ERCOT Electricity Demand and Generation Mix
ERCOT demand was 72,384 MW in the hour starting 15 Sept 2026, 10:00 CDT (UTC-05:00). Gas was the largest source in the hour starting 14 Sept 2026, 22:00 CDT (UTC-05:00), at 44% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- ERCOT is a regional transmission organization and balancing authority in the United States, part of the EIA Texas region.
- In the hour starting 15 Sept 2026, 10:00 CDT (UTC-05:00), demand in ERCOT was 72,384 MW, against a day-ahead forecast of 71,454 MW.
- Gas supplied 44.3% of ERCOT's generation in the hour starting 14 Sept 2026, 22:00 CDT (UTC-05:00).
- Demand in ERCOT totalled 464 TWh in 2024.
- Gas supplied 44.1% of ERCOT's generation in 2024.
- The highest daily demand in ERCOT from 2019 onward was 1.82 TWh, on 2026-08-24 (24 August 2026).
- The highest hourly demand in ERCOT since 2026-06-16 (16 June 2026) was 91,075 MW, in the hour starting 22 Jul 2026, 17:00 CDT (UTC-05:00).
- Solar's highest share of ERCOT's daily generation from 2019 onward was 30.8%, on 2026-05-02 (2 May 2026).
- Wind's highest share of ERCOT's daily generation from 2019 onward was 61.9%, on 2023-01-15 (15 January 2023).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 15 Sept 2026, 10:00 CDT (UTC-05:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T15:00:00Z.
Generation by Source
Latest hour with generation by source: 14 Sept 2026, 22:00 CDT (UTC-05:00)| Source | Output | Share |
|---|---|---|
| Gas | 33,069 MW | 44.3% |
| Wind | 25,054 MW | 33.6% |
| Coal | 10,140 MW | 13.6% |
| Nuclear | 4,961 MW | 6.7% |
| Storage | 1,264 MW | 1.7% |
| Hydro | 52 MW | 0.1% |
| Other | 50 MW | 0.1% |
| Solar | 1 MW | 0.0% |
| Total from these sources | 74,591 MW | |
| Net interchange | 96 MW | net exports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when ERCOT exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T03:00:00Z.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-16T17:00Z | 77,179 MW |
| 2026-08-16T18:00Z | 81,174 MW |
| 2026-08-16T19:00Z | 84,233 MW |
| 2026-08-16T20:00Z | 86,300 MW |
| 2026-08-16T21:00Z | 87,514 MW |
| 2026-08-16T22:00Z | 88,024 MW |
| 2026-08-16T23:00Z | 87,161 MW |
| 2026-08-17T00:00Z | 84,866 MW |
| 2026-08-17T01:00Z | 81,030 MW |
| 2026-08-17T02:00Z | 77,654 MW |
| 2026-08-17T03:00Z | 73,493 MW |
| 2026-08-17T04:00Z | 68,831 MW |
| 2026-08-17T05:00Z | 64,911 MW |
| 2026-08-17T06:00Z | 61,645 MW |
| 2026-08-17T07:00Z | 59,152 MW |
| 2026-08-17T08:00Z | 57,900 MW |
| 2026-08-17T09:00Z | 57,290 MW |
| 2026-08-17T10:00Z | 57,990 MW |
| 2026-08-17T11:00Z | 59,388 MW |
| 2026-08-17T12:00Z | 59,484 MW |
| 2026-08-17T13:00Z | 62,122 MW |
| 2026-08-17T14:00Z | 66,380 MW |
| 2026-08-17T15:00Z | 71,112 MW |
| 2026-08-17T16:00Z | 76,106 MW |
| 2026-08-17T17:00Z | 81,201 MW |
| 2026-08-17T18:00Z | 85,422 MW |
| 2026-08-17T19:00Z | 87,744 MW |
| 2026-08-17T20:00Z | 88,295 MW |
| 2026-08-17T21:00Z | 89,144 MW |
| 2026-08-17T22:00Z | 88,993 MW |
| 2026-08-17T23:00Z | 88,409 MW |
| 2026-08-18T00:00Z | 85,723 MW |
| 2026-08-18T01:00Z | 82,245 MW |
| 2026-08-18T02:00Z | 79,000 MW |
| 2026-08-18T03:00Z | 75,763 MW |
| 2026-08-18T04:00Z | 71,502 MW |
| 2026-08-18T05:00Z | 67,751 MW |
| 2026-08-18T06:00Z | 64,732 MW |
| 2026-08-18T07:00Z | 62,156 MW |
| 2026-08-18T08:00Z | 60,463 MW |
| 2026-08-18T09:00Z | 59,723 MW |
| 2026-08-18T10:00Z | 60,015 MW |
| 2026-08-18T11:00Z | 61,162 MW |
| 2026-08-18T12:00Z | 61,264 MW |
| 2026-08-18T13:00Z | 63,828 MW |
| 2026-08-18T14:00Z | 67,964 MW |
| 2026-08-18T15:00Z | 72,703 MW |
| 2026-08-18T16:00Z | 77,692 MW |
| 2026-08-18T17:00Z | 82,262 MW |
| 2026-08-18T18:00Z | 86,051 MW |
| 2026-08-18T19:00Z | 88,581 MW |
| 2026-08-18T20:00Z | 88,956 MW |
| 2026-08-18T21:00Z | 89,456 MW |
| 2026-08-18T22:00Z | 89,575 MW |
| 2026-08-18T23:00Z | 89,037 MW |
| 2026-08-19T00:00Z | 87,415 MW |
| 2026-08-19T01:00Z | 84,422 MW |
| 2026-08-19T02:00Z | 81,502 MW |
| 2026-08-19T03:00Z | 77,138 MW |
| 2026-08-19T04:00Z | 72,542 MW |
| 2026-08-19T05:00Z | 68,797 MW |
| 2026-08-19T06:00Z | 65,677 MW |
| 2026-08-19T07:00Z | 63,383 MW |
| 2026-08-19T08:00Z | 61,935 MW |
| 2026-08-19T09:00Z | 61,244 MW |
| 2026-08-19T10:00Z | 61,582 MW |
| 2026-08-19T11:00Z | 62,391 MW |
| 2026-08-19T12:00Z | 62,255 MW |
| 2026-08-19T13:00Z | 64,803 MW |
| 2026-08-19T14:00Z | 68,575 MW |
| 2026-08-19T15:00Z | 72,832 MW |
| 2026-08-19T16:00Z | 77,507 MW |
| 2026-08-19T17:00Z | 81,963 MW |
| 2026-08-19T18:00Z | 86,088 MW |
| 2026-08-19T19:00Z | 88,539 MW |
| 2026-08-19T20:00Z | 89,300 MW |
| 2026-08-19T21:00Z | 89,734 MW |
| 2026-08-19T22:00Z | 89,603 MW |
| 2026-08-19T23:00Z | 89,053 MW |
| 2026-08-20T00:00Z | 87,228 MW |
| 2026-08-20T01:00Z | 84,807 MW |
| 2026-08-20T02:00Z | 81,388 MW |
| 2026-08-20T03:00Z | 76,745 MW |
| 2026-08-20T04:00Z | 72,064 MW |
| 2026-08-20T05:00Z | 68,095 MW |
| 2026-08-20T06:00Z | 64,946 MW |
| 2026-08-20T07:00Z | 62,752 MW |
| 2026-08-20T08:00Z | 61,167 MW |
| 2026-08-20T09:00Z | 60,544 MW |
| 2026-08-20T10:00Z | 60,947 MW |
| 2026-08-20T11:00Z | 62,159 MW |
| 2026-08-20T12:00Z | 62,198 MW |
| 2026-08-20T13:00Z | 64,428 MW |
| 2026-08-20T14:00Z | 68,780 MW |
| 2026-08-20T15:00Z | 73,679 MW |
| 2026-08-20T16:00Z | 78,790 MW |
| 2026-08-20T17:00Z | 83,481 MW |
| 2026-08-20T18:00Z | 87,856 MW |
| 2026-08-20T19:00Z | 89,568 MW |
| 2026-08-20T20:00Z | 90,005 MW |
| 2026-08-20T21:00Z | 90,319 MW |
| 2026-08-20T22:00Z | 90,339 MW |
| 2026-08-20T23:00Z | 89,867 MW |
| 2026-08-21T00:00Z | 88,492 MW |
| 2026-08-21T01:00Z | 86,120 MW |
| 2026-08-21T02:00Z | 82,727 MW |
| 2026-08-21T03:00Z | 78,385 MW |
| 2026-08-21T04:00Z | 73,692 MW |
| 2026-08-21T05:00Z | 69,595 MW |
| 2026-08-21T06:00Z | 66,303 MW |
| 2026-08-21T07:00Z | 63,888 MW |
| 2026-08-21T08:00Z | 62,420 MW |
| 2026-08-21T09:00Z | 61,830 MW |
| 2026-08-21T10:00Z | 62,350 MW |
| 2026-08-21T11:00Z | 63,455 MW |
| 2026-08-21T12:00Z | 63,453 MW |
| 2026-08-21T13:00Z | 65,764 MW |
| 2026-08-21T14:00Z | 69,841 MW |
| 2026-08-21T15:00Z | 74,826 MW |
| 2026-08-21T16:00Z | 79,712 MW |
| 2026-08-21T17:00Z | 84,243 MW |
| 2026-08-21T18:00Z | 87,338 MW |
| 2026-08-21T19:00Z | 89,177 MW |
| 2026-08-21T20:00Z | 89,431 MW |
| 2026-08-21T21:00Z | 89,652 MW |
| 2026-08-21T22:00Z | 89,399 MW |
| 2026-08-21T23:00Z | 88,547 MW |
| 2026-08-22T00:00Z | 86,495 MW |
| 2026-08-22T01:00Z | 83,949 MW |
| 2026-08-22T02:00Z | 80,577 MW |
| 2026-08-22T03:00Z | 76,489 MW |
| 2026-08-22T04:00Z | 72,539 MW |
| 2026-08-22T05:00Z | 68,821 MW |
| 2026-08-22T06:00Z | 65,727 MW |
| 2026-08-22T07:00Z | 63,140 MW |
| 2026-08-22T08:00Z | 61,207 MW |
| 2026-08-22T09:00Z | 59,620 MW |
| 2026-08-22T10:00Z | 59,244 MW |
| 2026-08-22T11:00Z | 58,853 MW |
| 2026-08-22T12:00Z | 58,571 MW |
| 2026-08-22T13:00Z | 61,267 MW |
| 2026-08-22T14:00Z | 65,898 MW |
| 2026-08-22T15:00Z | 71,570 MW |
| 2026-08-22T16:00Z | 77,365 MW |
| 2026-08-22T17:00Z | 82,626 MW |
| 2026-08-22T18:00Z | 86,492 MW |
| 2026-08-22T19:00Z | 88,852 MW |
| 2026-08-22T20:00Z | 89,606 MW |
| 2026-08-22T21:00Z | 89,887 MW |
| 2026-08-22T22:00Z | 89,740 MW |
| 2026-08-22T23:00Z | 89,019 MW |
| 2026-08-23T00:00Z | 86,794 MW |
| 2026-08-23T01:00Z | 84,197 MW |
| 2026-08-23T02:00Z | 80,628 MW |
| 2026-08-23T03:00Z | 76,267 MW |
| 2026-08-23T04:00Z | 70,900 MW |
| 2026-08-23T05:00Z | 67,756 MW |
| 2026-08-23T06:00Z | 65,087 MW |
| 2026-08-23T07:00Z | 62,776 MW |
| 2026-08-23T08:00Z | 60,808 MW |
| 2026-08-23T09:00Z | 59,275 MW |
| 2026-08-23T10:00Z | 58,265 MW |
| 2026-08-23T11:00Z | 57,649 MW |
| 2026-08-23T12:00Z | 57,364 MW |
| 2026-08-23T13:00Z | 59,556 MW |
| 2026-08-23T14:00Z | 63,498 MW |
| 2026-08-23T15:00Z | 68,287 MW |
| 2026-08-23T16:00Z | 74,113 MW |
| 2026-08-23T17:00Z | 79,750 MW |
| 2026-08-23T18:00Z | 84,711 MW |
| 2026-08-23T19:00Z | 88,348 MW |
| 2026-08-23T20:00Z | 89,789 MW |
| 2026-08-23T21:00Z | 90,150 MW |
| 2026-08-23T22:00Z | 90,411 MW |
| 2026-08-23T23:00Z | 89,581 MW |
| 2026-08-24T00:00Z | 87,453 MW |
| 2026-08-24T01:00Z | 84,072 MW |
| 2026-08-24T02:00Z | 80,295 MW |
| 2026-08-24T03:00Z | 77,535 MW |
| 2026-08-24T04:00Z | 73,285 MW |
| 2026-08-24T05:00Z | 69,281 MW |
| 2026-08-24T06:00Z | 66,038 MW |
| 2026-08-24T07:00Z | 63,496 MW |
| 2026-08-24T08:00Z | 61,799 MW |
| 2026-08-24T09:00Z | 61,042 MW |
| 2026-08-24T10:00Z | 61,495 MW |
| 2026-08-24T11:00Z | 62,647 MW |
| 2026-08-24T12:00Z | 62,839 MW |
| 2026-08-24T13:00Z | 64,765 MW |
| 2026-08-24T14:00Z | 68,725 MW |
| 2026-08-24T15:00Z | 73,427 MW |
| 2026-08-24T16:00Z | 78,590 MW |
| 2026-08-24T17:00Z | 83,619 MW |
| 2026-08-24T18:00Z | 87,903 MW |
| 2026-08-24T19:00Z | 89,753 MW |
| 2026-08-24T20:00Z | 90,240 MW |
| 2026-08-24T21:00Z | 90,614 MW |
| 2026-08-24T22:00Z | 90,741 MW |
| 2026-08-24T23:00Z | 90,136 MW |
| 2026-08-25T00:00Z | 88,109 MW |
| 2026-08-25T01:00Z | 85,190 MW |
| 2026-08-25T02:00Z | 82,758 MW |
| 2026-08-25T03:00Z | 78,083 MW |
| 2026-08-25T04:00Z | 73,490 MW |
| 2026-08-25T05:00Z | 69,601 MW |
| 2026-08-25T06:00Z | 66,419 MW |
| 2026-08-25T07:00Z | 63,746 MW |
| 2026-08-25T08:00Z | 61,916 MW |
| 2026-08-25T09:00Z | 61,131 MW |
| 2026-08-25T10:00Z | 61,553 MW |
| 2026-08-25T11:00Z | 62,722 MW |
| 2026-08-25T12:00Z | 62,561 MW |
| 2026-08-25T13:00Z | 63,853 MW |
| 2026-08-25T14:00Z | 66,847 MW |
| 2026-08-25T15:00Z | 70,503 MW |
| 2026-08-25T16:00Z | 74,591 MW |
| 2026-08-25T17:00Z | 79,456 MW |
| 2026-08-25T18:00Z | 83,574 MW |
| 2026-08-25T19:00Z | 86,889 MW |
| 2026-08-25T20:00Z | 88,687 MW |
| 2026-08-25T21:00Z | 89,631 MW |
| 2026-08-25T22:00Z | 89,732 MW |
| 2026-08-25T23:00Z | 88,215 MW |
| 2026-08-26T00:00Z | 85,575 MW |
| 2026-08-26T01:00Z | 83,376 MW |
| 2026-08-26T02:00Z | 80,260 MW |
| 2026-08-26T03:00Z | 75,968 MW |
| 2026-08-26T04:00Z | 71,672 MW |
| 2026-08-26T05:00Z | 68,113 MW |
| 2026-08-26T06:00Z | 65,124 MW |
| 2026-08-26T07:00Z | 62,845 MW |
| 2026-08-26T08:00Z | 61,422 MW |
| 2026-08-26T09:00Z | 61,034 MW |
| 2026-08-26T10:00Z | 61,943 MW |
| 2026-08-26T11:00Z | 63,228 MW |
| 2026-08-26T12:00Z | 62,363 MW |
| 2026-08-26T13:00Z | 64,161 MW |
| 2026-08-26T14:00Z | 67,985 MW |
| 2026-08-26T15:00Z | 72,533 MW |
| 2026-08-26T16:00Z | 77,168 MW |
| 2026-08-26T17:00Z | 81,109 MW |
| 2026-08-26T18:00Z | 84,200 MW |
| 2026-08-26T19:00Z | 86,246 MW |
| 2026-08-26T20:00Z | 88,240 MW |
| 2026-08-26T21:00Z | 90,243 MW |
| 2026-08-26T22:00Z | 89,805 MW |
| 2026-08-26T23:00Z | 87,407 MW |
| 2026-08-27T00:00Z | 83,945 MW |
| 2026-08-27T01:00Z | 81,204 MW |
| 2026-08-27T02:00Z | 77,533 MW |
| 2026-08-27T03:00Z | 72,961 MW |
| 2026-08-27T04:00Z | 69,516 MW |
| 2026-08-27T05:00Z | 67,044 MW |
| 2026-08-27T06:00Z | 64,714 MW |
| 2026-08-27T07:00Z | 62,760 MW |
| 2026-08-27T08:00Z | 61,287 MW |
| 2026-08-27T09:00Z | 60,638 MW |
| 2026-08-27T10:00Z | 61,442 MW |
| 2026-08-27T11:00Z | 62,747 MW |
| 2026-08-27T12:00Z | 62,545 MW |
| 2026-08-27T13:00Z | 63,883 MW |
| 2026-08-27T14:00Z | 67,319 MW |
| 2026-08-27T15:00Z | 71,496 MW |
| 2026-08-27T16:00Z | 76,496 MW |
| 2026-08-27T17:00Z | 81,636 MW |
| 2026-08-27T18:00Z | 86,160 MW |
| 2026-08-27T19:00Z | 89,394 MW |
| 2026-08-27T20:00Z | 90,114 MW |
| 2026-08-27T21:00Z | 90,116 MW |
| 2026-08-27T22:00Z | 89,282 MW |
| 2026-08-27T23:00Z | 87,380 MW |
| 2026-08-28T00:00Z | 83,345 MW |
| 2026-08-28T01:00Z | 80,787 MW |
| 2026-08-28T02:00Z | 77,554 MW |
| 2026-08-28T03:00Z | 73,341 MW |
| 2026-08-28T04:00Z | 68,964 MW |
| 2026-08-28T05:00Z | 65,835 MW |
| 2026-08-28T06:00Z | 63,006 MW |
| 2026-08-28T07:00Z | 60,878 MW |
| 2026-08-28T08:00Z | 59,492 MW |
| 2026-08-28T09:00Z | 59,163 MW |
| 2026-08-28T10:00Z | 59,688 MW |
| 2026-08-28T11:00Z | 60,946 MW |
| 2026-08-28T12:00Z | 60,983 MW |
| 2026-08-28T13:00Z | 63,023 MW |
| 2026-08-28T14:00Z | 67,394 MW |
| 2026-08-28T15:00Z | 72,622 MW |
| 2026-08-28T16:00Z | 77,786 MW |
| 2026-08-28T17:00Z | 82,209 MW |
| 2026-08-28T18:00Z | 86,050 MW |
| 2026-08-28T19:00Z | 88,233 MW |
| 2026-08-28T20:00Z | 88,768 MW |
| 2026-08-28T21:00Z | 87,721 MW |
| 2026-08-28T22:00Z | 85,912 MW |
| 2026-08-28T23:00Z | 83,018 MW |
| 2026-08-29T00:00Z | 79,843 MW |
| 2026-08-29T01:00Z | 77,000 MW |
| 2026-08-29T02:00Z | 73,001 MW |
| 2026-08-29T03:00Z | 69,470 MW |
| 2026-08-29T04:00Z | 66,259 MW |
| 2026-08-29T05:00Z | 63,062 MW |
| 2026-08-29T06:00Z | 60,310 MW |
| 2026-08-29T07:00Z | 58,156 MW |
| 2026-08-29T08:00Z | 56,342 MW |
| 2026-08-29T09:00Z | 55,474 MW |
| 2026-08-29T10:00Z | 55,047 MW |
| 2026-08-29T11:00Z | 55,153 MW |
| 2026-08-29T12:00Z | 55,424 MW |
| 2026-08-29T13:00Z | 58,358 MW |
| 2026-08-29T14:00Z | 63,108 MW |
| 2026-08-29T15:00Z | 68,371 MW |
| 2026-08-29T16:00Z | 73,721 MW |
| 2026-08-29T17:00Z | 78,437 MW |
| 2026-08-29T18:00Z | 82,115 MW |
| 2026-08-29T19:00Z | 84,911 MW |
| 2026-08-29T20:00Z | 86,833 MW |
| 2026-08-29T21:00Z | 87,907 MW |
| 2026-08-29T22:00Z | 87,971 MW |
| 2026-08-29T23:00Z | 86,373 MW |
| 2026-08-30T00:00Z | 83,032 MW |
| 2026-08-30T01:00Z | 80,079 MW |
| 2026-08-30T02:00Z | 76,855 MW |
| 2026-08-30T03:00Z | 73,312 MW |
| 2026-08-30T04:00Z | 69,745 MW |
| 2026-08-30T05:00Z | 66,201 MW |
| 2026-08-30T06:00Z | 63,066 MW |
| 2026-08-30T07:00Z | 60,683 MW |
| 2026-08-30T08:00Z | 58,735 MW |
| 2026-08-30T09:00Z | 57,414 MW |
| 2026-08-30T10:00Z | 56,571 MW |
| 2026-08-30T11:00Z | 56,056 MW |
| 2026-08-30T12:00Z | 55,942 MW |
| 2026-08-30T13:00Z | 58,918 MW |
| 2026-08-30T14:00Z | 63,880 MW |
| 2026-08-30T15:00Z | 68,940 MW |
| 2026-08-30T16:00Z | 73,911 MW |
| 2026-08-30T17:00Z | 78,563 MW |
| 2026-08-30T18:00Z | 82,275 MW |
| 2026-08-30T19:00Z | 85,232 MW |
| 2026-08-30T20:00Z | 87,202 MW |
| 2026-08-30T21:00Z | 88,582 MW |
| 2026-08-30T22:00Z | 88,768 MW |
| 2026-08-30T23:00Z | 87,159 MW |
| 2026-08-31T00:00Z | 83,575 MW |
| 2026-08-31T01:00Z | 80,395 MW |
| 2026-08-31T02:00Z | 77,847 MW |
| 2026-08-31T03:00Z | 74,069 MW |
| 2026-08-31T04:00Z | 69,824 MW |
| 2026-08-31T05:00Z | 66,098 MW |
| 2026-08-31T06:00Z | 63,103 MW |
| 2026-08-31T07:00Z | 61,000 MW |
| 2026-08-31T08:00Z | 59,724 MW |
| 2026-08-31T09:00Z | 59,408 MW |
| 2026-08-31T10:00Z | 60,003 MW |
| 2026-08-31T11:00Z | 61,268 MW |
| 2026-08-31T12:00Z | 61,265 MW |
| 2026-08-31T13:00Z | 63,407 MW |
| 2026-08-31T14:00Z | 67,562 MW |
| 2026-08-31T15:00Z | 72,258 MW |
| 2026-08-31T16:00Z | 76,971 MW |
| 2026-08-31T17:00Z | 81,265 MW |
| 2026-08-31T18:00Z | 84,613 MW |
| 2026-08-31T19:00Z | 86,653 MW |
| 2026-08-31T20:00Z | 87,794 MW |
| 2026-08-31T21:00Z | 88,535 MW |
| 2026-08-31T22:00Z | 88,264 MW |
| 2026-08-31T23:00Z | 86,595 MW |
| 2026-09-01T00:00Z | 83,786 MW |
| 2026-09-01T01:00Z | 81,074 MW |
| 2026-09-01T02:00Z | 77,748 MW |
| 2026-09-01T03:00Z | 73,498 MW |
| 2026-09-01T04:00Z | 69,271 MW |
| 2026-09-01T05:00Z | 65,599 MW |
| 2026-09-01T06:00Z | 62,704 MW |
| 2026-09-01T07:00Z | 60,793 MW |
| 2026-09-01T08:00Z | 59,544 MW |
| 2026-09-01T09:00Z | 59,009 MW |
| 2026-09-01T10:00Z | 59,726 MW |
| 2026-09-01T11:00Z | 60,957 MW |
| 2026-09-01T12:00Z | 61,114 MW |
| 2026-09-01T13:00Z | 62,985 MW |
| 2026-09-01T14:00Z | 66,785 MW |
| 2026-09-01T15:00Z | 71,184 MW |
| 2026-09-01T16:00Z | 75,296 MW |
| 2026-09-01T17:00Z | 78,641 MW |
| 2026-09-01T18:00Z | 81,511 MW |
| 2026-09-01T19:00Z | 83,218 MW |
| 2026-09-01T20:00Z | 83,778 MW |
| 2026-09-01T21:00Z | 83,908 MW |
| 2026-09-01T22:00Z | 83,501 MW |
| 2026-09-01T23:00Z | 83,164 MW |
| 2026-09-02T00:00Z | 81,563 MW |
| 2026-09-02T01:00Z | 79,229 MW |
| 2026-09-02T02:00Z | 76,450 MW |
| 2026-09-02T03:00Z | 72,771 MW |
| 2026-09-02T04:00Z | 69,007 MW |
| 2026-09-02T05:00Z | 65,737 MW |
| 2026-09-02T06:00Z | 63,208 MW |
| 2026-09-02T07:00Z | 61,148 MW |
| 2026-09-02T08:00Z | 59,714 MW |
| 2026-09-02T09:00Z | 59,363 MW |
| 2026-09-02T10:00Z | 60,165 MW |
| 2026-09-02T11:00Z | 61,692 MW |
| 2026-09-02T12:00Z | 61,913 MW |
| 2026-09-02T13:00Z | 63,541 MW |
| 2026-09-02T14:00Z | 66,805 MW |
| 2026-09-02T15:00Z | 71,184 MW |
| 2026-09-02T16:00Z | 75,859 MW |
| 2026-09-02T17:00Z | 80,358 MW |
| 2026-09-02T18:00Z | 83,756 MW |
| 2026-09-02T19:00Z | 84,976 MW |
| 2026-09-02T20:00Z | 85,865 MW |
| 2026-09-02T21:00Z | 86,343 MW |
| 2026-09-02T22:00Z | 86,098 MW |
| 2026-09-02T23:00Z | 85,453 MW |
| 2026-09-03T00:00Z | 83,132 MW |
| 2026-09-03T01:00Z | 79,779 MW |
| 2026-09-03T02:00Z | 76,966 MW |
| 2026-09-03T03:00Z | 74,536 MW |
| 2026-09-03T04:00Z | 70,506 MW |
| 2026-09-03T05:00Z | 67,002 MW |
| 2026-09-03T06:00Z | 64,245 MW |
| 2026-09-03T07:00Z | 62,074 MW |
| 2026-09-03T08:00Z | 60,926 MW |
| 2026-09-03T09:00Z | 60,609 MW |
| 2026-09-03T10:00Z | 61,492 MW |
| 2026-09-03T11:00Z | 63,039 MW |
| 2026-09-03T12:00Z | 63,163 MW |
| 2026-09-03T13:00Z | 63,981 MW |
| 2026-09-03T14:00Z | 66,319 MW |
| 2026-09-03T15:00Z | 69,644 MW |
| 2026-09-03T16:00Z | 73,268 MW |
| 2026-09-03T17:00Z | 76,385 MW |
| 2026-09-03T18:00Z | 78,296 MW |
| 2026-09-03T19:00Z | 79,875 MW |
| 2026-09-03T20:00Z | 81,085 MW |
| 2026-09-03T21:00Z | 81,784 MW |
| 2026-09-03T22:00Z | 81,565 MW |
| 2026-09-03T23:00Z | 80,000 MW |
| 2026-09-04T00:00Z | 78,075 MW |
| 2026-09-04T01:00Z | 76,751 MW |
| 2026-09-04T02:00Z | 74,291 MW |
| 2026-09-04T03:00Z | 70,843 MW |
| 2026-09-04T04:00Z | 67,130 MW |
| 2026-09-04T05:00Z | 64,032 MW |
| 2026-09-04T06:00Z | 61,799 MW |
| 2026-09-04T07:00Z | 59,907 MW |
| 2026-09-04T08:00Z | 59,038 MW |
| 2026-09-04T09:00Z | 58,796 MW |
| 2026-09-04T10:00Z | 59,673 MW |
| 2026-09-04T11:00Z | 61,341 MW |
| 2026-09-04T12:00Z | 61,834 MW |
| 2026-09-04T13:00Z | 63,438 MW |
| 2026-09-04T14:00Z | 66,996 MW |
| 2026-09-04T15:00Z | 70,668 MW |
| 2026-09-04T16:00Z | 73,690 MW |
| 2026-09-04T17:00Z | 76,613 MW |
| 2026-09-04T18:00Z | 79,403 MW |
| 2026-09-04T19:00Z | 81,933 MW |
| 2026-09-04T20:00Z | 84,037 MW |
| 2026-09-04T21:00Z | 85,079 MW |
| 2026-09-04T22:00Z | 84,750 MW |
| 2026-09-04T23:00Z | 83,031 MW |
| 2026-09-05T00:00Z | 80,000 MW |
| 2026-09-05T01:00Z | 77,511 MW |
| 2026-09-05T02:00Z | 74,652 MW |
| 2026-09-05T03:00Z | 71,295 MW |
| 2026-09-05T04:00Z | 67,771 MW |
| 2026-09-05T05:00Z | 64,543 MW |
| 2026-09-05T06:00Z | 61,940 MW |
| 2026-09-05T07:00Z | 59,737 MW |
| 2026-09-05T08:00Z | 58,101 MW |
| 2026-09-05T09:00Z | 57,087 MW |
| 2026-09-05T10:00Z | 56,514 MW |
| 2026-09-05T11:00Z | 56,444 MW |
| 2026-09-05T12:00Z | 56,514 MW |
| 2026-09-05T13:00Z | 59,385 MW |
| 2026-09-05T14:00Z | 63,846 MW |
| 2026-09-05T15:00Z | 68,482 MW |
| 2026-09-05T16:00Z | 73,055 MW |
| 2026-09-05T17:00Z | 76,995 MW |
| 2026-09-05T18:00Z | 80,061 MW |
| 2026-09-05T19:00Z | 82,391 MW |
| 2026-09-05T20:00Z | 84,104 MW |
| 2026-09-05T21:00Z | 84,535 MW |
| 2026-09-05T22:00Z | 83,663 MW |
| 2026-09-05T23:00Z | 81,976 MW |
| 2026-09-06T00:00Z | 79,589 MW |
| 2026-09-06T01:00Z | 77,093 MW |
| 2026-09-06T02:00Z | 73,931 MW |
| 2026-09-06T03:00Z | 70,623 MW |
| 2026-09-06T04:00Z | 67,404 MW |
| 2026-09-06T05:00Z | 64,271 MW |
| 2026-09-06T06:00Z | 61,577 MW |
| 2026-09-06T07:00Z | 59,632 MW |
| 2026-09-06T08:00Z | 58,203 MW |
| 2026-09-06T09:00Z | 56,756 MW |
| 2026-09-06T10:00Z | 56,095 MW |
| 2026-09-06T11:00Z | 55,799 MW |
| 2026-09-06T12:00Z | 55,415 MW |
| 2026-09-06T13:00Z | 58,468 MW |
| 2026-09-06T14:00Z | 63,083 MW |
| 2026-09-06T15:00Z | 67,805 MW |
| 2026-09-06T16:00Z | 72,055 MW |
| 2026-09-06T17:00Z | 75,321 MW |
| 2026-09-06T18:00Z | 77,352 MW |
| 2026-09-06T19:00Z | 79,422 MW |
| 2026-09-06T20:00Z | 81,194 MW |
| 2026-09-06T21:00Z | 81,923 MW |
| 2026-09-06T22:00Z | 82,270 MW |
| 2026-09-06T23:00Z | 81,129 MW |
| 2026-09-07T00:00Z | 78,442 MW |
| 2026-09-07T01:00Z | 76,309 MW |
| 2026-09-07T02:00Z | 73,604 MW |
| 2026-09-07T03:00Z | 70,074 MW |
| 2026-09-07T04:00Z | 66,626 MW |
| 2026-09-07T05:00Z | 63,489 MW |
| 2026-09-07T06:00Z | 60,931 MW |
| 2026-09-07T07:00Z | 59,000 MW |
| 2026-09-07T08:00Z | 57,637 MW |
| 2026-09-07T09:00Z | 56,808 MW |
| 2026-09-07T10:00Z | 56,589 MW |
| 2026-09-07T11:00Z | 56,429 MW |
| 2026-09-07T12:00Z | 56,059 MW |
| 2026-09-07T13:00Z | 58,720 MW |
| 2026-09-07T14:00Z | 63,851 MW |
| 2026-09-07T15:00Z | 69,430 MW |
| 2026-09-07T16:00Z | 74,750 MW |
| 2026-09-07T17:00Z | 79,518 MW |
| 2026-09-07T18:00Z | 83,079 MW |
| 2026-09-07T19:00Z | 85,416 MW |
| 2026-09-07T20:00Z | 85,927 MW |
| 2026-09-07T21:00Z | 86,393 MW |
| 2026-09-07T22:00Z | 86,405 MW |
| 2026-09-07T23:00Z | 85,686 MW |
| 2026-09-08T00:00Z | 83,943 MW |
| 2026-09-08T01:00Z | 81,665 MW |
| 2026-09-08T02:00Z | 78,329 MW |
| 2026-09-08T03:00Z | 74,532 MW |
| 2026-09-08T04:00Z | 70,371 MW |
| 2026-09-08T05:00Z | 66,641 MW |
| 2026-09-08T06:00Z | 63,555 MW |
| 2026-09-08T07:00Z | 61,337 MW |
| 2026-09-08T08:00Z | 60,022 MW |
| 2026-09-08T09:00Z | 59,629 MW |
| 2026-09-08T10:00Z | 60,348 MW |
| 2026-09-08T11:00Z | 61,848 MW |
| 2026-09-08T12:00Z | 62,021 MW |
| 2026-09-08T13:00Z | 64,187 MW |
| 2026-09-08T14:00Z | 68,675 MW |
| 2026-09-08T15:00Z | 73,396 MW |
| 2026-09-08T16:00Z | 77,982 MW |
| 2026-09-08T17:00Z | 82,208 MW |
| 2026-09-08T18:00Z | 85,531 MW |
| 2026-09-08T19:00Z | 86,276 MW |
| 2026-09-08T20:00Z | 86,283 MW |
| 2026-09-08T21:00Z | 85,879 MW |
| 2026-09-08T22:00Z | 85,720 MW |
| 2026-09-08T23:00Z | 85,263 MW |
| 2026-09-09T00:00Z | 83,668 MW |
| 2026-09-09T01:00Z | 81,869 MW |
| 2026-09-09T02:00Z | 78,241 MW |
| 2026-09-09T03:00Z | 75,053 MW |
| 2026-09-09T04:00Z | 71,073 MW |
| 2026-09-09T05:00Z | 67,346 MW |
| 2026-09-09T06:00Z | 64,588 MW |
| 2026-09-09T07:00Z | 62,522 MW |
| 2026-09-09T08:00Z | 61,233 MW |
| 2026-09-09T09:00Z | 60,732 MW |
| 2026-09-09T10:00Z | 61,344 MW |
| 2026-09-09T11:00Z | 62,766 MW |
| 2026-09-09T12:00Z | 62,866 MW |
| 2026-09-09T13:00Z | 64,519 MW |
| 2026-09-09T14:00Z | 67,959 MW |
| 2026-09-09T15:00Z | 71,747 MW |
| 2026-09-09T16:00Z | 75,486 MW |
| 2026-09-09T17:00Z | 79,538 MW |
| 2026-09-09T18:00Z | 83,326 MW |
| 2026-09-09T19:00Z | 85,358 MW |
| 2026-09-09T20:00Z | 85,702 MW |
| 2026-09-09T21:00Z | 85,929 MW |
| 2026-09-09T22:00Z | 85,303 MW |
| 2026-09-09T23:00Z | 83,723 MW |
| 2026-09-10T00:00Z | 81,259 MW |
| 2026-09-10T01:00Z | 79,596 MW |
| 2026-09-10T02:00Z | 76,516 MW |
| 2026-09-10T03:00Z | 72,602 MW |
| 2026-09-10T04:00Z | 68,495 MW |
| 2026-09-10T05:00Z | 65,222 MW |
| 2026-09-10T06:00Z | 62,332 MW |
| 2026-09-10T07:00Z | 60,242 MW |
| 2026-09-10T08:00Z | 58,983 MW |
| 2026-09-10T09:00Z | 58,509 MW |
| 2026-09-10T10:00Z | 59,332 MW |
| 2026-09-10T11:00Z | 60,917 MW |
| 2026-09-10T12:00Z | 60,955 MW |
| 2026-09-10T13:00Z | 62,523 MW |
| 2026-09-10T14:00Z | 66,206 MW |
| 2026-09-10T15:00Z | 70,412 MW |
| 2026-09-10T16:00Z | 74,976 MW |
| 2026-09-10T17:00Z | 78,976 MW |
| 2026-09-10T18:00Z | 82,080 MW |
| 2026-09-10T19:00Z | 83,998 MW |
| 2026-09-10T20:00Z | 84,547 MW |
| 2026-09-10T21:00Z | 83,977 MW |
| 2026-09-10T22:00Z | 82,170 MW |
| 2026-09-10T23:00Z | 79,897 MW |
| 2026-09-11T00:00Z | 77,423 MW |
| 2026-09-11T01:00Z | 75,828 MW |
| 2026-09-11T02:00Z | 73,177 MW |
| 2026-09-11T03:00Z | 69,727 MW |
| 2026-09-11T04:00Z | 65,912 MW |
| 2026-09-11T05:00Z | 62,834 MW |
| 2026-09-11T06:00Z | 60,381 MW |
| 2026-09-11T07:00Z | 58,491 MW |
| 2026-09-11T08:00Z | 57,482 MW |
| 2026-09-11T09:00Z | 57,472 MW |
| 2026-09-11T10:00Z | 58,437 MW |
| 2026-09-11T11:00Z | 60,346 MW |
| 2026-09-11T12:00Z | 60,739 MW |
| 2026-09-11T13:00Z | 62,229 MW |
| 2026-09-11T14:00Z | 65,786 MW |
| 2026-09-11T15:00Z | 70,141 MW |
| 2026-09-11T16:00Z | 74,980 MW |
| 2026-09-11T17:00Z | 79,871 MW |
| 2026-09-11T18:00Z | 83,726 MW |
| 2026-09-11T19:00Z | 85,439 MW |
| 2026-09-11T20:00Z | 85,805 MW |
| 2026-09-11T21:00Z | 85,526 MW |
| 2026-09-11T22:00Z | 84,402 MW |
| 2026-09-11T23:00Z | 81,016 MW |
| 2026-09-12T00:00Z | 77,995 MW |
| 2026-09-12T01:00Z | 75,860 MW |
| 2026-09-12T02:00Z | 73,241 MW |
| 2026-09-12T03:00Z | 70,137 MW |
| 2026-09-12T04:00Z | 67,019 MW |
| 2026-09-12T05:00Z | 63,913 MW |
| 2026-09-12T06:00Z | 61,370 MW |
| 2026-09-12T07:00Z | 59,606 MW |
| 2026-09-12T08:00Z | 58,195 MW |
| 2026-09-12T09:00Z | 57,277 MW |
| 2026-09-12T10:00Z | 57,198 MW |
| 2026-09-12T11:00Z | 57,422 MW |
| 2026-09-12T12:00Z | 57,580 MW |
| 2026-09-12T13:00Z | 60,293 MW |
| 2026-09-12T14:00Z | 64,663 MW |
| 2026-09-12T15:00Z | 69,368 MW |
| 2026-09-12T16:00Z | 74,371 MW |
| 2026-09-12T17:00Z | 79,283 MW |
| 2026-09-12T18:00Z | 83,642 MW |
| 2026-09-12T19:00Z | 85,869 MW |
| 2026-09-12T20:00Z | 86,221 MW |
| 2026-09-12T21:00Z | 86,489 MW |
| 2026-09-12T22:00Z | 85,971 MW |
| 2026-09-12T23:00Z | 85,458 MW |
| 2026-09-13T00:00Z | 83,240 MW |
| 2026-09-13T01:00Z | 80,775 MW |
| 2026-09-13T02:00Z | 77,783 MW |
| 2026-09-13T03:00Z | 74,618 MW |
| 2026-09-13T04:00Z | 71,229 MW |
| 2026-09-13T05:00Z | 67,668 MW |
| 2026-09-13T06:00Z | 64,716 MW |
| 2026-09-13T07:00Z | 62,288 MW |
| 2026-09-13T08:00Z | 60,281 MW |
| 2026-09-13T09:00Z | 58,897 MW |
| 2026-09-13T10:00Z | 58,101 MW |
| 2026-09-13T11:00Z | 57,767 MW |
| 2026-09-13T12:00Z | 57,430 MW |
| 2026-09-13T13:00Z | 59,923 MW |
| 2026-09-13T14:00Z | 64,368 MW |
| 2026-09-13T15:00Z | 68,823 MW |
| 2026-09-13T16:00Z | 72,989 MW |
| 2026-09-13T17:00Z | 76,914 MW |
| 2026-09-13T18:00Z | 80,432 MW |
| 2026-09-13T19:00Z | 83,321 MW |
| 2026-09-13T20:00Z | 85,176 MW |
| 2026-09-13T21:00Z | 86,062 MW |
| 2026-09-13T22:00Z | 85,917 MW |
| 2026-09-13T23:00Z | 84,732 MW |
| 2026-09-14T00:00Z | 82,421 MW |
| 2026-09-14T01:00Z | 80,330 MW |
| 2026-09-14T02:00Z | 77,206 MW |
| 2026-09-14T03:00Z | 73,249 MW |
| 2026-09-14T04:00Z | 69,377 MW |
| 2026-09-14T05:00Z | 66,013 MW |
| 2026-09-14T06:00Z | 63,268 MW |
| 2026-09-14T07:00Z | 61,365 MW |
| 2026-09-14T08:00Z | 60,103 MW |
| 2026-09-14T09:00Z | 59,877 MW |
| 2026-09-14T10:00Z | 60,611 MW |
| 2026-09-14T11:00Z | 62,166 MW |
| 2026-09-14T12:00Z | 62,381 MW |
| 2026-09-14T13:00Z | 64,530 MW |
| 2026-09-14T14:00Z | 68,549 MW |
| 2026-09-14T15:00Z | 72,944 MW |
| 2026-09-14T16:00Z | 77,391 MW |
| 2026-09-14T17:00Z | 81,369 MW |
| 2026-09-14T18:00Z | 84,845 MW |
| 2026-09-14T19:00Z | 85,979 MW |
| 2026-09-14T20:00Z | 86,162 MW |
| 2026-09-14T21:00Z | 85,923 MW |
| 2026-09-14T22:00Z | 85,745 MW |
| 2026-09-14T23:00Z | 85,400 MW |
| 2026-09-15T00:00Z | 84,037 MW |
| 2026-09-15T01:00Z | 81,967 MW |
| 2026-09-15T02:00Z | 78,675 MW |
| 2026-09-15T03:00Z | 74,495 MW |
| 2026-09-15T04:00Z | 70,539 MW |
| 2026-09-15T05:00Z | 66,843 MW |
| 2026-09-15T06:00Z | 64,264 MW |
| 2026-09-15T07:00Z | 62,218 MW |
| 2026-09-15T08:00Z | 60,947 MW |
| 2026-09-15T09:00Z | 60,323 MW |
| 2026-09-15T10:00Z | 60,937 MW |
| 2026-09-15T11:00Z | 62,080 MW |
| 2026-09-15T12:00Z | 62,299 MW |
| 2026-09-15T13:00Z | 64,337 MW |
| 2026-09-15T14:00Z | 68,297 MW |
| 2026-09-15T15:00Z | 72,384 MW |
| 2026-09-15T16:00Z | n/a |
| Hour starting (UTC) | Gas | Solar | Wind | Coal | Nuclear |
|---|---|---|---|---|---|
| 2026-08-16T17:00Z | 25,696 MW | 34,929 MW | 6,845 MW | 6,406 MW | 4,969 MW |
| 2026-08-16T18:00Z | 28,235 MW | 34,700 MW | 6,481 MW | 8,085 MW | 4,964 MW |
| 2026-08-16T19:00Z | 30,933 MW | 34,367 MW | 6,435 MW | 8,701 MW | 4,959 MW |
| 2026-08-16T20:00Z | 32,890 MW | 34,060 MW | 6,803 MW | 8,923 MW | 4,955 MW |
| 2026-08-16T21:00Z | 34,153 MW | 33,438 MW | 7,257 MW | 8,974 MW | 4,950 MW |
| 2026-08-16T22:00Z | 34,827 MW | 31,680 MW | 8,290 MW | 9,010 MW | 4,947 MW |
| 2026-08-16T23:00Z | 38,362 MW | 24,294 MW | 9,898 MW | 9,164 MW | 4,947 MW |
| 2026-08-17T00:00Z | 43,030 MW | 7,664 MW | 10,612 MW | 9,387 MW | 4,947 MW |
| 2026-08-17T01:00Z | 44,574 MW | 147 MW | 11,006 MW | 9,489 MW | 4,948 MW |
| 2026-08-17T02:00Z | 44,627 MW | 0 MW | 12,672 MW | 9,561 MW | 4,951 MW |
| 2026-08-17T03:00Z | 42,123 MW | 0 MW | 15,268 MW | 9,395 MW | 4,954 MW |
| 2026-08-17T04:00Z | 37,328 MW | 0 MW | 17,201 MW | 9,286 MW | 4,956 MW |
| 2026-08-17T05:00Z | 33,873 MW | 0 MW | 18,012 MW | 9,020 MW | 4,959 MW |
| 2026-08-17T06:00Z | 32,366 MW | 0 MW | 16,717 MW | 8,998 MW | 4,961 MW |
| 2026-08-17T07:00Z | 31,561 MW | 0 MW | 15,911 MW | 8,826 MW | 4,964 MW |
| 2026-08-17T08:00Z | 30,668 MW | 0 MW | 15,594 MW | 8,314 MW | 4,967 MW |
| 2026-08-17T09:00Z | 30,670 MW | 0 MW | 14,599 MW | 8,191 MW | 4,968 MW |
| 2026-08-17T10:00Z | 31,896 MW | 0 MW | 12,633 MW | 8,683 MW | 4,969 MW |
| 2026-08-17T11:00Z | 33,140 MW | 5 MW | 10,318 MW | 9,350 MW | 4,970 MW |
| 2026-08-17T12:00Z | 33,495 MW | 3,597 MW | 8,219 MW | 9,253 MW | 4,972 MW |
| 2026-08-17T13:00Z | 30,209 MW | 20,751 MW | 5,598 MW | 7,303 MW | 4,973 MW |
| 2026-08-17T14:00Z | 27,896 MW | 31,824 MW | 4,288 MW | 5,462 MW | 4,973 MW |
| 2026-08-17T15:00Z | 28,572 MW | 34,210 MW | 3,228 MW | 5,325 MW | 4,973 MW |
| 2026-08-17T16:00Z | 29,755 MW | 34,728 MW | 2,110 MW | 6,239 MW | 4,971 MW |
| 2026-08-17T17:00Z | 32,148 MW | 34,874 MW | 1,733 MW | 7,866 MW | 4,969 MW |
| 2026-08-17T18:00Z | 35,910 MW | 34,217 MW | 2,056 MW | 8,560 MW | 4,966 MW |
| 2026-08-17T19:00Z | 38,285 MW | 33,546 MW | 2,971 MW | 8,691 MW | 4,962 MW |
| 2026-08-17T20:00Z | 38,450 MW | 33,162 MW | 4,066 MW | 8,683 MW | 4,955 MW |
| 2026-08-17T21:00Z | 38,512 MW | 32,091 MW | 5,479 MW | 8,922 MW | 4,952 MW |
| 2026-08-17T22:00Z | 38,848 MW | 30,213 MW | 6,333 MW | 9,003 MW | 4,953 MW |
| 2026-08-17T23:00Z | 42,465 MW | 22,959 MW | 7,591 MW | 9,044 MW | 4,953 MW |
| 2026-08-18T00:00Z | 46,169 MW | 7,202 MW | 8,070 MW | 9,396 MW | 4,954 MW |
| 2026-08-18T01:00Z | 47,907 MW | 133 MW | 8,546 MW | 9,746 MW | 4,958 MW |
| 2026-08-18T02:00Z | 47,284 MW | 1 MW | 10,375 MW | 9,858 MW | 4,962 MW |
| 2026-08-18T03:00Z | 45,193 MW | 1 MW | 13,003 MW | 9,784 MW | 4,963 MW |
| 2026-08-18T04:00Z | 40,882 MW | 1 MW | 15,439 MW | 9,707 MW | 4,966 MW |
| 2026-08-18T05:00Z | 35,483 MW | 0 MW | 17,554 MW | 10,058 MW | 4,965 MW |
| 2026-08-18T06:00Z | 33,046 MW | 0 MW | 18,303 MW | 9,899 MW | 4,963 MW |
| 2026-08-18T07:00Z | 31,499 MW | 0 MW | 18,082 MW | 9,748 MW | 4,966 MW |
| 2026-08-18T08:00Z | 30,806 MW | 0 MW | 17,450 MW | 9,466 MW | 4,956 MW |
| 2026-08-18T09:00Z | 30,564 MW | 0 MW | 16,867 MW | 8,878 MW | 4,915 MW |
| 2026-08-18T10:00Z | 30,639 MW | 0 MW | 15,830 MW | 8,668 MW | 4,916 MW |
| 2026-08-18T11:00Z | 31,428 MW | 4 MW | 14,573 MW | 8,923 MW | 4,917 MW |
| 2026-08-18T12:00Z | 31,507 MW | 3,545 MW | 12,774 MW | 8,966 MW | 4,919 MW |
| 2026-08-18T13:00Z | 27,384 MW | 20,955 MW | 9,348 MW | 7,328 MW | 4,919 MW |
| 2026-08-18T14:00Z | 25,781 MW | 31,288 MW | 7,932 MW | 6,351 MW | 4,921 MW |
| 2026-08-18T15:00Z | 26,028 MW | 33,560 MW | 7,884 MW | 6,205 MW | 4,925 MW |
| 2026-08-18T16:00Z | 28,040 MW | 33,739 MW | 5,594 MW | 6,897 MW | 4,923 MW |
| 2026-08-18T17:00Z | 31,585 MW | 33,913 MW | 4,219 MW | 8,091 MW | 4,921 MW |
| 2026-08-18T18:00Z | 34,425 MW | 33,407 MW | 4,772 MW | 9,118 MW | 4,915 MW |
| 2026-08-18T19:00Z | 35,938 MW | 33,382 MW | 6,103 MW | 9,665 MW | 4,909 MW |
| 2026-08-18T20:00Z | 35,450 MW | 33,039 MW | 7,175 MW | 9,321 MW | 4,907 MW |
| 2026-08-18T21:00Z | 35,729 MW | 32,141 MW | 7,682 MW | 9,399 MW | 4,911 MW |
| 2026-08-18T22:00Z | 36,754 MW | 30,478 MW | 8,279 MW | 9,340 MW | 4,919 MW |
| 2026-08-18T23:00Z | 39,985 MW | 23,459 MW | 9,160 MW | 9,714 MW | 4,921 MW |
| 2026-08-19T00:00Z | 44,416 MW | 7,332 MW | 10,158 MW | 10,356 MW | 4,922 MW |
| 2026-08-19T01:00Z | 45,562 MW | 160 MW | 12,292 MW | 10,569 MW | 4,924 MW |
| 2026-08-19T02:00Z | 44,618 MW | 0 MW | 16,667 MW | 10,537 MW | 4,925 MW |
| 2026-08-19T03:00Z | 41,144 MW | 0 MW | 20,043 MW | 10,451 MW | 4,929 MW |
| 2026-08-19T04:00Z | 36,503 MW | 0 MW | 22,136 MW | 10,146 MW | 4,943 MW |
| 2026-08-19T05:00Z | 32,005 MW | 0 MW | 22,963 MW | 9,665 MW | 4,960 MW |
| 2026-08-19T06:00Z | 30,458 MW | 0 MW | 23,097 MW | 8,408 MW | 4,965 MW |
| 2026-08-19T07:00Z | 29,224 MW | 0 MW | 22,721 MW | 7,936 MW | 4,966 MW |
| 2026-08-19T08:00Z | 28,309 MW | 0 MW | 22,231 MW | 7,625 MW | 4,967 MW |
| 2026-08-19T09:00Z | 28,063 MW | 0 MW | 21,625 MW | 7,351 MW | 4,967 MW |
| 2026-08-19T10:00Z | 28,515 MW | 0 MW | 21,090 MW | 7,497 MW | 4,967 MW |
| 2026-08-19T11:00Z | 29,083 MW | 5 MW | 19,708 MW | 7,514 MW | 4,968 MW |
| 2026-08-19T12:00Z | 28,334 MW | 3,181 MW | 17,769 MW | 7,195 MW | 4,969 MW |
| 2026-08-19T13:00Z | 26,075 MW | 19,425 MW | 13,263 MW | 6,672 MW | 4,970 MW |
| 2026-08-19T14:00Z | 23,835 MW | 30,968 MW | 11,036 MW | 5,993 MW | 4,969 MW |
| 2026-08-19T15:00Z | 23,604 MW | 33,478 MW | 10,503 MW | 5,852 MW | 4,968 MW |
| 2026-08-19T16:00Z | 26,077 MW | 34,380 MW | 8,230 MW | 6,365 MW | 4,965 MW |
| 2026-08-19T17:00Z | 29,001 MW | 34,064 MW | 7,448 MW | 8,080 MW | 4,964 MW |
| 2026-08-19T18:00Z | 31,526 MW | 33,899 MW | 7,131 MW | 9,360 MW | 4,962 MW |
| 2026-08-19T19:00Z | 34,705 MW | 33,173 MW | 6,581 MW | 10,089 MW | 4,961 MW |
| 2026-08-19T20:00Z | 35,770 MW | 32,470 MW | 7,083 MW | 10,250 MW | 4,960 MW |
| 2026-08-19T21:00Z | 36,231 MW | 31,384 MW | 8,206 MW | 10,279 MW | 4,958 MW |
| 2026-08-19T22:00Z | 36,543 MW | 29,120 MW | 9,591 MW | 10,319 MW | 4,958 MW |
| 2026-08-19T23:00Z | 39,878 MW | 21,531 MW | 10,898 MW | 10,739 MW | 4,959 MW |
| 2026-08-20T00:00Z | 44,299 MW | 6,648 MW | 11,769 MW | 10,846 MW | 4,960 MW |
| 2026-08-20T01:00Z | 45,063 MW | 183 MW | 13,246 MW | 10,953 MW | 4,960 MW |
| 2026-08-20T02:00Z | 44,210 MW | 1 MW | 16,216 MW | 11,078 MW | 4,961 MW |
| 2026-08-20T03:00Z | 41,168 MW | 1 MW | 17,990 MW | 10,876 MW | 4,962 MW |
| 2026-08-20T04:00Z | 36,976 MW | 1 MW | 19,936 MW | 10,349 MW | 4,964 MW |
| 2026-08-20T05:00Z | 32,506 MW | 1 MW | 21,461 MW | 9,604 MW | 4,965 MW |
| 2026-08-20T06:00Z | 30,797 MW | 1 MW | 21,583 MW | 8,551 MW | 4,966 MW |
| 2026-08-20T07:00Z | 29,976 MW | 1 MW | 21,022 MW | 7,892 MW | 4,967 MW |
| 2026-08-20T08:00Z | 29,616 MW | 1 MW | 20,420 MW | 7,653 MW | 4,969 MW |
| 2026-08-20T09:00Z | 29,123 MW | 1 MW | 19,324 MW | 7,332 MW | 4,969 MW |
| 2026-08-20T10:00Z | 29,936 MW | 1 MW | 18,120 MW | 7,836 MW | 4,969 MW |
| 2026-08-20T11:00Z | 30,966 MW | 4 MW | 16,211 MW | 8,932 MW | 4,970 MW |
| 2026-08-20T12:00Z | 30,807 MW | 2,953 MW | 14,242 MW | 9,628 MW | 4,972 MW |
| 2026-08-20T13:00Z | 27,250 MW | 19,005 MW | 10,795 MW | 7,667 MW | 4,971 MW |
| 2026-08-20T14:00Z | 25,820 MW | 30,485 MW | 9,752 MW | 6,046 MW | 4,971 MW |
| 2026-08-20T15:00Z | 26,864 MW | 33,168 MW | 9,342 MW | 6,296 MW | 4,971 MW |
| 2026-08-20T16:00Z | 28,369 MW | 34,192 MW | 6,692 MW | 7,607 MW | 4,970 MW |
| 2026-08-20T17:00Z | 30,199 MW | 34,342 MW | 5,903 MW | 9,467 MW | 4,969 MW |
| 2026-08-20T18:00Z | 32,550 MW | 33,952 MW | 7,078 MW | 10,181 MW | 4,968 MW |
| 2026-08-20T19:00Z | 34,364 MW | 33,649 MW | 7,784 MW | 10,069 MW | 4,966 MW |
| 2026-08-20T20:00Z | 35,627 MW | 32,855 MW | 8,204 MW | 10,239 MW | 4,964 MW |
| 2026-08-20T21:00Z | 36,121 MW | 31,866 MW | 8,926 MW | 10,068 MW | 4,962 MW |
| 2026-08-20T22:00Z | 36,361 MW | 29,534 MW | 10,455 MW | 9,858 MW | 4,961 MW |
| 2026-08-20T23:00Z | 39,991 MW | 21,660 MW | 11,604 MW | 10,370 MW | 4,962 MW |
| 2026-08-21T00:00Z | 45,233 MW | 5,824 MW | 12,050 MW | 10,829 MW | 4,961 MW |
| 2026-08-21T01:00Z | 45,534 MW | 71 MW | 12,979 MW | 10,970 MW | 4,962 MW |
| 2026-08-21T02:00Z | 45,274 MW | 0 MW | 15,039 MW | 11,028 MW | 4,964 MW |
| 2026-08-21T03:00Z | 43,430 MW | 0 MW | 17,225 MW | 10,883 MW | 4,965 MW |
| 2026-08-21T04:00Z | 38,576 MW | 0 MW | 18,697 MW | 10,762 MW | 4,966 MW |
| 2026-08-21T05:00Z | 34,771 MW | 0 MW | 18,867 MW | 10,538 MW | 4,967 MW |
| 2026-08-21T06:00Z | 33,891 MW | 0 MW | 17,196 MW | 10,558 MW | 4,967 MW |
| 2026-08-21T07:00Z | 33,475 MW | 0 MW | 15,984 MW | 10,540 MW | 4,966 MW |
| 2026-08-21T08:00Z | 33,207 MW | 0 MW | 14,870 MW | 10,581 MW | 4,966 MW |
| 2026-08-21T09:00Z | 33,397 MW | 0 MW | 13,260 MW | 10,765 MW | 4,966 MW |
| 2026-08-21T10:00Z | 33,686 MW | 0 MW | 12,797 MW | 10,792 MW | 4,967 MW |
| 2026-08-21T11:00Z | 33,811 MW | 4 MW | 12,458 MW | 10,758 MW | 4,968 MW |
| 2026-08-21T12:00Z | 34,016 MW | 2,669 MW | 11,316 MW | 10,653 MW | 4,968 MW |
| 2026-08-21T13:00Z | 31,463 MW | 16,978 MW | 8,616 MW | 9,192 MW | 4,968 MW |
| 2026-08-21T14:00Z | 30,874 MW | 27,582 MW | 6,981 MW | 8,731 MW | 4,969 MW |
| 2026-08-21T15:00Z | 31,651 MW | 31,001 MW | 5,760 MW | 9,932 MW | 4,969 MW |
| 2026-08-21T16:00Z | 31,989 MW | 32,610 MW | 4,060 MW | 9,915 MW | 4,968 MW |
| 2026-08-21T17:00Z | 33,816 MW | 32,994 MW | 3,408 MW | 10,173 MW | 4,966 MW |
| 2026-08-21T18:00Z | 35,871 MW | 32,715 MW | 3,980 MW | 10,246 MW | 4,963 MW |
| 2026-08-21T19:00Z | 37,194 MW | 32,121 MW | 5,246 MW | 10,490 MW | 4,960 MW |
| 2026-08-21T20:00Z | 37,581 MW | 30,593 MW | 6,373 MW | 10,381 MW | 4,957 MW |
| 2026-08-21T21:00Z | 38,360 MW | 28,924 MW | 7,498 MW | 10,354 MW | 4,954 MW |
| 2026-08-21T22:00Z | 38,774 MW | 26,912 MW | 8,885 MW | 10,483 MW | 4,952 MW |
| 2026-08-21T23:00Z | 41,167 MW | 19,467 MW | 10,350 MW | 10,568 MW | 4,952 MW |
| 2026-08-22T00:00Z | 45,058 MW | 5,455 MW | 10,849 MW | 10,959 MW | 4,953 MW |
| 2026-08-22T01:00Z | 45,453 MW | 74 MW | 11,627 MW | 10,989 MW | 4,955 MW |
| 2026-08-22T02:00Z | 44,776 MW | 0 MW | 14,702 MW | 10,915 MW | 4,956 MW |
| 2026-08-22T03:00Z | 42,418 MW | 0 MW | 16,104 MW | 10,657 MW | 4,957 MW |
| 2026-08-22T04:00Z | 39,547 MW | 0 MW | 16,893 MW | 10,607 MW | 4,958 MW |
| 2026-08-22T05:00Z | 35,844 MW | 0 MW | 17,553 MW | 10,472 MW | 4,959 MW |
| 2026-08-22T06:00Z | 33,825 MW | 0 MW | 17,703 MW | 9,879 MW | 4,960 MW |
| 2026-08-22T07:00Z | 32,201 MW | 0 MW | 17,416 MW | 9,008 MW | 4,961 MW |
| 2026-08-22T08:00Z | 31,640 MW | 0 MW | 15,971 MW | 9,016 MW | 4,962 MW |
| 2026-08-22T09:00Z | 31,723 MW | 0 MW | 14,372 MW | 9,580 MW | 4,962 MW |
| 2026-08-22T10:00Z | 31,586 MW | 0 MW | 13,790 MW | 9,245 MW | 4,962 MW |
| 2026-08-22T11:00Z | 30,844 MW | 4 MW | 14,088 MW | 8,545 MW | 4,962 MW |
| 2026-08-22T12:00Z | 30,442 MW | 2,431 MW | 13,670 MW | 8,051 MW | 4,964 MW |
| 2026-08-22T13:00Z | 29,244 MW | 15,450 MW | 10,559 MW | 7,359 MW | 4,964 MW |
| 2026-08-22T14:00Z | 29,488 MW | 26,376 MW | 7,372 MW | 7,257 MW | 4,964 MW |
| 2026-08-22T15:00Z | 29,109 MW | 30,944 MW | 6,246 MW | 7,097 MW | 4,963 MW |
| 2026-08-22T16:00Z | 30,191 MW | 32,215 MW | 4,557 MW | 7,560 MW | 4,963 MW |
| 2026-08-22T17:00Z | 34,330 MW | 32,232 MW | 2,541 MW | 9,609 MW | 4,438 MW |
| 2026-08-22T18:00Z | 37,382 MW | 31,967 MW | 1,964 MW | 10,746 MW | 4,454 MW |
| 2026-08-22T19:00Z | 40,432 MW | 30,587 MW | 2,572 MW | 10,879 MW | 4,456 MW |
| 2026-08-22T20:00Z | 41,212 MW | 29,801 MW | 3,923 MW | 10,868 MW | 4,462 MW |
| 2026-08-22T21:00Z | 41,060 MW | 27,952 MW | 6,051 MW | 10,670 MW | 4,490 MW |
| 2026-08-22T22:00Z | 42,157 MW | 24,599 MW | 8,074 MW | 10,603 MW | 4,505 MW |
| 2026-08-22T23:00Z | 43,730 MW | 16,950 MW | 9,378 MW | 10,898 MW | 4,511 MW |
| 2026-08-23T00:00Z | 45,854 MW | 4,280 MW | 10,395 MW | 10,917 MW | 4,533 MW |
| 2026-08-23T01:00Z | 46,183 MW | 77 MW | 12,593 MW | 10,846 MW | 4,557 MW |
| 2026-08-23T02:00Z | 45,888 MW | 0 MW | 14,607 MW | 10,772 MW | 4,575 MW |
| 2026-08-23T03:00Z | 45,179 MW | 0 MW | 13,144 MW | 10,820 MW | 4,577 MW |
| 2026-08-23T04:00Z | 44,411 MW | 1 MW | 10,107 MW | 10,951 MW | 4,580 MW |
| 2026-08-23T05:00Z | 42,945 MW | 0 MW | 8,870 MW | 10,646 MW | 4,582 MW |
| 2026-08-23T06:00Z | 41,474 MW | 0 MW | 8,299 MW | 10,383 MW | 4,584 MW |
| 2026-08-23T07:00Z | 38,432 MW | 0 MW | 8,976 MW | 10,221 MW | 4,587 MW |
| 2026-08-23T08:00Z | 36,532 MW | 0 MW | 9,297 MW | 10,210 MW | 4,588 MW |
| 2026-08-23T09:00Z | 35,045 MW | 0 MW | 9,575 MW | 10,110 MW | 4,588 MW |
| 2026-08-23T10:00Z | 34,004 MW | 0 MW | 9,192 MW | 10,010 MW | 4,590 MW |
| 2026-08-23T11:00Z | 34,199 MW | 3 MW | 8,546 MW | 9,730 MW | 4,591 MW |
| 2026-08-23T12:00Z | 33,469 MW | 1,833 MW | 8,017 MW | 9,598 MW | 4,592 MW |
| 2026-08-23T13:00Z | 32,392 MW | 12,709 MW | 5,882 MW | 8,867 MW | 4,592 MW |
| 2026-08-23T14:00Z | 31,751 MW | 24,594 MW | 4,137 MW | 8,195 MW | 4,592 MW |
| 2026-08-23T15:00Z | 31,143 MW | 30,007 MW | 4,124 MW | 7,568 MW | 4,592 MW |
| 2026-08-23T16:00Z | 30,796 MW | 32,646 MW | 3,340 MW | 7,112 MW | 4,591 MW |
| 2026-08-23T17:00Z | 32,540 MW | 33,186 MW | 2,840 MW | 7,819 MW | 4,588 MW |
| 2026-08-23T18:00Z | 35,317 MW | 33,285 MW | 2,972 MW | 8,869 MW | 4,585 MW |
| 2026-08-23T19:00Z | 38,023 MW | 32,855 MW | 3,416 MW | 9,528 MW | 4,583 MW |
| 2026-08-23T20:00Z | 39,722 MW | 31,964 MW | 4,305 MW | 9,672 MW | 4,580 MW |
| 2026-08-23T21:00Z | 40,585 MW | 31,039 MW | 5,189 MW | 9,644 MW | 4,578 MW |
| 2026-08-23T22:00Z | 41,291 MW | 29,015 MW | 6,051 MW | 9,665 MW | 4,575 MW |
| 2026-08-23T23:00Z | 43,721 MW | 20,896 MW | 6,995 MW | 9,766 MW | 4,574 MW |
| 2026-08-24T00:00Z | 46,182 MW | 5,381 MW | 8,587 MW | 9,818 MW | 4,574 MW |
| 2026-08-24T01:00Z | 47,267 MW | 76 MW | 11,392 MW | 9,961 MW | 4,575 MW |
| 2026-08-24T02:00Z | 46,812 MW | 0 MW | 15,826 MW | 9,894 MW | 4,576 MW |
| 2026-08-24T03:00Z | 44,230 MW | 0 MW | 18,897 MW | 9,568 MW | 4,578 MW |
| 2026-08-24T04:00Z | 38,652 MW | 0 MW | 20,970 MW | 9,451 MW | 4,580 MW |
| 2026-08-24T05:00Z | 33,990 MW | 0 MW | 21,851 MW | 9,395 MW | 4,582 MW |
| 2026-08-24T06:00Z | 31,965 MW | 0 MW | 21,623 MW | 8,288 MW | 4,583 MW |
| 2026-08-24T07:00Z | 30,970 MW | 0 MW | 21,199 MW | 7,222 MW | 4,584 MW |
| 2026-08-24T08:00Z | 30,482 MW | 0 MW | 20,781 MW | 6,661 MW | 4,585 MW |
| 2026-08-24T09:00Z | 30,409 MW | 0 MW | 20,028 MW | 6,534 MW | 4,585 MW |
| 2026-08-24T10:00Z | 31,025 MW | 0 MW | 18,711 MW | 7,049 MW | 4,586 MW |
| 2026-08-24T11:00Z | 31,389 MW | 1 MW | 18,611 MW | 7,869 MW | 4,587 MW |
| 2026-08-24T12:00Z | 30,104 MW | 2,424 MW | 18,370 MW | 7,900 MW | 4,587 MW |
| 2026-08-24T13:00Z | 26,806 MW | 17,260 MW | 14,751 MW | 6,925 MW | 4,587 MW |
| 2026-08-24T14:00Z | 25,124 MW | 28,521 MW | 13,677 MW | 5,794 MW | 4,588 MW |
| 2026-08-24T15:00Z | 25,089 MW | 32,103 MW | 12,996 MW | 5,846 MW | 4,587 MW |
| 2026-08-24T16:00Z | 26,642 MW | 33,008 MW | 10,836 MW | 6,219 MW | 4,588 MW |
| 2026-08-24T17:00Z | 30,390 MW | 32,843 MW | 9,167 MW | 7,393 MW | 4,586 MW |
| 2026-08-24T18:00Z | 33,765 MW | 33,106 MW | 7,317 MW | 8,801 MW | 4,585 MW |
| 2026-08-24T19:00Z | 37,130 MW | 32,288 MW | 6,490 MW | 9,418 MW | 4,582 MW |
| 2026-08-24T20:00Z | 37,848 MW | 32,326 MW | 6,338 MW | 9,332 MW | 4,578 MW |
| 2026-08-24T21:00Z | 38,260 MW | 32,217 MW | 6,573 MW | 9,026 MW | 4,575 MW |
| 2026-08-24T22:00Z | 39,526 MW | 29,701 MW | 7,407 MW | 9,210 MW | 4,573 MW |
| 2026-08-24T23:00Z | 41,806 MW | 21,002 MW | 9,686 MW | 9,600 MW | 4,573 MW |
| 2026-08-25T00:00Z | 44,093 MW | 5,578 MW | 13,042 MW | 9,816 MW | 4,573 MW |
| 2026-08-25T01:00Z | 44,829 MW | 55 MW | 17,578 MW | 9,869 MW | 4,574 MW |
| 2026-08-25T02:00Z | 42,863 MW | 0 MW | 22,276 MW | 9,825 MW | 4,575 MW |
| 2026-08-25T03:00Z | 38,384 MW | 0 MW | 24,547 MW | 9,527 MW | 4,577 MW |
| 2026-08-25T04:00Z | 34,483 MW | 0 MW | 25,100 MW | 9,172 MW | 4,579 MW |
| 2026-08-25T05:00Z | 32,090 MW | 0 MW | 25,059 MW | 8,360 MW | 4,595 MW |
| 2026-08-25T06:00Z | 30,621 MW | 0 MW | 24,529 MW | 7,692 MW | 4,618 MW |
| 2026-08-25T07:00Z | 30,186 MW | 0 MW | 23,503 MW | 6,922 MW | 4,718 MW |
| 2026-08-25T08:00Z | 29,874 MW | 0 MW | 22,490 MW | 6,828 MW | 4,827 MW |
| 2026-08-25T09:00Z | 29,353 MW | 0 MW | 21,725 MW | 6,788 MW | 4,912 MW |
| 2026-08-25T10:00Z | 30,426 MW | 0 MW | 19,425 MW | 7,262 MW | 4,952 MW |
| 2026-08-25T11:00Z | 32,220 MW | 0 MW | 15,874 MW | 8,830 MW | 4,958 MW |
| 2026-08-25T12:00Z | 33,179 MW | 1,680 MW | 12,473 MW | 9,457 MW | 4,958 MW |
| 2026-08-25T13:00Z | 31,946 MW | 13,203 MW | 8,151 MW | 8,990 MW | 4,959 MW |
| 2026-08-25T14:00Z | 32,077 MW | 21,571 MW | 5,746 MW | 9,011 MW | 4,960 MW |
| 2026-08-25T15:00Z | 31,814 MW | 26,280 MW | 4,961 MW | 9,508 MW | 4,959 MW |
| 2026-08-25T16:00Z | 30,925 MW | 30,146 MW | 4,669 MW | 8,389 MW | 4,956 MW |
| 2026-08-25T17:00Z | 32,064 MW | 31,178 MW | 4,225 MW | 7,713 MW | 4,954 MW |
| 2026-08-25T18:00Z | 34,047 MW | 31,125 MW | 5,104 MW | 8,694 MW | 4,953 MW |
| 2026-08-25T19:00Z | 35,411 MW | 31,076 MW | 6,570 MW | 9,191 MW | 4,952 MW |
| 2026-08-25T20:00Z | 36,402 MW | 30,405 MW | 7,670 MW | 9,206 MW | 4,949 MW |
| 2026-08-25T21:00Z | 38,555 MW | 28,289 MW | 8,252 MW | 9,651 MW | 4,945 MW |
| 2026-08-25T22:00Z | 40,390 MW | 24,843 MW | 9,823 MW | 9,755 MW | 4,943 MW |
| 2026-08-25T23:00Z | 42,612 MW | 16,449 MW | 11,763 MW | 9,814 MW | 4,942 MW |
| 2026-08-26T00:00Z | 44,185 MW | 3,761 MW | 14,302 MW | 9,947 MW | 4,944 MW |
| 2026-08-26T01:00Z | 44,288 MW | 47 MW | 14,523 MW | 10,156 MW | 4,946 MW |
| 2026-08-26T02:00Z | 43,613 MW | 0 MW | 16,599 MW | 10,244 MW | 4,948 MW |
| 2026-08-26T03:00Z | 40,581 MW | 0 MW | 18,699 MW | 10,276 MW | 4,950 MW |
| 2026-08-26T04:00Z | 36,562 MW | 0 MW | 19,872 MW | 10,330 MW | 4,952 MW |
| 2026-08-26T05:00Z | 33,402 MW | 0 MW | 21,117 MW | 10,345 MW | 4,954 MW |
| 2026-08-26T06:00Z | 32,869 MW | 0 MW | 19,380 MW | 10,350 MW | 4,956 MW |
| 2026-08-26T07:00Z | 33,720 MW | 0 MW | 14,323 MW | 10,442 MW | 4,957 MW |
| 2026-08-26T08:00Z | 35,268 MW | 0 MW | 9,701 MW | 10,515 MW | 4,958 MW |
| 2026-08-26T09:00Z | 36,795 MW | 0 MW | 7,048 MW | 10,678 MW | 4,958 MW |
| 2026-08-26T10:00Z | 38,541 MW | 0 MW | 5,235 MW | 10,820 MW | 4,958 MW |
| 2026-08-26T11:00Z | 39,282 MW | 1 MW | 4,097 MW | 10,868 MW | 4,959 MW |
| 2026-08-26T12:00Z | 39,983 MW | 1,227 MW | 3,844 MW | 10,824 MW | 4,960 MW |
| 2026-08-26T13:00Z | 37,576 MW | 9,919 MW | 3,242 MW | 10,661 MW | 4,960 MW |
| 2026-08-26T14:00Z | 36,363 MW | 19,413 MW | 2,502 MW | 10,797 MW | 4,961 MW |
| 2026-08-26T15:00Z | 36,104 MW | 25,815 MW | 1,981 MW | 10,913 MW | 4,960 MW |
| 2026-08-26T16:00Z | 36,664 MW | 29,130 MW | 1,492 MW | 10,933 MW | 4,960 MW |
| 2026-08-26T17:00Z | 38,259 MW | 29,570 MW | 1,160 MW | 10,941 MW | 4,958 MW |
| 2026-08-26T18:00Z | 39,497 MW | 29,164 MW | 1,502 MW | 10,854 MW | 4,956 MW |
| 2026-08-26T19:00Z | 39,969 MW | 28,788 MW | 2,819 MW | 10,840 MW | 4,952 MW |
| 2026-08-26T20:00Z | 41,628 MW | 27,133 MW | 3,585 MW | 10,939 MW | 4,946 MW |
| 2026-08-26T21:00Z | 44,403 MW | 26,188 MW | 3,958 MW | 10,977 MW | 4,941 MW |
| 2026-08-26T22:00Z | 45,526 MW | 23,988 MW | 4,114 MW | 11,076 MW | 4,940 MW |
| 2026-08-26T23:00Z | 46,546 MW | 16,902 MW | 4,996 MW | 11,301 MW | 4,942 MW |
| 2026-08-27T00:00Z | 46,948 MW | 3,869 MW | 6,227 MW | 11,461 MW | 4,941 MW |
| 2026-08-27T01:00Z | 46,895 MW | 25 MW | 6,637 MW | 11,571 MW | 4,942 MW |
| 2026-08-27T02:00Z | 46,905 MW | 0 MW | 7,187 MW | 11,521 MW | 4,944 MW |
| 2026-08-27T03:00Z | 47,249 MW | 0 MW | 7,716 MW | 11,191 MW | 4,946 MW |
| 2026-08-27T04:00Z | 45,801 MW | 0 MW | 7,855 MW | 10,924 MW | 4,947 MW |
| 2026-08-27T05:00Z | 43,801 MW | 0 MW | 7,892 MW | 10,710 MW | 4,949 MW |
| 2026-08-27T06:00Z | 42,465 MW | 0 MW | 8,196 MW | 10,679 MW | 4,951 MW |
| 2026-08-27T07:00Z | 41,012 MW | 0 MW | 7,117 MW | 10,703 MW | 4,953 MW |
| 2026-08-27T08:00Z | 40,658 MW | 0 MW | 6,633 MW | 10,714 MW | 4,955 MW |
| 2026-08-27T09:00Z | 40,656 MW | 0 MW | 5,769 MW | 10,708 MW | 4,956 MW |
| 2026-08-27T10:00Z | 39,934 MW | 0 MW | 5,786 MW | 10,840 MW | 4,958 MW |
| 2026-08-27T11:00Z | 39,919 MW | 1 MW | 4,114 MW | 10,933 MW | 4,958 MW |
| 2026-08-27T12:00Z | 39,231 MW | 1,761 MW | 3,551 MW | 10,754 MW | 4,959 MW |
| 2026-08-27T13:00Z | 35,540 MW | 13,265 MW | 3,711 MW | 10,162 MW | 4,962 MW |
| 2026-08-27T14:00Z | 33,114 MW | 23,233 MW | 4,919 MW | 9,326 MW | 4,963 MW |
| 2026-08-27T15:00Z | 31,614 MW | 26,246 MW | 7,762 MW | 8,413 MW | 4,962 MW |
| 2026-08-27T16:00Z | 29,921 MW | 29,392 MW | 8,710 MW | 7,936 MW | 4,962 MW |
| 2026-08-27T17:00Z | 31,178 MW | 31,538 MW | 8,050 MW | 7,984 MW | 4,960 MW |
| 2026-08-27T18:00Z | 35,603 MW | 31,641 MW | 5,714 MW | 9,050 MW | 4,958 MW |
| 2026-08-27T19:00Z | 38,043 MW | 31,527 MW | 6,091 MW | 9,613 MW | 4,955 MW |
| 2026-08-27T20:00Z | 38,735 MW | 30,318 MW | 7,680 MW | 9,689 MW | 4,951 MW |
| 2026-08-27T21:00Z | 39,172 MW | 27,512 MW | 10,257 MW | 9,615 MW | 4,948 MW |
| 2026-08-27T22:00Z | 38,963 MW | 24,693 MW | 12,327 MW | 9,194 MW | 4,946 MW |
| 2026-08-27T23:00Z | 41,215 MW | 16,624 MW | 13,749 MW | 9,279 MW | 4,946 MW |
| 2026-08-28T00:00Z | 46,231 MW | 3,168 MW | 10,692 MW | 10,294 MW | 4,947 MW |
| 2026-08-28T01:00Z | 47,037 MW | 20 MW | 8,668 MW | 10,466 MW | 4,950 MW |
| 2026-08-28T02:00Z | 46,978 MW | 0 MW | 8,049 MW | 10,317 MW | 4,952 MW |
| 2026-08-28T03:00Z | 46,647 MW | 0 MW | 6,827 MW | 10,195 MW | 4,953 MW |
| 2026-08-28T04:00Z | 45,776 MW | 0 MW | 6,656 MW | 10,099 MW | 4,955 MW |
| 2026-08-28T05:00Z | 43,433 MW | 0 MW | 6,812 MW | 10,131 MW | 4,956 MW |
| 2026-08-28T06:00Z | 41,141 MW | 0 MW | 6,674 MW | 10,172 MW | 4,958 MW |
| 2026-08-28T07:00Z | 39,592 MW | 0 MW | 6,182 MW | 10,125 MW | 4,959 MW |
| 2026-08-28T08:00Z | 38,611 MW | 0 MW | 5,900 MW | 10,074 MW | 4,959 MW |
| 2026-08-28T09:00Z | 38,919 MW | 0 MW | 4,723 MW | 10,140 MW | 4,961 MW |
| 2026-08-28T10:00Z | 40,287 MW | 0 MW | 3,097 MW | 10,165 MW | 4,962 MW |
| 2026-08-28T11:00Z | 40,808 MW | 1 MW | 2,724 MW | 10,240 MW | 4,962 MW |
| 2026-08-28T12:00Z | 40,236 MW | 2,257 MW | 2,129 MW | 10,263 MW | 4,963 MW |
| 2026-08-28T13:00Z | 35,556 MW | 16,701 MW | 1,299 MW | 9,892 MW | 4,963 MW |
| 2026-08-28T14:00Z | 32,962 MW | 28,483 MW | 1,251 MW | 9,058 MW | 4,963 MW |
| 2026-08-28T15:00Z | 32,841 MW | 31,497 MW | 1,032 MW | 10,069 MW | 4,962 MW |
| 2026-08-28T16:00Z | 33,385 MW | 32,633 MW | 1,168 MW | 10,625 MW | 4,960 MW |
| 2026-08-28T17:00Z | 34,316 MW | 32,614 MW | 1,380 MW | 10,679 MW | 4,956 MW |
| 2026-08-28T18:00Z | 36,991 MW | 31,488 MW | 2,299 MW | 10,785 MW | 4,952 MW |
| 2026-08-28T19:00Z | 39,223 MW | 29,838 MW | 3,653 MW | 10,789 MW | 4,953 MW |
| 2026-08-28T20:00Z | 40,972 MW | 28,626 MW | 4,657 MW | 10,755 MW | 4,956 MW |
| 2026-08-28T21:00Z | 40,812 MW | 26,312 MW | 5,748 MW | 10,745 MW | 4,955 MW |
| 2026-08-28T22:00Z | 40,487 MW | 23,012 MW | 7,103 MW | 10,800 MW | 4,955 MW |
| 2026-08-28T23:00Z | 41,037 MW | 16,193 MW | 8,472 MW | 10,883 MW | 4,954 MW |
| 2026-08-29T00:00Z | 43,120 MW | 4,054 MW | 10,050 MW | 10,962 MW | 4,955 MW |
| 2026-08-29T01:00Z | 42,864 MW | 20 MW | 11,570 MW | 10,841 MW | 4,955 MW |
| 2026-08-29T02:00Z | 40,209 MW | 0 MW | 14,412 MW | 10,516 MW | 4,956 MW |
| 2026-08-29T03:00Z | 37,204 MW | 0 MW | 16,027 MW | 9,761 MW | 4,957 MW |
| 2026-08-29T04:00Z | 35,222 MW | 0 MW | 16,395 MW | 9,270 MW | 4,957 MW |
| 2026-08-29T05:00Z | 32,476 MW | 0 MW | 15,994 MW | 9,532 MW | 4,958 MW |
| 2026-08-29T06:00Z | 30,506 MW | 0 MW | 15,197 MW | 9,864 MW | 4,959 MW |
| 2026-08-29T07:00Z | 29,716 MW | 0 MW | 14,054 MW | 9,470 MW | 4,960 MW |
| 2026-08-29T08:00Z | 29,985 MW | 0 MW | 12,862 MW | 9,772 MW | 4,960 MW |
| 2026-08-29T09:00Z | 29,329 MW | 0 MW | 11,905 MW | 9,423 MW | 4,961 MW |
| 2026-08-29T10:00Z | 29,503 MW | 0 MW | 10,730 MW | 9,399 MW | 4,962 MW |
| 2026-08-29T11:00Z | 29,270 MW | 1 MW | 10,317 MW | 9,055 MW | 4,962 MW |
| 2026-08-29T12:00Z | 29,099 MW | 2,477 MW | 9,529 MW | 8,950 MW | 4,963 MW |
| 2026-08-29T13:00Z | 25,032 MW | 18,477 MW | 7,022 MW | 7,363 MW | 4,964 MW |
| 2026-08-29T14:00Z | 22,697 MW | 30,483 MW | 5,178 MW | 6,298 MW | 4,964 MW |
| 2026-08-29T15:00Z | 24,157 MW | 32,660 MW | 5,376 MW | 6,188 MW | 4,963 MW |
| 2026-08-29T16:00Z | 24,632 MW | 33,803 MW | 6,010 MW | 6,350 MW | 4,962 MW |
| 2026-08-29T17:00Z | 26,488 MW | 33,748 MW | 6,248 MW | 7,231 MW | 4,958 MW |
| 2026-08-29T18:00Z | 28,398 MW | 33,479 MW | 6,783 MW | 8,593 MW | 4,954 MW |
| 2026-08-29T19:00Z | 30,215 MW | 32,784 MW | 7,239 MW | 9,932 MW | 4,948 MW |
| 2026-08-29T20:00Z | 32,833 MW | 31,612 MW | 7,486 MW | 10,447 MW | 4,944 MW |
| 2026-08-29T21:00Z | 34,344 MW | 30,506 MW | 8,089 MW | 10,670 MW | 4,943 MW |
| 2026-08-29T22:00Z | 35,053 MW | 27,747 MW | 9,713 MW | 10,842 MW | 4,942 MW |
| 2026-08-29T23:00Z | 36,519 MW | 18,832 MW | 11,927 MW | 10,921 MW | 4,943 MW |
| 2026-08-30T00:00Z | 38,809 MW | 4,165 MW | 13,549 MW | 10,998 MW | 4,943 MW |
| 2026-08-30T01:00Z | 39,012 MW | 22 MW | 15,239 MW | 10,927 MW | 4,944 MW |
| 2026-08-30T02:00Z | 38,612 MW | 0 MW | 18,940 MW | 10,885 MW | 4,946 MW |
| 2026-08-30T03:00Z | 35,589 MW | 0 MW | 21,349 MW | 10,841 MW | 4,947 MW |
| 2026-08-30T04:00Z | 31,750 MW | 1 MW | 22,490 MW | 10,494 MW | 4,948 MW |
| 2026-08-30T05:00Z | 29,047 MW | 0 MW | 22,416 MW | 9,741 MW | 4,950 MW |
| 2026-08-30T06:00Z | 27,176 MW | 0 MW | 22,001 MW | 9,028 MW | 4,951 MW |
| 2026-08-30T07:00Z | 26,300 MW | 0 MW | 21,373 MW | 8,244 MW | 4,951 MW |
| 2026-08-30T08:00Z | 25,643 MW | 0 MW | 20,455 MW | 7,779 MW | 4,952 MW |
| 2026-08-30T09:00Z | 25,234 MW | 0 MW | 19,540 MW | 7,674 MW | 4,953 MW |
| 2026-08-30T10:00Z | 25,470 MW | 0 MW | 18,379 MW | 7,687 MW | 4,955 MW |
| 2026-08-30T11:00Z | 25,783 MW | 1 MW | 17,079 MW | 8,060 MW | 4,956 MW |
| 2026-08-30T12:00Z | 25,320 MW | 2,459 MW | 15,330 MW | 8,428 MW | 4,957 MW |
| 2026-08-30T13:00Z | 22,034 MW | 18,357 MW | 11,794 MW | 6,724 MW | 4,959 MW |
| 2026-08-30T14:00Z | 20,290 MW | 30,185 MW | 13,135 MW | 5,907 MW | 4,959 MW |
| 2026-08-30T15:00Z | 19,968 MW | 32,617 MW | 13,586 MW | 6,015 MW | 4,958 MW |
| 2026-08-30T16:00Z | 21,459 MW | 33,558 MW | 11,253 MW | 6,427 MW | 4,956 MW |
| 2026-08-30T17:00Z | 24,595 MW | 33,603 MW | 9,318 MW | 7,369 MW | 4,951 MW |
| 2026-08-30T18:00Z | 27,510 MW | 32,671 MW | 9,377 MW | 8,527 MW | 4,947 MW |
| 2026-08-30T19:00Z | 28,577 MW | 32,368 MW | 9,993 MW | 9,796 MW | 4,945 MW |
| 2026-08-30T20:00Z | 30,658 MW | 31,568 MW | 10,175 MW | 10,238 MW | 4,943 MW |
| 2026-08-30T21:00Z | 32,415 MW | 30,285 MW | 10,149 MW | 10,272 MW | 4,942 MW |
| 2026-08-30T22:00Z | 33,509 MW | 28,493 MW | 10,765 MW | 10,480 MW | 4,942 MW |
| 2026-08-30T23:00Z | 35,786 MW | 20,042 MW | 12,533 MW | 10,517 MW | 4,943 MW |
| 2026-08-31T00:00Z | 38,007 MW | 4,292 MW | 14,451 MW | 10,778 MW | 4,944 MW |
| 2026-08-31T01:00Z | 38,873 MW | 16 MW | 16,417 MW | 10,908 MW | 4,946 MW |
| 2026-08-31T02:00Z | 38,464 MW | 0 MW | 19,574 MW | 10,707 MW | 4,948 MW |
| 2026-08-31T03:00Z | 34,975 MW | 0 MW | 22,464 MW | 10,440 MW | 4,949 MW |
| 2026-08-31T04:00Z | 30,880 MW | 0 MW | 23,956 MW | 10,015 MW | 4,951 MW |
| 2026-08-31T05:00Z | 28,599 MW | 0 MW | 24,032 MW | 9,146 MW | 4,952 MW |
| 2026-08-31T06:00Z | 27,462 MW | 0 MW | 23,225 MW | 8,277 MW | 4,953 MW |
| 2026-08-31T07:00Z | 26,931 MW | 0 MW | 22,144 MW | 7,712 MW | 4,955 MW |
| 2026-08-31T08:00Z | 26,832 MW | 0 MW | 20,960 MW | 7,435 MW | 4,956 MW |
| 2026-08-31T09:00Z | 27,271 MW | 0 MW | 19,515 MW | 7,776 MW | 4,957 MW |
| 2026-08-31T10:00Z | 28,193 MW | 0 MW | 17,808 MW | 8,893 MW | 4,958 MW |
| 2026-08-31T11:00Z | 29,512 MW | 0 MW | 15,585 MW | 9,952 MW | 4,959 MW |
| 2026-08-31T12:00Z | 29,952 MW | 2,198 MW | 13,263 MW | 10,096 MW | 4,960 MW |
| 2026-08-31T13:00Z | 26,730 MW | 18,255 MW | 9,639 MW | 8,504 MW | 4,959 MW |
| 2026-08-31T14:00Z | 25,375 MW | 30,060 MW | 10,233 MW | 7,282 MW | 4,964 MW |
| 2026-08-31T15:00Z | 26,225 MW | 32,654 MW | 9,960 MW | 6,962 MW | 4,965 MW |
| 2026-08-31T16:00Z | 26,136 MW | 33,863 MW | 8,560 MW | 7,315 MW | 4,963 MW |
| 2026-08-31T17:00Z | 28,697 MW | 32,831 MW | 7,426 MW | 8,563 MW | 4,959 MW |
| 2026-08-31T18:00Z | 31,785 MW | 31,374 MW | 7,231 MW | 9,769 MW | 4,952 MW |
| 2026-08-31T19:00Z | 33,475 MW | 30,638 MW | 8,199 MW | 10,099 MW | 4,947 MW |
| 2026-08-31T20:00Z | 34,968 MW | 28,619 MW | 8,969 MW | 10,262 MW | 4,945 MW |
| 2026-08-31T21:00Z | 36,502 MW | 27,758 MW | 9,817 MW | 10,172 MW | 4,944 MW |
| 2026-08-31T22:00Z | 37,205 MW | 25,902 MW | 10,686 MW | 10,183 MW | 4,943 MW |
| 2026-08-31T23:00Z | 38,345 MW | 17,151 MW | 13,151 MW | 10,216 MW | 4,944 MW |
| 2026-09-01T00:00Z | 38,995 MW | 3,625 MW | 15,344 MW | 10,300 MW | 4,945 MW |
| 2026-09-01T01:00Z | 39,422 MW | 7 MW | 16,646 MW | 10,315 MW | 4,947 MW |
| 2026-09-01T02:00Z | 39,110 MW | 0 MW | 19,158 MW | 10,283 MW | 4,948 MW |
| 2026-09-01T03:00Z | 36,926 MW | 0 MW | 20,584 MW | 10,224 MW | 4,950 MW |
| 2026-09-01T04:00Z | 33,432 MW | 0 MW | 20,625 MW | 10,161 MW | 4,950 MW |
| 2026-09-01T05:00Z | 31,239 MW | 0 MW | 19,821 MW | 10,186 MW | 4,950 MW |
| 2026-09-01T06:00Z | 29,796 MW | 0 MW | 18,724 MW | 10,061 MW | 4,952 MW |
| 2026-09-01T07:00Z | 29,474 MW | 0 MW | 17,473 MW | 9,987 MW | 4,953 MW |
| 2026-09-01T08:00Z | 30,165 MW | 0 MW | 16,648 MW | 10,114 MW | 4,954 MW |
| 2026-09-01T09:00Z | 29,952 MW | 0 MW | 15,592 MW | 9,743 MW | 4,955 MW |
| 2026-09-01T10:00Z | 30,067 MW | 0 MW | 14,401 MW | 9,972 MW | 4,955 MW |
| 2026-09-01T11:00Z | 30,693 MW | 1 MW | 13,459 MW | 10,033 MW | 4,956 MW |
| 2026-09-01T12:00Z | 30,824 MW | 1,894 MW | 11,629 MW | 10,085 MW | 4,957 MW |
| 2026-09-01T13:00Z | 29,504 MW | 15,360 MW | 8,259 MW | 9,273 MW | 4,959 MW |
| 2026-09-01T14:00Z | 28,889 MW | 27,499 MW | 7,973 MW | 8,286 MW | 4,963 MW |
| 2026-09-01T15:00Z | 28,432 MW | 30,371 MW | 8,872 MW | 8,197 MW | 4,963 MW |
| 2026-09-01T16:00Z | 28,000 MW | 30,492 MW | 8,507 MW | 7,672 MW | 4,964 MW |
| 2026-09-01T17:00Z | 29,890 MW | 30,080 MW | 6,546 MW | 8,499 MW | 4,963 MW |
| 2026-09-01T18:00Z | 33,364 MW | 28,711 MW | 5,578 MW | 9,944 MW | 4,958 MW |
| 2026-09-01T19:00Z | 35,635 MW | 28,498 MW | 5,727 MW | 9,879 MW | 4,957 MW |
| 2026-09-01T20:00Z | 36,378 MW | 27,305 MW | 6,169 MW | 9,527 MW | 4,955 MW |
| 2026-09-01T21:00Z | 37,726 MW | 24,465 MW | 6,631 MW | 9,834 MW | 4,956 MW |
| 2026-09-01T22:00Z | 39,056 MW | 20,694 MW | 7,775 MW | 10,205 MW | 4,956 MW |
| 2026-09-01T23:00Z | 40,529 MW | 13,087 MW | 9,291 MW | 10,262 MW | 4,955 MW |
| 2026-09-02T00:00Z | 41,035 MW | 2,995 MW | 11,361 MW | 10,362 MW | 4,956 MW |
| 2026-09-02T01:00Z | 42,060 MW | 5 MW | 13,175 MW | 10,468 MW | 4,956 MW |
| 2026-09-02T02:00Z | 42,133 MW | 0 MW | 16,295 MW | 10,347 MW | 4,957 MW |
| 2026-09-02T03:00Z | 38,974 MW | 0 MW | 18,163 MW | 10,215 MW | 4,958 MW |
| 2026-09-02T04:00Z | 34,999 MW | 0 MW | 19,078 MW | 10,135 MW | 4,959 MW |
| 2026-09-02T05:00Z | 31,468 MW | 0 MW | 20,819 MW | 10,090 MW | 4,959 MW |
| 2026-09-02T06:00Z | 30,080 MW | 0 MW | 20,785 MW | 9,845 MW | 4,960 MW |
| 2026-09-02T07:00Z | 29,783 MW | 0 MW | 19,449 MW | 9,902 MW | 4,961 MW |
| 2026-09-02T08:00Z | 29,742 MW | 0 MW | 17,779 MW | 9,961 MW | 4,961 MW |
| 2026-09-02T09:00Z | 29,596 MW | 0 MW | 16,271 MW | 9,895 MW | 4,962 MW |
| 2026-09-02T10:00Z | 30,090 MW | 1 MW | 15,138 MW | 10,105 MW | 4,963 MW |
| 2026-09-02T11:00Z | 31,177 MW | 3 MW | 13,928 MW | 10,218 MW | 4,964 MW |
| 2026-09-02T12:00Z | 31,696 MW | 1,621 MW | 12,087 MW | 10,210 MW | 4,964 MW |
| 2026-09-02T13:00Z | 30,268 MW | 14,516 MW | 8,720 MW | 9,585 MW | 4,965 MW |
| 2026-09-02T14:00Z | 29,213 MW | 26,715 MW | 7,822 MW | 8,215 MW | 4,965 MW |
| 2026-09-02T15:00Z | 27,816 MW | 30,539 MW | 8,255 MW | 7,120 MW | 4,965 MW |
| 2026-09-02T16:00Z | 27,914 MW | 32,289 MW | 5,901 MW | 6,776 MW | 4,965 MW |
| 2026-09-02T17:00Z | 31,741 MW | 31,879 MW | 3,486 MW | 8,359 MW | 4,964 MW |
| 2026-09-02T18:00Z | 35,705 MW | 30,377 MW | 2,793 MW | 9,886 MW | 4,963 MW |
| 2026-09-02T19:00Z | 36,951 MW | 30,054 MW | 3,239 MW | 10,175 MW | 4,961 MW |
| 2026-09-02T20:00Z | 38,380 MW | 28,302 MW | 4,399 MW | 10,202 MW | 4,959 MW |
| 2026-09-02T21:00Z | 39,663 MW | 26,525 MW | 5,289 MW | 10,227 MW | 4,956 MW |
| 2026-09-02T22:00Z | 40,901 MW | 22,376 MW | 6,807 MW | 10,312 MW | 4,955 MW |
| 2026-09-02T23:00Z | 41,815 MW | 14,198 MW | 8,191 MW | 10,359 MW | 4,956 MW |
| 2026-09-03T00:00Z | 42,729 MW | 2,841 MW | 9,910 MW | 10,578 MW | 4,956 MW |
| 2026-09-03T01:00Z | 43,933 MW | 2 MW | 12,433 MW | 10,844 MW | 4,957 MW |
| 2026-09-03T02:00Z | 43,420 MW | 0 MW | 16,581 MW | 10,552 MW | 4,958 MW |
| 2026-09-03T03:00Z | 38,620 MW | 0 MW | 20,155 MW | 10,314 MW | 4,959 MW |
| 2026-09-03T04:00Z | 34,053 MW | 0 MW | 21,604 MW | 10,296 MW | 4,959 MW |
| 2026-09-03T05:00Z | 34,053 MW | 0 MW | 21,604 MW | 10,296 MW | 4,959 MW |
| 2026-09-03T06:00Z | 30,080 MW | 0 MW | 20,785 MW | 9,845 MW | 4,960 MW |
| 2026-09-03T07:00Z | 29,783 MW | 0 MW | 19,449 MW | 9,902 MW | 4,961 MW |
| 2026-09-03T08:00Z | 29,742 MW | 0 MW | 17,779 MW | 9,961 MW | 4,961 MW |
| 2026-09-03T09:00Z | 29,596 MW | 0 MW | 16,271 MW | 9,895 MW | 4,962 MW |
| 2026-09-03T10:00Z | 30,090 MW | 1 MW | 15,138 MW | 10,105 MW | 4,963 MW |
| 2026-09-03T11:00Z | 31,177 MW | 3 MW | 13,928 MW | 10,218 MW | 4,964 MW |
| 2026-09-03T12:00Z | 31,696 MW | 1,621 MW | 12,087 MW | 10,210 MW | 4,964 MW |
| 2026-09-03T13:00Z | 30,268 MW | 14,516 MW | 8,720 MW | 9,585 MW | 4,965 MW |
| 2026-09-03T14:00Z | 29,213 MW | 26,715 MW | 7,822 MW | 8,215 MW | 4,965 MW |
| 2026-09-03T15:00Z | 27,816 MW | 30,539 MW | 8,255 MW | 7,120 MW | 4,965 MW |
| 2026-09-03T16:00Z | 27,914 MW | 32,289 MW | 5,901 MW | 6,776 MW | 4,965 MW |
| 2026-09-03T17:00Z | 31,741 MW | 31,879 MW | 3,486 MW | 8,359 MW | 4,964 MW |
| 2026-09-03T18:00Z | 35,705 MW | 30,377 MW | 2,793 MW | 9,886 MW | 4,963 MW |
| 2026-09-03T19:00Z | 36,951 MW | 30,054 MW | 3,239 MW | 10,175 MW | 4,961 MW |
| 2026-09-03T20:00Z | 38,380 MW | 28,302 MW | 4,399 MW | 10,202 MW | 4,959 MW |
| 2026-09-03T21:00Z | 39,663 MW | 26,525 MW | 5,289 MW | 10,227 MW | 4,956 MW |
| 2026-09-03T22:00Z | 40,901 MW | 22,376 MW | 6,807 MW | 10,312 MW | 4,955 MW |
| 2026-09-03T23:00Z | 41,815 MW | 14,198 MW | 8,191 MW | 10,359 MW | 4,956 MW |
| 2026-09-04T00:00Z | 42,729 MW | 2,841 MW | 9,910 MW | 10,578 MW | 4,956 MW |
| 2026-09-04T01:00Z | 43,933 MW | 2 MW | 12,433 MW | 10,844 MW | 4,957 MW |
| 2026-09-04T02:00Z | 43,420 MW | 0 MW | 16,581 MW | 10,552 MW | 4,958 MW |
| 2026-09-04T03:00Z | 38,620 MW | 0 MW | 20,155 MW | 10,314 MW | 4,959 MW |
| 2026-09-04T04:00Z | 34,053 MW | 0 MW | 21,604 MW | 10,296 MW | 4,959 MW |
| 2026-09-04T05:00Z | 29,586 MW | 1 MW | 21,159 MW | 9,121 MW | 4,959 MW |
| 2026-09-04T06:00Z | 29,467 MW | 1 MW | 20,076 MW | 8,713 MW | 4,960 MW |
| 2026-09-04T07:00Z | 29,192 MW | 1 MW | 18,861 MW | 8,558 MW | 4,960 MW |
| 2026-09-04T08:00Z | 29,442 MW | 1 MW | 17,627 MW | 8,733 MW | 4,960 MW |
| 2026-09-04T09:00Z | 29,216 MW | 1 MW | 16,433 MW | 8,676 MW | 4,961 MW |
| 2026-09-04T10:00Z | 29,897 MW | 1 MW | 15,230 MW | 9,203 MW | 4,962 MW |
| 2026-09-04T11:00Z | 30,726 MW | 1 MW | 14,092 MW | 9,387 MW | 4,962 MW |
| 2026-09-04T12:00Z | 31,125 MW | 1,456 MW | 12,543 MW | 9,824 MW | 4,963 MW |
| 2026-09-04T13:00Z | 29,345 MW | 12,802 MW | 10,706 MW | 8,830 MW | 4,964 MW |
| 2026-09-04T14:00Z | 27,234 MW | 23,800 MW | 10,879 MW | 7,267 MW | 4,965 MW |
| 2026-09-04T15:00Z | 26,405 MW | 27,458 MW | 9,901 MW | 7,124 MW | 4,966 MW |
| 2026-09-04T16:00Z | 27,485 MW | 29,152 MW | 6,973 MW | 7,813 MW | 4,966 MW |
| 2026-09-04T17:00Z | 28,548 MW | 30,890 MW | 4,864 MW | 8,951 MW | 4,965 MW |
| 2026-09-04T18:00Z | 30,356 MW | 30,295 MW | 4,199 MW | 10,416 MW | 4,964 MW |
| 2026-09-04T19:00Z | 32,490 MW | 28,840 MW | 4,845 MW | 10,917 MW | 4,962 MW |
| 2026-09-04T20:00Z | 33,723 MW | 27,876 MW | 6,511 MW | 10,906 MW | 4,960 MW |
| 2026-09-04T21:00Z | 33,382 MW | 26,604 MW | 10,236 MW | 10,532 MW | 4,959 MW |
| 2026-09-04T22:00Z | 33,137 MW | 23,703 MW | 13,121 MW | 10,174 MW | 4,957 MW |
| 2026-09-04T23:00Z | 33,769 MW | 14,523 MW | 17,723 MW | 10,496 MW | 4,957 MW |
| 2026-09-05T00:00Z | 35,274 MW | 2,307 MW | 21,023 MW | 11,494 MW | 4,958 MW |
| 2026-09-05T01:00Z | 35,091 MW | 7 MW | 20,904 MW | 11,591 MW | 4,960 MW |
| 2026-09-05T02:00Z | 35,172 MW | 0 MW | 19,571 MW | 11,486 MW | 4,960 MW |
| 2026-09-05T03:00Z | 34,772 MW | 0 MW | 17,674 MW | 11,500 MW | 4,960 MW |
| 2026-09-05T04:00Z | 33,543 MW | 0 MW | 16,145 MW | 11,458 MW | 4,962 MW |
| 2026-09-05T05:00Z | 32,481 MW | 0 MW | 15,531 MW | 10,997 MW | 4,962 MW |
| 2026-09-05T06:00Z | 32,015 MW | 0 MW | 14,325 MW | 10,631 MW | 4,963 MW |
| 2026-09-05T07:00Z | 31,783 MW | 0 MW | 13,446 MW | 10,426 MW | 4,964 MW |
| 2026-09-05T08:00Z | 30,739 MW | 0 MW | 12,645 MW | 9,965 MW | 4,964 MW |
| 2026-09-05T09:00Z | 30,633 MW | 0 MW | 11,802 MW | 9,904 MW | 4,964 MW |
| 2026-09-05T10:00Z | 31,051 MW | 0 MW | 10,281 MW | 9,811 MW | 4,965 MW |
| 2026-09-05T11:00Z | 31,315 MW | 1 MW | 9,103 MW | 9,942 MW | 4,966 MW |
| 2026-09-05T12:00Z | 31,193 MW | 1,725 MW | 8,294 MW | 10,002 MW | 4,966 MW |
| 2026-09-05T13:00Z | 28,791 MW | 15,860 MW | 6,047 MW | 9,166 MW | 4,966 MW |
| 2026-09-05T14:00Z | 27,472 MW | 27,777 MW | 5,301 MW | 7,934 MW | 4,967 MW |
| 2026-09-05T15:00Z | 27,651 MW | 30,192 MW | 4,230 MW | 7,711 MW | 4,967 MW |
| 2026-09-05T16:00Z | 28,789 MW | 30,281 MW | 3,000 MW | 8,409 MW | 4,967 MW |
| 2026-09-05T17:00Z | 30,655 MW | 29,715 MW | 2,692 MW | 9,979 MW | 4,965 MW |
| 2026-09-05T18:00Z | 32,361 MW | 28,921 MW | 3,718 MW | 10,648 MW | 4,963 MW |
| 2026-09-05T19:00Z | 34,369 MW | 27,985 MW | 4,692 MW | 10,686 MW | 4,960 MW |
| 2026-09-05T20:00Z | 35,460 MW | 27,714 MW | 5,513 MW | 10,729 MW | 4,959 MW |
| 2026-09-05T21:00Z | 37,114 MW | 25,362 MW | 6,349 MW | 10,722 MW | 4,958 MW |
| 2026-09-05T22:00Z | 38,872 MW | 20,547 MW | 7,599 MW | 10,754 MW | 4,957 MW |
| 2026-09-05T23:00Z | 40,023 MW | 13,087 MW | 9,473 MW | 10,663 MW | 4,956 MW |
| 2026-09-06T00:00Z | 41,007 MW | 2,412 MW | 11,644 MW | 10,714 MW | 4,957 MW |
| 2026-09-06T01:00Z | 40,770 MW | 1 MW | 12,935 MW | 10,749 MW | 4,958 MW |
| 2026-09-06T02:00Z | 40,300 MW | 1 MW | 14,490 MW | 10,673 MW | 4,960 MW |
| 2026-09-06T03:00Z | 39,040 MW | 1 MW | 15,053 MW | 10,621 MW | 4,960 MW |
| 2026-09-06T04:00Z | 37,311 MW | 1 MW | 14,112 MW | 10,597 MW | 4,961 MW |
| 2026-09-06T05:00Z | 34,965 MW | 1 MW | 13,934 MW | 10,235 MW | 4,962 MW |
| 2026-09-06T06:00Z | 33,914 MW | 1 MW | 13,132 MW | 10,028 MW | 4,964 MW |
| 2026-09-06T07:00Z | 33,778 MW | 1 MW | 11,756 MW | 9,617 MW | 4,964 MW |
| 2026-09-06T08:00Z | 33,759 MW | 1 MW | 9,815 MW | 9,326 MW | 4,966 MW |
| 2026-09-06T09:00Z | 34,292 MW | 1 MW | 7,554 MW | 9,157 MW | 4,966 MW |
| 2026-09-06T10:00Z | 34,586 MW | 1 MW | 5,835 MW | 9,087 MW | 4,967 MW |
| 2026-09-06T11:00Z | 34,727 MW | 1 MW | 4,233 MW | 8,977 MW | 4,967 MW |
| 2026-09-06T12:00Z | 35,623 MW | 1,561 MW | 3,194 MW | 8,708 MW | 4,967 MW |
| 2026-09-06T13:00Z | 32,162 MW | 15,308 MW | 1,919 MW | 7,834 MW | 4,967 MW |
| 2026-09-06T14:00Z | 31,311 MW | 27,896 MW | 1,341 MW | 7,208 MW | 4,967 MW |
| 2026-09-06T15:00Z | 32,023 MW | 29,510 MW | 2,118 MW | 7,600 MW | 4,967 MW |
| 2026-09-06T16:00Z | 32,282 MW | 28,693 MW | 3,300 MW | 8,145 MW | 4,968 MW |
| 2026-09-06T17:00Z | 32,328 MW | 27,956 MW | 5,023 MW | 8,267 MW | 4,968 MW |
| 2026-09-06T18:00Z | 31,876 MW | 27,840 MW | 5,780 MW | 8,420 MW | 4,966 MW |
| 2026-09-06T19:00Z | 32,555 MW | 27,383 MW | 6,450 MW | 8,526 MW | 4,964 MW |
| 2026-09-06T20:00Z | 34,107 MW | 26,909 MW | 6,496 MW | 8,954 MW | 4,963 MW |
| 2026-09-06T21:00Z | 34,217 MW | 26,401 MW | 7,808 MW | 8,737 MW | 4,961 MW |
| 2026-09-06T22:00Z | 35,838 MW | 23,543 MW | 9,118 MW | 8,588 MW | 4,959 MW |
| 2026-09-06T23:00Z | 39,966 MW | 14,024 MW | 9,923 MW | 9,068 MW | 4,957 MW |
| 2026-09-07T00:00Z | 41,300 MW | 2,504 MW | 10,130 MW | 9,238 MW | 4,958 MW |
| 2026-09-07T01:00Z | 41,669 MW | 9 MW | 10,918 MW | 9,171 MW | 4,960 MW |
| 2026-09-07T02:00Z | 41,784 MW | 4 MW | 12,728 MW | 9,183 MW | 4,961 MW |
| 2026-09-07T03:00Z | 40,861 MW | 1 MW | 13,654 MW | 9,142 MW | 4,962 MW |
| 2026-09-07T04:00Z | 38,448 MW | 1 MW | 13,718 MW | 9,064 MW | 4,962 MW |
| 2026-09-07T05:00Z | 35,766 MW | 1 MW | 13,735 MW | 8,966 MW | 4,964 MW |
| 2026-09-07T06:00Z | 34,708 MW | 1 MW | 12,649 MW | 8,862 MW | 4,964 MW |
| 2026-09-07T07:00Z | 34,360 MW | 1 MW | 11,116 MW | 8,943 MW | 4,965 MW |
| 2026-09-07T08:00Z | 33,670 MW | 1 MW | 10,324 MW | 8,594 MW | 4,966 MW |
| 2026-09-07T09:00Z | 33,598 MW | 1 MW | 9,392 MW | 8,415 MW | 4,966 MW |
| 2026-09-07T10:00Z | 34,049 MW | 1 MW | 8,045 MW | 8,592 MW | 4,966 MW |
| 2026-09-07T11:00Z | 33,975 MW | 1 MW | 7,147 MW | 8,853 MW | 4,968 MW |
| 2026-09-07T12:00Z | 33,037 MW | 1,801 MW | 6,915 MW | 8,646 MW | 4,969 MW |
| 2026-09-07T13:00Z | 29,565 MW | 17,085 MW | 4,983 MW | 8,063 MW | 4,970 MW |
| 2026-09-07T14:00Z | 28,707 MW | 29,840 MW | 3,587 MW | 7,413 MW | 4,969 MW |
| 2026-09-07T15:00Z | 29,390 MW | 32,159 MW | 3,091 MW | 7,678 MW | 4,968 MW |
| 2026-09-07T16:00Z | 29,080 MW | 32,327 MW | 2,958 MW | 7,613 MW | 4,966 MW |
| 2026-09-07T17:00Z | 31,795 MW | 30,910 MW | 3,603 MW | 8,697 MW | 4,964 MW |
| 2026-09-07T18:00Z | 33,455 MW | 30,355 MW | 5,549 MW | 9,405 MW | 4,961 MW |
| 2026-09-07T19:00Z | 33,989 MW | 29,944 MW | 7,564 MW | 9,326 MW | 4,958 MW |
| 2026-09-07T20:00Z | 34,459 MW | 29,096 MW | 8,479 MW | 8,972 MW | 4,954 MW |
| 2026-09-07T21:00Z | 35,744 MW | 27,206 MW | 9,417 MW | 9,253 MW | 4,950 MW |
| 2026-09-07T22:00Z | 36,254 MW | 25,837 MW | 10,297 MW | 9,344 MW | 4,946 MW |
| 2026-09-07T23:00Z | 39,466 MW | 16,011 MW | 11,606 MW | 9,681 MW | 4,946 MW |
| 2026-09-08T00:00Z | 42,696 MW | 2,553 MW | 12,663 MW | 9,888 MW | 4,947 MW |
| 2026-09-08T01:00Z | 42,821 MW | 2 MW | 13,262 MW | 9,893 MW | 4,948 MW |
| 2026-09-08T02:00Z | 42,749 MW | 1 MW | 15,748 MW | 10,024 MW | 4,949 MW |
| 2026-09-08T03:00Z | 40,621 MW | 1 MW | 18,011 MW | 9,978 MW | 4,953 MW |
| 2026-09-08T04:00Z | 37,382 MW | 1 MW | 18,858 MW | 9,427 MW | 4,953 MW |
| 2026-09-08T05:00Z | 34,635 MW | 1 MW | 18,106 MW | 8,714 MW | 4,954 MW |
| 2026-09-08T06:00Z | 33,300 MW | 1 MW | 17,001 MW | 8,280 MW | 4,955 MW |
| 2026-09-08T07:00Z | 33,487 MW | 1 MW | 15,615 MW | 8,609 MW | 4,953 MW |
| 2026-09-08T08:00Z | 32,961 MW | 1 MW | 14,307 MW | 8,484 MW | 4,954 MW |
| 2026-09-08T09:00Z | 33,153 MW | 1 MW | 13,088 MW | 8,555 MW | 4,956 MW |
| 2026-09-08T10:00Z | 33,864 MW | 1 MW | 12,330 MW | 8,549 MW | 4,958 MW |
| 2026-09-08T11:00Z | 34,100 MW | 1 MW | 12,226 MW | 8,752 MW | 4,959 MW |
| 2026-09-08T12:00Z | 33,799 MW | 1,716 MW | 11,586 MW | 8,528 MW | 4,960 MW |
| 2026-09-08T13:00Z | 30,760 MW | 16,853 MW | 8,527 MW | 7,844 MW | 4,961 MW |
| 2026-09-08T14:00Z | 29,622 MW | 29,296 MW | 7,486 MW | 7,364 MW | 4,961 MW |
| 2026-09-08T15:00Z | 29,281 MW | 31,635 MW | 7,606 MW | 7,161 MW | 4,959 MW |
| 2026-09-08T16:00Z | 29,933 MW | 31,697 MW | 7,425 MW | 7,155 MW | 4,961 MW |
| 2026-09-08T17:00Z | 32,711 MW | 30,064 MW | 7,516 MW | 7,942 MW | 4,961 MW |
| 2026-09-08T18:00Z | 35,423 MW | 29,101 MW | 8,858 MW | 8,636 MW | 4,960 MW |
| 2026-09-08T19:00Z | 36,244 MW | 28,955 MW | 9,689 MW | 8,559 MW | 4,958 MW |
| 2026-09-08T20:00Z | 35,949 MW | 28,180 MW | 10,519 MW | 7,968 MW | 4,956 MW |
| 2026-09-08T21:00Z | 35,094 MW | 28,192 MW | 11,160 MW | 7,182 MW | 4,952 MW |
| 2026-09-08T22:00Z | 36,134 MW | 25,516 MW | 12,180 MW | 7,249 MW | 4,948 MW |
| 2026-09-08T23:00Z | 40,175 MW | 15,167 MW | 13,450 MW | 8,135 MW | 4,948 MW |
| 2026-09-09T00:00Z | 42,699 MW | 2,432 MW | 14,070 MW | 8,480 MW | 4,948 MW |
| 2026-09-09T01:00Z | 43,366 MW | 1 MW | 14,540 MW | 8,673 MW | 4,950 MW |
| 2026-09-09T02:00Z | 43,465 MW | 1 MW | 16,483 MW | 8,692 MW | 4,954 MW |
| 2026-09-09T03:00Z | 42,230 MW | 1 MW | 17,744 MW | 8,447 MW | 4,955 MW |
| 2026-09-09T04:00Z | 38,759 MW | 1 MW | 18,314 MW | 8,378 MW | 4,956 MW |
| 2026-09-09T05:00Z | 35,992 MW | 1 MW | 17,747 MW | 8,483 MW | 4,956 MW |
| 2026-09-09T06:00Z | 34,388 MW | 1 MW | 16,902 MW | 8,465 MW | 4,955 MW |
| 2026-09-09T07:00Z | 33,538 MW | 1 MW | 16,322 MW | 8,363 MW | 4,955 MW |
| 2026-09-09T08:00Z | 33,253 MW | 1 MW | 15,961 MW | 8,278 MW | 4,957 MW |
| 2026-09-09T09:00Z | 33,246 MW | 1 MW | 15,257 MW | 8,185 MW | 4,959 MW |
| 2026-09-09T10:00Z | 33,509 MW | 1 MW | 14,194 MW | 8,257 MW | 4,959 MW |
| 2026-09-09T11:00Z | 34,638 MW | 1 MW | 13,004 MW | 8,626 MW | 4,961 MW |
| 2026-09-09T12:00Z | 34,795 MW | 1,561 MW | 11,586 MW | 8,303 MW | 4,961 MW |
| 2026-09-09T13:00Z | 32,520 MW | 15,678 MW | 8,555 MW | 7,186 MW | 4,962 MW |
| 2026-09-09T14:00Z | 31,503 MW | 26,753 MW | 7,231 MW | 6,902 MW | 4,963 MW |
| 2026-09-09T15:00Z | 31,704 MW | 29,995 MW | 6,385 MW | 7,463 MW | 4,963 MW |
| 2026-09-09T16:00Z | 32,328 MW | 30,548 MW | 5,393 MW | 7,622 MW | 4,964 MW |
| 2026-09-09T17:00Z | 34,376 MW | 29,595 MW | 3,726 MW | 7,699 MW | 4,964 MW |
| 2026-09-09T18:00Z | 37,900 MW | 28,396 MW | 3,934 MW | 8,044 MW | 4,961 MW |
| 2026-09-09T19:00Z | 39,596 MW | 27,777 MW | 5,214 MW | 8,317 MW | 4,958 MW |
| 2026-09-09T20:00Z | 39,317 MW | 27,997 MW | 6,478 MW | 8,379 MW | 4,955 MW |
| 2026-09-09T21:00Z | 39,782 MW | 26,317 MW | 7,895 MW | 8,314 MW | 4,952 MW |
| 2026-09-09T22:00Z | 39,848 MW | 22,767 MW | 9,985 MW | 8,175 MW | 4,954 MW |
| 2026-09-09T23:00Z | 43,007 MW | 13,531 MW | 12,051 MW | 8,161 MW | 4,954 MW |
| 2026-09-10T00:00Z | 45,370 MW | 2,083 MW | 11,874 MW | 8,419 MW | 4,955 MW |
| 2026-09-10T01:00Z | 45,031 MW | 0 MW | 11,736 MW | 8,670 MW | 4,954 MW |
| 2026-09-10T02:00Z | 43,952 MW | 0 MW | 13,164 MW | 8,712 MW | 4,956 MW |
| 2026-09-10T03:00Z | 41,782 MW | 0 MW | 15,235 MW | 8,560 MW | 4,956 MW |
| 2026-09-10T04:00Z | 37,797 MW | 0 MW | 16,363 MW | 8,573 MW | 4,958 MW |
| 2026-09-10T05:00Z | 34,896 MW | 0 MW | 16,767 MW | 8,419 MW | 4,959 MW |
| 2026-09-10T06:00Z | 33,369 MW | 0 MW | 16,360 MW | 8,306 MW | 4,960 MW |
| 2026-09-10T07:00Z | 32,896 MW | 0 MW | 16,067 MW | 8,424 MW | 4,961 MW |
| 2026-09-10T08:00Z | 32,029 MW | 0 MW | 14,641 MW | 8,094 MW | 4,961 MW |
| 2026-09-10T09:00Z | 31,959 MW | 0 MW | 13,678 MW | 8,007 MW | 4,962 MW |
| 2026-09-10T10:00Z | 32,815 MW | 0 MW | 12,622 MW | 8,409 MW | 4,963 MW |
| 2026-09-10T11:00Z | 33,776 MW | 0 MW | 11,214 MW | 8,599 MW | 4,963 MW |
| 2026-09-10T12:00Z | 33,834 MW | 1,461 MW | 10,692 MW | 8,817 MW | 4,964 MW |
| 2026-09-10T13:00Z | 30,837 MW | 15,675 MW | 8,218 MW | 8,263 MW | 4,965 MW |
| 2026-09-10T14:00Z | 29,596 MW | 27,801 MW | 7,815 MW | 7,522 MW | 4,966 MW |
| 2026-09-10T15:00Z | 28,125 MW | 30,978 MW | 7,208 MW | 7,147 MW | 4,963 MW |
| 2026-09-10T16:00Z | 27,873 MW | 31,624 MW | 5,958 MW | 6,813 MW | 4,962 MW |
| 2026-09-10T17:00Z | 31,419 MW | 30,933 MW | 4,517 MW | 7,328 MW | 4,959 MW |
| 2026-09-10T18:00Z | 35,515 MW | 28,761 MW | 4,449 MW | 8,293 MW | 4,958 MW |
| 2026-09-10T19:00Z | 38,596 MW | 26,001 MW | 5,358 MW | 8,837 MW | 4,956 MW |
| 2026-09-10T20:00Z | 39,933 MW | 22,645 MW | 7,564 MW | 9,319 MW | 4,956 MW |
| 2026-09-10T21:00Z | 41,058 MW | 19,843 MW | 7,825 MW | 9,407 MW | 4,956 MW |
| 2026-09-10T22:00Z | 42,600 MW | 14,228 MW | 10,283 MW | 9,549 MW | 4,955 MW |
| 2026-09-10T23:00Z | 42,786 MW | 8,038 MW | 13,764 MW | 9,658 MW | 4,953 MW |
| 2026-09-11T00:00Z | 42,516 MW | 1,066 MW | 15,163 MW | 9,756 MW | 4,955 MW |
| 2026-09-11T01:00Z | 41,536 MW | 6 MW | 14,567 MW | 9,754 MW | 4,957 MW |
| 2026-09-11T02:00Z | 40,220 MW | 6 MW | 14,090 MW | 9,938 MW | 4,958 MW |
| 2026-09-11T03:00Z | 37,937 MW | 6 MW | 15,259 MW | 10,043 MW | 4,959 MW |
| 2026-09-11T04:00Z | 35,794 MW | 2 MW | 14,886 MW | 9,867 MW | 4,961 MW |
| 2026-09-11T05:00Z | 33,982 MW | 0 MW | 13,711 MW | 9,840 MW | 4,962 MW |
| 2026-09-11T06:00Z | 32,803 MW | 0 MW | 12,566 MW | 9,724 MW | 4,963 MW |
| 2026-09-11T07:00Z | 31,643 MW | 0 MW | 12,774 MW | 8,964 MW | 4,963 MW |
| 2026-09-11T08:00Z | 31,514 MW | 0 MW | 12,225 MW | 8,929 MW | 4,964 MW |
| 2026-09-11T09:00Z | 31,713 MW | 0 MW | 10,901 MW | 9,625 MW | 4,965 MW |
| 2026-09-11T10:00Z | 32,174 MW | 0 MW | 10,003 MW | 9,824 MW | 4,966 MW |
| 2026-09-11T11:00Z | 32,957 MW | 0 MW | 8,480 MW | 9,929 MW | 4,967 MW |
| 2026-09-11T12:00Z | 33,306 MW | 1,154 MW | 7,375 MW | 9,944 MW | 4,968 MW |
| 2026-09-11T13:00Z | 31,487 MW | 13,205 MW | 5,865 MW | 9,488 MW | 4,968 MW |
| 2026-09-11T14:00Z | 29,111 MW | 25,467 MW | 6,141 MW | 8,049 MW | 4,968 MW |
| 2026-09-11T15:00Z | 28,139 MW | 30,571 MW | 6,405 MW | 7,879 MW | 4,969 MW |
| 2026-09-11T16:00Z | 28,728 MW | 31,692 MW | 6,295 MW | 8,172 MW | 4,968 MW |
| 2026-09-11T17:00Z | 29,844 MW | 32,480 MW | 5,900 MW | 8,146 MW | 4,965 MW |
| 2026-09-11T18:00Z | 32,701 MW | 32,435 MW | 5,449 MW | 8,367 MW | 4,964 MW |
| 2026-09-11T19:00Z | 34,910 MW | 30,860 MW | 5,849 MW | 8,751 MW | 4,962 MW |
| 2026-09-11T20:00Z | 35,686 MW | 28,465 MW | 7,026 MW | 9,029 MW | 4,959 MW |
| 2026-09-11T21:00Z | 37,249 MW | 23,397 MW | 8,013 MW | 8,951 MW | 4,958 MW |
| 2026-09-11T22:00Z | 38,346 MW | 20,735 MW | 8,928 MW | 9,055 MW | 4,957 MW |
| 2026-09-11T23:00Z | 39,285 MW | 12,387 MW | 10,521 MW | 9,153 MW | 4,957 MW |
| 2026-09-12T00:00Z | 39,530 MW | 1,831 MW | 14,704 MW | 9,300 MW | 4,959 MW |
| 2026-09-12T01:00Z | 37,886 MW | 0 MW | 20,129 MW | 9,113 MW | 4,960 MW |
| 2026-09-12T02:00Z | 34,211 MW | 0 MW | 25,097 MW | 8,416 MW | 4,961 MW |
| 2026-09-12T03:00Z | 30,804 MW | 0 MW | 26,881 MW | 7,380 MW | 4,962 MW |
| 2026-09-12T04:00Z | 29,149 MW | 0 MW | 26,503 MW | 7,154 MW | 4,963 MW |
| 2026-09-12T05:00Z | 27,370 MW | 0 MW | 25,801 MW | 6,734 MW | 4,963 MW |
| 2026-09-12T06:00Z | 25,895 MW | 0 MW | 24,887 MW | 6,524 MW | 4,964 MW |
| 2026-09-12T07:00Z | 25,220 MW | 0 MW | 24,285 MW | 6,090 MW | 4,964 MW |
| 2026-09-12T08:00Z | 24,448 MW | 0 MW | 23,215 MW | 5,703 MW | 4,965 MW |
| 2026-09-12T09:00Z | 25,162 MW | 0 MW | 21,266 MW | 5,794 MW | 4,966 MW |
| 2026-09-12T10:00Z | 25,833 MW | 0 MW | 19,995 MW | 6,254 MW | 4,966 MW |
| 2026-09-12T11:00Z | 26,252 MW | 0 MW | 18,999 MW | 6,684 MW | 4,967 MW |
| 2026-09-12T12:00Z | 25,615 MW | 1,423 MW | 18,737 MW | 6,501 MW | 4,968 MW |
| 2026-09-12T13:00Z | 22,181 MW | 14,622 MW | 16,443 MW | 6,032 MW | 4,969 MW |
| 2026-09-12T14:00Z | 20,177 MW | 27,878 MW | 15,218 MW | 5,397 MW | 4,970 MW |
| 2026-09-12T15:00Z | 20,374 MW | 32,083 MW | 14,085 MW | 5,662 MW | 4,969 MW |
| 2026-09-12T16:00Z | 21,582 MW | 33,600 MW | 12,213 MW | 6,612 MW | 4,968 MW |
| 2026-09-12T17:00Z | 24,387 MW | 33,836 MW | 11,674 MW | 7,129 MW | 4,966 MW |
| 2026-09-12T18:00Z | 25,750 MW | 33,615 MW | 13,329 MW | 7,109 MW | 4,965 MW |
| 2026-09-12T19:00Z | 27,890 MW | 32,731 MW | 13,963 MW | 7,512 MW | 4,962 MW |
| 2026-09-12T20:00Z | 29,042 MW | 31,810 MW | 13,825 MW | 7,316 MW | 4,961 MW |
| 2026-09-12T21:00Z | 29,721 MW | 31,050 MW | 14,177 MW | 7,428 MW | 4,959 MW |
| 2026-09-12T22:00Z | 30,445 MW | 28,139 MW | 15,113 MW | 7,642 MW | 4,958 MW |
| 2026-09-12T23:00Z | 34,689 MW | 15,469 MW | 16,787 MW | 8,632 MW | 4,958 MW |
| 2026-09-13T00:00Z | 36,963 MW | 1,852 MW | 18,334 MW | 9,063 MW | 4,959 MW |
| 2026-09-13T01:00Z | 37,287 MW | 0 MW | 20,966 MW | 9,237 MW | 4,959 MW |
| 2026-09-13T02:00Z | 37,033 MW | 1 MW | 23,809 MW | 9,272 MW | 4,961 MW |
| 2026-09-13T03:00Z | 34,734 MW | 1 MW | 25,555 MW | 9,143 MW | 4,961 MW |
| 2026-09-13T04:00Z | 31,489 MW | 1 MW | 25,328 MW | 9,417 MW | 4,962 MW |
| 2026-09-13T05:00Z | 29,659 MW | 1 MW | 24,083 MW | 9,100 MW | 4,964 MW |
| 2026-09-13T06:00Z | 28,890 MW | 1 MW | 22,981 MW | 8,143 MW | 4,964 MW |
| 2026-09-13T07:00Z | 28,188 MW | 1 MW | 21,738 MW | 7,986 MW | 4,965 MW |
| 2026-09-13T08:00Z | 28,467 MW | 1 MW | 19,295 MW | 8,112 MW | 4,965 MW |
| 2026-09-13T09:00Z | 28,555 MW | 1 MW | 17,508 MW | 8,079 MW | 4,965 MW |
| 2026-09-13T10:00Z | 28,294 MW | 1 MW | 16,855 MW | 8,138 MW | 4,965 MW |
| 2026-09-13T11:00Z | 28,298 MW | 0 MW | 15,622 MW | 8,495 MW | 4,966 MW |
| 2026-09-13T12:00Z | 28,308 MW | 1,367 MW | 14,217 MW | 8,290 MW | 4,967 MW |
| 2026-09-13T13:00Z | 25,090 MW | 14,679 MW | 12,453 MW | 7,374 MW | 4,968 MW |
| 2026-09-13T14:00Z | 22,750 MW | 25,130 MW | 14,004 MW | 6,394 MW | 4,968 MW |
| 2026-09-13T15:00Z | 23,156 MW | 28,526 MW | 14,460 MW | 6,504 MW | 4,967 MW |
| 2026-09-13T16:00Z | 23,508 MW | 29,327 MW | 13,067 MW | 6,952 MW | 4,966 MW |
| 2026-09-13T17:00Z | 23,784 MW | 30,295 MW | 12,278 MW | 7,223 MW | 4,966 MW |
| 2026-09-13T18:00Z | 24,627 MW | 30,257 MW | 13,226 MW | 7,756 MW | 4,965 MW |
| 2026-09-13T19:00Z | 26,518 MW | 29,632 MW | 13,977 MW | 8,808 MW | 4,965 MW |
| 2026-09-13T20:00Z | 27,802 MW | 29,551 MW | 14,669 MW | 9,082 MW | 4,965 MW |
| 2026-09-13T21:00Z | 28,168 MW | 28,548 MW | 15,696 MW | 9,385 MW | 4,965 MW |
| 2026-09-13T22:00Z | 28,277 MW | 25,788 MW | 17,857 MW | 8,978 MW | 4,965 MW |
| 2026-09-13T23:00Z | 31,628 MW | 14,480 MW | 20,461 MW | 10,219 MW | 4,965 MW |
| 2026-09-14T00:00Z | 35,575 MW | 1,653 MW | 21,387 MW | 10,449 MW | 4,965 MW |
| 2026-09-14T01:00Z | 35,683 MW | 0 MW | 21,503 MW | 10,580 MW | 4,966 MW |
| 2026-09-14T02:00Z | 34,717 MW | 1 MW | 21,937 MW | 10,651 MW | 4,967 MW |
| 2026-09-14T03:00Z | 33,906 MW | 1 MW | 21,635 MW | 10,624 MW | 4,968 MW |
| 2026-09-14T04:00Z | 32,086 MW | 1 MW | 21,196 MW | 10,544 MW | 4,968 MW |
| 2026-09-14T05:00Z | 29,825 MW | 1 MW | 21,198 MW | 10,038 MW | 4,968 MW |
| 2026-09-14T06:00Z | 28,450 MW | 1 MW | 21,017 MW | 9,001 MW | 4,969 MW |
| 2026-09-14T07:00Z | 27,403 MW | 1 MW | 21,154 MW | 8,534 MW | 4,970 MW |
| 2026-09-14T08:00Z | 26,712 MW | 1 MW | 20,717 MW | 8,225 MW | 4,970 MW |
| 2026-09-14T09:00Z | 26,594 MW | 1 MW | 20,259 MW | 8,169 MW | 4,971 MW |
| 2026-09-14T10:00Z | 27,555 MW | 1 MW | 19,207 MW | 8,615 MW | 4,971 MW |
| 2026-09-14T11:00Z | 28,382 MW | 1 MW | 18,505 MW | 9,232 MW | 4,971 MW |
| 2026-09-14T12:00Z | 28,465 MW | 1,489 MW | 18,152 MW | 9,105 MW | 4,971 MW |
| 2026-09-14T13:00Z | 23,535 MW | 15,782 MW | 17,086 MW | 7,896 MW | 4,971 MW |
| 2026-09-14T14:00Z | 20,365 MW | 26,574 MW | 19,334 MW | 6,745 MW | 4,971 MW |
| 2026-09-14T15:00Z | 21,068 MW | 27,684 MW | 19,720 MW | 6,685 MW | 4,967 MW |
| 2026-09-14T16:00Z | 21,112 MW | 28,505 MW | 19,960 MW | 6,586 MW | 4,968 MW |
| 2026-09-14T17:00Z | 23,285 MW | 27,694 MW | 19,814 MW | 6,953 MW | 4,967 MW |
| 2026-09-14T18:00Z | 25,802 MW | 27,539 MW | 19,742 MW | 8,048 MW | 4,964 MW |
| 2026-09-14T19:00Z | 26,647 MW | 27,332 MW | 19,908 MW | 8,631 MW | 4,961 MW |
| 2026-09-14T20:00Z | 27,007 MW | 26,677 MW | 20,427 MW | 8,706 MW | 4,959 MW |
| 2026-09-14T21:00Z | 27,259 MW | 25,826 MW | 20,562 MW | 8,090 MW | 4,958 MW |
| 2026-09-14T22:00Z | 28,172 MW | 23,400 MW | 21,466 MW | 8,377 MW | 4,957 MW |
| 2026-09-14T23:00Z | 32,138 MW | 12,938 MW | 23,533 MW | 9,662 MW | 4,957 MW |
| 2026-09-15T00:00Z | 34,863 MW | 1,431 MW | 24,567 MW | 10,132 MW | 4,957 MW |
| 2026-09-15T01:00Z | 35,349 MW | 0 MW | 22,868 MW | 10,326 MW | 4,958 MW |
| 2026-09-15T02:00Z | 34,966 MW | 0 MW | 23,442 MW | 10,283 MW | 4,960 MW |
| 2026-09-15T03:00Z | 33,069 MW | 1 MW | 25,054 MW | 10,140 MW | 4,961 MW |
| 2026-09-15T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T16:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T16:00Z.
Day by Day
Daily totals, Central time dates, through 2026-09-13| Date (Central time) | Demand |
|---|---|
| 2025-08-11 | 1.64 TWh |
| 2025-08-12 | 1.61 TWh |
| 2025-08-13 | 1.61 TWh |
| 2025-08-14 | 1.67 TWh |
| 2025-08-15 | 1.66 TWh |
| 2025-08-16 | 1.61 TWh |
| 2025-08-17 | 1.63 TWh |
| 2025-08-18 | 1.68 TWh |
| 2025-08-19 | 1.64 TWh |
| 2025-08-20 | 1.58 TWh |
| 2025-08-21 | 1.58 TWh |
| 2025-08-22 | 1.54 TWh |
| 2025-08-23 | 1.52 TWh |
| 2025-08-24 | 1.56 TWh |
| 2025-08-25 | 1.61 TWh |
| 2025-08-26 | 1.56 TWh |
| 2025-08-27 | 1.57 TWh |
| 2025-08-28 | 1.64 TWh |
| 2025-08-29 | 1.56 TWh |
| 2025-08-30 | 1.47 TWh |
| 2025-08-31 | 1.40 TWh |
| 2025-09-01 | 1.44 TWh |
| 2025-09-02 | 1.52 TWh |
| 2025-09-03 | 1.53 TWh |
| 2025-09-04 | 1.55 TWh |
| 2025-09-05 | 1.59 TWh |
| 2025-09-06 | 1.40 TWh |
| 2025-09-07 | 1.31 TWh |
| 2025-09-08 | 1.37 TWh |
| 2025-09-09 | 1.38 TWh |
| 2025-09-10 | 1.43 TWh |
| 2025-09-11 | 1.51 TWh |
| 2025-09-12 | 1.53 TWh |
| 2025-09-13 | 1.48 TWh |
| 2025-09-14 | 1.46 TWh |
| 2025-09-15 | 1.52 TWh |
| 2025-09-16 | 1.50 TWh |
| 2025-09-17 | 1.51 TWh |
| 2025-09-18 | 1.51 TWh |
| 2025-09-19 | 1.51 TWh |
| 2025-09-20 | 1.48 TWh |
| 2025-09-21 | 1.50 TWh |
| 2025-09-22 | 1.57 TWh |
| 2025-09-23 | 1.61 TWh |
| 2025-09-24 | 1.51 TWh |
| 2025-09-25 | 1.42 TWh |
| 2025-09-26 | 1.39 TWh |
| 2025-09-27 | 1.35 TWh |
| 2025-09-28 | 1.33 TWh |
| 2025-09-29 | 1.36 TWh |
| 2025-09-30 | 1.42 TWh |
| 2025-10-01 | 1.43 TWh |
| 2025-10-02 | 1.44 TWh |
| 2025-10-03 | 1.45 TWh |
| 2025-10-04 | 1.37 TWh |
| 2025-10-05 | 1.39 TWh |
| 2025-10-06 | 1.46 TWh |
| 2025-10-07 | 1.47 TWh |
| 2025-10-08 | 1.46 TWh |
| 2025-10-09 | 1.45 TWh |
| 2025-10-10 | 1.37 TWh |
| 2025-10-11 | 1.30 TWh |
| 2025-10-12 | 1.31 TWh |
| 2025-10-13 | 1.37 TWh |
| 2025-10-14 | 1.35 TWh |
| 2025-10-15 | 1.33 TWh |
| 2025-10-16 | 1.31 TWh |
| 2025-10-17 | 1.38 TWh |
| 2025-10-18 | 1.37 TWh |
| 2025-10-19 | 1.24 TWh |
| 2025-10-20 | 1.32 TWh |
| 2025-10-21 | 1.34 TWh |
| 2025-10-22 | 1.24 TWh |
| 2025-10-23 | 1.29 TWh |
| 2025-10-24 | 1.30 TWh |
| 2025-10-25 | 1.19 TWh |
| 2025-10-26 | 1.18 TWh |
| 2025-10-27 | 1.28 TWh |
| 2025-10-28 | 1.28 TWh |
| 2025-10-29 | 1.10 TWh |
| 2025-10-30 | 1.10 TWh |
| 2025-10-31 | 1.10 TWh |
| 2025-11-01 | 1.07 TWh |
| 2025-11-02 | 1.10 TWh |
| 2025-11-03 | 1.13 TWh |
| 2025-11-04 | 1.14 TWh |
| 2025-11-05 | 1.19 TWh |
| 2025-11-06 | 1.23 TWh |
| 2025-11-07 | 1.24 TWh |
| 2025-11-08 | 1.21 TWh |
| 2025-11-09 | 1.13 TWh |
| 2025-11-10 | 1.18 TWh |
| 2025-11-11 | 1.20 TWh |
| 2025-11-12 | 1.19 TWh |
| 2025-11-13 | 1.23 TWh |
| 2025-11-14 | 1.25 TWh |
| 2025-11-15 | 1.24 TWh |
| 2025-11-16 | 1.24 TWh |
| 2025-11-17 | 1.33 TWh |
| 2025-11-18 | 1.34 TWh |
| 2025-11-19 | 1.33 TWh |
| 2025-11-20 | 1.30 TWh |
| 2025-11-21 | 1.27 TWh |
| 2025-11-22 | 1.18 TWh |
| 2025-11-23 | 1.14 TWh |
| 2025-11-24 | 1.22 TWh |
| 2025-11-25 | 1.21 TWh |
| 2025-11-26 | 1.17 TWh |
| 2025-11-27 | 1.12 TWh |
| 2025-11-28 | 1.13 TWh |
| 2025-11-29 | 1.15 TWh |
| 2025-11-30 | 1.22 TWh |
| 2025-12-01 | 1.32 TWh |
| 2025-12-02 | 1.34 TWh |
| 2025-12-03 | 1.29 TWh |
| 2025-12-04 | 1.30 TWh |
| 2025-12-05 | n/a |
| 2025-12-06 | 1.20 TWh |
| 2025-12-07 | 1.17 TWh |
| 2025-12-08 | 1.27 TWh |
| 2025-12-09 | 1.26 TWh |
| 2025-12-10 | 1.20 TWh |
| 2025-12-11 | 1.18 TWh |
| 2025-12-12 | 1.15 TWh |
| 2025-12-13 | 1.14 TWh |
| 2025-12-14 | 1.23 TWh |
| 2025-12-15 | 1.35 TWh |
| 2025-12-16 | 1.26 TWh |
| 2025-12-17 | 1.15 TWh |
| 2025-12-18 | 1.17 TWh |
| 2025-12-19 | 1.21 TWh |
| 2025-12-20 | 1.16 TWh |
| 2025-12-21 | 1.14 TWh |
| 2025-12-22 | 1.19 TWh |
| 2025-12-23 | 1.21 TWh |
| 2025-12-24 | 1.18 TWh |
| 2025-12-25 | 1.13 TWh |
| 2025-12-26 | 1.19 TWh |
| 2025-12-27 | 1.18 TWh |
| 2025-12-28 | 1.17 TWh |
| 2025-12-29 | 1.28 TWh |
| 2025-12-30 | 1.30 TWh |
| 2025-12-31 | 1.24 TWh |
| 2026-01-01 | 1.13 TWh |
| 2026-01-02 | 1.13 TWh |
| 2026-01-03 | 1.10 TWh |
| 2026-01-04 | 1.11 TWh |
| 2026-01-05 | 1.17 TWh |
| 2026-01-06 | 1.17 TWh |
| 2026-01-07 | 1.18 TWh |
| 2026-01-08 | 1.19 TWh |
| 2026-01-09 | 1.17 TWh |
| 2026-01-10 | 1.18 TWh |
| 2026-01-11 | 1.22 TWh |
| 2026-01-12 | 1.25 TWh |
| 2026-01-13 | 1.23 TWh |
| 2026-01-14 | 1.21 TWh |
| 2026-01-15 | 1.25 TWh |
| 2026-01-16 | 1.22 TWh |
| 2026-01-17 | 1.29 TWh |
| 2026-01-18 | 1.34 TWh |
| 2026-01-19 | 1.31 TWh |
| 2026-01-20 | 1.30 TWh |
| 2026-01-21 | 1.19 TWh |
| 2026-01-22 | 1.21 TWh |
| 2026-01-23 | 1.25 TWh |
| 2026-01-24 | 1.50 TWh |
| 2026-01-25 | 1.70 TWh |
| 2026-01-26 | 1.64 TWh |
| 2026-01-27 | 1.53 TWh |
| 2026-01-28 | 1.40 TWh |
| 2026-01-29 | 1.34 TWh |
| 2026-01-30 | 1.39 TWh |
| 2026-01-31 | 1.51 TWh |
| 2026-02-01 | 1.45 TWh |
| 2026-02-02 | 1.31 TWh |
| 2026-02-03 | 1.17 TWh |
| 2026-02-04 | 1.21 TWh |
| 2026-02-05 | 1.25 TWh |
| 2026-02-06 | 1.18 TWh |
| 2026-02-07 | 1.12 TWh |
| 2026-02-08 | 1.10 TWh |
| 2026-02-09 | 1.15 TWh |
| 2026-02-10 | 1.15 TWh |
| 2026-02-11 | 1.15 TWh |
| 2026-02-12 | 1.17 TWh |
| 2026-02-13 | 1.16 TWh |
| 2026-02-14 | 1.12 TWh |
| 2026-02-15 | 1.09 TWh |
| 2026-02-16 | 1.16 TWh |
| 2026-02-17 | 1.18 TWh |
| 2026-02-18 | 1.18 TWh |
| 2026-02-19 | 1.20 TWh |
| 2026-02-20 | 1.19 TWh |
| 2026-02-21 | 1.14 TWh |
| 2026-02-22 | 1.14 TWh |
| 2026-02-23 | 1.22 TWh |
| 2026-02-24 | 1.21 TWh |
| 2026-02-25 | 1.17 TWh |
| 2026-02-26 | 1.21 TWh |
| 2026-02-27 | 1.20 TWh |
| 2026-02-28 | 1.17 TWh |
| 2026-03-01 | 1.17 TWh |
| 2026-03-02 | 1.22 TWh |
| 2026-03-03 | 1.26 TWh |
| 2026-03-04 | 1.27 TWh |
| 2026-03-05 | 1.28 TWh |
| 2026-03-06 | 1.30 TWh |
| 2026-03-07 | 1.21 TWh |
| 2026-03-08 | 1.07 TWh |
| 2026-03-09 | 1.23 TWh |
| 2026-03-10 | 1.29 TWh |
| 2026-03-11 | 1.22 TWh |
| 2026-03-12 | 1.12 TWh |
| 2026-03-13 | 1.15 TWh |
| 2026-03-14 | 1.15 TWh |
| 2026-03-15 | 1.19 TWh |
| 2026-03-16 | 1.20 TWh |
| 2026-03-17 | 1.23 TWh |
| 2026-03-18 | 1.17 TWh |
| 2026-03-19 | 1.18 TWh |
| 2026-03-20 | 1.22 TWh |
| 2026-03-21 | 1.25 TWh |
| 2026-03-22 | 1.25 TWh |
| 2026-03-23 | 1.24 TWh |
| 2026-03-24 | 1.25 TWh |
| 2026-03-25 | 1.32 TWh |
| 2026-03-26 | 1.32 TWh |
| 2026-03-27 | 1.25 TWh |
| 2026-03-28 | 1.12 TWh |
| 2026-03-29 | 1.18 TWh |
| 2026-03-30 | 1.29 TWh |
| 2026-03-31 | 1.32 TWh |
| 2026-04-01 | 1.34 TWh |
| 2026-04-02 | 1.32 TWh |
| 2026-04-03 | 1.32 TWh |
| 2026-04-04 | 1.19 TWh |
| 2026-04-05 | 1.06 TWh |
| 2026-04-06 | 1.12 TWh |
| 2026-04-07 | 1.13 TWh |
| 2026-04-08 | 1.18 TWh |
| 2026-04-09 | 1.23 TWh |
| 2026-04-10 | 1.25 TWh |
| 2026-04-11 | 1.23 TWh |
| 2026-04-12 | 1.21 TWh |
| 2026-04-13 | 1.33 TWh |
| 2026-04-14 | 1.33 TWh |
| 2026-04-15 | 1.32 TWh |
| 2026-04-16 | 1.36 TWh |
| 2026-04-17 | 1.34 TWh |
| 2026-04-18 | 1.17 TWh |
| 2026-04-19 | 1.07 TWh |
| 2026-04-20 | 1.11 TWh |
| 2026-04-21 | 1.14 TWh |
| 2026-04-22 | 1.22 TWh |
| 2026-04-23 | 1.29 TWh |
| 2026-04-24 | 1.37 TWh |
| 2026-04-25 | 1.37 TWh |
| 2026-04-26 | 1.37 TWh |
| 2026-04-27 | 1.47 TWh |
| 2026-04-28 | 1.47 TWh |
| 2026-04-29 | 1.33 TWh |
| 2026-04-30 | 1.25 TWh |
| 2026-05-01 | 1.15 TWh |
| 2026-05-02 | 1.11 TWh |
| 2026-05-03 | 1.16 TWh |
| 2026-05-04 | 1.27 TWh |
| 2026-05-05 | 1.37 TWh |
| 2026-05-06 | 1.30 TWh |
| 2026-05-07 | 1.20 TWh |
| 2026-05-08 | 1.22 TWh |
| 2026-05-09 | 1.37 TWh |
| 2026-05-10 | 1.34 TWh |
| 2026-05-11 | 1.29 TWh |
| 2026-05-12 | 1.34 TWh |
| 2026-05-13 | 1.41 TWh |
| 2026-05-14 | 1.45 TWh |
| 2026-05-15 | 1.42 TWh |
| 2026-05-16 | 1.42 TWh |
| 2026-05-17 | 1.44 TWh |
| 2026-05-18 | 1.56 TWh |
| 2026-05-19 | 1.47 TWh |
| 2026-05-20 | 1.30 TWh |
| 2026-05-21 | 1.28 TWh |
| 2026-05-22 | 1.40 TWh |
| 2026-05-23 | 1.29 TWh |
| 2026-05-24 | 1.32 TWh |
| 2026-05-25 | 1.37 TWh |
| 2026-05-26 | 1.39 TWh |
| 2026-05-27 | 1.29 TWh |
| 2026-05-28 | 1.41 TWh |
| 2026-05-29 | 1.52 TWh |
| 2026-05-30 | 1.49 TWh |
| 2026-05-31 | 1.51 TWh |
| 2026-06-01 | 1.58 TWh |
| 2026-06-02 | 1.55 TWh |
| 2026-06-03 | 1.44 TWh |
| 2026-06-04 | 1.45 TWh |
| 2026-06-05 | 1.42 TWh |
| 2026-06-06 | 1.42 TWh |
| 2026-06-07 | 1.47 TWh |
| 2026-06-08 | 1.60 TWh |
| 2026-06-09 | 1.60 TWh |
| 2026-06-10 | 1.62 TWh |
| 2026-06-11 | 1.64 TWh |
| 2026-06-12 | 1.61 TWh |
| 2026-06-13 | 1.58 TWh |
| 2026-06-14 | 1.51 TWh |
| 2026-06-15 | 1.44 TWh |
| 2026-06-16 | 1.49 TWh |
| 2026-06-17 | 1.58 TWh |
| 2026-06-18 | 1.68 TWh |
| 2026-06-19 | 1.55 TWh |
| 2026-06-20 | 1.47 TWh |
| 2026-06-21 | 1.53 TWh |
| 2026-06-22 | 1.68 TWh |
| 2026-06-23 | 1.66 TWh |
| 2026-06-24 | 1.65 TWh |
| 2026-06-25 | 1.63 TWh |
| 2026-06-26 | 1.66 TWh |
| 2026-06-27 | 1.65 TWh |
| 2026-06-28 | 1.67 TWh |
| 2026-06-29 | 1.71 TWh |
| 2026-06-30 | 1.68 TWh |
| 2026-07-01 | 1.67 TWh |
| 2026-07-02 | 1.67 TWh |
| 2026-07-03 | 1.66 TWh |
| 2026-07-04 | 1.66 TWh |
| 2026-07-05 | 1.63 TWh |
| 2026-07-06 | 1.66 TWh |
| 2026-07-07 | 1.66 TWh |
| 2026-07-08 | 1.69 TWh |
| 2026-07-09 | 1.70 TWh |
| 2026-07-10 | 1.67 TWh |
| 2026-07-11 | 1.59 TWh |
| 2026-07-12 | 1.57 TWh |
| 2026-07-13 | 1.54 TWh |
| 2026-07-14 | 1.47 TWh |
| 2026-07-15 | 1.43 TWh |
| 2026-07-16 | 1.51 TWh |
| 2026-07-17 | 1.60 TWh |
| 2026-07-18 | 1.62 TWh |
| 2026-07-19 | 1.63 TWh |
| 2026-07-20 | 1.70 TWh |
| 2026-07-21 | 1.73 TWh |
| 2026-07-22 | 1.81 TWh |
| 2026-07-23 | 1.73 TWh |
| 2026-07-24 | 1.70 TWh |
| 2026-07-25 | 1.68 TWh |
| 2026-07-26 | 1.68 TWh |
| 2026-07-27 | 1.75 TWh |
| 2026-07-28 | 1.76 TWh |
| 2026-07-29 | 1.77 TWh |
| 2026-07-30 | 1.78 TWh |
| 2026-07-31 | 1.78 TWh |
| 2026-08-01 | 1.69 TWh |
| 2026-08-02 | 1.65 TWh |
| 2026-08-03 | 1.71 TWh |
| 2026-08-04 | 1.74 TWh |
| 2026-08-05 | 1.76 TWh |
| 2026-08-06 | 1.75 TWh |
| 2026-08-07 | 1.75 TWh |
| 2026-08-08 | 1.69 TWh |
| 2026-08-09 | 1.68 TWh |
| 2026-08-10 | 1.70 TWh |
| 2026-08-11 | 1.74 TWh |
| 2026-08-12 | 1.79 TWh |
| 2026-08-13 | 1.80 TWh |
| 2026-08-14 | 1.78 TWh |
| 2026-08-15 | 1.77 TWh |
| 2026-08-16 | 1.72 TWh |
| 2026-08-17 | 1.76 TWh |
| 2026-08-18 | 1.80 TWh |
| 2026-08-19 | 1.81 TWh |
| 2026-08-20 | 1.82 TWh |
| 2026-08-21 | 1.82 TWh |
| 2026-08-22 | 1.79 TWh |
| 2026-08-23 | 1.77 TWh |
| 2026-08-24 | 1.82 TWh |
| 2026-08-25 | 1.79 TWh |
| 2026-08-26 | 1.78 TWh |
| 2026-08-27 | 1.78 TWh |
| 2026-08-28 | 1.74 TWh |
| 2026-08-29 | 1.70 TWh |
| 2026-08-30 | 1.72 TWh |
| 2026-08-31 | 1.76 TWh |
| 2026-09-01 | 1.72 TWh |
| 2026-09-02 | 1.75 TWh |
| 2026-09-03 | 1.70 TWh |
| 2026-09-04 | 1.71 TWh |
| 2026-09-05 | 1.68 TWh |
| 2026-09-06 | 1.65 TWh |
| 2026-09-07 | 1.71 TWh |
| 2026-09-08 | 1.77 TWh |
| 2026-09-09 | 1.75 TWh |
| 2026-09-10 | 1.70 TWh |
| 2026-09-11 | 1.70 TWh |
| 2026-09-12 | 1.72 TWh |
| 2026-09-13 | 1.72 TWh |
| 2026-09-14 | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 366 TWh | 366 TWh | Gas 39.2% | 256 |
| 2025 (partial) | 488 TWh | 485 TWh | Gas 40.9% | 364 |
| 2024 | 464 TWh | 464 TWh | Gas 44.1% | 366 |
| 2023 | 447 TWh | 446 TWh | Gas 45.2% | 365 |
| 2022 | 431 TWh | 429 TWh | Gas 42.6% | 365 |
| 2021 | 393 TWh | 391 TWh | Gas 41.9% | 365 |
| 2020 | 381 TWh | 380 TWh | Gas 45.2% | 366 |
| 2019 | 384 TWh | 383 TWh | Gas 47.3% | 365 |
A year is partial when EIA has not published every day; 2024 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 1.82 TWh | 2026-08-24 (24 August 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 91,075 MW | 22 Jul 2026, 17:00 CDT (UTC-05:00) |
| Highest solar share of a day's generation, 2019 onward | 30.8% | 2026-05-02 (2 May 2026) |
| Highest wind share of a day's generation, 2019 onward | 61.9% | 2023-01-15 (15 January 2023) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Power Flows With Neighbours
Net totals, 2026-08-16 (16 August 2026) to 2026-09-14 (14 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| SPP | ERCOT imports | 105 GWh |
| CEN | ERCOT exports | 30.8 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-14.