Germany and Luxembourg Electricity Demand and Generation Mix
Germany and Luxembourg demand was 67,611 MW in the hour starting 28 Oct 2026, 11:00 CET (UTC+01:00). Solar was the largest source in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00), at 30% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Germany and Luxembourg is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 11:00 CET (UTC+01:00), demand in Germany and Luxembourg was 67,611 MW, against a day-ahead forecast of 64,503 MW.
- Solar supplied 30.3% of Germany and Luxembourg's generation in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00).
- The day-ahead price in Germany and Luxembourg averaged EUR 249.21/MWh for delivery on 2026-10-28 (28 October 2026).
- Installed generating capacity in Germany and Luxembourg was 295 GW in 2026, as reported to ENTSO-E.
- Demand in Germany and Luxembourg totalled 471 TWh in 2025.
- Wind supplied 31.1% of Germany and Luxembourg's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 11:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T10:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 12:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Solar | 18,591 MW | 30.3% |
| Coal | 13,867 MW | 22.6% |
| Wind | 12,192 MW | 19.9% |
| Gas | 10,407 MW | 17.0% |
| Bioenergy | 3,909 MW | 6.4% |
| Other | 991 MW | 1.6% |
| Hydro | 961 MW | 1.6% |
| Oil | 285 MW | 0.5% |
| Other renewables | 72 MW | 0.1% |
| Geothermal | 19 MW | 0.0% |
| Storage | -1,747 MW | charging |
| Total from these sources | 61,295 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00:00Z.
Day-Ahead Price
Delivery day 2026-10-28 (28 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Germany and Luxembourg and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28.
Last 30 Days, Hourly
Times in UTCShow the data table (685 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-29T23:00Z | 43,212 MW |
| 2026-09-30T00:00Z | 42,571 MW |
| 2026-09-30T01:00Z | 42,203 MW |
| 2026-09-30T02:00Z | 42,794 MW |
| 2026-09-30T03:00Z | 46,593 MW |
| 2026-09-30T04:00Z | 54,325 MW |
| 2026-09-30T05:00Z | 57,977 MW |
| 2026-09-30T06:00Z | 60,189 MW |
| 2026-09-30T07:00Z | 62,372 MW |
| 2026-09-30T08:00Z | 63,136 MW |
| 2026-09-30T09:00Z | 62,515 MW |
| 2026-09-30T10:00Z | 61,575 MW |
| 2026-09-30T11:00Z | 60,466 MW |
| 2026-09-30T12:00Z | 58,271 MW |
| 2026-09-30T13:00Z | 57,329 MW |
| 2026-09-30T14:00Z | 57,862 MW |
| 2026-09-30T15:00Z | 59,991 MW |
| 2026-09-30T16:00Z | 61,078 MW |
| 2026-09-30T17:00Z | 61,713 MW |
| 2026-09-30T18:00Z | 59,287 MW |
| 2026-09-30T19:00Z | 55,448 MW |
| 2026-09-30T20:00Z | 51,580 MW |
| 2026-09-30T21:00Z | 48,617 MW |
| 2026-09-30T22:00Z | 46,363 MW |
| 2026-09-30T23:00Z | 44,871 MW |
| 2026-10-01T00:00Z | 44,129 MW |
| 2026-10-01T01:00Z | 44,066 MW |
| 2026-10-01T02:00Z | 44,401 MW |
| 2026-10-01T03:00Z | 47,805 MW |
| 2026-10-01T04:00Z | 55,325 MW |
| 2026-10-01T05:00Z | 58,736 MW |
| 2026-10-01T06:00Z | 60,666 MW |
| 2026-10-01T07:00Z | 62,841 MW |
| 2026-10-01T08:00Z | 63,441 MW |
| 2026-10-01T09:00Z | 65,418 MW |
| 2026-10-01T10:00Z | 64,801 MW |
| 2026-10-01T11:00Z | 64,163 MW |
| 2026-10-01T12:00Z | 63,364 MW |
| 2026-10-01T13:00Z | 63,225 MW |
| 2026-10-01T14:00Z | 62,938 MW |
| 2026-10-01T15:00Z | 62,841 MW |
| 2026-10-01T16:00Z | 62,346 MW |
| 2026-10-01T17:00Z | 62,469 MW |
| 2026-10-01T18:00Z | 59,995 MW |
| 2026-10-01T19:00Z | 57,389 MW |
| 2026-10-01T20:00Z | 53,819 MW |
| 2026-10-01T21:00Z | 51,305 MW |
| 2026-10-01T22:00Z | 49,123 MW |
| 2026-10-01T23:00Z | 47,290 MW |
| 2026-10-02T00:00Z | 46,930 MW |
| 2026-10-02T01:00Z | 47,142 MW |
| 2026-10-02T02:00Z | 48,083 MW |
| 2026-10-02T03:00Z | 50,719 MW |
| 2026-10-02T04:00Z | 57,148 MW |
| 2026-10-02T05:00Z | 60,761 MW |
| 2026-10-02T06:00Z | 63,765 MW |
| 2026-10-02T07:00Z | 65,538 MW |
| 2026-10-02T08:00Z | 66,333 MW |
| 2026-10-02T09:00Z | 65,496 MW |
| 2026-10-02T10:00Z | 64,631 MW |
| 2026-10-02T11:00Z | 62,437 MW |
| 2026-10-02T12:00Z | 58,841 MW |
| 2026-10-02T13:00Z | 59,040 MW |
| 2026-10-02T14:00Z | 59,635 MW |
| 2026-10-02T15:00Z | 59,731 MW |
| 2026-10-02T16:00Z | 59,531 MW |
| 2026-10-02T17:00Z | 59,434 MW |
| 2026-10-02T18:00Z | 57,258 MW |
| 2026-10-02T19:00Z | 54,692 MW |
| 2026-10-02T20:00Z | 51,347 MW |
| 2026-10-02T21:00Z | 48,566 MW |
| 2026-10-02T22:00Z | 45,895 MW |
| 2026-10-02T23:00Z | 44,838 MW |
| 2026-10-03T00:00Z | 43,684 MW |
| 2026-10-03T01:00Z | 43,565 MW |
| 2026-10-03T02:00Z | 43,175 MW |
| 2026-10-03T03:00Z | 43,024 MW |
| 2026-10-03T04:00Z | 44,266 MW |
| 2026-10-03T05:00Z | 45,091 MW |
| 2026-10-03T06:00Z | 48,297 MW |
| 2026-10-03T07:00Z | 51,345 MW |
| 2026-10-03T08:00Z | 52,046 MW |
| 2026-10-03T09:00Z | 52,161 MW |
| 2026-10-03T10:00Z | 51,803 MW |
| 2026-10-03T11:00Z | 49,425 MW |
| 2026-10-03T12:00Z | 46,624 MW |
| 2026-10-03T13:00Z | 45,796 MW |
| 2026-10-03T14:00Z | 46,875 MW |
| 2026-10-03T15:00Z | 49,436 MW |
| 2026-10-03T16:00Z | 50,764 MW |
| 2026-10-03T17:00Z | 51,687 MW |
| 2026-10-03T18:00Z | 50,081 MW |
| 2026-10-03T19:00Z | 48,440 MW |
| 2026-10-03T20:00Z | 46,335 MW |
| 2026-10-03T21:00Z | 44,244 MW |
| 2026-10-03T22:00Z | 42,181 MW |
| 2026-10-03T23:00Z | 40,541 MW |
| 2026-10-04T00:00Z | 39,822 MW |
| 2026-10-04T01:00Z | 39,358 MW |
| 2026-10-04T02:00Z | 39,341 MW |
| 2026-10-04T03:00Z | 40,201 MW |
| 2026-10-04T04:00Z | 41,381 MW |
| 2026-10-04T05:00Z | 42,681 MW |
| 2026-10-04T06:00Z | 45,543 MW |
| 2026-10-04T07:00Z | 47,767 MW |
| 2026-10-04T08:00Z | 48,463 MW |
| 2026-10-04T09:00Z | 47,984 MW |
| 2026-10-04T10:00Z | 47,519 MW |
| 2026-10-04T11:00Z | 46,483 MW |
| 2026-10-04T12:00Z | 44,193 MW |
| 2026-10-04T13:00Z | 43,487 MW |
| 2026-10-04T14:00Z | 45,948 MW |
| 2026-10-04T15:00Z | 50,195 MW |
| 2026-10-04T16:00Z | 52,329 MW |
| 2026-10-04T17:00Z | 52,882 MW |
| 2026-10-04T18:00Z | 51,572 MW |
| 2026-10-04T19:00Z | 50,101 MW |
| 2026-10-04T20:00Z | 48,471 MW |
| 2026-10-04T21:00Z | 46,647 MW |
| 2026-10-04T22:00Z | 44,284 MW |
| 2026-10-04T23:00Z | 43,308 MW |
| 2026-10-05T00:00Z | 42,821 MW |
| 2026-10-05T01:00Z | 42,691 MW |
| 2026-10-05T02:00Z | 44,662 MW |
| 2026-10-05T03:00Z | 47,852 MW |
| 2026-10-05T04:00Z | 55,148 MW |
| 2026-10-05T05:00Z | 59,357 MW |
| 2026-10-05T06:00Z | 61,696 MW |
| 2026-10-05T07:00Z | 63,745 MW |
| 2026-10-05T08:00Z | 63,106 MW |
| 2026-10-05T09:00Z | 61,437 MW |
| 2026-10-05T10:00Z | 59,808 MW |
| 2026-10-05T11:00Z | 58,979 MW |
| 2026-10-05T12:00Z | 57,998 MW |
| 2026-10-05T13:00Z | 56,837 MW |
| 2026-10-05T14:00Z | 57,339 MW |
| 2026-10-05T15:00Z | 59,599 MW |
| 2026-10-05T16:00Z | 61,275 MW |
| 2026-10-05T17:00Z | 61,938 MW |
| 2026-10-05T18:00Z | 58,728 MW |
| 2026-10-05T19:00Z | 55,212 MW |
| 2026-10-05T20:00Z | 52,004 MW |
| 2026-10-05T21:00Z | 49,676 MW |
| 2026-10-05T22:00Z | 47,459 MW |
| 2026-10-05T23:00Z | 45,735 MW |
| 2026-10-06T00:00Z | 45,113 MW |
| 2026-10-06T01:00Z | 45,035 MW |
| 2026-10-06T02:00Z | 46,082 MW |
| 2026-10-06T03:00Z | 49,070 MW |
| 2026-10-06T04:00Z | 56,185 MW |
| 2026-10-06T05:00Z | 60,023 MW |
| 2026-10-06T06:00Z | 62,523 MW |
| 2026-10-06T07:00Z | 64,135 MW |
| 2026-10-06T08:00Z | 64,684 MW |
| 2026-10-06T09:00Z | 62,689 MW |
| 2026-10-06T10:00Z | 60,942 MW |
| 2026-10-06T11:00Z | 60,042 MW |
| 2026-10-06T12:00Z | 58,207 MW |
| 2026-10-06T13:00Z | 57,214 MW |
| 2026-10-06T14:00Z | 57,862 MW |
| 2026-10-06T15:00Z | 59,160 MW |
| 2026-10-06T16:00Z | 60,567 MW |
| 2026-10-06T17:00Z | 60,798 MW |
| 2026-10-06T18:00Z | 58,882 MW |
| 2026-10-06T19:00Z | 54,817 MW |
| 2026-10-06T20:00Z | 51,179 MW |
| 2026-10-06T21:00Z | 48,299 MW |
| 2026-10-06T22:00Z | 46,241 MW |
| 2026-10-06T23:00Z | 45,181 MW |
| 2026-10-07T00:00Z | 44,491 MW |
| 2026-10-07T01:00Z | 45,579 MW |
| 2026-10-07T02:00Z | 46,727 MW |
| 2026-10-07T03:00Z | 49,687 MW |
| 2026-10-07T04:00Z | 55,682 MW |
| 2026-10-07T05:00Z | 60,327 MW |
| 2026-10-07T06:00Z | 63,328 MW |
| 2026-10-07T07:00Z | 64,532 MW |
| 2026-10-07T08:00Z | 63,923 MW |
| 2026-10-07T09:00Z | 61,515 MW |
| 2026-10-07T10:00Z | 59,385 MW |
| 2026-10-07T11:00Z | 59,281 MW |
| 2026-10-07T12:00Z | 57,857 MW |
| 2026-10-07T13:00Z | 58,607 MW |
| 2026-10-07T14:00Z | 58,968 MW |
| 2026-10-07T15:00Z | 60,464 MW |
| 2026-10-07T16:00Z | 61,575 MW |
| 2026-10-07T17:00Z | 62,702 MW |
| 2026-10-07T18:00Z | 60,219 MW |
| 2026-10-07T19:00Z | 56,521 MW |
| 2026-10-07T20:00Z | 52,454 MW |
| 2026-10-07T21:00Z | 48,314 MW |
| 2026-10-07T22:00Z | 46,236 MW |
| 2026-10-07T23:00Z | 44,771 MW |
| 2026-10-08T00:00Z | 43,542 MW |
| 2026-10-08T01:00Z | 45,168 MW |
| 2026-10-08T02:00Z | 46,618 MW |
| 2026-10-08T03:00Z | 50,034 MW |
| 2026-10-08T04:00Z | 55,188 MW |
| 2026-10-08T05:00Z | 59,129 MW |
| 2026-10-08T06:00Z | 62,062 MW |
| 2026-10-08T07:00Z | 64,747 MW |
| 2026-10-08T08:00Z | 66,196 MW |
| 2026-10-08T09:00Z | 67,231 MW |
| 2026-10-08T10:00Z | 66,788 MW |
| 2026-10-08T11:00Z | 65,971 MW |
| 2026-10-08T12:00Z | 64,858 MW |
| 2026-10-08T13:00Z | 62,483 MW |
| 2026-10-08T14:00Z | 61,557 MW |
| 2026-10-08T15:00Z | 61,522 MW |
| 2026-10-08T16:00Z | 62,512 MW |
| 2026-10-08T17:00Z | 63,203 MW |
| 2026-10-08T18:00Z | 60,382 MW |
| 2026-10-08T19:00Z | 56,452 MW |
| 2026-10-08T20:00Z | 53,350 MW |
| 2026-10-08T21:00Z | 49,209 MW |
| 2026-10-08T22:00Z | 45,472 MW |
| 2026-10-08T23:00Z | 44,229 MW |
| 2026-10-09T00:00Z | 43,258 MW |
| 2026-10-09T01:00Z | 44,393 MW |
| 2026-10-09T02:00Z | 44,923 MW |
| 2026-10-09T03:00Z | 47,712 MW |
| 2026-10-09T04:00Z | 54,566 MW |
| 2026-10-09T05:00Z | 58,545 MW |
| 2026-10-09T06:00Z | 61,285 MW |
| 2026-10-09T07:00Z | 63,140 MW |
| 2026-10-09T08:00Z | 62,827 MW |
| 2026-10-09T09:00Z | 64,235 MW |
| 2026-10-09T10:00Z | 63,773 MW |
| 2026-10-09T11:00Z | 61,114 MW |
| 2026-10-09T12:00Z | 59,897 MW |
| 2026-10-09T13:00Z | 59,334 MW |
| 2026-10-09T14:00Z | 58,961 MW |
| 2026-10-09T15:00Z | 59,079 MW |
| 2026-10-09T16:00Z | 59,626 MW |
| 2026-10-09T17:00Z | 59,230 MW |
| 2026-10-09T18:00Z | 55,620 MW |
| 2026-10-09T19:00Z | 52,104 MW |
| 2026-10-09T20:00Z | 49,648 MW |
| 2026-10-09T21:00Z | 47,645 MW |
| 2026-10-09T22:00Z | 44,355 MW |
| 2026-10-09T23:00Z | 40,659 MW |
| 2026-10-10T00:00Z | 41,467 MW |
| 2026-10-10T01:00Z | 40,520 MW |
| 2026-10-10T02:00Z | 40,324 MW |
| 2026-10-10T03:00Z | 41,395 MW |
| 2026-10-10T04:00Z | 43,318 MW |
| 2026-10-10T05:00Z | 45,977 MW |
| 2026-10-10T06:00Z | 48,591 MW |
| 2026-10-10T07:00Z | 51,097 MW |
| 2026-10-10T08:00Z | 54,714 MW |
| 2026-10-10T09:00Z | 55,424 MW |
| 2026-10-10T10:00Z | 54,546 MW |
| 2026-10-10T11:00Z | 52,257 MW |
| 2026-10-10T12:00Z | 50,772 MW |
| 2026-10-10T13:00Z | 49,160 MW |
| 2026-10-10T14:00Z | 49,765 MW |
| 2026-10-10T15:00Z | 51,045 MW |
| 2026-10-10T16:00Z | 50,856 MW |
| 2026-10-10T17:00Z | 51,669 MW |
| 2026-10-10T18:00Z | 48,898 MW |
| 2026-10-10T19:00Z | 45,398 MW |
| 2026-10-10T20:00Z | 44,101 MW |
| 2026-10-10T21:00Z | 41,190 MW |
| 2026-10-10T22:00Z | 39,682 MW |
| 2026-10-10T23:00Z | 38,118 MW |
| 2026-10-11T00:00Z | 36,735 MW |
| 2026-10-11T01:00Z | 36,737 MW |
| 2026-10-11T02:00Z | 36,355 MW |
| 2026-10-11T03:00Z | 36,933 MW |
| 2026-10-11T04:00Z | 38,592 MW |
| 2026-10-11T05:00Z | 39,652 MW |
| 2026-10-11T06:00Z | 42,162 MW |
| 2026-10-11T07:00Z | 45,837 MW |
| 2026-10-11T08:00Z | 48,946 MW |
| 2026-10-11T09:00Z | 51,078 MW |
| 2026-10-11T10:00Z | 51,321 MW |
| 2026-10-11T11:00Z | 49,522 MW |
| 2026-10-11T12:00Z | 46,310 MW |
| 2026-10-11T13:00Z | 45,659 MW |
| 2026-10-11T14:00Z | 46,692 MW |
| 2026-10-11T15:00Z | 48,897 MW |
| 2026-10-11T16:00Z | 51,228 MW |
| 2026-10-11T17:00Z | 52,285 MW |
| 2026-10-11T18:00Z | 50,022 MW |
| 2026-10-11T19:00Z | 48,399 MW |
| 2026-10-11T20:00Z | 47,344 MW |
| 2026-10-11T21:00Z | 45,430 MW |
| 2026-10-11T22:00Z | 43,059 MW |
| 2026-10-11T23:00Z | 42,122 MW |
| 2026-10-12T00:00Z | 41,988 MW |
| 2026-10-12T01:00Z | 42,294 MW |
| 2026-10-12T02:00Z | 43,522 MW |
| 2026-10-12T03:00Z | 46,983 MW |
| 2026-10-12T04:00Z | 54,288 MW |
| 2026-10-12T05:00Z | 59,586 MW |
| 2026-10-12T06:00Z | 62,741 MW |
| 2026-10-12T07:00Z | 64,293 MW |
| 2026-10-12T08:00Z | 65,264 MW |
| 2026-10-12T09:00Z | 64,515 MW |
| 2026-10-12T10:00Z | 62,634 MW |
| 2026-10-12T11:00Z | 60,311 MW |
| 2026-10-12T12:00Z | 58,337 MW |
| 2026-10-12T13:00Z | 57,245 MW |
| 2026-10-12T14:00Z | 58,112 MW |
| 2026-10-12T15:00Z | 59,072 MW |
| 2026-10-12T16:00Z | 61,196 MW |
| 2026-10-12T17:00Z | 62,107 MW |
| 2026-10-12T18:00Z | 58,701 MW |
| 2026-10-12T19:00Z | 55,985 MW |
| 2026-10-12T20:00Z | 53,362 MW |
| 2026-10-12T21:00Z | 49,794 MW |
| 2026-10-12T22:00Z | 47,167 MW |
| 2026-10-12T23:00Z | 46,277 MW |
| 2026-10-13T00:00Z | 45,957 MW |
| 2026-10-13T01:00Z | 46,807 MW |
| 2026-10-13T02:00Z | 47,872 MW |
| 2026-10-13T03:00Z | 50,777 MW |
| 2026-10-13T04:00Z | 56,996 MW |
| 2026-10-13T05:00Z | 62,106 MW |
| 2026-10-13T06:00Z | 63,689 MW |
| 2026-10-13T07:00Z | 65,032 MW |
| 2026-10-13T08:00Z | 65,217 MW |
| 2026-10-13T09:00Z | 65,250 MW |
| 2026-10-13T10:00Z | 65,269 MW |
| 2026-10-13T11:00Z | 64,389 MW |
| 2026-10-13T12:00Z | 63,054 MW |
| 2026-10-13T13:00Z | 61,956 MW |
| 2026-10-13T14:00Z | 62,354 MW |
| 2026-10-13T15:00Z | 62,864 MW |
| 2026-10-13T16:00Z | 64,034 MW |
| 2026-10-13T17:00Z | 63,568 MW |
| 2026-10-13T18:00Z | 61,307 MW |
| 2026-10-13T19:00Z | 56,766 MW |
| 2026-10-13T20:00Z | 52,927 MW |
| 2026-10-13T21:00Z | 49,387 MW |
| 2026-10-13T22:00Z | 47,298 MW |
| 2026-10-13T23:00Z | 46,831 MW |
| 2026-10-14T00:00Z | 46,705 MW |
| 2026-10-14T01:00Z | 45,914 MW |
| 2026-10-14T02:00Z | 47,261 MW |
| 2026-10-14T03:00Z | 50,755 MW |
| 2026-10-14T04:00Z | 57,604 MW |
| 2026-10-14T05:00Z | 61,286 MW |
| 2026-10-14T06:00Z | 62,373 MW |
| 2026-10-14T07:00Z | 63,675 MW |
| 2026-10-14T08:00Z | 64,087 MW |
| 2026-10-14T09:00Z | 64,869 MW |
| 2026-10-14T10:00Z | 63,567 MW |
| 2026-10-14T11:00Z | 62,126 MW |
| 2026-10-14T12:00Z | 59,014 MW |
| 2026-10-14T13:00Z | 57,468 MW |
| 2026-10-14T14:00Z | 59,095 MW |
| 2026-10-14T15:00Z | 60,314 MW |
| 2026-10-14T16:00Z | 62,272 MW |
| 2026-10-14T17:00Z | 62,649 MW |
| 2026-10-14T18:00Z | 60,545 MW |
| 2026-10-14T19:00Z | 57,437 MW |
| 2026-10-14T20:00Z | 54,351 MW |
| 2026-10-14T21:00Z | 50,830 MW |
| 2026-10-14T22:00Z | 48,366 MW |
| 2026-10-14T23:00Z | 46,888 MW |
| 2026-10-15T00:00Z | 46,601 MW |
| 2026-10-15T01:00Z | 46,760 MW |
| 2026-10-15T02:00Z | 48,323 MW |
| 2026-10-15T03:00Z | 51,685 MW |
| 2026-10-15T04:00Z | 58,251 MW |
| 2026-10-15T05:00Z | 61,945 MW |
| 2026-10-15T06:00Z | 63,970 MW |
| 2026-10-15T07:00Z | 64,949 MW |
| 2026-10-15T08:00Z | 65,293 MW |
| 2026-10-15T09:00Z | 64,903 MW |
| 2026-10-15T10:00Z | 63,644 MW |
| 2026-10-15T11:00Z | 62,823 MW |
| 2026-10-15T12:00Z | 60,080 MW |
| 2026-10-15T13:00Z | 59,250 MW |
| 2026-10-15T14:00Z | 59,639 MW |
| 2026-10-15T15:00Z | 61,287 MW |
| 2026-10-15T16:00Z | 63,153 MW |
| 2026-10-15T17:00Z | 62,824 MW |
| 2026-10-15T18:00Z | 60,860 MW |
| 2026-10-15T19:00Z | 57,814 MW |
| 2026-10-15T20:00Z | 54,213 MW |
| 2026-10-15T21:00Z | 50,469 MW |
| 2026-10-15T22:00Z | 47,980 MW |
| 2026-10-15T23:00Z | 46,014 MW |
| 2026-10-16T00:00Z | 45,425 MW |
| 2026-10-16T01:00Z | 45,841 MW |
| 2026-10-16T02:00Z | 46,666 MW |
| 2026-10-16T03:00Z | 49,401 MW |
| 2026-10-16T04:00Z | 54,823 MW |
| 2026-10-16T05:00Z | 59,930 MW |
| 2026-10-16T06:00Z | 63,091 MW |
| 2026-10-16T07:00Z | 64,434 MW |
| 2026-10-16T08:00Z | 65,864 MW |
| 2026-10-16T09:00Z | 65,589 MW |
| 2026-10-16T10:00Z | 62,565 MW |
| 2026-10-16T11:00Z | 60,280 MW |
| 2026-10-16T12:00Z | 57,537 MW |
| 2026-10-16T13:00Z | 56,428 MW |
| 2026-10-16T14:00Z | 57,339 MW |
| 2026-10-16T15:00Z | 58,268 MW |
| 2026-10-16T16:00Z | 59,639 MW |
| 2026-10-16T17:00Z | 59,634 MW |
| 2026-10-16T18:00Z | 57,096 MW |
| 2026-10-16T19:00Z | 54,526 MW |
| 2026-10-16T20:00Z | 50,996 MW |
| 2026-10-16T21:00Z | 46,658 MW |
| 2026-10-16T22:00Z | 43,755 MW |
| 2026-10-16T23:00Z | 42,287 MW |
| 2026-10-17T00:00Z | 42,520 MW |
| 2026-10-17T01:00Z | 42,216 MW |
| 2026-10-17T02:00Z | 42,293 MW |
| 2026-10-17T03:00Z | 43,439 MW |
| 2026-10-17T04:00Z | 45,824 MW |
| 2026-10-17T05:00Z | 48,077 MW |
| 2026-10-17T06:00Z | 50,417 MW |
| 2026-10-17T07:00Z | 53,055 MW |
| 2026-10-17T08:00Z | 55,499 MW |
| 2026-10-17T09:00Z | 57,232 MW |
| 2026-10-17T10:00Z | 56,992 MW |
| 2026-10-17T11:00Z | 55,250 MW |
| 2026-10-17T12:00Z | 53,879 MW |
| 2026-10-17T13:00Z | 52,875 MW |
| 2026-10-17T14:00Z | 52,368 MW |
| 2026-10-17T15:00Z | 52,976 MW |
| 2026-10-17T16:00Z | 54,464 MW |
| 2026-10-17T17:00Z | 53,214 MW |
| 2026-10-17T18:00Z | 50,516 MW |
| 2026-10-17T19:00Z | 48,166 MW |
| 2026-10-17T20:00Z | 46,589 MW |
| 2026-10-17T21:00Z | 43,828 MW |
| 2026-10-17T22:00Z | 42,072 MW |
| 2026-10-17T23:00Z | 40,195 MW |
| 2026-10-18T00:00Z | 39,038 MW |
| 2026-10-18T01:00Z | 39,067 MW |
| 2026-10-18T02:00Z | 39,193 MW |
| 2026-10-18T03:00Z | 39,653 MW |
| 2026-10-18T04:00Z | 41,118 MW |
| 2026-10-18T05:00Z | 43,022 MW |
| 2026-10-18T06:00Z | 46,038 MW |
| 2026-10-18T07:00Z | 48,939 MW |
| 2026-10-18T08:00Z | 51,343 MW |
| 2026-10-18T09:00Z | 53,123 MW |
| 2026-10-18T10:00Z | 53,352 MW |
| 2026-10-18T11:00Z | 52,752 MW |
| 2026-10-18T12:00Z | 50,994 MW |
| 2026-10-18T13:00Z | 50,727 MW |
| 2026-10-18T14:00Z | 50,515 MW |
| 2026-10-18T15:00Z | 51,488 MW |
| 2026-10-18T16:00Z | 52,958 MW |
| 2026-10-18T17:00Z | 52,802 MW |
| 2026-10-18T18:00Z | 50,335 MW |
| 2026-10-18T19:00Z | 49,031 MW |
| 2026-10-18T20:00Z | 46,667 MW |
| 2026-10-18T21:00Z | 45,174 MW |
| 2026-10-18T22:00Z | 43,253 MW |
| 2026-10-18T23:00Z | 42,095 MW |
| 2026-10-19T00:00Z | 42,013 MW |
| 2026-10-19T01:00Z | 42,196 MW |
| 2026-10-19T02:00Z | 43,178 MW |
| 2026-10-19T03:00Z | 47,137 MW |
| 2026-10-19T04:00Z | 55,483 MW |
| 2026-10-19T05:00Z | 60,543 MW |
| 2026-10-19T06:00Z | 62,131 MW |
| 2026-10-19T07:00Z | 63,059 MW |
| 2026-10-19T08:00Z | 64,097 MW |
| 2026-10-19T09:00Z | 65,248 MW |
| 2026-10-19T10:00Z | 64,386 MW |
| 2026-10-19T11:00Z | 64,484 MW |
| 2026-10-19T12:00Z | 61,943 MW |
| 2026-10-19T13:00Z | 59,863 MW |
| 2026-10-19T14:00Z | 59,341 MW |
| 2026-10-19T15:00Z | 59,380 MW |
| 2026-10-19T16:00Z | 61,428 MW |
| 2026-10-19T17:00Z | 61,599 MW |
| 2026-10-19T18:00Z | 59,773 MW |
| 2026-10-19T19:00Z | 56,708 MW |
| 2026-10-19T20:00Z | 53,013 MW |
| 2026-10-19T21:00Z | 49,733 MW |
| 2026-10-19T22:00Z | 47,184 MW |
| 2026-10-19T23:00Z | 45,104 MW |
| 2026-10-20T00:00Z | 44,940 MW |
| 2026-10-20T01:00Z | 46,072 MW |
| 2026-10-20T02:00Z | 47,378 MW |
| 2026-10-20T03:00Z | 50,332 MW |
| 2026-10-20T04:00Z | 56,959 MW |
| 2026-10-20T05:00Z | 61,688 MW |
| 2026-10-20T06:00Z | 63,252 MW |
| 2026-10-20T07:00Z | 63,932 MW |
| 2026-10-20T08:00Z | 65,104 MW |
| 2026-10-20T09:00Z | 66,408 MW |
| 2026-10-20T10:00Z | 65,946 MW |
| 2026-10-20T11:00Z | 63,971 MW |
| 2026-10-20T12:00Z | 62,119 MW |
| 2026-10-20T13:00Z | 61,239 MW |
| 2026-10-20T14:00Z | 61,564 MW |
| 2026-10-20T15:00Z | 63,460 MW |
| 2026-10-20T16:00Z | 64,177 MW |
| 2026-10-20T17:00Z | 63,940 MW |
| 2026-10-20T18:00Z | 61,103 MW |
| 2026-10-20T19:00Z | 58,035 MW |
| 2026-10-20T20:00Z | 54,764 MW |
| 2026-10-20T21:00Z | 51,024 MW |
| 2026-10-20T22:00Z | 47,698 MW |
| 2026-10-20T23:00Z | 46,171 MW |
| 2026-10-21T00:00Z | 45,715 MW |
| 2026-10-21T01:00Z | 46,312 MW |
| 2026-10-21T02:00Z | 47,192 MW |
| 2026-10-21T03:00Z | 50,803 MW |
| 2026-10-21T04:00Z | 57,197 MW |
| 2026-10-21T05:00Z | 62,763 MW |
| 2026-10-21T06:00Z | 65,990 MW |
| 2026-10-21T07:00Z | 67,293 MW |
| 2026-10-21T08:00Z | 69,198 MW |
| 2026-10-21T09:00Z | 69,621 MW |
| 2026-10-21T10:00Z | 69,334 MW |
| 2026-10-21T11:00Z | 68,360 MW |
| 2026-10-21T12:00Z | 66,358 MW |
| 2026-10-21T13:00Z | 65,907 MW |
| 2026-10-21T14:00Z | 64,876 MW |
| 2026-10-21T15:00Z | 66,707 MW |
| 2026-10-21T16:00Z | 68,513 MW |
| 2026-10-21T17:00Z | 67,244 MW |
| 2026-10-21T18:00Z | 63,312 MW |
| 2026-10-21T19:00Z | 59,771 MW |
| 2026-10-21T20:00Z | 56,036 MW |
| 2026-10-21T21:00Z | 51,865 MW |
| 2026-10-21T22:00Z | 48,580 MW |
| 2026-10-21T23:00Z | 47,199 MW |
| 2026-10-22T00:00Z | 47,041 MW |
| 2026-10-22T01:00Z | 48,222 MW |
| 2026-10-22T02:00Z | 49,446 MW |
| 2026-10-22T03:00Z | 53,013 MW |
| 2026-10-22T04:00Z | 59,023 MW |
| 2026-10-22T05:00Z | 62,614 MW |
| 2026-10-22T06:00Z | 64,190 MW |
| 2026-10-22T07:00Z | 64,259 MW |
| 2026-10-22T08:00Z | 65,253 MW |
| 2026-10-22T09:00Z | 65,937 MW |
| 2026-10-22T10:00Z | 65,725 MW |
| 2026-10-22T11:00Z | 65,611 MW |
| 2026-10-22T12:00Z | 62,894 MW |
| 2026-10-22T13:00Z | 61,704 MW |
| 2026-10-22T14:00Z | 61,452 MW |
| 2026-10-22T15:00Z | 62,487 MW |
| 2026-10-22T16:00Z | 64,210 MW |
| 2026-10-22T17:00Z | 62,605 MW |
| 2026-10-22T18:00Z | 59,463 MW |
| 2026-10-22T19:00Z | 56,638 MW |
| 2026-10-22T20:00Z | 54,065 MW |
| 2026-10-22T21:00Z | 50,239 MW |
| 2026-10-22T22:00Z | 47,280 MW |
| 2026-10-22T23:00Z | 46,620 MW |
| 2026-10-23T00:00Z | 45,621 MW |
| 2026-10-23T01:00Z | 45,798 MW |
| 2026-10-23T02:00Z | 47,726 MW |
| 2026-10-23T03:00Z | 50,100 MW |
| 2026-10-23T04:00Z | 57,101 MW |
| 2026-10-23T05:00Z | 62,453 MW |
| 2026-10-23T06:00Z | 64,937 MW |
| 2026-10-23T07:00Z | 66,529 MW |
| 2026-10-23T08:00Z | 67,496 MW |
| 2026-10-23T09:00Z | 67,445 MW |
| 2026-10-23T10:00Z | 66,778 MW |
| 2026-10-23T11:00Z | 64,890 MW |
| 2026-10-23T12:00Z | 63,914 MW |
| 2026-10-23T13:00Z | 61,802 MW |
| 2026-10-23T14:00Z | 61,119 MW |
| 2026-10-23T15:00Z | 61,371 MW |
| 2026-10-23T16:00Z | 62,231 MW |
| 2026-10-23T17:00Z | 60,896 MW |
| 2026-10-23T18:00Z | 59,224 MW |
| 2026-10-23T19:00Z | 55,525 MW |
| 2026-10-23T20:00Z | 52,701 MW |
| 2026-10-23T21:00Z | 49,951 MW |
| 2026-10-23T22:00Z | 47,582 MW |
| 2026-10-23T23:00Z | 45,094 MW |
| 2026-10-24T00:00Z | 44,183 MW |
| 2026-10-24T01:00Z | 44,196 MW |
| 2026-10-24T02:00Z | 44,201 MW |
| 2026-10-24T03:00Z | 44,728 MW |
| 2026-10-24T04:00Z | 46,861 MW |
| 2026-10-24T05:00Z | 48,325 MW |
| 2026-10-24T06:00Z | 49,214 MW |
| 2026-10-24T07:00Z | 51,372 MW |
| 2026-10-24T08:00Z | 54,420 MW |
| 2026-10-24T09:00Z | 56,331 MW |
| 2026-10-24T10:00Z | 57,181 MW |
| 2026-10-24T11:00Z | 56,376 MW |
| 2026-10-24T12:00Z | 54,128 MW |
| 2026-10-24T13:00Z | 52,165 MW |
| 2026-10-24T14:00Z | 52,302 MW |
| 2026-10-24T15:00Z | 52,474 MW |
| 2026-10-24T16:00Z | 54,372 MW |
| 2026-10-24T17:00Z | 54,125 MW |
| 2026-10-24T18:00Z | 52,023 MW |
| 2026-10-24T19:00Z | 50,332 MW |
| 2026-10-24T20:00Z | 47,990 MW |
| 2026-10-24T21:00Z | 46,986 MW |
| 2026-10-24T22:00Z | 43,669 MW |
| 2026-10-24T23:00Z | 41,939 MW |
| 2026-10-25T00:00Z | 40,731 MW |
| 2026-10-25T01:00Z | 41,297 MW |
| 2026-10-25T02:00Z | 41,470 MW |
| 2026-10-25T03:00Z | 42,043 MW |
| 2026-10-25T04:00Z | 41,748 MW |
| 2026-10-25T05:00Z | 43,487 MW |
| 2026-10-25T06:00Z | 45,784 MW |
| 2026-10-25T07:00Z | 48,702 MW |
| 2026-10-25T08:00Z | 51,017 MW |
| 2026-10-25T09:00Z | 52,613 MW |
| 2026-10-25T10:00Z | 54,364 MW |
| 2026-10-25T11:00Z | 53,704 MW |
| 2026-10-25T12:00Z | 52,170 MW |
| 2026-10-25T13:00Z | 51,218 MW |
| 2026-10-25T14:00Z | 50,931 MW |
| 2026-10-25T15:00Z | 51,416 MW |
| 2026-10-25T16:00Z | 53,641 MW |
| 2026-10-25T17:00Z | 54,618 MW |
| 2026-10-25T18:00Z | 53,133 MW |
| 2026-10-25T19:00Z | 51,780 MW |
| 2026-10-25T20:00Z | 49,951 MW |
| 2026-10-25T21:00Z | 48,148 MW |
| 2026-10-25T22:00Z | 45,579 MW |
| 2026-10-25T23:00Z | 44,941 MW |
| 2026-10-26T00:00Z | 43,345 MW |
| 2026-10-26T01:00Z | 43,370 MW |
| 2026-10-26T02:00Z | 43,141 MW |
| 2026-10-26T03:00Z | 44,683 MW |
| 2026-10-26T04:00Z | 48,482 MW |
| 2026-10-26T05:00Z | 54,926 MW |
| 2026-10-26T06:00Z | 59,947 MW |
| 2026-10-26T07:00Z | 62,407 MW |
| 2026-10-26T08:00Z | 63,372 MW |
| 2026-10-26T09:00Z | 65,345 MW |
| 2026-10-26T10:00Z | 63,965 MW |
| 2026-10-26T11:00Z | 63,755 MW |
| 2026-10-26T12:00Z | 63,559 MW |
| 2026-10-26T13:00Z | 62,461 MW |
| 2026-10-26T14:00Z | 61,170 MW |
| 2026-10-26T15:00Z | 60,676 MW |
| 2026-10-26T16:00Z | 63,661 MW |
| 2026-10-26T17:00Z | 63,703 MW |
| 2026-10-26T18:00Z | 61,882 MW |
| 2026-10-26T19:00Z | 58,664 MW |
| 2026-10-26T20:00Z | 56,431 MW |
| 2026-10-26T21:00Z | 53,491 MW |
| 2026-10-26T22:00Z | 49,947 MW |
| 2026-10-26T23:00Z | 46,288 MW |
| 2026-10-27T00:00Z | 45,077 MW |
| 2026-10-27T01:00Z | 44,920 MW |
| 2026-10-27T02:00Z | 45,264 MW |
| 2026-10-27T03:00Z | 47,303 MW |
| 2026-10-27T04:00Z | 49,700 MW |
| 2026-10-27T05:00Z | 56,045 MW |
| 2026-10-27T06:00Z | 60,258 MW |
| 2026-10-27T07:00Z | 62,504 MW |
| 2026-10-27T08:00Z | 65,057 MW |
| 2026-10-27T09:00Z | 65,634 MW |
| 2026-10-27T10:00Z | 65,735 MW |
| 2026-10-27T11:00Z | 66,197 MW |
| 2026-10-27T12:00Z | 64,173 MW |
| 2026-10-27T13:00Z | 61,434 MW |
| 2026-10-27T14:00Z | 60,104 MW |
| 2026-10-27T15:00Z | 60,507 MW |
| 2026-10-27T16:00Z | 62,787 MW |
| 2026-10-27T17:00Z | 62,746 MW |
| 2026-10-27T18:00Z | 61,604 MW |
| 2026-10-27T19:00Z | 57,679 MW |
| 2026-10-27T20:00Z | 54,593 MW |
| 2026-10-27T21:00Z | 51,013 MW |
| 2026-10-27T22:00Z | 47,607 MW |
| 2026-10-27T23:00Z | 47,350 MW |
| 2026-10-28T00:00Z | 45,512 MW |
| 2026-10-28T01:00Z | 43,912 MW |
| 2026-10-28T02:00Z | 45,490 MW |
| 2026-10-28T03:00Z | 46,333 MW |
| 2026-10-28T04:00Z | 50,599 MW |
| 2026-10-28T05:00Z | 57,180 MW |
| 2026-10-28T06:00Z | 60,860 MW |
| 2026-10-28T07:00Z | 63,917 MW |
| 2026-10-28T08:00Z | 65,501 MW |
| 2026-10-28T09:00Z | 66,745 MW |
| 2026-10-28T10:00Z | 67,611 MW |
| 2026-10-28T11:00Z | n/a |
Show the data table (685 rows)
| Hour starting (UTC) | Wind | Coal | Solar | Gas | Bioenergy |
|---|---|---|---|---|---|
| 2026-09-29T23:00Z | 26,622 MW | 13,096 MW | 0 MW | 3,929 MW | 3,721 MW |
| 2026-09-30T00:00Z | 25,998 MW | 12,990 MW | 0 MW | 3,793 MW | 3,684 MW |
| 2026-09-30T01:00Z | 25,587 MW | 12,738 MW | 0 MW | 3,765 MW | 3,664 MW |
| 2026-09-30T02:00Z | 24,706 MW | 12,666 MW | 0 MW | 3,936 MW | 3,683 MW |
| 2026-09-30T03:00Z | 24,510 MW | 12,819 MW | 0 MW | 4,109 MW | 3,753 MW |
| 2026-09-30T04:00Z | 24,588 MW | 13,302 MW | 0 MW | 4,459 MW | 3,936 MW |
| 2026-09-30T05:00Z | 24,081 MW | 13,178 MW | 1,075 MW | 4,677 MW | 4,069 MW |
| 2026-09-30T06:00Z | 23,234 MW | 12,614 MW | 8,524 MW | 5,057 MW | 4,102 MW |
| 2026-09-30T07:00Z | 20,491 MW | 12,382 MW | 20,703 MW | 4,189 MW | 4,017 MW |
| 2026-09-30T08:00Z | 16,257 MW | 11,064 MW | 32,066 MW | 3,169 MW | 3,856 MW |
| 2026-09-30T09:00Z | 12,859 MW | 10,151 MW | 40,925 MW | 2,705 MW | 3,733 MW |
| 2026-09-30T10:00Z | 13,633 MW | 8,533 MW | 45,397 MW | 2,524 MW | 3,642 MW |
| 2026-09-30T11:00Z | 12,905 MW | 8,493 MW | 45,428 MW | 2,492 MW | 3,616 MW |
| 2026-09-30T12:00Z | 13,380 MW | 8,303 MW | 41,919 MW | 2,388 MW | 3,608 MW |
| 2026-09-30T13:00Z | 14,913 MW | 9,099 MW | 34,849 MW | 2,584 MW | 3,657 MW |
| 2026-09-30T14:00Z | 15,555 MW | 12,437 MW | 23,731 MW | 3,555 MW | 3,811 MW |
| 2026-09-30T15:00Z | 14,834 MW | 14,943 MW | 10,730 MW | 5,619 MW | 4,104 MW |
| 2026-09-30T16:00Z | 15,619 MW | 15,511 MW | 1,577 MW | 6,577 MW | 4,347 MW |
| 2026-09-30T17:00Z | 19,028 MW | 15,948 MW | 3 MW | 6,783 MW | 4,413 MW |
| 2026-09-30T18:00Z | 21,431 MW | 15,635 MW | 0 MW | 6,703 MW | 4,353 MW |
| 2026-09-30T19:00Z | 22,015 MW | 15,115 MW | 0 MW | 6,282 MW | 4,240 MW |
| 2026-09-30T20:00Z | 19,946 MW | 14,707 MW | 0 MW | 5,740 MW | 4,126 MW |
| 2026-09-30T21:00Z | 17,849 MW | 14,338 MW | 0 MW | 5,504 MW | 4,005 MW |
| 2026-09-30T22:00Z | 17,729 MW | 14,561 MW | 0 MW | 5,464 MW | 3,908 MW |
| 2026-09-30T23:00Z | 17,581 MW | 14,686 MW | 0 MW | 4,990 MW | 3,877 MW |
| 2026-10-01T00:00Z | 16,703 MW | 14,918 MW | 0 MW | 4,690 MW | 3,846 MW |
| 2026-10-01T01:00Z | 15,979 MW | 15,058 MW | 0 MW | 4,424 MW | 3,851 MW |
| 2026-10-01T02:00Z | 15,793 MW | 15,090 MW | 0 MW | 4,598 MW | 3,868 MW |
| 2026-10-01T03:00Z | 16,072 MW | 15,320 MW | 0 MW | 5,581 MW | 3,934 MW |
| 2026-10-01T04:00Z | 16,736 MW | 15,625 MW | 0 MW | 7,181 MW | 4,116 MW |
| 2026-10-01T05:00Z | 17,040 MW | 15,281 MW | 914 MW | 7,869 MW | 4,270 MW |
| 2026-10-01T06:00Z | 15,959 MW | 14,455 MW | 6,438 MW | 8,051 MW | 4,306 MW |
| 2026-10-01T07:00Z | 13,020 MW | 14,261 MW | 14,272 MW | 7,478 MW | 4,263 MW |
| 2026-10-01T08:00Z | 10,687 MW | 12,874 MW | 21,032 MW | 6,624 MW | 4,114 MW |
| 2026-10-01T09:00Z | 8,524 MW | 12,827 MW | 25,202 MW | 5,679 MW | 4,021 MW |
| 2026-10-01T10:00Z | 8,099 MW | 12,525 MW | 27,079 MW | 5,597 MW | 3,912 MW |
| 2026-10-01T11:00Z | 7,282 MW | 12,247 MW | 25,396 MW | 5,486 MW | 3,864 MW |
| 2026-10-01T12:00Z | 7,272 MW | 12,701 MW | 21,515 MW | 5,667 MW | 3,861 MW |
| 2026-10-01T13:00Z | 7,909 MW | 12,664 MW | 16,428 MW | 6,075 MW | 3,895 MW |
| 2026-10-01T14:00Z | 8,593 MW | 13,961 MW | 10,030 MW | 7,353 MW | 4,040 MW |
| 2026-10-01T15:00Z | 9,966 MW | 15,667 MW | 4,236 MW | 7,825 MW | 4,313 MW |
| 2026-10-01T16:00Z | 10,485 MW | 16,001 MW | 681 MW | 8,045 MW | 4,456 MW |
| 2026-10-01T17:00Z | 10,581 MW | 16,041 MW | 5 MW | 8,206 MW | 4,496 MW |
| 2026-10-01T18:00Z | 10,668 MW | 16,002 MW | 0 MW | 8,649 MW | 4,440 MW |
| 2026-10-01T19:00Z | 10,083 MW | 15,977 MW | 0 MW | 8,815 MW | 4,304 MW |
| 2026-10-01T20:00Z | 9,407 MW | 15,831 MW | 0 MW | 8,622 MW | 4,180 MW |
| 2026-10-01T21:00Z | 8,692 MW | 15,923 MW | 0 MW | 8,397 MW | 4,070 MW |
| 2026-10-01T22:00Z | 8,125 MW | 15,482 MW | 0 MW | 8,222 MW | 3,956 MW |
| 2026-10-01T23:00Z | 7,491 MW | 15,448 MW | 0 MW | 8,203 MW | 3,911 MW |
| 2026-10-02T00:00Z | 6,794 MW | 15,495 MW | 0 MW | 8,171 MW | 3,876 MW |
| 2026-10-02T01:00Z | 6,265 MW | 15,781 MW | 0 MW | 8,177 MW | 3,872 MW |
| 2026-10-02T02:00Z | 5,772 MW | 16,003 MW | 0 MW | 8,262 MW | 3,886 MW |
| 2026-10-02T03:00Z | 5,182 MW | 16,070 MW | 0 MW | 8,420 MW | 3,945 MW |
| 2026-10-02T04:00Z | 4,566 MW | 15,785 MW | 0 MW | 9,098 MW | 4,105 MW |
| 2026-10-02T05:00Z | 3,963 MW | 15,804 MW | 270 MW | 9,327 MW | 4,263 MW |
| 2026-10-02T06:00Z | 3,338 MW | 15,958 MW | 3,399 MW | 9,219 MW | 4,303 MW |
| 2026-10-02T07:00Z | 2,785 MW | 15,782 MW | 9,558 MW | 8,967 MW | 4,237 MW |
| 2026-10-02T08:00Z | 2,207 MW | 15,934 MW | 16,618 MW | 7,727 MW | 4,087 MW |
| 2026-10-02T09:00Z | 2,056 MW | 15,670 MW | 23,265 MW | 6,247 MW | 3,972 MW |
| 2026-10-02T10:00Z | 2,131 MW | 14,822 MW | 27,513 MW | 4,736 MW | 3,877 MW |
| 2026-10-02T11:00Z | 1,968 MW | 14,222 MW | 28,631 MW | 4,371 MW | 3,849 MW |
| 2026-10-02T12:00Z | 1,914 MW | 14,205 MW | 26,423 MW | 4,482 MW | 3,848 MW |
| 2026-10-02T13:00Z | 1,944 MW | 14,743 MW | 21,924 MW | 5,495 MW | 3,880 MW |
| 2026-10-02T14:00Z | 1,754 MW | 15,714 MW | 15,324 MW | 7,777 MW | 3,989 MW |
| 2026-10-02T15:00Z | 1,469 MW | 16,137 MW | 7,392 MW | 9,655 MW | 4,204 MW |
| 2026-10-02T16:00Z | 1,476 MW | 16,358 MW | 1,285 MW | 10,288 MW | 4,408 MW |
| 2026-10-02T17:00Z | 1,635 MW | 16,307 MW | 3 MW | 10,688 MW | 4,449 MW |
| 2026-10-02T18:00Z | 2,150 MW | 16,354 MW | 0 MW | 10,609 MW | 4,394 MW |
| 2026-10-02T19:00Z | 2,528 MW | 16,310 MW | 0 MW | 9,954 MW | 4,290 MW |
| 2026-10-02T20:00Z | 2,838 MW | 16,085 MW | 0 MW | 9,260 MW | 4,177 MW |
| 2026-10-02T21:00Z | 2,968 MW | 15,686 MW | 0 MW | 9,023 MW | 4,063 MW |
| 2026-10-02T22:00Z | 3,082 MW | 15,034 MW | 0 MW | 8,360 MW | 3,949 MW |
| 2026-10-02T23:00Z | 3,129 MW | 15,055 MW | 0 MW | 8,205 MW | 3,910 MW |
| 2026-10-03T00:00Z | 3,260 MW | 15,070 MW | 0 MW | 8,071 MW | 3,897 MW |
| 2026-10-03T01:00Z | 3,332 MW | 14,541 MW | 0 MW | 8,058 MW | 3,893 MW |
| 2026-10-03T02:00Z | 3,551 MW | 14,613 MW | 0 MW | 8,135 MW | 3,927 MW |
| 2026-10-03T03:00Z | 3,609 MW | 14,945 MW | 0 MW | 8,194 MW | 4,000 MW |
| 2026-10-03T04:00Z | 3,919 MW | 15,161 MW | 0 MW | 8,360 MW | 4,198 MW |
| 2026-10-03T05:00Z | 4,318 MW | 15,082 MW | 389 MW | 8,453 MW | 4,355 MW |
| 2026-10-03T06:00Z | 4,505 MW | 15,052 MW | 4,617 MW | 8,101 MW | 4,393 MW |
| 2026-10-03T07:00Z | 4,303 MW | 14,886 MW | 12,576 MW | 5,725 MW | 4,325 MW |
| 2026-10-03T08:00Z | 3,629 MW | 13,900 MW | 21,458 MW | 2,980 MW | 4,164 MW |
| 2026-10-03T09:00Z | 3,246 MW | 11,281 MW | 30,070 MW | 2,357 MW | 4,042 MW |
| 2026-10-03T10:00Z | 3,452 MW | 9,140 MW | 35,894 MW | 1,904 MW | 3,898 MW |
| 2026-10-03T11:00Z | 3,649 MW | 7,594 MW | 36,911 MW | 1,804 MW | 3,879 MW |
| 2026-10-03T12:00Z | 3,629 MW | 7,746 MW | 34,407 MW | 1,785 MW | 3,894 MW |
| 2026-10-03T13:00Z | 3,462 MW | 10,166 MW | 28,475 MW | 1,880 MW | 3,939 MW |
| 2026-10-03T14:00Z | 2,875 MW | 13,121 MW | 19,279 MW | 2,992 MW | 4,075 MW |
| 2026-10-03T15:00Z | 2,293 MW | 14,749 MW | 8,702 MW | 6,548 MW | 4,306 MW |
| 2026-10-03T16:00Z | 2,367 MW | 15,131 MW | 1,226 MW | 8,338 MW | 4,498 MW |
| 2026-10-03T17:00Z | 2,649 MW | 15,344 MW | 1 MW | 8,622 MW | 4,510 MW |
| 2026-10-03T18:00Z | 3,003 MW | 15,315 MW | 0 MW | 8,761 MW | 4,455 MW |
| 2026-10-03T19:00Z | 3,031 MW | 15,341 MW | 0 MW | 8,501 MW | 4,324 MW |
| 2026-10-03T20:00Z | 2,903 MW | 15,330 MW | 0 MW | 8,347 MW | 4,183 MW |
| 2026-10-03T21:00Z | 2,773 MW | 15,324 MW | 0 MW | 8,104 MW | 4,062 MW |
| 2026-10-03T22:00Z | 2,666 MW | 15,264 MW | 0 MW | 7,922 MW | 3,965 MW |
| 2026-10-03T23:00Z | 2,344 MW | 15,283 MW | 0 MW | 7,857 MW | 3,921 MW |
| 2026-10-04T00:00Z | 2,034 MW | 15,292 MW | 0 MW | 7,792 MW | 3,894 MW |
| 2026-10-04T01:00Z | 1,647 MW | 15,205 MW | 0 MW | 7,795 MW | 3,886 MW |
| 2026-10-04T02:00Z | 1,349 MW | 15,080 MW | 0 MW | 7,715 MW | 3,908 MW |
| 2026-10-04T03:00Z | 1,288 MW | 15,178 MW | 0 MW | 7,740 MW | 3,978 MW |
| 2026-10-04T04:00Z | 1,325 MW | 15,194 MW | 0 MW | 7,810 MW | 4,184 MW |
| 2026-10-04T05:00Z | 1,351 MW | 14,943 MW | 505 MW | 7,556 MW | 4,362 MW |
| 2026-10-04T06:00Z | 1,401 MW | 14,058 MW | 5,783 MW | 5,368 MW | 4,401 MW |
| 2026-10-04T07:00Z | 1,147 MW | 12,748 MW | 16,002 MW | 3,033 MW | 4,322 MW |
| 2026-10-04T08:00Z | 700 MW | 10,764 MW | 26,794 MW | 2,009 MW | 4,155 MW |
| 2026-10-04T09:00Z | 965 MW | 7,317 MW | 35,214 MW | 1,682 MW | 4,031 MW |
| 2026-10-04T10:00Z | 1,401 MW | 6,287 MW | 39,569 MW | 1,638 MW | 3,898 MW |
| 2026-10-04T11:00Z | 1,787 MW | 6,264 MW | 39,154 MW | 1,639 MW | 3,858 MW |
| 2026-10-04T12:00Z | 2,107 MW | 6,414 MW | 35,346 MW | 1,634 MW | 3,867 MW |
| 2026-10-04T13:00Z | 2,406 MW | 7,246 MW | 29,575 MW | 1,757 MW | 3,917 MW |
| 2026-10-04T14:00Z | 2,806 MW | 11,355 MW | 19,934 MW | 2,500 MW | 4,039 MW |
| 2026-10-04T15:00Z | 3,005 MW | 13,979 MW | 8,808 MW | 5,794 MW | 4,202 MW |
| 2026-10-04T16:00Z | 3,140 MW | 14,940 MW | 1,199 MW | 7,404 MW | 4,396 MW |
| 2026-10-04T17:00Z | 3,231 MW | 15,105 MW | 1 MW | 7,634 MW | 4,436 MW |
| 2026-10-04T18:00Z | 3,687 MW | 15,261 MW | 0 MW | 7,715 MW | 4,360 MW |
| 2026-10-04T19:00Z | 4,260 MW | 15,418 MW | 0 MW | 7,701 MW | 4,218 MW |
| 2026-10-04T20:00Z | 4,873 MW | 15,558 MW | 0 MW | 7,592 MW | 4,079 MW |
| 2026-10-04T21:00Z | 5,946 MW | 15,716 MW | 0 MW | 7,344 MW | 3,953 MW |
| 2026-10-04T22:00Z | 6,830 MW | 15,696 MW | 0 MW | 6,628 MW | 3,856 MW |
| 2026-10-04T23:00Z | 8,428 MW | 15,481 MW | 0 MW | 6,244 MW | 3,814 MW |
| 2026-10-05T00:00Z | 9,722 MW | 15,687 MW | 0 MW | 6,026 MW | 3,805 MW |
| 2026-10-05T01:00Z | 10,985 MW | 15,985 MW | 0 MW | 5,801 MW | 3,803 MW |
| 2026-10-05T02:00Z | 12,168 MW | 16,170 MW | 0 MW | 5,630 MW | 3,829 MW |
| 2026-10-05T03:00Z | 12,574 MW | 16,275 MW | 0 MW | 5,912 MW | 3,896 MW |
| 2026-10-05T04:00Z | 14,064 MW | 16,487 MW | 0 MW | 7,220 MW | 4,084 MW |
| 2026-10-05T05:00Z | 14,531 MW | 16,397 MW | 427 MW | 8,052 MW | 4,236 MW |
| 2026-10-05T06:00Z | 14,576 MW | 16,320 MW | 6,505 MW | 8,063 MW | 4,269 MW |
| 2026-10-05T07:00Z | 12,913 MW | 14,537 MW | 18,701 MW | 6,869 MW | 4,195 MW |
| 2026-10-05T08:00Z | 9,754 MW | 12,562 MW | 31,413 MW | 4,606 MW | 4,009 MW |
| 2026-10-05T09:00Z | 9,618 MW | 9,825 MW | 41,096 MW | 3,308 MW | 3,891 MW |
| 2026-10-05T10:00Z | 10,838 MW | 8,665 MW | 45,565 MW | 3,628 MW | 3,816 MW |
| 2026-10-05T11:00Z | 12,003 MW | 8,545 MW | 44,581 MW | 3,493 MW | 3,792 MW |
| 2026-10-05T12:00Z | 13,206 MW | 8,793 MW | 40,992 MW | 3,676 MW | 3,791 MW |
| 2026-10-05T13:00Z | 13,949 MW | 9,728 MW | 34,351 MW | 3,732 MW | 3,838 MW |
| 2026-10-05T14:00Z | 14,355 MW | 13,479 MW | 23,366 MW | 4,186 MW | 3,970 MW |
| 2026-10-05T15:00Z | 14,081 MW | 15,854 MW | 10,197 MW | 6,831 MW | 4,211 MW |
| 2026-10-05T16:00Z | 14,321 MW | 16,599 MW | 1,286 MW | 8,990 MW | 4,398 MW |
| 2026-10-05T17:00Z | 15,156 MW | 16,797 MW | 1 MW | 9,019 MW | 4,420 MW |
| 2026-10-05T18:00Z | 16,565 MW | 16,657 MW | 0 MW | 9,119 MW | 4,377 MW |
| 2026-10-05T19:00Z | 17,600 MW | 16,352 MW | 0 MW | 8,973 MW | 4,253 MW |
| 2026-10-05T20:00Z | 17,788 MW | 16,287 MW | 0 MW | 8,598 MW | 4,129 MW |
| 2026-10-05T21:00Z | 17,137 MW | 15,971 MW | 0 MW | 7,361 MW | 3,996 MW |
| 2026-10-05T22:00Z | 16,417 MW | 15,721 MW | 0 MW | 6,412 MW | 3,885 MW |
| 2026-10-05T23:00Z | 15,484 MW | 15,590 MW | 0 MW | 6,321 MW | 3,834 MW |
| 2026-10-06T00:00Z | 14,308 MW | 15,189 MW | 0 MW | 5,990 MW | 3,802 MW |
| 2026-10-06T01:00Z | 13,548 MW | 14,986 MW | 0 MW | 5,799 MW | 3,799 MW |
| 2026-10-06T02:00Z | 11,835 MW | 15,106 MW | 0 MW | 6,071 MW | 3,824 MW |
| 2026-10-06T03:00Z | 10,207 MW | 15,705 MW | 0 MW | 7,176 MW | 3,895 MW |
| 2026-10-06T04:00Z | 8,812 MW | 16,508 MW | 0 MW | 9,185 MW | 4,081 MW |
| 2026-10-06T05:00Z | 7,553 MW | 16,574 MW | 514 MW | 9,729 MW | 4,245 MW |
| 2026-10-06T06:00Z | 6,217 MW | 15,779 MW | 7,054 MW | 10,002 MW | 4,241 MW |
| 2026-10-06T07:00Z | 4,457 MW | 14,830 MW | 18,413 MW | 9,943 MW | 4,155 MW |
| 2026-10-06T08:00Z | 2,755 MW | 13,957 MW | 28,679 MW | 8,099 MW | 3,997 MW |
| 2026-10-06T09:00Z | 2,080 MW | 13,260 MW | 36,007 MW | 7,114 MW | 3,873 MW |
| 2026-10-06T10:00Z | 1,777 MW | 12,900 MW | 39,932 MW | 6,514 MW | 3,787 MW |
| 2026-10-06T11:00Z | 1,678 MW | 12,502 MW | 40,108 MW | 6,419 MW | 3,744 MW |
| 2026-10-06T12:00Z | 1,517 MW | 12,838 MW | 36,902 MW | 6,545 MW | 3,757 MW |
| 2026-10-06T13:00Z | 1,113 MW | 13,934 MW | 30,719 MW | 6,729 MW | 3,802 MW |
| 2026-10-06T14:00Z | 810 MW | 15,065 MW | 20,559 MW | 8,613 MW | 3,928 MW |
| 2026-10-06T15:00Z | 508 MW | 16,298 MW | 8,580 MW | 10,093 MW | 4,170 MW |
| 2026-10-06T16:00Z | 511 MW | 17,078 MW | 950 MW | 11,468 MW | 4,361 MW |
| 2026-10-06T17:00Z | 692 MW | 17,198 MW | 1 MW | 11,789 MW | 4,379 MW |
| 2026-10-06T18:00Z | 982 MW | 17,005 MW | 0 MW | 11,701 MW | 4,316 MW |
| 2026-10-06T19:00Z | 1,441 MW | 16,869 MW | 0 MW | 10,729 MW | 4,199 MW |
| 2026-10-06T20:00Z | 1,878 MW | 16,666 MW | 0 MW | 9,545 MW | 4,044 MW |
| 2026-10-06T21:00Z | 2,062 MW | 16,554 MW | 0 MW | 9,214 MW | 3,929 MW |
| 2026-10-06T22:00Z | 2,316 MW | 16,480 MW | 0 MW | 8,928 MW | 3,849 MW |
| 2026-10-06T23:00Z | 2,548 MW | 16,498 MW | 0 MW | 8,866 MW | 3,806 MW |
| 2026-10-07T00:00Z | 2,716 MW | 16,514 MW | 0 MW | 8,818 MW | 3,781 MW |
| 2026-10-07T01:00Z | 2,850 MW | 16,514 MW | 0 MW | 8,854 MW | 3,774 MW |
| 2026-10-07T02:00Z | 3,123 MW | 16,713 MW | 0 MW | 8,923 MW | 3,802 MW |
| 2026-10-07T03:00Z | 3,373 MW | 16,896 MW | 0 MW | 9,119 MW | 3,874 MW |
| 2026-10-07T04:00Z | 3,523 MW | 16,850 MW | 0 MW | 9,834 MW | 4,039 MW |
| 2026-10-07T05:00Z | 3,909 MW | 16,782 MW | 389 MW | 9,902 MW | 4,189 MW |
| 2026-10-07T06:00Z | 4,600 MW | 16,753 MW | 6,500 MW | 9,863 MW | 4,216 MW |
| 2026-10-07T07:00Z | 4,525 MW | 16,474 MW | 18,612 MW | 9,636 MW | 4,175 MW |
| 2026-10-07T08:00Z | 3,157 MW | 15,038 MW | 30,878 MW | 7,849 MW | 4,035 MW |
| 2026-10-07T09:00Z | 2,393 MW | 13,212 MW | 39,504 MW | 6,943 MW | 3,907 MW |
| 2026-10-07T10:00Z | 2,857 MW | 12,600 MW | 43,585 MW | 6,352 MW | 3,797 MW |
| 2026-10-07T11:00Z | 3,419 MW | 12,644 MW | 43,196 MW | 5,974 MW | 3,767 MW |
| 2026-10-07T12:00Z | 4,269 MW | 13,680 MW | 37,859 MW | 5,290 MW | 3,763 MW |
| 2026-10-07T13:00Z | 4,680 MW | 15,713 MW | 28,953 MW | 6,511 MW | 3,791 MW |
| 2026-10-07T14:00Z | 4,505 MW | 16,514 MW | 17,446 MW | 7,757 MW | 3,948 MW |
| 2026-10-07T15:00Z | 4,309 MW | 16,610 MW | 6,364 MW | 8,607 MW | 4,184 MW |
| 2026-10-07T16:00Z | 5,398 MW | 16,717 MW | 579 MW | 8,798 MW | 4,361 MW |
| 2026-10-07T17:00Z | 8,458 MW | 16,817 MW | 0 MW | 8,421 MW | 4,387 MW |
| 2026-10-07T18:00Z | 12,148 MW | 16,698 MW | 0 MW | 8,324 MW | 4,311 MW |
| 2026-10-07T19:00Z | 13,458 MW | 16,465 MW | 0 MW | 7,753 MW | 4,212 MW |
| 2026-10-07T20:00Z | 13,657 MW | 16,093 MW | 0 MW | 6,674 MW | 4,080 MW |
| 2026-10-07T21:00Z | 14,040 MW | 15,078 MW | 0 MW | 4,988 MW | 3,959 MW |
| 2026-10-07T22:00Z | 14,003 MW | 13,649 MW | 0 MW | 3,907 MW | 3,881 MW |
| 2026-10-07T23:00Z | 14,651 MW | 13,357 MW | 0 MW | 3,794 MW | 3,837 MW |
| 2026-10-08T00:00Z | 15,346 MW | 12,979 MW | 0 MW | 3,927 MW | 3,818 MW |
| 2026-10-08T01:00Z | 16,228 MW | 12,681 MW | 0 MW | 4,738 MW | 3,819 MW |
| 2026-10-08T02:00Z | 17,439 MW | 13,465 MW | 0 MW | 4,785 MW | 3,779 MW |
| 2026-10-08T03:00Z | 18,089 MW | 14,361 MW | 0 MW | 4,818 MW | 3,760 MW |
| 2026-10-08T04:00Z | 18,883 MW | 15,063 MW | 0 MW | 5,440 MW | 3,929 MW |
| 2026-10-08T05:00Z | 19,943 MW | 15,354 MW | 147 MW | 5,481 MW | 4,100 MW |
| 2026-10-08T06:00Z | 23,019 MW | 15,219 MW | 2,222 MW | 5,782 MW | 4,123 MW |
| 2026-10-08T07:00Z | 27,707 MW | 14,962 MW | 5,793 MW | 5,625 MW | 4,138 MW |
| 2026-10-08T08:00Z | 30,402 MW | 13,734 MW | 10,044 MW | 5,364 MW | 3,990 MW |
| 2026-10-08T09:00Z | 32,197 MW | 12,666 MW | 13,529 MW | 4,945 MW | 3,819 MW |
| 2026-10-08T10:00Z | 33,273 MW | 12,213 MW | 15,021 MW | 4,864 MW | 3,848 MW |
| 2026-10-08T11:00Z | 34,792 MW | 12,185 MW | 14,992 MW | 4,470 MW | 3,804 MW |
| 2026-10-08T12:00Z | 36,393 MW | 11,982 MW | 14,030 MW | 4,235 MW | 3,820 MW |
| 2026-10-08T13:00Z | 38,652 MW | 11,664 MW | 11,824 MW | 4,325 MW | 3,870 MW |
| 2026-10-08T14:00Z | 39,131 MW | 12,107 MW | 8,692 MW | 4,642 MW | 4,017 MW |
| 2026-10-08T15:00Z | 38,429 MW | 12,957 MW | 4,388 MW | 5,506 MW | 4,235 MW |
| 2026-10-08T16:00Z | 37,262 MW | 13,692 MW | 590 MW | 6,009 MW | 4,393 MW |
| 2026-10-08T17:00Z | 35,663 MW | 13,811 MW | 0 MW | 6,008 MW | 4,420 MW |
| 2026-10-08T18:00Z | 36,449 MW | 13,424 MW | 0 MW | 6,270 MW | 4,347 MW |
| 2026-10-08T19:00Z | 35,881 MW | 11,972 MW | 0 MW | 6,041 MW | 4,231 MW |
| 2026-10-08T20:00Z | 34,825 MW | 11,061 MW | 0 MW | 5,772 MW | 4,110 MW |
| 2026-10-08T21:00Z | 35,010 MW | 9,616 MW | 0 MW | 5,681 MW | 3,988 MW |
| 2026-10-08T22:00Z | 35,380 MW | 8,612 MW | 0 MW | 4,675 MW | 3,861 MW |
| 2026-10-08T23:00Z | 33,893 MW | 7,832 MW | 0 MW | 4,583 MW | 3,818 MW |
| 2026-10-09T00:00Z | 33,474 MW | 7,890 MW | 0 MW | 4,334 MW | 3,772 MW |
| 2026-10-09T01:00Z | 33,290 MW | 7,508 MW | 0 MW | 4,411 MW | 3,774 MW |
| 2026-10-09T02:00Z | 32,065 MW | 7,672 MW | 0 MW | 4,323 MW | 3,808 MW |
| 2026-10-09T03:00Z | 32,022 MW | 7,739 MW | 0 MW | 4,551 MW | 3,902 MW |
| 2026-10-09T04:00Z | 32,539 MW | 7,742 MW | 0 MW | 4,531 MW | 4,118 MW |
| 2026-10-09T05:00Z | 34,313 MW | 8,472 MW | 313 MW | 4,866 MW | 4,273 MW |
| 2026-10-09T06:00Z | 35,778 MW | 9,013 MW | 4,425 MW | 4,868 MW | 4,288 MW |
| 2026-10-09T07:00Z | 38,066 MW | 7,841 MW | 11,766 MW | 4,679 MW | 4,257 MW |
| 2026-10-09T08:00Z | 40,127 MW | 6,153 MW | 19,272 MW | 4,024 MW | 4,100 MW |
| 2026-10-09T09:00Z | 40,909 MW | 5,844 MW | 22,312 MW | 3,202 MW | 3,976 MW |
| 2026-10-09T10:00Z | 43,045 MW | 5,449 MW | 21,667 MW | 2,634 MW | 3,906 MW |
| 2026-10-09T11:00Z | 45,215 MW | 5,044 MW | 18,491 MW | 2,612 MW | 3,909 MW |
| 2026-10-09T12:00Z | 47,889 MW | 4,900 MW | 14,124 MW | 2,593 MW | 3,897 MW |
| 2026-10-09T13:00Z | 48,222 MW | 5,122 MW | 9,554 MW | 2,655 MW | 3,928 MW |
| 2026-10-09T14:00Z | 47,439 MW | 5,373 MW | 5,167 MW | 2,820 MW | 4,095 MW |
| 2026-10-09T15:00Z | 48,103 MW | 5,595 MW | 1,714 MW | 3,078 MW | 4,308 MW |
| 2026-10-09T16:00Z | 48,170 MW | 6,148 MW | 107 MW | 3,154 MW | 4,461 MW |
| 2026-10-09T17:00Z | 48,875 MW | 6,203 MW | 0 MW | 3,012 MW | 4,474 MW |
| 2026-10-09T18:00Z | 48,338 MW | 5,854 MW | 0 MW | 2,884 MW | 4,401 MW |
| 2026-10-09T19:00Z | 48,713 MW | 5,291 MW | 0 MW | 2,421 MW | 4,282 MW |
| 2026-10-09T20:00Z | 47,441 MW | 4,595 MW | 0 MW | 2,291 MW | 4,150 MW |
| 2026-10-09T21:00Z | 46,133 MW | 3,882 MW | 0 MW | 2,403 MW | 4,038 MW |
| 2026-10-09T22:00Z | 44,470 MW | 3,793 MW | 0 MW | 2,520 MW | 3,937 MW |
| 2026-10-09T23:00Z | 42,377 MW | 3,917 MW | 0 MW | 2,433 MW | 3,885 MW |
| 2026-10-10T00:00Z | 42,186 MW | 3,602 MW | 0 MW | 2,590 MW | 3,869 MW |
| 2026-10-10T01:00Z | 40,338 MW | 3,587 MW | 0 MW | 2,651 MW | 3,866 MW |
| 2026-10-10T02:00Z | 38,441 MW | 3,720 MW | 0 MW | 2,602 MW | 3,895 MW |
| 2026-10-10T03:00Z | 37,261 MW | 3,335 MW | 0 MW | 2,397 MW | 3,953 MW |
| 2026-10-10T04:00Z | 35,107 MW | 3,236 MW | 0 MW | 2,503 MW | 4,179 MW |
| 2026-10-10T05:00Z | 34,135 MW | 3,237 MW | 88 MW | 2,725 MW | 4,351 MW |
| 2026-10-10T06:00Z | 31,871 MW | 3,322 MW | 2,903 MW | 2,704 MW | 4,373 MW |
| 2026-10-10T07:00Z | 29,720 MW | 3,526 MW | 9,604 MW | 2,610 MW | 4,323 MW |
| 2026-10-10T08:00Z | 28,334 MW | 3,732 MW | 16,572 MW | 2,394 MW | 4,150 MW |
| 2026-10-10T09:00Z | 29,058 MW | 3,614 MW | 21,405 MW | 1,786 MW | 3,981 MW |
| 2026-10-10T10:00Z | 31,009 MW | 3,847 MW | 23,565 MW | 1,663 MW | 3,870 MW |
| 2026-10-10T11:00Z | 30,470 MW | 3,812 MW | 23,774 MW | 1,394 MW | 3,847 MW |
| 2026-10-10T12:00Z | 31,081 MW | 3,654 MW | 22,936 MW | 1,466 MW | 3,881 MW |
| 2026-10-10T13:00Z | 31,140 MW | 3,698 MW | 19,801 MW | 1,668 MW | 3,942 MW |
| 2026-10-10T14:00Z | 31,068 MW | 4,382 MW | 14,170 MW | 1,891 MW | 4,103 MW |
| 2026-10-10T15:00Z | 30,344 MW | 5,630 MW | 6,080 MW | 2,390 MW | 4,322 MW |
| 2026-10-10T16:00Z | 29,892 MW | 6,457 MW | 504 MW | 3,259 MW | 4,477 MW |
| 2026-10-10T17:00Z | 31,074 MW | 6,819 MW | 0 MW | 3,641 MW | 4,511 MW |
| 2026-10-10T18:00Z | 32,769 MW | 7,084 MW | 0 MW | 3,452 MW | 4,448 MW |
| 2026-10-10T19:00Z | 32,324 MW | 7,179 MW | 0 MW | 3,348 MW | 4,334 MW |
| 2026-10-10T20:00Z | 31,507 MW | 6,834 MW | 0 MW | 3,329 MW | 4,168 MW |
| 2026-10-10T21:00Z | 32,318 MW | 6,802 MW | 0 MW | 3,221 MW | 4,061 MW |
| 2026-10-10T22:00Z | 34,026 MW | 6,836 MW | 0 MW | 3,239 MW | 3,976 MW |
| 2026-10-10T23:00Z | 34,510 MW | 6,556 MW | 0 MW | 3,195 MW | 3,925 MW |
| 2026-10-11T00:00Z | 35,130 MW | 6,313 MW | 0 MW | 3,083 MW | 3,905 MW |
| 2026-10-11T01:00Z | 34,999 MW | 6,488 MW | 0 MW | 2,972 MW | 3,899 MW |
| 2026-10-11T02:00Z | 34,883 MW | 6,731 MW | 0 MW | 2,739 MW | 3,929 MW |
| 2026-10-11T03:00Z | 34,304 MW | 7,060 MW | 0 MW | 2,249 MW | 3,995 MW |
| 2026-10-11T04:00Z | 35,273 MW | 6,995 MW | 0 MW | 2,060 MW | 4,197 MW |
| 2026-10-11T05:00Z | 33,866 MW | 7,064 MW | 153 MW | 1,989 MW | 4,361 MW |
| 2026-10-11T06:00Z | 31,239 MW | 7,192 MW | 3,464 MW | 1,970 MW | 4,396 MW |
| 2026-10-11T07:00Z | 30,583 MW | 6,951 MW | 10,388 MW | 1,934 MW | 4,339 MW |
| 2026-10-11T08:00Z | 31,051 MW | 5,915 MW | 16,826 MW | 1,540 MW | 4,205 MW |
| 2026-10-11T09:00Z | 30,849 MW | 5,238 MW | 21,777 MW | 1,512 MW | 4,049 MW |
| 2026-10-11T10:00Z | 30,618 MW | 5,162 MW | 24,029 MW | 1,511 MW | 3,922 MW |
| 2026-10-11T11:00Z | 29,579 MW | 5,214 MW | 23,861 MW | 1,573 MW | 3,891 MW |
| 2026-10-11T12:00Z | 27,257 MW | 5,528 MW | 22,401 MW | 1,712 MW | 3,889 MW |
| 2026-10-11T13:00Z | 24,991 MW | 7,280 MW | 18,735 MW | 2,053 MW | 3,960 MW |
| 2026-10-11T14:00Z | 22,119 MW | 10,193 MW | 12,239 MW | 2,934 MW | 4,130 MW |
| 2026-10-11T15:00Z | 18,896 MW | 12,342 MW | 4,984 MW | 4,839 MW | 4,352 MW |
| 2026-10-11T16:00Z | 17,136 MW | 13,386 MW | 381 MW | 6,948 MW | 4,516 MW |
| 2026-10-11T17:00Z | 18,077 MW | 13,901 MW | 0 MW | 7,921 MW | 4,524 MW |
| 2026-10-11T18:00Z | 18,963 MW | 14,277 MW | 0 MW | 8,439 MW | 4,477 MW |
| 2026-10-11T19:00Z | 18,535 MW | 14,846 MW | 0 MW | 8,604 MW | 4,367 MW |
| 2026-10-11T20:00Z | 17,000 MW | 15,383 MW | 0 MW | 8,457 MW | 4,206 MW |
| 2026-10-11T21:00Z | 15,683 MW | 15,623 MW | 0 MW | 7,341 MW | 4,090 MW |
| 2026-10-11T22:00Z | 14,597 MW | 15,883 MW | 0 MW | 5,816 MW | 3,995 MW |
| 2026-10-11T23:00Z | 13,300 MW | 16,090 MW | 0 MW | 5,504 MW | 3,955 MW |
| 2026-10-12T00:00Z | 12,215 MW | 16,030 MW | 0 MW | 5,454 MW | 3,939 MW |
| 2026-10-12T01:00Z | 11,825 MW | 16,245 MW | 0 MW | 5,534 MW | 3,929 MW |
| 2026-10-12T02:00Z | 11,020 MW | 16,297 MW | 0 MW | 5,713 MW | 3,956 MW |
| 2026-10-12T03:00Z | 9,974 MW | 16,689 MW | 0 MW | 6,890 MW | 4,025 MW |
| 2026-10-12T04:00Z | 9,365 MW | 17,069 MW | 0 MW | 9,371 MW | 4,217 MW |
| 2026-10-12T05:00Z | 8,820 MW | 16,979 MW | 211 MW | 10,087 MW | 4,362 MW |
| 2026-10-12T06:00Z | 8,104 MW | 17,087 MW | 5,276 MW | 10,363 MW | 4,404 MW |
| 2026-10-12T07:00Z | 6,236 MW | 17,056 MW | 16,473 MW | 10,180 MW | 4,311 MW |
| 2026-10-12T08:00Z | 4,519 MW | 16,492 MW | 28,201 MW | 7,447 MW | 4,184 MW |
| 2026-10-12T09:00Z | 3,947 MW | 15,435 MW | 36,731 MW | 6,077 MW | 4,041 MW |
| 2026-10-12T10:00Z | 3,871 MW | 15,373 MW | 39,647 MW | 5,006 MW | 3,938 MW |
| 2026-10-12T11:00Z | 4,538 MW | 15,259 MW | 37,902 MW | 4,825 MW | 3,910 MW |
| 2026-10-12T12:00Z | 4,810 MW | 15,490 MW | 34,665 MW | 4,627 MW | 3,912 MW |
| 2026-10-12T13:00Z | 4,784 MW | 15,897 MW | 28,856 MW | 4,953 MW | 3,975 MW |
| 2026-10-12T14:00Z | 3,895 MW | 16,452 MW | 19,601 MW | 6,548 MW | 4,145 MW |
| 2026-10-12T15:00Z | 3,158 MW | 17,563 MW | 7,683 MW | 9,811 MW | 4,364 MW |
| 2026-10-12T16:00Z | 3,121 MW | 17,886 MW | 516 MW | 10,948 MW | 4,482 MW |
| 2026-10-12T17:00Z | 4,498 MW | 17,928 MW | 0 MW | 11,007 MW | 4,471 MW |
| 2026-10-12T18:00Z | 6,998 MW | 17,762 MW | 0 MW | 10,823 MW | 4,407 MW |
| 2026-10-12T19:00Z | 9,587 MW | 17,411 MW | 0 MW | 10,175 MW | 4,288 MW |
| 2026-10-12T20:00Z | 11,906 MW | 16,872 MW | 0 MW | 9,043 MW | 4,191 MW |
| 2026-10-12T21:00Z | 13,154 MW | 16,358 MW | 0 MW | 7,548 MW | 4,086 MW |
| 2026-10-12T22:00Z | 14,431 MW | 15,572 MW | 0 MW | 6,510 MW | 3,994 MW |
| 2026-10-12T23:00Z | 15,239 MW | 15,588 MW | 0 MW | 6,070 MW | 3,960 MW |
| 2026-10-13T00:00Z | 15,274 MW | 15,572 MW | 0 MW | 6,511 MW | 3,931 MW |
| 2026-10-13T01:00Z | 15,512 MW | 15,779 MW | 0 MW | 6,963 MW | 3,913 MW |
| 2026-10-13T02:00Z | 15,692 MW | 15,888 MW | 0 MW | 7,671 MW | 3,925 MW |
| 2026-10-13T03:00Z | 16,376 MW | 15,984 MW | 0 MW | 8,130 MW | 3,968 MW |
| 2026-10-13T04:00Z | 17,302 MW | 16,299 MW | 0 MW | 9,172 MW | 4,122 MW |
| 2026-10-13T05:00Z | 19,050 MW | 16,190 MW | 235 MW | 9,545 MW | 4,263 MW |
| 2026-10-13T06:00Z | 19,642 MW | 16,192 MW | 4,740 MW | 9,440 MW | 4,308 MW |
| 2026-10-13T07:00Z | 19,364 MW | 15,877 MW | 12,338 MW | 8,867 MW | 4,261 MW |
| 2026-10-13T08:00Z | 18,135 MW | 14,923 MW | 19,883 MW | 7,081 MW | 4,143 MW |
| 2026-10-13T09:00Z | 17,124 MW | 13,910 MW | 25,261 MW | 5,999 MW | 4,041 MW |
| 2026-10-13T10:00Z | 17,851 MW | 13,492 MW | 27,626 MW | 5,533 MW | 3,948 MW |
| 2026-10-13T11:00Z | 18,797 MW | 12,126 MW | 25,392 MW | 5,229 MW | 3,872 MW |
| 2026-10-13T12:00Z | 19,461 MW | 12,610 MW | 19,619 MW | 5,973 MW | 3,877 MW |
| 2026-10-13T13:00Z | 21,275 MW | 14,728 MW | 13,116 MW | 6,863 MW | 3,924 MW |
| 2026-10-13T14:00Z | 24,315 MW | 15,337 MW | 6,731 MW | 7,090 MW | 4,064 MW |
| 2026-10-13T15:00Z | 26,451 MW | 15,491 MW | 2,147 MW | 8,086 MW | 4,289 MW |
| 2026-10-13T16:00Z | 29,368 MW | 15,982 MW | 104 MW | 8,765 MW | 4,440 MW |
| 2026-10-13T17:00Z | 32,409 MW | 16,027 MW | 0 MW | 8,732 MW | 4,448 MW |
| 2026-10-13T18:00Z | 34,736 MW | 15,160 MW | 0 MW | 8,212 MW | 4,385 MW |
| 2026-10-13T19:00Z | 34,787 MW | 14,303 MW | 0 MW | 7,936 MW | 4,255 MW |
| 2026-10-13T20:00Z | 32,029 MW | 14,479 MW | 0 MW | 7,636 MW | 4,124 MW |
| 2026-10-13T21:00Z | 30,363 MW | 13,877 MW | 0 MW | 7,003 MW | 4,022 MW |
| 2026-10-13T22:00Z | 31,413 MW | 13,193 MW | 0 MW | 6,436 MW | 3,922 MW |
| 2026-10-13T23:00Z | 31,917 MW | 13,004 MW | 0 MW | 6,365 MW | 3,876 MW |
| 2026-10-14T00:00Z | 32,272 MW | 12,461 MW | 0 MW | 5,865 MW | 3,838 MW |
| 2026-10-14T01:00Z | 30,901 MW | 12,253 MW | 0 MW | 5,969 MW | 3,828 MW |
| 2026-10-14T02:00Z | 30,212 MW | 13,696 MW | 0 MW | 6,377 MW | 3,854 MW |
| 2026-10-14T03:00Z | 28,474 MW | 15,306 MW | 0 MW | 7,299 MW | 3,908 MW |
| 2026-10-14T04:00Z | 27,696 MW | 16,444 MW | 0 MW | 8,251 MW | 4,067 MW |
| 2026-10-14T05:00Z | 26,211 MW | 16,381 MW | 82 MW | 8,743 MW | 4,216 MW |
| 2026-10-14T06:00Z | 23,724 MW | 15,554 MW | 3,679 MW | 7,857 MW | 4,299 MW |
| 2026-10-14T07:00Z | 20,371 MW | 15,299 MW | 12,955 MW | 6,979 MW | 4,250 MW |
| 2026-10-14T08:00Z | 17,565 MW | 14,698 MW | 23,388 MW | 4,916 MW | 4,112 MW |
| 2026-10-14T09:00Z | 16,326 MW | 13,984 MW | 31,691 MW | 3,303 MW | 4,001 MW |
| 2026-10-14T10:00Z | 17,033 MW | 12,422 MW | 35,519 MW | 2,886 MW | 3,912 MW |
| 2026-10-14T11:00Z | 17,580 MW | 11,285 MW | 35,538 MW | 2,831 MW | 3,887 MW |
| 2026-10-14T12:00Z | 17,005 MW | 11,576 MW | 32,045 MW | 2,872 MW | 3,875 MW |
| 2026-10-14T13:00Z | 15,724 MW | 13,092 MW | 25,645 MW | 3,020 MW | 3,918 MW |
| 2026-10-14T14:00Z | 13,478 MW | 15,430 MW | 16,809 MW | 4,792 MW | 4,090 MW |
| 2026-10-14T15:00Z | 11,124 MW | 16,976 MW | 6,302 MW | 8,143 MW | 4,275 MW |
| 2026-10-14T16:00Z | 9,820 MW | 17,170 MW | 389 MW | 9,248 MW | 4,449 MW |
| 2026-10-14T17:00Z | 9,788 MW | 17,280 MW | 0 MW | 9,309 MW | 4,468 MW |
| 2026-10-14T18:00Z | 10,648 MW | 17,183 MW | 0 MW | 9,731 MW | 4,418 MW |
| 2026-10-14T19:00Z | 11,369 MW | 17,287 MW | 0 MW | 9,611 MW | 4,309 MW |
| 2026-10-14T20:00Z | 11,998 MW | 16,760 MW | 0 MW | 9,363 MW | 4,183 MW |
| 2026-10-14T21:00Z | 11,824 MW | 15,796 MW | 0 MW | 8,598 MW | 4,065 MW |
| 2026-10-14T22:00Z | 12,539 MW | 15,059 MW | 0 MW | 7,909 MW | 3,943 MW |
| 2026-10-14T23:00Z | 12,992 MW | 14,723 MW | 0 MW | 7,454 MW | 3,901 MW |
| 2026-10-15T00:00Z | 12,563 MW | 14,778 MW | 0 MW | 7,268 MW | 3,882 MW |
| 2026-10-15T01:00Z | 12,566 MW | 15,120 MW | 0 MW | 7,363 MW | 3,873 MW |
| 2026-10-15T02:00Z | 12,522 MW | 15,801 MW | 0 MW | 7,698 MW | 3,899 MW |
| 2026-10-15T03:00Z | 12,976 MW | 16,087 MW | 0 MW | 8,776 MW | 3,965 MW |
| 2026-10-15T04:00Z | 14,107 MW | 16,630 MW | 0 MW | 9,878 MW | 4,147 MW |
| 2026-10-15T05:00Z | 14,313 MW | 16,528 MW | 98 MW | 10,524 MW | 4,278 MW |
| 2026-10-15T06:00Z | 15,213 MW | 16,049 MW | 3,593 MW | 10,679 MW | 4,318 MW |
| 2026-10-15T07:00Z | 14,583 MW | 15,862 MW | 11,918 MW | 10,095 MW | 4,271 MW |
| 2026-10-15T08:00Z | 11,986 MW | 14,958 MW | 22,212 MW | 8,529 MW | 4,114 MW |
| 2026-10-15T09:00Z | 10,383 MW | 13,750 MW | 31,592 MW | 6,707 MW | 4,012 MW |
| 2026-10-15T10:00Z | 9,510 MW | 11,995 MW | 37,131 MW | 5,280 MW | 3,909 MW |
| 2026-10-15T11:00Z | 10,436 MW | 10,788 MW | 37,959 MW | 4,472 MW | 3,877 MW |
| 2026-10-15T12:00Z | 11,991 MW | 11,091 MW | 34,446 MW | 4,219 MW | 3,888 MW |
| 2026-10-15T13:00Z | 12,096 MW | 12,365 MW | 27,669 MW | 4,732 MW | 3,948 MW |
| 2026-10-15T14:00Z | 11,942 MW | 14,438 MW | 17,011 MW | 6,605 MW | 4,117 MW |
| 2026-10-15T15:00Z | 12,112 MW | 15,657 MW | 5,423 MW | 9,970 MW | 4,315 MW |
| 2026-10-15T16:00Z | 14,099 MW | 16,131 MW | 221 MW | 10,732 MW | 4,453 MW |
| 2026-10-15T17:00Z | 15,402 MW | 15,784 MW | 0 MW | 11,003 MW | 4,452 MW |
| 2026-10-15T18:00Z | 16,786 MW | 15,512 MW | 0 MW | 11,200 MW | 4,384 MW |
| 2026-10-15T19:00Z | 16,497 MW | 15,132 MW | 0 MW | 11,069 MW | 4,302 MW |
| 2026-10-15T20:00Z | 15,798 MW | 14,896 MW | 0 MW | 10,776 MW | 4,182 MW |
| 2026-10-15T21:00Z | 14,504 MW | 14,836 MW | 0 MW | 10,418 MW | 4,058 MW |
| 2026-10-15T22:00Z | 13,003 MW | 15,298 MW | 0 MW | 9,602 MW | 3,948 MW |
| 2026-10-15T23:00Z | 11,591 MW | 15,694 MW | 0 MW | 9,395 MW | 3,907 MW |
| 2026-10-16T00:00Z | 10,568 MW | 15,540 MW | 0 MW | 9,302 MW | 3,861 MW |
| 2026-10-16T01:00Z | 10,026 MW | 15,272 MW | 0 MW | 9,306 MW | 3,851 MW |
| 2026-10-16T02:00Z | 10,007 MW | 15,297 MW | 0 MW | 9,339 MW | 3,882 MW |
| 2026-10-16T03:00Z | 10,539 MW | 15,357 MW | 0 MW | 9,491 MW | 3,950 MW |
| 2026-10-16T04:00Z | 12,787 MW | 15,242 MW | 0 MW | 9,317 MW | 4,149 MW |
| 2026-10-16T05:00Z | 14,671 MW | 15,868 MW | 112 MW | 9,719 MW | 4,298 MW |
| 2026-10-16T06:00Z | 16,445 MW | 15,838 MW | 4,104 MW | 10,300 MW | 4,341 MW |
| 2026-10-16T07:00Z | 16,464 MW | 15,361 MW | 13,395 MW | 9,281 MW | 4,297 MW |
| 2026-10-16T08:00Z | 14,703 MW | 14,898 MW | 24,258 MW | 6,503 MW | 4,146 MW |
| 2026-10-16T09:00Z | 12,278 MW | 14,243 MW | 33,801 MW | 4,694 MW | 4,008 MW |
| 2026-10-16T10:00Z | 9,634 MW | 13,869 MW | 38,891 MW | 4,219 MW | 3,916 MW |
| 2026-10-16T11:00Z | 8,940 MW | 14,192 MW | 39,126 MW | 4,093 MW | 3,894 MW |
| 2026-10-16T12:00Z | 8,664 MW | 14,514 MW | 34,534 MW | 4,301 MW | 3,898 MW |
| 2026-10-16T13:00Z | 8,647 MW | 14,658 MW | 26,059 MW | 5,130 MW | 3,954 MW |
| 2026-10-16T14:00Z | 7,849 MW | 15,316 MW | 15,179 MW | 7,682 MW | 4,126 MW |
| 2026-10-16T15:00Z | 8,286 MW | 15,909 MW | 4,576 MW | 9,335 MW | 4,317 MW |
| 2026-10-16T16:00Z | 9,554 MW | 15,903 MW | 194 MW | 10,369 MW | 4,448 MW |
| 2026-10-16T17:00Z | 11,474 MW | 15,885 MW | 0 MW | 10,265 MW | 4,449 MW |
| 2026-10-16T18:00Z | 13,356 MW | 15,803 MW | 0 MW | 10,283 MW | 4,392 MW |
| 2026-10-16T19:00Z | 13,948 MW | 15,398 MW | 0 MW | 10,231 MW | 4,311 MW |
| 2026-10-16T20:00Z | 15,541 MW | 15,021 MW | 0 MW | 9,453 MW | 4,190 MW |
| 2026-10-16T21:00Z | 17,486 MW | 13,786 MW | 0 MW | 7,993 MW | 4,057 MW |
| 2026-10-16T22:00Z | 17,722 MW | 12,957 MW | 0 MW | 6,684 MW | 3,946 MW |
| 2026-10-16T23:00Z | 16,832 MW | 12,712 MW | 0 MW | 6,068 MW | 3,900 MW |
| 2026-10-17T00:00Z | 17,947 MW | 12,649 MW | 0 MW | 5,374 MW | 3,879 MW |
| 2026-10-17T01:00Z | 19,023 MW | 12,627 MW | 0 MW | 5,164 MW | 3,887 MW |
| 2026-10-17T02:00Z | 19,949 MW | 12,446 MW | 0 MW | 4,830 MW | 3,927 MW |
| 2026-10-17T03:00Z | 20,649 MW | 12,206 MW | 0 MW | 4,816 MW | 4,000 MW |
| 2026-10-17T04:00Z | 22,820 MW | 11,820 MW | 0 MW | 5,042 MW | 4,219 MW |
| 2026-10-17T05:00Z | 24,431 MW | 11,374 MW | 34 MW | 5,198 MW | 4,371 MW |
| 2026-10-17T06:00Z | 24,563 MW | 11,157 MW | 1,500 MW | 5,578 MW | 4,395 MW |
| 2026-10-17T07:00Z | 23,642 MW | 10,882 MW | 4,921 MW | 5,841 MW | 4,350 MW |
| 2026-10-17T08:00Z | 23,259 MW | 9,956 MW | 8,319 MW | 5,895 MW | 4,227 MW |
| 2026-10-17T09:00Z | 23,817 MW | 9,542 MW | 11,187 MW | 4,990 MW | 4,069 MW |
| 2026-10-17T10:00Z | 24,274 MW | 9,265 MW | 12,806 MW | 3,950 MW | 3,964 MW |
| 2026-10-17T11:00Z | 24,335 MW | 8,992 MW | 12,895 MW | 3,669 MW | 3,939 MW |
| 2026-10-17T12:00Z | 24,508 MW | 8,528 MW | 12,071 MW | 3,749 MW | 3,957 MW |
| 2026-10-17T13:00Z | 24,109 MW | 8,738 MW | 9,805 MW | 3,763 MW | 4,007 MW |
| 2026-10-17T14:00Z | 23,481 MW | 10,306 MW | 6,089 MW | 4,547 MW | 4,205 MW |
| 2026-10-17T15:00Z | 22,680 MW | 11,947 MW | 2,044 MW | 5,677 MW | 4,394 MW |
| 2026-10-17T16:00Z | 23,435 MW | 12,109 MW | 101 MW | 6,561 MW | 4,497 MW |
| 2026-10-17T17:00Z | 24,881 MW | 12,275 MW | 0 MW | 6,991 MW | 4,488 MW |
| 2026-10-17T18:00Z | 25,413 MW | 12,463 MW | 0 MW | 6,945 MW | 4,418 MW |
| 2026-10-17T19:00Z | 25,313 MW | 12,487 MW | 0 MW | 6,861 MW | 4,283 MW |
| 2026-10-17T20:00Z | 24,690 MW | 12,434 MW | 0 MW | 6,635 MW | 4,158 MW |
| 2026-10-17T21:00Z | 23,268 MW | 12,368 MW | 0 MW | 6,753 MW | 4,043 MW |
| 2026-10-17T22:00Z | 23,560 MW | 11,671 MW | 0 MW | 6,859 MW | 3,958 MW |
| 2026-10-17T23:00Z | 22,832 MW | 11,634 MW | 0 MW | 6,820 MW | 3,926 MW |
| 2026-10-18T00:00Z | 22,309 MW | 11,343 MW | 0 MW | 6,369 MW | 3,904 MW |
| 2026-10-18T01:00Z | 21,847 MW | 11,698 MW | 0 MW | 6,573 MW | 3,899 MW |
| 2026-10-18T02:00Z | 21,420 MW | 11,884 MW | 0 MW | 6,867 MW | 3,937 MW |
| 2026-10-18T03:00Z | 21,756 MW | 11,838 MW | 0 MW | 6,632 MW | 4,021 MW |
| 2026-10-18T04:00Z | 22,312 MW | 11,683 MW | 0 MW | 6,308 MW | 4,219 MW |
| 2026-10-18T05:00Z | 22,202 MW | 11,634 MW | 12 MW | 6,433 MW | 4,402 MW |
| 2026-10-18T06:00Z | 22,329 MW | 11,909 MW | 776 MW | 6,906 MW | 4,458 MW |
| 2026-10-18T07:00Z | 21,657 MW | 12,183 MW | 3,045 MW | 6,777 MW | 4,400 MW |
| 2026-10-18T08:00Z | 20,939 MW | 12,033 MW | 5,994 MW | 6,505 MW | 4,275 MW |
| 2026-10-18T09:00Z | 20,233 MW | 11,183 MW | 8,836 MW | 6,284 MW | 4,137 MW |
| 2026-10-18T10:00Z | 19,516 MW | 10,949 MW | 10,450 MW | 6,024 MW | 4,038 MW |
| 2026-10-18T11:00Z | 19,128 MW | 10,521 MW | 11,092 MW | 5,536 MW | 3,992 MW |
| 2026-10-18T12:00Z | 18,847 MW | 10,332 MW | 10,261 MW | 5,839 MW | 3,981 MW |
| 2026-10-18T13:00Z | 19,372 MW | 10,837 MW | 8,243 MW | 6,016 MW | 4,039 MW |
| 2026-10-18T14:00Z | 20,664 MW | 11,858 MW | 4,832 MW | 6,682 MW | 4,218 MW |
| 2026-10-18T15:00Z | 21,944 MW | 12,320 MW | 1,269 MW | 7,755 MW | 4,396 MW |
| 2026-10-18T16:00Z | 23,111 MW | 12,406 MW | 27 MW | 8,173 MW | 4,500 MW |
| 2026-10-18T17:00Z | 24,672 MW | 12,415 MW | 0 MW | 7,983 MW | 4,501 MW |
| 2026-10-18T18:00Z | 25,964 MW | 12,403 MW | 0 MW | 7,528 MW | 4,404 MW |
| 2026-10-18T19:00Z | 26,659 MW | 12,209 MW | 0 MW | 7,109 MW | 4,265 MW |
| 2026-10-18T20:00Z | 25,021 MW | 11,762 MW | 0 MW | 6,444 MW | 4,154 MW |
| 2026-10-18T21:00Z | 24,153 MW | 11,227 MW | 0 MW | 5,915 MW | 4,068 MW |
| 2026-10-18T22:00Z | 23,543 MW | 11,858 MW | 0 MW | 6,239 MW | 3,978 MW |
| 2026-10-18T23:00Z | 22,710 MW | 11,532 MW | 0 MW | 6,503 MW | 3,946 MW |
| 2026-10-19T00:00Z | 22,742 MW | 11,767 MW | 0 MW | 6,457 MW | 3,915 MW |
| 2026-10-19T01:00Z | 22,206 MW | 11,944 MW | 0 MW | 6,393 MW | 3,900 MW |
| 2026-10-19T02:00Z | 21,418 MW | 12,197 MW | 0 MW | 6,706 MW | 3,933 MW |
| 2026-10-19T03:00Z | 21,422 MW | 12,837 MW | 0 MW | 7,920 MW | 4,004 MW |
| 2026-10-19T04:00Z | 22,479 MW | 13,638 MW | 0 MW | 9,273 MW | 4,179 MW |
| 2026-10-19T05:00Z | 21,605 MW | 13,625 MW | 54 MW | 10,185 MW | 4,370 MW |
| 2026-10-19T06:00Z | 20,851 MW | 13,653 MW | 2,661 MW | 10,036 MW | 4,416 MW |
| 2026-10-19T07:00Z | 19,270 MW | 13,577 MW | 9,462 MW | 9,935 MW | 4,288 MW |
| 2026-10-19T08:00Z | 17,614 MW | 13,141 MW | 18,216 MW | 9,281 MW | 4,084 MW |
| 2026-10-19T09:00Z | 17,543 MW | 12,838 MW | 25,932 MW | 6,717 MW | 4,011 MW |
| 2026-10-19T10:00Z | 18,147 MW | 11,863 MW | 29,698 MW | 5,897 MW | 3,956 MW |
| 2026-10-19T11:00Z | 19,307 MW | 11,531 MW | 30,431 MW | 5,773 MW | 3,929 MW |
| 2026-10-19T12:00Z | 19,840 MW | 11,346 MW | 28,442 MW | 5,676 MW | 3,915 MW |
| 2026-10-19T13:00Z | 20,300 MW | 11,845 MW | 22,719 MW | 6,201 MW | 3,995 MW |
| 2026-10-19T14:00Z | 20,636 MW | 12,975 MW | 13,487 MW | 8,659 MW | 4,198 MW |
| 2026-10-19T15:00Z | 20,876 MW | 13,057 MW | 3,846 MW | 9,955 MW | 4,408 MW |
| 2026-10-19T16:00Z | 25,015 MW | 13,460 MW | 112 MW | 10,884 MW | 4,529 MW |
| 2026-10-19T17:00Z | 29,363 MW | 13,721 MW | 0 MW | 11,231 MW | 4,537 MW |
| 2026-10-19T18:00Z | 31,774 MW | 13,659 MW | 0 MW | 10,177 MW | 4,452 MW |
| 2026-10-19T19:00Z | 32,657 MW | 13,303 MW | 0 MW | 7,823 MW | 4,331 MW |
| 2026-10-19T20:00Z | 31,508 MW | 13,375 MW | 0 MW | 7,307 MW | 4,222 MW |
| 2026-10-19T21:00Z | 30,865 MW | 13,426 MW | 0 MW | 6,480 MW | 4,109 MW |
| 2026-10-19T22:00Z | 30,518 MW | 13,725 MW | 0 MW | 6,983 MW | 3,990 MW |
| 2026-10-19T23:00Z | 29,019 MW | 13,821 MW | 0 MW | 7,217 MW | 3,959 MW |
| 2026-10-20T00:00Z | 27,438 MW | 13,655 MW | 0 MW | 6,917 MW | 3,934 MW |
| 2026-10-20T01:00Z | 26,725 MW | 13,619 MW | 0 MW | 6,860 MW | 3,936 MW |
| 2026-10-20T02:00Z | 26,110 MW | 13,660 MW | 0 MW | 7,281 MW | 3,958 MW |
| 2026-10-20T03:00Z | 25,547 MW | 13,922 MW | 0 MW | 7,383 MW | 4,017 MW |
| 2026-10-20T04:00Z | 25,227 MW | 14,205 MW | 0 MW | 8,455 MW | 4,167 MW |
| 2026-10-20T05:00Z | 24,084 MW | 13,968 MW | 19 MW | 9,110 MW | 4,338 MW |
| 2026-10-20T06:00Z | 22,967 MW | 13,750 MW | 2,394 MW | 9,464 MW | 4,363 MW |
| 2026-10-20T07:00Z | 21,064 MW | 13,585 MW | 8,857 MW | 9,264 MW | 4,298 MW |
| 2026-10-20T08:00Z | 19,121 MW | 13,877 MW | 15,440 MW | 8,708 MW | 4,161 MW |
| 2026-10-20T09:00Z | 18,771 MW | 14,166 MW | 20,951 MW | 7,769 MW | 4,044 MW |
| 2026-10-20T10:00Z | 18,170 MW | 14,138 MW | 24,088 MW | 7,157 MW | 3,971 MW |
| 2026-10-20T11:00Z | 17,435 MW | 14,129 MW | 24,006 MW | 7,140 MW | 3,941 MW |
| 2026-10-20T12:00Z | 16,972 MW | 14,095 MW | 20,945 MW | 7,580 MW | 3,918 MW |
| 2026-10-20T13:00Z | 17,915 MW | 14,350 MW | 14,668 MW | 8,520 MW | 3,993 MW |
| 2026-10-20T14:00Z | 19,244 MW | 14,671 MW | 8,085 MW | 10,480 MW | 4,137 MW |
| 2026-10-20T15:00Z | 19,715 MW | 14,969 MW | 2,112 MW | 12,722 MW | 4,355 MW |
| 2026-10-20T16:00Z | 20,329 MW | 15,105 MW | 41 MW | 13,291 MW | 4,483 MW |
| 2026-10-20T17:00Z | 20,165 MW | 15,366 MW | 0 MW | 13,306 MW | 4,480 MW |
| 2026-10-20T18:00Z | 20,294 MW | 15,238 MW | 0 MW | 12,817 MW | 4,385 MW |
| 2026-10-20T19:00Z | 19,312 MW | 15,086 MW | 0 MW | 12,288 MW | 4,253 MW |
| 2026-10-20T20:00Z | 18,411 MW | 15,085 MW | 0 MW | 11,711 MW | 4,125 MW |
| 2026-10-20T21:00Z | 17,299 MW | 14,899 MW | 0 MW | 9,958 MW | 4,026 MW |
| 2026-10-20T22:00Z | 17,725 MW | 14,364 MW | 0 MW | 8,079 MW | 3,981 MW |
| 2026-10-20T23:00Z | 17,402 MW | 13,979 MW | 0 MW | 7,650 MW | 3,947 MW |
| 2026-10-21T00:00Z | 17,135 MW | 13,698 MW | 0 MW | 7,189 MW | 3,927 MW |
| 2026-10-21T01:00Z | 17,223 MW | 13,906 MW | 0 MW | 6,887 MW | 3,919 MW |
| 2026-10-21T02:00Z | 16,503 MW | 14,011 MW | 0 MW | 7,031 MW | 3,934 MW |
| 2026-10-21T03:00Z | 15,164 MW | 14,310 MW | 0 MW | 8,160 MW | 3,992 MW |
| 2026-10-21T04:00Z | 14,909 MW | 14,838 MW | 0 MW | 10,351 MW | 4,129 MW |
| 2026-10-21T05:00Z | 14,996 MW | 15,378 MW | 17 MW | 11,677 MW | 4,277 MW |
| 2026-10-21T06:00Z | 14,673 MW | 15,505 MW | 927 MW | 12,045 MW | 4,308 MW |
| 2026-10-21T07:00Z | 13,965 MW | 15,570 MW | 3,716 MW | 11,239 MW | 4,277 MW |
| 2026-10-21T08:00Z | 12,487 MW | 15,661 MW | 7,460 MW | 11,060 MW | 4,130 MW |
| 2026-10-21T09:00Z | 11,270 MW | 15,080 MW | 9,830 MW | 10,977 MW | 4,024 MW |
| 2026-10-21T10:00Z | 9,450 MW | 15,058 MW | 10,996 MW | 11,112 MW | 3,949 MW |
| 2026-10-21T11:00Z | 8,848 MW | 15,053 MW | 10,452 MW | 11,011 MW | 3,931 MW |
| 2026-10-21T12:00Z | 9,150 MW | 14,889 MW | 8,109 MW | 10,645 MW | 3,948 MW |
| 2026-10-21T13:00Z | 10,389 MW | 15,238 MW | 5,442 MW | 11,134 MW | 4,009 MW |
| 2026-10-21T14:00Z | 12,998 MW | 15,200 MW | 2,770 MW | 11,649 MW | 4,170 MW |
| 2026-10-21T15:00Z | 15,908 MW | 15,405 MW | 760 MW | 12,068 MW | 4,405 MW |
| 2026-10-21T16:00Z | 17,957 MW | 15,241 MW | 12 MW | 13,144 MW | 4,542 MW |
| 2026-10-21T17:00Z | 19,265 MW | 15,415 MW | 0 MW | 13,602 MW | 4,552 MW |
| 2026-10-21T18:00Z | 21,490 MW | 15,463 MW | 0 MW | 12,379 MW | 4,475 MW |
| 2026-10-21T19:00Z | 23,884 MW | 15,038 MW | 0 MW | 9,090 MW | 4,373 MW |
| 2026-10-21T20:00Z | 25,944 MW | 15,050 MW | 0 MW | 7,226 MW | 4,248 MW |
| 2026-10-21T21:00Z | 27,882 MW | 14,400 MW | 0 MW | 6,156 MW | 4,117 MW |
| 2026-10-21T22:00Z | 30,561 MW | 14,327 MW | 0 MW | 5,582 MW | 4,019 MW |
| 2026-10-21T23:00Z | 31,190 MW | 13,829 MW | 0 MW | 5,305 MW | 3,967 MW |
| 2026-10-22T00:00Z | 33,132 MW | 12,960 MW | 0 MW | 5,017 MW | 3,958 MW |
| 2026-10-22T01:00Z | 34,743 MW | 11,959 MW | 0 MW | 5,085 MW | 3,930 MW |
| 2026-10-22T02:00Z | 35,251 MW | 12,659 MW | 0 MW | 4,885 MW | 3,952 MW |
| 2026-10-22T03:00Z | 36,300 MW | 12,643 MW | 0 MW | 5,260 MW | 4,032 MW |
| 2026-10-22T04:00Z | 38,122 MW | 13,560 MW | 0 MW | 5,073 MW | 4,201 MW |
| 2026-10-22T05:00Z | 37,504 MW | 14,062 MW | 9 MW | 5,902 MW | 4,351 MW |
| 2026-10-22T06:00Z | 35,813 MW | 14,456 MW | 2,642 MW | 5,973 MW | 4,415 MW |
| 2026-10-22T07:00Z | 34,588 MW | 13,835 MW | 12,330 MW | 5,225 MW | 4,369 MW |
| 2026-10-22T08:00Z | 35,331 MW | 11,387 MW | 23,557 MW | 4,084 MW | 4,230 MW |
| 2026-10-22T09:00Z | 35,484 MW | 8,970 MW | 30,235 MW | 3,661 MW | 4,102 MW |
| 2026-10-22T10:00Z | 35,172 MW | 9,336 MW | 31,015 MW | 3,357 MW | 3,998 MW |
| 2026-10-22T11:00Z | 34,371 MW | 9,168 MW | 28,377 MW | 3,357 MW | 3,965 MW |
| 2026-10-22T12:00Z | 36,477 MW | 8,480 MW | 24,029 MW | 3,564 MW | 3,981 MW |
| 2026-10-22T13:00Z | 36,335 MW | 8,960 MW | 17,018 MW | 3,735 MW | 4,040 MW |
| 2026-10-22T14:00Z | 33,902 MW | 12,832 MW | 9,360 MW | 4,339 MW | 4,221 MW |
| 2026-10-22T15:00Z | 30,524 MW | 14,649 MW | 2,482 MW | 5,785 MW | 4,408 MW |
| 2026-10-22T16:00Z | 30,142 MW | 15,104 MW | 35 MW | 7,093 MW | 4,575 MW |
| 2026-10-22T17:00Z | 29,640 MW | 15,192 MW | 0 MW | 7,192 MW | 4,570 MW |
| 2026-10-22T18:00Z | 28,558 MW | 14,829 MW | 0 MW | 6,676 MW | 4,461 MW |
| 2026-10-22T19:00Z | 27,219 MW | 14,867 MW | 0 MW | 6,582 MW | 4,364 MW |
| 2026-10-22T20:00Z | 26,242 MW | 14,914 MW | 0 MW | 5,909 MW | 4,241 MW |
| 2026-10-22T21:00Z | 25,564 MW | 14,814 MW | 0 MW | 4,825 MW | 4,107 MW |
| 2026-10-22T22:00Z | 24,393 MW | 14,055 MW | 0 MW | 4,490 MW | 4,012 MW |
| 2026-10-22T23:00Z | 23,006 MW | 13,765 MW | 0 MW | 4,331 MW | 3,978 MW |
| 2026-10-23T00:00Z | 21,616 MW | 13,610 MW | 0 MW | 4,089 MW | 3,969 MW |
| 2026-10-23T01:00Z | 21,367 MW | 13,117 MW | 0 MW | 3,944 MW | 3,970 MW |
| 2026-10-23T02:00Z | 21,053 MW | 13,059 MW | 0 MW | 4,039 MW | 3,995 MW |
| 2026-10-23T03:00Z | 21,711 MW | 12,953 MW | 0 MW | 4,648 MW | 4,049 MW |
| 2026-10-23T04:00Z | 24,213 MW | 13,506 MW | 0 MW | 5,722 MW | 4,219 MW |
| 2026-10-23T05:00Z | 26,735 MW | 13,438 MW | 25 MW | 6,796 MW | 4,402 MW |
| 2026-10-23T06:00Z | 28,715 MW | 13,051 MW | 1,708 MW | 6,847 MW | 4,440 MW |
| 2026-10-23T07:00Z | 30,434 MW | 13,389 MW | 5,317 MW | 6,684 MW | 4,391 MW |
| 2026-10-23T08:00Z | 31,359 MW | 12,674 MW | 8,962 MW | 6,105 MW | 4,228 MW |
| 2026-10-23T09:00Z | 33,162 MW | 11,510 MW | 12,085 MW | 4,941 MW | 4,124 MW |
| 2026-10-23T10:00Z | 35,472 MW | 10,617 MW | 13,725 MW | 3,852 MW | 4,024 MW |
| 2026-10-23T11:00Z | 37,544 MW | 10,081 MW | 13,964 MW | 3,505 MW | 3,994 MW |
| 2026-10-23T12:00Z | 39,674 MW | 9,979 MW | 12,076 MW | 3,456 MW | 3,987 MW |
| 2026-10-23T13:00Z | 42,243 MW | 9,570 MW | 9,104 MW | 3,156 MW | 4,040 MW |
| 2026-10-23T14:00Z | 45,291 MW | 9,366 MW | 5,161 MW | 3,342 MW | 4,224 MW |
| 2026-10-23T15:00Z | 48,887 MW | 8,885 MW | 1,335 MW | 3,183 MW | 4,429 MW |
| 2026-10-23T16:00Z | 52,038 MW | 8,533 MW | 11 MW | 3,539 MW | 4,545 MW |
| 2026-10-23T17:00Z | 53,247 MW | 7,131 MW | 0 MW | 3,238 MW | 4,548 MW |
| 2026-10-23T18:00Z | 53,653 MW | 6,323 MW | 0 MW | 3,080 MW | 4,473 MW |
| 2026-10-23T19:00Z | 52,908 MW | 5,575 MW | 0 MW | 2,716 MW | 4,350 MW |
| 2026-10-23T20:00Z | 50,628 MW | 5,039 MW | 0 MW | 2,538 MW | 4,224 MW |
| 2026-10-23T21:00Z | 49,257 MW | 4,133 MW | 0 MW | 2,835 MW | 4,105 MW |
| 2026-10-23T22:00Z | 48,881 MW | 3,298 MW | 0 MW | 2,526 MW | 3,996 MW |
| 2026-10-23T23:00Z | 49,072 MW | 3,036 MW | 0 MW | 2,415 MW | 3,957 MW |
| 2026-10-24T00:00Z | 48,892 MW | 2,958 MW | 0 MW | 2,208 MW | 3,938 MW |
| 2026-10-24T01:00Z | 49,212 MW | 2,961 MW | 0 MW | 1,912 MW | 3,938 MW |
| 2026-10-24T02:00Z | 49,043 MW | 2,972 MW | 0 MW | 1,906 MW | 3,978 MW |
| 2026-10-24T03:00Z | 49,039 MW | 3,080 MW | 0 MW | 1,897 MW | 4,041 MW |
| 2026-10-24T04:00Z | 50,836 MW | 3,381 MW | 0 MW | 1,956 MW | 4,245 MW |
| 2026-10-24T05:00Z | 50,009 MW | 3,286 MW | 7 MW | 1,637 MW | 4,434 MW |
| 2026-10-24T06:00Z | 47,240 MW | 3,422 MW | 1,688 MW | 1,530 MW | 4,473 MW |
| 2026-10-24T07:00Z | 46,881 MW | 3,455 MW | 6,446 MW | 1,527 MW | 4,428 MW |
| 2026-10-24T08:00Z | 47,987 MW | 3,201 MW | 11,258 MW | 1,430 MW | 4,276 MW |
| 2026-10-24T09:00Z | 48,104 MW | 3,145 MW | 14,779 MW | 1,785 MW | 4,134 MW |
| 2026-10-24T10:00Z | 47,875 MW | 3,117 MW | 17,855 MW | 1,916 MW | 3,993 MW |
| 2026-10-24T11:00Z | 46,400 MW | 3,111 MW | 19,139 MW | 1,870 MW | 3,973 MW |
| 2026-10-24T12:00Z | 45,712 MW | 3,111 MW | 17,688 MW | 1,659 MW | 3,989 MW |
| 2026-10-24T13:00Z | 44,830 MW | 3,144 MW | 14,282 MW | 1,504 MW | 4,069 MW |
| 2026-10-24T14:00Z | 41,955 MW | 3,403 MW | 8,789 MW | 1,457 MW | 4,281 MW |
| 2026-10-24T15:00Z | 39,472 MW | 3,775 MW | 2,218 MW | 1,528 MW | 4,494 MW |
| 2026-10-24T16:00Z | 40,166 MW | 3,900 MW | 20 MW | 1,896 MW | 4,622 MW |
| 2026-10-24T17:00Z | 41,977 MW | 3,882 MW | 0 MW | 1,870 MW | 4,594 MW |
| 2026-10-24T18:00Z | 46,329 MW | 3,788 MW | 0 MW | 1,597 MW | 4,474 MW |
| 2026-10-24T19:00Z | 47,000 MW | 3,608 MW | 0 MW | 1,443 MW | 4,352 MW |
| 2026-10-24T20:00Z | 46,880 MW | 3,419 MW | 0 MW | 1,378 MW | 4,218 MW |
| 2026-10-24T21:00Z | 47,394 MW | 3,184 MW | 0 MW | 1,729 MW | 4,106 MW |
| 2026-10-24T22:00Z | 45,294 MW | 3,161 MW | 0 MW | 1,620 MW | 3,991 MW |
| 2026-10-24T23:00Z | 44,829 MW | 3,155 MW | 0 MW | 1,725 MW | 3,969 MW |
| 2026-10-25T00:00Z | 44,343 MW | 3,144 MW | 0 MW | 2,005 MW | 3,957 MW |
| 2026-10-25T01:00Z | 43,074 MW | 3,291 MW | 0 MW | 2,264 MW | 3,903 MW |
| 2026-10-25T02:00Z | 43,325 MW | 3,298 MW | 7 MW | 2,306 MW | 3,938 MW |
| 2026-10-25T03:00Z | 42,437 MW | 3,287 MW | 0 MW | 2,596 MW | 4,020 MW |
| 2026-10-25T04:00Z | 43,111 MW | 3,153 MW | 0 MW | 1,965 MW | 4,208 MW |
| 2026-10-25T05:00Z | 44,487 MW | 3,013 MW | 12 MW | 1,629 MW | 4,366 MW |
| 2026-10-25T06:00Z | 45,559 MW | 3,022 MW | 428 MW | 1,639 MW | 4,448 MW |
| 2026-10-25T07:00Z | 45,997 MW | 3,073 MW | 2,834 MW | 1,658 MW | 4,406 MW |
| 2026-10-25T08:00Z | 45,631 MW | 3,083 MW | 6,929 MW | 1,586 MW | 4,282 MW |
| 2026-10-25T09:00Z | 41,702 MW | 3,090 MW | 11,673 MW | 1,535 MW | 4,122 MW |
| 2026-10-25T10:00Z | 40,475 MW | 3,094 MW | 14,981 MW | 1,521 MW | 4,007 MW |
| 2026-10-25T11:00Z | 40,554 MW | 3,126 MW | 15,533 MW | 1,547 MW | 4,000 MW |
| 2026-10-25T12:00Z | 39,831 MW | 3,116 MW | 14,831 MW | 1,535 MW | 4,003 MW |
| 2026-10-25T13:00Z | 39,780 MW | 3,108 MW | 11,875 MW | 1,538 MW | 4,054 MW |
| 2026-10-25T14:00Z | 43,058 MW | 3,115 MW | 7,065 MW | 1,466 MW | 4,247 MW |
| 2026-10-25T15:00Z | 46,625 MW | 3,572 MW | 1,786 MW | 1,288 MW | 4,464 MW |
| 2026-10-25T16:00Z | 48,671 MW | 4,250 MW | 21 MW | 1,249 MW | 4,579 MW |
| 2026-10-25T17:00Z | 49,763 MW | 4,555 MW | 0 MW | 1,461 MW | 4,589 MW |
| 2026-10-25T18:00Z | 49,248 MW | 4,504 MW | 0 MW | 1,556 MW | 4,524 MW |
| 2026-10-25T19:00Z | 49,650 MW | 4,489 MW | 0 MW | 1,726 MW | 4,399 MW |
| 2026-10-25T20:00Z | 48,510 MW | 4,451 MW | 0 MW | 2,041 MW | 4,253 MW |
| 2026-10-25T21:00Z | 45,226 MW | 4,609 MW | 0 MW | 2,094 MW | 4,159 MW |
| 2026-10-25T22:00Z | 45,355 MW | 4,539 MW | 0 MW | 2,101 MW | 4,076 MW |
| 2026-10-25T23:00Z | 45,651 MW | 4,490 MW | 0 MW | 2,009 MW | 3,993 MW |
| 2026-10-26T00:00Z | 45,096 MW | 4,420 MW | 0 MW | 1,995 MW | 3,949 MW |
| 2026-10-26T01:00Z | 44,930 MW | 4,362 MW | 0 MW | 2,115 MW | 3,936 MW |
| 2026-10-26T02:00Z | 44,234 MW | 4,493 MW | 0 MW | 2,102 MW | 3,959 MW |
| 2026-10-26T03:00Z | 42,579 MW | 5,237 MW | 0 MW | 2,144 MW | 4,016 MW |
| 2026-10-26T04:00Z | 41,464 MW | 6,110 MW | 0 MW | 2,553 MW | 4,179 MW |
| 2026-10-26T05:00Z | 42,401 MW | 7,218 MW | 4 MW | 3,689 MW | 4,369 MW |
| 2026-10-26T06:00Z | 40,157 MW | 8,138 MW | 1,767 MW | 4,538 MW | 4,417 MW |
| 2026-10-26T07:00Z | 36,861 MW | 8,312 MW | 9,334 MW | 4,452 MW | 4,362 MW |
| 2026-10-26T08:00Z | 33,903 MW | 8,345 MW | 20,120 MW | 4,189 MW | 4,230 MW |
| 2026-10-26T09:00Z | 33,215 MW | 7,611 MW | 26,748 MW | 3,748 MW | 4,114 MW |
| 2026-10-26T10:00Z | 31,741 MW | 7,792 MW | 27,267 MW | 3,659 MW | 3,986 MW |
| 2026-10-26T11:00Z | 30,051 MW | 8,669 MW | 24,976 MW | 3,717 MW | 3,947 MW |
| 2026-10-26T12:00Z | 28,406 MW | 9,987 MW | 19,603 MW | 4,326 MW | 3,957 MW |
| 2026-10-26T13:00Z | 27,280 MW | 10,889 MW | 13,713 MW | 5,305 MW | 4,004 MW |
| 2026-10-26T14:00Z | 24,419 MW | 11,451 MW | 6,822 MW | 5,949 MW | 4,189 MW |
| 2026-10-26T15:00Z | 24,103 MW | 11,636 MW | 1,420 MW | 6,419 MW | 4,388 MW |
| 2026-10-26T16:00Z | 26,136 MW | 12,190 MW | 6 MW | 6,652 MW | 4,501 MW |
| 2026-10-26T17:00Z | 29,556 MW | 12,392 MW | 0 MW | 6,911 MW | 4,545 MW |
| 2026-10-26T18:00Z | 32,032 MW | 12,372 MW | 0 MW | 6,523 MW | 4,454 MW |
| 2026-10-26T19:00Z | 32,689 MW | 12,503 MW | 0 MW | 6,125 MW | 4,284 MW |
| 2026-10-26T20:00Z | 32,309 MW | 12,304 MW | 0 MW | 5,830 MW | 4,221 MW |
| 2026-10-26T21:00Z | 30,342 MW | 12,035 MW | 0 MW | 5,593 MW | 4,148 MW |
| 2026-10-26T22:00Z | 28,527 MW | 11,841 MW | 0 MW | 4,954 MW | 4,056 MW |
| 2026-10-26T23:00Z | 28,122 MW | 11,536 MW | 0 MW | 4,582 MW | 4,005 MW |
| 2026-10-27T00:00Z | 27,773 MW | 11,179 MW | 0 MW | 4,488 MW | 3,967 MW |
| 2026-10-27T01:00Z | 26,684 MW | 10,606 MW | 0 MW | 4,186 MW | 3,969 MW |
| 2026-10-27T02:00Z | 26,296 MW | 10,581 MW | 0 MW | 4,274 MW | 3,978 MW |
| 2026-10-27T03:00Z | 26,123 MW | 10,832 MW | 0 MW | 4,340 MW | 4,021 MW |
| 2026-10-27T04:00Z | 25,810 MW | 11,608 MW | 0 MW | 4,925 MW | 4,155 MW |
| 2026-10-27T05:00Z | 28,457 MW | 12,204 MW | 3 MW | 6,151 MW | 4,304 MW |
| 2026-10-27T06:00Z | 28,110 MW | 12,523 MW | 1,436 MW | 6,197 MW | 4,418 MW |
| 2026-10-27T07:00Z | 26,473 MW | 12,591 MW | 7,323 MW | 5,565 MW | 4,389 MW |
| 2026-10-27T08:00Z | 24,400 MW | 12,524 MW | 16,355 MW | 5,587 MW | 4,299 MW |
| 2026-10-27T09:00Z | 23,549 MW | 11,193 MW | 24,494 MW | 4,181 MW | 4,169 MW |
| 2026-10-27T10:00Z | 22,341 MW | 10,299 MW | 29,055 MW | 3,832 MW | 4,058 MW |
| 2026-10-27T11:00Z | 21,464 MW | 10,492 MW | 30,391 MW | 3,691 MW | 4,006 MW |
| 2026-10-27T12:00Z | 21,491 MW | 10,670 MW | 27,259 MW | 4,208 MW | 4,003 MW |
| 2026-10-27T13:00Z | 21,952 MW | 11,425 MW | 20,691 MW | 4,932 MW | 4,036 MW |
| 2026-10-27T14:00Z | 22,245 MW | 12,679 MW | 11,530 MW | 5,953 MW | 4,189 MW |
| 2026-10-27T15:00Z | 22,955 MW | 13,033 MW | 2,562 MW | 7,452 MW | 4,379 MW |
| 2026-10-27T16:00Z | 25,200 MW | 13,383 MW | 12 MW | 8,439 MW | 4,529 MW |
| 2026-10-27T17:00Z | 26,876 MW | 13,703 MW | 0 MW | 9,227 MW | 4,540 MW |
| 2026-10-27T18:00Z | 27,658 MW | 13,665 MW | 0 MW | 9,625 MW | 4,452 MW |
| 2026-10-27T19:00Z | 24,622 MW | 13,694 MW | 0 MW | 9,224 MW | 4,290 MW |
| 2026-10-27T20:00Z | 21,795 MW | 13,770 MW | 0 MW | 8,334 MW | 4,167 MW |
| 2026-10-27T21:00Z | 20,241 MW | 13,574 MW | 0 MW | 7,797 MW | 4,094 MW |
| 2026-10-27T22:00Z | 19,481 MW | 13,686 MW | 0 MW | 7,424 MW | 3,918 MW |
| 2026-10-27T23:00Z | 18,090 MW | 13,864 MW | 0 MW | 6,741 MW | 3,906 MW |
| 2026-10-28T00:00Z | 15,630 MW | 13,523 MW | 0 MW | 6,536 MW | 3,869 MW |
| 2026-10-28T01:00Z | 13,488 MW | 13,381 MW | 0 MW | 6,506 MW | 3,809 MW |
| 2026-10-28T02:00Z | 12,937 MW | 13,680 MW | 0 MW | 6,614 MW | 3,828 MW |
| 2026-10-28T03:00Z | 12,445 MW | 14,019 MW | 0 MW | 6,914 MW | 3,890 MW |
| 2026-10-28T04:00Z | 11,796 MW | 14,555 MW | 0 MW | 8,601 MW | 3,985 MW |
| 2026-10-28T05:00Z | 11,283 MW | 15,353 MW | 5 MW | 10,436 MW | 4,146 MW |
| 2026-10-28T06:00Z | 10,720 MW | 15,432 MW | 795 MW | 10,407 MW | 4,272 MW |
| 2026-10-28T07:00Z | 11,051 MW | 15,382 MW | 4,003 MW | 10,665 MW | 4,287 MW |
| 2026-10-28T08:00Z | 10,984 MW | 15,241 MW | 8,149 MW | 10,578 MW | 4,177 MW |
| 2026-10-28T09:00Z | 10,861 MW | 14,572 MW | 12,592 MW | 10,622 MW | 4,061 MW |
| 2026-10-28T10:00Z | 11,376 MW | 14,095 MW | 16,590 MW | 10,674 MW | 3,965 MW |
| 2026-10-28T11:00Z | 12,192 MW | 13,867 MW | 18,591 MW | 10,407 MW | 3,909 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00Z.
Installed Capacity
Annual figure for 2026| Solar | |
|---|---|
| Wind | |
| Gas | |
| Coal | |
| Storage | |
| Bioenergy | |
| Hydro | |
| Other | |
| Oil | |
| Other renewables | |
| Geothermal |
Total installed capacity in Germany and Luxembourg: 295 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Berlin time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Berlin time) | Demand |
|---|---|
| 2025-09-23 | 1.29 TWh |
| 2025-09-24 | 1.33 TWh |
| 2025-09-25 | 1.38 TWh |
| 2025-09-26 | 1.36 TWh |
| 2025-09-27 | 1.13 TWh |
| 2025-09-28 | 1.04 TWh |
| 2025-09-29 | 1.29 TWh |
| 2025-09-30 | 1.32 TWh |
| 2025-10-01 | 1.30 TWh |
| 2025-10-02 | 1.29 TWh |
| 2025-10-03 | 1.11 TWh |
| 2025-10-04 | 1.18 TWh |
| 2025-10-05 | 1.14 TWh |
| 2025-10-06 | 1.38 TWh |
| 2025-10-07 | 1.35 TWh |
| 2025-10-08 | 1.35 TWh |
| 2025-10-09 | 1.38 TWh |
| 2025-10-10 | 1.40 TWh |
| 2025-10-11 | 1.19 TWh |
| 2025-10-12 | 1.10 TWh |
| 2025-10-13 | 1.33 TWh |
| 2025-10-14 | 1.35 TWh |
| 2025-10-15 | 1.37 TWh |
| 2025-10-16 | 1.40 TWh |
| 2025-10-17 | 1.38 TWh |
| 2025-10-18 | 1.17 TWh |
| 2025-10-19 | 1.12 TWh |
| 2025-10-20 | 1.41 TWh |
| 2025-10-21 | 1.42 TWh |
| 2025-10-22 | 1.39 TWh |
| 2025-10-23 | 1.42 TWh |
| 2025-10-24 | 1.42 TWh |
| 2025-10-25 | 1.26 TWh |
| 2025-10-26 | 1.23 TWh |
| 2025-10-27 | 1.45 TWh |
| 2025-10-28 | 1.46 TWh |
| 2025-10-29 | 1.43 TWh |
| 2025-10-30 | 1.41 TWh |
| 2025-10-31 | 1.31 TWh |
| 2025-11-01 | 1.17 TWh |
| 2025-11-02 | 1.12 TWh |
| 2025-11-03 | 1.40 TWh |
| 2025-11-04 | 1.42 TWh |
| 2025-11-05 | 1.42 TWh |
| 2025-11-06 | 1.43 TWh |
| 2025-11-07 | 1.42 TWh |
| 2025-11-08 | 1.23 TWh |
| 2025-11-09 | 1.15 TWh |
| 2025-11-10 | 1.40 TWh |
| 2025-11-11 | 1.43 TWh |
| 2025-11-12 | 1.45 TWh |
| 2025-11-13 | 1.47 TWh |
| 2025-11-14 | 1.41 TWh |
| 2025-11-15 | 1.25 TWh |
| 2025-11-16 | 1.16 TWh |
| 2025-11-17 | 1.49 TWh |
| 2025-11-18 | 1.54 TWh |
| 2025-11-19 | 1.53 TWh |
| 2025-11-20 | 1.54 TWh |
| 2025-11-21 | 1.51 TWh |
| 2025-11-22 | 1.36 TWh |
| 2025-11-23 | 1.33 TWh |
| 2025-11-24 | 1.54 TWh |
| 2025-11-25 | 1.51 TWh |
| 2025-11-26 | 1.53 TWh |
| 2025-11-27 | 1.59 TWh |
| 2025-11-28 | 1.54 TWh |
| 2025-11-29 | 1.30 TWh |
| 2025-11-30 | 1.26 TWh |
| 2025-12-01 | 1.53 TWh |
| 2025-12-02 | 1.58 TWh |
| 2025-12-03 | 1.55 TWh |
| 2025-12-04 | 1.56 TWh |
| 2025-12-05 | 1.52 TWh |
| 2025-12-06 | 1.33 TWh |
| 2025-12-07 | 1.20 TWh |
| 2025-12-08 | 1.50 TWh |
| 2025-12-09 | 1.48 TWh |
| 2025-12-10 | 1.52 TWh |
| 2025-12-11 | 1.54 TWh |
| 2025-12-12 | 1.45 TWh |
| 2025-12-13 | 1.32 TWh |
| 2025-12-14 | 1.29 TWh |
| 2025-12-15 | 1.50 TWh |
| 2025-12-16 | 1.49 TWh |
| 2025-12-17 | 1.47 TWh |
| 2025-12-18 | 1.46 TWh |
| 2025-12-19 | 1.41 TWh |
| 2025-12-20 | 1.21 TWh |
| 2025-12-21 | 1.16 TWh |
| 2025-12-22 | 1.34 TWh |
| 2025-12-23 | 1.35 TWh |
| 2025-12-24 | 1.23 TWh |
| 2025-12-25 | 1.17 TWh |
| 2025-12-26 | 1.17 TWh |
| 2025-12-27 | 1.25 TWh |
| 2025-12-28 | 1.21 TWh |
| 2025-12-29 | 1.33 TWh |
| 2025-12-30 | 1.32 TWh |
| 2025-12-31 | 1.27 TWh |
| 2026-01-01 | 1.18 TWh |
| 2026-01-02 | 1.34 TWh |
| 2026-01-03 | 1.34 TWh |
| 2026-01-04 | 1.29 TWh |
| 2026-01-05 | 1.47 TWh |
| 2026-01-06 | 1.50 TWh |
| 2026-01-07 | 1.64 TWh |
| 2026-01-08 | 1.64 TWh |
| 2026-01-09 | 1.61 TWh |
| 2026-01-10 | 1.44 TWh |
| 2026-01-11 | 1.40 TWh |
| 2026-01-12 | 1.62 TWh |
| 2026-01-13 | 1.56 TWh |
| 2026-01-14 | 1.57 TWh |
| 2026-01-15 | 1.54 TWh |
| 2026-01-16 | 1.52 TWh |
| 2026-01-17 | 1.34 TWh |
| 2026-01-18 | 1.31 TWh |
| 2026-01-19 | 1.59 TWh |
| 2026-01-20 | 1.59 TWh |
| 2026-01-21 | 1.62 TWh |
| 2026-01-22 | 1.67 TWh |
| 2026-01-23 | 1.63 TWh |
| 2026-01-24 | 1.41 TWh |
| 2026-01-25 | 1.37 TWh |
| 2026-01-26 | 1.62 TWh |
| 2026-01-27 | 1.61 TWh |
| 2026-01-28 | 1.63 TWh |
| 2026-01-29 | 1.68 TWh |
| 2026-01-30 | 1.62 TWh |
| 2026-01-31 | 1.42 TWh |
| 2026-02-01 | 1.36 TWh |
| 2026-02-02 | 1.61 TWh |
| 2026-02-03 | 1.68 TWh |
| 2026-02-04 | 1.64 TWh |
| 2026-02-05 | 1.64 TWh |
| 2026-02-06 | 1.58 TWh |
| 2026-02-07 | 1.35 TWh |
| 2026-02-08 | 1.30 TWh |
| 2026-02-09 | 1.52 TWh |
| 2026-02-10 | 1.53 TWh |
| 2026-02-11 | 1.53 TWh |
| 2026-02-12 | 1.55 TWh |
| 2026-02-13 | 1.52 TWh |
| 2026-02-14 | 1.35 TWh |
| 2026-02-15 | 1.28 TWh |
| 2026-02-16 | 1.56 TWh |
| 2026-02-17 | 1.53 TWh |
| 2026-02-18 | 1.55 TWh |
| 2026-02-19 | 1.59 TWh |
| 2026-02-20 | 1.58 TWh |
| 2026-02-21 | 1.37 TWh |
| 2026-02-22 | 1.22 TWh |
| 2026-02-23 | 1.48 TWh |
| 2026-02-24 | 1.45 TWh |
| 2026-02-25 | 1.43 TWh |
| 2026-02-26 | 1.45 TWh |
| 2026-02-27 | 1.38 TWh |
| 2026-02-28 | 1.20 TWh |
| 2026-03-01 | 1.16 TWh |
| 2026-03-02 | 1.36 TWh |
| 2026-03-03 | 1.37 TWh |
| 2026-03-04 | 1.39 TWh |
| 2026-03-05 | 1.37 TWh |
| 2026-03-06 | 1.36 TWh |
| 2026-03-07 | 1.15 TWh |
| 2026-03-08 | 1.10 TWh |
| 2026-03-09 | 1.34 TWh |
| 2026-03-10 | 1.35 TWh |
| 2026-03-11 | 1.42 TWh |
| 2026-03-12 | 1.42 TWh |
| 2026-03-13 | 1.41 TWh |
| 2026-03-14 | 1.22 TWh |
| 2026-03-15 | 1.16 TWh |
| 2026-03-16 | 1.43 TWh |
| 2026-03-17 | 1.41 TWh |
| 2026-03-18 | 1.37 TWh |
| 2026-03-19 | 1.34 TWh |
| 2026-03-20 | 1.33 TWh |
| 2026-03-21 | 1.18 TWh |
| 2026-03-22 | 1.08 TWh |
| 2026-03-23 | 1.32 TWh |
| 2026-03-24 | 1.38 TWh |
| 2026-03-25 | 1.48 TWh |
| 2026-03-26 | 1.47 TWh |
| 2026-03-27 | 1.40 TWh |
| 2026-03-28 | 1.25 TWh |
| 2026-03-29 | 1.11 TWh |
| 2026-03-30 | 1.42 TWh |
| 2026-03-31 | 1.42 TWh |
| 2026-04-01 | 1.38 TWh |
| 2026-04-02 | 1.37 TWh |
| 2026-04-03 | 1.14 TWh |
| 2026-04-04 | 1.16 TWh |
| 2026-04-05 | 1.05 TWh |
| 2026-04-06 | 1.06 TWh |
| 2026-04-07 | 1.29 TWh |
| 2026-04-08 | 1.29 TWh |
| 2026-04-09 | 1.32 TWh |
| 2026-04-10 | 1.34 TWh |
| 2026-04-11 | 1.13 TWh |
| 2026-04-12 | 1.10 TWh |
| 2026-04-13 | 1.38 TWh |
| 2026-04-14 | 1.37 TWh |
| 2026-04-15 | 1.31 TWh |
| 2026-04-16 | 1.30 TWh |
| 2026-04-17 | 1.27 TWh |
| 2026-04-18 | 1.10 TWh |
| 2026-04-19 | 1.08 TWh |
| 2026-04-20 | 1.35 TWh |
| 2026-04-21 | 1.34 TWh |
| 2026-04-22 | 1.31 TWh |
| 2026-04-23 | 1.32 TWh |
| 2026-04-24 | 1.29 TWh |
| 2026-04-25 | 1.12 TWh |
| 2026-04-26 | 1.00 TWh |
| 2026-04-27 | 1.23 TWh |
| 2026-04-28 | 1.27 TWh |
| 2026-04-29 | 1.27 TWh |
| 2026-04-30 | 1.26 TWh |
| 2026-05-01 | 996 GWh |
| 2026-05-02 | 1.03 TWh |
| 2026-05-03 | 1.00 TWh |
| 2026-05-04 | 1.27 TWh |
| 2026-05-05 | 1.29 TWh |
| 2026-05-06 | 1.34 TWh |
| 2026-05-07 | 1.31 TWh |
| 2026-05-08 | 1.26 TWh |
| 2026-05-09 | 1.06 TWh |
| 2026-05-10 | 991 GWh |
| 2026-05-11 | 1.30 TWh |
| 2026-05-12 | 1.32 TWh |
| 2026-05-13 | 1.28 TWh |
| 2026-05-14 | 1.06 TWh |
| 2026-05-15 | 1.12 TWh |
| 2026-05-16 | 1.06 TWh |
| 2026-05-17 | 1.02 TWh |
| 2026-05-18 | 1.24 TWh |
| 2026-05-19 | 1.25 TWh |
| 2026-05-20 | 1.30 TWh |
| 2026-05-21 | 1.28 TWh |
| 2026-05-22 | 1.22 TWh |
| 2026-05-23 | 1.04 TWh |
| 2026-05-24 | 951 GWh |
| 2026-05-25 | 977 GWh |
| 2026-05-26 | 1.23 TWh |
| 2026-05-27 | 1.28 TWh |
| 2026-05-28 | 1.23 TWh |
| 2026-05-29 | 1.23 TWh |
| 2026-05-30 | 1.08 TWh |
| 2026-05-31 | 995 GWh |
| 2026-06-01 | 1.21 TWh |
| 2026-06-02 | 1.29 TWh |
| 2026-06-03 | 1.28 TWh |
| 2026-06-04 | 1.16 TWh |
| 2026-06-05 | 1.16 TWh |
| 2026-06-06 | 1.04 TWh |
| 2026-06-07 | 991 GWh |
| 2026-06-08 | 1.23 TWh |
| 2026-06-09 | 1.31 TWh |
| 2026-06-10 | 1.30 TWh |
| 2026-06-11 | 1.27 TWh |
| 2026-06-12 | 1.30 TWh |
| 2026-06-13 | 1.08 TWh |
| 2026-06-14 | 1.03 TWh |
| 2026-06-15 | 1.27 TWh |
| 2026-06-16 | 1.28 TWh |
| 2026-06-17 | 1.26 TWh |
| 2026-06-18 | 1.27 TWh |
| 2026-06-19 | 1.26 TWh |
| 2026-06-20 | 1.09 TWh |
| 2026-06-21 | 1.03 TWh |
| 2026-06-22 | 1.28 TWh |
| 2026-06-23 | 1.30 TWh |
| 2026-06-24 | 1.32 TWh |
| 2026-06-25 | 1.35 TWh |
| 2026-06-26 | 1.33 TWh |
| 2026-06-27 | 1.15 TWh |
| 2026-06-28 | 1.10 TWh |
| 2026-06-29 | 1.32 TWh |
| 2026-06-30 | 1.32 TWh |
| 2026-07-01 | 1.34 TWh |
| 2026-07-02 | 1.32 TWh |
| 2026-07-03 | 1.23 TWh |
| 2026-07-04 | 1.09 TWh |
| 2026-07-05 | 1.02 TWh |
| 2026-07-06 | 1.29 TWh |
| 2026-07-07 | 1.31 TWh |
| 2026-07-08 | 1.30 TWh |
| 2026-07-09 | 1.31 TWh |
| 2026-07-10 | 1.26 TWh |
| 2026-07-11 | 1.09 TWh |
| 2026-07-12 | 1.03 TWh |
| 2026-07-13 | 1.31 TWh |
| 2026-07-14 | 1.34 TWh |
| 2026-07-15 | 1.34 TWh |
| 2026-07-16 | 1.35 TWh |
| 2026-07-17 | 1.33 TWh |
| 2026-07-18 | 1.11 TWh |
| 2026-07-19 | 1.02 TWh |
| 2026-07-20 | 1.24 TWh |
| 2026-07-21 | 1.25 TWh |
| 2026-07-22 | 1.29 TWh |
| 2026-07-23 | 1.27 TWh |
| 2026-07-24 | 1.26 TWh |
| 2026-07-25 | 1.08 TWh |
| 2026-07-26 | 1.04 TWh |
| 2026-07-27 | 1.24 TWh |
| 2026-07-28 | 1.28 TWh |
| 2026-07-29 | 1.30 TWh |
| 2026-07-30 | 1.34 TWh |
| 2026-07-31 | 1.28 TWh |
| 2026-08-01 | 1.09 TWh |
| 2026-08-02 | 997 GWh |
| 2026-08-03 | 1.23 TWh |
| 2026-08-04 | 1.28 TWh |
| 2026-08-05 | 1.27 TWh |
| 2026-08-06 | 1.24 TWh |
| 2026-08-07 | 1.18 TWh |
| 2026-08-08 | 1.03 TWh |
| 2026-08-09 | 982 GWh |
| 2026-08-10 | 1.21 TWh |
| 2026-08-11 | 1.21 TWh |
| 2026-08-12 | 1.20 TWh |
| 2026-08-13 | 1.21 TWh |
| 2026-08-14 | 1.20 TWh |
| 2026-08-15 | 1.08 TWh |
| 2026-08-16 | 1.03 TWh |
| 2026-08-17 | 1.20 TWh |
| 2026-08-18 | 1.23 TWh |
| 2026-08-19 | 1.22 TWh |
| 2026-08-20 | 1.17 TWh |
| 2026-08-21 | 1.16 TWh |
| 2026-08-22 | 1.03 TWh |
| 2026-08-23 | 950 GWh |
| 2026-08-24 | 1.17 TWh |
| 2026-08-25 | 1.23 TWh |
| 2026-08-26 | 1.26 TWh |
| 2026-08-27 | 1.25 TWh |
| 2026-08-28 | 1.23 TWh |
| 2026-08-29 | 1.04 TWh |
| 2026-08-30 | 970 GWh |
| 2026-08-31 | 1.22 TWh |
| 2026-09-01 | 1.26 TWh |
| 2026-09-02 | 1.29 TWh |
| 2026-09-03 | 1.28 TWh |
| 2026-09-04 | 1.29 TWh |
| 2026-09-05 | 1.10 TWh |
| 2026-09-06 | 1.01 TWh |
| 2026-09-07 | 1.28 TWh |
| 2026-09-08 | 1.29 TWh |
| 2026-09-09 | 1.32 TWh |
| 2026-09-10 | 1.31 TWh |
| 2026-09-11 | 1.30 TWh |
| 2026-09-12 | 1.10 TWh |
| 2026-09-13 | 1.07 TWh |
| 2026-09-14 | 1.31 TWh |
| 2026-09-15 | 1.34 TWh |
| 2026-09-16 | 1.36 TWh |
| 2026-09-17 | 1.34 TWh |
| 2026-09-18 | 1.28 TWh |
| 2026-09-19 | 1.11 TWh |
| 2026-09-20 | 1.05 TWh |
| 2026-09-21 | 1.26 TWh |
| 2026-09-22 | 1.28 TWh |
| 2026-09-23 | 1.30 TWh |
| 2026-09-24 | 1.33 TWh |
| 2026-09-25 | 1.28 TWh |
| 2026-09-26 | 1.11 TWh |
| 2026-09-27 | 1.04 TWh |
| 2026-09-28 | 1.28 TWh |
| 2026-09-29 | 1.31 TWh |
| 2026-09-30 | 1.32 TWh |
| 2026-10-01 | 1.37 TWh |
| 2026-10-02 | 1.36 TWh |
| 2026-10-03 | 1.14 TWh |
| 2026-10-04 | 1.10 TWh |
| 2026-10-05 | 1.32 TWh |
| 2026-10-06 | 1.34 TWh |
| 2026-10-07 | 1.34 TWh |
| 2026-10-08 | 1.38 TWh |
| 2026-10-09 | 1.32 TWh |
| 2026-10-10 | 1.14 TWh |
| 2026-10-11 | 1.07 TWh |
| 2026-10-12 | 1.33 TWh |
| 2026-10-13 | 1.39 TWh |
| 2026-10-14 | 1.37 TWh |
| 2026-10-15 | 1.38 TWh |
| 2026-10-16 | 1.34 TWh |
| 2026-10-17 | 1.19 TWh |
| 2026-10-18 | 1.13 TWh |
| 2026-10-19 | 1.34 TWh |
| 2026-10-20 | 1.39 TWh |
| 2026-10-21 | 1.44 TWh |
| 2026-10-22 | 1.40 TWh |
| 2026-10-23 | 1.39 TWh |
| 2026-10-24 | 1.21 TWh |
| 2026-10-25 | 1.21 TWh |
| 2026-10-26 | 1.36 TWh |
| 2026-10-27 | 1.36 TWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Berlin local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 385 TWh | 367 TWh | Wind 30.5% | 300 |
| 2025 | 471 TWh | 426 TWh | Wind 31.1% | 365 |
| 2024 | 470 TWh | 426 TWh | Wind 32.4% | 366 |
| 2023 | 463 TWh | 442 TWh | Wind 32.2% | 365 |
| 2022 | 487 TWh | 488 TWh | Coal 33.9% | 365 |
| 2021 | 510 TWh | 498 TWh | Coal 30.0% | 365 |
| 2020 | 490 TWh | 443 TWh | Wind 29.3% | 366 |
| 2019 | 503 TWh | 464 TWh | Coal 30.9% | 365 |
| 2018 (partial) | 125 TWh | 128 TWh | Coal 39.9% | 92 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Austria | Germany and Luxembourg exports | 688 GWh |
| Poland | Germany and Luxembourg exports | 665 GWh |
| France | Germany and Luxembourg imports | 451 GWh |
| Norway South-West (NO2) | Germany and Luxembourg imports | 286 GWh |
| Belgium | Germany and Luxembourg exports | 117 GWh |
| Switzerland | Germany and Luxembourg exports | 105 GWh |
| Netherlands | Germany and Luxembourg imports | 99.8 GWh |
| Denmark West (DK1) | Germany and Luxembourg exports | 71.1 GWh |
| Czechia | Germany and Luxembourg exports | 48.6 GWh |
| Sweden South (SE4) | Germany and Luxembourg imports | 45.5 GWh |
| Denmark East (DK2) | Germany and Luxembourg exports | 8.29 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Latest Grid Alerts
Newest alert 21 October 2026- Net imports Germany and Luxembourg imported a net 141 GWh on 21 October 2026, the 3rd highest daily net imports in 393 days of loaded history and 10% of its demand that day. All alerts that day
- Net imports Net imports into Germany and Luxembourg reached 214 GWh on 2 October 2026 (16% of demand), the highest daily net imports in 374 days of loaded history. All alerts that day
- Net imports Germany and Luxembourg imported a net 141 GWh on 1 October 2026, the highest daily net imports in 373 days of loaded history and 10% of its demand that day. All alerts that day
Follow this grid: RSS feed of Germany and Luxembourg alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Germany and Luxembourg, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Germany and Luxembourg Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/de-lu/
World Power Monitor. Germany and Luxembourg Electricity Demand and Generation Mix. Data as of 2026-10-28 10:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/de-lu/
@misc{wpm_zones_de_lu_2026,
title = {{Germany and Luxembourg Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 10:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/de-lu/}
} Permalink: https://worldpowermonitor.com/zones/de-lu/
The Copy buttons add today's date as the access date.