NYISO Electricity Demand and Generation Mix
NYISO demand was 16,451 MW in the hour starting 5 Nov 2026, 08:00 EST (UTC-05:00). Gas was the largest source in the hour starting 4 Nov 2026, 22:00 EST (UTC-05:00), at 44% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- NYISO is a regional transmission organization and balancing authority in the United States, part of the EIA New York region.
- In the hour starting 5 Nov 2026, 08:00 EST (UTC-05:00), demand in NYISO was 16,451 MW, against a day-ahead forecast of 16,160 MW.
- Gas supplied 44.3% of NYISO's generation in the hour starting 4 Nov 2026, 22:00 EST (UTC-05:00).
- Demand in NYISO totalled 152 TWh in 2025.
- Gas supplied 53.0% of NYISO's generation in 2025.
- The highest daily demand in NYISO from 2019 onward was 635 GWh, on 2025-06-24 (24 June 2025).
- The highest hourly demand in NYISO since 2026-06-16 (16 June 2026) was 31,097 MW, in the hour starting 2 Jul 2026, 18:00 EDT (UTC-04:00).
- Wind's highest share of NYISO's daily generation from 2019 onward was 15.3%, on 2025-03-16 (16 March 2025).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 5 Nov 2026, 08:00 EST (UTC-05:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T13:00:00Z.
Generation by Source
Latest hour with generation by source: 4 Nov 2026, 22:00 EST (UTC-05:00)| Source | Output | Share |
|---|---|---|
| Gas | 5,930 MW | 44.3% |
| Nuclear | 3,233 MW | 24.1% |
| Hydro | 2,305 MW | 17.2% |
| Wind | 1,726 MW | 12.9% |
| Other | 195 MW | 1.5% |
| Coal | 0 MW | 0.0% |
| Oil | 0 MW | 0.0% |
| Solar | 0 MW | 0.0% |
| Total from these sources | 13,389 MW | |
| Net interchange | -1,809 MW | net imports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when NYISO exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T03:00:00Z.
Last 30 Days, Hourly
Times in UTCShow the data table (720 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-06T15:00Z | 12,554 MW |
| 2026-10-06T16:00Z | 12,430 MW |
| 2026-10-06T17:00Z | 12,462 MW |
| 2026-10-06T18:00Z | 12,583 MW |
| 2026-10-06T19:00Z | 13,071 MW |
| 2026-10-06T20:00Z | 14,176 MW |
| 2026-10-06T21:00Z | 15,954 MW |
| 2026-10-06T22:00Z | 17,032 MW |
| 2026-10-06T23:00Z | 17,295 MW |
| 2026-10-07T00:00Z | 16,781 MW |
| 2026-10-07T01:00Z | 16,014 MW |
| 2026-10-07T02:00Z | 15,048 MW |
| 2026-10-07T03:00Z | 14,083 MW |
| 2026-10-07T04:00Z | 13,447 MW |
| 2026-10-07T05:00Z | 12,962 MW |
| 2026-10-07T06:00Z | 12,668 MW |
| 2026-10-07T07:00Z | 12,559 MW |
| 2026-10-07T08:00Z | 12,764 MW |
| 2026-10-07T09:00Z | 13,582 MW |
| 2026-10-07T10:00Z | 15,016 MW |
| 2026-10-07T11:00Z | 15,879 MW |
| 2026-10-07T12:00Z | 15,250 MW |
| 2026-10-07T13:00Z | 14,073 MW |
| 2026-10-07T14:00Z | 13,357 MW |
| 2026-10-07T15:00Z | 13,238 MW |
| 2026-10-07T16:00Z | 13,078 MW |
| 2026-10-07T17:00Z | 13,164 MW |
| 2026-10-07T18:00Z | 13,357 MW |
| 2026-10-07T19:00Z | 13,941 MW |
| 2026-10-07T20:00Z | 15,104 MW |
| 2026-10-07T21:00Z | 16,412 MW |
| 2026-10-07T22:00Z | 17,177 MW |
| 2026-10-07T23:00Z | 17,384 MW |
| 2026-10-08T00:00Z | 16,856 MW |
| 2026-10-08T01:00Z | 16,123 MW |
| 2026-10-08T02:00Z | 15,093 MW |
| 2026-10-08T03:00Z | 14,120 MW |
| 2026-10-08T04:00Z | 13,500 MW |
| 2026-10-08T05:00Z | 13,027 MW |
| 2026-10-08T06:00Z | 12,671 MW |
| 2026-10-08T07:00Z | 12,531 MW |
| 2026-10-08T08:00Z | 12,666 MW |
| 2026-10-08T09:00Z | 13,355 MW |
| 2026-10-08T10:00Z | 14,777 MW |
| 2026-10-08T11:00Z | 15,603 MW |
| 2026-10-08T12:00Z | 15,196 MW |
| 2026-10-08T13:00Z | 14,017 MW |
| 2026-10-08T14:00Z | 13,671 MW |
| 2026-10-08T15:00Z | 13,733 MW |
| 2026-10-08T16:00Z | 13,850 MW |
| 2026-10-08T17:00Z | 13,981 MW |
| 2026-10-08T18:00Z | 14,171 MW |
| 2026-10-08T19:00Z | 14,639 MW |
| 2026-10-08T20:00Z | 15,612 MW |
| 2026-10-08T21:00Z | 16,798 MW |
| 2026-10-08T22:00Z | 17,379 MW |
| 2026-10-08T23:00Z | 17,429 MW |
| 2026-10-09T00:00Z | 16,903 MW |
| 2026-10-09T01:00Z | 16,128 MW |
| 2026-10-09T02:00Z | 15,213 MW |
| 2026-10-09T03:00Z | 14,240 MW |
| 2026-10-09T04:00Z | 13,616 MW |
| 2026-10-09T05:00Z | 13,033 MW |
| 2026-10-09T06:00Z | 12,712 MW |
| 2026-10-09T07:00Z | 12,549 MW |
| 2026-10-09T08:00Z | 12,665 MW |
| 2026-10-09T09:00Z | 13,343 MW |
| 2026-10-09T10:00Z | 14,705 MW |
| 2026-10-09T11:00Z | 15,593 MW |
| 2026-10-09T12:00Z | 15,074 MW |
| 2026-10-09T13:00Z | 13,949 MW |
| 2026-10-09T14:00Z | 13,550 MW |
| 2026-10-09T15:00Z | 13,345 MW |
| 2026-10-09T16:00Z | 13,129 MW |
| 2026-10-09T17:00Z | 13,338 MW |
| 2026-10-09T18:00Z | 13,529 MW |
| 2026-10-09T19:00Z | 14,261 MW |
| 2026-10-09T20:00Z | 15,204 MW |
| 2026-10-09T21:00Z | 16,384 MW |
| 2026-10-09T22:00Z | 16,975 MW |
| 2026-10-09T23:00Z | 16,918 MW |
| 2026-10-10T00:00Z | 16,391 MW |
| 2026-10-10T01:00Z | 15,792 MW |
| 2026-10-10T02:00Z | 15,048 MW |
| 2026-10-10T03:00Z | 14,214 MW |
| 2026-10-10T04:00Z | 13,548 MW |
| 2026-10-10T05:00Z | 13,026 MW |
| 2026-10-10T06:00Z | 12,734 MW |
| 2026-10-10T07:00Z | 12,561 MW |
| 2026-10-10T08:00Z | 12,555 MW |
| 2026-10-10T09:00Z | 12,790 MW |
| 2026-10-10T10:00Z | 13,331 MW |
| 2026-10-10T11:00Z | 13,777 MW |
| 2026-10-10T12:00Z | 13,467 MW |
| 2026-10-10T13:00Z | 12,646 MW |
| 2026-10-10T14:00Z | 12,170 MW |
| 2026-10-10T15:00Z | 11,911 MW |
| 2026-10-10T16:00Z | 11,763 MW |
| 2026-10-10T17:00Z | 11,919 MW |
| 2026-10-10T18:00Z | 12,537 MW |
| 2026-10-10T19:00Z | 13,404 MW |
| 2026-10-10T20:00Z | 14,339 MW |
| 2026-10-10T21:00Z | 15,254 MW |
| 2026-10-10T22:00Z | 15,956 MW |
| 2026-10-10T23:00Z | 16,089 MW |
| 2026-10-11T00:00Z | 15,725 MW |
| 2026-10-11T01:00Z | 15,293 MW |
| 2026-10-11T02:00Z | 14,637 MW |
| 2026-10-11T03:00Z | 13,944 MW |
| 2026-10-11T04:00Z | 13,439 MW |
| 2026-10-11T05:00Z | 12,972 MW |
| 2026-10-11T06:00Z | 12,641 MW |
| 2026-10-11T07:00Z | 12,434 MW |
| 2026-10-11T08:00Z | 12,393 MW |
| 2026-10-11T09:00Z | 12,502 MW |
| 2026-10-11T10:00Z | 12,895 MW |
| 2026-10-11T11:00Z | 13,316 MW |
| 2026-10-11T12:00Z | 13,819 MW |
| 2026-10-11T13:00Z | 14,270 MW |
| 2026-10-11T14:00Z | 14,588 MW |
| 2026-10-11T15:00Z | 14,829 MW |
| 2026-10-11T16:00Z | 15,068 MW |
| 2026-10-11T17:00Z | 15,264 MW |
| 2026-10-11T18:00Z | 15,400 MW |
| 2026-10-11T19:00Z | 15,652 MW |
| 2026-10-11T20:00Z | 16,041 MW |
| 2026-10-11T21:00Z | 16,446 MW |
| 2026-10-11T22:00Z | 16,662 MW |
| 2026-10-11T23:00Z | 16,480 MW |
| 2026-10-12T00:00Z | 16,016 MW |
| 2026-10-12T01:00Z | 15,418 MW |
| 2026-10-12T02:00Z | 14,693 MW |
| 2026-10-12T03:00Z | 13,920 MW |
| 2026-10-12T04:00Z | 13,378 MW |
| 2026-10-12T05:00Z | 12,902 MW |
| 2026-10-12T06:00Z | 12,598 MW |
| 2026-10-12T07:00Z | 12,444 MW |
| 2026-10-12T08:00Z | 12,572 MW |
| 2026-10-12T09:00Z | 13,113 MW |
| 2026-10-12T10:00Z | 14,188 MW |
| 2026-10-12T11:00Z | 15,203 MW |
| 2026-10-12T12:00Z | 15,748 MW |
| 2026-10-12T13:00Z | 15,749 MW |
| 2026-10-12T14:00Z | 15,433 MW |
| 2026-10-12T15:00Z | 15,193 MW |
| 2026-10-12T16:00Z | 14,902 MW |
| 2026-10-12T17:00Z | 14,952 MW |
| 2026-10-12T18:00Z | 15,206 MW |
| 2026-10-12T19:00Z | 15,646 MW |
| 2026-10-12T20:00Z | 16,490 MW |
| 2026-10-12T21:00Z | 17,509 MW |
| 2026-10-12T22:00Z | 17,983 MW |
| 2026-10-12T23:00Z | 17,906 MW |
| 2026-10-13T00:00Z | 17,270 MW |
| 2026-10-13T01:00Z | 16,475 MW |
| 2026-10-13T02:00Z | 15,477 MW |
| 2026-10-13T03:00Z | 14,534 MW |
| 2026-10-13T04:00Z | 13,815 MW |
| 2026-10-13T05:00Z | 13,278 MW |
| 2026-10-13T06:00Z | 12,929 MW |
| 2026-10-13T07:00Z | 12,752 MW |
| 2026-10-13T08:00Z | 12,938 MW |
| 2026-10-13T09:00Z | 13,635 MW |
| 2026-10-13T10:00Z | 15,021 MW |
| 2026-10-13T11:00Z | 16,052 MW |
| 2026-10-13T12:00Z | 16,251 MW |
| 2026-10-13T13:00Z | 16,076 MW |
| 2026-10-13T14:00Z | 15,778 MW |
| 2026-10-13T15:00Z | 15,391 MW |
| 2026-10-13T16:00Z | 15,360 MW |
| 2026-10-13T17:00Z | 15,508 MW |
| 2026-10-13T18:00Z | 15,677 MW |
| 2026-10-13T19:00Z | 16,373 MW |
| 2026-10-13T20:00Z | 17,251 MW |
| 2026-10-13T21:00Z | 18,081 MW |
| 2026-10-13T22:00Z | 18,555 MW |
| 2026-10-13T23:00Z | 18,516 MW |
| 2026-10-14T00:00Z | 17,935 MW |
| 2026-10-14T01:00Z | 17,155 MW |
| 2026-10-14T02:00Z | 16,201 MW |
| 2026-10-14T03:00Z | 15,217 MW |
| 2026-10-14T04:00Z | 14,444 MW |
| 2026-10-14T05:00Z | 13,861 MW |
| 2026-10-14T06:00Z | 13,464 MW |
| 2026-10-14T07:00Z | 13,263 MW |
| 2026-10-14T08:00Z | 13,350 MW |
| 2026-10-14T09:00Z | 13,988 MW |
| 2026-10-14T10:00Z | 15,365 MW |
| 2026-10-14T11:00Z | 16,414 MW |
| 2026-10-14T12:00Z | 16,630 MW |
| 2026-10-14T13:00Z | 16,630 MW |
| 2026-10-14T14:00Z | 16,832 MW |
| 2026-10-14T15:00Z | 17,141 MW |
| 2026-10-14T16:00Z | 17,348 MW |
| 2026-10-14T17:00Z | 17,075 MW |
| 2026-10-14T18:00Z | 16,839 MW |
| 2026-10-14T19:00Z | 17,364 MW |
| 2026-10-14T20:00Z | 18,155 MW |
| 2026-10-14T21:00Z | 18,756 MW |
| 2026-10-14T22:00Z | 19,124 MW |
| 2026-10-14T23:00Z | 19,015 MW |
| 2026-10-15T00:00Z | 18,349 MW |
| 2026-10-15T01:00Z | 17,474 MW |
| 2026-10-15T02:00Z | 16,360 MW |
| 2026-10-15T03:00Z | 15,118 MW |
| 2026-10-15T04:00Z | 14,250 MW |
| 2026-10-15T05:00Z | 13,564 MW |
| 2026-10-15T06:00Z | 13,053 MW |
| 2026-10-15T07:00Z | 12,805 MW |
| 2026-10-15T08:00Z | 12,891 MW |
| 2026-10-15T09:00Z | 13,519 MW |
| 2026-10-15T10:00Z | 14,815 MW |
| 2026-10-15T11:00Z | 15,701 MW |
| 2026-10-15T12:00Z | 15,582 MW |
| 2026-10-15T13:00Z | 14,946 MW |
| 2026-10-15T14:00Z | 14,312 MW |
| 2026-10-15T15:00Z | 13,733 MW |
| 2026-10-15T16:00Z | 13,324 MW |
| 2026-10-15T17:00Z | 13,193 MW |
| 2026-10-15T18:00Z | 13,372 MW |
| 2026-10-15T19:00Z | 13,964 MW |
| 2026-10-15T20:00Z | 15,199 MW |
| 2026-10-15T21:00Z | 16,616 MW |
| 2026-10-15T22:00Z | 17,291 MW |
| 2026-10-15T23:00Z | 17,237 MW |
| 2026-10-16T00:00Z | 16,669 MW |
| 2026-10-16T01:00Z | 16,010 MW |
| 2026-10-16T02:00Z | 15,127 MW |
| 2026-10-16T03:00Z | 14,185 MW |
| 2026-10-16T04:00Z | 13,571 MW |
| 2026-10-16T05:00Z | 13,066 MW |
| 2026-10-16T06:00Z | 12,772 MW |
| 2026-10-16T07:00Z | 12,686 MW |
| 2026-10-16T08:00Z | 12,860 MW |
| 2026-10-16T09:00Z | 13,552 MW |
| 2026-10-16T10:00Z | 14,901 MW |
| 2026-10-16T11:00Z | 16,077 MW |
| 2026-10-16T12:00Z | 16,748 MW |
| 2026-10-16T13:00Z | 17,037 MW |
| 2026-10-16T14:00Z | 17,078 MW |
| 2026-10-16T15:00Z | 17,027 MW |
| 2026-10-16T16:00Z | 17,003 MW |
| 2026-10-16T17:00Z | 16,852 MW |
| 2026-10-16T18:00Z | 16,775 MW |
| 2026-10-16T19:00Z | 17,094 MW |
| 2026-10-16T20:00Z | 17,644 MW |
| 2026-10-16T21:00Z | 18,091 MW |
| 2026-10-16T22:00Z | 18,057 MW |
| 2026-10-16T23:00Z | 17,692 MW |
| 2026-10-17T00:00Z | 17,032 MW |
| 2026-10-17T01:00Z | 16,289 MW |
| 2026-10-17T02:00Z | 15,485 MW |
| 2026-10-17T03:00Z | 14,630 MW |
| 2026-10-17T04:00Z | 13,968 MW |
| 2026-10-17T05:00Z | 13,307 MW |
| 2026-10-17T06:00Z | 12,896 MW |
| 2026-10-17T07:00Z | 12,659 MW |
| 2026-10-17T08:00Z | 12,622 MW |
| 2026-10-17T09:00Z | 12,839 MW |
| 2026-10-17T10:00Z | 13,409 MW |
| 2026-10-17T11:00Z | 14,109 MW |
| 2026-10-17T12:00Z | 14,293 MW |
| 2026-10-17T13:00Z | 14,014 MW |
| 2026-10-17T14:00Z | 13,780 MW |
| 2026-10-17T15:00Z | 13,514 MW |
| 2026-10-17T16:00Z | 13,097 MW |
| 2026-10-17T17:00Z | 12,741 MW |
| 2026-10-17T18:00Z | 12,478 MW |
| 2026-10-17T19:00Z | 12,617 MW |
| 2026-10-17T20:00Z | 13,559 MW |
| 2026-10-17T21:00Z | 15,199 MW |
| 2026-10-17T22:00Z | 16,239 MW |
| 2026-10-17T23:00Z | 16,369 MW |
| 2026-10-18T00:00Z | 16,098 MW |
| 2026-10-18T01:00Z | 15,720 MW |
| 2026-10-18T02:00Z | 15,153 MW |
| 2026-10-18T03:00Z | 14,465 MW |
| 2026-10-18T04:00Z | 13,947 MW |
| 2026-10-18T05:00Z | 13,486 MW |
| 2026-10-18T06:00Z | 13,175 MW |
| 2026-10-18T07:00Z | 13,012 MW |
| 2026-10-18T08:00Z | 12,954 MW |
| 2026-10-18T09:00Z | 13,159 MW |
| 2026-10-18T10:00Z | 13,668 MW |
| 2026-10-18T11:00Z | 14,137 MW |
| 2026-10-18T12:00Z | 13,772 MW |
| 2026-10-18T13:00Z | 12,620 MW |
| 2026-10-18T14:00Z | 11,834 MW |
| 2026-10-18T15:00Z | 11,517 MW |
| 2026-10-18T16:00Z | 11,404 MW |
| 2026-10-18T17:00Z | 11,394 MW |
| 2026-10-18T18:00Z | 11,560 MW |
| 2026-10-18T19:00Z | 12,184 MW |
| 2026-10-18T20:00Z | 13,647 MW |
| 2026-10-18T21:00Z | 15,560 MW |
| 2026-10-18T22:00Z | 16,543 MW |
| 2026-10-18T23:00Z | 16,649 MW |
| 2026-10-19T00:00Z | 16,405 MW |
| 2026-10-19T01:00Z | 15,777 MW |
| 2026-10-19T02:00Z | 14,962 MW |
| 2026-10-19T03:00Z | 14,178 MW |
| 2026-10-19T04:00Z | 13,657 MW |
| 2026-10-19T05:00Z | 13,216 MW |
| 2026-10-19T06:00Z | 12,965 MW |
| 2026-10-19T07:00Z | 12,913 MW |
| 2026-10-19T08:00Z | 13,143 MW |
| 2026-10-19T09:00Z | 13,979 MW |
| 2026-10-19T10:00Z | 15,484 MW |
| 2026-10-19T11:00Z | 16,563 MW |
| 2026-10-19T12:00Z | 15,891 MW |
| 2026-10-19T13:00Z | 14,460 MW |
| 2026-10-19T14:00Z | 13,582 MW |
| 2026-10-19T15:00Z | 13,232 MW |
| 2026-10-19T16:00Z | 13,055 MW |
| 2026-10-19T17:00Z | 13,052 MW |
| 2026-10-19T18:00Z | 13,170 MW |
| 2026-10-19T19:00Z | 13,683 MW |
| 2026-10-19T20:00Z | 14,976 MW |
| 2026-10-19T21:00Z | 16,706 MW |
| 2026-10-19T22:00Z | 17,545 MW |
| 2026-10-19T23:00Z | 17,481 MW |
| 2026-10-20T00:00Z | 16,914 MW |
| 2026-10-20T01:00Z | 16,124 MW |
| 2026-10-20T02:00Z | 15,182 MW |
| 2026-10-20T03:00Z | 14,296 MW |
| 2026-10-20T04:00Z | 13,681 MW |
| 2026-10-20T05:00Z | 13,222 MW |
| 2026-10-20T06:00Z | 12,920 MW |
| 2026-10-20T07:00Z | 12,814 MW |
| 2026-10-20T08:00Z | 13,020 MW |
| 2026-10-20T09:00Z | 13,817 MW |
| 2026-10-20T10:00Z | 15,275 MW |
| 2026-10-20T11:00Z | 16,367 MW |
| 2026-10-20T12:00Z | 15,817 MW |
| 2026-10-20T13:00Z | 14,391 MW |
| 2026-10-20T14:00Z | 13,427 MW |
| 2026-10-20T15:00Z | 13,053 MW |
| 2026-10-20T16:00Z | 12,903 MW |
| 2026-10-20T17:00Z | 12,945 MW |
| 2026-10-20T18:00Z | 13,088 MW |
| 2026-10-20T19:00Z | 13,704 MW |
| 2026-10-20T20:00Z | 15,033 MW |
| 2026-10-20T21:00Z | 16,671 MW |
| 2026-10-20T22:00Z | 17,474 MW |
| 2026-10-20T23:00Z | 17,402 MW |
| 2026-10-21T00:00Z | 16,831 MW |
| 2026-10-21T01:00Z | 16,018 MW |
| 2026-10-21T02:00Z | 15,152 MW |
| 2026-10-21T03:00Z | 14,266 MW |
| 2026-10-21T04:00Z | 13,625 MW |
| 2026-10-21T05:00Z | 13,206 MW |
| 2026-10-21T06:00Z | 12,956 MW |
| 2026-10-21T07:00Z | 12,873 MW |
| 2026-10-21T08:00Z | 13,098 MW |
| 2026-10-21T09:00Z | 13,906 MW |
| 2026-10-21T10:00Z | 15,439 MW |
| 2026-10-21T11:00Z | 16,516 MW |
| 2026-10-21T12:00Z | 15,981 MW |
| 2026-10-21T13:00Z | 14,547 MW |
| 2026-10-21T14:00Z | 13,568 MW |
| 2026-10-21T15:00Z | 13,267 MW |
| 2026-10-21T16:00Z | 13,103 MW |
| 2026-10-21T17:00Z | 13,081 MW |
| 2026-10-21T18:00Z | 13,298 MW |
| 2026-10-21T19:00Z | 13,801 MW |
| 2026-10-21T20:00Z | 15,081 MW |
| 2026-10-21T21:00Z | 16,675 MW |
| 2026-10-21T22:00Z | 17,485 MW |
| 2026-10-21T23:00Z | 17,501 MW |
| 2026-10-22T00:00Z | 16,958 MW |
| 2026-10-22T01:00Z | 16,261 MW |
| 2026-10-22T02:00Z | 15,347 MW |
| 2026-10-22T03:00Z | 14,455 MW |
| 2026-10-22T04:00Z | 13,826 MW |
| 2026-10-22T05:00Z | 13,363 MW |
| 2026-10-22T06:00Z | 13,113 MW |
| 2026-10-22T07:00Z | 12,998 MW |
| 2026-10-22T08:00Z | 13,220 MW |
| 2026-10-22T09:00Z | 14,027 MW |
| 2026-10-22T10:00Z | 15,527 MW |
| 2026-10-22T11:00Z | 16,590 MW |
| 2026-10-22T12:00Z | 16,123 MW |
| 2026-10-22T13:00Z | 14,719 MW |
| 2026-10-22T14:00Z | 13,767 MW |
| 2026-10-22T15:00Z | 13,339 MW |
| 2026-10-22T16:00Z | 13,157 MW |
| 2026-10-22T17:00Z | 13,241 MW |
| 2026-10-22T18:00Z | 13,457 MW |
| 2026-10-22T19:00Z | 14,177 MW |
| 2026-10-22T20:00Z | 15,535 MW |
| 2026-10-22T21:00Z | 16,911 MW |
| 2026-10-22T22:00Z | 17,504 MW |
| 2026-10-22T23:00Z | 17,421 MW |
| 2026-10-23T00:00Z | 16,931 MW |
| 2026-10-23T01:00Z | 16,196 MW |
| 2026-10-23T02:00Z | 15,309 MW |
| 2026-10-23T03:00Z | 14,438 MW |
| 2026-10-23T04:00Z | 13,812 MW |
| 2026-10-23T05:00Z | 13,295 MW |
| 2026-10-23T06:00Z | 12,983 MW |
| 2026-10-23T07:00Z | 12,880 MW |
| 2026-10-23T08:00Z | 13,069 MW |
| 2026-10-23T09:00Z | 13,807 MW |
| 2026-10-23T10:00Z | 15,230 MW |
| 2026-10-23T11:00Z | 16,296 MW |
| 2026-10-23T12:00Z | 15,879 MW |
| 2026-10-23T13:00Z | 14,513 MW |
| 2026-10-23T14:00Z | 13,523 MW |
| 2026-10-23T15:00Z | 13,104 MW |
| 2026-10-23T16:00Z | 12,904 MW |
| 2026-10-23T17:00Z | 12,875 MW |
| 2026-10-23T18:00Z | 13,007 MW |
| 2026-10-23T19:00Z | 13,692 MW |
| 2026-10-23T20:00Z | 15,105 MW |
| 2026-10-23T21:00Z | 16,484 MW |
| 2026-10-23T22:00Z | 17,024 MW |
| 2026-10-23T23:00Z | 16,948 MW |
| 2026-10-24T00:00Z | 16,577 MW |
| 2026-10-24T01:00Z | 16,080 MW |
| 2026-10-24T02:00Z | 15,389 MW |
| 2026-10-24T03:00Z | 14,596 MW |
| 2026-10-24T04:00Z | 14,088 MW |
| 2026-10-24T05:00Z | 13,697 MW |
| 2026-10-24T06:00Z | 13,415 MW |
| 2026-10-24T07:00Z | 13,270 MW |
| 2026-10-24T08:00Z | 13,308 MW |
| 2026-10-24T09:00Z | 13,632 MW |
| 2026-10-24T10:00Z | 14,282 MW |
| 2026-10-24T11:00Z | 14,935 MW |
| 2026-10-24T12:00Z | 14,710 MW |
| 2026-10-24T13:00Z | 13,600 MW |
| 2026-10-24T14:00Z | 12,622 MW |
| 2026-10-24T15:00Z | 12,110 MW |
| 2026-10-24T16:00Z | 11,831 MW |
| 2026-10-24T17:00Z | 11,714 MW |
| 2026-10-24T18:00Z | 11,772 MW |
| 2026-10-24T19:00Z | 12,327 MW |
| 2026-10-24T20:00Z | 13,714 MW |
| 2026-10-24T21:00Z | 15,343 MW |
| 2026-10-24T22:00Z | 16,186 MW |
| 2026-10-24T23:00Z | 16,184 MW |
| 2026-10-25T00:00Z | 15,947 MW |
| 2026-10-25T01:00Z | 15,562 MW |
| 2026-10-25T02:00Z | 15,044 MW |
| 2026-10-25T03:00Z | 14,447 MW |
| 2026-10-25T04:00Z | 13,904 MW |
| 2026-10-25T05:00Z | 13,471 MW |
| 2026-10-25T06:00Z | 13,200 MW |
| 2026-10-25T07:00Z | 13,055 MW |
| 2026-10-25T08:00Z | 13,079 MW |
| 2026-10-25T09:00Z | 13,322 MW |
| 2026-10-25T10:00Z | 13,843 MW |
| 2026-10-25T11:00Z | 14,379 MW |
| 2026-10-25T12:00Z | 14,110 MW |
| 2026-10-25T13:00Z | 12,863 MW |
| 2026-10-25T14:00Z | 12,009 MW |
| 2026-10-25T15:00Z | 11,710 MW |
| 2026-10-25T16:00Z | 11,623 MW |
| 2026-10-25T17:00Z | 11,624 MW |
| 2026-10-25T18:00Z | 11,814 MW |
| 2026-10-25T19:00Z | 12,501 MW |
| 2026-10-25T20:00Z | 14,039 MW |
| 2026-10-25T21:00Z | 15,777 MW |
| 2026-10-25T22:00Z | 16,582 MW |
| 2026-10-25T23:00Z | 16,618 MW |
| 2026-10-26T00:00Z | 16,241 MW |
| 2026-10-26T01:00Z | 15,655 MW |
| 2026-10-26T02:00Z | 14,947 MW |
| 2026-10-26T03:00Z | 14,150 MW |
| 2026-10-26T04:00Z | 13,610 MW |
| 2026-10-26T05:00Z | 13,214 MW |
| 2026-10-26T06:00Z | 12,952 MW |
| 2026-10-26T07:00Z | 12,886 MW |
| 2026-10-26T08:00Z | 13,153 MW |
| 2026-10-26T09:00Z | 13,981 MW |
| 2026-10-26T10:00Z | 15,498 MW |
| 2026-10-26T11:00Z | 16,606 MW |
| 2026-10-26T12:00Z | 16,359 MW |
| 2026-10-26T13:00Z | 15,198 MW |
| 2026-10-26T14:00Z | 14,326 MW |
| 2026-10-26T15:00Z | 13,824 MW |
| 2026-10-26T16:00Z | 13,790 MW |
| 2026-10-26T17:00Z | 13,972 MW |
| 2026-10-26T18:00Z | 14,454 MW |
| 2026-10-26T19:00Z | 15,449 MW |
| 2026-10-26T20:00Z | 16,548 MW |
| 2026-10-26T21:00Z | 17,447 MW |
| 2026-10-26T22:00Z | 17,838 MW |
| 2026-10-26T23:00Z | 17,589 MW |
| 2026-10-27T00:00Z | 17,003 MW |
| 2026-10-27T01:00Z | 16,182 MW |
| 2026-10-27T02:00Z | 15,226 MW |
| 2026-10-27T03:00Z | 14,284 MW |
| 2026-10-27T04:00Z | 13,619 MW |
| 2026-10-27T05:00Z | 13,153 MW |
| 2026-10-27T06:00Z | 12,862 MW |
| 2026-10-27T07:00Z | 12,744 MW |
| 2026-10-27T08:00Z | 12,952 MW |
| 2026-10-27T09:00Z | 13,723 MW |
| 2026-10-27T10:00Z | 15,249 MW |
| 2026-10-27T11:00Z | 16,346 MW |
| 2026-10-27T12:00Z | 16,040 MW |
| 2026-10-27T13:00Z | 14,649 MW |
| 2026-10-27T14:00Z | 13,658 MW |
| 2026-10-27T15:00Z | 13,284 MW |
| 2026-10-27T16:00Z | 13,100 MW |
| 2026-10-27T17:00Z | 13,099 MW |
| 2026-10-27T18:00Z | 13,240 MW |
| 2026-10-27T19:00Z | 13,930 MW |
| 2026-10-27T20:00Z | 15,451 MW |
| 2026-10-27T21:00Z | 17,000 MW |
| 2026-10-27T22:00Z | 17,703 MW |
| 2026-10-27T23:00Z | 17,580 MW |
| 2026-10-28T00:00Z | 17,139 MW |
| 2026-10-28T01:00Z | 16,438 MW |
| 2026-10-28T02:00Z | 15,453 MW |
| 2026-10-28T03:00Z | 14,560 MW |
| 2026-10-28T04:00Z | 13,977 MW |
| 2026-10-28T05:00Z | 13,545 MW |
| 2026-10-28T06:00Z | 13,279 MW |
| 2026-10-28T07:00Z | 13,197 MW |
| 2026-10-28T08:00Z | 13,411 MW |
| 2026-10-28T09:00Z | 14,189 MW |
| 2026-10-28T10:00Z | 15,666 MW |
| 2026-10-28T11:00Z | 16,722 MW |
| 2026-10-28T12:00Z | 16,624 MW |
| 2026-10-28T13:00Z | 15,922 MW |
| 2026-10-28T14:00Z | 15,221 MW |
| 2026-10-28T15:00Z | 14,611 MW |
| 2026-10-28T16:00Z | 14,291 MW |
| 2026-10-28T17:00Z | 14,364 MW |
| 2026-10-28T18:00Z | 14,432 MW |
| 2026-10-28T19:00Z | 14,854 MW |
| 2026-10-28T20:00Z | 16,009 MW |
| 2026-10-28T21:00Z | 17,129 MW |
| 2026-10-28T22:00Z | 17,730 MW |
| 2026-10-28T23:00Z | 17,593 MW |
| 2026-10-29T00:00Z | 17,064 MW |
| 2026-10-29T01:00Z | 16,333 MW |
| 2026-10-29T02:00Z | 15,393 MW |
| 2026-10-29T03:00Z | 14,485 MW |
| 2026-10-29T04:00Z | 13,866 MW |
| 2026-10-29T05:00Z | 13,417 MW |
| 2026-10-29T06:00Z | 13,140 MW |
| 2026-10-29T07:00Z | 13,016 MW |
| 2026-10-29T08:00Z | 13,208 MW |
| 2026-10-29T09:00Z | 13,974 MW |
| 2026-10-29T10:00Z | 15,421 MW |
| 2026-10-29T11:00Z | 16,489 MW |
| 2026-10-29T12:00Z | 16,312 MW |
| 2026-10-29T13:00Z | 15,132 MW |
| 2026-10-29T14:00Z | 14,160 MW |
| 2026-10-29T15:00Z | 13,857 MW |
| 2026-10-29T16:00Z | 13,701 MW |
| 2026-10-29T17:00Z | 13,660 MW |
| 2026-10-29T18:00Z | 13,849 MW |
| 2026-10-29T19:00Z | 14,627 MW |
| 2026-10-29T20:00Z | 15,982 MW |
| 2026-10-29T21:00Z | 17,146 MW |
| 2026-10-29T22:00Z | 17,723 MW |
| 2026-10-29T23:00Z | 17,532 MW |
| 2026-10-30T00:00Z | 17,050 MW |
| 2026-10-30T01:00Z | 16,276 MW |
| 2026-10-30T02:00Z | 15,329 MW |
| 2026-10-30T03:00Z | 14,443 MW |
| 2026-10-30T04:00Z | 13,762 MW |
| 2026-10-30T05:00Z | 13,266 MW |
| 2026-10-30T06:00Z | 12,946 MW |
| 2026-10-30T07:00Z | 12,766 MW |
| 2026-10-30T08:00Z | 12,858 MW |
| 2026-10-30T09:00Z | 13,519 MW |
| 2026-10-30T10:00Z | 14,813 MW |
| 2026-10-30T11:00Z | 15,897 MW |
| 2026-10-30T12:00Z | 16,136 MW |
| 2026-10-30T13:00Z | 15,723 MW |
| 2026-10-30T14:00Z | 15,282 MW |
| 2026-10-30T15:00Z | 15,101 MW |
| 2026-10-30T16:00Z | 14,930 MW |
| 2026-10-30T17:00Z | 14,774 MW |
| 2026-10-30T18:00Z | 14,695 MW |
| 2026-10-30T19:00Z | 15,196 MW |
| 2026-10-30T20:00Z | 15,946 MW |
| 2026-10-30T21:00Z | 16,871 MW |
| 2026-10-30T22:00Z | 17,163 MW |
| 2026-10-30T23:00Z | 16,906 MW |
| 2026-10-31T00:00Z | 16,494 MW |
| 2026-10-31T01:00Z | 15,884 MW |
| 2026-10-31T02:00Z | 15,161 MW |
| 2026-10-31T03:00Z | 14,378 MW |
| 2026-10-31T04:00Z | 13,822 MW |
| 2026-10-31T05:00Z | 13,377 MW |
| 2026-10-31T06:00Z | 13,069 MW |
| 2026-10-31T07:00Z | 12,925 MW |
| 2026-10-31T08:00Z | 12,935 MW |
| 2026-10-31T09:00Z | 13,212 MW |
| 2026-10-31T10:00Z | 13,801 MW |
| 2026-10-31T11:00Z | 14,499 MW |
| 2026-10-31T12:00Z | 14,542 MW |
| 2026-10-31T13:00Z | 13,756 MW |
| 2026-10-31T14:00Z | 13,006 MW |
| 2026-10-31T15:00Z | 12,590 MW |
| 2026-10-31T16:00Z | 12,354 MW |
| 2026-10-31T17:00Z | 12,274 MW |
| 2026-10-31T18:00Z | 12,308 MW |
| 2026-10-31T19:00Z | 12,786 MW |
| 2026-10-31T20:00Z | 14,047 MW |
| 2026-10-31T21:00Z | 15,388 MW |
| 2026-10-31T22:00Z | 15,952 MW |
| 2026-10-31T23:00Z | 15,869 MW |
| 2026-11-01T00:00Z | 15,700 MW |
| 2026-11-01T01:00Z | 15,393 MW |
| 2026-11-01T02:00Z | 14,852 MW |
| 2026-11-01T03:00Z | 14,233 MW |
| 2026-11-01T04:00Z | 13,781 MW |
| 2026-11-01T05:00Z | 13,413 MW |
| 2026-11-01T06:00Z | 13,158 MW |
| 2026-11-01T07:00Z | 13,007 MW |
| 2026-11-01T08:00Z | 12,968 MW |
| 2026-11-01T09:00Z | 13,068 MW |
| 2026-11-01T10:00Z | 13,231 MW |
| 2026-11-01T11:00Z | 13,827 MW |
| 2026-11-01T12:00Z | 13,808 MW |
| 2026-11-01T13:00Z | 12,995 MW |
| 2026-11-01T14:00Z | 12,158 MW |
| 2026-11-01T15:00Z | 11,848 MW |
| 2026-11-01T16:00Z | 11,784 MW |
| 2026-11-01T17:00Z | 11,865 MW |
| 2026-11-01T18:00Z | 12,148 MW |
| 2026-11-01T19:00Z | 12,829 MW |
| 2026-11-01T20:00Z | 14,328 MW |
| 2026-11-01T21:00Z | 15,868 MW |
| 2026-11-01T22:00Z | 16,841 MW |
| 2026-11-01T23:00Z | 16,802 MW |
| 2026-11-02T00:00Z | 16,491 MW |
| 2026-11-02T01:00Z | 16,016 MW |
| 2026-11-02T02:00Z | 15,367 MW |
| 2026-11-02T03:00Z | 14,592 MW |
| 2026-11-02T04:00Z | 13,879 MW |
| 2026-11-02T05:00Z | 13,402 MW |
| 2026-11-02T06:00Z | 13,058 MW |
| 2026-11-02T07:00Z | 12,854 MW |
| 2026-11-02T08:00Z | 12,819 MW |
| 2026-11-02T09:00Z | 13,113 MW |
| 2026-11-02T10:00Z | 13,971 MW |
| 2026-11-02T11:00Z | 15,342 MW |
| 2026-11-02T12:00Z | 15,863 MW |
| 2026-11-02T13:00Z | 15,226 MW |
| 2026-11-02T14:00Z | 14,383 MW |
| 2026-11-02T15:00Z | 14,058 MW |
| 2026-11-02T16:00Z | 13,931 MW |
| 2026-11-02T17:00Z | 14,102 MW |
| 2026-11-02T18:00Z | 14,533 MW |
| 2026-11-02T19:00Z | 15,177 MW |
| 2026-11-02T20:00Z | 16,099 MW |
| 2026-11-02T21:00Z | 17,055 MW |
| 2026-11-02T22:00Z | 17,869 MW |
| 2026-11-02T23:00Z | 17,657 MW |
| 2026-11-03T00:00Z | 17,211 MW |
| 2026-11-03T01:00Z | 16,644 MW |
| 2026-11-03T02:00Z | 15,853 MW |
| 2026-11-03T03:00Z | 14,901 MW |
| 2026-11-03T04:00Z | 13,988 MW |
| 2026-11-03T05:00Z | 13,376 MW |
| 2026-11-03T06:00Z | 12,927 MW |
| 2026-11-03T07:00Z | 12,623 MW |
| 2026-11-03T08:00Z | 12,542 MW |
| 2026-11-03T09:00Z | 12,800 MW |
| 2026-11-03T10:00Z | 13,607 MW |
| 2026-11-03T11:00Z | 14,862 MW |
| 2026-11-03T12:00Z | 15,586 MW |
| 2026-11-03T13:00Z | 15,694 MW |
| 2026-11-03T14:00Z | 15,545 MW |
| 2026-11-03T15:00Z | 15,330 MW |
| 2026-11-03T16:00Z | 15,223 MW |
| 2026-11-03T17:00Z | 15,104 MW |
| 2026-11-03T18:00Z | 15,287 MW |
| 2026-11-03T19:00Z | 15,559 MW |
| 2026-11-03T20:00Z | 16,275 MW |
| 2026-11-03T21:00Z | 17,151 MW |
| 2026-11-03T22:00Z | 17,913 MW |
| 2026-11-03T23:00Z | 17,748 MW |
| 2026-11-04T00:00Z | 17,284 MW |
| 2026-11-04T01:00Z | 16,706 MW |
| 2026-11-04T02:00Z | 15,916 MW |
| 2026-11-04T03:00Z | 14,977 MW |
| 2026-11-04T04:00Z | 14,057 MW |
| 2026-11-04T05:00Z | 13,461 MW |
| 2026-11-04T06:00Z | 12,967 MW |
| 2026-11-04T07:00Z | 12,661 MW |
| 2026-11-04T08:00Z | 12,552 MW |
| 2026-11-04T09:00Z | 12,783 MW |
| 2026-11-04T10:00Z | 13,559 MW |
| 2026-11-04T11:00Z | 14,890 MW |
| 2026-11-04T12:00Z | 15,343 MW |
| 2026-11-04T13:00Z | 14,508 MW |
| 2026-11-04T14:00Z | 13,942 MW |
| 2026-11-04T15:00Z | 13,843 MW |
| 2026-11-04T16:00Z | 13,939 MW |
| 2026-11-04T17:00Z | 14,215 MW |
| 2026-11-04T18:00Z | 14,674 MW |
| 2026-11-04T19:00Z | 15,371 MW |
| 2026-11-04T20:00Z | 16,497 MW |
| 2026-11-04T21:00Z | 17,515 MW |
| 2026-11-04T22:00Z | 18,184 MW |
| 2026-11-04T23:00Z | 17,947 MW |
| 2026-11-05T00:00Z | 17,507 MW |
| 2026-11-05T01:00Z | 16,924 MW |
| 2026-11-05T02:00Z | 16,172 MW |
| 2026-11-05T03:00Z | 15,200 MW |
| 2026-11-05T04:00Z | 14,293 MW |
| 2026-11-05T05:00Z | 13,679 MW |
| 2026-11-05T06:00Z | 13,236 MW |
| 2026-11-05T07:00Z | 12,958 MW |
| 2026-11-05T08:00Z | 12,838 MW |
| 2026-11-05T09:00Z | 13,007 MW |
| 2026-11-05T10:00Z | 13,727 MW |
| 2026-11-05T11:00Z | 15,095 MW |
| 2026-11-05T12:00Z | 16,104 MW |
| 2026-11-05T13:00Z | 16,451 MW |
| 2026-11-05T14:00Z | n/a |
Show the data table (720 rows)
| Hour starting (UTC) | Gas | Nuclear | Hydro | Wind | Other |
|---|---|---|---|---|---|
| 2026-10-06T15:00Z | 3,584 MW | 3,117 MW | 2,128 MW | 479 MW | 799 MW |
| 2026-10-06T16:00Z | 3,505 MW | 2,999 MW | 2,057 MW | 485 MW | 751 MW |
| 2026-10-06T17:00Z | 3,480 MW | 3,077 MW | 2,070 MW | 559 MW | 779 MW |
| 2026-10-06T18:00Z | 3,561 MW | 3,065 MW | 2,068 MW | 559 MW | 809 MW |
| 2026-10-06T19:00Z | 3,611 MW | 3,000 MW | 2,030 MW | 507 MW | 762 MW |
| 2026-10-06T20:00Z | 4,533 MW | 3,256 MW | 2,645 MW | 506 MW | 695 MW |
| 2026-10-06T21:00Z | 6,579 MW | 3,273 MW | 3,140 MW | 396 MW | 387 MW |
| 2026-10-06T22:00Z | 7,535 MW | 3,305 MW | 3,714 MW | 261 MW | 208 MW |
| 2026-10-06T23:00Z | 7,941 MW | 3,315 MW | 3,871 MW | 285 MW | 192 MW |
| 2026-10-07T00:00Z | 7,542 MW | 3,305 MW | 3,705 MW | 328 MW | 188 MW |
| 2026-10-07T01:00Z | 6,894 MW | 3,296 MW | 3,263 MW | 472 MW | 186 MW |
| 2026-10-07T02:00Z | 6,344 MW | 3,289 MW | 2,459 MW | 620 MW | 187 MW |
| 2026-10-07T03:00Z | 5,372 MW | 3,262 MW | 2,286 MW | 909 MW | 184 MW |
| 2026-10-07T04:00Z | 5,331 MW | 3,247 MW | 2,161 MW | 1,064 MW | 181 MW |
| 2026-10-07T05:00Z | 4,834 MW | 3,245 MW | 2,134 MW | 1,107 MW | 180 MW |
| 2026-10-07T06:00Z | 4,749 MW | 3,164 MW | 2,071 MW | 1,080 MW | 175 MW |
| 2026-10-07T07:00Z | 4,625 MW | 3,159 MW | 2,057 MW | 1,093 MW | 178 MW |
| 2026-10-07T08:00Z | 4,871 MW | 3,159 MW | 2,093 MW | 1,025 MW | 176 MW |
| 2026-10-07T09:00Z | 5,562 MW | 3,254 MW | 2,428 MW | 1,025 MW | 180 MW |
| 2026-10-07T10:00Z | 6,224 MW | 3,278 MW | 2,787 MW | 1,294 MW | 184 MW |
| 2026-10-07T11:00Z | 7,093 MW | 3,285 MW | 3,448 MW | 1,460 MW | 214 MW |
| 2026-10-07T12:00Z | 6,737 MW | 3,297 MW | 3,123 MW | 1,410 MW | 469 MW |
| 2026-10-07T13:00Z | 5,320 MW | 3,266 MW | 2,793 MW | 1,370 MW | 696 MW |
| 2026-10-07T14:00Z | 4,901 MW | 3,183 MW | 2,405 MW | 1,196 MW | 715 MW |
| 2026-10-07T15:00Z | 4,788 MW | 3,176 MW | 2,466 MW | 1,141 MW | 677 MW |
| 2026-10-07T16:00Z | 4,764 MW | 3,161 MW | 2,195 MW | 1,002 MW | 776 MW |
| 2026-10-07T17:00Z | 4,824 MW | 3,207 MW | 2,288 MW | 1,039 MW | 766 MW |
| 2026-10-07T18:00Z | 5,042 MW | 3,228 MW | 2,227 MW | 1,225 MW | 791 MW |
| 2026-10-07T19:00Z | 4,984 MW | 3,225 MW | 2,572 MW | 1,402 MW | 743 MW |
| 2026-10-07T20:00Z | 5,641 MW | 3,228 MW | 3,074 MW | 1,348 MW | 557 MW |
| 2026-10-07T21:00Z | 6,762 MW | 3,253 MW | 3,655 MW | 1,076 MW | 323 MW |
| 2026-10-07T22:00Z | 7,701 MW | 3,264 MW | 3,706 MW | 1,040 MW | 195 MW |
| 2026-10-07T23:00Z | 7,915 MW | 3,269 MW | 3,665 MW | 1,254 MW | 189 MW |
| 2026-10-08T00:00Z | 7,490 MW | 3,274 MW | 3,426 MW | 1,584 MW | 183 MW |
| 2026-10-08T01:00Z | 6,943 MW | 3,268 MW | 3,185 MW | 1,677 MW | 184 MW |
| 2026-10-08T02:00Z | 5,906 MW | 3,255 MW | 2,580 MW | 1,795 MW | 182 MW |
| 2026-10-08T03:00Z | 5,610 MW | 3,253 MW | 2,236 MW | 1,717 MW | 184 MW |
| 2026-10-08T04:00Z | 5,256 MW | 3,248 MW | 2,398 MW | 1,518 MW | 185 MW |
| 2026-10-08T05:00Z | 5,083 MW | 3,242 MW | 2,385 MW | 1,218 MW | 179 MW |
| 2026-10-08T06:00Z | 4,649 MW | 3,237 MW | 2,190 MW | 1,199 MW | 178 MW |
| 2026-10-08T07:00Z | 4,646 MW | 3,243 MW | 2,211 MW | 1,218 MW | 183 MW |
| 2026-10-08T08:00Z | 4,938 MW | 3,249 MW | 2,273 MW | 1,070 MW | 179 MW |
| 2026-10-08T09:00Z | 5,587 MW | 3,265 MW | 2,377 MW | 1,038 MW | 180 MW |
| 2026-10-08T10:00Z | 6,420 MW | 3,278 MW | 2,820 MW | 1,003 MW | 188 MW |
| 2026-10-08T11:00Z | 6,449 MW | 3,272 MW | 3,230 MW | 1,139 MW | 219 MW |
| 2026-10-08T12:00Z | 6,428 MW | 3,284 MW | 3,120 MW | 1,144 MW | 453 MW |
| 2026-10-08T13:00Z | 5,650 MW | 3,271 MW | 2,723 MW | 1,240 MW | 682 MW |
| 2026-10-08T14:00Z | 5,152 MW | 3,239 MW | 2,501 MW | 1,361 MW | 702 MW |
| 2026-10-08T15:00Z | 4,813 MW | 3,234 MW | 2,311 MW | 1,536 MW | 702 MW |
| 2026-10-08T16:00Z | 4,800 MW | 3,225 MW | 2,240 MW | 1,784 MW | 663 MW |
| 2026-10-08T17:00Z | 4,884 MW | 3,227 MW | 2,216 MW | 1,751 MW | 694 MW |
| 2026-10-08T18:00Z | 5,185 MW | 3,236 MW | 2,259 MW | 1,667 MW | 704 MW |
| 2026-10-08T19:00Z | 5,675 MW | 3,229 MW | 2,649 MW | 1,678 MW | 689 MW |
| 2026-10-08T20:00Z | 6,312 MW | 3,237 MW | 3,145 MW | 1,618 MW | 580 MW |
| 2026-10-08T21:00Z | 7,410 MW | 3,270 MW | 3,426 MW | 1,433 MW | 291 MW |
| 2026-10-08T22:00Z | 7,894 MW | 3,278 MW | 3,710 MW | 1,206 MW | 198 MW |
| 2026-10-08T23:00Z | 7,947 MW | 3,275 MW | 3,768 MW | 1,237 MW | 194 MW |
| 2026-10-09T00:00Z | 7,794 MW | 3,291 MW | 3,648 MW | 1,229 MW | 194 MW |
| 2026-10-09T01:00Z | 7,471 MW | 3,305 MW | 3,463 MW | 1,096 MW | 193 MW |
| 2026-10-09T02:00Z | 6,952 MW | 3,294 MW | 2,874 MW | 963 MW | 195 MW |
| 2026-10-09T03:00Z | 6,174 MW | 3,276 MW | 2,407 MW | 825 MW | 190 MW |
| 2026-10-09T04:00Z | 5,612 MW | 3,258 MW | 2,368 MW | 826 MW | 189 MW |
| 2026-10-09T05:00Z | 5,208 MW | 3,256 MW | 2,212 MW | 697 MW | 185 MW |
| 2026-10-09T06:00Z | 5,040 MW | 3,258 MW | 2,022 MW | 752 MW | 188 MW |
| 2026-10-09T07:00Z | 4,948 MW | 3,263 MW | 1,996 MW | 795 MW | 187 MW |
| 2026-10-09T08:00Z | 5,172 MW | 3,254 MW | 2,048 MW | 804 MW | 187 MW |
| 2026-10-09T09:00Z | 5,742 MW | 3,277 MW | 2,413 MW | 746 MW | 192 MW |
| 2026-10-09T10:00Z | 6,613 MW | 3,295 MW | 3,162 MW | 710 MW | 186 MW |
| 2026-10-09T11:00Z | 7,115 MW | 3,300 MW | 3,491 MW | 671 MW | 214 MW |
| 2026-10-09T12:00Z | 6,489 MW | 3,299 MW | 3,151 MW | 668 MW | 474 MW |
| 2026-10-09T13:00Z | 6,215 MW | 3,294 MW | 2,622 MW | 707 MW | 746 MW |
| 2026-10-09T14:00Z | 5,558 MW | 3,272 MW | 2,507 MW | 883 MW | 799 MW |
| 2026-10-09T15:00Z | 4,990 MW | 3,257 MW | 2,330 MW | 1,178 MW | 746 MW |
| 2026-10-09T16:00Z | 4,840 MW | 3,259 MW | 2,360 MW | 1,077 MW | 757 MW |
| 2026-10-09T17:00Z | 4,980 MW | 3,258 MW | 2,453 MW | 1,160 MW | 761 MW |
| 2026-10-09T18:00Z | 5,084 MW | 3,257 MW | 2,300 MW | 1,346 MW | 733 MW |
| 2026-10-09T19:00Z | 5,536 MW | 3,265 MW | 2,669 MW | 1,301 MW | 727 MW |
| 2026-10-09T20:00Z | 6,021 MW | 3,285 MW | 3,149 MW | 1,289 MW | 559 MW |
| 2026-10-09T21:00Z | 7,044 MW | 3,301 MW | 3,536 MW | 998 MW | 326 MW |
| 2026-10-09T22:00Z | 7,716 MW | 3,309 MW | 3,602 MW | 893 MW | 194 MW |
| 2026-10-09T23:00Z | 7,640 MW | 3,313 MW | 3,513 MW | 868 MW | 194 MW |
| 2026-10-10T00:00Z | 7,774 MW | 3,325 MW | 3,433 MW | 838 MW | 191 MW |
| 2026-10-10T01:00Z | 7,291 MW | 3,341 MW | 3,104 MW | 739 MW | 191 MW |
| 2026-10-10T02:00Z | 6,944 MW | 3,309 MW | 2,696 MW | 585 MW | 196 MW |
| 2026-10-10T03:00Z | 6,282 MW | 3,310 MW | 2,310 MW | 480 MW | 196 MW |
| 2026-10-10T04:00Z | 5,275 MW | 3,314 MW | 1,986 MW | 371 MW | 200 MW |
| 2026-10-10T05:00Z | 4,733 MW | 3,332 MW | 1,917 MW | 296 MW | 197 MW |
| 2026-10-10T06:00Z | 4,608 MW | 3,323 MW | 1,858 MW | 247 MW | 195 MW |
| 2026-10-10T07:00Z | 4,682 MW | 3,320 MW | 1,837 MW | 213 MW | 193 MW |
| 2026-10-10T08:00Z | 4,754 MW | 3,316 MW | 1,828 MW | 154 MW | 195 MW |
| 2026-10-10T09:00Z | 4,777 MW | 3,314 MW | 1,935 MW | 157 MW | 189 MW |
| 2026-10-10T10:00Z | 5,180 MW | 3,324 MW | 1,979 MW | 162 MW | 198 MW |
| 2026-10-10T11:00Z | 5,609 MW | 3,352 MW | 2,229 MW | 174 MW | 219 MW |
| 2026-10-10T12:00Z | 5,585 MW | 3,341 MW | 2,173 MW | 217 MW | 405 MW |
| 2026-10-10T13:00Z | 5,223 MW | 3,314 MW | 2,012 MW | 221 MW | 648 MW |
| 2026-10-10T14:00Z | 4,426 MW | 3,209 MW | 1,849 MW | 163 MW | 706 MW |
| 2026-10-10T15:00Z | 4,057 MW | 3,196 MW | 1,735 MW | 154 MW | 713 MW |
| 2026-10-10T16:00Z | 4,045 MW | 3,126 MW | 1,726 MW | 145 MW | 717 MW |
| 2026-10-10T17:00Z | 4,209 MW | 3,140 MW | 1,789 MW | 132 MW | 692 MW |
| 2026-10-10T18:00Z | 4,614 MW | 3,170 MW | 1,981 MW | 131 MW | 624 MW |
| 2026-10-10T19:00Z | 5,096 MW | 3,279 MW | 2,358 MW | 129 MW | 503 MW |
| 2026-10-10T20:00Z | 5,477 MW | 3,329 MW | 2,668 MW | 124 MW | 401 MW |
| 2026-10-10T21:00Z | 6,207 MW | 3,327 MW | 2,932 MW | 190 MW | 273 MW |
| 2026-10-10T22:00Z | 6,874 MW | 3,331 MW | 3,078 MW | 314 MW | 202 MW |
| 2026-10-10T23:00Z | 7,016 MW | 3,327 MW | 2,955 MW | 503 MW | 195 MW |
| 2026-10-11T00:00Z | 6,817 MW | 3,315 MW | 2,598 MW | 742 MW | 196 MW |
| 2026-10-11T01:00Z | 6,329 MW | 3,325 MW | 2,418 MW | 876 MW | 195 MW |
| 2026-10-11T02:00Z | 6,148 MW | 3,338 MW | 1,869 MW | 1,072 MW | 199 MW |
| 2026-10-11T03:00Z | 5,509 MW | 3,316 MW | 1,830 MW | 1,199 MW | 196 MW |
| 2026-10-11T04:00Z | 5,043 MW | 3,293 MW | 1,790 MW | 1,196 MW | 187 MW |
| 2026-10-11T05:00Z | 4,734 MW | 3,209 MW | 1,687 MW | 1,179 MW | 186 MW |
| 2026-10-11T06:00Z | 4,676 MW | 3,202 MW | 1,678 MW | 1,143 MW | 185 MW |
| 2026-10-11T07:00Z | 4,569 MW | 3,215 MW | 1,693 MW | 1,133 MW | 186 MW |
| 2026-10-11T08:00Z | 4,789 MW | 3,216 MW | 1,709 MW | 1,143 MW | 186 MW |
| 2026-10-11T09:00Z | 4,956 MW | 3,214 MW | 1,682 MW | 1,156 MW | 189 MW |
| 2026-10-11T10:00Z | 5,282 MW | 3,300 MW | 1,730 MW | 1,336 MW | 191 MW |
| 2026-10-11T11:00Z | 5,509 MW | 3,294 MW | 1,957 MW | 1,419 MW | 199 MW |
| 2026-10-11T12:00Z | 5,689 MW | 3,292 MW | 2,079 MW | 1,412 MW | 231 MW |
| 2026-10-11T13:00Z | 6,055 MW | 3,315 MW | 2,021 MW | 1,287 MW | 271 MW |
| 2026-10-11T14:00Z | 6,577 MW | 3,341 MW | 2,288 MW | 1,148 MW | 293 MW |
| 2026-10-11T15:00Z | 7,030 MW | 3,345 MW | 2,249 MW | 933 MW | 323 MW |
| 2026-10-11T16:00Z | 7,168 MW | 3,338 MW | 2,241 MW | 883 MW | 323 MW |
| 2026-10-11T17:00Z | 7,092 MW | 3,340 MW | 2,225 MW | 819 MW | 317 MW |
| 2026-10-11T18:00Z | 7,314 MW | 3,352 MW | 2,285 MW | 660 MW | 312 MW |
| 2026-10-11T19:00Z | 7,542 MW | 3,357 MW | 2,657 MW | 576 MW | 242 MW |
| 2026-10-11T20:00Z | 7,648 MW | 3,362 MW | 3,056 MW | 661 MW | 202 MW |
| 2026-10-11T21:00Z | 7,664 MW | 3,346 MW | 3,237 MW | 635 MW | 179 MW |
| 2026-10-11T22:00Z | 7,770 MW | 3,333 MW | 3,368 MW | 603 MW | 177 MW |
| 2026-10-11T23:00Z | 7,570 MW | 3,345 MW | 3,143 MW | 586 MW | 168 MW |
| 2026-10-12T00:00Z | 7,227 MW | 3,346 MW | 3,000 MW | 528 MW | 171 MW |
| 2026-10-12T01:00Z | 6,883 MW | 3,331 MW | 2,491 MW | 518 MW | 166 MW |
| 2026-10-12T02:00Z | 6,549 MW | 3,338 MW | 2,057 MW | 438 MW | 162 MW |
| 2026-10-12T03:00Z | 6,258 MW | 3,348 MW | 1,692 MW | 342 MW | 166 MW |
| 2026-10-12T04:00Z | 6,292 MW | 3,348 MW | 1,589 MW | 190 MW | 162 MW |
| 2026-10-12T05:00Z | 6,235 MW | 3,337 MW | 1,545 MW | 148 MW | 158 MW |
| 2026-10-12T06:00Z | 6,106 MW | 3,333 MW | 1,563 MW | 308 MW | 157 MW |
| 2026-10-12T07:00Z | 5,922 MW | 3,319 MW | 1,565 MW | 433 MW | 158 MW |
| 2026-10-12T08:00Z | 5,823 MW | 3,318 MW | 1,563 MW | 542 MW | 158 MW |
| 2026-10-12T09:00Z | 6,072 MW | 3,311 MW | 1,872 MW | 659 MW | 158 MW |
| 2026-10-12T10:00Z | 6,606 MW | 3,295 MW | 2,551 MW | 654 MW | 163 MW |
| 2026-10-12T11:00Z | 7,106 MW | 3,294 MW | 2,811 MW | 636 MW | 158 MW |
| 2026-10-12T12:00Z | 7,133 MW | 3,305 MW | 2,855 MW | 644 MW | 204 MW |
| 2026-10-12T13:00Z | 7,154 MW | 3,310 MW | 2,411 MW | 664 MW | 264 MW |
| 2026-10-12T14:00Z | 6,765 MW | 3,300 MW | 2,428 MW | 813 MW | 325 MW |
| 2026-10-12T15:00Z | 6,467 MW | 3,297 MW | 2,413 MW | 877 MW | 398 MW |
| 2026-10-12T16:00Z | 6,419 MW | 3,282 MW | 2,447 MW | 705 MW | 539 MW |
| 2026-10-12T17:00Z | 6,256 MW | 3,282 MW | 2,492 MW | 614 MW | 632 MW |
| 2026-10-12T18:00Z | 6,355 MW | 3,293 MW | 2,448 MW | 568 MW | 582 MW |
| 2026-10-12T19:00Z | 6,946 MW | 3,300 MW | 2,734 MW | 559 MW | 498 MW |
| 2026-10-12T20:00Z | 7,858 MW | 3,295 MW | 3,376 MW | 516 MW | 392 MW |
| 2026-10-12T21:00Z | 8,591 MW | 3,295 MW | 3,522 MW | 473 MW | 256 MW |
| 2026-10-12T22:00Z | 9,160 MW | 3,291 MW | 3,436 MW | 501 MW | 173 MW |
| 2026-10-12T23:00Z | 9,196 MW | 3,286 MW | 3,481 MW | 677 MW | 158 MW |
| 2026-10-13T00:00Z | 8,784 MW | 3,280 MW | 3,238 MW | 799 MW | 159 MW |
| 2026-10-13T01:00Z | 7,805 MW | 3,274 MW | 2,937 MW | 864 MW | 156 MW |
| 2026-10-13T02:00Z | 7,004 MW | 3,271 MW | 2,295 MW | 824 MW | 163 MW |
| 2026-10-13T03:00Z | 6,123 MW | 3,261 MW | 2,091 MW | 742 MW | 169 MW |
| 2026-10-13T04:00Z | 5,632 MW | 3,116 MW | 1,972 MW | 696 MW | 167 MW |
| 2026-10-13T05:00Z | 5,386 MW | 3,107 MW | 1,970 MW | 686 MW | 167 MW |
| 2026-10-13T06:00Z | 5,102 MW | 3,088 MW | 1,941 MW | 700 MW | 170 MW |
| 2026-10-13T07:00Z | 5,082 MW | 3,011 MW | 1,901 MW | 731 MW | 166 MW |
| 2026-10-13T08:00Z | 5,207 MW | 3,013 MW | 1,905 MW | 763 MW | 165 MW |
| 2026-10-13T09:00Z | 5,535 MW | 3,065 MW | 1,958 MW | 921 MW | 173 MW |
| 2026-10-13T10:00Z | 6,358 MW | 3,184 MW | 2,404 MW | 1,059 MW | 187 MW |
| 2026-10-13T11:00Z | 7,291 MW | 3,263 MW | 2,779 MW | 1,068 MW | 173 MW |
| 2026-10-13T12:00Z | 7,320 MW | 3,271 MW | 2,730 MW | 1,180 MW | 236 MW |
| 2026-10-13T13:00Z | 7,207 MW | 3,285 MW | 2,663 MW | 1,147 MW | 326 MW |
| 2026-10-13T14:00Z | 7,568 MW | 3,278 MW | 2,318 MW | 1,308 MW | 367 MW |
| 2026-10-13T15:00Z | 7,437 MW | 3,210 MW | 2,251 MW | 1,267 MW | 527 MW |
| 2026-10-13T16:00Z | 7,027 MW | 3,230 MW | 2,707 MW | 1,212 MW | 606 MW |
| 2026-10-13T17:00Z | 7,010 MW | 3,283 MW | 3,144 MW | 1,134 MW | 614 MW |
| 2026-10-13T18:00Z | 7,606 MW | 3,280 MW | 3,159 MW | 1,127 MW | 649 MW |
| 2026-10-13T19:00Z | 8,069 MW | 3,277 MW | 3,343 MW | 937 MW | 533 MW |
| 2026-10-13T20:00Z | 8,129 MW | 3,281 MW | 3,676 MW | 986 MW | 451 MW |
| 2026-10-13T21:00Z | 8,457 MW | 3,279 MW | 3,861 MW | 1,048 MW | 278 MW |
| 2026-10-13T22:00Z | 9,070 MW | 3,299 MW | 3,998 MW | 1,163 MW | 190 MW |
| 2026-10-13T23:00Z | 8,854 MW | 3,302 MW | 3,834 MW | 1,275 MW | 176 MW |
| 2026-10-14T00:00Z | 8,823 MW | 3,289 MW | 3,889 MW | 1,347 MW | 182 MW |
| 2026-10-14T01:00Z | 8,623 MW | 3,291 MW | 3,484 MW | 1,412 MW | 188 MW |
| 2026-10-14T02:00Z | 7,904 MW | 3,291 MW | 2,516 MW | 1,566 MW | 175 MW |
| 2026-10-14T03:00Z | 7,160 MW | 3,302 MW | 2,132 MW | 1,202 MW | 180 MW |
| 2026-10-14T04:00Z | 6,363 MW | 3,188 MW | 1,646 MW | 1,182 MW | 232 MW |
| 2026-10-14T05:00Z | 5,502 MW | 3,091 MW | 1,584 MW | 1,116 MW | 225 MW |
| 2026-10-14T06:00Z | 5,140 MW | 3,012 MW | 1,534 MW | 1,025 MW | 220 MW |
| 2026-10-14T07:00Z | 4,883 MW | 3,010 MW | 1,531 MW | 1,088 MW | 222 MW |
| 2026-10-14T08:00Z | 4,933 MW | 3,013 MW | 1,562 MW | 1,047 MW | 223 MW |
| 2026-10-14T09:00Z | 5,747 MW | 3,164 MW | 1,926 MW | 1,078 MW | 239 MW |
| 2026-10-14T10:00Z | 6,964 MW | 3,256 MW | 2,586 MW | 1,129 MW | 245 MW |
| 2026-10-14T11:00Z | 8,292 MW | 3,282 MW | 2,747 MW | 1,001 MW | 260 MW |
| 2026-10-14T12:00Z | 8,524 MW | 3,295 MW | 2,772 MW | 792 MW | 296 MW |
| 2026-10-14T13:00Z | 7,567 MW | 3,293 MW | 2,658 MW | 885 MW | 354 MW |
| 2026-10-14T14:00Z | 7,227 MW | 3,288 MW | 2,566 MW | 799 MW | 372 MW |
| 2026-10-14T15:00Z | 7,579 MW | 3,292 MW | 2,577 MW | 881 MW | 449 MW |
| 2026-10-14T16:00Z | 8,103 MW | 3,292 MW | 2,837 MW | 966 MW | 479 MW |
| 2026-10-14T17:00Z | 8,456 MW | 3,288 MW | 2,824 MW | 1,104 MW | 427 MW |
| 2026-10-14T18:00Z | 8,805 MW | 3,293 MW | 3,236 MW | 1,164 MW | 415 MW |
| 2026-10-14T19:00Z | 8,911 MW | 3,287 MW | 3,051 MW | 1,218 MW | 397 MW |
| 2026-10-14T20:00Z | 9,486 MW | 3,271 MW | 2,863 MW | 1,193 MW | 354 MW |
| 2026-10-14T21:00Z | 9,612 MW | 3,282 MW | 2,922 MW | 1,162 MW | 286 MW |
| 2026-10-14T22:00Z | 9,505 MW | 3,286 MW | 3,541 MW | 1,032 MW | 253 MW |
| 2026-10-14T23:00Z | 9,768 MW | 3,288 MW | 3,551 MW | 827 MW | 241 MW |
| 2026-10-15T00:00Z | 9,512 MW | 3,288 MW | 3,454 MW | 784 MW | 238 MW |
| 2026-10-15T01:00Z | 8,973 MW | 3,294 MW | 3,160 MW | 809 MW | 243 MW |
| 2026-10-15T02:00Z | 8,534 MW | 3,308 MW | 2,608 MW | 759 MW | 236 MW |
| 2026-10-15T03:00Z | 7,093 MW | 3,309 MW | 1,825 MW | 730 MW | 245 MW |
| 2026-10-15T04:00Z | 6,043 MW | 3,264 MW | 1,645 MW | 664 MW | 177 MW |
| 2026-10-15T05:00Z | 5,385 MW | 3,250 MW | 1,622 MW | 683 MW | 171 MW |
| 2026-10-15T06:00Z | 5,239 MW | 3,251 MW | 1,639 MW | 617 MW | 167 MW |
| 2026-10-15T07:00Z | 5,035 MW | 3,160 MW | 1,576 MW | 544 MW | 168 MW |
| 2026-10-15T08:00Z | 5,563 MW | 3,174 MW | 1,596 MW | 418 MW | 183 MW |
| 2026-10-15T09:00Z | 6,456 MW | 3,368 MW | 1,855 MW | 359 MW | 178 MW |
| 2026-10-15T10:00Z | 7,287 MW | 3,373 MW | 2,262 MW | 375 MW | 187 MW |
| 2026-10-15T11:00Z | 8,000 MW | 3,358 MW | 2,840 MW | 412 MW | 243 MW |
| 2026-10-15T12:00Z | 7,461 MW | 3,352 MW | 2,871 MW | 454 MW | 345 MW |
| 2026-10-15T13:00Z | 6,281 MW | 3,366 MW | 2,466 MW | 397 MW | 498 MW |
| 2026-10-15T14:00Z | 5,695 MW | 3,368 MW | 2,489 MW | 304 MW | 524 MW |
| 2026-10-15T15:00Z | 5,092 MW | 3,328 MW | 2,299 MW | 210 MW | 580 MW |
| 2026-10-15T16:00Z | 4,806 MW | 3,240 MW | 2,244 MW | 159 MW | 626 MW |
| 2026-10-15T17:00Z | 4,813 MW | 3,235 MW | 2,326 MW | 98 MW | 674 MW |
| 2026-10-15T18:00Z | 4,943 MW | 3,232 MW | 2,374 MW | 81 MW | 771 MW |
| 2026-10-15T19:00Z | 5,226 MW | 3,226 MW | 2,654 MW | 100 MW | 749 MW |
| 2026-10-15T20:00Z | 6,379 MW | 3,312 MW | 3,218 MW | 163 MW | 618 MW |
| 2026-10-15T21:00Z | 7,922 MW | 3,330 MW | 3,647 MW | 185 MW | 302 MW |
| 2026-10-15T22:00Z | 8,504 MW | 3,333 MW | 3,748 MW | 279 MW | 188 MW |
| 2026-10-15T23:00Z | 8,523 MW | 3,329 MW | 3,788 MW | 578 MW | 187 MW |
| 2026-10-16T00:00Z | 7,978 MW | 3,309 MW | 3,301 MW | 909 MW | 179 MW |
| 2026-10-16T01:00Z | 7,008 MW | 3,309 MW | 2,897 MW | 1,174 MW | 188 MW |
| 2026-10-16T02:00Z | 6,238 MW | 3,315 MW | 2,427 MW | 1,272 MW | 180 MW |
| 2026-10-16T03:00Z | 5,588 MW | 3,318 MW | 1,871 MW | 1,393 MW | 179 MW |
| 2026-10-16T04:00Z | 5,021 MW | 3,269 MW | 1,689 MW | 1,483 MW | 183 MW |
| 2026-10-16T05:00Z | 4,426 MW | 3,212 MW | 1,620 MW | 1,598 MW | 182 MW |
| 2026-10-16T06:00Z | 4,160 MW | 3,128 MW | 1,562 MW | 1,686 MW | 172 MW |
| 2026-10-16T07:00Z | 3,994 MW | 3,122 MW | 1,553 MW | 1,776 MW | 171 MW |
| 2026-10-16T08:00Z | 4,118 MW | 3,121 MW | 1,551 MW | 1,722 MW | 165 MW |
| 2026-10-16T09:00Z | 4,797 MW | 3,212 MW | 1,877 MW | 1,783 MW | 171 MW |
| 2026-10-16T10:00Z | 5,669 MW | 3,289 MW | 2,460 MW | 1,695 MW | 193 MW |
| 2026-10-16T11:00Z | 6,236 MW | 3,288 MW | 2,979 MW | 1,682 MW | 185 MW |
| 2026-10-16T12:00Z | 6,488 MW | 3,287 MW | 3,051 MW | 1,733 MW | 214 MW |
| 2026-10-16T13:00Z | 6,691 MW | 3,294 MW | 2,846 MW | 1,750 MW | 247 MW |
| 2026-10-16T14:00Z | 6,928 MW | 3,306 MW | 2,653 MW | 1,846 MW | 318 MW |
| 2026-10-16T15:00Z | 7,011 MW | 3,296 MW | 2,640 MW | 1,964 MW | 432 MW |
| 2026-10-16T16:00Z | 7,252 MW | 3,297 MW | 2,682 MW | 1,903 MW | 370 MW |
| 2026-10-16T17:00Z | 6,878 MW | 3,279 MW | 2,565 MW | 1,867 MW | 395 MW |
| 2026-10-16T18:00Z | 6,645 MW | 3,279 MW | 2,639 MW | 1,968 MW | 371 MW |
| 2026-10-16T19:00Z | 6,916 MW | 3,285 MW | 2,856 MW | 1,945 MW | 276 MW |
| 2026-10-16T20:00Z | 7,061 MW | 3,295 MW | 3,088 MW | 1,945 MW | 225 MW |
| 2026-10-16T21:00Z | 6,949 MW | 3,290 MW | 3,529 MW | 1,836 MW | 183 MW |
| 2026-10-16T22:00Z | 7,459 MW | 3,294 MW | 3,540 MW | 1,695 MW | 182 MW |
| 2026-10-16T23:00Z | 6,979 MW | 3,295 MW | 3,480 MW | 1,710 MW | 180 MW |
| 2026-10-17T00:00Z | 6,074 MW | 3,212 MW | 3,320 MW | 1,587 MW | 186 MW |
| 2026-10-17T01:00Z | 5,687 MW | 3,100 MW | 3,007 MW | 1,450 MW | 180 MW |
| 2026-10-17T02:00Z | 4,792 MW | 3,082 MW | 2,580 MW | 1,399 MW | 186 MW |
| 2026-10-17T03:00Z | 4,058 MW | 3,167 MW | 2,227 MW | 1,418 MW | 176 MW |
| 2026-10-17T04:00Z | 3,243 MW | 3,262 MW | 2,188 MW | 1,443 MW | 180 MW |
| 2026-10-17T05:00Z | 2,863 MW | 3,278 MW | 2,009 MW | 1,391 MW | 177 MW |
| 2026-10-17T06:00Z | 2,905 MW | 3,251 MW | 1,850 MW | 1,400 MW | 179 MW |
| 2026-10-17T07:00Z | 2,959 MW | 3,192 MW | 1,869 MW | 1,328 MW | 175 MW |
| 2026-10-17T08:00Z | 3,013 MW | 3,304 MW | 1,888 MW | 1,470 MW | 176 MW |
| 2026-10-17T09:00Z | 3,313 MW | 3,306 MW | 1,946 MW | 1,495 MW | 181 MW |
| 2026-10-17T10:00Z | 3,787 MW | 3,309 MW | 1,948 MW | 1,389 MW | 188 MW |
| 2026-10-17T11:00Z | 4,622 MW | 3,338 MW | 2,393 MW | 1,283 MW | 194 MW |
| 2026-10-17T12:00Z | 4,545 MW | 3,335 MW | 2,303 MW | 1,245 MW | 316 MW |
| 2026-10-17T13:00Z | 4,184 MW | 3,336 MW | 2,236 MW | 1,247 MW | 540 MW |
| 2026-10-17T14:00Z | 4,513 MW | 3,340 MW | 2,218 MW | 1,334 MW | 626 MW |
| 2026-10-17T15:00Z | 4,610 MW | 3,332 MW | 2,172 MW | 1,178 MW | 706 MW |
| 2026-10-17T16:00Z | 4,147 MW | 3,335 MW | 2,096 MW | 952 MW | 766 MW |
| 2026-10-17T17:00Z | 3,968 MW | 3,311 MW | 2,065 MW | 909 MW | 807 MW |
| 2026-10-17T18:00Z | 3,722 MW | 3,306 MW | 2,005 MW | 868 MW | 834 MW |
| 2026-10-17T19:00Z | 3,557 MW | 3,294 MW | 2,267 MW | 778 MW | 830 MW |
| 2026-10-17T20:00Z | 3,915 MW | 3,303 MW | 2,782 MW | 739 MW | 649 MW |
| 2026-10-17T21:00Z | 4,975 MW | 3,324 MW | 3,019 MW | 621 MW | 315 MW |
| 2026-10-17T22:00Z | 5,489 MW | 3,349 MW | 3,341 MW | 566 MW | 189 MW |
| 2026-10-17T23:00Z | 5,455 MW | 3,355 MW | 3,256 MW | 688 MW | 177 MW |
| 2026-10-18T00:00Z | 4,985 MW | 3,320 MW | 3,045 MW | 904 MW | 182 MW |
| 2026-10-18T01:00Z | 4,994 MW | 3,306 MW | 2,643 MW | 1,071 MW | 178 MW |
| 2026-10-18T02:00Z | 4,737 MW | 3,304 MW | 2,434 MW | 1,154 MW | 176 MW |
| 2026-10-18T03:00Z | 4,441 MW | 3,302 MW | 2,174 MW | 1,169 MW | 180 MW |
| 2026-10-18T04:00Z | 4,440 MW | 3,301 MW | 2,087 MW | 1,202 MW | 174 MW |
| 2026-10-18T05:00Z | 4,090 MW | 3,297 MW | 2,096 MW | 1,252 MW | 171 MW |
| 2026-10-18T06:00Z | 4,103 MW | 3,271 MW | 2,083 MW | 1,298 MW | 174 MW |
| 2026-10-18T07:00Z | 4,132 MW | 3,200 MW | 2,042 MW | 1,214 MW | 175 MW |
| 2026-10-18T08:00Z | 4,209 MW | 3,208 MW | 2,036 MW | 1,200 MW | 176 MW |
| 2026-10-18T09:00Z | 4,595 MW | 3,215 MW | 2,033 MW | 1,202 MW | 177 MW |
| 2026-10-18T10:00Z | 4,957 MW | 3,300 MW | 1,951 MW | 1,171 MW | 185 MW |
| 2026-10-18T11:00Z | 5,271 MW | 3,298 MW | 2,364 MW | 1,140 MW | 210 MW |
| 2026-10-18T12:00Z | 4,988 MW | 3,301 MW | 2,449 MW | 896 MW | 434 MW |
| 2026-10-18T13:00Z | 4,190 MW | 3,213 MW | 2,206 MW | 575 MW | 743 MW |
| 2026-10-18T14:00Z | 3,080 MW | 3,201 MW | 2,096 MW | 525 MW | 846 MW |
| 2026-10-18T15:00Z | 2,683 MW | 3,090 MW | 2,123 MW | 496 MW | 806 MW |
| 2026-10-18T16:00Z | 2,599 MW | 2,927 MW | 2,066 MW | 467 MW | 766 MW |
| 2026-10-18T17:00Z | 2,530 MW | 2,842 MW | 2,066 MW | 598 MW | 762 MW |
| 2026-10-18T18:00Z | 2,586 MW | 2,881 MW | 2,137 MW | 627 MW | 787 MW |
| 2026-10-18T19:00Z | 2,809 MW | 2,961 MW | 2,247 MW | 568 MW | 813 MW |
| 2026-10-18T20:00Z | 3,736 MW | 3,216 MW | 2,722 MW | 512 MW | 643 MW |
| 2026-10-18T21:00Z | 5,051 MW | 3,231 MW | 3,346 MW | 333 MW | 324 MW |
| 2026-10-18T22:00Z | 5,665 MW | 3,244 MW | 3,783 MW | 442 MW | 190 MW |
| 2026-10-18T23:00Z | 5,815 MW | 3,242 MW | 3,782 MW | 766 MW | 182 MW |
| 2026-10-19T00:00Z | 5,493 MW | 3,234 MW | 3,459 MW | 1,087 MW | 181 MW |
| 2026-10-19T01:00Z | 5,000 MW | 3,244 MW | 3,139 MW | 1,184 MW | 178 MW |
| 2026-10-19T02:00Z | 4,888 MW | 3,257 MW | 2,446 MW | 1,313 MW | 183 MW |
| 2026-10-19T03:00Z | 4,403 MW | 3,256 MW | 2,471 MW | 1,408 MW | 179 MW |
| 2026-10-19T04:00Z | 4,465 MW | 3,252 MW | 2,450 MW | 1,287 MW | 163 MW |
| 2026-10-19T05:00Z | 4,286 MW | 3,255 MW | 2,322 MW | 1,269 MW | 161 MW |
| 2026-10-19T06:00Z | 4,227 MW | 3,185 MW | 2,279 MW | 1,202 MW | 155 MW |
| 2026-10-19T07:00Z | 4,278 MW | 3,188 MW | 2,274 MW | 1,236 MW | 167 MW |
| 2026-10-19T08:00Z | 4,418 MW | 3,194 MW | 2,261 MW | 1,234 MW | 167 MW |
| 2026-10-19T09:00Z | 4,613 MW | 3,287 MW | 2,462 MW | 1,215 MW | 161 MW |
| 2026-10-19T10:00Z | 5,709 MW | 3,293 MW | 2,820 MW | 1,068 MW | 156 MW |
| 2026-10-19T11:00Z | 6,549 MW | 3,316 MW | 3,477 MW | 967 MW | 181 MW |
| 2026-10-19T12:00Z | 6,491 MW | 3,315 MW | 3,401 MW | 717 MW | 352 MW |
| 2026-10-19T13:00Z | 5,533 MW | 3,305 MW | 2,943 MW | 516 MW | 582 MW |
| 2026-10-19T14:00Z | 5,229 MW | 3,234 MW | 2,549 MW | 362 MW | 634 MW |
| 2026-10-19T15:00Z | 4,820 MW | 3,223 MW | 2,460 MW | 272 MW | 761 MW |
| 2026-10-19T16:00Z | 4,631 MW | 3,137 MW | 2,421 MW | 213 MW | 808 MW |
| 2026-10-19T17:00Z | 4,639 MW | 3,138 MW | 2,397 MW | 213 MW | 801 MW |
| 2026-10-19T18:00Z | 4,665 MW | 3,139 MW | 2,337 MW | 243 MW | 813 MW |
| 2026-10-19T19:00Z | 4,814 MW | 3,162 MW | 2,615 MW | 325 MW | 827 MW |
| 2026-10-19T20:00Z | 5,425 MW | 3,295 MW | 3,148 MW | 401 MW | 675 MW |
| 2026-10-19T21:00Z | 6,877 MW | 3,305 MW | 3,941 MW | 378 MW | 298 MW |
| 2026-10-19T22:00Z | 7,661 MW | 3,305 MW | 4,199 MW | 419 MW | 166 MW |
| 2026-10-19T23:00Z | 7,839 MW | 3,313 MW | 3,901 MW | 611 MW | 162 MW |
| 2026-10-20T00:00Z | 7,417 MW | 3,314 MW | 3,761 MW | 743 MW | 159 MW |
| 2026-10-20T01:00Z | 7,188 MW | 3,330 MW | 3,198 MW | 572 MW | 155 MW |
| 2026-10-20T02:00Z | 7,020 MW | 3,347 MW | 2,549 MW | 512 MW | 156 MW |
| 2026-10-20T03:00Z | 6,341 MW | 3,335 MW | 2,039 MW | 528 MW | 156 MW |
| 2026-10-20T04:00Z | 5,719 MW | 3,344 MW | 1,779 MW | 556 MW | 158 MW |
| 2026-10-20T05:00Z | 5,462 MW | 3,344 MW | 1,782 MW | 636 MW | 156 MW |
| 2026-10-20T06:00Z | 5,187 MW | 3,332 MW | 1,771 MW | 623 MW | 156 MW |
| 2026-10-20T07:00Z | 5,105 MW | 3,238 MW | 1,729 MW | 568 MW | 151 MW |
| 2026-10-20T08:00Z | 5,208 MW | 3,329 MW | 1,773 MW | 656 MW | 157 MW |
| 2026-10-20T09:00Z | 6,197 MW | 3,339 MW | 1,907 MW | 693 MW | 166 MW |
| 2026-10-20T10:00Z | 6,590 MW | 3,341 MW | 2,665 MW | 681 MW | 155 MW |
| 2026-10-20T11:00Z | 7,043 MW | 3,315 MW | 3,643 MW | 697 MW | 186 MW |
| 2026-10-20T12:00Z | 6,863 MW | 3,320 MW | 3,263 MW | 635 MW | 404 MW |
| 2026-10-20T13:00Z | 5,786 MW | 3,313 MW | 2,548 MW | 425 MW | 770 MW |
| 2026-10-20T14:00Z | 4,559 MW | 3,319 MW | 2,408 MW | 336 MW | 911 MW |
| 2026-10-20T15:00Z | 4,118 MW | 3,314 MW | 2,366 MW | 330 MW | 916 MW |
| 2026-10-20T16:00Z | 4,046 MW | 3,221 MW | 2,310 MW | 384 MW | 889 MW |
| 2026-10-20T17:00Z | 4,086 MW | 3,217 MW | 2,436 MW | 387 MW | 871 MW |
| 2026-10-20T18:00Z | 4,403 MW | 3,302 MW | 2,463 MW | 397 MW | 910 MW |
| 2026-10-20T19:00Z | 4,911 MW | 3,293 MW | 2,707 MW | 487 MW | 896 MW |
| 2026-10-20T20:00Z | 5,840 MW | 3,293 MW | 3,141 MW | 516 MW | 664 MW |
| 2026-10-20T21:00Z | 7,013 MW | 3,310 MW | 3,780 MW | 501 MW | 307 MW |
| 2026-10-20T22:00Z | 7,761 MW | 3,313 MW | 4,007 MW | 604 MW | 185 MW |
| 2026-10-20T23:00Z | 7,151 MW | 3,306 MW | 3,675 MW | 783 MW | 158 MW |
| 2026-10-21T00:00Z | 6,745 MW | 3,310 MW | 3,601 MW | 824 MW | 162 MW |
| 2026-10-21T01:00Z | 6,469 MW | 3,322 MW | 3,056 MW | 846 MW | 161 MW |
| 2026-10-21T02:00Z | 6,093 MW | 3,319 MW | 2,477 MW | 958 MW | 161 MW |
| 2026-10-21T03:00Z | 5,487 MW | 3,318 MW | 2,158 MW | 936 MW | 163 MW |
| 2026-10-21T04:00Z | 5,173 MW | 3,272 MW | 2,004 MW | 874 MW | 214 MW |
| 2026-10-21T05:00Z | 4,841 MW | 3,179 MW | 1,955 MW | 825 MW | 207 MW |
| 2026-10-21T06:00Z | 4,886 MW | 3,172 MW | 1,946 MW | 786 MW | 205 MW |
| 2026-10-21T07:00Z | 4,962 MW | 3,097 MW | 1,902 MW | 594 MW | 203 MW |
| 2026-10-21T08:00Z | 5,560 MW | 3,198 MW | 1,971 MW | 449 MW | 214 MW |
| 2026-10-21T09:00Z | 5,961 MW | 3,195 MW | 2,056 MW | 382 MW | 213 MW |
| 2026-10-21T10:00Z | 6,797 MW | 3,308 MW | 2,686 MW | 311 MW | 220 MW |
| 2026-10-21T11:00Z | 7,343 MW | 3,292 MW | 3,239 MW | 253 MW | 240 MW |
| 2026-10-21T12:00Z | 6,855 MW | 3,303 MW | 3,341 MW | 199 MW | 487 MW |
| 2026-10-21T13:00Z | 5,800 MW | 3,302 MW | 2,741 MW | 147 MW | 848 MW |
| 2026-10-21T14:00Z | 4,764 MW | 3,293 MW | 2,132 MW | 135 MW | 972 MW |
| 2026-10-21T15:00Z | 4,393 MW | 3,290 MW | 2,060 MW | 129 MW | 945 MW |
| 2026-10-21T16:00Z | 4,332 MW | 3,283 MW | 2,071 MW | 133 MW | 926 MW |
| 2026-10-21T17:00Z | 4,300 MW | 3,291 MW | 2,197 MW | 145 MW | 851 MW |
| 2026-10-21T18:00Z | 4,346 MW | 3,293 MW | 2,294 MW | 146 MW | 959 MW |
| 2026-10-21T19:00Z | 4,595 MW | 3,285 MW | 2,575 MW | 144 MW | 987 MW |
| 2026-10-21T20:00Z | 5,765 MW | 3,285 MW | 3,301 MW | 144 MW | 780 MW |
| 2026-10-21T21:00Z | 6,568 MW | 3,290 MW | 3,852 MW | 157 MW | 421 MW |
| 2026-10-21T22:00Z | 6,999 MW | 3,290 MW | 3,741 MW | 240 MW | 299 MW |
| 2026-10-21T23:00Z | 7,190 MW | 3,294 MW | 3,952 MW | 334 MW | 301 MW |
| 2026-10-22T00:00Z | 6,882 MW | 3,283 MW | 3,556 MW | 350 MW | 223 MW |
| 2026-10-22T01:00Z | 6,823 MW | 3,283 MW | 3,071 MW | 296 MW | 228 MW |
| 2026-10-22T02:00Z | 6,585 MW | 3,305 MW | 2,517 MW | 248 MW | 238 MW |
| 2026-10-22T03:00Z | 6,114 MW | 3,311 MW | 2,022 MW | 246 MW | 239 MW |
| 2026-10-22T04:00Z | 5,786 MW | 3,347 MW | 1,899 MW | 272 MW | 178 MW |
| 2026-10-22T05:00Z | 5,341 MW | 3,241 MW | 1,895 MW | 318 MW | 170 MW |
| 2026-10-22T06:00Z | 4,941 MW | 3,239 MW | 1,835 MW | 387 MW | 169 MW |
| 2026-10-22T07:00Z | 4,872 MW | 3,235 MW | 1,824 MW | 499 MW | 169 MW |
| 2026-10-22T08:00Z | 5,398 MW | 3,248 MW | 1,912 MW | 507 MW | 176 MW |
| 2026-10-22T09:00Z | 5,879 MW | 3,343 MW | 2,151 MW | 489 MW | 179 MW |
| 2026-10-22T10:00Z | 6,388 MW | 3,338 MW | 2,942 MW | 510 MW | 180 MW |
| 2026-10-22T11:00Z | 6,576 MW | 3,319 MW | 3,424 MW | 594 MW | 202 MW |
| 2026-10-22T12:00Z | 6,428 MW | 3,332 MW | 3,101 MW | 536 MW | 368 MW |
| 2026-10-22T13:00Z | 5,894 MW | 3,347 MW | 2,475 MW | 451 MW | 767 MW |
| 2026-10-22T14:00Z | 5,306 MW | 3,338 MW | 2,265 MW | 370 MW | 926 MW |
| 2026-10-22T15:00Z | 4,864 MW | 3,325 MW | 2,282 MW | 325 MW | 918 MW |
| 2026-10-22T16:00Z | 4,799 MW | 3,318 MW | 2,233 MW | 329 MW | 890 MW |
| 2026-10-22T17:00Z | 4,618 MW | 3,233 MW | 2,182 MW | 445 MW | 855 MW |
| 2026-10-22T18:00Z | 4,528 MW | 3,229 MW | 2,114 MW | 595 MW | 864 MW |
| 2026-10-22T19:00Z | 4,610 MW | 3,314 MW | 2,474 MW | 614 MW | 840 MW |
| 2026-10-22T20:00Z | 5,279 MW | 3,318 MW | 3,185 MW | 607 MW | 626 MW |
| 2026-10-22T21:00Z | 6,467 MW | 3,314 MW | 3,722 MW | 516 MW | 319 MW |
| 2026-10-22T22:00Z | 7,569 MW | 3,299 MW | 3,797 MW | 434 MW | 261 MW |
| 2026-10-22T23:00Z | 7,741 MW | 3,291 MW | 3,923 MW | 407 MW | 253 MW |
| 2026-10-23T00:00Z | 7,434 MW | 3,309 MW | 3,535 MW | 418 MW | 233 MW |
| 2026-10-23T01:00Z | 7,191 MW | 3,315 MW | 3,032 MW | 651 MW | 173 MW |
| 2026-10-23T02:00Z | 6,764 MW | 3,318 MW | 2,601 MW | 771 MW | 171 MW |
| 2026-10-23T03:00Z | 6,162 MW | 3,315 MW | 2,054 MW | 696 MW | 177 MW |
| 2026-10-23T04:00Z | 5,611 MW | 3,325 MW | 2,063 MW | 649 MW | 176 MW |
| 2026-10-23T05:00Z | 5,091 MW | 3,335 MW | 1,999 MW | 559 MW | 169 MW |
| 2026-10-23T06:00Z | 4,755 MW | 3,224 MW | 1,908 MW | 496 MW | 169 MW |
| 2026-10-23T07:00Z | 4,726 MW | 3,251 MW | 1,919 MW | 426 MW | 172 MW |
| 2026-10-23T08:00Z | 5,055 MW | 3,282 MW | 2,000 MW | 402 MW | 174 MW |
| 2026-10-23T09:00Z | 5,684 MW | 3,360 MW | 2,270 MW | 408 MW | 186 MW |
| 2026-10-23T10:00Z | 6,458 MW | 3,336 MW | 3,080 MW | 344 MW | 186 MW |
| 2026-10-23T11:00Z | 6,872 MW | 3,320 MW | 3,736 MW | 295 MW | 198 MW |
| 2026-10-23T12:00Z | 6,572 MW | 3,334 MW | 3,314 MW | 234 MW | 413 MW |
| 2026-10-23T13:00Z | 5,902 MW | 3,376 MW | 2,423 MW | 153 MW | 805 MW |
| 2026-10-23T14:00Z | 4,943 MW | 3,391 MW | 1,989 MW | 125 MW | 1,037 MW |
| 2026-10-23T15:00Z | 4,694 MW | 3,295 MW | 1,799 MW | 114 MW | 990 MW |
| 2026-10-23T16:00Z | 4,701 MW | 3,301 MW | 1,846 MW | 114 MW | 887 MW |
| 2026-10-23T17:00Z | 4,805 MW | 3,298 MW | 1,786 MW | 103 MW | 890 MW |
| 2026-10-23T18:00Z | 4,989 MW | 3,291 MW | 1,879 MW | 93 MW | 887 MW |
| 2026-10-23T19:00Z | 5,319 MW | 3,306 MW | 2,315 MW | 89 MW | 858 MW |
| 2026-10-23T20:00Z | 6,103 MW | 3,352 MW | 3,077 MW | 88 MW | 588 MW |
| 2026-10-23T21:00Z | 6,861 MW | 3,336 MW | 3,816 MW | 79 MW | 277 MW |
| 2026-10-23T22:00Z | 7,291 MW | 3,313 MW | 3,946 MW | 129 MW | 182 MW |
| 2026-10-23T23:00Z | 7,364 MW | 3,320 MW | 3,751 MW | 214 MW | 185 MW |
| 2026-10-24T00:00Z | 6,817 MW | 3,332 MW | 3,676 MW | 231 MW | 177 MW |
| 2026-10-24T01:00Z | 6,738 MW | 3,331 MW | 3,303 MW | 203 MW | 178 MW |
| 2026-10-24T02:00Z | 6,709 MW | 3,336 MW | 2,939 MW | 197 MW | 177 MW |
| 2026-10-24T03:00Z | 6,248 MW | 3,351 MW | 2,414 MW | 230 MW | 172 MW |
| 2026-10-24T04:00Z | 5,564 MW | 3,320 MW | 2,456 MW | 249 MW | 172 MW |
| 2026-10-24T05:00Z | 4,948 MW | 3,335 MW | 2,361 MW | 272 MW | 176 MW |
| 2026-10-24T06:00Z | 4,922 MW | 3,336 MW | 2,320 MW | 277 MW | 177 MW |
| 2026-10-24T07:00Z | 5,132 MW | 3,327 MW | 2,497 MW | 295 MW | 173 MW |
| 2026-10-24T08:00Z | 5,272 MW | 3,336 MW | 2,527 MW | 323 MW | 178 MW |
| 2026-10-24T09:00Z | 5,373 MW | 3,338 MW | 2,503 MW | 295 MW | 170 MW |
| 2026-10-24T10:00Z | 5,715 MW | 3,324 MW | 2,987 MW | 281 MW | 171 MW |
| 2026-10-24T11:00Z | 5,853 MW | 3,319 MW | 3,199 MW | 258 MW | 190 MW |
| 2026-10-24T12:00Z | 5,728 MW | 3,348 MW | 3,025 MW | 245 MW | 372 MW |
| 2026-10-24T13:00Z | 4,881 MW | 3,388 MW | 2,276 MW | 160 MW | 717 MW |
| 2026-10-24T14:00Z | 4,114 MW | 3,415 MW | 1,859 MW | 81 MW | 912 MW |
| 2026-10-24T15:00Z | 3,681 MW | 3,313 MW | 1,785 MW | 40 MW | 892 MW |
| 2026-10-24T16:00Z | 3,537 MW | 3,296 MW | 1,815 MW | 16 MW | 879 MW |
| 2026-10-24T17:00Z | 3,487 MW | 3,294 MW | 1,839 MW | 11 MW | 882 MW |
| 2026-10-24T18:00Z | 3,562 MW | 3,290 MW | 1,820 MW | 9 MW | 906 MW |
| 2026-10-24T19:00Z | 3,925 MW | 3,284 MW | 2,061 MW | 10 MW | 888 MW |
| 2026-10-24T20:00Z | 4,911 MW | 3,307 MW | 2,557 MW | 10 MW | 640 MW |
| 2026-10-24T21:00Z | 5,902 MW | 3,366 MW | 3,015 MW | 17 MW | 294 MW |
| 2026-10-24T22:00Z | 6,562 MW | 3,352 MW | 3,151 MW | 59 MW | 198 MW |
| 2026-10-24T23:00Z | 6,347 MW | 3,345 MW | 3,287 MW | 105 MW | 197 MW |
| 2026-10-25T00:00Z | 6,263 MW | 3,352 MW | 3,235 MW | 117 MW | 196 MW |
| 2026-10-25T01:00Z | 6,310 MW | 3,366 MW | 2,956 MW | 110 MW | 194 MW |
| 2026-10-25T02:00Z | 6,236 MW | 3,355 MW | 2,671 MW | 149 MW | 200 MW |
| 2026-10-25T03:00Z | 5,941 MW | 3,353 MW | 2,312 MW | 278 MW | 198 MW |
| 2026-10-25T04:00Z | 5,700 MW | 3,342 MW | 2,238 MW | 359 MW | 193 MW |
| 2026-10-25T05:00Z | 5,511 MW | 3,351 MW | 2,063 MW | 428 MW | 198 MW |
| 2026-10-25T06:00Z | 5,243 MW | 3,342 MW | 2,041 MW | 491 MW | 193 MW |
| 2026-10-25T07:00Z | 5,175 MW | 3,337 MW | 1,986 MW | 550 MW | 177 MW |
| 2026-10-25T08:00Z | 5,124 MW | 3,339 MW | 1,972 MW | 635 MW | 181 MW |
| 2026-10-25T09:00Z | 5,476 MW | 3,332 MW | 2,145 MW | 643 MW | 180 MW |
| 2026-10-25T10:00Z | 5,705 MW | 3,324 MW | 2,360 MW | 678 MW | 180 MW |
| 2026-10-25T11:00Z | 6,209 MW | 3,321 MW | 2,646 MW | 674 MW | 191 MW |
| 2026-10-25T12:00Z | 5,949 MW | 3,331 MW | 2,519 MW | 587 MW | 413 MW |
| 2026-10-25T13:00Z | 4,710 MW | 3,371 MW | 1,901 MW | 368 MW | 799 MW |
| 2026-10-25T14:00Z | 4,194 MW | 3,343 MW | 1,806 MW | 165 MW | 950 MW |
| 2026-10-25T15:00Z | 3,852 MW | 3,276 MW | 1,801 MW | 94 MW | 908 MW |
| 2026-10-25T16:00Z | 3,694 MW | 3,228 MW | 1,824 MW | 51 MW | 871 MW |
| 2026-10-25T17:00Z | 3,765 MW | 3,153 MW | 1,808 MW | 34 MW | 853 MW |
| 2026-10-25T18:00Z | 3,779 MW | 3,198 MW | 1,812 MW | 41 MW | 865 MW |
| 2026-10-25T19:00Z | 4,270 MW | 3,276 MW | 2,144 MW | 53 MW | 861 MW |
| 2026-10-25T20:00Z | 5,505 MW | 3,340 MW | 2,666 MW | 44 MW | 613 MW |
| 2026-10-25T21:00Z | 6,484 MW | 3,329 MW | 3,403 MW | 55 MW | 253 MW |
| 2026-10-25T22:00Z | 6,970 MW | 3,325 MW | 3,672 MW | 173 MW | 187 MW |
| 2026-10-25T23:00Z | 6,948 MW | 3,324 MW | 3,625 MW | 429 MW | 180 MW |
| 2026-10-26T00:00Z | 6,795 MW | 3,338 MW | 3,166 MW | 623 MW | 183 MW |
| 2026-10-26T01:00Z | 6,554 MW | 3,337 MW | 2,737 MW | 744 MW | 177 MW |
| 2026-10-26T02:00Z | 6,128 MW | 3,339 MW | 2,487 MW | 828 MW | 178 MW |
| 2026-10-26T03:00Z | 5,773 MW | 3,337 MW | 2,280 MW | 839 MW | 174 MW |
| 2026-10-26T04:00Z | 5,145 MW | 3,324 MW | 2,011 MW | 1,089 MW | 166 MW |
| 2026-10-26T05:00Z | 4,906 MW | 3,237 MW | 1,947 MW | 1,129 MW | 168 MW |
| 2026-10-26T06:00Z | 4,793 MW | 3,241 MW | 1,898 MW | 1,123 MW | 172 MW |
| 2026-10-26T07:00Z | 4,895 MW | 3,248 MW | 1,855 MW | 1,181 MW | 168 MW |
| 2026-10-26T08:00Z | 5,181 MW | 3,300 MW | 1,897 MW | 1,252 MW | 166 MW |
| 2026-10-26T09:00Z | 5,541 MW | 3,317 MW | 2,352 MW | 1,309 MW | 171 MW |
| 2026-10-26T10:00Z | 5,999 MW | 3,305 MW | 3,115 MW | 1,236 MW | 180 MW |
| 2026-10-26T11:00Z | 6,359 MW | 3,291 MW | 3,483 MW | 1,162 MW | 189 MW |
| 2026-10-26T12:00Z | 6,282 MW | 3,298 MW | 3,382 MW | 1,060 MW | 333 MW |
| 2026-10-26T13:00Z | 5,863 MW | 3,326 MW | 2,664 MW | 796 MW | 687 MW |
| 2026-10-26T14:00Z | 5,509 MW | 3,336 MW | 2,075 MW | 663 MW | 818 MW |
| 2026-10-26T15:00Z | 5,221 MW | 3,332 MW | 2,004 MW | 637 MW | 862 MW |
| 2026-10-26T16:00Z | 5,070 MW | 3,250 MW | 2,120 MW | 692 MW | 804 MW |
| 2026-10-26T17:00Z | 5,074 MW | 3,334 MW | 2,105 MW | 762 MW | 800 MW |
| 2026-10-26T18:00Z | 5,210 MW | 3,333 MW | 2,204 MW | 794 MW | 730 MW |
| 2026-10-26T19:00Z | 5,711 MW | 3,336 MW | 2,583 MW | 844 MW | 524 MW |
| 2026-10-26T20:00Z | 6,314 MW | 3,335 MW | 3,172 MW | 773 MW | 290 MW |
| 2026-10-26T21:00Z | 6,674 MW | 3,317 MW | 3,779 MW | 652 MW | 195 MW |
| 2026-10-26T22:00Z | 7,108 MW | 3,312 MW | 3,676 MW | 613 MW | 191 MW |
| 2026-10-26T23:00Z | 7,207 MW | 3,307 MW | 3,633 MW | 655 MW | 185 MW |
| 2026-10-27T00:00Z | 6,850 MW | 3,314 MW | 3,274 MW | 699 MW | 181 MW |
| 2026-10-27T01:00Z | 6,265 MW | 3,329 MW | 2,854 MW | 639 MW | 189 MW |
| 2026-10-27T02:00Z | 6,171 MW | 3,342 MW | 2,414 MW | 548 MW | 184 MW |
| 2026-10-27T03:00Z | 5,721 MW | 3,346 MW | 1,966 MW | 479 MW | 184 MW |
| 2026-10-27T04:00Z | 5,329 MW | 3,254 MW | 1,943 MW | 405 MW | 181 MW |
| 2026-10-27T05:00Z | 5,227 MW | 3,258 MW | 1,911 MW | 385 MW | 183 MW |
| 2026-10-27T06:00Z | 4,991 MW | 3,255 MW | 1,847 MW | 357 MW | 180 MW |
| 2026-10-27T07:00Z | 5,094 MW | 3,253 MW | 1,846 MW | 335 MW | 186 MW |
| 2026-10-27T08:00Z | 5,478 MW | 3,256 MW | 1,940 MW | 316 MW | 180 MW |
| 2026-10-27T09:00Z | 5,785 MW | 3,266 MW | 1,983 MW | 306 MW | 181 MW |
| 2026-10-27T10:00Z | 6,320 MW | 3,331 MW | 2,643 MW | 342 MW | 181 MW |
| 2026-10-27T11:00Z | 6,654 MW | 3,311 MW | 3,239 MW | 314 MW | 198 MW |
| 2026-10-27T12:00Z | 6,611 MW | 3,317 MW | 2,964 MW | 265 MW | 387 MW |
| 2026-10-27T13:00Z | 5,957 MW | 3,347 MW | 2,098 MW | 140 MW | 763 MW |
| 2026-10-27T14:00Z | 5,518 MW | 3,277 MW | 1,974 MW | 94 MW | 919 MW |
| 2026-10-27T15:00Z | 5,190 MW | 3,212 MW | 2,103 MW | 67 MW | 879 MW |
| 2026-10-27T16:00Z | 5,061 MW | 3,177 MW | 1,921 MW | 55 MW | 851 MW |
| 2026-10-27T17:00Z | 5,074 MW | 3,214 MW | 1,971 MW | 41 MW | 865 MW |
| 2026-10-27T18:00Z | 5,071 MW | 3,243 MW | 2,003 MW | 39 MW | 862 MW |
| 2026-10-27T19:00Z | 5,687 MW | 3,292 MW | 2,386 MW | 45 MW | 838 MW |
| 2026-10-27T20:00Z | 6,813 MW | 3,326 MW | 3,122 MW | 61 MW | 560 MW |
| 2026-10-27T21:00Z | 7,665 MW | 3,313 MW | 3,610 MW | 69 MW | 248 MW |
| 2026-10-27T22:00Z | 8,072 MW | 3,308 MW | 3,841 MW | 110 MW | 194 MW |
| 2026-10-27T23:00Z | 8,098 MW | 3,304 MW | 3,582 MW | 146 MW | 188 MW |
| 2026-10-28T00:00Z | 8,138 MW | 3,310 MW | 3,416 MW | 140 MW | 189 MW |
| 2026-10-28T01:00Z | 7,839 MW | 3,324 MW | 3,026 MW | 124 MW | 191 MW |
| 2026-10-28T02:00Z | 7,394 MW | 3,344 MW | 2,322 MW | 160 MW | 193 MW |
| 2026-10-28T03:00Z | 6,779 MW | 3,348 MW | 1,920 MW | 227 MW | 193 MW |
| 2026-10-28T04:00Z | 6,375 MW | 3,345 MW | 2,085 MW | 257 MW | 173 MW |
| 2026-10-28T05:00Z | 6,075 MW | 3,340 MW | 1,960 MW | 270 MW | 177 MW |
| 2026-10-28T06:00Z | 5,980 MW | 3,343 MW | 1,944 MW | 357 MW | 171 MW |
| 2026-10-28T07:00Z | 5,830 MW | 3,252 MW | 1,888 MW | 416 MW | 164 MW |
| 2026-10-28T08:00Z | 5,857 MW | 3,269 MW | 1,899 MW | 526 MW | 164 MW |
| 2026-10-28T09:00Z | 6,445 MW | 3,335 MW | 2,012 MW | 708 MW | 173 MW |
| 2026-10-28T10:00Z | 6,830 MW | 3,339 MW | 2,447 MW | 831 MW | 172 MW |
| 2026-10-28T11:00Z | 7,227 MW | 3,329 MW | 3,107 MW | 873 MW | 170 MW |
| 2026-10-28T12:00Z | 7,173 MW | 3,334 MW | 3,081 MW | 836 MW | 252 MW |
| 2026-10-28T13:00Z | 6,868 MW | 3,348 MW | 2,427 MW | 665 MW | 408 MW |
| 2026-10-28T14:00Z | 7,205 MW | 3,341 MW | 2,380 MW | 376 MW | 555 MW |
| 2026-10-28T15:00Z | 6,697 MW | 3,338 MW | 2,266 MW | 208 MW | 620 MW |
| 2026-10-28T16:00Z | 6,196 MW | 3,294 MW | 2,260 MW | 144 MW | 629 MW |
| 2026-10-28T17:00Z | 6,513 MW | 3,305 MW | 2,320 MW | 111 MW | 623 MW |
| 2026-10-28T18:00Z | 6,511 MW | 3,336 MW | 2,370 MW | 110 MW | 676 MW |
| 2026-10-28T19:00Z | 7,133 MW | 3,327 MW | 2,732 MW | 93 MW | 586 MW |
| 2026-10-28T20:00Z | 7,582 MW | 3,321 MW | 2,899 MW | 121 MW | 386 MW |
| 2026-10-28T21:00Z | 7,900 MW | 3,313 MW | 3,763 MW | 148 MW | 239 MW |
| 2026-10-28T22:00Z | 8,143 MW | 3,300 MW | 4,199 MW | 256 MW | 176 MW |
| 2026-10-28T23:00Z | 8,277 MW | 3,306 MW | 3,973 MW | 452 MW | 183 MW |
| 2026-10-29T00:00Z | 7,979 MW | 3,307 MW | 3,602 MW | 596 MW | 176 MW |
| 2026-10-29T01:00Z | 7,909 MW | 3,320 MW | 3,192 MW | 583 MW | 189 MW |
| 2026-10-29T02:00Z | 7,175 MW | 3,323 MW | 2,391 MW | 762 MW | 189 MW |
| 2026-10-29T03:00Z | 5,967 MW | 3,318 MW | 2,050 MW | 953 MW | 191 MW |
| 2026-10-29T04:00Z | 4,801 MW | 3,303 MW | 2,119 MW | 1,125 MW | 192 MW |
| 2026-10-29T05:00Z | 4,344 MW | 3,300 MW | 2,110 MW | 1,206 MW | 189 MW |
| 2026-10-29T06:00Z | 4,161 MW | 3,297 MW | 2,110 MW | 1,242 MW | 189 MW |
| 2026-10-29T07:00Z | 4,232 MW | 3,300 MW | 2,119 MW | 1,174 MW | 195 MW |
| 2026-10-29T08:00Z | 4,335 MW | 3,298 MW | 2,095 MW | 1,164 MW | 190 MW |
| 2026-10-29T09:00Z | 5,101 MW | 3,301 MW | 2,105 MW | 1,170 MW | 192 MW |
| 2026-10-29T10:00Z | 6,038 MW | 3,300 MW | 2,448 MW | 1,196 MW | 186 MW |
| 2026-10-29T11:00Z | 6,347 MW | 3,285 MW | 3,084 MW | 1,254 MW | 195 MW |
| 2026-10-29T12:00Z | 6,300 MW | 3,284 MW | 3,137 MW | 1,208 MW | 342 MW |
| 2026-10-29T13:00Z | 5,842 MW | 3,297 MW | 2,382 MW | 999 MW | 678 MW |
| 2026-10-29T14:00Z | 5,326 MW | 3,298 MW | 2,047 MW | 730 MW | 872 MW |
| 2026-10-29T15:00Z | 4,930 MW | 3,282 MW | 2,040 MW | 795 MW | 854 MW |
| 2026-10-29T16:00Z | 4,894 MW | 3,191 MW | 1,891 MW | 1,122 MW | 817 MW |
| 2026-10-29T17:00Z | 4,750 MW | 3,198 MW | 1,844 MW | 1,295 MW | 807 MW |
| 2026-10-29T18:00Z | 4,806 MW | 3,203 MW | 1,764 MW | 1,458 MW | 814 MW |
| 2026-10-29T19:00Z | 5,232 MW | 3,219 MW | 2,284 MW | 1,407 MW | 762 MW |
| 2026-10-29T20:00Z | 6,233 MW | 3,268 MW | 2,955 MW | 1,226 MW | 522 MW |
| 2026-10-29T21:00Z | 6,965 MW | 3,262 MW | 3,496 MW | 1,083 MW | 284 MW |
| 2026-10-29T22:00Z | 7,161 MW | 3,266 MW | 3,844 MW | 1,105 MW | 231 MW |
| 2026-10-29T23:00Z | 7,030 MW | 3,269 MW | 3,823 MW | 1,294 MW | 194 MW |
| 2026-10-30T00:00Z | 6,815 MW | 3,272 MW | 3,475 MW | 1,429 MW | 187 MW |
| 2026-10-30T01:00Z | 6,580 MW | 3,300 MW | 2,862 MW | 1,747 MW | 190 MW |
| 2026-10-30T02:00Z | 5,950 MW | 3,306 MW | 2,310 MW | 1,888 MW | 193 MW |
| 2026-10-30T03:00Z | 5,272 MW | 3,294 MW | 2,136 MW | 1,562 MW | 191 MW |
| 2026-10-30T04:00Z | 4,871 MW | 3,301 MW | 2,115 MW | 1,254 MW | 192 MW |
| 2026-10-30T05:00Z | 4,705 MW | 3,297 MW | 2,074 MW | 1,200 MW | 189 MW |
| 2026-10-30T06:00Z | 4,411 MW | 3,296 MW | 2,017 MW | 1,097 MW | 186 MW |
| 2026-10-30T07:00Z | 4,291 MW | 3,287 MW | 1,994 MW | 1,125 MW | 189 MW |
| 2026-10-30T08:00Z | 4,294 MW | 3,302 MW | 1,976 MW | 1,252 MW | 189 MW |
| 2026-10-30T09:00Z | 4,838 MW | 3,313 MW | 2,061 MW | 1,398 MW | 190 MW |
| 2026-10-30T10:00Z | 5,768 MW | 3,315 MW | 2,330 MW | 1,319 MW | 188 MW |
| 2026-10-30T11:00Z | 6,403 MW | 3,309 MW | 2,804 MW | 1,414 MW | 194 MW |
| 2026-10-30T12:00Z | 6,489 MW | 3,324 MW | 3,106 MW | 1,330 MW | 243 MW |
| 2026-10-30T13:00Z | 6,239 MW | 3,326 MW | 2,639 MW | 1,274 MW | 347 MW |
| 2026-10-30T14:00Z | 5,873 MW | 3,343 MW | 2,168 MW | 1,409 MW | 424 MW |
| 2026-10-30T15:00Z | 5,609 MW | 3,340 MW | 2,132 MW | 1,484 MW | 477 MW |
| 2026-10-30T16:00Z | 5,479 MW | 3,341 MW | 2,080 MW | 1,564 MW | 538 MW |
| 2026-10-30T17:00Z | 5,430 MW | 3,329 MW | 2,062 MW | 1,602 MW | 595 MW |
| 2026-10-30T18:00Z | 5,512 MW | 3,270 MW | 2,037 MW | 1,563 MW | 531 MW |
| 2026-10-30T19:00Z | 5,966 MW | 3,321 MW | 2,352 MW | 1,576 MW | 483 MW |
| 2026-10-30T20:00Z | 6,400 MW | 3,332 MW | 2,814 MW | 1,447 MW | 427 MW |
| 2026-10-30T21:00Z | 6,861 MW | 3,302 MW | 3,660 MW | 1,191 MW | 224 MW |
| 2026-10-30T22:00Z | 6,759 MW | 3,297 MW | 3,702 MW | 1,015 MW | 192 MW |
| 2026-10-30T23:00Z | 6,723 MW | 3,304 MW | 3,320 MW | 1,101 MW | 190 MW |
| 2026-10-31T00:00Z | 6,784 MW | 3,327 MW | 3,255 MW | 1,171 MW | 191 MW |
| 2026-10-31T01:00Z | 6,655 MW | 3,346 MW | 2,974 MW | 1,161 MW | 189 MW |
| 2026-10-31T02:00Z | 6,183 MW | 3,356 MW | 2,505 MW | 1,008 MW | 194 MW |
| 2026-10-31T03:00Z | 5,371 MW | 3,386 MW | 2,035 MW | 907 MW | 202 MW |
| 2026-10-31T04:00Z | 5,004 MW | 3,369 MW | 2,014 MW | 826 MW | 192 MW |
| 2026-10-31T05:00Z | 4,980 MW | 3,310 MW | 1,915 MW | 652 MW | 190 MW |
| 2026-10-31T06:00Z | 4,931 MW | 3,374 MW | 1,867 MW | 586 MW | 193 MW |
| 2026-10-31T07:00Z | 4,937 MW | 3,299 MW | 1,835 MW | 486 MW | 193 MW |
| 2026-10-31T08:00Z | 5,095 MW | 3,394 MW | 1,849 MW | 451 MW | 200 MW |
| 2026-10-31T09:00Z | 5,383 MW | 3,392 MW | 1,957 MW | 400 MW | 200 MW |
| 2026-10-31T10:00Z | 5,566 MW | 3,381 MW | 2,204 MW | 381 MW | 197 MW |
| 2026-10-31T11:00Z | 6,243 MW | 3,345 MW | 2,784 MW | 362 MW | 204 MW |
| 2026-10-31T12:00Z | 6,228 MW | 3,357 MW | 2,615 MW | 320 MW | 346 MW |
| 2026-10-31T13:00Z | 5,514 MW | 3,379 MW | 1,918 MW | 230 MW | 699 MW |
| 2026-10-31T14:00Z | 4,895 MW | 3,358 MW | 1,716 MW | 227 MW | 922 MW |
| 2026-10-31T15:00Z | 4,737 MW | 3,279 MW | 1,708 MW | 309 MW | 788 MW |
| 2026-10-31T16:00Z | 4,280 MW | 3,274 MW | 1,722 MW | 356 MW | 802 MW |
| 2026-10-31T17:00Z | 4,148 MW | 3,260 MW | 1,649 MW | 402 MW | 834 MW |
| 2026-10-31T18:00Z | 4,259 MW | 3,256 MW | 1,684 MW | 431 MW | 859 MW |
| 2026-10-31T19:00Z | 4,991 MW | 3,335 MW | 2,016 MW | 417 MW | 859 MW |
| 2026-10-31T20:00Z | 6,261 MW | 3,369 MW | 2,763 MW | 378 MW | 586 MW |
| 2026-10-31T21:00Z | 6,867 MW | 3,346 MW | 3,277 MW | 344 MW | 259 MW |
| 2026-10-31T22:00Z | 6,907 MW | 3,339 MW | 3,255 MW | 349 MW | 199 MW |
| 2026-10-31T23:00Z | 6,726 MW | 3,330 MW | 3,043 MW | 462 MW | 200 MW |
| 2026-11-01T00:00Z | 6,483 MW | 3,335 MW | 2,918 MW | 586 MW | 200 MW |
| 2026-11-01T01:00Z | 6,462 MW | 3,330 MW | 2,805 MW | 564 MW | 200 MW |
| 2026-11-01T02:00Z | 6,450 MW | 3,328 MW | 2,676 MW | 383 MW | 201 MW |
| 2026-11-01T03:00Z | 5,970 MW | 3,329 MW | 2,381 MW | 259 MW | 199 MW |
| 2026-11-01T04:00Z | 5,886 MW | 3,316 MW | 2,335 MW | 192 MW | 199 MW |
| 2026-11-01T05:00Z | 5,708 MW | 3,318 MW | 2,314 MW | 161 MW | 205 MW |
| 2026-11-01T06:00Z | 5,807 MW | 3,308 MW | 2,268 MW | 186 MW | 211 MW |
| 2026-11-01T07:00Z | 5,506 MW | 3,306 MW | 2,193 MW | 266 MW | 199 MW |
| 2026-11-01T08:00Z | 5,855 MW | 3,304 MW | 2,289 MW | 276 MW | 195 MW |
| 2026-11-01T09:00Z | 5,832 MW | 3,345 MW | 2,312 MW | 315 MW | 195 MW |
| 2026-11-01T10:00Z | 5,876 MW | 3,328 MW | 2,321 MW | 306 MW | 198 MW |
| 2026-11-01T11:00Z | 6,049 MW | 3,310 MW | 2,703 MW | 417 MW | 204 MW |
| 2026-11-01T12:00Z | 5,832 MW | 3,311 MW | 2,595 MW | 432 MW | 334 MW |
| 2026-11-01T13:00Z | 4,884 MW | 3,264 MW | 2,529 MW | 416 MW | 678 MW |
| 2026-11-01T14:00Z | 4,045 MW | 3,107 MW | 2,281 MW | 299 MW | 838 MW |
| 2026-11-01T15:00Z | 3,868 MW | 3,114 MW | 2,256 MW | 252 MW | 815 MW |
| 2026-11-01T16:00Z | 3,764 MW | 3,120 MW | 2,128 MW | 359 MW | 774 MW |
| 2026-11-01T17:00Z | 3,795 MW | 3,151 MW | 1,907 MW | 507 MW | 810 MW |
| 2026-11-01T18:00Z | 3,966 MW | 3,175 MW | 1,937 MW | 501 MW | 810 MW |
| 2026-11-01T19:00Z | 4,499 MW | 3,260 MW | 2,203 MW | 479 MW | 795 MW |
| 2026-11-01T20:00Z | 5,664 MW | 3,269 MW | 2,897 MW | 390 MW | 512 MW |
| 2026-11-01T21:00Z | 6,842 MW | 3,348 MW | 3,550 MW | 307 MW | 235 MW |
| 2026-11-01T22:00Z | 7,228 MW | 3,343 MW | 3,870 MW | 396 MW | 199 MW |
| 2026-11-01T23:00Z | 7,226 MW | 3,341 MW | 3,523 MW | 788 MW | 197 MW |
| 2026-11-02T00:00Z | 7,010 MW | 3,333 MW | 3,204 MW | 1,130 MW | 192 MW |
| 2026-11-02T01:00Z | 6,798 MW | 3,336 MW | 2,986 MW | 1,253 MW | 180 MW |
| 2026-11-02T02:00Z | 6,327 MW | 3,312 MW | 2,716 MW | 1,309 MW | 172 MW |
| 2026-11-02T03:00Z | 6,070 MW | 3,297 MW | 2,262 MW | 1,473 MW | 174 MW |
| 2026-11-02T04:00Z | 5,902 MW | 3,292 MW | 2,131 MW | 1,508 MW | 176 MW |
| 2026-11-02T05:00Z | 5,685 MW | 3,299 MW | 2,097 MW | 1,487 MW | 173 MW |
| 2026-11-02T06:00Z | 5,273 MW | 3,234 MW | 1,956 MW | 1,387 MW | 173 MW |
| 2026-11-02T07:00Z | 5,238 MW | 3,285 MW | 1,934 MW | 1,358 MW | 174 MW |
| 2026-11-02T08:00Z | 5,242 MW | 3,227 MW | 1,913 MW | 1,223 MW | 168 MW |
| 2026-11-02T09:00Z | 5,375 MW | 3,328 MW | 1,993 MW | 1,180 MW | 173 MW |
| 2026-11-02T10:00Z | 5,669 MW | 3,338 MW | 2,122 MW | 1,101 MW | 176 MW |
| 2026-11-02T11:00Z | 6,337 MW | 3,339 MW | 2,762 MW | 1,044 MW | 179 MW |
| 2026-11-02T12:00Z | 6,393 MW | 3,334 MW | 3,064 MW | 875 MW | 252 MW |
| 2026-11-02T13:00Z | 5,653 MW | 3,353 MW | 2,870 MW | 678 MW | 589 MW |
| 2026-11-02T14:00Z | 5,413 MW | 3,339 MW | 2,617 MW | 406 MW | 825 MW |
| 2026-11-02T15:00Z | 5,793 MW | 3,345 MW | 2,647 MW | 323 MW | 742 MW |
| 2026-11-02T16:00Z | 5,449 MW | 3,317 MW | 2,567 MW | 342 MW | 633 MW |
| 2026-11-02T17:00Z | 5,608 MW | 3,289 MW | 2,668 MW | 442 MW | 527 MW |
| 2026-11-02T18:00Z | 5,879 MW | 3,282 MW | 2,780 MW | 509 MW | 532 MW |
| 2026-11-02T19:00Z | 6,130 MW | 3,279 MW | 2,961 MW | 476 MW | 496 MW |
| 2026-11-02T20:00Z | 6,543 MW | 3,305 MW | 3,321 MW | 401 MW | 378 MW |
| 2026-11-02T21:00Z | 7,186 MW | 3,316 MW | 3,815 MW | 386 MW | 233 MW |
| 2026-11-02T22:00Z | 7,343 MW | 3,300 MW | 4,207 MW | 494 MW | 191 MW |
| 2026-11-02T23:00Z | 7,051 MW | 3,297 MW | 3,800 MW | 707 MW | 197 MW |
| 2026-11-03T00:00Z | 7,058 MW | 3,301 MW | 3,740 MW | 807 MW | 198 MW |
| 2026-11-03T01:00Z | 6,974 MW | 3,293 MW | 3,376 MW | 780 MW | 196 MW |
| 2026-11-03T02:00Z | 6,738 MW | 3,279 MW | 3,017 MW | 763 MW | 195 MW |
| 2026-11-03T03:00Z | 6,216 MW | 3,260 MW | 2,437 MW | 750 MW | 196 MW |
| 2026-11-03T04:00Z | 5,457 MW | 3,233 MW | 2,224 MW | 821 MW | 184 MW |
| 2026-11-03T05:00Z | 5,136 MW | 3,237 MW | 2,005 MW | 825 MW | 188 MW |
| 2026-11-03T06:00Z | 5,037 MW | 3,236 MW | 1,970 MW | 869 MW | 183 MW |
| 2026-11-03T07:00Z | 4,976 MW | 3,226 MW | 1,919 MW | 878 MW | 188 MW |
| 2026-11-03T08:00Z | 4,950 MW | 3,227 MW | 1,918 MW | 848 MW | 188 MW |
| 2026-11-03T09:00Z | 5,050 MW | 3,226 MW | 1,972 MW | 791 MW | 180 MW |
| 2026-11-03T10:00Z | 5,855 MW | 3,247 MW | 2,109 MW | 753 MW | 187 MW |
| 2026-11-03T11:00Z | 6,076 MW | 3,277 MW | 2,598 MW | 842 MW | 195 MW |
| 2026-11-03T12:00Z | 6,182 MW | 3,262 MW | 3,007 MW | 825 MW | 233 MW |
| 2026-11-03T13:00Z | 5,998 MW | 3,250 MW | 3,161 MW | 795 MW | 329 MW |
| 2026-11-03T14:00Z | 5,913 MW | 3,244 MW | 3,260 MW | 677 MW | 362 MW |
| 2026-11-03T15:00Z | 5,839 MW | 3,243 MW | 3,299 MW | 544 MW | 456 MW |
| 2026-11-03T16:00Z | 5,589 MW | 3,236 MW | 3,229 MW | 466 MW | 532 MW |
| 2026-11-03T17:00Z | 5,639 MW | 3,228 MW | 3,269 MW | 416 MW | 541 MW |
| 2026-11-03T18:00Z | 5,871 MW | 3,227 MW | 3,273 MW | 444 MW | 517 MW |
| 2026-11-03T19:00Z | 6,051 MW | 3,221 MW | 3,298 MW | 359 MW | 597 MW |
| 2026-11-03T20:00Z | 6,484 MW | 3,222 MW | 3,476 MW | 294 MW | 427 MW |
| 2026-11-03T21:00Z | 7,066 MW | 3,239 MW | 3,722 MW | 343 MW | 224 MW |
| 2026-11-03T22:00Z | 7,372 MW | 3,281 MW | 3,941 MW | 557 MW | 191 MW |
| 2026-11-03T23:00Z | 7,285 MW | 3,289 MW | 3,921 MW | 814 MW | 191 MW |
| 2026-11-04T00:00Z | 7,134 MW | 3,288 MW | 3,619 MW | 1,003 MW | 186 MW |
| 2026-11-04T01:00Z | 6,371 MW | 3,283 MW | 3,443 MW | 1,303 MW | 189 MW |
| 2026-11-04T02:00Z | 6,316 MW | 3,263 MW | 3,067 MW | 1,402 MW | 182 MW |
| 2026-11-04T03:00Z | 5,766 MW | 3,247 MW | 2,348 MW | 1,499 MW | 180 MW |
| 2026-11-04T04:00Z | 4,583 MW | 3,241 MW | 1,959 MW | 1,534 MW | 179 MW |
| 2026-11-04T05:00Z | 4,494 MW | 3,235 MW | 1,856 MW | 1,568 MW | 179 MW |
| 2026-11-04T06:00Z | 4,323 MW | 3,140 MW | 1,740 MW | 1,496 MW | 174 MW |
| 2026-11-04T07:00Z | 3,908 MW | 3,125 MW | 1,663 MW | 1,470 MW | 175 MW |
| 2026-11-04T08:00Z | 3,991 MW | 3,129 MW | 1,683 MW | 1,415 MW | 177 MW |
| 2026-11-04T09:00Z | 4,364 MW | 3,128 MW | 1,713 MW | 1,320 MW | 178 MW |
| 2026-11-04T10:00Z | 4,832 MW | 3,182 MW | 1,800 MW | 1,235 MW | 186 MW |
| 2026-11-04T11:00Z | 5,658 MW | 3,230 MW | 2,382 MW | 1,148 MW | 207 MW |
| 2026-11-04T12:00Z | 5,856 MW | 3,248 MW | 2,801 MW | 956 MW | 308 MW |
| 2026-11-04T13:00Z | 5,124 MW | 3,268 MW | 2,687 MW | 664 MW | 648 MW |
| 2026-11-04T14:00Z | 5,158 MW | 3,252 MW | 2,946 MW | 393 MW | 786 MW |
| 2026-11-04T15:00Z | 4,889 MW | 3,250 MW | 2,929 MW | 296 MW | 775 MW |
| 2026-11-04T16:00Z | 4,799 MW | 3,153 MW | 2,863 MW | 273 MW | 782 MW |
| 2026-11-04T17:00Z | 5,063 MW | 3,143 MW | 2,892 MW | 317 MW | 786 MW |
| 2026-11-04T18:00Z | 4,871 MW | 3,195 MW | 3,168 MW | 411 MW | 779 MW |
| 2026-11-04T19:00Z | 5,225 MW | 3,252 MW | 3,169 MW | 451 MW | 669 MW |
| 2026-11-04T20:00Z | 5,278 MW | 3,254 MW | 3,712 MW | 473 MW | 390 MW |
| 2026-11-04T21:00Z | 5,759 MW | 3,264 MW | 3,816 MW | 649 MW | 218 MW |
| 2026-11-04T22:00Z | 6,515 MW | 3,271 MW | 3,904 MW | 906 MW | 201 MW |
| 2026-11-04T23:00Z | 6,638 MW | 3,260 MW | 3,887 MW | 1,155 MW | 197 MW |
| 2026-11-05T00:00Z | 6,446 MW | 3,262 MW | 3,611 MW | 1,350 MW | 203 MW |
| 2026-11-05T01:00Z | 6,363 MW | 3,229 MW | 3,480 MW | 1,389 MW | 196 MW |
| 2026-11-05T02:00Z | 6,056 MW | 3,225 MW | 3,288 MW | 1,591 MW | 199 MW |
| 2026-11-05T03:00Z | 5,930 MW | 3,233 MW | 2,305 MW | 1,726 MW | 195 MW |
| 2026-11-05T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T14:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T14:00Z.
Day by Day
Daily totals, Eastern time dates, through 2026-11-04Show the data table (400 rows)
| Date (Eastern time) | Demand |
|---|---|
| 2025-10-01 | 353 GWh |
| 2025-10-02 | 346 GWh |
| 2025-10-03 | 349 GWh |
| 2025-10-04 | 345 GWh |
| 2025-10-05 | 366 GWh |
| 2025-10-06 | 399 GWh |
| 2025-10-07 | 413 GWh |
| 2025-10-08 | 380 GWh |
| 2025-10-09 | 340 GWh |
| 2025-10-10 | 344 GWh |
| 2025-10-11 | 336 GWh |
| 2025-10-12 | 332 GWh |
| 2025-10-13 | 368 GWh |
| 2025-10-14 | 365 GWh |
| 2025-10-15 | 356 GWh |
| 2025-10-16 | 349 GWh |
| 2025-10-17 | 355 GWh |
| 2025-10-18 | 333 GWh |
| 2025-10-19 | 334 GWh |
| 2025-10-20 | 368 GWh |
| 2025-10-21 | 356 GWh |
| 2025-10-22 | 363 GWh |
| 2025-10-23 | 366 GWh |
| 2025-10-24 | 363 GWh |
| 2025-10-25 | 342 GWh |
| 2025-10-26 | 335 GWh |
| 2025-10-27 | 368 GWh |
| 2025-10-28 | 373 GWh |
| 2025-10-29 | 373 GWh |
| 2025-10-30 | 391 GWh |
| 2025-10-31 | 377 GWh |
| 2025-11-01 | 352 GWh |
| 2025-11-02 | 356 GWh |
| 2025-11-03 | 381 GWh |
| 2025-11-04 | 367 GWh |
| 2025-11-05 | 382 GWh |
| 2025-11-06 | 379 GWh |
| 2025-11-07 | 383 GWh |
| 2025-11-08 | 344 GWh |
| 2025-11-09 | 362 GWh |
| 2025-11-10 | 401 GWh |
| 2025-11-11 | 420 GWh |
| 2025-11-12 | 416 GWh |
| 2025-11-13 | 400 GWh |
| 2025-11-14 | 394 GWh |
| 2025-11-15 | 374 GWh |
| 2025-11-16 | 369 GWh |
| 2025-11-17 | 414 GWh |
| 2025-11-18 | 406 GWh |
| 2025-11-19 | 405 GWh |
| 2025-11-20 | 402 GWh |
| 2025-11-21 | 405 GWh |
| 2025-11-22 | 373 GWh |
| 2025-11-23 | 388 GWh |
| 2025-11-24 | 392 GWh |
| 2025-11-25 | 402 GWh |
| 2025-11-26 | 387 GWh |
| 2025-11-27 | 372 GWh |
| 2025-11-28 | 398 GWh |
| 2025-11-29 | 390 GWh |
| 2025-11-30 | 402 GWh |
| 2025-12-01 | 418 GWh |
| 2025-12-02 | 447 GWh |
| 2025-12-03 | 436 GWh |
| 2025-12-04 | 449 GWh |
| 2025-12-05 | 469 GWh |
| 2025-12-06 | 428 GWh |
| 2025-12-07 | 416 GWh |
| 2025-12-08 | 459 GWh |
| 2025-12-09 | 480 GWh |
| 2025-12-10 | 457 GWh |
| 2025-12-11 | 463 GWh |
| 2025-12-12 | 468 GWh |
| 2025-12-13 | 447 GWh |
| 2025-12-14 | 459 GWh |
| 2025-12-15 | 500 GWh |
| 2025-12-16 | 480 GWh |
| 2025-12-17 | 461 GWh |
| 2025-12-18 | 429 GWh |
| 2025-12-19 | 431 GWh |
| 2025-12-20 | 426 GWh |
| 2025-12-21 | 421 GWh |
| 2025-12-22 | 448 GWh |
| 2025-12-23 | 450 GWh |
| 2025-12-24 | 417 GWh |
| 2025-12-25 | 404 GWh |
| 2025-12-26 | 464 GWh |
| 2025-12-27 | 454 GWh |
| 2025-12-28 | 446 GWh |
| 2025-12-29 | 441 GWh |
| 2025-12-30 | 470 GWh |
| 2025-12-31 | 462 GWh |
| 2026-01-01 | 448 GWh |
| 2026-01-02 | 479 GWh |
| 2026-01-03 | 459 GWh |
| 2026-01-04 | 450 GWh |
| 2026-01-05 | 473 GWh |
| 2026-01-06 | 449 GWh |
| 2026-01-07 | 434 GWh |
| 2026-01-08 | 416 GWh |
| 2026-01-09 | 421 GWh |
| 2026-01-10 | 402 GWh |
| 2026-01-11 | 403 GWh |
| 2026-01-12 | 443 GWh |
| 2026-01-13 | 428 GWh |
| 2026-01-14 | 420 GWh |
| 2026-01-15 | 440 GWh |
| 2026-01-16 | 466 GWh |
| 2026-01-17 | 435 GWh |
| 2026-01-18 | 435 GWh |
| 2026-01-19 | 464 GWh |
| 2026-01-20 | 498 GWh |
| 2026-01-21 | 498 GWh |
| 2026-01-22 | 449 GWh |
| 2026-01-23 | 471 GWh |
| 2026-01-24 | 498 GWh |
| 2026-01-25 | 512 GWh |
| 2026-01-26 | 502 GWh |
| 2026-01-27 | 520 GWh |
| 2026-01-28 | 517 GWh |
| 2026-01-29 | 522 GWh |
| 2026-01-30 | 531 GWh |
| 2026-01-31 | 503 GWh |
| 2026-02-01 | 503 GWh |
| 2026-02-02 | 504 GWh |
| 2026-02-03 | 493 GWh |
| 2026-02-04 | 473 GWh |
| 2026-02-05 | 479 GWh |
| 2026-02-06 | 479 GWh |
| 2026-02-07 | 504 GWh |
| 2026-02-08 | 523 GWh |
| 2026-02-09 | 385 GWh |
| 2026-02-10 | 488 GWh |
| 2026-02-11 | 466 GWh |
| 2026-02-12 | 462 GWh |
| 2026-02-13 | 455 GWh |
| 2026-02-14 | 427 GWh |
| 2026-02-15 | 408 GWh |
| 2026-02-16 | 431 GWh |
| 2026-02-17 | 433 GWh |
| 2026-02-18 | 439 GWh |
| 2026-02-19 | 427 GWh |
| 2026-02-20 | 441 GWh |
| 2026-02-21 | 409 GWh |
| 2026-02-22 | 425 GWh |
| 2026-02-23 | 450 GWh |
| 2026-02-24 | 462 GWh |
| 2026-02-25 | 457 GWh |
| 2026-02-26 | 428 GWh |
| 2026-02-27 | 419 GWh |
| 2026-02-28 | 383 GWh |
| 2026-03-01 | 399 GWh |
| 2026-03-02 | 438 GWh |
| 2026-03-03 | 459 GWh |
| 2026-03-04 | 406 GWh |
| 2026-03-05 | 426 GWh |
| 2026-03-06 | 421 GWh |
| 2026-03-07 | 383 GWh |
| 2026-03-08 | 342 GWh |
| 2026-03-09 | 356 GWh |
| 2026-03-10 | 358 GWh |
| 2026-03-11 | 368 GWh |
| 2026-03-12 | 398 GWh |
| 2026-03-13 | 413 GWh |
| 2026-03-14 | 379 GWh |
| 2026-03-15 | 380 GWh |
| 2026-03-16 | 393 GWh |
| 2026-03-17 | 401 GWh |
| 2026-03-18 | 414 GWh |
| 2026-03-19 | 415 GWh |
| 2026-03-20 | 396 GWh |
| 2026-03-21 | 357 GWh |
| 2026-03-22 | 369 GWh |
| 2026-03-23 | 407 GWh |
| 2026-03-24 | 380 GWh |
| 2026-03-25 | 373 GWh |
| 2026-03-26 | 364 GWh |
| 2026-03-27 | 359 GWh |
| 2026-03-28 | 362 GWh |
| 2026-03-29 | 346 GWh |
| 2026-03-30 | 354 GWh |
| 2026-03-31 | 362 GWh |
| 2026-04-01 | 372 GWh |
| 2026-04-02 | 379 GWh |
| 2026-04-03 | 348 GWh |
| 2026-04-04 | 323 GWh |
| 2026-04-05 | 342 GWh |
| 2026-04-06 | 359 GWh |
| 2026-04-07 | 370 GWh |
| 2026-04-08 | 360 GWh |
| 2026-04-09 | 349 GWh |
| 2026-04-10 | 346 GWh |
| 2026-04-11 | 312 GWh |
| 2026-04-12 | 325 GWh |
| 2026-04-13 | 357 GWh |
| 2026-04-14 | 364 GWh |
| 2026-04-15 | 386 GWh |
| 2026-04-16 | 404 GWh |
| 2026-04-17 | 380 GWh |
| 2026-04-18 | 321 GWh |
| 2026-04-19 | 337 GWh |
| 2026-04-20 | 358 GWh |
| 2026-04-21 | 356 GWh |
| 2026-04-22 | 358 GWh |
| 2026-04-23 | 337 GWh |
| 2026-04-24 | 327 GWh |
| 2026-04-25 | 344 GWh |
| 2026-04-26 | 313 GWh |
| 2026-04-27 | 327 GWh |
| 2026-04-28 | 340 GWh |
| 2026-04-29 | 348 GWh |
| 2026-04-30 | 357 GWh |
| 2026-05-01 | 336 GWh |
| 2026-05-02 | 323 GWh |
| 2026-05-03 | 314 GWh |
| 2026-05-04 | 335 GWh |
| 2026-05-05 | 354 GWh |
| 2026-05-06 | 374 GWh |
| 2026-05-07 | 336 GWh |
| 2026-05-08 | 336 GWh |
| 2026-05-09 | 331 GWh |
| 2026-05-10 | 308 GWh |
| 2026-05-11 | 335 GWh |
| 2026-05-12 | 324 GWh |
| 2026-05-13 | 351 GWh |
| 2026-05-14 | 357 GWh |
| 2026-05-15 | 337 GWh |
| 2026-05-16 | 317 GWh |
| 2026-05-17 | 352 GWh |
| 2026-05-18 | 437 GWh |
| 2026-05-19 | 481 GWh |
| 2026-05-20 | 478 GWh |
| 2026-05-21 | 368 GWh |
| 2026-05-22 | 335 GWh |
| 2026-05-23 | 341 GWh |
| 2026-05-24 | 336 GWh |
| 2026-05-25 | 330 GWh |
| 2026-05-26 | 363 GWh |
| 2026-05-27 | 393 GWh |
| 2026-05-28 | 376 GWh |
| 2026-05-29 | 354 GWh |
| 2026-05-30 | 314 GWh |
| 2026-05-31 | 313 GWh |
| 2026-06-01 | 341 GWh |
| 2026-06-02 | 347 GWh |
| 2026-06-03 | 373 GWh |
| 2026-06-04 | 396 GWh |
| 2026-06-05 | 428 GWh |
| 2026-06-06 | 435 GWh |
| 2026-06-07 | 412 GWh |
| 2026-06-08 | 397 GWh |
| 2026-06-09 | 411 GWh |
| 2026-06-10 | 464 GWh |
| 2026-06-11 | 532 GWh |
| 2026-06-12 | 537 GWh |
| 2026-06-13 | 458 GWh |
| 2026-06-14 | 456 GWh |
| 2026-06-15 | 416 GWh |
| 2026-06-16 | 380 GWh |
| 2026-06-17 | 405 GWh |
| 2026-06-18 | 451 GWh |
| 2026-06-19 | 417 GWh |
| 2026-06-20 | 381 GWh |
| 2026-06-21 | 382 GWh |
| 2026-06-22 | 425 GWh |
| 2026-06-23 | 410 GWh |
| 2026-06-24 | 407 GWh |
| 2026-06-25 | 431 GWh |
| 2026-06-26 | 440 GWh |
| 2026-06-27 | 414 GWh |
| 2026-06-28 | 423 GWh |
| 2026-06-29 | 484 GWh |
| 2026-06-30 | 522 GWh |
| 2026-07-01 | 570 GWh |
| 2026-07-02 | 625 GWh |
| 2026-07-03 | 612 GWh |
| 2026-07-04 | 550 GWh |
| 2026-07-05 | 486 GWh |
| 2026-07-06 | 459 GWh |
| 2026-07-07 | 427 GWh |
| 2026-07-08 | 458 GWh |
| 2026-07-09 | 503 GWh |
| 2026-07-10 | 516 GWh |
| 2026-07-11 | 457 GWh |
| 2026-07-12 | 430 GWh |
| 2026-07-13 | 485 GWh |
| 2026-07-14 | 543 GWh |
| 2026-07-15 | 582 GWh |
| 2026-07-16 | 512 GWh |
| 2026-07-17 | 477 GWh |
| 2026-07-18 | 455 GWh |
| 2026-07-19 | 412 GWh |
| 2026-07-20 | 426 GWh |
| 2026-07-21 | 475 GWh |
| 2026-07-22 | 477 GWh |
| 2026-07-23 | 420 GWh |
| 2026-07-24 | 425 GWh |
| 2026-07-25 | 407 GWh |
| 2026-07-26 | 418 GWh |
| 2026-07-27 | 484 GWh |
| 2026-07-28 | 491 GWh |
| 2026-07-29 | 473 GWh |
| 2026-07-30 | 448 GWh |
| 2026-07-31 | 467 GWh |
| 2026-08-01 | 472 GWh |
| 2026-08-02 | 485 GWh |
| 2026-08-03 | 498 GWh |
| 2026-08-04 | 461 GWh |
| 2026-08-05 | 491 GWh |
| 2026-08-06 | 566 GWh |
| 2026-08-07 | 566 GWh |
| 2026-08-08 | 511 GWh |
| 2026-08-09 | 502 GWh |
| 2026-08-10 | 515 GWh |
| 2026-08-11 | 514 GWh |
| 2026-08-12 | 492 GWh |
| 2026-08-13 | 505 GWh |
| 2026-08-14 | 485 GWh |
| 2026-08-15 | 431 GWh |
| 2026-08-16 | 430 GWh |
| 2026-08-17 | 481 GWh |
| 2026-08-18 | 486 GWh |
| 2026-08-19 | 482 GWh |
| 2026-08-20 | 469 GWh |
| 2026-08-21 | 417 GWh |
| 2026-08-22 | 404 GWh |
| 2026-08-23 | 422 GWh |
| 2026-08-24 | 430 GWh |
| 2026-08-25 | 425 GWh |
| 2026-08-26 | 433 GWh |
| 2026-08-27 | 460 GWh |
| 2026-08-28 | 454 GWh |
| 2026-08-29 | 384 GWh |
| 2026-08-30 | 411 GWh |
| 2026-08-31 | 450 GWh |
| 2026-09-01 | 475 GWh |
| 2026-09-02 | 446 GWh |
| 2026-09-03 | 479 GWh |
| 2026-09-04 | 484 GWh |
| 2026-09-05 | 417 GWh |
| 2026-09-06 | 380 GWh |
| 2026-09-07 | 375 GWh |
| 2026-09-08 | 418 GWh |
| 2026-09-09 | 466 GWh |
| 2026-09-10 | 479 GWh |
| 2026-09-11 | 423 GWh |
| 2026-09-12 | 393 GWh |
| 2026-09-13 | 430 GWh |
| 2026-09-14 | 405 GWh |
| 2026-09-15 | 376 GWh |
| 2026-09-16 | 412 GWh |
| 2026-09-17 | 463 GWh |
| 2026-09-18 | 443 GWh |
| 2026-09-19 | 356 GWh |
| 2026-09-20 | 373 GWh |
| 2026-09-21 | 373 GWh |
| 2026-09-22 | 357 GWh |
| 2026-09-23 | 340 GWh |
| 2026-09-24 | 337 GWh |
| 2026-09-25 | 340 GWh |
| 2026-09-26 | 334 GWh |
| 2026-09-27 | 340 GWh |
| 2026-09-28 | 367 GWh |
| 2026-09-29 | 369 GWh |
| 2026-09-30 | 368 GWh |
| 2026-10-01 | 397 GWh |
| 2026-10-02 | 414 GWh |
| 2026-10-03 | 336 GWh |
| 2026-10-04 | 332 GWh |
| 2026-10-05 | 348 GWh |
| 2026-10-06 | 338 GWh |
| 2026-10-07 | 347 GWh |
| 2026-10-08 | 351 GWh |
| 2026-10-09 | 345 GWh |
| 2026-10-10 | 325 GWh |
| 2026-10-11 | 347 GWh |
| 2026-10-12 | 363 GWh |
| 2026-10-13 | 376 GWh |
| 2026-10-14 | 392 GWh |
| 2026-10-15 | 351 GWh |
| 2026-10-16 | 380 GWh |
| 2026-10-17 | 335 GWh |
| 2026-10-18 | 328 GWh |
| 2026-10-19 | 351 GWh |
| 2026-10-20 | 349 GWh |
| 2026-10-21 | 352 GWh |
| 2026-10-22 | 355 GWh |
| 2026-10-23 | 349 GWh |
| 2026-10-24 | 334 GWh |
| 2026-10-25 | 331 GWh |
| 2026-10-26 | 361 GWh |
| 2026-10-27 | 353 GWh |
| 2026-10-28 | 366 GWh |
| 2026-10-29 | 359 GWh |
| 2026-10-30 | 360 GWh |
| 2026-10-31 | 333 GWh |
| 2026-11-01 | 346 GWh |
| 2026-11-02 | 359 GWh |
| 2026-11-03 | 364 GWh |
| 2026-11-04 | 359 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 127 TWh | 112 TWh | Gas 54.2% | 308 |
| 2025 | 152 TWh | 132 TWh | Gas 53.0% | 365 |
| 2024 | 151 TWh | 131 TWh | Gas 52.1% | 366 |
| 2023 | 147 TWh | 124 TWh | Gas 49.4% | 365 |
| 2022 | 153 TWh | 124 TWh | Gas 48.5% | 365 |
| 2021 | 152 TWh | 124 TWh | Gas 45.0% | 365 |
| 2020 | 150 TWh | 129 TWh | Gas 39.3% | 366 |
| 2019 | 156 TWh | 131 TWh | Gas 34.7% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 635 GWh | 2025-06-24 (24 June 2025) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 31,097 MW | 2 Jul 2026, 18:00 EDT (UTC-04:00) |
| Highest wind share of a day's generation, 2019 onward | 15.3% | 2025-03-16 (16 March 2025) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Power Flows With Neighbours
Net totals, 2026-10-06 (6 October 2026) to 2026-11-04 (4 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| PJM | NYISO imports | 1.18 TWh |
| IESO | NYISO imports | 160 GWh |
| ISO-NE | NYISO exports | 101 GWh |
| HQT | NYISO imports | 26.7 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Share and Embed
Figures as of 2026-11-05 (5 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for NYISO, credited to EIA. The image is rebuilt with the page. More about grid widgets.
Embed this widget
Free to use on your own site. Keep the source line in the frame; it carries the data licence and a link back here.
The frame reports its height to the page with postMessage type wpm-embed-height if you want it to resize.
Related
Cite this page
World Power Monitor. (2026). NYISO Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/nyiso/
World Power Monitor. NYISO Electricity Demand and Generation Mix. Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/zones/nyiso/
@misc{wpm_zones_nyiso_2026,
title = {{NYISO Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/zones/nyiso/}
} Permalink: https://worldpowermonitor.com/zones/nyiso/