03T13:00Z | 88,961 MW |
| 2026-11-03T14:00Z | 89,131 MW |
| 2026-11-03T15:00Z | 90,288 MW |
| 2026-11-03T16:00Z | 90,859 MW |
| 2026-11-03T17:00Z | 91,729 MW |
| 2026-11-03T18:00Z | 92,108 MW |
| 2026-11-03T19:00Z | 92,491 MW |
| 2026-11-03T20:00Z | 93,367 MW |
| 2026-11-03T21:00Z | 94,577 MW |
| 2026-11-03T22:00Z | 96,923 MW |
| 2026-11-03T23:00Z | 97,425 MW |
| 2026-11-04T00:00Z | 95,683 MW |
| 2026-11-04T01:00Z | 93,077 MW |
| 2026-11-04T02:00Z | 89,679 MW |
| 2026-11-04T03:00Z | 85,982 MW |
| 2026-11-04T04:00Z | 83,854 MW |
| 2026-11-04T05:00Z | 81,006 MW |
| 2026-11-04T06:00Z | 79,501 MW |
| 2026-11-04T07:00Z | 78,473 MW |
| 2026-11-04T08:00Z | 77,844 MW |
| 2026-11-04T09:00Z | 78,780 MW |
| 2026-11-04T10:00Z | 81,160 MW |
| 2026-11-04T11:00Z | 85,155 MW |
| 2026-11-04T12:00Z | 88,210 MW |
| 2026-11-04T13:00Z | 88,128 MW |
| 2026-11-04T14:00Z | 88,520 MW |
| 2026-11-04T15:00Z | 89,332 MW |
| 2026-11-04T16:00Z | 90,406 MW |
| 2026-11-04T17:00Z | 90,873 MW |
| 2026-11-04T18:00Z | 92,139 MW |
| 2026-11-04T19:00Z | 92,505 MW |
| 2026-11-04T20:00Z | 93,062 MW |
| 2026-11-04T21:00Z | 94,334 MW |
| 2026-11-04T22:00Z | 96,657 MW |
| 2026-11-04T23:00Z | 96,673 MW |
| 2026-11-05T00:00Z | 95,041 MW |
| 2026-11-05T01:00Z | 92,719 MW |
| 2026-11-05T02:00Z | 89,658 MW |
| 2026-11-05T03:00Z | 86,504 MW |
| 2026-11-05T04:00Z | 83,002 MW |
| 2026-11-05T05:00Z | 80,136 MW |
| 2026-11-05T06:00Z | 78,153 MW |
| 2026-11-05T07:00Z | 77,081 MW |
| 2026-11-05T08:00Z | 76,795 MW |
| 2026-11-05T09:00Z | 77,274 MW |
| 2026-11-05T10:00Z | 79,231 MW |
| 2026-11-05T11:00Z | 84,680 MW |
| 2026-11-05T12:00Z | 88,643 MW |
| 2026-11-05T13:00Z | 90,540 MW |
| 2026-11-05T14:00Z | n/a |
Show the data table (720 rows)
| Hour starting (UTC) | Gas | Nuclear | Coal | Solar | Wind |
|---|---|---|---|---|---|
| 2026-10-06T15:00Z | 27,729 MW | 27,722 MW | 8,892 MW | 13,379 MW | 2,314 MW |
| 2026-10-06T16:00Z | 27,828 MW | 27,709 MW | 8,718 MW | 13,173 MW | 2,989 MW |
| 2026-10-06T17:00Z | 28,493 MW | 27,696 MW | 8,858 MW | 13,132 MW | 2,827 MW |
| 2026-10-06T18:00Z | 28,827 MW | 27,685 MW | 8,996 MW | 13,121 MW | 2,774 MW |
| 2026-10-06T19:00Z | 29,596 MW | 27,669 MW | 9,288 MW | 13,140 MW | 2,735 MW |
| 2026-10-06T20:00Z | 30,683 MW | 27,660 MW | 9,563 MW | 12,515 MW | 2,882 MW |
| 2026-10-06T21:00Z | 34,336 MW | 27,654 MW | 9,665 MW | 8,584 MW | 2,929 MW |
| 2026-10-06T22:00Z | 38,114 MW | 27,650 MW | 11,466 MW | 2,286 MW | 2,826 MW |
| 2026-10-06T23:00Z | 39,729 MW | 27,658 MW | 13,748 MW | 74 MW | 2,732 MW |
| 2026-10-07T00:00Z | 38,238 MW | 27,666 MW | 13,923 MW | 31 MW | 4,259 MW |
| 2026-10-07T01:00Z | 35,814 MW | 27,674 MW | 13,490 MW | 28 MW | 5,439 MW |
| 2026-10-07T02:00Z | 33,582 MW | 27,692 MW | 13,136 MW | 28 MW | 5,943 MW |
| 2026-10-07T03:00Z | 30,829 MW | 27,695 MW | 12,884 MW | 28 MW | 6,366 MW |
| 2026-10-07T04:00Z | 27,892 MW | 27,710 MW | 12,190 MW | 28 MW | 6,659 MW |
| 2026-10-07T05:00Z | 27,203 MW | 27,719 MW | 11,640 MW | 28 MW | 6,615 MW |
| 2026-10-07T06:00Z | 26,946 MW | 27,723 MW | 10,552 MW | 28 MW | 6,585 MW |
| 2026-10-07T07:00Z | 26,669 MW | 27,732 MW | 10,209 MW | 28 MW | 6,716 MW |
| 2026-10-07T08:00Z | 27,431 MW | 27,733 MW | 9,926 MW | 28 MW | 6,893 MW |
| 2026-10-07T09:00Z | 28,838 MW | 27,736 MW | 10,268 MW | 28 MW | 6,782 MW |
| 2026-10-07T10:00Z | 30,874 MW | 27,739 MW | 10,864 MW | 28 MW | 6,605 MW |
| 2026-10-07T11:00Z | 32,527 MW | 27,744 MW | 12,449 MW | 241 MW | 6,526 MW |
| 2026-10-07T12:00Z | 31,748 MW | 27,748 MW | 12,554 MW | 4,215 MW | 5,866 MW |
| 2026-10-07T13:00Z | 29,029 MW | 27,738 MW | 10,916 MW | 10,825 MW | 4,213 MW |
| 2026-10-07T14:00Z | 28,090 MW | 27,706 MW | 9,907 MW | 13,009 MW | 2,801 MW |
| 2026-10-07T15:00Z | 28,344 MW | 27,681 MW | 10,310 MW | 13,236 MW | 2,358 MW |
| 2026-10-07T16:00Z | 28,470 MW | 27,655 MW | 10,764 MW | 13,069 MW | 2,180 MW |
| 2026-10-07T17:00Z | 28,306 MW | 27,629 MW | 11,269 MW | 12,995 MW | 2,706 MW |
| 2026-10-07T18:00Z | 28,880 MW | 27,606 MW | 11,405 MW | 13,105 MW | 3,456 MW |
| 2026-10-07T19:00Z | 29,683 MW | 27,586 MW | 11,476 MW | 13,155 MW | 4,171 MW |
| 2026-10-07T20:00Z | 31,366 MW | 27,568 MW | 11,254 MW | 12,301 MW | 4,736 MW |
| 2026-10-07T21:00Z | 34,643 MW | 27,562 MW | 11,639 MW | 8,159 MW | 4,642 MW |
| 2026-10-07T22:00Z | 38,090 MW | 27,553 MW | 13,657 MW | 1,858 MW | 4,107 MW |
| 2026-10-07T23:00Z | 38,747 MW | 27,566 MW | 15,190 MW | 55 MW | 4,182 MW |
| 2026-10-08T00:00Z | 38,013 MW | 27,586 MW | 15,156 MW | 28 MW | 5,172 MW |
| 2026-10-08T01:00Z | 36,266 MW | 27,605 MW | 14,256 MW | 28 MW | 5,402 MW |
| 2026-10-08T02:00Z | 34,444 MW | 27,619 MW | 14,144 MW | 28 MW | 4,683 MW |
| 2026-10-08T03:00Z | 31,333 MW | 27,616 MW | 14,653 MW | 28 MW | 3,878 MW |
| 2026-10-08T04:00Z | 28,405 MW | 27,629 MW | 14,525 MW | 28 MW | 3,418 MW |
| 2026-10-08T05:00Z | 27,697 MW | 27,635 MW | 14,471 MW | 28 MW | 3,079 MW |
| 2026-10-08T06:00Z | 27,103 MW | 27,644 MW | 13,139 MW | 28 MW | 3,026 MW |
| 2026-10-08T07:00Z | 27,057 MW | 27,655 MW | 12,519 MW | 28 MW | 3,213 MW |
| 2026-10-08T08:00Z | 27,241 MW | 27,664 MW | 12,354 MW | 28 MW | 3,178 MW |
| 2026-10-08T09:00Z | 28,852 MW | 27,666 MW | 12,850 MW | 28 MW | 2,519 MW |
| 2026-10-08T10:00Z | 31,559 MW | 27,670 MW | 12,495 MW | 28 MW | 1,867 MW |
| 2026-10-08T11:00Z | 33,412 MW | 27,673 MW | 14,154 MW | 188 MW | 1,378 MW |
| 2026-10-08T12:00Z | 32,737 MW | 27,679 MW | 14,238 MW | 3,879 MW | 1,238 MW |
| 2026-10-08T13:00Z | 30,246 MW | 27,666 MW | 11,992 MW | 10,343 MW | 935 MW |
| 2026-10-08T14:00Z | 30,484 MW | 27,648 MW | 11,133 MW | 12,589 MW | 865 MW |
| 2026-10-08T15:00Z | 30,064 MW | 27,624 MW | 11,584 MW | 12,862 MW | 1,207 MW |
| 2026-10-08T16:00Z | 29,919 MW | 27,610 MW | 11,651 MW | 12,628 MW | 1,993 MW |
| 2026-10-08T17:00Z | 30,282 MW | 27,597 MW | 12,008 MW | 12,517 MW | 2,627 MW |
| 2026-10-08T18:00Z | 31,024 MW | 27,588 MW | 12,482 MW | 12,489 MW | 2,966 MW |
| 2026-10-08T19:00Z | 32,106 MW | 27,576 MW | 12,325 MW | 12,467 MW | 3,169 MW |
| 2026-10-08T20:00Z | 34,166 MW | 27,573 MW | 12,898 MW | 11,484 MW | 3,011 MW |
| 2026-10-08T21:00Z | 36,949 MW | 27,577 MW | 13,443 MW | 7,231 MW | 2,559 MW |
| 2026-10-08T22:00Z | 39,612 MW | 27,583 MW | 14,967 MW | 1,715 MW | 1,648 MW |
| 2026-10-08T23:00Z | 40,397 MW | 27,590 MW | 16,436 MW | 95 MW | 1,097 MW |
| 2026-10-09T00:00Z | 40,182 MW | 27,601 MW | 16,790 MW | 78 MW | 1,017 MW |
| 2026-10-09T01:00Z | 38,334 MW | 27,609 MW | 16,164 MW | 78 MW | 863 MW |
| 2026-10-09T02:00Z | 35,018 MW | 27,625 MW | 15,662 MW | 78 MW | 748 MW |
| 2026-10-09T03:00Z | 31,440 MW | 27,639 MW | 15,392 MW | 78 MW | 661 MW |
| 2026-10-09T04:00Z | 28,697 MW | 27,661 MW | 15,206 MW | 78 MW | 838 MW |
| 2026-10-09T05:00Z | 27,933 MW | 27,672 MW | 14,840 MW | 78 MW | 1,127 MW |
| 2026-10-09T06:00Z | 27,236 MW | 27,679 MW | 14,827 MW | 78 MW | 1,227 MW |
| 2026-10-09T07:00Z | 26,398 MW | 27,698 MW | 14,179 MW | 78 MW | 1,269 MW |
| 2026-10-09T08:00Z | 26,790 MW | 27,700 MW | 13,577 MW | 78 MW | 1,622 MW |
| 2026-10-09T09:00Z | 27,988 MW | 27,716 MW | 13,089 MW | 78 MW | 2,209 MW |
| 2026-10-09T10:00Z | 30,390 MW | 27,733 MW | 12,706 MW | 78 MW | 2,269 MW |
| 2026-10-09T11:00Z | 31,886 MW | 27,723 MW | 13,498 MW | 170 MW | 2,457 MW |
| 2026-10-09T12:00Z | 32,034 MW | 27,722 MW | 14,778 MW | 2,470 MW | 2,599 MW |
| 2026-10-09T13:00Z | 29,885 MW | 27,710 MW | 14,724 MW | 7,653 MW | 1,741 MW |
| 2026-10-09T14:00Z | 29,473 MW | 27,692 MW | 13,403 MW | 10,129 MW | 1,608 MW |
| 2026-10-09T15:00Z | 29,583 MW | 27,670 MW | 13,189 MW | 10,076 MW | 2,025 MW |
| 2026-10-09T16:00Z | 29,696 MW | 27,647 MW | 13,236 MW | 10,215 MW | 1,529 MW |
| 2026-10-09T17:00Z | 30,288 MW | 27,625 MW | 14,001 MW | 10,150 MW | 1,500 MW |
| 2026-10-09T18:00Z | 30,724 MW | 27,609 MW | 14,241 MW | 9,728 MW | 1,537 MW |
| 2026-10-09T19:00Z | 31,660 MW | 27,596 MW | 14,268 MW | 9,194 MW | 1,418 MW |
| 2026-10-09T20:00Z | 34,237 MW | 27,599 MW | 13,938 MW | 6,523 MW | 1,264 MW |
| 2026-10-09T21:00Z | 35,630 MW | 27,584 MW | 14,139 MW | 3,452 MW | 1,113 MW |
| 2026-10-09T22:00Z | 36,001 MW | 27,576 MW | 15,015 MW | 856 MW | 1,169 MW |
| 2026-10-09T23:00Z | 36,670 MW | 27,585 MW | 15,363 MW | 26 MW | 1,945 MW |
| 2026-10-10T00:00Z | 35,880 MW | 27,595 MW | 14,730 MW | 18 MW | 3,589 MW |
| 2026-10-10T01:00Z | 34,058 MW | 27,604 MW | 14,323 MW | 18 MW | 4,856 MW |
| 2026-10-10T02:00Z | 31,507 MW | 27,621 MW | 14,455 MW | 18 MW | 5,808 MW |
| 2026-10-10T03:00Z | 29,301 MW | 27,633 MW | 12,956 MW | 18 MW | 6,263 MW |
| 2026-10-10T04:00Z | 28,299 MW | 27,630 MW | 12,359 MW | 18 MW | 6,513 MW |
| 2026-10-10T05:00Z | 27,052 MW | 27,562 MW | 12,000 MW | 18 MW | 6,839 MW |
| 2026-10-10T06:00Z | 26,715 MW | 27,527 MW | 11,619 MW | 18 MW | 6,851 MW |
| 2026-10-10T07:00Z | 26,228 MW | 27,491 MW | 11,371 MW | 18 MW | 6,783 MW |
| 2026-10-10T08:00Z | 25,988 MW | 27,448 MW | 11,283 MW | 18 MW | 6,637 MW |
| 2026-10-10T09:00Z | 26,277 MW | 27,415 MW | 11,463 MW | 18 MW | 6,319 MW |
| 2026-10-10T10:00Z | 27,018 MW | 27,422 MW | 12,211 MW | 18 MW | 5,996 MW |
| 2026-10-10T11:00Z | 27,607 MW | 27,415 MW | 12,749 MW | 54 MW | 5,871 MW |
| 2026-10-10T12:00Z | 28,025 MW | 27,416 MW | 13,256 MW | 943 MW | 6,196 MW |
| 2026-10-10T13:00Z | 27,631 MW | 27,404 MW | 12,849 MW | 2,750 MW | 5,782 MW |
| 2026-10-10T14:00Z | 28,259 MW | 27,386 MW | 12,675 MW | 4,418 MW | 4,044 MW |
| 2026-10-10T15:00Z | 28,417 MW | 27,359 MW | 12,875 MW | 5,342 MW | 2,872 MW |
| 2026-10-10T16:00Z | 28,563 MW | 27,334 MW | 12,699 MW | 5,847 MW | 3,008 MW |
| 2026-10-10T17:00Z | 28,036 MW | 27,318 MW | 12,360 MW | 5,687 MW | 3,496 MW |
| 2026-10-10T18:00Z | 28,170 MW | 27,302 MW | 12,160 MW | 4,999 MW | 4,284 MW |
| 2026-10-10T19:00Z | 29,766 MW | 27,291 MW | 12,287 MW | 3,780 MW | 4,808 MW |
| 2026-10-10T20:00Z | 30,196 MW | 27,290 MW | 12,639 MW | 2,621 MW | 4,818 MW |
| 2026-10-10T21:00Z | 30,470 MW | 27,287 MW | 12,565 MW | 1,482 MW | 4,537 MW |
| 2026-10-10T22:00Z | 31,953 MW | 27,295 MW | 13,349 MW | 342 MW | 4,392 MW |
| 2026-10-10T23:00Z | 32,752 MW | 27,322 MW | 14,101 MW | 22 MW | 4,977 MW |
| 2026-10-11T00:00Z | 32,247 MW | 27,376 MW | 13,579 MW | 18 MW | 5,982 MW |
| 2026-10-11T01:00Z | 30,701 MW | 27,422 MW | 13,489 MW | 18 MW | 6,559 MW |
| 2026-10-11T02:00Z | 29,439 MW | 27,477 MW | 13,636 MW | 18 MW | 6,397 MW |
| 2026-10-11T03:00Z | 28,350 MW | 27,554 MW | 13,037 MW | 18 MW | 6,312 MW |
| 2026-10-11T04:00Z | 27,356 MW | 27,602 MW | 12,357 MW | 18 MW | 6,096 MW |
| 2026-10-11T05:00Z | 26,863 MW | 27,610 MW | 12,064 MW | 18 MW | 5,603 MW |
| 2026-10-11T06:00Z | 25,907 MW | 27,622 MW | 11,738 MW | 18 MW | 5,252 MW |
| 2026-10-11T07:00Z | 26,743 MW | 27,620 MW | 11,742 MW | 18 MW | 4,700 MW |
| 2026-10-11T08:00Z | 26,623 MW | 27,619 MW | 11,631 MW | 18 MW | 3,959 MW |
| 2026-10-11T09:00Z | 27,346 MW | 27,625 MW | 12,141 MW | 18 MW | 3,419 MW |
| 2026-10-11T10:00Z | 28,203 MW | 27,623 MW | 12,798 MW | 18 MW | 2,956 MW |
| 2026-10-11T11:00Z | 29,233 MW | 27,608 MW | 12,670 MW | 19 MW | 2,766 MW |
| 2026-10-11T12:00Z | 30,190 MW | 27,609 MW | 13,542 MW | 151 MW | 2,665 MW |
| 2026-10-11T13:00Z | 30,700 MW | 27,584 MW | 13,759 MW | 807 MW | 2,654 MW |
| 2026-10-11T14:00Z | 31,705 MW | 27,457 MW | 14,048 MW | 1,699 MW | 2,382 MW |
| 2026-10-11T15:00Z | 32,426 MW | 27,295 MW | 14,364 MW | 2,263 MW | 2,296 MW |
| 2026-10-11T16:00Z | 33,085 MW | 27,160 MW | 14,454 MW | 2,866 MW | 2,047 MW |
| 2026-10-11T17:00Z | 33,888 MW | 27,016 MW | 14,918 MW | 2,956 MW | 1,947 MW |
| 2026-10-11T18:00Z | 34,330 MW | 26,840 MW | 14,794 MW | 2,810 MW | 1,992 MW |
| 2026-10-11T19:00Z | 35,285 MW | 26,787 MW | 14,655 MW | 2,585 MW | 1,985 MW |
| 2026-10-11T20:00Z | 34,966 MW | 26,736 MW | 14,914 MW | 2,607 MW | 1,975 MW |
| 2026-10-11T21:00Z | 35,347 MW | 26,626 MW | 15,736 MW | 1,850 MW | 1,580 MW |
| 2026-10-11T22:00Z | 35,882 MW | 26,554 MW | 17,475 MW | 425 MW | 1,379 MW |
| 2026-10-11T23:00Z | 36,270 MW | 26,540 MW | 18,383 MW | 28 MW | 1,407 MW |
| 2026-10-12T00:00Z | 36,025 MW | 26,492 MW | 17,973 MW | 25 MW | 1,759 MW |
| 2026-10-12T01:00Z | 34,624 MW | 26,496 MW | 17,219 MW | 25 MW | 2,289 MW |
| 2026-10-12T02:00Z | 32,625 MW | 26,504 MW | 17,454 MW | 25 MW | 2,981 MW |
| 2026-10-12T03:00Z | 31,327 MW | 26,484 MW | 16,007 MW | 25 MW | 3,691 MW |
| 2026-10-12T04:00Z | 30,078 MW | 26,438 MW | 14,407 MW | 25 MW | 4,355 MW |
| 2026-10-12T05:00Z | 29,205 MW | 26,441 MW | 13,586 MW | 25 MW | 5,036 MW |
| 2026-10-12T06:00Z | 28,186 MW | 26,436 MW | 12,877 MW | 25 MW | 5,877 MW |
| 2026-10-12T07:00Z | 27,226 MW | 26,442 MW | 12,458 MW | 25 MW | 6,380 MW |
| 2026-10-12T08:00Z | 27,837 MW | 26,442 MW | 12,579 MW | 25 MW | 6,266 MW |
| 2026-10-12T09:00Z | 28,674 MW | 26,445 MW | 12,881 MW | 25 MW | 6,058 MW |
| 2026-10-12T10:00Z | 31,404 MW | 26,437 MW | 13,272 MW | 25 MW | 5,845 MW |
| 2026-10-12T11:00Z | 33,252 MW | 26,435 MW | 14,235 MW | 69 MW | 5,772 MW |
| 2026-10-12T12:00Z | 34,052 MW | 26,436 MW | 14,994 MW | 1,313 MW | 5,939 MW |
| 2026-10-12T13:00Z | 34,048 MW | 26,431 MW | 14,629 MW | 4,263 MW | 5,510 MW |
| 2026-10-12T14:00Z | 33,270 MW | 26,087 MW | 14,161 MW | 7,494 MW | 4,703 MW |
| 2026-10-12T15:00Z | 32,914 MW | 25,978 MW | 13,765 MW | 9,574 MW | 4,368 MW |
| 2026-10-12T16:00Z | 33,083 MW | 25,947 MW | 13,675 MW | 10,354 MW | 4,185 MW |
| 2026-10-12T17:00Z | 33,731 MW | 25,919 MW | 14,053 MW | 10,483 MW | 4,735 MW |
| 2026-10-12T18:00Z | 33,362 MW | 25,867 MW | 14,245 MW | 10,870 MW | 6,166 MW |
| 2026-10-12T19:00Z | 33,762 MW | 25,858 MW | 14,392 MW | 10,472 MW | 6,634 MW |
| 2026-10-12T20:00Z | 34,865 MW | 25,860 MW | 14,658 MW | 10,230 MW | 6,556 MW |
| 2026-10-12T21:00Z | 36,985 MW | 25,852 MW | 16,395 MW | 6,173 MW | 6,384 MW |
| 2026-10-12T22:00Z | 40,537 MW | 25,862 MW | 18,868 MW | 1,229 MW | 5,667 MW |
| 2026-10-12T23:00Z | 40,348 MW | 25,885 MW | 19,977 MW | 24 MW | 6,229 MW |
| 2026-10-13T00:00Z | 39,161 MW | 25,885 MW | 19,097 MW | 19 MW | 7,249 MW |
| 2026-10-13T01:00Z | 36,408 MW | 25,901 MW | 17,819 MW | 19 MW | 7,644 MW |
| 2026-10-13T02:00Z | 34,328 MW | 25,908 MW | 17,317 MW | 19 MW | 8,072 MW |
| 2026-10-13T03:00Z | 31,848 MW | 25,915 MW | 16,452 MW | 19 MW | 8,412 MW |
| 2026-10-13T04:00Z | 30,361 MW | 25,908 MW | 15,297 MW | 19 MW | 8,274 MW |
| 2026-10-13T05:00Z | 30,645 MW | 25,877 MW | 14,153 MW | 19 MW | 8,174 MW |
| 2026-10-13T06:00Z | 30,243 MW | 25,887 MW | 13,418 MW | 19 MW | 8,107 MW |
| 2026-10-13T07:00Z | 29,772 MW | 25,893 MW | 12,911 MW | 19 MW | 8,049 MW |
| 2026-10-13T08:00Z | 29,876 MW | 25,901 MW | 13,330 MW | 19 MW | 7,749 MW |
| 2026-10-13T09:00Z | 30,836 MW | 25,912 MW | 14,408 MW | 19 MW | 7,466 MW |
| 2026-10-13T10:00Z | 33,470 MW | 25,913 MW | 16,032 MW | 19 MW | 7,055 MW |
| 2026-10-13T11:00Z | 36,059 MW | 25,924 MW | 17,771 MW | 121 MW | 6,606 MW |
| 2026-10-13T12:00Z | 36,106 MW | 25,926 MW | 17,428 MW | 2,999 MW | 6,121 MW |
| 2026-10-13T13:00Z | 34,051 MW | 25,899 MW | 15,392 MW | 9,073 MW | 5,179 MW |
| 2026-10-13T14:00Z | 34,852 MW | 25,868 MW | 14,256 MW | 11,561 MW | 3,867 MW |
| 2026-10-13T15:00Z | 35,080 MW | 25,890 MW | 14,984 MW | 12,123 MW | 2,783 MW |
| 2026-10-13T16:00Z | 35,269 MW | 25,870 MW | 15,743 MW | 11,873 MW | 3,150 MW |
| 2026-10-13T17:00Z | 36,403 MW | 25,827 MW | 16,586 MW | 11,800 MW | 3,025 MW |
| 2026-10-13T18:00Z | 37,293 MW | 25,772 MW | 17,139 MW | 11,787 MW | 2,963 MW |
| 2026-10-13T19:00Z | 38,216 MW | 25,720 MW | 17,265 MW | 11,926 MW | 3,639 MW |
| 2026-10-13T20:00Z | 40,118 MW | 25,678 MW | 17,922 MW | 10,673 MW | 3,954 MW |
| 2026-10-13T21:00Z | 42,663 MW | 25,650 MW | 18,837 MW | 6,540 MW | 3,904 MW |
| 2026-10-13T22:00Z | 45,588 MW | 25,663 MW | 20,256 MW | 1,179 MW | 3,259 MW |
| 2026-10-13T23:00Z | 46,355 MW | 25,671 MW | 21,013 MW | 27 MW | 2,905 MW |
| 2026-10-14T00:00Z | 44,047 MW | 25,675 MW | 20,442 MW | 24 MW | 3,453 MW |
| 2026-10-14T01:00Z | 42,012 MW | 25,711 MW | 19,871 MW | 25 MW | 4,223 MW |
| 2026-10-14T02:00Z | 39,608 MW | 25,732 MW | 19,914 MW | 25 MW | 4,840 MW |
| 2026-10-14T03:00Z | 36,029 MW | 25,757 MW | 18,886 MW | 25 MW | 5,072 MW |
| 2026-10-14T04:00Z | 34,396 MW | 25,776 MW | 17,429 MW | 25 MW | 4,974 MW |
| 2026-10-14T05:00Z | 33,948 MW | 25,799 MW | 15,587 MW | 25 MW | 5,044 MW |
| 2026-10-14T06:00Z | 33,799 MW | 25,820 MW | 14,640 MW | 25 MW | 4,555 MW |
| 2026-10-14T07:00Z | 33,748 MW | 25,861 MW | 14,536 MW | 25 MW | 3,460 MW |
| 2026-10-14T08:00Z | 33,456 MW | 25,771 MW | 13,918 MW | 25 MW | 4,026 MW |
| 2026-10-14T09:00Z | 34,963 MW | 25,426 MW | 14,599 MW | 25 MW | 3,889 MW |
| 2026-10-14T10:00Z | 37,735 MW | 25,375 MW | 16,946 MW | 25 MW | 2,796 MW |
| 2026-10-14T11:00Z | 39,399 MW | 25,370 MW | 19,027 MW | 124 MW | 2,459 MW |
| 2026-10-14T12:00Z | 40,042 MW | 25,376 MW | 19,282 MW | 2,495 MW | 2,374 MW |
| 2026-10-14T13:00Z | 39,774 MW | 25,373 MW | 18,725 MW | 6,415 MW | 2,181 MW |
| 2026-10-14T14:00Z | 39,754 MW | 25,357 MW | 19,299 MW | 8,700 MW | 1,954 MW |
| 2026-10-14T15:00Z | 40,741 MW | 25,350 MW | 19,518 MW | 9,202 MW | 1,468 MW |
| 2026-10-14T16:00Z | 41,771 MW | 25,334 MW | 19,341 MW | 8,991 MW | 1,266 MW |
| 2026-10-14T17:00Z | 42,444 MW | 25,317 MW | 19,488 MW | 8,643 MW | 1,858 MW |
| 2026-10-14T18:00Z | 42,575 MW | 25,364 MW | 19,739 MW | 7,653 MW | 2,177 MW |
| 2026-10-14T19:00Z | 43,304 MW | 25,413 MW | 19,773 MW | 6,872 MW | 2,029 MW |
| 2026-10-14T20:00Z | 43,197 MW | 25,430 MW | 19,508 MW | 5,651 MW | 2,020 MW |
| 2026-10-14T21:00Z | 43,792 MW | 25,474 MW | 19,626 MW | 2,830 MW | 2,421 MW |
| 2026-10-14T22:00Z | 45,771 MW | 25,554 MW | 20,147 MW | 301 MW | 2,610 MW |
| 2026-10-14T23:00Z | 45,359 MW | 25,636 MW | 20,310 MW | 16 MW | 2,797 MW |
| 2026-10-15T00:00Z | 45,456 MW | 25,731 MW | 20,331 MW | 16 MW | 2,718 MW |
| 2026-10-15T01:00Z | 44,163 MW | 25,755 MW | 20,202 MW | 16 MW | 3,445 MW |
| 2026-10-15T02:00Z | 41,601 MW | 25,949 MW | 20,081 MW | 16 MW | 3,554 MW |
| 2026-10-15T03:00Z | 37,333 MW | 26,149 MW | 19,299 MW | 16 MW | 3,773 MW |
| 2026-10-15T04:00Z | 34,281 MW | 26,326 MW | 18,083 MW | 16 MW | 3,500 MW |
| 2026-10-15T05:00Z | 31,336 MW | 26,575 MW | 18,462 MW | 16 MW | 3,197 MW |
| 2026-10-15T06:00Z | 30,128 MW | 26,664 MW | 18,397 MW | 16 MW | 2,783 MW |
| 2026-10-15T07:00Z | 29,142 MW | 26,686 MW | 17,554 MW | 16 MW | 2,456 MW |
| 2026-10-15T08:00Z | 29,081 MW | 26,708 MW | 18,081 MW | 16 MW | 1,940 MW |
| 2026-10-15T09:00Z | 30,873 MW | 26,729 MW | 17,996 MW | 16 MW | 1,981 MW |
| 2026-10-15T10:00Z | 34,532 MW | 26,738 MW | 18,834 MW | 16 MW | 1,982 MW |
| 2026-10-15T11:00Z | 36,387 MW | 26,774 MW | 19,073 MW | 65 MW | 2,147 MW |
| 2026-10-15T12:00Z | 36,618 MW | 26,797 MW | 19,640 MW | 1,336 MW | 2,601 MW |
| 2026-10-15T13:00Z | 35,853 MW | 26,792 MW | 19,406 MW | 3,609 MW | 2,616 MW |
| 2026-10-15T14:00Z | 35,183 MW | 26,802 MW | 19,171 MW | 5,079 MW | 2,170 MW |
| 2026-10-15T15:00Z | 35,033 MW | 26,809 MW | 18,550 MW | 5,801 MW | 2,365 MW |
| 2026-10-15T16:00Z | 35,289 MW | 26,809 MW | 17,921 MW | 6,445 MW | 2,320 MW |
| 2026-10-15T17:00Z | 35,673 MW | 26,805 MW | 17,362 MW | 6,459 MW | 2,209 MW |
| 2026-10-15T18:00Z | 36,584 MW | 26,814 MW | 17,694 MW | 5,279 MW | 2,297 MW |
| 2026-10-15T19:00Z | 37,169 MW | 26,806 MW | 18,447 MW | 3,850 MW | 2,459 MW |
| 2026-10-15T20:00Z | 38,012 MW | 26,787 MW | 18,859 MW | 2,879 MW | 3,115 MW |
| 2026-10-15T21:00Z | 38,755 MW | 26,778 MW | 18,951 MW | 1,322 MW | 4,035 MW |
| 2026-10-15T22:00Z | 39,693 MW | 26,769 MW | 19,581 MW | 219 MW | 4,965 MW |
| 2026-10-15T23:00Z | 39,338 MW | 26,763 MW | 19,463 MW | 17 MW | 5,904 MW |
| 2026-10-16T00:00Z | 38,247 MW | 26,752 MW | 19,259 MW | 16 MW | 6,583 MW |
| 2026-10-16T01:00Z | 36,244 MW | 26,732 MW | 19,057 MW | 16 MW | 6,821 MW |
| 2026-10-16T02:00Z | 36,244 MW | 26,732 MW | 19,057 MW | 16 MW | 6,821 MW |
| 2026-10-16T03:00Z | 37,333 MW | 26,149 MW | 19,299 MW | 16 MW | 3,773 MW |
| 2026-10-16T04:00Z | 28,114 MW | 26,734 MW | 16,507 MW | 16 MW | 7,698 MW |
| 2026-10-16T05:00Z | 27,462 MW | 26,706 MW | 15,425 MW | 16 MW | 8,060 MW |
| 2026-10-16T06:00Z | 26,475 MW | 26,668 MW | 15,320 MW | 16 MW | 8,387 MW |
| 2026-10-16T07:00Z | 25,186 MW | 26,667 MW | 14,761 MW | 16 MW | 8,141 MW |
| 2026-10-16T08:00Z | 25,646 MW | 26,663 MW | 14,217 MW | 16 MW | 8,334 MW |
| 2026-10-16T09:00Z | 26,451 MW | 26,647 MW | 14,091 MW | 16 MW | 8,733 MW |
| 2026-10-16T10:00Z | 29,696 MW | 26,650 MW | 14,751 MW | 16 MW | 8,913 MW |
| 2026-10-16T11:00Z | 32,540 MW | 26,657 MW | 15,232 MW | 22 MW | 8,807 MW |
| 2026-10-16T12:00Z | 34,175 MW | 26,682 MW | 15,555 MW | 399 MW | 8,445 MW |
| 2026-10-16T13:00Z | 35,065 MW | 26,630 MW | 15,580 MW | 1,632 MW | 8,032 MW |
| 2026-10-16T14:00Z | 34,829 MW | 26,724 MW | 15,111 MW | 3,699 MW | 7,918 MW |
| 2026-10-16T15:00Z | 34,282 MW | 26,820 MW | 14,380 MW | 5,405 MW | 7,443 MW |
| 2026-10-16T16:00Z | 34,479 MW | 26,831 MW | 14,080 MW | 6,429 MW | 7,518 MW |
| 2026-10-16T17:00Z | 34,517 MW | 26,839 MW | 14,387 MW | 6,888 MW | 7,305 MW |
| 2026-10-16T18:00Z | 34,027 MW | 26,843 MW | 13,988 MW | 6,981 MW | 7,802 MW |
| 2026-10-16T19:00Z | 33,452 MW | 26,840 MW | 14,288 MW | 6,429 MW | 7,979 MW |
| 2026-10-16T20:00Z | 34,657 MW | 26,841 MW | 14,479 MW | 5,232 MW | 7,766 MW |
| 2026-10-16T21:00Z | 36,752 MW | 26,857 MW | 15,440 MW | 2,309 MW | 7,598 MW |
| 2026-10-16T22:00Z | 36,708 MW | 26,874 MW | 16,262 MW | 237 MW | 8,004 MW |
| 2026-10-16T23:00Z | 36,977 MW | 26,906 MW | 15,852 MW | 17 MW | 8,332 MW |
| 2026-10-17T00:00Z | 36,338 MW | 26,932 MW | 15,422 MW | 16 MW | 8,293 MW |
| 2026-10-17T01:00Z | 34,871 MW | 26,938 MW | 14,628 MW | 16 MW | 8,008 MW |
| 2026-10-17T02:00Z | 32,602 MW | 26,906 MW | 14,550 MW | 16 MW | 8,083 MW |
| 2026-10-17T03:00Z | 30,306 MW | 26,878 MW | 14,867 MW | 16 MW | 7,850 MW |
| 2026-10-17T04:00Z | 27,975 MW | 27,029 MW | 14,650 MW | 16 MW | 7,312 MW |
| 2026-10-17T05:00Z | 26,308 MW | 27,267 MW | 14,528 MW | 16 MW | 6,822 MW |
| 2026-10-17T06:00Z | 25,660 MW | 27,074 MW | 13,798 MW | 16 MW | 6,358 MW |
| 2026-10-17T07:00Z | 25,694 MW | 27,067 MW | 13,393 MW | 16 MW | 5,900 MW |
| 2026-10-17T08:00Z | 25,889 MW | 27,063 MW | 13,463 MW | 16 MW | 5,294 MW |
| 2026-10-17T09:00Z | 25,795 MW | 27,060 MW | 13,534 MW | 16 MW | 4,766 MW |
| 2026-10-17T10:00Z | 26,310 MW | 27,087 MW | 13,350 MW | 16 MW | 4,475 MW |
| 2026-10-17T11:00Z | 27,930 MW | 27,110 MW | 12,721 MW | 17 MW | 3,911 MW |
| 2026-10-17T12:00Z | 29,312 MW | 27,120 MW | 13,397 MW | 924 MW | 3,223 MW |
| 2026-10-17T13:00Z | 29,277 MW | 27,118 MW | 13,411 MW | 4,340 MW | 2,720 MW |
| 2026-10-17T14:00Z | 29,132 MW | 27,110 MW | 13,158 MW | 6,205 MW | 2,589 MW |
| 2026-10-17T15:00Z | 28,535 MW | 27,124 MW | 13,287 MW | 6,687 MW | 2,054 MW |
| 2026-10-17T16:00Z | 27,175 MW | 27,119 MW | 12,314 MW | 7,387 MW | 1,884 MW |
| 2026-10-17T17:00Z | 26,016 MW | 27,082 MW | 11,245 MW | 8,278 MW | 1,848 MW |
| 2026-10-17T18:00Z | 24,886 MW | 27,015 MW | 10,754 MW | 9,003 MW | 1,786 MW |
| 2026-10-17T19:00Z | 24,662 MW | 26,970 MW | 10,520 MW | 9,347 MW | 1,725 MW |
| 2026-10-17T20:00Z | 25,766 MW | 26,921 MW | 10,524 MW | 9,238 MW | 1,610 MW |
| 2026-10-17T21:00Z | 27,508 MW | 26,876 MW | 10,762 MW | 5,989 MW | 1,641 MW |
| 2026-10-17T22:00Z | 31,116 MW | 26,836 MW | 11,738 MW | 1,092 MW | 1,706 MW |
| 2026-10-17T23:00Z | 33,664 MW | 26,823 MW | 13,696 MW | 36 MW | 1,819 MW |
| 2026-10-18T00:00Z | 32,987 MW | 26,839 MW | 14,175 MW | 35 MW | 2,225 MW |
| 2026-10-18T01:00Z | 32,337 MW | 26,847 MW | 13,949 MW | 35 MW | 2,583 MW |
| 2026-10-18T02:00Z | 31,264 MW | 26,750 MW | 13,993 MW | 35 MW | 2,679 MW |
| 2026-10-18T03:00Z | 30,249 MW | 26,567 MW | 14,327 MW | 35 MW | 2,803 MW |
| 2026-10-18T04:00Z | 28,340 MW | 26,581 MW | 12,981 MW | 35 MW | 3,049 MW |
| 2026-10-18T05:00Z | 28,172 MW | 26,781 MW | 11,683 MW | 35 MW | 3,475 MW |
| 2026-10-18T06:00Z | 27,133 MW | 26,842 MW | 11,290 MW | 35 MW | 3,931 MW |
| 2026-10-18T07:00Z | 27,292 MW | 26,872 MW | 11,243 MW | 35 MW | 4,463 MW |
| 2026-10-18T08:00Z | 26,986 MW | 26,926 MW | 11,208 MW | 35 MW | 4,820 MW |
| 2026-10-18T09:00Z | 26,807 MW | 26,959 MW | 11,211 MW | 35 MW | 5,243 MW |
| 2026-10-18T10:00Z | 26,347 MW | 26,993 MW | 11,287 MW | 35 MW | 5,771 MW |
| 2026-10-18T11:00Z | 27,000 MW | 27,044 MW | 11,413 MW | 104 MW | 5,945 MW |
| 2026-10-18T12:00Z | 27,156 MW | 27,185 MW | 11,934 MW | 3,217 MW | 5,863 MW |
| 2026-10-18T13:00Z | 23,348 MW | 27,323 MW | 11,205 MW | 10,354 MW | 4,911 MW |
| 2026-10-18T14:00Z | 21,473 MW | 27,444 MW | 10,962 MW | 13,372 MW | 3,566 MW |
| 2026-10-18T15:00Z | 19,667 MW | 27,548 MW | 10,627 MW | 13,244 MW | 4,425 MW |
| 2026-10-18T16:00Z | 19,907 MW | 27,589 MW | 10,326 MW | 12,810 MW | 4,014 MW |
| 2026-10-18T17:00Z | 20,733 MW | 27,618 MW | 10,246 MW | 12,657 MW | 3,380 MW |
| 2026-10-18T18:00Z | 20,835 MW | 27,638 MW | 10,244 MW | 12,728 MW | 2,931 MW |
| 2026-10-18T19:00Z | 21,081 MW | 27,651 MW | 10,357 MW | 12,785 MW | 2,861 MW |
| 2026-10-18T20:00Z | 22,873 MW | 27,669 MW | 10,442 MW | 11,813 MW | 2,824 MW |
| 2026-10-18T21:00Z | 27,700 MW | 27,690 MW | 10,765 MW | 6,812 MW | 2,826 MW |
| 2026-10-18T22:00Z | 31,136 MW | 27,720 MW | 12,838 MW | 1,020 MW | 2,493 MW |
| 2026-10-18T23:00Z | 32,214 MW | 27,752 MW | 14,830 MW | 34 MW | 2,631 MW |
| 2026-10-19T00:00Z | 31,477 MW | 27,784 MW | 15,475 MW | 33 MW | 3,349 MW |
| 2026-10-19T01:00Z | 30,901 MW | 27,811 MW | 14,884 MW | 33 MW | 4,151 MW |
| 2026-10-19T02:00Z | 29,835 MW | 27,857 MW | 14,635 MW | 33 MW | 4,922 MW |
| 2026-10-19T03:00Z | 28,431 MW | 27,868 MW | 14,038 MW | 33 MW | 5,191 MW |
| 2026-10-19T04:00Z | 28,123 MW | 27,874 MW | 12,921 MW | 33 MW | 5,064 MW |
| 2026-10-19T05:00Z | 27,943 MW | 27,884 MW | 12,619 MW | 33 MW | 5,069 MW |
| 2026-10-19T06:00Z | 27,800 MW | 27,886 MW | 12,369 MW | 33 MW | 4,853 MW |
| 2026-10-19T07:00Z | 27,587 MW | 27,893 MW | 12,409 MW | 33 MW | 4,194 MW |
| 2026-10-19T08:00Z | 28,628 MW | 27,888 MW | 12,957 MW | 33 MW | 3,400 MW |
| 2026-10-19T09:00Z | 30,439 MW | 27,902 MW | 13,431 MW | 33 MW | 2,570 MW |
| 2026-10-19T10:00Z | 33,346 MW | 27,902 MW | 13,987 MW | 33 MW | 1,797 MW |
| 2026-10-19T11:00Z | 35,627 MW | 27,902 MW | 15,648 MW | 94 MW | 1,209 MW |
| 2026-10-19T12:00Z | 34,986 MW | 27,900 MW | 17,031 MW | 2,851 MW | 978 MW |
| 2026-10-19T13:00Z | 31,731 MW | 27,894 MW | 15,547 MW | 9,604 MW | 765 MW |
| 2026-10-19T14:00Z | 30,791 MW | 27,878 MW | 13,584 MW | 12,627 MW | 665 MW |
| 2026-10-19T15:00Z | 29,384 MW | 27,852 MW | 13,021 MW | 12,722 MW | 672 MW |
| 2026-10-19T16:00Z | 28,941 MW | 27,820 MW | 13,369 MW | 12,371 MW | 718 MW |
| 2026-10-19T17:00Z | 28,581 MW | 27,792 MW | 13,559 MW | 12,228 MW | 740 MW |
| 2026-10-19T18:00Z | 28,285 MW | 27,771 MW | 13,475 MW | 12,412 MW | 763 MW |
| 2026-10-19T19:00Z | 28,532 MW | 27,738 MW | 13,205 MW | 12,577 MW | 754 MW |
| 2026-10-19T20:00Z | 29,268 MW | 27,773 MW | 13,096 MW | 11,461 MW | 728 MW |
| 2026-10-19T21:00Z | 32,130 MW | 27,829 MW | 13,076 MW | 6,258 MW | 700 MW |
| 2026-10-19T22:00Z | 35,629 MW | 27,839 MW | 15,213 MW | 980 MW | 568 MW |
| 2026-10-19T23:00Z | 36,758 MW | 27,855 MW | 17,221 MW | 99 MW | 646 MW |
| 2026-10-20T00:00Z | 35,808 MW | 27,866 MW | 17,939 MW | 99 MW | 745 MW |
| 2026-10-20T01:00Z | 33,791 MW | 27,873 MW | 18,062 MW | 99 MW | 982 MW |
| 2026-10-20T02:00Z | 31,437 MW | 27,878 MW | 17,912 MW | 61 MW | 1,234 MW |
| 2026-10-20T03:00Z | 30,346 MW | 27,888 MW | 17,144 MW | 33 MW | 1,312 MW |
| 2026-10-20T04:00Z | 30,091 MW | 27,903 MW | 16,500 MW | 33 MW | 1,331 MW |
| 2026-10-20T05:00Z | 29,863 MW | 27,912 MW | 16,178 MW | 33 MW | 1,442 MW |
| 2026-10-20T06:00Z | 29,243 MW | 27,913 MW | 16,109 MW | 33 MW | 1,427 MW |
| 2026-10-20T07:00Z | 29,146 MW | 27,909 MW | 15,974 MW | 33 MW | 1,414 MW |
| 2026-10-20T08:00Z | 29,994 MW | 27,918 MW | 16,207 MW | 33 MW | 1,344 MW |
| 2026-10-20T09:00Z | 31,306 MW | 27,927 MW | 16,063 MW | 33 MW | 1,333 MW |
| 2026-10-20T10:00Z | 33,701 MW | 27,922 MW | 16,031 MW | 33 MW | 1,239 MW |
| 2026-10-20T11:00Z | 36,515 MW | 27,922 MW | 16,722 MW | 82 MW | 1,230 MW |
| 2026-10-20T12:00Z | 36,007 MW | 27,924 MW | 16,994 MW | 2,814 MW | 1,126 MW |
| 2026-10-20T13:00Z | 31,272 MW | 27,885 MW | 15,909 MW | 9,128 MW | 762 MW |
| 2026-10-20T14:00Z | 29,476 MW | 27,884 MW | 14,550 MW | 12,162 MW | 585 MW |
| 2026-10-20T15:00Z | 28,684 MW | 27,861 MW | 14,067 MW | 12,291 MW | 746 MW |
| 2026-10-20T16:00Z | 28,121 MW | 27,839 MW | 14,761 MW | 12,025 MW | 720 MW |
| 2026-10-20T17:00Z | 27,783 MW | 27,814 MW | 14,991 MW | 11,946 MW | 748 MW |
| 2026-10-20T18:00Z | 27,997 MW | 27,797 MW | 14,777 MW | 12,006 MW | 785 MW |
| 2026-10-20T19:00Z | 28,443 MW | 27,733 MW | 14,228 MW | 12,066 MW | 811 MW |
| 2026-10-20T20:00Z | 30,951 MW | 27,747 MW | 14,360 MW | 11,024 MW | 834 MW |
| 2026-10-20T21:00Z | 35,228 MW | 27,780 MW | 14,765 MW | 5,949 MW | 795 MW |
| 2026-10-20T22:00Z | 39,048 MW | 27,789 MW | 15,871 MW | 792 MW | 849 MW |
| 2026-10-20T23:00Z | 40,388 MW | 27,802 MW | 16,681 MW | 38 MW | 1,142 MW |
| 2026-10-21T00:00Z | 39,990 MW | 27,797 MW | 16,738 MW | 33 MW | 1,667 MW |
| 2026-10-21T01:00Z | 38,580 MW | 27,803 MW | 16,189 MW | 33 MW | 1,985 MW |
| 2026-10-21T02:00Z | 36,069 MW | 27,820 MW | 15,767 MW | 33 MW | 2,028 MW |
| 2026-10-21T03:00Z | 33,445 MW | 27,824 MW | 14,458 MW | 33 MW | 2,215 MW |
| 2026-10-21T04:00Z | 32,196 MW | 27,835 MW | 13,451 MW | 33 MW | 2,165 MW |
| 2026-10-21T05:00Z | 31,160 MW | 27,849 MW | 12,935 MW | 33 MW | 2,005 MW |
| 2026-10-21T06:00Z | 30,612 MW | 27,864 MW | 12,745 MW | 33 MW | 1,860 MW |
| 2026-10-21T07:00Z | 30,669 MW | 27,879 MW | 12,993 MW | 33 MW | 1,556 MW |
| 2026-10-21T08:00Z | 31,354 MW | 27,885 MW | 13,544 MW | 33 MW | 1,289 MW |
| 2026-10-21T09:00Z | 32,523 MW | 27,886 MW | 14,204 MW | 33 MW | 1,110 MW |
| 2026-10-21T10:00Z | 34,272 MW | 27,894 MW | 14,512 MW | 33 MW | 878 MW |
| 2026-10-21T11:00Z | 36,886 MW | 27,898 MW | 15,534 MW | 80 MW | 808 MW |
| 2026-10-21T12:00Z | 37,139 MW | 27,902 MW | 16,603 MW | 2,583 MW | 678 MW |
| 2026-10-21T13:00Z | 32,574 MW | 27,898 MW | 15,828 MW | 8,725 MW | 444 MW |
| 2026-10-21T14:00Z | 30,036 MW | 27,878 MW | 14,724 MW | 12,048 MW | 230 MW |
| 2026-10-21T15:00Z | 29,363 MW | 27,860 MW | 14,555 MW | 12,440 MW | 222 MW |
| 2026-10-21T16:00Z | 29,113 MW | 27,846 MW | 13,843 MW | 12,309 MW | 335 MW |
| 2026-10-21T17:00Z | 29,219 MW | 27,827 MW | 13,498 MW | 12,176 MW | 562 MW |
| 2026-10-21T18:00Z | 29,451 MW | 27,810 MW | 13,573 MW | 12,396 MW | 550 MW |
| 2026-10-21T19:00Z | 29,798 MW | 27,797 MW | 13,829 MW | 12,466 MW | 511 MW |
| 2026-10-21T20:00Z | 31,611 MW | 27,787 MW | 13,337 MW | 11,349 MW | 497 MW |
| 2026-10-21T21:00Z | 35,352 MW | 27,777 MW | 13,536 MW | 6,013 MW | 509 MW |
| 2026-10-21T22:00Z | 38,956 MW | 27,779 MW | 14,956 MW | 751 MW | 520 MW |
| 2026-10-21T23:00Z | 40,844 MW | 27,790 MW | 16,110 MW | 33 MW | 663 MW |
| 2026-10-22T00:00Z | 40,458 MW | 27,806 MW | 16,971 MW | 33 MW | 795 MW |
| 2026-10-22T01:00Z | 38,695 MW | 27,819 MW | 16,973 MW | 33 MW | 910 MW |
| 2026-10-22T02:00Z | 36,000 MW | 27,826 MW | 16,871 MW | 33 MW | 937 MW |
| 2026-10-22T03:00Z | 32,955 MW | 27,839 MW | 16,291 MW | 33 MW | 988 MW |
| 2026-10-22T04:00Z | 31,955 MW | 27,846 MW | 15,365 MW | 33 MW | 1,009 MW |
| 2026-10-22T05:00Z | 31,870 MW | 27,850 MW | 15,170 MW | 33 MW | 1,012 MW |
| 2026-10-22T06:00Z | 31,712 MW | 27,855 MW | 14,383 MW | 33 MW | 1,013 MW |
| 2026-10-22T07:00Z | 32,073 MW | 27,852 MW | 13,739 MW | 33 MW | 1,221 MW |
| 2026-10-22T08:00Z | 32,798 MW | 27,864 MW | 13,811 MW | 33 MW | 1,459 MW |
| 2026-10-22T09:00Z | 34,645 MW | 27,698 MW | 13,490 MW | 33 MW | 1,439 MW |
| 2026-10-22T10:00Z | 37,113 MW | 27,432 MW | 13,916 MW | 33 MW | 1,443 MW |
| 2026-10-22T11:00Z | 39,249 MW | 27,442 MW | 15,276 MW | 77 MW | 1,408 MW |
| 2026-10-22T12:00Z | 39,194 MW | 27,444 MW | 15,815 MW | 2,578 MW | 1,290 MW |
| 2026-10-22T13:00Z | 34,745 MW | 27,331 MW | 14,587 MW | 8,675 MW | 973 MW |
| 2026-10-22T14:00Z | 33,098 MW | 27,004 MW | 13,875 MW | 12,086 MW | 664 MW |
| 2026-10-22T15:00Z | 32,959 MW | 26,992 MW | 13,486 MW | 12,640 MW | 515 MW |
| 2026-10-22T16:00Z | 32,160 MW | 27,207 MW | 13,409 MW | 12,336 MW | 578 MW |
| 2026-10-22T17:00Z | 32,380 MW | 27,302 MW | 13,579 MW | 12,211 MW | 656 MW |
| 2026-10-22T18:00Z | 31,811 MW | 27,428 MW | 13,158 MW | 12,406 MW | 753 MW |
| 2026-10-22T19:00Z | 31,791 MW | 27,447 MW | 12,985 MW | 12,528 MW | 795 MW |
| 2026-10-22T20:00Z | 31,791 MW | 27,447 MW | 12,985 MW | 12,528 MW | 795 MW |
| 2026-10-22T21:00Z | 31,791 MW | 27,447 MW | 12,985 MW | 12,528 MW | 795 MW |
| 2026-10-22T22:00Z | 39,417 MW | 27,715 MW | 14,954 MW | 654 MW | 1,124 MW |
| 2026-10-22T23:00Z | 40,435 MW | 27,746 MW | 16,181 MW | 19 MW | 1,221 MW |
| 2026-10-23T00:00Z | 39,712 MW | 27,757 MW | 16,258 MW | 14 MW | 1,377 MW |
| 2026-10-23T01:00Z | 37,460 MW | 27,769 MW | 16,112 MW | 8 MW | 1,692 MW |
| 2026-10-23T02:00Z | 35,609 MW | 27,804 MW | 15,702 MW | 8 MW | 1,843 MW |
| 2026-10-23T03:00Z | 33,385 MW | 27,817 MW | 15,407 MW | 8 MW | 2,007 MW |
| 2026-10-23T04:00Z | 31,556 MW | 27,838 MW | 14,089 MW | 8 MW | 2,115 MW |
| 2026-10-23T05:00Z | 30,714 MW | 27,890 MW | 13,022 MW | 8 MW | 1,944 MW |
| 2026-10-23T06:00Z | 29,757 MW | 27,987 MW | 12,132 MW | 8 MW | 1,917 MW |
| 2026-10-23T07:00Z | 30,016 MW | 28,083 MW | 11,876 MW | 8 MW | 1,899 MW |
| 2026-10-23T08:00Z | 30,297 MW | 28,167 MW | 12,069 MW | 8 MW | 1,899 MW |
| 2026-10-23T09:00Z | 31,963 MW | 28,196 MW | 12,771 MW | 8 MW | 1,751 MW |
| 2026-10-23T10:00Z | 34,406 MW | 28,211 MW | 12,798 MW | 8 MW | 1,678 MW |
| 2026-10-23T11:00Z | 37,071 MW | 28,220 MW | 13,740 MW | 48 MW | 1,529 MW |
| 2026-10-23T12:00Z | 36,778 MW | 28,216 MW | 14,469 MW | 2,427 MW | 1,634 MW |
| 2026-10-23T13:00Z | 33,074 MW | 28,214 MW | 13,553 MW | 8,585 MW | 1,195 MW |
| 2026-10-23T14:00Z | 30,495 MW | 28,206 MW | 12,567 MW | 11,952 MW | 851 MW |
| 2026-10-23T15:00Z | 30,369 MW | 28,185 MW | 12,729 MW | 12,071 MW | 450 MW |
| 2026-10-23T16:00Z | 29,929 MW | 28,172 MW | 12,625 MW | 11,795 MW | 510 MW |
| 2026-10-23T17:00Z | 29,641 MW | 28,160 MW | 12,220 MW | 11,647 MW | 616 MW |
| 2026-10-23T18:00Z | 29,646 MW | 28,138 MW | 11,851 MW | 11,576 MW | 663 MW |
| 2026-10-23T19:00Z | 30,441 MW | 28,127 MW | 11,971 MW | 10,924 MW | 718 MW |
| 2026-10-23T20:00Z | 31,725 MW | 28,120 MW | 11,286 MW | 9,553 MW | 769 MW |
| 2026-10-23T21:00Z | 35,412 MW | 28,124 MW | 10,771 MW | 5,050 MW | 794 MW |
| 2026-10-23T22:00Z | 38,692 MW | 28,120 MW | 12,590 MW | 583 MW | 924 MW |
| 2026-10-23T23:00Z | 37,904 MW | 28,139 MW | 13,095 MW | 7 MW | 1,419 MW |
| 2026-10-24T00:00Z | 37,565 MW | 28,149 MW | 12,146 MW | 7 MW | 2,683 MW |
| 2026-10-24T01:00Z | 36,014 MW | 28,041 MW | 11,630 MW | 7 MW | 3,935 MW |
| 2026-10-24T02:00Z | 34,287 MW | 27,782 MW | 11,349 MW | 7 MW | 4,353 MW |
| 2026-10-24T03:00Z | 32,708 MW | 27,768 MW | 10,845 MW | 7 MW | 4,988 MW |
| 2026-10-24T04:00Z | 30,848 MW | 27,845 MW | 10,773 MW | 7 MW | 5,069 MW |
| 2026-10-24T05:00Z | 29,734 MW | 28,053 MW | 11,714 MW | 7 MW | 4,520 MW |
| 2026-10-24T06:00Z | 29,516 MW | 28,141 MW | 11,926 MW | 7 MW | 4,025 MW |
| 2026-10-24T07:00Z | 29,528 MW | 28,168 MW | 11,918 MW | 7 MW | 3,836 MW |
| 2026-10-24T08:00Z | 30,523 MW | 28,175 MW | 11,879 MW | 7 MW | 3,031 MW |
| 2026-10-24T09:00Z | 32,016 MW | 28,227 MW | 12,243 MW | 7 MW | 2,677 MW |
| 2026-10-24T10:00Z | 32,952 MW | 28,258 MW | 12,589 MW | 7 MW | 2,340 MW |
| 2026-10-24T11:00Z | 34,172 MW | 28,304 MW | 12,752 MW | 42 MW | 2,373 MW |
| 2026-10-24T12:00Z | 34,675 MW | 28,353 MW | 13,576 MW | 2,327 MW | 2,302 MW |
| 2026-10-24T13:00Z | 31,509 MW | 28,253 MW | 12,896 MW | 8,601 MW | 1,992 MW |
| 2026-10-24T14:00Z | 30,116 MW | 28,098 MW | 12,063 MW | 11,839 MW | 1,432 MW |
| 2026-10-24T15:00Z | 29,680 MW | 28,092 MW | 11,257 MW | 11,938 MW | 1,058 MW |
| 2026-10-24T16:00Z | 29,686 MW | 28,079 MW | 10,273 MW | 11,572 MW | 943 MW |
| 2026-10-24T17:00Z | 29,338 MW | 28,111 MW | 10,071 MW | 11,313 MW | 843 MW |
| 2026-10-24T18:00Z | 29,665 MW | 28,253 MW | 9,534 MW | 10,962 MW | 850 MW |
| 2026-10-24T19:00Z | 30,119 MW | 28,387 MW | 9,779 MW | 11,004 MW | 846 MW |
| 2026-10-24T20:00Z | 32,160 MW | 28,459 MW | 9,933 MW | 9,260 MW | 773 MW |
| 2026-10-24T21:00Z | 36,057 MW | 28,487 MW | 10,439 MW | 4,276 MW | 796 MW |
| 2026-10-24T22:00Z | 37,899 MW | 28,509 MW | 12,568 MW | 389 MW | 1,054 MW |
| 2026-10-24T23:00Z | 38,097 MW | 28,504 MW | 13,698 MW | 7 MW | 1,552 MW |
| 2026-10-25T00:00Z | 37,456 MW | 28,441 MW | 13,862 MW | 7 MW | 2,182 MW |
| 2026-10-25T01:00Z | 36,683 MW | 28,515 MW | 13,459 MW | 7 MW | 2,672 MW |
| 2026-10-25T02:00Z | 35,245 MW | 28,541 MW | 12,838 MW | 7 MW | 2,865 MW |
| 2026-10-25T03:00Z | 33,192 MW | 28,554 MW | 12,487 MW | 7 MW | 3,314 MW |
| 2026-10-25T04:00Z | 32,201 MW | 28,580 MW | 12,032 MW | 7 MW | 3,152 MW |
| 2026-10-25T05:00Z | 31,733 MW | 28,617 MW | 11,449 MW | 7 MW | 3,133 MW |
| 2026-10-25T06:00Z | 31,640 MW | 28,661 MW | 10,729 MW | 7 MW | 2,976 MW |
| 2026-10-25T07:00Z | 31,784 MW | 28,698 MW | 10,807 MW | 7 MW | 2,848 MW |
| 2026-10-25T08:00Z | 32,263 MW | 28,706 MW | 11,032 MW | 7 MW | 2,521 MW |
| 2026-10-25T09:00Z | 32,240 MW | 28,699 MW | 10,958 MW | 7 MW | 2,243 MW |
| 2026-10-25T10:00Z | 32,955 MW | 28,698 MW | 11,221 MW | 7 MW | 2,053 MW |
| 2026-10-25T11:00Z | 33,260 MW | 28,704 MW | 11,070 MW | 41 MW | 1,868 MW |
| 2026-10-25T12:00Z | 33,422 MW | 28,813 MW | 11,840 MW | 2,343 MW | 1,542 MW |
| 2026-10-25T13:00Z | 31,150 MW | 28,853 MW | 10,439 MW | 8,994 MW | 1,251 MW |
| 2026-10-25T14:00Z | 28,968 MW | 28,840 MW | 9,706 MW | 12,145 MW | 900 MW |
| 2026-10-25T15:00Z | 29,273 MW | 28,816 MW | 9,359 MW | 12,302 MW | 538 MW |
| 2026-10-25T16:00Z | 28,937 MW | 28,787 MW | 9,511 MW | 12,089 MW | 423 MW |
| 2026-10-25T17:00Z | 28,745 MW | 28,778 MW | 9,965 MW | 11,901 MW | 405 MW |
| 2026-10-25T18:00Z | 28,986 MW | 28,852 MW | 10,216 MW | 11,774 MW | 378 MW |
| 2026-10-25T19:00Z | 30,045 MW | 28,842 MW | 10,594 MW | 11,489 MW | 389 MW |
| 2026-10-25T20:00Z | 31,709 MW | 28,885 MW | 9,779 MW | 10,230 MW | 461 MW |
| 2026-10-25T21:00Z | 35,290 MW | 28,992 MW | 10,348 MW | 4,952 MW | 499 MW |
| 2026-10-25T22:00Z | 38,100 MW | 29,039 MW | 12,035 MW | 475 MW | 532 MW |
| 2026-10-25T23:00Z | 39,229 MW | 29,050 MW | 13,196 MW | 8 MW | 684 MW |
| 2026-10-26T00:00Z | 38,223 MW | 29,062 MW | 13,607 MW | 8 MW | 798 MW |
| 2026-10-26T01:00Z | 37,186 MW | 28,912 MW | 13,641 MW | 8 MW | 934 MW |
| 2026-10-26T02:00Z | 34,817 MW | 28,733 MW | 13,342 MW | 8 MW | 1,218 MW |
| 2026-10-26T03:00Z | 33,136 MW | 28,689 MW | 13,376 MW | 8 MW | 1,403 MW |
| 2026-10-26T04:00Z | 30,841 MW | 28,580 MW | 12,519 MW | 8 MW | 1,478 MW |
| 2026-10-26T05:00Z | 30,615 MW | 28,463 MW | 11,813 MW | 8 MW | 1,584 MW |
| 2026-10-26T06:00Z | 30,175 MW | 28,457 MW | 11,181 MW | 8 MW | 1,833 MW |
| 2026-10-26T07:00Z | 30,770 MW | 28,465 MW | 11,162 MW | 8 MW | 1,870 MW |
| 2026-10-26T08:00Z | 31,739 MW | 28,478 MW | 11,055 MW | 8 MW | 2,032 MW |
| 2026-10-26T09:00Z | 34,391 MW | 28,493 MW | 10,581 MW | 8 MW | 1,998 MW |
| 2026-10-26T10:00Z | 36,596 MW | 28,494 MW | 10,560 MW | 8 MW | 1,918 MW |
| 2026-10-26T11:00Z | 40,231 MW | 28,507 MW | 11,753 MW | 34 MW | 1,852 MW |
| 2026-10-26T12:00Z | 40,319 MW | 28,529 MW | 12,783 MW | 2,128 MW | 1,751 MW |
| 2026-10-26T13:00Z | 36,589 MW | 28,550 MW | 11,685 MW | 8,333 MW | 1,276 MW |
| 2026-10-26T14:00Z | 34,071 MW | 28,556 MW | 10,631 MW | 11,817 MW | 894 MW |
| 2026-10-26T15:00Z | 33,363 MW | 28,551 MW | 11,285 MW | 11,874 MW | 745 MW |
| 2026-10-26T16:00Z | 32,765 MW | 28,514 MW | 11,680 MW | 11,589 MW | 530 MW |
| 2026-10-26T17:00Z | 33,289 MW | 28,479 MW | 11,924 MW | 11,254 MW | 356 MW |
| 2026-10-26T18:00Z | 33,587 MW | 28,493 MW | 12,120 MW | 11,307 MW | 309 MW |
| 2026-10-26T19:00Z | 34,381 MW | 28,534 MW | 12,084 MW | 11,119 MW | 434 MW |
| 2026-10-26T20:00Z | 36,204 MW | 28,578 MW | 11,531 MW | 8,634 MW | 593 MW |
| 2026-10-26T21:00Z | 38,406 MW | 28,578 MW | 11,526 MW | 3,643 MW | 823 MW |
| 2026-10-26T22:00Z | 41,278 MW | 28,612 MW | 12,458 MW | 340 MW | 1,508 MW |
| 2026-10-26T23:00Z | 40,793 MW | 28,654 MW | 13,035 MW | 19 MW | 2,289 MW |
| 2026-10-27T00:00Z | 39,628 MW | 28,712 MW | 12,225 MW | 19 MW | 2,927 MW |
| 2026-10-27T01:00Z | 37,629 MW | 28,753 MW | 12,722 MW | 19 MW | 3,121 MW |
| 2026-10-27T02:00Z | 36,014 MW | 28,810 MW | 13,114 MW | 19 MW | 3,359 MW |
| 2026-10-27T03:00Z | 33,742 MW | 28,860 MW | 12,781 MW | 14 MW | 3,132 MW |
| 2026-10-27T04:00Z | 32,600 MW | 28,897 MW | 12,266 MW | 13 MW | 2,832 MW |
| 2026-10-27T05:00Z | 31,748 MW | 28,946 MW | 12,203 MW | 13 MW | 2,610 MW |
| 2026-10-27T06:00Z | 31,386 MW | 28,992 MW | 12,103 MW | 13 MW | 2,555 MW |
| 2026-10-27T07:00Z | 31,128 MW | 29,031 MW | 11,954 MW | 13 MW | 2,340 MW |
| 2026-10-27T08:00Z | 31,511 MW | 29,045 MW | 12,489 MW | 13 MW | 1,916 MW |
| 2026-10-27T09:00Z | 32,145 MW | 29,057 MW | 12,239 MW | 13 MW | 1,725 MW |
| 2026-10-27T10:00Z | 34,508 MW | 29,067 MW | 12,595 MW | 13 MW | 1,616 MW |
| 2026-10-27T11:00Z | 38,372 MW | 29,088 MW | 12,912 MW | 38 MW | 1,335 MW |
| 2026-10-27T12:00Z | 39,223 MW | 29,108 MW | 13,238 MW | 2,045 MW | 1,447 MW |
| 2026-10-27T13:00Z | 36,134 MW | 29,114 MW | 12,915 MW | 7,808 MW | 1,277 MW |
| 2026-10-27T14:00Z | 34,873 MW | 29,102 MW | 11,966 MW | 11,104 MW | 829 MW |
| 2026-10-27T15:00Z | 35,480 MW | 29,083 MW | 12,222 MW | 11,265 MW | 537 MW |
| 2026-10-27T16:00Z | 34,380 MW | 29,061 MW | 12,065 MW | 11,160 MW | 593 MW |
| 2026-10-27T17:00Z | 34,248 MW | 29,052 MW | 11,541 MW | 11,053 MW | 783 MW |
| 2026-10-27T18:00Z | 34,254 MW | 29,045 MW | 11,320 MW | 10,976 MW | 1,104 MW |
| 2026-10-27T19:00Z | 34,522 MW | 29,045 MW | 11,632 MW | 10,728 MW | 1,334 MW |
| 2026-10-27T20:00Z | 36,307 MW | 29,046 MW | 12,079 MW | 8,145 MW | 1,644 MW |
| 2026-10-27T21:00Z | 38,698 MW | 29,050 MW | 11,691 MW | 3,159 MW | 1,401 MW |
| 2026-10-27T22:00Z | 41,016 MW | 29,063 MW | 12,841 MW | 231 MW | 1,176 MW |
| 2026-10-27T23:00Z | 42,264 MW | 29,084 MW | 13,788 MW | 21 MW | 1,543 MW |
| 2026-10-28T00:00Z | 40,897 MW | 29,106 MW | 13,566 MW | 17 MW | 2,005 MW |
| 2026-10-28T01:00Z | 39,287 MW | 29,133 MW | 13,064 MW | 17 MW | 2,120 MW |
| 2026-10-28T02:00Z | 37,350 MW | 29,143 MW | 12,099 MW | 17 MW | 2,371 MW |
| 2026-10-28T03:00Z | 35,829 MW | 29,148 MW | 11,716 MW | 17 MW | 2,326 MW |
| 2026-10-28T04:00Z | 33,921 MW | 29,152 MW | 12,223 MW | 17 MW | 2,240 MW |
| 2026-10-28T05:00Z | 32,571 MW | 29,175 MW | 11,985 MW | 17 MW | 2,427 MW |
| 2026-10-28T06:00Z | 32,586 MW | 29,198 MW | 11,422 MW | 17 MW | 2,732 MW |
| 2026-10-28T07:00Z | 32,011 MW | 29,202 MW | 11,088 MW | 17 MW | 2,659 MW |
| 2026-10-28T08:00Z | 32,905 MW | 29,209 MW | 11,134 MW | 17 MW | 2,355 MW |
| 2026-10-28T09:00Z | 34,476 MW | 29,213 MW | 10,302 MW | 17 MW | 2,121 MW |
| 2026-10-28T10:00Z | 37,168 MW | 29,223 MW | 10,147 MW | 12 MW | 2,032 MW |
| 2026-10-28T11:00Z | 39,821 MW | 29,227 MW | 10,815 MW | 19 MW | 2,167 MW |
| 2026-10-28T12:00Z | 40,514 MW | 29,241 MW | 11,488 MW | 1,022 MW | 2,348 MW |
| 2026-10-28T13:00Z | 38,125 MW | 29,239 MW | 11,607 MW | 4,995 MW | 2,216 MW |
| 2026-10-28T14:00Z | 36,195 MW | 29,151 MW | 11,049 MW | 8,478 MW | 1,527 MW |
| 2026-10-28T15:00Z | 35,208 MW | 29,200 MW | 11,105 MW | 9,882 MW | 1,413 MW |
| 2026-10-28T16:00Z | 34,249 MW | 29,177 MW | 10,871 MW | 10,330 MW | 1,690 MW |
| 2026-10-28T17:00Z | 34,055 MW | 29,168 MW | 11,311 MW | 10,153 MW | 2,368 MW |
| 2026-10-28T18:00Z | 34,365 MW | 29,153 MW | 10,886 MW | 9,908 MW | 2,921 MW |
| 2026-10-28T19:00Z | 34,798 MW | 29,146 MW | 10,697 MW | 9,428 MW | 3,075 MW |
| 2026-10-28T20:00Z | 36,160 MW | 29,135 MW | 10,860 MW | 8,114 MW | 3,323 MW |
| 2026-10-28T21:00Z | 37,535 MW | 29,139 MW | 10,639 MW | 4,042 MW | 2,960 MW |
| 2026-10-28T22:00Z | 39,766 MW | 29,134 MW | 11,588 MW | 693 MW | 2,744 MW |
| 2026-10-28T23:00Z | 40,475 MW | 29,141 MW | 11,987 MW | 69 MW | 2,987 MW |
| 2026-10-29T00:00Z | 40,010 MW | 29,158 MW | 11,828 MW | 11 MW | 4,880 MW |
| 2026-10-29T01:00Z | 38,823 MW | 29,103 MW | 11,746 MW | 11 MW | 5,486 MW |
| 2026-10-29T02:00Z | 36,331 MW | 28,883 MW | 11,510 MW | 11 MW | 6,138 MW |
| 2026-10-29T03:00Z | 33,982 MW | 28,898 MW | 11,602 MW | 11 MW | 6,303 MW |
| 2026-10-29T04:00Z | 32,520 MW | 28,929 MW | 11,379 MW | 11 MW | 6,363 MW |
| 2026-10-29T05:00Z | 31,734 MW | 29,057 MW | 10,871 MW | 11 MW | 6,602 MW |
| 2026-10-29T06:00Z | 31,468 MW | 29,248 MW | 10,504 MW | 11 MW | 6,640 MW |
| 2026-10-29T07:00Z | 31,168 MW | 29,290 MW | 10,259 MW | 11 MW | 6,455 MW |
| 2026-10-29T08:00Z | 31,633 MW | 29,297 MW | 10,327 MW | 11 MW | 6,217 MW |
| 2026-10-29T09:00Z | 32,597 MW | 29,305 MW | 10,087 MW | 11 MW | 6,042 MW |
| 2026-10-29T10:00Z | 34,938 MW | 29,311 MW | 10,282 MW | 11 MW | 6,122 MW |
| 2026-10-29T11:00Z | 37,482 MW | 29,310 MW | 10,654 MW | 22 MW | 6,345 MW |
| 2026-10-29T12:00Z | 38,203 MW | 29,304 MW | 10,475 MW | 1,322 MW | 6,387 MW |
| 2026-10-29T13:00Z | 35,815 MW | 29,309 MW | 10,146 MW | 6,315 MW | 5,460 MW |
| 2026-10-29T14:00Z | 33,795 MW | 29,290 MW | 9,826 MW | 10,243 MW | 3,866 MW |
| 2026-10-29T15:00Z | 34,197 MW | 29,260 MW | 9,863 MW | 10,890 MW | 3,587 MW |
| 2026-10-29T16:00Z | 33,837 MW | 29,237 MW | 10,058 MW | 11,092 MW | 3,538 MW |
| 2026-10-29T17:00Z | 34,477 MW | 29,212 MW | 10,614 MW | 10,696 MW | 3,501 MW |
| 2026-10-29T18:00Z | 34,215 MW | 29,205 MW | 10,713 MW | 10,810 MW | 3,645 MW |
| 2026-10-29T19:00Z | 33,875 MW | 29,181 MW | 10,626 MW | 10,788 MW | 3,675 MW |
| 2026-10-29T20:00Z | 36,242 MW | 29,172 MW | 11,064 MW | 8,903 MW | 3,746 MW |
| 2026-10-29T21:00Z | 39,083 MW | 29,178 MW | 11,179 MW | 3,613 MW | 3,174 MW |
| 2026-10-29T22:00Z | 41,333 MW | 29,182 MW | 12,566 MW | 289 MW | 2,810 MW |
| 2026-10-29T23:00Z | 41,755 MW | 29,191 MW | 13,364 MW | 37 MW | 3,088 MW |
| 2026-10-30T00:00Z | 40,790 MW | 29,207 MW | 13,414 MW | 38 MW | 3,577 MW |
| 2026-10-30T01:00Z | 39,614 MW | 29,206 MW | 13,055 MW | 38 MW | 3,461 MW |
| 2026-10-30T02:00Z | 38,124 MW | 29,217 MW | 12,645 MW | 38 MW | 3,228 MW |
| 2026-10-30T03:00Z | 35,807 MW | 29,233 MW | 11,620 MW | 38 MW | 3,298 MW |
| 2026-10-30T04:00Z | 33,536 MW | 29,234 MW | 11,090 MW | 42 MW | 3,493 MW |
| 2026-10-30T05:00Z | 32,182 MW | 29,239 MW | 10,488 MW | 42 MW | 3,694 MW |
| 2026-10-30T06:00Z | 31,820 MW | 29,245 MW | 9,751 MW | 42 MW | 3,909 MW |
| 2026-10-30T07:00Z | 31,093 MW | 29,265 MW | 9,387 MW | 42 MW | 4,257 MW |
| 2026-10-30T08:00Z | 31,218 MW | 29,268 MW | 9,321 MW | 17 MW | 4,232 MW |
| 2026-10-30T09:00Z | 31,823 MW | 29,277 MW | 9,510 MW | 17 MW | 4,364 MW |
| 2026-10-30T10:00Z | 33,090 MW | 29,285 MW | 10,532 MW | 17 MW | 4,739 MW |
| 2026-10-30T11:00Z | 34,986 MW | 29,287 MW | 11,880 MW | 31 MW | 4,534 MW |
| 2026-10-30T12:00Z | 36,502 MW | 29,278 MW | 12,648 MW | 1,793 MW | 3,697 MW |
| 2026-10-30T13:00Z | 33,816 MW | 29,270 MW | 11,995 MW | 7,916 MW | 2,902 MW |
| 2026-10-30T14:00Z | 32,849 MW | 29,268 MW | 10,630 MW | 11,744 MW | 2,356 MW |
| 2026-10-30T15:00Z | 33,273 MW | 29,241 MW | 10,709 MW | 11,748 MW | 2,099 MW |
| 2026-10-30T16:00Z | 32,515 MW | 29,223 MW | 11,170 MW | 11,134 MW | 2,071 MW |
| 2026-10-30T17:00Z | 31,586 MW | 29,228 MW | 12,013 MW | 11,021 MW | 2,266 MW |
| 2026-10-30T18:00Z | 32,078 MW | 29,235 MW | 11,167 MW | 11,563 MW | 2,405 MW |
| 2026-10-30T19:00Z | 33,348 MW | 29,226 MW | 11,112 MW | 11,441 MW | 2,387 MW |
| 2026-10-30T20:00Z | 34,519 MW | 29,234 MW | 11,297 MW | 9,174 MW | 2,619 MW |
| 2026-10-30T21:00Z | 35,790 MW | 29,240 MW | 11,840 MW | 3,564 MW | 2,628 MW |
| 2026-10-30T22:00Z | 36,760 MW | 29,266 MW | 12,725 MW | 232 MW | 2,776 MW |
| 2026-10-30T23:00Z | 36,816 MW | 29,276 MW | 12,961 MW | 17 MW | 3,210 MW |
| 2026-10-31T00:00Z | 36,567 MW | 29,274 MW | 12,419 MW | 17 MW | 3,880 MW |
| 2026-10-31T01:00Z | 35,878 MW | 29,299 MW | 12,463 MW | 17 MW | 4,008 MW |
| 2026-10-31T02:00Z | 34,828 MW | 29,105 MW | 12,378 MW | 17 MW | 4,291 MW |
| 2026-10-31T03:00Z | 33,176 MW | 28,777 MW | 11,766 MW | 17 MW | 4,642 MW |
| 2026-10-31T04:00Z | 31,836 MW | 28,932 MW | 11,249 MW | 17 MW | 4,415 MW |
| 2026-10-31T05:00Z | 32,453 MW | 29,192 MW | 10,774 MW | 17 MW | 4,406 MW |
| 2026-10-31T06:00Z | 32,114 MW | 29,224 MW | 10,755 MW | 17 MW | 4,324 MW |
| 2026-10-31T07:00Z | 31,720 MW | 29,245 MW | 10,922 MW | 17 MW | 4,390 MW |
| 2026-10-31T08:00Z | 31,347 MW | 29,265 MW | 10,845 MW | 17 MW | 4,543 MW |
| 2026-10-31T09:00Z | 31,548 MW | 29,289 MW | 10,862 MW | 17 MW | 4,254 MW |
| 2026-10-31T10:00Z | 31,557 MW | 29,304 MW | 10,824 MW | 15 MW | 3,940 MW |
| 2026-10-31T11:00Z | 32,678 MW | 29,328 MW | 10,876 MW | 33 MW | 4,090 MW |
| 2026-10-31T12:00Z | 33,585 MW | 29,346 MW | 11,579 MW | 1,417 MW | 4,142 MW |
| 2026-10-31T13:00Z | 32,370 MW | 29,360 MW | 10,991 MW | 5,405 MW | 3,963 MW |
| 2026-10-31T14:00Z | 32,366 MW | 29,360 MW | 10,868 MW | 7,719 MW | 3,428 MW |
| 2026-10-31T15:00Z | 31,659 MW | 29,369 MW | 10,946 MW | 8,448 MW | 2,926 MW |
| 2026-10-31T16:00Z | 31,060 MW | 29,365 MW | 10,561 MW | 8,942 MW | 2,161 MW |
| 2026-10-31T17:00Z | 31,581 MW | 29,356 MW | 11,021 MW | 8,988 MW | 1,449 MW |
| 2026-10-31T18:00Z | 31,771 MW | 29,348 MW | 11,274 MW | 8,952 MW | 1,133 MW |
| 2026-10-31T19:00Z | 31,876 MW | 29,338 MW | 11,535 MW | 7,657 MW | 985 MW |
| 2026-10-31T20:00Z | 33,400 MW | 29,333 MW | 12,306 MW | 4,734 MW | 1,085 MW |
| 2026-10-31T21:00Z | 34,331 MW | 29,334 MW | 12,694 MW | 1,432 MW | 1,082 MW |
| 2026-10-31T22:00Z | 34,752 MW | 29,334 MW | 12,699 MW | 83 MW | 1,112 MW |
| 2026-10-31T23:00Z | 34,807 MW | 29,337 MW | 12,768 MW | 30 MW | 1,552 MW |
| 2026-11-01T00:00Z | 35,289 MW | 29,345 MW | 12,903 MW | 30 MW | 1,843 MW |
| 2026-11-01T01:00Z | 34,544 MW | 29,349 MW | 12,309 MW | 30 MW | 2,229 MW |
| 2026-11-01T02:00Z | 33,915 MW | 29,357 MW | 11,653 MW | 30 MW | 2,600 MW |
| 2026-11-01T03:00Z | 32,713 MW | 29,363 MW | 11,368 MW | 30 MW | 2,752 MW |
| 2026-11-01T04:00Z | 32,713 MW | 29,363 MW | 11,368 MW | 30 MW | 2,752 MW |
| 2026-11-01T05:00Z | 32,453 MW | 29,192 MW | 10,774 MW | 17 MW | 4,406 MW |
| 2026-11-01T06:00Z | 32,114 MW | 29,224 MW | 10,755 MW | 17 MW | 4,324 MW |
| 2026-11-01T07:00Z | 31,720 MW | 29,245 MW | 10,922 MW | 17 MW | 4,390 MW |
| 2026-11-01T08:00Z | 31,347 MW | 29,265 MW | 10,845 MW | 17 MW | 4,543 MW |
| 2026-11-01T09:00Z | 31,548 MW | 29,289 MW | 10,862 MW | 17 MW | 4,254 MW |
| 2026-11-01T10:00Z | 31,557 MW | 29,304 MW | 10,824 MW | 15 MW | 3,940 MW |
| 2026-11-01T11:00Z | 32,678 MW | 29,328 MW | 10,876 MW | 33 MW | 4,090 MW |
| 2026-11-01T12:00Z | 33,585 MW | 29,346 MW | 11,579 MW | 1,417 MW | 4,142 MW |
| 2026-11-01T13:00Z | 32,370 MW | 29,360 MW | 10,991 MW | 5,405 MW | 3,963 MW |
| 2026-11-01T14:00Z | 32,366 MW | 29,360 MW | 10,868 MW | 7,719 MW | 3,428 MW |
| 2026-11-01T15:00Z | 31,659 MW | 29,369 MW | 10,946 MW | 8,448 MW | 2,926 MW |
| 2026-11-01T16:00Z | 31,060 MW | 29,365 MW | 10,561 MW | 8,942 MW | 2,161 MW |
| 2026-11-01T17:00Z | 31,581 MW | 29,356 MW | 11,021 MW | 8,988 MW | 1,449 MW |
| 2026-11-01T18:00Z | 31,771 MW | 29,348 MW | 11,274 MW | 8,952 MW | 1,133 MW |
| 2026-11-01T19:00Z | 31,876 MW | 29,338 MW | 11,535 MW | 7,657 MW | 985 MW |
| 2026-11-01T20:00Z | 33,400 MW | 29,333 MW | 12,306 MW | 4,734 MW | 1,085 MW |
| 2026-11-01T21:00Z | 34,331 MW | 29,334 MW | 12,694 MW | 1,432 MW | 1,082 MW |
| 2026-11-01T22:00Z | 34,752 MW | 29,334 MW | 12,699 MW | 83 MW | 1,112 MW |
| 2026-11-01T23:00Z | 34,807 MW | 29,337 MW | 12,768 MW | 30 MW | 1,552 MW |
| 2026-11-02T00:00Z | 35,289 MW | 29,345 MW | 12,903 MW | 30 MW | 1,843 MW |
| 2026-11-02T01:00Z | 34,544 MW | 29,349 MW | 12,309 MW | 30 MW | 2,229 MW |
| 2026-11-02T02:00Z | 33,915 MW | 29,357 MW | 11,653 MW | 30 MW | 2,600 MW |
| 2026-11-02T03:00Z | 32,713 MW | 29,363 MW | 11,368 MW | 30 MW | 2,752 MW |
| 2026-11-02T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-02T05:00Z | 31,528 MW | 29,364 MW | 11,444 MW | 18 MW | 3,551 MW |
| 2026-11-02T06:00Z | 30,955 MW | 29,367 MW | 11,354 MW | 18 MW | 3,286 MW |
| 2026-11-02T07:00Z | 31,060 MW | 29,372 MW | 11,473 MW | 17 MW | 3,524 MW |
| 2026-11-02T08:00Z | 31,118 MW | 29,363 MW | 11,174 MW | 17 MW | 3,408 MW |
| 2026-11-02T09:00Z | 31,613 MW | 29,363 MW | 11,588 MW | 17 MW | 3,459 MW |
| 2026-11-02T10:00Z | 32,188 MW | 29,362 MW | 11,513 MW | 17 MW | 3,791 MW |
| 2026-11-02T11:00Z | 34,421 MW | 29,359 MW | 11,989 MW | 20 MW | 3,860 MW |
| 2026-11-02T12:00Z | 35,689 MW | 29,364 MW | 13,373 MW | 471 MW | 4,045 MW |
| 2026-11-02T13:00Z | 35,466 MW | 29,361 MW | 14,063 MW | 1,950 MW | 4,311 MW |
| 2026-11-02T14:00Z | 35,095 MW | 29,345 MW | 14,155 MW | 3,583 MW | 4,413 MW |
| 2026-11-02T15:00Z | 34,218 MW | 29,329 MW | 14,170 MW | 5,016 MW | 4,537 MW |
| 2026-11-02T16:00Z | 34,129 MW | 29,310 MW | 14,149 MW | 5,549 MW | 4,426 MW |
| 2026-11-02T17:00Z | 34,055 MW | 29,294 MW | 14,045 MW | 5,510 MW | 4,483 MW |
| 2026-11-02T18:00Z | 34,780 MW | 29,281 MW | 14,050 MW | 5,266 MW | 4,769 MW |
| 2026-11-02T19:00Z | 36,185 MW | 29,272 MW | 14,609 MW | 4,252 MW | 4,764 MW |
| 2026-11-02T20:00Z | 35,742 MW | 29,268 MW | 14,388 MW | 3,312 MW | 4,951 MW |
| 2026-11-02T21:00Z | 36,771 MW | 29,270 MW | 14,387 MW | 1,104 MW | 5,344 MW |
| 2026-11-02T22:00Z | 36,966 MW | 29,276 MW | 14,334 MW | 98 MW | 5,770 MW |
| 2026-11-02T23:00Z | 37,578 MW | 29,292 MW | 14,372 MW | 72 MW | 6,188 MW |
| 2026-11-03T00:00Z | 37,413 MW | 29,297 MW | 13,882 MW | 72 MW | 6,447 MW |
| 2026-11-03T01:00Z | 36,832 MW | 29,293 MW | 14,418 MW | 72 MW | 6,698 MW |
| 2026-11-03T02:00Z | 35,777 MW | 29,305 MW | 14,572 MW | 72 MW | 6,671 MW |
| 2026-11-03T03:00Z | 33,983 MW | 29,301 MW | 14,247 MW | 52 MW | 6,939 MW |
| 2026-11-03T04:00Z | 32,203 MW | 29,299 MW | 13,882 MW | 17 MW | 6,790 MW |
| 2026-11-03T05:00Z | 30,720 MW | 29,309 MW | 13,493 MW | 17 MW | 6,652 MW |
| 2026-11-03T06:00Z | 30,816 MW | 29,309 MW | 13,073 MW | 17 MW | 6,758 MW |
| 2026-11-03T07:00Z | 30,186 MW | 29,321 MW | 12,555 MW | 17 MW | 6,331 MW |
| 2026-11-03T08:00Z | 30,074 MW | 29,317 MW | 12,222 MW | 17 MW | 6,540 MW |
| 2026-11-03T09:00Z | 30,310 MW | 29,319 MW | 11,943 MW | 17 MW | 6,837 MW |
| 2026-11-03T10:00Z | 31,230 MW | 29,320 MW | 12,204 MW | 17 MW | 7,191 MW |
| 2026-11-03T11:00Z | 31,702 MW | 29,333 MW | 12,534 MW | 19 MW | 7,318 MW |
| 2026-11-03T12:00Z | 32,707 MW | 29,335 MW | 13,271 MW | 1,239 MW | 7,499 MW |
| 2026-11-03T13:00Z | 31,093 MW | 29,327 MW | 12,968 MW | 6,103 MW | 7,608 MW |
| 2026-11-03T14:00Z | 31,035 MW | 29,308 MW | 12,337 MW | 9,143 MW | 7,545 MW |
| 2026-11-03T15:00Z | 32,351 MW | 29,298 MW | 12,741 MW | 9,723 MW | 7,447 MW |
| 2026-11-03T16:00Z | 31,018 MW | 29,276 MW | 12,458 MW | 10,374 MW | 7,366 MW |
| 2026-11-03T17:00Z | 31,210 MW | 29,253 MW | 12,678 MW | 10,474 MW | 7,158 MW |
| 2026-11-03T18:00Z | 31,775 MW | 29,227 MW | 12,710 MW | 10,567 MW | 6,965 MW |
| 2026-11-03T19:00Z | 31,845 MW | 29,220 MW | 12,447 MW | 9,958 MW | 6,891 MW |
| 2026-11-03T20:00Z | 33,045 MW | 29,210 MW | 12,855 MW | 7,941 MW | 6,831 MW |
| 2026-11-03T21:00Z | 35,370 MW | 29,204 MW | 13,757 MW | 3,109 MW | 6,804 MW |
| 2026-11-03T22:00Z | 38,225 MW | 29,207 MW | 14,569 MW | 180 MW | 6,619 MW |
| 2026-11-03T23:00Z | 39,006 MW | 29,210 MW | 14,920 MW | 17 MW | 7,457 MW |
| 2026-11-04T00:00Z | 38,467 MW | 29,213 MW | 14,714 MW | 17 MW | 7,758 MW |
| 2026-11-04T01:00Z | 36,635 MW | 29,220 MW | 14,930 MW | 17 MW | 7,821 MW |
| 2026-11-04T02:00Z | 36,013 MW | 29,226 MW | 14,939 MW | 17 MW | 8,537 MW |
| 2026-11-04T03:00Z | 34,354 MW | 29,237 MW | 14,296 MW | 17 MW | 8,645 MW |
| 2026-11-04T04:00Z | 33,196 MW | 29,242 MW | 13,626 MW | 17 MW | 8,849 MW |
| 2026-11-04T05:00Z | 31,088 MW | 29,248 MW | 12,095 MW | 17 MW | 8,446 MW |
| 2026-11-04T06:00Z | 30,809 MW | 29,246 MW | 12,057 MW | 17 MW | 7,936 MW |
| 2026-11-04T07:00Z | 29,683 MW | 29,249 MW | 11,694 MW | 17 MW | 7,562 MW |
| 2026-11-04T08:00Z | 29,875 MW | 29,261 MW | 11,489 MW | 17 MW | 7,140 MW |
| 2026-11-04T09:00Z | 30,611 MW | 29,282 MW | 11,795 MW | 17 MW | 6,382 MW |
| 2026-11-04T10:00Z | 31,230 MW | 29,281 MW | 12,332 MW | 17 MW | 6,235 MW |
| 2026-11-04T11:00Z | 32,757 MW | 29,286 MW | 12,977 MW | 19 MW | 6,159 MW |
| 2026-11-04T12:00Z | 33,442 MW | 29,290 MW | 13,246 MW | 964 MW | 6,282 MW |
| 2026-11-04T13:00Z | 32,722 MW | 29,289 MW | 13,037 MW | 3,637 MW | 6,044 MW |
| 2026-11-04T14:00Z | 33,413 MW | 29,282 MW | 12,806 MW | 5,342 MW | 5,667 MW |
| 2026-11-04T15:00Z | 33,428 MW | 29,251 MW | 12,719 MW | 5,889 MW | 5,775 MW |
| 2026-11-04T16:00Z | 34,286 MW | 29,232 MW | 12,915 MW | 6,224 MW | 5,518 MW |
| 2026-11-04T17:00Z | 34,069 MW | 29,220 MW | 13,117 MW | 5,767 MW | 5,638 MW |
| 2026-11-04T18:00Z | 34,155 MW | 29,209 MW | 13,613 MW | 5,261 MW | 6,193 MW |
| 2026-11-04T19:00Z | 35,595 MW | 29,203 MW | 13,737 MW | 4,963 MW | 6,199 MW |
| 2026-11-04T20:00Z | 36,366 MW | 29,205 MW | 13,884 MW | 3,475 MW | 5,760 MW |
| 2026-11-04T21:00Z | 37,532 MW | 29,209 MW | 13,963 MW | 1,166 MW | 5,440 MW |
| 2026-11-04T22:00Z | 38,363 MW | 29,216 MW | 14,251 MW | 118 MW | 5,290 MW |
| 2026-11-04T23:00Z | 39,121 MW | 29,226 MW | 14,234 MW | 90 MW | 5,437 MW |
| 2026-11-05T00:00Z | 38,854 MW | 29,236 MW | 13,851 MW | 90 MW | 5,593 MW |
| 2026-11-05T01:00Z | 38,375 MW | 29,245 MW | 13,688 MW | 90 MW | 5,493 MW |
| 2026-11-05T02:00Z | 37,298 MW | 29,247 MW | 13,783 MW | 90 MW | 5,711 MW |
| 2026-11-05T03:00Z | 35,350 MW | 29,254 MW | 13,533 MW | 90 MW | 5,993 MW |
| 2026-11-05T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T14:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T14:00Z.
Day by Day
Daily totals, Eastern time dates, through 2026-11-04Show the data table (400 rows)
| Date (Eastern time) | Demand |
|---|---|
| 2025-10-01 | 2.10 TWh |
| 2025-10-02 | 2.05 TWh |
| 2025-10-03 | 2.08 TWh |
| 2025-10-04 | 2.03 TWh |
| 2025-10-05 | 2.03 TWh |
| 2025-10-06 | 2.21 TWh |
| 2025-10-07 | 2.19 TWh |
| 2025-10-08 | 2.07 TWh |
| 2025-10-09 | 1.94 TWh |
| 2025-10-10 | 1.94 TWh |
| 2025-10-11 | 1.85 TWh |
| 2025-10-12 | 1.84 TWh |
| 2025-10-13 | 1.99 TWh |
| 2025-10-14 | 2.01 TWh |
| 2025-10-15 | 1.98 TWh |
| 2025-10-16 | 1.96 TWh |
| 2025-10-17 | 1.97 TWh |
| 2025-10-18 | 1.88 TWh |
| 2025-10-19 | 1.85 TWh |
| 2025-10-20 | 1.96 TWh |
| 2025-10-21 | 2.01 TWh |
| 2025-10-22 | 2.01 TWh |
| 2025-10-23 | 2.04 TWh |
| 2025-10-24 | 2.05 TWh |
| 2025-10-25 | 1.95 TWh |
| 2025-10-26 | 1.90 TWh |
| 2025-10-27 | 2.06 TWh |
| 2025-10-28 | 2.10 TWh |
| 2025-10-29 | 2.10 TWh |
| 2025-10-30 | 2.08 TWh |
| 2025-10-31 | 2.03 TWh |
| 2025-11-01 | 1.93 TWh |
| 2025-11-02 | 2.00 TWh |
| 2025-11-03 | 2.07 TWh |
| 2025-11-04 | 2.08 TWh |
| 2025-11-05 | 2.06 TWh |
| 2025-11-06 | 2.06 TWh |
| 2025-11-07 | 2.10 TWh |
| 2025-11-08 | 1.90 TWh |
| 2025-11-09 | 1.98 TWh |
| 2025-11-10 | 2.27 TWh |
| 2025-11-11 | 2.43 TWh |
| 2025-11-12 | 2.26 TWh |
| 2025-11-13 | 2.19 TWh |
| 2025-11-14 | 2.17 TWh |
| 2025-11-15 | 1.96 TWh |
| 2025-11-16 | 1.94 TWh |
| 2025-11-17 | 2.24 TWh |
| 2025-11-18 | 2.31 TWh |
| 2025-11-19 | 2.24 TWh |
| 2025-11-20 | 2.24 TWh |
| 2025-11-21 | 2.15 TWh |
| 2025-11-22 | 2.02 TWh |
| 2025-11-23 | 2.03 TWh |
| 2025-11-24 | 2.20 TWh |
| 2025-11-25 | 2.17 TWh |
| 2025-11-26 | 2.15 TWh |
| 2025-11-27 | 2.15 TWh |
| 2025-11-28 | 2.29 TWh |
| 2025-11-29 | 2.33 TWh |
| 2025-11-30 | 2.31 TWh |
| 2025-12-01 | 2.46 TWh |
| 2025-12-02 | 2.57 TWh |
| 2025-12-03 | 2.57 TWh |
| 2025-12-04 | 2.63 TWh |
| 2025-12-05 | 2.70 TWh |
| 2025-12-06 | 2.47 TWh |
| 2025-12-07 | 2.41 TWh |
| 2025-12-08 | 2.67 TWh |
| 2025-12-09 | 2.76 TWh |
| 2025-12-10 | 2.59 TWh |
| 2025-12-11 | 2.63 TWh |
| 2025-12-12 | 2.65 TWh |
| 2025-12-13 | 2.57 TWh |
| 2025-12-14 | 2.75 TWh |
| 2025-12-15 | 3.04 TWh |
| 2025-12-16 | 2.81 TWh |
| 2025-12-17 | 2.54 TWh |
| 2025-12-18 | 2.44 TWh |
| 2025-12-19 | 2.43 TWh |
| 2025-12-20 | 2.45 TWh |
| 2025-12-21 | 2.37 TWh |
| 2025-12-22 | 2.55 TWh |
| 2025-12-23 | 2.37 TWh |
| 2025-12-24 | 2.15 TWh |
| 2025-12-25 | 2.05 TWh |
| 2025-12-26 | 2.29 TWh |
| 2025-12-27 | 2.24 TWh |
| 2025-12-28 | 2.23 TWh |
| 2025-12-29 | 2.42 TWh |
| 2025-12-30 | 2.71 TWh |
| 2025-12-31 | 2.61 TWh |
| 2026-01-01 | 2.48 TWh |
| 2026-01-02 | 2.58 TWh |
| 2026-01-03 | 2.54 TWh |
| 2026-01-04 | 2.46 TWh |
| 2026-01-05 | 2.56 TWh |
| 2026-01-06 | 2.42 TWh |
| 2026-01-07 | 2.29 TWh |
| 2026-01-08 | 2.30 TWh |
| 2026-01-09 | 2.25 TWh |
| 2026-01-10 | 2.16 TWh |
| 2026-01-11 | 2.30 TWh |
| 2026-01-12 | 2.53 TWh |
| 2026-01-13 | 2.46 TWh |
| 2026-01-14 | 2.40 TWh |
| 2026-01-15 | 2.68 TWh |
| 2026-01-16 | 2.76 TWh |
| 2026-01-17 | 2.49 TWh |
| 2026-01-18 | 2.55 TWh |
| 2026-01-19 | 2.79 TWh |
| 2026-01-20 | 2.94 TWh |
| 2026-01-21 | 2.86 TWh |
| 2026-01-22 | 2.56 TWh |
| 2026-01-23 | 2.74 TWh |
| 2026-01-24 | 3.05 TWh |
| 2026-01-25 | 2.97 TWh |
| 2026-01-26 | 2.95 TWh |
| 2026-01-27 | 3.10 TWh |
| 2026-01-28 | 3.09 TWh |
| 2026-01-29 | 3.10 TWh |
| 2026-01-30 | 3.12 TWh |
| 2026-01-31 | 3.08 TWh |
| 2026-02-01 | 3.00 TWh |
| 2026-02-02 | 2.99 TWh |
| 2026-02-03 | 2.79 TWh |
| 2026-02-04 | 2.75 TWh |
| 2026-02-05 | 2.89 TWh |
| 2026-02-06 | 2.86 TWh |
| 2026-02-07 | 2.90 TWh |
| 2026-02-08 | 3.00 TWh |
| 2026-02-09 | 2.94 TWh |
| 2026-02-10 | 2.61 TWh |
| 2026-02-11 | 2.49 TWh |
| 2026-02-12 | 2.63 TWh |
| 2026-02-13 | 2.60 TWh |
| 2026-02-14 | 2.36 TWh |
| 2026-02-15 | 2.28 TWh |
| 2026-02-16 | 2.42 TWh |
| 2026-02-17 | 2.38 TWh |
| 2026-02-18 | 2.30 TWh |
| 2026-02-19 | 2.31 TWh |
| 2026-02-20 | 2.32 TWh |
| 2026-02-21 | 2.23 TWh |
| 2026-02-22 | 2.43 TWh |
| 2026-02-23 | 2.69 TWh |
| 2026-02-24 | 2.68 TWh |
| 2026-02-25 | 2.47 TWh |
| 2026-02-26 | 2.41 TWh |
| 2026-02-27 | 2.33 TWh |
| 2026-02-28 | 2.13 TWh |
| 2026-03-01 | 2.16 TWh |
| 2026-03-02 | 2.53 TWh |
| 2026-03-03 | 2.50 TWh |
| 2026-03-04 | 2.29 TWh |
| 2026-03-05 | 2.22 TWh |
| 2026-03-06 | 2.18 TWh |
| 2026-03-07 | 2.04 TWh |
| 2026-03-08 | 1.86 TWh |
| 2026-03-09 | 2.06 TWh |
| 2026-03-10 | 2.06 TWh |
| 2026-03-11 | 2.10 TWh |
| 2026-03-12 | 2.22 TWh |
| 2026-03-13 | 2.29 TWh |
| 2026-03-14 | 2.07 TWh |
| 2026-03-15 | 2.08 TWh |
| 2026-03-16 | 2.21 TWh |
| 2026-03-17 | 2.48 TWh |
| 2026-03-18 | 2.52 TWh |
| 2026-03-19 | 2.30 TWh |
| 2026-03-20 | 2.13 TWh |
| 2026-03-21 | 1.92 TWh |
| 2026-03-22 | 1.93 TWh |
| 2026-03-23 | 2.14 TWh |
| 2026-03-24 | 2.22 TWh |
| 2026-03-25 | 2.16 TWh |
| 2026-03-26 | 2.07 TWh |
| 2026-03-27 | 2.09 TWh |
| 2026-03-28 | 2.08 TWh |
| 2026-03-29 | 2.03 TWh |
| 2026-03-30 | 2.05 TWh |
| 2026-03-31 | 2.07 TWh |
| 2026-04-01 | 2.12 TWh |
| 2026-04-02 | 2.10 TWh |
| 2026-04-03 | 2.01 TWh |
| 2026-04-04 | 1.98 TWh |
| 2026-04-05 | 1.88 TWh |
| 2026-04-06 | 2.02 TWh |
| 2026-04-07 | 2.08 TWh |
| 2026-04-08 | 2.14 TWh |
| 2026-04-09 | 2.08 TWh |
| 2026-04-10 | 2.01 TWh |
| 2026-04-11 | 1.85 TWh |
| 2026-04-12 | 1.87 TWh |
| 2026-04-13 | 2.08 TWh |
| 2026-04-14 | 2.21 TWh |
| 2026-04-15 | 2.32 TWh |
| 2026-04-16 | 2.33 TWh |
| 2026-04-17 | 2.22 TWh |
| 2026-04-18 | 1.96 TWh |
| 2026-04-19 | 1.86 TWh |
| 2026-04-20 | 2.04 TWh |
| 2026-04-21 | 2.08 TWh |
| 2026-04-22 | 2.05 TWh |
| 2026-04-23 | 2.09 TWh |
| 2026-04-24 | 2.08 TWh |
| 2026-04-25 | 1.91 TWh |
| 2026-04-26 | 1.87 TWh |
| 2026-04-27 | 2.00 TWh |
| 2026-04-28 | 2.02 TWh |
| 2026-04-29 | 2.02 TWh |
| 2026-04-30 | 2.01 TWh |
| 2026-05-01 | 1.99 TWh |
| 2026-05-02 | 1.89 TWh |
| 2026-05-03 | 1.88 TWh |
| 2026-05-04 | 2.01 TWh |
| 2026-05-05 | 2.05 TWh |
| 2026-05-06 | 2.05 TWh |
| 2026-05-07 | 2.00 TWh |
| 2026-05-08 | 1.98 TWh |
| 2026-05-09 | 1.89 TWh |
| 2026-05-10 | 1.86 TWh |
| 2026-05-11 | 1.98 TWh |
| 2026-05-12 | 2.02 TWh |
| 2026-05-13 | 2.02 TWh |
| 2026-05-14 | 2.01 TWh |
| 2026-05-15 | 2.00 TWh |
| 2026-05-16 | 1.97 TWh |
| 2026-05-17 | 2.21 TWh |
| 2026-05-18 | 2.61 TWh |
| 2026-05-19 | 2.70 TWh |
| 2026-05-20 | 2.50 TWh |
| 2026-05-21 | 2.12 TWh |
| 2026-05-22 | 2.00 TWh |
| 2026-05-23 | 1.93 TWh |
| 2026-05-24 | 1.91 TWh |
| 2026-05-25 | 2.03 TWh |
| 2026-05-26 | 2.26 TWh |
| 2026-05-27 | 2.38 TWh |
| 2026-05-28 | 2.27 TWh |
| 2026-05-29 | 2.16 TWh |
| 2026-05-30 | 1.97 TWh |
| 2026-05-31 | 1.93 TWh |
| 2026-06-01 | 2.11 TWh |
| 2026-06-02 | 2.10 TWh |
| 2026-06-03 | 2.19 TWh |
| 2026-06-04 | 2.35 TWh |
| 2026-06-05 | 2.49 TWh |
| 2026-06-06 | 2.46 TWh |
| 2026-06-07 | 2.45 TWh |
| 2026-06-08 | 2.49 TWh |
| 2026-06-09 | 2.54 TWh |
| 2026-06-10 | 2.75 TWh |
| 2026-06-11 | 2.91 TWh |
| 2026-06-12 | 2.82 TWh |
| 2026-06-13 | 2.54 TWh |
| 2026-06-14 | 2.46 TWh |
| 2026-06-15 | 2.32 TWh |
| 2026-06-16 | 2.22 TWh |
| 2026-06-17 | 2.37 TWh |
| 2026-06-18 | 2.53 TWh |
| 2026-06-19 | 2.37 TWh |
| 2026-06-20 | 2.20 TWh |
| 2026-06-21 | 2.23 TWh |
| 2026-06-22 | 2.44 TWh |
| 2026-06-23 | 2.34 TWh |
| 2026-06-24 | 2.32 TWh |
| 2026-06-25 | 2.44 TWh |
| 2026-06-26 | 2.49 TWh |
| 2026-06-27 | 2.34 TWh |
| 2026-06-28 | 2.39 TWh |
| 2026-06-29 | 2.82 TWh |
| 2026-06-30 | 3.01 TWh |
| 2026-07-01 | 3.23 TWh |
| 2026-07-02 | 3.34 TWh |
| 2026-07-03 | 3.21 TWh |
| 2026-07-04 | 2.91 TWh |
| 2026-07-05 | 2.69 TWh |
| 2026-07-06 | 2.75 TWh |
| 2026-07-07 | 2.70 TWh |
| 2026-07-08 | 2.78 TWh |
| 2026-07-09 | 2.85 TWh |
| 2026-07-10 | 2.81 TWh |
| 2026-07-11 | 2.61 TWh |
| 2026-07-12 | 2.56 TWh |
| 2026-07-13 | 2.75 TWh |
| 2026-07-14 | 2.95 TWh |
| 2026-07-15 | 3.16 TWh |
| 2026-07-16 | 3.14 TWh |
| 2026-07-17 | 2.93 TWh |
| 2026-07-18 | 2.76 TWh |
| 2026-07-19 | 2.55 TWh |
| 2026-07-20 | 2.61 TWh |
| 2026-07-21 | 2.79 TWh |
| 2026-07-22 | 2.61 TWh |
| 2026-07-23 | 2.41 TWh |
| 2026-07-24 | 2.41 TWh |
| 2026-07-25 | 2.32 TWh |
| 2026-07-26 | 2.44 TWh |
| 2026-07-27 | 2.74 TWh |
| 2026-07-28 | 2.68 TWh |
| 2026-07-29 | 2.57 TWh |
| 2026-07-30 | 2.58 TWh |
| 2026-07-31 | 2.66 TWh |
| 2026-08-01 | 2.51 TWh |
| 2026-08-02 | 2.51 TWh |
| 2026-08-03 | 2.72 TWh |
| 2026-08-04 | 2.69 TWh |
| 2026-08-05 | 2.80 TWh |
| 2026-08-06 | 2.93 TWh |
| 2026-08-07 | 2.90 TWh |
| 2026-08-08 | 2.75 TWh |
| 2026-08-09 | 2.75 TWh |
| 2026-08-10 | 2.86 TWh |
| 2026-08-11 | 2.71 TWh |
| 2026-08-12 | 2.66 TWh |
| 2026-08-13 | 2.77 TWh |
| 2026-08-14 | 2.75 TWh |
| 2026-08-15 | 2.59 TWh |
| 2026-08-16 | 2.56 TWh |
| 2026-08-17 | 2.78 TWh |
| 2026-08-18 | 2.76 TWh |
| 2026-08-19 | 2.70 TWh |
| 2026-08-20 | 2.66 TWh |
| 2026-08-21 | 2.51 TWh |
| 2026-08-22 | 2.39 TWh |
| 2026-08-23 | 2.31 TWh |
| 2026-08-24 | 2.38 TWh |
| 2026-08-25 | 2.41 TWh |
| 2026-08-26 | 2.53 TWh |
| 2026-08-27 | 2.66 TWh |
| 2026-08-28 | 2.62 TWh |
| 2026-08-29 | 2.36 TWh |
| 2026-08-30 | 2.45 TWh |
| 2026-08-31 | 2.75 TWh |
| 2026-09-01 | 3.00 TWh |
| 2026-09-02 | 2.97 TWh |
| 2026-09-03 | 3.00 TWh |
| 2026-09-04 | 2.91 TWh |
| 2026-09-05 | 2.55 TWh |
| 2026-09-06 | 2.31 TWh |
| 2026-09-07 | 2.27 TWh |
| 2026-09-08 | 2.51 TWh |
| 2026-09-09 | 2.72 TWh |
| 2026-09-10 | 2.73 TWh |
| 2026-09-11 | 2.58 TWh |
| 2026-09-12 | 2.41 TWh |
| 2026-09-13 | 2.47 TWh |
| 2026-09-14 | 2.36 TWh |
| 2026-09-15 | 2.32 TWh |
| 2026-09-16 | 2.53 TWh |
| 2026-09-17 | 2.63 TWh |
| 2026-09-18 | 2.57 TWh |
| 2026-09-19 | 2.25 TWh |
| 2026-09-20 | 2.28 TWh |
| 2026-09-21 | 2.26 TWh |
| 2026-09-22 | 2.14 TWh |
| 2026-09-23 | 2.08 TWh |
| 2026-09-24 | 2.05 TWh |
| 2026-09-25 | 2.02 TWh |
| 2026-09-26 | 1.93 TWh |
| 2026-09-27 | 1.92 TWh |
| 2026-09-28 | 2.09 TWh |
| 2026-09-29 | 2.16 TWh |
| 2026-09-30 | 2.20 TWh |
| 2026-10-01 | 2.33 TWh |
| 2026-10-02 | 2.30 TWh |
| 2026-10-03 | 1.97 TWh |
| 2026-10-04 | 1.93 TWh |
| 2026-10-05 | 2.04 TWh |
| 2026-10-06 | 2.02 TWh |
| 2026-10-07 | 2.06 TWh |
| 2026-10-08 | 2.07 TWh |
| 2026-10-09 | 2.04 TWh |
| 2026-10-10 | 1.94 TWh |
| 2026-10-11 | 1.98 TWh |
| 2026-10-12 | 2.15 TWh |
| 2026-10-13 | 2.26 TWh |
| 2026-10-14 | 2.31 TWh |
| 2026-10-15 | 2.15 TWh |
| 2026-10-16 | 2.16 TWh |
| 2026-10-17 | 1.94 TWh |
| 2026-10-18 | 1.94 TWh |
| 2026-10-19 | 2.10 TWh |
| 2026-10-20 | 2.08 TWh |
| 2026-10-21 | 2.08 TWh |
| 2026-10-22 | 2.10 TWh |
| 2026-10-23 | 2.06 TWh |
| 2026-10-24 | 1.97 TWh |
| 2026-10-25 | 1.96 TWh |
| 2026-10-26 | 2.10 TWh |
| 2026-10-27 | 2.10 TWh |
| 2026-10-28 | 2.10 TWh |
| 2026-10-29 | 2.10 TWh |
| 2026-10-30 | 2.05 TWh |
| 2026-10-31 | 1.94 TWh |
| 2026-11-01 | 2.03 TWh |
| 2026-11-02 | 2.10 TWh |
| 2026-11-03 | 2.12 TWh |
| 2026-11-04 | 2.11 TWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 733 TWh | 756 TWh | Gas 41.2% | 308 |
| 2025 | 843 TWh | 875 TWh | Gas 42.0% | 365 |
| 2024 | 815 TWh | 848 TWh | Gas 43.7% | 366 |
| 2023 (partial) | 783 TWh | 823 TWh | Gas 43.8% | 364 |
| 2022 | 810 TWh | 842 TWh | Gas 39.5% | 365 |
| 2021 | 796 TWh | 834 TWh | Gas 37.5% | 365 |
| 2020 | 771 TWh | 804 TWh | Gas 39.6% | 366 |
| 2019 | 800 TWh | 822 TWh | Gas 35.8% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 3.34 TWh | 2026-07-02 (2 July 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 162.6 GW | 2 Jul 2026, 17:00 EDT (UTC-04:00) |
| Highest solar share of a day's generation, 2019 onward | 7.3% | 2026-05-31 (31 May 2026) |
| Highest wind share of a day's generation, 2019 onward | 10.6% | 2024-04-12 (12 April 2024) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Power Flows With Neighbours
Net totals, 2026-10-06 (6 October 2026) to 2026-11-04 (4 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| NYISO | PJM exports | 952 GWh |
| CPLE | PJM imports | 821 GWh |
| TVA | PJM imports | 646 GWh |
| MISO | PJM exports | 644 GWh |
| LGEE | PJM imports | 174 GWh |
| DUK | PJM imports | 140 GWh |
| CPLW | PJM imports | 9.94 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Share and Embed
Figures as of 2026-11-05 (5 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for PJM, credited to EIA. The image is rebuilt with the page. More about grid widgets.
Embed this widget
Free to use on your own site. Keep the source line in the frame; it carries the data licence and a link back here.
The frame reports its height to the page with postMessage type wpm-embed-height if you want it to resize.
Related
Cite this page
World Power Monitor. (2026). PJM Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/pjm/
World Power Monitor. PJM Electricity Demand and Generation Mix. Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/zones/pjm/
@misc{wpm_zones_pjm_2026,
title = {{PJM Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/zones/pjm/}
} Permalink: https://worldpowermonitor.com/zones/pjm/
The Copy buttons add today's date as the access date.