France Electricity Demand and Generation Mix
France demand was 52,161 MW in the hour starting 28 Oct 2026, 13:00 CET (UTC+01:00). Nuclear was the largest source in the hour starting 28 Oct 2026, 13:00 CET (UTC+01:00), at 65% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- France is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 13:00 CET (UTC+01:00), demand in France was 52,161 MW, against a day-ahead forecast of 54,075 MW.
- Nuclear supplied 65.1% of France's generation in the hour starting 28 Oct 2026, 13:00 CET (UTC+01:00).
- The day-ahead price in France averaged EUR 266.72/MWh for delivery on 2026-10-29 (29 October 2026).
- Installed generating capacity in France was 164 GW in 2026, as reported to ENTSO-E.
- Demand in France totalled 428 TWh in 2024.
- Nuclear supplied 70.4% of France's generation in 2024.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 13:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 13:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Nuclear | 41,026 MW | 65.1% |
| Solar | 15,278 MW | 24.2% |
| Hydro | 2,798 MW | 4.4% |
| Wind | 1,855 MW | 2.9% |
| Gas | 1,362 MW | 2.2% |
| Other | 410 MW | 0.7% |
| Bioenergy | 279 MW | 0.4% |
| Oil | 37 MW | 0.1% |
| Coal | -8 MW | own use |
| Storage | -1,980 MW | charging |
| Total from these sources | 63,044 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Day-Ahead Price
Delivery day 2026-10-29 (29 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for France and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-29.
Last 30 Days, Hourly
Times in UTCShow the data table (686 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-29T23:00Z | 39,424 MW |
| 2026-09-30T00:00Z | 37,304 MW |
| 2026-09-30T01:00Z | 35,529 MW |
| 2026-09-30T02:00Z | 34,672 MW |
| 2026-09-30T03:00Z | 36,095 MW |
| 2026-09-30T04:00Z | 39,978 MW |
| 2026-09-30T05:00Z | 43,737 MW |
| 2026-09-30T06:00Z | 46,321 MW |
| 2026-09-30T07:00Z | 47,782 MW |
| 2026-09-30T08:00Z | 48,254 MW |
| 2026-09-30T09:00Z | 49,046 MW |
| 2026-09-30T10:00Z | 49,898 MW |
| 2026-09-30T11:00Z | 48,964 MW |
| 2026-09-30T12:00Z | 49,160 MW |
| 2026-09-30T13:00Z | 48,651 MW |
| 2026-09-30T14:00Z | 47,450 MW |
| 2026-09-30T15:00Z | 46,788 MW |
| 2026-09-30T16:00Z | 47,903 MW |
| 2026-09-30T17:00Z | 49,567 MW |
| 2026-09-30T18:00Z | 47,368 MW |
| 2026-09-30T19:00Z | 44,109 MW |
| 2026-09-30T20:00Z | 44,012 MW |
| 2026-09-30T21:00Z | 43,040 MW |
| 2026-09-30T22:00Z | 40,809 MW |
| 2026-09-30T23:00Z | 39,053 MW |
| 2026-10-01T00:00Z | 36,684 MW |
| 2026-10-01T01:00Z | 34,825 MW |
| 2026-10-01T02:00Z | 34,583 MW |
| 2026-10-01T03:00Z | 36,068 MW |
| 2026-10-01T04:00Z | 39,877 MW |
| 2026-10-01T05:00Z | 44,100 MW |
| 2026-10-01T06:00Z | 46,457 MW |
| 2026-10-01T07:00Z | 47,567 MW |
| 2026-10-01T08:00Z | 48,108 MW |
| 2026-10-01T09:00Z | 48,979 MW |
| 2026-10-01T10:00Z | 49,194 MW |
| 2026-10-01T11:00Z | 47,598 MW |
| 2026-10-01T12:00Z | 47,518 MW |
| 2026-10-01T13:00Z | 46,657 MW |
| 2026-10-01T14:00Z | 45,402 MW |
| 2026-10-01T15:00Z | 44,804 MW |
| 2026-10-01T16:00Z | 46,425 MW |
| 2026-10-01T17:00Z | 48,641 MW |
| 2026-10-01T18:00Z | 46,747 MW |
| 2026-10-01T19:00Z | 43,584 MW |
| 2026-10-01T20:00Z | 43,544 MW |
| 2026-10-01T21:00Z | 42,862 MW |
| 2026-10-01T22:00Z | 40,676 MW |
| 2026-10-01T23:00Z | 38,879 MW |
| 2026-10-02T00:00Z | 36,779 MW |
| 2026-10-02T01:00Z | 34,923 MW |
| 2026-10-02T02:00Z | 34,547 MW |
| 2026-10-02T03:00Z | 35,966 MW |
| 2026-10-02T04:00Z | 39,830 MW |
| 2026-10-02T05:00Z | 43,934 MW |
| 2026-10-02T06:00Z | 45,872 MW |
| 2026-10-02T07:00Z | 46,421 MW |
| 2026-10-02T08:00Z | 46,498 MW |
| 2026-10-02T09:00Z | 46,902 MW |
| 2026-10-02T10:00Z | 47,481 MW |
| 2026-10-02T11:00Z | 46,109 MW |
| 2026-10-02T12:00Z | 45,991 MW |
| 2026-10-02T13:00Z | 45,186 MW |
| 2026-10-02T14:00Z | 43,851 MW |
| 2026-10-02T15:00Z | 44,129 MW |
| 2026-10-02T16:00Z | 45,457 MW |
| 2026-10-02T17:00Z | 47,106 MW |
| 2026-10-02T18:00Z | 45,489 MW |
| 2026-10-02T19:00Z | 42,821 MW |
| 2026-10-02T20:00Z | 42,797 MW |
| 2026-10-02T21:00Z | 42,216 MW |
| 2026-10-02T22:00Z | 39,893 MW |
| 2026-10-02T23:00Z | 38,009 MW |
| 2026-10-03T00:00Z | 35,718 MW |
| 2026-10-03T01:00Z | 33,600 MW |
| 2026-10-03T02:00Z | 32,761 MW |
| 2026-10-03T03:00Z | 32,903 MW |
| 2026-10-03T04:00Z | 34,121 MW |
| 2026-10-03T05:00Z | 35,594 MW |
| 2026-10-03T06:00Z | 37,270 MW |
| 2026-10-03T07:00Z | 39,671 MW |
| 2026-10-03T08:00Z | 40,986 MW |
| 2026-10-03T09:00Z | 42,185 MW |
| 2026-10-03T10:00Z | 44,086 MW |
| 2026-10-03T11:00Z | 42,814 MW |
| 2026-10-03T12:00Z | 42,364 MW |
| 2026-10-03T13:00Z | 40,783 MW |
| 2026-10-03T14:00Z | 39,434 MW |
| 2026-10-03T15:00Z | 39,515 MW |
| 2026-10-03T16:00Z | 40,911 MW |
| 2026-10-03T17:00Z | 42,887 MW |
| 2026-10-03T18:00Z | 41,532 MW |
| 2026-10-03T19:00Z | 39,191 MW |
| 2026-10-03T20:00Z | 39,753 MW |
| 2026-10-03T21:00Z | 39,794 MW |
| 2026-10-03T22:00Z | 37,955 MW |
| 2026-10-03T23:00Z | 36,215 MW |
| 2026-10-04T00:00Z | 33,957 MW |
| 2026-10-04T01:00Z | 31,783 MW |
| 2026-10-04T02:00Z | 30,896 MW |
| 2026-10-04T03:00Z | 30,760 MW |
| 2026-10-04T04:00Z | 31,465 MW |
| 2026-10-04T05:00Z | 32,365 MW |
| 2026-10-04T06:00Z | 33,759 MW |
| 2026-10-04T07:00Z | 36,072 MW |
| 2026-10-04T08:00Z | 38,174 MW |
| 2026-10-04T09:00Z | 39,847 MW |
| 2026-10-04T10:00Z | 41,910 MW |
| 2026-10-04T11:00Z | 40,487 MW |
| 2026-10-04T12:00Z | 40,047 MW |
| 2026-10-04T13:00Z | 39,018 MW |
| 2026-10-04T14:00Z | 38,127 MW |
| 2026-10-04T15:00Z | 38,338 MW |
| 2026-10-04T16:00Z | 40,671 MW |
| 2026-10-04T17:00Z | 43,432 MW |
| 2026-10-04T18:00Z | 42,209 MW |
| 2026-10-04T19:00Z | 40,148 MW |
| 2026-10-04T20:00Z | 40,445 MW |
| 2026-10-04T21:00Z | 39,950 MW |
| 2026-10-04T22:00Z | 38,037 MW |
| 2026-10-04T23:00Z | 36,471 MW |
| 2026-10-05T00:00Z | 34,493 MW |
| 2026-10-05T01:00Z | 32,828 MW |
| 2026-10-05T02:00Z | 32,623 MW |
| 2026-10-05T03:00Z | 34,610 MW |
| 2026-10-05T04:00Z | 38,769 MW |
| 2026-10-05T05:00Z | 43,394 MW |
| 2026-10-05T06:00Z | 45,358 MW |
| 2026-10-05T07:00Z | 45,964 MW |
| 2026-10-05T08:00Z | 46,651 MW |
| 2026-10-05T09:00Z | 47,521 MW |
| 2026-10-05T10:00Z | 48,656 MW |
| 2026-10-05T11:00Z | 47,672 MW |
| 2026-10-05T12:00Z | 48,093 MW |
| 2026-10-05T13:00Z | 47,057 MW |
| 2026-10-05T14:00Z | 45,550 MW |
| 2026-10-05T15:00Z | 45,550 MW |
| 2026-10-05T16:00Z | 47,273 MW |
| 2026-10-05T17:00Z | 49,242 MW |
| 2026-10-05T18:00Z | 46,944 MW |
| 2026-10-05T19:00Z | 43,580 MW |
| 2026-10-05T20:00Z | 43,365 MW |
| 2026-10-05T21:00Z | 42,508 MW |
| 2026-10-05T22:00Z | 40,322 MW |
| 2026-10-05T23:00Z | 38,613 MW |
| 2026-10-06T00:00Z | 36,596 MW |
| 2026-10-06T01:00Z | 34,706 MW |
| 2026-10-06T02:00Z | 34,318 MW |
| 2026-10-06T03:00Z | 35,918 MW |
| 2026-10-06T04:00Z | 39,873 MW |
| 2026-10-06T05:00Z | 44,411 MW |
| 2026-10-06T06:00Z | 46,093 MW |
| 2026-10-06T07:00Z | 46,626 MW |
| 2026-10-06T08:00Z | 47,330 MW |
| 2026-10-06T09:00Z | 48,553 MW |
| 2026-10-06T10:00Z | 49,144 MW |
| 2026-10-06T11:00Z | 48,334 MW |
| 2026-10-06T12:00Z | 48,620 MW |
| 2026-10-06T13:00Z | 47,873 MW |
| 2026-10-06T14:00Z | 46,621 MW |
| 2026-10-06T15:00Z | 46,203 MW |
| 2026-10-06T16:00Z | 47,551 MW |
| 2026-10-06T17:00Z | 49,371 MW |
| 2026-10-06T18:00Z | 46,711 MW |
| 2026-10-06T19:00Z | 43,145 MW |
| 2026-10-06T20:00Z | 42,893 MW |
| 2026-10-06T21:00Z | 41,994 MW |
| 2026-10-06T22:00Z | 39,876 MW |
| 2026-10-06T23:00Z | 38,544 MW |
| 2026-10-07T00:00Z | 36,379 MW |
| 2026-10-07T01:00Z | 34,622 MW |
| 2026-10-07T02:00Z | 34,246 MW |
| 2026-10-07T03:00Z | 35,677 MW |
| 2026-10-07T04:00Z | 39,383 MW |
| 2026-10-07T05:00Z | 43,670 MW |
| 2026-10-07T06:00Z | 46,216 MW |
| 2026-10-07T07:00Z | 48,042 MW |
| 2026-10-07T08:00Z | 48,975 MW |
| 2026-10-07T09:00Z | 49,880 MW |
| 2026-10-07T10:00Z | 50,712 MW |
| 2026-10-07T11:00Z | 49,309 MW |
| 2026-10-07T12:00Z | 49,281 MW |
| 2026-10-07T13:00Z | 48,052 MW |
| 2026-10-07T14:00Z | 46,585 MW |
| 2026-10-07T15:00Z | 46,350 MW |
| 2026-10-07T16:00Z | 48,654 MW |
| 2026-10-07T17:00Z | 50,361 MW |
| 2026-10-07T18:00Z | 47,328 MW |
| 2026-10-07T19:00Z | 44,088 MW |
| 2026-10-07T20:00Z | 43,902 MW |
| 2026-10-07T21:00Z | 43,045 MW |
| 2026-10-07T22:00Z | 41,197 MW |
| 2026-10-07T23:00Z | 39,260 MW |
| 2026-10-08T00:00Z | 36,837 MW |
| 2026-10-08T01:00Z | 35,246 MW |
| 2026-10-08T02:00Z | 34,906 MW |
| 2026-10-08T03:00Z | 36,043 MW |
| 2026-10-08T04:00Z | 40,333 MW |
| 2026-10-08T05:00Z | 44,420 MW |
| 2026-10-08T06:00Z | 46,738 MW |
| 2026-10-08T07:00Z | 47,693 MW |
| 2026-10-08T08:00Z | 48,516 MW |
| 2026-10-08T09:00Z | 49,830 MW |
| 2026-10-08T10:00Z | 50,070 MW |
| 2026-10-08T11:00Z | 48,700 MW |
| 2026-10-08T12:00Z | 47,835 MW |
| 2026-10-08T13:00Z | 46,730 MW |
| 2026-10-08T14:00Z | 45,295 MW |
| 2026-10-08T15:00Z | 45,168 MW |
| 2026-10-08T16:00Z | 47,709 MW |
| 2026-10-08T17:00Z | 49,964 MW |
| 2026-10-08T18:00Z | 47,848 MW |
| 2026-10-08T19:00Z | 44,498 MW |
| 2026-10-08T20:00Z | 44,484 MW |
| 2026-10-08T21:00Z | 43,610 MW |
| 2026-10-08T22:00Z | 41,564 MW |
| 2026-10-08T23:00Z | 39,858 MW |
| 2026-10-09T00:00Z | 37,880 MW |
| 2026-10-09T01:00Z | 35,803 MW |
| 2026-10-09T02:00Z | 35,321 MW |
| 2026-10-09T03:00Z | 37,209 MW |
| 2026-10-09T04:00Z | 40,983 MW |
| 2026-10-09T05:00Z | 45,421 MW |
| 2026-10-09T06:00Z | 47,831 MW |
| 2026-10-09T07:00Z | 49,037 MW |
| 2026-10-09T08:00Z | 49,503 MW |
| 2026-10-09T09:00Z | 49,684 MW |
| 2026-10-09T10:00Z | 49,858 MW |
| 2026-10-09T11:00Z | 48,609 MW |
| 2026-10-09T12:00Z | 48,890 MW |
| 2026-10-09T13:00Z | 47,832 MW |
| 2026-10-09T14:00Z | 46,047 MW |
| 2026-10-09T15:00Z | 46,348 MW |
| 2026-10-09T16:00Z | 47,903 MW |
| 2026-10-09T17:00Z | 49,664 MW |
| 2026-10-09T18:00Z | 47,352 MW |
| 2026-10-09T19:00Z | 44,534 MW |
| 2026-10-09T20:00Z | 44,835 MW |
| 2026-10-09T21:00Z | 44,305 MW |
| 2026-10-09T22:00Z | 42,000 MW |
| 2026-10-09T23:00Z | 39,823 MW |
| 2026-10-10T00:00Z | 37,561 MW |
| 2026-10-10T01:00Z | 34,966 MW |
| 2026-10-10T02:00Z | 33,786 MW |
| 2026-10-10T03:00Z | 34,003 MW |
| 2026-10-10T04:00Z | 35,549 MW |
| 2026-10-10T05:00Z | 37,298 MW |
| 2026-10-10T06:00Z | 39,030 MW |
| 2026-10-10T07:00Z | 40,952 MW |
| 2026-10-10T08:00Z | 42,292 MW |
| 2026-10-10T09:00Z | 43,398 MW |
| 2026-10-10T10:00Z | 44,897 MW |
| 2026-10-10T11:00Z | 43,162 MW |
| 2026-10-10T12:00Z | 42,500 MW |
| 2026-10-10T13:00Z | 40,618 MW |
| 2026-10-10T14:00Z | 39,274 MW |
| 2026-10-10T15:00Z | 39,776 MW |
| 2026-10-10T16:00Z | 42,165 MW |
| 2026-10-10T17:00Z | 44,760 MW |
| 2026-10-10T18:00Z | 43,208 MW |
| 2026-10-10T19:00Z | 40,994 MW |
| 2026-10-10T20:00Z | 41,781 MW |
| 2026-10-10T21:00Z | 41,802 MW |
| 2026-10-10T22:00Z | 40,181 MW |
| 2026-10-10T23:00Z | 38,087 MW |
| 2026-10-11T00:00Z | 35,509 MW |
| 2026-10-11T01:00Z | 33,472 MW |
| 2026-10-11T02:00Z | 32,707 MW |
| 2026-10-11T03:00Z | 32,602 MW |
| 2026-10-11T04:00Z | 33,484 MW |
| 2026-10-11T05:00Z | 34,603 MW |
| 2026-10-11T06:00Z | 36,041 MW |
| 2026-10-11T07:00Z | 38,058 MW |
| 2026-10-11T08:00Z | 39,909 MW |
| 2026-10-11T09:00Z | 41,734 MW |
| 2026-10-11T10:00Z | 43,840 MW |
| 2026-10-11T11:00Z | 42,798 MW |
| 2026-10-11T12:00Z | 42,428 MW |
| 2026-10-11T13:00Z | 41,445 MW |
| 2026-10-11T14:00Z | 39,863 MW |
| 2026-10-11T15:00Z | 39,843 MW |
| 2026-10-11T16:00Z | 42,676 MW |
| 2026-10-11T17:00Z | 46,205 MW |
| 2026-10-11T18:00Z | 44,571 MW |
| 2026-10-11T19:00Z | 42,399 MW |
| 2026-10-11T20:00Z | 42,403 MW |
| 2026-10-11T21:00Z | 42,093 MW |
| 2026-10-11T22:00Z | 40,388 MW |
| 2026-10-11T23:00Z | 38,845 MW |
| 2026-10-12T00:00Z | 36,878 MW |
| 2026-10-12T01:00Z | 34,864 MW |
| 2026-10-12T02:00Z | 34,656 MW |
| 2026-10-12T03:00Z | 36,845 MW |
| 2026-10-12T04:00Z | 41,666 MW |
| 2026-10-12T05:00Z | 46,777 MW |
| 2026-10-12T06:00Z | 48,963 MW |
| 2026-10-12T07:00Z | 49,395 MW |
| 2026-10-12T08:00Z | 49,500 MW |
| 2026-10-12T09:00Z | 49,134 MW |
| 2026-10-12T10:00Z | 49,495 MW |
| 2026-10-12T11:00Z | 48,358 MW |
| 2026-10-12T12:00Z | 48,553 MW |
| 2026-10-12T13:00Z | 47,419 MW |
| 2026-10-12T14:00Z | 45,744 MW |
| 2026-10-12T15:00Z | 45,374 MW |
| 2026-10-12T16:00Z | 48,168 MW |
| 2026-10-12T17:00Z | 51,126 MW |
| 2026-10-12T18:00Z | 48,427 MW |
| 2026-10-12T19:00Z | 45,195 MW |
| 2026-10-12T20:00Z | 44,799 MW |
| 2026-10-12T21:00Z | 43,910 MW |
| 2026-10-12T22:00Z | 41,781 MW |
| 2026-10-12T23:00Z | 40,233 MW |
| 2026-10-13T00:00Z | 38,221 MW |
| 2026-10-13T01:00Z | 36,447 MW |
| 2026-10-13T02:00Z | 36,117 MW |
| 2026-10-13T03:00Z | 37,528 MW |
| 2026-10-13T04:00Z | 41,654 MW |
| 2026-10-13T05:00Z | 46,225 MW |
| 2026-10-13T06:00Z | 48,311 MW |
| 2026-10-13T07:00Z | 49,253 MW |
| 2026-10-13T08:00Z | 49,994 MW |
| 2026-10-13T09:00Z | 49,627 MW |
| 2026-10-13T10:00Z | 49,807 MW |
| 2026-10-13T11:00Z | 48,729 MW |
| 2026-10-13T12:00Z | 48,900 MW |
| 2026-10-13T13:00Z | 47,604 MW |
| 2026-10-13T14:00Z | 45,975 MW |
| 2026-10-13T15:00Z | 45,488 MW |
| 2026-10-13T16:00Z | 47,204 MW |
| 2026-10-13T17:00Z | 50,971 MW |
| 2026-10-13T18:00Z | 48,102 MW |
| 2026-10-13T19:00Z | 44,890 MW |
| 2026-10-13T20:00Z | 44,563 MW |
| 2026-10-13T21:00Z | 44,039 MW |
| 2026-10-13T22:00Z | 41,987 MW |
| 2026-10-13T23:00Z | 39,919 MW |
| 2026-10-14T00:00Z | 37,731 MW |
| 2026-10-14T01:00Z | 35,976 MW |
| 2026-10-14T02:00Z | 35,527 MW |
| 2026-10-14T03:00Z | 37,224 MW |
| 2026-10-14T04:00Z | 41,379 MW |
| 2026-10-14T05:00Z | 46,089 MW |
| 2026-10-14T06:00Z | 48,619 MW |
| 2026-10-14T07:00Z | 49,301 MW |
| 2026-10-14T08:00Z | 49,470 MW |
| 2026-10-14T09:00Z | 49,789 MW |
| 2026-10-14T10:00Z | 49,788 MW |
| 2026-10-14T11:00Z | 48,623 MW |
| 2026-10-14T12:00Z | 48,623 MW |
| 2026-10-14T13:00Z | 47,525 MW |
| 2026-10-14T14:00Z | 46,043 MW |
| 2026-10-14T15:00Z | 45,911 MW |
| 2026-10-14T16:00Z | 48,547 MW |
| 2026-10-14T17:00Z | 51,425 MW |
| 2026-10-14T18:00Z | 48,937 MW |
| 2026-10-14T19:00Z | 45,409 MW |
| 2026-10-14T20:00Z | 44,822 MW |
| 2026-10-14T21:00Z | 44,383 MW |
| 2026-10-14T22:00Z | 42,316 MW |
| 2026-10-14T23:00Z | 40,573 MW |
| 2026-10-15T00:00Z | 38,525 MW |
| 2026-10-15T01:00Z | 36,543 MW |
| 2026-10-15T02:00Z | 36,023 MW |
| 2026-10-15T03:00Z | 37,525 MW |
| 2026-10-15T04:00Z | 41,795 MW |
| 2026-10-15T05:00Z | 46,428 MW |
| 2026-10-15T06:00Z | 48,399 MW |
| 2026-10-15T07:00Z | 48,995 MW |
| 2026-10-15T08:00Z | 49,163 MW |
| 2026-10-15T09:00Z | 49,598 MW |
| 2026-10-15T10:00Z | 49,455 MW |
| 2026-10-15T11:00Z | 48,045 MW |
| 2026-10-15T12:00Z | 48,287 MW |
| 2026-10-15T13:00Z | 47,501 MW |
| 2026-10-15T14:00Z | 46,137 MW |
| 2026-10-15T15:00Z | 45,786 MW |
| 2026-10-15T16:00Z | 47,821 MW |
| 2026-10-15T17:00Z | 50,422 MW |
| 2026-10-15T18:00Z | 47,847 MW |
| 2026-10-15T19:00Z | 44,580 MW |
| 2026-10-15T20:00Z | 44,433 MW |
| 2026-10-15T21:00Z | 43,845 MW |
| 2026-10-15T22:00Z | 41,711 MW |
| 2026-10-15T23:00Z | 39,975 MW |
| 2026-10-16T00:00Z | 37,696 MW |
| 2026-10-16T01:00Z | 35,751 MW |
| 2026-10-16T02:00Z | 35,348 MW |
| 2026-10-16T03:00Z | 36,943 MW |
| 2026-10-16T04:00Z | 40,784 MW |
| 2026-10-16T05:00Z | 45,589 MW |
| 2026-10-16T06:00Z | 47,691 MW |
| 2026-10-16T07:00Z | 48,162 MW |
| 2026-10-16T08:00Z | 48,277 MW |
| 2026-10-16T09:00Z | 48,625 MW |
| 2026-10-16T10:00Z | 49,094 MW |
| 2026-10-16T11:00Z | 47,519 MW |
| 2026-10-16T12:00Z | 47,820 MW |
| 2026-10-16T13:00Z | 46,746 MW |
| 2026-10-16T14:00Z | 44,909 MW |
| 2026-10-16T15:00Z | 45,237 MW |
| 2026-10-16T16:00Z | 47,053 MW |
| 2026-10-16T17:00Z | 49,075 MW |
| 2026-10-16T18:00Z | 46,629 MW |
| 2026-10-16T19:00Z | 43,855 MW |
| 2026-10-16T20:00Z | 44,094 MW |
| 2026-10-16T21:00Z | 43,483 MW |
| 2026-10-16T22:00Z | 41,359 MW |
| 2026-10-16T23:00Z | 39,573 MW |
| 2026-10-17T00:00Z | 37,164 MW |
| 2026-10-17T01:00Z | 35,005 MW |
| 2026-10-17T02:00Z | 34,118 MW |
| 2026-10-17T03:00Z | 34,636 MW |
| 2026-10-17T04:00Z | 35,963 MW |
| 2026-10-17T05:00Z | 37,610 MW |
| 2026-10-17T06:00Z | 39,671 MW |
| 2026-10-17T07:00Z | 41,669 MW |
| 2026-10-17T08:00Z | 42,802 MW |
| 2026-10-17T09:00Z | 44,055 MW |
| 2026-10-17T10:00Z | 45,479 MW |
| 2026-10-17T11:00Z | 43,975 MW |
| 2026-10-17T12:00Z | 43,752 MW |
| 2026-10-17T13:00Z | 42,607 MW |
| 2026-10-17T14:00Z | 40,858 MW |
| 2026-10-17T15:00Z | 41,026 MW |
| 2026-10-17T16:00Z | 42,985 MW |
| 2026-10-17T17:00Z | 45,613 MW |
| 2026-10-17T18:00Z | 43,925 MW |
| 2026-10-17T19:00Z | 41,959 MW |
| 2026-10-17T20:00Z | 42,543 MW |
| 2026-10-17T21:00Z | 42,694 MW |
| 2026-10-17T22:00Z | 40,721 MW |
| 2026-10-17T23:00Z | 39,181 MW |
| 2026-10-18T00:00Z | 37,212 MW |
| 2026-10-18T01:00Z | 35,290 MW |
| 2026-10-18T02:00Z | 34,280 MW |
| 2026-10-18T03:00Z | 34,570 MW |
| 2026-10-18T04:00Z | 35,774 MW |
| 2026-10-18T05:00Z | 36,948 MW |
| 2026-10-18T06:00Z | 38,424 MW |
| 2026-10-18T07:00Z | 40,699 MW |
| 2026-10-18T08:00Z | 42,886 MW |
| 2026-10-18T09:00Z | 44,706 MW |
| 2026-10-18T10:00Z | 46,541 MW |
| 2026-10-18T11:00Z | 44,581 MW |
| 2026-10-18T12:00Z | 43,509 MW |
| 2026-10-18T13:00Z | 42,407 MW |
| 2026-10-18T14:00Z | 41,047 MW |
| 2026-10-18T15:00Z | 41,414 MW |
| 2026-10-18T16:00Z | 44,567 MW |
| 2026-10-18T17:00Z | 48,323 MW |
| 2026-10-18T18:00Z | 46,623 MW |
| 2026-10-18T19:00Z | 44,758 MW |
| 2026-10-18T20:00Z | 45,054 MW |
| 2026-10-18T21:00Z | 44,738 MW |
| 2026-10-18T22:00Z | 43,119 MW |
| 2026-10-18T23:00Z | 41,564 MW |
| 2026-10-19T00:00Z | 39,339 MW |
| 2026-10-19T01:00Z | 37,471 MW |
| 2026-10-19T02:00Z | 37,450 MW |
| 2026-10-19T03:00Z | 39,675 MW |
| 2026-10-19T04:00Z | 43,917 MW |
| 2026-10-19T05:00Z | 48,688 MW |
| 2026-10-19T06:00Z | 52,255 MW |
| 2026-10-19T07:00Z | 53,916 MW |
| 2026-10-19T08:00Z | 54,615 MW |
| 2026-10-19T09:00Z | 55,133 MW |
| 2026-10-19T10:00Z | 55,707 MW |
| 2026-10-19T11:00Z | 54,009 MW |
| 2026-10-19T12:00Z | 54,407 MW |
| 2026-10-19T13:00Z | 52,615 MW |
| 2026-10-19T14:00Z | 50,537 MW |
| 2026-10-19T15:00Z | 50,089 MW |
| 2026-10-19T16:00Z | 52,978 MW |
| 2026-10-19T17:00Z | 56,219 MW |
| 2026-10-19T18:00Z | 53,092 MW |
| 2026-10-19T19:00Z | 49,364 MW |
| 2026-10-19T20:00Z | 48,906 MW |
| 2026-10-19T21:00Z | 48,248 MW |
| 2026-10-19T22:00Z | 45,975 MW |
| 2026-10-19T23:00Z | 44,128 MW |
| 2026-10-20T00:00Z | 41,976 MW |
| 2026-10-20T01:00Z | 39,630 MW |
| 2026-10-20T02:00Z | 39,091 MW |
| 2026-10-20T03:00Z | 40,809 MW |
| 2026-10-20T04:00Z | 44,781 MW |
| 2026-10-20T05:00Z | 49,326 MW |
| 2026-10-20T06:00Z | 52,634 MW |
| 2026-10-20T07:00Z | 54,339 MW |
| 2026-10-20T08:00Z | 54,656 MW |
| 2026-10-20T09:00Z | 55,324 MW |
| 2026-10-20T10:00Z | 55,476 MW |
| 2026-10-20T11:00Z | 53,991 MW |
| 2026-10-20T12:00Z | 53,732 MW |
| 2026-10-20T13:00Z | 52,105 MW |
| 2026-10-20T14:00Z | 50,276 MW |
| 2026-10-20T15:00Z | 50,118 MW |
| 2026-10-20T16:00Z | 53,042 MW |
| 2026-10-20T17:00Z | 55,776 MW |
| 2026-10-20T18:00Z | 52,734 MW |
| 2026-10-20T19:00Z | 49,100 MW |
| 2026-10-20T20:00Z | 48,889 MW |
| 2026-10-20T21:00Z | 48,008 MW |
| 2026-10-20T22:00Z | 46,061 MW |
| 2026-10-20T23:00Z | 44,457 MW |
| 2026-10-21T00:00Z | 42,414 MW |
| 2026-10-21T01:00Z | 40,514 MW |
| 2026-10-21T02:00Z | 40,040 MW |
| 2026-10-21T03:00Z | 41,770 MW |
| 2026-10-21T04:00Z | 46,062 MW |
| 2026-10-21T05:00Z | 50,157 MW |
| 2026-10-21T06:00Z | 52,932 MW |
| 2026-10-21T07:00Z | 54,253 MW |
| 2026-10-21T08:00Z | 54,978 MW |
| 2026-10-21T09:00Z | 55,912 MW |
| 2026-10-21T10:00Z | 56,044 MW |
| 2026-10-21T11:00Z | 55,027 MW |
| 2026-10-21T12:00Z | 54,543 MW |
| 2026-10-21T13:00Z | 53,015 MW |
| 2026-10-21T14:00Z | 51,499 MW |
| 2026-10-21T15:00Z | 50,599 MW |
| 2026-10-21T16:00Z | 53,144 MW |
| 2026-10-21T17:00Z | 57,199 MW |
| 2026-10-21T18:00Z | 54,107 MW |
| 2026-10-21T19:00Z | 51,024 MW |
| 2026-10-21T20:00Z | 50,973 MW |
| 2026-10-21T21:00Z | 50,218 MW |
| 2026-10-21T22:00Z | 48,148 MW |
| 2026-10-21T23:00Z | 46,284 MW |
| 2026-10-22T00:00Z | 44,370 MW |
| 2026-10-22T01:00Z | 42,258 MW |
| 2026-10-22T02:00Z | 41,848 MW |
| 2026-10-22T03:00Z | 43,827 MW |
| 2026-10-22T04:00Z | 47,834 MW |
| 2026-10-22T05:00Z | 52,226 MW |
| 2026-10-22T06:00Z | 55,173 MW |
| 2026-10-22T07:00Z | 55,697 MW |
| 2026-10-22T08:00Z | 55,722 MW |
| 2026-10-22T09:00Z | 55,883 MW |
| 2026-10-22T10:00Z | 55,716 MW |
| 2026-10-22T11:00Z | 54,259 MW |
| 2026-10-22T12:00Z | 54,120 MW |
| 2026-10-22T13:00Z | 52,332 MW |
| 2026-10-22T14:00Z | 50,028 MW |
| 2026-10-22T15:00Z | 49,227 MW |
| 2026-10-22T16:00Z | 52,600 MW |
| 2026-10-22T17:00Z | 55,928 MW |
| 2026-10-22T18:00Z | 52,923 MW |
| 2026-10-22T19:00Z | 49,782 MW |
| 2026-10-22T20:00Z | 49,730 MW |
| 2026-10-22T21:00Z | 49,093 MW |
| 2026-10-22T22:00Z | 47,140 MW |
| 2026-10-22T23:00Z | 45,663 MW |
| 2026-10-23T00:00Z | 43,775 MW |
| 2026-10-23T01:00Z | 41,632 MW |
| 2026-10-23T02:00Z | 41,202 MW |
| 2026-10-23T03:00Z | 42,654 MW |
| 2026-10-23T04:00Z | 46,359 MW |
| 2026-10-23T05:00Z | 50,461 MW |
| 2026-10-23T06:00Z | 53,561 MW |
| 2026-10-23T07:00Z | 55,009 MW |
| 2026-10-23T08:00Z | 56,507 MW |
| 2026-10-23T09:00Z | 57,657 MW |
| 2026-10-23T10:00Z | 57,645 MW |
| 2026-10-23T11:00Z | 56,427 MW |
| 2026-10-23T12:00Z | 56,132 MW |
| 2026-10-23T13:00Z | 54,714 MW |
| 2026-10-23T14:00Z | 52,310 MW |
| 2026-10-23T15:00Z | 51,841 MW |
| 2026-10-23T16:00Z | 53,972 MW |
| 2026-10-23T17:00Z | 56,547 MW |
| 2026-10-23T18:00Z | 54,229 MW |
| 2026-10-23T19:00Z | 51,290 MW |
| 2026-10-23T20:00Z | 51,403 MW |
| 2026-10-23T21:00Z | 51,052 MW |
| 2026-10-23T22:00Z | 48,790 MW |
| 2026-10-23T23:00Z | 46,978 MW |
| 2026-10-24T00:00Z | 44,634 MW |
| 2026-10-24T01:00Z | 42,024 MW |
| 2026-10-24T02:00Z | 40,980 MW |
| 2026-10-24T03:00Z | 41,085 MW |
| 2026-10-24T04:00Z | 42,573 MW |
| 2026-10-24T05:00Z | 44,480 MW |
| 2026-10-24T06:00Z | 46,177 MW |
| 2026-10-24T07:00Z | 48,317 MW |
| 2026-10-24T08:00Z | 49,601 MW |
| 2026-10-24T09:00Z | 50,571 MW |
| 2026-10-24T10:00Z | 51,890 MW |
| 2026-10-24T11:00Z | 50,516 MW |
| 2026-10-24T12:00Z | 50,273 MW |
| 2026-10-24T13:00Z | 48,798 MW |
| 2026-10-24T14:00Z | 48,024 MW |
| 2026-10-24T15:00Z | 48,280 MW |
| 2026-10-24T16:00Z | 50,987 MW |
| 2026-10-24T17:00Z | 53,455 MW |
| 2026-10-24T18:00Z | 51,051 MW |
| 2026-10-24T19:00Z | 48,669 MW |
| 2026-10-24T20:00Z | 49,033 MW |
| 2026-10-24T21:00Z | 48,998 MW |
| 2026-10-24T22:00Z | 46,758 MW |
| 2026-10-24T23:00Z | 44,300 MW |
| 2026-10-25T00:00Z | 41,588 MW |
| 2026-10-25T01:00Z | 39,412 MW |
| 2026-10-25T02:00Z | 37,630 MW |
| 2026-10-25T03:00Z | 37,026 MW |
| 2026-10-25T04:00Z | 37,801 MW |
| 2026-10-25T05:00Z | 39,124 MW |
| 2026-10-25T06:00Z | 40,082 MW |
| 2026-10-25T07:00Z | 42,459 MW |
| 2026-10-25T08:00Z | 45,045 MW |
| 2026-10-25T09:00Z | 46,057 MW |
| 2026-10-25T10:00Z | 47,368 MW |
| 2026-10-25T11:00Z | 48,505 MW |
| 2026-10-25T12:00Z | 46,190 MW |
| 2026-10-25T13:00Z | 45,312 MW |
| 2026-10-25T14:00Z | 44,164 MW |
| 2026-10-25T15:00Z | 43,201 MW |
| 2026-10-25T16:00Z | 44,884 MW |
| 2026-10-25T17:00Z | 49,382 MW |
| 2026-10-25T18:00Z | 50,875 MW |
| 2026-10-25T19:00Z | 48,574 MW |
| 2026-10-25T20:00Z | 46,795 MW |
| 2026-10-25T21:00Z | 47,126 MW |
| 2026-10-25T22:00Z | 47,119 MW |
| 2026-10-25T23:00Z | 45,845 MW |
| 2026-10-26T00:00Z | 44,571 MW |
| 2026-10-26T01:00Z | 41,884 MW |
| 2026-10-26T02:00Z | 39,802 MW |
| 2026-10-26T03:00Z | 40,014 MW |
| 2026-10-26T04:00Z | 42,573 MW |
| 2026-10-26T05:00Z | 47,124 MW |
| 2026-10-26T06:00Z | 50,728 MW |
| 2026-10-26T07:00Z | 53,536 MW |
| 2026-10-26T08:00Z | 54,681 MW |
| 2026-10-26T09:00Z | 54,698 MW |
| 2026-10-26T10:00Z | 54,905 MW |
| 2026-10-26T11:00Z | 55,892 MW |
| 2026-10-26T12:00Z | 54,725 MW |
| 2026-10-26T13:00Z | 54,805 MW |
| 2026-10-26T14:00Z | 53,368 MW |
| 2026-10-26T15:00Z | 51,817 MW |
| 2026-10-26T16:00Z | 52,356 MW |
| 2026-10-26T17:00Z | 56,382 MW |
| 2026-10-26T18:00Z | 56,894 MW |
| 2026-10-26T19:00Z | 52,987 MW |
| 2026-10-26T20:00Z | 49,713 MW |
| 2026-10-26T21:00Z | 49,506 MW |
| 2026-10-26T22:00Z | 48,929 MW |
| 2026-10-26T23:00Z | 46,739 MW |
| 2026-10-27T00:00Z | 45,101 MW |
| 2026-10-27T01:00Z | 42,923 MW |
| 2026-10-27T02:00Z | 41,118 MW |
| 2026-10-27T03:00Z | 40,624 MW |
| 2026-10-27T04:00Z | 42,250 MW |
| 2026-10-27T05:00Z | 46,490 MW |
| 2026-10-27T06:00Z | 49,912 MW |
| 2026-10-27T07:00Z | 51,677 MW |
| 2026-10-27T08:00Z | 51,876 MW |
| 2026-10-27T09:00Z | 51,435 MW |
| 2026-10-27T10:00Z | 51,803 MW |
| 2026-10-27T11:00Z | 52,854 MW |
| 2026-10-27T12:00Z | 51,656 MW |
| 2026-10-27T13:00Z | 51,784 MW |
| 2026-10-27T14:00Z | 50,695 MW |
| 2026-10-27T15:00Z | 49,701 MW |
| 2026-10-27T16:00Z | 50,185 MW |
| 2026-10-27T17:00Z | 54,314 MW |
| 2026-10-27T18:00Z | 54,985 MW |
| 2026-10-27T19:00Z | 51,361 MW |
| 2026-10-27T20:00Z | 48,449 MW |
| 2026-10-27T21:00Z | 48,468 MW |
| 2026-10-27T22:00Z | 48,113 MW |
| 2026-10-27T23:00Z | 46,129 MW |
| 2026-10-28T00:00Z | 44,584 MW |
| 2026-10-28T01:00Z | 42,568 MW |
| 2026-10-28T02:00Z | 40,660 MW |
| 2026-10-28T03:00Z | 40,668 MW |
| 2026-10-28T04:00Z | 43,037 MW |
| 2026-10-28T05:00Z | 47,438 MW |
| 2026-10-28T06:00Z | 51,333 MW |
| 2026-10-28T07:00Z | 53,549 MW |
| 2026-10-28T08:00Z | 53,728 MW |
| 2026-10-28T09:00Z | 53,706 MW |
| 2026-10-28T10:00Z | 53,443 MW |
| 2026-10-28T11:00Z | 53,807 MW |
| 2026-10-28T12:00Z | 52,161 MW |
Show the data table (686 rows)
| Hour starting (UTC) | Nuclear | Wind | Solar | Hydro | Gas |
|---|---|---|---|---|---|
| 2026-09-29T23:00Z | 33,817 MW | n/a | 0 MW | 2,379 MW | 662 MW |
| 2026-09-30T00:00Z | 32,556 MW | n/a | 0 MW | 2,139 MW | 451 MW |
| 2026-09-30T01:00Z | 32,053 MW | n/a | 0 MW | 2,092 MW | 284 MW |
| 2026-09-30T02:00Z | 31,154 MW | n/a | 0 MW | 2,094 MW | 281 MW |
| 2026-09-30T03:00Z | 30,900 MW | n/a | 0 MW | 2,315 MW | 410 MW |
| 2026-09-30T04:00Z | 31,623 MW | n/a | 0 MW | 2,723 MW | 2,157 MW |
| 2026-09-30T05:00Z | 31,740 MW | n/a | 205 MW | 2,994 MW | 3,227 MW |
| 2026-09-30T06:00Z | 31,728 MW | n/a | 998 MW | 2,703 MW | 3,104 MW |
| 2026-09-30T07:00Z | 31,507 MW | n/a | 2,776 MW | 2,724 MW | 2,319 MW |
| 2026-09-30T08:00Z | 30,794 MW | n/a | 4,878 MW | 2,553 MW | 1,774 MW |
| 2026-09-30T09:00Z | 29,737 MW | n/a | 6,674 MW | 2,296 MW | 1,952 MW |
| 2026-09-30T10:00Z | 29,770 MW | n/a | 7,801 MW | 2,289 MW | 1,492 MW |
| 2026-09-30T11:00Z | 29,879 MW | n/a | 8,204 MW | 2,414 MW | 1,145 MW |
| 2026-09-30T12:00Z | 29,915 MW | n/a | 7,799 MW | 2,119 MW | 2,100 MW |
| 2026-09-30T13:00Z | 30,125 MW | n/a | 6,924 MW | 2,243 MW | 2,063 MW |
| 2026-09-30T14:00Z | 30,389 MW | n/a | 5,327 MW | 3,324 MW | 2,274 MW |
| 2026-09-30T15:00Z | 30,469 MW | n/a | 3,281 MW | 3,752 MW | 3,106 MW |
| 2026-09-30T16:00Z | 30,684 MW | n/a | 1,660 MW | 4,366 MW | 3,708 MW |
| 2026-09-30T17:00Z | 31,028 MW | n/a | 479 MW | 4,871 MW | 4,077 MW |
| 2026-09-30T18:00Z | 31,164 MW | n/a | 201 MW | 4,679 MW | 3,863 MW |
| 2026-09-30T19:00Z | 31,208 MW | n/a | 0 MW | 3,996 MW | 3,756 MW |
| 2026-09-30T20:00Z | 31,254 MW | n/a | 0 MW | 3,243 MW | 3,741 MW |
| 2026-09-30T21:00Z | 31,274 MW | n/a | 0 MW | 3,105 MW | 3,544 MW |
| 2026-09-30T22:00Z | 31,312 MW | n/a | 0 MW | 3,003 MW | 2,904 MW |
| 2026-09-30T23:00Z | 31,340 MW | n/a | 0 MW | 3,102 MW | 2,480 MW |
| 2026-10-01T00:00Z | 31,364 MW | n/a | 0 MW | 2,977 MW | 2,938 MW |
| 2026-10-01T01:00Z | 31,384 MW | n/a | 0 MW | 2,749 MW | 3,209 MW |
| 2026-10-01T02:00Z | 31,406 MW | n/a | 0 MW | 2,618 MW | 3,201 MW |
| 2026-10-01T03:00Z | 31,418 MW | n/a | 0 MW | 2,735 MW | 3,259 MW |
| 2026-10-01T04:00Z | 31,432 MW | n/a | 0 MW | 3,435 MW | 3,885 MW |
| 2026-10-01T05:00Z | 31,415 MW | n/a | 192 MW | 3,814 MW | 4,139 MW |
| 2026-10-01T06:00Z | 31,266 MW | n/a | 760 MW | 3,662 MW | 4,195 MW |
| 2026-10-01T07:00Z | 30,849 MW | n/a | 2,744 MW | 3,621 MW | 4,259 MW |
| 2026-10-01T08:00Z | 30,692 MW | n/a | 5,680 MW | 3,285 MW | 4,207 MW |
| 2026-10-01T09:00Z | 30,732 MW | n/a | 8,158 MW | 2,955 MW | 3,239 MW |
| 2026-10-01T10:00Z | 30,650 MW | n/a | 9,601 MW | 2,624 MW | 2,695 MW |
| 2026-10-01T11:00Z | 30,641 MW | n/a | 10,135 MW | 2,704 MW | 2,583 MW |
| 2026-10-01T12:00Z | 30,667 MW | n/a | 9,516 MW | 3,278 MW | 2,452 MW |
| 2026-10-01T13:00Z | 30,585 MW | n/a | 9,108 MW | 3,395 MW | 2,457 MW |
| 2026-10-01T14:00Z | 30,692 MW | n/a | 7,728 MW | 3,805 MW | 3,006 MW |
| 2026-10-01T15:00Z | 30,741 MW | n/a | 5,361 MW | 4,697 MW | 3,930 MW |
| 2026-10-01T16:00Z | 30,745 MW | n/a | 2,530 MW | 5,932 MW | 4,031 MW |
| 2026-10-01T17:00Z | 30,748 MW | n/a | 521 MW | 6,307 MW | 4,053 MW |
| 2026-10-01T18:00Z | 30,750 MW | n/a | 164 MW | 5,920 MW | 4,235 MW |
| 2026-10-01T19:00Z | 30,762 MW | n/a | 0 MW | 5,025 MW | 4,161 MW |
| 2026-10-01T20:00Z | 30,773 MW | n/a | 0 MW | 4,115 MW | 4,051 MW |
| 2026-10-01T21:00Z | 30,789 MW | n/a | 0 MW | 3,821 MW | 3,540 MW |
| 2026-10-01T22:00Z | 30,854 MW | n/a | 0 MW | 3,764 MW | 3,507 MW |
| 2026-10-01T23:00Z | 31,006 MW | n/a | 0 MW | 3,676 MW | 3,601 MW |
| 2026-10-02T00:00Z | 30,958 MW | n/a | 0 MW | 3,145 MW | 3,541 MW |
| 2026-10-02T01:00Z | 31,104 MW | n/a | 0 MW | 2,952 MW | 3,639 MW |
| 2026-10-02T02:00Z | 31,102 MW | n/a | 0 MW | 2,875 MW | 3,566 MW |
| 2026-10-02T03:00Z | 31,222 MW | n/a | 0 MW | 3,166 MW | 3,696 MW |
| 2026-10-02T04:00Z | 30,946 MW | n/a | 0 MW | 4,216 MW | 3,877 MW |
| 2026-10-02T05:00Z | 30,848 MW | n/a | 177 MW | 4,876 MW | 3,998 MW |
| 2026-10-02T06:00Z | 30,850 MW | n/a | 1,038 MW | 5,043 MW | 4,059 MW |
| 2026-10-02T07:00Z | 30,178 MW | n/a | 4,268 MW | 4,246 MW | 3,976 MW |
| 2026-10-02T08:00Z | 29,887 MW | n/a | 8,725 MW | 3,923 MW | 3,916 MW |
| 2026-10-02T09:00Z | 30,088 MW | n/a | 12,410 MW | 2,896 MW | 3,323 MW |
| 2026-10-02T10:00Z | 30,587 MW | n/a | 14,535 MW | 2,596 MW | 2,782 MW |
| 2026-10-02T11:00Z | 30,651 MW | n/a | 15,385 MW | 2,406 MW | 2,149 MW |
| 2026-10-02T12:00Z | 30,627 MW | n/a | 14,841 MW | 2,294 MW | 2,170 MW |
| 2026-10-02T13:00Z | 30,610 MW | n/a | 13,322 MW | 2,376 MW | 2,056 MW |
| 2026-10-02T14:00Z | 30,579 MW | n/a | 10,436 MW | 3,374 MW | 2,232 MW |
| 2026-10-02T15:00Z | 30,501 MW | n/a | 6,485 MW | 4,281 MW | 3,545 MW |
| 2026-10-02T16:00Z | 30,552 MW | n/a | 2,609 MW | 5,502 MW | 3,947 MW |
| 2026-10-02T17:00Z | 30,650 MW | n/a | 509 MW | 6,256 MW | 3,977 MW |
| 2026-10-02T18:00Z | 31,428 MW | n/a | 202 MW | 5,564 MW | 3,996 MW |
| 2026-10-02T19:00Z | 31,803 MW | n/a | 0 MW | 4,258 MW | 3,992 MW |
| 2026-10-02T20:00Z | 31,823 MW | n/a | 0 MW | 3,690 MW | 3,817 MW |
| 2026-10-02T21:00Z | 31,335 MW | n/a | 0 MW | 3,430 MW | 3,737 MW |
| 2026-10-02T22:00Z | 31,262 MW | 3,359 MW | 0 MW | 3,498 MW | 3,927 MW |
| 2026-10-02T23:00Z | 31,153 MW | 3,093 MW | 0 MW | 3,176 MW | 3,966 MW |
| 2026-10-03T00:00Z | 31,089 MW | 2,830 MW | 0 MW | 2,800 MW | 3,967 MW |
| 2026-10-03T01:00Z | 30,898 MW | 2,591 MW | 0 MW | 2,603 MW | 4,011 MW |
| 2026-10-03T02:00Z | 30,708 MW | 2,231 MW | 0 MW | 2,655 MW | 4,135 MW |
| 2026-10-03T03:00Z | 30,664 MW | 2,130 MW | 0 MW | 2,793 MW | 4,099 MW |
| 2026-10-03T04:00Z | 31,028 MW | 2,207 MW | 0 MW | 3,153 MW | 4,011 MW |
| 2026-10-03T05:00Z | 31,684 MW | 2,247 MW | 213 MW | 3,362 MW | 4,001 MW |
| 2026-10-03T06:00Z | 31,629 MW | 2,388 MW | 949 MW | 3,064 MW | 3,658 MW |
| 2026-10-03T07:00Z | 31,392 MW | 2,239 MW | 3,613 MW | 2,493 MW | 2,937 MW |
| 2026-10-03T08:00Z | 31,295 MW | 1,884 MW | 7,146 MW | 1,969 MW | 1,733 MW |
| 2026-10-03T09:00Z | 31,207 MW | 1,673 MW | 10,764 MW | 1,636 MW | 1,281 MW |
| 2026-10-03T10:00Z | 31,107 MW | 1,894 MW | 13,017 MW | 1,651 MW | 925 MW |
| 2026-10-03T11:00Z | 31,010 MW | 1,933 MW | 14,075 MW | 1,660 MW | 793 MW |
| 2026-10-03T12:00Z | 30,437 MW | 2,141 MW | 13,540 MW | 1,707 MW | 671 MW |
| 2026-10-03T13:00Z | 30,936 MW | 2,128 MW | 11,819 MW | 1,861 MW | 733 MW |
| 2026-10-03T14:00Z | 31,523 MW | 2,340 MW | 8,811 MW | 2,211 MW | 991 MW |
| 2026-10-03T15:00Z | 32,449 MW | 2,702 MW | 5,177 MW | 3,811 MW | 2,876 MW |
| 2026-10-03T16:00Z | 33,212 MW | 3,304 MW | 2,054 MW | 4,732 MW | 3,928 MW |
| 2026-10-03T17:00Z | 33,719 MW | 4,276 MW | 442 MW | 4,930 MW | 4,094 MW |
| 2026-10-03T18:00Z | 33,844 MW | 5,389 MW | 223 MW | 4,287 MW | 3,888 MW |
| 2026-10-03T19:00Z | 33,895 MW | 6,093 MW | 0 MW | 3,287 MW | 3,457 MW |
| 2026-10-03T20:00Z | 33,866 MW | 6,226 MW | 0 MW | 2,898 MW | 3,454 MW |
| 2026-10-03T21:00Z | 33,827 MW | 5,985 MW | 0 MW | 2,672 MW | 3,358 MW |
| 2026-10-03T22:00Z | 33,822 MW | 5,620 MW | 0 MW | 2,694 MW | 3,122 MW |
| 2026-10-03T23:00Z | 34,114 MW | 5,220 MW | 0 MW | 2,860 MW | 2,887 MW |
| 2026-10-04T00:00Z | 34,441 MW | 4,930 MW | 0 MW | 2,741 MW | 2,671 MW |
| 2026-10-04T01:00Z | 34,483 MW | 4,688 MW | 0 MW | 2,371 MW | 2,490 MW |
| 2026-10-04T02:00Z | 34,502 MW | 4,626 MW | 0 MW | 2,164 MW | 2,508 MW |
| 2026-10-04T03:00Z | 34,555 MW | 4,569 MW | 0 MW | 2,186 MW | 2,553 MW |
| 2026-10-04T04:00Z | 34,673 MW | 4,238 MW | 0 MW | 2,529 MW | 2,607 MW |
| 2026-10-04T05:00Z | 34,644 MW | 4,137 MW | 214 MW | 3,264 MW | 2,668 MW |
| 2026-10-04T06:00Z | 34,610 MW | 4,084 MW | 992 MW | 3,153 MW | 2,275 MW |
| 2026-10-04T07:00Z | 34,594 MW | 3,864 MW | 3,722 MW | 2,599 MW | 750 MW |
| 2026-10-04T08:00Z | 34,429 MW | 3,020 MW | 7,696 MW | 2,068 MW | 373 MW |
| 2026-10-04T09:00Z | 33,502 MW | 2,500 MW | 11,330 MW | 1,617 MW | 346 MW |
| 2026-10-04T10:00Z | 31,016 MW | 2,462 MW | 13,728 MW | 1,537 MW | 347 MW |
| 2026-10-04T11:00Z | 29,739 MW | 2,361 MW | 14,621 MW | 1,541 MW | 362 MW |
| 2026-10-04T12:00Z | 30,082 MW | 2,210 MW | 13,998 MW | 1,611 MW | 369 MW |
| 2026-10-04T13:00Z | 32,136 MW | 2,242 MW | 12,546 MW | 1,790 MW | 358 MW |
| 2026-10-04T14:00Z | 34,868 MW | 2,294 MW | 9,695 MW | 2,073 MW | 387 MW |
| 2026-10-04T15:00Z | 35,517 MW | 2,443 MW | 6,097 MW | 2,455 MW | 1,638 MW |
| 2026-10-04T16:00Z | 35,809 MW | 2,599 MW | 2,523 MW | 3,486 MW | 2,875 MW |
| 2026-10-04T17:00Z | 36,144 MW | 2,840 MW | 481 MW | 4,117 MW | 3,052 MW |
| 2026-10-04T18:00Z | 36,408 MW | 3,646 MW | 221 MW | 4,164 MW | 3,264 MW |
| 2026-10-04T19:00Z | 36,432 MW | 4,276 MW | 0 MW | 3,569 MW | 3,419 MW |
| 2026-10-04T20:00Z | 36,387 MW | 4,158 MW | 0 MW | 3,054 MW | 3,424 MW |
| 2026-10-04T21:00Z | 36,403 MW | 3,713 MW | 0 MW | 2,573 MW | 3,403 MW |
| 2026-10-04T22:00Z | 36,442 MW | 3,262 MW | 0 MW | 2,578 MW | 2,400 MW |
| 2026-10-04T23:00Z | 36,144 MW | 2,679 MW | 0 MW | 2,498 MW | 1,487 MW |
| 2026-10-05T00:00Z | 36,284 MW | 2,417 MW | 0 MW | 2,127 MW | 1,391 MW |
| 2026-10-05T01:00Z | 36,775 MW | 2,237 MW | 0 MW | 2,004 MW | 1,469 MW |
| 2026-10-05T02:00Z | 36,920 MW | 2,038 MW | 0 MW | 2,143 MW | 1,429 MW |
| 2026-10-05T03:00Z | 36,942 MW | 1,888 MW | 0 MW | 2,428 MW | 1,818 MW |
| 2026-10-05T04:00Z | 36,978 MW | 1,875 MW | 0 MW | 3,236 MW | 3,353 MW |
| 2026-10-05T05:00Z | 37,168 MW | 1,831 MW | 207 MW | 3,692 MW | 3,935 MW |
| 2026-10-05T06:00Z | 37,522 MW | 1,826 MW | 1,023 MW | 3,625 MW | 3,938 MW |
| 2026-10-05T07:00Z | 37,752 MW | 1,748 MW | 4,618 MW | 3,142 MW | 2,994 MW |
| 2026-10-05T08:00Z | 37,716 MW | 1,357 MW | 10,131 MW | 2,485 MW | 1,103 MW |
| 2026-10-05T09:00Z | 37,496 MW | 1,095 MW | 15,034 MW | 1,962 MW | 695 MW |
| 2026-10-05T10:00Z | 37,184 MW | 1,046 MW | 17,640 MW | 1,870 MW | 593 MW |
| 2026-10-05T11:00Z | 35,713 MW | 1,075 MW | 18,427 MW | 1,890 MW | 578 MW |
| 2026-10-05T12:00Z | 35,344 MW | 1,074 MW | 17,712 MW | 1,925 MW | 570 MW |
| 2026-10-05T13:00Z | 35,392 MW | 1,096 MW | 16,173 MW | 2,007 MW | 634 MW |
| 2026-10-05T14:00Z | 36,420 MW | 1,075 MW | 13,037 MW | 2,242 MW | 904 MW |
| 2026-10-05T15:00Z | 37,435 MW | 1,094 MW | 8,293 MW | 2,896 MW | 3,003 MW |
| 2026-10-05T16:00Z | 37,740 MW | 1,176 MW | 3,104 MW | 4,264 MW | 4,168 MW |
| 2026-10-05T17:00Z | 37,791 MW | 1,411 MW | 486 MW | 5,194 MW | 4,245 MW |
| 2026-10-05T18:00Z | 37,867 MW | 2,041 MW | 202 MW | 4,591 MW | 4,274 MW |
| 2026-10-05T19:00Z | 37,925 MW | 2,622 MW | 0 MW | 3,898 MW | 4,246 MW |
| 2026-10-05T20:00Z | 37,958 MW | 2,956 MW | 0 MW | 3,604 MW | 4,199 MW |
| 2026-10-05T21:00Z | 38,066 MW | 3,060 MW | 0 MW | 3,196 MW | 3,911 MW |
| 2026-10-05T22:00Z | 38,164 MW | 2,950 MW | 0 MW | 2,656 MW | 3,684 MW |
| 2026-10-05T23:00Z | 38,163 MW | 2,680 MW | 0 MW | 2,503 MW | 3,425 MW |
| 2026-10-06T00:00Z | 38,245 MW | 2,358 MW | 0 MW | 2,400 MW | 3,307 MW |
| 2026-10-06T01:00Z | 38,334 MW | 2,038 MW | 0 MW | 2,397 MW | 3,337 MW |
| 2026-10-06T02:00Z | 38,407 MW | 1,873 MW | 0 MW | 2,460 MW | 3,056 MW |
| 2026-10-06T03:00Z | 38,431 MW | 1,818 MW | 0 MW | 2,635 MW | 3,180 MW |
| 2026-10-06T04:00Z | 38,472 MW | 1,768 MW | 0 MW | 3,235 MW | 3,669 MW |
| 2026-10-06T05:00Z | 38,473 MW | 1,829 MW | 224 MW | 3,650 MW | 4,267 MW |
| 2026-10-06T06:00Z | 38,474 MW | 1,960 MW | 1,178 MW | 3,860 MW | 4,402 MW |
| 2026-10-06T07:00Z | 38,284 MW | 1,947 MW | 5,141 MW | 3,407 MW | 4,317 MW |
| 2026-10-06T08:00Z | 37,607 MW | 1,602 MW | 10,435 MW | 2,780 MW | 3,665 MW |
| 2026-10-06T09:00Z | 37,114 MW | 1,404 MW | 14,693 MW | 2,448 MW | 1,753 MW |
| 2026-10-06T10:00Z | 37,230 MW | 1,413 MW | 16,803 MW | 2,155 MW | 1,398 MW |
| 2026-10-06T11:00Z | 37,123 MW | 1,527 MW | 17,360 MW | 2,035 MW | 1,438 MW |
| 2026-10-06T12:00Z | 37,085 MW | 1,674 MW | 16,314 MW | 2,064 MW | 1,696 MW |
| 2026-10-06T13:00Z | 37,042 MW | 1,677 MW | 14,348 MW | 2,354 MW | 2,032 MW |
| 2026-10-06T14:00Z | 37,138 MW | 1,791 MW | 10,640 MW | 2,700 MW | 2,997 MW |
| 2026-10-06T15:00Z | 37,550 MW | 1,807 MW | 6,112 MW | 3,724 MW | 4,042 MW |
| 2026-10-06T16:00Z | 37,597 MW | 2,080 MW | 2,180 MW | 5,308 MW | 4,282 MW |
| 2026-10-06T17:00Z | 37,689 MW | 2,595 MW | 439 MW | 5,826 MW | 4,432 MW |
| 2026-10-06T18:00Z | 37,927 MW | 3,536 MW | 219 MW | 5,421 MW | 4,464 MW |
| 2026-10-06T19:00Z | 37,856 MW | 4,622 MW | 0 MW | 4,463 MW | 4,264 MW |
| 2026-10-06T20:00Z | 37,945 MW | 5,096 MW | 0 MW | 3,791 MW | 4,285 MW |
| 2026-10-06T21:00Z | 37,962 MW | 5,071 MW | 0 MW | 3,487 MW | 4,017 MW |
| 2026-10-06T22:00Z | 37,999 MW | 4,661 MW | 0 MW | 3,378 MW | 3,903 MW |
| 2026-10-06T23:00Z | 38,021 MW | 4,104 MW | 0 MW | 3,131 MW | 4,160 MW |
| 2026-10-07T00:00Z | 37,963 MW | 3,330 MW | 0 MW | 2,907 MW | 3,961 MW |
| 2026-10-07T01:00Z | 38,048 MW | 3,070 MW | 0 MW | 2,726 MW | 3,664 MW |
| 2026-10-07T02:00Z | 37,740 MW | 2,814 MW | 0 MW | 2,792 MW | 3,571 MW |
| 2026-10-07T03:00Z | 37,489 MW | 2,678 MW | 0 MW | 3,194 MW | 3,845 MW |
| 2026-10-07T04:00Z | 37,500 MW | 2,863 MW | 0 MW | 3,596 MW | 4,206 MW |
| 2026-10-07T05:00Z | 37,488 MW | 3,139 MW | 172 MW | 4,236 MW | 4,298 MW |
| 2026-10-07T06:00Z | 37,450 MW | 3,614 MW | 751 MW | 4,142 MW | 4,325 MW |
| 2026-10-07T07:00Z | 36,574 MW | 3,399 MW | 2,334 MW | 3,745 MW | 4,262 MW |
| 2026-10-07T08:00Z | 36,590 MW | 2,955 MW | 4,156 MW | 3,462 MW | 4,024 MW |
| 2026-10-07T09:00Z | 36,600 MW | 3,114 MW | 5,732 MW | 3,122 MW | 2,882 MW |
| 2026-10-07T10:00Z | 36,572 MW | 3,547 MW | 6,545 MW | 2,983 MW | 2,601 MW |
| 2026-10-07T11:00Z | 36,547 MW | 4,023 MW | 6,615 MW | 3,040 MW | 2,506 MW |
| 2026-10-07T12:00Z | 36,518 MW | 4,645 MW | 6,250 MW | 3,173 MW | 2,408 MW |
| 2026-10-07T13:00Z | 36,470 MW | 5,390 MW | 5,478 MW | 3,236 MW | 2,540 MW |
| 2026-10-07T14:00Z | 36,439 MW | 5,763 MW | 4,117 MW | 3,333 MW | 3,133 MW |
| 2026-10-07T15:00Z | 36,380 MW | 5,894 MW | 2,573 MW | 4,854 MW | 3,886 MW |
| 2026-10-07T16:00Z | 36,467 MW | 6,435 MW | 1,168 MW | 5,704 MW | 4,190 MW |
| 2026-10-07T17:00Z | 36,592 MW | 7,119 MW | 346 MW | 5,576 MW | 4,201 MW |
| 2026-10-07T18:00Z | 36,706 MW | 8,090 MW | 186 MW | 4,994 MW | 4,128 MW |
| 2026-10-07T19:00Z | 36,725 MW | 9,561 MW | 0 MW | 4,312 MW | 3,616 MW |
| 2026-10-07T20:00Z | 36,486 MW | 10,903 MW | 0 MW | 3,940 MW | 2,315 MW |
| 2026-10-07T21:00Z | 36,453 MW | 11,716 MW | 0 MW | 3,598 MW | 2,106 MW |
| 2026-10-07T22:00Z | 36,478 MW | 12,365 MW | 0 MW | 3,621 MW | 1,270 MW |
| 2026-10-07T23:00Z | 35,874 MW | 12,922 MW | 0 MW | 3,389 MW | 546 MW |
| 2026-10-08T00:00Z | 35,025 MW | 12,346 MW | 0 MW | 3,021 MW | 513 MW |
| 2026-10-08T01:00Z | 33,789 MW | 13,008 MW | 0 MW | 2,666 MW | 485 MW |
| 2026-10-08T02:00Z | 33,572 MW | 13,101 MW | 0 MW | 2,634 MW | 503 MW |
| 2026-10-08T03:00Z | 33,942 MW | 13,146 MW | 0 MW | 2,926 MW | 499 MW |
| 2026-10-08T04:00Z | 36,498 MW | 14,020 MW | 0 MW | 3,139 MW | 500 MW |
| 2026-10-08T05:00Z | 37,179 MW | 14,035 MW | 182 MW | 3,333 MW | 622 MW |
| 2026-10-08T06:00Z | 37,290 MW | 13,148 MW | 673 MW | 3,380 MW | 867 MW |
| 2026-10-08T07:00Z | 37,277 MW | 12,351 MW | 2,861 MW | 3,550 MW | 907 MW |
| 2026-10-08T08:00Z | 37,227 MW | 12,280 MW | 6,468 MW | 2,980 MW | 908 MW |
| 2026-10-08T09:00Z | 36,983 MW | 12,561 MW | 9,635 MW | 2,720 MW | 752 MW |
| 2026-10-08T10:00Z | 36,322 MW | 11,656 MW | 11,234 MW | 2,714 MW | 684 MW |
| 2026-10-08T11:00Z | 36,002 MW | 10,659 MW | 11,663 MW | 2,630 MW | 685 MW |
| 2026-10-08T12:00Z | 36,129 MW | 9,794 MW | 10,777 MW | 2,462 MW | 577 MW |
| 2026-10-08T13:00Z | 36,135 MW | 9,207 MW | 10,002 MW | 2,566 MW | 730 MW |
| 2026-10-08T14:00Z | 36,206 MW | 8,758 MW | 8,037 MW | 2,773 MW | 701 MW |
| 2026-10-08T15:00Z | 37,014 MW | 7,865 MW | 5,486 MW | 3,292 MW | 965 MW |
| 2026-10-08T16:00Z | 37,540 MW | 6,511 MW | 2,283 MW | 4,429 MW | 2,275 MW |
| 2026-10-08T17:00Z | 37,581 MW | 5,254 MW | 451 MW | 4,908 MW | 3,058 MW |
| 2026-10-08T18:00Z | 37,636 MW | 4,746 MW | 226 MW | 4,652 MW | 3,065 MW |
| 2026-10-08T19:00Z | 37,673 MW | 4,690 MW | 0 MW | 4,032 MW | 2,908 MW |
| 2026-10-08T20:00Z | 37,744 MW | 4,445 MW | 0 MW | 3,759 MW | 1,773 MW |
| 2026-10-08T21:00Z | 37,784 MW | 4,336 MW | 0 MW | 3,663 MW | 1,356 MW |
| 2026-10-08T22:00Z | 37,733 MW | 4,574 MW | 0 MW | 3,449 MW | 719 MW |
| 2026-10-08T23:00Z | 37,437 MW | 5,244 MW | 0 MW | 3,378 MW | 532 MW |
| 2026-10-09T00:00Z | 36,700 MW | 5,950 MW | 0 MW | 3,199 MW | 519 MW |
| 2026-10-09T01:00Z | 36,566 MW | 6,707 MW | 0 MW | 2,825 MW | 502 MW |
| 2026-10-09T02:00Z | 36,101 MW | 7,462 MW | 0 MW | 2,766 MW | 531 MW |
| 2026-10-09T03:00Z | 36,191 MW | 8,252 MW | 0 MW | 2,918 MW | 522 MW |
| 2026-10-09T04:00Z | 36,517 MW | 9,075 MW | 0 MW | 3,091 MW | 520 MW |
| 2026-10-09T05:00Z | 36,655 MW | 10,291 MW | 189 MW | 3,430 MW | 509 MW |
| 2026-10-09T06:00Z | 36,948 MW | 11,274 MW | 819 MW | 3,705 MW | 533 MW |
| 2026-10-09T07:00Z | 37,700 MW | 11,658 MW | 4,171 MW | 3,463 MW | 705 MW |
| 2026-10-09T08:00Z | 37,514 MW | 11,246 MW | 8,213 MW | 3,275 MW | 712 MW |
| 2026-10-09T09:00Z | 37,260 MW | 10,786 MW | 10,748 MW | 2,996 MW | 693 MW |
| 2026-10-09T10:00Z | 35,831 MW | 12,251 MW | 12,319 MW | 2,621 MW | 674 MW |
| 2026-10-09T11:00Z | 34,062 MW | 12,989 MW | 12,465 MW | 2,512 MW | 678 MW |
| 2026-10-09T12:00Z | 33,845 MW | 13,432 MW | 11,517 MW | 2,466 MW | 688 MW |
| 2026-10-09T13:00Z | 34,131 MW | 13,745 MW | 9,901 MW | 2,467 MW | 544 MW |
| 2026-10-09T14:00Z | 34,624 MW | 13,895 MW | 7,235 MW | 2,655 MW | 525 MW |
| 2026-10-09T15:00Z | 36,162 MW | 13,992 MW | 4,173 MW | 2,922 MW | 536 MW |
| 2026-10-09T16:00Z | 37,652 MW | 14,316 MW | 1,558 MW | 3,496 MW | 571 MW |
| 2026-10-09T17:00Z | 37,947 MW | 14,491 MW | 362 MW | 4,068 MW | 574 MW |
| 2026-10-09T18:00Z | 37,963 MW | 14,576 MW | 223 MW | 3,746 MW | 564 MW |
| 2026-10-09T19:00Z | 37,968 MW | 14,916 MW | 0 MW | 3,159 MW | 573 MW |
| 2026-10-09T20:00Z | 37,985 MW | 14,763 MW | 0 MW | 3,117 MW | 574 MW |
| 2026-10-09T21:00Z | 37,631 MW | 14,184 MW | 0 MW | 3,124 MW | 529 MW |
| 2026-10-09T22:00Z | 35,329 MW | 13,140 MW | 0 MW | 2,771 MW | 526 MW |
| 2026-10-09T23:00Z | 34,132 MW | 11,989 MW | 0 MW | 2,530 MW | 532 MW |
| 2026-10-10T00:00Z | 33,556 MW | 10,656 MW | 0 MW | 2,420 MW | 523 MW |
| 2026-10-10T01:00Z | 32,820 MW | 9,525 MW | 0 MW | 2,310 MW | 522 MW |
| 2026-10-10T02:00Z | 33,010 MW | 8,005 MW | 0 MW | 2,252 MW | 529 MW |
| 2026-10-10T03:00Z | 33,255 MW | 7,069 MW | 0 MW | 2,292 MW | 530 MW |
| 2026-10-10T04:00Z | 33,325 MW | 6,695 MW | 0 MW | 2,511 MW | 528 MW |
| 2026-10-10T05:00Z | 34,612 MW | 6,629 MW | 224 MW | 2,778 MW | 541 MW |
| 2026-10-10T06:00Z | 35,029 MW | 6,344 MW | 687 MW | 3,042 MW | 533 MW |
| 2026-10-10T07:00Z | 34,959 MW | 5,469 MW | 3,146 MW | 3,027 MW | 547 MW |
| 2026-10-10T08:00Z | 33,585 MW | 4,683 MW | 7,199 MW | 2,469 MW | 594 MW |
| 2026-10-10T09:00Z | 31,204 MW | 4,888 MW | 10,765 MW | 1,936 MW | 507 MW |
| 2026-10-10T10:00Z | 29,839 MW | 5,757 MW | 12,588 MW | 1,956 MW | 543 MW |
| 2026-10-10T11:00Z | 29,909 MW | 6,022 MW | 12,831 MW | 1,949 MW | 510 MW |
| 2026-10-10T12:00Z | 30,469 MW | 6,562 MW | 11,822 MW | 1,979 MW | 485 MW |
| 2026-10-10T13:00Z | 31,383 MW | 4,937 MW | 8,620 MW | 2,290 MW | 556 MW |
| 2026-10-10T14:00Z | 32,252 MW | 6,112 MW | 7,399 MW | 2,223 MW | 527 MW |
| 2026-10-10T15:00Z | 33,862 MW | 7,250 MW | 5,414 MW | 2,271 MW | 524 MW |
| 2026-10-10T16:00Z | 37,859 MW | 6,457 MW | 1,939 MW | 2,883 MW | 551 MW |
| 2026-10-10T17:00Z | 38,292 MW | 5,511 MW | 352 MW | 3,216 MW | 577 MW |
| 2026-10-10T18:00Z | 38,369 MW | 5,382 MW | 224 MW | 3,110 MW | 399 MW |
| 2026-10-10T19:00Z | 38,369 MW | 5,725 MW | 0 MW | 2,624 MW | 392 MW |
| 2026-10-10T20:00Z | 38,291 MW | 5,884 MW | 0 MW | 2,439 MW | 437 MW |
| 2026-10-10T21:00Z | 37,838 MW | 5,671 MW | 0 MW | 2,499 MW | 778 MW |
| 2026-10-10T22:00Z | 37,766 MW | 5,369 MW | 0 MW | 2,676 MW | 800 MW |
| 2026-10-10T23:00Z | 37,469 MW | 4,755 MW | 0 MW | 2,466 MW | 569 MW |
| 2026-10-11T00:00Z | 37,041 MW | 4,329 MW | 0 MW | 2,250 MW | 549 MW |
| 2026-10-11T01:00Z | 36,524 MW | 4,114 MW | 0 MW | 2,176 MW | 552 MW |
| 2026-10-11T02:00Z | 36,428 MW | 3,861 MW | 0 MW | 2,171 MW | 556 MW |
| 2026-10-11T03:00Z | 36,974 MW | 3,492 MW | 0 MW | 2,209 MW | 590 MW |
| 2026-10-11T04:00Z | 37,480 MW | 3,439 MW | 0 MW | 2,424 MW | 572 MW |
| 2026-10-11T05:00Z | 37,810 MW | 3,216 MW | 224 MW | 2,924 MW | 561 MW |
| 2026-10-11T06:00Z | 37,871 MW | 3,234 MW | 746 MW | 2,868 MW | 551 MW |
| 2026-10-11T07:00Z | 37,869 MW | 2,960 MW | 3,341 MW | 2,583 MW | 545 MW |
| 2026-10-11T08:00Z | 37,693 MW | 2,389 MW | 7,215 MW | 2,050 MW | 568 MW |
| 2026-10-11T09:00Z | 36,851 MW | 2,216 MW | 10,810 MW | 1,765 MW | 563 MW |
| 2026-10-11T10:00Z | 36,038 MW | 2,377 MW | 13,069 MW | 1,680 MW | 581 MW |
| 2026-10-11T11:00Z | 35,857 MW | 2,445 MW | 13,536 MW | 1,666 MW | 606 MW |
| 2026-10-11T12:00Z | 35,878 MW | 2,345 MW | 12,616 MW | 1,694 MW | 581 MW |
| 2026-10-11T13:00Z | 36,510 MW | 2,254 MW | 10,293 MW | 1,878 MW | 569 MW |
| 2026-10-11T14:00Z | 37,249 MW | 1,921 MW | 7,275 MW | 2,127 MW | 943 MW |
| 2026-10-11T15:00Z | 37,863 MW | 1,850 MW | 3,846 MW | 2,467 MW | 1,752 MW |
| 2026-10-11T16:00Z | 37,985 MW | 1,809 MW | 1,369 MW | 3,426 MW | 2,838 MW |
| 2026-10-11T17:00Z | 38,009 MW | 1,980 MW | 291 MW | 4,152 MW | 3,431 MW |
| 2026-10-11T18:00Z | 38,039 MW | 2,384 MW | 196 MW | 3,616 MW | 3,488 MW |
| 2026-10-11T19:00Z | 38,115 MW | 2,601 MW | 0 MW | 2,827 MW | 3,485 MW |
| 2026-10-11T20:00Z | 38,291 MW | 2,764 MW | 0 MW | 2,507 MW | 3,512 MW |
| 2026-10-11T21:00Z | 38,441 MW | 2,913 MW | 0 MW | 2,451 MW | 3,442 MW |
| 2026-10-11T22:00Z | 38,603 MW | 3,205 MW | 0 MW | 2,394 MW | 2,316 MW |
| 2026-10-11T23:00Z | 38,726 MW | 3,486 MW | 0 MW | 2,153 MW | 1,336 MW |
| 2026-10-12T00:00Z | 38,844 MW | 3,674 MW | 0 MW | 2,053 MW | 1,216 MW |
| 2026-10-12T01:00Z | 38,924 MW | 3,645 MW | 0 MW | 2,045 MW | 1,161 MW |
| 2026-10-12T02:00Z | 38,988 MW | 3,471 MW | 0 MW | 2,068 MW | 1,375 MW |
| 2026-10-12T03:00Z | 39,022 MW | 3,675 MW | 0 MW | 2,171 MW | 1,858 MW |
| 2026-10-12T04:00Z | 39,018 MW | 4,102 MW | 0 MW | 2,785 MW | 3,633 MW |
| 2026-10-12T05:00Z | 39,021 MW | 4,550 MW | 231 MW | 3,122 MW | 3,874 MW |
| 2026-10-12T06:00Z | 39,023 MW | 4,984 MW | 784 MW | 3,553 MW | 3,937 MW |
| 2026-10-12T07:00Z | 39,008 MW | 5,225 MW | 3,595 MW | 2,900 MW | 3,864 MW |
| 2026-10-12T08:00Z | 38,972 MW | 4,643 MW | 7,471 MW | 2,215 MW | 2,933 MW |
| 2026-10-12T09:00Z | 37,938 MW | 4,364 MW | 10,924 MW | 1,796 MW | 1,083 MW |
| 2026-10-12T10:00Z | 37,805 MW | 4,824 MW | 12,988 MW | 1,693 MW | 813 MW |
| 2026-10-12T11:00Z | 36,767 MW | 5,302 MW | 13,780 MW | 1,741 MW | 562 MW |
| 2026-10-12T12:00Z | 36,664 MW | 5,355 MW | 13,133 MW | 1,861 MW | 581 MW |
| 2026-10-12T13:00Z | 36,882 MW | 5,070 MW | 11,486 MW | 2,147 MW | 693 MW |
| 2026-10-12T14:00Z | 37,653 MW | 4,974 MW | 8,737 MW | 2,458 MW | 1,415 MW |
| 2026-10-12T15:00Z | 37,640 MW | 4,831 MW | 5,022 MW | 2,943 MW | 3,246 MW |
| 2026-10-12T16:00Z | 38,317 MW | 4,827 MW | 1,596 MW | 4,392 MW | 3,941 MW |
| 2026-10-12T17:00Z | 38,722 MW | 4,906 MW | 312 MW | 4,999 MW | 4,023 MW |
| 2026-10-12T18:00Z | 38,731 MW | 5,072 MW | 210 MW | 4,323 MW | 3,972 MW |
| 2026-10-12T19:00Z | 38,784 MW | 5,126 MW | 0 MW | 3,609 MW | 3,803 MW |
| 2026-10-12T20:00Z | 38,800 MW | 5,219 MW | 0 MW | 3,337 MW | 3,086 MW |
| 2026-10-12T21:00Z | 38,824 MW | 5,027 MW | 0 MW | 2,880 MW | 1,642 MW |
| 2026-10-12T22:00Z | 38,802 MW | 4,754 MW | 0 MW | 2,623 MW | 730 MW |
| 2026-10-12T23:00Z | 38,715 MW | 4,497 MW | 0 MW | 2,409 MW | 528 MW |
| 2026-10-13T00:00Z | 38,694 MW | 4,289 MW | 0 MW | 2,296 MW | 485 MW |
| 2026-10-13T01:00Z | 38,702 MW | 4,418 MW | 0 MW | 2,189 MW | 509 MW |
| 2026-10-13T02:00Z | 38,682 MW | 4,370 MW | 0 MW | 2,136 MW | 582 MW |
| 2026-10-13T03:00Z | 38,683 MW | 4,501 MW | 0 MW | 2,188 MW | 870 MW |
| 2026-10-13T04:00Z | 38,791 MW | 4,711 MW | 0 MW | 2,408 MW | 2,619 MW |
| 2026-10-13T05:00Z | 38,799 MW | 4,938 MW | 203 MW | 3,302 MW | 2,883 MW |
| 2026-10-13T06:00Z | 38,755 MW | 5,279 MW | 686 MW | 3,414 MW | 2,466 MW |
| 2026-10-13T07:00Z | 38,699 MW | 5,262 MW | 2,921 MW | 2,998 MW | 2,369 MW |
| 2026-10-13T08:00Z | 38,678 MW | 5,196 MW | 6,040 MW | 2,382 MW | 1,197 MW |
| 2026-10-13T09:00Z | 37,626 MW | 5,273 MW | 8,424 MW | 2,137 MW | 362 MW |
| 2026-10-13T10:00Z | 37,488 MW | 5,795 MW | 9,969 MW | 2,118 MW | 341 MW |
| 2026-10-13T11:00Z | 36,936 MW | 5,938 MW | 11,335 MW | 2,214 MW | 317 MW |
| 2026-10-13T12:00Z | 36,855 MW | 6,615 MW | 10,984 MW | 2,250 MW | 284 MW |
| 2026-10-13T13:00Z | 36,540 MW | 6,783 MW | 9,830 MW | 2,389 MW | 251 MW |
| 2026-10-13T14:00Z | 36,752 MW | 6,834 MW | 7,523 MW | 2,671 MW | 280 MW |
| 2026-10-13T15:00Z | 37,313 MW | 6,437 MW | 4,613 MW | 3,073 MW | 683 MW |
| 2026-10-13T16:00Z | 37,509 MW | 5,828 MW | 1,546 MW | 3,371 MW | 2,582 MW |
| 2026-10-13T17:00Z | 38,522 MW | 5,432 MW | 303 MW | 4,040 MW | 3,141 MW |
| 2026-10-13T18:00Z | 38,523 MW | 5,228 MW | 211 MW | 4,176 MW | 3,327 MW |
| 2026-10-13T19:00Z | 38,518 MW | 4,929 MW | 0 MW | 3,359 MW | 3,146 MW |
| 2026-10-13T20:00Z | 38,545 MW | 4,620 MW | 0 MW | 2,766 MW | 1,559 MW |
| 2026-10-13T21:00Z | 38,593 MW | 4,323 MW | 0 MW | 2,647 MW | 1,160 MW |
| 2026-10-13T22:00Z | 38,607 MW | 3,785 MW | 0 MW | 2,496 MW | 783 MW |
| 2026-10-13T23:00Z | 37,324 MW | 3,126 MW | 0 MW | 3,262 MW | 520 MW |
| 2026-10-14T00:00Z | 37,267 MW | 2,502 MW | 0 MW | 3,528 MW | 529 MW |
| 2026-10-14T01:00Z | 37,348 MW | 2,060 MW | 0 MW | 2,910 MW | 598 MW |
| 2026-10-14T02:00Z | 37,404 MW | 1,737 MW | 0 MW | 2,777 MW | 651 MW |
| 2026-10-14T03:00Z | 37,614 MW | 1,557 MW | 0 MW | 2,971 MW | 974 MW |
| 2026-10-14T04:00Z | 37,703 MW | 1,545 MW | 0 MW | 3,345 MW | 2,746 MW |
| 2026-10-14T05:00Z | 37,392 MW | 1,641 MW | 207 MW | 3,953 MW | 3,947 MW |
| 2026-10-14T06:00Z | 37,205 MW | 1,543 MW | 614 MW | 4,480 MW | 4,128 MW |
| 2026-10-14T07:00Z | 37,263 MW | 1,415 MW | 3,055 MW | 3,766 MW | 4,343 MW |
| 2026-10-14T08:00Z | 37,311 MW | 1,239 MW | 6,921 MW | 2,618 MW | 3,346 MW |
| 2026-10-14T09:00Z | 37,395 MW | 1,038 MW | 10,365 MW | 1,879 MW | 2,056 MW |
| 2026-10-14T10:00Z | 37,268 MW | 888 MW | 13,062 MW | 2,190 MW | 1,909 MW |
| 2026-10-14T11:00Z | 37,070 MW | 869 MW | 15,177 MW | 2,085 MW | 1,453 MW |
| 2026-10-14T12:00Z | 36,946 MW | 940 MW | 15,655 MW | 1,793 MW | 1,051 MW |
| 2026-10-14T13:00Z | 37,096 MW | 901 MW | 14,673 MW | 1,980 MW | 1,073 MW |
| 2026-10-14T14:00Z | 37,127 MW | 856 MW | 11,815 MW | 2,173 MW | 1,253 MW |
| 2026-10-14T15:00Z | 37,214 MW | 789 MW | 7,026 MW | 3,053 MW | 3,015 MW |
| 2026-10-14T16:00Z | 37,568 MW | 756 MW | 2,065 MW | 4,232 MW | 4,170 MW |
| 2026-10-14T17:00Z | 37,864 MW | 920 MW | 283 MW | 4,971 MW | 4,534 MW |
| 2026-10-14T18:00Z | 37,888 MW | 1,253 MW | 183 MW | 4,451 MW | 4,588 MW |
| 2026-10-14T19:00Z | 37,876 MW | 1,631 MW | 0 MW | 3,763 MW | 4,601 MW |
| 2026-10-14T20:00Z | 37,550 MW | 2,122 MW | 0 MW | 3,229 MW | 4,557 MW |
| 2026-10-14T21:00Z | 37,412 MW | 2,491 MW | 0 MW | 3,104 MW | 3,990 MW |
| 2026-10-14T22:00Z | 37,438 MW | 2,631 MW | 0 MW | 2,959 MW | 3,121 MW |
| 2026-10-14T23:00Z | 37,562 MW | 3,044 MW | 0 MW | 3,022 MW | 2,153 MW |
| 2026-10-15T00:00Z | 37,654 MW | 3,206 MW | 0 MW | 3,068 MW | 1,762 MW |
| 2026-10-15T01:00Z | 37,799 MW | 3,336 MW | 0 MW | 2,907 MW | 1,696 MW |
| 2026-10-15T02:00Z | 38,476 MW | 3,187 MW | 0 MW | 2,886 MW | 1,534 MW |
| 2026-10-15T03:00Z | 38,806 MW | 2,999 MW | 0 MW | 3,055 MW | 2,170 MW |
| 2026-10-15T04:00Z | 38,865 MW | 2,890 MW | 0 MW | 3,179 MW | 4,105 MW |
| 2026-10-15T05:00Z | 38,545 MW | 2,818 MW | 198 MW | 3,624 MW | 4,408 MW |
| 2026-10-15T06:00Z | 38,348 MW | 2,911 MW | 690 MW | 4,037 MW | 4,393 MW |
| 2026-10-15T07:00Z | 38,322 MW | 2,954 MW | 4,043 MW | 3,621 MW | 4,328 MW |
| 2026-10-15T08:00Z | 38,317 MW | 2,531 MW | 9,148 MW | 2,927 MW | 2,858 MW |
| 2026-10-15T09:00Z | 38,255 MW | 2,040 MW | 13,595 MW | 2,614 MW | 1,349 MW |
| 2026-10-15T10:00Z | 38,065 MW | 1,714 MW | 16,370 MW | 2,011 MW | 1,075 MW |
| 2026-10-15T11:00Z | 37,977 MW | 1,553 MW | 17,883 MW | 2,045 MW | 948 MW |
| 2026-10-15T12:00Z | 37,895 MW | 1,628 MW | 17,672 MW | 2,135 MW | 823 MW |
| 2026-10-15T13:00Z | 37,822 MW | 1,727 MW | 15,828 MW | 2,442 MW | 1,096 MW |
| 2026-10-15T14:00Z | 37,821 MW | 1,562 MW | 12,280 MW | 2,624 MW | 1,512 MW |
| 2026-10-15T15:00Z | 38,166 MW | 1,340 MW | 7,107 MW | 3,659 MW | 3,492 MW |
| 2026-10-15T16:00Z | 38,476 MW | 1,245 MW | 2,050 MW | 4,684 MW | 4,531 MW |
| 2026-10-15T17:00Z | 38,601 MW | 1,722 MW | 281 MW | 5,247 MW | 4,658 MW |
| 2026-10-15T18:00Z | 38,632 MW | 2,497 MW | 180 MW | 4,639 MW | 4,691 MW |
| 2026-10-15T19:00Z | 38,634 MW | 3,118 MW | 0 MW | 3,931 MW | 4,693 MW |
| 2026-10-15T20:00Z | 38,654 MW | 3,347 MW | 0 MW | 3,471 MW | 4,717 MW |
| 2026-10-15T21:00Z | 38,894 MW | 3,328 MW | 0 MW | 3,041 MW | 4,470 MW |
| 2026-10-15T22:00Z | 39,191 MW | 3,408 MW | 0 MW | 2,899 MW | 3,570 MW |
| 2026-10-15T23:00Z | 39,280 MW | 3,370 MW | 0 MW | 2,731 MW | 3,231 MW |
| 2026-10-16T00:00Z | 39,304 MW | 3,179 MW | 0 MW | 2,661 MW | 2,862 MW |
| 2026-10-16T01:00Z | 39,322 MW | 2,993 MW | 0 MW | 2,654 MW | 2,786 MW |
| 2026-10-16T02:00Z | 39,349 MW | 3,184 MW | 0 MW | 2,677 MW | 2,767 MW |
| 2026-10-16T03:00Z | 39,369 MW | 3,225 MW | 0 MW | 2,846 MW | 3,403 MW |
| 2026-10-16T04:00Z | 39,383 MW | 3,168 MW | 0 MW | 3,364 MW | 4,336 MW |
| 2026-10-16T05:00Z | 39,390 MW | 3,109 MW | 183 MW | 3,717 MW | 4,681 MW |
| 2026-10-16T06:00Z | 39,396 MW | 3,090 MW | 584 MW | 4,082 MW | 4,728 MW |
| 2026-10-16T07:00Z | 38,938 MW | 3,211 MW | 3,049 MW | 3,836 MW | 4,680 MW |
| 2026-10-16T08:00Z | 38,302 MW | 2,871 MW | 6,663 MW | 3,147 MW | 4,340 MW |
| 2026-10-16T09:00Z | 38,333 MW | 2,875 MW | 9,852 MW | 2,510 MW | 2,133 MW |
| 2026-10-16T10:00Z | 38,339 MW | 3,277 MW | 11,755 MW | 1,803 MW | 988 MW |
| 2026-10-16T11:00Z | 38,207 MW | 3,761 MW | 12,548 MW | 1,644 MW | 806 MW |
| 2026-10-16T12:00Z | 38,221 MW | 4,620 MW | 12,166 MW | 1,730 MW | 927 MW |
| 2026-10-16T13:00Z | 38,162 MW | 5,472 MW | 10,672 MW | 1,834 MW | 1,010 MW |
| 2026-10-16T14:00Z | 38,108 MW | 5,667 MW | 8,028 MW | 2,102 MW | 1,858 MW |
| 2026-10-16T15:00Z | 38,171 MW | 6,001 MW | 4,412 MW | 3,538 MW | 3,346 MW |
| 2026-10-16T16:00Z | 38,462 MW | 6,527 MW | 1,249 MW | 3,969 MW | 4,151 MW |
| 2026-10-16T17:00Z | 38,715 MW | 7,305 MW | 259 MW | 4,068 MW | 4,196 MW |
| 2026-10-16T18:00Z | 39,123 MW | 7,899 MW | 202 MW | 3,705 MW | 4,195 MW |
| 2026-10-16T19:00Z | 39,037 MW | 8,334 MW | 0 MW | 3,120 MW | 3,862 MW |
| 2026-10-16T20:00Z | 38,705 MW | 9,215 MW | 0 MW | 2,571 MW | 3,314 MW |
| 2026-10-16T21:00Z | 38,666 MW | 9,115 MW | 0 MW | 2,373 MW | 2,230 MW |
| 2026-10-16T22:00Z | 38,656 MW | 9,403 MW | 0 MW | 2,228 MW | 1,121 MW |
| 2026-10-16T23:00Z | 38,703 MW | 9,553 MW | 0 MW | 1,868 MW | 328 MW |
| 2026-10-17T00:00Z | 38,190 MW | 9,252 MW | 0 MW | 1,646 MW | 344 MW |
| 2026-10-17T01:00Z | 38,036 MW | 8,790 MW | 0 MW | 1,518 MW | 345 MW |
| 2026-10-17T02:00Z | 38,044 MW | 8,610 MW | 0 MW | 1,486 MW | 342 MW |
| 2026-10-17T03:00Z | 38,498 MW | 8,708 MW | 0 MW | 1,539 MW | 344 MW |
| 2026-10-17T04:00Z | 38,645 MW | 8,669 MW | 0 MW | 1,807 MW | 333 MW |
| 2026-10-17T05:00Z | 38,658 MW | 9,011 MW | 205 MW | 1,983 MW | 341 MW |
| 2026-10-17T06:00Z | 38,570 MW | 9,356 MW | 527 MW | 1,927 MW | 342 MW |
| 2026-10-17T07:00Z | 38,259 MW | 9,043 MW | 2,608 MW | 1,833 MW | 368 MW |
| 2026-10-17T08:00Z | 37,519 MW | 8,448 MW | 6,034 MW | 1,659 MW | 356 MW |
| 2026-10-17T09:00Z | 36,254 MW | 9,345 MW | 9,075 MW | 1,461 MW | 327 MW |
| 2026-10-17T10:00Z | 35,025 MW | 10,851 MW | 10,724 MW | 1,427 MW | 335 MW |
| 2026-10-17T11:00Z | 33,826 MW | 11,798 MW | 11,214 MW | 1,382 MW | 362 MW |
| 2026-10-17T12:00Z | 32,925 MW | 12,053 MW | 10,728 MW | 1,467 MW | 366 MW |
| 2026-10-17T13:00Z | 32,409 MW | 12,083 MW | 9,239 MW | 1,558 MW | 364 MW |
| 2026-10-17T14:00Z | 33,466 MW | 11,812 MW | 6,982 MW | 1,631 MW | 344 MW |
| 2026-10-17T15:00Z | 35,951 MW | 11,483 MW | 4,150 MW | 2,301 MW | 355 MW |
| 2026-10-17T16:00Z | 36,781 MW | 10,372 MW | 1,328 MW | 3,284 MW | 905 MW |
| 2026-10-17T17:00Z | 36,905 MW | 9,414 MW | 267 MW | 4,562 MW | 1,453 MW |
| 2026-10-17T18:00Z | 36,915 MW | 10,051 MW | 194 MW | 3,700 MW | 1,975 MW |
| 2026-10-17T19:00Z | 36,879 MW | 10,335 MW | 0 MW | 2,507 MW | 1,446 MW |
| 2026-10-17T20:00Z | 36,759 MW | 10,059 MW | 0 MW | 2,123 MW | 978 MW |
| 2026-10-17T21:00Z | 36,803 MW | 9,631 MW | 0 MW | 1,908 MW | 1,534 MW |
| 2026-10-17T22:00Z | 36,878 MW | 9,334 MW | 0 MW | 1,897 MW | 1,645 MW |
| 2026-10-17T23:00Z | 36,857 MW | 8,489 MW | 0 MW | 1,726 MW | 1,784 MW |
| 2026-10-18T00:00Z | 36,884 MW | 7,939 MW | 0 MW | 1,713 MW | 1,457 MW |
| 2026-10-18T01:00Z | 36,677 MW | 7,608 MW | 0 MW | 1,535 MW | 1,355 MW |
| 2026-10-18T02:00Z | 36,626 MW | 7,059 MW | 0 MW | 1,429 MW | 1,364 MW |
| 2026-10-18T03:00Z | 36,729 MW | 6,854 MW | 0 MW | 1,488 MW | 1,495 MW |
| 2026-10-18T04:00Z | 36,942 MW | 6,598 MW | 0 MW | 1,631 MW | 1,669 MW |
| 2026-10-18T05:00Z | 36,943 MW | 6,326 MW | 199 MW | 1,766 MW | 1,777 MW |
| 2026-10-18T06:00Z | 36,868 MW | 5,678 MW | 417 MW | 1,940 MW | 2,015 MW |
| 2026-10-18T07:00Z | 36,891 MW | 4,756 MW | 2,381 MW | 2,555 MW | 2,081 MW |
| 2026-10-18T08:00Z | 36,842 MW | 3,658 MW | 5,763 MW | 2,947 MW | 2,103 MW |
| 2026-10-18T09:00Z | 36,813 MW | 2,987 MW | 8,736 MW | 2,902 MW | 2,089 MW |
| 2026-10-18T10:00Z | 36,668 MW | 2,890 MW | 10,459 MW | 2,400 MW | 1,969 MW |
| 2026-10-18T11:00Z | 36,607 MW | 3,208 MW | 10,929 MW | 1,884 MW | 2,023 MW |
| 2026-10-18T12:00Z | 36,596 MW | 3,150 MW | 10,142 MW | 1,831 MW | 2,212 MW |
| 2026-10-18T13:00Z | 36,513 MW | 3,403 MW | 8,750 MW | 2,068 MW | 2,308 MW |
| 2026-10-18T14:00Z | 36,574 MW | 3,000 MW | 6,771 MW | 2,764 MW | 2,886 MW |
| 2026-10-18T15:00Z | 36,625 MW | 2,674 MW | 4,148 MW | 3,668 MW | 3,882 MW |
| 2026-10-18T16:00Z | 36,654 MW | 2,435 MW | 1,314 MW | 4,328 MW | 4,233 MW |
| 2026-10-18T17:00Z | 36,690 MW | 1,943 MW | 232 MW | 4,754 MW | 4,624 MW |
| 2026-10-18T18:00Z | 36,699 MW | 2,193 MW | 176 MW | 4,536 MW | 4,777 MW |
| 2026-10-18T19:00Z | 36,709 MW | 2,064 MW | 0 MW | 3,927 MW | 4,680 MW |
| 2026-10-18T20:00Z | 36,718 MW | 1,993 MW | 0 MW | 3,707 MW | 4,653 MW |
| 2026-10-18T21:00Z | 36,741 MW | 1,794 MW | 0 MW | 3,127 MW | 4,651 MW |
| 2026-10-18T22:00Z | 36,647 MW | 1,743 MW | 0 MW | 2,576 MW | 2,698 MW |
| 2026-10-18T23:00Z | 36,633 MW | 1,626 MW | 0 MW | 2,303 MW | 1,642 MW |
| 2026-10-19T00:00Z | 36,862 MW | 1,707 MW | 0 MW | 2,249 MW | 1,569 MW |
| 2026-10-19T01:00Z | 36,987 MW | 1,708 MW | 0 MW | 2,200 MW | 1,553 MW |
| 2026-10-19T02:00Z | 36,967 MW | 1,682 MW | 0 MW | 2,197 MW | 1,571 MW |
| 2026-10-19T03:00Z | 36,957 MW | 1,697 MW | 0 MW | 2,473 MW | 2,387 MW |
| 2026-10-19T04:00Z | 36,982 MW | 1,848 MW | 0 MW | 3,224 MW | 4,305 MW |
| 2026-10-19T05:00Z | 37,055 MW | 2,117 MW | 183 MW | 3,994 MW | 4,862 MW |
| 2026-10-19T06:00Z | 37,066 MW | 2,534 MW | 379 MW | 4,549 MW | 5,049 MW |
| 2026-10-19T07:00Z | 37,083 MW | 2,712 MW | 2,147 MW | 4,179 MW | 5,095 MW |
| 2026-10-19T08:00Z | 37,087 MW | 2,771 MW | 4,786 MW | 4,349 MW | 5,084 MW |
| 2026-10-19T09:00Z | 37,069 MW | 2,578 MW | 6,886 MW | 3,816 MW | 4,737 MW |
| 2026-10-19T10:00Z | 37,044 MW | 2,384 MW | 7,907 MW | 3,067 MW | 4,618 MW |
| 2026-10-19T11:00Z | 37,024 MW | 2,305 MW | 7,665 MW | 2,706 MW | 4,675 MW |
| 2026-10-19T12:00Z | 37,008 MW | 2,335 MW | 6,822 MW | 2,693 MW | 4,540 MW |
| 2026-10-19T13:00Z | 36,999 MW | 2,717 MW | 5,595 MW | 2,945 MW | 4,702 MW |
| 2026-10-19T14:00Z | 36,998 MW | 3,245 MW | 3,976 MW | 3,442 MW | 4,734 MW |
| 2026-10-19T15:00Z | 36,993 MW | 3,668 MW | 2,155 MW | 4,266 MW | 5,011 MW |
| 2026-10-19T16:00Z | 36,976 MW | 3,726 MW | 744 MW | 5,152 MW | 5,490 MW |
| 2026-10-19T17:00Z | 36,963 MW | 4,181 MW | 247 MW | 5,390 MW | 5,489 MW |
| 2026-10-19T18:00Z | 36,955 MW | 4,727 MW | 203 MW | 4,604 MW | 5,490 MW |
| 2026-10-19T19:00Z | 36,949 MW | 4,862 MW | 0 MW | 3,805 MW | 5,021 MW |
| 2026-10-19T20:00Z | 36,919 MW | 5,232 MW | 0 MW | 3,388 MW | 4,288 MW |
| 2026-10-19T21:00Z | 36,953 MW | 5,629 MW | 0 MW | 3,096 MW | 2,898 MW |
| 2026-10-19T22:00Z | 37,129 MW | 5,749 MW | 0 MW | 2,755 MW | 2,227 MW |
| 2026-10-19T23:00Z | 37,400 MW | 5,588 MW | 0 MW | 2,482 MW | 1,489 MW |
| 2026-10-20T00:00Z | 38,053 MW | 5,907 MW | 0 MW | 2,436 MW | 1,364 MW |
| 2026-10-20T01:00Z | 38,162 MW | 6,481 MW | 0 MW | 2,563 MW | 912 MW |
| 2026-10-20T02:00Z | 38,023 MW | 6,914 MW | 0 MW | 2,669 MW | 1,253 MW |
| 2026-10-20T03:00Z | 38,078 MW | 7,202 MW | 0 MW | 2,926 MW | 1,445 MW |
| 2026-10-20T04:00Z | 38,234 MW | 7,410 MW | 0 MW | 3,414 MW | 2,592 MW |
| 2026-10-20T05:00Z | 38,233 MW | 7,605 MW | 183 MW | 4,089 MW | 4,140 MW |
| 2026-10-20T06:00Z | 38,214 MW | 6,913 MW | 301 MW | 4,339 MW | 4,260 MW |
| 2026-10-20T07:00Z | 38,240 MW | 6,343 MW | 1,405 MW | 4,079 MW | 4,207 MW |
| 2026-10-20T08:00Z | 38,244 MW | 5,676 MW | 3,296 MW | 3,851 MW | 3,703 MW |
| 2026-10-20T09:00Z | 38,243 MW | 5,180 MW | 5,149 MW | 3,560 MW | 3,595 MW |
| 2026-10-20T10:00Z | 38,159 MW | 5,062 MW | 6,527 MW | 3,150 MW | 3,043 MW |
| 2026-10-20T11:00Z | 38,149 MW | 5,210 MW | 7,382 MW | 2,948 MW | 2,689 MW |
| 2026-10-20T12:00Z | 38,129 MW | 6,014 MW | 7,353 MW | 2,884 MW | 2,641 MW |
| 2026-10-20T13:00Z | 38,196 MW | 6,252 MW | 6,619 MW | 2,844 MW | 2,424 MW |
| 2026-10-20T14:00Z | 38,406 MW | 6,218 MW | 5,061 MW | 3,295 MW | 2,505 MW |
| 2026-10-20T15:00Z | 38,287 MW | 6,460 MW | 3,187 MW | 4,026 MW | 3,143 MW |
| 2026-10-20T16:00Z | 38,258 MW | 7,121 MW | 1,133 MW | 4,763 MW | 3,332 MW |
| 2026-10-20T17:00Z | 37,976 MW | 7,338 MW | 255 MW | 5,305 MW | 3,297 MW |
| 2026-10-20T18:00Z | 38,123 MW | 7,520 MW | 206 MW | 4,766 MW | 3,307 MW |
| 2026-10-20T19:00Z | 37,696 MW | 7,813 MW | 0 MW | 4,195 MW | 2,900 MW |
| 2026-10-20T20:00Z | 37,706 MW | 8,560 MW | 0 MW | 3,810 MW | 2,234 MW |
| 2026-10-20T21:00Z | 37,654 MW | 9,135 MW | 0 MW | 3,572 MW | 1,184 MW |
| 2026-10-20T22:00Z | 38,208 MW | 9,678 MW | 0 MW | 3,679 MW | 642 MW |
| 2026-10-20T23:00Z | 38,354 MW | 9,897 MW | 0 MW | 3,557 MW | 282 MW |
| 2026-10-21T00:00Z | 38,344 MW | 9,926 MW | 0 MW | 3,410 MW | 286 MW |
| 2026-10-21T01:00Z | 37,552 MW | 10,366 MW | 0 MW | 3,354 MW | 284 MW |
| 2026-10-21T02:00Z | 37,277 MW | 10,465 MW | 0 MW | 3,413 MW | 320 MW |
| 2026-10-21T03:00Z | 37,297 MW | 11,080 MW | 0 MW | 3,665 MW | 335 MW |
| 2026-10-21T04:00Z | 37,259 MW | 12,267 MW | 0 MW | 3,805 MW | 1,092 MW |
| 2026-10-21T05:00Z | 37,269 MW | 13,616 MW | 229 MW | 4,181 MW | 2,118 MW |
| 2026-10-21T06:00Z | 37,251 MW | 14,361 MW | 387 MW | 4,727 MW | 2,093 MW |
| 2026-10-21T07:00Z | 37,266 MW | 14,378 MW | 1,823 MW | 5,064 MW | 2,307 MW |
| 2026-10-21T08:00Z | 37,224 MW | 14,462 MW | 4,535 MW | 4,539 MW | 1,980 MW |
| 2026-10-21T09:00Z | 37,109 MW | 15,152 MW | 7,536 MW | 4,000 MW | 1,474 MW |
| 2026-10-21T10:00Z | 37,070 MW | 15,441 MW | 9,759 MW | 3,615 MW | 720 MW |
| 2026-10-21T11:00Z | 35,964 MW | 14,979 MW | 10,907 MW | 3,330 MW | 757 MW |
| 2026-10-21T12:00Z | 35,400 MW | 15,057 MW | 10,978 MW | 3,281 MW | 763 MW |
| 2026-10-21T13:00Z | 34,666 MW | 15,778 MW | 10,090 MW | 3,000 MW | 669 MW |
| 2026-10-21T14:00Z | 35,087 MW | 16,216 MW | 8,277 MW | 3,035 MW | 323 MW |
| 2026-10-21T15:00Z | 36,603 MW | 15,850 MW | 4,823 MW | 3,349 MW | 415 MW |
| 2026-10-21T16:00Z | 38,087 MW | 14,914 MW | 1,294 MW | 4,882 MW | 1,656 MW |
| 2026-10-21T17:00Z | 38,287 MW | 14,374 MW | 266 MW | 5,394 MW | 2,359 MW |
| 2026-10-21T18:00Z | 38,321 MW | 13,457 MW | 195 MW | 4,905 MW | 2,402 MW |
| 2026-10-21T19:00Z | 38,322 MW | 13,487 MW | 0 MW | 4,627 MW | 2,333 MW |
| 2026-10-21T20:00Z | 38,339 MW | 12,862 MW | 0 MW | 4,467 MW | 1,717 MW |
| 2026-10-21T21:00Z | 38,388 MW | 12,739 MW | 0 MW | 4,119 MW | 1,000 MW |
| 2026-10-21T22:00Z | 38,365 MW | 12,470 MW | 0 MW | 3,512 MW | 336 MW |
| 2026-10-21T23:00Z | 38,343 MW | 12,084 MW | 0 MW | 3,295 MW | 220 MW |
| 2026-10-22T00:00Z | 38,290 MW | 12,243 MW | 0 MW | 3,295 MW | 226 MW |
| 2026-10-22T01:00Z | 38,316 MW | 12,514 MW | 0 MW | 3,264 MW | 276 MW |
| 2026-10-22T02:00Z | 38,266 MW | 13,270 MW | 0 MW | 3,031 MW | 289 MW |
| 2026-10-22T03:00Z | 38,267 MW | 14,141 MW | 0 MW | 3,055 MW | 288 MW |
| 2026-10-22T04:00Z | 38,342 MW | 14,730 MW | 0 MW | 3,567 MW | 288 MW |
| 2026-10-22T05:00Z | 38,408 MW | 15,219 MW | 219 MW | 3,906 MW | 285 MW |
| 2026-10-22T06:00Z | 38,415 MW | 15,032 MW | 420 MW | 3,962 MW | 286 MW |
| 2026-10-22T07:00Z | 38,421 MW | 14,211 MW | 2,461 MW | 3,903 MW | 281 MW |
| 2026-10-22T08:00Z | 38,285 MW | 13,232 MW | 5,816 MW | 3,684 MW | 288 MW |
| 2026-10-22T09:00Z | 38,100 MW | 12,614 MW | 8,626 MW | 3,168 MW | 282 MW |
| 2026-10-22T10:00Z | 36,869 MW | 12,277 MW | 10,178 MW | 3,059 MW | 268 MW |
| 2026-10-22T11:00Z | 35,992 MW | 12,008 MW | 10,808 MW | 3,016 MW | 287 MW |
| 2026-10-22T12:00Z | 35,728 MW | 11,685 MW | 10,309 MW | 2,994 MW | 288 MW |
| 2026-10-22T13:00Z | 35,833 MW | 11,334 MW | 8,858 MW | 2,819 MW | 336 MW |
| 2026-10-22T14:00Z | 36,054 MW | 10,218 MW | 6,199 MW | 2,938 MW | 799 MW |
| 2026-10-22T15:00Z | 36,833 MW | 8,938 MW | 2,997 MW | 4,070 MW | 2,372 MW |
| 2026-10-22T16:00Z | 37,823 MW | 8,822 MW | 795 MW | 5,167 MW | 3,640 MW |
| 2026-10-22T17:00Z | 38,740 MW | 10,725 MW | 205 MW | 5,721 MW | 3,678 MW |
| 2026-10-22T18:00Z | 39,059 MW | 12,598 MW | 189 MW | 5,104 MW | 3,466 MW |
| 2026-10-22T19:00Z | 39,119 MW | 14,078 MW | 0 MW | 4,439 MW | 3,233 MW |
| 2026-10-22T20:00Z | 39,106 MW | 14,918 MW | 0 MW | 4,035 MW | 1,582 MW |
| 2026-10-22T21:00Z | 39,086 MW | 15,374 MW | 0 MW | 3,826 MW | 718 MW |
| 2026-10-22T22:00Z | 39,055 MW | 15,768 MW | 0 MW | 4,133 MW | 424 MW |
| 2026-10-22T23:00Z | 39,017 MW | 16,097 MW | 0 MW | 3,269 MW | 295 MW |
| 2026-10-23T00:00Z | 38,855 MW | 16,574 MW | 0 MW | 2,776 MW | 294 MW |
| 2026-10-23T01:00Z | 38,291 MW | 16,988 MW | 0 MW | 2,290 MW | 292 MW |
| 2026-10-23T02:00Z | 38,446 MW | 16,924 MW | 0 MW | 2,229 MW | 285 MW |
| 2026-10-23T03:00Z | 39,067 MW | 17,099 MW | 0 MW | 2,481 MW | 296 MW |
| 2026-10-23T04:00Z | 39,325 MW | 16,967 MW | 0 MW | 2,888 MW | 502 MW |
| 2026-10-23T05:00Z | 39,405 MW | 17,131 MW | 188 MW | 3,994 MW | 1,217 MW |
| 2026-10-23T06:00Z | 39,419 MW | 17,412 MW | 345 MW | 4,966 MW | 2,072 MW |
| 2026-10-23T07:00Z | 39,395 MW | 17,378 MW | 1,690 MW | 4,261 MW | 2,122 MW |
| 2026-10-23T08:00Z | 39,347 MW | 17,098 MW | 4,226 MW | 3,911 MW | 2,067 MW |
| 2026-10-23T09:00Z | 39,169 MW | 17,396 MW | 6,845 MW | 3,111 MW | 1,811 MW |
| 2026-10-23T10:00Z | 38,963 MW | 17,296 MW | 8,703 MW | 3,044 MW | 1,638 MW |
| 2026-10-23T11:00Z | 39,145 MW | 16,902 MW | 10,109 MW | 2,525 MW | 1,563 MW |
| 2026-10-23T12:00Z | 39,125 MW | 17,190 MW | 10,521 MW | 2,391 MW | 1,485 MW |
| 2026-10-23T13:00Z | 38,846 MW | 17,764 MW | 9,576 MW | 2,278 MW | 1,604 MW |
| 2026-10-23T14:00Z | 38,684 MW | 17,580 MW | 7,054 MW | 2,301 MW | 1,721 MW |
| 2026-10-23T15:00Z | 38,819 MW | 18,172 MW | 3,832 MW | 2,757 MW | 1,681 MW |
| 2026-10-23T16:00Z | 39,050 MW | 18,417 MW | 1,025 MW | 3,958 MW | 1,543 MW |
| 2026-10-23T17:00Z | 39,113 MW | 18,487 MW | 225 MW | 4,242 MW | 1,497 MW |
| 2026-10-23T18:00Z | 39,036 MW | 18,111 MW | 205 MW | 3,896 MW | 1,485 MW |
| 2026-10-23T19:00Z | 38,978 MW | 17,655 MW | 0 MW | 3,622 MW | 1,169 MW |
| 2026-10-23T20:00Z | 37,826 MW | 17,330 MW | 0 MW | 3,630 MW | 1,126 MW |
| 2026-10-23T21:00Z | 36,495 MW | 17,280 MW | 0 MW | 3,288 MW | 1,114 MW |
| 2026-10-23T22:00Z | 35,970 MW | 17,070 MW | 0 MW | 3,361 MW | 762 MW |
| 2026-10-23T23:00Z | 35,801 MW | 16,531 MW | 0 MW | 2,993 MW | 723 MW |
| 2026-10-24T00:00Z | 35,786 MW | 16,096 MW | 0 MW | 2,619 MW | 701 MW |
| 2026-10-24T01:00Z | 35,733 MW | 15,509 MW | 0 MW | 2,376 MW | 674 MW |
| 2026-10-24T02:00Z | 35,337 MW | 14,573 MW | 0 MW | 2,363 MW | 687 MW |
| 2026-10-24T03:00Z | 35,237 MW | 13,185 MW | 0 MW | 2,381 MW | 713 MW |
| 2026-10-24T04:00Z | 35,330 MW | 11,880 MW | 0 MW | 2,562 MW | 697 MW |
| 2026-10-24T05:00Z | 35,437 MW | 11,503 MW | 230 MW | 2,713 MW | 697 MW |
| 2026-10-24T06:00Z | 33,814 MW | 10,755 MW | 340 MW | 2,809 MW | 696 MW |
| 2026-10-24T07:00Z | 33,572 MW | 9,877 MW | 1,740 MW | 2,856 MW | 708 MW |
| 2026-10-24T08:00Z | 34,144 MW | 9,903 MW | 4,134 MW | 2,580 MW | 695 MW |
| 2026-10-24T09:00Z | 34,487 MW | 10,271 MW | 6,412 MW | 2,400 MW | 683 MW |
| 2026-10-24T10:00Z | 33,971 MW | 11,540 MW | 7,710 MW | 2,286 MW | 678 MW |
| 2026-10-24T11:00Z | 33,311 MW | 12,498 MW | 7,909 MW | 2,105 MW | 702 MW |
| 2026-10-24T12:00Z | 33,070 MW | 13,468 MW | 7,206 MW | 2,183 MW | 691 MW |
| 2026-10-24T13:00Z | 33,350 MW | 14,292 MW | 5,710 MW | 2,245 MW | 694 MW |
| 2026-10-24T14:00Z | 34,323 MW | 15,546 MW | 3,892 MW | 2,433 MW | 688 MW |
| 2026-10-24T15:00Z | 34,865 MW | 16,457 MW | 1,855 MW | 2,831 MW | 690 MW |
| 2026-10-24T16:00Z | 34,951 MW | 17,274 MW | 564 MW | 3,344 MW | 701 MW |
| 2026-10-24T17:00Z | 35,050 MW | 18,096 MW | 208 MW | 3,561 MW | 722 MW |
| 2026-10-24T18:00Z | 35,120 MW | 18,563 MW | 190 MW | 3,224 MW | 694 MW |
| 2026-10-24T19:00Z | 34,987 MW | 18,854 MW | 0 MW | 3,108 MW | 694 MW |
| 2026-10-24T20:00Z | 34,856 MW | 18,907 MW | 0 MW | 3,389 MW | 677 MW |
| 2026-10-24T21:00Z | 34,036 MW | 18,979 MW | 0 MW | 3,075 MW | 672 MW |
| 2026-10-24T22:00Z | 31,485 MW | 19,015 MW | 0 MW | 2,947 MW | 708 MW |
| 2026-10-24T23:00Z | 30,247 MW | 19,014 MW | 0 MW | 2,777 MW | 692 MW |
| 2026-10-25T00:00Z | 30,249 MW | 18,941 MW | 0 MW | 2,653 MW | 692 MW |
| 2026-10-25T01:00Z | 29,757 MW | 19,070 MW | 0 MW | 2,361 MW | 677 MW |
| 2026-10-25T02:00Z | 27,550 MW | 18,992 MW | 0 MW | 2,370 MW | 689 MW |
| 2026-10-25T03:00Z | 26,734 MW | 18,687 MW | 0 MW | 2,770 MW | 702 MW |
| 2026-10-25T04:00Z | 27,310 MW | 18,253 MW | 0 MW | 2,809 MW | 704 MW |
| 2026-10-25T05:00Z | 28,492 MW | 17,695 MW | 184 MW | 2,821 MW | 663 MW |
| 2026-10-25T06:00Z | 29,587 MW | 17,172 MW | 272 MW | 2,915 MW | 676 MW |
| 2026-10-25T07:00Z | 30,389 MW | 16,843 MW | 1,528 MW | 3,031 MW | 691 MW |
| 2026-10-25T08:00Z | 30,077 MW | 16,819 MW | 3,759 MW | 2,574 MW | 699 MW |
| 2026-10-25T09:00Z | 29,789 MW | 16,739 MW | 5,960 MW | 2,461 MW | 696 MW |
| 2026-10-25T10:00Z | 29,821 MW | 17,339 MW | 7,359 MW | 2,366 MW | 681 MW |
| 2026-10-25T11:00Z | 29,560 MW | 17,502 MW | 8,271 MW | 2,265 MW | 693 MW |
| 2026-10-25T12:00Z | 29,521 MW | 17,489 MW | 8,245 MW | 2,317 MW | 691 MW |
| 2026-10-25T13:00Z | 30,264 MW | 17,208 MW | 7,599 MW | 2,361 MW | 681 MW |
| 2026-10-25T14:00Z | 30,513 MW | 16,726 MW | 5,850 MW | 2,400 MW | 739 MW |
| 2026-10-25T15:00Z | 31,353 MW | 15,918 MW | 3,257 MW | 2,649 MW | 731 MW |
| 2026-10-25T16:00Z | 32,633 MW | 14,248 MW | 857 MW | 3,090 MW | 726 MW |
| 2026-10-25T17:00Z | 32,994 MW | 12,586 MW | 207 MW | 3,571 MW | 751 MW |
| 2026-10-25T18:00Z | 33,344 MW | 11,605 MW | 0 MW | 3,800 MW | 743 MW |
| 2026-10-25T19:00Z | 33,957 MW | 11,163 MW | 0 MW | 3,733 MW | 726 MW |
| 2026-10-25T20:00Z | 34,042 MW | 10,507 MW | 0 MW | 3,468 MW | 742 MW |
| 2026-10-25T21:00Z | 33,957 MW | 9,217 MW | 0 MW | 3,570 MW | 756 MW |
| 2026-10-25T22:00Z | 34,171 MW | 8,836 MW | 0 MW | 3,369 MW | 749 MW |
| 2026-10-25T23:00Z | 34,896 MW | 9,140 MW | 0 MW | 3,433 MW | 694 MW |
| 2026-10-26T00:00Z | 35,319 MW | 8,721 MW | 0 MW | 3,296 MW | 717 MW |
| 2026-10-26T01:00Z | 34,979 MW | 8,464 MW | 0 MW | 3,159 MW | 717 MW |
| 2026-10-26T02:00Z | 34,828 MW | 8,295 MW | 0 MW | 3,277 MW | 705 MW |
| 2026-10-26T03:00Z | 35,266 MW | 7,869 MW | 0 MW | 3,306 MW | 723 MW |
| 2026-10-26T04:00Z | 35,501 MW | 7,887 MW | 0 MW | 3,525 MW | 748 MW |
| 2026-10-26T05:00Z | 35,606 MW | 7,783 MW | 0 MW | 4,248 MW | 840 MW |
| 2026-10-26T06:00Z | 35,815 MW | 8,013 MW | 353 MW | 5,085 MW | 1,129 MW |
| 2026-10-26T07:00Z | 35,957 MW | 8,357 MW | 1,985 MW | 5,114 MW | 1,304 MW |
| 2026-10-26T08:00Z | 36,289 MW | 8,339 MW | 5,261 MW | 4,761 MW | 1,279 MW |
| 2026-10-26T09:00Z | 37,049 MW | 8,017 MW | 7,783 MW | 4,121 MW | 1,025 MW |
| 2026-10-26T10:00Z | 37,303 MW | 8,053 MW | 8,995 MW | 3,916 MW | 730 MW |
| 2026-10-26T11:00Z | 37,491 MW | 8,921 MW | 9,184 MW | 4,353 MW | 706 MW |
| 2026-10-26T12:00Z | 37,551 MW | 9,444 MW | 8,713 MW | 3,952 MW | 718 MW |
| 2026-10-26T13:00Z | 37,520 MW | 9,676 MW | 7,459 MW | 4,303 MW | 765 MW |
| 2026-10-26T14:00Z | 37,529 MW | 9,840 MW | 5,594 MW | 4,747 MW | 924 MW |
| 2026-10-26T15:00Z | 37,493 MW | 10,048 MW | 3,149 MW | 5,625 MW | 1,461 MW |
| 2026-10-26T16:00Z | 37,789 MW | 9,967 MW | 850 MW | 6,425 MW | 1,687 MW |
| 2026-10-26T17:00Z | 38,408 MW | 9,810 MW | 205 MW | 6,271 MW | 1,598 MW |
| 2026-10-26T18:00Z | 38,744 MW | 9,777 MW | 183 MW | 5,774 MW | 1,586 MW |
| 2026-10-26T19:00Z | 38,756 MW | 9,540 MW | 0 MW | 5,010 MW | 1,810 MW |
| 2026-10-26T20:00Z | 38,701 MW | 9,463 MW | 0 MW | 4,455 MW | 1,326 MW |
| 2026-10-26T21:00Z | 38,605 MW | 9,507 MW | 0 MW | 4,186 MW | 1,159 MW |
| 2026-10-26T22:00Z | 38,186 MW | 9,607 MW | 0 MW | 4,049 MW | 1,108 MW |
| 2026-10-26T23:00Z | 38,025 MW | 9,399 MW | 0 MW | 3,887 MW | 1,213 MW |
| 2026-10-27T00:00Z | 37,095 MW | 9,473 MW | 0 MW | 3,697 MW | 1,353 MW |
| 2026-10-27T01:00Z | 37,151 MW | 9,799 MW | 0 MW | 3,628 MW | 1,465 MW |
| 2026-10-27T02:00Z | 37,158 MW | 10,193 MW | 0 MW | 3,262 MW | 1,763 MW |
| 2026-10-27T03:00Z | 37,177 MW | 10,243 MW | 0 MW | 2,734 MW | 1,833 MW |
| 2026-10-27T04:00Z | 37,039 MW | 9,987 MW | 0 MW | 2,847 MW | 1,914 MW |
| 2026-10-27T05:00Z | 37,020 MW | 10,092 MW | 0 MW | 3,587 MW | 1,946 MW |
| 2026-10-27T06:00Z | 37,194 MW | 10,776 MW | 339 MW | 3,948 MW | 2,094 MW |
| 2026-10-27T07:00Z | 37,308 MW | 10,474 MW | 2,397 MW | 3,899 MW | 1,956 MW |
| 2026-10-27T08:00Z | 37,288 MW | 9,253 MW | 6,543 MW | 3,371 MW | 1,676 MW |
| 2026-10-27T09:00Z | 37,269 MW | 8,197 MW | 10,414 MW | 3,015 MW | 1,228 MW |
| 2026-10-27T10:00Z | 37,270 MW | 7,667 MW | 12,560 MW | 2,896 MW | 1,190 MW |
| 2026-10-27T11:00Z | 37,202 MW | 7,881 MW | 13,202 MW | 2,807 MW | 1,220 MW |
| 2026-10-27T12:00Z | 37,176 MW | 7,492 MW | 12,129 MW | 2,872 MW | 1,571 MW |
| 2026-10-27T13:00Z | 37,236 MW | 7,030 MW | 9,822 MW | 2,925 MW | 1,894 MW |
| 2026-10-27T14:00Z | 37,300 MW | 6,648 MW | 6,755 MW | 3,338 MW | 2,633 MW |
| 2026-10-27T15:00Z | 37,338 MW | 6,466 MW | 3,293 MW | 4,393 MW | 3,537 MW |
| 2026-10-27T16:00Z | 37,413 MW | 5,682 MW | 785 MW | 4,933 MW | 4,600 MW |
| 2026-10-27T17:00Z | 37,452 MW | 5,354 MW | 218 MW | 6,023 MW | 4,793 MW |
| 2026-10-27T18:00Z | 37,500 MW | 6,022 MW | 204 MW | 6,129 MW | 4,821 MW |
| 2026-10-27T19:00Z | 37,538 MW | 6,278 MW | 0 MW | 5,534 MW | 4,802 MW |
| 2026-10-27T20:00Z | 37,572 MW | 6,210 MW | 0 MW | 4,602 MW | 4,750 MW |
| 2026-10-27T21:00Z | 37,624 MW | 6,003 MW | 0 MW | 4,195 MW | 4,791 MW |
| 2026-10-27T22:00Z | 37,730 MW | 5,374 MW | 0 MW | 3,769 MW | 4,755 MW |
| 2026-10-27T23:00Z | 37,829 MW | 5,042 MW | 0 MW | 3,048 MW | 3,849 MW |
| 2026-10-28T00:00Z | 37,948 MW | 4,777 MW | 0 MW | 2,809 MW | 3,464 MW |
| 2026-10-28T01:00Z | 38,237 MW | 4,466 MW | 0 MW | 2,591 MW | 2,802 MW |
| 2026-10-28T02:00Z | 39,069 MW | 3,904 MW | 0 MW | 2,517 MW | 2,831 MW |
| 2026-10-28T03:00Z | 39,488 MW | 3,500 MW | 0 MW | 2,615 MW | 2,950 MW |
| 2026-10-28T04:00Z | 40,163 MW | 3,177 MW | 0 MW | 2,602 MW | 3,357 MW |
| 2026-10-28T05:00Z | 40,855 MW | 2,808 MW | 0 MW | 3,690 MW | 4,393 MW |
| 2026-10-28T06:00Z | 41,390 MW | 2,508 MW | 311 MW | 4,352 MW | 4,874 MW |
| 2026-10-28T07:00Z | 41,619 MW | 2,308 MW | 2,497 MW | 4,414 MW | 4,810 MW |
| 2026-10-28T08:00Z | 41,823 MW | 2,276 MW | 7,081 MW | 4,009 MW | 3,754 MW |
| 2026-10-28T09:00Z | 41,784 MW | 1,745 MW | 11,431 MW | 3,308 MW | 2,099 MW |
| 2026-10-28T10:00Z | 41,653 MW | 1,621 MW | 14,141 MW | 2,912 MW | 1,403 MW |
| 2026-10-28T11:00Z | 41,499 MW | 1,786 MW | 15,792 MW | 2,813 MW | 1,335 MW |
| 2026-10-28T12:00Z | 41,026 MW | 1,855 MW | 15,278 MW | 2,798 MW | 1,362 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00Z.
Installed Capacity
Annual figure for 2026| Nuclear | |
|---|---|
| Solar | |
| Wind | |
| Hydro | |
| Gas | |
| Storage | |
| Oil | |
| Other | |
| Coal | |
| Bioenergy | |
| Other renewables | |
| Geothermal |
Total installed capacity in France: 164 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Paris time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Paris time) | Demand |
|---|---|
| 2025-09-23 | 1.08 TWh |
| 2025-09-24 | 1.12 TWh |
| 2025-09-25 | 1.14 TWh |
| 2025-09-26 | 1.14 TWh |
| 2025-09-27 | 1.01 TWh |
| 2025-09-28 | 970 GWh |
| 2025-09-29 | 1.09 TWh |
| 2025-09-30 | 1.10 TWh |
| 2025-10-01 | 1.11 TWh |
| 2025-10-02 | 1.10 TWh |
| 2025-10-03 | 1.10 TWh |
| 2025-10-04 | 989 GWh |
| 2025-10-05 | 963 GWh |
| 2025-10-06 | 1.12 TWh |
| 2025-10-07 | 1.11 TWh |
| 2025-10-08 | 1.11 TWh |
| 2025-10-09 | 1.12 TWh |
| 2025-10-10 | 1.11 TWh |
| 2025-10-11 | 999 GWh |
| 2025-10-12 | 956 GWh |
| 2025-10-13 | 1.10 TWh |
| 2025-10-14 | 1.12 TWh |
| 2025-10-15 | 1.13 TWh |
| 2025-10-16 | 1.14 TWh |
| 2025-10-17 | 1.13 TWh |
| 2025-10-18 | 1.03 TWh |
| 2025-10-19 | 1.01 TWh |
| 2025-10-20 | 1.11 TWh |
| 2025-10-21 | 1.13 TWh |
| 2025-10-22 | 1.13 TWh |
| 2025-10-23 | 1.14 TWh |
| 2025-10-24 | 1.18 TWh |
| 2025-10-25 | 1.08 TWh |
| 2025-10-26 | 1.09 TWh |
| 2025-10-27 | 1.21 TWh |
| 2025-10-28 | 1.20 TWh |
| 2025-10-29 | 1.20 TWh |
| 2025-10-30 | 1.19 TWh |
| 2025-10-31 | 1.16 TWh |
| 2025-11-01 | 1.03 TWh |
| 2025-11-02 | 1.03 TWh |
| 2025-11-03 | 1.19 TWh |
| 2025-11-04 | 1.19 TWh |
| 2025-11-05 | 1.19 TWh |
| 2025-11-06 | 1.19 TWh |
| 2025-11-07 | 1.20 TWh |
| 2025-11-08 | 1.12 TWh |
| 2025-11-09 | 1.10 TWh |
| 2025-11-10 | 1.19 TWh |
| 2025-11-11 | 1.12 TWh |
| 2025-11-12 | 1.21 TWh |
| 2025-11-13 | 1.19 TWh |
| 2025-11-14 | 1.16 TWh |
| 2025-11-15 | 1.07 TWh |
| 2025-11-16 | 1.07 TWh |
| 2025-11-17 | 1.27 TWh |
| 2025-11-18 | 1.43 TWh |
| 2025-11-19 | 1.48 TWh |
| 2025-11-20 | 1.56 TWh |
| 2025-11-21 | 1.65 TWh |
| 2025-11-22 | 1.61 TWh |
| 2025-11-23 | 1.50 TWh |
| 2025-11-24 | 1.49 TWh |
| 2025-11-25 | 1.51 TWh |
| 2025-11-26 | 1.58 TWh |
| 2025-11-27 | 1.60 TWh |
| 2025-11-28 | 1.53 TWh |
| 2025-11-29 | 1.35 TWh |
| 2025-11-30 | 1.32 TWh |
| 2025-12-01 | 1.54 TWh |
| 2025-12-02 | 1.52 TWh |
| 2025-12-03 | 1.51 TWh |
| 2025-12-04 | 1.52 TWh |
| 2025-12-05 | 1.55 TWh |
| 2025-12-06 | 1.35 TWh |
| 2025-12-07 | 1.24 TWh |
| 2025-12-08 | 1.31 TWh |
| 2025-12-09 | 1.33 TWh |
| 2025-12-10 | n/a |
| 2025-12-11 | 1.39 TWh |
| 2025-12-12 | 1.36 TWh |
| 2025-12-13 | 1.30 TWh |
| 2025-12-14 | 1.31 TWh |
| 2025-12-15 | 1.43 TWh |
| 2025-12-16 | 1.39 TWh |
| 2025-12-17 | 1.42 TWh |
| 2025-12-18 | 1.39 TWh |
| 2025-12-19 | 1.34 TWh |
| 2025-12-20 | 1.27 TWh |
| 2025-12-21 | 1.22 TWh |
| 2025-12-22 | 1.37 TWh |
| 2025-12-23 | 1.44 TWh |
| 2025-12-24 | 1.48 TWh |
| 2025-12-25 | 1.44 TWh |
| 2025-12-26 | 1.55 TWh |
| 2025-12-27 | 1.53 TWh |
| 2025-12-28 | 1.51 TWh |
| 2025-12-29 | 1.63 TWh |
| 2025-12-30 | 1.64 TWh |
| 2025-12-31 | 1.66 TWh |
| 2026-01-01 | 1.63 TWh |
| 2026-01-02 | 1.67 TWh |
| 2026-01-03 | 1.67 TWh |
| 2026-01-04 | 1.69 TWh |
| 2026-01-05 | 1.93 TWh |
| 2026-01-06 | 1.98 TWh |
| 2026-01-07 | 1.94 TWh |
| 2026-01-08 | 1.75 TWh |
| 2026-01-09 | 1.67 TWh |
| 2026-01-10 | 1.60 TWh |
| 2026-01-11 | 1.59 TWh |
| 2026-01-12 | 1.63 TWh |
| 2026-01-13 | 1.52 TWh |
| 2026-01-14 | 1.47 TWh |
| 2026-01-15 | 1.46 TWh |
| 2026-01-16 | 1.46 TWh |
| 2026-01-17 | 1.36 TWh |
| 2026-01-18 | 1.33 TWh |
| 2026-01-19 | 1.51 TWh |
| 2026-01-20 | 1.54 TWh |
| 2026-01-21 | 1.53 TWh |
| 2026-01-22 | 1.51 TWh |
| 2026-01-23 | 1.55 TWh |
| 2026-01-24 | 1.47 TWh |
| 2026-01-25 | 1.44 TWh |
| 2026-01-26 | 1.59 TWh |
| 2026-01-27 | 1.60 TWh |
| 2026-01-28 | 1.60 TWh |
| 2026-01-29 | 1.63 TWh |
| 2026-01-30 | 1.55 TWh |
| 2026-01-31 | 1.42 TWh |
| 2026-02-01 | 1.35 TWh |
| 2026-02-02 | 1.50 TWh |
| 2026-02-03 | 1.47 TWh |
| 2026-02-04 | 1.50 TWh |
| 2026-02-05 | 1.49 TWh |
| 2026-02-06 | 1.42 TWh |
| 2026-02-07 | 1.32 TWh |
| 2026-02-08 | 1.30 TWh |
| 2026-02-09 | 1.47 TWh |
| 2026-02-10 | 1.45 TWh |
| 2026-02-11 | 1.40 TWh |
| 2026-02-12 | 1.40 TWh |
| 2026-02-13 | 1.45 TWh |
| 2026-02-14 | 1.42 TWh |
| 2026-02-15 | 1.48 TWh |
| 2026-02-16 | 1.51 TWh |
| 2026-02-17 | 1.51 TWh |
| 2026-02-18 | 1.53 TWh |
| 2026-02-19 | 1.51 TWh |
| 2026-02-20 | 1.47 TWh |
| 2026-02-21 | 1.27 TWh |
| 2026-02-22 | 1.20 TWh |
| 2026-02-23 | 1.31 TWh |
| 2026-02-24 | 1.27 TWh |
| 2026-02-25 | 1.26 TWh |
| 2026-02-26 | 1.24 TWh |
| 2026-02-27 | 1.25 TWh |
| 2026-02-28 | 1.18 TWh |
| 2026-03-01 | 1.18 TWh |
| 2026-03-02 | 1.28 TWh |
| 2026-03-03 | 1.27 TWh |
| 2026-03-04 | 1.25 TWh |
| 2026-03-05 | 1.24 TWh |
| 2026-03-06 | 1.25 TWh |
| 2026-03-07 | 1.14 TWh |
| 2026-03-08 | 1.10 TWh |
| 2026-03-09 | 1.22 TWh |
| 2026-03-10 | 1.24 TWh |
| 2026-03-11 | 1.29 TWh |
| 2026-03-12 | 1.30 TWh |
| 2026-03-13 | 1.33 TWh |
| 2026-03-14 | 1.27 TWh |
| 2026-03-15 | 1.26 TWh |
| 2026-03-16 | 1.35 TWh |
| 2026-03-17 | 1.27 TWh |
| 2026-03-18 | 1.24 TWh |
| 2026-03-19 | 1.23 TWh |
| 2026-03-20 | 1.21 TWh |
| 2026-03-21 | 1.11 TWh |
| 2026-03-22 | 1.11 TWh |
| 2026-03-23 | 1.24 TWh |
| 2026-03-24 | 1.23 TWh |
| 2026-03-25 | 1.32 TWh |
| 2026-03-26 | 1.40 TWh |
| 2026-03-27 | 1.40 TWh |
| 2026-03-28 | 1.28 TWh |
| 2026-03-29 | 1.19 TWh |
| 2026-03-30 | 1.34 TWh |
| 2026-03-31 | 1.36 TWh |
| 2026-04-01 | 1.35 TWh |
| 2026-04-02 | 1.33 TWh |
| 2026-04-03 | 1.31 TWh |
| 2026-04-04 | 1.09 TWh |
| 2026-04-05 | 1.01 TWh |
| 2026-04-06 | 1.02 TWh |
| 2026-04-07 | 1.09 TWh |
| 2026-04-08 | 1.08 TWh |
| 2026-04-09 | 1.08 TWh |
| 2026-04-10 | 1.07 TWh |
| 2026-04-11 | 1.01 TWh |
| 2026-04-12 | 1.03 TWh |
| 2026-04-13 | 1.20 TWh |
| 2026-04-14 | 1.19 TWh |
| 2026-04-15 | 1.14 TWh |
| 2026-04-16 | 1.10 TWh |
| 2026-04-17 | 1.07 TWh |
| 2026-04-18 | 955 GWh |
| 2026-04-19 | 919 GWh |
| 2026-04-20 | 1.05 TWh |
| 2026-04-21 | 1.09 TWh |
| 2026-04-22 | 1.10 TWh |
| 2026-04-23 | 1.08 TWh |
| 2026-04-24 | 1.06 TWh |
| 2026-04-25 | 956 GWh |
| 2026-04-26 | 910 GWh |
| 2026-04-27 | 1.03 TWh |
| 2026-04-28 | 1.05 TWh |
| 2026-04-29 | 1.05 TWh |
| 2026-04-30 | 1.04 TWh |
| 2026-05-01 | 879 GWh |
| 2026-05-02 | 904 GWh |
| 2026-05-03 | 896 GWh |
| 2026-05-04 | 1.05 TWh |
| 2026-05-05 | 1.07 TWh |
| 2026-05-06 | 1.09 TWh |
| 2026-05-07 | 1.08 TWh |
| 2026-05-08 | 942 GWh |
| 2026-05-09 | 895 GWh |
| 2026-05-10 | 901 GWh |
| 2026-05-11 | 1.05 TWh |
| 2026-05-12 | 1.06 TWh |
| 2026-05-13 | 1.08 TWh |
| 2026-05-14 | 1.01 TWh |
| 2026-05-15 | 1.06 TWh |
| 2026-05-16 | 1.01 TWh |
| 2026-05-17 | 965 GWh |
| 2026-05-18 | 1.09 TWh |
| 2026-05-19 | 1.10 TWh |
| 2026-05-20 | 1.07 TWh |
| 2026-05-21 | 1.06 TWh |
| 2026-05-22 | 1.04 TWh |
| 2026-05-23 | 925 GWh |
| 2026-05-24 | 873 GWh |
| 2026-05-25 | 936 GWh |
| 2026-05-26 | 1.08 TWh |
| 2026-05-27 | 1.10 TWh |
| 2026-05-28 | 1.11 TWh |
| 2026-05-29 | 1.10 TWh |
| 2026-05-30 | 984 GWh |
| 2026-05-31 | 906 GWh |
| 2026-06-01 | 1.03 TWh |
| 2026-06-02 | 1.06 TWh |
| 2026-06-03 | 1.04 TWh |
| 2026-06-04 | 1.06 TWh |
| 2026-06-05 | 1.02 TWh |
| 2026-06-06 | 918 GWh |
| 2026-06-07 | 873 GWh |
| 2026-06-08 | 1.03 TWh |
| 2026-06-09 | 1.03 TWh |
| 2026-06-10 | 1.04 TWh |
| 2026-06-11 | 1.05 TWh |
| 2026-06-12 | 1.05 TWh |
| 2026-06-13 | 946 GWh |
| 2026-06-14 | 893 GWh |
| 2026-06-15 | 1.05 TWh |
| 2026-06-16 | 1.08 TWh |
| 2026-06-17 | 1.11 TWh |
| 2026-06-18 | 1.15 TWh |
| 2026-06-19 | 1.13 TWh |
| 2026-06-20 | 1.03 TWh |
| 2026-06-21 | 1.01 TWh |
| 2026-06-22 | 1.19 TWh |
| 2026-06-23 | 1.23 TWh |
| 2026-06-24 | 1.25 TWh |
| 2026-06-25 | 1.26 TWh |
| 2026-06-26 | 1.23 TWh |
| 2026-06-27 | 1.10 TWh |
| 2026-06-28 | 1.03 TWh |
| 2026-06-29 | 1.12 TWh |
| 2026-06-30 | 1.14 TWh |
| 2026-07-01 | 1.12 TWh |
| 2026-07-02 | 1.11 TWh |
| 2026-07-03 | 1.12 TWh |
| 2026-07-04 | 1.01 TWh |
| 2026-07-05 | 973 GWh |
| 2026-07-06 | 1.15 TWh |
| 2026-07-07 | 1.17 TWh |
| 2026-07-08 | 1.19 TWh |
| 2026-07-09 | 1.20 TWh |
| 2026-07-10 | 1.20 TWh |
| 2026-07-11 | 1.08 TWh |
| 2026-07-12 | 1.02 TWh |
| 2026-07-13 | 1.12 TWh |
| 2026-07-14 | 1.08 TWh |
| 2026-07-15 | 1.19 TWh |
| 2026-07-16 | 1.19 TWh |
| 2026-07-17 | 1.15 TWh |
| 2026-07-18 | 1.03 TWh |
| 2026-07-19 | 949 GWh |
| 2026-07-20 | 1.08 TWh |
| 2026-07-21 | 1.10 TWh |
| 2026-07-22 | 1.07 TWh |
| 2026-07-23 | 1.08 TWh |
| 2026-07-24 | 1.08 TWh |
| 2026-07-25 | 982 GWh |
| 2026-07-26 | 919 GWh |
| 2026-07-27 | 1.04 TWh |
| 2026-07-28 | 1.09 TWh |
| 2026-07-29 | 1.13 TWh |
| 2026-07-30 | 1.12 TWh |
| 2026-07-31 | 1.09 TWh |
| 2026-08-01 | 973 GWh |
| 2026-08-02 | 943 GWh |
| 2026-08-03 | 1.06 TWh |
| 2026-08-04 | 1.07 TWh |
| 2026-08-05 | 1.06 TWh |
| 2026-08-06 | 1.04 TWh |
| 2026-08-07 | 1.02 TWh |
| 2026-08-08 | 959 GWh |
| 2026-08-09 | 935 GWh |
| 2026-08-10 | 1.02 TWh |
| 2026-08-11 | 1.04 TWh |
| 2026-08-12 | 1.06 TWh |
| 2026-08-13 | 1.09 TWh |
| 2026-08-14 | 1.09 TWh |
| 2026-08-15 | 996 GWh |
| 2026-08-16 | 948 GWh |
| 2026-08-17 | 1.03 TWh |
| 2026-08-18 | 1.05 TWh |
| 2026-08-19 | 1.05 TWh |
| 2026-08-20 | 1.03 TWh |
| 2026-08-21 | 991 GWh |
| 2026-08-22 | 897 GWh |
| 2026-08-23 | 865 GWh |
| 2026-08-24 | 1.02 TWh |
| 2026-08-25 | 1.03 TWh |
| 2026-08-26 | 1.06 TWh |
| 2026-08-27 | 1.08 TWh |
| 2026-08-28 | 1.05 TWh |
| 2026-08-29 | 947 GWh |
| 2026-08-30 | 904 GWh |
| 2026-08-31 | 1.04 TWh |
| 2026-09-01 | 1.05 TWh |
| 2026-09-02 | 1.07 TWh |
| 2026-09-03 | 1.08 TWh |
| 2026-09-04 | 1.10 TWh |
| 2026-09-05 | 977 GWh |
| 2026-09-06 | 946 GWh |
| 2026-09-07 | 1.09 TWh |
| 2026-09-08 | 1.11 TWh |
| 2026-09-09 | 1.06 TWh |
| 2026-09-10 | 1.05 TWh |
| 2026-09-11 | 1.04 TWh |
| 2026-09-12 | 934 GWh |
| 2026-09-13 | 907 GWh |
| 2026-09-14 | 1.05 TWh |
| 2026-09-15 | 1.07 TWh |
| 2026-09-16 | 1.07 TWh |
| 2026-09-17 | 1.05 TWh |
| 2026-09-18 | 1.04 TWh |
| 2026-09-19 | 937 GWh |
| 2026-09-20 | 905 GWh |
| 2026-09-21 | 1.02 TWh |
| 2026-09-22 | 1.04 TWh |
| 2026-09-23 | 1.05 TWh |
| 2026-09-24 | 1.06 TWh |
| 2026-09-25 | 1.05 TWh |
| 2026-09-26 | 938 GWh |
| 2026-09-27 | 900 GWh |
| 2026-09-28 | 1.04 TWh |
| 2026-09-29 | 1.06 TWh |
| 2026-09-30 | 1.07 TWh |
| 2026-10-01 | 1.05 TWh |
| 2026-10-02 | 1.03 TWh |
| 2026-10-03 | 936 GWh |
| 2026-10-04 | 898 GWh |
| 2026-10-05 | 1.03 TWh |
| 2026-10-06 | 1.05 TWh |
| 2026-10-07 | 1.06 TWh |
| 2026-10-08 | 1.06 TWh |
| 2026-10-09 | 1.08 TWh |
| 2026-10-10 | 966 GWh |
| 2026-10-11 | 947 GWh |
| 2026-10-12 | 1.07 TWh |
| 2026-10-13 | 1.08 TWh |
| 2026-10-14 | 1.08 TWh |
| 2026-10-15 | 1.08 TWh |
| 2026-10-16 | 1.06 TWh |
| 2026-10-17 | 981 GWh |
| 2026-10-18 | 994 GWh |
| 2026-10-19 | 1.17 TWh |
| 2026-10-20 | 1.19 TWh |
| 2026-10-21 | 1.21 TWh |
| 2026-10-22 | 1.22 TWh |
| 2026-10-23 | 1.23 TWh |
| 2026-10-24 | 1.15 TWh |
| 2026-10-25 | 1.11 TWh |
| 2026-10-26 | 1.21 TWh |
| 2026-10-27 | 1.17 TWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Paris local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 348 TWh | 387 TWh | Nuclear 75.5% | 300 |
| 2025 (partial) | 433 TWh | 486 TWh | Nuclear 76.1% | 364 |
| 2024 | 428 TWh | 510 TWh | Nuclear 70.4% | 366 |
| 2023 | 422 TWh | 452 TWh | Nuclear 70.0% | 365 |
| 2022 | 431 TWh | 401 TWh | Nuclear 69.2% | 365 |
| 2021 | 456 TWh | 498 TWh | Nuclear 72.2% | 365 |
| 2020 | 442 TWh | 478 TWh | Nuclear 70.0% | 366 |
| 2019 (partial) | 464 TWh | 516 TWh | Nuclear 73.0% | 364 |
| 2018 | 463 TWh | 523 TWh | Nuclear 74.5% | 365 |
| 2017 | 469 TWh | 502 TWh | Nuclear 75.3% | 365 |
| 2016 (partial) | 473 TWh | 495 TWh | Nuclear 74.9% | 364 |
| 2015 | 469 TWh | 523 TWh | Nuclear 78.8% | 365 |
A year is partial when ENTSO-E has not published every day; 2024 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Italy North | France exports | 1.96 TWh |
| Switzerland | France exports | 1.13 TWh |
| Belgium | France exports | 699 GWh |
| Great Britain | France exports | 458 GWh |
| Germany and Luxembourg | France exports | 451 GWh |
| Spain | France exports | 437 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for France, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). France Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/fr/
World Power Monitor. France Electricity Demand and Generation Mix. Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/fr/
@misc{wpm_zones_fr_2026,
title = {{France Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/fr/}
} Permalink: https://worldpowermonitor.com/zones/fr/
The Copy buttons add today's date as the access date.