Sweden North (SE1) Demand Forecast Accuracy and Bias, 30 September to 28 October 2026
The day-ahead demand forecast for Sweden North (SE1) was off by 12.4% on average (mean absolute percentage error) over 685 hours from 30 September to 28 October 2026, and 30% of hours landed within 5% of the reading. Its bias was +2.0%: it ran high on average, an over forecast. The largest miss was 625 MW (32.9%) too low at 11 Oct 2026, 21:00 CEST (UTC+02:00). Dates and times are local (Europe/Stockholm).
Key Facts
- The day-ahead demand forecast for Sweden North (SE1) was off by 12.4% on average (mean absolute percentage error) over 685 hours from 30 September to 28 October 2026, and 30% of hours landed within 5% of the reading. Its bias was +2.0%: it ran high on average, an over forecast. The largest miss was 625 MW (32.9%) too low at 11 Oct 2026, 21:00 CEST (UTC+02:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Sweden North (SE1) came 42 (1 is the smallest error).
- On average the forecast differed from reported demand by 138 MW, against average demand of 1,189 MW.
- The forecast was above reported demand in 47% of compared hours.
Forecast Error at a Glance
685 hours from 30 September to 28 October 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-7 MW per hour on average): the forecast ran high on average, an over forecast. The worst miss was 625 MW (32.9%) too low at 11 Oct 2026, 21:00 CEST (UTC+02:00): forecast 1,278 MW, reported 1,903 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 28 Oct 2026, 12:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 21 Oct, 14:00 | 1,246 MW | 1,207 MW |
| 21 Oct, 15:00 | 1,326 MW | 1,224 MW |
| 21 Oct, 16:00 | 1,308 MW | 1,238 MW |
| 21 Oct, 17:00 | 1,356 MW | 1,253 MW |
| 21 Oct, 18:00 | 1,291 MW | 1,251 MW |
| 21 Oct, 19:00 | 1,329 MW | 1,255 MW |
| 21 Oct, 20:00 | 1,305 MW | 1,242 MW |
| 21 Oct, 21:00 | 1,280 MW | 1,221 MW |
| 21 Oct, 22:00 | 1,254 MW | 1,184 MW |
| 21 Oct, 23:00 | 1,180 MW | 1,166 MW |
| 22 Oct, 00:00 | 1,149 MW | 1,134 MW |
| 22 Oct, 01:00 | 1,286 MW | 1,110 MW |
| 22 Oct, 02:00 | 1,287 MW | 1,105 MW |
| 22 Oct, 03:00 | 1,337 MW | 1,103 MW |
| 22 Oct, 04:00 | 1,381 MW | 1,119 MW |
| 22 Oct, 05:00 | 1,297 MW | 1,133 MW |
| 22 Oct, 06:00 | 1,332 MW | 1,165 MW |
| 22 Oct, 07:00 | 1,292 MW | 1,200 MW |
| 22 Oct, 08:00 | 1,312 MW | 1,221 MW |
| 22 Oct, 09:00 | 1,300 MW | 1,219 MW |
| 22 Oct, 10:00 | 1,314 MW | 1,208 MW |
| 22 Oct, 11:00 | 1,317 MW | 1,203 MW |
| 22 Oct, 12:00 | 1,231 MW | 1,204 MW |
| 22 Oct, 13:00 | 1,202 MW | 1,206 MW |
| 22 Oct, 14:00 | 1,272 MW | 1,203 MW |
| 22 Oct, 15:00 | 1,216 MW | 1,216 MW |
| 22 Oct, 16:00 | 1,242 MW | 1,225 MW |
| 22 Oct, 17:00 | 1,217 MW | 1,232 MW |
| 22 Oct, 18:00 | 1,216 MW | 1,227 MW |
| 22 Oct, 19:00 | 1,329 MW | 1,222 MW |
| 22 Oct, 20:00 | 1,246 MW | 1,207 MW |
| 22 Oct, 21:00 | 1,184 MW | 1,196 MW |
| 22 Oct, 22:00 | 1,192 MW | 1,157 MW |
| 22 Oct, 23:00 | 1,191 MW | 1,135 MW |
| 23 Oct, 00:00 | 1,183 MW | 1,108 MW |
| 23 Oct, 01:00 | 1,123 MW | 1,080 MW |
| 23 Oct, 02:00 | 1,210 MW | 1,084 MW |
| 23 Oct, 03:00 | 1,293 MW | 1,092 MW |
| 23 Oct, 04:00 | 1,274 MW | 1,101 MW |
| 23 Oct, 05:00 | 1,140 MW | 1,117 MW |
| 23 Oct, 06:00 | 1,250 MW | 1,149 MW |
| 23 Oct, 07:00 | 1,533 MW | 1,190 MW |
| 23 Oct, 08:00 | 1,348 MW | 1,203 MW |
| 23 Oct, 09:00 | 1,274 MW | 1,208 MW |
| 23 Oct, 10:00 | 1,315 MW | 1,202 MW |
| 23 Oct, 11:00 | 1,260 MW | 1,201 MW |
| 23 Oct, 12:00 | 1,286 MW | 1,195 MW |
| 23 Oct, 13:00 | 1,215 MW | 1,193 MW |
| 23 Oct, 14:00 | 1,240 MW | 1,191 MW |
| 23 Oct, 15:00 | 1,293 MW | 1,205 MW |
| 23 Oct, 16:00 | 1,282 MW | 1,208 MW |
| 23 Oct, 17:00 | 1,338 MW | 1,220 MW |
| 23 Oct, 18:00 | 1,399 MW | 1,214 MW |
| 23 Oct, 19:00 | 1,435 MW | 1,211 MW |
| 23 Oct, 20:00 | 1,304 MW | 1,184 MW |
| 23 Oct, 21:00 | 1,233 MW | 1,170 MW |
| 23 Oct, 22:00 | 1,286 MW | 1,133 MW |
| 23 Oct, 23:00 | 1,268 MW | 1,108 MW |
| 24 Oct, 00:00 | 1,280 MW | 1,091 MW |
| 24 Oct, 01:00 | 1,236 MW | 1,076 MW |
| 24 Oct, 02:00 | 1,325 MW | 1,073 MW |
| 24 Oct, 03:00 | 1,302 MW | 1,069 MW |
| 24 Oct, 04:00 | 1,266 MW | 1,073 MW |
| 24 Oct, 05:00 | 1,312 MW | 1,071 MW |
| 24 Oct, 06:00 | 1,237 MW | 1,071 MW |
| 24 Oct, 07:00 | 1,231 MW | 1,090 MW |
| 24 Oct, 08:00 | 1,239 MW | 1,121 MW |
| 24 Oct, 09:00 | 1,203 MW | 1,146 MW |
| 24 Oct, 10:00 | 1,180 MW | 1,144 MW |
| 24 Oct, 11:00 | 1,189 MW | 1,139 MW |
| 24 Oct, 12:00 | 1,184 MW | 1,141 MW |
| 24 Oct, 13:00 | 1,226 MW | 1,143 MW |
| 24 Oct, 14:00 | 1,149 MW | 1,139 MW |
| 24 Oct, 15:00 | 1,163 MW | 1,150 MW |
| 24 Oct, 16:00 | 1,013 MW | 1,168 MW |
| 24 Oct, 17:00 | 1,086 MW | 1,179 MW |
| 24 Oct, 18:00 | 1,174 MW | 1,174 MW |
| 24 Oct, 19:00 | 845 MW | 1,171 MW |
| 24 Oct, 20:00 | 909 MW | 1,163 MW |
| 24 Oct, 21:00 | 1,093 MW | 1,152 MW |
| 24 Oct, 22:00 | 948 MW | 1,126 MW |
| 24 Oct, 23:00 | 980 MW | 1,105 MW |
| 25 Oct, 00:00 | 983 MW | 1,088 MW |
| 25 Oct, 01:00 | 1,007 MW | 1,064 MW |
| 25 Oct, 02:00 | 1,170 MW | 1,069 MW |
| 25 Oct, 02:00 | 1,049 MW | 1,076 MW |
| 25 Oct, 03:00 | 1,010 MW | 1,076 MW |
| 25 Oct, 04:00 | 1,073 MW | 1,089 MW |
| 25 Oct, 05:00 | 1,025 MW | 1,100 MW |
| 25 Oct, 06:00 | 1,093 MW | 1,110 MW |
| 25 Oct, 07:00 | 1,148 MW | 1,105 MW |
| 25 Oct, 08:00 | 1,183 MW | 1,130 MW |
| 25 Oct, 09:00 | 1,120 MW | 1,135 MW |
| 25 Oct, 10:00 | 1,108 MW | 1,147 MW |
| 25 Oct, 11:00 | 1,075 MW | 1,158 MW |
| 25 Oct, 12:00 | 1,177 MW | 1,156 MW |
| 25 Oct, 13:00 | 1,211 MW | 1,155 MW |
| 25 Oct, 14:00 | 1,330 MW | 1,158 MW |
| 25 Oct, 15:00 | 1,233 MW | 1,173 MW |
| 25 Oct, 16:00 | 1,098 MW | 1,185 MW |
| 25 Oct, 17:00 | 1,072 MW | 1,191 MW |
| 25 Oct, 18:00 | 1,108 MW | 1,194 MW |
| 25 Oct, 19:00 | 1,159 MW | 1,181 MW |
| 25 Oct, 20:00 | 1,116 MW | 1,161 MW |
| 25 Oct, 21:00 | 1,089 MW | 1,140 MW |
| 25 Oct, 22:00 | 1,090 MW | 1,128 MW |
| 25 Oct, 23:00 | 1,010 MW | 1,097 MW |
| 26 Oct, 00:00 | 1,100 MW | 1,092 MW |
| 26 Oct, 01:00 | 1,116 MW | 1,081 MW |
| 26 Oct, 02:00 | 1,141 MW | 1,076 MW |
| 26 Oct, 03:00 | 985 MW | 1,082 MW |
| 26 Oct, 04:00 | 901 MW | 1,101 MW |
| 26 Oct, 05:00 | 795 MW | 1,133 MW |
| 26 Oct, 06:00 | 1,017 MW | 1,165 MW |
| 26 Oct, 07:00 | 1,449 MW | 1,176 MW |
| 26 Oct, 08:00 | 1,525 MW | 1,195 MW |
| 26 Oct, 09:00 | 1,348 MW | 1,193 MW |
| 26 Oct, 10:00 | 1,139 MW | 1,186 MW |
| 26 Oct, 11:00 | 1,223 MW | 1,194 MW |
| 26 Oct, 12:00 | 1,298 MW | 1,196 MW |
| 26 Oct, 13:00 | 1,289 MW | 1,196 MW |
| 26 Oct, 14:00 | 1,400 MW | 1,202 MW |
| 26 Oct, 15:00 | 1,230 MW | 1,217 MW |
| 26 Oct, 16:00 | 1,279 MW | 1,219 MW |
| 26 Oct, 17:00 | 1,346 MW | 1,216 MW |
| 26 Oct, 18:00 | 1,247 MW | 1,216 MW |
| 26 Oct, 19:00 | 1,187 MW | 1,205 MW |
| 26 Oct, 20:00 | 1,310 MW | 1,199 MW |
| 26 Oct, 21:00 | 1,389 MW | 1,172 MW |
| 26 Oct, 22:00 | 1,235 MW | 1,142 MW |
| 26 Oct, 23:00 | 1,242 MW | 1,116 MW |
| 27 Oct, 00:00 | 1,101 MW | 1,098 MW |
| 27 Oct, 01:00 | 942 MW | 1,085 MW |
| 27 Oct, 02:00 | 979 MW | 1,094 MW |
| 27 Oct, 03:00 | 1,062 MW | 1,097 MW |
| 27 Oct, 04:00 | 1,060 MW | 1,114 MW |
| 27 Oct, 05:00 | 957 MW | 1,169 MW |
| 27 Oct, 06:00 | 956 MW | 1,199 MW |
| 27 Oct, 07:00 | 1,162 MW | 1,209 MW |
| 27 Oct, 08:00 | 1,349 MW | 1,216 MW |
| 27 Oct, 09:00 | 1,067 MW | 1,205 MW |
| 27 Oct, 10:00 | 1,085 MW | 1,194 MW |
| 27 Oct, 11:00 | 1,353 MW | 1,196 MW |
| 27 Oct, 12:00 | 1,252 MW | 1,200 MW |
| 27 Oct, 13:00 | 1,160 MW | 1,203 MW |
| 27 Oct, 14:00 | 1,021 MW | 1,198 MW |
| 27 Oct, 15:00 | 1,037 MW | 1,213 MW |
| 27 Oct, 16:00 | 1,351 MW | 1,225 MW |
| 27 Oct, 17:00 | 1,425 MW | 1,229 MW |
| 27 Oct, 18:00 | 1,350 MW | 1,231 MW |
| 27 Oct, 19:00 | 1,261 MW | 1,222 MW |
| 27 Oct, 20:00 | 1,118 MW | 1,203 MW |
| 27 Oct, 21:00 | 1,036 MW | 1,176 MW |
| 27 Oct, 22:00 | 1,011 MW | 1,142 MW |
| 27 Oct, 23:00 | 965 MW | 1,109 MW |
| 28 Oct, 00:00 | 998 MW | 1,094 MW |
| 28 Oct, 01:00 | 1,084 MW | 1,087 MW |
| 28 Oct, 02:00 | 1,076 MW | 1,085 MW |
| 28 Oct, 03:00 | 1,173 MW | 1,086 MW |
| 28 Oct, 04:00 | 1,153 MW | 1,104 MW |
| 28 Oct, 05:00 | 1,105 MW | 1,139 MW |
| 28 Oct, 06:00 | 1,105 MW | 1,182 MW |
| 28 Oct, 07:00 | 1,134 MW | 1,180 MW |
| 28 Oct, 08:00 | 1,087 MW | 1,187 MW |
| 28 Oct, 09:00 | 1,225 MW | 1,187 MW |
| 28 Oct, 10:00 | 1,379 MW | 1,195 MW |
| 28 Oct, 11:00 | 1,256 MW | 1,188 MW |
| 28 Oct, 12:00 | 1,059 MW | 1,185 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (685 of 685 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Sweden North (SE1) Demand Forecast Accuracy and Bias. https://worldpowermonitor.com/forecast-accuracy/se1/
World Power Monitor. Sweden North (SE1) Demand Forecast Accuracy and Bias. Data as of 2026-10-28. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/se1/
@misc{wpm_forecast_accuracy_se1_2026,
title = {{Sweden North (SE1) Demand Forecast Accuracy and Bias}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/se1/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/se1/