Poland Electricity Demand and Generation Mix
Poland demand was 22,831 MW in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00). Coal was the largest source in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00), at 60% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Poland is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00), demand in Poland was 22,831 MW, against a day-ahead forecast of 23,213 MW.
- Coal supplied 59.8% of Poland's generation in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00).
- The day-ahead price in Poland averaged EUR 305.59/MWh for delivery on 2026-10-29 (29 October 2026).
- Installed generating capacity in Poland was 68.3 GW in 2026, as reported to ENTSO-E.
- Demand in Poland totalled 158 TWh in 2025.
- Coal supplied 53.4% of Poland's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 12:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 12:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Coal | 13,352 MW | 59.8% |
| Solar | 4,477 MW | 20.0% |
| Gas | 2,766 MW | 12.4% |
| Wind | 570 MW | 2.6% |
| Other | 489 MW | 2.2% |
| Bioenergy | 341 MW | 1.5% |
| Oil | 187 MW | 0.8% |
| Other renewables | 83 MW | 0.4% |
| Hydro | 66 MW | 0.3% |
| Storage | -741 MW | charging |
| Total from these sources | 22,331 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00:00Z.
Day-Ahead Price
Delivery day 2026-10-29 (29 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Poland and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-29.
Last 30 Days, Hourly
Times in UTCShow the data table (685 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-29T23:00Z | 14,909 MW |
| 2026-09-30T00:00Z | 14,593 MW |
| 2026-09-30T01:00Z | 14,571 MW |
| 2026-09-30T02:00Z | 15,022 MW |
| 2026-09-30T03:00Z | 16,211 MW |
| 2026-09-30T04:00Z | 18,453 MW |
| 2026-09-30T05:00Z | 19,854 MW |
| 2026-09-30T06:00Z | 20,124 MW |
| 2026-09-30T07:00Z | 19,550 MW |
| 2026-09-30T08:00Z | 18,802 MW |
| 2026-09-30T09:00Z | 18,534 MW |
| 2026-09-30T10:00Z | 18,723 MW |
| 2026-09-30T11:00Z | 18,839 MW |
| 2026-09-30T12:00Z | 18,732 MW |
| 2026-09-30T13:00Z | 19,523 MW |
| 2026-09-30T14:00Z | 20,213 MW |
| 2026-09-30T15:00Z | 20,568 MW |
| 2026-09-30T16:00Z | 20,686 MW |
| 2026-09-30T17:00Z | 21,378 MW |
| 2026-09-30T18:00Z | 20,835 MW |
| 2026-09-30T19:00Z | 19,149 MW |
| 2026-09-30T20:00Z | 17,655 MW |
| 2026-09-30T21:00Z | 16,358 MW |
| 2026-09-30T22:00Z | 15,412 MW |
| 2026-09-30T23:00Z | 14,792 MW |
| 2026-10-01T00:00Z | 14,557 MW |
| 2026-10-01T01:00Z | 14,617 MW |
| 2026-10-01T02:00Z | 14,913 MW |
| 2026-10-01T03:00Z | 16,092 MW |
| 2026-10-01T04:00Z | 18,534 MW |
| 2026-10-01T05:00Z | 19,626 MW |
| 2026-10-01T06:00Z | 20,055 MW |
| 2026-10-01T07:00Z | 19,393 MW |
| 2026-10-01T08:00Z | 18,994 MW |
| 2026-10-01T09:00Z | 19,131 MW |
| 2026-10-01T10:00Z | 19,383 MW |
| 2026-10-01T11:00Z | 18,995 MW |
| 2026-10-01T12:00Z | 19,098 MW |
| 2026-10-01T13:00Z | 19,483 MW |
| 2026-10-01T14:00Z | 20,187 MW |
| 2026-10-01T15:00Z | 20,481 MW |
| 2026-10-01T16:00Z | 20,683 MW |
| 2026-10-01T17:00Z | 21,258 MW |
| 2026-10-01T18:00Z | 20,553 MW |
| 2026-10-01T19:00Z | 18,950 MW |
| 2026-10-01T20:00Z | 17,442 MW |
| 2026-10-01T21:00Z | 16,242 MW |
| 2026-10-01T22:00Z | 15,320 MW |
| 2026-10-01T23:00Z | 14,909 MW |
| 2026-10-02T00:00Z | 14,655 MW |
| 2026-10-02T01:00Z | 14,621 MW |
| 2026-10-02T02:00Z | 15,004 MW |
| 2026-10-02T03:00Z | 16,066 MW |
| 2026-10-02T04:00Z | 18,364 MW |
| 2026-10-02T05:00Z | 19,760 MW |
| 2026-10-02T06:00Z | 20,159 MW |
| 2026-10-02T07:00Z | 19,553 MW |
| 2026-10-02T08:00Z | 18,767 MW |
| 2026-10-02T09:00Z | 18,817 MW |
| 2026-10-02T10:00Z | 19,184 MW |
| 2026-10-02T11:00Z | 19,152 MW |
| 2026-10-02T12:00Z | 19,144 MW |
| 2026-10-02T13:00Z | 19,750 MW |
| 2026-10-02T14:00Z | 20,461 MW |
| 2026-10-02T15:00Z | 20,565 MW |
| 2026-10-02T16:00Z | 20,774 MW |
| 2026-10-02T17:00Z | 21,290 MW |
| 2026-10-02T18:00Z | 20,645 MW |
| 2026-10-02T19:00Z | 19,029 MW |
| 2026-10-02T20:00Z | 17,718 MW |
| 2026-10-02T21:00Z | 16,569 MW |
| 2026-10-02T22:00Z | 15,742 MW |
| 2026-10-02T23:00Z | 15,028 MW |
| 2026-10-03T00:00Z | 14,651 MW |
| 2026-10-03T01:00Z | 14,616 MW |
| 2026-10-03T02:00Z | 14,716 MW |
| 2026-10-03T03:00Z | 14,967 MW |
| 2026-10-03T04:00Z | 15,721 MW |
| 2026-10-03T05:00Z | 16,453 MW |
| 2026-10-03T06:00Z | 17,279 MW |
| 2026-10-03T07:00Z | 17,436 MW |
| 2026-10-03T08:00Z | 17,169 MW |
| 2026-10-03T09:00Z | 16,837 MW |
| 2026-10-03T10:00Z | 16,567 MW |
| 2026-10-03T11:00Z | 16,766 MW |
| 2026-10-03T12:00Z | 16,618 MW |
| 2026-10-03T13:00Z | 17,071 MW |
| 2026-10-03T14:00Z | 17,695 MW |
| 2026-10-03T15:00Z | 18,064 MW |
| 2026-10-03T16:00Z | 18,508 MW |
| 2026-10-03T17:00Z | 18,868 MW |
| 2026-10-03T18:00Z | 18,213 MW |
| 2026-10-03T19:00Z | 17,149 MW |
| 2026-10-03T20:00Z | 16,028 MW |
| 2026-10-03T21:00Z | 14,976 MW |
| 2026-10-03T22:00Z | 14,016 MW |
| 2026-10-03T23:00Z | 13,423 MW |
| 2026-10-04T00:00Z | 13,068 MW |
| 2026-10-04T01:00Z | 12,888 MW |
| 2026-10-04T02:00Z | 12,996 MW |
| 2026-10-04T03:00Z | 13,250 MW |
| 2026-10-04T04:00Z | 13,507 MW |
| 2026-10-04T05:00Z | 13,932 MW |
| 2026-10-04T06:00Z | 14,729 MW |
| 2026-10-04T07:00Z | 14,874 MW |
| 2026-10-04T08:00Z | 14,857 MW |
| 2026-10-04T09:00Z | 14,923 MW |
| 2026-10-04T10:00Z | 15,189 MW |
| 2026-10-04T11:00Z | 15,413 MW |
| 2026-10-04T12:00Z | 15,233 MW |
| 2026-10-04T13:00Z | 15,476 MW |
| 2026-10-04T14:00Z | 15,918 MW |
| 2026-10-04T15:00Z | 16,412 MW |
| 2026-10-04T16:00Z | 17,325 MW |
| 2026-10-04T17:00Z | 17,707 MW |
| 2026-10-04T18:00Z | 17,160 MW |
| 2026-10-04T19:00Z | 16,134 MW |
| 2026-10-04T20:00Z | 15,326 MW |
| 2026-10-04T21:00Z | 14,301 MW |
| 2026-10-04T22:00Z | 13,747 MW |
| 2026-10-04T23:00Z | 13,359 MW |
| 2026-10-05T00:00Z | 13,255 MW |
| 2026-10-05T01:00Z | 13,312 MW |
| 2026-10-05T02:00Z | 13,757 MW |
| 2026-10-05T03:00Z | 15,094 MW |
| 2026-10-05T04:00Z | 18,007 MW |
| 2026-10-05T05:00Z | 19,463 MW |
| 2026-10-05T06:00Z | 20,180 MW |
| 2026-10-05T07:00Z | 19,649 MW |
| 2026-10-05T08:00Z | 19,058 MW |
| 2026-10-05T09:00Z | 19,153 MW |
| 2026-10-05T10:00Z | 19,214 MW |
| 2026-10-05T11:00Z | 19,286 MW |
| 2026-10-05T12:00Z | 19,181 MW |
| 2026-10-05T13:00Z | 19,738 MW |
| 2026-10-05T14:00Z | 20,230 MW |
| 2026-10-05T15:00Z | 20,485 MW |
| 2026-10-05T16:00Z | 20,868 MW |
| 2026-10-05T17:00Z | 21,332 MW |
| 2026-10-05T18:00Z | 20,780 MW |
| 2026-10-05T19:00Z | 19,092 MW |
| 2026-10-05T20:00Z | 17,620 MW |
| 2026-10-05T21:00Z | 16,245 MW |
| 2026-10-05T22:00Z | 15,344 MW |
| 2026-10-05T23:00Z | 14,788 MW |
| 2026-10-06T00:00Z | 14,661 MW |
| 2026-10-06T01:00Z | 14,581 MW |
| 2026-10-06T02:00Z | 14,974 MW |
| 2026-10-06T03:00Z | 16,109 MW |
| 2026-10-06T04:00Z | 18,719 MW |
| 2026-10-06T05:00Z | 20,077 MW |
| 2026-10-06T06:00Z | 20,577 MW |
| 2026-10-06T07:00Z | 20,191 MW |
| 2026-10-06T08:00Z | 19,505 MW |
| 2026-10-06T09:00Z | 19,057 MW |
| 2026-10-06T10:00Z | 19,218 MW |
| 2026-10-06T11:00Z | 19,246 MW |
| 2026-10-06T12:00Z | 19,271 MW |
| 2026-10-06T13:00Z | 19,809 MW |
| 2026-10-06T14:00Z | 20,822 MW |
| 2026-10-06T15:00Z | 21,254 MW |
| 2026-10-06T16:00Z | 21,296 MW |
| 2026-10-06T17:00Z | 21,625 MW |
| 2026-10-06T18:00Z | 21,071 MW |
| 2026-10-06T19:00Z | 19,395 MW |
| 2026-10-06T20:00Z | 18,070 MW |
| 2026-10-06T21:00Z | 16,752 MW |
| 2026-10-06T22:00Z | 15,859 MW |
| 2026-10-06T23:00Z | 15,368 MW |
| 2026-10-07T00:00Z | 15,154 MW |
| 2026-10-07T01:00Z | 15,055 MW |
| 2026-10-07T02:00Z | 15,578 MW |
| 2026-10-07T03:00Z | 16,643 MW |
| 2026-10-07T04:00Z | 19,169 MW |
| 2026-10-07T05:00Z | 20,423 MW |
| 2026-10-07T06:00Z | 20,328 MW |
| 2026-10-07T07:00Z | 19,567 MW |
| 2026-10-07T08:00Z | 18,599 MW |
| 2026-10-07T09:00Z | 18,514 MW |
| 2026-10-07T10:00Z | 18,375 MW |
| 2026-10-07T11:00Z | 18,851 MW |
| 2026-10-07T12:00Z | 19,259 MW |
| 2026-10-07T13:00Z | 20,007 MW |
| 2026-10-07T14:00Z | 20,464 MW |
| 2026-10-07T15:00Z | 20,691 MW |
| 2026-10-07T16:00Z | 21,327 MW |
| 2026-10-07T17:00Z | 21,748 MW |
| 2026-10-07T18:00Z | 21,044 MW |
| 2026-10-07T19:00Z | 19,336 MW |
| 2026-10-07T20:00Z | 17,733 MW |
| 2026-10-07T21:00Z | 16,423 MW |
| 2026-10-07T22:00Z | 15,523 MW |
| 2026-10-07T23:00Z | 14,964 MW |
| 2026-10-08T00:00Z | 14,808 MW |
| 2026-10-08T01:00Z | 14,842 MW |
| 2026-10-08T02:00Z | 15,315 MW |
| 2026-10-08T03:00Z | 16,379 MW |
| 2026-10-08T04:00Z | 18,888 MW |
| 2026-10-08T05:00Z | 19,969 MW |
| 2026-10-08T06:00Z | 20,244 MW |
| 2026-10-08T07:00Z | 19,788 MW |
| 2026-10-08T08:00Z | 19,081 MW |
| 2026-10-08T09:00Z | 19,074 MW |
| 2026-10-08T10:00Z | 19,118 MW |
| 2026-10-08T11:00Z | 19,589 MW |
| 2026-10-08T12:00Z | 20,264 MW |
| 2026-10-08T13:00Z | 20,785 MW |
| 2026-10-08T14:00Z | 20,820 MW |
| 2026-10-08T15:00Z | 20,741 MW |
| 2026-10-08T16:00Z | 21,272 MW |
| 2026-10-08T17:00Z | 21,663 MW |
| 2026-10-08T18:00Z | 21,053 MW |
| 2026-10-08T19:00Z | 19,111 MW |
| 2026-10-08T20:00Z | 17,489 MW |
| 2026-10-08T21:00Z | 16,205 MW |
| 2026-10-08T22:00Z | 15,341 MW |
| 2026-10-08T23:00Z | 14,854 MW |
| 2026-10-09T00:00Z | 14,587 MW |
| 2026-10-09T01:00Z | 14,658 MW |
| 2026-10-09T02:00Z | 15,088 MW |
| 2026-10-09T03:00Z | 16,056 MW |
| 2026-10-09T04:00Z | 18,592 MW |
| 2026-10-09T05:00Z | 19,756 MW |
| 2026-10-09T06:00Z | 20,256 MW |
| 2026-10-09T07:00Z | 19,625 MW |
| 2026-10-09T08:00Z | 19,754 MW |
| 2026-10-09T09:00Z | 20,270 MW |
| 2026-10-09T10:00Z | 20,308 MW |
| 2026-10-09T11:00Z | 20,005 MW |
| 2026-10-09T12:00Z | 19,480 MW |
| 2026-10-09T13:00Z | 20,092 MW |
| 2026-10-09T14:00Z | 20,275 MW |
| 2026-10-09T15:00Z | 20,602 MW |
| 2026-10-09T16:00Z | 21,276 MW |
| 2026-10-09T17:00Z | 21,359 MW |
| 2026-10-09T18:00Z | 20,628 MW |
| 2026-10-09T19:00Z | 19,076 MW |
| 2026-10-09T20:00Z | 17,896 MW |
| 2026-10-09T21:00Z | 16,633 MW |
| 2026-10-09T22:00Z | 15,789 MW |
| 2026-10-09T23:00Z | 15,094 MW |
| 2026-10-10T00:00Z | 14,690 MW |
| 2026-10-10T01:00Z | 14,605 MW |
| 2026-10-10T02:00Z | 14,602 MW |
| 2026-10-10T03:00Z | 14,742 MW |
| 2026-10-10T04:00Z | 15,560 MW |
| 2026-10-10T05:00Z | 16,524 MW |
| 2026-10-10T06:00Z | 17,569 MW |
| 2026-10-10T07:00Z | 18,056 MW |
| 2026-10-10T08:00Z | 18,444 MW |
| 2026-10-10T09:00Z | 18,263 MW |
| 2026-10-10T10:00Z | 18,135 MW |
| 2026-10-10T11:00Z | 18,261 MW |
| 2026-10-10T12:00Z | 17,963 MW |
| 2026-10-10T13:00Z | 18,193 MW |
| 2026-10-10T14:00Z | 18,496 MW |
| 2026-10-10T15:00Z | 18,578 MW |
| 2026-10-10T16:00Z | 19,174 MW |
| 2026-10-10T17:00Z | 19,004 MW |
| 2026-10-10T18:00Z | 18,418 MW |
| 2026-10-10T19:00Z | 17,419 MW |
| 2026-10-10T20:00Z | 16,165 MW |
| 2026-10-10T21:00Z | 14,907 MW |
| 2026-10-10T22:00Z | 14,042 MW |
| 2026-10-10T23:00Z | 13,450 MW |
| 2026-10-11T00:00Z | 13,079 MW |
| 2026-10-11T01:00Z | 12,863 MW |
| 2026-10-11T02:00Z | 12,924 MW |
| 2026-10-11T03:00Z | 13,101 MW |
| 2026-10-11T04:00Z | 13,617 MW |
| 2026-10-11T05:00Z | 13,943 MW |
| 2026-10-11T06:00Z | 14,780 MW |
| 2026-10-11T07:00Z | 14,979 MW |
| 2026-10-11T08:00Z | 14,949 MW |
| 2026-10-11T09:00Z | 15,067 MW |
| 2026-10-11T10:00Z | 15,904 MW |
| 2026-10-11T11:00Z | 16,289 MW |
| 2026-10-11T12:00Z | 15,861 MW |
| 2026-10-11T13:00Z | 15,652 MW |
| 2026-10-11T14:00Z | 16,310 MW |
| 2026-10-11T15:00Z | 16,743 MW |
| 2026-10-11T16:00Z | 17,932 MW |
| 2026-10-11T17:00Z | 18,041 MW |
| 2026-10-11T18:00Z | 17,510 MW |
| 2026-10-11T19:00Z | 16,602 MW |
| 2026-10-11T20:00Z | 15,659 MW |
| 2026-10-11T21:00Z | 14,643 MW |
| 2026-10-11T22:00Z | 14,019 MW |
| 2026-10-11T23:00Z | 13,618 MW |
| 2026-10-12T00:00Z | 13,567 MW |
| 2026-10-12T01:00Z | 13,656 MW |
| 2026-10-12T02:00Z | 14,062 MW |
| 2026-10-12T03:00Z | 15,436 MW |
| 2026-10-12T04:00Z | 18,578 MW |
| 2026-10-12T05:00Z | 20,143 MW |
| 2026-10-12T06:00Z | 20,654 MW |
| 2026-10-12T07:00Z | 20,452 MW |
| 2026-10-12T08:00Z | 20,527 MW |
| 2026-10-12T09:00Z | 21,270 MW |
| 2026-10-12T10:00Z | 21,498 MW |
| 2026-10-12T11:00Z | 21,408 MW |
| 2026-10-12T12:00Z | 21,041 MW |
| 2026-10-12T13:00Z | 21,162 MW |
| 2026-10-12T14:00Z | 21,349 MW |
| 2026-10-12T15:00Z | 21,148 MW |
| 2026-10-12T16:00Z | 21,785 MW |
| 2026-10-12T17:00Z | 22,080 MW |
| 2026-10-12T18:00Z | 21,485 MW |
| 2026-10-12T19:00Z | 19,984 MW |
| 2026-10-12T20:00Z | 18,542 MW |
| 2026-10-12T21:00Z | 17,128 MW |
| 2026-10-12T22:00Z | 16,192 MW |
| 2026-10-12T23:00Z | 15,530 MW |
| 2026-10-13T00:00Z | 15,300 MW |
| 2026-10-13T01:00Z | 15,438 MW |
| 2026-10-13T02:00Z | 15,780 MW |
| 2026-10-13T03:00Z | 16,984 MW |
| 2026-10-13T04:00Z | 19,819 MW |
| 2026-10-13T05:00Z | 21,313 MW |
| 2026-10-13T06:00Z | 21,758 MW |
| 2026-10-13T07:00Z | 21,373 MW |
| 2026-10-13T08:00Z | 21,261 MW |
| 2026-10-13T09:00Z | 21,525 MW |
| 2026-10-13T10:00Z | 21,894 MW |
| 2026-10-13T11:00Z | 21,160 MW |
| 2026-10-13T12:00Z | 21,191 MW |
| 2026-10-13T13:00Z | 21,389 MW |
| 2026-10-13T14:00Z | 21,634 MW |
| 2026-10-13T15:00Z | 21,567 MW |
| 2026-10-13T16:00Z | 22,236 MW |
| 2026-10-13T17:00Z | 22,225 MW |
| 2026-10-13T18:00Z | 21,524 MW |
| 2026-10-13T19:00Z | 19,751 MW |
| 2026-10-13T20:00Z | 18,300 MW |
| 2026-10-13T21:00Z | 16,972 MW |
| 2026-10-13T22:00Z | 16,176 MW |
| 2026-10-13T23:00Z | 15,699 MW |
| 2026-10-14T00:00Z | 15,486 MW |
| 2026-10-14T01:00Z | 15,484 MW |
| 2026-10-14T02:00Z | 16,001 MW |
| 2026-10-14T03:00Z | 17,061 MW |
| 2026-10-14T04:00Z | 19,503 MW |
| 2026-10-14T05:00Z | 20,978 MW |
| 2026-10-14T06:00Z | 21,729 MW |
| 2026-10-14T07:00Z | 21,736 MW |
| 2026-10-14T08:00Z | 21,641 MW |
| 2026-10-14T09:00Z | 21,650 MW |
| 2026-10-14T10:00Z | 21,863 MW |
| 2026-10-14T11:00Z | 21,970 MW |
| 2026-10-14T12:00Z | 21,548 MW |
| 2026-10-14T13:00Z | 21,453 MW |
| 2026-10-14T14:00Z | 21,409 MW |
| 2026-10-14T15:00Z | 21,536 MW |
| 2026-10-14T16:00Z | 22,101 MW |
| 2026-10-14T17:00Z | 22,247 MW |
| 2026-10-14T18:00Z | 21,597 MW |
| 2026-10-14T19:00Z | 19,926 MW |
| 2026-10-14T20:00Z | 18,491 MW |
| 2026-10-14T21:00Z | 17,243 MW |
| 2026-10-14T22:00Z | 16,389 MW |
| 2026-10-14T23:00Z | 15,763 MW |
| 2026-10-15T00:00Z | 15,414 MW |
| 2026-10-15T01:00Z | 15,511 MW |
| 2026-10-15T02:00Z | 15,881 MW |
| 2026-10-15T03:00Z | 17,039 MW |
| 2026-10-15T04:00Z | 19,674 MW |
| 2026-10-15T05:00Z | 21,233 MW |
| 2026-10-15T06:00Z | 21,853 MW |
| 2026-10-15T07:00Z | 21,630 MW |
| 2026-10-15T08:00Z | 21,467 MW |
| 2026-10-15T09:00Z | 21,709 MW |
| 2026-10-15T10:00Z | 21,332 MW |
| 2026-10-15T11:00Z | 21,048 MW |
| 2026-10-15T12:00Z | 21,221 MW |
| 2026-10-15T13:00Z | 21,610 MW |
| 2026-10-15T14:00Z | 21,827 MW |
| 2026-10-15T15:00Z | 21,703 MW |
| 2026-10-15T16:00Z | 22,381 MW |
| 2026-10-15T17:00Z | 22,552 MW |
| 2026-10-15T18:00Z | 21,892 MW |
| 2026-10-15T19:00Z | 20,229 MW |
| 2026-10-15T20:00Z | 18,801 MW |
| 2026-10-15T21:00Z | 17,418 MW |
| 2026-10-15T22:00Z | 16,488 MW |
| 2026-10-15T23:00Z | 15,903 MW |
| 2026-10-16T00:00Z | 15,619 MW |
| 2026-10-16T01:00Z | 15,640 MW |
| 2026-10-16T02:00Z | 16,141 MW |
| 2026-10-16T03:00Z | 17,138 MW |
| 2026-10-16T04:00Z | 19,805 MW |
| 2026-10-16T05:00Z | 20,948 MW |
| 2026-10-16T06:00Z | 21,428 MW |
| 2026-10-16T07:00Z | 21,281 MW |
| 2026-10-16T08:00Z | 20,170 MW |
| 2026-10-16T09:00Z | 19,759 MW |
| 2026-10-16T10:00Z | 20,166 MW |
| 2026-10-16T11:00Z | 20,259 MW |
| 2026-10-16T12:00Z | 20,420 MW |
| 2026-10-16T13:00Z | 20,613 MW |
| 2026-10-16T14:00Z | 21,303 MW |
| 2026-10-16T15:00Z | 21,117 MW |
| 2026-10-16T16:00Z | 21,579 MW |
| 2026-10-16T17:00Z | 21,597 MW |
| 2026-10-16T18:00Z | 21,170 MW |
| 2026-10-16T19:00Z | 19,627 MW |
| 2026-10-16T20:00Z | 18,289 MW |
| 2026-10-16T21:00Z | 17,260 MW |
| 2026-10-16T22:00Z | 16,496 MW |
| 2026-10-16T23:00Z | 15,765 MW |
| 2026-10-17T00:00Z | 15,494 MW |
| 2026-10-17T01:00Z | 15,389 MW |
| 2026-10-17T02:00Z | 15,547 MW |
| 2026-10-17T03:00Z | 15,907 MW |
| 2026-10-17T04:00Z | 16,996 MW |
| 2026-10-17T05:00Z | 17,848 MW |
| 2026-10-17T06:00Z | 18,686 MW |
| 2026-10-17T07:00Z | 19,094 MW |
| 2026-10-17T08:00Z | 18,490 MW |
| 2026-10-17T09:00Z | 18,304 MW |
| 2026-10-17T10:00Z | 18,486 MW |
| 2026-10-17T11:00Z | 18,675 MW |
| 2026-10-17T12:00Z | 18,471 MW |
| 2026-10-17T13:00Z | 18,572 MW |
| 2026-10-17T14:00Z | 18,911 MW |
| 2026-10-17T15:00Z | 18,985 MW |
| 2026-10-17T16:00Z | 19,559 MW |
| 2026-10-17T17:00Z | 19,482 MW |
| 2026-10-17T18:00Z | 18,912 MW |
| 2026-10-17T19:00Z | 17,850 MW |
| 2026-10-17T20:00Z | 16,835 MW |
| 2026-10-17T21:00Z | 15,618 MW |
| 2026-10-17T22:00Z | 14,725 MW |
| 2026-10-17T23:00Z | 14,146 MW |
| 2026-10-18T00:00Z | 13,789 MW |
| 2026-10-18T01:00Z | 13,579 MW |
| 2026-10-18T02:00Z | 13,749 MW |
| 2026-10-18T03:00Z | 13,955 MW |
| 2026-10-18T04:00Z | 14,480 MW |
| 2026-10-18T05:00Z | 14,884 MW |
| 2026-10-18T06:00Z | 15,806 MW |
| 2026-10-18T07:00Z | 16,255 MW |
| 2026-10-18T08:00Z | 16,214 MW |
| 2026-10-18T09:00Z | 16,128 MW |
| 2026-10-18T10:00Z | 16,193 MW |
| 2026-10-18T11:00Z | 16,215 MW |
| 2026-10-18T12:00Z | 16,169 MW |
| 2026-10-18T13:00Z | 16,424 MW |
| 2026-10-18T14:00Z | 17,105 MW |
| 2026-10-18T15:00Z | 17,612 MW |
| 2026-10-18T16:00Z | 18,308 MW |
| 2026-10-18T17:00Z | 18,658 MW |
| 2026-10-18T18:00Z | 18,170 MW |
| 2026-10-18T19:00Z | 17,164 MW |
| 2026-10-18T20:00Z | 16,438 MW |
| 2026-10-18T21:00Z | 15,356 MW |
| 2026-10-18T22:00Z | 14,687 MW |
| 2026-10-18T23:00Z | 14,167 MW |
| 2026-10-19T00:00Z | 14,052 MW |
| 2026-10-19T01:00Z | 14,084 MW |
| 2026-10-19T02:00Z | 14,550 MW |
| 2026-10-19T03:00Z | 16,008 MW |
| 2026-10-19T04:00Z | 19,216 MW |
| 2026-10-19T05:00Z | 21,048 MW |
| 2026-10-19T06:00Z | 22,164 MW |
| 2026-10-19T07:00Z | 22,719 MW |
| 2026-10-19T08:00Z | 22,203 MW |
| 2026-10-19T09:00Z | 22,519 MW |
| 2026-10-19T10:00Z | 22,735 MW |
| 2026-10-19T11:00Z | 22,538 MW |
| 2026-10-19T12:00Z | 22,096 MW |
| 2026-10-19T13:00Z | 22,509 MW |
| 2026-10-19T14:00Z | 22,514 MW |
| 2026-10-19T15:00Z | 22,301 MW |
| 2026-10-19T16:00Z | 22,942 MW |
| 2026-10-19T17:00Z | 22,743 MW |
| 2026-10-19T18:00Z | 22,130 MW |
| 2026-10-19T19:00Z | 20,506 MW |
| 2026-10-19T20:00Z | 18,948 MW |
| 2026-10-19T21:00Z | 17,721 MW |
| 2026-10-19T22:00Z | 16,795 MW |
| 2026-10-19T23:00Z | 16,184 MW |
| 2026-10-20T00:00Z | 15,884 MW |
| 2026-10-20T01:00Z | 15,931 MW |
| 2026-10-20T02:00Z | 16,361 MW |
| 2026-10-20T03:00Z | 17,382 MW |
| 2026-10-20T04:00Z | 20,278 MW |
| 2026-10-20T05:00Z | 21,831 MW |
| 2026-10-20T06:00Z | 22,668 MW |
| 2026-10-20T07:00Z | 22,967 MW |
| 2026-10-20T08:00Z | 23,001 MW |
| 2026-10-20T09:00Z | 23,203 MW |
| 2026-10-20T10:00Z | 23,388 MW |
| 2026-10-20T11:00Z | 22,869 MW |
| 2026-10-20T12:00Z | 22,565 MW |
| 2026-10-20T13:00Z | 22,466 MW |
| 2026-10-20T14:00Z | 22,164 MW |
| 2026-10-20T15:00Z | 22,237 MW |
| 2026-10-20T16:00Z | 22,820 MW |
| 2026-10-20T17:00Z | 22,770 MW |
| 2026-10-20T18:00Z | 22,042 MW |
| 2026-10-20T19:00Z | 20,232 MW |
| 2026-10-20T20:00Z | 18,735 MW |
| 2026-10-20T21:00Z | 17,366 MW |
| 2026-10-20T22:00Z | 16,486 MW |
| 2026-10-20T23:00Z | 15,841 MW |
| 2026-10-21T00:00Z | 15,628 MW |
| 2026-10-21T01:00Z | 15,695 MW |
| 2026-10-21T02:00Z | 16,115 MW |
| 2026-10-21T03:00Z | 17,210 MW |
| 2026-10-21T04:00Z | 19,872 MW |
| 2026-10-21T05:00Z | 21,246 MW |
| 2026-10-21T06:00Z | 21,611 MW |
| 2026-10-21T07:00Z | 21,431 MW |
| 2026-10-21T08:00Z | 20,928 MW |
| 2026-10-21T09:00Z | 20,401 MW |
| 2026-10-21T10:00Z | 20,140 MW |
| 2026-10-21T11:00Z | 20,186 MW |
| 2026-10-21T12:00Z | 20,492 MW |
| 2026-10-21T13:00Z | 21,157 MW |
| 2026-10-21T14:00Z | 21,407 MW |
| 2026-10-21T15:00Z | 21,433 MW |
| 2026-10-21T16:00Z | 22,173 MW |
| 2026-10-21T17:00Z | 22,174 MW |
| 2026-10-21T18:00Z | 21,532 MW |
| 2026-10-21T19:00Z | 20,026 MW |
| 2026-10-21T20:00Z | 18,617 MW |
| 2026-10-21T21:00Z | 17,236 MW |
| 2026-10-21T22:00Z | 16,456 MW |
| 2026-10-21T23:00Z | 16,035 MW |
| 2026-10-22T00:00Z | 15,634 MW |
| 2026-10-22T01:00Z | 15,668 MW |
| 2026-10-22T02:00Z | 16,037 MW |
| 2026-10-22T03:00Z | 17,077 MW |
| 2026-10-22T04:00Z | 19,916 MW |
| 2026-10-22T05:00Z | 21,452 MW |
| 2026-10-22T06:00Z | 22,269 MW |
| 2026-10-22T07:00Z | 22,583 MW |
| 2026-10-22T08:00Z | 22,642 MW |
| 2026-10-22T09:00Z | 22,963 MW |
| 2026-10-22T10:00Z | 23,008 MW |
| 2026-10-22T11:00Z | 22,801 MW |
| 2026-10-22T12:00Z | 22,481 MW |
| 2026-10-22T13:00Z | 22,481 MW |
| 2026-10-22T14:00Z | 22,321 MW |
| 2026-10-22T15:00Z | 22,528 MW |
| 2026-10-22T16:00Z | 22,880 MW |
| 2026-10-22T17:00Z | 22,746 MW |
| 2026-10-22T18:00Z | 22,313 MW |
| 2026-10-22T19:00Z | 20,586 MW |
| 2026-10-22T20:00Z | 19,085 MW |
| 2026-10-22T21:00Z | 17,740 MW |
| 2026-10-22T22:00Z | 16,885 MW |
| 2026-10-22T23:00Z | 16,314 MW |
| 2026-10-23T00:00Z | 16,004 MW |
| 2026-10-23T01:00Z | 16,004 MW |
| 2026-10-23T02:00Z | 16,359 MW |
| 2026-10-23T03:00Z | 17,543 MW |
| 2026-10-23T04:00Z | 20,315 MW |
| 2026-10-23T05:00Z | 21,581 MW |
| 2026-10-23T06:00Z | 21,882 MW |
| 2026-10-23T07:00Z | 21,497 MW |
| 2026-10-23T08:00Z | 20,534 MW |
| 2026-10-23T09:00Z | 20,135 MW |
| 2026-10-23T10:00Z | 20,143 MW |
| 2026-10-23T11:00Z | 20,374 MW |
| 2026-10-23T12:00Z | 20,583 MW |
| 2026-10-23T13:00Z | 21,378 MW |
| 2026-10-23T14:00Z | 21,678 MW |
| 2026-10-23T15:00Z | 21,523 MW |
| 2026-10-23T16:00Z | 21,906 MW |
| 2026-10-23T17:00Z | 22,062 MW |
| 2026-10-23T18:00Z | 21,399 MW |
| 2026-10-23T19:00Z | 19,754 MW |
| 2026-10-23T20:00Z | 18,498 MW |
| 2026-10-23T21:00Z | 17,195 MW |
| 2026-10-23T22:00Z | 16,307 MW |
| 2026-10-23T23:00Z | 15,627 MW |
| 2026-10-24T00:00Z | 15,195 MW |
| 2026-10-24T01:00Z | 15,103 MW |
| 2026-10-24T02:00Z | 15,280 MW |
| 2026-10-24T03:00Z | 15,660 MW |
| 2026-10-24T04:00Z | 16,723 MW |
| 2026-10-24T05:00Z | 17,447 MW |
| 2026-10-24T06:00Z | 18,549 MW |
| 2026-10-24T07:00Z | 19,342 MW |
| 2026-10-24T08:00Z | 19,480 MW |
| 2026-10-24T09:00Z | 19,843 MW |
| 2026-10-24T10:00Z | 19,364 MW |
| 2026-10-24T11:00Z | 18,952 MW |
| 2026-10-24T12:00Z | 18,882 MW |
| 2026-10-24T13:00Z | 18,698 MW |
| 2026-10-24T14:00Z | 18,745 MW |
| 2026-10-24T15:00Z | 18,969 MW |
| 2026-10-24T16:00Z | 19,463 MW |
| 2026-10-24T17:00Z | 19,417 MW |
| 2026-10-24T18:00Z | 18,729 MW |
| 2026-10-24T19:00Z | 17,737 MW |
| 2026-10-24T20:00Z | 16,798 MW |
| 2026-10-24T21:00Z | 15,663 MW |
| 2026-10-24T22:00Z | 14,879 MW |
| 2026-10-24T23:00Z | 14,216 MW |
| 2026-10-25T00:00Z | 13,677 MW |
| 2026-10-25T01:00Z | 13,407 MW |
| 2026-10-25T02:00Z | 13,577 MW |
| 2026-10-25T03:00Z | 13,681 MW |
| 2026-10-25T04:00Z | 13,893 MW |
| 2026-10-25T05:00Z | 14,140 MW |
| 2026-10-25T06:00Z | 14,850 MW |
| 2026-10-25T07:00Z | 16,070 MW |
| 2026-10-25T08:00Z | 16,147 MW |
| 2026-10-25T09:00Z | 16,295 MW |
| 2026-10-25T10:00Z | 16,791 MW |
| 2026-10-25T11:00Z | 17,200 MW |
| 2026-10-25T12:00Z | 17,471 MW |
| 2026-10-25T13:00Z | 17,454 MW |
| 2026-10-25T14:00Z | 17,437 MW |
| 2026-10-25T15:00Z | 17,769 MW |
| 2026-10-25T16:00Z | 18,272 MW |
| 2026-10-25T17:00Z | 18,484 MW |
| 2026-10-25T18:00Z | 18,396 MW |
| 2026-10-25T19:00Z | 17,888 MW |
| 2026-10-25T20:00Z | 16,976 MW |
| 2026-10-25T21:00Z | 16,042 MW |
| 2026-10-25T22:00Z | 15,025 MW |
| 2026-10-25T23:00Z | 14,412 MW |
| 2026-10-26T00:00Z | 13,936 MW |
| 2026-10-26T01:00Z | 13,952 MW |
| 2026-10-26T02:00Z | 14,055 MW |
| 2026-10-26T03:00Z | 14,604 MW |
| 2026-10-26T04:00Z | 16,103 MW |
| 2026-10-26T05:00Z | 19,085 MW |
| 2026-10-26T06:00Z | 21,024 MW |
| 2026-10-26T07:00Z | 21,818 MW |
| 2026-10-26T08:00Z | 21,715 MW |
| 2026-10-26T09:00Z | 21,272 MW |
| 2026-10-26T10:00Z | 21,801 MW |
| 2026-10-26T11:00Z | 21,759 MW |
| 2026-10-26T12:00Z | 21,672 MW |
| 2026-10-26T13:00Z | 21,833 MW |
| 2026-10-26T14:00Z | 21,782 MW |
| 2026-10-26T15:00Z | 22,082 MW |
| 2026-10-26T16:00Z | 22,642 MW |
| 2026-10-26T17:00Z | 22,691 MW |
| 2026-10-26T18:00Z | 22,456 MW |
| 2026-10-26T19:00Z | 21,805 MW |
| 2026-10-26T20:00Z | 20,244 MW |
| 2026-10-26T21:00Z | 18,805 MW |
| 2026-10-26T22:00Z | 17,680 MW |
| 2026-10-26T23:00Z | 16,948 MW |
| 2026-10-27T00:00Z | 16,447 MW |
| 2026-10-27T01:00Z | 16,369 MW |
| 2026-10-27T02:00Z | 16,515 MW |
| 2026-10-27T03:00Z | 16,918 MW |
| 2026-10-27T04:00Z | 18,102 MW |
| 2026-10-27T05:00Z | 20,508 MW |
| 2026-10-27T06:00Z | 21,492 MW |
| 2026-10-27T07:00Z | 21,705 MW |
| 2026-10-27T08:00Z | 21,511 MW |
| 2026-10-27T09:00Z | 20,756 MW |
| 2026-10-27T10:00Z | 20,650 MW |
| 2026-10-27T11:00Z | 20,848 MW |
| 2026-10-27T12:00Z | 21,096 MW |
| 2026-10-27T13:00Z | 21,601 MW |
| 2026-10-27T14:00Z | 21,963 MW |
| 2026-10-27T15:00Z | 21,976 MW |
| 2026-10-27T16:00Z | 22,671 MW |
| 2026-10-27T17:00Z | 22,658 MW |
| 2026-10-27T18:00Z | 22,695 MW |
| 2026-10-27T19:00Z | 22,054 MW |
| 2026-10-27T20:00Z | 20,407 MW |
| 2026-10-27T21:00Z | 18,901 MW |
| 2026-10-27T22:00Z | 17,658 MW |
| 2026-10-27T23:00Z | 16,830 MW |
| 2026-10-28T00:00Z | 16,372 MW |
| 2026-10-28T01:00Z | 16,095 MW |
| 2026-10-28T02:00Z | 16,141 MW |
| 2026-10-28T03:00Z | 16,683 MW |
| 2026-10-28T04:00Z | 17,900 MW |
| 2026-10-28T05:00Z | 20,193 MW |
| 2026-10-28T06:00Z | 21,926 MW |
| 2026-10-28T07:00Z | 22,809 MW |
| 2026-10-28T08:00Z | 22,799 MW |
| 2026-10-28T09:00Z | 22,514 MW |
| 2026-10-28T10:00Z | 22,703 MW |
| 2026-10-28T11:00Z | 22,831 MW |
Show the data table (685 rows)
| Hour starting (UTC) | Coal | Wind | Solar | Gas | Other |
|---|---|---|---|---|---|
| 2026-09-29T23:00Z | 8,203 MW | 5,230 MW | 0 MW | 1,579 MW | 516 MW |
| 2026-09-30T00:00Z | 8,264 MW | 4,874 MW | 0 MW | 1,578 MW | 514 MW |
| 2026-09-30T01:00Z | 8,240 MW | 4,567 MW | 0 MW | 1,578 MW | 515 MW |
| 2026-09-30T02:00Z | 8,413 MW | 4,278 MW | 0 MW | 1,521 MW | 516 MW |
| 2026-09-30T03:00Z | 9,179 MW | 4,132 MW | 0 MW | 1,582 MW | 524 MW |
| 2026-09-30T04:00Z | 10,441 MW | 3,994 MW | 102 MW | 2,176 MW | 516 MW |
| 2026-09-30T05:00Z | 10,430 MW | 3,809 MW | 1,817 MW | 2,139 MW | 525 MW |
| 2026-09-30T06:00Z | 9,363 MW | 2,811 MW | 5,477 MW | 1,576 MW | 498 MW |
| 2026-09-30T07:00Z | 8,697 MW | 1,395 MW | 8,091 MW | 1,578 MW | 503 MW |
| 2026-09-30T08:00Z | 7,114 MW | 1,249 MW | 10,854 MW | 1,496 MW | 496 MW |
| 2026-09-30T09:00Z | 6,836 MW | 1,466 MW | 11,871 MW | 1,451 MW | 493 MW |
| 2026-09-30T10:00Z | 6,514 MW | 2,436 MW | 12,128 MW | 1,441 MW | 494 MW |
| 2026-09-30T11:00Z | 6,604 MW | 2,386 MW | 11,298 MW | 1,458 MW | 496 MW |
| 2026-09-30T12:00Z | 6,908 MW | 2,566 MW | 9,369 MW | 1,495 MW | 492 MW |
| 2026-09-30T13:00Z | 7,953 MW | 2,977 MW | 7,645 MW | 1,752 MW | 496 MW |
| 2026-09-30T14:00Z | 9,546 MW | 3,289 MW | 4,620 MW | 2,007 MW | 513 MW |
| 2026-09-30T15:00Z | 10,360 MW | 3,717 MW | 1,742 MW | 2,317 MW | 549 MW |
| 2026-09-30T16:00Z | 10,949 MW | 4,960 MW | 114 MW | 2,707 MW | 559 MW |
| 2026-09-30T17:00Z | 10,823 MW | 6,028 MW | 0 MW | 2,670 MW | 557 MW |
| 2026-09-30T18:00Z | 10,268 MW | 6,460 MW | 0 MW | 2,248 MW | 547 MW |
| 2026-09-30T19:00Z | 10,145 MW | 6,446 MW | 0 MW | 1,927 MW | 530 MW |
| 2026-09-30T20:00Z | 10,331 MW | 6,360 MW | 0 MW | 1,875 MW | 519 MW |
| 2026-09-30T21:00Z | 10,110 MW | 6,218 MW | 0 MW | 1,782 MW | 512 MW |
| 2026-09-30T22:00Z | 10,171 MW | 6,067 MW | 0 MW | 1,446 MW | 500 MW |
| 2026-09-30T23:00Z | 10,393 MW | 5,983 MW | 0 MW | 1,444 MW | 500 MW |
| 2026-10-01T00:00Z | 10,664 MW | 5,833 MW | 0 MW | 1,166 MW | 503 MW |
| 2026-10-01T01:00Z | 10,514 MW | 5,737 MW | 0 MW | 1,182 MW | 503 MW |
| 2026-10-01T02:00Z | 10,248 MW | 5,697 MW | 0 MW | 1,163 MW | 504 MW |
| 2026-10-01T03:00Z | 10,537 MW | 5,566 MW | 0 MW | 1,191 MW | 514 MW |
| 2026-10-01T04:00Z | 11,165 MW | 5,527 MW | 100 MW | 1,250 MW | 520 MW |
| 2026-10-01T05:00Z | 11,018 MW | 5,213 MW | 1,314 MW | 1,211 MW | 520 MW |
| 2026-10-01T06:00Z | 11,029 MW | 4,299 MW | 4,133 MW | 1,335 MW | 515 MW |
| 2026-10-01T07:00Z | 9,370 MW | 3,311 MW | 7,102 MW | 1,187 MW | 498 MW |
| 2026-10-01T08:00Z | 8,556 MW | 2,552 MW | 9,256 MW | 1,124 MW | 488 MW |
| 2026-10-01T09:00Z | 7,632 MW | 2,863 MW | 11,074 MW | 1,054 MW | 481 MW |
| 2026-10-01T10:00Z | 7,271 MW | 3,043 MW | 11,458 MW | 1,050 MW | 480 MW |
| 2026-10-01T11:00Z | 7,750 MW | 3,109 MW | 10,551 MW | 1,074 MW | 480 MW |
| 2026-10-01T12:00Z | 7,940 MW | 3,237 MW | 9,568 MW | 1,224 MW | 480 MW |
| 2026-10-01T13:00Z | 8,850 MW | 3,843 MW | 7,921 MW | 1,506 MW | 493 MW |
| 2026-10-01T14:00Z | 10,904 MW | 3,690 MW | 4,663 MW | 2,005 MW | 496 MW |
| 2026-10-01T15:00Z | 11,435 MW | 3,925 MW | 1,613 MW | 2,060 MW | 515 MW |
| 2026-10-01T16:00Z | 11,592 MW | 5,031 MW | 87 MW | 2,360 MW | 528 MW |
| 2026-10-01T17:00Z | 11,398 MW | 6,118 MW | 0 MW | 2,117 MW | 526 MW |
| 2026-10-01T18:00Z | 10,998 MW | 6,370 MW | 0 MW | 1,954 MW | 514 MW |
| 2026-10-01T19:00Z | 11,360 MW | 6,479 MW | 0 MW | 1,972 MW | 516 MW |
| 2026-10-01T20:00Z | 11,581 MW | 6,260 MW | 0 MW | 1,538 MW | 508 MW |
| 2026-10-01T21:00Z | 11,641 MW | 6,000 MW | 0 MW | 1,379 MW | 509 MW |
| 2026-10-01T22:00Z | 11,471 MW | 5,664 MW | 0 MW | 1,323 MW | 514 MW |
| 2026-10-01T23:00Z | 11,727 MW | 5,455 MW | 0 MW | 1,539 MW | 512 MW |
| 2026-10-02T00:00Z | 11,652 MW | 5,252 MW | 0 MW | 1,539 MW | 509 MW |
| 2026-10-02T01:00Z | 11,846 MW | 4,890 MW | 0 MW | 1,580 MW | 508 MW |
| 2026-10-02T02:00Z | 11,726 MW | 4,651 MW | 0 MW | 1,590 MW | 513 MW |
| 2026-10-02T03:00Z | 11,940 MW | 4,459 MW | 0 MW | 1,608 MW | 524 MW |
| 2026-10-02T04:00Z | 11,881 MW | 4,339 MW | 80 MW | 2,043 MW | 529 MW |
| 2026-10-02T05:00Z | 11,395 MW | 3,992 MW | 1,711 MW | 2,040 MW | 531 MW |
| 2026-10-02T06:00Z | 10,353 MW | 2,977 MW | 5,351 MW | 1,599 MW | 521 MW |
| 2026-10-02T07:00Z | 10,041 MW | 1,569 MW | 8,719 MW | 1,537 MW | 506 MW |
| 2026-10-02T08:00Z | 9,299 MW | 971 MW | 11,046 MW | 1,510 MW | 489 MW |
| 2026-10-02T09:00Z | 8,112 MW | 1,004 MW | 12,741 MW | 1,341 MW | 485 MW |
| 2026-10-02T10:00Z | 8,056 MW | 1,158 MW | 12,244 MW | 1,376 MW | 486 MW |
| 2026-10-02T11:00Z | 8,643 MW | 1,069 MW | 11,215 MW | 1,437 MW | 486 MW |
| 2026-10-02T12:00Z | 9,560 MW | 920 MW | 10,304 MW | 1,545 MW | 495 MW |
| 2026-10-02T13:00Z | 10,535 MW | 776 MW | 8,254 MW | 1,828 MW | 505 MW |
| 2026-10-02T14:00Z | 11,622 MW | 677 MW | 4,891 MW | 1,901 MW | 512 MW |
| 2026-10-02T15:00Z | 12,465 MW | 846 MW | 1,537 MW | 2,355 MW | 537 MW |
| 2026-10-02T16:00Z | 12,661 MW | 1,293 MW | 79 MW | 2,445 MW | 550 MW |
| 2026-10-02T17:00Z | 12,487 MW | 1,937 MW | 0 MW | 2,060 MW | 564 MW |
| 2026-10-02T18:00Z | 12,273 MW | 2,264 MW | 0 MW | 2,022 MW | 568 MW |
| 2026-10-02T19:00Z | 12,524 MW | 2,272 MW | 0 MW | 2,272 MW | 562 MW |
| 2026-10-02T20:00Z | 12,307 MW | 2,156 MW | 0 MW | 2,037 MW | 535 MW |
| 2026-10-02T21:00Z | 12,220 MW | 1,971 MW | 0 MW | 1,848 MW | 519 MW |
| 2026-10-02T22:00Z | 11,726 MW | 1,672 MW | 0 MW | 1,966 MW | 513 MW |
| 2026-10-02T23:00Z | 11,412 MW | 1,151 MW | 0 MW | 2,102 MW | 514 MW |
| 2026-10-03T00:00Z | 11,348 MW | 766 MW | 0 MW | 1,978 MW | 514 MW |
| 2026-10-03T01:00Z | 11,436 MW | 529 MW | 0 MW | 1,870 MW | 515 MW |
| 2026-10-03T02:00Z | 11,489 MW | 385 MW | 0 MW | 1,759 MW | 517 MW |
| 2026-10-03T03:00Z | 11,601 MW | 261 MW | 0 MW | 1,815 MW | 522 MW |
| 2026-10-03T04:00Z | 11,454 MW | 222 MW | 77 MW | 1,992 MW | 526 MW |
| 2026-10-03T05:00Z | 11,040 MW | 235 MW | 1,229 MW | 2,096 MW | 527 MW |
| 2026-10-03T06:00Z | 10,590 MW | 206 MW | 3,914 MW | 1,716 MW | 515 MW |
| 2026-10-03T07:00Z | 10,509 MW | 116 MW | 6,637 MW | 1,433 MW | 505 MW |
| 2026-10-03T08:00Z | 8,922 MW | 83 MW | 8,718 MW | 1,192 MW | 496 MW |
| 2026-10-03T09:00Z | 8,098 MW | 86 MW | 10,138 MW | 1,129 MW | 489 MW |
| 2026-10-03T10:00Z | 7,924 MW | 108 MW | 10,630 MW | 1,126 MW | 488 MW |
| 2026-10-03T11:00Z | 7,916 MW | 100 MW | 9,987 MW | 1,125 MW | 488 MW |
| 2026-10-03T12:00Z | 7,967 MW | 84 MW | 8,955 MW | 1,129 MW | 487 MW |
| 2026-10-03T13:00Z | 8,883 MW | 71 MW | 7,277 MW | 1,219 MW | 489 MW |
| 2026-10-03T14:00Z | 10,974 MW | 50 MW | 4,383 MW | 1,542 MW | 499 MW |
| 2026-10-03T15:00Z | 11,271 MW | 59 MW | 1,361 MW | 1,664 MW | 525 MW |
| 2026-10-03T16:00Z | 11,529 MW | 84 MW | 64 MW | 1,896 MW | 535 MW |
| 2026-10-03T17:00Z | 11,576 MW | 113 MW | 0 MW | 1,837 MW | 538 MW |
| 2026-10-03T18:00Z | 11,533 MW | 134 MW | 0 MW | 2,065 MW | 546 MW |
| 2026-10-03T19:00Z | 11,396 MW | 123 MW | 0 MW | 1,824 MW | 546 MW |
| 2026-10-03T20:00Z | 11,400 MW | 142 MW | 0 MW | 1,862 MW | 535 MW |
| 2026-10-03T21:00Z | 11,208 MW | 149 MW | 0 MW | 1,824 MW | 539 MW |
| 2026-10-03T22:00Z | 11,123 MW | 179 MW | 0 MW | 1,861 MW | 511 MW |
| 2026-10-03T23:00Z | 11,238 MW | 237 MW | 0 MW | 1,786 MW | 508 MW |
| 2026-10-04T00:00Z | 11,115 MW | 315 MW | 0 MW | 1,751 MW | 511 MW |
| 2026-10-04T01:00Z | 11,105 MW | 388 MW | 0 MW | 1,752 MW | 510 MW |
| 2026-10-04T02:00Z | 11,222 MW | 556 MW | 0 MW | 1,566 MW | 509 MW |
| 2026-10-04T03:00Z | 11,181 MW | 650 MW | 0 MW | 1,535 MW | 514 MW |
| 2026-10-04T04:00Z | 11,119 MW | 698 MW | 61 MW | 1,425 MW | 517 MW |
| 2026-10-04T05:00Z | 10,823 MW | 807 MW | 914 MW | 1,419 MW | 521 MW |
| 2026-10-04T06:00Z | 9,800 MW | 889 MW | 3,455 MW | 1,323 MW | 487 MW |
| 2026-10-04T07:00Z | 8,516 MW | 661 MW | 6,298 MW | 1,223 MW | 481 MW |
| 2026-10-04T08:00Z | 7,585 MW | 408 MW | 8,956 MW | 1,131 MW | 471 MW |
| 2026-10-04T09:00Z | 7,131 MW | 556 MW | 10,588 MW | 1,120 MW | 464 MW |
| 2026-10-04T10:00Z | 7,243 MW | 942 MW | 10,082 MW | 1,112 MW | 458 MW |
| 2026-10-04T11:00Z | 7,462 MW | 1,076 MW | 9,154 MW | 1,109 MW | 459 MW |
| 2026-10-04T12:00Z | 7,928 MW | 1,042 MW | 7,933 MW | 1,115 MW | 456 MW |
| 2026-10-04T13:00Z | 7,975 MW | 1,059 MW | 6,421 MW | 1,192 MW | 458 MW |
| 2026-10-04T14:00Z | 9,482 MW | 1,044 MW | 3,946 MW | 1,312 MW | 473 MW |
| 2026-10-04T15:00Z | 10,894 MW | 893 MW | 1,313 MW | 1,651 MW | 494 MW |
| 2026-10-04T16:00Z | 11,453 MW | 931 MW | 71 MW | 1,991 MW | 531 MW |
| 2026-10-04T17:00Z | 11,414 MW | 1,071 MW | 0 MW | 1,963 MW | 534 MW |
| 2026-10-04T18:00Z | 11,475 MW | 1,251 MW | 0 MW | 1,996 MW | 540 MW |
| 2026-10-04T19:00Z | 11,252 MW | 1,373 MW | 0 MW | 1,973 MW | 540 MW |
| 2026-10-04T20:00Z | 10,994 MW | 1,476 MW | 0 MW | 1,694 MW | 520 MW |
| 2026-10-04T21:00Z | 11,006 MW | 1,351 MW | 0 MW | 1,609 MW | 516 MW |
| 2026-10-04T22:00Z | 11,370 MW | 1,316 MW | 0 MW | 1,312 MW | 513 MW |
| 2026-10-04T23:00Z | 11,091 MW | 1,317 MW | 0 MW | 1,309 MW | 511 MW |
| 2026-10-05T00:00Z | 10,926 MW | 1,333 MW | 0 MW | 1,311 MW | 512 MW |
| 2026-10-05T01:00Z | 11,012 MW | 1,474 MW | 0 MW | 1,310 MW | 516 MW |
| 2026-10-05T02:00Z | 10,624 MW | 1,607 MW | 0 MW | 1,315 MW | 514 MW |
| 2026-10-05T03:00Z | 10,749 MW | 1,816 MW | 0 MW | 1,552 MW | 518 MW |
| 2026-10-05T04:00Z | 11,369 MW | 2,080 MW | 20 MW | 1,821 MW | 522 MW |
| 2026-10-05T05:00Z | 11,478 MW | 2,274 MW | 895 MW | 1,767 MW | 522 MW |
| 2026-10-05T06:00Z | 10,796 MW | 2,239 MW | 3,458 MW | 1,681 MW | 517 MW |
| 2026-10-05T07:00Z | 9,984 MW | 1,753 MW | 6,844 MW | 1,379 MW | 483 MW |
| 2026-10-05T08:00Z | 8,869 MW | 1,352 MW | 10,054 MW | 1,298 MW | 475 MW |
| 2026-10-05T09:00Z | 8,522 MW | 1,911 MW | 10,918 MW | 1,235 MW | 464 MW |
| 2026-10-05T10:00Z | 7,778 MW | 2,209 MW | 10,958 MW | 1,168 MW | 465 MW |
| 2026-10-05T11:00Z | 7,797 MW | 2,382 MW | 10,253 MW | 1,176 MW | 464 MW |
| 2026-10-05T12:00Z | 8,327 MW | 2,307 MW | 8,694 MW | 1,289 MW | 467 MW |
| 2026-10-05T13:00Z | 9,104 MW | 2,323 MW | 7,350 MW | 1,492 MW | 470 MW |
| 2026-10-05T14:00Z | 10,227 MW | 2,321 MW | 4,576 MW | 1,750 MW | 492 MW |
| 2026-10-05T15:00Z | 12,257 MW | 2,225 MW | 1,375 MW | 2,063 MW | 528 MW |
| 2026-10-05T16:00Z | 12,436 MW | 2,890 MW | 22 MW | 2,449 MW | 546 MW |
| 2026-10-05T17:00Z | 12,229 MW | 3,972 MW | 0 MW | 2,394 MW | 548 MW |
| 2026-10-05T18:00Z | 11,845 MW | 4,742 MW | 0 MW | 1,935 MW | 545 MW |
| 2026-10-05T19:00Z | 10,828 MW | 5,002 MW | 0 MW | 1,834 MW | 524 MW |
| 2026-10-05T20:00Z | 10,439 MW | 5,222 MW | 0 MW | 1,772 MW | 518 MW |
| 2026-10-05T21:00Z | 10,084 MW | 5,282 MW | 0 MW | 1,641 MW | 506 MW |
| 2026-10-05T22:00Z | 10,539 MW | 5,291 MW | 0 MW | 1,452 MW | 510 MW |
| 2026-10-05T23:00Z | 10,881 MW | 5,185 MW | 0 MW | 1,469 MW | 510 MW |
| 2026-10-06T00:00Z | 11,274 MW | 5,156 MW | 0 MW | 1,452 MW | 508 MW |
| 2026-10-06T01:00Z | 11,186 MW | 4,872 MW | 0 MW | 1,458 MW | 505 MW |
| 2026-10-06T02:00Z | 11,358 MW | 4,600 MW | 0 MW | 1,479 MW | 506 MW |
| 2026-10-06T03:00Z | 11,443 MW | 4,350 MW | 0 MW | 1,522 MW | 515 MW |
| 2026-10-06T04:00Z | 11,810 MW | 4,049 MW | 17 MW | 1,899 MW | 523 MW |
| 2026-10-06T05:00Z | 12,057 MW | 3,740 MW | 858 MW | 2,244 MW | 532 MW |
| 2026-10-06T06:00Z | 11,481 MW | 2,760 MW | 3,790 MW | 1,686 MW | 512 MW |
| 2026-10-06T07:00Z | 10,979 MW | 1,926 MW | 6,965 MW | 1,706 MW | 500 MW |
| 2026-10-06T08:00Z | 9,742 MW | 1,650 MW | 9,288 MW | 1,581 MW | 491 MW |
| 2026-10-06T09:00Z | 8,205 MW | 2,024 MW | 10,310 MW | 1,274 MW | 482 MW |
| 2026-10-06T10:00Z | 8,026 MW | 2,069 MW | 10,240 MW | 1,264 MW | 468 MW |
| 2026-10-06T11:00Z | 8,417 MW | 2,171 MW | 9,355 MW | 1,333 MW | 478 MW |
| 2026-10-06T12:00Z | 9,333 MW | 2,121 MW | 8,201 MW | 1,559 MW | 481 MW |
| 2026-10-06T13:00Z | 11,127 MW | 2,122 MW | 6,440 MW | 1,983 MW | 492 MW |
| 2026-10-06T14:00Z | 11,780 MW | 1,814 MW | 4,161 MW | 2,214 MW | 513 MW |
| 2026-10-06T15:00Z | 13,237 MW | 1,590 MW | 1,616 MW | 2,868 MW | 536 MW |
| 2026-10-06T16:00Z | 14,045 MW | 1,665 MW | 63 MW | 3,118 MW | 546 MW |
| 2026-10-06T17:00Z | 13,698 MW | 1,609 MW | 0 MW | 3,166 MW | 553 MW |
| 2026-10-06T18:00Z | 13,416 MW | 1,531 MW | 0 MW | 3,177 MW | 573 MW |
| 2026-10-06T19:00Z | 13,202 MW | 1,348 MW | 0 MW | 2,781 MW | 556 MW |
| 2026-10-06T20:00Z | 13,021 MW | 1,156 MW | 0 MW | 2,556 MW | 534 MW |
| 2026-10-06T21:00Z | 12,403 MW | 942 MW | 0 MW | 2,359 MW | 520 MW |
| 2026-10-06T22:00Z | 12,484 MW | 793 MW | 0 MW | 1,732 MW | 510 MW |
| 2026-10-06T23:00Z | 12,519 MW | 596 MW | 0 MW | 1,822 MW | 511 MW |
| 2026-10-07T00:00Z | 12,555 MW | 487 MW | 0 MW | 1,589 MW | 510 MW |
| 2026-10-07T01:00Z | 12,415 MW | 484 MW | 0 MW | 1,436 MW | 512 MW |
| 2026-10-07T02:00Z | 12,600 MW | 504 MW | 0 MW | 1,461 MW | 520 MW |
| 2026-10-07T03:00Z | 12,887 MW | 547 MW | 0 MW | 1,902 MW | 523 MW |
| 2026-10-07T04:00Z | 13,190 MW | 575 MW | 18 MW | 2,265 MW | 526 MW |
| 2026-10-07T05:00Z | 13,448 MW | 690 MW | 928 MW | 2,363 MW | 528 MW |
| 2026-10-07T06:00Z | 12,938 MW | 818 MW | 3,632 MW | 1,996 MW | 518 MW |
| 2026-10-07T07:00Z | 10,208 MW | 666 MW | 6,514 MW | 1,407 MW | 505 MW |
| 2026-10-07T08:00Z | 10,743 MW | 425 MW | 8,673 MW | 1,384 MW | 497 MW |
| 2026-10-07T09:00Z | 10,494 MW | 560 MW | 9,709 MW | 1,327 MW | 488 MW |
| 2026-10-07T10:00Z | 10,152 MW | 623 MW | 9,499 MW | 1,287 MW | 485 MW |
| 2026-10-07T11:00Z | 10,412 MW | 740 MW | 8,963 MW | 1,296 MW | 481 MW |
| 2026-10-07T12:00Z | 11,459 MW | 849 MW | 7,197 MW | 1,419 MW | 486 MW |
| 2026-10-07T13:00Z | 12,259 MW | 1,077 MW | 5,289 MW | 1,505 MW | 498 MW |
| 2026-10-07T14:00Z | 13,034 MW | 1,234 MW | 2,786 MW | 1,885 MW | 523 MW |
| 2026-10-07T15:00Z | 12,878 MW | 1,599 MW | 868 MW | 1,948 MW | 551 MW |
| 2026-10-07T16:00Z | 12,886 MW | 2,566 MW | 20 MW | 2,292 MW | 559 MW |
| 2026-10-07T17:00Z | 12,726 MW | 3,638 MW | 0 MW | 2,206 MW | 562 MW |
| 2026-10-07T18:00Z | 12,638 MW | 4,203 MW | 0 MW | 2,124 MW | 558 MW |
| 2026-10-07T19:00Z | 11,822 MW | 4,659 MW | 0 MW | 1,563 MW | 537 MW |
| 2026-10-07T20:00Z | 10,921 MW | 4,615 MW | 0 MW | 1,443 MW | 523 MW |
| 2026-10-07T21:00Z | 11,362 MW | 4,513 MW | 0 MW | 1,454 MW | 516 MW |
| 2026-10-07T22:00Z | 10,990 MW | 4,280 MW | 0 MW | 1,408 MW | 502 MW |
| 2026-10-07T23:00Z | 10,495 MW | 3,966 MW | 0 MW | 1,393 MW | 502 MW |
| 2026-10-08T00:00Z | 10,643 MW | 3,756 MW | 0 MW | 1,377 MW | 501 MW |
| 2026-10-08T01:00Z | 10,489 MW | 3,626 MW | 0 MW | 1,387 MW | 505 MW |
| 2026-10-08T02:00Z | 10,490 MW | 3,581 MW | 0 MW | 1,371 MW | 507 MW |
| 2026-10-08T03:00Z | 10,970 MW | 3,479 MW | 0 MW | 1,406 MW | 511 MW |
| 2026-10-08T04:00Z | 11,900 MW | 3,670 MW | 19 MW | 1,759 MW | 515 MW |
| 2026-10-08T05:00Z | 11,718 MW | 3,827 MW | 875 MW | 1,655 MW | 518 MW |
| 2026-10-08T06:00Z | 11,062 MW | 3,677 MW | 2,902 MW | 1,409 MW | 509 MW |
| 2026-10-08T07:00Z | 10,351 MW | 2,974 MW | 5,238 MW | 1,472 MW | 503 MW |
| 2026-10-08T08:00Z | 10,651 MW | 2,207 MW | 6,817 MW | 1,705 MW | 471 MW |
| 2026-10-08T09:00Z | 10,470 MW | 1,994 MW | 7,956 MW | 1,552 MW | 484 MW |
| 2026-10-08T10:00Z | 10,283 MW | 2,046 MW | 7,929 MW | 1,699 MW | 475 MW |
| 2026-10-08T11:00Z | 9,800 MW | 2,098 MW | 7,267 MW | 1,779 MW | 477 MW |
| 2026-10-08T12:00Z | 10,464 MW | 2,475 MW | 5,600 MW | 2,022 MW | 480 MW |
| 2026-10-08T13:00Z | 10,828 MW | 3,157 MW | 3,239 MW | 2,256 MW | 484 MW |
| 2026-10-08T14:00Z | 11,909 MW | 3,717 MW | 1,410 MW | 2,002 MW | 492 MW |
| 2026-10-08T15:00Z | 11,676 MW | 4,333 MW | 395 MW | 1,623 MW | 524 MW |
| 2026-10-08T16:00Z | 11,616 MW | 5,490 MW | 35 MW | 1,491 MW | 527 MW |
| 2026-10-08T17:00Z | 11,237 MW | 6,735 MW | 0 MW | 1,641 MW | 529 MW |
| 2026-10-08T18:00Z | 10,512 MW | 7,164 MW | 0 MW | 1,571 MW | 527 MW |
| 2026-10-08T19:00Z | 10,569 MW | 7,591 MW | 0 MW | 1,496 MW | 516 MW |
| 2026-10-08T20:00Z | 9,900 MW | 7,655 MW | 0 MW | 1,300 MW | 515 MW |
| 2026-10-08T21:00Z | 8,612 MW | 7,574 MW | 0 MW | 1,191 MW | 516 MW |
| 2026-10-08T22:00Z | 8,027 MW | 6,599 MW | 0 MW | 1,111 MW | 483 MW |
| 2026-10-08T23:00Z | 7,995 MW | 6,634 MW | 0 MW | 1,081 MW | 483 MW |
| 2026-10-09T00:00Z | 7,936 MW | 6,684 MW | 0 MW | 1,079 MW | 492 MW |
| 2026-10-09T01:00Z | 7,853 MW | 6,912 MW | 0 MW | 1,178 MW | 490 MW |
| 2026-10-09T02:00Z | 7,570 MW | 7,125 MW | 0 MW | 1,284 MW | 487 MW |
| 2026-10-09T03:00Z | 8,041 MW | 7,056 MW | 0 MW | 1,352 MW | 491 MW |
| 2026-10-09T04:00Z | 8,617 MW | 8,361 MW | 11 MW | 1,395 MW | 490 MW |
| 2026-10-09T05:00Z | 9,254 MW | 8,151 MW | 705 MW | 1,408 MW | 496 MW |
| 2026-10-09T06:00Z | 8,624 MW | 7,960 MW | 3,017 MW | 1,403 MW | 492 MW |
| 2026-10-09T07:00Z | 7,808 MW | 7,886 MW | 5,259 MW | 1,334 MW | 484 MW |
| 2026-10-09T08:00Z | 7,809 MW | 6,233 MW | 6,763 MW | 1,368 MW | 478 MW |
| 2026-10-09T09:00Z | 7,909 MW | 6,889 MW | 7,586 MW | 1,365 MW | 466 MW |
| 2026-10-09T10:00Z | 7,626 MW | 7,498 MW | 7,301 MW | 1,327 MW | 469 MW |
| 2026-10-09T11:00Z | 7,714 MW | 7,105 MW | 6,664 MW | 1,334 MW | 469 MW |
| 2026-10-09T12:00Z | 7,543 MW | 7,046 MW | 5,758 MW | 1,300 MW | 467 MW |
| 2026-10-09T13:00Z | 8,413 MW | 6,628 MW | 4,350 MW | 1,504 MW | 476 MW |
| 2026-10-09T14:00Z | 9,579 MW | 6,458 MW | 2,346 MW | 1,446 MW | 477 MW |
| 2026-10-09T15:00Z | 10,593 MW | 5,960 MW | 615 MW | 1,546 MW | 495 MW |
| 2026-10-09T16:00Z | 11,075 MW | 6,051 MW | 35 MW | 1,590 MW | 504 MW |
| 2026-10-09T17:00Z | 11,006 MW | 6,034 MW | 0 MW | 1,531 MW | 503 MW |
| 2026-10-09T18:00Z | 10,571 MW | 5,993 MW | 0 MW | 1,518 MW | 499 MW |
| 2026-10-09T19:00Z | 9,881 MW | 5,885 MW | 0 MW | 1,485 MW | 499 MW |
| 2026-10-09T20:00Z | 9,462 MW | 5,808 MW | 0 MW | 1,406 MW | 493 MW |
| 2026-10-09T21:00Z | 8,455 MW | 5,810 MW | 0 MW | 1,373 MW | 494 MW |
| 2026-10-09T22:00Z | 7,948 MW | 5,655 MW | 0 MW | 1,274 MW | 485 MW |
| 2026-10-09T23:00Z | 7,755 MW | 5,354 MW | 0 MW | 1,262 MW | 485 MW |
| 2026-10-10T00:00Z | 7,487 MW | 5,301 MW | 0 MW | 1,222 MW | 485 MW |
| 2026-10-10T01:00Z | 7,348 MW | 5,333 MW | 0 MW | 1,230 MW | 478 MW |
| 2026-10-10T02:00Z | 7,352 MW | 5,435 MW | 0 MW | 1,229 MW | 481 MW |
| 2026-10-10T03:00Z | 7,543 MW | 5,389 MW | 0 MW | 1,223 MW | 481 MW |
| 2026-10-10T04:00Z | 7,837 MW | 5,587 MW | 12 MW | 1,253 MW | 487 MW |
| 2026-10-10T05:00Z | 8,193 MW | 5,622 MW | 376 MW | 1,304 MW | 489 MW |
| 2026-10-10T06:00Z | 8,477 MW | 5,653 MW | 1,261 MW | 1,283 MW | 466 MW |
| 2026-10-10T07:00Z | 7,555 MW | 5,370 MW | 2,472 MW | 1,278 MW | 480 MW |
| 2026-10-10T08:00Z | 8,501 MW | 4,107 MW | 3,670 MW | 1,281 MW | 477 MW |
| 2026-10-10T09:00Z | 8,273 MW | 4,374 MW | 4,039 MW | 1,278 MW | 468 MW |
| 2026-10-10T10:00Z | 7,514 MW | 4,386 MW | 4,831 MW | 1,255 MW | 464 MW |
| 2026-10-10T11:00Z | 8,525 MW | 3,159 MW | 4,883 MW | 1,392 MW | 457 MW |
| 2026-10-10T12:00Z | 9,252 MW | 2,914 MW | 4,238 MW | 1,503 MW | 459 MW |
| 2026-10-10T13:00Z | 9,954 MW | 2,599 MW | 2,932 MW | 2,103 MW | 468 MW |
| 2026-10-10T14:00Z | 10,885 MW | 2,062 MW | 1,704 MW | 1,936 MW | 484 MW |
| 2026-10-10T15:00Z | 11,062 MW | 1,845 MW | 504 MW | 2,070 MW | 511 MW |
| 2026-10-10T16:00Z | 11,146 MW | 2,493 MW | 23 MW | 2,031 MW | 510 MW |
| 2026-10-10T17:00Z | 10,837 MW | 3,225 MW | 0 MW | 1,823 MW | 519 MW |
| 2026-10-10T18:00Z | 10,353 MW | 3,402 MW | 0 MW | 1,799 MW | 529 MW |
| 2026-10-10T19:00Z | 10,473 MW | 3,695 MW | 0 MW | 1,780 MW | 515 MW |
| 2026-10-10T20:00Z | 10,121 MW | 3,658 MW | 0 MW | 1,749 MW | 515 MW |
| 2026-10-10T21:00Z | 9,635 MW | 3,460 MW | 0 MW | 1,795 MW | 515 MW |
| 2026-10-10T22:00Z | 8,896 MW | 3,248 MW | 0 MW | 1,606 MW | 503 MW |
| 2026-10-10T23:00Z | 8,104 MW | 3,401 MW | 0 MW | 1,548 MW | 512 MW |
| 2026-10-11T00:00Z | 7,765 MW | 3,402 MW | 0 MW | 1,580 MW | 506 MW |
| 2026-10-11T01:00Z | 7,912 MW | 3,529 MW | 0 MW | 1,588 MW | 511 MW |
| 2026-10-11T02:00Z | 7,559 MW | 3,537 MW | 0 MW | 1,584 MW | 510 MW |
| 2026-10-11T03:00Z | 7,963 MW | 3,360 MW | 0 MW | 1,589 MW | 511 MW |
| 2026-10-11T04:00Z | 8,613 MW | 3,363 MW | 13 MW | 1,590 MW | 509 MW |
| 2026-10-11T05:00Z | 8,636 MW | 3,457 MW | 440 MW | 1,589 MW | 511 MW |
| 2026-10-11T06:00Z | 8,713 MW | 3,060 MW | 2,171 MW | 1,600 MW | 500 MW |
| 2026-10-11T07:00Z | 7,404 MW | 2,587 MW | 4,373 MW | 1,592 MW | 497 MW |
| 2026-10-11T08:00Z | 7,171 MW | 2,419 MW | 5,959 MW | 1,541 MW | 489 MW |
| 2026-10-11T09:00Z | 6,523 MW | 2,738 MW | 6,910 MW | 1,465 MW | 487 MW |
| 2026-10-11T10:00Z | 6,863 MW | 2,951 MW | 6,931 MW | 1,463 MW | 481 MW |
| 2026-10-11T11:00Z | 7,337 MW | 3,115 MW | 6,482 MW | 1,480 MW | 485 MW |
| 2026-10-11T12:00Z | 7,406 MW | 3,254 MW | 5,404 MW | 1,500 MW | 478 MW |
| 2026-10-11T13:00Z | 7,955 MW | 3,152 MW | 3,810 MW | 1,523 MW | 479 MW |
| 2026-10-11T14:00Z | 9,128 MW | 2,808 MW | 2,261 MW | 1,711 MW | 489 MW |
| 2026-10-11T15:00Z | 10,579 MW | 2,695 MW | 592 MW | 2,122 MW | 505 MW |
| 2026-10-11T16:00Z | 11,200 MW | 3,141 MW | 27 MW | 2,206 MW | 506 MW |
| 2026-10-11T17:00Z | 11,020 MW | 3,515 MW | 0 MW | 2,211 MW | 511 MW |
| 2026-10-11T18:00Z | 10,447 MW | 4,048 MW | 0 MW | 1,881 MW | 513 MW |
| 2026-10-11T19:00Z | 10,471 MW | 4,303 MW | 0 MW | 1,792 MW | 513 MW |
| 2026-10-11T20:00Z | 10,291 MW | 4,448 MW | 0 MW | 1,772 MW | 517 MW |
| 2026-10-11T21:00Z | 10,083 MW | 4,470 MW | 0 MW | 1,763 MW | 517 MW |
| 2026-10-11T22:00Z | 10,144 MW | 4,351 MW | 0 MW | 1,671 MW | 497 MW |
| 2026-10-11T23:00Z | 10,601 MW | 4,000 MW | 0 MW | 1,681 MW | 497 MW |
| 2026-10-12T00:00Z | 11,107 MW | 3,763 MW | 0 MW | 1,767 MW | 496 MW |
| 2026-10-12T01:00Z | 11,198 MW | 3,796 MW | 0 MW | 1,816 MW | 505 MW |
| 2026-10-12T02:00Z | 11,087 MW | 3,578 MW | 0 MW | 1,754 MW | 505 MW |
| 2026-10-12T03:00Z | 11,352 MW | 3,436 MW | 0 MW | 1,788 MW | 508 MW |
| 2026-10-12T04:00Z | 12,141 MW | 3,508 MW | 3 MW | 2,291 MW | 508 MW |
| 2026-10-12T05:00Z | 12,286 MW | 3,308 MW | 494 MW | 2,238 MW | 509 MW |
| 2026-10-12T06:00Z | 12,075 MW | 3,038 MW | 2,060 MW | 2,361 MW | 509 MW |
| 2026-10-12T07:00Z | 11,305 MW | 2,843 MW | 3,814 MW | 2,124 MW | 493 MW |
| 2026-10-12T08:00Z | 11,349 MW | 2,944 MW | 5,323 MW | 1,745 MW | 483 MW |
| 2026-10-12T09:00Z | 10,817 MW | 2,935 MW | 6,230 MW | 1,706 MW | 481 MW |
| 2026-10-12T10:00Z | 11,320 MW | 3,038 MW | 6,047 MW | 2,169 MW | 478 MW |
| 2026-10-12T11:00Z | 11,155 MW | 3,097 MW | 5,748 MW | 2,096 MW | 481 MW |
| 2026-10-12T12:00Z | 11,086 MW | 3,033 MW | 5,231 MW | 2,025 MW | 503 MW |
| 2026-10-12T13:00Z | 11,329 MW | 3,121 MW | 4,148 MW | 2,044 MW | 511 MW |
| 2026-10-12T14:00Z | 12,736 MW | 2,888 MW | 2,428 MW | 2,077 MW | 508 MW |
| 2026-10-12T15:00Z | 13,410 MW | 2,412 MW | 609 MW | 2,433 MW | 521 MW |
| 2026-10-12T16:00Z | 13,218 MW | 2,412 MW | 0 MW | 2,859 MW | 524 MW |
| 2026-10-12T17:00Z | 12,785 MW | 2,336 MW | 0 MW | 2,817 MW | 527 MW |
| 2026-10-12T18:00Z | 12,954 MW | 2,192 MW | 0 MW | 2,763 MW | 528 MW |
| 2026-10-12T19:00Z | 13,242 MW | 2,199 MW | 0 MW | 2,579 MW | 508 MW |
| 2026-10-12T20:00Z | 12,941 MW | 2,082 MW | 0 MW | 2,462 MW | 508 MW |
| 2026-10-12T21:00Z | 12,231 MW | 1,870 MW | 0 MW | 2,039 MW | 504 MW |
| 2026-10-12T22:00Z | 12,149 MW | 1,823 MW | 0 MW | 1,825 MW | 511 MW |
| 2026-10-12T23:00Z | 12,124 MW | 1,678 MW | 0 MW | 1,795 MW | 510 MW |
| 2026-10-13T00:00Z | 12,082 MW | 1,628 MW | 0 MW | 1,824 MW | 511 MW |
| 2026-10-13T01:00Z | 12,239 MW | 1,501 MW | 0 MW | 1,789 MW | 494 MW |
| 2026-10-13T02:00Z | 12,161 MW | 1,315 MW | 0 MW | 1,800 MW | 490 MW |
| 2026-10-13T03:00Z | 12,319 MW | 1,076 MW | 0 MW | 1,946 MW | 491 MW |
| 2026-10-13T04:00Z | 13,153 MW | 897 MW | 4 MW | 2,635 MW | 495 MW |
| 2026-10-13T05:00Z | 13,142 MW | 739 MW | 532 MW | 2,684 MW | 493 MW |
| 2026-10-13T06:00Z | 13,039 MW | 583 MW | 2,481 MW | 2,608 MW | 501 MW |
| 2026-10-13T07:00Z | 12,697 MW | 376 MW | 5,146 MW | 2,034 MW | 499 MW |
| 2026-10-13T08:00Z | 10,621 MW | 226 MW | 8,137 MW | 1,770 MW | 482 MW |
| 2026-10-13T09:00Z | 10,330 MW | 193 MW | 9,071 MW | 1,707 MW | 481 MW |
| 2026-10-13T10:00Z | 11,302 MW | 189 MW | 8,770 MW | 1,837 MW | 483 MW |
| 2026-10-13T11:00Z | 11,498 MW | 199 MW | 7,710 MW | 1,843 MW | 486 MW |
| 2026-10-13T12:00Z | 11,665 MW | 236 MW | 7,265 MW | 2,006 MW | 513 MW |
| 2026-10-13T13:00Z | 11,767 MW | 271 MW | 5,518 MW | 1,927 MW | 518 MW |
| 2026-10-13T14:00Z | 13,041 MW | 375 MW | 2,920 MW | 2,284 MW | 520 MW |
| 2026-10-13T15:00Z | 13,569 MW | 641 MW | 617 MW | 2,828 MW | 532 MW |
| 2026-10-13T16:00Z | 13,321 MW | 1,266 MW | 0 MW | 2,481 MW | 537 MW |
| 2026-10-13T17:00Z | 13,262 MW | 2,091 MW | 0 MW | 2,397 MW | 539 MW |
| 2026-10-13T18:00Z | 12,858 MW | 3,080 MW | 0 MW | 2,308 MW | 539 MW |
| 2026-10-13T19:00Z | 11,118 MW | 4,302 MW | 0 MW | 2,043 MW | 518 MW |
| 2026-10-13T20:00Z | 10,678 MW | 5,044 MW | 0 MW | 1,878 MW | 521 MW |
| 2026-10-13T21:00Z | 9,508 MW | 5,567 MW | 0 MW | 1,622 MW | 512 MW |
| 2026-10-13T22:00Z | 9,816 MW | 5,896 MW | 0 MW | 1,430 MW | 509 MW |
| 2026-10-13T23:00Z | 9,403 MW | 6,009 MW | 0 MW | 1,411 MW | 510 MW |
| 2026-10-14T00:00Z | 9,294 MW | 6,024 MW | 0 MW | 1,398 MW | 511 MW |
| 2026-10-14T01:00Z | 9,296 MW | 5,897 MW | 0 MW | 1,396 MW | 509 MW |
| 2026-10-14T02:00Z | 10,077 MW | 5,654 MW | 0 MW | 1,416 MW | 511 MW |
| 2026-10-14T03:00Z | 10,211 MW | 5,686 MW | 0 MW | 1,443 MW | 513 MW |
| 2026-10-14T04:00Z | 11,429 MW | 5,605 MW | 7 MW | 1,555 MW | 518 MW |
| 2026-10-14T05:00Z | 11,733 MW | 5,477 MW | 402 MW | 1,714 MW | 522 MW |
| 2026-10-14T06:00Z | 11,785 MW | 5,214 MW | 1,723 MW | 1,636 MW | 515 MW |
| 2026-10-14T07:00Z | 11,255 MW | 5,021 MW | 3,123 MW | 1,596 MW | 514 MW |
| 2026-10-14T08:00Z | 10,744 MW | 5,097 MW | 4,499 MW | 1,544 MW | 516 MW |
| 2026-10-14T09:00Z | 9,982 MW | 5,346 MW | 5,591 MW | 1,731 MW | 513 MW |
| 2026-10-14T10:00Z | 9,364 MW | 5,413 MW | 6,404 MW | 1,520 MW | 516 MW |
| 2026-10-14T11:00Z | 9,202 MW | 5,772 MW | 6,369 MW | 1,455 MW | 515 MW |
| 2026-10-14T12:00Z | 9,447 MW | 5,875 MW | 5,711 MW | 1,537 MW | 516 MW |
| 2026-10-14T13:00Z | 10,317 MW | 5,729 MW | 4,302 MW | 1,813 MW | 523 MW |
| 2026-10-14T14:00Z | 11,672 MW | 5,625 MW | 1,988 MW | 2,130 MW | 526 MW |
| 2026-10-14T15:00Z | 12,382 MW | 5,219 MW | 431 MW | 2,566 MW | 539 MW |
| 2026-10-14T16:00Z | 13,159 MW | 5,235 MW | 0 MW | 2,783 MW | 542 MW |
| 2026-10-14T17:00Z | 12,934 MW | 5,563 MW | 0 MW | 2,635 MW | 529 MW |
| 2026-10-14T18:00Z | 12,591 MW | 5,708 MW | 0 MW | 2,314 MW | 541 MW |
| 2026-10-14T19:00Z | 12,412 MW | 5,479 MW | 0 MW | 1,783 MW | 539 MW |
| 2026-10-14T20:00Z | 12,249 MW | 5,071 MW | 0 MW | 1,697 MW | 535 MW |
| 2026-10-14T21:00Z | 11,607 MW | 4,445 MW | 0 MW | 1,645 MW | 546 MW |
| 2026-10-14T22:00Z | 11,983 MW | 3,833 MW | 0 MW | 1,777 MW | 527 MW |
| 2026-10-14T23:00Z | 12,027 MW | 3,394 MW | 0 MW | 1,789 MW | 533 MW |
| 2026-10-15T00:00Z | 11,709 MW | 3,380 MW | 0 MW | 1,520 MW | 534 MW |
| 2026-10-15T01:00Z | 11,556 MW | 3,167 MW | 0 MW | 1,540 MW | 535 MW |
| 2026-10-15T02:00Z | 11,445 MW | 2,994 MW | 0 MW | 1,677 MW | 534 MW |
| 2026-10-15T03:00Z | 11,452 MW | 2,745 MW | 0 MW | 1,857 MW | 539 MW |
| 2026-10-15T04:00Z | 12,360 MW | 2,248 MW | 2 MW | 2,260 MW | 532 MW |
| 2026-10-15T05:00Z | 12,770 MW | 1,790 MW | 385 MW | 2,449 MW | 546 MW |
| 2026-10-15T06:00Z | 13,225 MW | 1,347 MW | 1,529 MW | 2,475 MW | 539 MW |
| 2026-10-15T07:00Z | 13,809 MW | 891 MW | 2,987 MW | 2,379 MW | 532 MW |
| 2026-10-15T08:00Z | 12,893 MW | 595 MW | 5,130 MW | 2,136 MW | 523 MW |
| 2026-10-15T09:00Z | 11,704 MW | 481 MW | 7,384 MW | 1,963 MW | 513 MW |
| 2026-10-15T10:00Z | 10,762 MW | 605 MW | 8,126 MW | 1,756 MW | 510 MW |
| 2026-10-15T11:00Z | 10,775 MW | 603 MW | 7,862 MW | 1,686 MW | 497 MW |
| 2026-10-15T12:00Z | 11,195 MW | 584 MW | 6,895 MW | 1,763 MW | 516 MW |
| 2026-10-15T13:00Z | 11,661 MW | 542 MW | 4,850 MW | 2,060 MW | 515 MW |
| 2026-10-15T14:00Z | 12,809 MW | 507 MW | 2,432 MW | 2,168 MW | 526 MW |
| 2026-10-15T15:00Z | 13,490 MW | 649 MW | 474 MW | 2,751 MW | 541 MW |
| 2026-10-15T16:00Z | 13,632 MW | 878 MW | 0 MW | 2,756 MW | 534 MW |
| 2026-10-15T17:00Z | 13,465 MW | 1,132 MW | 0 MW | 2,427 MW | 543 MW |
| 2026-10-15T18:00Z | 13,489 MW | 1,362 MW | 0 MW | 2,497 MW | 553 MW |
| 2026-10-15T19:00Z | 12,956 MW | 1,509 MW | 0 MW | 2,184 MW | 544 MW |
| 2026-10-15T20:00Z | 12,388 MW | 1,522 MW | 0 MW | 1,971 MW | 541 MW |
| 2026-10-15T21:00Z | 12,617 MW | 1,612 MW | 0 MW | 1,948 MW | 535 MW |
| 2026-10-15T22:00Z | 12,087 MW | 1,661 MW | 0 MW | 1,821 MW | 504 MW |
| 2026-10-15T23:00Z | 11,493 MW | 1,788 MW | 0 MW | 1,805 MW | 506 MW |
| 2026-10-16T00:00Z | 11,241 MW | 1,832 MW | 0 MW | 1,802 MW | 509 MW |
| 2026-10-16T01:00Z | 11,232 MW | 1,789 MW | 0 MW | 1,823 MW | 514 MW |
| 2026-10-16T02:00Z | 11,710 MW | 1,798 MW | 0 MW | 1,805 MW | 499 MW |
| 2026-10-16T03:00Z | 12,485 MW | 1,810 MW | 0 MW | 1,833 MW | 497 MW |
| 2026-10-16T04:00Z | 13,625 MW | 2,025 MW | 2 MW | 2,091 MW | 506 MW |
| 2026-10-16T05:00Z | 13,454 MW | 2,234 MW | 556 MW | 2,360 MW | 510 MW |
| 2026-10-16T06:00Z | 12,487 MW | 2,268 MW | 3,251 MW | 2,098 MW | 502 MW |
| 2026-10-16T07:00Z | 10,387 MW | 1,540 MW | 7,174 MW | 1,737 MW | 486 MW |
| 2026-10-16T08:00Z | 9,631 MW | 899 MW | 9,774 MW | 1,572 MW | 476 MW |
| 2026-10-16T09:00Z | 8,843 MW | 1,002 MW | 11,117 MW | 1,507 MW | 474 MW |
| 2026-10-16T10:00Z | 8,832 MW | 1,207 MW | 11,512 MW | 1,483 MW | 469 MW |
| 2026-10-16T11:00Z | 8,786 MW | 1,297 MW | 11,293 MW | 1,561 MW | 467 MW |
| 2026-10-16T12:00Z | 8,995 MW | 1,114 MW | 10,178 MW | 1,653 MW | 470 MW |
| 2026-10-16T13:00Z | 9,702 MW | 1,036 MW | 7,691 MW | 1,950 MW | 498 MW |
| 2026-10-16T14:00Z | 12,676 MW | 1,022 MW | 3,822 MW | 2,277 MW | 509 MW |
| 2026-10-16T15:00Z | 13,278 MW | 1,573 MW | 620 MW | 2,542 MW | 528 MW |
| 2026-10-16T16:00Z | 12,952 MW | 2,553 MW | 0 MW | 2,580 MW | 532 MW |
| 2026-10-16T17:00Z | 12,964 MW | 3,405 MW | 0 MW | 2,476 MW | 535 MW |
| 2026-10-16T18:00Z | 13,032 MW | 3,955 MW | 0 MW | 2,513 MW | 539 MW |
| 2026-10-16T19:00Z | 12,573 MW | 4,151 MW | 0 MW | 2,211 MW | 528 MW |
| 2026-10-16T20:00Z | 11,691 MW | 3,971 MW | 0 MW | 2,011 MW | 520 MW |
| 2026-10-16T21:00Z | 11,350 MW | 3,620 MW | 0 MW | 2,061 MW | 518 MW |
| 2026-10-16T22:00Z | 10,465 MW | 3,419 MW | 0 MW | 2,084 MW | 531 MW |
| 2026-10-16T23:00Z | 10,548 MW | 3,020 MW | 0 MW | 2,074 MW | 528 MW |
| 2026-10-17T00:00Z | 10,300 MW | 2,669 MW | 0 MW | 2,075 MW | 527 MW |
| 2026-10-17T01:00Z | 10,439 MW | 2,294 MW | 0 MW | 1,968 MW | 526 MW |
| 2026-10-17T02:00Z | 10,611 MW | 1,854 MW | 0 MW | 1,943 MW | 528 MW |
| 2026-10-17T03:00Z | 10,736 MW | 1,479 MW | 0 MW | 1,991 MW | 529 MW |
| 2026-10-17T04:00Z | 10,761 MW | 1,283 MW | 2 MW | 2,157 MW | 533 MW |
| 2026-10-17T05:00Z | 11,032 MW | 1,088 MW | 577 MW | 2,166 MW | 536 MW |
| 2026-10-17T06:00Z | 10,717 MW | 898 MW | 2,770 MW | 1,956 MW | 531 MW |
| 2026-10-17T07:00Z | 9,868 MW | 538 MW | 5,556 MW | 1,908 MW | 529 MW |
| 2026-10-17T08:00Z | 9,302 MW | 198 MW | 7,622 MW | 1,696 MW | 525 MW |
| 2026-10-17T09:00Z | 8,873 MW | 166 MW | 9,481 MW | 1,658 MW | 521 MW |
| 2026-10-17T10:00Z | 8,082 MW | 184 MW | 10,450 MW | 1,697 MW | 513 MW |
| 2026-10-17T11:00Z | 8,449 MW | 134 MW | 9,983 MW | 1,720 MW | 514 MW |
| 2026-10-17T12:00Z | 9,235 MW | 161 MW | 8,051 MW | 1,739 MW | 513 MW |
| 2026-10-17T13:00Z | 10,606 MW | 321 MW | 5,119 MW | 2,142 MW | 519 MW |
| 2026-10-17T14:00Z | 11,346 MW | 507 MW | 2,249 MW | 1,963 MW | 543 MW |
| 2026-10-17T15:00Z | 12,319 MW | 652 MW | 335 MW | 2,507 MW | 561 MW |
| 2026-10-17T16:00Z | 11,990 MW | 891 MW | 0 MW | 2,585 MW | 562 MW |
| 2026-10-17T17:00Z | 11,833 MW | 1,150 MW | 0 MW | 2,528 MW | 563 MW |
| 2026-10-17T18:00Z | 11,781 MW | 1,283 MW | 0 MW | 2,255 MW | 552 MW |
| 2026-10-17T19:00Z | 11,707 MW | 1,410 MW | 0 MW | 1,955 MW | 546 MW |
| 2026-10-17T20:00Z | 11,565 MW | 1,450 MW | 0 MW | 1,944 MW | 548 MW |
| 2026-10-17T21:00Z | 10,889 MW | 1,551 MW | 0 MW | 1,948 MW | 542 MW |
| 2026-10-17T22:00Z | 10,619 MW | 1,779 MW | 0 MW | 1,824 MW | 533 MW |
| 2026-10-17T23:00Z | 9,958 MW | 2,024 MW | 0 MW | 1,768 MW | 530 MW |
| 2026-10-18T00:00Z | 9,558 MW | 2,107 MW | 0 MW | 1,761 MW | 528 MW |
| 2026-10-18T01:00Z | 9,504 MW | 2,273 MW | 0 MW | 1,767 MW | 528 MW |
| 2026-10-18T02:00Z | 9,649 MW | 2,382 MW | 0 MW | 1,771 MW | 529 MW |
| 2026-10-18T03:00Z | 9,820 MW | 2,459 MW | 0 MW | 1,779 MW | 533 MW |
| 2026-10-18T04:00Z | 10,165 MW | 2,573 MW | 2 MW | 1,768 MW | 531 MW |
| 2026-10-18T05:00Z | 10,226 MW | 2,613 MW | 315 MW | 1,793 MW | 536 MW |
| 2026-10-18T06:00Z | 9,578 MW | 2,457 MW | 1,912 MW | 1,761 MW | 528 MW |
| 2026-10-18T07:00Z | 8,995 MW | 2,110 MW | 3,836 MW | 1,730 MW | 522 MW |
| 2026-10-18T08:00Z | 8,940 MW | 1,953 MW | 5,807 MW | 1,700 MW | 518 MW |
| 2026-10-18T09:00Z | 8,132 MW | 2,190 MW | 6,995 MW | 1,588 MW | 515 MW |
| 2026-10-18T10:00Z | 8,100 MW | 2,340 MW | 7,542 MW | 1,588 MW | 513 MW |
| 2026-10-18T11:00Z | 8,333 MW | 2,363 MW | 7,193 MW | 1,637 MW | 501 MW |
| 2026-10-18T12:00Z | 8,623 MW | 2,517 MW | 6,069 MW | 1,689 MW | 496 MW |
| 2026-10-18T13:00Z | 9,200 MW | 2,911 MW | 4,098 MW | 1,914 MW | 514 MW |
| 2026-10-18T14:00Z | 10,397 MW | 3,078 MW | 2,008 MW | 1,870 MW | 515 MW |
| 2026-10-18T15:00Z | 10,443 MW | 3,364 MW | 362 MW | 1,906 MW | 535 MW |
| 2026-10-18T16:00Z | 10,944 MW | 3,600 MW | 0 MW | 1,956 MW | 534 MW |
| 2026-10-18T17:00Z | 11,099 MW | 3,892 MW | 0 MW | 1,916 MW | 534 MW |
| 2026-10-18T18:00Z | 10,697 MW | 3,740 MW | 0 MW | 1,926 MW | 541 MW |
| 2026-10-18T19:00Z | 10,937 MW | 3,409 MW | 0 MW | 1,912 MW | 532 MW |
| 2026-10-18T20:00Z | 11,198 MW | 3,335 MW | 0 MW | 1,927 MW | 532 MW |
| 2026-10-18T21:00Z | 11,034 MW | 3,150 MW | 0 MW | 1,906 MW | 528 MW |
| 2026-10-18T22:00Z | 10,930 MW | 3,098 MW | 0 MW | 1,811 MW | 509 MW |
| 2026-10-18T23:00Z | 10,934 MW | 2,946 MW | 0 MW | 1,841 MW | 508 MW |
| 2026-10-19T00:00Z | 10,994 MW | 2,853 MW | 0 MW | 1,821 MW | 507 MW |
| 2026-10-19T01:00Z | 11,134 MW | 2,794 MW | 0 MW | 1,825 MW | 507 MW |
| 2026-10-19T02:00Z | 10,980 MW | 2,854 MW | 0 MW | 1,830 MW | 503 MW |
| 2026-10-19T03:00Z | 10,886 MW | 2,995 MW | 0 MW | 1,845 MW | 516 MW |
| 2026-10-19T04:00Z | 12,972 MW | 3,193 MW | 0 MW | 2,036 MW | 522 MW |
| 2026-10-19T05:00Z | 13,680 MW | 3,279 MW | 338 MW | 2,315 MW | 524 MW |
| 2026-10-19T06:00Z | 13,763 MW | 2,924 MW | 2,155 MW | 2,226 MW | 503 MW |
| 2026-10-19T07:00Z | 12,824 MW | 2,029 MW | 4,690 MW | 1,991 MW | 502 MW |
| 2026-10-19T08:00Z | 12,110 MW | 1,850 MW | 6,188 MW | 1,841 MW | 496 MW |
| 2026-10-19T09:00Z | 11,231 MW | 2,138 MW | 7,178 MW | 1,820 MW | 492 MW |
| 2026-10-19T10:00Z | 11,382 MW | 1,683 MW | 7,480 MW | 1,807 MW | 490 MW |
| 2026-10-19T11:00Z | 12,366 MW | 1,548 MW | 6,800 MW | 1,877 MW | 497 MW |
| 2026-10-19T12:00Z | 12,262 MW | 1,464 MW | 5,369 MW | 1,983 MW | 494 MW |
| 2026-10-19T13:00Z | 12,956 MW | 1,489 MW | 4,038 MW | 2,158 MW | 528 MW |
| 2026-10-19T14:00Z | 14,159 MW | 1,493 MW | 1,995 MW | 2,545 MW | 546 MW |
| 2026-10-19T15:00Z | 14,647 MW | 1,686 MW | 293 MW | 2,668 MW | 558 MW |
| 2026-10-19T16:00Z | 14,474 MW | 2,109 MW | 0 MW | 2,447 MW | 557 MW |
| 2026-10-19T17:00Z | 14,270 MW | 2,106 MW | 0 MW | 2,502 MW | 557 MW |
| 2026-10-19T18:00Z | 14,367 MW | 1,884 MW | 0 MW | 2,566 MW | 546 MW |
| 2026-10-19T19:00Z | 14,480 MW | 1,652 MW | 0 MW | 2,270 MW | 538 MW |
| 2026-10-19T20:00Z | 13,971 MW | 1,343 MW | 0 MW | 2,254 MW | 539 MW |
| 2026-10-19T21:00Z | 13,059 MW | 1,193 MW | 0 MW | 2,023 MW | 535 MW |
| 2026-10-19T22:00Z | 12,380 MW | 1,279 MW | 0 MW | 2,006 MW | 529 MW |
| 2026-10-19T23:00Z | 12,450 MW | 1,386 MW | 0 MW | 1,863 MW | 524 MW |
| 2026-10-20T00:00Z | 12,485 MW | 1,360 MW | 0 MW | 1,835 MW | 520 MW |
| 2026-10-20T01:00Z | 12,135 MW | 1,357 MW | 0 MW | 1,823 MW | 523 MW |
| 2026-10-20T02:00Z | 12,280 MW | 1,397 MW | 0 MW | 1,829 MW | 521 MW |
| 2026-10-20T03:00Z | 12,857 MW | 1,469 MW | 0 MW | 1,803 MW | 523 MW |
| 2026-10-20T04:00Z | 13,638 MW | 1,532 MW | 0 MW | 2,279 MW | 518 MW |
| 2026-10-20T05:00Z | 13,882 MW | 1,583 MW | 169 MW | 2,628 MW | 534 MW |
| 2026-10-20T06:00Z | 13,850 MW | 1,640 MW | 722 MW | 2,673 MW | 527 MW |
| 2026-10-20T07:00Z | 14,302 MW | 1,713 MW | 1,583 MW | 2,719 MW | 529 MW |
| 2026-10-20T08:00Z | 13,916 MW | 1,842 MW | 2,302 MW | 2,699 MW | 529 MW |
| 2026-10-20T09:00Z | 13,584 MW | 2,024 MW | 3,017 MW | 2,791 MW | 524 MW |
| 2026-10-20T10:00Z | 13,624 MW | 2,119 MW | 3,494 MW | 2,588 MW | 519 MW |
| 2026-10-20T11:00Z | 13,662 MW | 2,363 MW | 3,083 MW | 2,733 MW | 518 MW |
| 2026-10-20T12:00Z | 13,526 MW | 2,722 MW | 2,616 MW | 2,593 MW | 516 MW |
| 2026-10-20T13:00Z | 13,559 MW | 3,030 MW | 2,076 MW | 2,530 MW | 517 MW |
| 2026-10-20T14:00Z | 13,964 MW | 3,462 MW | 948 MW | 2,611 MW | 528 MW |
| 2026-10-20T15:00Z | 14,146 MW | 4,129 MW | 179 MW | 2,451 MW | 536 MW |
| 2026-10-20T16:00Z | 13,966 MW | 4,825 MW | 0 MW | 2,389 MW | 543 MW |
| 2026-10-20T17:00Z | 13,512 MW | 5,344 MW | 0 MW | 2,207 MW | 543 MW |
| 2026-10-20T18:00Z | 13,134 MW | 5,303 MW | 0 MW | 2,011 MW | 545 MW |
| 2026-10-20T19:00Z | 13,118 MW | 5,366 MW | 0 MW | 1,750 MW | 539 MW |
| 2026-10-20T20:00Z | 13,143 MW | 5,209 MW | 0 MW | 1,687 MW | 535 MW |
| 2026-10-20T21:00Z | 12,643 MW | 5,134 MW | 0 MW | 1,653 MW | 527 MW |
| 2026-10-20T22:00Z | 11,895 MW | 5,157 MW | 0 MW | 1,500 MW | 513 MW |
| 2026-10-20T23:00Z | 11,173 MW | 5,170 MW | 0 MW | 1,472 MW | 511 MW |
| 2026-10-21T00:00Z | 11,196 MW | 5,217 MW | 0 MW | 1,474 MW | 510 MW |
| 2026-10-21T01:00Z | 11,135 MW | 5,186 MW | 0 MW | 1,463 MW | 512 MW |
| 2026-10-21T02:00Z | 11,316 MW | 5,358 MW | 0 MW | 1,525 MW | 511 MW |
| 2026-10-21T03:00Z | 11,684 MW | 5,425 MW | 0 MW | 1,575 MW | 512 MW |
| 2026-10-21T04:00Z | 12,832 MW | 5,461 MW | 0 MW | 1,696 MW | 516 MW |
| 2026-10-21T05:00Z | 13,055 MW | 5,357 MW | 304 MW | 1,686 MW | 506 MW |
| 2026-10-21T06:00Z | 12,927 MW | 5,280 MW | 2,009 MW | 1,573 MW | 502 MW |
| 2026-10-21T07:00Z | 12,239 MW | 4,883 MW | 4,648 MW | 1,537 MW | 498 MW |
| 2026-10-21T08:00Z | 11,435 MW | 4,528 MW | 7,042 MW | 1,694 MW | 487 MW |
| 2026-10-21T09:00Z | 10,402 MW | 4,507 MW | 8,675 MW | 1,464 MW | 480 MW |
| 2026-10-21T10:00Z | 9,878 MW | 4,634 MW | 9,311 MW | 1,401 MW | 483 MW |
| 2026-10-21T11:00Z | 9,528 MW | 4,807 MW | 9,492 MW | 1,423 MW | 485 MW |
| 2026-10-21T12:00Z | 10,033 MW | 4,895 MW | 8,310 MW | 1,544 MW | 480 MW |
| 2026-10-21T13:00Z | 10,766 MW | 4,893 MW | 5,568 MW | 1,717 MW | 481 MW |
| 2026-10-21T14:00Z | 12,990 MW | 4,778 MW | 2,318 MW | 1,893 MW | 476 MW |
| 2026-10-21T15:00Z | 13,374 MW | 5,479 MW | 276 MW | 1,742 MW | 486 MW |
| 2026-10-21T16:00Z | 13,165 MW | 6,228 MW | 0 MW | 1,644 MW | 487 MW |
| 2026-10-21T17:00Z | 12,880 MW | 6,587 MW | 0 MW | 1,605 MW | 485 MW |
| 2026-10-21T18:00Z | 13,085 MW | 6,772 MW | 0 MW | 1,517 MW | 493 MW |
| 2026-10-21T19:00Z | 12,707 MW | 6,675 MW | 0 MW | 1,520 MW | 490 MW |
| 2026-10-21T20:00Z | 11,777 MW | 6,327 MW | 0 MW | 1,449 MW | 492 MW |
| 2026-10-21T21:00Z | 10,899 MW | 6,056 MW | 0 MW | 1,433 MW | 484 MW |
| 2026-10-21T22:00Z | 10,225 MW | 5,874 MW | 0 MW | 1,422 MW | 491 MW |
| 2026-10-21T23:00Z | 10,271 MW | 5,642 MW | 0 MW | 1,429 MW | 490 MW |
| 2026-10-22T00:00Z | 10,219 MW | 5,295 MW | 0 MW | 1,471 MW | 489 MW |
| 2026-10-22T01:00Z | 9,949 MW | 5,115 MW | 0 MW | 1,525 MW | 493 MW |
| 2026-10-22T02:00Z | 10,188 MW | 5,045 MW | 0 MW | 1,543 MW | 490 MW |
| 2026-10-22T03:00Z | 10,877 MW | 4,982 MW | 0 MW | 1,572 MW | 495 MW |
| 2026-10-22T04:00Z | 12,313 MW | 4,988 MW | 0 MW | 1,767 MW | 506 MW |
| 2026-10-22T05:00Z | 12,567 MW | 4,528 MW | 149 MW | 1,738 MW | 509 MW |
| 2026-10-22T06:00Z | 13,052 MW | 4,262 MW | 505 MW | 1,854 MW | 479 MW |
| 2026-10-22T07:00Z | 13,069 MW | 3,968 MW | 958 MW | 1,807 MW | 502 MW |
| 2026-10-22T08:00Z | 13,096 MW | 3,825 MW | 1,313 MW | 1,813 MW | 500 MW |
| 2026-10-22T09:00Z | 13,417 MW | 3,575 MW | 1,680 MW | 2,011 MW | 500 MW |
| 2026-10-22T10:00Z | 13,216 MW | 3,286 MW | 1,919 MW | 1,881 MW | 501 MW |
| 2026-10-22T11:00Z | 13,298 MW | 3,146 MW | 2,040 MW | 1,956 MW | 508 MW |
| 2026-10-22T12:00Z | 12,834 MW | 3,094 MW | 2,030 MW | 1,871 MW | 507 MW |
| 2026-10-22T13:00Z | 12,322 MW | 3,069 MW | 1,602 MW | 1,852 MW | 514 MW |
| 2026-10-22T14:00Z | 13,019 MW | 3,016 MW | 813 MW | 1,846 MW | 516 MW |
| 2026-10-22T15:00Z | 13,105 MW | 3,182 MW | 174 MW | 2,108 MW | 523 MW |
| 2026-10-22T16:00Z | 13,270 MW | 3,526 MW | 0 MW | 2,058 MW | 521 MW |
| 2026-10-22T17:00Z | 12,564 MW | 4,008 MW | 0 MW | 2,146 MW | 518 MW |
| 2026-10-22T18:00Z | 12,939 MW | 4,208 MW | 0 MW | 1,977 MW | 521 MW |
| 2026-10-22T19:00Z | 12,549 MW | 4,287 MW | 0 MW | 1,831 MW | 516 MW |
| 2026-10-22T20:00Z | 12,268 MW | 4,139 MW | 0 MW | 1,758 MW | 515 MW |
| 2026-10-22T21:00Z | 11,842 MW | 3,956 MW | 0 MW | 1,676 MW | 514 MW |
| 2026-10-22T22:00Z | 11,613 MW | 3,897 MW | 0 MW | 1,549 MW | 522 MW |
| 2026-10-22T23:00Z | 11,608 MW | 3,603 MW | 0 MW | 1,673 MW | 518 MW |
| 2026-10-23T00:00Z | 11,470 MW | 3,480 MW | 0 MW | 1,747 MW | 524 MW |
| 2026-10-23T01:00Z | 11,299 MW | 3,460 MW | 0 MW | 1,806 MW | 524 MW |
| 2026-10-23T02:00Z | 11,578 MW | 3,313 MW | 0 MW | 1,771 MW | 525 MW |
| 2026-10-23T03:00Z | 11,627 MW | 3,036 MW | 0 MW | 1,867 MW | 526 MW |
| 2026-10-23T04:00Z | 12,690 MW | 2,878 MW | 0 MW | 2,435 MW | 530 MW |
| 2026-10-23T05:00Z | 12,610 MW | 2,691 MW | 325 MW | 2,556 MW | 533 MW |
| 2026-10-23T06:00Z | 12,499 MW | 2,410 MW | 2,865 MW | 2,324 MW | 534 MW |
| 2026-10-23T07:00Z | 10,752 MW | 1,488 MW | 6,769 MW | 1,793 MW | 527 MW |
| 2026-10-23T08:00Z | 10,662 MW | 747 MW | 9,739 MW | 1,702 MW | 515 MW |
| 2026-10-23T09:00Z | 9,489 MW | 761 MW | 11,314 MW | 1,633 MW | 503 MW |
| 2026-10-23T10:00Z | 8,652 MW | 1,421 MW | 11,643 MW | 1,540 MW | 502 MW |
| 2026-10-23T11:00Z | 8,852 MW | 1,901 MW | 9,864 MW | 1,580 MW | 507 MW |
| 2026-10-23T12:00Z | 10,287 MW | 1,874 MW | 7,425 MW | 1,853 MW | 504 MW |
| 2026-10-23T13:00Z | 11,845 MW | 1,639 MW | 4,451 MW | 2,084 MW | 515 MW |
| 2026-10-23T14:00Z | 13,250 MW | 1,804 MW | 1,606 MW | 2,540 MW | 519 MW |
| 2026-10-23T15:00Z | 12,851 MW | 2,661 MW | 201 MW | 2,526 MW | 533 MW |
| 2026-10-23T16:00Z | 12,989 MW | 3,759 MW | 0 MW | 2,419 MW | 539 MW |
| 2026-10-23T17:00Z | 12,931 MW | 4,822 MW | 0 MW | 2,124 MW | 541 MW |
| 2026-10-23T18:00Z | 12,287 MW | 5,503 MW | 0 MW | 1,787 MW | 516 MW |
| 2026-10-23T19:00Z | 11,367 MW | 5,968 MW | 0 MW | 1,431 MW | 513 MW |
| 2026-10-23T20:00Z | 10,465 MW | 6,139 MW | 0 MW | 1,341 MW | 504 MW |
| 2026-10-23T21:00Z | 9,557 MW | 6,252 MW | 0 MW | 1,117 MW | 497 MW |
| 2026-10-23T22:00Z | 8,260 MW | 6,253 MW | 0 MW | 1,021 MW | 494 MW |
| 2026-10-23T23:00Z | 7,678 MW | 6,224 MW | 0 MW | 1,030 MW | 492 MW |
| 2026-10-24T00:00Z | 7,394 MW | 6,089 MW | 0 MW | 1,018 MW | 493 MW |
| 2026-10-24T01:00Z | 7,574 MW | 6,032 MW | 0 MW | 1,023 MW | 494 MW |
| 2026-10-24T02:00Z | 7,490 MW | 5,974 MW | 0 MW | 1,026 MW | 495 MW |
| 2026-10-24T03:00Z | 7,949 MW | 5,842 MW | 0 MW | 1,041 MW | 499 MW |
| 2026-10-24T04:00Z | 8,610 MW | 5,899 MW | 0 MW | 1,124 MW | 505 MW |
| 2026-10-24T05:00Z | 8,976 MW | 5,517 MW | 339 MW | 1,184 MW | 506 MW |
| 2026-10-24T06:00Z | 8,915 MW | 5,056 MW | 2,142 MW | 1,212 MW | 500 MW |
| 2026-10-24T07:00Z | 8,492 MW | 4,218 MW | 4,950 MW | 1,122 MW | 491 MW |
| 2026-10-24T08:00Z | 7,573 MW | 3,294 MW | 6,952 MW | 1,072 MW | 490 MW |
| 2026-10-24T09:00Z | 7,726 MW | 3,216 MW | 7,569 MW | 995 MW | 480 MW |
| 2026-10-24T10:00Z | 8,523 MW | 3,128 MW | 6,990 MW | 1,065 MW | 485 MW |
| 2026-10-24T11:00Z | 8,640 MW | 3,406 MW | 6,139 MW | 975 MW | 491 MW |
| 2026-10-24T12:00Z | 8,185 MW | 3,827 MW | 5,123 MW | 1,134 MW | 489 MW |
| 2026-10-24T13:00Z | 9,033 MW | 3,690 MW | 3,335 MW | 1,384 MW | 495 MW |
| 2026-10-24T14:00Z | 10,469 MW | 3,552 MW | 1,458 MW | 1,748 MW | 501 MW |
| 2026-10-24T15:00Z | 10,828 MW | 3,835 MW | 187 MW | 1,734 MW | 514 MW |
| 2026-10-24T16:00Z | 11,149 MW | 4,153 MW | 0 MW | 1,739 MW | 518 MW |
| 2026-10-24T17:00Z | 10,968 MW | 4,323 MW | 0 MW | 1,655 MW | 518 MW |
| 2026-10-24T18:00Z | 10,948 MW | 4,167 MW | 0 MW | 1,627 MW | 521 MW |
| 2026-10-24T19:00Z | 10,627 MW | 4,122 MW | 0 MW | 1,371 MW | 519 MW |
| 2026-10-24T20:00Z | 10,107 MW | 4,275 MW | 0 MW | 1,224 MW | 513 MW |
| 2026-10-24T21:00Z | 8,850 MW | 4,256 MW | 0 MW | 1,124 MW | 509 MW |
| 2026-10-24T22:00Z | 7,782 MW | 4,497 MW | 0 MW | 1,065 MW | 515 MW |
| 2026-10-24T23:00Z | 7,284 MW | 4,699 MW | 0 MW | 1,017 MW | 511 MW |
| 2026-10-25T00:00Z | 6,700 MW | 5,110 MW | 0 MW | 999 MW | 510 MW |
| 2026-10-25T01:00Z | 6,037 MW | 5,553 MW | 0 MW | 945 MW | 499 MW |
| 2026-10-25T02:00Z | 6,304 MW | 5,178 MW | 0 MW | 958 MW | 510 MW |
| 2026-10-25T03:00Z | 6,474 MW | 5,516 MW | 0 MW | 957 MW | 508 MW |
| 2026-10-25T04:00Z | 6,555 MW | 6,170 MW | 0 MW | 959 MW | 509 MW |
| 2026-10-25T05:00Z | 6,742 MW | 6,727 MW | 0 MW | 981 MW | 512 MW |
| 2026-10-25T06:00Z | 6,427 MW | 7,013 MW | 1,774 MW | 939 MW | 507 MW |
| 2026-10-25T07:00Z | 6,164 MW | 6,084 MW | 4,094 MW | 997 MW | 504 MW |
| 2026-10-25T08:00Z | 6,481 MW | 4,981 MW | 5,137 MW | 1,018 MW | 500 MW |
| 2026-10-25T09:00Z | 5,933 MW | 5,473 MW | 5,484 MW | 957 MW | 492 MW |
| 2026-10-25T10:00Z | 6,400 MW | 6,391 MW | 4,940 MW | 969 MW | 488 MW |
| 2026-10-25T11:00Z | 6,302 MW | 7,354 MW | 4,342 MW | 966 MW | 486 MW |
| 2026-10-25T12:00Z | 6,403 MW | 7,616 MW | 3,511 MW | 994 MW | 484 MW |
| 2026-10-25T13:00Z | 6,076 MW | 8,308 MW | 2,046 MW | 971 MW | 488 MW |
| 2026-10-25T14:00Z | 7,058 MW | 8,030 MW | 834 MW | 1,068 MW | 503 MW |
| 2026-10-25T15:00Z | 8,115 MW | 7,820 MW | 128 MW | 1,201 MW | 528 MW |
| 2026-10-25T16:00Z | 8,098 MW | 7,558 MW | 0 MW | 1,253 MW | 538 MW |
| 2026-10-25T17:00Z | 7,761 MW | 7,407 MW | 0 MW | 1,399 MW | 548 MW |
| 2026-10-25T18:00Z | 7,985 MW | 7,042 MW | 0 MW | 1,412 MW | 551 MW |
| 2026-10-25T19:00Z | 7,994 MW | 6,438 MW | 0 MW | 1,396 MW | 547 MW |
| 2026-10-25T20:00Z | 7,818 MW | 6,151 MW | 0 MW | 1,377 MW | 534 MW |
| 2026-10-25T21:00Z | 7,829 MW | 6,134 MW | 0 MW | 1,236 MW | 532 MW |
| 2026-10-25T22:00Z | 7,606 MW | 5,707 MW | 0 MW | 1,091 MW | 521 MW |
| 2026-10-25T23:00Z | 7,441 MW | 5,581 MW | 0 MW | 1,092 MW | 498 MW |
| 2026-10-26T00:00Z | 8,160 MW | 4,761 MW | 0 MW | 1,105 MW | 502 MW |
| 2026-10-26T01:00Z | 8,394 MW | 4,666 MW | 0 MW | 1,095 MW | 503 MW |
| 2026-10-26T02:00Z | 8,435 MW | 4,718 MW | 0 MW | 1,091 MW | 502 MW |
| 2026-10-26T03:00Z | 8,744 MW | 4,915 MW | 0 MW | 1,095 MW | 505 MW |
| 2026-10-26T04:00Z | 9,648 MW | 4,936 MW | 0 MW | 1,146 MW | 508 MW |
| 2026-10-26T05:00Z | 10,975 MW | 5,508 MW | 90 MW | 1,274 MW | 519 MW |
| 2026-10-26T06:00Z | 11,518 MW | 5,684 MW | 1,401 MW | 1,278 MW | 525 MW |
| 2026-10-26T07:00Z | 10,256 MW | 5,328 MW | 4,064 MW | 1,223 MW | 520 MW |
| 2026-10-26T08:00Z | 8,685 MW | 4,716 MW | 6,543 MW | 1,101 MW | 513 MW |
| 2026-10-26T09:00Z | 8,433 MW | 4,393 MW | 7,972 MW | 1,156 MW | 507 MW |
| 2026-10-26T10:00Z | 8,587 MW | 4,119 MW | 8,049 MW | 1,229 MW | 503 MW |
| 2026-10-26T11:00Z | 9,395 MW | 3,809 MW | 7,066 MW | 1,349 MW | 504 MW |
| 2026-10-26T12:00Z | 10,244 MW | 3,546 MW | 5,829 MW | 1,475 MW | 498 MW |
| 2026-10-26T13:00Z | 11,041 MW | 3,250 MW | 4,039 MW | 2,018 MW | 507 MW |
| 2026-10-26T14:00Z | 12,026 MW | 2,746 MW | 1,724 MW | 2,369 MW | 518 MW |
| 2026-10-26T15:00Z | 12,260 MW | 2,823 MW | 127 MW | 2,461 MW | 524 MW |
| 2026-10-26T16:00Z | 12,249 MW | 3,335 MW | 0 MW | 2,449 MW | 522 MW |
| 2026-10-26T17:00Z | 12,180 MW | 3,727 MW | 0 MW | 2,197 MW | 528 MW |
| 2026-10-26T18:00Z | 12,295 MW | 3,866 MW | 0 MW | 2,233 MW | 528 MW |
| 2026-10-26T19:00Z | 12,349 MW | 3,745 MW | 0 MW | 2,383 MW | 529 MW |
| 2026-10-26T20:00Z | 12,179 MW | 3,368 MW | 0 MW | 1,953 MW | 529 MW |
| 2026-10-26T21:00Z | 12,142 MW | 3,036 MW | 0 MW | 1,825 MW | 522 MW |
| 2026-10-26T22:00Z | 11,566 MW | 2,741 MW | 0 MW | 1,773 MW | 525 MW |
| 2026-10-26T23:00Z | 11,385 MW | 2,250 MW | 0 MW | 1,620 MW | 493 MW |
| 2026-10-27T00:00Z | 11,295 MW | 1,993 MW | 0 MW | 1,604 MW | 491 MW |
| 2026-10-27T01:00Z | 11,678 MW | 1,755 MW | 0 MW | 1,656 MW | 488 MW |
| 2026-10-27T02:00Z | 11,940 MW | 1,641 MW | 0 MW | 1,731 MW | 490 MW |
| 2026-10-27T03:00Z | 12,025 MW | 1,817 MW | 0 MW | 1,704 MW | 487 MW |
| 2026-10-27T04:00Z | 12,533 MW | 2,251 MW | 0 MW | 1,817 MW | 492 MW |
| 2026-10-27T05:00Z | 12,794 MW | 2,975 MW | 194 MW | 2,030 MW | 493 MW |
| 2026-10-27T06:00Z | 11,334 MW | 3,711 MW | 2,498 MW | 1,462 MW | 491 MW |
| 2026-10-27T07:00Z | 9,746 MW | 3,850 MW | 6,099 MW | 1,361 MW | 484 MW |
| 2026-10-27T08:00Z | 9,482 MW | 2,622 MW | 8,507 MW | 1,210 MW | 478 MW |
| 2026-10-27T09:00Z | 8,746 MW | 2,419 MW | 9,349 MW | 1,161 MW | 468 MW |
| 2026-10-27T10:00Z | 8,760 MW | 2,466 MW | 9,529 MW | 1,100 MW | 464 MW |
| 2026-10-27T11:00Z | 8,315 MW | 2,298 MW | 10,199 MW | 1,171 MW | 461 MW |
| 2026-10-27T12:00Z | 9,238 MW | 2,669 MW | 8,807 MW | 1,294 MW | 468 MW |
| 2026-10-27T13:00Z | 10,167 MW | 2,835 MW | 6,193 MW | 1,674 MW | 467 MW |
| 2026-10-27T14:00Z | 11,564 MW | 2,787 MW | 2,325 MW | 2,000 MW | 489 MW |
| 2026-10-27T15:00Z | 12,758 MW | 3,510 MW | 150 MW | 2,277 MW | 486 MW |
| 2026-10-27T16:00Z | 12,861 MW | 4,985 MW | 0 MW | 2,119 MW | 475 MW |
| 2026-10-27T17:00Z | 12,605 MW | 5,775 MW | 0 MW | 1,914 MW | 505 MW |
| 2026-10-27T18:00Z | 12,544 MW | 6,296 MW | 0 MW | 1,929 MW | 509 MW |
| 2026-10-27T19:00Z | 12,375 MW | 6,392 MW | 0 MW | 1,942 MW | 512 MW |
| 2026-10-27T20:00Z | 12,016 MW | 6,161 MW | 0 MW | 1,910 MW | 510 MW |
| 2026-10-27T21:00Z | 11,112 MW | 5,932 MW | 0 MW | 1,876 MW | 508 MW |
| 2026-10-27T22:00Z | 10,452 MW | 5,879 MW | 0 MW | 1,821 MW | 498 MW |
| 2026-10-27T23:00Z | 11,047 MW | 5,584 MW | 0 MW | 1,807 MW | 493 MW |
| 2026-10-28T00:00Z | 11,321 MW | 5,136 MW | 0 MW | 1,780 MW | 494 MW |
| 2026-10-28T01:00Z | 11,857 MW | 4,565 MW | 0 MW | 1,770 MW | 495 MW |
| 2026-10-28T02:00Z | 11,710 MW | 4,228 MW | 0 MW | 1,790 MW | 496 MW |
| 2026-10-28T03:00Z | 11,444 MW | 3,919 MW | 0 MW | 1,919 MW | 494 MW |
| 2026-10-28T04:00Z | 11,606 MW | 3,444 MW | 0 MW | 2,041 MW | 497 MW |
| 2026-10-28T05:00Z | 12,574 MW | 2,949 MW | 112 MW | 2,643 MW | 506 MW |
| 2026-10-28T06:00Z | 12,808 MW | 2,472 MW | 1,308 MW | 2,538 MW | 493 MW |
| 2026-10-28T07:00Z | 13,083 MW | 1,587 MW | 3,079 MW | 2,784 MW | 500 MW |
| 2026-10-28T08:00Z | 13,482 MW | 932 MW | 4,261 MW | 3,043 MW | 494 MW |
| 2026-10-28T09:00Z | 13,580 MW | 630 MW | 5,124 MW | 2,765 MW | 492 MW |
| 2026-10-28T10:00Z | 12,996 MW | 543 MW | 5,195 MW | 2,622 MW | 488 MW |
| 2026-10-28T11:00Z | 13,352 MW | 570 MW | 4,477 MW | 2,766 MW | 489 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00Z.
Installed Capacity
Annual figure for 2026| Coal | |
|---|---|
| Solar | |
| Wind | |
| Gas | |
| Other | |
| Storage | |
| Hydro | |
| Bioenergy | |
| Oil |
Total installed capacity in Poland: 68.3 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Warsaw time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Warsaw time) | Demand |
|---|---|
| 2025-09-23 | 448 GWh |
| 2025-09-24 | 444 GWh |
| 2025-09-25 | 437 GWh |
| 2025-09-26 | 434 GWh |
| 2025-09-27 | 376 GWh |
| 2025-09-28 | 348 GWh |
| 2025-09-29 | 437 GWh |
| 2025-09-30 | 468 GWh |
| 2025-10-01 | 462 GWh |
| 2025-10-02 | 458 GWh |
| 2025-10-03 | 462 GWh |
| 2025-10-04 | 401 GWh |
| 2025-10-05 | 361 GWh |
| 2025-10-06 | 448 GWh |
| 2025-10-07 | 470 GWh |
| 2025-10-08 | 465 GWh |
| 2025-10-09 | 468 GWh |
| 2025-10-10 | 457 GWh |
| 2025-10-11 | 406 GWh |
| 2025-10-12 | 370 GWh |
| 2025-10-13 | 438 GWh |
| 2025-10-14 | 477 GWh |
| 2025-10-15 | 473 GWh |
| 2025-10-16 | 473 GWh |
| 2025-10-17 | 474 GWh |
| 2025-10-18 | 419 GWh |
| 2025-10-19 | 381 GWh |
| 2025-10-20 | 453 GWh |
| 2025-10-21 | 469 GWh |
| 2025-10-22 | 471 GWh |
| 2025-10-23 | 465 GWh |
| 2025-10-24 | 476 GWh |
| 2025-10-25 | 412 GWh |
| 2025-10-26 | 392 GWh |
| 2025-10-27 | 465 GWh |
| 2025-10-28 | 480 GWh |
| 2025-10-29 | 468 GWh |
| 2025-10-30 | 469 GWh |
| 2025-10-31 | 458 GWh |
| 2025-11-01 | 355 GWh |
| 2025-11-02 | 360 GWh |
| 2025-11-03 | 465 GWh |
| 2025-11-04 | 465 GWh |
| 2025-11-05 | 469 GWh |
| 2025-11-06 | 470 GWh |
| 2025-11-07 | 468 GWh |
| 2025-11-08 | 433 GWh |
| 2025-11-09 | 392 GWh |
| 2025-11-10 | 425 GWh |
| 2025-11-11 | 396 GWh |
| 2025-11-12 | 465 GWh |
| 2025-11-13 | 468 GWh |
| 2025-11-14 | 486 GWh |
| 2025-11-15 | 441 GWh |
| 2025-11-16 | 399 GWh |
| 2025-11-17 | 488 GWh |
| 2025-11-18 | 503 GWh |
| 2025-11-19 | 505 GWh |
| 2025-11-20 | 516 GWh |
| 2025-11-21 | 520 GWh |
| 2025-11-22 | 475 GWh |
| 2025-11-23 | 448 GWh |
| 2025-11-24 | 533 GWh |
| 2025-11-25 | 532 GWh |
| 2025-11-26 | 526 GWh |
| 2025-11-27 | 528 GWh |
| 2025-11-28 | 531 GWh |
| 2025-11-29 | 474 GWh |
| 2025-11-30 | 430 GWh |
| 2025-12-01 | 516 GWh |
| 2025-12-02 | 528 GWh |
| 2025-12-03 | 525 GWh |
| 2025-12-04 | 516 GWh |
| 2025-12-05 | 511 GWh |
| 2025-12-06 | 453 GWh |
| 2025-12-07 | 413 GWh |
| 2025-12-08 | 488 GWh |
| 2025-12-09 | 499 GWh |
| 2025-12-10 | 493 GWh |
| 2025-12-11 | 490 GWh |
| 2025-12-12 | 502 GWh |
| 2025-12-13 | 450 GWh |
| 2025-12-14 | 409 GWh |
| 2025-12-15 | 499 GWh |
| 2025-12-16 | 525 GWh |
| 2025-12-17 | 524 GWh |
| 2025-12-18 | 507 GWh |
| 2025-12-19 | 488 GWh |
| 2025-12-20 | 455 GWh |
| 2025-12-21 | 424 GWh |
| 2025-12-22 | 480 GWh |
| 2025-12-23 | 479 GWh |
| 2025-12-24 | 411 GWh |
| 2025-12-25 | 392 GWh |
| 2025-12-26 | 383 GWh |
| 2025-12-27 | 407 GWh |
| 2025-12-28 | 388 GWh |
| 2025-12-29 | 451 GWh |
| 2025-12-30 | 452 GWh |
| 2025-12-31 | 442 GWh |
| 2026-01-01 | 378 GWh |
| 2026-01-02 | 427 GWh |
| 2026-01-03 | 430 GWh |
| 2026-01-04 | 411 GWh |
| 2026-01-05 | 478 GWh |
| 2026-01-06 | 454 GWh |
| 2026-01-07 | 545 GWh |
| 2026-01-08 | 571 GWh |
| 2026-01-09 | 574 GWh |
| 2026-01-10 | 515 GWh |
| 2026-01-11 | 458 GWh |
| 2026-01-12 | 557 GWh |
| 2026-01-13 | 569 GWh |
| 2026-01-14 | 558 GWh |
| 2026-01-15 | 541 GWh |
| 2026-01-16 | 536 GWh |
| 2026-01-17 | 493 GWh |
| 2026-01-18 | 456 GWh |
| 2026-01-19 | 547 GWh |
| 2026-01-20 | 557 GWh |
| 2026-01-21 | 560 GWh |
| 2026-01-22 | 558 GWh |
| 2026-01-23 | 558 GWh |
| 2026-01-24 | 500 GWh |
| 2026-01-25 | 455 GWh |
| 2026-01-26 | 525 GWh |
| 2026-01-27 | 539 GWh |
| 2026-01-28 | 543 GWh |
| 2026-01-29 | 547 GWh |
| 2026-01-30 | 551 GWh |
| 2026-01-31 | 505 GWh |
| 2026-02-01 | 477 GWh |
| 2026-02-02 | 569 GWh |
| 2026-02-03 | 581 GWh |
| 2026-02-04 | 571 GWh |
| 2026-02-05 | 559 GWh |
| 2026-02-06 | 545 GWh |
| 2026-02-07 | 489 GWh |
| 2026-02-08 | 445 GWh |
| 2026-02-09 | 543 GWh |
| 2026-02-10 | 554 GWh |
| 2026-02-11 | 531 GWh |
| 2026-02-12 | 510 GWh |
| 2026-02-13 | 504 GWh |
| 2026-02-14 | 473 GWh |
| 2026-02-15 | 450 GWh |
| 2026-02-16 | 541 GWh |
| 2026-02-17 | 560 GWh |
| 2026-02-18 | 553 GWh |
| 2026-02-19 | 551 GWh |
| 2026-02-20 | 542 GWh |
| 2026-02-21 | 474 GWh |
| 2026-02-22 | 421 GWh |
| 2026-02-23 | 481 GWh |
| 2026-02-24 | 500 GWh |
| 2026-02-25 | 508 GWh |
| 2026-02-26 | 482 GWh |
| 2026-02-27 | 468 GWh |
| 2026-02-28 | 407 GWh |
| 2026-03-01 | 377 GWh |
| 2026-03-02 | 455 GWh |
| 2026-03-03 | 466 GWh |
| 2026-03-04 | 462 GWh |
| 2026-03-05 | 471 GWh |
| 2026-03-06 | 475 GWh |
| 2026-03-07 | 416 GWh |
| 2026-03-08 | 379 GWh |
| 2026-03-09 | 439 GWh |
| 2026-03-10 | 457 GWh |
| 2026-03-11 | 449 GWh |
| 2026-03-12 | 457 GWh |
| 2026-03-13 | 443 GWh |
| 2026-03-14 | 385 GWh |
| 2026-03-15 | 363 GWh |
| 2026-03-16 | 455 GWh |
| 2026-03-17 | 475 GWh |
| 2026-03-18 | 466 GWh |
| 2026-03-19 | 471 GWh |
| 2026-03-20 | 472 GWh |
| 2026-03-21 | 413 GWh |
| 2026-03-22 | 375 GWh |
| 2026-03-23 | 449 GWh |
| 2026-03-24 | 458 GWh |
| 2026-03-25 | 453 GWh |
| 2026-03-26 | 475 GWh |
| 2026-03-27 | 480 GWh |
| 2026-03-28 | 428 GWh |
| 2026-03-29 | 373 GWh |
| 2026-03-30 | 466 GWh |
| 2026-03-31 | 482 GWh |
| 2026-04-01 | 480 GWh |
| 2026-04-02 | 470 GWh |
| 2026-04-03 | 447 GWh |
| 2026-04-04 | 383 GWh |
| 2026-04-05 | 313 GWh |
| 2026-04-06 | 323 GWh |
| 2026-04-07 | 426 GWh |
| 2026-04-08 | 472 GWh |
| 2026-04-09 | 483 GWh |
| 2026-04-10 | 475 GWh |
| 2026-04-11 | 433 GWh |
| 2026-04-12 | 374 GWh |
| 2026-04-13 | 446 GWh |
| 2026-04-14 | 461 GWh |
| 2026-04-15 | 467 GWh |
| 2026-04-16 | 461 GWh |
| 2026-04-17 | 454 GWh |
| 2026-04-18 | 403 GWh |
| 2026-04-19 | 361 GWh |
| 2026-04-20 | 444 GWh |
| 2026-04-21 | 451 GWh |
| 2026-04-22 | 445 GWh |
| 2026-04-23 | 441 GWh |
| 2026-04-24 | 447 GWh |
| 2026-04-25 | 393 GWh |
| 2026-04-26 | 371 GWh |
| 2026-04-27 | 438 GWh |
| 2026-04-28 | 452 GWh |
| 2026-04-29 | 463 GWh |
| 2026-04-30 | 449 GWh |
| 2026-05-01 | 369 GWh |
| 2026-05-02 | 356 GWh |
| 2026-05-03 | 333 GWh |
| 2026-05-04 | 409 GWh |
| 2026-05-05 | 436 GWh |
| 2026-05-06 | 433 GWh |
| 2026-05-07 | 442 GWh |
| 2026-05-08 | 440 GWh |
| 2026-05-09 | 387 GWh |
| 2026-05-10 | 349 GWh |
| 2026-05-11 | 416 GWh |
| 2026-05-12 | 437 GWh |
| 2026-05-13 | 441 GWh |
| 2026-05-14 | 440 GWh |
| 2026-05-15 | 453 GWh |
| 2026-05-16 | 400 GWh |
| 2026-05-17 | 362 GWh |
| 2026-05-18 | 433 GWh |
| 2026-05-19 | 438 GWh |
| 2026-05-20 | 440 GWh |
| 2026-05-21 | 430 GWh |
| 2026-05-22 | 433 GWh |
| 2026-05-23 | 393 GWh |
| 2026-05-24 | 343 GWh |
| 2026-05-25 | 414 GWh |
| 2026-05-26 | 427 GWh |
| 2026-05-27 | 434 GWh |
| 2026-05-28 | 429 GWh |
| 2026-05-29 | 425 GWh |
| 2026-05-30 | 383 GWh |
| 2026-05-31 | 348 GWh |
| 2026-06-01 | 424 GWh |
| 2026-06-02 | 433 GWh |
| 2026-06-03 | 429 GWh |
| 2026-06-04 | 353 GWh |
| 2026-06-05 | 383 GWh |
| 2026-06-06 | 368 GWh |
| 2026-06-07 | 343 GWh |
| 2026-06-08 | 420 GWh |
| 2026-06-09 | 434 GWh |
| 2026-06-10 | 438 GWh |
| 2026-06-11 | 433 GWh |
| 2026-06-12 | 430 GWh |
| 2026-06-13 | 376 GWh |
| 2026-06-14 | 332 GWh |
| 2026-06-15 | 405 GWh |
| 2026-06-16 | 415 GWh |
| 2026-06-17 | 429 GWh |
| 2026-06-18 | 439 GWh |
| 2026-06-19 | 448 GWh |
| 2026-06-20 | 402 GWh |
| 2026-06-21 | 362 GWh |
| 2026-06-22 | 436 GWh |
| 2026-06-23 | 446 GWh |
| 2026-06-24 | 448 GWh |
| 2026-06-25 | 457 GWh |
| 2026-06-26 | 465 GWh |
| 2026-06-27 | 416 GWh |
| 2026-06-28 | 400 GWh |
| 2026-06-29 | 468 GWh |
| 2026-06-30 | 472 GWh |
| 2026-07-01 | 469 GWh |
| 2026-07-02 | 445 GWh |
| 2026-07-03 | 427 GWh |
| 2026-07-04 | 370 GWh |
| 2026-07-05 | 339 GWh |
| 2026-07-06 | 403 GWh |
| 2026-07-07 | 426 GWh |
| 2026-07-08 | 420 GWh |
| 2026-07-09 | 423 GWh |
| 2026-07-10 | 427 GWh |
| 2026-07-11 | 382 GWh |
| 2026-07-12 | 349 GWh |
| 2026-07-13 | 424 GWh |
| 2026-07-14 | 438 GWh |
| 2026-07-15 | 446 GWh |
| 2026-07-16 | 442 GWh |
| 2026-07-17 | 447 GWh |
| 2026-07-18 | 391 GWh |
| 2026-07-19 | 349 GWh |
| 2026-07-20 | 405 GWh |
| 2026-07-21 | 414 GWh |
| 2026-07-22 | 417 GWh |
| 2026-07-23 | 421 GWh |
| 2026-07-24 | 417 GWh |
| 2026-07-25 | 376 GWh |
| 2026-07-26 | 338 GWh |
| 2026-07-27 | 406 GWh |
| 2026-07-28 | 408 GWh |
| 2026-07-29 | 423 GWh |
| 2026-07-30 | 430 GWh |
| 2026-07-31 | 442 GWh |
| 2026-08-01 | 396 GWh |
| 2026-08-02 | 348 GWh |
| 2026-08-03 | 419 GWh |
| 2026-08-04 | 446 GWh |
| 2026-08-05 | 467 GWh |
| 2026-08-06 | 460 GWh |
| 2026-08-07 | 438 GWh |
| 2026-08-08 | 380 GWh |
| 2026-08-09 | 344 GWh |
| 2026-08-10 | 419 GWh |
| 2026-08-11 | 420 GWh |
| 2026-08-12 | 418 GWh |
| 2026-08-13 | 418 GWh |
| 2026-08-14 | 397 GWh |
| 2026-08-15 | 344 GWh |
| 2026-08-16 | 335 GWh |
| 2026-08-17 | 414 GWh |
| 2026-08-18 | 418 GWh |
| 2026-08-19 | 431 GWh |
| 2026-08-20 | 432 GWh |
| 2026-08-21 | 435 GWh |
| 2026-08-22 | 371 GWh |
| 2026-08-23 | 333 GWh |
| 2026-08-24 | 415 GWh |
| 2026-08-25 | 443 GWh |
| 2026-08-26 | 431 GWh |
| 2026-08-27 | 434 GWh |
| 2026-08-28 | 427 GWh |
| 2026-08-29 | 392 GWh |
| 2026-08-30 | 350 GWh |
| 2026-08-31 | 433 GWh |
| 2026-09-01 | 438 GWh |
| 2026-09-02 | 443 GWh |
| 2026-09-03 | 440 GWh |
| 2026-09-04 | 444 GWh |
| 2026-09-05 | 391 GWh |
| 2026-09-06 | 352 GWh |
| 2026-09-07 | 424 GWh |
| 2026-09-08 | 441 GWh |
| 2026-09-09 | 451 GWh |
| 2026-09-10 | 441 GWh |
| 2026-09-11 | 452 GWh |
| 2026-09-12 | 399 GWh |
| 2026-09-13 | 352 GWh |
| 2026-09-14 | 439 GWh |
| 2026-09-15 | 445 GWh |
| 2026-09-16 | 441 GWh |
| 2026-09-17 | 450 GWh |
| 2026-09-18 | 436 GWh |
| 2026-09-19 | 387 GWh |
| 2026-09-20 | 353 GWh |
| 2026-09-21 | 427 GWh |
| 2026-09-22 | 445 GWh |
| 2026-09-23 | 452 GWh |
| 2026-09-24 | 462 GWh |
| 2026-09-25 | 459 GWh |
| 2026-09-26 | 399 GWh |
| 2026-09-27 | 355 GWh |
| 2026-09-28 | 422 GWh |
| 2026-09-29 | 437 GWh |
| 2026-09-30 | 439 GWh |
| 2026-10-01 | 439 GWh |
| 2026-10-02 | 440 GWh |
| 2026-10-03 | 397 GWh |
| 2026-10-04 | 358 GWh |
| 2026-10-05 | 432 GWh |
| 2026-10-06 | 446 GWh |
| 2026-10-07 | 446 GWh |
| 2026-10-08 | 447 GWh |
| 2026-10-09 | 446 GWh |
| 2026-10-10 | 409 GWh |
| 2026-10-11 | 364 GWh |
| 2026-10-12 | 455 GWh |
| 2026-10-13 | 472 GWh |
| 2026-10-14 | 475 GWh |
| 2026-10-15 | 476 GWh |
| 2026-10-16 | 464 GWh |
| 2026-10-17 | 424 GWh |
| 2026-10-18 | 382 GWh |
| 2026-10-19 | 477 GWh |
| 2026-10-20 | 492 GWh |
| 2026-10-21 | 469 GWh |
| 2026-10-22 | 490 GWh |
| 2026-10-23 | 472 GWh |
| 2026-10-24 | 426 GWh |
| 2026-10-25 | 400 GWh |
| 2026-10-26 | 469 GWh |
| 2026-10-27 | 482 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Warsaw local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 132 TWh | 135 TWh | Coal 53.2% | 300 |
| 2025 | 158 TWh | 158 TWh | Coal 53.4% | 365 |
| 2024 (partial) | 163 TWh | 158 TWh | Coal 56.8% | 365 |
| 2023 | 166 TWh | 153 TWh | Coal 63.5% | 365 |
| 2022 | 172 TWh | 163 TWh | Coal 73.1% | 365 |
| 2021 | 175 TWh | 161 TWh | Coal 75.8% | 365 |
| 2020 | 165 TWh | 141 TWh | Coal 74.6% | 366 |
| 2019 | 169 TWh | 146 TWh | Coal 78.6% | 365 |
| 2018 | 171 TWh | 152 TWh | Coal 82.5% | 365 |
| 2017 | 168 TWh | 152 TWh | Coal 82.8% | 365 |
| 2016 | 164 TWh | 149 TWh | Coal 84.7% | 366 |
| 2015 | 161 TWh | 148 TWh | Coal 86.9% | 365 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Czechia | Poland exports | 871 GWh |
| Germany and Luxembourg | Poland imports | 665 GWh |
| Slovakia | Poland exports | 353 GWh |
| Lithuania | Poland imports | 92.6 GWh |
| Sweden South (SE4) | Poland imports | 487 MWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Poland, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Poland Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/pl/
World Power Monitor. Poland Electricity Demand and Generation Mix. Data as of 2026-10-28 11:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/pl/
@misc{wpm_zones_pl_2026,
title = {{Poland Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 11:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/pl/}
} Permalink: https://worldpowermonitor.com/zones/pl/
The Copy buttons add today's date as the access date.