Grid Stress Alerts for 10 October 2026
5 notable grid events on 10 October 2026 in ENTSO-E and EIA operator data: 5 net imports. Records are judged against the days loaded for each zone, and each sentence says how many.
Key Facts
- Net imports into Norway South-East (NO1) reached 56.6 GWh on 10 October 2026 (60% of demand), the highest daily net imports in 379 days of loaded history.
- Net imports into Portugal reached 65.7 GWh on 10 October 2026 (52% of demand), the highest daily net imports in 382 days of loaded history.
- Net imports into Italy Sicily reached 14.8 GWh on 10 October 2026 (35% of demand), the 2nd highest daily net imports in 378 days of loaded history.
All Alerts, 10 October 2026
5 events- Net imports Net imports into Norway South-East (NO1) reached 56.6 GWh on 10 October 2026 (60% of demand), the highest daily net imports in 379 days of loaded history. Norway South-East (NO1) grid
- Net imports Net imports into Portugal reached 65.7 GWh on 10 October 2026 (52% of demand), the highest daily net imports in 382 days of loaded history. Portugal grid
- Net imports Net imports into Italy Sicily reached 14.8 GWh on 10 October 2026 (35% of demand), the 2nd highest daily net imports in 378 days of loaded history. Italy Sicily grid
- Net imports Norway South-West (NO2) imported a net 35.4 GWh on 10 October 2026, the 2nd highest daily net imports in 378 days of loaded history and 36% of its demand that day. Norway South-West (NO2) grid
- Net imports Switzerland imported a net 18.7 GWh on 10 October 2026, the 2nd highest daily net imports in 382 days of loaded history and 11% of its demand that day. Switzerland grid
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-10. Operator data only, kept apart from annual statistics.