Italy North Electricity Demand and Generation Mix
Italy North demand was 20,872 MW in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00). Gas was the largest source in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00), at 61% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Italy North is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00), demand in Italy North was 20,872 MW, against a day-ahead forecast of 19,568 MW.
- Gas supplied 61.4% of Italy North's generation in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00).
- The day-ahead price in Italy North averaged EUR 278.45/MWh for delivery on 2026-10-28 (28 October 2026).
- Demand in Italy North totalled 156 TWh in 2025.
- Gas supplied 53.6% of Italy North's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 12:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 12:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Gas | 10,815 MW | 61.4% |
| Solar | 3,739 MW | 21.2% |
| Hydro | 1,498 MW | 8.5% |
| Other | 1,327 MW | 7.5% |
| Bioenergy | 140 MW | 0.8% |
| Oil | 51 MW | 0.3% |
| Wind | 24 MW | 0.1% |
| Coal | 10 MW | 0.1% |
| Total from these sources | 17,602 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00:00Z.
Day-Ahead Price
Delivery day 2026-10-28 (28 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Italy North and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28.
Last 30 Days, Hourly
Times in UTCShow the data table (685 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-29T23:00Z | 14,912 MW |
| 2026-09-30T00:00Z | 14,425 MW |
| 2026-09-30T01:00Z | 14,294 MW |
| 2026-09-30T02:00Z | 14,421 MW |
| 2026-09-30T03:00Z | 15,375 MW |
| 2026-09-30T04:00Z | 18,323 MW |
| 2026-09-30T05:00Z | 20,971 MW |
| 2026-09-30T06:00Z | 22,265 MW |
| 2026-09-30T07:00Z | 21,904 MW |
| 2026-09-30T08:00Z | 20,981 MW |
| 2026-09-30T09:00Z | 20,400 MW |
| 2026-09-30T10:00Z | 18,808 MW |
| 2026-09-30T11:00Z | 18,926 MW |
| 2026-09-30T12:00Z | 19,745 MW |
| 2026-09-30T13:00Z | 20,196 MW |
| 2026-09-30T14:00Z | 20,960 MW |
| 2026-09-30T15:00Z | 21,444 MW |
| 2026-09-30T16:00Z | 21,656 MW |
| 2026-09-30T17:00Z | 22,311 MW |
| 2026-09-30T18:00Z | 21,280 MW |
| 2026-09-30T19:00Z | 19,798 MW |
| 2026-09-30T20:00Z | 17,787 MW |
| 2026-09-30T21:00Z | 16,496 MW |
| 2026-09-30T22:00Z | 15,508 MW |
| 2026-09-30T23:00Z | 14,730 MW |
| 2026-10-01T00:00Z | 14,606 MW |
| 2026-10-01T01:00Z | 14,430 MW |
| 2026-10-01T02:00Z | 14,489 MW |
| 2026-10-01T03:00Z | 15,551 MW |
| 2026-10-01T04:00Z | 18,310 MW |
| 2026-10-01T05:00Z | 20,896 MW |
| 2026-10-01T06:00Z | 22,462 MW |
| 2026-10-01T07:00Z | 22,435 MW |
| 2026-10-01T08:00Z | 21,765 MW |
| 2026-10-01T09:00Z | 21,333 MW |
| 2026-10-01T10:00Z | 19,505 MW |
| 2026-10-01T11:00Z | 19,477 MW |
| 2026-10-01T12:00Z | 20,222 MW |
| 2026-10-01T13:00Z | 20,523 MW |
| 2026-10-01T14:00Z | 20,977 MW |
| 2026-10-01T15:00Z | 21,227 MW |
| 2026-10-01T16:00Z | 21,598 MW |
| 2026-10-01T17:00Z | 22,358 MW |
| 2026-10-01T18:00Z | 21,238 MW |
| 2026-10-01T19:00Z | 19,726 MW |
| 2026-10-01T20:00Z | 17,774 MW |
| 2026-10-01T21:00Z | 16,652 MW |
| 2026-10-01T22:00Z | 15,738 MW |
| 2026-10-01T23:00Z | 15,148 MW |
| 2026-10-02T00:00Z | 14,811 MW |
| 2026-10-02T01:00Z | 14,701 MW |
| 2026-10-02T02:00Z | 14,797 MW |
| 2026-10-02T03:00Z | 15,661 MW |
| 2026-10-02T04:00Z | 18,465 MW |
| 2026-10-02T05:00Z | 21,022 MW |
| 2026-10-02T06:00Z | 22,592 MW |
| 2026-10-02T07:00Z | 22,110 MW |
| 2026-10-02T08:00Z | 21,175 MW |
| 2026-10-02T09:00Z | 20,197 MW |
| 2026-10-02T10:00Z | 18,546 MW |
| 2026-10-02T11:00Z | 18,204 MW |
| 2026-10-02T12:00Z | 18,613 MW |
| 2026-10-02T13:00Z | 19,014 MW |
| 2026-10-02T14:00Z | 19,604 MW |
| 2026-10-02T15:00Z | 20,358 MW |
| 2026-10-02T16:00Z | 21,202 MW |
| 2026-10-02T17:00Z | 21,885 MW |
| 2026-10-02T18:00Z | 20,734 MW |
| 2026-10-02T19:00Z | 19,137 MW |
| 2026-10-02T20:00Z | 17,344 MW |
| 2026-10-02T21:00Z | 16,141 MW |
| 2026-10-02T22:00Z | 15,305 MW |
| 2026-10-02T23:00Z | 14,643 MW |
| 2026-10-03T00:00Z | 13,988 MW |
| 2026-10-03T01:00Z | 13,891 MW |
| 2026-10-03T02:00Z | 13,882 MW |
| 2026-10-03T03:00Z | 14,056 MW |
| 2026-10-03T04:00Z | 15,138 MW |
| 2026-10-03T05:00Z | 16,036 MW |
| 2026-10-03T06:00Z | 16,386 MW |
| 2026-10-03T07:00Z | 15,994 MW |
| 2026-10-03T08:00Z | 14,997 MW |
| 2026-10-03T09:00Z | 13,949 MW |
| 2026-10-03T10:00Z | 12,987 MW |
| 2026-10-03T11:00Z | 12,350 MW |
| 2026-10-03T12:00Z | 12,238 MW |
| 2026-10-03T13:00Z | 12,730 MW |
| 2026-10-03T14:00Z | 13,721 MW |
| 2026-10-03T15:00Z | 15,381 MW |
| 2026-10-03T16:00Z | 16,707 MW |
| 2026-10-03T17:00Z | 17,988 MW |
| 2026-10-03T18:00Z | 17,158 MW |
| 2026-10-03T19:00Z | 16,011 MW |
| 2026-10-03T20:00Z | 14,809 MW |
| 2026-10-03T21:00Z | 13,832 MW |
| 2026-10-03T22:00Z | 13,033 MW |
| 2026-10-03T23:00Z | 12,514 MW |
| 2026-10-04T00:00Z | 12,094 MW |
| 2026-10-04T01:00Z | 11,829 MW |
| 2026-10-04T02:00Z | 11,685 MW |
| 2026-10-04T03:00Z | 11,857 MW |
| 2026-10-04T04:00Z | 12,336 MW |
| 2026-10-04T05:00Z | 12,590 MW |
| 2026-10-04T06:00Z | 12,809 MW |
| 2026-10-04T07:00Z | 12,647 MW |
| 2026-10-04T08:00Z | 11,909 MW |
| 2026-10-04T09:00Z | 11,348 MW |
| 2026-10-04T10:00Z | 10,923 MW |
| 2026-10-04T11:00Z | 10,316 MW |
| 2026-10-04T12:00Z | 10,168 MW |
| 2026-10-04T13:00Z | 10,680 MW |
| 2026-10-04T14:00Z | 11,644 MW |
| 2026-10-04T15:00Z | 13,264 MW |
| 2026-10-04T16:00Z | 14,948 MW |
| 2026-10-04T17:00Z | 16,511 MW |
| 2026-10-04T18:00Z | 15,952 MW |
| 2026-10-04T19:00Z | 14,982 MW |
| 2026-10-04T20:00Z | 14,052 MW |
| 2026-10-04T21:00Z | 13,009 MW |
| 2026-10-04T22:00Z | 12,320 MW |
| 2026-10-04T23:00Z | 11,855 MW |
| 2026-10-05T00:00Z | 11,669 MW |
| 2026-10-05T01:00Z | 11,597 MW |
| 2026-10-05T02:00Z | 11,979 MW |
| 2026-10-05T03:00Z | 13,320 MW |
| 2026-10-05T04:00Z | 16,841 MW |
| 2026-10-05T05:00Z | 19,730 MW |
| 2026-10-05T06:00Z | 21,636 MW |
| 2026-10-05T07:00Z | 21,882 MW |
| 2026-10-05T08:00Z | 20,950 MW |
| 2026-10-05T09:00Z | 20,064 MW |
| 2026-10-05T10:00Z | 18,516 MW |
| 2026-10-05T11:00Z | 18,744 MW |
| 2026-10-05T12:00Z | 19,298 MW |
| 2026-10-05T13:00Z | 19,816 MW |
| 2026-10-05T14:00Z | 20,146 MW |
| 2026-10-05T15:00Z | 20,506 MW |
| 2026-10-05T16:00Z | 21,021 MW |
| 2026-10-05T17:00Z | 21,847 MW |
| 2026-10-05T18:00Z | 20,877 MW |
| 2026-10-05T19:00Z | 19,362 MW |
| 2026-10-05T20:00Z | 17,517 MW |
| 2026-10-05T21:00Z | 16,139 MW |
| 2026-10-05T22:00Z | 15,207 MW |
| 2026-10-05T23:00Z | 14,740 MW |
| 2026-10-06T00:00Z | 14,319 MW |
| 2026-10-06T01:00Z | 14,210 MW |
| 2026-10-06T02:00Z | 14,400 MW |
| 2026-10-06T03:00Z | 15,354 MW |
| 2026-10-06T04:00Z | 18,301 MW |
| 2026-10-06T05:00Z | 21,075 MW |
| 2026-10-06T06:00Z | 22,844 MW |
| 2026-10-06T07:00Z | 22,609 MW |
| 2026-10-06T08:00Z | 21,728 MW |
| 2026-10-06T09:00Z | 20,754 MW |
| 2026-10-06T10:00Z | 19,054 MW |
| 2026-10-06T11:00Z | 19,162 MW |
| 2026-10-06T12:00Z | 19,792 MW |
| 2026-10-06T13:00Z | 20,289 MW |
| 2026-10-06T14:00Z | 20,932 MW |
| 2026-10-06T15:00Z | 21,342 MW |
| 2026-10-06T16:00Z | 21,688 MW |
| 2026-10-06T17:00Z | 22,392 MW |
| 2026-10-06T18:00Z | 21,255 MW |
| 2026-10-06T19:00Z | 19,810 MW |
| 2026-10-06T20:00Z | 17,942 MW |
| 2026-10-06T21:00Z | 16,575 MW |
| 2026-10-06T22:00Z | 15,563 MW |
| 2026-10-06T23:00Z | 15,073 MW |
| 2026-10-07T00:00Z | 14,679 MW |
| 2026-10-07T01:00Z | 14,544 MW |
| 2026-10-07T02:00Z | 14,768 MW |
| 2026-10-07T03:00Z | 15,614 MW |
| 2026-10-07T04:00Z | 18,492 MW |
| 2026-10-07T05:00Z | 21,250 MW |
| 2026-10-07T06:00Z | 22,982 MW |
| 2026-10-07T07:00Z | 23,308 MW |
| 2026-10-07T08:00Z | 22,693 MW |
| 2026-10-07T09:00Z | 21,957 MW |
| 2026-10-07T10:00Z | 20,646 MW |
| 2026-10-07T11:00Z | 21,000 MW |
| 2026-10-07T12:00Z | 21,855 MW |
| 2026-10-07T13:00Z | 21,875 MW |
| 2026-10-07T14:00Z | 21,976 MW |
| 2026-10-07T15:00Z | 21,781 MW |
| 2026-10-07T16:00Z | 21,914 MW |
| 2026-10-07T17:00Z | 22,302 MW |
| 2026-10-07T18:00Z | 21,282 MW |
| 2026-10-07T19:00Z | 19,688 MW |
| 2026-10-07T20:00Z | 17,834 MW |
| 2026-10-07T21:00Z | 16,598 MW |
| 2026-10-07T22:00Z | 15,680 MW |
| 2026-10-07T23:00Z | 14,968 MW |
| 2026-10-08T00:00Z | 14,739 MW |
| 2026-10-08T01:00Z | 14,512 MW |
| 2026-10-08T02:00Z | 14,679 MW |
| 2026-10-08T03:00Z | 15,301 MW |
| 2026-10-08T04:00Z | 18,078 MW |
| 2026-10-08T05:00Z | 21,013 MW |
| 2026-10-08T06:00Z | 23,042 MW |
| 2026-10-08T07:00Z | 23,590 MW |
| 2026-10-08T08:00Z | 23,273 MW |
| 2026-10-08T09:00Z | 23,135 MW |
| 2026-10-08T10:00Z | 21,124 MW |
| 2026-10-08T11:00Z | 20,661 MW |
| 2026-10-08T12:00Z | 21,041 MW |
| 2026-10-08T13:00Z | 21,118 MW |
| 2026-10-08T14:00Z | 21,341 MW |
| 2026-10-08T15:00Z | 21,266 MW |
| 2026-10-08T16:00Z | 21,455 MW |
| 2026-10-08T17:00Z | 22,085 MW |
| 2026-10-08T18:00Z | 20,932 MW |
| 2026-10-08T19:00Z | 19,398 MW |
| 2026-10-08T20:00Z | 17,556 MW |
| 2026-10-08T21:00Z | 16,432 MW |
| 2026-10-08T22:00Z | 15,347 MW |
| 2026-10-08T23:00Z | 14,701 MW |
| 2026-10-09T00:00Z | 14,325 MW |
| 2026-10-09T01:00Z | 14,340 MW |
| 2026-10-09T02:00Z | 14,517 MW |
| 2026-10-09T03:00Z | 15,202 MW |
| 2026-10-09T04:00Z | 18,203 MW |
| 2026-10-09T05:00Z | 21,012 MW |
| 2026-10-09T06:00Z | 22,326 MW |
| 2026-10-09T07:00Z | 22,332 MW |
| 2026-10-09T08:00Z | 21,423 MW |
| 2026-10-09T09:00Z | 21,110 MW |
| 2026-10-09T10:00Z | 19,222 MW |
| 2026-10-09T11:00Z | 19,090 MW |
| 2026-10-09T12:00Z | 19,582 MW |
| 2026-10-09T13:00Z | 19,684 MW |
| 2026-10-09T14:00Z | 19,882 MW |
| 2026-10-09T15:00Z | 20,028 MW |
| 2026-10-09T16:00Z | 20,765 MW |
| 2026-10-09T17:00Z | 21,620 MW |
| 2026-10-09T18:00Z | 20,346 MW |
| 2026-10-09T19:00Z | 18,886 MW |
| 2026-10-09T20:00Z | 17,173 MW |
| 2026-10-09T21:00Z | 15,990 MW |
| 2026-10-09T22:00Z | 15,013 MW |
| 2026-10-09T23:00Z | 14,321 MW |
| 2026-10-10T00:00Z | 13,968 MW |
| 2026-10-10T01:00Z | 13,678 MW |
| 2026-10-10T02:00Z | 13,507 MW |
| 2026-10-10T03:00Z | 13,684 MW |
| 2026-10-10T04:00Z | 14,916 MW |
| 2026-10-10T05:00Z | 15,993 MW |
| 2026-10-10T06:00Z | 16,467 MW |
| 2026-10-10T07:00Z | 16,748 MW |
| 2026-10-10T08:00Z | 16,061 MW |
| 2026-10-10T09:00Z | 15,498 MW |
| 2026-10-10T10:00Z | 14,439 MW |
| 2026-10-10T11:00Z | 13,903 MW |
| 2026-10-10T12:00Z | 13,582 MW |
| 2026-10-10T13:00Z | 13,659 MW |
| 2026-10-10T14:00Z | 14,052 MW |
| 2026-10-10T15:00Z | 15,146 MW |
| 2026-10-10T16:00Z | 16,674 MW |
| 2026-10-10T17:00Z | 17,936 MW |
| 2026-10-10T18:00Z | 16,877 MW |
| 2026-10-10T19:00Z | 15,809 MW |
| 2026-10-10T20:00Z | 14,843 MW |
| 2026-10-10T21:00Z | 13,787 MW |
| 2026-10-10T22:00Z | 13,055 MW |
| 2026-10-10T23:00Z | 12,462 MW |
| 2026-10-11T00:00Z | 12,100 MW |
| 2026-10-11T01:00Z | 11,798 MW |
| 2026-10-11T02:00Z | 11,811 MW |
| 2026-10-11T03:00Z | 12,102 MW |
| 2026-10-11T04:00Z | 12,618 MW |
| 2026-10-11T05:00Z | 12,943 MW |
| 2026-10-11T06:00Z | 13,245 MW |
| 2026-10-11T07:00Z | 13,330 MW |
| 2026-10-11T08:00Z | 12,974 MW |
| 2026-10-11T09:00Z | 12,524 MW |
| 2026-10-11T10:00Z | 12,032 MW |
| 2026-10-11T11:00Z | 11,314 MW |
| 2026-10-11T12:00Z | 11,243 MW |
| 2026-10-11T13:00Z | 11,767 MW |
| 2026-10-11T14:00Z | 12,841 MW |
| 2026-10-11T15:00Z | 14,270 MW |
| 2026-10-11T16:00Z | 15,629 MW |
| 2026-10-11T17:00Z | 16,917 MW |
| 2026-10-11T18:00Z | 16,275 MW |
| 2026-10-11T19:00Z | 15,341 MW |
| 2026-10-11T20:00Z | 14,283 MW |
| 2026-10-11T21:00Z | 13,198 MW |
| 2026-10-11T22:00Z | 12,512 MW |
| 2026-10-11T23:00Z | 12,156 MW |
| 2026-10-12T00:00Z | 11,723 MW |
| 2026-10-12T01:00Z | 11,823 MW |
| 2026-10-12T02:00Z | 12,126 MW |
| 2026-10-12T03:00Z | 13,424 MW |
| 2026-10-12T04:00Z | 16,883 MW |
| 2026-10-12T05:00Z | 20,082 MW |
| 2026-10-12T06:00Z | 22,048 MW |
| 2026-10-12T07:00Z | 22,087 MW |
| 2026-10-12T08:00Z | 21,056 MW |
| 2026-10-12T09:00Z | 20,355 MW |
| 2026-10-12T10:00Z | 18,330 MW |
| 2026-10-12T11:00Z | 18,118 MW |
| 2026-10-12T12:00Z | 18,992 MW |
| 2026-10-12T13:00Z | 19,202 MW |
| 2026-10-12T14:00Z | 19,885 MW |
| 2026-10-12T15:00Z | 20,244 MW |
| 2026-10-12T16:00Z | 20,750 MW |
| 2026-10-12T17:00Z | 21,742 MW |
| 2026-10-12T18:00Z | 20,615 MW |
| 2026-10-12T19:00Z | 18,941 MW |
| 2026-10-12T20:00Z | 17,027 MW |
| 2026-10-12T21:00Z | 15,778 MW |
| 2026-10-12T22:00Z | 14,880 MW |
| 2026-10-12T23:00Z | 14,311 MW |
| 2026-10-13T00:00Z | 13,929 MW |
| 2026-10-13T01:00Z | 13,816 MW |
| 2026-10-13T02:00Z | 14,012 MW |
| 2026-10-13T03:00Z | 14,981 MW |
| 2026-10-13T04:00Z | 17,894 MW |
| 2026-10-13T05:00Z | 20,886 MW |
| 2026-10-13T06:00Z | 22,612 MW |
| 2026-10-13T07:00Z | 21,937 MW |
| 2026-10-13T08:00Z | 20,603 MW |
| 2026-10-13T09:00Z | 19,666 MW |
| 2026-10-13T10:00Z | 17,905 MW |
| 2026-10-13T11:00Z | 18,165 MW |
| 2026-10-13T12:00Z | 18,560 MW |
| 2026-10-13T13:00Z | 19,069 MW |
| 2026-10-13T14:00Z | 19,745 MW |
| 2026-10-13T15:00Z | 20,373 MW |
| 2026-10-13T16:00Z | 21,077 MW |
| 2026-10-13T17:00Z | 21,818 MW |
| 2026-10-13T18:00Z | 20,750 MW |
| 2026-10-13T19:00Z | 19,312 MW |
| 2026-10-13T20:00Z | 17,311 MW |
| 2026-10-13T21:00Z | 16,101 MW |
| 2026-10-13T22:00Z | 15,079 MW |
| 2026-10-13T23:00Z | 14,390 MW |
| 2026-10-14T00:00Z | 14,132 MW |
| 2026-10-14T01:00Z | 13,961 MW |
| 2026-10-14T02:00Z | 14,225 MW |
| 2026-10-14T03:00Z | 15,150 MW |
| 2026-10-14T04:00Z | 18,045 MW |
| 2026-10-14T05:00Z | 20,948 MW |
| 2026-10-14T06:00Z | 22,266 MW |
| 2026-10-14T07:00Z | 22,010 MW |
| 2026-10-14T08:00Z | 21,064 MW |
| 2026-10-14T09:00Z | 20,204 MW |
| 2026-10-14T10:00Z | 18,214 MW |
| 2026-10-14T11:00Z | 18,159 MW |
| 2026-10-14T12:00Z | 18,533 MW |
| 2026-10-14T13:00Z | 18,960 MW |
| 2026-10-14T14:00Z | 19,729 MW |
| 2026-10-14T15:00Z | 20,361 MW |
| 2026-10-14T16:00Z | 21,354 MW |
| 2026-10-14T17:00Z | 22,180 MW |
| 2026-10-14T18:00Z | 21,330 MW |
| 2026-10-14T19:00Z | 19,672 MW |
| 2026-10-14T20:00Z | 17,839 MW |
| 2026-10-14T21:00Z | 16,475 MW |
| 2026-10-14T22:00Z | 15,203 MW |
| 2026-10-14T23:00Z | 14,614 MW |
| 2026-10-15T00:00Z | 14,291 MW |
| 2026-10-15T01:00Z | 14,169 MW |
| 2026-10-15T02:00Z | 14,360 MW |
| 2026-10-15T03:00Z | 15,240 MW |
| 2026-10-15T04:00Z | 18,416 MW |
| 2026-10-15T05:00Z | 21,365 MW |
| 2026-10-15T06:00Z | 22,774 MW |
| 2026-10-15T07:00Z | 22,635 MW |
| 2026-10-15T08:00Z | 21,521 MW |
| 2026-10-15T09:00Z | 20,756 MW |
| 2026-10-15T10:00Z | 19,116 MW |
| 2026-10-15T11:00Z | 19,252 MW |
| 2026-10-15T12:00Z | 19,697 MW |
| 2026-10-15T13:00Z | 20,204 MW |
| 2026-10-15T14:00Z | 20,954 MW |
| 2026-10-15T15:00Z | 21,195 MW |
| 2026-10-15T16:00Z | 21,821 MW |
| 2026-10-15T17:00Z | 22,407 MW |
| 2026-10-15T18:00Z | 21,321 MW |
| 2026-10-15T19:00Z | 20,017 MW |
| 2026-10-15T20:00Z | 17,964 MW |
| 2026-10-15T21:00Z | 16,505 MW |
| 2026-10-15T22:00Z | 15,411 MW |
| 2026-10-15T23:00Z | 14,837 MW |
| 2026-10-16T00:00Z | 14,458 MW |
| 2026-10-16T01:00Z | 14,364 MW |
| 2026-10-16T02:00Z | 14,526 MW |
| 2026-10-16T03:00Z | 15,427 MW |
| 2026-10-16T04:00Z | 18,314 MW |
| 2026-10-16T05:00Z | 21,375 MW |
| 2026-10-16T06:00Z | 22,758 MW |
| 2026-10-16T07:00Z | 22,434 MW |
| 2026-10-16T08:00Z | 21,537 MW |
| 2026-10-16T09:00Z | 20,533 MW |
| 2026-10-16T10:00Z | 18,909 MW |
| 2026-10-16T11:00Z | 18,990 MW |
| 2026-10-16T12:00Z | 19,283 MW |
| 2026-10-16T13:00Z | 19,923 MW |
| 2026-10-16T14:00Z | 20,192 MW |
| 2026-10-16T15:00Z | 20,469 MW |
| 2026-10-16T16:00Z | 21,476 MW |
| 2026-10-16T17:00Z | 22,100 MW |
| 2026-10-16T18:00Z | 20,744 MW |
| 2026-10-16T19:00Z | 19,141 MW |
| 2026-10-16T20:00Z | 17,389 MW |
| 2026-10-16T21:00Z | 16,107 MW |
| 2026-10-16T22:00Z | 15,076 MW |
| 2026-10-16T23:00Z | 14,496 MW |
| 2026-10-17T00:00Z | 14,035 MW |
| 2026-10-17T01:00Z | 13,774 MW |
| 2026-10-17T02:00Z | 13,645 MW |
| 2026-10-17T03:00Z | 13,845 MW |
| 2026-10-17T04:00Z | 14,863 MW |
| 2026-10-17T05:00Z | 16,321 MW |
| 2026-10-17T06:00Z | 16,866 MW |
| 2026-10-17T07:00Z | 17,059 MW |
| 2026-10-17T08:00Z | 16,225 MW |
| 2026-10-17T09:00Z | 15,113 MW |
| 2026-10-17T10:00Z | 14,041 MW |
| 2026-10-17T11:00Z | 13,346 MW |
| 2026-10-17T12:00Z | 13,208 MW |
| 2026-10-17T13:00Z | 13,593 MW |
| 2026-10-17T14:00Z | 14,483 MW |
| 2026-10-17T15:00Z | 15,981 MW |
| 2026-10-17T16:00Z | 17,449 MW |
| 2026-10-17T17:00Z | 18,279 MW |
| 2026-10-17T18:00Z | 17,212 MW |
| 2026-10-17T19:00Z | 16,278 MW |
| 2026-10-17T20:00Z | 15,041 MW |
| 2026-10-17T21:00Z | 14,005 MW |
| 2026-10-17T22:00Z | 13,287 MW |
| 2026-10-17T23:00Z | 12,679 MW |
| 2026-10-18T00:00Z | 12,315 MW |
| 2026-10-18T01:00Z | 12,101 MW |
| 2026-10-18T02:00Z | 12,161 MW |
| 2026-10-18T03:00Z | 12,490 MW |
| 2026-10-18T04:00Z | 12,997 MW |
| 2026-10-18T05:00Z | 13,423 MW |
| 2026-10-18T06:00Z | 13,643 MW |
| 2026-10-18T07:00Z | 14,108 MW |
| 2026-10-18T08:00Z | 14,336 MW |
| 2026-10-18T09:00Z | 14,309 MW |
| 2026-10-18T10:00Z | 14,197 MW |
| 2026-10-18T11:00Z | 13,602 MW |
| 2026-10-18T12:00Z | 13,426 MW |
| 2026-10-18T13:00Z | 13,415 MW |
| 2026-10-18T14:00Z | 13,978 MW |
| 2026-10-18T15:00Z | 14,829 MW |
| 2026-10-18T16:00Z | 16,377 MW |
| 2026-10-18T17:00Z | 17,154 MW |
| 2026-10-18T18:00Z | 16,640 MW |
| 2026-10-18T19:00Z | 15,615 MW |
| 2026-10-18T20:00Z | 14,510 MW |
| 2026-10-18T21:00Z | 13,480 MW |
| 2026-10-18T22:00Z | 12,557 MW |
| 2026-10-18T23:00Z | 12,085 MW |
| 2026-10-19T00:00Z | 11,841 MW |
| 2026-10-19T01:00Z | 11,765 MW |
| 2026-10-19T02:00Z | 12,089 MW |
| 2026-10-19T03:00Z | 13,494 MW |
| 2026-10-19T04:00Z | 17,129 MW |
| 2026-10-19T05:00Z | 20,344 MW |
| 2026-10-19T06:00Z | 22,050 MW |
| 2026-10-19T07:00Z | 22,169 MW |
| 2026-10-19T08:00Z | 21,533 MW |
| 2026-10-19T09:00Z | 20,784 MW |
| 2026-10-19T10:00Z | 19,047 MW |
| 2026-10-19T11:00Z | 19,225 MW |
| 2026-10-19T12:00Z | 19,566 MW |
| 2026-10-19T13:00Z | 19,752 MW |
| 2026-10-19T14:00Z | 20,407 MW |
| 2026-10-19T15:00Z | 20,606 MW |
| 2026-10-19T16:00Z | 21,616 MW |
| 2026-10-19T17:00Z | 21,971 MW |
| 2026-10-19T18:00Z | 20,806 MW |
| 2026-10-19T19:00Z | 19,333 MW |
| 2026-10-19T20:00Z | 17,478 MW |
| 2026-10-19T21:00Z | 16,138 MW |
| 2026-10-19T22:00Z | 15,138 MW |
| 2026-10-19T23:00Z | 14,488 MW |
| 2026-10-20T00:00Z | 14,028 MW |
| 2026-10-20T01:00Z | 13,888 MW |
| 2026-10-20T02:00Z | 14,127 MW |
| 2026-10-20T03:00Z | 15,175 MW |
| 2026-10-20T04:00Z | 18,301 MW |
| 2026-10-20T05:00Z | 21,387 MW |
| 2026-10-20T06:00Z | 23,183 MW |
| 2026-10-20T07:00Z | 23,383 MW |
| 2026-10-20T08:00Z | 23,125 MW |
| 2026-10-20T09:00Z | 22,637 MW |
| 2026-10-20T10:00Z | 21,399 MW |
| 2026-10-20T11:00Z | 21,760 MW |
| 2026-10-20T12:00Z | 22,475 MW |
| 2026-10-20T13:00Z | 22,641 MW |
| 2026-10-20T14:00Z | 22,830 MW |
| 2026-10-20T15:00Z | 22,198 MW |
| 2026-10-20T16:00Z | 22,333 MW |
| 2026-10-20T17:00Z | 22,266 MW |
| 2026-10-20T18:00Z | 21,091 MW |
| 2026-10-20T19:00Z | 19,434 MW |
| 2026-10-20T20:00Z | 17,436 MW |
| 2026-10-20T21:00Z | 16,209 MW |
| 2026-10-20T22:00Z | 15,167 MW |
| 2026-10-20T23:00Z | 14,464 MW |
| 2026-10-21T00:00Z | 14,107 MW |
| 2026-10-21T01:00Z | 14,052 MW |
| 2026-10-21T02:00Z | 14,303 MW |
| 2026-10-21T03:00Z | 15,189 MW |
| 2026-10-21T04:00Z | 17,955 MW |
| 2026-10-21T05:00Z | 21,193 MW |
| 2026-10-21T06:00Z | 23,111 MW |
| 2026-10-21T07:00Z | 23,351 MW |
| 2026-10-21T08:00Z | 23,254 MW |
| 2026-10-21T09:00Z | 22,822 MW |
| 2026-10-21T10:00Z | 20,996 MW |
| 2026-10-21T11:00Z | 20,756 MW |
| 2026-10-21T12:00Z | 20,832 MW |
| 2026-10-21T13:00Z | 21,111 MW |
| 2026-10-21T14:00Z | 21,300 MW |
| 2026-10-21T15:00Z | 21,113 MW |
| 2026-10-21T16:00Z | 21,780 MW |
| 2026-10-21T17:00Z | 22,297 MW |
| 2026-10-21T18:00Z | 20,789 MW |
| 2026-10-21T19:00Z | 19,131 MW |
| 2026-10-21T20:00Z | 17,291 MW |
| 2026-10-21T21:00Z | 16,034 MW |
| 2026-10-21T22:00Z | 15,068 MW |
| 2026-10-21T23:00Z | 14,353 MW |
| 2026-10-22T00:00Z | 14,035 MW |
| 2026-10-22T01:00Z | 13,876 MW |
| 2026-10-22T02:00Z | 14,124 MW |
| 2026-10-22T03:00Z | 15,061 MW |
| 2026-10-22T04:00Z | 18,011 MW |
| 2026-10-22T05:00Z | 21,161 MW |
| 2026-10-22T06:00Z | 22,753 MW |
| 2026-10-22T07:00Z | 22,547 MW |
| 2026-10-22T08:00Z | 21,204 MW |
| 2026-10-22T09:00Z | 20,117 MW |
| 2026-10-22T10:00Z | 18,247 MW |
| 2026-10-22T11:00Z | 18,380 MW |
| 2026-10-22T12:00Z | 18,693 MW |
| 2026-10-22T13:00Z | 19,198 MW |
| 2026-10-22T14:00Z | 19,651 MW |
| 2026-10-22T15:00Z | 20,133 MW |
| 2026-10-22T16:00Z | 21,090 MW |
| 2026-10-22T17:00Z | 21,543 MW |
| 2026-10-22T18:00Z | 20,595 MW |
| 2026-10-22T19:00Z | 19,061 MW |
| 2026-10-22T20:00Z | 17,218 MW |
| 2026-10-22T21:00Z | 16,139 MW |
| 2026-10-22T22:00Z | 15,235 MW |
| 2026-10-22T23:00Z | 14,590 MW |
| 2026-10-23T00:00Z | 14,261 MW |
| 2026-10-23T01:00Z | 14,183 MW |
| 2026-10-23T02:00Z | 14,293 MW |
| 2026-10-23T03:00Z | 15,140 MW |
| 2026-10-23T04:00Z | 17,891 MW |
| 2026-10-23T05:00Z | 20,811 MW |
| 2026-10-23T06:00Z | 22,449 MW |
| 2026-10-23T07:00Z | 22,596 MW |
| 2026-10-23T08:00Z | 22,144 MW |
| 2026-10-23T09:00Z | 21,673 MW |
| 2026-10-23T10:00Z | 20,453 MW |
| 2026-10-23T11:00Z | 21,071 MW |
| 2026-10-23T12:00Z | 21,293 MW |
| 2026-10-23T13:00Z | 21,327 MW |
| 2026-10-23T14:00Z | 21,341 MW |
| 2026-10-23T15:00Z | 21,089 MW |
| 2026-10-23T16:00Z | 21,662 MW |
| 2026-10-23T17:00Z | 21,862 MW |
| 2026-10-23T18:00Z | 20,778 MW |
| 2026-10-23T19:00Z | 19,024 MW |
| 2026-10-23T20:00Z | 17,350 MW |
| 2026-10-23T21:00Z | 16,033 MW |
| 2026-10-23T22:00Z | 14,930 MW |
| 2026-10-23T23:00Z | 14,268 MW |
| 2026-10-24T00:00Z | 13,892 MW |
| 2026-10-24T01:00Z | 13,661 MW |
| 2026-10-24T02:00Z | 13,633 MW |
| 2026-10-24T03:00Z | 13,901 MW |
| 2026-10-24T04:00Z | 15,100 MW |
| 2026-10-24T05:00Z | 16,381 MW |
| 2026-10-24T06:00Z | 17,207 MW |
| 2026-10-24T07:00Z | 17,159 MW |
| 2026-10-24T08:00Z | 16,351 MW |
| 2026-10-24T09:00Z | 15,194 MW |
| 2026-10-24T10:00Z | 13,971 MW |
| 2026-10-24T11:00Z | 13,359 MW |
| 2026-10-24T12:00Z | 13,012 MW |
| 2026-10-24T13:00Z | 13,340 MW |
| 2026-10-24T14:00Z | 14,375 MW |
| 2026-10-24T15:00Z | 15,788 MW |
| 2026-10-24T16:00Z | 17,497 MW |
| 2026-10-24T17:00Z | 18,274 MW |
| 2026-10-24T18:00Z | 17,345 MW |
| 2026-10-24T19:00Z | 16,232 MW |
| 2026-10-24T20:00Z | 15,096 MW |
| 2026-10-24T21:00Z | 14,225 MW |
| 2026-10-24T22:00Z | 12,244 MW |
| 2026-10-24T23:00Z | 11,701 MW |
| 2026-10-25T00:00Z | 11,287 MW |
| 2026-10-25T01:00Z | 11,038 MW |
| 2026-10-25T02:00Z | 10,894 MW |
| 2026-10-25T03:00Z | 11,014 MW |
| 2026-10-25T04:00Z | 11,314 MW |
| 2026-10-25T05:00Z | 11,904 MW |
| 2026-10-25T06:00Z | 12,290 MW |
| 2026-10-25T07:00Z | 13,165 MW |
| 2026-10-25T08:00Z | 13,225 MW |
| 2026-10-25T09:00Z | 12,978 MW |
| 2026-10-25T10:00Z | 13,131 MW |
| 2026-10-25T11:00Z | 13,128 MW |
| 2026-10-25T12:00Z | 13,013 MW |
| 2026-10-25T13:00Z | 13,211 MW |
| 2026-10-25T14:00Z | 13,332 MW |
| 2026-10-25T15:00Z | 13,969 MW |
| 2026-10-25T16:00Z | 15,429 MW |
| 2026-10-25T17:00Z | 16,674 MW |
| 2026-10-25T18:00Z | 17,051 MW |
| 2026-10-25T19:00Z | 16,120 MW |
| 2026-10-25T20:00Z | 15,170 MW |
| 2026-10-25T21:00Z | 13,892 MW |
| 2026-10-25T22:00Z | 12,757 MW |
| 2026-10-25T23:00Z | 12,845 MW |
| 2026-10-26T00:00Z | 12,431 MW |
| 2026-10-26T01:00Z | 12,137 MW |
| 2026-10-26T02:00Z | 12,069 MW |
| 2026-10-26T03:00Z | 12,460 MW |
| 2026-10-26T04:00Z | 13,819 MW |
| 2026-10-26T05:00Z | 17,237 MW |
| 2026-10-26T06:00Z | 19,901 MW |
| 2026-10-26T07:00Z | 21,078 MW |
| 2026-10-26T08:00Z | 20,605 MW |
| 2026-10-26T09:00Z | 19,805 MW |
| 2026-10-26T10:00Z | 19,250 MW |
| 2026-10-26T11:00Z | 18,090 MW |
| 2026-10-26T12:00Z | 18,774 MW |
| 2026-10-26T13:00Z | 19,819 MW |
| 2026-10-26T14:00Z | 20,968 MW |
| 2026-10-26T15:00Z | 22,032 MW |
| 2026-10-26T16:00Z | 22,309 MW |
| 2026-10-26T17:00Z | 22,511 MW |
| 2026-10-26T18:00Z | 22,382 MW |
| 2026-10-26T19:00Z | 21,252 MW |
| 2026-10-26T20:00Z | 19,505 MW |
| 2026-10-26T21:00Z | 17,342 MW |
| 2026-10-26T22:00Z | 15,978 MW |
| 2026-10-26T23:00Z | 14,923 MW |
| 2026-10-27T00:00Z | 14,298 MW |
| 2026-10-27T01:00Z | 14,040 MW |
| 2026-10-27T02:00Z | 13,989 MW |
| 2026-10-27T03:00Z | 14,216 MW |
| 2026-10-27T04:00Z | 15,328 MW |
| 2026-10-27T05:00Z | 18,706 MW |
| 2026-10-27T06:00Z | 21,243 MW |
| 2026-10-27T07:00Z | 22,341 MW |
| 2026-10-27T08:00Z | 21,609 MW |
| 2026-10-27T09:00Z | 20,572 MW |
| 2026-10-27T10:00Z | 19,959 MW |
| 2026-10-27T11:00Z | 18,627 MW |
| 2026-10-27T12:00Z | 19,137 MW |
| 2026-10-27T13:00Z | 20,269 MW |
| 2026-10-27T14:00Z | 21,393 MW |
| 2026-10-27T15:00Z | 22,088 MW |
| 2026-10-27T16:00Z | 22,587 MW |
| 2026-10-27T17:00Z | 22,824 MW |
| 2026-10-27T18:00Z | 22,480 MW |
| 2026-10-27T19:00Z | 21,359 MW |
| 2026-10-27T20:00Z | 19,728 MW |
| 2026-10-27T21:00Z | 17,687 MW |
| 2026-10-27T22:00Z | 16,156 MW |
| 2026-10-27T23:00Z | 15,039 MW |
| 2026-10-28T00:00Z | 14,451 MW |
| 2026-10-28T01:00Z | 14,111 MW |
| 2026-10-28T02:00Z | 14,092 MW |
| 2026-10-28T03:00Z | 14,284 MW |
| 2026-10-28T04:00Z | 15,410 MW |
| 2026-10-28T05:00Z | 18,824 MW |
| 2026-10-28T06:00Z | 21,284 MW |
| 2026-10-28T07:00Z | 22,752 MW |
| 2026-10-28T08:00Z | 22,545 MW |
| 2026-10-28T09:00Z | 21,928 MW |
| 2026-10-28T10:00Z | 22,129 MW |
| 2026-10-28T11:00Z | 20,872 MW |
Show the data table (685 rows)
| Hour starting (UTC) | Gas | Hydro | Other | Solar | Bioenergy |
|---|---|---|---|---|---|
| 2026-09-29T23:00Z | 7,955 MW | 1,522 MW | 1,175 MW | 0 MW | 198 MW |
| 2026-09-30T00:00Z | 7,795 MW | 1,309 MW | 1,183 MW | 0 MW | 198 MW |
| 2026-09-30T01:00Z | 8,045 MW | 1,287 MW | 1,155 MW | 0 MW | 200 MW |
| 2026-09-30T02:00Z | 8,151 MW | 1,270 MW | 1,146 MW | 0 MW | 198 MW |
| 2026-09-30T03:00Z | 8,673 MW | 1,394 MW | 1,143 MW | 0 MW | 198 MW |
| 2026-09-30T04:00Z | 9,624 MW | 2,198 MW | 1,148 MW | 0 MW | 197 MW |
| 2026-09-30T05:00Z | 10,304 MW | 3,251 MW | 1,165 MW | 85 MW | 195 MW |
| 2026-09-30T06:00Z | 9,982 MW | 2,846 MW | 1,161 MW | 1,054 MW | 197 MW |
| 2026-09-30T07:00Z | 9,741 MW | 1,944 MW | 1,162 MW | 2,499 MW | 197 MW |
| 2026-09-30T08:00Z | 8,745 MW | 1,498 MW | 1,143 MW | 3,701 MW | 198 MW |
| 2026-09-30T09:00Z | 7,545 MW | 1,246 MW | 1,155 MW | 4,426 MW | 198 MW |
| 2026-09-30T10:00Z | 6,572 MW | 1,217 MW | 1,163 MW | 4,729 MW | 198 MW |
| 2026-09-30T11:00Z | 6,497 MW | 1,157 MW | 1,165 MW | 4,585 MW | 199 MW |
| 2026-09-30T12:00Z | 6,679 MW | 1,132 MW | 1,167 MW | 4,429 MW | 196 MW |
| 2026-09-30T13:00Z | 8,021 MW | 1,173 MW | 1,163 MW | 3,612 MW | 194 MW |
| 2026-09-30T14:00Z | 9,886 MW | 1,301 MW | 1,170 MW | 2,555 MW | 194 MW |
| 2026-09-30T15:00Z | 12,294 MW | 1,997 MW | 1,231 MW | 1,360 MW | 165 MW |
| 2026-09-30T16:00Z | 12,231 MW | 2,862 MW | 1,287 MW | 225 MW | 157 MW |
| 2026-09-30T17:00Z | 12,270 MW | 3,426 MW | 1,303 MW | 0 MW | 157 MW |
| 2026-09-30T18:00Z | 12,257 MW | 3,172 MW | 1,316 MW | 0 MW | 160 MW |
| 2026-09-30T19:00Z | 12,222 MW | 2,593 MW | 1,295 MW | 0 MW | 160 MW |
| 2026-09-30T20:00Z | 11,737 MW | 1,858 MW | 1,285 MW | 0 MW | 160 MW |
| 2026-09-30T21:00Z | 10,274 MW | 1,622 MW | 1,268 MW | 0 MW | 158 MW |
| 2026-09-30T22:00Z | 8,342 MW | 1,483 MW | 1,233 MW | 0 MW | 198 MW |
| 2026-09-30T23:00Z | 7,888 MW | 1,328 MW | 1,218 MW | 0 MW | 197 MW |
| 2026-10-01T00:00Z | 8,216 MW | 1,251 MW | 1,216 MW | 0 MW | 195 MW |
| 2026-10-01T01:00Z | 8,518 MW | 1,211 MW | 1,210 MW | 0 MW | 197 MW |
| 2026-10-01T02:00Z | 8,391 MW | 1,177 MW | 1,223 MW | 0 MW | 199 MW |
| 2026-10-01T03:00Z | 9,164 MW | 1,293 MW | 1,231 MW | 0 MW | 196 MW |
| 2026-10-01T04:00Z | 9,886 MW | 2,102 MW | 1,251 MW | 0 MW | 191 MW |
| 2026-10-01T05:00Z | 10,000 MW | 2,854 MW | 1,254 MW | 82 MW | 161 MW |
| 2026-10-01T06:00Z | 10,132 MW | 2,629 MW | 1,245 MW | 896 MW | 161 MW |
| 2026-10-01T07:00Z | 9,885 MW | 2,375 MW | 1,233 MW | 2,049 MW | 161 MW |
| 2026-10-01T08:00Z | 9,206 MW | 1,800 MW | 1,225 MW | 3,016 MW | 163 MW |
| 2026-10-01T09:00Z | 8,103 MW | 1,542 MW | 1,209 MW | 3,697 MW | 163 MW |
| 2026-10-01T10:00Z | 6,640 MW | 1,205 MW | 1,217 MW | 3,979 MW | 163 MW |
| 2026-10-01T11:00Z | 6,695 MW | 1,186 MW | 1,225 MW | 3,924 MW | 163 MW |
| 2026-10-01T12:00Z | 7,499 MW | 1,109 MW | 1,215 MW | 3,679 MW | 161 MW |
| 2026-10-01T13:00Z | 8,329 MW | 1,153 MW | 1,225 MW | 3,023 MW | 161 MW |
| 2026-10-01T14:00Z | 9,740 MW | 1,382 MW | 1,249 MW | 2,257 MW | 171 MW |
| 2026-10-01T15:00Z | 10,053 MW | 2,296 MW | 1,278 MW | 1,111 MW | 176 MW |
| 2026-10-01T16:00Z | 10,143 MW | 3,205 MW | 1,306 MW | 166 MW | 178 MW |
| 2026-10-01T17:00Z | 10,568 MW | 3,641 MW | 1,305 MW | 0 MW | 178 MW |
| 2026-10-01T18:00Z | 10,809 MW | 3,143 MW | 1,314 MW | 0 MW | 179 MW |
| 2026-10-01T19:00Z | 10,626 MW | 2,690 MW | 1,319 MW | 0 MW | 180 MW |
| 2026-10-01T20:00Z | 10,418 MW | 1,934 MW | 1,296 MW | 0 MW | 181 MW |
| 2026-10-01T21:00Z | 8,907 MW | 1,579 MW | 1,300 MW | 0 MW | 179 MW |
| 2026-10-01T22:00Z | 7,982 MW | 1,454 MW | 1,278 MW | 0 MW | 178 MW |
| 2026-10-01T23:00Z | 7,691 MW | 1,420 MW | 1,266 MW | 0 MW | 178 MW |
| 2026-10-02T00:00Z | 7,555 MW | 1,383 MW | 1,264 MW | 0 MW | 178 MW |
| 2026-10-02T01:00Z | 7,585 MW | 1,314 MW | 1,265 MW | 0 MW | 178 MW |
| 2026-10-02T02:00Z | 7,794 MW | 1,296 MW | 1,258 MW | 0 MW | 177 MW |
| 2026-10-02T03:00Z | 9,097 MW | 1,395 MW | 1,274 MW | 0 MW | 175 MW |
| 2026-10-02T04:00Z | 9,905 MW | 2,119 MW | 1,287 MW | 0 MW | 175 MW |
| 2026-10-02T05:00Z | 10,055 MW | 2,748 MW | 1,292 MW | 86 MW | 176 MW |
| 2026-10-02T06:00Z | 10,068 MW | 2,920 MW | 1,270 MW | 1,021 MW | 177 MW |
| 2026-10-02T07:00Z | 9,633 MW | 2,216 MW | 1,278 MW | 2,479 MW | 178 MW |
| 2026-10-02T08:00Z | 7,711 MW | 1,832 MW | 1,265 MW | 3,635 MW | 178 MW |
| 2026-10-02T09:00Z | 6,507 MW | 1,420 MW | 1,256 MW | 4,483 MW | 177 MW |
| 2026-10-02T10:00Z | 5,574 MW | 1,210 MW | 1,275 MW | 4,963 MW | 178 MW |
| 2026-10-02T11:00Z | 4,942 MW | 1,143 MW | 1,278 MW | 4,804 MW | 162 MW |
| 2026-10-02T12:00Z | 5,816 MW | 1,148 MW | 1,281 MW | 4,584 MW | 178 MW |
| 2026-10-02T13:00Z | 5,701 MW | 1,178 MW | 1,283 MW | 3,902 MW | 178 MW |
| 2026-10-02T14:00Z | 7,264 MW | 1,584 MW | 1,305 MW | 2,875 MW | 183 MW |
| 2026-10-02T15:00Z | 9,628 MW | 2,169 MW | 1,342 MW | 1,488 MW | 193 MW |
| 2026-10-02T16:00Z | 10,355 MW | 3,201 MW | 1,370 MW | 229 MW | 196 MW |
| 2026-10-02T17:00Z | 10,743 MW | 3,674 MW | 1,386 MW | 0 MW | 195 MW |
| 2026-10-02T18:00Z | 10,568 MW | 3,311 MW | 1,406 MW | 0 MW | 196 MW |
| 2026-10-02T19:00Z | 10,684 MW | 2,628 MW | 1,409 MW | 0 MW | 197 MW |
| 2026-10-02T20:00Z | 10,233 MW | 1,968 MW | 1,369 MW | 0 MW | 196 MW |
| 2026-10-02T21:00Z | 9,572 MW | 1,786 MW | 1,350 MW | 0 MW | 194 MW |
| 2026-10-02T22:00Z | 7,725 MW | 1,701 MW | 1,329 MW | 0 MW | 195 MW |
| 2026-10-02T23:00Z | 7,146 MW | 1,588 MW | 1,330 MW | 0 MW | 196 MW |
| 2026-10-03T00:00Z | 6,659 MW | 1,405 MW | 1,337 MW | 0 MW | 196 MW |
| 2026-10-03T01:00Z | 6,085 MW | 1,289 MW | 1,338 MW | 0 MW | 198 MW |
| 2026-10-03T02:00Z | 6,084 MW | 1,284 MW | 1,345 MW | 0 MW | 197 MW |
| 2026-10-03T03:00Z | 6,202 MW | 1,319 MW | 1,345 MW | 0 MW | 196 MW |
| 2026-10-03T04:00Z | 6,142 MW | 1,898 MW | 1,355 MW | 0 MW | 194 MW |
| 2026-10-03T05:00Z | 6,273 MW | 2,241 MW | 1,362 MW | 97 MW | 195 MW |
| 2026-10-03T06:00Z | 5,016 MW | 1,966 MW | 1,347 MW | 1,234 MW | 195 MW |
| 2026-10-03T07:00Z | 3,337 MW | 1,402 MW | 1,337 MW | 2,944 MW | 196 MW |
| 2026-10-03T08:00Z | 2,515 MW | 1,091 MW | 1,335 MW | 4,329 MW | 196 MW |
| 2026-10-03T09:00Z | 1,832 MW | 1,019 MW | 1,315 MW | 5,220 MW | 196 MW |
| 2026-10-03T10:00Z | 1,860 MW | 994 MW | 1,303 MW | 5,692 MW | 195 MW |
| 2026-10-03T11:00Z | 1,661 MW | 1,001 MW | 1,303 MW | 5,697 MW | 196 MW |
| 2026-10-03T12:00Z | 1,432 MW | 1,011 MW | 1,306 MW | 5,305 MW | 198 MW |
| 2026-10-03T13:00Z | 1,703 MW | 1,033 MW | 1,312 MW | 4,481 MW | 197 MW |
| 2026-10-03T14:00Z | 2,941 MW | 1,125 MW | 1,314 MW | 3,237 MW | 196 MW |
| 2026-10-03T15:00Z | 6,344 MW | 1,602 MW | 1,342 MW | 1,554 MW | 196 MW |
| 2026-10-03T16:00Z | 7,596 MW | 2,358 MW | 1,366 MW | 225 MW | 196 MW |
| 2026-10-03T17:00Z | 7,475 MW | 2,828 MW | 1,372 MW | 0 MW | 195 MW |
| 2026-10-03T18:00Z | 7,519 MW | 2,687 MW | 1,382 MW | 0 MW | 195 MW |
| 2026-10-03T19:00Z | 7,859 MW | 2,150 MW | 1,380 MW | 0 MW | 197 MW |
| 2026-10-03T20:00Z | 7,488 MW | 1,807 MW | 1,357 MW | 0 MW | 197 MW |
| 2026-10-03T21:00Z | 7,205 MW | 1,544 MW | 1,353 MW | 0 MW | 196 MW |
| 2026-10-03T22:00Z | 5,387 MW | 1,601 MW | 1,323 MW | 0 MW | 200 MW |
| 2026-10-03T23:00Z | 4,873 MW | 1,551 MW | 1,312 MW | 0 MW | 200 MW |
| 2026-10-04T00:00Z | 4,705 MW | 1,360 MW | 1,308 MW | 0 MW | 201 MW |
| 2026-10-04T01:00Z | 4,409 MW | 1,274 MW | 1,311 MW | 0 MW | 202 MW |
| 2026-10-04T02:00Z | 4,182 MW | 1,209 MW | 1,301 MW | 0 MW | 200 MW |
| 2026-10-04T03:00Z | 4,375 MW | 1,307 MW | 1,311 MW | 0 MW | 200 MW |
| 2026-10-04T04:00Z | 4,719 MW | 1,477 MW | 1,312 MW | 0 MW | 202 MW |
| 2026-10-04T05:00Z | 4,871 MW | 1,714 MW | 1,321 MW | 99 MW | 201 MW |
| 2026-10-04T06:00Z | 4,374 MW | 1,433 MW | 1,319 MW | 1,340 MW | 203 MW |
| 2026-10-04T07:00Z | 3,201 MW | 1,207 MW | 1,307 MW | 3,251 MW | 202 MW |
| 2026-10-04T08:00Z | 1,828 MW | 1,005 MW | 1,300 MW | 4,644 MW | 203 MW |
| 2026-10-04T09:00Z | 1,664 MW | 921 MW | 1,279 MW | 5,492 MW | 202 MW |
| 2026-10-04T10:00Z | 1,907 MW | 896 MW | 1,280 MW | 5,884 MW | 200 MW |
| 2026-10-04T11:00Z | 1,479 MW | 884 MW | 1,263 MW | 5,866 MW | 201 MW |
| 2026-10-04T12:00Z | 1,712 MW | 873 MW | 1,260 MW | 5,454 MW | 201 MW |
| 2026-10-04T13:00Z | 1,927 MW | 927 MW | 1,260 MW | 4,640 MW | 201 MW |
| 2026-10-04T14:00Z | 3,368 MW | 1,024 MW | 1,270 MW | 3,352 MW | 198 MW |
| 2026-10-04T15:00Z | 5,800 MW | 1,259 MW | 1,279 MW | 1,569 MW | 199 MW |
| 2026-10-04T16:00Z | 7,824 MW | 1,951 MW | 1,323 MW | 204 MW | 200 MW |
| 2026-10-04T17:00Z | 7,822 MW | 2,455 MW | 1,340 MW | 0 MW | 200 MW |
| 2026-10-04T18:00Z | 7,892 MW | 2,415 MW | 1,348 MW | 0 MW | 200 MW |
| 2026-10-04T19:00Z | 7,897 MW | 2,073 MW | 1,341 MW | 0 MW | 197 MW |
| 2026-10-04T20:00Z | 7,757 MW | 1,798 MW | 1,330 MW | 0 MW | 195 MW |
| 2026-10-04T21:00Z | 7,782 MW | 1,394 MW | 1,307 MW | 0 MW | 196 MW |
| 2026-10-04T22:00Z | 7,554 MW | 1,272 MW | 1,307 MW | 0 MW | 194 MW |
| 2026-10-04T23:00Z | 6,864 MW | 1,138 MW | 1,309 MW | 0 MW | 195 MW |
| 2026-10-05T00:00Z | 6,901 MW | 1,112 MW | 1,304 MW | 0 MW | 196 MW |
| 2026-10-05T01:00Z | 6,801 MW | 1,108 MW | 1,302 MW | 0 MW | 197 MW |
| 2026-10-05T02:00Z | 7,206 MW | 1,138 MW | 1,285 MW | 0 MW | 196 MW |
| 2026-10-05T03:00Z | 8,231 MW | 1,300 MW | 1,290 MW | 0 MW | 196 MW |
| 2026-10-05T04:00Z | 8,814 MW | 2,055 MW | 1,289 MW | 0 MW | 194 MW |
| 2026-10-05T05:00Z | 9,165 MW | 2,822 MW | 1,280 MW | 35 MW | 192 MW |
| 2026-10-05T06:00Z | 8,838 MW | 2,447 MW | 1,275 MW | 645 MW | 191 MW |
| 2026-10-05T07:00Z | 8,578 MW | 1,966 MW | 1,269 MW | 1,753 MW | 191 MW |
| 2026-10-05T08:00Z | 7,560 MW | 1,422 MW | 1,254 MW | 2,772 MW | 190 MW |
| 2026-10-05T09:00Z | 6,343 MW | 1,175 MW | 1,249 MW | 3,697 MW | 189 MW |
| 2026-10-05T10:00Z | 4,270 MW | 1,032 MW | 1,264 MW | 4,283 MW | 189 MW |
| 2026-10-05T11:00Z | 4,744 MW | 1,022 MW | 1,260 MW | 4,182 MW | 192 MW |
| 2026-10-05T12:00Z | 5,597 MW | 1,056 MW | 1,246 MW | 3,914 MW | 192 MW |
| 2026-10-05T13:00Z | 7,194 MW | 1,176 MW | 1,258 MW | 3,262 MW | 193 MW |
| 2026-10-05T14:00Z | 8,648 MW | 1,646 MW | 1,281 MW | 2,156 MW | 195 MW |
| 2026-10-05T15:00Z | 9,325 MW | 2,205 MW | 1,321 MW | 948 MW | 194 MW |
| 2026-10-05T16:00Z | 9,913 MW | 2,708 MW | 1,332 MW | 115 MW | 195 MW |
| 2026-10-05T17:00Z | 9,812 MW | 3,198 MW | 1,348 MW | 0 MW | 196 MW |
| 2026-10-05T18:00Z | 9,923 MW | 3,086 MW | 1,361 MW | 0 MW | 194 MW |
| 2026-10-05T19:00Z | 10,012 MW | 2,476 MW | 1,360 MW | 0 MW | 196 MW |
| 2026-10-05T20:00Z | 9,728 MW | 1,951 MW | 1,340 MW | 0 MW | 195 MW |
| 2026-10-05T21:00Z | 9,169 MW | 1,758 MW | 1,315 MW | 0 MW | 195 MW |
| 2026-10-05T22:00Z | 9,129 MW | 1,561 MW | 1,298 MW | 0 MW | 194 MW |
| 2026-10-05T23:00Z | 9,315 MW | 1,530 MW | 1,294 MW | 0 MW | 196 MW |
| 2026-10-06T00:00Z | 9,475 MW | 1,467 MW | 1,296 MW | 0 MW | 197 MW |
| 2026-10-06T01:00Z | 9,391 MW | 1,326 MW | 1,297 MW | 0 MW | 198 MW |
| 2026-10-06T02:00Z | 9,577 MW | 1,300 MW | 1,294 MW | 0 MW | 198 MW |
| 2026-10-06T03:00Z | 9,539 MW | 1,326 MW | 1,307 MW | 0 MW | 198 MW |
| 2026-10-06T04:00Z | 10,162 MW | 2,280 MW | 1,329 MW | 0 MW | 199 MW |
| 2026-10-06T05:00Z | 10,327 MW | 2,776 MW | 1,329 MW | 52 MW | 198 MW |
| 2026-10-06T06:00Z | 10,282 MW | 2,839 MW | 1,328 MW | 864 MW | 196 MW |
| 2026-10-06T07:00Z | 10,351 MW | 1,980 MW | 1,313 MW | 2,182 MW | 199 MW |
| 2026-10-06T08:00Z | 9,243 MW | 1,494 MW | 1,301 MW | 3,356 MW | 195 MW |
| 2026-10-06T09:00Z | 8,165 MW | 1,258 MW | 1,299 MW | 4,251 MW | 197 MW |
| 2026-10-06T10:00Z | 6,976 MW | 1,118 MW | 1,284 MW | 4,787 MW | 196 MW |
| 2026-10-06T11:00Z | 6,738 MW | 1,040 MW | 1,276 MW | 4,666 MW | 196 MW |
| 2026-10-06T12:00Z | 8,072 MW | 1,019 MW | 1,273 MW | 4,191 MW | 198 MW |
| 2026-10-06T13:00Z | 9,046 MW | 1,028 MW | 1,285 MW | 3,548 MW | 196 MW |
| 2026-10-06T14:00Z | 10,470 MW | 1,493 MW | 1,304 MW | 2,452 MW | 196 MW |
| 2026-10-06T15:00Z | 11,552 MW | 2,398 MW | 1,338 MW | 1,100 MW | 197 MW |
| 2026-10-06T16:00Z | 11,942 MW | 3,013 MW | 1,334 MW | 119 MW | 197 MW |
| 2026-10-06T17:00Z | 12,128 MW | 3,413 MW | 1,350 MW | 0 MW | 197 MW |
| 2026-10-06T18:00Z | 11,948 MW | 3,156 MW | 1,344 MW | 0 MW | 196 MW |
| 2026-10-06T19:00Z | 11,814 MW | 2,617 MW | 1,358 MW | 0 MW | 196 MW |
| 2026-10-06T20:00Z | 11,179 MW | 2,031 MW | 1,350 MW | 0 MW | 197 MW |
| 2026-10-06T21:00Z | 11,424 MW | 1,616 MW | 1,326 MW | 0 MW | 197 MW |
| 2026-10-06T22:00Z | 9,802 MW | 1,424 MW | 1,302 MW | 0 MW | 196 MW |
| 2026-10-06T23:00Z | 9,430 MW | 1,366 MW | 1,295 MW | 0 MW | 195 MW |
| 2026-10-07T00:00Z | 9,615 MW | 1,303 MW | 1,300 MW | 0 MW | 197 MW |
| 2026-10-07T01:00Z | 9,567 MW | 1,179 MW | 1,301 MW | 0 MW | 197 MW |
| 2026-10-07T02:00Z | 9,592 MW | 1,202 MW | 1,298 MW | 0 MW | 198 MW |
| 2026-10-07T03:00Z | 10,103 MW | 1,309 MW | 1,312 MW | 0 MW | 199 MW |
| 2026-10-07T04:00Z | 10,979 MW | 1,915 MW | 1,324 MW | 0 MW | 199 MW |
| 2026-10-07T05:00Z | 11,278 MW | 2,525 MW | 1,339 MW | 46 MW | 198 MW |
| 2026-10-07T06:00Z | 10,884 MW | 2,476 MW | 1,344 MW | 692 MW | 199 MW |
| 2026-10-07T07:00Z | 10,916 MW | 1,915 MW | 1,342 MW | 1,799 MW | 199 MW |
| 2026-10-07T08:00Z | 9,571 MW | 1,586 MW | 1,322 MW | 2,697 MW | 198 MW |
| 2026-10-07T09:00Z | 9,142 MW | 1,345 MW | 1,312 MW | 3,276 MW | 199 MW |
| 2026-10-07T10:00Z | 8,527 MW | 1,196 MW | 1,303 MW | 3,319 MW | 198 MW |
| 2026-10-07T11:00Z | 8,951 MW | 1,193 MW | 1,298 MW | 2,893 MW | 199 MW |
| 2026-10-07T12:00Z | 9,561 MW | 1,279 MW | 1,293 MW | 2,245 MW | 199 MW |
| 2026-10-07T13:00Z | 9,845 MW | 1,345 MW | 1,294 MW | 1,601 MW | 197 MW |
| 2026-10-07T14:00Z | 10,652 MW | 1,462 MW | 1,313 MW | 1,048 MW | 198 MW |
| 2026-10-07T15:00Z | 11,475 MW | 2,030 MW | 1,332 MW | 393 MW | 198 MW |
| 2026-10-07T16:00Z | 11,510 MW | 2,773 MW | 1,345 MW | 25 MW | 198 MW |
| 2026-10-07T17:00Z | 11,358 MW | 3,129 MW | 1,359 MW | 0 MW | 197 MW |
| 2026-10-07T18:00Z | 11,278 MW | 2,608 MW | 1,362 MW | 0 MW | 197 MW |
| 2026-10-07T19:00Z | 10,941 MW | 2,166 MW | 1,367 MW | 0 MW | 198 MW |
| 2026-10-07T20:00Z | 9,515 MW | 1,946 MW | 1,335 MW | 0 MW | 197 MW |
| 2026-10-07T21:00Z | 8,983 MW | 1,742 MW | 1,319 MW | 0 MW | 197 MW |
| 2026-10-07T22:00Z | 7,795 MW | 1,477 MW | 1,312 MW | 0 MW | 196 MW |
| 2026-10-07T23:00Z | 7,016 MW | 1,361 MW | 1,309 MW | 0 MW | 198 MW |
| 2026-10-08T00:00Z | 7,488 MW | 1,310 MW | 1,315 MW | 0 MW | 198 MW |
| 2026-10-08T01:00Z | 7,406 MW | 1,266 MW | 1,317 MW | 0 MW | 197 MW |
| 2026-10-08T02:00Z | 7,545 MW | 1,262 MW | 1,321 MW | 0 MW | 197 MW |
| 2026-10-08T03:00Z | 7,788 MW | 1,259 MW | 1,323 MW | 0 MW | 197 MW |
| 2026-10-08T04:00Z | 8,751 MW | 1,587 MW | 1,324 MW | 0 MW | 195 MW |
| 2026-10-08T05:00Z | 9,699 MW | 2,161 MW | 1,342 MW | 8 MW | 196 MW |
| 2026-10-08T06:00Z | 9,997 MW | 2,575 MW | 1,336 MW | 401 MW | 198 MW |
| 2026-10-08T07:00Z | 9,941 MW | 2,581 MW | 1,334 MW | 1,147 MW | 197 MW |
| 2026-10-08T08:00Z | 9,841 MW | 2,309 MW | 1,324 MW | 1,812 MW | 197 MW |
| 2026-10-08T09:00Z | 10,037 MW | 2,182 MW | 1,315 MW | 2,568 MW | 198 MW |
| 2026-10-08T10:00Z | 9,379 MW | 1,800 MW | 1,307 MW | 2,956 MW | 198 MW |
| 2026-10-08T11:00Z | 8,464 MW | 1,707 MW | 1,307 MW | 2,896 MW | 197 MW |
| 2026-10-08T12:00Z | 8,644 MW | 1,797 MW | 1,301 MW | 3,045 MW | 196 MW |
| 2026-10-08T13:00Z | 8,557 MW | 1,920 MW | 1,307 MW | 2,454 MW | 195 MW |
| 2026-10-08T14:00Z | 9,886 MW | 2,080 MW | 1,336 MW | 1,584 MW | 195 MW |
| 2026-10-08T15:00Z | 9,718 MW | 2,505 MW | 1,354 MW | 606 MW | 196 MW |
| 2026-10-08T16:00Z | 9,733 MW | 2,614 MW | 1,369 MW | 61 MW | 196 MW |
| 2026-10-08T17:00Z | 10,313 MW | 3,018 MW | 1,376 MW | 0 MW | 196 MW |
| 2026-10-08T18:00Z | 10,055 MW | 2,618 MW | 1,382 MW | 0 MW | 192 MW |
| 2026-10-08T19:00Z | 9,760 MW | 2,310 MW | 1,381 MW | 0 MW | 193 MW |
| 2026-10-08T20:00Z | 9,157 MW | 2,088 MW | 1,358 MW | 0 MW | 193 MW |
| 2026-10-08T21:00Z | 8,659 MW | 1,918 MW | 1,347 MW | 0 MW | 194 MW |
| 2026-10-08T22:00Z | 9,132 MW | 1,703 MW | 1,341 MW | 0 MW | 197 MW |
| 2026-10-08T23:00Z | 8,416 MW | 1,670 MW | 1,336 MW | 0 MW | 197 MW |
| 2026-10-09T00:00Z | 8,581 MW | 1,625 MW | 1,336 MW | 0 MW | 197 MW |
| 2026-10-09T01:00Z | 9,013 MW | 1,484 MW | 1,326 MW | 0 MW | 198 MW |
| 2026-10-09T02:00Z | 9,100 MW | 1,530 MW | 1,335 MW | 0 MW | 197 MW |
| 2026-10-09T03:00Z | 8,584 MW | 1,592 MW | 1,351 MW | 0 MW | 196 MW |
| 2026-10-09T04:00Z | 8,829 MW | 2,637 MW | 1,362 MW | 0 MW | 196 MW |
| 2026-10-09T05:00Z | 8,862 MW | 3,035 MW | 1,360 MW | 25 MW | 195 MW |
| 2026-10-09T06:00Z | 8,937 MW | 2,879 MW | 1,344 MW | 796 MW | 197 MW |
| 2026-10-09T07:00Z | 8,879 MW | 2,622 MW | 1,339 MW | 2,099 MW | 197 MW |
| 2026-10-09T08:00Z | 8,786 MW | 1,797 MW | 1,333 MW | 3,154 MW | 198 MW |
| 2026-10-09T09:00Z | 9,092 MW | 1,523 MW | 1,323 MW | 3,913 MW | 199 MW |
| 2026-10-09T10:00Z | 7,813 MW | 1,303 MW | 1,318 MW | 4,012 MW | 198 MW |
| 2026-10-09T11:00Z | 7,474 MW | 1,194 MW | 1,316 MW | 4,060 MW | 198 MW |
| 2026-10-09T12:00Z | 8,034 MW | 1,239 MW | 1,315 MW | 3,925 MW | 197 MW |
| 2026-10-09T13:00Z | 8,094 MW | 1,365 MW | 1,312 MW | 3,578 MW | 196 MW |
| 2026-10-09T14:00Z | 8,922 MW | 1,722 MW | 1,334 MW | 2,444 MW | 195 MW |
| 2026-10-09T15:00Z | 9,762 MW | 2,626 MW | 1,373 MW | 988 MW | 172 MW |
| 2026-10-09T16:00Z | 10,259 MW | 2,838 MW | 1,381 MW | 106 MW | 169 MW |
| 2026-10-09T17:00Z | 10,211 MW | 3,259 MW | 1,400 MW | 0 MW | 155 MW |
| 2026-10-09T18:00Z | 9,797 MW | 2,795 MW | 1,405 MW | 0 MW | 157 MW |
| 2026-10-09T19:00Z | 9,960 MW | 2,547 MW | 1,408 MW | 0 MW | 158 MW |
| 2026-10-09T20:00Z | 9,613 MW | 1,853 MW | 1,371 MW | 0 MW | 148 MW |
| 2026-10-09T21:00Z | 9,499 MW | 1,572 MW | 1,358 MW | 0 MW | 151 MW |
| 2026-10-09T22:00Z | 8,022 MW | 1,817 MW | 1,325 MW | 0 MW | 193 MW |
| 2026-10-09T23:00Z | 7,586 MW | 1,429 MW | 1,308 MW | 0 MW | 191 MW |
| 2026-10-10T00:00Z | 7,568 MW | 1,358 MW | 1,315 MW | 0 MW | 194 MW |
| 2026-10-10T01:00Z | 6,942 MW | 1,329 MW | 1,323 MW | 0 MW | 197 MW |
| 2026-10-10T02:00Z | 6,723 MW | 1,311 MW | 1,330 MW | 0 MW | 198 MW |
| 2026-10-10T03:00Z | 6,720 MW | 1,444 MW | 1,350 MW | 0 MW | 198 MW |
| 2026-10-10T04:00Z | 7,325 MW | 1,954 MW | 1,373 MW | 0 MW | 194 MW |
| 2026-10-10T05:00Z | 7,380 MW | 2,141 MW | 1,374 MW | 30 MW | 194 MW |
| 2026-10-10T06:00Z | 7,527 MW | 1,980 MW | 1,368 MW | 679 MW | 196 MW |
| 2026-10-10T07:00Z | 7,736 MW | 1,644 MW | 1,360 MW | 1,780 MW | 198 MW |
| 2026-10-10T08:00Z | 6,885 MW | 1,297 MW | 1,324 MW | 2,654 MW | 199 MW |
| 2026-10-10T09:00Z | 6,506 MW | 1,141 MW | 1,303 MW | 3,356 MW | 200 MW |
| 2026-10-10T10:00Z | 6,227 MW | 1,097 MW | 1,294 MW | 3,644 MW | 197 MW |
| 2026-10-10T11:00Z | 6,487 MW | 1,014 MW | 1,286 MW | 3,627 MW | 198 MW |
| 2026-10-10T12:00Z | 6,169 MW | 993 MW | 1,290 MW | 3,381 MW | 196 MW |
| 2026-10-10T13:00Z | 6,231 MW | 978 MW | 1,288 MW | 2,896 MW | 196 MW |
| 2026-10-10T14:00Z | 6,448 MW | 1,323 MW | 1,310 MW | 1,857 MW | 196 MW |
| 2026-10-10T15:00Z | 7,663 MW | 1,756 MW | 1,334 MW | 753 MW | 197 MW |
| 2026-10-10T16:00Z | 8,194 MW | 2,126 MW | 1,345 MW | 75 MW | 197 MW |
| 2026-10-10T17:00Z | 8,149 MW | 2,644 MW | 1,356 MW | 0 MW | 197 MW |
| 2026-10-10T18:00Z | 8,171 MW | 2,339 MW | 1,356 MW | 0 MW | 197 MW |
| 2026-10-10T19:00Z | 7,811 MW | 2,175 MW | 1,354 MW | 0 MW | 198 MW |
| 2026-10-10T20:00Z | 7,446 MW | 1,897 MW | 1,336 MW | 0 MW | 198 MW |
| 2026-10-10T21:00Z | 7,413 MW | 1,490 MW | 1,319 MW | 0 MW | 198 MW |
| 2026-10-10T22:00Z | 5,346 MW | 1,429 MW | 1,315 MW | 0 MW | 197 MW |
| 2026-10-10T23:00Z | 4,161 MW | 1,403 MW | 1,314 MW | 0 MW | 197 MW |
| 2026-10-11T00:00Z | 3,850 MW | 1,367 MW | 1,316 MW | 0 MW | 198 MW |
| 2026-10-11T01:00Z | 3,730 MW | 1,068 MW | 1,316 MW | 0 MW | 198 MW |
| 2026-10-11T02:00Z | 3,356 MW | 1,009 MW | 1,321 MW | 0 MW | 197 MW |
| 2026-10-11T03:00Z | 3,268 MW | 1,117 MW | 1,328 MW | 0 MW | 196 MW |
| 2026-10-11T04:00Z | 3,109 MW | 1,444 MW | 1,337 MW | 0 MW | 197 MW |
| 2026-10-11T05:00Z | 3,545 MW | 1,481 MW | 1,340 MW | 32 MW | 197 MW |
| 2026-10-11T06:00Z | 2,770 MW | 1,366 MW | 1,340 MW | 757 MW | 198 MW |
| 2026-10-11T07:00Z | 2,146 MW | 1,120 MW | 1,345 MW | 2,125 MW | 199 MW |
| 2026-10-11T08:00Z | 1,366 MW | 938 MW | 1,323 MW | 3,355 MW | 199 MW |
| 2026-10-11T09:00Z | 1,258 MW | 893 MW | 1,314 MW | 4,282 MW | 199 MW |
| 2026-10-11T10:00Z | 1,380 MW | 894 MW | 1,301 MW | 4,726 MW | 199 MW |
| 2026-10-11T11:00Z | 1,463 MW | 871 MW | 1,292 MW | 4,821 MW | 199 MW |
| 2026-10-11T12:00Z | 1,641 MW | 885 MW | 1,273 MW | 4,396 MW | 199 MW |
| 2026-10-11T13:00Z | 1,991 MW | 939 MW | 1,262 MW | 3,617 MW | 198 MW |
| 2026-10-11T14:00Z | 2,712 MW | 1,022 MW | 1,279 MW | 2,340 MW | 197 MW |
| 2026-10-11T15:00Z | 4,684 MW | 1,591 MW | 1,304 MW | 809 MW | 199 MW |
| 2026-10-11T16:00Z | 5,911 MW | 1,871 MW | 1,336 MW | 63 MW | 197 MW |
| 2026-10-11T17:00Z | 6,384 MW | 2,301 MW | 1,350 MW | 0 MW | 196 MW |
| 2026-10-11T18:00Z | 6,241 MW | 2,118 MW | 1,357 MW | 0 MW | 197 MW |
| 2026-10-11T19:00Z | 5,962 MW | 1,845 MW | 1,352 MW | 0 MW | 197 MW |
| 2026-10-11T20:00Z | 5,646 MW | 1,552 MW | 1,325 MW | 0 MW | 197 MW |
| 2026-10-11T21:00Z | 5,004 MW | 1,328 MW | 1,302 MW | 0 MW | 198 MW |
| 2026-10-11T22:00Z | 5,287 MW | 1,103 MW | 1,298 MW | 0 MW | 198 MW |
| 2026-10-11T23:00Z | 5,424 MW | 1,124 MW | 1,299 MW | 0 MW | 197 MW |
| 2026-10-12T00:00Z | 5,067 MW | 1,026 MW | 1,293 MW | 0 MW | 198 MW |
| 2026-10-12T01:00Z | 5,366 MW | 959 MW | 1,294 MW | 0 MW | 199 MW |
| 2026-10-12T02:00Z | 5,433 MW | 954 MW | 1,293 MW | 0 MW | 198 MW |
| 2026-10-12T03:00Z | 6,575 MW | 1,179 MW | 1,289 MW | 0 MW | 198 MW |
| 2026-10-12T04:00Z | 8,763 MW | 1,973 MW | 1,290 MW | 0 MW | 197 MW |
| 2026-10-12T05:00Z | 8,868 MW | 3,040 MW | 1,301 MW | 10 MW | 196 MW |
| 2026-10-12T06:00Z | 9,384 MW | 2,997 MW | 1,304 MW | 547 MW | 196 MW |
| 2026-10-12T07:00Z | 9,645 MW | 2,169 MW | 1,306 MW | 1,725 MW | 196 MW |
| 2026-10-12T08:00Z | 8,874 MW | 1,505 MW | 1,291 MW | 2,738 MW | 179 MW |
| 2026-10-12T09:00Z | 8,240 MW | 1,190 MW | 1,284 MW | 3,561 MW | 180 MW |
| 2026-10-12T10:00Z | 7,491 MW | 1,106 MW | 1,290 MW | 4,078 MW | 181 MW |
| 2026-10-12T11:00Z | 7,044 MW | 1,037 MW | 1,286 MW | 4,308 MW | 189 MW |
| 2026-10-12T12:00Z | 6,609 MW | 1,007 MW | 1,359 MW | 4,573 MW | 196 MW |
| 2026-10-12T13:00Z | 6,576 MW | 1,197 MW | 1,375 MW | 4,041 MW | 196 MW |
| 2026-10-12T14:00Z | 8,266 MW | 1,577 MW | 1,405 MW | 2,863 MW | 197 MW |
| 2026-10-12T15:00Z | 9,434 MW | 2,317 MW | 1,424 MW | 1,164 MW | 196 MW |
| 2026-10-12T16:00Z | 10,410 MW | 2,654 MW | 1,367 MW | 89 MW | 196 MW |
| 2026-10-12T17:00Z | 10,648 MW | 3,137 MW | 1,313 MW | 0 MW | 196 MW |
| 2026-10-12T18:00Z | 10,419 MW | 2,737 MW | 1,321 MW | 0 MW | 195 MW |
| 2026-10-12T19:00Z | 9,929 MW | 2,028 MW | 1,328 MW | 0 MW | 196 MW |
| 2026-10-12T20:00Z | 8,585 MW | 1,624 MW | 1,308 MW | 0 MW | 195 MW |
| 2026-10-12T21:00Z | 8,256 MW | 1,333 MW | 1,293 MW | 0 MW | 196 MW |
| 2026-10-12T22:00Z | 7,025 MW | 1,157 MW | 1,285 MW | 0 MW | 195 MW |
| 2026-10-12T23:00Z | 6,802 MW | 1,108 MW | 1,259 MW | 0 MW | 196 MW |
| 2026-10-13T00:00Z | 6,935 MW | 1,030 MW | 1,256 MW | 0 MW | 196 MW |
| 2026-10-13T01:00Z | 6,690 MW | 1,001 MW | 1,272 MW | 0 MW | 197 MW |
| 2026-10-13T02:00Z | 6,437 MW | 1,033 MW | 1,283 MW | 0 MW | 196 MW |
| 2026-10-13T03:00Z | 6,571 MW | 1,202 MW | 1,298 MW | 0 MW | 195 MW |
| 2026-10-13T04:00Z | 7,725 MW | 1,701 MW | 1,304 MW | 0 MW | 193 MW |
| 2026-10-13T05:00Z | 8,351 MW | 2,840 MW | 1,314 MW | 36 MW | 194 MW |
| 2026-10-13T06:00Z | 8,699 MW | 2,714 MW | 1,306 MW | 943 MW | 196 MW |
| 2026-10-13T07:00Z | 8,295 MW | 1,898 MW | 1,296 MW | 2,575 MW | 197 MW |
| 2026-10-13T08:00Z | 6,943 MW | 1,345 MW | 1,284 MW | 4,011 MW | 197 MW |
| 2026-10-13T09:00Z | 6,067 MW | 1,042 MW | 1,280 MW | 4,972 MW | 198 MW |
| 2026-10-13T10:00Z | 5,957 MW | 946 MW | 1,284 MW | 5,366 MW | 197 MW |
| 2026-10-13T11:00Z | 6,593 MW | 910 MW | 1,275 MW | 5,219 MW | 193 MW |
| 2026-10-13T12:00Z | 6,889 MW | 921 MW | 1,274 MW | 4,711 MW | 197 MW |
| 2026-10-13T13:00Z | 7,467 MW | 1,042 MW | 1,276 MW | 3,893 MW | 197 MW |
| 2026-10-13T14:00Z | 8,754 MW | 1,347 MW | 1,290 MW | 2,636 MW | 195 MW |
| 2026-10-13T15:00Z | 10,057 MW | 1,998 MW | 1,314 MW | 1,043 MW | 197 MW |
| 2026-10-13T16:00Z | 9,760 MW | 2,597 MW | 1,333 MW | 74 MW | 195 MW |
| 2026-10-13T17:00Z | 9,775 MW | 2,726 MW | 1,344 MW | 0 MW | 195 MW |
| 2026-10-13T18:00Z | 10,137 MW | 2,494 MW | 1,365 MW | 0 MW | 196 MW |
| 2026-10-13T19:00Z | 10,324 MW | 1,796 MW | 1,356 MW | 0 MW | 196 MW |
| 2026-10-13T20:00Z | 8,740 MW | 1,252 MW | 1,320 MW | 0 MW | 197 MW |
| 2026-10-13T21:00Z | 8,124 MW | 1,088 MW | 1,290 MW | 0 MW | 195 MW |
| 2026-10-13T22:00Z | 6,380 MW | 1,048 MW | 1,288 MW | 0 MW | 195 MW |
| 2026-10-13T23:00Z | 5,790 MW | 1,010 MW | 1,285 MW | 0 MW | 196 MW |
| 2026-10-14T00:00Z | 5,727 MW | 964 MW | 1,289 MW | 0 MW | 198 MW |
| 2026-10-14T01:00Z | 5,624 MW | 927 MW | 1,287 MW | 0 MW | 198 MW |
| 2026-10-14T02:00Z | 5,780 MW | 944 MW | 1,290 MW | 0 MW | 196 MW |
| 2026-10-14T03:00Z | 6,479 MW | 1,042 MW | 1,311 MW | 0 MW | 197 MW |
| 2026-10-14T04:00Z | 7,675 MW | 1,462 MW | 1,338 MW | 0 MW | 199 MW |
| 2026-10-14T05:00Z | 7,936 MW | 2,470 MW | 1,351 MW | 28 MW | 215 MW |
| 2026-10-14T06:00Z | 8,340 MW | 2,895 MW | 1,360 MW | 844 MW | 200 MW |
| 2026-10-14T07:00Z | 8,151 MW | 2,061 MW | 1,363 MW | 2,475 MW | 200 MW |
| 2026-10-14T08:00Z | 6,563 MW | 1,656 MW | 1,342 MW | 3,810 MW | 201 MW |
| 2026-10-14T09:00Z | 5,758 MW | 1,292 MW | 1,337 MW | 4,746 MW | 200 MW |
| 2026-10-14T10:00Z | 5,046 MW | 1,001 MW | 1,331 MW | 5,266 MW | 200 MW |
| 2026-10-14T11:00Z | 5,099 MW | 889 MW | 1,327 MW | 5,289 MW | 198 MW |
| 2026-10-14T12:00Z | 5,362 MW | 907 MW | 1,318 MW | 4,930 MW | 197 MW |
| 2026-10-14T13:00Z | 5,819 MW | 948 MW | 1,321 MW | 4,135 MW | 196 MW |
| 2026-10-14T14:00Z | 7,536 MW | 1,266 MW | 1,345 MW | 2,775 MW | 195 MW |
| 2026-10-14T15:00Z | 8,911 MW | 1,899 MW | 1,447 MW | 1,110 MW | 195 MW |
| 2026-10-14T16:00Z | 8,662 MW | 2,762 MW | 1,462 MW | 80 MW | 195 MW |
| 2026-10-14T17:00Z | 8,491 MW | 3,282 MW | 1,473 MW | 0 MW | 194 MW |
| 2026-10-14T18:00Z | 8,667 MW | 2,763 MW | 1,467 MW | 0 MW | 195 MW |
| 2026-10-14T19:00Z | 8,575 MW | 2,182 MW | 1,454 MW | 0 MW | 196 MW |
| 2026-10-14T20:00Z | 7,946 MW | 1,717 MW | 1,418 MW | 0 MW | 196 MW |
| 2026-10-14T21:00Z | 7,912 MW | 1,375 MW | 1,384 MW | 0 MW | 196 MW |
| 2026-10-14T22:00Z | 7,002 MW | 1,107 MW | 1,365 MW | 0 MW | 196 MW |
| 2026-10-14T23:00Z | 6,742 MW | 1,188 MW | 1,362 MW | 0 MW | 195 MW |
| 2026-10-15T00:00Z | 6,587 MW | 1,017 MW | 1,363 MW | 0 MW | 195 MW |
| 2026-10-15T01:00Z | 6,315 MW | 965 MW | 1,358 MW | 0 MW | 196 MW |
| 2026-10-15T02:00Z | 6,386 MW | 956 MW | 1,367 MW | 0 MW | 196 MW |
| 2026-10-15T03:00Z | 7,020 MW | 1,066 MW | 1,384 MW | 0 MW | 196 MW |
| 2026-10-15T04:00Z | 8,092 MW | 1,839 MW | 1,420 MW | 0 MW | 195 MW |
| 2026-10-15T05:00Z | 8,170 MW | 2,844 MW | 1,436 MW | 16 MW | 189 MW |
| 2026-10-15T06:00Z | 8,271 MW | 2,936 MW | 1,412 MW | 783 MW | 195 MW |
| 2026-10-15T07:00Z | 7,969 MW | 2,086 MW | 1,408 MW | 2,541 MW | 178 MW |
| 2026-10-15T08:00Z | 6,579 MW | 1,448 MW | 1,399 MW | 4,003 MW | 174 MW |
| 2026-10-15T09:00Z | 5,600 MW | 1,155 MW | 1,391 MW | 4,709 MW | 176 MW |
| 2026-10-15T10:00Z | 5,658 MW | 978 MW | 1,408 MW | 5,018 MW | 176 MW |
| 2026-10-15T11:00Z | 5,833 MW | 940 MW | 1,412 MW | 4,762 MW | 182 MW |
| 2026-10-15T12:00Z | 6,593 MW | 1,120 MW | 1,410 MW | 4,036 MW | 195 MW |
| 2026-10-15T13:00Z | 7,431 MW | 1,912 MW | 1,393 MW | 3,283 MW | 195 MW |
| 2026-10-15T14:00Z | 9,227 MW | 2,318 MW | 1,405 MW | 2,352 MW | 193 MW |
| 2026-10-15T15:00Z | 9,831 MW | 2,724 MW | 1,421 MW | 912 MW | 194 MW |
| 2026-10-15T16:00Z | 10,136 MW | 3,237 MW | 1,446 MW | 62 MW | 195 MW |
| 2026-10-15T17:00Z | 9,970 MW | 3,270 MW | 1,461 MW | 0 MW | 195 MW |
| 2026-10-15T18:00Z | 10,211 MW | 2,945 MW | 1,465 MW | 0 MW | 196 MW |
| 2026-10-15T19:00Z | 10,192 MW | 2,517 MW | 1,451 MW | 0 MW | 198 MW |
| 2026-10-15T20:00Z | 10,070 MW | 1,922 MW | 1,417 MW | 0 MW | 199 MW |
| 2026-10-15T21:00Z | 9,602 MW | 1,468 MW | 1,406 MW | 0 MW | 197 MW |
| 2026-10-15T22:00Z | 9,071 MW | 1,118 MW | 1,418 MW | 0 MW | 196 MW |
| 2026-10-15T23:00Z | 8,560 MW | 1,070 MW | 1,421 MW | 0 MW | 197 MW |
| 2026-10-16T00:00Z | 8,662 MW | 1,055 MW | 1,419 MW | 0 MW | 197 MW |
| 2026-10-16T01:00Z | 9,385 MW | 1,004 MW | 1,419 MW | 0 MW | 196 MW |
| 2026-10-16T02:00Z | 9,381 MW | 1,013 MW | 1,424 MW | 0 MW | 195 MW |
| 2026-10-16T03:00Z | 9,471 MW | 1,122 MW | 1,444 MW | 0 MW | 195 MW |
| 2026-10-16T04:00Z | 9,735 MW | 1,796 MW | 1,471 MW | 0 MW | 195 MW |
| 2026-10-16T05:00Z | 9,881 MW | 3,129 MW | 1,481 MW | 18 MW | 195 MW |
| 2026-10-16T06:00Z | 9,396 MW | 3,049 MW | 1,474 MW | 693 MW | 197 MW |
| 2026-10-16T07:00Z | 8,918 MW | 1,705 MW | 1,469 MW | 2,299 MW | 197 MW |
| 2026-10-16T08:00Z | 7,502 MW | 1,193 MW | 1,455 MW | 3,796 MW | 196 MW |
| 2026-10-16T09:00Z | 6,256 MW | 932 MW | 1,449 MW | 4,698 MW | 196 MW |
| 2026-10-16T10:00Z | 5,911 MW | 903 MW | 1,441 MW | 4,996 MW | 195 MW |
| 2026-10-16T11:00Z | 5,748 MW | 890 MW | 1,442 MW | 4,885 MW | 194 MW |
| 2026-10-16T12:00Z | 6,054 MW | 871 MW | 1,450 MW | 4,526 MW | 194 MW |
| 2026-10-16T13:00Z | 7,313 MW | 927 MW | 1,451 MW | 3,576 MW | 192 MW |
| 2026-10-16T14:00Z | 8,823 MW | 1,127 MW | 1,460 MW | 2,238 MW | 190 MW |
| 2026-10-16T15:00Z | 9,404 MW | 2,031 MW | 1,477 MW | 738 MW | 191 MW |
| 2026-10-16T16:00Z | 9,095 MW | 2,852 MW | 1,485 MW | 39 MW | 195 MW |
| 2026-10-16T17:00Z | 9,277 MW | 3,020 MW | 1,491 MW | 0 MW | 200 MW |
| 2026-10-16T18:00Z | 9,518 MW | 2,866 MW | 1,500 MW | 0 MW | 199 MW |
| 2026-10-16T19:00Z | 9,547 MW | 2,003 MW | 1,490 MW | 0 MW | 199 MW |
| 2026-10-16T20:00Z | 9,184 MW | 1,316 MW | 1,455 MW | 0 MW | 199 MW |
| 2026-10-16T21:00Z | 8,684 MW | 1,119 MW | 1,440 MW | 0 MW | 199 MW |
| 2026-10-16T22:00Z | 6,643 MW | 1,012 MW | 1,431 MW | 0 MW | 198 MW |
| 2026-10-16T23:00Z | 6,142 MW | 948 MW | 1,427 MW | 0 MW | 199 MW |
| 2026-10-17T00:00Z | 6,119 MW | 943 MW | 1,417 MW | 0 MW | 199 MW |
| 2026-10-17T01:00Z | 6,252 MW | 946 MW | 1,418 MW | 0 MW | 202 MW |
| 2026-10-17T02:00Z | 6,241 MW | 952 MW | 1,401 MW | 0 MW | 200 MW |
| 2026-10-17T03:00Z | 6,292 MW | 1,009 MW | 1,423 MW | 0 MW | 199 MW |
| 2026-10-17T04:00Z | 6,437 MW | 1,269 MW | 1,449 MW | 0 MW | 200 MW |
| 2026-10-17T05:00Z | 6,718 MW | 1,588 MW | 1,450 MW | 10 MW | 198 MW |
| 2026-10-17T06:00Z | 6,548 MW | 1,443 MW | 1,455 MW | 526 MW | 200 MW |
| 2026-10-17T07:00Z | 6,203 MW | 1,112 MW | 1,476 MW | 1,900 MW | 198 MW |
| 2026-10-17T08:00Z | 4,671 MW | 925 MW | 1,442 MW | 3,284 MW | 198 MW |
| 2026-10-17T09:00Z | 3,994 MW | 838 MW | 1,426 MW | 4,200 MW | 198 MW |
| 2026-10-17T10:00Z | 4,039 MW | 812 MW | 1,440 MW | 5,001 MW | 198 MW |
| 2026-10-17T11:00Z | 3,629 MW | 779 MW | 1,451 MW | 4,903 MW | 197 MW |
| 2026-10-17T12:00Z | 4,098 MW | 795 MW | 1,445 MW | 4,380 MW | 197 MW |
| 2026-10-17T13:00Z | 4,016 MW | 835 MW | 1,444 MW | 3,753 MW | 195 MW |
| 2026-10-17T14:00Z | 5,486 MW | 1,122 MW | 1,471 MW | 2,437 MW | 196 MW |
| 2026-10-17T15:00Z | 7,115 MW | 2,086 MW | 1,494 MW | 746 MW | 196 MW |
| 2026-10-17T16:00Z | 7,913 MW | 2,595 MW | 1,512 MW | 31 MW | 196 MW |
| 2026-10-17T17:00Z | 7,943 MW | 2,900 MW | 1,501 MW | 0 MW | 197 MW |
| 2026-10-17T18:00Z | 7,797 MW | 2,853 MW | 1,510 MW | 0 MW | 197 MW |
| 2026-10-17T19:00Z | 7,925 MW | 2,502 MW | 1,513 MW | 0 MW | 198 MW |
| 2026-10-17T20:00Z | 7,936 MW | 1,586 MW | 1,481 MW | 0 MW | 200 MW |
| 2026-10-17T21:00Z | 7,548 MW | 1,087 MW | 1,469 MW | 0 MW | 199 MW |
| 2026-10-17T22:00Z | 7,104 MW | 1,062 MW | 1,432 MW | 0 MW | 199 MW |
| 2026-10-17T23:00Z | 6,883 MW | 1,060 MW | 1,430 MW | 0 MW | 201 MW |
| 2026-10-18T00:00Z | 6,374 MW | 969 MW | 1,429 MW | 0 MW | 201 MW |
| 2026-10-18T01:00Z | 6,002 MW | 877 MW | 1,437 MW | 0 MW | 199 MW |
| 2026-10-18T02:00Z | 5,986 MW | 869 MW | 1,433 MW | 0 MW | 199 MW |
| 2026-10-18T03:00Z | 6,192 MW | 962 MW | 1,459 MW | 0 MW | 198 MW |
| 2026-10-18T04:00Z | 6,472 MW | 1,080 MW | 1,484 MW | 0 MW | 200 MW |
| 2026-10-18T05:00Z | 6,435 MW | 1,366 MW | 1,503 MW | 7 MW | 199 MW |
| 2026-10-18T06:00Z | 5,348 MW | 1,202 MW | 1,495 MW | 461 MW | 199 MW |
| 2026-10-18T07:00Z | 3,854 MW | 989 MW | 1,483 MW | 1,480 MW | 200 MW |
| 2026-10-18T08:00Z | 3,044 MW | 906 MW | 1,471 MW | 2,279 MW | 199 MW |
| 2026-10-18T09:00Z | 3,001 MW | 806 MW | 1,466 MW | 2,821 MW | 200 MW |
| 2026-10-18T10:00Z | 3,196 MW | 778 MW | 1,456 MW | 3,102 MW | 197 MW |
| 2026-10-18T11:00Z | 3,040 MW | 772 MW | 1,453 MW | 3,113 MW | 197 MW |
| 2026-10-18T12:00Z | 3,352 MW | 777 MW | 1,445 MW | 2,747 MW | 198 MW |
| 2026-10-18T13:00Z | 3,399 MW | 803 MW | 1,441 MW | 2,085 MW | 197 MW |
| 2026-10-18T14:00Z | 4,816 MW | 907 MW | 1,446 MW | 1,165 MW | 197 MW |
| 2026-10-18T15:00Z | 6,392 MW | 1,323 MW | 1,457 MW | 354 MW | 196 MW |
| 2026-10-18T16:00Z | 6,673 MW | 2,091 MW | 1,501 MW | 11 MW | 197 MW |
| 2026-10-18T17:00Z | 6,492 MW | 2,423 MW | 1,506 MW | 0 MW | 197 MW |
| 2026-10-18T18:00Z | 6,577 MW | 2,270 MW | 1,507 MW | 0 MW | 199 MW |
| 2026-10-18T19:00Z | 6,570 MW | 1,853 MW | 1,496 MW | 0 MW | 197 MW |
| 2026-10-18T20:00Z | 6,522 MW | 1,313 MW | 1,471 MW | 0 MW | 199 MW |
| 2026-10-18T21:00Z | 6,073 MW | 1,129 MW | 1,464 MW | 0 MW | 197 MW |
| 2026-10-18T22:00Z | 6,172 MW | 978 MW | 1,440 MW | 0 MW | 197 MW |
| 2026-10-18T23:00Z | 5,921 MW | 958 MW | 1,439 MW | 0 MW | 198 MW |
| 2026-10-19T00:00Z | 6,201 MW | 949 MW | 1,434 MW | 0 MW | 197 MW |
| 2026-10-19T01:00Z | 6,616 MW | 955 MW | 1,436 MW | 0 MW | 198 MW |
| 2026-10-19T02:00Z | 6,404 MW | 983 MW | 1,442 MW | 0 MW | 197 MW |
| 2026-10-19T03:00Z | 7,235 MW | 1,135 MW | 1,465 MW | 0 MW | 193 MW |
| 2026-10-19T04:00Z | 8,419 MW | 2,077 MW | 1,464 MW | 0 MW | 192 MW |
| 2026-10-19T05:00Z | 9,042 MW | 2,987 MW | 1,457 MW | 11 MW | 195 MW |
| 2026-10-19T06:00Z | 9,296 MW | 2,861 MW | 1,438 MW | 544 MW | 196 MW |
| 2026-10-19T07:00Z | 9,373 MW | 2,154 MW | 1,437 MW | 1,737 MW | 200 MW |
| 2026-10-19T08:00Z | 8,885 MW | 1,603 MW | 1,430 MW | 2,822 MW | 200 MW |
| 2026-10-19T09:00Z | 7,786 MW | 1,229 MW | 1,442 MW | 3,539 MW | 202 MW |
| 2026-10-19T10:00Z | 7,319 MW | 1,005 MW | 1,439 MW | 3,794 MW | 201 MW |
| 2026-10-19T11:00Z | 7,383 MW | 969 MW | 1,446 MW | 4,065 MW | 202 MW |
| 2026-10-19T12:00Z | 7,281 MW | 1,026 MW | 1,442 MW | 3,925 MW | 202 MW |
| 2026-10-19T13:00Z | 7,470 MW | 1,168 MW | 1,442 MW | 3,267 MW | 201 MW |
| 2026-10-19T14:00Z | 8,988 MW | 2,066 MW | 1,467 MW | 2,060 MW | 201 MW |
| 2026-10-19T15:00Z | 9,703 MW | 2,541 MW | 1,478 MW | 642 MW | 202 MW |
| 2026-10-19T16:00Z | 9,739 MW | 3,100 MW | 1,486 MW | 25 MW | 203 MW |
| 2026-10-19T17:00Z | 9,820 MW | 3,430 MW | 1,494 MW | 0 MW | 204 MW |
| 2026-10-19T18:00Z | 9,833 MW | 3,162 MW | 1,488 MW | 0 MW | 204 MW |
| 2026-10-19T19:00Z | 9,616 MW | 2,877 MW | 1,491 MW | 0 MW | 205 MW |
| 2026-10-19T20:00Z | 9,075 MW | 2,141 MW | 1,451 MW | 0 MW | 191 MW |
| 2026-10-19T21:00Z | 8,848 MW | 1,508 MW | 1,447 MW | 0 MW | 186 MW |
| 2026-10-19T22:00Z | 7,517 MW | 1,255 MW | 1,432 MW | 0 MW | 186 MW |
| 2026-10-19T23:00Z | 7,450 MW | 1,176 MW | 1,427 MW | 0 MW | 186 MW |
| 2026-10-20T00:00Z | 7,570 MW | 1,173 MW | 1,428 MW | 0 MW | 186 MW |
| 2026-10-20T01:00Z | 7,637 MW | 1,160 MW | 1,429 MW | 0 MW | 188 MW |
| 2026-10-20T02:00Z | 7,450 MW | 1,155 MW | 1,433 MW | 0 MW | 187 MW |
| 2026-10-20T03:00Z | 7,918 MW | 1,257 MW | 1,459 MW | 0 MW | 186 MW |
| 2026-10-20T04:00Z | 9,059 MW | 1,929 MW | 1,466 MW | 0 MW | 186 MW |
| 2026-10-20T05:00Z | 9,431 MW | 2,842 MW | 1,479 MW | 7 MW | 187 MW |
| 2026-10-20T06:00Z | 9,611 MW | 2,759 MW | 1,475 MW | 388 MW | 185 MW |
| 2026-10-20T07:00Z | 9,446 MW | 2,317 MW | 1,477 MW | 1,422 MW | 183 MW |
| 2026-10-20T08:00Z | 8,830 MW | 1,962 MW | 1,474 MW | 2,342 MW | 182 MW |
| 2026-10-20T09:00Z | 8,904 MW | 1,480 MW | 1,455 MW | 2,873 MW | 182 MW |
| 2026-10-20T10:00Z | 8,576 MW | 1,100 MW | 1,438 MW | 3,056 MW | 177 MW |
| 2026-10-20T11:00Z | 8,584 MW | 1,065 MW | 1,435 MW | 2,659 MW | 171 MW |
| 2026-10-20T12:00Z | 9,220 MW | 1,173 MW | 1,437 MW | 2,313 MW | 172 MW |
| 2026-10-20T13:00Z | 9,548 MW | 1,332 MW | 1,448 MW | 1,593 MW | 173 MW |
| 2026-10-20T14:00Z | 9,859 MW | 2,003 MW | 1,448 MW | 654 MW | 179 MW |
| 2026-10-20T15:00Z | 9,697 MW | 2,482 MW | 1,444 MW | 145 MW | 193 MW |
| 2026-10-20T16:00Z | 9,744 MW | 2,661 MW | 1,447 MW | 2 MW | 205 MW |
| 2026-10-20T17:00Z | 9,693 MW | 2,854 MW | 1,446 MW | 0 MW | 206 MW |
| 2026-10-20T18:00Z | 9,626 MW | 2,387 MW | 1,447 MW | 0 MW | 208 MW |
| 2026-10-20T19:00Z | 9,502 MW | 1,908 MW | 1,449 MW | 0 MW | 207 MW |
| 2026-10-20T20:00Z | 7,982 MW | 1,523 MW | 1,415 MW | 0 MW | 205 MW |
| 2026-10-20T21:00Z | 7,459 MW | 1,447 MW | 1,403 MW | 0 MW | 204 MW |
| 2026-10-20T22:00Z | 6,877 MW | 1,483 MW | 1,386 MW | 0 MW | 205 MW |
| 2026-10-20T23:00Z | 6,615 MW | 1,538 MW | 1,390 MW | 0 MW | 204 MW |
| 2026-10-21T00:00Z | 6,970 MW | 1,606 MW | 1,394 MW | 0 MW | 205 MW |
| 2026-10-21T01:00Z | 7,189 MW | 1,578 MW | 1,403 MW | 0 MW | 205 MW |
| 2026-10-21T02:00Z | 7,658 MW | 1,699 MW | 1,406 MW | 0 MW | 205 MW |
| 2026-10-21T03:00Z | 8,278 MW | 1,896 MW | 1,415 MW | 0 MW | 204 MW |
| 2026-10-21T04:00Z | 8,840 MW | 2,126 MW | 1,431 MW | 0 MW | 203 MW |
| 2026-10-21T05:00Z | 9,170 MW | 3,108 MW | 1,430 MW | 0 MW | 205 MW |
| 2026-10-21T06:00Z | 8,500 MW | 3,451 MW | 1,425 MW | 226 MW | 205 MW |
| 2026-10-21T07:00Z | 8,614 MW | 3,172 MW | 1,417 MW | 958 MW | 205 MW |
| 2026-10-21T08:00Z | 8,284 MW | 3,016 MW | 1,415 MW | 1,807 MW | 206 MW |
| 2026-10-21T09:00Z | 7,801 MW | 2,748 MW | 1,405 MW | 2,381 MW | 203 MW |
| 2026-10-21T10:00Z | 8,111 MW | 2,503 MW | 1,411 MW | 2,763 MW | 203 MW |
| 2026-10-21T11:00Z | 8,807 MW | 2,402 MW | 1,411 MW | 2,656 MW | 205 MW |
| 2026-10-21T12:00Z | 8,441 MW | 2,399 MW | 1,418 MW | 2,872 MW | 204 MW |
| 2026-10-21T13:00Z | 7,882 MW | 2,742 MW | 1,419 MW | 2,563 MW | 204 MW |
| 2026-10-21T14:00Z | 8,611 MW | 2,915 MW | 1,437 MW | 1,646 MW | 204 MW |
| 2026-10-21T15:00Z | 8,435 MW | 3,302 MW | 1,433 MW | 462 MW | 205 MW |
| 2026-10-21T16:00Z | 8,943 MW | 3,334 MW | 1,441 MW | 16 MW | 204 MW |
| 2026-10-21T17:00Z | 9,126 MW | 3,527 MW | 1,455 MW | 0 MW | 205 MW |
| 2026-10-21T18:00Z | 9,117 MW | 3,194 MW | 1,459 MW | 0 MW | 205 MW |
| 2026-10-21T19:00Z | 8,829 MW | 2,718 MW | 1,460 MW | 0 MW | 207 MW |
| 2026-10-21T20:00Z | 6,903 MW | 2,445 MW | 1,411 MW | 0 MW | 207 MW |
| 2026-10-21T21:00Z | 5,681 MW | 2,354 MW | 1,398 MW | 0 MW | 205 MW |
| 2026-10-21T22:00Z | 3,964 MW | 2,276 MW | 1,389 MW | 0 MW | 206 MW |
| 2026-10-21T23:00Z | 4,043 MW | 2,201 MW | 1,387 MW | 0 MW | 206 MW |
| 2026-10-22T00:00Z | 4,125 MW | 2,247 MW | 1,389 MW | 0 MW | 207 MW |
| 2026-10-22T01:00Z | 4,063 MW | 2,225 MW | 1,389 MW | 0 MW | 206 MW |
| 2026-10-22T02:00Z | 4,126 MW | 2,207 MW | 1,386 MW | 0 MW | 205 MW |
| 2026-10-22T03:00Z | 4,832 MW | 2,178 MW | 1,400 MW | 0 MW | 206 MW |
| 2026-10-22T04:00Z | 7,074 MW | 2,379 MW | 1,429 MW | 0 MW | 209 MW |
| 2026-10-22T05:00Z | 7,855 MW | 2,986 MW | 1,427 MW | 4 MW | 206 MW |
| 2026-10-22T06:00Z | 7,836 MW | 3,483 MW | 1,433 MW | 410 MW | 208 MW |
| 2026-10-22T07:00Z | 7,967 MW | 2,848 MW | 1,417 MW | 1,732 MW | 209 MW |
| 2026-10-22T08:00Z | 7,068 MW | 2,389 MW | 1,402 MW | 3,422 MW | 209 MW |
| 2026-10-22T09:00Z | 5,966 MW | 2,097 MW | 1,388 MW | 4,525 MW | 208 MW |
| 2026-10-22T10:00Z | 5,474 MW | 1,953 MW | 1,404 MW | 5,203 MW | 206 MW |
| 2026-10-22T11:00Z | 5,304 MW | 1,883 MW | 1,413 MW | 5,401 MW | 206 MW |
| 2026-10-22T12:00Z | 5,329 MW | 1,869 MW | 1,417 MW | 4,967 MW | 208 MW |
| 2026-10-22T13:00Z | 6,942 MW | 1,920 MW | 1,417 MW | 4,184 MW | 205 MW |
| 2026-10-22T14:00Z | 8,975 MW | 2,127 MW | 1,421 MW | 2,675 MW | 203 MW |
| 2026-10-22T15:00Z | 9,932 MW | 2,410 MW | 1,360 MW | 824 MW | 207 MW |
| 2026-10-22T16:00Z | 9,741 MW | 2,855 MW | 1,343 MW | 29 MW | 208 MW |
| 2026-10-22T17:00Z | 9,942 MW | 3,114 MW | 1,354 MW | 0 MW | 208 MW |
| 2026-10-22T18:00Z | 10,071 MW | 2,871 MW | 1,364 MW | 0 MW | 208 MW |
| 2026-10-22T19:00Z | 9,817 MW | 2,371 MW | 1,370 MW | 0 MW | 210 MW |
| 2026-10-22T20:00Z | 9,000 MW | 2,186 MW | 1,352 MW | 0 MW | 208 MW |
| 2026-10-22T21:00Z | 8,500 MW | 2,077 MW | 1,345 MW | 0 MW | 208 MW |
| 2026-10-22T22:00Z | 8,013 MW | 1,835 MW | 1,396 MW | 0 MW | 207 MW |
| 2026-10-22T23:00Z | 7,860 MW | 1,750 MW | 1,404 MW | 0 MW | 207 MW |
| 2026-10-23T00:00Z | 7,608 MW | 1,778 MW | 1,411 MW | 0 MW | 208 MW |
| 2026-10-23T01:00Z | 7,887 MW | 1,758 MW | 1,417 MW | 0 MW | 209 MW |
| 2026-10-23T02:00Z | 7,541 MW | 1,791 MW | 1,420 MW | 0 MW | 208 MW |
| 2026-10-23T03:00Z | 8,434 MW | 1,860 MW | 1,428 MW | 0 MW | 207 MW |
| 2026-10-23T04:00Z | 9,306 MW | 2,445 MW | 1,444 MW | 0 MW | 207 MW |
| 2026-10-23T05:00Z | 10,204 MW | 3,099 MW | 1,453 MW | 4 MW | 206 MW |
| 2026-10-23T06:00Z | 9,777 MW | 3,082 MW | 1,436 MW | 302 MW | 208 MW |
| 2026-10-23T07:00Z | 9,457 MW | 2,480 MW | 1,432 MW | 1,152 MW | 206 MW |
| 2026-10-23T08:00Z | 9,030 MW | 2,142 MW | 1,448 MW | 2,343 MW | 207 MW |
| 2026-10-23T09:00Z | 8,578 MW | 1,773 MW | 1,440 MW | 3,251 MW | 208 MW |
| 2026-10-23T10:00Z | 8,380 MW | 1,614 MW | 1,436 MW | 3,299 MW | 208 MW |
| 2026-10-23T11:00Z | 8,801 MW | 1,572 MW | 1,430 MW | 2,675 MW | 207 MW |
| 2026-10-23T12:00Z | 9,423 MW | 1,604 MW | 1,423 MW | 2,209 MW | 201 MW |
| 2026-10-23T13:00Z | 9,528 MW | 1,669 MW | 1,427 MW | 1,625 MW | 198 MW |
| 2026-10-23T14:00Z | 10,413 MW | 1,939 MW | 1,439 MW | 806 MW | 199 MW |
| 2026-10-23T15:00Z | 10,093 MW | 2,301 MW | 1,464 MW | 239 MW | 200 MW |
| 2026-10-23T16:00Z | 9,436 MW | 2,810 MW | 1,461 MW | 16 MW | 202 MW |
| 2026-10-23T17:00Z | 9,493 MW | 2,964 MW | 1,482 MW | 0 MW | 204 MW |
| 2026-10-23T18:00Z | 9,469 MW | 2,755 MW | 1,488 MW | 0 MW | 209 MW |
| 2026-10-23T19:00Z | 9,286 MW | 2,242 MW | 1,472 MW | 0 MW | 210 MW |
| 2026-10-23T20:00Z | 8,094 MW | 2,024 MW | 1,452 MW | 0 MW | 210 MW |
| 2026-10-23T21:00Z | 7,741 MW | 1,812 MW | 1,443 MW | 0 MW | 207 MW |
| 2026-10-23T22:00Z | 7,282 MW | 1,758 MW | 1,427 MW | 0 MW | 208 MW |
| 2026-10-23T23:00Z | 7,237 MW | 1,672 MW | 1,424 MW | 0 MW | 208 MW |
| 2026-10-24T00:00Z | 7,133 MW | 1,750 MW | 1,422 MW | 0 MW | 208 MW |
| 2026-10-24T01:00Z | 7,332 MW | 1,739 MW | 1,424 MW | 0 MW | 208 MW |
| 2026-10-24T02:00Z | 7,215 MW | 1,757 MW | 1,426 MW | 0 MW | 208 MW |
| 2026-10-24T03:00Z | 7,181 MW | 1,808 MW | 1,448 MW | 0 MW | 207 MW |
| 2026-10-24T04:00Z | 6,871 MW | 2,079 MW | 1,466 MW | 0 MW | 207 MW |
| 2026-10-24T05:00Z | 7,296 MW | 2,470 MW | 1,475 MW | 1 MW | 207 MW |
| 2026-10-24T06:00Z | 6,846 MW | 2,672 MW | 1,470 MW | 371 MW | 208 MW |
| 2026-10-24T07:00Z | 6,430 MW | 2,133 MW | 1,465 MW | 1,519 MW | 208 MW |
| 2026-10-24T08:00Z | 6,164 MW | 1,684 MW | 1,440 MW | 2,948 MW | 209 MW |
| 2026-10-24T09:00Z | 5,714 MW | 1,559 MW | 1,433 MW | 3,879 MW | 209 MW |
| 2026-10-24T10:00Z | 5,934 MW | 1,563 MW | 1,437 MW | 4,086 MW | 209 MW |
| 2026-10-24T11:00Z | 5,319 MW | 1,591 MW | 1,449 MW | 4,153 MW | 210 MW |
| 2026-10-24T12:00Z | 5,234 MW | 1,563 MW | 1,436 MW | 3,901 MW | 208 MW |
| 2026-10-24T13:00Z | 6,119 MW | 1,467 MW | 1,441 MW | 2,898 MW | 207 MW |
| 2026-10-24T14:00Z | 7,135 MW | 1,744 MW | 1,453 MW | 1,794 MW | 207 MW |
| 2026-10-24T15:00Z | 7,530 MW | 2,201 MW | 1,494 MW | 503 MW | 207 MW |
| 2026-10-24T16:00Z | 7,397 MW | 2,567 MW | 1,488 MW | 13 MW | 209 MW |
| 2026-10-24T17:00Z | 7,115 MW | 2,881 MW | 1,504 MW | 0 MW | 208 MW |
| 2026-10-24T18:00Z | 7,792 MW | 2,805 MW | 1,507 MW | 0 MW | 208 MW |
| 2026-10-24T19:00Z | 8,006 MW | 2,244 MW | 1,503 MW | 0 MW | 209 MW |
| 2026-10-24T20:00Z | 7,223 MW | 2,000 MW | 1,493 MW | 0 MW | 208 MW |
| 2026-10-24T21:00Z | 6,691 MW | 1,837 MW | 1,471 MW | 0 MW | 208 MW |
| 2026-10-24T22:00Z | 6,452 MW | 1,872 MW | 744 MW | 0 MW | 208 MW |
| 2026-10-24T23:00Z | 7,035 MW | 1,526 MW | 737 MW | 0 MW | 210 MW |
| 2026-10-25T00:00Z | 6,943 MW | 1,578 MW | 719 MW | 0 MW | 209 MW |
| 2026-10-25T01:00Z | 6,097 MW | 1,535 MW | 687 MW | 0 MW | 209 MW |
| 2026-10-25T02:00Z | 6,332 MW | 1,596 MW | 753 MW | 0 MW | 208 MW |
| 2026-10-25T03:00Z | 5,741 MW | 1,634 MW | 778 MW | 0 MW | 225 MW |
| 2026-10-25T04:00Z | 6,041 MW | 1,705 MW | 730 MW | 0 MW | 208 MW |
| 2026-10-25T05:00Z | 5,985 MW | 1,763 MW | 741 MW | 4 MW | 209 MW |
| 2026-10-25T06:00Z | 5,795 MW | 1,839 MW | 752 MW | 311 MW | 210 MW |
| 2026-10-25T07:00Z | 5,672 MW | 1,729 MW | 719 MW | 1,013 MW | 210 MW |
| 2026-10-25T08:00Z | 5,486 MW | 1,497 MW | 695 MW | 2,057 MW | 210 MW |
| 2026-10-25T09:00Z | 5,356 MW | 1,354 MW | 755 MW | 2,847 MW | 211 MW |
| 2026-10-25T10:00Z | 5,136 MW | 1,296 MW | 720 MW | 3,015 MW | 210 MW |
| 2026-10-25T11:00Z | 5,451 MW | 1,296 MW | 695 MW | 2,632 MW | 211 MW |
| 2026-10-25T12:00Z | 6,133 MW | 1,319 MW | 663 MW | 1,919 MW | 210 MW |
| 2026-10-25T13:00Z | 6,491 MW | 1,579 MW | 699 MW | 1,328 MW | 208 MW |
| 2026-10-25T14:00Z | 7,018 MW | 1,800 MW | 785 MW | 795 MW | 208 MW |
| 2026-10-25T15:00Z | 8,538 MW | 1,939 MW | 876 MW | 272 MW | 207 MW |
| 2026-10-25T16:00Z | 9,329 MW | 2,144 MW | 822 MW | 13 MW | 207 MW |
| 2026-10-25T17:00Z | 9,330 MW | 2,371 MW | 800 MW | 0 MW | 209 MW |
| 2026-10-25T18:00Z | 9,435 MW | 2,624 MW | 757 MW | 0 MW | 208 MW |
| 2026-10-25T19:00Z | 9,950 MW | 2,279 MW | 746 MW | 0 MW | 209 MW |
| 2026-10-25T20:00Z | 10,026 MW | 1,843 MW | 688 MW | 0 MW | 207 MW |
| 2026-10-25T21:00Z | 9,117 MW | 1,708 MW | 699 MW | 0 MW | 209 MW |
| 2026-10-25T22:00Z | 8,360 MW | 1,594 MW | 646 MW | 0 MW | 199 MW |
| 2026-10-25T23:00Z | 7,338 MW | 1,447 MW | 1,412 MW | 0 MW | 199 MW |
| 2026-10-26T00:00Z | 6,862 MW | 1,479 MW | 1,407 MW | 0 MW | 198 MW |
| 2026-10-26T01:00Z | 6,664 MW | 1,566 MW | 1,409 MW | 0 MW | 198 MW |
| 2026-10-26T02:00Z | 6,704 MW | 1,508 MW | 1,406 MW | 0 MW | 197 MW |
| 2026-10-26T03:00Z | 7,109 MW | 1,469 MW | 1,403 MW | 0 MW | 197 MW |
| 2026-10-26T04:00Z | 7,804 MW | 1,531 MW | 1,406 MW | 0 MW | 196 MW |
| 2026-10-26T05:00Z | 9,281 MW | 2,135 MW | 1,388 MW | 4 MW | 199 MW |
| 2026-10-26T06:00Z | 9,403 MW | 2,507 MW | 1,387 MW | 487 MW | 199 MW |
| 2026-10-26T07:00Z | 9,205 MW | 2,250 MW | 1,379 MW | 1,975 MW | 200 MW |
| 2026-10-26T08:00Z | 7,610 MW | 1,640 MW | 1,369 MW | 3,607 MW | 201 MW |
| 2026-10-26T09:00Z | 6,258 MW | 1,418 MW | 1,361 MW | 4,573 MW | 200 MW |
| 2026-10-26T10:00Z | 6,479 MW | 1,343 MW | 1,352 MW | 5,011 MW | 202 MW |
| 2026-10-26T11:00Z | 6,453 MW | 1,269 MW | 1,363 MW | 4,998 MW | 200 MW |
| 2026-10-26T12:00Z | 6,886 MW | 1,289 MW | 1,378 MW | 4,546 MW | 202 MW |
| 2026-10-26T13:00Z | 8,268 MW | 1,366 MW | 1,381 MW | 3,584 MW | 200 MW |
| 2026-10-26T14:00Z | 10,155 MW | 2,014 MW | 1,399 MW | 1,812 MW | 198 MW |
| 2026-10-26T15:00Z | 10,141 MW | 2,753 MW | 1,419 MW | 484 MW | 197 MW |
| 2026-10-26T16:00Z | 10,482 MW | 3,054 MW | 1,426 MW | 19 MW | 198 MW |
| 2026-10-26T17:00Z | 10,569 MW | 3,147 MW | 1,430 MW | 0 MW | 197 MW |
| 2026-10-26T18:00Z | 11,059 MW | 2,999 MW | 1,449 MW | 0 MW | 200 MW |
| 2026-10-26T19:00Z | 10,933 MW | 2,722 MW | 1,436 MW | 0 MW | 198 MW |
| 2026-10-26T20:00Z | 10,117 MW | 2,148 MW | 1,426 MW | 0 MW | 199 MW |
| 2026-10-26T21:00Z | 9,459 MW | 1,742 MW | 1,412 MW | 0 MW | 199 MW |
| 2026-10-26T22:00Z | 8,554 MW | 1,616 MW | 1,401 MW | 0 MW | 198 MW |
| 2026-10-26T23:00Z | 7,682 MW | 1,500 MW | 1,381 MW | 0 MW | 197 MW |
| 2026-10-27T00:00Z | 7,280 MW | 1,442 MW | 1,384 MW | 0 MW | 198 MW |
| 2026-10-27T01:00Z | 7,918 MW | 1,547 MW | 1,385 MW | 0 MW | 199 MW |
| 2026-10-27T02:00Z | 8,070 MW | 1,553 MW | 1,384 MW | 0 MW | 200 MW |
| 2026-10-27T03:00Z | 8,251 MW | 1,572 MW | 1,396 MW | 0 MW | 200 MW |
| 2026-10-27T04:00Z | 8,555 MW | 1,725 MW | 1,407 MW | 0 MW | 199 MW |
| 2026-10-27T05:00Z | 8,793 MW | 2,303 MW | 1,416 MW | 2 MW | 199 MW |
| 2026-10-27T06:00Z | 8,871 MW | 2,844 MW | 1,424 MW | 457 MW | 201 MW |
| 2026-10-27T07:00Z | 8,379 MW | 2,668 MW | 1,417 MW | 1,936 MW | 202 MW |
| 2026-10-27T08:00Z | 7,751 MW | 2,014 MW | 1,411 MW | 3,618 MW | 198 MW |
| 2026-10-27T09:00Z | 6,865 MW | 1,521 MW | 1,389 MW | 4,542 MW | 201 MW |
| 2026-10-27T10:00Z | 7,661 MW | 1,299 MW | 1,380 MW | 4,983 MW | 199 MW |
| 2026-10-27T11:00Z | 7,341 MW | 1,229 MW | 1,380 MW | 4,978 MW | 204 MW |
| 2026-10-27T12:00Z | 7,180 MW | 1,237 MW | 1,384 MW | 4,531 MW | 204 MW |
| 2026-10-27T13:00Z | 9,140 MW | 1,380 MW | 1,381 MW | 3,562 MW | 202 MW |
| 2026-10-27T14:00Z | 10,896 MW | 1,795 MW | 1,403 MW | 2,030 MW | 188 MW |
| 2026-10-27T15:00Z | 11,592 MW | 2,474 MW | 1,411 MW | 490 MW | 186 MW |
| 2026-10-27T16:00Z | 11,367 MW | 2,848 MW | 1,415 MW | 10 MW | 184 MW |
| 2026-10-27T17:00Z | 11,767 MW | 2,866 MW | 1,402 MW | 0 MW | 194 MW |
| 2026-10-27T18:00Z | 11,976 MW | 2,700 MW | 1,398 MW | 0 MW | 196 MW |
| 2026-10-27T19:00Z | 11,823 MW | 2,526 MW | 1,407 MW | 0 MW | 196 MW |
| 2026-10-27T20:00Z | 11,253 MW | 1,971 MW | 1,401 MW | 0 MW | 195 MW |
| 2026-10-27T21:00Z | 10,193 MW | 1,673 MW | 1,391 MW | 0 MW | 194 MW |
| 2026-10-27T22:00Z | 9,333 MW | 1,505 MW | 1,381 MW | 0 MW | 193 MW |
| 2026-10-27T23:00Z | 8,659 MW | 1,377 MW | 1,362 MW | 0 MW | 196 MW |
| 2026-10-28T00:00Z | 8,803 MW | 1,318 MW | 1,362 MW | 0 MW | 195 MW |
| 2026-10-28T01:00Z | 8,422 MW | 1,361 MW | 1,364 MW | 0 MW | 196 MW |
| 2026-10-28T02:00Z | 8,670 MW | 1,361 MW | 1,362 MW | 0 MW | 198 MW |
| 2026-10-28T03:00Z | 8,232 MW | 1,354 MW | 1,361 MW | 0 MW | 197 MW |
| 2026-10-28T04:00Z | 9,182 MW | 1,486 MW | 1,363 MW | 0 MW | 197 MW |
| 2026-10-28T05:00Z | 10,078 MW | 2,028 MW | 1,386 MW | 2 MW | 195 MW |
| 2026-10-28T06:00Z | 10,678 MW | 2,600 MW | 1,393 MW | 336 MW | 195 MW |
| 2026-10-28T07:00Z | 10,291 MW | 2,342 MW | 1,389 MW | 1,543 MW | 187 MW |
| 2026-10-28T08:00Z | 10,309 MW | 1,845 MW | 1,373 MW | 2,815 MW | 175 MW |
| 2026-10-28T09:00Z | 10,322 MW | 1,424 MW | 1,314 MW | 3,660 MW | 145 MW |
| 2026-10-28T10:00Z | 11,270 MW | 1,319 MW | 1,312 MW | 3,984 MW | 152 MW |
| 2026-10-28T11:00Z | 10,815 MW | 1,498 MW | 1,327 MW | 3,739 MW | 140 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00Z.
Day by Day
Daily totals, Europe/Rome time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Rome time) | Demand |
|---|---|
| 2025-09-23 | 473 GWh |
| 2025-09-24 | 464 GWh |
| 2025-09-25 | 440 GWh |
| 2025-09-26 | 454 GWh |
| 2025-09-27 | 361 GWh |
| 2025-09-28 | 302 GWh |
| 2025-09-29 | 414 GWh |
| 2025-09-30 | 449 GWh |
| 2025-10-01 | 446 GWh |
| 2025-10-02 | 433 GWh |
| 2025-10-03 | 419 GWh |
| 2025-10-04 | 353 GWh |
| 2025-10-05 | 311 GWh |
| 2025-10-06 | 423 GWh |
| 2025-10-07 | 445 GWh |
| 2025-10-08 | 451 GWh |
| 2025-10-09 | 457 GWh |
| 2025-10-10 | 445 GWh |
| 2025-10-11 | 348 GWh |
| 2025-10-12 | 308 GWh |
| 2025-10-13 | 430 GWh |
| 2025-10-14 | 456 GWh |
| 2025-10-15 | 460 GWh |
| 2025-10-16 | 457 GWh |
| 2025-10-17 | 447 GWh |
| 2025-10-18 | 350 GWh |
| 2025-10-19 | 313 GWh |
| 2025-10-20 | 442 GWh |
| 2025-10-21 | 466 GWh |
| 2025-10-22 | 466 GWh |
| 2025-10-23 | 465 GWh |
| 2025-10-24 | 441 GWh |
| 2025-10-25 | 347 GWh |
| 2025-10-26 | 317 GWh |
| 2025-10-27 | 421 GWh |
| 2025-10-28 | 451 GWh |
| 2025-10-29 | 466 GWh |
| 2025-10-30 | 463 GWh |
| 2025-10-31 | 441 GWh |
| 2025-11-01 | 316 GWh |
| 2025-11-02 | 305 GWh |
| 2025-11-03 | 416 GWh |
| 2025-11-04 | 447 GWh |
| 2025-11-05 | 462 GWh |
| 2025-11-06 | 460 GWh |
| 2025-11-07 | 460 GWh |
| 2025-11-08 | 358 GWh |
| 2025-11-09 | 320 GWh |
| 2025-11-10 | 446 GWh |
| 2025-11-11 | 468 GWh |
| 2025-11-12 | 471 GWh |
| 2025-11-13 | 473 GWh |
| 2025-11-14 | 477 GWh |
| 2025-11-15 | 382 GWh |
| 2025-11-16 | 337 GWh |
| 2025-11-17 | 459 GWh |
| 2025-11-18 | 491 GWh |
| 2025-11-19 | 501 GWh |
| 2025-11-20 | 507 GWh |
| 2025-11-21 | 514 GWh |
| 2025-11-22 | 410 GWh |
| 2025-11-23 | 356 GWh |
| 2025-11-24 | 510 GWh |
| 2025-11-25 | 524 GWh |
| 2025-11-26 | 515 GWh |
| 2025-11-27 | 516 GWh |
| 2025-11-28 | 511 GWh |
| 2025-11-29 | 407 GWh |
| 2025-11-30 | 381 GWh |
| 2025-12-01 | 517 GWh |
| 2025-12-02 | 538 GWh |
| 2025-12-03 | 534 GWh |
| 2025-12-04 | 525 GWh |
| 2025-12-05 | 513 GWh |
| 2025-12-06 | 412 GWh |
| 2025-12-07 | 354 GWh |
| 2025-12-08 | 347 GWh |
| 2025-12-09 | 504 GWh |
| 2025-12-10 | 539 GWh |
| 2025-12-11 | 539 GWh |
| 2025-12-12 | 495 GWh |
| 2025-12-13 | 399 GWh |
| 2025-12-14 | 365 GWh |
| 2025-12-15 | 502 GWh |
| 2025-12-16 | 534 GWh |
| 2025-12-17 | 516 GWh |
| 2025-12-18 | 508 GWh |
| 2025-12-19 | 478 GWh |
| 2025-12-20 | 380 GWh |
| 2025-12-21 | 342 GWh |
| 2025-12-22 | 417 GWh |
| 2025-12-23 | 423 GWh |
| 2025-12-24 | 342 GWh |
| 2025-12-25 | 286 GWh |
| 2025-12-26 | 284 GWh |
| 2025-12-27 | 310 GWh |
| 2025-12-28 | 304 GWh |
| 2025-12-29 | 363 GWh |
| 2025-12-30 | 375 GWh |
| 2025-12-31 | 340 GWh |
| 2026-01-01 | 315 GWh |
| 2026-01-02 | 355 GWh |
| 2026-01-03 | 356 GWh |
| 2026-01-04 | 342 GWh |
| 2026-01-05 | 389 GWh |
| 2026-01-06 | 369 GWh |
| 2026-01-07 | 490 GWh |
| 2026-01-08 | 527 GWh |
| 2026-01-09 | 534 GWh |
| 2026-01-10 | 426 GWh |
| 2026-01-11 | 379 GWh |
| 2026-01-12 | 519 GWh |
| 2026-01-13 | 546 GWh |
| 2026-01-14 | 544 GWh |
| 2026-01-15 | 539 GWh |
| 2026-01-16 | 531 GWh |
| 2026-01-17 | 426 GWh |
| 2026-01-18 | 380 GWh |
| 2026-01-19 | 510 GWh |
| 2026-01-20 | 540 GWh |
| 2026-01-21 | 541 GWh |
| 2026-01-22 | 550 GWh |
| 2026-01-23 | 548 GWh |
| 2026-01-24 | 443 GWh |
| 2026-01-25 | 392 GWh |
| 2026-01-26 | 509 GWh |
| 2026-01-27 | 536 GWh |
| 2026-01-28 | 548 GWh |
| 2026-01-29 | 530 GWh |
| 2026-01-30 | 527 GWh |
| 2026-01-31 | 425 GWh |
| 2026-02-01 | 380 GWh |
| 2026-02-02 | 514 GWh |
| 2026-02-03 | 546 GWh |
| 2026-02-04 | 545 GWh |
| 2026-02-05 | 523 GWh |
| 2026-02-06 | 515 GWh |
| 2026-02-07 | 419 GWh |
| 2026-02-08 | 372 GWh |
| 2026-02-09 | 496 GWh |
| 2026-02-10 | 515 GWh |
| 2026-02-11 | 517 GWh |
| 2026-02-12 | 515 GWh |
| 2026-02-13 | 498 GWh |
| 2026-02-14 | 415 GWh |
| 2026-02-15 | 353 GWh |
| 2026-02-16 | 487 GWh |
| 2026-02-17 | 491 GWh |
| 2026-02-18 | 494 GWh |
| 2026-02-19 | 518 GWh |
| 2026-02-20 | 497 GWh |
| 2026-02-21 | 397 GWh |
| 2026-02-22 | 353 GWh |
| 2026-02-23 | 466 GWh |
| 2026-02-24 | 489 GWh |
| 2026-02-25 | 494 GWh |
| 2026-02-26 | 482 GWh |
| 2026-02-27 | 480 GWh |
| 2026-02-28 | 396 GWh |
| 2026-03-01 | 362 GWh |
| 2026-03-02 | 469 GWh |
| 2026-03-03 | 485 GWh |
| 2026-03-04 | 487 GWh |
| 2026-03-05 | 497 GWh |
| 2026-03-06 | 472 GWh |
| 2026-03-07 | 382 GWh |
| 2026-03-08 | 342 GWh |
| 2026-03-09 | 457 GWh |
| 2026-03-10 | 485 GWh |
| 2026-03-11 | 483 GWh |
| 2026-03-12 | 481 GWh |
| 2026-03-13 | 463 GWh |
| 2026-03-14 | 387 GWh |
| 2026-03-15 | 340 GWh |
| 2026-03-16 | 437 GWh |
| 2026-03-17 | 452 GWh |
| 2026-03-18 | 476 GWh |
| 2026-03-19 | 455 GWh |
| 2026-03-20 | 448 GWh |
| 2026-03-21 | 375 GWh |
| 2026-03-22 | 338 GWh |
| 2026-03-23 | 438 GWh |
| 2026-03-24 | 450 GWh |
| 2026-03-25 | 453 GWh |
| 2026-03-26 | 479 GWh |
| 2026-03-27 | 457 GWh |
| 2026-03-28 | 356 GWh |
| 2026-03-29 | 302 GWh |
| 2026-03-30 | 426 GWh |
| 2026-03-31 | 449 GWh |
| 2026-04-01 | 462 GWh |
| 2026-04-02 | 440 GWh |
| 2026-04-03 | 399 GWh |
| 2026-04-04 | 314 GWh |
| 2026-04-05 | 275 GWh |
| 2026-04-06 | 279 GWh |
| 2026-04-07 | 392 GWh |
| 2026-04-08 | 419 GWh |
| 2026-04-09 | 423 GWh |
| 2026-04-10 | 427 GWh |
| 2026-04-11 | 332 GWh |
| 2026-04-12 | 313 GWh |
| 2026-04-13 | 431 GWh |
| 2026-04-14 | 454 GWh |
| 2026-04-15 | 444 GWh |
| 2026-04-16 | 424 GWh |
| 2026-04-17 | 418 GWh |
| 2026-04-18 | 326 GWh |
| 2026-04-19 | 291 GWh |
| 2026-04-20 | 397 GWh |
| 2026-04-21 | 430 GWh |
| 2026-04-22 | 429 GWh |
| 2026-04-23 | 412 GWh |
| 2026-04-24 | 402 GWh |
| 2026-04-25 | 299 GWh |
| 2026-04-26 | 284 GWh |
| 2026-04-27 | 399 GWh |
| 2026-04-28 | 427 GWh |
| 2026-04-29 | 436 GWh |
| 2026-04-30 | 398 GWh |
| 2026-05-01 | 284 GWh |
| 2026-05-02 | 288 GWh |
| 2026-05-03 | 285 GWh |
| 2026-05-04 | 401 GWh |
| 2026-05-05 | 450 GWh |
| 2026-05-06 | 439 GWh |
| 2026-05-07 | 411 GWh |
| 2026-05-08 | 418 GWh |
| 2026-05-09 | 319 GWh |
| 2026-05-10 | 306 GWh |
| 2026-05-11 | 403 GWh |
| 2026-05-12 | 408 GWh |
| 2026-05-13 | 412 GWh |
| 2026-05-14 | 427 GWh |
| 2026-05-15 | 443 GWh |
| 2026-05-16 | 330 GWh |
| 2026-05-17 | 280 GWh |
| 2026-05-18 | 391 GWh |
| 2026-05-19 | 410 GWh |
| 2026-05-20 | 412 GWh |
| 2026-05-21 | 414 GWh |
| 2026-05-22 | 411 GWh |
| 2026-05-23 | 331 GWh |
| 2026-05-24 | 295 GWh |
| 2026-05-25 | 419 GWh |
| 2026-05-26 | 465 GWh |
| 2026-05-27 | 486 GWh |
| 2026-05-28 | 490 GWh |
| 2026-05-29 | 462 GWh |
| 2026-05-30 | 370 GWh |
| 2026-05-31 | 336 GWh |
| 2026-06-01 | 361 GWh |
| 2026-06-02 | 347 GWh |
| 2026-06-03 | 418 GWh |
| 2026-06-04 | 442 GWh |
| 2026-06-05 | 439 GWh |
| 2026-06-06 | 347 GWh |
| 2026-06-07 | 305 GWh |
| 2026-06-08 | 431 GWh |
| 2026-06-09 | 467 GWh |
| 2026-06-10 | 465 GWh |
| 2026-06-11 | 427 GWh |
| 2026-06-12 | 429 GWh |
| 2026-06-13 | 351 GWh |
| 2026-06-14 | 312 GWh |
| 2026-06-15 | 438 GWh |
| 2026-06-16 | 472 GWh |
| 2026-06-17 | 487 GWh |
| 2026-06-18 | 508 GWh |
| 2026-06-19 | 521 GWh |
| 2026-06-20 | 433 GWh |
| 2026-06-21 | 399 GWh |
| 2026-06-22 | 536 GWh |
| 2026-06-23 | 565 GWh |
| 2026-06-24 | 572 GWh |
| 2026-06-25 | 586 GWh |
| 2026-06-26 | 574 GWh |
| 2026-06-27 | 482 GWh |
| 2026-06-28 | 441 GWh |
| 2026-06-29 | 562 GWh |
| 2026-06-30 | 571 GWh |
| 2026-07-01 | 561 GWh |
| 2026-07-02 | 504 GWh |
| 2026-07-03 | 517 GWh |
| 2026-07-04 | 425 GWh |
| 2026-07-05 | 384 GWh |
| 2026-07-06 | 516 GWh |
| 2026-07-07 | 545 GWh |
| 2026-07-08 | 557 GWh |
| 2026-07-09 | 562 GWh |
| 2026-07-10 | 561 GWh |
| 2026-07-11 | 463 GWh |
| 2026-07-12 | 400 GWh |
| 2026-07-13 | 546 GWh |
| 2026-07-14 | 583 GWh |
| 2026-07-15 | 576 GWh |
| 2026-07-16 | 561 GWh |
| 2026-07-17 | 554 GWh |
| 2026-07-18 | 465 GWh |
| 2026-07-19 | 401 GWh |
| 2026-07-20 | 516 GWh |
| 2026-07-21 | 527 GWh |
| 2026-07-22 | 509 GWh |
| 2026-07-23 | 502 GWh |
| 2026-07-24 | 482 GWh |
| 2026-07-25 | 390 GWh |
| 2026-07-26 | 354 GWh |
| 2026-07-27 | 477 GWh |
| 2026-07-28 | 524 GWh |
| 2026-07-29 | 545 GWh |
| 2026-07-30 | 562 GWh |
| 2026-07-31 | 566 GWh |
| 2026-08-01 | 462 GWh |
| 2026-08-02 | 413 GWh |
| 2026-08-03 | 514 GWh |
| 2026-08-04 | 535 GWh |
| 2026-08-05 | 532 GWh |
| 2026-08-06 | 525 GWh |
| 2026-08-07 | 478 GWh |
| 2026-08-08 | 403 GWh |
| 2026-08-09 | 371 GWh |
| 2026-08-10 | 413 GWh |
| 2026-08-11 | 415 GWh |
| 2026-08-12 | 411 GWh |
| 2026-08-13 | 406 GWh |
| 2026-08-14 | 388 GWh |
| 2026-08-15 | 337 GWh |
| 2026-08-16 | 339 GWh |
| 2026-08-17 | 369 GWh |
| 2026-08-18 | 376 GWh |
| 2026-08-19 | 400 GWh |
| 2026-08-20 | 411 GWh |
| 2026-08-21 | 375 GWh |
| 2026-08-22 | 321 GWh |
| 2026-08-23 | 300 GWh |
| 2026-08-24 | 405 GWh |
| 2026-08-25 | 436 GWh |
| 2026-08-26 | 450 GWh |
| 2026-08-27 | 478 GWh |
| 2026-08-28 | 494 GWh |
| 2026-08-29 | 389 GWh |
| 2026-08-30 | 351 GWh |
| 2026-08-31 | 481 GWh |
| 2026-09-01 | 517 GWh |
| 2026-09-02 | 526 GWh |
| 2026-09-03 | 529 GWh |
| 2026-09-04 | 528 GWh |
| 2026-09-05 | 422 GWh |
| 2026-09-06 | 381 GWh |
| 2026-09-07 | 506 GWh |
| 2026-09-08 | 537 GWh |
| 2026-09-09 | 534 GWh |
| 2026-09-10 | 500 GWh |
| 2026-09-11 | 455 GWh |
| 2026-09-12 | 356 GWh |
| 2026-09-13 | 309 GWh |
| 2026-09-14 | 433 GWh |
| 2026-09-15 | 468 GWh |
| 2026-09-16 | 476 GWh |
| 2026-09-17 | 479 GWh |
| 2026-09-18 | 461 GWh |
| 2026-09-19 | 360 GWh |
| 2026-09-20 | 312 GWh |
| 2026-09-21 | 445 GWh |
| 2026-09-22 | 451 GWh |
| 2026-09-23 | 453 GWh |
| 2026-09-24 | 455 GWh |
| 2026-09-25 | 449 GWh |
| 2026-09-26 | 351 GWh |
| 2026-09-27 | 309 GWh |
| 2026-09-28 | 424 GWh |
| 2026-09-29 | 453 GWh |
| 2026-09-30 | 453 GWh |
| 2026-10-01 | 458 GWh |
| 2026-10-02 | 447 GWh |
| 2026-10-03 | 354 GWh |
| 2026-10-04 | 303 GWh |
| 2026-10-05 | 428 GWh |
| 2026-10-06 | 456 GWh |
| 2026-10-07 | 470 GWh |
| 2026-10-08 | 466 GWh |
| 2026-10-09 | 447 GWh |
| 2026-10-10 | 361 GWh |
| 2026-10-11 | 316 GWh |
| 2026-10-12 | 426 GWh |
| 2026-10-13 | 440 GWh |
| 2026-10-14 | 444 GWh |
| 2026-10-15 | 456 GWh |
| 2026-10-16 | 451 GWh |
| 2026-10-17 | 364 GWh |
| 2026-10-18 | 335 GWh |
| 2026-10-19 | 434 GWh |
| 2026-10-20 | 471 GWh |
| 2026-10-21 | 462 GWh |
| 2026-10-22 | 442 GWh |
| 2026-10-23 | 459 GWh |
| 2026-10-24 | 364 GWh |
| 2026-10-25 | 330 GWh |
| 2026-10-26 | 435 GWh |
| 2026-10-27 | 456 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Rome local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 132 TWh | 91.9 TWh | Gas 56.5% | 300 |
| 2025 | 156 TWh | 109 TWh | Gas 53.6% | 365 |
| 2024 (partial) | 155 TWh | 117 TWh | Gas 43.6% | 365 |
| 2023 | 154 TWh | 111 TWh | Gas 51.4% | 365 |
| 2022 | 160 TWh | 118 TWh | Gas 59.9% | 365 |
| 2021 | 162 TWh | 125 TWh | Gas 55.1% | 365 |
| 2020 | 153 TWh | 121 TWh | Gas 50.2% | 366 |
| 2019 | 165 TWh | 127 TWh | Gas 47.9% | 365 |
| 2018 | 167 TWh | 127 TWh | Other 34.6% | 365 |
| 2017 | 162 TWh | 123 TWh | Other 41.1% | 365 |
| 2016 | 158 TWh | 116 TWh | Other 45.1% | 366 |
| 2015 | 160 TWh | 112 TWh | Other 42.3% | 365 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| France | Italy North imports | 1.96 TWh |
| Switzerland | Italy North imports | 1.13 TWh |
| Italy Centre-North | Italy North exports | 450 GWh |
| Slovenia | Italy North imports | 447 GWh |
| Austria | Italy North imports | 173 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Latest Grid Alerts
Newest alert 21 October 2026- Net imports Italy North imported a net 139 GWh on 21 October 2026, the 3rd highest daily net imports in 362 days of loaded history and 30% of its demand that day. All alerts that day
- Net imports Net imports into Italy North reached 144 GWh on 20 October 2026 (31% of demand), the highest daily net imports in 361 days of loaded history. All alerts that day
- Net imports Net imports into Italy North reached 133 GWh on 15 October 2026 (29% of demand), the 3rd highest daily net imports in 356 days of loaded history. All alerts that day
Follow this grid: RSS feed of Italy North alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Italy North, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Italy North Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/it-nord/
World Power Monitor. Italy North Electricity Demand and Generation Mix. Data as of 2026-10-28 11:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/it-nord/
@misc{wpm_zones_it_nord_2026,
title = {{Italy North Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 11:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/it-nord/}
} Permalink: https://worldpowermonitor.com/zones/it-nord/
The Copy buttons add today's date as the access date.