ERCOT Electricity Demand and Generation Mix
ERCOT demand was 48,948 MW in the hour starting 5 Nov 2026, 07:00 CST (UTC-06:00). Gas was the largest source in the hour starting 4 Nov 2026, 22:00 CST (UTC-06:00), at 45% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- ERCOT is a regional transmission organization and balancing authority in the United States, part of the EIA Texas region.
- In the hour starting 5 Nov 2026, 07:00 CST (UTC-06:00), demand in ERCOT was 48,948 MW, against a day-ahead forecast of 48,882 MW.
- Gas supplied 45.4% of ERCOT's generation in the hour starting 4 Nov 2026, 22:00 CST (UTC-06:00).
- Demand in ERCOT totalled 464 TWh in 2024.
- Gas supplied 44.1% of ERCOT's generation in 2024.
- The highest daily demand in ERCOT from 2019 onward was 1.82 TWh, on 2026-08-24 (24 August 2026).
- The highest hourly demand in ERCOT since 2026-06-16 (16 June 2026) was 91,075 MW, in the hour starting 22 Jul 2026, 17:00 CDT (UTC-05:00).
- Solar's highest share of ERCOT's daily generation from 2019 onward was 30.8%, on 2026-05-02 (2 May 2026).
- Wind's highest share of ERCOT's daily generation from 2019 onward was 61.9%, on 2023-01-15 (15 January 2023).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 5 Nov 2026, 07:00 CST (UTC-06:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T13:00:00Z.
Generation by Source
Latest hour with generation by source: 4 Nov 2026, 22:00 CST (UTC-06:00)| Source | Output | Share |
|---|---|---|
| Gas | 23,415 MW | 45.4% |
| Wind | 19,000 MW | 36.9% |
| Coal | 5,265 MW | 10.2% |
| Nuclear | 3,836 MW | 7.4% |
| Hydro | 29 MW | 0.1% |
| Other | 3 MW | 0.0% |
| Solar | 0 MW | 0.0% |
| Storage | -1,610 MW | charging |
| Total from these sources | 51,548 MW | |
| Net interchange | -219 MW | net imports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when ERCOT exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T04:00:00Z.
Last 30 Days, Hourly
Times in UTCShow the data table (720 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-06T15:00Z | 56,477 MW |
| 2026-10-06T16:00Z | 59,522 MW |
| 2026-10-06T17:00Z | 62,898 MW |
| 2026-10-06T18:00Z | 66,331 MW |
| 2026-10-06T19:00Z | 69,046 MW |
| 2026-10-06T20:00Z | 70,983 MW |
| 2026-10-06T21:00Z | 72,385 MW |
| 2026-10-06T22:00Z | 71,936 MW |
| 2026-10-06T23:00Z | 68,582 MW |
| 2026-10-07T00:00Z | 65,508 MW |
| 2026-10-07T01:00Z | 63,666 MW |
| 2026-10-07T02:00Z | 62,126 MW |
| 2026-10-07T03:00Z | 58,563 MW |
| 2026-10-07T04:00Z | 54,911 MW |
| 2026-10-07T05:00Z | 51,889 MW |
| 2026-10-07T06:00Z | 49,833 MW |
| 2026-10-07T07:00Z | 48,199 MW |
| 2026-10-07T08:00Z | 47,353 MW |
| 2026-10-07T09:00Z | 47,317 MW |
| 2026-10-07T10:00Z | 48,469 MW |
| 2026-10-07T11:00Z | 50,578 MW |
| 2026-10-07T12:00Z | 51,359 MW |
| 2026-10-07T13:00Z | 51,904 MW |
| 2026-10-07T14:00Z | 54,134 MW |
| 2026-10-07T15:00Z | 57,020 MW |
| 2026-10-07T16:00Z | 60,425 MW |
| 2026-10-07T17:00Z | 63,754 MW |
| 2026-10-07T18:00Z | 67,068 MW |
| 2026-10-07T19:00Z | 69,563 MW |
| 2026-10-07T20:00Z | 71,619 MW |
| 2026-10-07T21:00Z | 73,194 MW |
| 2026-10-07T22:00Z | 72,750 MW |
| 2026-10-07T23:00Z | 68,326 MW |
| 2026-10-08T00:00Z | 65,453 MW |
| 2026-10-08T01:00Z | 63,286 MW |
| 2026-10-08T02:00Z | 60,323 MW |
| 2026-10-08T03:00Z | 57,365 MW |
| 2026-10-08T04:00Z | 55,058 MW |
| 2026-10-08T05:00Z | 52,251 MW |
| 2026-10-08T06:00Z | 49,923 MW |
| 2026-10-08T07:00Z | 48,640 MW |
| 2026-10-08T08:00Z | 47,833 MW |
| 2026-10-08T09:00Z | 48,029 MW |
| 2026-10-08T10:00Z | 49,230 MW |
| 2026-10-08T11:00Z | 51,216 MW |
| 2026-10-08T12:00Z | 52,129 MW |
| 2026-10-08T13:00Z | 52,904 MW |
| 2026-10-08T14:00Z | 55,529 MW |
| 2026-10-08T15:00Z | 58,657 MW |
| 2026-10-08T16:00Z | 62,115 MW |
| 2026-10-08T17:00Z | 65,716 MW |
| 2026-10-08T18:00Z | 69,078 MW |
| 2026-10-08T19:00Z | 71,813 MW |
| 2026-10-08T20:00Z | 73,953 MW |
| 2026-10-08T21:00Z | 75,099 MW |
| 2026-10-08T22:00Z | 73,554 MW |
| 2026-10-08T23:00Z | 69,421 MW |
| 2026-10-09T00:00Z | 66,695 MW |
| 2026-10-09T01:00Z | 63,875 MW |
| 2026-10-09T02:00Z | 61,253 MW |
| 2026-10-09T03:00Z | 58,240 MW |
| 2026-10-09T04:00Z | 55,826 MW |
| 2026-10-09T05:00Z | 52,928 MW |
| 2026-10-09T06:00Z | 50,532 MW |
| 2026-10-09T07:00Z | 48,677 MW |
| 2026-10-09T08:00Z | 47,584 MW |
| 2026-10-09T09:00Z | 47,305 MW |
| 2026-10-09T10:00Z | 48,093 MW |
| 2026-10-09T11:00Z | 49,424 MW |
| 2026-10-09T12:00Z | 49,940 MW |
| 2026-10-09T13:00Z | 51,102 MW |
| 2026-10-09T14:00Z | 54,408 MW |
| 2026-10-09T15:00Z | 57,619 MW |
| 2026-10-09T16:00Z | 61,070 MW |
| 2026-10-09T17:00Z | 64,569 MW |
| 2026-10-09T18:00Z | 67,987 MW |
| 2026-10-09T19:00Z | 70,757 MW |
| 2026-10-09T20:00Z | 72,953 MW |
| 2026-10-09T21:00Z | 73,905 MW |
| 2026-10-09T22:00Z | 72,911 MW |
| 2026-10-09T23:00Z | 69,165 MW |
| 2026-10-10T00:00Z | 65,562 MW |
| 2026-10-10T01:00Z | 62,773 MW |
| 2026-10-10T02:00Z | 59,891 MW |
| 2026-10-10T03:00Z | 57,260 MW |
| 2026-10-10T04:00Z | 54,396 MW |
| 2026-10-10T05:00Z | 51,534 MW |
| 2026-10-10T06:00Z | 49,320 MW |
| 2026-10-10T07:00Z | 47,658 MW |
| 2026-10-10T08:00Z | 46,360 MW |
| 2026-10-10T09:00Z | 45,795 MW |
| 2026-10-10T10:00Z | 45,871 MW |
| 2026-10-10T11:00Z | 46,535 MW |
| 2026-10-10T12:00Z | 47,222 MW |
| 2026-10-10T13:00Z | 48,990 MW |
| 2026-10-10T14:00Z | 52,236 MW |
| 2026-10-10T15:00Z | 55,401 MW |
| 2026-10-10T16:00Z | 58,809 MW |
| 2026-10-10T17:00Z | 62,360 MW |
| 2026-10-10T18:00Z | 65,811 MW |
| 2026-10-10T19:00Z | 68,539 MW |
| 2026-10-10T20:00Z | 70,632 MW |
| 2026-10-10T21:00Z | 71,638 MW |
| 2026-10-10T22:00Z | 71,219 MW |
| 2026-10-10T23:00Z | 68,538 MW |
| 2026-10-11T00:00Z | 65,863 MW |
| 2026-10-11T01:00Z | 63,569 MW |
| 2026-10-11T02:00Z | 61,068 MW |
| 2026-10-11T03:00Z | 58,833 MW |
| 2026-10-11T04:00Z | 56,259 MW |
| 2026-10-11T05:00Z | 53,743 MW |
| 2026-10-11T06:00Z | 51,665 MW |
| 2026-10-11T07:00Z | 50,107 MW |
| 2026-10-11T08:00Z | 48,929 MW |
| 2026-10-11T09:00Z | 48,308 MW |
| 2026-10-11T10:00Z | 48,032 MW |
| 2026-10-11T11:00Z | 48,312 MW |
| 2026-10-11T12:00Z | 48,628 MW |
| 2026-10-11T13:00Z | 50,236 MW |
| 2026-10-11T14:00Z | 53,516 MW |
| 2026-10-11T15:00Z | 57,262 MW |
| 2026-10-11T16:00Z | 60,703 MW |
| 2026-10-11T17:00Z | 64,212 MW |
| 2026-10-11T18:00Z | 67,525 MW |
| 2026-10-11T19:00Z | 70,112 MW |
| 2026-10-11T20:00Z | 72,063 MW |
| 2026-10-11T21:00Z | 73,209 MW |
| 2026-10-11T22:00Z | 72,791 MW |
| 2026-10-11T23:00Z | 70,555 MW |
| 2026-10-12T00:00Z | 68,574 MW |
| 2026-10-12T01:00Z | 66,301 MW |
| 2026-10-12T02:00Z | 63,799 MW |
| 2026-10-12T03:00Z | 60,735 MW |
| 2026-10-12T04:00Z | 57,525 MW |
| 2026-10-12T05:00Z | 54,942 MW |
| 2026-10-12T06:00Z | 53,021 MW |
| 2026-10-12T07:00Z | 51,756 MW |
| 2026-10-12T08:00Z | 51,142 MW |
| 2026-10-12T09:00Z | 51,271 MW |
| 2026-10-12T10:00Z | 52,334 MW |
| 2026-10-12T11:00Z | 53,760 MW |
| 2026-10-12T12:00Z | 54,861 MW |
| 2026-10-12T13:00Z | 56,147 MW |
| 2026-10-12T14:00Z | 58,644 MW |
| 2026-10-12T15:00Z | 62,195 MW |
| 2026-10-12T16:00Z | 65,717 MW |
| 2026-10-12T17:00Z | 68,479 MW |
| 2026-10-12T18:00Z | 71,243 MW |
| 2026-10-12T19:00Z | 73,746 MW |
| 2026-10-12T20:00Z | 75,563 MW |
| 2026-10-12T21:00Z | 76,139 MW |
| 2026-10-12T22:00Z | 75,412 MW |
| 2026-10-12T23:00Z | 73,617 MW |
| 2026-10-13T00:00Z | 72,605 MW |
| 2026-10-13T01:00Z | 71,080 MW |
| 2026-10-13T02:00Z | 68,858 MW |
| 2026-10-13T03:00Z | 65,953 MW |
| 2026-10-13T04:00Z | 62,918 MW |
| 2026-10-13T05:00Z | 60,089 MW |
| 2026-10-13T06:00Z | 58,155 MW |
| 2026-10-13T07:00Z | 56,849 MW |
| 2026-10-13T08:00Z | 56,229 MW |
| 2026-10-13T09:00Z | 56,432 MW |
| 2026-10-13T10:00Z | 57,499 MW |
| 2026-10-13T11:00Z | 59,334 MW |
| 2026-10-13T12:00Z | 60,317 MW |
| 2026-10-13T13:00Z | 61,056 MW |
| 2026-10-13T14:00Z | 63,522 MW |
| 2026-10-13T15:00Z | 66,831 MW |
| 2026-10-13T16:00Z | 70,420 MW |
| 2026-10-13T17:00Z | 73,776 MW |
| 2026-10-13T18:00Z | 76,792 MW |
| 2026-10-13T19:00Z | 79,081 MW |
| 2026-10-13T20:00Z | 80,629 MW |
| 2026-10-13T21:00Z | 81,154 MW |
| 2026-10-13T22:00Z | 79,962 MW |
| 2026-10-13T23:00Z | 77,939 MW |
| 2026-10-14T00:00Z | 76,323 MW |
| 2026-10-14T01:00Z | 74,376 MW |
| 2026-10-14T02:00Z | 71,845 MW |
| 2026-10-14T03:00Z | 68,709 MW |
| 2026-10-14T04:00Z | 65,297 MW |
| 2026-10-14T05:00Z | 62,293 MW |
| 2026-10-14T06:00Z | 59,903 MW |
| 2026-10-14T07:00Z | 58,024 MW |
| 2026-10-14T08:00Z | 57,101 MW |
| 2026-10-14T09:00Z | 57,117 MW |
| 2026-10-14T10:00Z | 57,998 MW |
| 2026-10-14T11:00Z | 59,787 MW |
| 2026-10-14T12:00Z | 60,683 MW |
| 2026-10-14T13:00Z | 61,143 MW |
| 2026-10-14T14:00Z | 63,591 MW |
| 2026-10-14T15:00Z | 66,665 MW |
| 2026-10-14T16:00Z | 70,116 MW |
| 2026-10-14T17:00Z | 73,228 MW |
| 2026-10-14T18:00Z | 75,750 MW |
| 2026-10-14T19:00Z | 77,783 MW |
| 2026-10-14T20:00Z | 79,018 MW |
| 2026-10-14T21:00Z | 78,960 MW |
| 2026-10-14T22:00Z | 77,372 MW |
| 2026-10-14T23:00Z | 74,692 MW |
| 2026-10-15T00:00Z | 72,939 MW |
| 2026-10-15T01:00Z | 70,618 MW |
| 2026-10-15T02:00Z | 67,099 MW |
| 2026-10-15T03:00Z | 63,332 MW |
| 2026-10-15T04:00Z | 60,250 MW |
| 2026-10-15T05:00Z | 57,534 MW |
| 2026-10-15T06:00Z | 55,100 MW |
| 2026-10-15T07:00Z | 53,676 MW |
| 2026-10-15T08:00Z | 52,535 MW |
| 2026-10-15T09:00Z | 52,338 MW |
| 2026-10-15T10:00Z | 53,184 MW |
| 2026-10-15T11:00Z | 54,945 MW |
| 2026-10-15T12:00Z | 55,673 MW |
| 2026-10-15T13:00Z | 56,449 MW |
| 2026-10-15T14:00Z | 58,959 MW |
| 2026-10-15T15:00Z | 61,902 MW |
| 2026-10-15T16:00Z | 64,797 MW |
| 2026-10-15T17:00Z | 67,789 MW |
| 2026-10-15T18:00Z | 70,441 MW |
| 2026-10-15T19:00Z | 72,622 MW |
| 2026-10-15T20:00Z | 74,394 MW |
| 2026-10-15T21:00Z | 74,961 MW |
| 2026-10-15T22:00Z | 73,804 MW |
| 2026-10-15T23:00Z | 71,275 MW |
| 2026-10-16T00:00Z | 69,339 MW |
| 2026-10-16T01:00Z | 66,866 MW |
| 2026-10-16T02:00Z | 64,179 MW |
| 2026-10-16T03:00Z | 60,930 MW |
| 2026-10-16T04:00Z | 57,353 MW |
| 2026-10-16T05:00Z | 54,462 MW |
| 2026-10-16T06:00Z | 52,002 MW |
| 2026-10-16T07:00Z | 50,470 MW |
| 2026-10-16T08:00Z | 49,416 MW |
| 2026-10-16T09:00Z | 49,297 MW |
| 2026-10-16T10:00Z | 50,126 MW |
| 2026-10-16T11:00Z | 51,743 MW |
| 2026-10-16T12:00Z | 52,619 MW |
| 2026-10-16T13:00Z | 52,924 MW |
| 2026-10-16T14:00Z | 53,267 MW |
| 2026-10-16T15:00Z | 53,375 MW |
| 2026-10-16T16:00Z | 53,125 MW |
| 2026-10-16T17:00Z | 52,980 MW |
| 2026-10-16T18:00Z | 53,192 MW |
| 2026-10-16T19:00Z | 53,339 MW |
| 2026-10-16T20:00Z | 53,556 MW |
| 2026-10-16T21:00Z | 53,422 MW |
| 2026-10-16T22:00Z | 52,885 MW |
| 2026-10-16T23:00Z | 52,147 MW |
| 2026-10-17T00:00Z | 52,001 MW |
| 2026-10-17T01:00Z | 51,212 MW |
| 2026-10-17T02:00Z | 49,979 MW |
| 2026-10-17T03:00Z | 48,320 MW |
| 2026-10-17T04:00Z | 46,465 MW |
| 2026-10-17T05:00Z | 44,874 MW |
| 2026-10-17T06:00Z | 43,573 MW |
| 2026-10-17T07:00Z | 42,688 MW |
| 2026-10-17T08:00Z | 42,168 MW |
| 2026-10-17T09:00Z | 42,305 MW |
| 2026-10-17T10:00Z | 42,760 MW |
| 2026-10-17T11:00Z | 43,827 MW |
| 2026-10-17T12:00Z | 44,894 MW |
| 2026-10-17T13:00Z | 45,576 MW |
| 2026-10-17T14:00Z | 46,755 MW |
| 2026-10-17T15:00Z | 47,031 MW |
| 2026-10-17T16:00Z | 47,076 MW |
| 2026-10-17T17:00Z | 47,068 MW |
| 2026-10-17T18:00Z | 47,292 MW |
| 2026-10-17T19:00Z | 47,599 MW |
| 2026-10-17T20:00Z | 48,371 MW |
| 2026-10-17T21:00Z | 49,310 MW |
| 2026-10-17T22:00Z | 49,573 MW |
| 2026-10-17T23:00Z | 49,266 MW |
| 2026-10-18T00:00Z | 49,533 MW |
| 2026-10-18T01:00Z | 48,765 MW |
| 2026-10-18T02:00Z | 47,623 MW |
| 2026-10-18T03:00Z | 46,248 MW |
| 2026-10-18T04:00Z | 44,759 MW |
| 2026-10-18T05:00Z | 43,229 MW |
| 2026-10-18T06:00Z | 42,289 MW |
| 2026-10-18T07:00Z | 41,457 MW |
| 2026-10-18T08:00Z | 41,024 MW |
| 2026-10-18T09:00Z | 41,256 MW |
| 2026-10-18T10:00Z | 41,507 MW |
| 2026-10-18T11:00Z | 42,488 MW |
| 2026-10-18T12:00Z | 43,387 MW |
| 2026-10-18T13:00Z | 44,210 MW |
| 2026-10-18T14:00Z | 45,203 MW |
| 2026-10-18T15:00Z | 45,971 MW |
| 2026-10-18T16:00Z | 46,317 MW |
| 2026-10-18T17:00Z | 46,889 MW |
| 2026-10-18T18:00Z | 47,652 MW |
| 2026-10-18T19:00Z | 48,670 MW |
| 2026-10-18T20:00Z | 49,997 MW |
| 2026-10-18T21:00Z | 51,362 MW |
| 2026-10-18T22:00Z | 52,072 MW |
| 2026-10-18T23:00Z | 51,865 MW |
| 2026-10-19T00:00Z | 52,376 MW |
| 2026-10-19T01:00Z | 51,497 MW |
| 2026-10-19T02:00Z | 50,162 MW |
| 2026-10-19T03:00Z | 48,060 MW |
| 2026-10-19T04:00Z | 45,986 MW |
| 2026-10-19T05:00Z | 44,223 MW |
| 2026-10-19T06:00Z | 42,962 MW |
| 2026-10-19T07:00Z | 42,235 MW |
| 2026-10-19T08:00Z | 42,042 MW |
| 2026-10-19T09:00Z | 42,725 MW |
| 2026-10-19T10:00Z | 44,178 MW |
| 2026-10-19T11:00Z | 46,831 MW |
| 2026-10-19T12:00Z | 48,311 MW |
| 2026-10-19T13:00Z | 48,622 MW |
| 2026-10-19T14:00Z | 49,430 MW |
| 2026-10-19T15:00Z | 50,066 MW |
| 2026-10-19T16:00Z | 50,761 MW |
| 2026-10-19T17:00Z | 51,624 MW |
| 2026-10-19T18:00Z | 52,900 MW |
| 2026-10-19T19:00Z | 54,334 MW |
| 2026-10-19T20:00Z | 55,335 MW |
| 2026-10-19T21:00Z | 56,396 MW |
| 2026-10-19T22:00Z | 56,949 MW |
| 2026-10-19T23:00Z | 56,339 MW |
| 2026-10-20T00:00Z | 56,249 MW |
| 2026-10-20T01:00Z | 55,472 MW |
| 2026-10-20T02:00Z | 53,542 MW |
| 2026-10-20T03:00Z | 51,053 MW |
| 2026-10-20T04:00Z | 48,227 MW |
| 2026-10-20T05:00Z | 46,165 MW |
| 2026-10-20T06:00Z | 44,804 MW |
| 2026-10-20T07:00Z | 43,816 MW |
| 2026-10-20T08:00Z | 43,311 MW |
| 2026-10-20T09:00Z | 43,500 MW |
| 2026-10-20T10:00Z | 44,796 MW |
| 2026-10-20T11:00Z | 47,527 MW |
| 2026-10-20T12:00Z | 48,640 MW |
| 2026-10-20T13:00Z | 48,734 MW |
| 2026-10-20T14:00Z | 49,425 MW |
| 2026-10-20T15:00Z | 50,557 MW |
| 2026-10-20T16:00Z | 51,917 MW |
| 2026-10-20T17:00Z | 53,088 MW |
| 2026-10-20T18:00Z | 55,016 MW |
| 2026-10-20T19:00Z | 56,948 MW |
| 2026-10-20T20:00Z | 58,570 MW |
| 2026-10-20T21:00Z | 59,959 MW |
| 2026-10-20T22:00Z | 60,212 MW |
| 2026-10-20T23:00Z | 58,879 MW |
| 2026-10-21T00:00Z | 58,232 MW |
| 2026-10-21T01:00Z | 56,645 MW |
| 2026-10-21T02:00Z | 54,513 MW |
| 2026-10-21T03:00Z | 51,599 MW |
| 2026-10-21T04:00Z | 48,857 MW |
| 2026-10-21T05:00Z | 46,650 MW |
| 2026-10-21T06:00Z | 44,987 MW |
| 2026-10-21T07:00Z | 44,128 MW |
| 2026-10-21T08:00Z | 43,708 MW |
| 2026-10-21T09:00Z | 44,036 MW |
| 2026-10-21T10:00Z | 45,395 MW |
| 2026-10-21T11:00Z | 47,937 MW |
| 2026-10-21T12:00Z | 49,380 MW |
| 2026-10-21T13:00Z | 49,406 MW |
| 2026-10-21T14:00Z | 50,617 MW |
| 2026-10-21T15:00Z | 52,027 MW |
| 2026-10-21T16:00Z | 53,678 MW |
| 2026-10-21T17:00Z | 55,484 MW |
| 2026-10-21T18:00Z | 57,633 MW |
| 2026-10-21T19:00Z | 59,681 MW |
| 2026-10-21T20:00Z | 61,478 MW |
| 2026-10-21T21:00Z | 63,026 MW |
| 2026-10-21T22:00Z | 62,732 MW |
| 2026-10-21T23:00Z | 61,145 MW |
| 2026-10-22T00:00Z | 60,186 MW |
| 2026-10-22T01:00Z | 58,470 MW |
| 2026-10-22T02:00Z | 56,129 MW |
| 2026-10-22T03:00Z | 53,405 MW |
| 2026-10-22T04:00Z | 50,291 MW |
| 2026-10-22T05:00Z | 47,857 MW |
| 2026-10-22T06:00Z | 45,964 MW |
| 2026-10-22T07:00Z | 44,768 MW |
| 2026-10-22T08:00Z | 44,266 MW |
| 2026-10-22T09:00Z | 44,409 MW |
| 2026-10-22T10:00Z | 45,772 MW |
| 2026-10-22T11:00Z | 48,284 MW |
| 2026-10-22T12:00Z | 49,448 MW |
| 2026-10-22T13:00Z | 49,766 MW |
| 2026-10-22T14:00Z | 51,387 MW |
| 2026-10-22T15:00Z | 52,864 MW |
| 2026-10-22T16:00Z | 54,555 MW |
| 2026-10-22T17:00Z | 56,339 MW |
| 2026-10-22T18:00Z | 58,280 MW |
| 2026-10-22T19:00Z | 60,211 MW |
| 2026-10-22T20:00Z | 62,151 MW |
| 2026-10-22T21:00Z | 63,398 MW |
| 2026-10-22T22:00Z | 63,087 MW |
| 2026-10-22T23:00Z | 61,155 MW |
| 2026-10-23T00:00Z | 59,731 MW |
| 2026-10-23T01:00Z | 58,034 MW |
| 2026-10-23T02:00Z | 56,025 MW |
| 2026-10-23T03:00Z | 53,159 MW |
| 2026-10-23T04:00Z | 50,083 MW |
| 2026-10-23T05:00Z | 47,613 MW |
| 2026-10-23T06:00Z | 45,845 MW |
| 2026-10-23T07:00Z | 44,813 MW |
| 2026-10-23T08:00Z | 44,215 MW |
| 2026-10-23T09:00Z | 44,421 MW |
| 2026-10-23T10:00Z | 45,545 MW |
| 2026-10-23T11:00Z | 47,866 MW |
| 2026-10-23T12:00Z | 48,727 MW |
| 2026-10-23T13:00Z | 49,252 MW |
| 2026-10-23T14:00Z | 50,948 MW |
| 2026-10-23T15:00Z | 52,458 MW |
| 2026-10-23T16:00Z | 54,313 MW |
| 2026-10-23T17:00Z | 56,230 MW |
| 2026-10-23T18:00Z | 58,642 MW |
| 2026-10-23T19:00Z | 60,848 MW |
| 2026-10-23T20:00Z | 62,803 MW |
| 2026-10-23T21:00Z | 63,956 MW |
| 2026-10-23T22:00Z | 63,475 MW |
| 2026-10-23T23:00Z | 61,261 MW |
| 2026-10-24T00:00Z | 59,591 MW |
| 2026-10-24T01:00Z | 57,748 MW |
| 2026-10-24T02:00Z | 55,909 MW |
| 2026-10-24T03:00Z | 53,647 MW |
| 2026-10-24T04:00Z | 51,105 MW |
| 2026-10-24T05:00Z | 48,692 MW |
| 2026-10-24T06:00Z | 46,734 MW |
| 2026-10-24T07:00Z | 45,322 MW |
| 2026-10-24T08:00Z | 44,474 MW |
| 2026-10-24T09:00Z | 44,116 MW |
| 2026-10-24T10:00Z | 44,386 MW |
| 2026-10-24T11:00Z | 45,189 MW |
| 2026-10-24T12:00Z | 46,271 MW |
| 2026-10-24T13:00Z | 47,568 MW |
| 2026-10-24T14:00Z | 49,463 MW |
| 2026-10-24T15:00Z | 51,609 MW |
| 2026-10-24T16:00Z | 53,770 MW |
| 2026-10-24T17:00Z | 55,830 MW |
| 2026-10-24T18:00Z | 57,893 MW |
| 2026-10-24T19:00Z | 59,779 MW |
| 2026-10-24T20:00Z | 61,388 MW |
| 2026-10-24T21:00Z | 62,094 MW |
| 2026-10-24T22:00Z | 61,625 MW |
| 2026-10-24T23:00Z | 59,911 MW |
| 2026-10-25T00:00Z | 58,813 MW |
| 2026-10-25T01:00Z | 57,416 MW |
| 2026-10-25T02:00Z | 55,830 MW |
| 2026-10-25T03:00Z | 53,873 MW |
| 2026-10-25T04:00Z | 51,692 MW |
| 2026-10-25T05:00Z | 49,473 MW |
| 2026-10-25T06:00Z | 47,510 MW |
| 2026-10-25T07:00Z | 46,042 MW |
| 2026-10-25T08:00Z | 45,064 MW |
| 2026-10-25T09:00Z | 44,772 MW |
| 2026-10-25T10:00Z | 44,674 MW |
| 2026-10-25T11:00Z | 45,199 MW |
| 2026-10-25T12:00Z | 45,730 MW |
| 2026-10-25T13:00Z | 46,770 MW |
| 2026-10-25T14:00Z | 48,526 MW |
| 2026-10-25T15:00Z | 50,584 MW |
| 2026-10-25T16:00Z | 52,689 MW |
| 2026-10-25T17:00Z | 54,594 MW |
| 2026-10-25T18:00Z | 56,326 MW |
| 2026-10-25T19:00Z | 57,698 MW |
| 2026-10-25T20:00Z | 58,296 MW |
| 2026-10-25T21:00Z | 58,266 MW |
| 2026-10-25T22:00Z | 57,642 MW |
| 2026-10-25T23:00Z | 57,230 MW |
| 2026-10-26T00:00Z | 57,506 MW |
| 2026-10-26T01:00Z | 56,549 MW |
| 2026-10-26T02:00Z | 54,832 MW |
| 2026-10-26T03:00Z | 52,263 MW |
| 2026-10-26T04:00Z | 49,476 MW |
| 2026-10-26T05:00Z | 47,330 MW |
| 2026-10-26T06:00Z | 45,696 MW |
| 2026-10-26T07:00Z | 44,756 MW |
| 2026-10-26T08:00Z | 44,208 MW |
| 2026-10-26T09:00Z | 44,434 MW |
| 2026-10-26T10:00Z | 45,622 MW |
| 2026-10-26T11:00Z | 48,175 MW |
| 2026-10-26T12:00Z | 48,966 MW |
| 2026-10-26T13:00Z | 48,867 MW |
| 2026-10-26T14:00Z | 50,147 MW |
| 2026-10-26T15:00Z | 51,681 MW |
| 2026-10-26T16:00Z | 53,510 MW |
| 2026-10-26T17:00Z | 55,344 MW |
| 2026-10-26T18:00Z | 57,075 MW |
| 2026-10-26T19:00Z | 58,655 MW |
| 2026-10-26T20:00Z | 59,715 MW |
| 2026-10-26T21:00Z | 60,001 MW |
| 2026-10-26T22:00Z | 59,364 MW |
| 2026-10-26T23:00Z | 58,255 MW |
| 2026-10-27T00:00Z | 58,393 MW |
| 2026-10-27T01:00Z | 57,034 MW |
| 2026-10-27T02:00Z | 54,525 MW |
| 2026-10-27T03:00Z | 51,615 MW |
| 2026-10-27T04:00Z | 49,509 MW |
| 2026-10-27T05:00Z | 47,276 MW |
| 2026-10-27T06:00Z | 45,576 MW |
| 2026-10-27T07:00Z | 44,607 MW |
| 2026-10-27T08:00Z | 44,316 MW |
| 2026-10-27T09:00Z | 44,667 MW |
| 2026-10-27T10:00Z | 46,073 MW |
| 2026-10-27T11:00Z | 48,486 MW |
| 2026-10-27T12:00Z | 49,632 MW |
| 2026-10-27T13:00Z | 49,852 MW |
| 2026-10-27T14:00Z | 51,179 MW |
| 2026-10-27T15:00Z | 52,593 MW |
| 2026-10-27T16:00Z | 54,204 MW |
| 2026-10-27T17:00Z | 55,851 MW |
| 2026-10-27T18:00Z | 57,560 MW |
| 2026-10-27T19:00Z | 58,988 MW |
| 2026-10-27T20:00Z | 60,273 MW |
| 2026-10-27T21:00Z | 61,075 MW |
| 2026-10-27T22:00Z | 60,793 MW |
| 2026-10-27T23:00Z | 59,772 MW |
| 2026-10-28T00:00Z | 59,283 MW |
| 2026-10-28T01:00Z | 58,308 MW |
| 2026-10-28T02:00Z | 56,837 MW |
| 2026-10-28T03:00Z | 54,140 MW |
| 2026-10-28T04:00Z | 51,403 MW |
| 2026-10-28T05:00Z | 49,195 MW |
| 2026-10-28T06:00Z | 47,282 MW |
| 2026-10-28T07:00Z | 46,079 MW |
| 2026-10-28T08:00Z | 45,336 MW |
| 2026-10-28T09:00Z | 45,856 MW |
| 2026-10-28T10:00Z | 47,390 MW |
| 2026-10-28T11:00Z | 49,943 MW |
| 2026-10-28T12:00Z | 51,328 MW |
| 2026-10-28T13:00Z | 51,552 MW |
| 2026-10-28T14:00Z | 52,902 MW |
| 2026-10-28T15:00Z | 54,526 MW |
| 2026-10-28T16:00Z | 56,114 MW |
| 2026-10-28T17:00Z | 57,968 MW |
| 2026-10-28T18:00Z | 60,046 MW |
| 2026-10-28T19:00Z | 61,692 MW |
| 2026-10-28T20:00Z | 62,815 MW |
| 2026-10-28T21:00Z | 63,410 MW |
| 2026-10-28T22:00Z | 62,539 MW |
| 2026-10-28T23:00Z | 61,385 MW |
| 2026-10-29T00:00Z | 61,255 MW |
| 2026-10-29T01:00Z | 60,106 MW |
| 2026-10-29T02:00Z | 58,424 MW |
| 2026-10-29T03:00Z | 55,966 MW |
| 2026-10-29T04:00Z | 52,992 MW |
| 2026-10-29T05:00Z | 50,343 MW |
| 2026-10-29T06:00Z | 48,624 MW |
| 2026-10-29T07:00Z | 47,534 MW |
| 2026-10-29T08:00Z | 46,874 MW |
| 2026-10-29T09:00Z | 46,873 MW |
| 2026-10-29T10:00Z | 48,135 MW |
| 2026-10-29T11:00Z | 50,690 MW |
| 2026-10-29T12:00Z | 51,937 MW |
| 2026-10-29T13:00Z | 52,358 MW |
| 2026-10-29T14:00Z | 53,455 MW |
| 2026-10-29T15:00Z | 55,054 MW |
| 2026-10-29T16:00Z | 56,409 MW |
| 2026-10-29T17:00Z | 57,714 MW |
| 2026-10-29T18:00Z | 58,807 MW |
| 2026-10-29T19:00Z | 59,503 MW |
| 2026-10-29T20:00Z | 59,665 MW |
| 2026-10-29T21:00Z | 59,413 MW |
| 2026-10-29T22:00Z | 58,348 MW |
| 2026-10-29T23:00Z | 57,854 MW |
| 2026-10-30T00:00Z | 57,937 MW |
| 2026-10-30T01:00Z | 57,040 MW |
| 2026-10-30T02:00Z | 55,675 MW |
| 2026-10-30T03:00Z | 53,525 MW |
| 2026-10-30T04:00Z | 50,825 MW |
| 2026-10-30T05:00Z | 48,535 MW |
| 2026-10-30T06:00Z | 47,109 MW |
| 2026-10-30T07:00Z | 46,100 MW |
| 2026-10-30T08:00Z | 45,609 MW |
| 2026-10-30T09:00Z | 45,945 MW |
| 2026-10-30T10:00Z | 47,379 MW |
| 2026-10-30T11:00Z | 49,640 MW |
| 2026-10-30T12:00Z | 51,033 MW |
| 2026-10-30T13:00Z | 51,481 MW |
| 2026-10-30T14:00Z | 52,450 MW |
| 2026-10-30T15:00Z | 53,637 MW |
| 2026-10-30T16:00Z | 54,386 MW |
| 2026-10-30T17:00Z | 54,938 MW |
| 2026-10-30T18:00Z | 55,639 MW |
| 2026-10-30T19:00Z | 56,026 MW |
| 2026-10-30T20:00Z | 55,991 MW |
| 2026-10-30T21:00Z | 55,848 MW |
| 2026-10-30T22:00Z | 55,656 MW |
| 2026-10-30T23:00Z | 55,216 MW |
| 2026-10-31T00:00Z | 55,235 MW |
| 2026-10-31T01:00Z | 54,653 MW |
| 2026-10-31T02:00Z | 53,741 MW |
| 2026-10-31T03:00Z | 52,293 MW |
| 2026-10-31T04:00Z | 50,395 MW |
| 2026-10-31T05:00Z | 48,388 MW |
| 2026-10-31T06:00Z | 46,976 MW |
| 2026-10-31T07:00Z | 45,901 MW |
| 2026-10-31T08:00Z | 45,243 MW |
| 2026-10-31T09:00Z | 44,939 MW |
| 2026-10-31T10:00Z | 45,338 MW |
| 2026-10-31T11:00Z | 46,031 MW |
| 2026-10-31T12:00Z | 47,038 MW |
| 2026-10-31T13:00Z | 48,322 MW |
| 2026-10-31T14:00Z | 50,089 MW |
| 2026-10-31T15:00Z | 51,957 MW |
| 2026-10-31T16:00Z | 54,042 MW |
| 2026-10-31T17:00Z | 55,559 MW |
| 2026-10-31T18:00Z | 57,113 MW |
| 2026-10-31T19:00Z | 58,414 MW |
| 2026-10-31T20:00Z | 59,331 MW |
| 2026-10-31T21:00Z | 59,790 MW |
| 2026-10-31T22:00Z | 59,229 MW |
| 2026-10-31T23:00Z | 57,502 MW |
| 2026-11-01T00:00Z | 56,426 MW |
| 2026-11-01T01:00Z | 55,189 MW |
| 2026-11-01T02:00Z | 53,634 MW |
| 2026-11-01T03:00Z | 51,846 MW |
| 2026-11-01T04:00Z | 50,121 MW |
| 2026-11-01T05:00Z | 48,805 MW |
| 2026-11-01T06:00Z | 47,189 MW |
| 2026-11-01T07:00Z | 45,925 MW |
| 2026-11-01T08:00Z | 44,978 MW |
| 2026-11-01T09:00Z | 44,541 MW |
| 2026-11-01T10:00Z | 44,323 MW |
| 2026-11-01T11:00Z | 44,156 MW |
| 2026-11-01T12:00Z | 44,606 MW |
| 2026-11-01T13:00Z | 45,844 MW |
| 2026-11-01T14:00Z | 48,242 MW |
| 2026-11-01T15:00Z | 50,736 MW |
| 2026-11-01T16:00Z | 53,384 MW |
| 2026-11-01T17:00Z | 56,001 MW |
| 2026-11-01T18:00Z | 58,568 MW |
| 2026-11-01T19:00Z | 60,553 MW |
| 2026-11-01T20:00Z | 62,242 MW |
| 2026-11-01T21:00Z | 62,943 MW |
| 2026-11-01T22:00Z | 62,508 MW |
| 2026-11-01T23:00Z | 61,673 MW |
| 2026-11-02T00:00Z | 61,183 MW |
| 2026-11-02T01:00Z | 59,876 MW |
| 2026-11-02T02:00Z | 58,455 MW |
| 2026-11-02T03:00Z | 56,586 MW |
| 2026-11-02T04:00Z | 53,918 MW |
| 2026-11-02T05:00Z | 51,295 MW |
| 2026-11-02T06:00Z | 49,089 MW |
| 2026-11-02T07:00Z | 47,501 MW |
| 2026-11-02T08:00Z | 46,620 MW |
| 2026-11-02T09:00Z | 46,320 MW |
| 2026-11-02T10:00Z | 46,949 MW |
| 2026-11-02T11:00Z | 48,480 MW |
| 2026-11-02T12:00Z | 50,933 MW |
| 2026-11-02T13:00Z | 52,090 MW |
| 2026-11-02T14:00Z | 53,736 MW |
| 2026-11-02T15:00Z | 55,830 MW |
| 2026-11-02T16:00Z | 58,459 MW |
| 2026-11-02T17:00Z | 61,162 MW |
| 2026-11-02T18:00Z | 63,133 MW |
| 2026-11-02T19:00Z | 65,026 MW |
| 2026-11-02T20:00Z | 65,822 MW |
| 2026-11-02T21:00Z | 65,888 MW |
| 2026-11-02T22:00Z | 65,691 MW |
| 2026-11-02T23:00Z | 64,815 MW |
| 2026-11-03T00:00Z | 64,708 MW |
| 2026-11-03T01:00Z | 63,419 MW |
| 2026-11-03T02:00Z | 61,837 MW |
| 2026-11-03T03:00Z | 59,798 MW |
| 2026-11-03T04:00Z | 57,370 MW |
| 2026-11-03T05:00Z | 54,693 MW |
| 2026-11-03T06:00Z | 52,382 MW |
| 2026-11-03T07:00Z | 50,461 MW |
| 2026-11-03T08:00Z | 49,261 MW |
| 2026-11-03T09:00Z | 48,444 MW |
| 2026-11-03T10:00Z | 48,542 MW |
| 2026-11-03T11:00Z | 49,522 MW |
| 2026-11-03T12:00Z | 51,454 MW |
| 2026-11-03T13:00Z | 51,790 MW |
| 2026-11-03T14:00Z | 53,375 MW |
| 2026-11-03T15:00Z | 54,925 MW |
| 2026-11-03T16:00Z | 56,413 MW |
| 2026-11-03T17:00Z | 58,048 MW |
| 2026-11-03T18:00Z | 58,784 MW |
| 2026-11-03T19:00Z | 59,229 MW |
| 2026-11-03T20:00Z | 59,628 MW |
| 2026-11-03T21:00Z | 59,935 MW |
| 2026-11-03T22:00Z | 59,217 MW |
| 2026-11-03T23:00Z | 56,810 MW |
| 2026-11-04T00:00Z | 55,573 MW |
| 2026-11-04T01:00Z | 54,436 MW |
| 2026-11-04T02:00Z | 53,105 MW |
| 2026-11-04T03:00Z | 51,592 MW |
| 2026-11-04T04:00Z | 49,543 MW |
| 2026-11-04T05:00Z | 47,695 MW |
| 2026-11-04T06:00Z | 46,014 MW |
| 2026-11-04T07:00Z | 44,557 MW |
| 2026-11-04T08:00Z | 43,671 MW |
| 2026-11-04T09:00Z | 43,196 MW |
| 2026-11-04T10:00Z | 43,488 MW |
| 2026-11-04T11:00Z | 45,080 MW |
| 2026-11-04T12:00Z | 47,448 MW |
| 2026-11-04T13:00Z | 48,479 MW |
| 2026-11-04T14:00Z | 49,578 MW |
| 2026-11-04T15:00Z | 50,573 MW |
| 2026-11-04T16:00Z | 51,432 MW |
| 2026-11-04T17:00Z | 52,471 MW |
| 2026-11-04T18:00Z | 53,997 MW |
| 2026-11-04T19:00Z | 55,542 MW |
| 2026-11-04T20:00Z | 57,110 MW |
| 2026-11-04T21:00Z | 58,262 MW |
| 2026-11-04T22:00Z | 58,473 MW |
| 2026-11-04T23:00Z | 57,438 MW |
| 2026-11-05T00:00Z | 56,728 MW |
| 2026-11-05T01:00Z | 55,509 MW |
| 2026-11-05T02:00Z | 54,333 MW |
| 2026-11-05T03:00Z | 52,714 MW |
| 2026-11-05T04:00Z | 50,158 MW |
| 2026-11-05T05:00Z | 47,477 MW |
| 2026-11-05T06:00Z | 45,604 MW |
| 2026-11-05T07:00Z | 44,419 MW |
| 2026-11-05T08:00Z | 43,779 MW |
| 2026-11-05T09:00Z | 43,086 MW |
| 2026-11-05T10:00Z | 43,527 MW |
| 2026-11-05T11:00Z | 45,163 MW |
| 2026-11-05T12:00Z | 47,971 MW |
| 2026-11-05T13:00Z | 48,948 MW |
| 2026-11-05T14:00Z | n/a |
Show the data table (720 rows)
| Hour starting (UTC) | Gas | Wind | Solar | Coal | Nuclear |
|---|---|---|---|---|---|
| 2026-10-06T15:00Z | 19,680 MW | 3,011 MW | 32,461 MW | 5,792 MW | 5,011 MW |
| 2026-10-06T16:00Z | 18,749 MW | 3,760 MW | 32,122 MW | 5,652 MW | 5,010 MW |
| 2026-10-06T17:00Z | 19,121 MW | 3,818 MW | 31,655 MW | 5,570 MW | 5,009 MW |
| 2026-10-06T18:00Z | 22,205 MW | 3,631 MW | 30,837 MW | 5,789 MW | 5,008 MW |
| 2026-10-06T19:00Z | 25,085 MW | 3,787 MW | 29,996 MW | 5,994 MW | 5,007 MW |
| 2026-10-06T20:00Z | 27,266 MW | 3,812 MW | 29,152 MW | 6,436 MW | 5,007 MW |
| 2026-10-06T21:00Z | 29,311 MW | 3,629 MW | 28,420 MW | 6,797 MW | 5,006 MW |
| 2026-10-06T22:00Z | 32,449 MW | 3,307 MW | 23,185 MW | 7,535 MW | 5,006 MW |
| 2026-10-06T23:00Z | 36,536 MW | 3,065 MW | 7,678 MW | 8,673 MW | 5,006 MW |
| 2026-10-07T00:00Z | 38,058 MW | 3,745 MW | 152 MW | 8,871 MW | 5,006 MW |
| 2026-10-07T01:00Z | 38,199 MW | 5,788 MW | 0 MW | 8,359 MW | 5,006 MW |
| 2026-10-07T02:00Z | 36,977 MW | 8,332 MW | 0 MW | 7,969 MW | 5,006 MW |
| 2026-10-07T03:00Z | 35,645 MW | 9,980 MW | 0 MW | 7,287 MW | 5,007 MW |
| 2026-10-07T04:00Z | 32,482 MW | 10,468 MW | 0 MW | 6,763 MW | 5,008 MW |
| 2026-10-07T05:00Z | 30,807 MW | 10,671 MW | 0 MW | 5,978 MW | 5,009 MW |
| 2026-10-07T06:00Z | 29,642 MW | 10,973 MW | 0 MW | 5,764 MW | 5,012 MW |
| 2026-10-07T07:00Z | 29,327 MW | 10,853 MW | 0 MW | 5,733 MW | 5,012 MW |
| 2026-10-07T08:00Z | 28,811 MW | 10,910 MW | 0 MW | 5,732 MW | 5,011 MW |
| 2026-10-07T09:00Z | 28,091 MW | 10,510 MW | 0 MW | 5,747 MW | 5,004 MW |
| 2026-10-07T10:00Z | 28,658 MW | 8,908 MW | 2 MW | 5,745 MW | 4,997 MW |
| 2026-10-07T11:00Z | 30,275 MW | 7,129 MW | 0 MW | 5,733 MW | 4,997 MW |
| 2026-10-07T12:00Z | 29,802 MW | 6,020 MW | 615 MW | 5,744 MW | 4,998 MW |
| 2026-10-07T13:00Z | 26,378 MW | 4,907 MW | 12,950 MW | 5,489 MW | 4,999 MW |
| 2026-10-07T14:00Z | 20,131 MW | 2,811 MW | 28,817 MW | 4,907 MW | 4,998 MW |
| 2026-10-07T15:00Z | 20,762 MW | 1,735 MW | 32,543 MW | 4,818 MW | 4,998 MW |
| 2026-10-07T16:00Z | 21,456 MW | 1,532 MW | 32,340 MW | 4,957 MW | 4,997 MW |
| 2026-10-07T17:00Z | 22,825 MW | 1,452 MW | 31,210 MW | 5,108 MW | 5,007 MW |
| 2026-10-07T18:00Z | 25,083 MW | 2,108 MW | 30,383 MW | 5,517 MW | 5,007 MW |
| 2026-10-07T19:00Z | 26,723 MW | 2,415 MW | 30,430 MW | 5,992 MW | 5,004 MW |
| 2026-10-07T20:00Z | 27,901 MW | 2,680 MW | 30,831 MW | 6,355 MW | 5,001 MW |
| 2026-10-07T21:00Z | 29,609 MW | 2,783 MW | 30,324 MW | 6,533 MW | 5,000 MW |
| 2026-10-07T22:00Z | 34,137 MW | 2,684 MW | 23,766 MW | 6,917 MW | 4,998 MW |
| 2026-10-07T23:00Z | 37,388 MW | 2,233 MW | 7,533 MW | 7,822 MW | 4,997 MW |
| 2026-10-08T00:00Z | 38,303 MW | 2,937 MW | 118 MW | 7,996 MW | 4,997 MW |
| 2026-10-08T01:00Z | 38,273 MW | 4,716 MW | 0 MW | 8,059 MW | 4,997 MW |
| 2026-10-08T02:00Z | 37,555 MW | 6,312 MW | 0 MW | 7,838 MW | 4,997 MW |
| 2026-10-08T03:00Z | 36,438 MW | 7,500 MW | 0 MW | 7,465 MW | 4,997 MW |
| 2026-10-08T04:00Z | 35,268 MW | 8,141 MW | 0 MW | 7,068 MW | 4,997 MW |
| 2026-10-08T05:00Z | 33,243 MW | 8,302 MW | 0 MW | 6,285 MW | 4,996 MW |
| 2026-10-08T06:00Z | 32,255 MW | 8,268 MW | 0 MW | 5,881 MW | 4,996 MW |
| 2026-10-08T07:00Z | 32,282 MW | 7,392 MW | 0 MW | 5,721 MW | 4,996 MW |
| 2026-10-08T08:00Z | 32,355 MW | 5,649 MW | 0 MW | 5,654 MW | 4,996 MW |
| 2026-10-08T09:00Z | 32,861 MW | 4,431 MW | 0 MW | 5,890 MW | 4,995 MW |
| 2026-10-08T10:00Z | 33,482 MW | 3,487 MW | 0 MW | 6,524 MW | 4,995 MW |
| 2026-10-08T11:00Z | 33,841 MW | 2,795 MW | 0 MW | 7,072 MW | 4,995 MW |
| 2026-10-08T12:00Z | 34,428 MW | 2,303 MW | 521 MW | 6,585 MW | 4,994 MW |
| 2026-10-08T13:00Z | 30,934 MW | 1,927 MW | 12,265 MW | 5,943 MW | 4,993 MW |
| 2026-10-08T14:00Z | 25,625 MW | 1,023 MW | 28,268 MW | 5,393 MW | 4,993 MW |
| 2026-10-08T15:00Z | 25,287 MW | 1,143 MW | 32,084 MW | 5,392 MW | 4,991 MW |
| 2026-10-08T16:00Z | 24,247 MW | 1,683 MW | 31,905 MW | 5,372 MW | 4,989 MW |
| 2026-10-08T17:00Z | 25,124 MW | 1,794 MW | 30,500 MW | 5,488 MW | 4,988 MW |
| 2026-10-08T18:00Z | 27,858 MW | 2,097 MW | 29,824 MW | 5,542 MW | 4,986 MW |
| 2026-10-08T19:00Z | 30,353 MW | 1,954 MW | 29,968 MW | 5,643 MW | 4,984 MW |
| 2026-10-08T20:00Z | 31,484 MW | 1,849 MW | 30,330 MW | 6,048 MW | 4,983 MW |
| 2026-10-08T21:00Z | 32,835 MW | 1,979 MW | 29,261 MW | 6,799 MW | 4,981 MW |
| 2026-10-08T22:00Z | 35,656 MW | 1,949 MW | 22,803 MW | 7,469 MW | 4,979 MW |
| 2026-10-08T23:00Z | 38,293 MW | 2,442 MW | 6,727 MW | 7,953 MW | 4,979 MW |
| 2026-10-09T00:00Z | 38,892 MW | 3,596 MW | 76 MW | 7,874 MW | 4,979 MW |
| 2026-10-09T01:00Z | 38,738 MW | 5,397 MW | 0 MW | 7,869 MW | 4,978 MW |
| 2026-10-09T02:00Z | 38,023 MW | 6,960 MW | 1 MW | 7,532 MW | 4,978 MW |
| 2026-10-09T03:00Z | 37,123 MW | 7,839 MW | 0 MW | 7,097 MW | 4,979 MW |
| 2026-10-09T04:00Z | 35,653 MW | 8,394 MW | 0 MW | 6,436 MW | 4,978 MW |
| 2026-10-09T05:00Z | 33,303 MW | 8,806 MW | 0 MW | 5,681 MW | 4,978 MW |
| 2026-10-09T06:00Z | 32,265 MW | 8,658 MW | 0 MW | 5,497 MW | 4,979 MW |
| 2026-10-09T07:00Z | 31,919 MW | 7,635 MW | 0 MW | 5,574 MW | 4,979 MW |
| 2026-10-09T08:00Z | 31,783 MW | 6,406 MW | 0 MW | 5,586 MW | 4,980 MW |
| 2026-10-09T09:00Z | 31,970 MW | 4,978 MW | 0 MW | 5,652 MW | 4,981 MW |
| 2026-10-09T10:00Z | 32,461 MW | 4,253 MW | 0 MW | 5,725 MW | 4,982 MW |
| 2026-10-09T11:00Z | 32,712 MW | 3,713 MW | 1 MW | 5,934 MW | 4,983 MW |
| 2026-10-09T12:00Z | 32,753 MW | 3,008 MW | 563 MW | 5,855 MW | 4,984 MW |
| 2026-10-09T13:00Z | 29,184 MW | 2,682 MW | 11,581 MW | 5,700 MW | 4,984 MW |
| 2026-10-09T14:00Z | 25,494 MW | 1,513 MW | 27,402 MW | 5,407 MW | 4,984 MW |
| 2026-10-09T15:00Z | 24,513 MW | 1,440 MW | 31,573 MW | 5,401 MW | 4,983 MW |
| 2026-10-09T16:00Z | 22,207 MW | 1,788 MW | 32,279 MW | 5,308 MW | 4,982 MW |
| 2026-10-09T17:00Z | 23,285 MW | 1,683 MW | 31,500 MW | 5,093 MW | 4,982 MW |
| 2026-10-09T18:00Z | 26,138 MW | 1,701 MW | 30,905 MW | 5,453 MW | 4,980 MW |
| 2026-10-09T19:00Z | 27,872 MW | 1,899 MW | 31,433 MW | 5,653 MW | 4,977 MW |
| 2026-10-09T20:00Z | 29,457 MW | 2,077 MW | 31,562 MW | 5,901 MW | 4,976 MW |
| 2026-10-09T21:00Z | 30,626 MW | 2,519 MW | 30,478 MW | 6,246 MW | 4,974 MW |
| 2026-10-09T22:00Z | 33,891 MW | 2,986 MW | 23,510 MW | 6,785 MW | 4,973 MW |
| 2026-10-09T23:00Z | 36,761 MW | 3,328 MW | 6,607 MW | 7,482 MW | 4,972 MW |
| 2026-10-10T00:00Z | 37,257 MW | 4,848 MW | 97 MW | 7,601 MW | 4,971 MW |
| 2026-10-10T01:00Z | 37,183 MW | 8,061 MW | 0 MW | 7,114 MW | 4,972 MW |
| 2026-10-10T02:00Z | 35,708 MW | 10,660 MW | 0 MW | 6,470 MW | 4,973 MW |
| 2026-10-10T03:00Z | 32,078 MW | 13,091 MW | 0 MW | 6,332 MW | 4,973 MW |
| 2026-10-10T04:00Z | 28,706 MW | 14,412 MW | 0 MW | 6,122 MW | 4,974 MW |
| 2026-10-10T05:00Z | 26,278 MW | 14,513 MW | 0 MW | 5,736 MW | 4,974 MW |
| 2026-10-10T06:00Z | 25,142 MW | 13,921 MW | 0 MW | 5,521 MW | 4,973 MW |
| 2026-10-10T07:00Z | 24,526 MW | 13,007 MW | 0 MW | 5,482 MW | 4,973 MW |
| 2026-10-10T08:00Z | 23,794 MW | 12,785 MW | 0 MW | 5,280 MW | 4,973 MW |
| 2026-10-10T09:00Z | 23,212 MW | 12,467 MW | 0 MW | 5,281 MW | 4,973 MW |
| 2026-10-10T10:00Z | 23,183 MW | 11,820 MW | 0 MW | 5,316 MW | 4,972 MW |
| 2026-10-10T11:00Z | 24,067 MW | 11,271 MW | 0 MW | 5,510 MW | 4,972 MW |
| 2026-10-10T12:00Z | 24,244 MW | 10,949 MW | 485 MW | 5,533 MW | 4,972 MW |
| 2026-10-10T13:00Z | 19,081 MW | 10,145 MW | 12,177 MW | 5,145 MW | 4,972 MW |
| 2026-10-10T14:00Z | 14,746 MW | 7,213 MW | 29,163 MW | 4,600 MW | 4,971 MW |
| 2026-10-10T15:00Z | 13,821 MW | 8,812 MW | 32,612 MW | 4,283 MW | 4,970 MW |
| 2026-10-10T16:00Z | 13,567 MW | 11,326 MW | 30,980 MW | 3,877 MW | 4,969 MW |
| 2026-10-10T17:00Z | 14,100 MW | 11,356 MW | 30,449 MW | 3,553 MW | 4,968 MW |
| 2026-10-10T18:00Z | 15,422 MW | 11,336 MW | 30,886 MW | 3,798 MW | 4,966 MW |
| 2026-10-10T19:00Z | 17,034 MW | 11,978 MW | 31,020 MW | 4,245 MW | 4,964 MW |
| 2026-10-10T20:00Z | 18,784 MW | 12,916 MW | 30,094 MW | 4,571 MW | 4,960 MW |
| 2026-10-10T21:00Z | 19,582 MW | 14,613 MW | 28,410 MW | 4,886 MW | 4,952 MW |
| 2026-10-10T22:00Z | 22,354 MW | 16,391 MW | 22,106 MW | 5,302 MW | 4,950 MW |
| 2026-10-10T23:00Z | 26,696 MW | 17,286 MW | 6,619 MW | 6,187 MW | 4,951 MW |
| 2026-10-11T00:00Z | 27,778 MW | 17,526 MW | 64 MW | 6,357 MW | 4,951 MW |
| 2026-10-11T01:00Z | 26,564 MW | 21,012 MW | 1 MW | 6,315 MW | 4,953 MW |
| 2026-10-11T02:00Z | 24,228 MW | 24,224 MW | 1 MW | 5,853 MW | 4,954 MW |
| 2026-10-11T03:00Z | 22,859 MW | 25,235 MW | 1 MW | 5,574 MW | 4,955 MW |
| 2026-10-11T04:00Z | 20,886 MW | 25,476 MW | 1 MW | 5,219 MW | 4,955 MW |
| 2026-10-11T05:00Z | 18,577 MW | 25,819 MW | 1 MW | 4,376 MW | 4,956 MW |
| 2026-10-11T06:00Z | 16,980 MW | 25,919 MW | 1 MW | 3,872 MW | 4,957 MW |
| 2026-10-11T07:00Z | 15,609 MW | 26,107 MW | 1 MW | 3,754 MW | 4,958 MW |
| 2026-10-11T08:00Z | 14,907 MW | 25,669 MW | 1 MW | 3,547 MW | 4,959 MW |
| 2026-10-11T09:00Z | 14,405 MW | 25,273 MW | 1 MW | 3,468 MW | 4,959 MW |
| 2026-10-11T10:00Z | 14,193 MW | 25,091 MW | 1 MW | 3,485 MW | 4,959 MW |
| 2026-10-11T11:00Z | 14,387 MW | 24,824 MW | 1 MW | 3,602 MW | 4,960 MW |
| 2026-10-11T12:00Z | 14,566 MW | 24,317 MW | 452 MW | 3,596 MW | 4,960 MW |
| 2026-10-11T13:00Z | 11,833 MW | 22,139 MW | 10,683 MW | 3,286 MW | 4,960 MW |
| 2026-10-11T14:00Z | 11,022 MW | 20,233 MW | 21,956 MW | 3,034 MW | 4,960 MW |
| 2026-10-11T15:00Z | 11,610 MW | 22,309 MW | 22,676 MW | 2,849 MW | 4,959 MW |
| 2026-10-11T16:00Z | 12,023 MW | 22,807 MW | 23,693 MW | 2,719 MW | 4,958 MW |
| 2026-10-11T17:00Z | 12,673 MW | 22,850 MW | 23,759 MW | 2,638 MW | 4,956 MW |
| 2026-10-11T18:00Z | 14,076 MW | 22,785 MW | 24,098 MW | 2,794 MW | 4,954 MW |
| 2026-10-11T19:00Z | 15,880 MW | 22,313 MW | 24,424 MW | 3,231 MW | 4,952 MW |
| 2026-10-11T20:00Z | 17,779 MW | 21,953 MW | 24,381 MW | 3,564 MW | 4,951 MW |
| 2026-10-11T21:00Z | 19,357 MW | 21,855 MW | 24,023 MW | 3,668 MW | 4,949 MW |
| 2026-10-11T22:00Z | 22,761 MW | 22,144 MW | 18,409 MW | 4,065 MW | 4,948 MW |
| 2026-10-11T23:00Z | 26,512 MW | 24,267 MW | 4,768 MW | 4,865 MW | 4,947 MW |
| 2026-10-12T00:00Z | 27,270 MW | 24,358 MW | 45 MW | 4,978 MW | 4,947 MW |
| 2026-10-12T01:00Z | 27,625 MW | 24,502 MW | 1 MW | 4,928 MW | 4,947 MW |
| 2026-10-12T02:00Z | 27,381 MW | 24,744 MW | 1 MW | 4,935 MW | 4,947 MW |
| 2026-10-12T03:00Z | 25,541 MW | 25,033 MW | 1 MW | 4,887 MW | 4,947 MW |
| 2026-10-12T04:00Z | 23,449 MW | 24,857 MW | 1 MW | 4,328 MW | 4,947 MW |
| 2026-10-12T05:00Z | 21,461 MW | 24,866 MW | 1 MW | 3,862 MW | 4,947 MW |
| 2026-10-12T06:00Z | 21,002 MW | 24,639 MW | 1 MW | 3,750 MW | 4,947 MW |
| 2026-10-12T07:00Z | 21,099 MW | 23,872 MW | 1 MW | 3,752 MW | 4,945 MW |
| 2026-10-12T08:00Z | 21,343 MW | 23,206 MW | 1 MW | 3,762 MW | 4,945 MW |
| 2026-10-12T09:00Z | 21,429 MW | 22,468 MW | 1 MW | 3,736 MW | 4,943 MW |
| 2026-10-12T10:00Z | 21,929 MW | 21,861 MW | 1 MW | 3,803 MW | 4,943 MW |
| 2026-10-12T11:00Z | 23,253 MW | 20,490 MW | 1 MW | 4,030 MW | 4,943 MW |
| 2026-10-12T12:00Z | 23,504 MW | 19,107 MW | 274 MW | 4,114 MW | 4,943 MW |
| 2026-10-12T13:00Z | 22,121 MW | 17,684 MW | 7,332 MW | 3,970 MW | 4,943 MW |
| 2026-10-12T14:00Z | 19,346 MW | 17,499 MW | 17,066 MW | 3,737 MW | 4,943 MW |
| 2026-10-12T15:00Z | 19,582 MW | 19,779 MW | 18,884 MW | 3,847 MW | 4,942 MW |
| 2026-10-12T16:00Z | 20,006 MW | 19,757 MW | 20,865 MW | 3,974 MW | 4,940 MW |
| 2026-10-12T17:00Z | 21,052 MW | 19,082 MW | 20,923 MW | 4,172 MW | 4,940 MW |
| 2026-10-12T18:00Z | 22,853 MW | 17,823 MW | 21,901 MW | 4,233 MW | 4,939 MW |
| 2026-10-12T19:00Z | 25,241 MW | 16,795 MW | 22,567 MW | 4,640 MW | 4,939 MW |
| 2026-10-12T20:00Z | 26,888 MW | 16,620 MW | 22,423 MW | 5,219 MW | 4,937 MW |
| 2026-10-12T21:00Z | 28,848 MW | 17,144 MW | 20,193 MW | 5,538 MW | 4,936 MW |
| 2026-10-12T22:00Z | 29,936 MW | 18,528 MW | 15,892 MW | 5,841 MW | 4,936 MW |
| 2026-10-12T23:00Z | 31,320 MW | 19,974 MW | 4,457 MW | 6,812 MW | 4,936 MW |
| 2026-10-13T00:00Z | 31,484 MW | 19,753 MW | 36 MW | 6,735 MW | 4,935 MW |
| 2026-10-13T01:00Z | 31,567 MW | 21,056 MW | 1 MW | 6,843 MW | 4,936 MW |
| 2026-10-13T02:00Z | 31,492 MW | 22,785 MW | 1 MW | 7,190 MW | 4,941 MW |
| 2026-10-13T03:00Z | 30,203 MW | 24,182 MW | 1 MW | 7,203 MW | 4,942 MW |
| 2026-10-13T04:00Z | 28,387 MW | 25,018 MW | 1 MW | 6,934 MW | 4,941 MW |
| 2026-10-13T05:00Z | 26,397 MW | 24,598 MW | 1 MW | 6,562 MW | 4,941 MW |
| 2026-10-13T06:00Z | 25,362 MW | 23,485 MW | 1 MW | 6,402 MW | 4,936 MW |
| 2026-10-13T07:00Z | 25,089 MW | 22,371 MW | 1 MW | 6,140 MW | 4,934 MW |
| 2026-10-13T08:00Z | 25,252 MW | 21,699 MW | 1 MW | 6,124 MW | 4,934 MW |
| 2026-10-13T09:00Z | 25,445 MW | 20,778 MW | 1 MW | 5,744 MW | 4,934 MW |
| 2026-10-13T10:00Z | 26,274 MW | 20,061 MW | 1 MW | 5,702 MW | 4,934 MW |
| 2026-10-13T11:00Z | 26,701 MW | 19,462 MW | 1 MW | 6,086 MW | 4,934 MW |
| 2026-10-13T12:00Z | 26,861 MW | 18,271 MW | 184 MW | 6,153 MW | 4,934 MW |
| 2026-10-13T13:00Z | 26,765 MW | 16,679 MW | 6,118 MW | 5,770 MW | 4,933 MW |
| 2026-10-13T14:00Z | 25,318 MW | 17,240 MW | 14,916 MW | 5,421 MW | 4,932 MW |
| 2026-10-13T15:00Z | 24,129 MW | 19,568 MW | 19,129 MW | 5,691 MW | 4,932 MW |
| 2026-10-13T16:00Z | 24,096 MW | 18,872 MW | 21,905 MW | 5,901 MW | 4,931 MW |
| 2026-10-13T17:00Z | 24,794 MW | 16,931 MW | 23,527 MW | 7,176 MW | 4,929 MW |
| 2026-10-13T18:00Z | 26,372 MW | 15,577 MW | 24,475 MW | 8,047 MW | 4,927 MW |
| 2026-10-13T19:00Z | 27,422 MW | 15,229 MW | 24,716 MW | 8,185 MW | 4,926 MW |
| 2026-10-13T20:00Z | 28,668 MW | 16,202 MW | 23,146 MW | 8,298 MW | 4,926 MW |
| 2026-10-13T21:00Z | 30,099 MW | 17,986 MW | 20,822 MW | 8,307 MW | 4,925 MW |
| 2026-10-13T22:00Z | 31,961 MW | 20,199 MW | 14,226 MW | 8,315 MW | 4,925 MW |
| 2026-10-13T23:00Z | 33,390 MW | 22,567 MW | 3,401 MW | 8,483 MW | 4,925 MW |
| 2026-10-14T00:00Z | 34,035 MW | 22,048 MW | 32 MW | 8,506 MW | 4,924 MW |
| 2026-10-14T01:00Z | 34,077 MW | 22,340 MW | 0 MW | 8,453 MW | 4,926 MW |
| 2026-10-14T02:00Z | 33,847 MW | 22,621 MW | 0 MW | 8,470 MW | 4,929 MW |
| 2026-10-14T03:00Z | 32,526 MW | 22,928 MW | 0 MW | 8,368 MW | 4,928 MW |
| 2026-10-14T04:00Z | 30,680 MW | 23,343 MW | 0 MW | 7,923 MW | 4,927 MW |
| 2026-10-14T05:00Z | 29,534 MW | 22,748 MW | 0 MW | 7,978 MW | 4,924 MW |
| 2026-10-14T06:00Z | 28,641 MW | 21,989 MW | 0 MW | 7,560 MW | 4,921 MW |
| 2026-10-14T07:00Z | 28,303 MW | 20,745 MW | 1 MW | 7,428 MW | 4,921 MW |
| 2026-10-14T08:00Z | 28,168 MW | 19,260 MW | 1 MW | 7,529 MW | 4,920 MW |
| 2026-10-14T09:00Z | 27,917 MW | 18,611 MW | 0 MW | 7,521 MW | 4,920 MW |
| 2026-10-14T10:00Z | 28,024 MW | 17,568 MW | 0 MW | 7,573 MW | 4,920 MW |
| 2026-10-14T11:00Z | 28,499 MW | 16,353 MW | 0 MW | 7,872 MW | 4,919 MW |
| 2026-10-14T12:00Z | 28,730 MW | 13,366 MW | 163 MW | 8,527 MW | 4,919 MW |
| 2026-10-14T13:00Z | 28,641 MW | 10,373 MW | 5,372 MW | 8,487 MW | 4,919 MW |
| 2026-10-14T14:00Z | 28,003 MW | 12,390 MW | 14,097 MW | 7,908 MW | 4,918 MW |
| 2026-10-14T15:00Z | 26,989 MW | 15,092 MW | 17,920 MW | 7,535 MW | 4,917 MW |
| 2026-10-14T16:00Z | 25,475 MW | 15,272 MW | 22,002 MW | 7,235 MW | 4,916 MW |
| 2026-10-14T17:00Z | 26,277 MW | 15,561 MW | 21,316 MW | 7,511 MW | 4,915 MW |
| 2026-10-14T18:00Z | 27,562 MW | 16,095 MW | 21,156 MW | 7,615 MW | 4,913 MW |
| 2026-10-14T19:00Z | 28,029 MW | 17,996 MW | 20,306 MW | 7,281 MW | 4,912 MW |
| 2026-10-14T20:00Z | 29,176 MW | 19,645 MW | 18,096 MW | 7,482 MW | 4,912 MW |
| 2026-10-14T21:00Z | 29,207 MW | 22,291 MW | 15,990 MW | 7,369 MW | 4,910 MW |
| 2026-10-14T22:00Z | 30,178 MW | 22,727 MW | 11,579 MW | 8,072 MW | 4,910 MW |
| 2026-10-14T23:00Z | 33,093 MW | 20,963 MW | 2,523 MW | 8,403 MW | 4,910 MW |
| 2026-10-15T00:00Z | 33,722 MW | 16,961 MW | 38 MW | 8,451 MW | 4,910 MW |
| 2026-10-15T01:00Z | 33,804 MW | 14,708 MW | 0 MW | 8,404 MW | 4,910 MW |
| 2026-10-15T02:00Z | 34,164 MW | 13,601 MW | 1 MW | 8,488 MW | 4,910 MW |
| 2026-10-15T03:00Z | 33,754 MW | 13,841 MW | 5 MW | 8,347 MW | 4,909 MW |
| 2026-10-15T04:00Z | 32,327 MW | 14,335 MW | 1 MW | 8,162 MW | 4,910 MW |
| 2026-10-15T05:00Z | 30,798 MW | 14,886 MW | 1 MW | 7,717 MW | 4,910 MW |
| 2026-10-15T06:00Z | 30,199 MW | 13,897 MW | 1 MW | 7,780 MW | 4,910 MW |
| 2026-10-15T07:00Z | 30,063 MW | 13,572 MW | 1 MW | 7,384 MW | 4,910 MW |
| 2026-10-15T08:00Z | 29,941 MW | 12,870 MW | 1 MW | 6,701 MW | 4,910 MW |
| 2026-10-15T09:00Z | 30,005 MW | 12,219 MW | 1 MW | 6,542 MW | 4,910 MW |
| 2026-10-15T10:00Z | 29,923 MW | 12,595 MW | 1 MW | 6,126 MW | 4,910 MW |
| 2026-10-15T11:00Z | 30,001 MW | 11,761 MW | 1 MW | 6,894 MW | 4,910 MW |
| 2026-10-15T12:00Z | 30,099 MW | 10,084 MW | 243 MW | 7,963 MW | 4,910 MW |
| 2026-10-15T13:00Z | 29,390 MW | 9,389 MW | 6,908 MW | 7,173 MW | 4,909 MW |
| 2026-10-15T14:00Z | 27,747 MW | 9,127 MW | 18,303 MW | 6,195 MW | 4,907 MW |
| 2026-10-15T15:00Z | 26,319 MW | 10,392 MW | 20,986 MW | 6,007 MW | 4,907 MW |
| 2026-10-15T16:00Z | 24,830 MW | 10,873 MW | 22,107 MW | 5,762 MW | 4,906 MW |
| 2026-10-15T17:00Z | 23,309 MW | 11,522 MW | 23,310 MW | 5,442 MW | 4,904 MW |
| 2026-10-15T18:00Z | 25,451 MW | 12,528 MW | 22,781 MW | 5,335 MW | 4,901 MW |
| 2026-10-15T19:00Z | 25,661 MW | 14,374 MW | 22,609 MW | 5,404 MW | 4,897 MW |
| 2026-10-15T20:00Z | 24,486 MW | 17,018 MW | 22,632 MW | 5,517 MW | 4,895 MW |
| 2026-10-15T21:00Z | 24,648 MW | 18,181 MW | 20,996 MW | 5,557 MW | 4,893 MW |
| 2026-10-15T22:00Z | 27,143 MW | 19,067 MW | 13,924 MW | 5,766 MW | 4,892 MW |
| 2026-10-15T23:00Z | 29,198 MW | 21,466 MW | 2,681 MW | 6,614 MW | 4,892 MW |
| 2026-10-16T00:00Z | 29,128 MW | 22,760 MW | 12 MW | 6,984 MW | 4,892 MW |
| 2026-10-16T01:00Z | 28,875 MW | 22,963 MW | 1 MW | 7,033 MW | 4,892 MW |
| 2026-10-16T02:00Z | 27,657 MW | 23,439 MW | 1 MW | 6,952 MW | 4,893 MW |
| 2026-10-16T03:00Z | 25,493 MW | 23,493 MW | 1 MW | 6,714 MW | 4,893 MW |
| 2026-10-16T04:00Z | 22,743 MW | 23,368 MW | 1 MW | 6,255 MW | 4,894 MW |
| 2026-10-16T05:00Z | 20,271 MW | 22,702 MW | 1 MW | 5,867 MW | 4,895 MW |
| 2026-10-16T06:00Z | 19,021 MW | 22,353 MW | 1 MW | 5,661 MW | 4,895 MW |
| 2026-10-16T07:00Z | 17,610 MW | 22,548 MW | 1 MW | 5,395 MW | 4,896 MW |
| 2026-10-16T08:00Z | 16,712 MW | 22,593 MW | 2 MW | 5,416 MW | 4,896 MW |
| 2026-10-16T09:00Z | 16,299 MW | 22,772 MW | 2 MW | 5,350 MW | 4,896 MW |
| 2026-10-16T10:00Z | 15,990 MW | 23,482 MW | 2 MW | 5,357 MW | 4,897 MW |
| 2026-10-16T11:00Z | 15,613 MW | 24,373 MW | 2 MW | 5,455 MW | 4,898 MW |
| 2026-10-16T12:00Z | 14,948 MW | 26,047 MW | 87 MW | 5,488 MW | 4,898 MW |
| 2026-10-16T13:00Z | 12,929 MW | 26,492 MW | 2,750 MW | 5,354 MW | 4,899 MW |
| 2026-10-16T14:00Z | 10,899 MW | 25,100 MW | 7,439 MW | 5,025 MW | 4,899 MW |
| 2026-10-16T15:00Z | 10,062 MW | 24,575 MW | 11,230 MW | 4,649 MW | 4,900 MW |
| 2026-10-16T16:00Z | 9,868 MW | 24,710 MW | 13,432 MW | 4,474 MW | 4,901 MW |
| 2026-10-16T17:00Z | 9,395 MW | 24,536 MW | 15,880 MW | 4,091 MW | 4,903 MW |
| 2026-10-16T18:00Z | 8,927 MW | 24,167 MW | 17,599 MW | 3,382 MW | 4,903 MW |
| 2026-10-16T19:00Z | 8,060 MW | 24,115 MW | 18,492 MW | 3,259 MW | 4,902 MW |
| 2026-10-16T20:00Z | 7,725 MW | 23,986 MW | 17,775 MW | 3,300 MW | 4,903 MW |
| 2026-10-16T21:00Z | 7,897 MW | 23,823 MW | 15,902 MW | 3,173 MW | 4,904 MW |
| 2026-10-16T22:00Z | 9,667 MW | 24,655 MW | 11,091 MW | 3,240 MW | 4,905 MW |
| 2026-10-16T23:00Z | 12,898 MW | 26,040 MW | 2,220 MW | 4,550 MW | 4,906 MW |
| 2026-10-17T00:00Z | 15,706 MW | 22,052 MW | 10 MW | 5,829 MW | 4,906 MW |
| 2026-10-17T01:00Z | 16,202 MW | 19,476 MW | 0 MW | 6,466 MW | 4,908 MW |
| 2026-10-17T02:00Z | 16,495 MW | 18,827 MW | 0 MW | 6,737 MW | 4,909 MW |
| 2026-10-17T03:00Z | 16,200 MW | 18,774 MW | 1 MW | 6,814 MW | 4,910 MW |
| 2026-10-17T04:00Z | 16,185 MW | 18,417 MW | 1 MW | 6,453 MW | 4,912 MW |
| 2026-10-17T05:00Z | 16,681 MW | 17,064 MW | 1 MW | 5,986 MW | 4,913 MW |
| 2026-10-17T06:00Z | 17,001 MW | 15,777 MW | 1 MW | 5,965 MW | 4,914 MW |
| 2026-10-17T07:00Z | 17,330 MW | 14,485 MW | 1 MW | 6,001 MW | 4,915 MW |
| 2026-10-17T08:00Z | 17,838 MW | 13,074 MW | 1 MW | 5,756 MW | 4,916 MW |
| 2026-10-17T09:00Z | 18,047 MW | 11,747 MW | 1 MW | 6,343 MW | 4,917 MW |
| 2026-10-17T10:00Z | 18,081 MW | 11,110 MW | 1 MW | 7,086 MW | 4,918 MW |
| 2026-10-17T11:00Z | 17,925 MW | 10,568 MW | 1 MW | 7,175 MW | 4,918 MW |
| 2026-10-17T12:00Z | 17,989 MW | 9,363 MW | 387 MW | 6,898 MW | 4,918 MW |
| 2026-10-17T13:00Z | 15,328 MW | 7,576 MW | 11,057 MW | 6,584 MW | 4,917 MW |
| 2026-10-17T14:00Z | 8,589 MW | 6,120 MW | 27,261 MW | 4,622 MW | 4,917 MW |
| 2026-10-17T15:00Z | 7,688 MW | 5,912 MW | 31,497 MW | 4,084 MW | 4,918 MW |
| 2026-10-17T16:00Z | 7,257 MW | 4,768 MW | 32,938 MW | 3,997 MW | 4,917 MW |
| 2026-10-17T17:00Z | 7,169 MW | 4,192 MW | 32,821 MW | 3,799 MW | 4,917 MW |
| 2026-10-17T18:00Z | 7,195 MW | 4,067 MW | 31,908 MW | 3,682 MW | 4,917 MW |
| 2026-10-17T19:00Z | 7,179 MW | 4,102 MW | 30,577 MW | 3,111 MW | 4,916 MW |
| 2026-10-17T20:00Z | 7,439 MW | 4,059 MW | 30,316 MW | 2,990 MW | 4,915 MW |
| 2026-10-17T21:00Z | 8,845 MW | 3,863 MW | 29,767 MW | 2,990 MW | 4,914 MW |
| 2026-10-17T22:00Z | 15,793 MW | 3,323 MW | 21,286 MW | 3,810 MW | 4,914 MW |
| 2026-10-17T23:00Z | 24,022 MW | 2,581 MW | 4,611 MW | 6,358 MW | 4,914 MW |
| 2026-10-18T00:00Z | 25,730 MW | 2,587 MW | 26 MW | 7,329 MW | 4,914 MW |
| 2026-10-18T01:00Z | 26,250 MW | 2,991 MW | 0 MW | 7,808 MW | 4,914 MW |
| 2026-10-18T02:00Z | 26,593 MW | 3,546 MW | 0 MW | 7,926 MW | 4,914 MW |
| 2026-10-18T03:00Z | 26,844 MW | 4,122 MW | 0 MW | 7,856 MW | 4,914 MW |
| 2026-10-18T04:00Z | 26,936 MW | 4,596 MW | 0 MW | 7,420 MW | 4,915 MW |
| 2026-10-18T05:00Z | 25,658 MW | 4,887 MW | 0 MW | 6,545 MW | 4,915 MW |
| 2026-10-18T06:00Z | 25,162 MW | 5,509 MW | 0 MW | 6,085 MW | 4,916 MW |
| 2026-10-18T07:00Z | 24,147 MW | 6,159 MW | 0 MW | 6,002 MW | 4,916 MW |
| 2026-10-18T08:00Z | 23,087 MW | 6,778 MW | 0 MW | 5,912 MW | 4,916 MW |
| 2026-10-18T09:00Z | 22,641 MW | 7,626 MW | 0 MW | 5,598 MW | 4,916 MW |
| 2026-10-18T10:00Z | 22,818 MW | 7,788 MW | 0 MW | 5,597 MW | 4,917 MW |
| 2026-10-18T11:00Z | 22,754 MW | 8,101 MW | 0 MW | 5,586 MW | 4,918 MW |
| 2026-10-18T12:00Z | 22,178 MW | 8,695 MW | 280 MW | 5,587 MW | 4,917 MW |
| 2026-10-18T13:00Z | 15,832 MW | 9,014 MW | 9,400 MW | 5,347 MW | 4,918 MW |
| 2026-10-18T14:00Z | 9,234 MW | 6,380 MW | 26,386 MW | 4,331 MW | 4,620 MW |
| 2026-10-18T15:00Z | 8,584 MW | 7,066 MW | 30,349 MW | 3,581 MW | 4,075 MW |
| 2026-10-18T16:00Z | 8,019 MW | 7,887 MW | 31,181 MW | 3,383 MW | 3,914 MW |
| 2026-10-18T17:00Z | 7,789 MW | 6,610 MW | 31,220 MW | 3,253 MW | 3,842 MW |
| 2026-10-18T18:00Z | 7,792 MW | 5,978 MW | 29,796 MW | 3,302 MW | 3,840 MW |
| 2026-10-18T19:00Z | 7,870 MW | 5,869 MW | 29,581 MW | 3,262 MW | 3,839 MW |
| 2026-10-18T20:00Z | 8,818 MW | 5,955 MW | 29,082 MW | 3,434 MW | 3,838 MW |
| 2026-10-18T21:00Z | 10,838 MW | 6,510 MW | 27,280 MW | 3,627 MW | 3,837 MW |
| 2026-10-18T22:00Z | 16,095 MW | 7,357 MW | 19,782 MW | 4,374 MW | 3,835 MW |
| 2026-10-18T23:00Z | 21,988 MW | 7,533 MW | 4,496 MW | 5,905 MW | 3,833 MW |
| 2026-10-19T00:00Z | 23,935 MW | 8,897 MW | 15 MW | 6,541 MW | 3,834 MW |
| 2026-10-19T01:00Z | 24,036 MW | 11,561 MW | 1 MW | 6,804 MW | 3,836 MW |
| 2026-10-19T02:00Z | 23,558 MW | 13,660 MW | 1 MW | 6,812 MW | 3,836 MW |
| 2026-10-19T03:00Z | 22,290 MW | 15,033 MW | 1 MW | 6,516 MW | 3,837 MW |
| 2026-10-19T04:00Z | 21,237 MW | 15,497 MW | 1 MW | 5,707 MW | 3,838 MW |
| 2026-10-19T05:00Z | 20,788 MW | 15,371 MW | 1 MW | 5,508 MW | 3,839 MW |
| 2026-10-19T06:00Z | 20,645 MW | 14,734 MW | 1 MW | 5,554 MW | 3,840 MW |
| 2026-10-19T07:00Z | 20,707 MW | 14,040 MW | 1 MW | 5,551 MW | 3,841 MW |
| 2026-10-19T08:00Z | 20,496 MW | 13,312 MW | 1 MW | 5,451 MW | 3,842 MW |
| 2026-10-19T09:00Z | 20,893 MW | 12,383 MW | 1 MW | 5,567 MW | 3,839 MW |
| 2026-10-19T10:00Z | 21,734 MW | 11,746 MW | 2 MW | 5,610 MW | 3,840 MW |
| 2026-10-19T11:00Z | 22,541 MW | 11,676 MW | 0 MW | 5,611 MW | 3,841 MW |
| 2026-10-19T12:00Z | 22,536 MW | 11,740 MW | 248 MW | 5,597 MW | 3,841 MW |
| 2026-10-19T13:00Z | 20,552 MW | 11,032 MW | 8,278 MW | 5,360 MW | 3,842 MW |
| 2026-10-19T14:00Z | 14,386 MW | 7,663 MW | 22,470 MW | 4,878 MW | 3,838 MW |
| 2026-10-19T15:00Z | 12,321 MW | 8,287 MW | 27,882 MW | 4,547 MW | 3,837 MW |
| 2026-10-19T16:00Z | 11,092 MW | 9,478 MW | 28,662 MW | 4,057 MW | 3,837 MW |
| 2026-10-19T17:00Z | 10,527 MW | 8,529 MW | 29,403 MW | 4,008 MW | 3,837 MW |
| 2026-10-19T18:00Z | 10,163 MW | 7,659 MW | 29,380 MW | 3,895 MW | 3,837 MW |
| 2026-10-19T19:00Z | 11,570 MW | 7,183 MW | 29,090 MW | 3,973 MW | 3,835 MW |
| 2026-10-19T20:00Z | 13,045 MW | 6,550 MW | 28,660 MW | 4,487 MW | 3,833 MW |
| 2026-10-19T21:00Z | 16,165 MW | 6,594 MW | 25,760 MW | 5,607 MW | 3,833 MW |
| 2026-10-19T22:00Z | 20,097 MW | 7,334 MW | 18,523 MW | 5,830 MW | 3,832 MW |
| 2026-10-19T23:00Z | 24,250 MW | 8,122 MW | 3,716 MW | 7,289 MW | 3,832 MW |
| 2026-10-20T00:00Z | 25,302 MW | 10,292 MW | 32 MW | 7,297 MW | 3,833 MW |
| 2026-10-20T01:00Z | 25,583 MW | 13,708 MW | 9 MW | 7,100 MW | 3,834 MW |
| 2026-10-20T02:00Z | 25,211 MW | 16,362 MW | 5 MW | 6,860 MW | 3,834 MW |
| 2026-10-20T03:00Z | 22,937 MW | 17,938 MW | 0 MW | 6,880 MW | 3,835 MW |
| 2026-10-20T04:00Z | 21,155 MW | 18,302 MW | 0 MW | 6,518 MW | 3,835 MW |
| 2026-10-20T05:00Z | 20,993 MW | 17,855 MW | 0 MW | 5,819 MW | 3,836 MW |
| 2026-10-20T06:00Z | 20,741 MW | 17,284 MW | 0 MW | 5,700 MW | 3,836 MW |
| 2026-10-20T07:00Z | 21,090 MW | 15,171 MW | 0 MW | 5,746 MW | 3,836 MW |
| 2026-10-20T08:00Z | 21,338 MW | 13,414 MW | 0 MW | 5,743 MW | 3,837 MW |
| 2026-10-20T09:00Z | 21,519 MW | 12,099 MW | 0 MW | 5,761 MW | 3,838 MW |
| 2026-10-20T10:00Z | 22,786 MW | 10,413 MW | 0 MW | 5,771 MW | 3,838 MW |
| 2026-10-20T11:00Z | 23,586 MW | 9,876 MW | 0 MW | 5,760 MW | 3,838 MW |
| 2026-10-20T12:00Z | 23,616 MW | 10,010 MW | 230 MW | 5,698 MW | 3,839 MW |
| 2026-10-20T13:00Z | 20,387 MW | 10,295 MW | 9,093 MW | 5,488 MW | 3,840 MW |
| 2026-10-20T14:00Z | 13,034 MW | 7,886 MW | 25,892 MW | 4,801 MW | 3,840 MW |
| 2026-10-20T15:00Z | 11,223 MW | 8,550 MW | 30,997 MW | 4,884 MW | 3,840 MW |
| 2026-10-20T16:00Z | 11,264 MW | 9,428 MW | 30,737 MW | 4,704 MW | 3,839 MW |
| 2026-10-20T17:00Z | 11,149 MW | 8,125 MW | 29,960 MW | 4,240 MW | 3,839 MW |
| 2026-10-20T18:00Z | 11,889 MW | 6,933 MW | 29,970 MW | 4,076 MW | 3,838 MW |
| 2026-10-20T19:00Z | 12,695 MW | 6,457 MW | 30,842 MW | 4,430 MW | 3,836 MW |
| 2026-10-20T20:00Z | 13,553 MW | 6,733 MW | 30,721 MW | 4,980 MW | 3,835 MW |
| 2026-10-20T21:00Z | 15,724 MW | 7,081 MW | 28,835 MW | 5,451 MW | 3,834 MW |
| 2026-10-20T22:00Z | 20,828 MW | 7,984 MW | 20,599 MW | 6,266 MW | 3,833 MW |
| 2026-10-20T23:00Z | 26,638 MW | 8,497 MW | 4,248 MW | 7,927 MW | 3,832 MW |
| 2026-10-21T00:00Z | 28,156 MW | 10,007 MW | 41 MW | 8,553 MW | 3,833 MW |
| 2026-10-21T01:00Z | 27,606 MW | 13,277 MW | 0 MW | 8,333 MW | 3,833 MW |
| 2026-10-21T02:00Z | 26,557 MW | 14,820 MW | 0 MW | 7,734 MW | 3,832 MW |
| 2026-10-21T03:00Z | 25,416 MW | 15,336 MW | 1 MW | 7,738 MW | 3,831 MW |
| 2026-10-21T04:00Z | 23,429 MW | 15,847 MW | 9 MW | 7,171 MW | 3,830 MW |
| 2026-10-21T05:00Z | 22,560 MW | 16,001 MW | 5 MW | 6,463 MW | 3,834 MW |
| 2026-10-21T06:00Z | 21,937 MW | 15,417 MW | 1 MW | 5,952 MW | 3,837 MW |
| 2026-10-21T07:00Z | 22,014 MW | 14,392 MW | 1 MW | 5,959 MW | 3,838 MW |
| 2026-10-21T08:00Z | 22,494 MW | 13,232 MW | 1 MW | 6,120 MW | 3,839 MW |
| 2026-10-21T09:00Z | 22,322 MW | 11,851 MW | 0 MW | 5,940 MW | 3,838 MW |
| 2026-10-21T10:00Z | 23,882 MW | 10,709 MW | 1 MW | 6,272 MW | 3,839 MW |
| 2026-10-21T11:00Z | 24,475 MW | 9,347 MW | 1 MW | 6,869 MW | 3,839 MW |
| 2026-10-21T12:00Z | 24,728 MW | 8,172 MW | 162 MW | 6,616 MW | 3,840 MW |
| 2026-10-21T13:00Z | 23,705 MW | 6,857 MW | 8,298 MW | 6,117 MW | 3,839 MW |
| 2026-10-21T14:00Z | 19,370 MW | 4,098 MW | 24,426 MW | 5,146 MW | 3,839 MW |
| 2026-10-21T15:00Z | 19,338 MW | 3,017 MW | 28,815 MW | 4,622 MW | 3,839 MW |
| 2026-10-21T16:00Z | 20,118 MW | 2,799 MW | 29,009 MW | 4,306 MW | 3,839 MW |
| 2026-10-21T17:00Z | 19,661 MW | 1,999 MW | 28,459 MW | 4,412 MW | 3,839 MW |
| 2026-10-21T18:00Z | 20,395 MW | 1,673 MW | 28,458 MW | 4,527 MW | 3,840 MW |
| 2026-10-21T19:00Z | 21,333 MW | 1,979 MW | 28,239 MW | 5,104 MW | 3,840 MW |
| 2026-10-21T20:00Z | 23,037 MW | 2,527 MW | 27,565 MW | 5,495 MW | 3,840 MW |
| 2026-10-21T21:00Z | 25,940 MW | 3,142 MW | 24,514 MW | 6,199 MW | 3,843 MW |
| 2026-10-21T22:00Z | 30,023 MW | 3,585 MW | 17,232 MW | 7,095 MW | 3,843 MW |
| 2026-10-21T23:00Z | 33,030 MW | 4,189 MW | 3,615 MW | 7,796 MW | 3,842 MW |
| 2026-10-22T00:00Z | 33,415 MW | 6,358 MW | 27 MW | 8,051 MW | 3,843 MW |
| 2026-10-22T01:00Z | 32,923 MW | 9,633 MW | 0 MW | 8,166 MW | 3,845 MW |
| 2026-10-22T02:00Z | 31,543 MW | 11,690 MW | 0 MW | 8,158 MW | 3,846 MW |
| 2026-10-22T03:00Z | 29,551 MW | 12,569 MW | 0 MW | 8,072 MW | 3,846 MW |
| 2026-10-22T04:00Z | 27,253 MW | 12,924 MW | 0 MW | 7,609 MW | 3,846 MW |
| 2026-10-22T05:00Z | 25,789 MW | 12,854 MW | 11 MW | 6,605 MW | 3,846 MW |
| 2026-10-22T06:00Z | 26,251 MW | 11,419 MW | 4 MW | 6,482 MW | 3,847 MW |
| 2026-10-22T07:00Z | 26,249 MW | 9,622 MW | 7 MW | 6,256 MW | 3,847 MW |
| 2026-10-22T08:00Z | 26,498 MW | 8,164 MW | 31 MW | 6,464 MW | 3,848 MW |
| 2026-10-22T09:00Z | 26,841 MW | 6,464 MW | 9 MW | 6,672 MW | 3,848 MW |
| 2026-10-22T10:00Z | 27,865 MW | 5,382 MW | 0 MW | 6,920 MW | 3,849 MW |
| 2026-10-22T11:00Z | 27,765 MW | 5,063 MW | 6 MW | 7,136 MW | 3,850 MW |
| 2026-10-22T12:00Z | 28,322 MW | 4,891 MW | 199 MW | 7,270 MW | 3,850 MW |
| 2026-10-22T13:00Z | 26,688 MW | 4,398 MW | 8,528 MW | 6,848 MW | 3,849 MW |
| 2026-10-22T14:00Z | 20,192 MW | 2,972 MW | 23,865 MW | 5,607 MW | 3,849 MW |
| 2026-10-22T15:00Z | 19,312 MW | 1,583 MW | 28,945 MW | 5,258 MW | 3,847 MW |
| 2026-10-22T16:00Z | 19,775 MW | 1,660 MW | 29,219 MW | 5,343 MW | 3,848 MW |
| 2026-10-22T17:00Z | 19,697 MW | 2,432 MW | 29,295 MW | 5,492 MW | 3,847 MW |
| 2026-10-22T18:00Z | 19,154 MW | 4,110 MW | 28,660 MW | 5,580 MW | 3,847 MW |
| 2026-10-22T19:00Z | 18,406 MW | 5,680 MW | 28,859 MW | 5,568 MW | 3,845 MW |
| 2026-10-22T20:00Z | 19,592 MW | 6,204 MW | 28,672 MW | 5,590 MW | 3,845 MW |
| 2026-10-22T21:00Z | 21,049 MW | 7,078 MW | 26,597 MW | 5,584 MW | 3,844 MW |
| 2026-10-22T22:00Z | 26,115 MW | 8,009 MW | 16,257 MW | 6,406 MW | 3,845 MW |
| 2026-10-22T23:00Z | 30,011 MW | 8,676 MW | 2,268 MW | 7,994 MW | 3,845 MW |
| 2026-10-23T00:00Z | 29,749 MW | 11,192 MW | 6 MW | 8,204 MW | 3,846 MW |
| 2026-10-23T01:00Z | 28,167 MW | 14,511 MW | 9 MW | 7,784 MW | 3,846 MW |
| 2026-10-23T02:00Z | 27,038 MW | 16,417 MW | 0 MW | 7,508 MW | 3,846 MW |
| 2026-10-23T03:00Z | 24,703 MW | 17,789 MW | 0 MW | 6,702 MW | 3,848 MW |
| 2026-10-23T04:00Z | 21,937 MW | 18,968 MW | 0 MW | 6,356 MW | 3,853 MW |
| 2026-10-23T05:00Z | 19,679 MW | 19,712 MW | 0 MW | 5,715 MW | 3,854 MW |
| 2026-10-23T06:00Z | 19,250 MW | 19,549 MW | 0 MW | 5,215 MW | 3,853 MW |
| 2026-10-23T07:00Z | 18,960 MW | 18,601 MW | 0 MW | 5,210 MW | 3,854 MW |
| 2026-10-23T08:00Z | 19,200 MW | 17,350 MW | 0 MW | 5,293 MW | 3,854 MW |
| 2026-10-23T09:00Z | 19,502 MW | 15,853 MW | 0 MW | 5,481 MW | 3,854 MW |
| 2026-10-23T10:00Z | 20,227 MW | 14,741 MW | 0 MW | 5,668 MW | 3,854 MW |
| 2026-10-23T11:00Z | 20,794 MW | 14,356 MW | 0 MW | 6,039 MW | 3,854 MW |
| 2026-10-23T12:00Z | 21,131 MW | 13,939 MW | 201 MW | 5,889 MW | 3,855 MW |
| 2026-10-23T13:00Z | 18,062 MW | 13,160 MW | 9,052 MW | 5,451 MW | 3,855 MW |
| 2026-10-23T14:00Z | 12,139 MW | 11,429 MW | 23,976 MW | 4,163 MW | 3,855 MW |
| 2026-10-23T15:00Z | 10,992 MW | 12,094 MW | 27,529 MW | 3,444 MW | 3,856 MW |
| 2026-10-23T16:00Z | 11,012 MW | 12,578 MW | 28,180 MW | 3,310 MW | 3,855 MW |
| 2026-10-23T17:00Z | 11,535 MW | 12,801 MW | 27,614 MW | 3,531 MW | 3,854 MW |
| 2026-10-23T18:00Z | 12,543 MW | 13,428 MW | 26,931 MW | 3,524 MW | 3,853 MW |
| 2026-10-23T19:00Z | 13,300 MW | 13,947 MW | 28,067 MW | 3,863 MW | 3,851 MW |
| 2026-10-23T20:00Z | 13,897 MW | 14,487 MW | 27,997 MW | 4,115 MW | 3,849 MW |
| 2026-10-23T21:00Z | 15,448 MW | 14,976 MW | 27,025 MW | 4,215 MW | 3,849 MW |
| 2026-10-23T22:00Z | 19,163 MW | 17,127 MW | 17,756 MW | 4,774 MW | 3,849 MW |
| 2026-10-23T23:00Z | 23,019 MW | 18,188 MW | 3,100 MW | 5,964 MW | 3,848 MW |
| 2026-10-24T00:00Z | 22,755 MW | 19,856 MW | 5 MW | 6,580 MW | 3,849 MW |
| 2026-10-24T01:00Z | 21,642 MW | 23,149 MW | 1 MW | 6,626 MW | 3,849 MW |
| 2026-10-24T02:00Z | 20,181 MW | 25,120 MW | 2 MW | 6,134 MW | 3,851 MW |
| 2026-10-24T03:00Z | 19,127 MW | 25,500 MW | 1 MW | 5,842 MW | 3,850 MW |
| 2026-10-24T04:00Z | 17,802 MW | 25,190 MW | 2 MW | 5,261 MW | 3,847 MW |
| 2026-10-24T05:00Z | 16,381 MW | 24,117 MW | 2 MW | 4,855 MW | 3,846 MW |
| 2026-10-24T06:00Z | 16,913 MW | 22,266 MW | 1 MW | 4,694 MW | 3,846 MW |
| 2026-10-24T07:00Z | 16,750 MW | 20,705 MW | 1 MW | 4,454 MW | 3,846 MW |
| 2026-10-24T08:00Z | 17,480 MW | 18,621 MW | 1 MW | 4,707 MW | 3,847 MW |
| 2026-10-24T09:00Z | 17,967 MW | 16,988 MW | 1 MW | 5,143 MW | 3,847 MW |
| 2026-10-24T10:00Z | 18,137 MW | 15,850 MW | 1 MW | 5,335 MW | 3,848 MW |
| 2026-10-24T11:00Z | 18,786 MW | 15,228 MW | 1 MW | 5,339 MW | 3,848 MW |
| 2026-10-24T12:00Z | 18,538 MW | 15,112 MW | 167 MW | 5,363 MW | 3,848 MW |
| 2026-10-24T13:00Z | 15,756 MW | 13,985 MW | 7,869 MW | 5,264 MW | 3,848 MW |
| 2026-10-24T14:00Z | 11,985 MW | 11,958 MW | 22,002 MW | 4,046 MW | 3,848 MW |
| 2026-10-24T15:00Z | 11,097 MW | 14,770 MW | 25,074 MW | 3,202 MW | 3,848 MW |
| 2026-10-24T16:00Z | 10,753 MW | 17,220 MW | 24,983 MW | 3,059 MW | 3,848 MW |
| 2026-10-24T17:00Z | 10,740 MW | 16,642 MW | 25,489 MW | 3,046 MW | 3,848 MW |
| 2026-10-24T18:00Z | 11,213 MW | 15,864 MW | 26,092 MW | 3,046 MW | 3,848 MW |
| 2026-10-24T19:00Z | 11,803 MW | 16,119 MW | 25,678 MW | 3,260 MW | 3,846 MW |
| 2026-10-24T20:00Z | 13,135 MW | 17,067 MW | 24,487 MW | 3,838 MW | 3,846 MW |
| 2026-10-24T21:00Z | 14,865 MW | 17,908 MW | 21,750 MW | 4,135 MW | 3,845 MW |
| 2026-10-24T22:00Z | 19,788 MW | 19,450 MW | 12,970 MW | 4,961 MW | 3,845 MW |
| 2026-10-24T23:00Z | 22,227 MW | 18,359 MW | 1,788 MW | 6,642 MW | 3,845 MW |
| 2026-10-25T00:00Z | 23,150 MW | 18,119 MW | 1 MW | 7,165 MW | 3,845 MW |
| 2026-10-25T01:00Z | 22,984 MW | 20,064 MW | 0 MW | 7,096 MW | 3,845 MW |
| 2026-10-25T02:00Z | 21,727 MW | 22,172 MW | 0 MW | 6,864 MW | 3,845 MW |
| 2026-10-25T03:00Z | 20,056 MW | 23,180 MW | 0 MW | 6,422 MW | 3,846 MW |
| 2026-10-25T04:00Z | 18,999 MW | 23,328 MW | 0 MW | 5,547 MW | 3,846 MW |
| 2026-10-25T05:00Z | 18,219 MW | 22,364 MW | 0 MW | 5,257 MW | 3,847 MW |
| 2026-10-25T06:00Z | 17,942 MW | 21,117 MW | 0 MW | 5,141 MW | 3,846 MW |
| 2026-10-25T07:00Z | 17,094 MW | 20,521 MW | 0 MW | 4,886 MW | 3,847 MW |
| 2026-10-25T08:00Z | 16,688 MW | 19,828 MW | 0 MW | 4,829 MW | 3,848 MW |
| 2026-10-25T09:00Z | 17,136 MW | 18,430 MW | 0 MW | 5,189 MW | 3,848 MW |
| 2026-10-25T10:00Z | 17,649 MW | 17,094 MW | 0 MW | 5,567 MW | 3,848 MW |
| 2026-10-25T11:00Z | 18,068 MW | 16,171 MW | 0 MW | 5,635 MW | 3,848 MW |
| 2026-10-25T12:00Z | 18,666 MW | 15,741 MW | 145 MW | 5,841 MW | 3,849 MW |
| 2026-10-25T13:00Z | 16,497 MW | 15,333 MW | 5,181 MW | 5,862 MW | 3,848 MW |
| 2026-10-25T14:00Z | 13,475 MW | 14,630 MW | 15,255 MW | 5,480 MW | 3,849 MW |
| 2026-10-25T15:00Z | 12,099 MW | 16,854 MW | 18,933 MW | 4,429 MW | 3,849 MW |
| 2026-10-25T16:00Z | 11,768 MW | 19,195 MW | 20,923 MW | 4,033 MW | 3,850 MW |
| 2026-10-25T17:00Z | 12,533 MW | 18,813 MW | 20,750 MW | 4,026 MW | 3,849 MW |
| 2026-10-25T18:00Z | 13,186 MW | 17,818 MW | 19,647 MW | 4,856 MW | 3,849 MW |
| 2026-10-25T19:00Z | 13,931 MW | 17,732 MW | 19,400 MW | 5,163 MW | 3,848 MW |
| 2026-10-25T20:00Z | 15,955 MW | 18,248 MW | 15,788 MW | 4,857 MW | 3,848 MW |
| 2026-10-25T21:00Z | 19,412 MW | 18,607 MW | 11,026 MW | 5,500 MW | 3,848 MW |
| 2026-10-25T22:00Z | 22,473 MW | 18,531 MW | 5,219 MW | 6,742 MW | 3,848 MW |
| 2026-10-25T23:00Z | 23,070 MW | 17,936 MW | 932 MW | 7,268 MW | 3,848 MW |
| 2026-10-26T00:00Z | 23,304 MW | 17,218 MW | 0 MW | 7,914 MW | 3,848 MW |
| 2026-10-26T01:00Z | 23,252 MW | 17,610 MW | 0 MW | 7,969 MW | 3,849 MW |
| 2026-10-26T02:00Z | 22,897 MW | 18,949 MW | 0 MW | 7,444 MW | 3,849 MW |
| 2026-10-26T03:00Z | 21,552 MW | 19,578 MW | 0 MW | 7,107 MW | 3,850 MW |
| 2026-10-26T04:00Z | 20,555 MW | 19,646 MW | 0 MW | 6,249 MW | 3,850 MW |
| 2026-10-26T05:00Z | 19,892 MW | 19,623 MW | 0 MW | 5,706 MW | 3,851 MW |
| 2026-10-26T06:00Z | 19,826 MW | 19,146 MW | 0 MW | 5,670 MW | 3,851 MW |
| 2026-10-26T07:00Z | 19,430 MW | 18,596 MW | 0 MW | 5,389 MW | 3,851 MW |
| 2026-10-26T08:00Z | 19,435 MW | 17,230 MW | 0 MW | 5,205 MW | 3,851 MW |
| 2026-10-26T09:00Z | 20,784 MW | 14,380 MW | 0 MW | 5,896 MW | 3,851 MW |
| 2026-10-26T10:00Z | 21,918 MW | 12,292 MW | 0 MW | 6,456 MW | 3,851 MW |
| 2026-10-26T11:00Z | 22,672 MW | 11,951 MW | 0 MW | 7,182 MW | 3,851 MW |
| 2026-10-26T12:00Z | 22,799 MW | 11,407 MW | 84 MW | 7,080 MW | 3,852 MW |
| 2026-10-26T13:00Z | 21,857 MW | 11,447 MW | 5,120 MW | 6,255 MW | 3,854 MW |
| 2026-10-26T14:00Z | 19,518 MW | 10,615 MW | 14,391 MW | 5,500 MW | 3,853 MW |
| 2026-10-26T15:00Z | 18,828 MW | 9,887 MW | 17,832 MW | 5,420 MW | 3,853 MW |
| 2026-10-26T16:00Z | 18,136 MW | 10,244 MW | 19,281 MW | 4,899 MW | 3,852 MW |
| 2026-10-26T17:00Z | 20,477 MW | 8,486 MW | 19,579 MW | 4,899 MW | 3,851 MW |
| 2026-10-26T18:00Z | 21,885 MW | 7,583 MW | 18,415 MW | 5,869 MW | 3,851 MW |
| 2026-10-26T19:00Z | 23,430 MW | 6,810 MW | 18,834 MW | 6,521 MW | 3,850 MW |
| 2026-10-26T20:00Z | 24,891 MW | 6,107 MW | 17,946 MW | 7,168 MW | 3,850 MW |
| 2026-10-26T21:00Z | 27,733 MW | 6,101 MW | 14,219 MW | 7,757 MW | 3,848 MW |
| 2026-10-26T22:00Z | 30,014 MW | 7,087 MW | 6,940 MW | 7,756 MW | 3,848 MW |
| 2026-10-26T23:00Z | 30,902 MW | 7,544 MW | 823 MW | 7,759 MW | 3,849 MW |
| 2026-10-27T00:00Z | 31,007 MW | 8,903 MW | 0 MW | 7,763 MW | 3,849 MW |
| 2026-10-27T01:00Z | 31,091 MW | 9,427 MW | 0 MW | 7,645 MW | 3,849 MW |
| 2026-10-27T02:00Z | 30,634 MW | 9,226 MW | 0 MW | 7,539 MW | 3,849 MW |
| 2026-10-27T03:00Z | 30,110 MW | 9,616 MW | 0 MW | 7,448 MW | 3,849 MW |
| 2026-10-27T04:00Z | 28,878 MW | 10,130 MW | 0 MW | 7,318 MW | 3,849 MW |
| 2026-10-27T05:00Z | 27,945 MW | 9,897 MW | 0 MW | 6,619 MW | 3,849 MW |
| 2026-10-27T06:00Z | 27,766 MW | 9,299 MW | 0 MW | 6,399 MW | 3,850 MW |
| 2026-10-27T07:00Z | 27,981 MW | 8,407 MW | 0 MW | 6,519 MW | 3,850 MW |
| 2026-10-27T08:00Z | 27,649 MW | 8,357 MW | 0 MW | 6,568 MW | 3,850 MW |
| 2026-10-27T09:00Z | 27,067 MW | 8,170 MW | 0 MW | 6,547 MW | 3,850 MW |
| 2026-10-27T10:00Z | 27,261 MW | 7,565 MW | 0 MW | 6,715 MW | 3,850 MW |
| 2026-10-27T11:00Z | 27,847 MW | 7,163 MW | 0 MW | 7,086 MW | 3,850 MW |
| 2026-10-27T12:00Z | 28,707 MW | 7,397 MW | 23 MW | 6,731 MW | 3,850 MW |
| 2026-10-27T13:00Z | 28,103 MW | 7,692 MW | 2,869 MW | 6,589 MW | 3,850 MW |
| 2026-10-27T14:00Z | 25,315 MW | 7,018 MW | 12,413 MW | 5,755 MW | 3,850 MW |
| 2026-10-27T15:00Z | 22,054 MW | 7,696 MW | 18,541 MW | 4,980 MW | 3,850 MW |
| 2026-10-27T16:00Z | 20,430 MW | 8,873 MW | 22,038 MW | 4,743 MW | 3,850 MW |
| 2026-10-27T17:00Z | 19,478 MW | 9,509 MW | 23,654 MW | 4,549 MW | 3,850 MW |
| 2026-10-27T18:00Z | 19,978 MW | 9,408 MW | 23,928 MW | 4,713 MW | 3,849 MW |
| 2026-10-27T19:00Z | 20,279 MW | 9,816 MW | 23,870 MW | 4,804 MW | 3,848 MW |
| 2026-10-27T20:00Z | 19,870 MW | 10,667 MW | 23,520 MW | 4,802 MW | 3,848 MW |
| 2026-10-27T21:00Z | 20,224 MW | 11,545 MW | 21,600 MW | 4,696 MW | 3,847 MW |
| 2026-10-27T22:00Z | 23,983 MW | 12,135 MW | 13,238 MW | 5,603 MW | 3,847 MW |
| 2026-10-27T23:00Z | 26,846 MW | 11,658 MW | 2,154 MW | 6,691 MW | 3,847 MW |
| 2026-10-28T00:00Z | 27,312 MW | 13,247 MW | 1 MW | 7,354 MW | 3,848 MW |
| 2026-10-28T01:00Z | 26,773 MW | 17,367 MW | 0 MW | 7,461 MW | 3,848 MW |
| 2026-10-28T02:00Z | 24,567 MW | 20,535 MW | 1 MW | 6,821 MW | 3,848 MW |
| 2026-10-28T03:00Z | 23,372 MW | 21,926 MW | 1 MW | 6,029 MW | 3,848 MW |
| 2026-10-28T04:00Z | 21,726 MW | 22,437 MW | 1 MW | 5,567 MW | 3,848 MW |
| 2026-10-28T05:00Z | 20,233 MW | 22,190 MW | 1 MW | 5,333 MW | 3,847 MW |
| 2026-10-28T06:00Z | 19,415 MW | 21,674 MW | 1 MW | 5,142 MW | 3,847 MW |
| 2026-10-28T07:00Z | 19,394 MW | 21,052 MW | 1 MW | 4,793 MW | 3,848 MW |
| 2026-10-28T08:00Z | 19,483 MW | 19,576 MW | 1 MW | 4,592 MW | 3,848 MW |
| 2026-10-28T09:00Z | 20,551 MW | 17,857 MW | 1 MW | 4,685 MW | 3,848 MW |
| 2026-10-28T10:00Z | 21,565 MW | 16,650 MW | 0 MW | 5,114 MW | 3,848 MW |
| 2026-10-28T11:00Z | 22,389 MW | 16,040 MW | 1 MW | 5,482 MW | 3,849 MW |
| 2026-10-28T12:00Z | 22,842 MW | 15,188 MW | 50 MW | 5,688 MW | 3,849 MW |
| 2026-10-28T13:00Z | 23,093 MW | 13,585 MW | 3,113 MW | 5,721 MW | 3,849 MW |
| 2026-10-28T14:00Z | 21,714 MW | 11,450 MW | 11,307 MW | 5,564 MW | 3,849 MW |
| 2026-10-28T15:00Z | 19,536 MW | 12,748 MW | 17,479 MW | 5,085 MW | 3,853 MW |
| 2026-10-28T16:00Z | 19,222 MW | 12,521 MW | 20,663 MW | 4,995 MW | 3,850 MW |
| 2026-10-28T17:00Z | 19,813 MW | 11,158 MW | 21,703 MW | 5,454 MW | 3,848 MW |
| 2026-10-28T18:00Z | 20,514 MW | 9,542 MW | 22,370 MW | 5,532 MW | 3,847 MW |
| 2026-10-28T19:00Z | 21,294 MW | 8,984 MW | 22,913 MW | 5,767 MW | 3,846 MW |
| 2026-10-28T20:00Z | 22,030 MW | 9,158 MW | 21,933 MW | 6,152 MW | 3,846 MW |
| 2026-10-28T21:00Z | 24,018 MW | 9,068 MW | 18,757 MW | 7,401 MW | 3,846 MW |
| 2026-10-28T22:00Z | 26,541 MW | 9,270 MW | 11,257 MW | 8,382 MW | 3,846 MW |
| 2026-10-28T23:00Z | 28,187 MW | 9,486 MW | 1,640 MW | 8,712 MW | 3,846 MW |
| 2026-10-29T00:00Z | 28,901 MW | 11,901 MW | 0 MW | 8,708 MW | 3,846 MW |
| 2026-10-29T01:00Z | 28,907 MW | 15,304 MW | 0 MW | 8,563 MW | 3,846 MW |
| 2026-10-29T02:00Z | 27,730 MW | 17,623 MW | 0 MW | 8,495 MW | 3,847 MW |
| 2026-10-29T03:00Z | 25,610 MW | 19,242 MW | 0 MW | 8,031 MW | 3,847 MW |
| 2026-10-29T04:00Z | 25,133 MW | 19,796 MW | 0 MW | 7,264 MW | 3,847 MW |
| 2026-10-29T05:00Z | 24,171 MW | 19,680 MW | 0 MW | 6,481 MW | 3,846 MW |
| 2026-10-29T06:00Z | 24,045 MW | 18,915 MW | 0 MW | 6,394 MW | 3,846 MW |
| 2026-10-29T07:00Z | 24,025 MW | 18,286 MW | 0 MW | 6,866 MW | 3,847 MW |
| 2026-10-29T08:00Z | 24,051 MW | 16,946 MW | 0 MW | 6,987 MW | 3,847 MW |
| 2026-10-29T09:00Z | 24,071 MW | 14,624 MW | 0 MW | 6,590 MW | 3,849 MW |
| 2026-10-29T10:00Z | 25,242 MW | 11,970 MW | 0 MW | 6,902 MW | 3,854 MW |
| 2026-10-29T11:00Z | 26,928 MW | 10,044 MW | 0 MW | 7,695 MW | 3,854 MW |
| 2026-10-29T12:00Z | 27,564 MW | 8,731 MW | 71 MW | 8,413 MW | 3,854 MW |
| 2026-10-29T13:00Z | 27,679 MW | 7,450 MW | 2,579 MW | 8,729 MW | 3,853 MW |
| 2026-10-29T14:00Z | 27,540 MW | 5,681 MW | 8,255 MW | 8,633 MW | 3,850 MW |
| 2026-10-29T15:00Z | 27,244 MW | 5,284 MW | 12,202 MW | 7,945 MW | 3,849 MW |
| 2026-10-29T16:00Z | 27,576 MW | 5,920 MW | 14,534 MW | 7,621 MW | 3,848 MW |
| 2026-10-29T17:00Z | 27,714 MW | 6,126 MW | 15,490 MW | 7,644 MW | 3,847 MW |
| 2026-10-29T18:00Z | 27,352 MW | 6,702 MW | 14,949 MW | 7,653 MW | 3,846 MW |
| 2026-10-29T19:00Z | 28,114 MW | 7,180 MW | 12,964 MW | 8,115 MW | 3,844 MW |
| 2026-10-29T20:00Z | 28,720 MW | 8,693 MW | 9,965 MW | 8,622 MW | 3,844 MW |
| 2026-10-29T21:00Z | 29,263 MW | 10,446 MW | 7,535 MW | 8,309 MW | 3,844 MW |
| 2026-10-29T22:00Z | 29,152 MW | 12,452 MW | 3,487 MW | 8,101 MW | 3,844 MW |
| 2026-10-29T23:00Z | 29,109 MW | 14,217 MW | 352 MW | 8,263 MW | 3,844 MW |
| 2026-10-30T00:00Z | 29,234 MW | 14,057 MW | 0 MW | 8,296 MW | 3,845 MW |
| 2026-10-30T01:00Z | 29,010 MW | 13,937 MW | 0 MW | 8,392 MW | 3,845 MW |
| 2026-10-30T02:00Z | 28,777 MW | 13,035 MW | 0 MW | 8,645 MW | 3,845 MW |
| 2026-10-30T03:00Z | 28,185 MW | 12,581 MW | 0 MW | 8,657 MW | 3,846 MW |
| 2026-10-30T04:00Z | 27,663 MW | 12,241 MW | 0 MW | 7,705 MW | 3,846 MW |
| 2026-10-30T05:00Z | 26,794 MW | 11,626 MW | 0 MW | 6,767 MW | 3,846 MW |
| 2026-10-30T06:00Z | 26,322 MW | 11,279 MW | 0 MW | 6,825 MW | 3,846 MW |
| 2026-10-30T07:00Z | 25,835 MW | 11,328 MW | 0 MW | 6,627 MW | 3,846 MW |
| 2026-10-30T08:00Z | 25,518 MW | 10,917 MW | 0 MW | 6,444 MW | 3,846 MW |
| 2026-10-30T09:00Z | 25,477 MW | 10,580 MW | 0 MW | 6,541 MW | 3,847 MW |
| 2026-10-30T10:00Z | 25,692 MW | 10,813 MW | 0 MW | 6,822 MW | 3,847 MW |
| 2026-10-30T11:00Z | 26,536 MW | 10,203 MW | 0 MW | 7,478 MW | 3,848 MW |
| 2026-10-30T12:00Z | 27,405 MW | 10,247 MW | 25 MW | 7,571 MW | 3,848 MW |
| 2026-10-30T13:00Z | 27,590 MW | 10,233 MW | 1,364 MW | 7,572 MW | 3,848 MW |
| 2026-10-30T14:00Z | 27,717 MW | 9,527 MW | 3,775 MW | 7,633 MW | 3,848 MW |
| 2026-10-30T15:00Z | 27,944 MW | 9,700 MW | 5,612 MW | 7,761 MW | 3,847 MW |
| 2026-10-30T16:00Z | 28,245 MW | 10,698 MW | 7,538 MW | 8,215 MW | 3,847 MW |
| 2026-10-30T17:00Z | 28,247 MW | 10,557 MW | 9,252 MW | 8,580 MW | 3,847 MW |
| 2026-10-30T18:00Z | 27,877 MW | 9,507 MW | 9,626 MW | 8,279 MW | 3,848 MW |
| 2026-10-30T19:00Z | 28,459 MW | 8,577 MW | 8,195 MW | 7,966 MW | 3,847 MW |
| 2026-10-30T20:00Z | 29,128 MW | 8,271 MW | 7,096 MW | 8,048 MW | 3,848 MW |
| 2026-10-30T21:00Z | 29,657 MW | 7,939 MW | 5,558 MW | 8,363 MW | 3,847 MW |
| 2026-10-30T22:00Z | 31,028 MW | 7,288 MW | 2,971 MW | 8,417 MW | 3,847 MW |
| 2026-10-30T23:00Z | 32,563 MW | 7,268 MW | 648 MW | 8,441 MW | 3,847 MW |
| 2026-10-31T00:00Z | 32,927 MW | 7,742 MW | 0 MW | 8,492 MW | 3,847 MW |
| 2026-10-31T01:00Z | 32,610 MW | 7,903 MW | 0 MW | 8,482 MW | 3,847 MW |
| 2026-10-31T02:00Z | 32,028 MW | 7,497 MW | 0 MW | 8,481 MW | 3,847 MW |
| 2026-10-31T03:00Z | 31,961 MW | 6,993 MW | 0 MW | 8,511 MW | 3,848 MW |
| 2026-10-31T04:00Z | 31,127 MW | 6,744 MW | 0 MW | 8,482 MW | 3,848 MW |
| 2026-10-31T05:00Z | 29,809 MW | 6,252 MW | 0 MW | 8,618 MW | 3,848 MW |
| 2026-10-31T06:00Z | 29,785 MW | 5,010 MW | 0 MW | 8,753 MW | 3,848 MW |
| 2026-10-31T07:00Z | 29,846 MW | 3,449 MW | 0 MW | 8,806 MW | 3,848 MW |
| 2026-10-31T08:00Z | 29,828 MW | 2,453 MW | 0 MW | 8,854 MW | 3,848 MW |
| 2026-10-31T09:00Z | 29,872 MW | 2,064 MW | 0 MW | 8,872 MW | 3,848 MW |
| 2026-10-31T10:00Z | 30,065 MW | 1,630 MW | 1 MW | 8,864 MW | 3,848 MW |
| 2026-10-31T11:00Z | 30,945 MW | 1,021 MW | 1 MW | 8,866 MW | 3,848 MW |
| 2026-10-31T12:00Z | 31,419 MW | 898 MW | 36 MW | 8,798 MW | 3,849 MW |
| 2026-10-31T13:00Z | 31,662 MW | 907 MW | 1,538 MW | 8,753 MW | 3,849 MW |
| 2026-10-31T14:00Z | 31,567 MW | 846 MW | 4,833 MW | 8,612 MW | 3,849 MW |
| 2026-10-31T15:00Z | 31,027 MW | 805 MW | 8,834 MW | 8,640 MW | 3,849 MW |
| 2026-10-31T16:00Z | 30,261 MW | 757 MW | 12,662 MW | 8,523 MW | 3,848 MW |
| 2026-10-31T17:00Z | 30,120 MW | 695 MW | 15,841 MW | 8,689 MW | 3,848 MW |
| 2026-10-31T18:00Z | 29,999 MW | 820 MW | 17,042 MW | 8,689 MW | 3,846 MW |
| 2026-10-31T19:00Z | 30,241 MW | 1,148 MW | 17,201 MW | 8,459 MW | 3,845 MW |
| 2026-10-31T20:00Z | 30,586 MW | 1,802 MW | 16,430 MW | 8,470 MW | 3,846 MW |
| 2026-10-31T21:00Z | 31,241 MW | 2,085 MW | 15,136 MW | 8,433 MW | 3,846 MW |
| 2026-10-31T22:00Z | 32,293 MW | 2,132 MW | 9,791 MW | 8,634 MW | 3,847 MW |
| 2026-10-31T23:00Z | 33,769 MW | 2,488 MW | 1,326 MW | 8,783 MW | 3,847 MW |
| 2026-11-01T00:00Z | 33,993 MW | 3,254 MW | 0 MW | 8,773 MW | 3,847 MW |
| 2026-11-01T01:00Z | 34,244 MW | 3,943 MW | 0 MW | 8,661 MW | 3,847 MW |
| 2026-11-01T02:00Z | 34,440 MW | 4,277 MW | 0 MW | 8,682 MW | 3,847 MW |
| 2026-11-01T03:00Z | 34,175 MW | 4,320 MW | 0 MW | 8,649 MW | 3,848 MW |
| 2026-11-01T04:00Z | 33,512 MW | 4,463 MW | 0 MW | 8,658 MW | 3,848 MW |
| 2026-11-01T05:00Z | 31,048 MW | 5,079 MW | 0 MW | 8,476 MW | 3,848 MW |
| 2026-11-01T06:00Z | 29,970 MW | 5,556 MW | 0 MW | 8,270 MW | 3,848 MW |
| 2026-11-01T07:00Z | 29,783 MW | 4,993 MW | 0 MW | 7,948 MW | 3,849 MW |
| 2026-11-01T08:00Z | 29,837 MW | 4,487 MW | 0 MW | 7,403 MW | 3,849 MW |
| 2026-11-01T09:00Z | 29,207 MW | 4,379 MW | 0 MW | 7,051 MW | 3,849 MW |
| 2026-11-01T10:00Z | 28,778 MW | 4,799 MW | 0 MW | 6,979 MW | 3,849 MW |
| 2026-11-01T11:00Z | 28,305 MW | 4,629 MW | 0 MW | 7,038 MW | 3,849 MW |
| 2026-11-01T12:00Z | 28,151 MW | 4,523 MW | 31 MW | 7,095 MW | 3,849 MW |
| 2026-11-01T13:00Z | 27,345 MW | 4,695 MW | 3,420 MW | 6,857 MW | 3,849 MW |
| 2026-11-01T14:00Z | 25,310 MW | 4,725 MW | 10,789 MW | 6,382 MW | 3,848 MW |
| 2026-11-01T15:00Z | 24,110 MW | 5,609 MW | 14,909 MW | 6,288 MW | 3,848 MW |
| 2026-11-01T16:00Z | 23,526 MW | 8,369 MW | 17,597 MW | 5,687 MW | 3,847 MW |
| 2026-11-01T17:00Z | 22,891 MW | 11,358 MW | 19,419 MW | 4,846 MW | 3,846 MW |
| 2026-11-01T18:00Z | 22,228 MW | 12,933 MW | 19,973 MW | 4,643 MW | 3,842 MW |
| 2026-11-01T19:00Z | 22,940 MW | 13,199 MW | 18,529 MW | 4,800 MW | 3,834 MW |
| 2026-11-01T20:00Z | 22,863 MW | 13,900 MW | 17,631 MW | 4,818 MW | 3,829 MW |
| 2026-11-01T21:00Z | 24,061 MW | 15,178 MW | 14,706 MW | 4,932 MW | 3,828 MW |
| 2026-11-01T22:00Z | 26,880 MW | 14,564 MW | 7,478 MW | 5,796 MW | 3,828 MW |
| 2026-11-01T23:00Z | 28,477 MW | 14,434 MW | 831 MW | 6,554 MW | 3,833 MW |
| 2026-11-02T00:00Z | 28,212 MW | 16,288 MW | 1 MW | 6,749 MW | 3,833 MW |
| 2026-11-02T01:00Z | 27,569 MW | 19,688 MW | 1 MW | 6,643 MW | 3,833 MW |
| 2026-11-02T02:00Z | 25,791 MW | 22,795 MW | 1 MW | 6,079 MW | 3,834 MW |
| 2026-11-02T03:00Z | 24,277 MW | 23,442 MW | 1 MW | 5,740 MW | 3,830 MW |
| 2026-11-02T04:00Z | 22,547 MW | 23,428 MW | 0 MW | 5,626 MW | 3,832 MW |
| 2026-11-02T05:00Z | 20,971 MW | 23,047 MW | 0 MW | 5,587 MW | 3,832 MW |
| 2026-11-02T06:00Z | 19,206 MW | 22,868 MW | 0 MW | 5,407 MW | 3,832 MW |
| 2026-11-02T07:00Z | 17,976 MW | 23,064 MW | 1 MW | 5,030 MW | 3,833 MW |
| 2026-11-02T08:00Z | 17,812 MW | 22,929 MW | 1 MW | 4,527 MW | 3,835 MW |
| 2026-11-02T09:00Z | 17,271 MW | 22,889 MW | 1 MW | 4,479 MW | 3,836 MW |
| 2026-11-02T10:00Z | 17,165 MW | 22,628 MW | 1 MW | 4,043 MW | 3,837 MW |
| 2026-11-02T11:00Z | 17,708 MW | 22,806 MW | 1 MW | 4,154 MW | 3,838 MW |
| 2026-11-02T12:00Z | 18,857 MW | 22,665 MW | 23 MW | 4,800 MW | 3,838 MW |
| 2026-11-02T13:00Z | 18,299 MW | 22,169 MW | 2,929 MW | 4,864 MW | 3,838 MW |
| 2026-11-02T14:00Z | 15,903 MW | 19,987 MW | 10,811 MW | 4,417 MW | 3,839 MW |
| 2026-11-02T15:00Z | 14,698 MW | 18,925 MW | 16,103 MW | 3,854 MW | 3,838 MW |
| 2026-11-02T16:00Z | 15,448 MW | 19,278 MW | 17,957 MW | 4,016 MW | 3,837 MW |
| 2026-11-02T17:00Z | 16,605 MW | 19,050 MW | 18,678 MW | 4,570 MW | 3,836 MW |
| 2026-11-02T18:00Z | 16,719 MW | 19,810 MW | 18,989 MW | 5,076 MW | 3,838 MW |
| 2026-11-02T19:00Z | 17,734 MW | 20,489 MW | 17,418 MW | 5,831 MW | 3,838 MW |
| 2026-11-02T20:00Z | 18,512 MW | 20,853 MW | 16,341 MW | 6,068 MW | 3,838 MW |
| 2026-11-02T21:00Z | 20,183 MW | 21,066 MW | 14,793 MW | 5,935 MW | 3,836 MW |
| 2026-11-02T22:00Z | 22,826 MW | 21,572 MW | 10,112 MW | 5,994 MW | 3,833 MW |
| 2026-11-02T23:00Z | 25,748 MW | 22,640 MW | 1,536 MW | 6,787 MW | 3,833 MW |
| 2026-11-03T00:00Z | 26,830 MW | 22,600 MW | 0 MW | 7,006 MW | 3,834 MW |
| 2026-11-03T01:00Z | 27,004 MW | 21,049 MW | 1 MW | 7,138 MW | 3,834 MW |
| 2026-11-03T02:00Z | 27,209 MW | 20,590 MW | 0 MW | 7,079 MW | 3,835 MW |
| 2026-11-03T03:00Z | 27,148 MW | 20,205 MW | 0 MW | 7,028 MW | 3,835 MW |
| 2026-11-03T04:00Z | 26,163 MW | 20,462 MW | 0 MW | 6,415 MW | 3,834 MW |
| 2026-11-03T05:00Z | 24,617 MW | 19,986 MW | 0 MW | 6,343 MW | 3,781 MW |
| 2026-11-03T06:00Z | 22,707 MW | 19,716 MW | 0 MW | 6,685 MW | 3,783 MW |
| 2026-11-03T07:00Z | 22,374 MW | 18,966 MW | 0 MW | 6,954 MW | 3,810 MW |
| 2026-11-03T08:00Z | 22,342 MW | 18,679 MW | 0 MW | 6,523 MW | 3,827 MW |
| 2026-11-03T09:00Z | 22,272 MW | 17,731 MW | 0 MW | 6,187 MW | 3,827 MW |
| 2026-11-03T10:00Z | 22,272 MW | 17,519 MW | 0 MW | 6,151 MW | 3,827 MW |
| 2026-11-03T11:00Z | 22,588 MW | 16,800 MW | 1 MW | 6,630 MW | 3,827 MW |
| 2026-11-03T12:00Z | 22,852 MW | 16,827 MW | 34 MW | 6,366 MW | 3,827 MW |
| 2026-11-03T13:00Z | 22,470 MW | 16,456 MW | 2,966 MW | 6,047 MW | 3,826 MW |
| 2026-11-03T14:00Z | 17,711 MW | 15,418 MW | 13,162 MW | 5,642 MW | 3,827 MW |
| 2026-11-03T15:00Z | 16,809 MW | 15,631 MW | 18,262 MW | 5,402 MW | 3,827 MW |
| 2026-11-03T16:00Z | 16,964 MW | 14,100 MW | 20,440 MW | 5,369 MW | 3,827 MW |
| 2026-11-03T17:00Z | 18,121 MW | 12,410 MW | 21,385 MW | 5,074 MW | 3,826 MW |
| 2026-11-03T18:00Z | 19,181 MW | 10,969 MW | 20,793 MW | 4,797 MW | 3,826 MW |
| 2026-11-03T19:00Z | 19,745 MW | 10,409 MW | 21,256 MW | 4,474 MW | 3,826 MW |
| 2026-11-03T20:00Z | 20,551 MW | 10,251 MW | 21,312 MW | 4,383 MW | 3,827 MW |
| 2026-11-03T21:00Z | 21,602 MW | 10,464 MW | 19,919 MW | 5,082 MW | 3,827 MW |
| 2026-11-03T22:00Z | 23,726 MW | 11,010 MW | 14,056 MW | 6,487 MW | 3,828 MW |
| 2026-11-03T23:00Z | 29,870 MW | 8,950 MW | 2,107 MW | 7,471 MW | 3,830 MW |
| 2026-11-04T00:00Z | 31,510 MW | 7,556 MW | 0 MW | 7,842 MW | 3,832 MW |
| 2026-11-04T01:00Z | 32,063 MW | 7,206 MW | 0 MW | 7,880 MW | 3,833 MW |
| 2026-11-04T02:00Z | 32,183 MW | 6,634 MW | 0 MW | 7,870 MW | 3,833 MW |
| 2026-11-04T03:00Z | 31,672 MW | 5,907 MW | 0 MW | 7,613 MW | 3,834 MW |
| 2026-11-04T04:00Z | 31,332 MW | 4,947 MW | 0 MW | 7,480 MW | 3,835 MW |
| 2026-11-04T05:00Z | 31,332 MW | 4,741 MW | 0 MW | 7,438 MW | 3,835 MW |
| 2026-11-04T06:00Z | 30,885 MW | 5,065 MW | 0 MW | 7,451 MW | 3,835 MW |
| 2026-11-04T07:00Z | 30,252 MW | 5,047 MW | 0 MW | 7,493 MW | 3,835 MW |
| 2026-11-04T08:00Z | 29,341 MW | 4,770 MW | 0 MW | 7,231 MW | 3,836 MW |
| 2026-11-04T09:00Z | 29,131 MW | 4,059 MW | 0 MW | 6,871 MW | 3,837 MW |
| 2026-11-04T10:00Z | 28,938 MW | 3,980 MW | 0 MW | 6,882 MW | 3,837 MW |
| 2026-11-04T11:00Z | 28,756 MW | 3,958 MW | 0 MW | 7,173 MW | 3,838 MW |
| 2026-11-04T12:00Z | 28,662 MW | 3,714 MW | 51 MW | 7,326 MW | 3,839 MW |
| 2026-11-04T13:00Z | 26,470 MW | 3,381 MW | 7,267 MW | 6,710 MW | 3,839 MW |
| 2026-11-04T14:00Z | 18,685 MW | 2,277 MW | 25,508 MW | 4,802 MW | 3,839 MW |
| 2026-11-04T15:00Z | 15,194 MW | 2,007 MW | 30,685 MW | 3,872 MW | 3,839 MW |
| 2026-11-04T16:00Z | 15,492 MW | 2,520 MW | 30,001 MW | 3,860 MW | 3,838 MW |
| 2026-11-04T17:00Z | 15,144 MW | 2,859 MW | 29,228 MW | 4,137 MW | 3,837 MW |
| 2026-11-04T18:00Z | 15,456 MW | 3,307 MW | 28,921 MW | 4,385 MW | 3,837 MW |
| 2026-11-04T19:00Z | 15,886 MW | 3,862 MW | 28,908 MW | 4,477 MW | 3,836 MW |
| 2026-11-04T20:00Z | 16,366 MW | 4,941 MW | 29,257 MW | 4,618 MW | 3,836 MW |
| 2026-11-04T21:00Z | 17,482 MW | 5,690 MW | 27,580 MW | 4,557 MW | 3,835 MW |
| 2026-11-04T22:00Z | 22,582 MW | 6,733 MW | 17,895 MW | 5,074 MW | 3,834 MW |
| 2026-11-04T23:00Z | 27,150 MW | 7,093 MW | 2,266 MW | 6,417 MW | 3,834 MW |
| 2026-11-05T00:00Z | 27,822 MW | 10,183 MW | 0 MW | 6,838 MW | 3,834 MW |
| 2026-11-05T01:00Z | 27,200 MW | 14,198 MW | 0 MW | 6,743 MW | 3,834 MW |
| 2026-11-05T02:00Z | 26,097 MW | 16,880 MW | 0 MW | 6,424 MW | 3,835 MW |
| 2026-11-05T03:00Z | 24,521 MW | 18,467 MW | 0 MW | 6,003 MW | 3,836 MW |
| 2026-11-05T04:00Z | 23,415 MW | 19,000 MW | 0 MW | 5,265 MW | 3,836 MW |
| 2026-11-05T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T14:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T14:00Z.
Day by Day
Daily totals, Central time dates, through 2026-11-04Show the data table (400 rows)
| Date (Central time) | Demand |
|---|---|
| 2025-10-01 | 1.43 TWh |
| 2025-10-02 | 1.44 TWh |
| 2025-10-03 | 1.45 TWh |
| 2025-10-04 | 1.37 TWh |
| 2025-10-05 | 1.39 TWh |
| 2025-10-06 | 1.46 TWh |
| 2025-10-07 | 1.47 TWh |
| 2025-10-08 | 1.46 TWh |
| 2025-10-09 | 1.45 TWh |
| 2025-10-10 | 1.37 TWh |
| 2025-10-11 | 1.30 TWh |
| 2025-10-12 | 1.31 TWh |
| 2025-10-13 | 1.37 TWh |
| 2025-10-14 | 1.35 TWh |
| 2025-10-15 | 1.33 TWh |
| 2025-10-16 | 1.31 TWh |
| 2025-10-17 | 1.38 TWh |
| 2025-10-18 | 1.37 TWh |
| 2025-10-19 | 1.24 TWh |
| 2025-10-20 | 1.32 TWh |
| 2025-10-21 | 1.34 TWh |
| 2025-10-22 | 1.24 TWh |
| 2025-10-23 | 1.29 TWh |
| 2025-10-24 | 1.30 TWh |
| 2025-10-25 | 1.19 TWh |
| 2025-10-26 | 1.18 TWh |
| 2025-10-27 | 1.28 TWh |
| 2025-10-28 | 1.28 TWh |
| 2025-10-29 | 1.10 TWh |
| 2025-10-30 | 1.10 TWh |
| 2025-10-31 | 1.10 TWh |
| 2025-11-01 | 1.07 TWh |
| 2025-11-02 | 1.10 TWh |
| 2025-11-03 | 1.13 TWh |
| 2025-11-04 | 1.14 TWh |
| 2025-11-05 | 1.19 TWh |
| 2025-11-06 | 1.23 TWh |
| 2025-11-07 | 1.24 TWh |
| 2025-11-08 | 1.21 TWh |
| 2025-11-09 | 1.13 TWh |
| 2025-11-10 | 1.18 TWh |
| 2025-11-11 | 1.20 TWh |
| 2025-11-12 | 1.19 TWh |
| 2025-11-13 | 1.23 TWh |
| 2025-11-14 | 1.25 TWh |
| 2025-11-15 | 1.24 TWh |
| 2025-11-16 | 1.24 TWh |
| 2025-11-17 | 1.33 TWh |
| 2025-11-18 | 1.34 TWh |
| 2025-11-19 | 1.33 TWh |
| 2025-11-20 | 1.30 TWh |
| 2025-11-21 | 1.27 TWh |
| 2025-11-22 | 1.18 TWh |
| 2025-11-23 | 1.14 TWh |
| 2025-11-24 | 1.22 TWh |
| 2025-11-25 | 1.21 TWh |
| 2025-11-26 | 1.17 TWh |
| 2025-11-27 | 1.12 TWh |
| 2025-11-28 | 1.13 TWh |
| 2025-11-29 | 1.15 TWh |
| 2025-11-30 | 1.22 TWh |
| 2025-12-01 | 1.32 TWh |
| 2025-12-02 | 1.34 TWh |
| 2025-12-03 | 1.29 TWh |
| 2025-12-04 | 1.30 TWh |
| 2025-12-05 | n/a |
| 2025-12-06 | 1.20 TWh |
| 2025-12-07 | 1.17 TWh |
| 2025-12-08 | 1.27 TWh |
| 2025-12-09 | 1.26 TWh |
| 2025-12-10 | 1.20 TWh |
| 2025-12-11 | 1.18 TWh |
| 2025-12-12 | 1.15 TWh |
| 2025-12-13 | 1.14 TWh |
| 2025-12-14 | 1.23 TWh |
| 2025-12-15 | 1.35 TWh |
| 2025-12-16 | 1.26 TWh |
| 2025-12-17 | 1.15 TWh |
| 2025-12-18 | 1.17 TWh |
| 2025-12-19 | 1.21 TWh |
| 2025-12-20 | 1.16 TWh |
| 2025-12-21 | 1.14 TWh |
| 2025-12-22 | 1.19 TWh |
| 2025-12-23 | 1.21 TWh |
| 2025-12-24 | 1.18 TWh |
| 2025-12-25 | 1.13 TWh |
| 2025-12-26 | 1.19 TWh |
| 2025-12-27 | 1.18 TWh |
| 2025-12-28 | 1.17 TWh |
| 2025-12-29 | 1.28 TWh |
| 2025-12-30 | 1.30 TWh |
| 2025-12-31 | 1.24 TWh |
| 2026-01-01 | 1.13 TWh |
| 2026-01-02 | 1.13 TWh |
| 2026-01-03 | 1.10 TWh |
| 2026-01-04 | 1.11 TWh |
| 2026-01-05 | 1.17 TWh |
| 2026-01-06 | 1.17 TWh |
| 2026-01-07 | 1.18 TWh |
| 2026-01-08 | 1.19 TWh |
| 2026-01-09 | 1.17 TWh |
| 2026-01-10 | 1.18 TWh |
| 2026-01-11 | 1.22 TWh |
| 2026-01-12 | 1.25 TWh |
| 2026-01-13 | 1.23 TWh |
| 2026-01-14 | 1.21 TWh |
| 2026-01-15 | 1.25 TWh |
| 2026-01-16 | 1.22 TWh |
| 2026-01-17 | 1.29 TWh |
| 2026-01-18 | 1.34 TWh |
| 2026-01-19 | 1.31 TWh |
| 2026-01-20 | 1.30 TWh |
| 2026-01-21 | 1.19 TWh |
| 2026-01-22 | 1.21 TWh |
| 2026-01-23 | 1.25 TWh |
| 2026-01-24 | 1.50 TWh |
| 2026-01-25 | 1.70 TWh |
| 2026-01-26 | 1.64 TWh |
| 2026-01-27 | 1.53 TWh |
| 2026-01-28 | 1.40 TWh |
| 2026-01-29 | 1.34 TWh |
| 2026-01-30 | 1.39 TWh |
| 2026-01-31 | 1.51 TWh |
| 2026-02-01 | 1.45 TWh |
| 2026-02-02 | 1.31 TWh |
| 2026-02-03 | 1.17 TWh |
| 2026-02-04 | 1.21 TWh |
| 2026-02-05 | 1.25 TWh |
| 2026-02-06 | 1.18 TWh |
| 2026-02-07 | 1.12 TWh |
| 2026-02-08 | 1.10 TWh |
| 2026-02-09 | 1.15 TWh |
| 2026-02-10 | 1.15 TWh |
| 2026-02-11 | 1.15 TWh |
| 2026-02-12 | 1.17 TWh |
| 2026-02-13 | 1.16 TWh |
| 2026-02-14 | 1.12 TWh |
| 2026-02-15 | 1.09 TWh |
| 2026-02-16 | 1.16 TWh |
| 2026-02-17 | 1.18 TWh |
| 2026-02-18 | 1.18 TWh |
| 2026-02-19 | 1.20 TWh |
| 2026-02-20 | 1.19 TWh |
| 2026-02-21 | 1.14 TWh |
| 2026-02-22 | 1.14 TWh |
| 2026-02-23 | 1.22 TWh |
| 2026-02-24 | 1.21 TWh |
| 2026-02-25 | 1.17 TWh |
| 2026-02-26 | 1.21 TWh |
| 2026-02-27 | 1.20 TWh |
| 2026-02-28 | 1.17 TWh |
| 2026-03-01 | 1.17 TWh |
| 2026-03-02 | 1.22 TWh |
| 2026-03-03 | 1.26 TWh |
| 2026-03-04 | 1.27 TWh |
| 2026-03-05 | 1.28 TWh |
| 2026-03-06 | 1.30 TWh |
| 2026-03-07 | 1.21 TWh |
| 2026-03-08 | 1.07 TWh |
| 2026-03-09 | 1.23 TWh |
| 2026-03-10 | 1.29 TWh |
| 2026-03-11 | 1.22 TWh |
| 2026-03-12 | 1.12 TWh |
| 2026-03-13 | 1.15 TWh |
| 2026-03-14 | 1.15 TWh |
| 2026-03-15 | 1.19 TWh |
| 2026-03-16 | 1.20 TWh |
| 2026-03-17 | 1.23 TWh |
| 2026-03-18 | 1.17 TWh |
| 2026-03-19 | 1.18 TWh |
| 2026-03-20 | 1.22 TWh |
| 2026-03-21 | 1.25 TWh |
| 2026-03-22 | 1.25 TWh |
| 2026-03-23 | 1.24 TWh |
| 2026-03-24 | 1.25 TWh |
| 2026-03-25 | 1.32 TWh |
| 2026-03-26 | 1.32 TWh |
| 2026-03-27 | 1.25 TWh |
| 2026-03-28 | 1.12 TWh |
| 2026-03-29 | 1.18 TWh |
| 2026-03-30 | 1.29 TWh |
| 2026-03-31 | 1.32 TWh |
| 2026-04-01 | 1.34 TWh |
| 2026-04-02 | 1.32 TWh |
| 2026-04-03 | 1.32 TWh |
| 2026-04-04 | 1.19 TWh |
| 2026-04-05 | 1.06 TWh |
| 2026-04-06 | 1.12 TWh |
| 2026-04-07 | 1.13 TWh |
| 2026-04-08 | 1.18 TWh |
| 2026-04-09 | 1.23 TWh |
| 2026-04-10 | 1.25 TWh |
| 2026-04-11 | 1.23 TWh |
| 2026-04-12 | 1.21 TWh |
| 2026-04-13 | 1.33 TWh |
| 2026-04-14 | 1.33 TWh |
| 2026-04-15 | 1.32 TWh |
| 2026-04-16 | 1.36 TWh |
| 2026-04-17 | 1.34 TWh |
| 2026-04-18 | 1.17 TWh |
| 2026-04-19 | 1.07 TWh |
| 2026-04-20 | 1.11 TWh |
| 2026-04-21 | 1.14 TWh |
| 2026-04-22 | 1.22 TWh |
| 2026-04-23 | 1.29 TWh |
| 2026-04-24 | 1.37 TWh |
| 2026-04-25 | 1.37 TWh |
| 2026-04-26 | 1.37 TWh |
| 2026-04-27 | 1.47 TWh |
| 2026-04-28 | 1.47 TWh |
| 2026-04-29 | 1.33 TWh |
| 2026-04-30 | 1.25 TWh |
| 2026-05-01 | 1.15 TWh |
| 2026-05-02 | 1.11 TWh |
| 2026-05-03 | 1.16 TWh |
| 2026-05-04 | 1.27 TWh |
| 2026-05-05 | 1.37 TWh |
| 2026-05-06 | 1.30 TWh |
| 2026-05-07 | 1.20 TWh |
| 2026-05-08 | 1.22 TWh |
| 2026-05-09 | 1.37 TWh |
| 2026-05-10 | 1.34 TWh |
| 2026-05-11 | 1.29 TWh |
| 2026-05-12 | 1.34 TWh |
| 2026-05-13 | 1.41 TWh |
| 2026-05-14 | 1.45 TWh |
| 2026-05-15 | 1.42 TWh |
| 2026-05-16 | 1.42 TWh |
| 2026-05-17 | 1.44 TWh |
| 2026-05-18 | 1.56 TWh |
| 2026-05-19 | 1.47 TWh |
| 2026-05-20 | 1.30 TWh |
| 2026-05-21 | 1.28 TWh |
| 2026-05-22 | 1.40 TWh |
| 2026-05-23 | 1.29 TWh |
| 2026-05-24 | 1.32 TWh |
| 2026-05-25 | 1.37 TWh |
| 2026-05-26 | 1.39 TWh |
| 2026-05-27 | 1.29 TWh |
| 2026-05-28 | 1.41 TWh |
| 2026-05-29 | 1.52 TWh |
| 2026-05-30 | 1.49 TWh |
| 2026-05-31 | 1.51 TWh |
| 2026-06-01 | 1.58 TWh |
| 2026-06-02 | 1.55 TWh |
| 2026-06-03 | 1.44 TWh |
| 2026-06-04 | 1.45 TWh |
| 2026-06-05 | 1.42 TWh |
| 2026-06-06 | 1.42 TWh |
| 2026-06-07 | 1.47 TWh |
| 2026-06-08 | 1.60 TWh |
| 2026-06-09 | 1.60 TWh |
| 2026-06-10 | 1.62 TWh |
| 2026-06-11 | 1.64 TWh |
| 2026-06-12 | 1.61 TWh |
| 2026-06-13 | 1.58 TWh |
| 2026-06-14 | 1.51 TWh |
| 2026-06-15 | 1.44 TWh |
| 2026-06-16 | 1.49 TWh |
| 2026-06-17 | 1.58 TWh |
| 2026-06-18 | 1.68 TWh |
| 2026-06-19 | 1.55 TWh |
| 2026-06-20 | 1.47 TWh |
| 2026-06-21 | 1.53 TWh |
| 2026-06-22 | 1.68 TWh |
| 2026-06-23 | 1.66 TWh |
| 2026-06-24 | 1.65 TWh |
| 2026-06-25 | 1.63 TWh |
| 2026-06-26 | 1.66 TWh |
| 2026-06-27 | 1.65 TWh |
| 2026-06-28 | 1.67 TWh |
| 2026-06-29 | 1.71 TWh |
| 2026-06-30 | 1.68 TWh |
| 2026-07-01 | 1.67 TWh |
| 2026-07-02 | 1.67 TWh |
| 2026-07-03 | 1.66 TWh |
| 2026-07-04 | 1.66 TWh |
| 2026-07-05 | 1.63 TWh |
| 2026-07-06 | 1.66 TWh |
| 2026-07-07 | 1.66 TWh |
| 2026-07-08 | 1.69 TWh |
| 2026-07-09 | 1.70 TWh |
| 2026-07-10 | 1.67 TWh |
| 2026-07-11 | 1.59 TWh |
| 2026-07-12 | 1.57 TWh |
| 2026-07-13 | 1.54 TWh |
| 2026-07-14 | 1.47 TWh |
| 2026-07-15 | 1.43 TWh |
| 2026-07-16 | 1.51 TWh |
| 2026-07-17 | 1.60 TWh |
| 2026-07-18 | 1.62 TWh |
| 2026-07-19 | 1.63 TWh |
| 2026-07-20 | 1.70 TWh |
| 2026-07-21 | 1.73 TWh |
| 2026-07-22 | 1.81 TWh |
| 2026-07-23 | 1.73 TWh |
| 2026-07-24 | 1.70 TWh |
| 2026-07-25 | 1.68 TWh |
| 2026-07-26 | 1.68 TWh |
| 2026-07-27 | 1.75 TWh |
| 2026-07-28 | 1.76 TWh |
| 2026-07-29 | 1.77 TWh |
| 2026-07-30 | 1.78 TWh |
| 2026-07-31 | 1.78 TWh |
| 2026-08-01 | 1.69 TWh |
| 2026-08-02 | 1.65 TWh |
| 2026-08-03 | 1.71 TWh |
| 2026-08-04 | 1.74 TWh |
| 2026-08-05 | 1.76 TWh |
| 2026-08-06 | 1.75 TWh |
| 2026-08-07 | 1.75 TWh |
| 2026-08-08 | 1.69 TWh |
| 2026-08-09 | 1.68 TWh |
| 2026-08-10 | 1.70 TWh |
| 2026-08-11 | 1.74 TWh |
| 2026-08-12 | 1.79 TWh |
| 2026-08-13 | 1.80 TWh |
| 2026-08-14 | 1.78 TWh |
| 2026-08-15 | 1.77 TWh |
| 2026-08-16 | 1.72 TWh |
| 2026-08-17 | 1.76 TWh |
| 2026-08-18 | 1.80 TWh |
| 2026-08-19 | 1.81 TWh |
| 2026-08-20 | 1.82 TWh |
| 2026-08-21 | 1.82 TWh |
| 2026-08-22 | 1.79 TWh |
| 2026-08-23 | 1.77 TWh |
| 2026-08-24 | 1.82 TWh |
| 2026-08-25 | 1.79 TWh |
| 2026-08-26 | 1.78 TWh |
| 2026-08-27 | 1.78 TWh |
| 2026-08-28 | 1.74 TWh |
| 2026-08-29 | 1.70 TWh |
| 2026-08-30 | 1.72 TWh |
| 2026-08-31 | 1.76 TWh |
| 2026-09-01 | 1.72 TWh |
| 2026-09-02 | 1.75 TWh |
| 2026-09-03 | 1.70 TWh |
| 2026-09-04 | 1.71 TWh |
| 2026-09-05 | 1.68 TWh |
| 2026-09-06 | 1.65 TWh |
| 2026-09-07 | 1.71 TWh |
| 2026-09-08 | 1.77 TWh |
| 2026-09-09 | 1.75 TWh |
| 2026-09-10 | 1.70 TWh |
| 2026-09-11 | 1.70 TWh |
| 2026-09-12 | 1.72 TWh |
| 2026-09-13 | 1.72 TWh |
| 2026-09-14 | 1.76 TWh |
| 2026-09-15 | 1.76 TWh |
| 2026-09-16 | 1.74 TWh |
| 2026-09-17 | 1.70 TWh |
| 2026-09-18 | 1.66 TWh |
| 2026-09-19 | 1.61 TWh |
| 2026-09-20 | 1.61 TWh |
| 2026-09-21 | 1.67 TWh |
| 2026-09-22 | 1.66 TWh |
| 2026-09-23 | 1.67 TWh |
| 2026-09-24 | 1.65 TWh |
| 2026-09-25 | 1.59 TWh |
| 2026-09-26 | 1.53 TWh |
| 2026-09-27 | 1.57 TWh |
| 2026-09-28 | 1.63 TWh |
| 2026-09-29 | 1.63 TWh |
| 2026-09-30 | 1.64 TWh |
| 2026-10-01 | 1.49 TWh |
| 2026-10-02 | 1.42 TWh |
| 2026-10-03 | 1.36 TWh |
| 2026-10-04 | 1.31 TWh |
| 2026-10-05 | 1.39 TWh |
| 2026-10-06 | 1.40 TWh |
| 2026-10-07 | 1.41 TWh |
| 2026-10-08 | 1.43 TWh |
| 2026-10-09 | 1.41 TWh |
| 2026-10-10 | 1.38 TWh |
| 2026-10-11 | 1.43 TWh |
| 2026-10-12 | 1.52 TWh |
| 2026-10-13 | 1.63 TWh |
| 2026-10-14 | 1.61 TWh |
| 2026-10-15 | 1.50 TWh |
| 2026-10-16 | 1.24 TWh |
| 2026-10-17 | 1.11 TWh |
| 2026-10-18 | 1.11 TWh |
| 2026-10-19 | 1.20 TWh |
| 2026-10-20 | 1.24 TWh |
| 2026-10-21 | 1.27 TWh |
| 2026-10-22 | 1.28 TWh |
| 2026-10-23 | 1.28 TWh |
| 2026-10-24 | 1.26 TWh |
| 2026-10-25 | 1.24 TWh |
| 2026-10-26 | 1.25 TWh |
| 2026-10-27 | 1.27 TWh |
| 2026-10-28 | 1.32 TWh |
| 2026-10-29 | 1.29 TWh |
| 2026-10-30 | 1.25 TWh |
| 2026-10-31 | 1.25 TWh |
| 2026-11-01 | 1.33 TWh |
| 2026-11-02 | 1.37 TWh |
| 2026-11-03 | 1.29 TWh |
| 2026-11-04 | 1.22 TWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 441 TWh | 441 TWh | Gas 40.3% | 308 |
| 2025 (partial) | 488 TWh | 485 TWh | Gas 40.9% | 364 |
| 2024 | 464 TWh | 464 TWh | Gas 44.1% | 366 |
| 2023 | 447 TWh | 446 TWh | Gas 45.2% | 365 |
| 2022 | 431 TWh | 429 TWh | Gas 42.6% | 365 |
| 2021 | 393 TWh | 391 TWh | Gas 41.9% | 365 |
| 2020 | 381 TWh | 380 TWh | Gas 45.2% | 366 |
| 2019 | 384 TWh | 383 TWh | Gas 47.3% | 365 |
A year is partial when EIA has not published every day; 2024 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 1.82 TWh | 2026-08-24 (24 August 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 91,075 MW | 22 Jul 2026, 17:00 CDT (UTC-05:00) |
| Highest solar share of a day's generation, 2019 onward | 30.8% | 2026-05-02 (2 May 2026) |
| Highest wind share of a day's generation, 2019 onward | 61.9% | 2023-01-15 (15 January 2023) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Power Flows With Neighbours
Net totals, 2026-10-06 (6 October 2026) to 2026-11-04 (4 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| SPP | ERCOT imports | 80.1 GWh |
| CEN | ERCOT exports | 13.1 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Share and Embed
Figures as of 2026-11-05 (5 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for ERCOT, credited to EIA. The image is rebuilt with the page. More about grid widgets.
Embed this widget
Free to use on your own site. Keep the source line in the frame; it carries the data licence and a link back here.
The frame reports its height to the page with postMessage type wpm-embed-height if you want it to resize.
Related
Cite this page
World Power Monitor. (2026). ERCOT Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/ercot/
World Power Monitor. ERCOT Electricity Demand and Generation Mix. Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/zones/ercot/
@misc{wpm_zones_ercot_2026,
title = {{ERCOT Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/zones/ercot/}
} Permalink: https://worldpowermonitor.com/zones/ercot/