Grid Stress Alerts for 21 October 2026
3 notable grid events on 21 October 2026 in ENTSO-E and EIA operator data: 3 net imports. Records are judged against the days loaded for each zone, and each sentence says how many.
Key Facts
- Net imports into Slovenia reached 10.4 GWh on 21 October 2026 (27% of demand), the 2nd highest daily net imports in 390 days of loaded history.
- Germany and Luxembourg imported a net 141 GWh on 21 October 2026, the 3rd highest daily net imports in 393 days of loaded history and 10% of its demand that day.
- Italy North imported a net 139 GWh on 21 October 2026, the 3rd highest daily net imports in 362 days of loaded history and 30% of its demand that day.
All Alerts, 21 October 2026
3 events- Net imports Net imports into Slovenia reached 10.4 GWh on 21 October 2026 (27% of demand), the 2nd highest daily net imports in 390 days of loaded history. Slovenia grid
- Net imports Germany and Luxembourg imported a net 141 GWh on 21 October 2026, the 3rd highest daily net imports in 393 days of loaded history and 10% of its demand that day. Germany and Luxembourg grid
- Net imports Italy North imported a net 139 GWh on 21 October 2026, the 3rd highest daily net imports in 362 days of loaded history and 30% of its demand that day. Italy North grid
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-21. Operator data only, kept apart from annual statistics.