Portugal demand was 6,703 MW in the hour starting 28 Oct 2026, 12:00 WET (UTC+00:00). Solar was the largest source in the hour starting 28 Oct 2026, 12:00 WET (UTC+00:00), at 66% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Portugal is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 12:00 WET (UTC+00:00), demand in Portugal was 6,703 MW, against a day-ahead forecast of 6,294 MW.
- Solar supplied 66.4% of Portugal's generation in the hour starting 28 Oct 2026, 12:00 WET (UTC+00:00).
- The day-ahead price in Portugal averaged EUR 207.25/MWh for delivery on 2026-10-27 (27 October 2026).
- Installed generating capacity in Portugal was 22.1 GW in 2026, as reported to ENTSO-E.
- Demand in Portugal totalled 53.0 TWh in 2025.
- Wind supplied 30.8% of Portugal's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 12:00 WET (UTC+00:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 12:00 WET (UTC+00:00)| Source | Output | Share |
|---|---|---|
| Solar | 2,937 MW | 66.4% |
| Gas | 676 MW | 15.3% |
| Wind | 399 MW | 9.0% |
| Bioenergy | 275 MW | 6.2% |
| Hydro | 132 MW | 3.0% |
| Other | 4 MW | 0.1% |
| Coal | 0 MW | 0.0% |
| Storage | -2,003 MW | charging |
| Total from these sources | 4,421 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
The sources reported in this hour add up to 36% of demand, so the generation report for Portugal looks incomplete and the shares above are shares of what was reported.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Day-Ahead Price
Delivery day 2026-10-27 (27 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Portugal and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Last 30 Days, Hourly
Times in UTCShow the data table (685 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-30T00:00Z | 5,452 MW |
| 2026-09-30T01:00Z | 5,236 MW |
| 2026-09-30T02:00Z | 5,139 MW |
| 2026-09-30T03:00Z | 5,072 MW |
| 2026-09-30T04:00Z | 5,102 MW |
| 2026-09-30T05:00Z | 5,516 MW |
| 2026-09-30T06:00Z | 6,130 MW |
| 2026-09-30T07:00Z | 6,862 MW |
| 2026-09-30T08:00Z | 7,204 MW |
| 2026-09-30T09:00Z | 7,236 MW |
| 2026-09-30T10:00Z | 7,254 MW |
| 2026-09-30T11:00Z | 6,931 MW |
| 2026-09-30T12:00Z | 6,625 MW |
| 2026-09-30T13:00Z | 6,651 MW |
| 2026-09-30T14:00Z | 6,538 MW |
| 2026-09-30T15:00Z | 6,638 MW |
| 2026-09-30T16:00Z | 6,740 MW |
| 2026-09-30T17:00Z | 6,956 MW |
| 2026-09-30T18:00Z | 7,555 MW |
| 2026-09-30T19:00Z | 7,543 MW |
| 2026-09-30T20:00Z | 7,068 MW |
| 2026-09-30T21:00Z | 6,539 MW |
| 2026-09-30T22:00Z | 5,943 MW |
| 2026-09-30T23:00Z | 5,512 MW |
| 2026-10-01T00:00Z | 5,236 MW |
| 2026-10-01T01:00Z | 5,033 MW |
| 2026-10-01T02:00Z | 4,915 MW |
| 2026-10-01T03:00Z | 4,920 MW |
| 2026-10-01T04:00Z | 5,028 MW |
| 2026-10-01T05:00Z | 5,494 MW |
| 2026-10-01T06:00Z | 6,140 MW |
| 2026-10-01T07:00Z | 6,717 MW |
| 2026-10-01T08:00Z | 6,813 MW |
| 2026-10-01T09:00Z | 6,530 MW |
| 2026-10-01T10:00Z | 6,398 MW |
| 2026-10-01T11:00Z | 6,194 MW |
| 2026-10-01T12:00Z | 6,038 MW |
| 2026-10-01T13:00Z | 6,208 MW |
| 2026-10-01T14:00Z | 6,185 MW |
| 2026-10-01T15:00Z | 6,357 MW |
| 2026-10-01T16:00Z | 6,456 MW |
| 2026-10-01T17:00Z | 6,820 MW |
| 2026-10-01T18:00Z | 7,505 MW |
| 2026-10-01T19:00Z | 7,457 MW |
| 2026-10-01T20:00Z | 6,935 MW |
| 2026-10-01T21:00Z | 6,449 MW |
| 2026-10-01T22:00Z | 5,883 MW |
| 2026-10-01T23:00Z | 5,455 MW |
| 2026-10-02T00:00Z | 5,171 MW |
| 2026-10-02T01:00Z | 4,958 MW |
| 2026-10-02T02:00Z | 4,842 MW |
| 2026-10-02T03:00Z | 4,779 MW |
| 2026-10-02T04:00Z | 4,851 MW |
| 2026-10-02T05:00Z | 5,305 MW |
| 2026-10-02T06:00Z | 5,907 MW |
| 2026-10-02T07:00Z | 6,462 MW |
| 2026-10-02T08:00Z | 6,643 MW |
| 2026-10-02T09:00Z | 6,550 MW |
| 2026-10-02T10:00Z | 6,658 MW |
| 2026-10-02T11:00Z | 6,398 MW |
| 2026-10-02T12:00Z | 6,275 MW |
| 2026-10-02T13:00Z | 6,564 MW |
| 2026-10-02T14:00Z | 6,721 MW |
| 2026-10-02T15:00Z | 6,792 MW |
| 2026-10-02T16:00Z | 6,684 MW |
| 2026-10-02T17:00Z | 6,886 MW |
| 2026-10-02T18:00Z | 7,388 MW |
| 2026-10-02T19:00Z | 7,331 MW |
| 2026-10-02T20:00Z | 6,844 MW |
| 2026-10-02T21:00Z | 6,343 MW |
| 2026-10-02T22:00Z | 5,813 MW |
| 2026-10-02T23:00Z | 5,477 MW |
| 2026-10-03T00:00Z | 5,223 MW |
| 2026-10-03T01:00Z | 5,013 MW |
| 2026-10-03T02:00Z | 4,842 MW |
| 2026-10-03T03:00Z | 4,710 MW |
| 2026-10-03T04:00Z | 4,704 MW |
| 2026-10-03T05:00Z | 4,852 MW |
| 2026-10-03T06:00Z | 5,040 MW |
| 2026-10-03T07:00Z | 5,267 MW |
| 2026-10-03T08:00Z | 5,451 MW |
| 2026-10-03T09:00Z | 5,423 MW |
| 2026-10-03T10:00Z | 5,438 MW |
| 2026-10-03T11:00Z | 5,566 MW |
| 2026-10-03T12:00Z | 5,447 MW |
| 2026-10-03T13:00Z | 5,388 MW |
| 2026-10-03T14:00Z | 5,408 MW |
| 2026-10-03T15:00Z | 5,526 MW |
| 2026-10-03T16:00Z | 5,654 MW |
| 2026-10-03T17:00Z | 5,981 MW |
| 2026-10-03T18:00Z | 6,498 MW |
| 2026-10-03T19:00Z | 6,476 MW |
| 2026-10-03T20:00Z | 6,034 MW |
| 2026-10-03T21:00Z | 5,664 MW |
| 2026-10-03T22:00Z | 5,250 MW |
| 2026-10-03T23:00Z | 4,908 MW |
| 2026-10-04T00:00Z | 4,649 MW |
| 2026-10-04T01:00Z | 4,458 MW |
| 2026-10-04T02:00Z | 4,332 MW |
| 2026-10-04T03:00Z | 4,247 MW |
| 2026-10-04T04:00Z | 4,241 MW |
| 2026-10-04T05:00Z | 4,354 MW |
| 2026-10-04T06:00Z | 4,455 MW |
| 2026-10-04T07:00Z | 4,637 MW |
| 2026-10-04T08:00Z | 4,847 MW |
| 2026-10-04T09:00Z | 4,967 MW |
| 2026-10-04T10:00Z | 5,066 MW |
| 2026-10-04T11:00Z | 5,131 MW |
| 2026-10-04T12:00Z | 4,954 MW |
| 2026-10-04T13:00Z | 4,933 MW |
| 2026-10-04T14:00Z | 5,024 MW |
| 2026-10-04T15:00Z | 5,160 MW |
| 2026-10-04T16:00Z | 5,215 MW |
| 2026-10-04T17:00Z | 5,567 MW |
| 2026-10-04T18:00Z | 6,155 MW |
| 2026-10-04T19:00Z | 6,186 MW |
| 2026-10-04T20:00Z | 5,805 MW |
| 2026-10-04T21:00Z | 5,502 MW |
| 2026-10-04T22:00Z | 5,112 MW |
| 2026-10-04T23:00Z | 4,788 MW |
| 2026-10-05T00:00Z | 4,498 MW |
| 2026-10-05T01:00Z | 4,277 MW |
| 2026-10-05T02:00Z | 4,160 MW |
| 2026-10-05T03:00Z | 4,107 MW |
| 2026-10-05T04:00Z | 4,120 MW |
| 2026-10-05T05:00Z | 4,328 MW |
| 2026-10-05T06:00Z | 4,496 MW |
| 2026-10-05T07:00Z | 4,687 MW |
| 2026-10-05T08:00Z | 4,854 MW |
| 2026-10-05T09:00Z | 4,968 MW |
| 2026-10-05T10:00Z | 5,191 MW |
| 2026-10-05T11:00Z | 5,439 MW |
| 2026-10-05T12:00Z | 5,324 MW |
| 2026-10-05T13:00Z | 5,193 MW |
| 2026-10-05T14:00Z | 5,103 MW |
| 2026-10-05T15:00Z | 5,123 MW |
| 2026-10-05T16:00Z | 5,468 MW |
| 2026-10-05T17:00Z | 5,923 MW |
| 2026-10-05T18:00Z | 6,572 MW |
| 2026-10-05T19:00Z | 6,544 MW |
| 2026-10-05T20:00Z | 6,115 MW |
| 2026-10-05T21:00Z | 5,666 MW |
| 2026-10-05T22:00Z | 5,228 MW |
| 2026-10-05T23:00Z | 4,919 MW |
| 2026-10-06T00:00Z | 4,690 MW |
| 2026-10-06T01:00Z | 4,518 MW |
| 2026-10-06T02:00Z | 4,435 MW |
| 2026-10-06T03:00Z | 4,405 MW |
| 2026-10-06T04:00Z | 4,511 MW |
| 2026-10-06T05:00Z | 5,034 MW |
| 2026-10-06T06:00Z | 5,734 MW |
| 2026-10-06T07:00Z | 6,502 MW |
| 2026-10-06T08:00Z | 6,892 MW |
| 2026-10-06T09:00Z | 6,923 MW |
| 2026-10-06T10:00Z | 6,850 MW |
| 2026-10-06T11:00Z | 6,661 MW |
| 2026-10-06T12:00Z | 6,499 MW |
| 2026-10-06T13:00Z | 6,511 MW |
| 2026-10-06T14:00Z | 6,449 MW |
| 2026-10-06T15:00Z | 6,550 MW |
| 2026-10-06T16:00Z | 6,633 MW |
| 2026-10-06T17:00Z | 6,915 MW |
| 2026-10-06T18:00Z | 7,509 MW |
| 2026-10-06T19:00Z | 7,391 MW |
| 2026-10-06T20:00Z | 6,875 MW |
| 2026-10-06T21:00Z | 6,312 MW |
| 2026-10-06T22:00Z | 5,744 MW |
| 2026-10-06T23:00Z | 5,305 MW |
| 2026-10-07T00:00Z | 5,022 MW |
| 2026-10-07T01:00Z | 4,850 MW |
| 2026-10-07T02:00Z | 4,757 MW |
| 2026-10-07T03:00Z | 4,704 MW |
| 2026-10-07T04:00Z | 4,791 MW |
| 2026-10-07T05:00Z | 5,263 MW |
| 2026-10-07T06:00Z | 5,941 MW |
| 2026-10-07T07:00Z | 6,612 MW |
| 2026-10-07T08:00Z | 6,850 MW |
| 2026-10-07T09:00Z | 6,832 MW |
| 2026-10-07T10:00Z | 6,802 MW |
| 2026-10-07T11:00Z | 6,477 MW |
| 2026-10-07T12:00Z | 6,299 MW |
| 2026-10-07T13:00Z | 6,405 MW |
| 2026-10-07T14:00Z | 6,431 MW |
| 2026-10-07T15:00Z | 6,472 MW |
| 2026-10-07T16:00Z | 6,573 MW |
| 2026-10-07T17:00Z | 6,908 MW |
| 2026-10-07T18:00Z | 7,545 MW |
| 2026-10-07T19:00Z | 7,483 MW |
| 2026-10-07T20:00Z | 6,954 MW |
| 2026-10-07T21:00Z | 6,389 MW |
| 2026-10-07T22:00Z | 5,861 MW |
| 2026-10-07T23:00Z | 5,514 MW |
| 2026-10-08T00:00Z | 5,172 MW |
| 2026-10-08T01:00Z | 5,035 MW |
| 2026-10-08T02:00Z | 4,922 MW |
| 2026-10-08T03:00Z | 4,865 MW |
| 2026-10-08T04:00Z | 4,955 MW |
| 2026-10-08T05:00Z | 5,426 MW |
| 2026-10-08T06:00Z | 6,113 MW |
| 2026-10-08T07:00Z | 6,708 MW |
| 2026-10-08T08:00Z | 6,697 MW |
| 2026-10-08T09:00Z | 6,401 MW |
| 2026-10-08T10:00Z | 6,281 MW |
| 2026-10-08T11:00Z | 6,067 MW |
| 2026-10-08T12:00Z | 5,940 MW |
| 2026-10-08T13:00Z | 6,151 MW |
| 2026-10-08T14:00Z | 6,256 MW |
| 2026-10-08T15:00Z | 6,450 MW |
| 2026-10-08T16:00Z | 6,544 MW |
| 2026-10-08T17:00Z | 6,833 MW |
| 2026-10-08T18:00Z | 7,495 MW |
| 2026-10-08T19:00Z | 7,414 MW |
| 2026-10-08T20:00Z | 6,939 MW |
| 2026-10-08T21:00Z | 6,402 MW |
| 2026-10-08T22:00Z | 5,907 MW |
| 2026-10-08T23:00Z | 5,514 MW |
| 2026-10-09T00:00Z | 5,227 MW |
| 2026-10-09T01:00Z | 5,074 MW |
| 2026-10-09T02:00Z | 4,986 MW |
| 2026-10-09T03:00Z | 4,943 MW |
| 2026-10-09T04:00Z | 5,013 MW |
| 2026-10-09T05:00Z | 5,500 MW |
| 2026-10-09T06:00Z | 6,166 MW |
| 2026-10-09T07:00Z | 6,810 MW |
| 2026-10-09T08:00Z | 6,824 MW |
| 2026-10-09T09:00Z | 6,514 MW |
| 2026-10-09T10:00Z | 6,343 MW |
| 2026-10-09T11:00Z | 6,097 MW |
| 2026-10-09T12:00Z | 5,952 MW |
| 2026-10-09T13:00Z | 6,106 MW |
| 2026-10-09T14:00Z | 6,137 MW |
| 2026-10-09T15:00Z | 6,071 MW |
| 2026-10-09T16:00Z | 6,635 MW |
| 2026-10-09T17:00Z | 7,410 MW |
| 2026-10-09T18:00Z | 7,746 MW |
| 2026-10-09T19:00Z | 7,512 MW |
| 2026-10-09T20:00Z | 7,208 MW |
| 2026-10-09T21:00Z | 6,450 MW |
| 2026-10-09T22:00Z | 5,768 MW |
| 2026-10-09T23:00Z | 5,248 MW |
| 2026-10-10T00:00Z | 4,950 MW |
| 2026-10-10T01:00Z | 4,736 MW |
| 2026-10-10T02:00Z | 4,576 MW |
| 2026-10-10T03:00Z | 4,500 MW |
| 2026-10-10T04:00Z | 4,526 MW |
| 2026-10-10T05:00Z | 4,672 MW |
| 2026-10-10T06:00Z | 4,932 MW |
| 2026-10-10T07:00Z | 5,195 MW |
| 2026-10-10T08:00Z | 5,392 MW |
| 2026-10-10T09:00Z | 5,387 MW |
| 2026-10-10T10:00Z | 5,324 MW |
| 2026-10-10T11:00Z | 5,371 MW |
| 2026-10-10T12:00Z | 5,240 MW |
| 2026-10-10T13:00Z | 5,152 MW |
| 2026-10-10T14:00Z | 5,160 MW |
| 2026-10-10T15:00Z | 5,257 MW |
| 2026-10-10T16:00Z | 5,530 MW |
| 2026-10-10T17:00Z | 5,864 MW |
| 2026-10-10T18:00Z | 6,354 MW |
| 2026-10-10T19:00Z | 6,357 MW |
| 2026-10-10T20:00Z | 5,957 MW |
| 2026-10-10T21:00Z | 5,640 MW |
| 2026-10-10T22:00Z | 5,233 MW |
| 2026-10-10T23:00Z | 4,896 MW |
| 2026-10-11T00:00Z | 4,636 MW |
| 2026-10-11T01:00Z | 4,455 MW |
| 2026-10-11T02:00Z | 4,317 MW |
| 2026-10-11T03:00Z | 4,246 MW |
| 2026-10-11T04:00Z | 4,231 MW |
| 2026-10-11T05:00Z | 4,374 MW |
| 2026-10-11T06:00Z | 4,455 MW |
| 2026-10-11T07:00Z | 4,698 MW |
| 2026-10-11T08:00Z | 5,079 MW |
| 2026-10-11T09:00Z | 5,302 MW |
| 2026-10-11T10:00Z | 5,418 MW |
| 2026-10-11T11:00Z | 5,526 MW |
| 2026-10-11T12:00Z | 5,320 MW |
| 2026-10-11T13:00Z | 5,184 MW |
| 2026-10-11T14:00Z | 5,129 MW |
| 2026-10-11T15:00Z | 5,202 MW |
| 2026-10-11T16:00Z | 5,347 MW |
| 2026-10-11T17:00Z | 5,648 MW |
| 2026-10-11T18:00Z | 6,267 MW |
| 2026-10-11T19:00Z | 6,305 MW |
| 2026-10-11T20:00Z | 5,965 MW |
| 2026-10-11T21:00Z | 5,583 MW |
| 2026-10-11T22:00Z | 5,156 MW |
| 2026-10-11T23:00Z | 4,791 MW |
| 2026-10-12T00:00Z | 4,557 MW |
| 2026-10-12T01:00Z | 4,390 MW |
| 2026-10-12T02:00Z | 4,285 MW |
| 2026-10-12T03:00Z | 4,267 MW |
| 2026-10-12T04:00Z | 4,412 MW |
| 2026-10-12T05:00Z | 4,960 MW |
| 2026-10-12T06:00Z | 5,713 MW |
| 2026-10-12T07:00Z | 6,531 MW |
| 2026-10-12T08:00Z | 6,758 MW |
| 2026-10-12T09:00Z | 6,524 MW |
| 2026-10-12T10:00Z | 6,366 MW |
| 2026-10-12T11:00Z | 6,122 MW |
| 2026-10-12T12:00Z | 6,026 MW |
| 2026-10-12T13:00Z | 6,144 MW |
| 2026-10-12T14:00Z | 6,255 MW |
| 2026-10-12T15:00Z | 6,357 MW |
| 2026-10-12T16:00Z | 6,514 MW |
| 2026-10-12T17:00Z | 6,843 MW |
| 2026-10-12T18:00Z | 7,500 MW |
| 2026-10-12T19:00Z | 7,369 MW |
| 2026-10-12T20:00Z | 6,843 MW |
| 2026-10-12T21:00Z | 6,294 MW |
| 2026-10-12T22:00Z | 5,690 MW |
| 2026-10-12T23:00Z | 5,339 MW |
| 2026-10-13T00:00Z | 5,058 MW |
| 2026-10-13T01:00Z | 4,866 MW |
| 2026-10-13T02:00Z | 4,747 MW |
| 2026-10-13T03:00Z | 4,658 MW |
| 2026-10-13T04:00Z | 4,681 MW |
| 2026-10-13T05:00Z | 5,168 MW |
| 2026-10-13T06:00Z | 5,907 MW |
| 2026-10-13T07:00Z | 6,706 MW |
| 2026-10-13T08:00Z | 6,941 MW |
| 2026-10-13T09:00Z | 6,677 MW |
| 2026-10-13T10:00Z | 6,470 MW |
| 2026-10-13T11:00Z | 6,158 MW |
| 2026-10-13T12:00Z | 6,072 MW |
| 2026-10-13T13:00Z | 6,197 MW |
| 2026-10-13T14:00Z | 6,345 MW |
| 2026-10-13T15:00Z | 6,524 MW |
| 2026-10-13T16:00Z | 6,730 MW |
| 2026-10-13T17:00Z | 6,996 MW |
| 2026-10-13T18:00Z | 7,598 MW |
| 2026-10-13T19:00Z | 7,429 MW |
| 2026-10-13T20:00Z | 6,918 MW |
| 2026-10-13T21:00Z | 6,374 MW |
| 2026-10-13T22:00Z | 5,785 MW |
| 2026-10-13T23:00Z | 5,314 MW |
| 2026-10-14T00:00Z | 5,014 MW |
| 2026-10-14T01:00Z | 4,810 MW |
| 2026-10-14T02:00Z | 4,684 MW |
| 2026-10-14T03:00Z | 4,620 MW |
| 2026-10-14T04:00Z | 4,697 MW |
| 2026-10-14T05:00Z | 5,132 MW |
| 2026-10-14T06:00Z | 5,828 MW |
| 2026-10-14T07:00Z | 6,632 MW |
| 2026-10-14T08:00Z | 6,720 MW |
| 2026-10-14T09:00Z | 6,478 MW |
| 2026-10-14T10:00Z | 6,401 MW |
| 2026-10-14T11:00Z | 6,223 MW |
| 2026-10-14T12:00Z | 6,164 MW |
| 2026-10-14T13:00Z | 6,357 MW |
| 2026-10-14T14:00Z | 6,483 MW |
| 2026-10-14T15:00Z | 6,627 MW |
| 2026-10-14T16:00Z | 6,751 MW |
| 2026-10-14T17:00Z | 7,040 MW |
| 2026-10-14T18:00Z | 7,628 MW |
| 2026-10-14T19:00Z | 7,445 MW |
| 2026-10-14T20:00Z | 6,909 MW |
| 2026-10-14T21:00Z | 6,348 MW |
| 2026-10-14T22:00Z | 5,782 MW |
| 2026-10-14T23:00Z | 5,361 MW |
| 2026-10-15T00:00Z | 5,068 MW |
| 2026-10-15T01:00Z | 4,856 MW |
| 2026-10-15T02:00Z | 4,758 MW |
| 2026-10-15T03:00Z | 4,682 MW |
| 2026-10-15T04:00Z | 4,763 MW |
| 2026-10-15T05:00Z | 5,211 MW |
| 2026-10-15T06:00Z | 5,923 MW |
| 2026-10-15T07:00Z | 6,703 MW |
| 2026-10-15T08:00Z | 6,840 MW |
| 2026-10-15T09:00Z | 6,649 MW |
| 2026-10-15T10:00Z | 6,541 MW |
| 2026-10-15T11:00Z | 6,301 MW |
| 2026-10-15T12:00Z | 6,163 MW |
| 2026-10-15T13:00Z | 6,348 MW |
| 2026-10-15T14:00Z | 6,385 MW |
| 2026-10-15T15:00Z | 6,577 MW |
| 2026-10-15T16:00Z | 6,722 MW |
| 2026-10-15T17:00Z | 7,025 MW |
| 2026-10-15T18:00Z | 7,601 MW |
| 2026-10-15T19:00Z | 7,420 MW |
| 2026-10-15T20:00Z | 6,892 MW |
| 2026-10-15T21:00Z | 6,384 MW |
| 2026-10-15T22:00Z | 5,821 MW |
| 2026-10-15T23:00Z | 5,443 MW |
| 2026-10-16T00:00Z | 5,149 MW |
| 2026-10-16T01:00Z | 4,915 MW |
| 2026-10-16T02:00Z | 4,788 MW |
| 2026-10-16T03:00Z | 4,725 MW |
| 2026-10-16T04:00Z | 4,804 MW |
| 2026-10-16T05:00Z | 5,241 MW |
| 2026-10-16T06:00Z | 5,954 MW |
| 2026-10-16T07:00Z | 6,675 MW |
| 2026-10-16T08:00Z | 6,767 MW |
| 2026-10-16T09:00Z | 6,683 MW |
| 2026-10-16T10:00Z | 6,585 MW |
| 2026-10-16T11:00Z | 6,347 MW |
| 2026-10-16T12:00Z | 6,240 MW |
| 2026-10-16T13:00Z | 6,394 MW |
| 2026-10-16T14:00Z | 6,436 MW |
| 2026-10-16T15:00Z | 6,500 MW |
| 2026-10-16T16:00Z | 6,656 MW |
| 2026-10-16T17:00Z | 6,918 MW |
| 2026-10-16T18:00Z | 7,452 MW |
| 2026-10-16T19:00Z | 7,260 MW |
| 2026-10-16T20:00Z | 6,760 MW |
| 2026-10-16T21:00Z | 6,270 MW |
| 2026-10-16T22:00Z | 5,793 MW |
| 2026-10-16T23:00Z | 5,481 MW |
| 2026-10-17T00:00Z | 5,198 MW |
| 2026-10-17T01:00Z | 5,001 MW |
| 2026-10-17T02:00Z | 4,823 MW |
| 2026-10-17T03:00Z | 4,712 MW |
| 2026-10-17T04:00Z | 4,696 MW |
| 2026-10-17T05:00Z | 4,874 MW |
| 2026-10-17T06:00Z | 5,101 MW |
| 2026-10-17T07:00Z | 5,454 MW |
| 2026-10-17T08:00Z | 5,632 MW |
| 2026-10-17T09:00Z | 5,605 MW |
| 2026-10-17T10:00Z | 5,576 MW |
| 2026-10-17T11:00Z | 5,586 MW |
| 2026-10-17T12:00Z | 5,418 MW |
| 2026-10-17T13:00Z | 5,309 MW |
| 2026-10-17T14:00Z | 5,333 MW |
| 2026-10-17T15:00Z | 5,348 MW |
| 2026-10-17T16:00Z | 5,669 MW |
| 2026-10-17T17:00Z | 6,101 MW |
| 2026-10-17T18:00Z | 6,617 MW |
| 2026-10-17T19:00Z | 6,441 MW |
| 2026-10-17T20:00Z | 6,024 MW |
| 2026-10-17T21:00Z | 5,724 MW |
| 2026-10-17T22:00Z | 5,339 MW |
| 2026-10-17T23:00Z | 5,018 MW |
| 2026-10-18T00:00Z | 4,762 MW |
| 2026-10-18T01:00Z | 4,571 MW |
| 2026-10-18T02:00Z | 4,438 MW |
| 2026-10-18T03:00Z | 4,350 MW |
| 2026-10-18T04:00Z | 4,355 MW |
| 2026-10-18T05:00Z | 4,458 MW |
| 2026-10-18T06:00Z | 4,584 MW |
| 2026-10-18T07:00Z | 4,790 MW |
| 2026-10-18T08:00Z | 4,937 MW |
| 2026-10-18T09:00Z | 4,929 MW |
| 2026-10-18T10:00Z | 5,013 MW |
| 2026-10-18T11:00Z | 5,106 MW |
| 2026-10-18T12:00Z | 4,859 MW |
| 2026-10-18T13:00Z | 4,692 MW |
| 2026-10-18T14:00Z | 4,652 MW |
| 2026-10-18T15:00Z | 4,827 MW |
| 2026-10-18T16:00Z | 5,212 MW |
| 2026-10-18T17:00Z | 5,816 MW |
| 2026-10-18T18:00Z | 6,472 MW |
| 2026-10-18T19:00Z | 6,404 MW |
| 2026-10-18T20:00Z | 5,980 MW |
| 2026-10-18T21:00Z | 5,616 MW |
| 2026-10-18T22:00Z | 5,244 MW |
| 2026-10-18T23:00Z | 5,007 MW |
| 2026-10-19T00:00Z | 4,764 MW |
| 2026-10-19T01:00Z | 4,597 MW |
| 2026-10-19T02:00Z | 4,464 MW |
| 2026-10-19T03:00Z | 4,374 MW |
| 2026-10-19T04:00Z | 4,504 MW |
| 2026-10-19T05:00Z | 4,999 MW |
| 2026-10-19T06:00Z | 5,671 MW |
| 2026-10-19T07:00Z | 6,352 MW |
| 2026-10-19T08:00Z | 6,444 MW |
| 2026-10-19T09:00Z | 6,211 MW |
| 2026-10-19T10:00Z | 6,119 MW |
| 2026-10-19T11:00Z | 5,841 MW |
| 2026-10-19T12:00Z | 5,667 MW |
| 2026-10-19T13:00Z | 5,811 MW |
| 2026-10-19T14:00Z | 5,911 MW |
| 2026-10-19T15:00Z | 6,167 MW |
| 2026-10-19T16:00Z | 6,414 MW |
| 2026-10-19T17:00Z | 6,814 MW |
| 2026-10-19T18:00Z | 7,524 MW |
| 2026-10-19T19:00Z | 7,298 MW |
| 2026-10-19T20:00Z | 6,792 MW |
| 2026-10-19T21:00Z | 6,240 MW |
| 2026-10-19T22:00Z | 5,670 MW |
| 2026-10-19T23:00Z | 5,228 MW |
| 2026-10-20T00:00Z | 4,934 MW |
| 2026-10-20T01:00Z | 4,738 MW |
| 2026-10-20T02:00Z | 4,620 MW |
| 2026-10-20T03:00Z | 4,565 MW |
| 2026-10-20T04:00Z | 4,673 MW |
| 2026-10-20T05:00Z | 5,122 MW |
| 2026-10-20T06:00Z | 5,856 MW |
| 2026-10-20T07:00Z | 6,622 MW |
| 2026-10-20T08:00Z | 6,882 MW |
| 2026-10-20T09:00Z | 6,735 MW |
| 2026-10-20T10:00Z | 6,733 MW |
| 2026-10-20T11:00Z | 6,318 MW |
| 2026-10-20T12:00Z | 6,119 MW |
| 2026-10-20T13:00Z | 6,256 MW |
| 2026-10-20T14:00Z | 6,258 MW |
| 2026-10-20T15:00Z | 6,523 MW |
| 2026-10-20T16:00Z | 6,577 MW |
| 2026-10-20T17:00Z | 6,915 MW |
| 2026-10-20T18:00Z | 7,563 MW |
| 2026-10-20T19:00Z | 7,383 MW |
| 2026-10-20T20:00Z | 6,906 MW |
| 2026-10-20T21:00Z | 6,356 MW |
| 2026-10-20T22:00Z | 5,790 MW |
| 2026-10-20T23:00Z | 5,491 MW |
| 2026-10-21T00:00Z | 5,208 MW |
| 2026-10-21T01:00Z | 5,036 MW |
| 2026-10-21T02:00Z | 4,914 MW |
| 2026-10-21T03:00Z | 4,843 MW |
| 2026-10-21T04:00Z | 4,907 MW |
| 2026-10-21T05:00Z | 5,370 MW |
| 2026-10-21T06:00Z | 6,158 MW |
| 2026-10-21T07:00Z | 6,874 MW |
| 2026-10-21T08:00Z | 7,015 MW |
| 2026-10-21T09:00Z | 6,654 MW |
| 2026-10-21T10:00Z | 6,457 MW |
| 2026-10-21T11:00Z | 6,175 MW |
| 2026-10-21T12:00Z | 6,012 MW |
| 2026-10-21T13:00Z | 6,144 MW |
| 2026-10-21T14:00Z | 6,216 MW |
| 2026-10-21T15:00Z | 6,420 MW |
| 2026-10-21T16:00Z | 6,575 MW |
| 2026-10-21T17:00Z | 6,941 MW |
| 2026-10-21T18:00Z | 7,631 MW |
| 2026-10-21T19:00Z | 7,471 MW |
| 2026-10-21T20:00Z | 6,989 MW |
| 2026-10-21T21:00Z | 6,436 MW |
| 2026-10-21T22:00Z | 5,836 MW |
| 2026-10-21T23:00Z | 5,473 MW |
| 2026-10-22T00:00Z | 5,170 MW |
| 2026-10-22T01:00Z | 4,951 MW |
| 2026-10-22T02:00Z | 4,841 MW |
| 2026-10-22T03:00Z | 4,788 MW |
| 2026-10-22T04:00Z | 4,935 MW |
| 2026-10-22T05:00Z | 5,455 MW |
| 2026-10-22T06:00Z | 6,212 MW |
| 2026-10-22T07:00Z | 6,870 MW |
| 2026-10-22T08:00Z | 6,970 MW |
| 2026-10-22T09:00Z | 6,656 MW |
| 2026-10-22T10:00Z | 6,470 MW |
| 2026-10-22T11:00Z | 6,189 MW |
| 2026-10-22T12:00Z | 6,082 MW |
| 2026-10-22T13:00Z | 6,244 MW |
| 2026-10-22T14:00Z | 6,396 MW |
| 2026-10-22T15:00Z | 6,671 MW |
| 2026-10-22T16:00Z | 6,778 MW |
| 2026-10-22T17:00Z | 7,130 MW |
| 2026-10-22T18:00Z | 7,828 MW |
| 2026-10-22T19:00Z | 7,643 MW |
| 2026-10-22T20:00Z | 7,172 MW |
| 2026-10-22T21:00Z | 6,602 MW |
| 2026-10-22T22:00Z | 6,042 MW |
| 2026-10-22T23:00Z | 5,687 MW |
| 2026-10-23T00:00Z | 5,372 MW |
| 2026-10-23T01:00Z | 5,169 MW |
| 2026-10-23T02:00Z | 5,053 MW |
| 2026-10-23T03:00Z | 4,968 MW |
| 2026-10-23T04:00Z | 5,037 MW |
| 2026-10-23T05:00Z | 5,472 MW |
| 2026-10-23T06:00Z | 6,233 MW |
| 2026-10-23T07:00Z | 7,005 MW |
| 2026-10-23T08:00Z | 7,074 MW |
| 2026-10-23T09:00Z | 6,757 MW |
| 2026-10-23T10:00Z | 6,612 MW |
| 2026-10-23T11:00Z | 6,322 MW |
| 2026-10-23T12:00Z | 6,108 MW |
| 2026-10-23T13:00Z | 6,258 MW |
| 2026-10-23T14:00Z | 6,289 MW |
| 2026-10-23T15:00Z | 6,490 MW |
| 2026-10-23T16:00Z | 6,618 MW |
| 2026-10-23T17:00Z | 6,995 MW |
| 2026-10-23T18:00Z | 7,602 MW |
| 2026-10-23T19:00Z | 7,427 MW |
| 2026-10-23T20:00Z | 6,994 MW |
| 2026-10-23T21:00Z | 6,490 MW |
| 2026-10-23T22:00Z | 5,906 MW |
| 2026-10-23T23:00Z | 5,456 MW |
| 2026-10-24T00:00Z | 5,097 MW |
| 2026-10-24T01:00Z | 4,827 MW |
| 2026-10-24T02:00Z | 4,699 MW |
| 2026-10-24T03:00Z | 4,665 MW |
| 2026-10-24T04:00Z | 4,718 MW |
| 2026-10-24T05:00Z | 4,864 MW |
| 2026-10-24T06:00Z | 5,144 MW |
| 2026-10-24T07:00Z | 5,505 MW |
| 2026-10-24T08:00Z | 5,700 MW |
| 2026-10-24T09:00Z | 5,601 MW |
| 2026-10-24T10:00Z | 5,522 MW |
| 2026-10-24T11:00Z | 5,502 MW |
| 2026-10-24T12:00Z | 5,267 MW |
| 2026-10-24T13:00Z | 5,119 MW |
| 2026-10-24T14:00Z | 5,114 MW |
| 2026-10-24T15:00Z | 5,272 MW |
| 2026-10-24T16:00Z | 5,605 MW |
| 2026-10-24T17:00Z | 6,099 MW |
| 2026-10-24T18:00Z | 6,766 MW |
| 2026-10-24T19:00Z | 6,619 MW |
| 2026-10-24T20:00Z | 6,196 MW |
| 2026-10-24T21:00Z | 5,806 MW |
| 2026-10-24T22:00Z | 5,462 MW |
| 2026-10-24T23:00Z | 5,095 MW |
| 2026-10-25T00:00Z | 4,813 MW |
| 2026-10-25T01:00Z | 4,598 MW |
| 2026-10-25T02:00Z | 4,482 MW |
| 2026-10-25T03:00Z | 4,390 MW |
| 2026-10-25T04:00Z | 4,361 MW |
| 2026-10-25T05:00Z | 4,359 MW |
| 2026-10-25T06:00Z | 4,465 MW |
| 2026-10-25T07:00Z | 4,602 MW |
| 2026-10-25T08:00Z | 4,974 MW |
| 2026-10-25T09:00Z | 5,200 MW |
| 2026-10-25T10:00Z | 5,340 MW |
| 2026-10-25T11:00Z | 5,470 MW |
| 2026-10-25T12:00Z | 5,485 MW |
| 2026-10-25T13:00Z | 5,197 MW |
| 2026-10-25T14:00Z | 5,066 MW |
| 2026-10-25T15:00Z | 5,156 MW |
| 2026-10-25T16:00Z | 5,394 MW |
| 2026-10-25T17:00Z | 5,816 MW |
| 2026-10-25T18:00Z | 6,475 MW |
| 2026-10-25T19:00Z | 6,689 MW |
| 2026-10-25T20:00Z | 6,438 MW |
| 2026-10-25T21:00Z | 5,995 MW |
| 2026-10-25T22:00Z | 5,606 MW |
| 2026-10-25T23:00Z | 5,168 MW |
| 2026-10-26T00:00Z | 4,891 MW |
| 2026-10-26T01:00Z | 4,676 MW |
| 2026-10-26T02:00Z | 4,519 MW |
| 2026-10-26T03:00Z | 4,370 MW |
| 2026-10-26T04:00Z | 4,363 MW |
| 2026-10-26T05:00Z | 4,509 MW |
| 2026-10-26T06:00Z | 5,028 MW |
| 2026-10-26T07:00Z | 5,795 MW |
| 2026-10-26T08:00Z | 6,518 MW |
| 2026-10-26T09:00Z | 6,610 MW |
| 2026-10-26T10:00Z | 6,425 MW |
| 2026-10-26T11:00Z | 6,401 MW |
| 2026-10-26T12:00Z | 6,280 MW |
| 2026-10-26T13:00Z | 6,250 MW |
| 2026-10-26T14:00Z | 6,498 MW |
| 2026-10-26T15:00Z | 6,612 MW |
| 2026-10-26T16:00Z | 6,748 MW |
| 2026-10-26T17:00Z | 6,977 MW |
| 2026-10-26T18:00Z | 7,472 MW |
| 2026-10-26T19:00Z | 7,611 MW |
| 2026-10-26T20:00Z | 7,364 MW |
| 2026-10-26T21:00Z | 6,916 MW |
| 2026-10-26T22:00Z | 6,320 MW |
| 2026-10-26T23:00Z | 5,720 MW |
| 2026-10-27T00:00Z | 5,290 MW |
| 2026-10-27T01:00Z | 5,007 MW |
| 2026-10-27T02:00Z | 4,818 MW |
| 2026-10-27T03:00Z | 4,725 MW |
| 2026-10-27T04:00Z | 4,753 MW |
| 2026-10-27T05:00Z | 4,892 MW |
| 2026-10-27T06:00Z | 5,370 MW |
| 2026-10-27T07:00Z | 6,082 MW |
| 2026-10-27T08:00Z | 6,762 MW |
| 2026-10-27T09:00Z | 6,896 MW |
| 2026-10-27T10:00Z | 6,810 MW |
| 2026-10-27T11:00Z | 6,982 MW |
| 2026-10-27T12:00Z | 6,823 MW |
| 2026-10-27T13:00Z | 6,832 MW |
| 2026-10-27T14:00Z | 7,060 MW |
| 2026-10-27T15:00Z | 7,142 MW |
| 2026-10-27T16:00Z | 7,164 MW |
| 2026-10-27T17:00Z | 7,309 MW |
| 2026-10-27T18:00Z | 7,752 MW |
| 2026-10-27T19:00Z | 7,930 MW |
| 2026-10-27T20:00Z | 7,643 MW |
| 2026-10-27T21:00Z | 7,122 MW |
| 2026-10-27T22:00Z | 6,507 MW |
| 2026-10-27T23:00Z | 5,918 MW |
| 2026-10-28T00:00Z | 5,495 MW |
| 2026-10-28T01:00Z | 5,214 MW |
| 2026-10-28T02:00Z | 5,065 MW |
| 2026-10-28T03:00Z | 4,950 MW |
| 2026-10-28T04:00Z | 4,866 MW |
| 2026-10-28T05:00Z | 4,979 MW |
| 2026-10-28T06:00Z | 5,476 MW |
| 2026-10-28T07:00Z | 6,425 MW |
| 2026-10-28T08:00Z | 7,311 MW |
| 2026-10-28T09:00Z | 7,503 MW |
| 2026-10-28T10:00Z | 7,139 MW |
| 2026-10-28T11:00Z | 6,899 MW |
| 2026-10-28T12:00Z | 6,703 MW |
Show the data table (685 rows)
| Hour starting (UTC) | Wind | Solar | Gas | Storage | Hydro |
|---|---|---|---|---|---|
| 2026-09-30T00:00Z | 2,769 MW | 0 MW | 656 MW | 145 MW | 397 MW |
| 2026-09-30T01:00Z | 2,377 MW | 0 MW | 685 MW | 256 MW | 315 MW |
| 2026-09-30T02:00Z | 2,162 MW | 0 MW | 605 MW | 223 MW | 290 MW |
| 2026-09-30T03:00Z | 1,826 MW | 0 MW | 681 MW | 120 MW | 311 MW |
| 2026-09-30T04:00Z | 1,534 MW | 0 MW | 647 MW | 671 MW | 436 MW |
| 2026-09-30T05:00Z | 1,447 MW | 0 MW | 776 MW | 1,800 MW | 957 MW |
| 2026-09-30T06:00Z | 1,057 MW | 12 MW | 754 MW | 1,867 MW | 1,160 MW |
| 2026-09-30T07:00Z | 711 MW | 220 MW | 751 MW | 1,371 MW | 874 MW |
| 2026-09-30T08:00Z | 776 MW | 609 MW | 715 MW | 740 MW | 630 MW |
| 2026-09-30T09:00Z | 1,048 MW | 1,021 MW | 672 MW | -247 MW | 429 MW |
| 2026-09-30T10:00Z | 1,278 MW | 1,492 MW | 662 MW | -1,264 MW | 466 MW |
| 2026-09-30T11:00Z | 1,207 MW | 2,016 MW | 632 MW | -1,932 MW | 606 MW |
| 2026-09-30T12:00Z | 969 MW | 2,307 MW | 712 MW | -1,770 MW | 668 MW |
| 2026-09-30T13:00Z | 905 MW | 2,181 MW | 715 MW | -796 MW | 578 MW |
| 2026-09-30T14:00Z | 936 MW | 1,973 MW | 667 MW | -526 MW | 629 MW |
| 2026-09-30T15:00Z | 1,145 MW | 1,568 MW | 708 MW | -472 MW | 689 MW |
| 2026-09-30T16:00Z | 1,147 MW | 1,027 MW | 1,203 MW | 1,128 MW | 1,194 MW |
| 2026-09-30T17:00Z | 918 MW | 342 MW | 1,413 MW | 1,954 MW | 1,580 MW |
| 2026-09-30T18:00Z | 801 MW | 22 MW | 1,599 MW | 2,242 MW | 2,294 MW |
| 2026-09-30T19:00Z | 821 MW | 4 MW | 1,968 MW | 1,870 MW | 2,239 MW |
| 2026-09-30T20:00Z | 906 MW | 0 MW | 1,417 MW | 1,662 MW | 1,273 MW |
| 2026-09-30T21:00Z | 1,003 MW | 0 MW | 1,124 MW | 1,332 MW | 1,214 MW |
| 2026-09-30T22:00Z | 1,243 MW | 0 MW | 1,016 MW | 702 MW | 681 MW |
| 2026-09-30T23:00Z | 1,318 MW | 0 MW | 1,055 MW | 682 MW | 688 MW |
| 2026-10-01T00:00Z | 1,333 MW | 0 MW | 952 MW | 258 MW | 727 MW |
| 2026-10-01T01:00Z | 1,317 MW | 0 MW | 804 MW | 196 MW | 765 MW |
| 2026-10-01T02:00Z | 1,461 MW | 0 MW | 636 MW | -160 MW | 742 MW |
| 2026-10-01T03:00Z | 1,675 MW | 0 MW | 680 MW | -34 MW | 813 MW |
| 2026-10-01T04:00Z | 1,846 MW | 0 MW | 777 MW | 997 MW | 848 MW |
| 2026-10-01T05:00Z | 1,967 MW | 0 MW | 850 MW | 1,488 MW | 1,470 MW |
| 2026-10-01T06:00Z | 2,085 MW | 38 MW | 836 MW | 1,499 MW | 1,646 MW |
| 2026-10-01T07:00Z | 2,094 MW | 768 MW | 758 MW | 732 MW | 1,139 MW |
| 2026-10-01T08:00Z | 1,750 MW | 1,966 MW | 649 MW | -918 MW | 501 MW |
| 2026-10-01T09:00Z | 1,353 MW | 2,606 MW | 590 MW | -1,981 MW | 506 MW |
| 2026-10-01T10:00Z | 1,153 MW | 2,763 MW | 594 MW | -2,224 MW | 456 MW |
| 2026-10-01T11:00Z | 1,018 MW | 2,882 MW | 639 MW | -2,363 MW | 464 MW |
| 2026-10-01T12:00Z | 945 MW | 3,043 MW | 636 MW | -2,322 MW | 390 MW |
| 2026-10-01T13:00Z | 981 MW | 3,206 MW | 613 MW | -2,361 MW | 482 MW |
| 2026-10-01T14:00Z | 1,069 MW | 3,075 MW | 623 MW | -2,292 MW | 443 MW |
| 2026-10-01T15:00Z | 1,088 MW | 2,699 MW | 635 MW | -1,961 MW | 556 MW |
| 2026-10-01T16:00Z | 1,089 MW | 1,759 MW | 746 MW | -430 MW | 711 MW |
| 2026-10-01T17:00Z | 1,212 MW | 504 MW | 969 MW | 1,338 MW | 1,406 MW |
| 2026-10-01T18:00Z | 1,578 MW | 17 MW | 1,036 MW | 2,195 MW | 2,029 MW |
| 2026-10-01T19:00Z | 2,033 MW | 10 MW | 1,002 MW | 1,672 MW | 1,837 MW |
| 2026-10-01T20:00Z | 2,556 MW | 7 MW | 947 MW | 861 MW | 1,134 MW |
| 2026-10-01T21:00Z | 2,847 MW | 4 MW | 714 MW | 656 MW | 1,056 MW |
| 2026-10-01T22:00Z | 2,937 MW | 4 MW | 688 MW | 319 MW | 749 MW |
| 2026-10-01T23:00Z | 2,844 MW | 3 MW | 682 MW | 365 MW | 621 MW |
| 2026-10-02T00:00Z | 2,442 MW | 0 MW | 717 MW | 401 MW | 594 MW |
| 2026-10-02T01:00Z | 2,117 MW | 0 MW | 699 MW | 437 MW | 471 MW |
| 2026-10-02T02:00Z | 1,972 MW | 0 MW | 671 MW | 434 MW | 475 MW |
| 2026-10-02T03:00Z | 1,804 MW | 0 MW | 700 MW | 546 MW | 601 MW |
| 2026-10-02T04:00Z | 1,719 MW | 0 MW | 887 MW | 826 MW | 1,008 MW |
| 2026-10-02T05:00Z | 1,802 MW | 2 MW | 1,003 MW | 1,550 MW | 1,413 MW |
| 2026-10-02T06:00Z | 1,790 MW | 35 MW | 992 MW | 1,830 MW | 1,843 MW |
| 2026-10-02T07:00Z | 1,480 MW | 742 MW | 897 MW | 1,010 MW | 1,098 MW |
| 2026-10-02T08:00Z | 1,095 MW | 1,829 MW | 690 MW | -206 MW | 622 MW |
| 2026-10-02T09:00Z | 770 MW | 2,506 MW | 683 MW | -953 MW | 545 MW |
| 2026-10-02T10:00Z | 502 MW | 2,935 MW | 657 MW | -1,092 MW | 532 MW |
| 2026-10-02T11:00Z | 286 MW | 3,027 MW | 606 MW | -1,296 MW | 533 MW |
| 2026-10-02T12:00Z | 198 MW | 3,051 MW | 682 MW | -1,302 MW | 529 MW |
| 2026-10-02T13:00Z | 133 MW | 2,781 MW | 728 MW | -1,316 MW | 543 MW |
| 2026-10-02T14:00Z | 117 MW | 2,344 MW | 730 MW | -977 MW | 550 MW |
| 2026-10-02T15:00Z | 118 MW | 1,547 MW | 873 MW | -146 MW | 553 MW |
| 2026-10-02T16:00Z | 158 MW | 811 MW | 1,111 MW | 1,076 MW | 794 MW |
| 2026-10-02T17:00Z | 264 MW | 251 MW | 1,425 MW | 2,050 MW | 1,645 MW |
| 2026-10-02T18:00Z | 420 MW | 8 MW | 1,432 MW | 2,150 MW | 1,789 MW |
| 2026-10-02T19:00Z | 515 MW | 2 MW | 1,343 MW | 1,858 MW | 1,444 MW |
| 2026-10-02T20:00Z | 652 MW | 1 MW | 1,326 MW | 1,369 MW | 1,221 MW |
| 2026-10-02T21:00Z | 688 MW | 1 MW | 1,230 MW | 698 MW | 860 MW |
| 2026-10-02T22:00Z | 700 MW | 1 MW | 1,002 MW | 621 MW | 606 MW |
| 2026-10-02T23:00Z | 743 MW | 1 MW | 741 MW | 561 MW | 612 MW |
| 2026-10-03T00:00Z | 1,055 MW | 0 MW | 674 MW | 622 MW | 720 MW |
| 2026-10-03T01:00Z | 1,219 MW | 0 MW | 689 MW | 414 MW | 699 MW |
| 2026-10-03T02:00Z | 1,181 MW | 0 MW | 696 MW | 410 MW | 639 MW |
| 2026-10-03T03:00Z | 1,366 MW | 0 MW | 649 MW | 459 MW | 596 MW |
| 2026-10-03T04:00Z | 1,606 MW | 0 MW | 648 MW | 378 MW | 421 MW |
| 2026-10-03T05:00Z | 1,675 MW | 0 MW | 697 MW | 679 MW | 531 MW |
| 2026-10-03T06:00Z | 1,515 MW | 17 MW | 685 MW | 633 MW | 533 MW |
| 2026-10-03T07:00Z | 1,152 MW | 406 MW | 708 MW | 543 MW | 478 MW |
| 2026-10-03T08:00Z | 824 MW | 1,185 MW | 670 MW | 478 MW | 420 MW |
| 2026-10-03T09:00Z | 612 MW | 1,912 MW | 610 MW | -631 MW | 362 MW |
| 2026-10-03T10:00Z | 463 MW | 2,451 MW | 610 MW | -1,366 MW | 374 MW |
| 2026-10-03T11:00Z | 260 MW | 2,814 MW | 658 MW | -1,838 MW | 392 MW |
| 2026-10-03T12:00Z | 154 MW | 2,762 MW | 666 MW | -2,115 MW | 403 MW |
| 2026-10-03T13:00Z | 122 MW | 2,633 MW | 669 MW | -1,867 MW | 426 MW |
| 2026-10-03T14:00Z | 118 MW | 2,217 MW | 729 MW | -1,302 MW | 411 MW |
| 2026-10-03T15:00Z | 130 MW | 1,625 MW | 700 MW | -427 MW | 420 MW |
| 2026-10-03T16:00Z | 186 MW | 803 MW | 636 MW | 820 MW | 659 MW |
| 2026-10-03T17:00Z | 235 MW | 167 MW | 727 MW | 1,690 MW | 1,303 MW |
| 2026-10-03T18:00Z | 232 MW | 8 MW | 706 MW | 2,130 MW | 1,555 MW |
| 2026-10-03T19:00Z | 310 MW | 3 MW | 687 MW | 1,691 MW | 1,448 MW |
| 2026-10-03T20:00Z | 382 MW | 0 MW | 707 MW | 1,339 MW | 1,360 MW |
| 2026-10-03T21:00Z | 500 MW | 0 MW | 681 MW | 1,092 MW | 1,143 MW |
| 2026-10-03T22:00Z | 664 MW | 0 MW | 679 MW | 541 MW | 603 MW |
| 2026-10-03T23:00Z | 744 MW | 0 MW | 655 MW | 460 MW | 473 MW |
| 2026-10-04T00:00Z | 683 MW | 0 MW | 659 MW | 450 MW | 431 MW |
| 2026-10-04T01:00Z | 533 MW | 0 MW | 693 MW | -60 MW | 486 MW |
| 2026-10-04T02:00Z | 499 MW | 0 MW | 687 MW | 37 MW | 473 MW |
| 2026-10-04T03:00Z | 515 MW | 0 MW | 617 MW | 139 MW | 420 MW |
| 2026-10-04T04:00Z | 587 MW | 0 MW | 653 MW | 148 MW | 366 MW |
| 2026-10-04T05:00Z | 664 MW | 0 MW | 642 MW | 295 MW | 292 MW |
| 2026-10-04T06:00Z | 758 MW | 11 MW | 684 MW | 386 MW | 315 MW |
| 2026-10-04T07:00Z | 892 MW | 387 MW | 633 MW | 111 MW | 256 MW |
| 2026-10-04T08:00Z | 756 MW | 1,373 MW | 595 MW | -958 MW | 244 MW |
| 2026-10-04T09:00Z | 578 MW | 1,953 MW | 679 MW | -1,939 MW | 279 MW |
| 2026-10-04T10:00Z | 546 MW | 2,018 MW | 670 MW | -2,216 MW | 300 MW |
| 2026-10-04T11:00Z | 468 MW | 2,281 MW | 653 MW | -2,290 MW | 263 MW |
| 2026-10-04T12:00Z | 306 MW | 2,410 MW | 674 MW | -2,306 MW | 265 MW |
| 2026-10-04T13:00Z | 219 MW | 2,296 MW | 671 MW | -2,310 MW | 261 MW |
| 2026-10-04T14:00Z | 261 MW | 2,157 MW | 662 MW | -1,738 MW | 259 MW |
| 2026-10-04T15:00Z | 313 MW | 2,043 MW | 644 MW | -233 MW | 277 MW |
| 2026-10-04T16:00Z | 233 MW | 1,152 MW | 701 MW | 1,305 MW | 656 MW |
| 2026-10-04T17:00Z | 174 MW | 309 MW | 740 MW | 1,962 MW | 1,251 MW |
| 2026-10-04T18:00Z | 185 MW | 11 MW | 737 MW | 1,924 MW | 1,551 MW |
| 2026-10-04T19:00Z | 261 MW | 3 MW | 706 MW | 1,419 MW | 1,568 MW |
| 2026-10-04T20:00Z | 342 MW | 1 MW | 749 MW | 1,314 MW | 1,000 MW |
| 2026-10-04T21:00Z | 480 MW | 0 MW | 773 MW | 1,234 MW | 959 MW |
| 2026-10-04T22:00Z | 627 MW | 0 MW | 821 MW | 555 MW | 777 MW |
| 2026-10-04T23:00Z | 711 MW | 0 MW | 827 MW | 472 MW | 743 MW |
| 2026-10-05T00:00Z | 905 MW | 0 MW | 717 MW | 397 MW | 636 MW |
| 2026-10-05T01:00Z | 1,114 MW | 0 MW | 680 MW | 380 MW | 629 MW |
| 2026-10-05T02:00Z | 1,333 MW | 0 MW | 660 MW | 301 MW | 587 MW |
| 2026-10-05T03:00Z | 1,488 MW | 0 MW | 690 MW | 319 MW | 590 MW |
| 2026-10-05T04:00Z | 1,579 MW | 0 MW | 818 MW | 504 MW | 688 MW |
| 2026-10-05T05:00Z | 1,726 MW | 2 MW | 831 MW | 1,199 MW | 1,484 MW |
| 2026-10-05T06:00Z | 1,732 MW | 14 MW | 830 MW | 1,589 MW | 1,562 MW |
| 2026-10-05T07:00Z | 1,702 MW | 311 MW | 816 MW | 1,218 MW | 644 MW |
| 2026-10-05T08:00Z | 1,513 MW | 1,044 MW | 669 MW | -124 MW | 434 MW |
| 2026-10-05T09:00Z | 1,436 MW | 1,814 MW | 662 MW | -1,591 MW | 460 MW |
| 2026-10-05T10:00Z | 1,347 MW | 2,193 MW | 650 MW | -2,432 MW | 357 MW |
| 2026-10-05T11:00Z | 1,200 MW | 2,388 MW | 645 MW | -2,466 MW | 397 MW |
| 2026-10-05T12:00Z | 1,095 MW | 2,497 MW | 652 MW | -2,231 MW | 382 MW |
| 2026-10-05T13:00Z | 1,016 MW | 2,476 MW | 653 MW | -2,399 MW | 342 MW |
| 2026-10-05T14:00Z | 1,066 MW | 2,117 MW | 684 MW | -2,141 MW | 378 MW |
| 2026-10-05T15:00Z | 929 MW | 1,697 MW | 709 MW | -372 MW | 661 MW |
| 2026-10-05T16:00Z | 666 MW | 1,028 MW | 777 MW | 1,105 MW | 1,419 MW |
| 2026-10-05T17:00Z | 449 MW | 269 MW | 939 MW | 2,140 MW | 1,913 MW |
| 2026-10-05T18:00Z | 502 MW | 6 MW | 1,008 MW | 2,254 MW | 2,453 MW |
| 2026-10-05T19:00Z | 609 MW | 3 MW | 950 MW | 2,158 MW | 2,114 MW |
| 2026-10-05T20:00Z | 634 MW | 1 MW | 958 MW | 1,528 MW | 1,349 MW |
| 2026-10-05T21:00Z | 622 MW | 0 MW | 949 MW | 977 MW | 1,281 MW |
| 2026-10-05T22:00Z | 780 MW | 0 MW | 776 MW | 450 MW | 905 MW |
| 2026-10-05T23:00Z | 816 MW | 0 MW | 795 MW | 364 MW | 794 MW |
| 2026-10-06T00:00Z | 859 MW | 0 MW | 766 MW | 327 MW | 720 MW |
| 2026-10-06T01:00Z | 806 MW | 0 MW | 716 MW | 680 MW | 407 MW |
| 2026-10-06T02:00Z | 720 MW | 0 MW | 709 MW | 673 MW | 413 MW |
| 2026-10-06T03:00Z | 532 MW | 0 MW | 716 MW | 598 MW | 533 MW |
| 2026-10-06T04:00Z | 508 MW | 0 MW | 798 MW | 599 MW | 788 MW |
| 2026-10-06T05:00Z | 533 MW | 6 MW | 856 MW | 991 MW | 1,559 MW |
| 2026-10-06T06:00Z | 526 MW | 16 MW | 828 MW | 1,285 MW | 1,922 MW |
| 2026-10-06T07:00Z | 523 MW | 290 MW | 862 MW | 1,141 MW | 1,440 MW |
| 2026-10-06T08:00Z | 484 MW | 869 MW | 850 MW | 669 MW | 530 MW |
| 2026-10-06T09:00Z | 403 MW | 1,402 MW | 790 MW | -0 MW | 427 MW |
| 2026-10-06T10:00Z | 368 MW | 1,810 MW | 697 MW | -701 MW | 386 MW |
| 2026-10-06T11:00Z | 381 MW | 2,090 MW | 693 MW | -1,081 MW | 305 MW |
| 2026-10-06T12:00Z | 397 MW | 2,178 MW | 785 MW | -1,421 MW | 371 MW |
| 2026-10-06T13:00Z | 465 MW | 2,274 MW | 787 MW | -1,608 MW | 284 MW |
| 2026-10-06T14:00Z | 386 MW | 2,233 MW | 887 MW | -1,171 MW | 232 MW |
| 2026-10-06T15:00Z | 388 MW | 1,952 MW | 1,031 MW | -406 MW | 233 MW |
| 2026-10-06T16:00Z | 559 MW | 1,079 MW | 1,451 MW | 338 MW | 620 MW |
| 2026-10-06T17:00Z | 723 MW | 297 MW | 1,570 MW | 1,611 MW | 1,833 MW |
| 2026-10-06T18:00Z | 1,141 MW | 12 MW | 1,567 MW | 1,723 MW | 2,237 MW |
| 2026-10-06T19:00Z | 1,278 MW | 10 MW | 1,476 MW | 1,580 MW | 2,113 MW |
| 2026-10-06T20:00Z | 1,267 MW | 10 MW | 1,510 MW | 873 MW | 1,599 MW |
| 2026-10-06T21:00Z | 1,197 MW | 7 MW | 1,211 MW | 223 MW | 1,227 MW |
| 2026-10-06T22:00Z | 837 MW | 0 MW | 937 MW | 761 MW | 782 MW |
| 2026-10-06T23:00Z | 628 MW | 0 MW | 809 MW | 526 MW | 806 MW |
| 2026-10-07T00:00Z | 585 MW | 1 MW | 803 MW | 499 MW | 781 MW |
| 2026-10-07T01:00Z | 729 MW | 1 MW | 728 MW | 446 MW | 580 MW |
| 2026-10-07T02:00Z | 852 MW | 0 MW | 695 MW | 386 MW | 573 MW |
| 2026-10-07T03:00Z | 939 MW | 0 MW | 681 MW | 383 MW | 562 MW |
| 2026-10-07T04:00Z | 1,084 MW | 0 MW | 732 MW | 228 MW | 693 MW |
| 2026-10-07T05:00Z | 1,229 MW | 0 MW | 800 MW | 840 MW | 1,770 MW |
| 2026-10-07T06:00Z | 1,257 MW | 29 MW | 779 MW | 1,019 MW | 1,861 MW |
| 2026-10-07T07:00Z | 1,164 MW | 432 MW | 805 MW | 667 MW | 1,151 MW |
| 2026-10-07T08:00Z | 932 MW | 1,272 MW | 706 MW | -2 MW | 534 MW |
| 2026-10-07T09:00Z | 871 MW | 1,858 MW | 614 MW | -1,635 MW | 408 MW |
| 2026-10-07T10:00Z | 804 MW | 2,385 MW | 541 MW | -1,889 MW | 268 MW |
| 2026-10-07T11:00Z | 774 MW | 2,604 MW | 645 MW | -2,128 MW | 319 MW |
| 2026-10-07T12:00Z | 825 MW | 2,427 MW | 687 MW | -2,181 MW | 307 MW |
| 2026-10-07T13:00Z | 928 MW | 2,472 MW | 661 MW | -2,270 MW | 227 MW |
| 2026-10-07T14:00Z | 1,109 MW | 2,323 MW | 667 MW | -2,209 MW | 226 MW |
| 2026-10-07T15:00Z | 1,328 MW | 2,152 MW | 628 MW | -2,042 MW | 280 MW |
| 2026-10-07T16:00Z | 1,555 MW | 1,285 MW | 685 MW | 160 MW | 387 MW |
| 2026-10-07T17:00Z | 1,897 MW | 306 MW | 756 MW | 1,952 MW | 1,427 MW |
| 2026-10-07T18:00Z | 2,151 MW | 15 MW | 739 MW | 2,032 MW | 1,554 MW |
| 2026-10-07T19:00Z | 2,486 MW | 22 MW | 683 MW | 1,601 MW | 1,221 MW |
| 2026-10-07T20:00Z | 2,629 MW | 17 MW | 693 MW | 1,240 MW | 652 MW |
| 2026-10-07T21:00Z | 2,533 MW | 13 MW | 669 MW | 509 MW | 384 MW |
| 2026-10-07T22:00Z | 2,249 MW | 0 MW | 687 MW | 829 MW | 460 MW |
| 2026-10-07T23:00Z | 2,122 MW | 0 MW | 683 MW | 325 MW | 428 MW |
| 2026-10-08T00:00Z | 2,162 MW | 0 MW | 691 MW | 223 MW | 310 MW |
| 2026-10-08T01:00Z | 2,079 MW | 0 MW | 688 MW | 138 MW | 302 MW |
| 2026-10-08T02:00Z | 2,083 MW | 0 MW | 679 MW | 112 MW | 316 MW |
| 2026-10-08T03:00Z | 2,094 MW | 0 MW | 684 MW | 113 MW | 321 MW |
| 2026-10-08T04:00Z | 2,149 MW | 0 MW | 709 MW | 179 MW | 350 MW |
| 2026-10-08T05:00Z | 2,326 MW | 0 MW | 706 MW | 743 MW | 864 MW |
| 2026-10-08T06:00Z | 2,461 MW | 21 MW | 746 MW | 1,168 MW | 1,411 MW |
| 2026-10-08T07:00Z | 2,516 MW | 595 MW | 655 MW | -226 MW | 534 MW |
| 2026-10-08T08:00Z | 2,363 MW | 1,620 MW | 600 MW | -1,972 MW | 272 MW |
| 2026-10-08T09:00Z | 2,059 MW | 2,057 MW | 605 MW | -2,112 MW | 237 MW |
| 2026-10-08T10:00Z | 1,775 MW | 2,289 MW | 623 MW | -2,349 MW | 235 MW |
| 2026-10-08T11:00Z | 1,361 MW | 2,534 MW | 650 MW | -2,324 MW | 202 MW |
| 2026-10-08T12:00Z | 1,096 MW | 2,450 MW | 683 MW | -2,325 MW | 230 MW |
| 2026-10-08T13:00Z | 1,003 MW | 2,412 MW | 667 MW | -2,399 MW | 215 MW |
| 2026-10-08T14:00Z | 1,179 MW | 2,248 MW | 641 MW | -2,423 MW | 208 MW |
| 2026-10-08T15:00Z | 1,368 MW | 1,831 MW | 662 MW | -2,141 MW | 224 MW |
| 2026-10-08T16:00Z | 1,574 MW | 1,346 MW | 631 MW | -789 MW | 155 MW |
| 2026-10-08T17:00Z | 1,877 MW | 328 MW | 776 MW | 1,422 MW | 443 MW |
| 2026-10-08T18:00Z | 2,418 MW | 33 MW | 740 MW | 2,141 MW | 1,263 MW |
| 2026-10-08T19:00Z | 2,998 MW | 27 MW | 750 MW | 1,422 MW | 888 MW |
| 2026-10-08T20:00Z | 3,326 MW | 0 MW | 712 MW | 1,271 MW | 585 MW |
| 2026-10-08T21:00Z | 3,466 MW | 0 MW | 787 MW | 944 MW | 73 MW |
| 2026-10-08T22:00Z | 3,519 MW | 0 MW | 693 MW | 965 MW | 34 MW |
| 2026-10-08T23:00Z | 3,663 MW | 0 MW | 675 MW | 668 MW | 24 MW |
| 2026-10-09T00:00Z | 3,850 MW | 0 MW | 661 MW | 467 MW | 24 MW |
| 2026-10-09T01:00Z | 3,897 MW | 0 MW | 664 MW | 212 MW | 25 MW |
| 2026-10-09T02:00Z | 3,867 MW | 0 MW | 675 MW | 42 MW | 24 MW |
| 2026-10-09T03:00Z | 3,802 MW | 0 MW | 643 MW | 156 MW | 72 MW |
| 2026-10-09T04:00Z | 3,696 MW | 0 MW | 642 MW | 544 MW | 105 MW |
| 2026-10-09T05:00Z | 3,420 MW | 0 MW | 685 MW | 1,309 MW | 563 MW |
| 2026-10-09T06:00Z | 3,185 MW | 19 MW | 708 MW | 1,589 MW | 553 MW |
| 2026-10-09T07:00Z | 2,912 MW | 704 MW | 611 MW | -218 MW | 188 MW |
| 2026-10-09T08:00Z | 2,438 MW | 1,530 MW | 624 MW | -2,191 MW | 217 MW |
| 2026-10-09T09:00Z | 1,891 MW | 1,595 MW | 682 MW | -2,480 MW | 238 MW |
| 2026-10-09T10:00Z | 1,173 MW | 1,859 MW | 694 MW | -2,354 MW | 237 MW |
| 2026-10-09T11:00Z | 659 MW | 2,202 MW | 682 MW | -2,310 MW | 140 MW |
| 2026-10-09T12:00Z | 431 MW | 2,268 MW | 680 MW | -2,287 MW | 128 MW |
| 2026-10-09T13:00Z | 397 MW | 2,381 MW | 638 MW | -2,236 MW | 131 MW |
| 2026-10-09T14:00Z | 463 MW | 2,352 MW | 658 MW | -2,107 MW | 117 MW |
| 2026-10-09T15:00Z | 501 MW | 2,137 MW | 715 MW | -2,095 MW | 119 MW |
| 2026-10-09T16:00Z | 542 MW | 1,512 MW | 917 MW | -499 MW | 206 MW |
| 2026-10-09T17:00Z | 577 MW | 347 MW | 997 MW | 2,339 MW | 978 MW |
| 2026-10-09T18:00Z | 845 MW | 15 MW | 979 MW | 2,717 MW | 1,533 MW |
| 2026-10-09T19:00Z | 1,141 MW | 11 MW | 887 MW | 2,477 MW | 1,038 MW |
| 2026-10-09T20:00Z | 1,331 MW | 0 MW | 905 MW | 1,800 MW | 479 MW |
| 2026-10-09T21:00Z | 1,334 MW | 0 MW | 793 MW | 1,558 MW | 138 MW |
| 2026-10-09T22:00Z | 1,200 MW | 6 MW | 681 MW | 950 MW | 53 MW |
| 2026-10-09T23:00Z | 992 MW | 0 MW | 646 MW | 696 MW | 20 MW |
| 2026-10-10T00:00Z | 883 MW | 0 MW | 639 MW | 606 MW | 17 MW |
| 2026-10-10T01:00Z | 914 MW | 0 MW | 639 MW | 604 MW | 16 MW |
| 2026-10-10T02:00Z | 900 MW | 0 MW | 656 MW | 720 MW | 15 MW |
| 2026-10-10T03:00Z | 718 MW | 0 MW | 678 MW | 905 MW | 9 MW |
| 2026-10-10T04:00Z | 584 MW | 0 MW | 687 MW | 948 MW | 36 MW |
| 2026-10-10T05:00Z | 513 MW | 0 MW | 720 MW | 1,074 MW | 166 MW |
| 2026-10-10T06:00Z | 519 MW | 14 MW | 696 MW | 1,291 MW | 188 MW |
| 2026-10-10T07:00Z | 511 MW | 502 MW | 674 MW | -492 MW | 160 MW |
| 2026-10-10T08:00Z | 331 MW | 1,622 MW | 619 MW | -1,704 MW | 157 MW |
| 2026-10-10T09:00Z | 146 MW | 2,202 MW | 624 MW | -2,380 MW | 30 MW |
| 2026-10-10T10:00Z | 68 MW | 2,669 MW | 648 MW | -2,520 MW | 50 MW |
| 2026-10-10T11:00Z | 43 MW | 2,550 MW | 608 MW | -2,380 MW | 40 MW |
| 2026-10-10T12:00Z | 45 MW | 2,458 MW | 577 MW | -2,430 MW | 13 MW |
| 2026-10-10T13:00Z | 102 MW | 2,358 MW | 660 MW | -2,437 MW | 63 MW |
| 2026-10-10T14:00Z | 174 MW | 2,372 MW | 629 MW | -2,405 MW | 79 MW |
| 2026-10-10T15:00Z | 219 MW | 2,407 MW | 667 MW | -1,852 MW | 118 MW |
| 2026-10-10T16:00Z | 287 MW | 1,479 MW | 704 MW | -186 MW | 220 MW |
| 2026-10-10T17:00Z | 331 MW | 313 MW | 748 MW | 1,793 MW | 425 MW |
| 2026-10-10T18:00Z | 428 MW | 15 MW | 742 MW | 2,426 MW | 783 MW |
| 2026-10-10T19:00Z | 514 MW | 15 MW | 712 MW | 2,193 MW | 717 MW |
| 2026-10-10T20:00Z | 538 MW | 5 MW | 723 MW | 1,807 MW | 541 MW |
| 2026-10-10T21:00Z | 587 MW | 0 MW | 703 MW | 1,745 MW | 442 MW |
| 2026-10-10T22:00Z | 492 MW | 0 MW | 701 MW | 1,211 MW | 260 MW |
| 2026-10-10T23:00Z | 465 MW | 0 MW | 698 MW | 995 MW | 206 MW |
| 2026-10-11T00:00Z | 395 MW | 0 MW | 720 MW | 953 MW | 157 MW |
| 2026-10-11T01:00Z | 407 MW | 0 MW | 711 MW | 879 MW | 126 MW |
| 2026-10-11T02:00Z | 361 MW | 0 MW | 707 MW | 840 MW | 162 MW |
| 2026-10-11T03:00Z | 329 MW | 0 MW | 709 MW | 836 MW | 183 MW |
| 2026-10-11T04:00Z | 341 MW | 0 MW | 690 MW | 797 MW | 353 MW |
| 2026-10-11T05:00Z | 291 MW | 0 MW | 708 MW | 1,036 MW | 348 MW |
| 2026-10-11T06:00Z | 293 MW | 13 MW | 699 MW | 873 MW | 325 MW |
| 2026-10-11T07:00Z | 306 MW | 324 MW | 678 MW | -22 MW | 180 MW |
| 2026-10-11T08:00Z | 268 MW | 980 MW | 703 MW | -890 MW | 188 MW |
| 2026-10-11T09:00Z | 313 MW | 1,415 MW | 680 MW | -1,908 MW | 165 MW |
| 2026-10-11T10:00Z | 245 MW | 1,817 MW | 646 MW | -2,650 MW | 470 MW |
| 2026-10-11T11:00Z | 257 MW | 2,135 MW | 694 MW | -2,667 MW | 369 MW |
| 2026-10-11T12:00Z | 358 MW | 2,183 MW | 665 MW | -2,599 MW | 260 MW |
| 2026-10-11T13:00Z | 529 MW | 2,025 MW | 673 MW | -2,741 MW | 151 MW |
| 2026-10-11T14:00Z | 621 MW | 2,065 MW | 685 MW | -2,666 MW | 151 MW |
| 2026-10-11T15:00Z | 699 MW | 1,761 MW | 696 MW | -1,566 MW | 168 MW |
| 2026-10-11T16:00Z | 846 MW | 928 MW | 665 MW | 214 MW | 168 MW |
| 2026-10-11T17:00Z | 978 MW | 197 MW | 735 MW | 1,802 MW | 832 MW |
| 2026-10-11T18:00Z | 925 MW | 15 MW | 739 MW | 1,934 MW | 926 MW |
| 2026-10-11T19:00Z | 876 MW | 15 MW | 719 MW | 2,103 MW | 587 MW |
| 2026-10-11T20:00Z | 745 MW | 5 MW | 715 MW | 1,550 MW | 290 MW |
| 2026-10-11T21:00Z | 639 MW | 0 MW | 680 MW | 706 MW | 227 MW |
| 2026-10-11T22:00Z | 559 MW | 0 MW | 702 MW | 181 MW | 257 MW |
| 2026-10-11T23:00Z | 477 MW | 0 MW | 683 MW | 216 MW | 227 MW |
| 2026-10-12T00:00Z | 407 MW | 0 MW | 689 MW | -115 MW | 114 MW |
| 2026-10-12T01:00Z | 394 MW | 0 MW | 690 MW | -171 MW | 99 MW |
| 2026-10-12T02:00Z | 374 MW | 0 MW | 670 MW | -206 MW | 141 MW |
| 2026-10-12T03:00Z | 362 MW | 0 MW | 701 MW | -335 MW | 188 MW |
| 2026-10-12T04:00Z | 322 MW | 0 MW | 746 MW | 22 MW | 316 MW |
| 2026-10-12T05:00Z | 323 MW | 0 MW | 760 MW | 607 MW | 819 MW |
| 2026-10-12T06:00Z | 337 MW | 11 MW | 773 MW | 1,058 MW | 947 MW |
| 2026-10-12T07:00Z | 326 MW | 401 MW | 733 MW | 592 MW | 564 MW |
| 2026-10-12T08:00Z | 248 MW | 1,295 MW | 694 MW | 48 MW | 288 MW |
| 2026-10-12T09:00Z | 179 MW | 2,134 MW | 628 MW | -776 MW | 199 MW |
| 2026-10-12T10:00Z | 136 MW | 2,865 MW | 581 MW | -1,551 MW | 170 MW |
| 2026-10-12T11:00Z | 106 MW | 3,264 MW | 575 MW | -2,093 MW | 151 MW |
| 2026-10-12T12:00Z | 112 MW | 3,239 MW | 542 MW | -2,040 MW | 89 MW |
| 2026-10-12T13:00Z | 128 MW | 2,754 MW | 635 MW | -1,621 MW | 87 MW |
| 2026-10-12T14:00Z | 184 MW | 2,375 MW | 652 MW | -1,310 MW | 196 MW |
| 2026-10-12T15:00Z | 251 MW | 2,164 MW | 627 MW | -1,030 MW | 179 MW |
| 2026-10-12T16:00Z | 277 MW | 1,397 MW | 697 MW | -42 MW | 256 MW |
| 2026-10-12T17:00Z | 335 MW | 276 MW | 742 MW | 1,396 MW | 1,430 MW |
| 2026-10-12T18:00Z | 393 MW | 15 MW | 766 MW | 1,869 MW | 1,754 MW |
| 2026-10-12T19:00Z | 402 MW | 15 MW | 782 MW | 1,896 MW | 1,192 MW |
| 2026-10-12T20:00Z | 407 MW | 1 MW | 771 MW | 1,488 MW | 725 MW |
| 2026-10-12T21:00Z | 388 MW | 0 MW | 729 MW | 939 MW | 590 MW |
| 2026-10-12T22:00Z | 331 MW | 0 MW | 761 MW | 1,090 MW | 517 MW |
| 2026-10-12T23:00Z | 309 MW | 0 MW | 660 MW | 557 MW | 514 MW |
| 2026-10-13T00:00Z | 308 MW | 0 MW | 628 MW | 345 MW | 457 MW |
| 2026-10-13T01:00Z | 308 MW | 0 MW | 747 MW | 295 MW | 245 MW |
| 2026-10-13T02:00Z | 317 MW | 0 MW | 762 MW | 327 MW | 220 MW |
| 2026-10-13T03:00Z | 349 MW | 0 MW | 885 MW | 255 MW | 249 MW |
| 2026-10-13T04:00Z | 389 MW | 0 MW | 1,004 MW | 673 MW | 653 MW |
| 2026-10-13T05:00Z | 437 MW | 0 MW | 1,039 MW | 1,523 MW | 1,706 MW |
| 2026-10-13T06:00Z | 424 MW | 10 MW | 1,035 MW | 1,935 MW | 1,830 MW |
| 2026-10-13T07:00Z | 358 MW | 524 MW | 981 MW | 757 MW | 685 MW |
| 2026-10-13T08:00Z | 327 MW | 1,695 MW | 589 MW | -366 MW | 338 MW |
| 2026-10-13T09:00Z | 221 MW | 2,577 MW | 598 MW | -1,619 MW | 265 MW |
| 2026-10-13T10:00Z | 145 MW | 3,001 MW | 578 MW | -1,978 MW | 196 MW |
| 2026-10-13T11:00Z | 132 MW | 3,187 MW | 584 MW | -1,944 MW | 142 MW |
| 2026-10-13T12:00Z | 119 MW | 3,208 MW | 785 MW | -1,979 MW | 146 MW |
| 2026-10-13T13:00Z | 117 MW | 3,125 MW | 822 MW | -1,410 MW | 173 MW |
| 2026-10-13T14:00Z | 145 MW | 2,880 MW | 822 MW | -1,087 MW | 183 MW |
| 2026-10-13T15:00Z | 179 MW | 2,358 MW | 800 MW | -486 MW | 276 MW |
| 2026-10-13T16:00Z | 207 MW | 1,308 MW | 951 MW | 626 MW | 414 MW |
| 2026-10-13T17:00Z | 267 MW | 227 MW | 1,088 MW | 1,755 MW | 1,509 MW |
| 2026-10-13T18:00Z | 288 MW | 15 MW | 1,089 MW | 1,880 MW | 1,827 MW |
| 2026-10-13T19:00Z | 234 MW | 9 MW | 1,062 MW | 1,541 MW | 1,480 MW |
| 2026-10-13T20:00Z | 180 MW | 0 MW | 1,079 MW | 1,192 MW | 1,051 MW |
| 2026-10-13T21:00Z | 175 MW | 0 MW | 768 MW | 1,294 MW | 727 MW |
| 2026-10-13T22:00Z | 193 MW | 0 MW | 645 MW | 991 MW | 366 MW |
| 2026-10-13T23:00Z | 178 MW | 0 MW | 694 MW | 957 MW | 319 MW |
| 2026-10-14T00:00Z | 203 MW | 0 MW | 687 MW | 900 MW | 345 MW |
| 2026-10-14T01:00Z | 258 MW | 0 MW | 694 MW | 923 MW | 373 MW |
| 2026-10-14T02:00Z | 259 MW | 0 MW | 694 MW | 930 MW | 379 MW |
| 2026-10-14T03:00Z | 263 MW | 0 MW | 677 MW | 914 MW | 338 MW |
| 2026-10-14T04:00Z | 310 MW | 0 MW | 716 MW | 1,099 MW | 377 MW |
| 2026-10-14T05:00Z | 390 MW | 0 MW | 783 MW | 673 MW | 1,089 MW |
| 2026-10-14T06:00Z | 390 MW | 8 MW | 784 MW | 712 MW | 1,575 MW |
| 2026-10-14T07:00Z | 373 MW | 536 MW | 814 MW | 573 MW | 922 MW |
| 2026-10-14T08:00Z | 289 MW | 1,765 MW | 657 MW | 116 MW | 577 MW |
| 2026-10-14T09:00Z | 217 MW | 2,639 MW | 656 MW | -736 MW | 409 MW |
| 2026-10-14T10:00Z | 214 MW | 3,038 MW | 682 MW | -1,005 MW | 174 MW |
| 2026-10-14T11:00Z | 214 MW | 3,225 MW | 670 MW | -1,301 MW | 127 MW |
| 2026-10-14T12:00Z | 189 MW | 3,256 MW | 704 MW | -1,383 MW | 97 MW |
| 2026-10-14T13:00Z | 191 MW | 3,165 MW | 696 MW | -1,178 MW | 160 MW |
| 2026-10-14T14:00Z | 156 MW | 2,888 MW | 707 MW | -816 MW | 217 MW |
| 2026-10-14T15:00Z | 148 MW | 2,360 MW | 702 MW | 177 MW | 217 MW |
| 2026-10-14T16:00Z | 158 MW | 1,274 MW | 1,064 MW | 1,076 MW | 424 MW |
| 2026-10-14T17:00Z | 227 MW | 213 MW | 1,379 MW | 1,788 MW | 1,762 MW |
| 2026-10-14T18:00Z | 287 MW | 15 MW | 1,463 MW | 1,859 MW | 1,721 MW |
| 2026-10-14T19:00Z | 321 MW | 12 MW | 1,382 MW | 1,414 MW | 1,600 MW |
| 2026-10-14T20:00Z | 332 MW | 0 MW | 1,093 MW | 1,044 MW | 1,036 MW |
| 2026-10-14T21:00Z | 334 MW | 0 MW | 927 MW | 975 MW | 717 MW |
| 2026-10-14T22:00Z | 333 MW | 0 MW | 1,097 MW | 1,091 MW | 373 MW |
| 2026-10-14T23:00Z | 356 MW | 0 MW | 1,034 MW | 494 MW | 67 MW |
| 2026-10-15T00:00Z | 374 MW | 0 MW | 998 MW | 198 MW | 76 MW |
| 2026-10-15T01:00Z | 449 MW | 0 MW | 962 MW | 272 MW | 76 MW |
| 2026-10-15T02:00Z | 499 MW | 0 MW | 970 MW | 273 MW | 76 MW |
| 2026-10-15T03:00Z | 550 MW | 0 MW | 965 MW | 158 MW | 78 MW |
| 2026-10-15T04:00Z | 676 MW | 0 MW | 1,089 MW | 689 MW | 294 MW |
| 2026-10-15T05:00Z | 765 MW | 0 MW | 1,093 MW | 1,324 MW | 1,188 MW |
| 2026-10-15T06:00Z | 796 MW | 7 MW | 1,109 MW | 1,343 MW | 1,489 MW |
| 2026-10-15T07:00Z | 788 MW | 485 MW | 1,046 MW | 1,037 MW | 455 MW |
| 2026-10-15T08:00Z | 658 MW | 1,621 MW | 863 MW | -153 MW | 296 MW |
| 2026-10-15T09:00Z | 506 MW | 2,470 MW | 585 MW | -1,641 MW | 216 MW |
| 2026-10-15T10:00Z | 398 MW | 2,866 MW | 646 MW | -2,003 MW | 186 MW |
| 2026-10-15T11:00Z | 351 MW | 3,039 MW | 632 MW | -2,251 MW | 83 MW |
| 2026-10-15T12:00Z | 334 MW | 3,267 MW | 681 MW | -2,213 MW | 74 MW |
| 2026-10-15T13:00Z | 272 MW | 3,152 MW | 716 MW | -2,156 MW | 93 MW |
| 2026-10-15T14:00Z | 236 MW | 2,854 MW | 703 MW | -1,884 MW | 141 MW |
| 2026-10-15T15:00Z | 270 MW | 2,290 MW | 876 MW | -436 MW | 213 MW |
| 2026-10-15T16:00Z | 332 MW | 1,245 MW | 1,223 MW | 1,069 MW | 287 MW |
| 2026-10-15T17:00Z | 416 MW | 202 MW | 1,404 MW | 1,933 MW | 1,162 MW |
| 2026-10-15T18:00Z | 495 MW | 15 MW | 1,447 MW | 2,005 MW | 1,316 MW |
| 2026-10-15T19:00Z | 528 MW | 11 MW | 1,420 MW | 1,774 MW | 1,270 MW |
| 2026-10-15T20:00Z | 526 MW | 0 MW | 1,143 MW | 1,135 MW | 732 MW |
| 2026-10-15T21:00Z | 509 MW | 0 MW | 832 MW | 1,010 MW | 558 MW |
| 2026-10-15T22:00Z | 469 MW | 0 MW | 741 MW | 313 MW | 504 MW |
| 2026-10-15T23:00Z | 389 MW | 0 MW | 734 MW | 284 MW | 446 MW |
| 2026-10-16T00:00Z | 374 MW | 0 MW | 687 MW | 214 MW | 398 MW |
| 2026-10-16T01:00Z | 376 MW | 0 MW | 694 MW | -1 MW | 365 MW |
| 2026-10-16T02:00Z | 356 MW | 0 MW | 685 MW | -3 MW | 527 MW |
| 2026-10-16T03:00Z | 344 MW | 0 MW | 677 MW | -2 MW | 540 MW |
| 2026-10-16T04:00Z | 335 MW | 0 MW | 706 MW | 607 MW | 810 MW |
| 2026-10-16T05:00Z | 305 MW | 0 MW | 780 MW | 1,107 MW | 1,404 MW |
| 2026-10-16T06:00Z | 285 MW | 5 MW | 782 MW | 1,180 MW | 1,630 MW |
| 2026-10-16T07:00Z | 283 MW | 492 MW | 769 MW | 1,163 MW | 1,029 MW |
| 2026-10-16T08:00Z | 215 MW | 1,689 MW | 659 MW | 651 MW | 555 MW |
| 2026-10-16T09:00Z | 150 MW | 2,531 MW | 592 MW | -712 MW | 415 MW |
| 2026-10-16T10:00Z | 118 MW | 3,004 MW | 667 MW | -1,214 MW | 304 MW |
| 2026-10-16T11:00Z | 152 MW | 3,197 MW | 677 MW | -1,623 MW | 278 MW |
| 2026-10-16T12:00Z | 191 MW | 3,101 MW | 670 MW | -1,662 MW | 202 MW |
| 2026-10-16T13:00Z | 311 MW | 2,983 MW | 672 MW | -1,503 MW | 199 MW |
| 2026-10-16T14:00Z | 535 MW | 2,668 MW | 676 MW | -1,350 MW | 223 MW |
| 2026-10-16T15:00Z | 590 MW | 2,028 MW | 686 MW | -486 MW | 268 MW |
| 2026-10-16T16:00Z | 649 MW | 1,052 MW | 732 MW | 757 MW | 482 MW |
| 2026-10-16T17:00Z | 820 MW | 166 MW | 723 MW | 1,618 MW | 890 MW |
| 2026-10-16T18:00Z | 1,006 MW | 15 MW | 767 MW | 1,374 MW | 803 MW |
| 2026-10-16T19:00Z | 1,039 MW | 5 MW | 740 MW | 987 MW | 692 MW |
| 2026-10-16T20:00Z | 939 MW | 0 MW | 704 MW | 279 MW | 720 MW |
| 2026-10-16T21:00Z | 841 MW | 0 MW | 683 MW | 236 MW | 692 MW |
| 2026-10-16T22:00Z | 794 MW | 0 MW | 703 MW | 836 MW | 864 MW |
| 2026-10-16T23:00Z | 780 MW | 0 MW | 656 MW | 483 MW | 645 MW |
| 2026-10-17T00:00Z | 762 MW | 0 MW | 599 MW | 226 MW | 604 MW |
| 2026-10-17T01:00Z | 769 MW | 0 MW | 615 MW | 262 MW | 556 MW |
| 2026-10-17T02:00Z | 941 MW | 0 MW | 624 MW | 231 MW | 452 MW |
| 2026-10-17T03:00Z | 1,177 MW | 0 MW | 605 MW | 302 MW | 420 MW |
| 2026-10-17T04:00Z | 1,408 MW | 0 MW | 601 MW | 405 MW | 409 MW |
| 2026-10-17T05:00Z | 1,627 MW | 0 MW | 620 MW | 870 MW | 549 MW |
| 2026-10-17T06:00Z | 1,830 MW | 4 MW | 626 MW | 747 MW | 635 MW |
| 2026-10-17T07:00Z | 2,025 MW | 232 MW | 596 MW | 75 MW | 296 MW |
| 2026-10-17T08:00Z | 2,013 MW | 1,102 MW | 548 MW | -1,769 MW | 152 MW |
| 2026-10-17T09:00Z | 1,926 MW | 1,800 MW | 527 MW | -2,357 MW | 124 MW |
| 2026-10-17T10:00Z | 1,862 MW | 2,144 MW | 640 MW | -2,423 MW | 165 MW |
| 2026-10-17T11:00Z | 1,876 MW | 2,364 MW | 616 MW | -2,425 MW | 154 MW |
| 2026-10-17T12:00Z | 1,913 MW | 2,219 MW | 624 MW | -2,423 MW | 153 MW |
| 2026-10-17T13:00Z | 2,005 MW | 1,883 MW | 627 MW | -2,424 MW | 154 MW |
| 2026-10-17T14:00Z | 2,005 MW | 1,656 MW | 624 MW | -2,342 MW | 154 MW |
| 2026-10-17T15:00Z | 2,031 MW | 1,513 MW | 616 MW | -2,039 MW | 141 MW |
| 2026-10-17T16:00Z | 1,975 MW | 861 MW | 663 MW | -588 MW | 121 MW |
| 2026-10-17T17:00Z | 2,270 MW | 183 MW | 649 MW | 941 MW | 229 MW |
| 2026-10-17T18:00Z | 2,666 MW | 15 MW | 605 MW | 1,546 MW | 370 MW |
| 2026-10-17T19:00Z | 2,879 MW | 6 MW | 681 MW | 1,357 MW | 266 MW |
| 2026-10-17T20:00Z | 2,971 MW | 0 MW | 731 MW | 994 MW | 68 MW |
| 2026-10-17T21:00Z | 3,178 MW | 0 MW | 721 MW | 611 MW | 57 MW |
| 2026-10-17T22:00Z | 3,346 MW | 0 MW | 732 MW | -267 MW | 38 MW |
| 2026-10-17T23:00Z | 3,385 MW | 0 MW | 727 MW | -568 MW | 43 MW |
| 2026-10-18T00:00Z | 3,574 MW | 0 MW | 734 MW | -923 MW | 53 MW |
| 2026-10-18T01:00Z | 3,707 MW | 0 MW | 715 MW | -1,364 MW | 34 MW |
| 2026-10-18T02:00Z | 3,782 MW | 0 MW | 656 MW | -1,398 MW | 51 MW |
| 2026-10-18T03:00Z | 3,628 MW | 0 MW | 732 MW | -1,482 MW | 52 MW |
| 2026-10-18T04:00Z | 3,608 MW | 0 MW | 651 MW | -1,118 MW | 39 MW |
| 2026-10-18T05:00Z | 3,553 MW | 0 MW | 632 MW | -1,087 MW | 68 MW |
| 2026-10-18T06:00Z | 3,531 MW | 2 MW | 656 MW | -551 MW | 127 MW |
| 2026-10-18T07:00Z | 3,481 MW | 281 MW | 654 MW | -1,152 MW | 171 MW |
| 2026-10-18T08:00Z | 3,503 MW | 1,085 MW | 640 MW | -2,107 MW | 135 MW |
| 2026-10-18T09:00Z | 3,546 MW | 1,707 MW | 598 MW | -2,415 MW | 124 MW |
| 2026-10-18T10:00Z | 3,455 MW | 1,956 MW | 648 MW | -2,453 MW | 165 MW |
| 2026-10-18T11:00Z | 3,311 MW | 2,086 MW | 654 MW | -2,405 MW | 168 MW |
| 2026-10-18T12:00Z | 3,100 MW | 2,205 MW | 633 MW | -2,410 MW | 152 MW |
| 2026-10-18T13:00Z | 2,830 MW | 1,854 MW | 656 MW | -2,320 MW | 172 MW |
| 2026-10-18T14:00Z | 2,664 MW | 1,870 MW | 657 MW | -2,289 MW | 168 MW |
| 2026-10-18T15:00Z | 2,608 MW | 1,629 MW | 689 MW | -2,184 MW | 180 MW |
| 2026-10-18T16:00Z | 2,696 MW | 964 MW | 705 MW | -897 MW | 194 MW |
| 2026-10-18T17:00Z | 2,825 MW | 147 MW | 688 MW | 810 MW | 319 MW |
| 2026-10-18T18:00Z | 3,086 MW | 15 MW | 618 MW | 1,812 MW | 455 MW |
| 2026-10-18T19:00Z | 3,300 MW | 12 MW | 612 MW | 1,660 MW | 518 MW |
| 2026-10-18T20:00Z | 3,549 MW | 0 MW | 628 MW | 1,301 MW | 141 MW |
| 2026-10-18T21:00Z | 3,530 MW | 0 MW | 646 MW | 541 MW | 95 MW |
| 2026-10-18T22:00Z | 3,450 MW | 0 MW | 641 MW | 617 MW | 128 MW |
| 2026-10-18T23:00Z | 3,335 MW | 0 MW | 682 MW | 100 MW | 174 MW |
| 2026-10-19T00:00Z | 3,151 MW | 0 MW | 688 MW | -199 MW | 77 MW |
| 2026-10-19T01:00Z | 3,021 MW | 0 MW | 675 MW | 85 MW | 81 MW |
| 2026-10-19T02:00Z | 2,960 MW | 0 MW | 658 MW | 302 MW | 199 MW |
| 2026-10-19T03:00Z | 2,841 MW | 0 MW | 648 MW | 629 MW | 238 MW |
| 2026-10-19T04:00Z | 2,657 MW | 0 MW | 730 MW | 499 MW | 182 MW |
| 2026-10-19T05:00Z | 2,520 MW | 0 MW | 778 MW | 1,179 MW | 561 MW |
| 2026-10-19T06:00Z | 2,357 MW | 3 MW | 823 MW | 2,066 MW | 1,121 MW |
| 2026-10-19T07:00Z | 2,079 MW | 427 MW | 770 MW | 1,137 MW | 799 MW |
| 2026-10-19T08:00Z | 1,567 MW | 1,580 MW | 701 MW | -287 MW | 477 MW |
| 2026-10-19T09:00Z | 1,235 MW | 2,386 MW | 700 MW | -369 MW | 346 MW |
| 2026-10-19T10:00Z | 938 MW | 2,765 MW | 702 MW | -620 MW | 308 MW |
| 2026-10-19T11:00Z | 661 MW | 3,012 MW | 761 MW | -254 MW | 249 MW |
| 2026-10-19T12:00Z | 486 MW | 3,140 MW | 711 MW | -169 MW | 216 MW |
| 2026-10-19T13:00Z | 331 MW | 2,983 MW | 711 MW | -65 MW | 200 MW |
| 2026-10-19T14:00Z | 209 MW | 2,654 MW | 763 MW | -69 MW | 337 MW |
| 2026-10-19T15:00Z | 273 MW | 2,141 MW | 917 MW | 603 MW | 409 MW |
| 2026-10-19T16:00Z | 430 MW | 1,146 MW | 1,079 MW | 1,690 MW | 828 MW |
| 2026-10-19T17:00Z | 516 MW | 167 MW | 1,269 MW | 2,122 MW | 1,111 MW |
| 2026-10-19T18:00Z | 527 MW | 16 MW | 1,418 MW | 2,366 MW | 1,692 MW |
| 2026-10-19T19:00Z | 482 MW | 8 MW | 1,437 MW | 2,298 MW | 1,577 MW |
| 2026-10-19T20:00Z | 431 MW | 1 MW | 1,437 MW | 1,687 MW | 812 MW |
| 2026-10-19T21:00Z | 345 MW | 1 MW | 1,271 MW | 999 MW | 727 MW |
| 2026-10-19T22:00Z | 307 MW | 0 MW | 1,103 MW | 1,079 MW | 658 MW |
| 2026-10-19T23:00Z | 283 MW | 0 MW | 1,089 MW | 1,102 MW | 604 MW |
| 2026-10-20T00:00Z | 297 MW | 0 MW | 1,145 MW | 862 MW | 546 MW |
| 2026-10-20T01:00Z | 333 MW | 0 MW | 1,171 MW | 662 MW | 492 MW |
| 2026-10-20T02:00Z | 434 MW | 0 MW | 842 MW | 519 MW | 456 MW |
| 2026-10-20T03:00Z | 534 MW | 0 MW | 744 MW | 530 MW | 509 MW |
| 2026-10-20T04:00Z | 518 MW | 0 MW | 767 MW | 630 MW | 621 MW |
| 2026-10-20T05:00Z | 518 MW | 0 MW | 769 MW | 1,447 MW | 723 MW |
| 2026-10-20T06:00Z | 488 MW | 3 MW | 848 MW | 1,940 MW | 789 MW |
| 2026-10-20T07:00Z | 418 MW | 211 MW | 807 MW | 1,389 MW | 606 MW |
| 2026-10-20T08:00Z | 406 MW | 865 MW | 694 MW | 800 MW | 514 MW |
| 2026-10-20T09:00Z | 409 MW | 1,600 MW | 703 MW | -784 MW | 345 MW |
| 2026-10-20T10:00Z | 368 MW | 2,194 MW | 678 MW | -1,772 MW | 350 MW |
| 2026-10-20T11:00Z | 292 MW | 2,574 MW | 639 MW | -2,228 MW | 277 MW |
| 2026-10-20T12:00Z | 293 MW | 2,844 MW | 635 MW | -2,459 MW | 200 MW |
| 2026-10-20T13:00Z | 530 MW | 2,914 MW | 607 MW | -2,453 MW | 187 MW |
| 2026-10-20T14:00Z | 829 MW | 2,793 MW | 663 MW | -2,451 MW | 142 MW |
| 2026-10-20T15:00Z | 1,118 MW | 2,252 MW | 660 MW | -1,763 MW | 284 MW |
| 2026-10-20T16:00Z | 1,648 MW | 1,059 MW | 717 MW | 493 MW | 418 MW |
| 2026-10-20T17:00Z | 1,758 MW | 148 MW | 737 MW | 1,955 MW | 958 MW |
| 2026-10-20T18:00Z | 1,725 MW | 15 MW | 752 MW | 2,063 MW | 1,179 MW |
| 2026-10-20T19:00Z | 2,144 MW | 13 MW | 699 MW | 1,136 MW | 682 MW |
| 2026-10-20T20:00Z | 2,578 MW | 0 MW | 688 MW | 135 MW | 223 MW |
| 2026-10-20T21:00Z | 2,668 MW | 0 MW | 649 MW | -83 MW | 218 MW |
| 2026-10-20T22:00Z | 2,545 MW | 0 MW | 634 MW | 81 MW | 233 MW |
| 2026-10-20T23:00Z | 2,490 MW | 0 MW | 699 MW | -280 MW | 225 MW |
| 2026-10-21T00:00Z | 2,397 MW | 0 MW | 631 MW | -47 MW | 216 MW |
| 2026-10-21T01:00Z | 2,101 MW | 0 MW | 655 MW | 261 MW | 239 MW |
| 2026-10-21T02:00Z | 2,039 MW | 0 MW | 624 MW | 230 MW | 127 MW |
| 2026-10-21T03:00Z | 1,729 MW | 0 MW | 679 MW | 639 MW | 81 MW |
| 2026-10-21T04:00Z | 1,491 MW | 0 MW | 669 MW | 790 MW | 310 MW |
| 2026-10-21T05:00Z | 1,440 MW | 0 MW | 739 MW | 1,080 MW | 406 MW |
| 2026-10-21T06:00Z | 1,508 MW | 3 MW | 809 MW | 1,782 MW | 582 MW |
| 2026-10-21T07:00Z | 1,353 MW | 353 MW | 765 MW | 774 MW | 465 MW |
| 2026-10-21T08:00Z | 1,082 MW | 1,280 MW | 606 MW | -1,070 MW | 265 MW |
| 2026-10-21T09:00Z | 899 MW | 2,004 MW | 575 MW | -2,278 MW | 227 MW |
| 2026-10-21T10:00Z | 662 MW | 2,318 MW | 619 MW | -2,302 MW | 221 MW |
| 2026-10-21T11:00Z | 621 MW | 2,453 MW | 598 MW | -2,302 MW | 167 MW |
| 2026-10-21T12:00Z | 542 MW | 2,358 MW | 674 MW | -2,239 MW | 152 MW |
| 2026-10-21T13:00Z | 562 MW | 2,356 MW | 544 MW | -2,185 MW | 103 MW |
| 2026-10-21T14:00Z | 610 MW | 2,161 MW | 636 MW | -2,054 MW | 154 MW |
| 2026-10-21T15:00Z | 633 MW | 2,102 MW | 688 MW | -1,721 MW | 201 MW |
| 2026-10-21T16:00Z | 688 MW | 1,180 MW | 901 MW | 679 MW | 268 MW |
| 2026-10-21T17:00Z | 797 MW | 153 MW | 1,174 MW | 1,783 MW | 622 MW |
| 2026-10-21T18:00Z | 787 MW | 15 MW | 1,292 MW | 2,272 MW | 1,291 MW |
| 2026-10-21T19:00Z | 682 MW | 13 MW | 1,189 MW | 2,297 MW | 1,204 MW |
| 2026-10-21T20:00Z | 607 MW | 0 MW | 1,109 MW | 1,729 MW | 456 MW |
| 2026-10-21T21:00Z | 650 MW | 0 MW | 954 MW | 1,228 MW | 302 MW |
| 2026-10-21T22:00Z | 637 MW | 0 MW | 920 MW | 990 MW | 373 MW |
| 2026-10-21T23:00Z | 566 MW | 0 MW | 932 MW | 1,065 MW | 404 MW |
| 2026-10-22T00:00Z | 570 MW | 0 MW | 853 MW | 1,099 MW | 347 MW |
| 2026-10-22T01:00Z | 565 MW | 0 MW | 775 MW | 1,098 MW | 179 MW |
| 2026-10-22T02:00Z | 418 MW | 0 MW | 749 MW | 1,201 MW | 176 MW |
| 2026-10-22T03:00Z | 321 MW | 0 MW | 719 MW | 1,041 MW | 180 MW |
| 2026-10-22T04:00Z | 327 MW | 0 MW | 778 MW | 1,153 MW | 344 MW |
| 2026-10-22T05:00Z | 310 MW | 0 MW | 789 MW | 1,637 MW | 1,083 MW |
| 2026-10-22T06:00Z | 272 MW | 3 MW | 796 MW | 1,957 MW | 1,930 MW |
| 2026-10-22T07:00Z | 253 MW | 447 MW | 759 MW | 1,352 MW | 986 MW |
| 2026-10-22T08:00Z | 186 MW | 1,744 MW | 606 MW | -643 MW | 239 MW |
| 2026-10-22T09:00Z | 166 MW | 2,637 MW | 608 MW | -1,791 MW | 193 MW |
| 2026-10-22T10:00Z | 245 MW | 2,916 MW | 593 MW | -2,138 MW | 174 MW |
| 2026-10-22T11:00Z | 387 MW | 2,887 MW | 563 MW | -2,333 MW | 144 MW |
| 2026-10-22T12:00Z | 716 MW | 2,674 MW | 611 MW | -2,334 MW | 143 MW |
| 2026-10-22T13:00Z | 1,179 MW | 2,530 MW | 568 MW | -2,268 MW | 133 MW |
| 2026-10-22T14:00Z | 1,814 MW | 2,314 MW | 637 MW | -2,302 MW | 162 MW |
| 2026-10-22T15:00Z | 2,251 MW | 2,026 MW | 644 MW | -1,946 MW | 175 MW |
| 2026-10-22T16:00Z | 2,332 MW | 1,094 MW | 677 MW | 30 MW | 235 MW |
| 2026-10-22T17:00Z | 2,344 MW | 120 MW | 760 MW | 1,984 MW | 851 MW |
| 2026-10-22T18:00Z | 2,310 MW | 15 MW | 758 MW | 2,025 MW | 983 MW |
| 2026-10-22T19:00Z | 2,403 MW | 8 MW | 715 MW | 1,290 MW | 244 MW |
| 2026-10-22T20:00Z | 2,699 MW | 0 MW | 672 MW | 651 MW | 90 MW |
| 2026-10-22T21:00Z | 2,909 MW | 0 MW | 665 MW | 422 MW | 70 MW |
| 2026-10-22T22:00Z | 3,030 MW | 0 MW | 671 MW | -232 MW | 79 MW |
| 2026-10-22T23:00Z | 2,868 MW | 0 MW | 746 MW | -402 MW | 119 MW |
| 2026-10-23T00:00Z | 2,752 MW | 0 MW | 668 MW | -913 MW | 183 MW |
| 2026-10-23T01:00Z | 2,604 MW | 0 MW | 688 MW | -1,133 MW | 149 MW |
| 2026-10-23T02:00Z | 2,545 MW | 0 MW | 667 MW | -1,304 MW | 141 MW |
| 2026-10-23T03:00Z | 2,365 MW | 0 MW | 672 MW | -993 MW | 136 MW |
| 2026-10-23T04:00Z | 2,232 MW | 0 MW | 668 MW | -412 MW | 90 MW |
| 2026-10-23T05:00Z | 2,124 MW | 0 MW | 704 MW | 435 MW | 217 MW |
| 2026-10-23T06:00Z | 2,114 MW | 1 MW | 627 MW | 1,148 MW | 372 MW |
| 2026-10-23T07:00Z | 2,075 MW | 218 MW | 675 MW | 534 MW | 134 MW |
| 2026-10-23T08:00Z | 1,823 MW | 1,060 MW | 654 MW | -1,095 MW | 201 MW |
| 2026-10-23T09:00Z | 1,569 MW | 1,388 MW | 618 MW | -2,133 MW | 229 MW |
| 2026-10-23T10:00Z | 1,189 MW | 1,681 MW | 682 MW | -2,362 MW | 299 MW |
| 2026-10-23T11:00Z | 795 MW | 2,001 MW | 681 MW | -2,294 MW | 210 MW |
| 2026-10-23T12:00Z | 676 MW | 2,088 MW | 694 MW | -2,243 MW | 222 MW |
| 2026-10-23T13:00Z | 916 MW | 1,862 MW | 638 MW | -2,212 MW | 239 MW |
| 2026-10-23T14:00Z | 1,098 MW | 1,755 MW | 605 MW | -2,392 MW | 232 MW |
| 2026-10-23T15:00Z | 1,126 MW | 1,723 MW | 658 MW | -1,852 MW | 210 MW |
| 2026-10-23T16:00Z | 1,356 MW | 1,016 MW | 666 MW | 93 MW | 99 MW |
| 2026-10-23T17:00Z | 1,563 MW | 130 MW | 748 MW | 1,575 MW | 449 MW |
| 2026-10-23T18:00Z | 1,669 MW | 15 MW | 736 MW | 2,149 MW | 765 MW |
| 2026-10-23T19:00Z | 1,704 MW | 15 MW | 723 MW | 1,871 MW | 568 MW |
| 2026-10-23T20:00Z | 1,863 MW | 1 MW | 643 MW | 1,291 MW | 238 MW |
| 2026-10-23T21:00Z | 1,826 MW | 0 MW | 686 MW | 931 MW | 125 MW |
| 2026-10-23T22:00Z | 1,290 MW | 0 MW | 705 MW | 1,133 MW | 16 MW |
| 2026-10-23T23:00Z | 1,123 MW | 0 MW | 711 MW | 1,120 MW | 16 MW |
| 2026-10-24T00:00Z | 1,069 MW | 0 MW | 668 MW | 945 MW | 70 MW |
| 2026-10-24T01:00Z | 900 MW | 0 MW | 640 MW | 805 MW | 85 MW |
| 2026-10-24T02:00Z | 880 MW | 0 MW | 634 MW | 693 MW | 151 MW |
| 2026-10-24T03:00Z | 657 MW | 0 MW | 684 MW | 664 MW | 216 MW |
| 2026-10-24T04:00Z | 330 MW | 0 MW | 696 MW | 791 MW | 288 MW |
| 2026-10-24T05:00Z | 226 MW | 0 MW | 644 MW | 1,260 MW | 391 MW |
| 2026-10-24T06:00Z | 279 MW | 2 MW | 698 MW | 1,464 MW | 498 MW |
| 2026-10-24T07:00Z | 314 MW | 374 MW | 711 MW | 727 MW | 351 MW |
| 2026-10-24T08:00Z | 182 MW | 1,614 MW | 678 MW | -1,408 MW | 259 MW |
| 2026-10-24T09:00Z | 94 MW | 2,469 MW | 654 MW | -2,282 MW | 228 MW |
| 2026-10-24T10:00Z | 86 MW | 2,512 MW | 653 MW | -2,377 MW | 237 MW |
| 2026-10-24T11:00Z | 121 MW | 2,455 MW | 659 MW | -2,337 MW | 206 MW |
| 2026-10-24T12:00Z | 160 MW | 2,501 MW | 667 MW | -2,286 MW | 171 MW |
| 2026-10-24T13:00Z | 285 MW | 2,201 MW | 638 MW | -2,219 MW | 142 MW |
| 2026-10-24T14:00Z | 512 MW | 2,162 MW | 592 MW | -2,253 MW | 149 MW |
| 2026-10-24T15:00Z | 749 MW | 1,959 MW | 663 MW | -1,992 MW | 242 MW |
| 2026-10-24T16:00Z | 975 MW | 1,090 MW | 677 MW | -147 MW | 190 MW |
| 2026-10-24T17:00Z | 1,227 MW | 129 MW | 706 MW | 1,595 MW | 403 MW |
| 2026-10-24T18:00Z | 1,427 MW | 15 MW | 793 MW | 2,019 MW | 663 MW |
| 2026-10-24T19:00Z | 1,617 MW | 15 MW | 779 MW | 1,693 MW | 699 MW |
| 2026-10-24T20:00Z | 1,623 MW | 1 MW | 708 MW | 1,173 MW | 420 MW |
| 2026-10-24T21:00Z | 1,585 MW | 0 MW | 696 MW | 550 MW | 59 MW |
| 2026-10-24T22:00Z | 1,555 MW | 0 MW | 698 MW | 312 MW | 33 MW |
| 2026-10-24T23:00Z | 1,531 MW | 0 MW | 685 MW | -27 MW | 140 MW |
| 2026-10-25T00:00Z | 1,544 MW | 0 MW | 662 MW | -284 MW | 144 MW |
| 2026-10-25T01:00Z | 1,717 MW | 0 MW | 590 MW | -515 MW | 134 MW |
| 2026-10-25T02:00Z | 2,015 MW | 0 MW | 663 MW | -735 MW | 21 MW |
| 2026-10-25T03:00Z | 2,367 MW | 0 MW | 644 MW | -1,218 MW | 20 MW |
| 2026-10-25T04:00Z | 2,695 MW | 0 MW | 651 MW | -1,426 MW | 7 MW |
| 2026-10-25T05:00Z | 2,706 MW | 0 MW | 693 MW | -1,173 MW | 7 MW |
| 2026-10-25T06:00Z | 2,582 MW | 1 MW | 727 MW | -524 MW | 9 MW |
| 2026-10-25T07:00Z | 2,104 MW | 210 MW | 612 MW | -2,066 MW | 299 MW |
| 2026-10-25T08:00Z | 1,491 MW | 739 MW | 676 MW | -2,387 MW | 419 MW |
| 2026-10-25T09:00Z | 1,196 MW | 1,136 MW | 639 MW | -2,017 MW | 292 MW |
| 2026-10-25T10:00Z | 839 MW | 1,387 MW | 683 MW | -2,218 MW | 391 MW |
| 2026-10-25T11:00Z | 671 MW | 1,553 MW | 674 MW | -1,917 MW | 183 MW |
| 2026-10-25T12:00Z | 592 MW | 1,614 MW | 651 MW | -1,949 MW | 167 MW |
| 2026-10-25T13:00Z | 552 MW | 1,622 MW | 632 MW | -1,842 MW | 153 MW |
| 2026-10-25T14:00Z | 635 MW | 1,568 MW | 630 MW | -1,837 MW | 162 MW |
| 2026-10-25T15:00Z | 689 MW | 1,366 MW | 659 MW | -1,823 MW | 225 MW |
| 2026-10-25T16:00Z | 840 MW | 768 MW | 682 MW | -506 MW | 211 MW |
| 2026-10-25T17:00Z | 1,131 MW | 90 MW | 691 MW | 1,474 MW | 413 MW |
| 2026-10-25T18:00Z | 1,353 MW | 15 MW | 690 MW | 1,565 MW | 419 MW |
| 2026-10-25T19:00Z | 1,249 MW | 15 MW | 732 MW | 1,708 MW | 953 MW |
| 2026-10-25T20:00Z | 1,070 MW | 15 MW | 642 MW | 1,886 MW | 901 MW |
| 2026-10-25T21:00Z | 893 MW | 9 MW | 660 MW | 1,722 MW | 332 MW |
| 2026-10-25T22:00Z | 705 MW | 0 MW | 592 MW | 1,572 MW | 75 MW |
| 2026-10-25T23:00Z | 601 MW | 0 MW | 646 MW | 649 MW | 91 MW |
| 2026-10-26T00:00Z | 539 MW | 0 MW | 642 MW | 654 MW | 190 MW |
| 2026-10-26T01:00Z | 406 MW | 0 MW | 648 MW | 527 MW | 361 MW |
| 2026-10-26T02:00Z | 276 MW | 0 MW | 665 MW | 655 MW | 164 MW |
| 2026-10-26T03:00Z | 263 MW | 0 MW | 650 MW | 607 MW | 205 MW |
| 2026-10-26T04:00Z | 354 MW | 0 MW | 661 MW | 666 MW | 324 MW |
| 2026-10-26T05:00Z | 472 MW | 0 MW | 755 MW | 1,213 MW | 734 MW |
| 2026-10-26T06:00Z | 548 MW | 1 MW | 743 MW | 1,752 MW | 1,322 MW |
| 2026-10-26T07:00Z | 624 MW | 347 MW | 729 MW | 1,120 MW | 949 MW |
| 2026-10-26T08:00Z | 529 MW | 1,527 MW | 634 MW | -156 MW | 440 MW |
| 2026-10-26T09:00Z | 498 MW | 2,455 MW | 621 MW | -1,411 MW | 179 MW |
| 2026-10-26T10:00Z | 459 MW | 2,570 MW | 633 MW | -1,937 MW | 194 MW |
| 2026-10-26T11:00Z | 520 MW | 2,777 MW | 624 MW | -2,011 MW | 211 MW |
| 2026-10-26T12:00Z | 609 MW | 3,102 MW | 714 MW | -2,108 MW | 200 MW |
| 2026-10-26T13:00Z | 639 MW | 3,048 MW | 805 MW | -2,273 MW | 231 MW |
| 2026-10-26T14:00Z | 593 MW | 2,785 MW | 766 MW | -2,119 MW | 227 MW |
| 2026-10-26T15:00Z | 456 MW | 2,197 MW | 799 MW | -781 MW | 214 MW |
| 2026-10-26T16:00Z | 528 MW | 1,016 MW | 962 MW | 1,198 MW | 681 MW |
| 2026-10-26T17:00Z | 634 MW | 101 MW | 973 MW | 2,263 MW | 1,287 MW |
| 2026-10-26T18:00Z | 779 MW | 15 MW | 969 MW | 2,308 MW | 1,550 MW |
| 2026-10-26T19:00Z | 788 MW | 15 MW | 988 MW | 2,469 MW | 1,640 MW |
| 2026-10-26T20:00Z | 960 MW | 12 MW | 991 MW | 2,103 MW | 1,501 MW |
| 2026-10-26T21:00Z | 1,140 MW | 0 MW | 916 MW | 1,254 MW | 973 MW |
| 2026-10-26T22:00Z | 991 MW | 0 MW | 801 MW | 724 MW | 717 MW |
| 2026-10-26T23:00Z | 1,005 MW | 0 MW | 730 MW | 688 MW | 289 MW |
| 2026-10-27T00:00Z | 895 MW | 0 MW | 751 MW | 598 MW | 294 MW |
| 2026-10-27T01:00Z | 801 MW | 0 MW | 684 MW | 265 MW | 417 MW |
| 2026-10-27T02:00Z | 827 MW | 0 MW | 684 MW | 248 MW | 424 MW |
| 2026-10-27T03:00Z | 719 MW | 0 MW | 681 MW | 306 MW | 404 MW |
| 2026-10-27T04:00Z | 550 MW | 0 MW | 712 MW | 438 MW | 395 MW |
| 2026-10-27T05:00Z | 474 MW | 0 MW | 795 MW | 837 MW | 830 MW |
| 2026-10-27T06:00Z | 581 MW | 0 MW | 734 MW | 1,585 MW | 1,117 MW |
| 2026-10-27T07:00Z | 693 MW | 152 MW | 737 MW | 1,095 MW | 1,019 MW |
| 2026-10-27T08:00Z | 736 MW | 932 MW | 650 MW | 219 MW | 618 MW |
| 2026-10-27T09:00Z | 708 MW | 1,667 MW | 666 MW | -925 MW | 275 MW |
| 2026-10-27T10:00Z | 658 MW | 2,175 MW | 687 MW | -1,653 MW | 241 MW |
| 2026-10-27T11:00Z | 544 MW | 2,387 MW | 765 MW | -1,705 MW | 238 MW |
| 2026-10-27T12:00Z | 310 MW | 2,525 MW | 714 MW | -1,583 MW | 214 MW |
| 2026-10-27T13:00Z | 409 MW | 2,700 MW | 714 MW | -1,306 MW | 211 MW |
| 2026-10-27T14:00Z | 592 MW | 2,583 MW | 679 MW | -437 MW | 205 MW |
| 2026-10-27T15:00Z | 701 MW | 1,974 MW | 727 MW | 542 MW | 153 MW |
| 2026-10-27T16:00Z | 792 MW | 877 MW | 818 MW | 1,862 MW | 971 MW |
| 2026-10-27T17:00Z | 768 MW | 70 MW | 802 MW | 2,295 MW | 1,864 MW |
| 2026-10-27T18:00Z | 632 MW | 0 MW | 762 MW | 2,186 MW | 1,803 MW |
| 2026-10-27T19:00Z | 535 MW | 0 MW | 764 MW | 1,823 MW | 1,694 MW |
| 2026-10-27T20:00Z | 426 MW | 0 MW | 784 MW | 1,397 MW | 1,062 MW |
| 2026-10-27T21:00Z | 366 MW | 0 MW | 758 MW | 1,170 MW | 765 MW |
| 2026-10-27T22:00Z | 319 MW | 0 MW | 716 MW | 723 MW | 632 MW |
| 2026-10-27T23:00Z | 310 MW | 0 MW | 714 MW | 631 MW | 572 MW |
| 2026-10-28T00:00Z | 417 MW | 0 MW | 711 MW | 257 MW | 395 MW |
| 2026-10-28T01:00Z | 436 MW | 0 MW | 716 MW | 216 MW | 425 MW |
| 2026-10-28T02:00Z | 486 MW | 0 MW | 709 MW | 381 MW | 434 MW |
| 2026-10-28T03:00Z | 571 MW | 0 MW | 677 MW | 209 MW | 442 MW |
| 2026-10-28T04:00Z | 716 MW | 0 MW | 711 MW | 271 MW | 567 MW |
| 2026-10-28T05:00Z | 865 MW | 0 MW | 774 MW | 1,009 MW | 946 MW |
| 2026-10-28T06:00Z | 949 MW | 0 MW | 861 MW | 1,789 MW | 1,742 MW |
| 2026-10-28T07:00Z | 980 MW | 236 MW | 791 MW | 1,079 MW | 929 MW |
| 2026-10-28T08:00Z | 921 MW | 1,014 MW | 675 MW | -708 MW | 457 MW |
| 2026-10-28T09:00Z | 782 MW | 1,829 MW | 749 MW | -1,512 MW | 345 MW |
| 2026-10-28T10:00Z | 645 MW | 2,457 MW | 690 MW | -1,664 MW | 276 MW |
| 2026-10-28T11:00Z | 509 MW | 2,799 MW | 769 MW | -2,158 MW | 244 MW |
| 2026-10-28T12:00Z | 399 MW | 2,937 MW | 676 MW | -2,003 MW | 132 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00Z.
Installed Capacity
Annual figure for 2026| Wind | |
|---|---|
| Hydro | |
| Gas | |
| Storage | |
| Solar | |
| Bioenergy | |
| Other |
Total installed capacity in Portugal: 22.1 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Lisbon time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Lisbon time) | Demand |
|---|---|
| 2025-09-23 | 141 GWh |
| 2025-09-24 | 142 GWh |
| 2025-09-25 | 142 GWh |
| 2025-09-26 | 143 GWh |
| 2025-09-27 | 131 GWh |
| 2025-09-28 | 120 GWh |
| 2025-09-29 | 139 GWh |
| 2025-09-30 | 144 GWh |
| 2025-10-01 | 144 GWh |
| 2025-10-02 | 145 GWh |
| 2025-10-03 | 145 GWh |
| 2025-10-04 | 128 GWh |
| 2025-10-05 | 117 GWh |
| 2025-10-06 | 140 GWh |
| 2025-10-07 | 147 GWh |
| 2025-10-08 | 146 GWh |
| 2025-10-09 | 145 GWh |
| 2025-10-10 | 144 GWh |
| 2025-10-11 | 125 GWh |
| 2025-10-12 | 119 GWh |
| 2025-10-13 | 141 GWh |
| 2025-10-14 | 145 GWh |
| 2025-10-15 | 146 GWh |
| 2025-10-16 | 147 GWh |
| 2025-10-17 | 146 GWh |
| 2025-10-18 | 128 GWh |
| 2025-10-19 | 124 GWh |
| 2025-10-20 | 145 GWh |
| 2025-10-21 | 154 GWh |
| 2025-10-22 | 154 GWh |
| 2025-10-23 | 152 GWh |
| 2025-10-24 | 151 GWh |
| 2025-10-25 | 134 GWh |
| 2025-10-26 | 123 GWh |
| 2025-10-27 | 140 GWh |
| 2025-10-28 | 151 GWh |
| 2025-10-29 | 148 GWh |
| 2025-10-30 | 150 GWh |
| 2025-10-31 | 156 GWh |
| 2025-11-01 | 127 GWh |
| 2025-11-02 | 119 GWh |
| 2025-11-03 | 142 GWh |
| 2025-11-04 | 153 GWh |
| 2025-11-05 | 153 GWh |
| 2025-11-06 | 151 GWh |
| 2025-11-07 | 154 GWh |
| 2025-11-08 | 131 GWh |
| 2025-11-09 | 124 GWh |
| 2025-11-10 | 151 GWh |
| 2025-11-11 | 154 GWh |
| 2025-11-12 | 158 GWh |
| 2025-11-13 | 159 GWh |
| 2025-11-14 | 160 GWh |
| 2025-11-15 | 140 GWh |
| 2025-11-16 | 131 GWh |
| 2025-11-17 | 152 GWh |
| 2025-11-18 | 155 GWh |
| 2025-11-19 | 159 GWh |
| 2025-11-20 | 161 GWh |
| 2025-11-21 | 165 GWh |
| 2025-11-22 | 150 GWh |
| 2025-11-23 | 145 GWh |
| 2025-11-24 | 168 GWh |
| 2025-11-25 | 167 GWh |
| 2025-11-26 | 169 GWh |
| 2025-11-27 | 170 GWh |
| 2025-11-28 | 170 GWh |
| 2025-11-29 | 153 GWh |
| 2025-11-30 | 138 GWh |
| 2025-12-01 | 146 GWh |
| 2025-12-02 | 172 GWh |
| 2025-12-03 | 179 GWh |
| 2025-12-04 | 177 GWh |
| 2025-12-05 | 175 GWh |
| 2025-12-06 | 152 GWh |
| 2025-12-07 | 139 GWh |
| 2025-12-08 | 142 GWh |
| 2025-12-09 | 169 GWh |
| 2025-12-10 | 162 GWh |
| 2025-12-11 | 168 GWh |
| 2025-12-12 | 175 GWh |
| 2025-12-13 | 146 GWh |
| 2025-12-14 | 138 GWh |
| 2025-12-15 | 175 GWh |
| 2025-12-16 | 178 GWh |
| 2025-12-17 | 176 GWh |
| 2025-12-18 | 175 GWh |
| 2025-12-19 | 170 GWh |
| 2025-12-20 | 156 GWh |
| 2025-12-21 | 153 GWh |
| 2025-12-22 | 172 GWh |
| 2025-12-23 | 167 GWh |
| 2025-12-24 | 147 GWh |
| 2025-12-25 | 134 GWh |
| 2025-12-26 | 154 GWh |
| 2025-12-27 | 158 GWh |
| 2025-12-28 | 147 GWh |
| 2025-12-29 | 159 GWh |
| 2025-12-30 | 163 GWh |
| 2025-12-31 | 155 GWh |
| 2026-01-01 | 143 GWh |
| 2026-01-02 | 156 GWh |
| 2026-01-03 | 148 GWh |
| 2026-01-04 | 141 GWh |
| 2026-01-05 | 172 GWh |
| 2026-01-06 | 186 GWh |
| 2026-01-07 | 188 GWh |
| 2026-01-08 | 193 GWh |
| 2026-01-09 | 183 GWh |
| 2026-01-10 | 162 GWh |
| 2026-01-11 | 157 GWh |
| 2026-01-12 | 181 GWh |
| 2026-01-13 | 183 GWh |
| 2026-01-14 | 179 GWh |
| 2026-01-15 | 188 GWh |
| 2026-01-16 | 186 GWh |
| 2026-01-17 | 166 GWh |
| 2026-01-18 | 157 GWh |
| 2026-01-19 | 185 GWh |
| 2026-01-20 | 194 GWh |
| 2026-01-21 | 193 GWh |
| 2026-01-22 | 196 GWh |
| 2026-01-23 | 197 GWh |
| 2026-01-24 | 174 GWh |
| 2026-01-25 | 160 GWh |
| 2026-01-26 | 187 GWh |
| 2026-01-27 | 187 GWh |
| 2026-01-28 | 169 GWh |
| 2026-01-29 | 170 GWh |
| 2026-01-30 | 170 GWh |
| 2026-01-31 | 150 GWh |
| 2026-02-01 | 149 GWh |
| 2026-02-02 | 174 GWh |
| 2026-02-03 | 183 GWh |
| 2026-02-04 | 184 GWh |
| 2026-02-05 | 175 GWh |
| 2026-02-06 | 176 GWh |
| 2026-02-07 | 162 GWh |
| 2026-02-08 | 151 GWh |
| 2026-02-09 | 177 GWh |
| 2026-02-10 | 181 GWh |
| 2026-02-11 | 181 GWh |
| 2026-02-12 | 171 GWh |
| 2026-02-13 | 175 GWh |
| 2026-02-14 | 153 GWh |
| 2026-02-15 | 149 GWh |
| 2026-02-16 | 165 GWh |
| 2026-02-17 | 150 GWh |
| 2026-02-18 | 174 GWh |
| 2026-02-19 | 170 GWh |
| 2026-02-20 | 168 GWh |
| 2026-02-21 | 145 GWh |
| 2026-02-22 | 132 GWh |
| 2026-02-23 | 153 GWh |
| 2026-02-24 | 159 GWh |
| 2026-02-25 | 163 GWh |
| 2026-02-26 | 155 GWh |
| 2026-02-27 | 165 GWh |
| 2026-02-28 | 141 GWh |
| 2026-03-01 | 131 GWh |
| 2026-03-02 | 164 GWh |
| 2026-03-03 | 159 GWh |
| 2026-03-04 | 157 GWh |
| 2026-03-05 | 169 GWh |
| 2026-03-06 | 171 GWh |
| 2026-03-07 | 143 GWh |
| 2026-03-08 | 135 GWh |
| 2026-03-09 | 167 GWh |
| 2026-03-10 | 167 GWh |
| 2026-03-11 | 162 GWh |
| 2026-03-12 | 162 GWh |
| 2026-03-13 | 166 GWh |
| 2026-03-14 | 153 GWh |
| 2026-03-15 | 131 GWh |
| 2026-03-16 | 149 GWh |
| 2026-03-17 | 152 GWh |
| 2026-03-18 | 158 GWh |
| 2026-03-19 | 160 GWh |
| 2026-03-20 | 162 GWh |
| 2026-03-21 | 138 GWh |
| 2026-03-22 | 125 GWh |
| 2026-03-23 | 145 GWh |
| 2026-03-24 | 146 GWh |
| 2026-03-25 | 147 GWh |
| 2026-03-26 | 146 GWh |
| 2026-03-27 | 144 GWh |
| 2026-03-28 | 127 GWh |
| 2026-03-29 | 113 GWh |
| 2026-03-30 | 142 GWh |
| 2026-03-31 | 143 GWh |
| 2026-04-01 | 141 GWh |
| 2026-04-02 | 139 GWh |
| 2026-04-03 | 123 GWh |
| 2026-04-04 | 116 GWh |
| 2026-04-05 | 104 GWh |
| 2026-04-06 | 127 GWh |
| 2026-04-07 | 150 GWh |
| 2026-04-08 | 150 GWh |
| 2026-04-09 | 145 GWh |
| 2026-04-10 | 144 GWh |
| 2026-04-11 | 127 GWh |
| 2026-04-12 | 120 GWh |
| 2026-04-13 | 149 GWh |
| 2026-04-14 | 152 GWh |
| 2026-04-15 | 149 GWh |
| 2026-04-16 | 144 GWh |
| 2026-04-17 | 142 GWh |
| 2026-04-18 | 124 GWh |
| 2026-04-19 | 116 GWh |
| 2026-04-20 | 138 GWh |
| 2026-04-21 | 147 GWh |
| 2026-04-22 | 141 GWh |
| 2026-04-23 | 142 GWh |
| 2026-04-24 | 141 GWh |
| 2026-04-25 | 121 GWh |
| 2026-04-26 | 115 GWh |
| 2026-04-27 | 139 GWh |
| 2026-04-28 | 145 GWh |
| 2026-04-29 | 149 GWh |
| 2026-04-30 | 146 GWh |
| 2026-05-01 | 121 GWh |
| 2026-05-02 | 120 GWh |
| 2026-05-03 | 116 GWh |
| 2026-05-04 | 136 GWh |
| 2026-05-05 | 144 GWh |
| 2026-05-06 | 142 GWh |
| 2026-05-07 | 142 GWh |
| 2026-05-08 | 145 GWh |
| 2026-05-09 | 130 GWh |
| 2026-05-10 | 120 GWh |
| 2026-05-11 | 143 GWh |
| 2026-05-12 | 145 GWh |
| 2026-05-13 | 143 GWh |
| 2026-05-14 | 139 GWh |
| 2026-05-15 | 141 GWh |
| 2026-05-16 | 122 GWh |
| 2026-05-17 | 116 GWh |
| 2026-05-18 | 137 GWh |
| 2026-05-19 | 147 GWh |
| 2026-05-20 | 143 GWh |
| 2026-05-21 | 145 GWh |
| 2026-05-22 | 147 GWh |
| 2026-05-23 | 132 GWh |
| 2026-05-24 | 120 GWh |
| 2026-05-25 | 143 GWh |
| 2026-05-26 | 149 GWh |
| 2026-05-27 | 152 GWh |
| 2026-05-28 | 149 GWh |
| 2026-05-29 | 149 GWh |
| 2026-05-30 | 132 GWh |
| 2026-05-31 | 121 GWh |
| 2026-06-01 | 143 GWh |
| 2026-06-02 | 146 GWh |
| 2026-06-03 | 143 GWh |
| 2026-06-04 | 125 GWh |
| 2026-06-05 | 132 GWh |
| 2026-06-06 | 124 GWh |
| 2026-06-07 | 116 GWh |
| 2026-06-08 | 138 GWh |
| 2026-06-09 | 141 GWh |
| 2026-06-10 | 125 GWh |
| 2026-06-11 | 147 GWh |
| 2026-06-12 | 154 GWh |
| 2026-06-13 | 137 GWh |
| 2026-06-14 | 126 GWh |
| 2026-06-15 | 150 GWh |
| 2026-06-16 | 148 GWh |
| 2026-06-17 | 152 GWh |
| 2026-06-18 | 152 GWh |
| 2026-06-19 | 152 GWh |
| 2026-06-20 | 135 GWh |
| 2026-06-21 | 129 GWh |
| 2026-06-22 | 156 GWh |
| 2026-06-23 | 159 GWh |
| 2026-06-24 | 149 GWh |
| 2026-06-25 | 153 GWh |
| 2026-06-26 | 152 GWh |
| 2026-06-27 | 130 GWh |
| 2026-06-28 | 122 GWh |
| 2026-06-29 | 147 GWh |
| 2026-06-30 | 155 GWh |
| 2026-07-01 | 160 GWh |
| 2026-07-02 | 166 GWh |
| 2026-07-03 | 171 GWh |
| 2026-07-04 | 152 GWh |
| 2026-07-05 | 144 GWh |
| 2026-07-06 | 164 GWh |
| 2026-07-07 | 160 GWh |
| 2026-07-08 | 158 GWh |
| 2026-07-09 | 155 GWh |
| 2026-07-10 | 150 GWh |
| 2026-07-11 | 130 GWh |
| 2026-07-12 | 121 GWh |
| 2026-07-13 | 146 GWh |
| 2026-07-14 | 148 GWh |
| 2026-07-15 | 149 GWh |
| 2026-07-16 | 151 GWh |
| 2026-07-17 | 149 GWh |
| 2026-07-18 | 133 GWh |
| 2026-07-19 | 124 GWh |
| 2026-07-20 | 149 GWh |
| 2026-07-21 | 152 GWh |
| 2026-07-22 | 153 GWh |
| 2026-07-23 | 153 GWh |
| 2026-07-24 | 152 GWh |
| 2026-07-25 | 132 GWh |
| 2026-07-26 | 122 GWh |
| 2026-07-27 | 153 GWh |
| 2026-07-28 | 158 GWh |
| 2026-07-29 | 156 GWh |
| 2026-07-30 | 153 GWh |
| 2026-07-31 | 152 GWh |
| 2026-08-01 | 136 GWh |
| 2026-08-02 | 128 GWh |
| 2026-08-03 | 147 GWh |
| 2026-08-04 | 151 GWh |
| 2026-08-05 | 149 GWh |
| 2026-08-06 | 150 GWh |
| 2026-08-07 | 150 GWh |
| 2026-08-08 | 136 GWh |
| 2026-08-09 | 127 GWh |
| 2026-08-10 | 142 GWh |
| 2026-08-11 | 146 GWh |
| 2026-08-12 | 147 GWh |
| 2026-08-13 | 149 GWh |
| 2026-08-14 | 148 GWh |
| 2026-08-15 | 131 GWh |
| 2026-08-16 | 127 GWh |
| 2026-08-17 | 146 GWh |
| 2026-08-18 | 150 GWh |
| 2026-08-19 | 148 GWh |
| 2026-08-20 | 145 GWh |
| 2026-08-21 | 136 GWh |
| 2026-08-22 | 123 GWh |
| 2026-08-23 | 122 GWh |
| 2026-08-24 | 138 GWh |
| 2026-08-25 | 139 GWh |
| 2026-08-26 | 140 GWh |
| 2026-08-27 | 135 GWh |
| 2026-08-28 | 136 GWh |
| 2026-08-29 | 122 GWh |
| 2026-08-30 | 118 GWh |
| 2026-08-31 | 136 GWh |
| 2026-09-01 | 141 GWh |
| 2026-09-02 | 145 GWh |
| 2026-09-03 | 153 GWh |
| 2026-09-04 | 160 GWh |
| 2026-09-05 | 138 GWh |
| 2026-09-06 | 128 GWh |
| 2026-09-07 | 150 GWh |
| 2026-09-08 | 156 GWh |
| 2026-09-09 | 152 GWh |
| 2026-09-10 | 150 GWh |
| 2026-09-11 | 151 GWh |
| 2026-09-12 | 137 GWh |
| 2026-09-13 | 131 GWh |
| 2026-09-14 | 156 GWh |
| 2026-09-15 | 157 GWh |
| 2026-09-16 | 154 GWh |
| 2026-09-17 | 153 GWh |
| 2026-09-18 | 152 GWh |
| 2026-09-19 | 136 GWh |
| 2026-09-20 | 130 GWh |
| 2026-09-21 | 156 GWh |
| 2026-09-22 | 160 GWh |
| 2026-09-23 | 159 GWh |
| 2026-09-24 | 157 GWh |
| 2026-09-25 | 154 GWh |
| 2026-09-26 | 138 GWh |
| 2026-09-27 | 130 GWh |
| 2026-09-28 | 150 GWh |
| 2026-09-29 | 161 GWh |
| 2026-09-30 | 154 GWh |
| 2026-10-01 | 147 GWh |
| 2026-10-02 | 148 GWh |
| 2026-10-03 | 130 GWh |
| 2026-10-04 | 120 GWh |
| 2026-10-05 | 122 GWh |
| 2026-10-06 | 145 GWh |
| 2026-10-07 | 148 GWh |
| 2026-10-08 | 146 GWh |
| 2026-10-09 | 148 GWh |
| 2026-10-10 | 127 GWh |
| 2026-10-11 | 123 GWh |
| 2026-10-12 | 142 GWh |
| 2026-10-13 | 146 GWh |
| 2026-10-14 | 146 GWh |
| 2026-10-15 | 147 GWh |
| 2026-10-16 | 147 GWh |
| 2026-10-17 | 131 GWh |
| 2026-10-18 | 121 GWh |
| 2026-10-19 | 140 GWh |
| 2026-10-20 | 146 GWh |
| 2026-10-21 | 148 GWh |
| 2026-10-22 | 150 GWh |
| 2026-10-23 | 150 GWh |
| 2026-10-24 | 131 GWh |
| 2026-10-25 | 131 GWh |
| 2026-10-26 | 145 GWh |
| 2026-10-27 | 154 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Lisbon local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 44.3 TWh | 33.7 TWh | Wind 29.8% | 300 |
| 2025 | 53.0 TWh | 43.7 TWh | Wind 30.8% | 365 |
| 2024 | 51.4 TWh | 40.9 TWh | Wind 34.6% | 366 |
| 2023 | 50.7 TWh | 40.5 TWh | Wind 32.0% | 365 |
| 2022 | 50.3 TWh | 41.0 TWh | Gas 40.0% | 365 |
| 2021 | 49.5 TWh | 44.7 TWh | Gas 32.4% | 365 |
| 2020 | 48.8 TWh | 46.7 TWh | Gas 35.5% | 366 |
| 2019 | 50.3 TWh | 46.9 TWh | Gas 34.3% | 365 |
| 2018 | 50.9 TWh | 53.5 TWh | Gas 27.0% | 365 |
| 2017 | 49.6 TWh | 52.3 TWh | Gas 33.7% | 365 |
| 2016 | 49.3 TWh | 54.3 TWh | Hydro 24.4% | 366 |
| 2015 | 49.0 TWh | 46.7 TWh | Coal 29.3% | 365 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Spain | Portugal imports | 1.53 TWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Latest Grid Alerts
Newest alert 23 October 2026- Net imports Net imports into Portugal reached 67.5 GWh on 23 October 2026 (45% of demand), the 3rd highest daily net imports in 395 days of loaded history. All alerts that day
- Net imports Net imports into Portugal reached 70.9 GWh on 16 October 2026 (48% of demand), the 2nd highest daily net imports in 388 days of loaded history. All alerts that day
- Net imports Portugal imported a net 66.1 GWh on 13 October 2026, the 2nd highest daily net imports in 385 days of loaded history and 45% of its demand that day. All alerts that day
Follow this grid: RSS feed of Portugal alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Portugal, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Portugal Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/pt/
World Power Monitor. Portugal Electricity Demand and Generation Mix. Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/pt/
@misc{wpm_zones_pt_2026,
title = {{Portugal Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/pt/}
} Permalink: https://worldpowermonitor.com/zones/pt/
The Copy buttons add today's date as the access date.