Romania demand was 7,078 MW in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00). Hydro was the largest source in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00), at 28% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Romania is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00), demand in Romania was 7,078 MW, against a day-ahead forecast of 6,910 MW.
- Hydro supplied 27.7% of Romania's generation in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00).
- The day-ahead price in Romania averaged EUR 310.92/MWh for delivery on 2026-10-28 (28 October 2026).
- Installed generating capacity in Romania was 17.9 GW in 2026, as reported to ENTSO-E.
- Demand in Romania totalled 53.6 TWh in 2025.
- Hydro supplied 25.5% of Romania's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 14:00 EET (UTC+02:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 14:00 EET (UTC+02:00)| Source | Output | Share |
|---|---|---|
| Hydro | 1,407 MW | 27.7% |
| Gas | 1,370 MW | 27.0% |
| Wind | 1,207 MW | 23.8% |
| Solar | 625 MW | 12.3% |
| Coal | 397 MW | 7.8% |
| Bioenergy | 55 MW | 1.1% |
| Storage | 9 MW | 0.2% |
| Nuclear | 0 MW | 0.0% |
| Total from these sources | 5,069 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Day-Ahead Price
Delivery day 2026-10-28 (28 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Romania and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28.
Last 30 Days, Hourly
Times in UTCShow the data table (687 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-29T22:00Z | 4,981 MW |
| 2026-09-29T23:00Z | 4,945 MW |
| 2026-09-30T00:00Z | 5,037 MW |
| 2026-09-30T01:00Z | 5,118 MW |
| 2026-09-30T02:00Z | 5,303 MW |
| 2026-09-30T03:00Z | 5,726 MW |
| 2026-09-30T04:00Z | 6,227 MW |
| 2026-09-30T05:00Z | 6,235 MW |
| 2026-09-30T06:00Z | 5,696 MW |
| 2026-09-30T07:00Z | 5,083 MW |
| 2026-09-30T08:00Z | 4,656 MW |
| 2026-09-30T09:00Z | 4,067 MW |
| 2026-09-30T10:00Z | 4,017 MW |
| 2026-09-30T11:00Z | 4,405 MW |
| 2026-09-30T12:00Z | 4,470 MW |
| 2026-09-30T13:00Z | 4,902 MW |
| 2026-09-30T14:00Z | 5,623 MW |
| 2026-09-30T15:00Z | 6,354 MW |
| 2026-09-30T16:00Z | 6,910 MW |
| 2026-09-30T17:00Z | 6,999 MW |
| 2026-09-30T18:00Z | 6,623 MW |
| 2026-09-30T19:00Z | 5,970 MW |
| 2026-09-30T20:00Z | 5,545 MW |
| 2026-09-30T21:00Z | 5,171 MW |
| 2026-09-30T22:00Z | 5,087 MW |
| 2026-09-30T23:00Z | 5,079 MW |
| 2026-10-01T00:00Z | 5,195 MW |
| 2026-10-01T01:00Z | 5,069 MW |
| 2026-10-01T02:00Z | 5,162 MW |
| 2026-10-01T03:00Z | 5,679 MW |
| 2026-10-01T04:00Z | 6,179 MW |
| 2026-10-01T05:00Z | 6,043 MW |
| 2026-10-01T06:00Z | 5,400 MW |
| 2026-10-01T07:00Z | 4,798 MW |
| 2026-10-01T08:00Z | 4,336 MW |
| 2026-10-01T09:00Z | 4,092 MW |
| 2026-10-01T10:00Z | 4,122 MW |
| 2026-10-01T11:00Z | 4,042 MW |
| 2026-10-01T12:00Z | 4,232 MW |
| 2026-10-01T13:00Z | 4,712 MW |
| 2026-10-01T14:00Z | 5,453 MW |
| 2026-10-01T15:00Z | 6,202 MW |
| 2026-10-01T16:00Z | 6,749 MW |
| 2026-10-01T17:00Z | 6,844 MW |
| 2026-10-01T18:00Z | 6,526 MW |
| 2026-10-01T19:00Z | 5,928 MW |
| 2026-10-01T20:00Z | 5,579 MW |
| 2026-10-01T21:00Z | 5,342 MW |
| 2026-10-01T22:00Z | 5,133 MW |
| 2026-10-01T23:00Z | 5,162 MW |
| 2026-10-02T00:00Z | 5,142 MW |
| 2026-10-02T01:00Z | 5,142 MW |
| 2026-10-02T02:00Z | 5,179 MW |
| 2026-10-02T03:00Z | 5,692 MW |
| 2026-10-02T04:00Z | 6,346 MW |
| 2026-10-02T05:00Z | 6,331 MW |
| 2026-10-02T06:00Z | 5,752 MW |
| 2026-10-02T07:00Z | 5,140 MW |
| 2026-10-02T08:00Z | 4,615 MW |
| 2026-10-02T09:00Z | 4,176 MW |
| 2026-10-02T10:00Z | 4,328 MW |
| 2026-10-02T11:00Z | 4,307 MW |
| 2026-10-02T12:00Z | 4,489 MW |
| 2026-10-02T13:00Z | 5,028 MW |
| 2026-10-02T14:00Z | 5,765 MW |
| 2026-10-02T15:00Z | 6,405 MW |
| 2026-10-02T16:00Z | 6,895 MW |
| 2026-10-02T17:00Z | 6,900 MW |
| 2026-10-02T18:00Z | 6,562 MW |
| 2026-10-02T19:00Z | 6,021 MW |
| 2026-10-02T20:00Z | n/a |
| 2026-10-02T21:00Z | 5,268 MW |
| 2026-10-02T22:00Z | 5,054 MW |
| 2026-10-02T23:00Z | 4,952 MW |
| 2026-10-03T00:00Z | 4,867 MW |
| 2026-10-03T01:00Z | 5,038 MW |
| 2026-10-03T02:00Z | 5,180 MW |
| 2026-10-03T03:00Z | 5,099 MW |
| 2026-10-03T04:00Z | 5,248 MW |
| 2026-10-03T05:00Z | 5,222 MW |
| 2026-10-03T06:00Z | 4,731 MW |
| 2026-10-03T07:00Z | 4,100 MW |
| 2026-10-03T08:00Z | 3,617 MW |
| 2026-10-03T09:00Z | 3,449 MW |
| 2026-10-03T10:00Z | 3,497 MW |
| 2026-10-03T11:00Z | 3,590 MW |
| 2026-10-03T12:00Z | 3,840 MW |
| 2026-10-03T13:00Z | 4,332 MW |
| 2026-10-03T14:00Z | 5,046 MW |
| 2026-10-03T15:00Z | 5,791 MW |
| 2026-10-03T16:00Z | 6,340 MW |
| 2026-10-03T17:00Z | 6,328 MW |
| 2026-10-03T18:00Z | 6,028 MW |
| 2026-10-03T19:00Z | 5,579 MW |
| 2026-10-03T20:00Z | 5,174 MW |
| 2026-10-03T21:00Z | 4,865 MW |
| 2026-10-03T22:00Z | 4,679 MW |
| 2026-10-03T23:00Z | 4,554 MW |
| 2026-10-04T00:00Z | 4,600 MW |
| 2026-10-04T01:00Z | 4,554 MW |
| 2026-10-04T02:00Z | 4,647 MW |
| 2026-10-04T03:00Z | 4,640 MW |
| 2026-10-04T04:00Z | 4,690 MW |
| 2026-10-04T05:00Z | 4,435 MW |
| 2026-10-04T06:00Z | 3,909 MW |
| 2026-10-04T07:00Z | 3,284 MW |
| 2026-10-04T08:00Z | 2,867 MW |
| 2026-10-04T09:00Z | 2,807 MW |
| 2026-10-04T10:00Z | 2,893 MW |
| 2026-10-04T11:00Z | 3,042 MW |
| 2026-10-04T12:00Z | 3,199 MW |
| 2026-10-04T13:00Z | 3,684 MW |
| 2026-10-04T14:00Z | 4,478 MW |
| 2026-10-04T15:00Z | 5,192 MW |
| 2026-10-04T16:00Z | 5,820 MW |
| 2026-10-04T17:00Z | 5,900 MW |
| 2026-10-04T18:00Z | 5,643 MW |
| 2026-10-04T19:00Z | 5,251 MW |
| 2026-10-04T20:00Z | 4,860 MW |
| 2026-10-04T21:00Z | 4,625 MW |
| 2026-10-04T22:00Z | 4,513 MW |
| 2026-10-04T23:00Z | 4,499 MW |
| 2026-10-05T00:00Z | 4,585 MW |
| 2026-10-05T01:00Z | 4,635 MW |
| 2026-10-05T02:00Z | 4,768 MW |
| 2026-10-05T03:00Z | 5,319 MW |
| 2026-10-05T04:00Z | 5,948 MW |
| 2026-10-05T05:00Z | 6,115 MW |
| 2026-10-05T06:00Z | 5,677 MW |
| 2026-10-05T07:00Z | 4,989 MW |
| 2026-10-05T08:00Z | 4,442 MW |
| 2026-10-05T09:00Z | 4,283 MW |
| 2026-10-05T10:00Z | 4,251 MW |
| 2026-10-05T11:00Z | 4,464 MW |
| 2026-10-05T12:00Z | 4,759 MW |
| 2026-10-05T13:00Z | 5,147 MW |
| 2026-10-05T14:00Z | 5,830 MW |
| 2026-10-05T15:00Z | 6,447 MW |
| 2026-10-05T16:00Z | 6,930 MW |
| 2026-10-05T17:00Z | 6,965 MW |
| 2026-10-05T18:00Z | 6,603 MW |
| 2026-10-05T19:00Z | 6,030 MW |
| 2026-10-05T20:00Z | 5,658 MW |
| 2026-10-05T21:00Z | 5,304 MW |
| 2026-10-05T22:00Z | 5,037 MW |
| 2026-10-05T23:00Z | 5,094 MW |
| 2026-10-06T00:00Z | 5,198 MW |
| 2026-10-06T01:00Z | 5,179 MW |
| 2026-10-06T02:00Z | 5,154 MW |
| 2026-10-06T03:00Z | 5,703 MW |
| 2026-10-06T04:00Z | 6,305 MW |
| 2026-10-06T05:00Z | 6,377 MW |
| 2026-10-06T06:00Z | 5,904 MW |
| 2026-10-06T07:00Z | 5,172 MW |
| 2026-10-06T08:00Z | 4,533 MW |
| 2026-10-06T09:00Z | 4,338 MW |
| 2026-10-06T10:00Z | 4,467 MW |
| 2026-10-06T11:00Z | 4,470 MW |
| 2026-10-06T12:00Z | 4,652 MW |
| 2026-10-06T13:00Z | 5,128 MW |
| 2026-10-06T14:00Z | 5,798 MW |
| 2026-10-06T15:00Z | 6,371 MW |
| 2026-10-06T16:00Z | 6,927 MW |
| 2026-10-06T17:00Z | 6,908 MW |
| 2026-10-06T18:00Z | 6,536 MW |
| 2026-10-06T19:00Z | 5,952 MW |
| 2026-10-06T20:00Z | 5,475 MW |
| 2026-10-06T21:00Z | 5,156 MW |
| 2026-10-06T22:00Z | 5,086 MW |
| 2026-10-06T23:00Z | 5,123 MW |
| 2026-10-07T00:00Z | 5,152 MW |
| 2026-10-07T01:00Z | 5,160 MW |
| 2026-10-07T02:00Z | 5,148 MW |
| 2026-10-07T03:00Z | 5,758 MW |
| 2026-10-07T04:00Z | 6,324 MW |
| 2026-10-07T05:00Z | 6,422 MW |
| 2026-10-07T06:00Z | 6,029 MW |
| 2026-10-07T07:00Z | 5,200 MW |
| 2026-10-07T08:00Z | 4,607 MW |
| 2026-10-07T09:00Z | 4,461 MW |
| 2026-10-07T10:00Z | 4,672 MW |
| 2026-10-07T11:00Z | 4,645 MW |
| 2026-10-07T12:00Z | 4,803 MW |
| 2026-10-07T13:00Z | 5,308 MW |
| 2026-10-07T14:00Z | 5,965 MW |
| 2026-10-07T15:00Z | 6,458 MW |
| 2026-10-07T16:00Z | 6,978 MW |
| 2026-10-07T17:00Z | 6,983 MW |
| 2026-10-07T18:00Z | 6,569 MW |
| 2026-10-07T19:00Z | 5,991 MW |
| 2026-10-07T20:00Z | 5,521 MW |
| 2026-10-07T21:00Z | 5,192 MW |
| 2026-10-07T22:00Z | 5,132 MW |
| 2026-10-07T23:00Z | 4,996 MW |
| 2026-10-08T00:00Z | 5,097 MW |
| 2026-10-08T01:00Z | 5,020 MW |
| 2026-10-08T02:00Z | 5,226 MW |
| 2026-10-08T03:00Z | 5,669 MW |
| 2026-10-08T04:00Z | 6,308 MW |
| 2026-10-08T05:00Z | 6,408 MW |
| 2026-10-08T06:00Z | 5,872 MW |
| 2026-10-08T07:00Z | 5,180 MW |
| 2026-10-08T08:00Z | 4,549 MW |
| 2026-10-08T09:00Z | 4,419 MW |
| 2026-10-08T10:00Z | 4,564 MW |
| 2026-10-08T11:00Z | 4,474 MW |
| 2026-10-08T12:00Z | 4,663 MW |
| 2026-10-08T13:00Z | 5,197 MW |
| 2026-10-08T14:00Z | 5,904 MW |
| 2026-10-08T15:00Z | 6,459 MW |
| 2026-10-08T16:00Z | 6,962 MW |
| 2026-10-08T17:00Z | 6,935 MW |
| 2026-10-08T18:00Z | 6,569 MW |
| 2026-10-08T19:00Z | 5,936 MW |
| 2026-10-08T20:00Z | 5,504 MW |
| 2026-10-08T21:00Z | 5,218 MW |
| 2026-10-08T22:00Z | 5,074 MW |
| 2026-10-08T23:00Z | 5,176 MW |
| 2026-10-09T00:00Z | 5,104 MW |
| 2026-10-09T01:00Z | 5,110 MW |
| 2026-10-09T02:00Z | 5,174 MW |
| 2026-10-09T03:00Z | 5,793 MW |
| 2026-10-09T04:00Z | 6,256 MW |
| 2026-10-09T05:00Z | 6,421 MW |
| 2026-10-09T06:00Z | 6,122 MW |
| 2026-10-09T07:00Z | 5,566 MW |
| 2026-10-09T08:00Z | 5,171 MW |
| 2026-10-09T09:00Z | 4,981 MW |
| 2026-10-09T10:00Z | 5,166 MW |
| 2026-10-09T11:00Z | 5,192 MW |
| 2026-10-09T12:00Z | 5,388 MW |
| 2026-10-09T13:00Z | 5,601 MW |
| 2026-10-09T14:00Z | 6,189 MW |
| 2026-10-09T15:00Z | 6,534 MW |
| 2026-10-09T16:00Z | 6,896 MW |
| 2026-10-09T17:00Z | 6,848 MW |
| 2026-10-09T18:00Z | 6,481 MW |
| 2026-10-09T19:00Z | 5,908 MW |
| 2026-10-09T20:00Z | 5,556 MW |
| 2026-10-09T21:00Z | 5,222 MW |
| 2026-10-09T22:00Z | 5,019 MW |
| 2026-10-09T23:00Z | 4,952 MW |
| 2026-10-10T00:00Z | 5,023 MW |
| 2026-10-10T01:00Z | 5,048 MW |
| 2026-10-10T02:00Z | 4,949 MW |
| 2026-10-10T03:00Z | 5,033 MW |
| 2026-10-10T04:00Z | 5,265 MW |
| 2026-10-10T05:00Z | 5,359 MW |
| 2026-10-10T06:00Z | 5,117 MW |
| 2026-10-10T07:00Z | 4,696 MW |
| 2026-10-10T08:00Z | 4,305 MW |
| 2026-10-10T09:00Z | 4,103 MW |
| 2026-10-10T10:00Z | 3,992 MW |
| 2026-10-10T11:00Z | 4,186 MW |
| 2026-10-10T12:00Z | 4,352 MW |
| 2026-10-10T13:00Z | 4,835 MW |
| 2026-10-10T14:00Z | 5,488 MW |
| 2026-10-10T15:00Z | 5,925 MW |
| 2026-10-10T16:00Z | 6,351 MW |
| 2026-10-10T17:00Z | 6,313 MW |
| 2026-10-10T18:00Z | 5,995 MW |
| 2026-10-10T19:00Z | 5,475 MW |
| 2026-10-10T20:00Z | 5,218 MW |
| 2026-10-10T21:00Z | 4,921 MW |
| 2026-10-10T22:00Z | 4,735 MW |
| 2026-10-10T23:00Z | 4,522 MW |
| 2026-10-11T00:00Z | 4,465 MW |
| 2026-10-11T01:00Z | 4,540 MW |
| 2026-10-11T02:00Z | 4,666 MW |
| 2026-10-11T03:00Z | 4,686 MW |
| 2026-10-11T04:00Z | 4,750 MW |
| 2026-10-11T05:00Z | 4,772 MW |
| 2026-10-11T06:00Z | 4,520 MW |
| 2026-10-11T07:00Z | 4,202 MW |
| 2026-10-11T08:00Z | 3,994 MW |
| 2026-10-11T09:00Z | 3,803 MW |
| 2026-10-11T10:00Z | 3,843 MW |
| 2026-10-11T11:00Z | 4,318 MW |
| 2026-10-11T12:00Z | 4,506 MW |
| 2026-10-11T13:00Z | 4,874 MW |
| 2026-10-11T14:00Z | 5,441 MW |
| 2026-10-11T15:00Z | 5,780 MW |
| 2026-10-11T16:00Z | 6,083 MW |
| 2026-10-11T17:00Z | 6,022 MW |
| 2026-10-11T18:00Z | 5,737 MW |
| 2026-10-11T19:00Z | 5,254 MW |
| 2026-10-11T20:00Z | 4,901 MW |
| 2026-10-11T21:00Z | 4,666 MW |
| 2026-10-11T22:00Z | 4,508 MW |
| 2026-10-11T23:00Z | 4,626 MW |
| 2026-10-12T00:00Z | 4,735 MW |
| 2026-10-12T01:00Z | 4,758 MW |
| 2026-10-12T02:00Z | 4,802 MW |
| 2026-10-12T03:00Z | 5,325 MW |
| 2026-10-12T04:00Z | 6,098 MW |
| 2026-10-12T05:00Z | 6,549 MW |
| 2026-10-12T06:00Z | 6,750 MW |
| 2026-10-12T07:00Z | 6,619 MW |
| 2026-10-12T08:00Z | 6,376 MW |
| 2026-10-12T09:00Z | 6,290 MW |
| 2026-10-12T10:00Z | 6,575 MW |
| 2026-10-12T11:00Z | 6,574 MW |
| 2026-10-12T12:00Z | 6,372 MW |
| 2026-10-12T13:00Z | 6,284 MW |
| 2026-10-12T14:00Z | 6,496 MW |
| 2026-10-12T15:00Z | 6,795 MW |
| 2026-10-12T16:00Z | 7,145 MW |
| 2026-10-12T17:00Z | 7,037 MW |
| 2026-10-12T18:00Z | 6,668 MW |
| 2026-10-12T19:00Z | 6,016 MW |
| 2026-10-12T20:00Z | 5,573 MW |
| 2026-10-12T21:00Z | 5,193 MW |
| 2026-10-12T22:00Z | 5,036 MW |
| 2026-10-12T23:00Z | 5,085 MW |
| 2026-10-13T00:00Z | 5,162 MW |
| 2026-10-13T01:00Z | 5,190 MW |
| 2026-10-13T02:00Z | 5,119 MW |
| 2026-10-13T03:00Z | 5,729 MW |
| 2026-10-13T04:00Z | 6,435 MW |
| 2026-10-13T05:00Z | 6,768 MW |
| 2026-10-13T06:00Z | 6,691 MW |
| 2026-10-13T07:00Z | 6,494 MW |
| 2026-10-13T08:00Z | 6,135 MW |
| 2026-10-13T09:00Z | 6,101 MW |
| 2026-10-13T10:00Z | 6,189 MW |
| 2026-10-13T11:00Z | 6,189 MW |
| 2026-10-13T12:00Z | 6,145 MW |
| 2026-10-13T13:00Z | 6,248 MW |
| 2026-10-13T14:00Z | 6,487 MW |
| 2026-10-13T15:00Z | 6,854 MW |
| 2026-10-13T16:00Z | 7,219 MW |
| 2026-10-13T17:00Z | 7,213 MW |
| 2026-10-13T18:00Z | 6,807 MW |
| 2026-10-13T19:00Z | 6,180 MW |
| 2026-10-13T20:00Z | 5,716 MW |
| 2026-10-13T21:00Z | 5,326 MW |
| 2026-10-13T22:00Z | 5,150 MW |
| 2026-10-13T23:00Z | 5,105 MW |
| 2026-10-14T00:00Z | 5,256 MW |
| 2026-10-14T01:00Z | 5,346 MW |
| 2026-10-14T02:00Z | 5,239 MW |
| 2026-10-14T03:00Z | 5,791 MW |
| 2026-10-14T04:00Z | 6,455 MW |
| 2026-10-14T05:00Z | 6,706 MW |
| 2026-10-14T06:00Z | 6,435 MW |
| 2026-10-14T07:00Z | 5,849 MW |
| 2026-10-14T08:00Z | 5,231 MW |
| 2026-10-14T09:00Z | 4,952 MW |
| 2026-10-14T10:00Z | 4,904 MW |
| 2026-10-14T11:00Z | 4,748 MW |
| 2026-10-14T12:00Z | 4,674 MW |
| 2026-10-14T13:00Z | 5,046 MW |
| 2026-10-14T14:00Z | 5,842 MW |
| 2026-10-14T15:00Z | 6,547 MW |
| 2026-10-14T16:00Z | 7,044 MW |
| 2026-10-14T17:00Z | 7,050 MW |
| 2026-10-14T18:00Z | 6,735 MW |
| 2026-10-14T19:00Z | 6,175 MW |
| 2026-10-14T20:00Z | 5,708 MW |
| 2026-10-14T21:00Z | 5,376 MW |
| 2026-10-14T22:00Z | 5,225 MW |
| 2026-10-14T23:00Z | 5,209 MW |
| 2026-10-15T00:00Z | 5,330 MW |
| 2026-10-15T01:00Z | 5,237 MW |
| 2026-10-15T02:00Z | 5,320 MW |
| 2026-10-15T03:00Z | 5,912 MW |
| 2026-10-15T04:00Z | 6,645 MW |
| 2026-10-15T05:00Z | 6,886 MW |
| 2026-10-15T06:00Z | 6,743 MW |
| 2026-10-15T07:00Z | 6,478 MW |
| 2026-10-15T08:00Z | 6,167 MW |
| 2026-10-15T09:00Z | 5,971 MW |
| 2026-10-15T10:00Z | 6,117 MW |
| 2026-10-15T11:00Z | 5,914 MW |
| 2026-10-15T12:00Z | 5,902 MW |
| 2026-10-15T13:00Z | 6,128 MW |
| 2026-10-15T14:00Z | 6,549 MW |
| 2026-10-15T15:00Z | 6,954 MW |
| 2026-10-15T16:00Z | 7,360 MW |
| 2026-10-15T17:00Z | 7,235 MW |
| 2026-10-15T18:00Z | 6,878 MW |
| 2026-10-15T19:00Z | 6,240 MW |
| 2026-10-15T20:00Z | 5,812 MW |
| 2026-10-15T21:00Z | 5,442 MW |
| 2026-10-15T22:00Z | 5,308 MW |
| 2026-10-15T23:00Z | 5,258 MW |
| 2026-10-16T00:00Z | 5,306 MW |
| 2026-10-16T01:00Z | 5,338 MW |
| 2026-10-16T02:00Z | 5,419 MW |
| 2026-10-16T03:00Z | 5,931 MW |
| 2026-10-16T04:00Z | 6,662 MW |
| 2026-10-16T05:00Z | 6,942 MW |
| 2026-10-16T06:00Z | 6,672 MW |
| 2026-10-16T07:00Z | 6,216 MW |
| 2026-10-16T08:00Z | 5,710 MW |
| 2026-10-16T09:00Z | 5,513 MW |
| 2026-10-16T10:00Z | 5,400 MW |
| 2026-10-16T11:00Z | 5,514 MW |
| 2026-10-16T12:00Z | 5,727 MW |
| 2026-10-16T13:00Z | 6,108 MW |
| 2026-10-16T14:00Z | 6,445 MW |
| 2026-10-16T15:00Z | 6,927 MW |
| 2026-10-16T16:00Z | 7,265 MW |
| 2026-10-16T17:00Z | 7,217 MW |
| 2026-10-16T18:00Z | 6,825 MW |
| 2026-10-16T19:00Z | 6,246 MW |
| 2026-10-16T20:00Z | 5,808 MW |
| 2026-10-16T21:00Z | 5,537 MW |
| 2026-10-16T22:00Z | 5,342 MW |
| 2026-10-16T23:00Z | 5,236 MW |
| 2026-10-17T00:00Z | 5,266 MW |
| 2026-10-17T01:00Z | 5,337 MW |
| 2026-10-17T02:00Z | 5,289 MW |
| 2026-10-17T03:00Z | 5,320 MW |
| 2026-10-17T04:00Z | 5,520 MW |
| 2026-10-17T05:00Z | 5,728 MW |
| 2026-10-17T06:00Z | 5,979 MW |
| 2026-10-17T07:00Z | 5,821 MW |
| 2026-10-17T08:00Z | 5,639 MW |
| 2026-10-17T09:00Z | 5,509 MW |
| 2026-10-17T10:00Z | 5,737 MW |
| 2026-10-17T11:00Z | 5,853 MW |
| 2026-10-17T12:00Z | 5,902 MW |
| 2026-10-17T13:00Z | 6,034 MW |
| 2026-10-17T14:00Z | 6,340 MW |
| 2026-10-17T15:00Z | 6,661 MW |
| 2026-10-17T16:00Z | 6,862 MW |
| 2026-10-17T17:00Z | 6,724 MW |
| 2026-10-17T18:00Z | 6,391 MW |
| 2026-10-17T19:00Z | 5,877 MW |
| 2026-10-17T20:00Z | 5,532 MW |
| 2026-10-17T21:00Z | 5,237 MW |
| 2026-10-17T22:00Z | 4,936 MW |
| 2026-10-17T23:00Z | 4,808 MW |
| 2026-10-18T00:00Z | 4,762 MW |
| 2026-10-18T01:00Z | 4,630 MW |
| 2026-10-18T02:00Z | 4,678 MW |
| 2026-10-18T03:00Z | 4,810 MW |
| 2026-10-18T04:00Z | 5,068 MW |
| 2026-10-18T05:00Z | 5,188 MW |
| 2026-10-18T06:00Z | 5,092 MW |
| 2026-10-18T07:00Z | 4,914 MW |
| 2026-10-18T08:00Z | 4,687 MW |
| 2026-10-18T09:00Z | 4,454 MW |
| 2026-10-18T10:00Z | 4,436 MW |
| 2026-10-18T11:00Z | 4,652 MW |
| 2026-10-18T12:00Z | 4,798 MW |
| 2026-10-18T13:00Z | 5,145 MW |
| 2026-10-18T14:00Z | 5,438 MW |
| 2026-10-18T15:00Z | 5,913 MW |
| 2026-10-18T16:00Z | 6,257 MW |
| 2026-10-18T17:00Z | 6,212 MW |
| 2026-10-18T18:00Z | 5,949 MW |
| 2026-10-18T19:00Z | 5,497 MW |
| 2026-10-18T20:00Z | 5,208 MW |
| 2026-10-18T21:00Z | 4,856 MW |
| 2026-10-18T22:00Z | 4,634 MW |
| 2026-10-18T23:00Z | 4,641 MW |
| 2026-10-19T00:00Z | 4,799 MW |
| 2026-10-19T01:00Z | 4,765 MW |
| 2026-10-19T02:00Z | 4,914 MW |
| 2026-10-19T03:00Z | 5,587 MW |
| 2026-10-19T04:00Z | 6,398 MW |
| 2026-10-19T05:00Z | 6,900 MW |
| 2026-10-19T06:00Z | 6,755 MW |
| 2026-10-19T07:00Z | 6,614 MW |
| 2026-10-19T08:00Z | 6,041 MW |
| 2026-10-19T09:00Z | 5,782 MW |
| 2026-10-19T10:00Z | 5,876 MW |
| 2026-10-19T11:00Z | 6,035 MW |
| 2026-10-19T12:00Z | 6,057 MW |
| 2026-10-19T13:00Z | 6,217 MW |
| 2026-10-19T14:00Z | 6,639 MW |
| 2026-10-19T15:00Z | 7,108 MW |
| 2026-10-19T16:00Z | 7,346 MW |
| 2026-10-19T17:00Z | 7,264 MW |
| 2026-10-19T18:00Z | 6,885 MW |
| 2026-10-19T19:00Z | 6,264 MW |
| 2026-10-19T20:00Z | 5,934 MW |
| 2026-10-19T21:00Z | 5,427 MW |
| 2026-10-19T22:00Z | 5,364 MW |
| 2026-10-19T23:00Z | 5,285 MW |
| 2026-10-20T00:00Z | 5,232 MW |
| 2026-10-20T01:00Z | 5,253 MW |
| 2026-10-20T02:00Z | 5,358 MW |
| 2026-10-20T03:00Z | 5,899 MW |
| 2026-10-20T04:00Z | 6,638 MW |
| 2026-10-20T05:00Z | 7,005 MW |
| 2026-10-20T06:00Z | 6,783 MW |
| 2026-10-20T07:00Z | 6,254 MW |
| 2026-10-20T08:00Z | 5,591 MW |
| 2026-10-20T09:00Z | 5,132 MW |
| 2026-10-20T10:00Z | 5,110 MW |
| 2026-10-20T11:00Z | 5,193 MW |
| 2026-10-20T12:00Z | 5,252 MW |
| 2026-10-20T13:00Z | 5,641 MW |
| 2026-10-20T14:00Z | 6,246 MW |
| 2026-10-20T15:00Z | 6,772 MW |
| 2026-10-20T16:00Z | 7,234 MW |
| 2026-10-20T17:00Z | 7,111 MW |
| 2026-10-20T18:00Z | 6,752 MW |
| 2026-10-20T19:00Z | 6,158 MW |
| 2026-10-20T20:00Z | 5,822 MW |
| 2026-10-20T21:00Z | 5,424 MW |
| 2026-10-20T22:00Z | 5,234 MW |
| 2026-10-20T23:00Z | 5,217 MW |
| 2026-10-21T00:00Z | 5,172 MW |
| 2026-10-21T01:00Z | 5,207 MW |
| 2026-10-21T02:00Z | 5,331 MW |
| 2026-10-21T03:00Z | 5,875 MW |
| 2026-10-21T04:00Z | 6,640 MW |
| 2026-10-21T05:00Z | 6,926 MW |
| 2026-10-21T06:00Z | 6,691 MW |
| 2026-10-21T07:00Z | 6,262 MW |
| 2026-10-21T08:00Z | 5,862 MW |
| 2026-10-21T09:00Z | 5,505 MW |
| 2026-10-21T10:00Z | 5,326 MW |
| 2026-10-21T11:00Z | 5,154 MW |
| 2026-10-21T12:00Z | 5,089 MW |
| 2026-10-21T13:00Z | 5,549 MW |
| 2026-10-21T14:00Z | 6,265 MW |
| 2026-10-21T15:00Z | 6,854 MW |
| 2026-10-21T16:00Z | 7,222 MW |
| 2026-10-21T17:00Z | 7,101 MW |
| 2026-10-21T18:00Z | 6,714 MW |
| 2026-10-21T19:00Z | 6,202 MW |
| 2026-10-21T20:00Z | 5,657 MW |
| 2026-10-21T21:00Z | 5,305 MW |
| 2026-10-21T22:00Z | 5,137 MW |
| 2026-10-21T23:00Z | 5,061 MW |
| 2026-10-22T00:00Z | 5,272 MW |
| 2026-10-22T01:00Z | 5,378 MW |
| 2026-10-22T02:00Z | 5,437 MW |
| 2026-10-22T03:00Z | 5,811 MW |
| 2026-10-22T04:00Z | 6,559 MW |
| 2026-10-22T05:00Z | 7,040 MW |
| 2026-10-22T06:00Z | 7,201 MW |
| 2026-10-22T07:00Z | 7,163 MW |
| 2026-10-22T08:00Z | 7,155 MW |
| 2026-10-22T09:00Z | 7,115 MW |
| 2026-10-22T10:00Z | 7,102 MW |
| 2026-10-22T11:00Z | 6,645 MW |
| 2026-10-22T12:00Z | 6,497 MW |
| 2026-10-22T13:00Z | 6,742 MW |
| 2026-10-22T14:00Z | 6,801 MW |
| 2026-10-22T15:00Z | 7,165 MW |
| 2026-10-22T16:00Z | 7,427 MW |
| 2026-10-22T17:00Z | 7,285 MW |
| 2026-10-22T18:00Z | 6,906 MW |
| 2026-10-22T19:00Z | 6,290 MW |
| 2026-10-22T20:00Z | 5,819 MW |
| 2026-10-22T21:00Z | 5,454 MW |
| 2026-10-22T22:00Z | 5,415 MW |
| 2026-10-22T23:00Z | 5,180 MW |
| 2026-10-23T00:00Z | 5,239 MW |
| 2026-10-23T01:00Z | 5,346 MW |
| 2026-10-23T02:00Z | 5,497 MW |
| 2026-10-23T03:00Z | 5,902 MW |
| 2026-10-23T04:00Z | 6,687 MW |
| 2026-10-23T05:00Z | 7,134 MW |
| 2026-10-23T06:00Z | 7,174 MW |
| 2026-10-23T07:00Z | 6,933 MW |
| 2026-10-23T08:00Z | 6,569 MW |
| 2026-10-23T09:00Z | 6,271 MW |
| 2026-10-23T10:00Z | 6,475 MW |
| 2026-10-23T11:00Z | 6,200 MW |
| 2026-10-23T12:00Z | 6,029 MW |
| 2026-10-23T13:00Z | 6,274 MW |
| 2026-10-23T14:00Z | 6,635 MW |
| 2026-10-23T15:00Z | 7,011 MW |
| 2026-10-23T16:00Z | 7,259 MW |
| 2026-10-23T17:00Z | 7,130 MW |
| 2026-10-23T18:00Z | 6,901 MW |
| 2026-10-23T19:00Z | 6,221 MW |
| 2026-10-23T20:00Z | 5,803 MW |
| 2026-10-23T21:00Z | 5,514 MW |
| 2026-10-23T22:00Z | 5,343 MW |
| 2026-10-23T23:00Z | 5,209 MW |
| 2026-10-24T00:00Z | 5,161 MW |
| 2026-10-24T01:00Z | 5,171 MW |
| 2026-10-24T02:00Z | 5,202 MW |
| 2026-10-24T03:00Z | 5,302 MW |
| 2026-10-24T04:00Z | 5,611 MW |
| 2026-10-24T05:00Z | 5,821 MW |
| 2026-10-24T06:00Z | 5,712 MW |
| 2026-10-24T07:00Z | 5,353 MW |
| 2026-10-24T08:00Z | 5,001 MW |
| 2026-10-24T09:00Z | 4,654 MW |
| 2026-10-24T10:00Z | 4,505 MW |
| 2026-10-24T11:00Z | 4,497 MW |
| 2026-10-24T12:00Z | 4,589 MW |
| 2026-10-24T13:00Z | 4,947 MW |
| 2026-10-24T14:00Z | 5,770 MW |
| 2026-10-24T15:00Z | 6,425 MW |
| 2026-10-24T16:00Z | 6,740 MW |
| 2026-10-24T17:00Z | 6,651 MW |
| 2026-10-24T18:00Z | 6,350 MW |
| 2026-10-24T19:00Z | 5,884 MW |
| 2026-10-24T20:00Z | 5,440 MW |
| 2026-10-24T21:00Z | 5,135 MW |
| 2026-10-24T22:00Z | 4,963 MW |
| 2026-10-24T23:00Z | 4,841 MW |
| 2026-10-25T00:00Z | n/a |
| 2026-10-25T01:00Z | n/a |
| 2026-10-25T02:00Z | n/a |
| 2026-10-25T03:00Z | 4,785 MW |
| 2026-10-25T04:00Z | 4,934 MW |
| 2026-10-25T05:00Z | 5,004 MW |
| 2026-10-25T06:00Z | 4,913 MW |
| 2026-10-25T07:00Z | n/a |
| 2026-10-25T08:00Z | n/a |
| 2026-10-25T09:00Z | 4,152 MW |
| 2026-10-25T10:00Z | 4,042 MW |
| 2026-10-25T11:00Z | 4,110 MW |
| 2026-10-25T12:00Z | 4,299 MW |
| 2026-10-25T13:00Z | 4,647 MW |
| 2026-10-25T14:00Z | 5,262 MW |
| 2026-10-25T15:00Z | 5,894 MW |
| 2026-10-25T16:00Z | 6,192 MW |
| 2026-10-25T17:00Z | 6,187 MW |
| 2026-10-25T18:00Z | 6,042 MW |
| 2026-10-25T19:00Z | 5,771 MW |
| 2026-10-25T20:00Z | 5,354 MW |
| 2026-10-25T21:00Z | 5,074 MW |
| 2026-10-25T22:00Z | 4,856 MW |
| 2026-10-25T23:00Z | 4,911 MW |
| 2026-10-26T00:00Z | 4,815 MW |
| 2026-10-26T01:00Z | 4,729 MW |
| 2026-10-26T02:00Z | 4,765 MW |
| 2026-10-26T03:00Z | 4,979 MW |
| 2026-10-26T04:00Z | 5,544 MW |
| 2026-10-26T05:00Z | 6,100 MW |
| 2026-10-26T06:00Z | 6,395 MW |
| 2026-10-26T07:00Z | 6,347 MW |
| 2026-10-26T08:00Z | 6,188 MW |
| 2026-10-26T09:00Z | 6,368 MW |
| 2026-10-26T10:00Z | 6,467 MW |
| 2026-10-26T11:00Z | 6,532 MW |
| 2026-10-26T12:00Z | 6,698 MW |
| 2026-10-26T13:00Z | 6,698 MW |
| 2026-10-26T14:00Z | 6,812 MW |
| 2026-10-26T15:00Z | 7,182 MW |
| 2026-10-26T16:00Z | 7,269 MW |
| 2026-10-26T17:00Z | 7,197 MW |
| 2026-10-26T18:00Z | 6,969 MW |
| 2026-10-26T19:00Z | 6,603 MW |
| 2026-10-26T20:00Z | 6,088 MW |
| 2026-10-26T21:00Z | 5,731 MW |
| 2026-10-26T22:00Z | 5,462 MW |
| 2026-10-26T23:00Z | 5,482 MW |
| 2026-10-27T00:00Z | 5,229 MW |
| 2026-10-27T01:00Z | 5,162 MW |
| 2026-10-27T02:00Z | 5,324 MW |
| 2026-10-27T03:00Z | 5,463 MW |
| 2026-10-27T04:00Z | 5,798 MW |
| 2026-10-27T05:00Z | 6,413 MW |
| 2026-10-27T06:00Z | 6,814 MW |
| 2026-10-27T07:00Z | 6,967 MW |
| 2026-10-27T08:00Z | 6,788 MW |
| 2026-10-27T09:00Z | 6,743 MW |
| 2026-10-27T10:00Z | 6,832 MW |
| 2026-10-27T11:00Z | 6,775 MW |
| 2026-10-27T12:00Z | 6,847 MW |
| 2026-10-27T13:00Z | 6,974 MW |
| 2026-10-27T14:00Z | 7,145 MW |
| 2026-10-27T15:00Z | 7,327 MW |
| 2026-10-27T16:00Z | 7,492 MW |
| 2026-10-27T17:00Z | 7,432 MW |
| 2026-10-27T18:00Z | 7,200 MW |
| 2026-10-27T19:00Z | 6,834 MW |
| 2026-10-27T20:00Z | 6,330 MW |
| 2026-10-27T21:00Z | 6,027 MW |
| 2026-10-27T22:00Z | 5,591 MW |
| 2026-10-27T23:00Z | 5,493 MW |
| 2026-10-28T00:00Z | 5,455 MW |
| 2026-10-28T01:00Z | 5,341 MW |
| 2026-10-28T02:00Z | 5,253 MW |
| 2026-10-28T03:00Z | 5,461 MW |
| 2026-10-28T04:00Z | 5,927 MW |
| 2026-10-28T05:00Z | 6,616 MW |
| 2026-10-28T06:00Z | 7,181 MW |
| 2026-10-28T07:00Z | 7,382 MW |
| 2026-10-28T08:00Z | 7,280 MW |
| 2026-10-28T09:00Z | 7,336 MW |
| 2026-10-28T10:00Z | 7,276 MW |
| 2026-10-28T11:00Z | 7,207 MW |
| 2026-10-28T12:00Z | 7,078 MW |
Show the data table (687 rows)
| Hour starting (UTC) | Gas | Wind | Hydro | Coal | Solar |
|---|---|---|---|---|---|
| 2026-09-29T22:00Z | 1,217 MW | 2,320 MW | 269 MW | 771 MW | 0 MW |
| 2026-09-29T23:00Z | 1,228 MW | 2,163 MW | 266 MW | 788 MW | 0 MW |
| 2026-09-30T00:00Z | 1,251 MW | 2,071 MW | 258 MW | 794 MW | 0 MW |
| 2026-09-30T01:00Z | 1,220 MW | 1,947 MW | 262 MW | 806 MW | 0 MW |
| 2026-09-30T02:00Z | 1,225 MW | 1,871 MW | 280 MW | 825 MW | 0 MW |
| 2026-09-30T03:00Z | 1,223 MW | 1,840 MW | 398 MW | 814 MW | 0 MW |
| 2026-09-30T04:00Z | 1,243 MW | 1,753 MW | 795 MW | 831 MW | 56 MW |
| 2026-09-30T05:00Z | 1,291 MW | 1,392 MW | 862 MW | 836 MW | 639 MW |
| 2026-09-30T06:00Z | 1,260 MW | 992 MW | 812 MW | 813 MW | 1,564 MW |
| 2026-09-30T07:00Z | 1,079 MW | 1,176 MW | 687 MW | 768 MW | 2,365 MW |
| 2026-09-30T08:00Z | 834 MW | 1,739 MW | 268 MW | 747 MW | 2,640 MW |
| 2026-09-30T09:00Z | 816 MW | 1,776 MW | 222 MW | 710 MW | 2,822 MW |
| 2026-09-30T10:00Z | 803 MW | 1,701 MW | 221 MW | 668 MW | 2,985 MW |
| 2026-09-30T11:00Z | 802 MW | 1,705 MW | 221 MW | 655 MW | 2,841 MW |
| 2026-09-30T12:00Z | 803 MW | 1,621 MW | 247 MW | 694 MW | 2,588 MW |
| 2026-09-30T13:00Z | 856 MW | 1,567 MW | 216 MW | 701 MW | 2,140 MW |
| 2026-09-30T14:00Z | 1,158 MW | 1,379 MW | 279 MW | 741 MW | 1,217 MW |
| 2026-09-30T15:00Z | 1,301 MW | 890 MW | 700 MW | 826 MW | 270 MW |
| 2026-09-30T16:00Z | 1,396 MW | 757 MW | 1,891 MW | 807 MW | 2 MW |
| 2026-09-30T17:00Z | 1,420 MW | 743 MW | 1,907 MW | 791 MW | 0 MW |
| 2026-09-30T18:00Z | 1,414 MW | 734 MW | 1,782 MW | 797 MW | 0 MW |
| 2026-09-30T19:00Z | 1,374 MW | 911 MW | 922 MW | 789 MW | 0 MW |
| 2026-09-30T20:00Z | 1,335 MW | 1,180 MW | 651 MW | 792 MW | 0 MW |
| 2026-09-30T21:00Z | 1,308 MW | 1,559 MW | 539 MW | 795 MW | 0 MW |
| 2026-09-30T22:00Z | 1,145 MW | 1,882 MW | 283 MW | 717 MW | 0 MW |
| 2026-09-30T23:00Z | 1,147 MW | 1,921 MW | 275 MW | 708 MW | 0 MW |
| 2026-10-01T00:00Z | 1,152 MW | 1,803 MW | 275 MW | 730 MW | 0 MW |
| 2026-10-01T01:00Z | 1,144 MW | 1,638 MW | 283 MW | 797 MW | 0 MW |
| 2026-10-01T02:00Z | 1,142 MW | 1,635 MW | 312 MW | 785 MW | 0 MW |
| 2026-10-01T03:00Z | 1,157 MW | 1,636 MW | 405 MW | 787 MW | 0 MW |
| 2026-10-01T04:00Z | 1,167 MW | 1,582 MW | 1,242 MW | 805 MW | 60 MW |
| 2026-10-01T05:00Z | 1,147 MW | 1,333 MW | 1,365 MW | 797 MW | 771 MW |
| 2026-10-01T06:00Z | 1,126 MW | 950 MW | 864 MW | 807 MW | 1,818 MW |
| 2026-10-01T07:00Z | 1,038 MW | 1,160 MW | 257 MW | 720 MW | 2,572 MW |
| 2026-10-01T08:00Z | 754 MW | 1,616 MW | 210 MW | 681 MW | 2,817 MW |
| 2026-10-01T09:00Z | 738 MW | 1,837 MW | 202 MW | 674 MW | 2,933 MW |
| 2026-10-01T10:00Z | 738 MW | 1,715 MW | 206 MW | 672 MW | 2,974 MW |
| 2026-10-01T11:00Z | 739 MW | 1,693 MW | 215 MW | 704 MW | 2,848 MW |
| 2026-10-01T12:00Z | 744 MW | 1,748 MW | 212 MW | 703 MW | 2,593 MW |
| 2026-10-01T13:00Z | 756 MW | 1,773 MW | 208 MW | 690 MW | 2,018 MW |
| 2026-10-01T14:00Z | 1,003 MW | 1,637 MW | 292 MW | 710 MW | 1,096 MW |
| 2026-10-01T15:00Z | 1,147 MW | 1,351 MW | 1,381 MW | 781 MW | 216 MW |
| 2026-10-01T16:00Z | 1,258 MW | 1,177 MW | 1,595 MW | 847 MW | 0 MW |
| 2026-10-01T17:00Z | 1,289 MW | 1,083 MW | 1,597 MW | 835 MW | 0 MW |
| 2026-10-01T18:00Z | 1,290 MW | 1,067 MW | 1,616 MW | 832 MW | 0 MW |
| 2026-10-01T19:00Z | 1,248 MW | 1,225 MW | 1,045 MW | 816 MW | 0 MW |
| 2026-10-01T20:00Z | 1,207 MW | 1,655 MW | 778 MW | 811 MW | 0 MW |
| 2026-10-01T21:00Z | 1,145 MW | 2,201 MW | 362 MW | 760 MW | 0 MW |
| 2026-10-01T22:00Z | 1,093 MW | 2,296 MW | 200 MW | 715 MW | 0 MW |
| 2026-10-01T23:00Z | 1,059 MW | 2,257 MW | 200 MW | 712 MW | 0 MW |
| 2026-10-02T00:00Z | 1,057 MW | 2,169 MW | 221 MW | 713 MW | 0 MW |
| 2026-10-02T01:00Z | 1,092 MW | 2,126 MW | 261 MW | 716 MW | 0 MW |
| 2026-10-02T02:00Z | 1,100 MW | 2,156 MW | 262 MW | 711 MW | 0 MW |
| 2026-10-02T03:00Z | 1,140 MW | 2,145 MW | 309 MW | 743 MW | 0 MW |
| 2026-10-02T04:00Z | 1,179 MW | 2,095 MW | 870 MW | 785 MW | 62 MW |
| 2026-10-02T05:00Z | 1,161 MW | 1,857 MW | 1,139 MW | 778 MW | 758 MW |
| 2026-10-02T06:00Z | 1,166 MW | 1,425 MW | 859 MW | 792 MW | 1,815 MW |
| 2026-10-02T07:00Z | 1,079 MW | 1,447 MW | 337 MW | 763 MW | 2,493 MW |
| 2026-10-02T08:00Z | 774 MW | 1,920 MW | 244 MW | 683 MW | 2,742 MW |
| 2026-10-02T09:00Z | 735 MW | 2,373 MW | 229 MW | 680 MW | 2,856 MW |
| 2026-10-02T10:00Z | 734 MW | 2,383 MW | 252 MW | 677 MW | 2,886 MW |
| 2026-10-02T11:00Z | 733 MW | 2,157 MW | 276 MW | 679 MW | 2,775 MW |
| 2026-10-02T12:00Z | 717 MW | 1,986 MW | 295 MW | 728 MW | 2,563 MW |
| 2026-10-02T13:00Z | 957 MW | 1,756 MW | 247 MW | 745 MW | 1,917 MW |
| 2026-10-02T14:00Z | 1,005 MW | 1,451 MW | 248 MW | 741 MW | 976 MW |
| 2026-10-02T15:00Z | 1,114 MW | 1,119 MW | 1,446 MW | 824 MW | 192 MW |
| 2026-10-02T16:00Z | 1,174 MW | 1,139 MW | 1,558 MW | 807 MW | 0 MW |
| 2026-10-02T17:00Z | 1,187 MW | 1,165 MW | 1,474 MW | 806 MW | 0 MW |
| 2026-10-02T18:00Z | 1,194 MW | 1,040 MW | 1,466 MW | 814 MW | 0 MW |
| 2026-10-02T19:00Z | 1,191 MW | 894 MW | 1,441 MW | 808 MW | 0 MW |
| 2026-10-02T20:00Z | n/a | 857 MW | n/a | n/a | 0 MW |
| 2026-10-02T21:00Z | 1,201 MW | 945 MW | 580 MW | 760 MW | 0 MW |
| 2026-10-02T22:00Z | 1,199 MW | 1,015 MW | 258 MW | 538 MW | 0 MW |
| 2026-10-02T23:00Z | 1,199 MW | 1,001 MW | 249 MW | 531 MW | 0 MW |
| 2026-10-03T00:00Z | 1,178 MW | 889 MW | 280 MW | 535 MW | 0 MW |
| 2026-10-03T01:00Z | 1,190 MW | 731 MW | 244 MW | 544 MW | 0 MW |
| 2026-10-03T02:00Z | 1,167 MW | 657 MW | 315 MW | 533 MW | 0 MW |
| 2026-10-03T03:00Z | 1,167 MW | 558 MW | 389 MW | 532 MW | 0 MW |
| 2026-10-03T04:00Z | 1,171 MW | 488 MW | 612 MW | 547 MW | 42 MW |
| 2026-10-03T05:00Z | 1,149 MW | 425 MW | 630 MW | 513 MW | 597 MW |
| 2026-10-03T06:00Z | 1,112 MW | 220 MW | 538 MW | 515 MW | 1,475 MW |
| 2026-10-03T07:00Z | 869 MW | 163 MW | 338 MW | 509 MW | 2,133 MW |
| 2026-10-03T08:00Z | 746 MW | 161 MW | 254 MW | 496 MW | 2,436 MW |
| 2026-10-03T09:00Z | 733 MW | 127 MW | 245 MW | 484 MW | 2,507 MW |
| 2026-10-03T10:00Z | 725 MW | 84 MW | 238 MW | 482 MW | 2,565 MW |
| 2026-10-03T11:00Z | 724 MW | 41 MW | 252 MW | 495 MW | 2,509 MW |
| 2026-10-03T12:00Z | 738 MW | 29 MW | 260 MW | 494 MW | 2,291 MW |
| 2026-10-03T13:00Z | 761 MW | 16 MW | 351 MW | 503 MW | 1,775 MW |
| 2026-10-03T14:00Z | 1,049 MW | 19 MW | 311 MW | 502 MW | 916 MW |
| 2026-10-03T15:00Z | 1,136 MW | 34 MW | 804 MW | 528 MW | 183 MW |
| 2026-10-03T16:00Z | 1,181 MW | 17 MW | 905 MW | 526 MW | 1 MW |
| 2026-10-03T17:00Z | 1,196 MW | 5 MW | 840 MW | 522 MW | 0 MW |
| 2026-10-03T18:00Z | 1,204 MW | 30 MW | 1,158 MW | 524 MW | 0 MW |
| 2026-10-03T19:00Z | 1,209 MW | 42 MW | 816 MW | 524 MW | 0 MW |
| 2026-10-03T20:00Z | 1,194 MW | 73 MW | 536 MW | 525 MW | 0 MW |
| 2026-10-03T21:00Z | 1,196 MW | 108 MW | 341 MW | 524 MW | 0 MW |
| 2026-10-03T22:00Z | 1,191 MW | 110 MW | 241 MW | 524 MW | 0 MW |
| 2026-10-03T23:00Z | 1,182 MW | 115 MW | 239 MW | 526 MW | 0 MW |
| 2026-10-04T00:00Z | 1,180 MW | 101 MW | 238 MW | 526 MW | 0 MW |
| 2026-10-04T01:00Z | 1,136 MW | 92 MW | 238 MW | 525 MW | 0 MW |
| 2026-10-04T02:00Z | 1,133 MW | 88 MW | 243 MW | 526 MW | 0 MW |
| 2026-10-04T03:00Z | 1,145 MW | 43 MW | 287 MW | 526 MW | 0 MW |
| 2026-10-04T04:00Z | 1,150 MW | 29 MW | 582 MW | 527 MW | 35 MW |
| 2026-10-04T05:00Z | 1,132 MW | 27 MW | 579 MW | 507 MW | 576 MW |
| 2026-10-04T06:00Z | 1,097 MW | 4 MW | 492 MW | 496 MW | 1,446 MW |
| 2026-10-04T07:00Z | 787 MW | 0 MW | 297 MW | 506 MW | 2,073 MW |
| 2026-10-04T08:00Z | 750 MW | 0 MW | 235 MW | 504 MW | 2,385 MW |
| 2026-10-04T09:00Z | 741 MW | 0 MW | 218 MW | 491 MW | 2,447 MW |
| 2026-10-04T10:00Z | 738 MW | 0 MW | 219 MW | 489 MW | 2,486 MW |
| 2026-10-04T11:00Z | 725 MW | 0 MW | 236 MW | 482 MW | 2,361 MW |
| 2026-10-04T12:00Z | 741 MW | 0 MW | 232 MW | 479 MW | 2,182 MW |
| 2026-10-04T13:00Z | 752 MW | 0 MW | 314 MW | 490 MW | 1,702 MW |
| 2026-10-04T14:00Z | 1,055 MW | 0 MW | 264 MW | 512 MW | 890 MW |
| 2026-10-04T15:00Z | 1,141 MW | 21 MW | 798 MW | 527 MW | 138 MW |
| 2026-10-04T16:00Z | 1,188 MW | 95 MW | 1,130 MW | 523 MW | 0 MW |
| 2026-10-04T17:00Z | 1,192 MW | 194 MW | 1,303 MW | 520 MW | 0 MW |
| 2026-10-04T18:00Z | 1,198 MW | 266 MW | 816 MW | 521 MW | 0 MW |
| 2026-10-04T19:00Z | 1,205 MW | 299 MW | 647 MW | 520 MW | 0 MW |
| 2026-10-04T20:00Z | 1,199 MW | 354 MW | 426 MW | 520 MW | 0 MW |
| 2026-10-04T21:00Z | 1,169 MW | 407 MW | 320 MW | 487 MW | 0 MW |
| 2026-10-04T22:00Z | 1,172 MW | 369 MW | 249 MW | 479 MW | 0 MW |
| 2026-10-04T23:00Z | 1,188 MW | 292 MW | 247 MW | 524 MW | 0 MW |
| 2026-10-05T00:00Z | 1,158 MW | 172 MW | 276 MW | 524 MW | 0 MW |
| 2026-10-05T01:00Z | 1,154 MW | 93 MW | 253 MW | 529 MW | 0 MW |
| 2026-10-05T02:00Z | 1,163 MW | 61 MW | 403 MW | 529 MW | 0 MW |
| 2026-10-05T03:00Z | 1,173 MW | 40 MW | 1,219 MW | 525 MW | 0 MW |
| 2026-10-05T04:00Z | 1,215 MW | 26 MW | 1,399 MW | 518 MW | 43 MW |
| 2026-10-05T05:00Z | 1,175 MW | 29 MW | 1,420 MW | 516 MW | 705 MW |
| 2026-10-05T06:00Z | 1,113 MW | 28 MW | 1,181 MW | 502 MW | 1,773 MW |
| 2026-10-05T07:00Z | 1,090 MW | 0 MW | 302 MW | 493 MW | 2,522 MW |
| 2026-10-05T08:00Z | 1,071 MW | 0 MW | 297 MW | 320 MW | 2,890 MW |
| 2026-10-05T09:00Z | 988 MW | 0 MW | 295 MW | 319 MW | 3,006 MW |
| 2026-10-05T10:00Z | 913 MW | 0 MW | 295 MW | 314 MW | 3,019 MW |
| 2026-10-05T11:00Z | 928 MW | 11 MW | 292 MW | 363 MW | 2,917 MW |
| 2026-10-05T12:00Z | 917 MW | 46 MW | 295 MW | 402 MW | 2,611 MW |
| 2026-10-05T13:00Z | 1,055 MW | 80 MW | 303 MW | 442 MW | 1,948 MW |
| 2026-10-05T14:00Z | 1,126 MW | 83 MW | 665 MW | 532 MW | 1,015 MW |
| 2026-10-05T15:00Z | 1,231 MW | 82 MW | 1,531 MW | 595 MW | 158 MW |
| 2026-10-05T16:00Z | 1,295 MW | 141 MW | 1,580 MW | 624 MW | 1 MW |
| 2026-10-05T17:00Z | 1,331 MW | 151 MW | 1,670 MW | 639 MW | 0 MW |
| 2026-10-05T18:00Z | 1,353 MW | 194 MW | 1,708 MW | 626 MW | 0 MW |
| 2026-10-05T19:00Z | 1,348 MW | 202 MW | 1,519 MW | 624 MW | 0 MW |
| 2026-10-05T20:00Z | 1,309 MW | 247 MW | 1,344 MW | 624 MW | 0 MW |
| 2026-10-05T21:00Z | 1,274 MW | 279 MW | 1,005 MW | 604 MW | 0 MW |
| 2026-10-05T22:00Z | 1,249 MW | 283 MW | 278 MW | 598 MW | 0 MW |
| 2026-10-05T23:00Z | 1,245 MW | 308 MW | 269 MW | 598 MW | 0 MW |
| 2026-10-06T00:00Z | 1,248 MW | 296 MW | 267 MW | 609 MW | 0 MW |
| 2026-10-06T01:00Z | 1,216 MW | 307 MW | 271 MW | 602 MW | 0 MW |
| 2026-10-06T02:00Z | 1,213 MW | 254 MW | 276 MW | 612 MW | 0 MW |
| 2026-10-06T03:00Z | 1,233 MW | 167 MW | 744 MW | 622 MW | 0 MW |
| 2026-10-06T04:00Z | 1,266 MW | 142 MW | 1,462 MW | 628 MW | 28 MW |
| 2026-10-06T05:00Z | 1,238 MW | 142 MW | 1,480 MW | 608 MW | 585 MW |
| 2026-10-06T06:00Z | 1,194 MW | 90 MW | 1,388 MW | 592 MW | 1,593 MW |
| 2026-10-06T07:00Z | 1,169 MW | 33 MW | 318 MW | 599 MW | 2,324 MW |
| 2026-10-06T08:00Z | 1,125 MW | 2 MW | 292 MW | 574 MW | 2,717 MW |
| 2026-10-06T09:00Z | 1,111 MW | 0 MW | 287 MW | 568 MW | 2,932 MW |
| 2026-10-06T10:00Z | 1,099 MW | 0 MW | 288 MW | 565 MW | 2,902 MW |
| 2026-10-06T11:00Z | 1,100 MW | 6 MW | 290 MW | 573 MW | 2,800 MW |
| 2026-10-06T12:00Z | 1,105 MW | 13 MW | 292 MW | 573 MW | 2,578 MW |
| 2026-10-06T13:00Z | 1,063 MW | 37 MW | 293 MW | 525 MW | 1,883 MW |
| 2026-10-06T14:00Z | 1,072 MW | 52 MW | 434 MW | 533 MW | 976 MW |
| 2026-10-06T15:00Z | 1,231 MW | 74 MW | 1,489 MW | 610 MW | 141 MW |
| 2026-10-06T16:00Z | 1,317 MW | 85 MW | 1,597 MW | 626 MW | 0 MW |
| 2026-10-06T17:00Z | 1,354 MW | 104 MW | 1,681 MW | 607 MW | 0 MW |
| 2026-10-06T18:00Z | 1,347 MW | 144 MW | 1,579 MW | 596 MW | 0 MW |
| 2026-10-06T19:00Z | 1,336 MW | 159 MW | 1,477 MW | 601 MW | 0 MW |
| 2026-10-06T20:00Z | 1,299 MW | 190 MW | 1,327 MW | 612 MW | 0 MW |
| 2026-10-06T21:00Z | 1,281 MW | 210 MW | 559 MW | 609 MW | 0 MW |
| 2026-10-06T22:00Z | 1,265 MW | 169 MW | 544 MW | 625 MW | 0 MW |
| 2026-10-06T23:00Z | 1,260 MW | 108 MW | 562 MW | 603 MW | 0 MW |
| 2026-10-07T00:00Z | 1,258 MW | 78 MW | 530 MW | 612 MW | 0 MW |
| 2026-10-07T01:00Z | 1,218 MW | 46 MW | 515 MW | 612 MW | 0 MW |
| 2026-10-07T02:00Z | 1,219 MW | 16 MW | 532 MW | 622 MW | 0 MW |
| 2026-10-07T03:00Z | 1,230 MW | 2 MW | 1,091 MW | 612 MW | 0 MW |
| 2026-10-07T04:00Z | 1,244 MW | 0 MW | 1,464 MW | 619 MW | 35 MW |
| 2026-10-07T05:00Z | 1,249 MW | 1 MW | 1,497 MW | 605 MW | 617 MW |
| 2026-10-07T06:00Z | 1,186 MW | 1 MW | 1,401 MW | 580 MW | 1,589 MW |
| 2026-10-07T07:00Z | 1,149 MW | 5 MW | 793 MW | 595 MW | 2,308 MW |
| 2026-10-07T08:00Z | 1,114 MW | 28 MW | 288 MW | 580 MW | 2,662 MW |
| 2026-10-07T09:00Z | 1,117 MW | 57 MW | 285 MW | 571 MW | 2,781 MW |
| 2026-10-07T10:00Z | 1,121 MW | 73 MW | 284 MW | 565 MW | 2,750 MW |
| 2026-10-07T11:00Z | 1,118 MW | 115 MW | 290 MW | 574 MW | 2,633 MW |
| 2026-10-07T12:00Z | 1,126 MW | 310 MW | 297 MW | 580 MW | 2,301 MW |
| 2026-10-07T13:00Z | 1,116 MW | 557 MW | 292 MW | 578 MW | 1,624 MW |
| 2026-10-07T14:00Z | 1,163 MW | 706 MW | 475 MW | 613 MW | 731 MW |
| 2026-10-07T15:00Z | 1,265 MW | 785 MW | 1,545 MW | 621 MW | 113 MW |
| 2026-10-07T16:00Z | 1,291 MW | 1,022 MW | 1,601 MW | 597 MW | 0 MW |
| 2026-10-07T17:00Z | 1,299 MW | 1,150 MW | 1,546 MW | 599 MW | 0 MW |
| 2026-10-07T18:00Z | 1,328 MW | 1,202 MW | 1,513 MW | 614 MW | 0 MW |
| 2026-10-07T19:00Z | 1,300 MW | 1,280 MW | 1,432 MW | 603 MW | 0 MW |
| 2026-10-07T20:00Z | 1,275 MW | 1,260 MW | 1,287 MW | 601 MW | 0 MW |
| 2026-10-07T21:00Z | 1,250 MW | 1,230 MW | 722 MW | 612 MW | 0 MW |
| 2026-10-07T22:00Z | 1,196 MW | 1,139 MW | 560 MW | 603 MW | 0 MW |
| 2026-10-07T23:00Z | 1,186 MW | 1,056 MW | 1,119 MW | 606 MW | 0 MW |
| 2026-10-08T00:00Z | 1,202 MW | 916 MW | 1,123 MW | 634 MW | 0 MW |
| 2026-10-08T01:00Z | 1,201 MW | 825 MW | 1,125 MW | 635 MW | 0 MW |
| 2026-10-08T02:00Z | 1,198 MW | 812 MW | 1,159 MW | 620 MW | 0 MW |
| 2026-10-08T03:00Z | 1,206 MW | 750 MW | 1,259 MW | 619 MW | 0 MW |
| 2026-10-08T04:00Z | 1,250 MW | 819 MW | 1,424 MW | 603 MW | 26 MW |
| 2026-10-08T05:00Z | 1,259 MW | 863 MW | 1,448 MW | 615 MW | 479 MW |
| 2026-10-08T06:00Z | 1,215 MW | 695 MW | 1,515 MW | 613 MW | 1,364 MW |
| 2026-10-08T07:00Z | 1,169 MW | 703 MW | 407 MW | 604 MW | 2,196 MW |
| 2026-10-08T08:00Z | 1,125 MW | 796 MW | 266 MW | 580 MW | 2,608 MW |
| 2026-10-08T09:00Z | 1,109 MW | 968 MW | 260 MW | 575 MW | 2,758 MW |
| 2026-10-08T10:00Z | 1,098 MW | 1,105 MW | 254 MW | 573 MW | 2,782 MW |
| 2026-10-08T11:00Z | 1,094 MW | 1,136 MW | 258 MW | 575 MW | 2,766 MW |
| 2026-10-08T12:00Z | 1,096 MW | 1,295 MW | 258 MW | 572 MW | 2,383 MW |
| 2026-10-08T13:00Z | 1,104 MW | 1,585 MW | 316 MW | 567 MW | 1,694 MW |
| 2026-10-08T14:00Z | 1,167 MW | 1,712 MW | 1,043 MW | 616 MW | 801 MW |
| 2026-10-08T15:00Z | 1,239 MW | 1,691 MW | 1,588 MW | 614 MW | 98 MW |
| 2026-10-08T16:00Z | 1,239 MW | 1,898 MW | 1,667 MW | 590 MW | 0 MW |
| 2026-10-08T17:00Z | 1,201 MW | 2,062 MW | 1,526 MW | 587 MW | 0 MW |
| 2026-10-08T18:00Z | 1,225 MW | 1,958 MW | 1,500 MW | 608 MW | 0 MW |
| 2026-10-08T19:00Z | 1,243 MW | 1,896 MW | 1,414 MW | 593 MW | 0 MW |
| 2026-10-08T20:00Z | 1,268 MW | 1,836 MW | 1,277 MW | 617 MW | 0 MW |
| 2026-10-08T21:00Z | 1,262 MW | 1,813 MW | 1,205 MW | 606 MW | 0 MW |
| 2026-10-08T22:00Z | 1,244 MW | 1,645 MW | 1,155 MW | 599 MW | 0 MW |
| 2026-10-08T23:00Z | 1,230 MW | 1,448 MW | 985 MW | 617 MW | 0 MW |
| 2026-10-09T00:00Z | 1,252 MW | 1,221 MW | 876 MW | 623 MW | 0 MW |
| 2026-10-09T01:00Z | 1,291 MW | 970 MW | 794 MW | 621 MW | 0 MW |
| 2026-10-09T02:00Z | 1,094 MW | 864 MW | 1,161 MW | 601 MW | 0 MW |
| 2026-10-09T03:00Z | 884 MW | 734 MW | 1,441 MW | 616 MW | 0 MW |
| 2026-10-09T04:00Z | 923 MW | 712 MW | 1,496 MW | 601 MW | 24 MW |
| 2026-10-09T05:00Z | 863 MW | 664 MW | 1,454 MW | 600 MW | 422 MW |
| 2026-10-09T06:00Z | 815 MW | 398 MW | 1,396 MW | 613 MW | 1,201 MW |
| 2026-10-09T07:00Z | 787 MW | 256 MW | 517 MW | 609 MW | 1,788 MW |
| 2026-10-09T08:00Z | 760 MW | 272 MW | 293 MW | 586 MW | 2,075 MW |
| 2026-10-09T09:00Z | 749 MW | 289 MW | 288 MW | 603 MW | 2,271 MW |
| 2026-10-09T10:00Z | 761 MW | 341 MW | 282 MW | 653 MW | 2,299 MW |
| 2026-10-09T11:00Z | 835 MW | 474 MW | 281 MW | 681 MW | 2,209 MW |
| 2026-10-09T12:00Z | 856 MW | 468 MW | 287 MW | 726 MW | 1,841 MW |
| 2026-10-09T13:00Z | 1,100 MW | 410 MW | 396 MW | 770 MW | 1,256 MW |
| 2026-10-09T14:00Z | 1,180 MW | 368 MW | 1,589 MW | 777 MW | 569 MW |
| 2026-10-09T15:00Z | 1,213 MW | 387 MW | 1,588 MW | 794 MW | 68 MW |
| 2026-10-09T16:00Z | 1,280 MW | 422 MW | 1,593 MW | 816 MW | 0 MW |
| 2026-10-09T17:00Z | 1,318 MW | 384 MW | 1,595 MW | 804 MW | 0 MW |
| 2026-10-09T18:00Z | 1,317 MW | 393 MW | 1,557 MW | 812 MW | 0 MW |
| 2026-10-09T19:00Z | 1,334 MW | 518 MW | 1,478 MW | 826 MW | 0 MW |
| 2026-10-09T20:00Z | 1,316 MW | 660 MW | 1,342 MW | 825 MW | 0 MW |
| 2026-10-09T21:00Z | 1,321 MW | 526 MW | 1,324 MW | 746 MW | 0 MW |
| 2026-10-09T22:00Z | 1,100 MW | 511 MW | 1,252 MW | 676 MW | 0 MW |
| 2026-10-09T23:00Z | 886 MW | 598 MW | 1,162 MW | 664 MW | 0 MW |
| 2026-10-10T00:00Z | 812 MW | 701 MW | 1,150 MW | 663 MW | 0 MW |
| 2026-10-10T01:00Z | 800 MW | 590 MW | 1,149 MW | 675 MW | 0 MW |
| 2026-10-10T02:00Z | 834 MW | 474 MW | 1,190 MW | 689 MW | 0 MW |
| 2026-10-10T03:00Z | 830 MW | 484 MW | 1,247 MW | 662 MW | 0 MW |
| 2026-10-10T04:00Z | 850 MW | 571 MW | 1,207 MW | 664 MW | 13 MW |
| 2026-10-10T05:00Z | 822 MW | 512 MW | 1,155 MW | 653 MW | 373 MW |
| 2026-10-10T06:00Z | 815 MW | 278 MW | 731 MW | 682 MW | 1,007 MW |
| 2026-10-10T07:00Z | 778 MW | 118 MW | 384 MW | 663 MW | 1,561 MW |
| 2026-10-10T08:00Z | 742 MW | 83 MW | 340 MW | 591 MW | 1,976 MW |
| 2026-10-10T09:00Z | 679 MW | 23 MW | 295 MW | 575 MW | 2,066 MW |
| 2026-10-10T10:00Z | 719 MW | 4 MW | 268 MW | 661 MW | 2,181 MW |
| 2026-10-10T11:00Z | 716 MW | 9 MW | 257 MW | 654 MW | 2,074 MW |
| 2026-10-10T12:00Z | 719 MW | 18 MW | 253 MW | 642 MW | 1,777 MW |
| 2026-10-10T13:00Z | 736 MW | 62 MW | 271 MW | 669 MW | 1,302 MW |
| 2026-10-10T14:00Z | 810 MW | 159 MW | 1,243 MW | 715 MW | 573 MW |
| 2026-10-10T15:00Z | 866 MW | 215 MW | 1,362 MW | 742 MW | 45 MW |
| 2026-10-10T16:00Z | 927 MW | 341 MW | 1,490 MW | 767 MW | 0 MW |
| 2026-10-10T17:00Z | 941 MW | 490 MW | 1,475 MW | 743 MW | 0 MW |
| 2026-10-10T18:00Z | 878 MW | 564 MW | 1,414 MW | 732 MW | 0 MW |
| 2026-10-10T19:00Z | 878 MW | 512 MW | 1,342 MW | 768 MW | 0 MW |
| 2026-10-10T20:00Z | 893 MW | 507 MW | 1,272 MW | 786 MW | 0 MW |
| 2026-10-10T21:00Z | 845 MW | 534 MW | 1,206 MW | 773 MW | 0 MW |
| 2026-10-10T22:00Z | 839 MW | 583 MW | 1,133 MW | 771 MW | 0 MW |
| 2026-10-10T23:00Z | 824 MW | 618 MW | 1,031 MW | 775 MW | 0 MW |
| 2026-10-11T00:00Z | 821 MW | 618 MW | 799 MW | 757 MW | 0 MW |
| 2026-10-11T01:00Z | 823 MW | 638 MW | 329 MW | 763 MW | 0 MW |
| 2026-10-11T02:00Z | 834 MW | 667 MW | 393 MW | 763 MW | 0 MW |
| 2026-10-11T03:00Z | 832 MW | 679 MW | 598 MW | 756 MW | 0 MW |
| 2026-10-11T04:00Z | 847 MW | 661 MW | 992 MW | 754 MW | 10 MW |
| 2026-10-11T05:00Z | 843 MW | 718 MW | 1,174 MW | 759 MW | 308 MW |
| 2026-10-11T06:00Z | 784 MW | 740 MW | 509 MW | 752 MW | 909 MW |
| 2026-10-11T07:00Z | 738 MW | 950 MW | 277 MW | 740 MW | 1,360 MW |
| 2026-10-11T08:00Z | 687 MW | 1,544 MW | 240 MW | 671 MW | 1,492 MW |
| 2026-10-11T09:00Z | 688 MW | 1,825 MW | 233 MW | 647 MW | 1,522 MW |
| 2026-10-11T10:00Z | 706 MW | 1,924 MW | 236 MW | 698 MW | 1,556 MW |
| 2026-10-11T11:00Z | 702 MW | 2,052 MW | 247 MW | 723 MW | 1,401 MW |
| 2026-10-11T12:00Z | 717 MW | 2,111 MW | 240 MW | 753 MW | 995 MW |
| 2026-10-11T13:00Z | 742 MW | 2,013 MW | 407 MW | 769 MW | 654 MW |
| 2026-10-11T14:00Z | 769 MW | 2,057 MW | 405 MW | 764 MW | 262 MW |
| 2026-10-11T15:00Z | 833 MW | 2,088 MW | 944 MW | 762 MW | 19 MW |
| 2026-10-11T16:00Z | 912 MW | 2,070 MW | 1,284 MW | 768 MW | 0 MW |
| 2026-10-11T17:00Z | 1,190 MW | 2,065 MW | 1,289 MW | 763 MW | 0 MW |
| 2026-10-11T18:00Z | 1,223 MW | 1,820 MW | 1,307 MW | 755 MW | 0 MW |
| 2026-10-11T19:00Z | 1,223 MW | 1,567 MW | 1,269 MW | 754 MW | 0 MW |
| 2026-10-11T20:00Z | 1,208 MW | 1,381 MW | 1,209 MW | 754 MW | 0 MW |
| 2026-10-11T21:00Z | 1,198 MW | 1,007 MW | 920 MW | 778 MW | 0 MW |
| 2026-10-11T22:00Z | 1,199 MW | 735 MW | 643 MW | 767 MW | 0 MW |
| 2026-10-11T23:00Z | 1,200 MW | 727 MW | 720 MW | 755 MW | 0 MW |
| 2026-10-12T00:00Z | 1,179 MW | 719 MW | 723 MW | 732 MW | 0 MW |
| 2026-10-12T01:00Z | 1,118 MW | 980 MW | 573 MW | 668 MW | 0 MW |
| 2026-10-12T02:00Z | 1,016 MW | 1,190 MW | 354 MW | 656 MW | 0 MW |
| 2026-10-12T03:00Z | 1,110 MW | 1,441 MW | 755 MW | 687 MW | 0 MW |
| 2026-10-12T04:00Z | 1,196 MW | 1,061 MW | 1,205 MW | 770 MW | 0 MW |
| 2026-10-12T05:00Z | 1,242 MW | 651 MW | 1,621 MW | 780 MW | 98 MW |
| 2026-10-12T06:00Z | 1,203 MW | 566 MW | 1,831 MW | 750 MW | 357 MW |
| 2026-10-12T07:00Z | 1,175 MW | 645 MW | 1,467 MW | 746 MW | 642 MW |
| 2026-10-12T08:00Z | 1,158 MW | 719 MW | 865 MW | 749 MW | 860 MW |
| 2026-10-12T09:00Z | 1,146 MW | 775 MW | 924 MW | 747 MW | 936 MW |
| 2026-10-12T10:00Z | 1,134 MW | 920 MW | 778 MW | 736 MW | 961 MW |
| 2026-10-12T11:00Z | 1,108 MW | 1,079 MW | 886 MW | 729 MW | 902 MW |
| 2026-10-12T12:00Z | 1,125 MW | 1,374 MW | 605 MW | 751 MW | 668 MW |
| 2026-10-12T13:00Z | 1,147 MW | 1,556 MW | 619 MW | 763 MW | 431 MW |
| 2026-10-12T14:00Z | 1,184 MW | 1,589 MW | 1,445 MW | 825 MW | 177 MW |
| 2026-10-12T15:00Z | 1,240 MW | 1,517 MW | 1,525 MW | 863 MW | 14 MW |
| 2026-10-12T16:00Z | 1,314 MW | 1,584 MW | 1,617 MW | 861 MW | 0 MW |
| 2026-10-12T17:00Z | 1,326 MW | 1,674 MW | 1,594 MW | 814 MW | 0 MW |
| 2026-10-12T18:00Z | 1,278 MW | 1,823 MW | 1,523 MW | 822 MW | 0 MW |
| 2026-10-12T19:00Z | 1,234 MW | 2,030 MW | 1,345 MW | 822 MW | 0 MW |
| 2026-10-12T20:00Z | 1,213 MW | 2,058 MW | 1,221 MW | 827 MW | 0 MW |
| 2026-10-12T21:00Z | 1,219 MW | 2,095 MW | 887 MW | 828 MW | 0 MW |
| 2026-10-12T22:00Z | 1,212 MW | 2,218 MW | 507 MW | 812 MW | 0 MW |
| 2026-10-12T23:00Z | 1,226 MW | 2,154 MW | 447 MW | 837 MW | 0 MW |
| 2026-10-13T00:00Z | 1,222 MW | 2,150 MW | 738 MW | 835 MW | 0 MW |
| 2026-10-13T01:00Z | 1,183 MW | 2,117 MW | 371 MW | 827 MW | 0 MW |
| 2026-10-13T02:00Z | 1,179 MW | 2,139 MW | 228 MW | 822 MW | 0 MW |
| 2026-10-13T03:00Z | 1,189 MW | 2,334 MW | 274 MW | 822 MW | 0 MW |
| 2026-10-13T04:00Z | 1,189 MW | 2,450 MW | 1,323 MW | 817 MW | 0 MW |
| 2026-10-13T05:00Z | 1,233 MW | 2,575 MW | 1,423 MW | 822 MW | 106 MW |
| 2026-10-13T06:00Z | 1,177 MW | 2,637 MW | 1,299 MW | 824 MW | 445 MW |
| 2026-10-13T07:00Z | 1,147 MW | 2,659 MW | 1,282 MW | 788 MW | 812 MW |
| 2026-10-13T08:00Z | 1,156 MW | 2,672 MW | 316 MW | 780 MW | 1,082 MW |
| 2026-10-13T09:00Z | 1,132 MW | 2,690 MW | 250 MW | 780 MW | 1,428 MW |
| 2026-10-13T10:00Z | 1,061 MW | 2,683 MW | 225 MW | 730 MW | 1,476 MW |
| 2026-10-13T11:00Z | 1,131 MW | 2,759 MW | 256 MW | 811 MW | 1,185 MW |
| 2026-10-13T12:00Z | 1,157 MW | 2,691 MW | 268 MW | 837 MW | 948 MW |
| 2026-10-13T13:00Z | 1,168 MW | 2,621 MW | 352 MW | 818 MW | 651 MW |
| 2026-10-13T14:00Z | 1,201 MW | 2,438 MW | 1,373 MW | 838 MW | 311 MW |
| 2026-10-13T15:00Z | 1,284 MW | 2,319 MW | 1,543 MW | 859 MW | 28 MW |
| 2026-10-13T16:00Z | 1,347 MW | 2,264 MW | 1,651 MW | 842 MW | 0 MW |
| 2026-10-13T17:00Z | 1,337 MW | 2,307 MW | 1,633 MW | 836 MW | 0 MW |
| 2026-10-13T18:00Z | 1,326 MW | 2,446 MW | 1,516 MW | 828 MW | 0 MW |
| 2026-10-13T19:00Z | 1,294 MW | 2,513 MW | 1,431 MW | 833 MW | 0 MW |
| 2026-10-13T20:00Z | 1,273 MW | 2,379 MW | 1,301 MW | 856 MW | 0 MW |
| 2026-10-13T21:00Z | 1,272 MW | 2,223 MW | 745 MW | 858 MW | 0 MW |
| 2026-10-13T22:00Z | 1,250 MW | 2,279 MW | 1,262 MW | 858 MW | 0 MW |
| 2026-10-13T23:00Z | 1,248 MW | 2,266 MW | 1,156 MW | 853 MW | 0 MW |
| 2026-10-14T00:00Z | 1,252 MW | 2,369 MW | 1,130 MW | 834 MW | 0 MW |
| 2026-10-14T01:00Z | 1,203 MW | 2,439 MW | 1,076 MW | 835 MW | 0 MW |
| 2026-10-14T02:00Z | 1,212 MW | 2,409 MW | 1,098 MW | 853 MW | 0 MW |
| 2026-10-14T03:00Z | 1,231 MW | 2,432 MW | 1,290 MW | 860 MW | 0 MW |
| 2026-10-14T04:00Z | 1,274 MW | 2,354 MW | 1,462 MW | 865 MW | 6 MW |
| 2026-10-14T05:00Z | 1,255 MW | 2,333 MW | 1,546 MW | 827 MW | 235 MW |
| 2026-10-14T06:00Z | 1,202 MW | 2,477 MW | 1,383 MW | 824 MW | 824 MW |
| 2026-10-14T07:00Z | 1,164 MW | 2,342 MW | 1,314 MW | 816 MW | 1,449 MW |
| 2026-10-14T08:00Z | 1,144 MW | 2,225 MW | 1,213 MW | 814 MW | 2,028 MW |
| 2026-10-14T09:00Z | 1,118 MW | 2,211 MW | 1,146 MW | 785 MW | 2,245 MW |
| 2026-10-14T10:00Z | 1,043 MW | 2,376 MW | 813 MW | 736 MW | 2,203 MW |
| 2026-10-14T11:00Z | 1,046 MW | 2,493 MW | 496 MW | 698 MW | 2,206 MW |
| 2026-10-14T12:00Z | 1,042 MW | 2,255 MW | 481 MW | 692 MW | 2,098 MW |
| 2026-10-14T13:00Z | 1,082 MW | 2,331 MW | 569 MW | 726 MW | 1,600 MW |
| 2026-10-14T14:00Z | 1,180 MW | 2,378 MW | 1,130 MW | 790 MW | 727 MW |
| 2026-10-14T15:00Z | 1,250 MW | 2,221 MW | 1,535 MW | 833 MW | 81 MW |
| 2026-10-14T16:00Z | 1,263 MW | 2,129 MW | 1,533 MW | 858 MW | 2 MW |
| 2026-10-14T17:00Z | 1,292 MW | 2,258 MW | 1,544 MW | 838 MW | 0 MW |
| 2026-10-14T18:00Z | 1,265 MW | 2,338 MW | 1,526 MW | 831 MW | 0 MW |
| 2026-10-14T19:00Z | 1,258 MW | 2,356 MW | 1,439 MW | 817 MW | 0 MW |
| 2026-10-14T20:00Z | 1,292 MW | 2,167 MW | 1,290 MW | 854 MW | 0 MW |
| 2026-10-14T21:00Z | 1,298 MW | 1,869 MW | 1,253 MW | 853 MW | 0 MW |
| 2026-10-14T22:00Z | 1,288 MW | 1,708 MW | 319 MW | 854 MW | 0 MW |
| 2026-10-14T23:00Z | 1,270 MW | 1,770 MW | 270 MW | 832 MW | 0 MW |
| 2026-10-15T00:00Z | 1,255 MW | 1,814 MW | 264 MW | 832 MW | 0 MW |
| 2026-10-15T01:00Z | 1,263 MW | 1,879 MW | 274 MW | 835 MW | 0 MW |
| 2026-10-15T02:00Z | 1,260 MW | 1,853 MW | 267 MW | 825 MW | 0 MW |
| 2026-10-15T03:00Z | 1,275 MW | 1,662 MW | 713 MW | 863 MW | 0 MW |
| 2026-10-15T04:00Z | 1,315 MW | 1,488 MW | 1,473 MW | 861 MW | 14 MW |
| 2026-10-15T05:00Z | 1,335 MW | 1,297 MW | 1,603 MW | 851 MW | 322 MW |
| 2026-10-15T06:00Z | 1,346 MW | 950 MW | 1,852 MW | 863 MW | 935 MW |
| 2026-10-15T07:00Z | 1,286 MW | 1,060 MW | 1,732 MW | 823 MW | 1,362 MW |
| 2026-10-15T08:00Z | 1,285 MW | 1,332 MW | 827 MW | 862 MW | 1,424 MW |
| 2026-10-15T09:00Z | 1,210 MW | 1,723 MW | 971 MW | 824 MW | 1,567 MW |
| 2026-10-15T10:00Z | 1,205 MW | 1,969 MW | 419 MW | 810 MW | 1,814 MW |
| 2026-10-15T11:00Z | 1,253 MW | 1,949 MW | 292 MW | 794 MW | 1,782 MW |
| 2026-10-15T12:00Z | 1,294 MW | 2,058 MW | 266 MW | 832 MW | 1,475 MW |
| 2026-10-15T13:00Z | 1,226 MW | 2,159 MW | 338 MW | 800 MW | 980 MW |
| 2026-10-15T14:00Z | 1,236 MW | 1,963 MW | 1,292 MW | 841 MW | 404 MW |
| 2026-10-15T15:00Z | 1,288 MW | 1,624 MW | 1,524 MW | 860 MW | 32 MW |
| 2026-10-15T16:00Z | 1,347 MW | 1,547 MW | 1,612 MW | 822 MW | 0 MW |
| 2026-10-15T17:00Z | 1,311 MW | 1,551 MW | 1,579 MW | 840 MW | 0 MW |
| 2026-10-15T18:00Z | 1,321 MW | 1,748 MW | 1,530 MW | 759 MW | 0 MW |
| 2026-10-15T19:00Z | 1,318 MW | 1,746 MW | 1,390 MW | 756 MW | 0 MW |
| 2026-10-15T20:00Z | 1,310 MW | 1,795 MW | 1,287 MW | 754 MW | 0 MW |
| 2026-10-15T21:00Z | 1,269 MW | 1,863 MW | 1,224 MW | 761 MW | 0 MW |
| 2026-10-15T22:00Z | 1,282 MW | 1,640 MW | 1,151 MW | 832 MW | 0 MW |
| 2026-10-15T23:00Z | 1,279 MW | 1,704 MW | 866 MW | 827 MW | 0 MW |
| 2026-10-16T00:00Z | 1,270 MW | 1,636 MW | 856 MW | 825 MW | 0 MW |
| 2026-10-16T01:00Z | 1,275 MW | 1,515 MW | 817 MW | 843 MW | 0 MW |
| 2026-10-16T02:00Z | 1,275 MW | 1,533 MW | 1,073 MW | 826 MW | 0 MW |
| 2026-10-16T03:00Z | 1,269 MW | 1,602 MW | 1,248 MW | 827 MW | 0 MW |
| 2026-10-16T04:00Z | 1,313 MW | 1,667 MW | 1,431 MW | 827 MW | 1 MW |
| 2026-10-16T05:00Z | 1,311 MW | 1,570 MW | 1,482 MW | 828 MW | 177 MW |
| 2026-10-16T06:00Z | 1,266 MW | 1,570 MW | 1,438 MW | 842 MW | 645 MW |
| 2026-10-16T07:00Z | 1,231 MW | 1,862 MW | 1,295 MW | 817 MW | 1,170 MW |
| 2026-10-16T08:00Z | 1,186 MW | 1,895 MW | 256 MW | 804 MW | 1,584 MW |
| 2026-10-16T09:00Z | 1,192 MW | 1,895 MW | 255 MW | 815 MW | 1,972 MW |
| 2026-10-16T10:00Z | 1,181 MW | 1,743 MW | 244 MW | 797 MW | 2,008 MW |
| 2026-10-16T11:00Z | 1,154 MW | 1,646 MW | 258 MW | 745 MW | 1,895 MW |
| 2026-10-16T12:00Z | 1,195 MW | 1,448 MW | 249 MW | 763 MW | 1,680 MW |
| 2026-10-16T13:00Z | 1,234 MW | 1,402 MW | 270 MW | 827 MW | 1,109 MW |
| 2026-10-16T14:00Z | 1,282 MW | 1,272 MW | 1,372 MW | 839 MW | 473 MW |
| 2026-10-16T15:00Z | 1,313 MW | 1,121 MW | 1,531 MW | 841 MW | 31 MW |
| 2026-10-16T16:00Z | 1,345 MW | 1,238 MW | 1,546 MW | 821 MW | 0 MW |
| 2026-10-16T17:00Z | 1,325 MW | 1,351 MW | 1,547 MW | 802 MW | 0 MW |
| 2026-10-16T18:00Z | 1,298 MW | 1,509 MW | 1,377 MW | 817 MW | 0 MW |
| 2026-10-16T19:00Z | 1,307 MW | 1,400 MW | 1,390 MW | 824 MW | 0 MW |
| 2026-10-16T20:00Z | 1,355 MW | 828 MW | 1,474 MW | 844 MW | 0 MW |
| 2026-10-16T21:00Z | 1,334 MW | 657 MW | 1,513 MW | 829 MW | 0 MW |
| 2026-10-16T22:00Z | 1,355 MW | 649 MW | 1,242 MW | 792 MW | 0 MW |
| 2026-10-16T23:00Z | 1,344 MW | 585 MW | 1,069 MW | 779 MW | 0 MW |
| 2026-10-17T00:00Z | 1,316 MW | 773 MW | 644 MW | 750 MW | 0 MW |
| 2026-10-17T01:00Z | 1,312 MW | 790 MW | 587 MW | 782 MW | 0 MW |
| 2026-10-17T02:00Z | 1,317 MW | 742 MW | 909 MW | 785 MW | 0 MW |
| 2026-10-17T03:00Z | 1,301 MW | 902 MW | 1,159 MW | 755 MW | 0 MW |
| 2026-10-17T04:00Z | 1,308 MW | 820 MW | 1,250 MW | 756 MW | 2 MW |
| 2026-10-17T05:00Z | 1,309 MW | 568 MW | 1,274 MW | 759 MW | 116 MW |
| 2026-10-17T06:00Z | 1,288 MW | 271 MW | 1,193 MW | 764 MW | 494 MW |
| 2026-10-17T07:00Z | 1,290 MW | 202 MW | 565 MW | 745 MW | 839 MW |
| 2026-10-17T08:00Z | 1,264 MW | 233 MW | 266 MW | 701 MW | 1,002 MW |
| 2026-10-17T09:00Z | 1,262 MW | 209 MW | 252 MW | 707 MW | 1,182 MW |
| 2026-10-17T10:00Z | 1,266 MW | 269 MW | 254 MW | 770 MW | 1,156 MW |
| 2026-10-17T11:00Z | 1,266 MW | 282 MW | 285 MW | 766 MW | 954 MW |
| 2026-10-17T12:00Z | 1,267 MW | 360 MW | 306 MW | 758 MW | 751 MW |
| 2026-10-17T13:00Z | 1,291 MW | 247 MW | 317 MW | 784 MW | 447 MW |
| 2026-10-17T14:00Z | 1,344 MW | 130 MW | 1,668 MW | 792 MW | 152 MW |
| 2026-10-17T15:00Z | 1,362 MW | 87 MW | 1,841 MW | 784 MW | 7 MW |
| 2026-10-17T16:00Z | 1,371 MW | 213 MW | 1,731 MW | 778 MW | 0 MW |
| 2026-10-17T17:00Z | 1,384 MW | 213 MW | 1,719 MW | 759 MW | 0 MW |
| 2026-10-17T18:00Z | 1,385 MW | 266 MW | 1,589 MW | 758 MW | 0 MW |
| 2026-10-17T19:00Z | 1,359 MW | 234 MW | 1,406 MW | 796 MW | 0 MW |
| 2026-10-17T20:00Z | 1,348 MW | 363 MW | 1,610 MW | 759 MW | 0 MW |
| 2026-10-17T21:00Z | 1,319 MW | 505 MW | 1,327 MW | 779 MW | 0 MW |
| 2026-10-17T22:00Z | 1,310 MW | 607 MW | 1,180 MW | 786 MW | 0 MW |
| 2026-10-17T23:00Z | 1,299 MW | 889 MW | 1,156 MW | 755 MW | 0 MW |
| 2026-10-18T00:00Z | 1,290 MW | 1,116 MW | 920 MW | 754 MW | 0 MW |
| 2026-10-18T01:00Z | 1,300 MW | 903 MW | 707 MW | 781 MW | 0 MW |
| 2026-10-18T02:00Z | 1,330 MW | 837 MW | 405 MW | 801 MW | 0 MW |
| 2026-10-18T03:00Z | 1,340 MW | 739 MW | 590 MW | 801 MW | 0 MW |
| 2026-10-18T04:00Z | 1,313 MW | 863 MW | 1,036 MW | 784 MW | 0 MW |
| 2026-10-18T05:00Z | 1,326 MW | 1,028 MW | 1,395 MW | 756 MW | 146 MW |
| 2026-10-18T06:00Z | 1,304 MW | 1,180 MW | 618 MW | 759 MW | 592 MW |
| 2026-10-18T07:00Z | 1,261 MW | 1,444 MW | 267 MW | 738 MW | 1,057 MW |
| 2026-10-18T08:00Z | 1,209 MW | 1,723 MW | 262 MW | 688 MW | 1,341 MW |
| 2026-10-18T09:00Z | 1,194 MW | 1,896 MW | 263 MW | 727 MW | 1,621 MW |
| 2026-10-18T10:00Z | 1,222 MW | 1,979 MW | 297 MW | 766 MW | 1,730 MW |
| 2026-10-18T11:00Z | 1,214 MW | 1,986 MW | 293 MW | 769 MW | 1,567 MW |
| 2026-10-18T12:00Z | 1,216 MW | 2,103 MW | 323 MW | 765 MW | 1,305 MW |
| 2026-10-18T13:00Z | 1,214 MW | 2,097 MW | 324 MW | 773 MW | 806 MW |
| 2026-10-18T14:00Z | 1,230 MW | 2,278 MW | 406 MW | 762 MW | 303 MW |
| 2026-10-18T15:00Z | 1,270 MW | 2,300 MW | 1,308 MW | 763 MW | 19 MW |
| 2026-10-18T16:00Z | 1,322 MW | 2,286 MW | 1,331 MW | 777 MW | 0 MW |
| 2026-10-18T17:00Z | 1,322 MW | 2,326 MW | 1,362 MW | 759 MW | 0 MW |
| 2026-10-18T18:00Z | 1,326 MW | 2,234 MW | 1,354 MW | 796 MW | 0 MW |
| 2026-10-18T19:00Z | 1,327 MW | 2,268 MW | 1,293 MW | 762 MW | 0 MW |
| 2026-10-18T20:00Z | 1,295 MW | 2,338 MW | 1,223 MW | 758 MW | 0 MW |
| 2026-10-18T21:00Z | 1,296 MW | 2,438 MW | 1,157 MW | 753 MW | 0 MW |
| 2026-10-18T22:00Z | 1,296 MW | 2,453 MW | 253 MW | 758 MW | 0 MW |
| 2026-10-18T23:00Z | 1,293 MW | 2,329 MW | 271 MW | 788 MW | 0 MW |
| 2026-10-19T00:00Z | 1,291 MW | 2,381 MW | 315 MW | 783 MW | 0 MW |
| 2026-10-19T01:00Z | 1,288 MW | 2,473 MW | 285 MW | 754 MW | 0 MW |
| 2026-10-19T02:00Z | 1,292 MW | 2,500 MW | 269 MW | 769 MW | 0 MW |
| 2026-10-19T03:00Z | 1,281 MW | 2,517 MW | 1,241 MW | 759 MW | 0 MW |
| 2026-10-19T04:00Z | 1,309 MW | 2,543 MW | 1,460 MW | 756 MW | 0 MW |
| 2026-10-19T05:00Z | 1,294 MW | 2,546 MW | 1,537 MW | 755 MW | 206 MW |
| 2026-10-19T06:00Z | 1,283 MW | 2,483 MW | 1,491 MW | 755 MW | 830 MW |
| 2026-10-19T07:00Z | 1,226 MW | 2,471 MW | 1,397 MW | 741 MW | 1,625 MW |
| 2026-10-19T08:00Z | 1,184 MW | 2,474 MW | 347 MW | 673 MW | 1,925 MW |
| 2026-10-19T09:00Z | 1,206 MW | 2,429 MW | 308 MW | 743 MW | 1,988 MW |
| 2026-10-19T10:00Z | 1,227 MW | 2,402 MW | 364 MW | 780 MW | 1,960 MW |
| 2026-10-19T11:00Z | 1,200 MW | 2,412 MW | 320 MW | 744 MW | 1,792 MW |
| 2026-10-19T12:00Z | 1,189 MW | 2,516 MW | 308 MW | 747 MW | 1,467 MW |
| 2026-10-19T13:00Z | 1,210 MW | 2,503 MW | 344 MW | 750 MW | 964 MW |
| 2026-10-19T14:00Z | 1,248 MW | 2,408 MW | 1,501 MW | 796 MW | 366 MW |
| 2026-10-19T15:00Z | 1,304 MW | 2,445 MW | 1,571 MW | 821 MW | 25 MW |
| 2026-10-19T16:00Z | 1,333 MW | 2,487 MW | 1,616 MW | 807 MW | 0 MW |
| 2026-10-19T17:00Z | 1,335 MW | 2,375 MW | 1,617 MW | 812 MW | 0 MW |
| 2026-10-19T18:00Z | 1,353 MW | 2,347 MW | 1,593 MW | 814 MW | 0 MW |
| 2026-10-19T19:00Z | 1,339 MW | 2,379 MW | 1,509 MW | 802 MW | 0 MW |
| 2026-10-19T20:00Z | 1,281 MW | 2,243 MW | 1,354 MW | 748 MW | 0 MW |
| 2026-10-19T21:00Z | 1,304 MW | 1,971 MW | 1,296 MW | 793 MW | 0 MW |
| 2026-10-19T22:00Z | 1,268 MW | 1,829 MW | 1,237 MW | 812 MW | 0 MW |
| 2026-10-19T23:00Z | 1,326 MW | 1,428 MW | 1,336 MW | 850 MW | 0 MW |
| 2026-10-20T00:00Z | 1,292 MW | 1,269 MW | 1,206 MW | 818 MW | 0 MW |
| 2026-10-20T01:00Z | 1,291 MW | 1,133 MW | 1,211 MW | 819 MW | 0 MW |
| 2026-10-20T02:00Z | 1,292 MW | 969 MW | 1,258 MW | 822 MW | 0 MW |
| 2026-10-20T03:00Z | 1,305 MW | 889 MW | 1,341 MW | 821 MW | 0 MW |
| 2026-10-20T04:00Z | 1,340 MW | 844 MW | 1,538 MW | 826 MW | 3 MW |
| 2026-10-20T05:00Z | 1,339 MW | 802 MW | 1,616 MW | 821 MW | 194 MW |
| 2026-10-20T06:00Z | 1,330 MW | 527 MW | 1,563 MW | 824 MW | 731 MW |
| 2026-10-20T07:00Z | 1,287 MW | 323 MW | 1,495 MW | 820 MW | 1,508 MW |
| 2026-10-20T08:00Z | 1,244 MW | 194 MW | 558 MW | 825 MW | 2,126 MW |
| 2026-10-20T09:00Z | 1,202 MW | 46 MW | 292 MW | 782 MW | 2,579 MW |
| 2026-10-20T10:00Z | 1,179 MW | 10 MW | 263 MW | 745 MW | 2,584 MW |
| 2026-10-20T11:00Z | 1,191 MW | 18 MW | 306 MW | 802 MW | 2,514 MW |
| 2026-10-20T12:00Z | 1,194 MW | 17 MW | 275 MW | 792 MW | 2,192 MW |
| 2026-10-20T13:00Z | 1,226 MW | 91 MW | 361 MW | 801 MW | 1,469 MW |
| 2026-10-20T14:00Z | 1,308 MW | 204 MW | 1,461 MW | 815 MW | 538 MW |
| 2026-10-20T15:00Z | 1,356 MW | 410 MW | 1,709 MW | 825 MW | 25 MW |
| 2026-10-20T16:00Z | 1,360 MW | 514 MW | 1,739 MW | 841 MW | 0 MW |
| 2026-10-20T17:00Z | 1,365 MW | 602 MW | 1,723 MW | 860 MW | 0 MW |
| 2026-10-20T18:00Z | 1,373 MW | 623 MW | 1,805 MW | 839 MW | 0 MW |
| 2026-10-20T19:00Z | 1,367 MW | 603 MW | 1,629 MW | 858 MW | 0 MW |
| 2026-10-20T20:00Z | 1,427 MW | 571 MW | 1,519 MW | 825 MW | 0 MW |
| 2026-10-20T21:00Z | 1,473 MW | 529 MW | 1,297 MW | 820 MW | 0 MW |
| 2026-10-20T22:00Z | 1,402 MW | 545 MW | 370 MW | 824 MW | 0 MW |
| 2026-10-20T23:00Z | 1,303 MW | 572 MW | 692 MW | 829 MW | 0 MW |
| 2026-10-21T00:00Z | 1,313 MW | 514 MW | 1,140 MW | 832 MW | 0 MW |
| 2026-10-21T01:00Z | 1,306 MW | 484 MW | 1,068 MW | 834 MW | 0 MW |
| 2026-10-21T02:00Z | 1,312 MW | 605 MW | 881 MW | 827 MW | 0 MW |
| 2026-10-21T03:00Z | 1,326 MW | 707 MW | 980 MW | 839 MW | 0 MW |
| 2026-10-21T04:00Z | 1,313 MW | 817 MW | 1,528 MW | 862 MW | 0 MW |
| 2026-10-21T05:00Z | 1,333 MW | 849 MW | 1,567 MW | 825 MW | 182 MW |
| 2026-10-21T06:00Z | 1,336 MW | 734 MW | 1,592 MW | 856 MW | 740 MW |
| 2026-10-21T07:00Z | 1,339 MW | 642 MW | 1,309 MW | 862 MW | 1,254 MW |
| 2026-10-21T08:00Z | 1,271 MW | 668 MW | 691 MW | 831 MW | 1,608 MW |
| 2026-10-21T09:00Z | 1,254 MW | 674 MW | 497 MW | 822 MW | 1,910 MW |
| 2026-10-21T10:00Z | 1,217 MW | 699 MW | 313 MW | 810 MW | 2,291 MW |
| 2026-10-21T11:00Z | 1,142 MW | 873 MW | 293 MW | 745 MW | 2,513 MW |
| 2026-10-21T12:00Z | 1,132 MW | 1,183 MW | 293 MW | 719 MW | 2,299 MW |
| 2026-10-21T13:00Z | 1,180 MW | 1,514 MW | 1,258 MW | 773 MW | 1,576 MW |
| 2026-10-21T14:00Z | 1,271 MW | 1,644 MW | 1,506 MW | 790 MW | 559 MW |
| 2026-10-21T15:00Z | 1,327 MW | 1,713 MW | 1,739 MW | 845 MW | 22 MW |
| 2026-10-21T16:00Z | 1,309 MW | 1,844 MW | 1,760 MW | 824 MW | 0 MW |
| 2026-10-21T17:00Z | 1,322 MW | 1,709 MW | 1,692 MW | 858 MW | 0 MW |
| 2026-10-21T18:00Z | 1,326 MW | 1,686 MW | 1,682 MW | 830 MW | 0 MW |
| 2026-10-21T19:00Z | 1,303 MW | 1,756 MW | 1,525 MW | 814 MW | 0 MW |
| 2026-10-21T20:00Z | 1,307 MW | 1,787 MW | 1,383 MW | 817 MW | 0 MW |
| 2026-10-21T21:00Z | 1,318 MW | 1,762 MW | 518 MW | 836 MW | 0 MW |
| 2026-10-21T22:00Z | 1,297 MW | 1,791 MW | 264 MW | 855 MW | 0 MW |
| 2026-10-21T23:00Z | 1,294 MW | 1,835 MW | 248 MW | 827 MW | 0 MW |
| 2026-10-22T00:00Z | 1,286 MW | 1,911 MW | 247 MW | 818 MW | 0 MW |
| 2026-10-22T01:00Z | 1,286 MW | 1,902 MW | 243 MW | 833 MW | 0 MW |
| 2026-10-22T02:00Z | 1,291 MW | 1,881 MW | 244 MW | 823 MW | 0 MW |
| 2026-10-22T03:00Z | 1,339 MW | 1,804 MW | 375 MW | 855 MW | 0 MW |
| 2026-10-22T04:00Z | 1,345 MW | 1,894 MW | 1,469 MW | 857 MW | 0 MW |
| 2026-10-22T05:00Z | 1,342 MW | 2,031 MW | 1,561 MW | 828 MW | 78 MW |
| 2026-10-22T06:00Z | 1,316 MW | 2,119 MW | 1,563 MW | 860 MW | 191 MW |
| 2026-10-22T07:00Z | 996 MW | 2,208 MW | 1,965 MW | 866 MW | 294 MW |
| 2026-10-22T08:00Z | 990 MW | 2,256 MW | 2,141 MW | 821 MW | 473 MW |
| 2026-10-22T09:00Z | 1,186 MW | 2,283 MW | 1,667 MW | 790 MW | 776 MW |
| 2026-10-22T10:00Z | 1,285 MW | 2,235 MW | 731 MW | 820 MW | 974 MW |
| 2026-10-22T11:00Z | 1,290 MW | 2,013 MW | 279 MW | 849 MW | 1,021 MW |
| 2026-10-22T12:00Z | 1,319 MW | 1,667 MW | 378 MW | 855 MW | 790 MW |
| 2026-10-22T13:00Z | 1,327 MW | 1,481 MW | 844 MW | 833 MW | 605 MW |
| 2026-10-22T14:00Z | 1,360 MW | 1,274 MW | 1,647 MW | 841 MW | 250 MW |
| 2026-10-22T15:00Z | 1,380 MW | 1,150 MW | 1,734 MW | 868 MW | 5 MW |
| 2026-10-22T16:00Z | 1,366 MW | 1,130 MW | 1,860 MW | 828 MW | 0 MW |
| 2026-10-22T17:00Z | 1,428 MW | 981 MW | 1,728 MW | 837 MW | 0 MW |
| 2026-10-22T18:00Z | 1,530 MW | 786 MW | 1,637 MW | 829 MW | 0 MW |
| 2026-10-22T19:00Z | 1,588 MW | 553 MW | 1,528 MW | 828 MW | 0 MW |
| 2026-10-22T20:00Z | 1,637 MW | 415 MW | 1,341 MW | 821 MW | 0 MW |
| 2026-10-22T21:00Z | 1,662 MW | 253 MW | 1,045 MW | 798 MW | 0 MW |
| 2026-10-22T22:00Z | 1,447 MW | 133 MW | 936 MW | 865 MW | 0 MW |
| 2026-10-22T23:00Z | 1,362 MW | 87 MW | 1,285 MW | 836 MW | 0 MW |
| 2026-10-23T00:00Z | 1,365 MW | 88 MW | 1,282 MW | 822 MW | 0 MW |
| 2026-10-23T01:00Z | 1,355 MW | 89 MW | 1,058 MW | 841 MW | 0 MW |
| 2026-10-23T02:00Z | 1,352 MW | 96 MW | 470 MW | 841 MW | 0 MW |
| 2026-10-23T03:00Z | 1,369 MW | 88 MW | 1,072 MW | 862 MW | 0 MW |
| 2026-10-23T04:00Z | 1,375 MW | 155 MW | 1,608 MW | 835 MW | 0 MW |
| 2026-10-23T05:00Z | 1,375 MW | 308 MW | 1,613 MW | 839 MW | 54 MW |
| 2026-10-23T06:00Z | 1,365 MW | 439 MW | 1,565 MW | 831 MW | 399 MW |
| 2026-10-23T07:00Z | 1,331 MW | 589 MW | 569 MW | 821 MW | 863 MW |
| 2026-10-23T08:00Z | 1,145 MW | 629 MW | 747 MW | 828 MW | 1,220 MW |
| 2026-10-23T09:00Z | 1,091 MW | 914 MW | 1,110 MW | 806 MW | 1,393 MW |
| 2026-10-23T10:00Z | 1,281 MW | 1,004 MW | 1,025 MW | 757 MW | 1,526 MW |
| 2026-10-23T11:00Z | 1,242 MW | 1,248 MW | 429 MW | 722 MW | 1,556 MW |
| 2026-10-23T12:00Z | 1,201 MW | 1,378 MW | 254 MW | 710 MW | 1,415 MW |
| 2026-10-23T13:00Z | 1,152 MW | 1,598 MW | 243 MW | 714 MW | 926 MW |
| 2026-10-23T14:00Z | 1,282 MW | 1,908 MW | 458 MW | 755 MW | 396 MW |
| 2026-10-23T15:00Z | 1,314 MW | 2,213 MW | 1,576 MW | 736 MW | 16 MW |
| 2026-10-23T16:00Z | 1,431 MW | 2,124 MW | 1,575 MW | 713 MW | 0 MW |
| 2026-10-23T17:00Z | 1,559 MW | 2,076 MW | 1,533 MW | 731 MW | 0 MW |
| 2026-10-23T18:00Z | 1,705 MW | 2,156 MW | 1,415 MW | 701 MW | 0 MW |
| 2026-10-23T19:00Z | 1,784 MW | 2,014 MW | 1,224 MW | 726 MW | 0 MW |
| 2026-10-23T20:00Z | 1,445 MW | 1,620 MW | 1,404 MW | 831 MW | 0 MW |
| 2026-10-23T21:00Z | 1,370 MW | 1,421 MW | 957 MW | 816 MW | 0 MW |
| 2026-10-23T22:00Z | 1,337 MW | 1,493 MW | 742 MW | 753 MW | 0 MW |
| 2026-10-23T23:00Z | 1,268 MW | 1,532 MW | 260 MW | 669 MW | 0 MW |
| 2026-10-24T00:00Z | 1,265 MW | 1,401 MW | 264 MW | 681 MW | 0 MW |
| 2026-10-24T01:00Z | 1,315 MW | 1,192 MW | 272 MW | 723 MW | 0 MW |
| 2026-10-24T02:00Z | 1,311 MW | 1,134 MW | 611 MW | 695 MW | 0 MW |
| 2026-10-24T03:00Z | 1,329 MW | 989 MW | 1,127 MW | 748 MW | 0 MW |
| 2026-10-24T04:00Z | 1,336 MW | 869 MW | 1,281 MW | 753 MW | 0 MW |
| 2026-10-24T05:00Z | 1,332 MW | 705 MW | 1,305 MW | 750 MW | 155 MW |
| 2026-10-24T06:00Z | 1,310 MW | 546 MW | 1,228 MW | 751 MW | 603 MW |
| 2026-10-24T07:00Z | 1,339 MW | 405 MW | 427 MW | 764 MW | 1,109 MW |
| 2026-10-24T08:00Z | 1,336 MW | 334 MW | 512 MW | 715 MW | 1,658 MW |
| 2026-10-24T09:00Z | 1,294 MW | 257 MW | 382 MW | 698 MW | 1,960 MW |
| 2026-10-24T10:00Z | 1,288 MW | 173 MW | 254 MW | 735 MW | 2,119 MW |
| 2026-10-24T11:00Z | 1,295 MW | 151 MW | 251 MW | 750 MW | 2,058 MW |
| 2026-10-24T12:00Z | 1,284 MW | 89 MW | 253 MW | 717 MW | 1,900 MW |
| 2026-10-24T13:00Z | 1,294 MW | 14 MW | 286 MW | 751 MW | 1,295 MW |
| 2026-10-24T14:00Z | 1,372 MW | 3 MW | 1,321 MW | 793 MW | 417 MW |
| 2026-10-24T15:00Z | 1,422 MW | 9 MW | 1,467 MW | 783 MW | 13 MW |
| 2026-10-24T16:00Z | 1,407 MW | 18 MW | 1,568 MW | 793 MW | 0 MW |
| 2026-10-24T17:00Z | 1,378 MW | 23 MW | 1,510 MW | 788 MW | 0 MW |
| 2026-10-24T18:00Z | 1,397 MW | 30 MW | 1,475 MW | 791 MW | 0 MW |
| 2026-10-24T19:00Z | 1,383 MW | 62 MW | 1,399 MW | 774 MW | 0 MW |
| 2026-10-24T20:00Z | 1,382 MW | 89 MW | 1,282 MW | 790 MW | 0 MW |
| 2026-10-24T21:00Z | 1,411 MW | 88 MW | 1,211 MW | 783 MW | 0 MW |
| 2026-10-24T22:00Z | 1,387 MW | 70 MW | 1,152 MW | 762 MW | 0 MW |
| 2026-10-24T23:00Z | 1,384 MW | 71 MW | 291 MW | 767 MW | 0 MW |
| 2026-10-25T00:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-25T01:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-25T02:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-25T03:00Z | 1,384 MW | 19 MW | 295 MW | 765 MW | 0 MW |
| 2026-10-25T04:00Z | 1,400 MW | 3 MW | 1,137 MW | 775 MW | 0 MW |
| 2026-10-25T05:00Z | 1,409 MW | 15 MW | 1,195 MW | 769 MW | 123 MW |
| 2026-10-25T06:00Z | 1,383 MW | 18 MW | 590 MW | 758 MW | 543 MW |
| 2026-10-25T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-25T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-25T09:00Z | 1,350 MW | 32 MW | 424 MW | 747 MW | 1,505 MW |
| 2026-10-25T10:00Z | 1,344 MW | 31 MW | 414 MW | 770 MW | 1,574 MW |
| 2026-10-25T11:00Z | 1,338 MW | 51 MW | 415 MW | 742 MW | 1,619 MW |
| 2026-10-25T12:00Z | 1,323 MW | 97 MW | 288 MW | 765 MW | 1,451 MW |
| 2026-10-25T13:00Z | 1,323 MW | 146 MW | 296 MW | 745 MW | 1,044 MW |
| 2026-10-25T14:00Z | 1,339 MW | 238 MW | 1,168 MW | 775 MW | 368 MW |
| 2026-10-25T15:00Z | 1,416 MW | 267 MW | 1,328 MW | 776 MW | 12 MW |
| 2026-10-25T16:00Z | 1,441 MW | 261 MW | 1,622 MW | 693 MW | 0 MW |
| 2026-10-25T17:00Z | 1,424 MW | 295 MW | 1,596 MW | 676 MW | 0 MW |
| 2026-10-25T18:00Z | 1,425 MW | 371 MW | 1,504 MW | 690 MW | 0 MW |
| 2026-10-25T19:00Z | 1,443 MW | 391 MW | 1,514 MW | 696 MW | 0 MW |
| 2026-10-25T20:00Z | 1,452 MW | 347 MW | 1,405 MW | 696 MW | 0 MW |
| 2026-10-25T21:00Z | 1,457 MW | 285 MW | 1,295 MW | 704 MW | 0 MW |
| 2026-10-25T22:00Z | 1,453 MW | 239 MW | 803 MW | 701 MW | 0 MW |
| 2026-10-25T23:00Z | 1,428 MW | 203 MW | 636 MW | 661 MW | 0 MW |
| 2026-10-26T00:00Z | 1,421 MW | 194 MW | 541 MW | 684 MW | 0 MW |
| 2026-10-26T01:00Z | 1,410 MW | 152 MW | 775 MW | 740 MW | 0 MW |
| 2026-10-26T02:00Z | 1,406 MW | 108 MW | 496 MW | 739 MW | 0 MW |
| 2026-10-26T03:00Z | 1,419 MW | 62 MW | 277 MW | 745 MW | 0 MW |
| 2026-10-26T04:00Z | 1,424 MW | 30 MW | 629 MW | 750 MW | 0 MW |
| 2026-10-26T05:00Z | 1,413 MW | 14 MW | 1,372 MW | 751 MW | 95 MW |
| 2026-10-26T06:00Z | 1,393 MW | 21 MW | 1,441 MW | 755 MW | 496 MW |
| 2026-10-26T07:00Z | 1,389 MW | 10 MW | 772 MW | 752 MW | 785 MW |
| 2026-10-26T08:00Z | 1,393 MW | 14 MW | 660 MW | 771 MW | 862 MW |
| 2026-10-26T09:00Z | 1,386 MW | 25 MW | 682 MW | 760 MW | 826 MW |
| 2026-10-26T10:00Z | 1,377 MW | 52 MW | 907 MW | 757 MW | 799 MW |
| 2026-10-26T11:00Z | 1,374 MW | 79 MW | 1,021 MW | 766 MW | 744 MW |
| 2026-10-26T12:00Z | 1,379 MW | 128 MW | 1,502 MW | 753 MW | 610 MW |
| 2026-10-26T13:00Z | 1,389 MW | 205 MW | 1,864 MW | 749 MW | 408 MW |
| 2026-10-26T14:00Z | 1,418 MW | 339 MW | 1,798 MW | 749 MW | 148 MW |
| 2026-10-26T15:00Z | 1,438 MW | 458 MW | 1,595 MW | 773 MW | 4 MW |
| 2026-10-26T16:00Z | 1,463 MW | 546 MW | 1,675 MW | 825 MW | 0 MW |
| 2026-10-26T17:00Z | 1,451 MW | 637 MW | 1,656 MW | 832 MW | 0 MW |
| 2026-10-26T18:00Z | 1,469 MW | 649 MW | 1,664 MW | 849 MW | 0 MW |
| 2026-10-26T19:00Z | 1,475 MW | 685 MW | 1,728 MW | 835 MW | 0 MW |
| 2026-10-26T20:00Z | 1,470 MW | 644 MW | 1,706 MW | 841 MW | 0 MW |
| 2026-10-26T21:00Z | 1,478 MW | 594 MW | 1,563 MW | 830 MW | 0 MW |
| 2026-10-26T22:00Z | 1,453 MW | 527 MW | 897 MW | 849 MW | 0 MW |
| 2026-10-26T23:00Z | 1,415 MW | 562 MW | 428 MW | 775 MW | 0 MW |
| 2026-10-27T00:00Z | 1,384 MW | 721 MW | 267 MW | 598 MW | 0 MW |
| 2026-10-27T01:00Z | 1,377 MW | 827 MW | 258 MW | 593 MW | 0 MW |
| 2026-10-27T02:00Z | 1,385 MW | 852 MW | 264 MW | 602 MW | 0 MW |
| 2026-10-27T03:00Z | 1,397 MW | 878 MW | 292 MW | 596 MW | 0 MW |
| 2026-10-27T04:00Z | 1,415 MW | 852 MW | 865 MW | 604 MW | 0 MW |
| 2026-10-27T05:00Z | 1,429 MW | 846 MW | 1,480 MW | 587 MW | 70 MW |
| 2026-10-27T06:00Z | 1,430 MW | 880 MW | 1,627 MW | 394 MW | 393 MW |
| 2026-10-27T07:00Z | 1,392 MW | 913 MW | 1,200 MW | 390 MW | 688 MW |
| 2026-10-27T08:00Z | 1,398 MW | 1,102 MW | 584 MW | 389 MW | 824 MW |
| 2026-10-27T09:00Z | 1,377 MW | 1,429 MW | 675 MW | 386 MW | 863 MW |
| 2026-10-27T10:00Z | 1,394 MW | 1,733 MW | 1,290 MW | 386 MW | 834 MW |
| 2026-10-27T11:00Z | 1,428 MW | 1,908 MW | 1,488 MW | 398 MW | 747 MW |
| 2026-10-27T12:00Z | 1,446 MW | 1,992 MW | 1,838 MW | 401 MW | 604 MW |
| 2026-10-27T13:00Z | 1,448 MW | 2,031 MW | 1,319 MW | 390 MW | 395 MW |
| 2026-10-27T14:00Z | 1,458 MW | 2,135 MW | 2,179 MW | 393 MW | 142 MW |
| 2026-10-27T15:00Z | 1,453 MW | 2,209 MW | 2,157 MW | 390 MW | 1 MW |
| 2026-10-27T16:00Z | 1,467 MW | 2,323 MW | 2,123 MW | 393 MW | 0 MW |
| 2026-10-27T17:00Z | 1,467 MW | 2,232 MW | 1,972 MW | 395 MW | 0 MW |
| 2026-10-27T18:00Z | 1,459 MW | 2,203 MW | 1,736 MW | 398 MW | 0 MW |
| 2026-10-27T19:00Z | 1,453 MW | 2,216 MW | 1,644 MW | 400 MW | 0 MW |
| 2026-10-27T20:00Z | 1,432 MW | 2,217 MW | 1,549 MW | 394 MW | 0 MW |
| 2026-10-27T21:00Z | 1,398 MW | 2,368 MW | 1,361 MW | 385 MW | 0 MW |
| 2026-10-27T22:00Z | 1,346 MW | 2,289 MW | 541 MW | 382 MW | 0 MW |
| 2026-10-27T23:00Z | 1,359 MW | 2,272 MW | 674 MW | 364 MW | 0 MW |
| 2026-10-28T00:00Z | 1,347 MW | 2,196 MW | 1,172 MW | 354 MW | 0 MW |
| 2026-10-28T01:00Z | 1,354 MW | 2,107 MW | 1,174 MW | 367 MW | 0 MW |
| 2026-10-28T02:00Z | 1,355 MW | 2,041 MW | 1,178 MW | 368 MW | 0 MW |
| 2026-10-28T03:00Z | 1,340 MW | 2,052 MW | 1,180 MW | 372 MW | 0 MW |
| 2026-10-28T04:00Z | 1,341 MW | 2,075 MW | 1,195 MW | 347 MW | 0 MW |
| 2026-10-28T05:00Z | 1,396 MW | 1,868 MW | 1,399 MW | 387 MW | 23 MW |
| 2026-10-28T06:00Z | 1,413 MW | 1,644 MW | 1,556 MW | 391 MW | 142 MW |
| 2026-10-28T07:00Z | 1,419 MW | 1,502 MW | 1,743 MW | 386 MW | 288 MW |
| 2026-10-28T08:00Z | 1,422 MW | 1,328 MW | 1,582 MW | 379 MW | 425 MW |
| 2026-10-28T09:00Z | 1,415 MW | 1,133 MW | 1,508 MW | 371 MW | 644 MW |
| 2026-10-28T10:00Z | 1,411 MW | 1,016 MW | 1,435 MW | 374 MW | 784 MW |
| 2026-10-28T11:00Z | 1,375 MW | 1,091 MW | 1,380 MW | 371 MW | 817 MW |
| 2026-10-28T12:00Z | 1,370 MW | 1,207 MW | 1,407 MW | 397 MW | 625 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00Z.
Installed Capacity
Annual figure for 2026| Hydro | |
|---|---|
| Wind | |
| Solar | |
| Gas | |
| Coal | |
| Nuclear | |
| Storage | |
| Bioenergy |
Total installed capacity in Romania: 17.9 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Bucharest time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Bucharest time) | Demand |
|---|---|
| 2025-09-23 | 134 GWh |
| 2025-09-24 | 139 GWh |
| 2025-09-25 | 146 GWh |
| 2025-09-26 | 142 GWh |
| 2025-09-27 | 125 GWh |
| 2025-09-28 | 113 GWh |
| 2025-09-29 | 146 GWh |
| 2025-09-30 | 145 GWh |
| 2025-10-01 | 144 GWh |
| 2025-10-02 | 157 GWh |
| 2025-10-03 | 162 GWh |
| 2025-10-04 | 145 GWh |
| 2025-10-05 | 124 GWh |
| 2025-10-06 | 156 GWh |
| 2025-10-07 | 159 GWh |
| 2025-10-08 | 160 GWh |
| 2025-10-09 | 153 GWh |
| 2025-10-10 | 148 GWh |
| 2025-10-11 | 133 GWh |
| 2025-10-12 | 124 GWh |
| 2025-10-13 | 146 GWh |
| 2025-10-14 | 148 GWh |
| 2025-10-15 | 155 GWh |
| 2025-10-16 | 153 GWh |
| 2025-10-17 | 149 GWh |
| 2025-10-18 | 141 GWh |
| 2025-10-19 | 121 GWh |
| 2025-10-20 | 143 GWh |
| 2025-10-21 | 152 GWh |
| 2025-10-22 | 149 GWh |
| 2025-10-23 | 149 GWh |
| 2025-10-24 | 154 GWh |
| 2025-10-25 | 133 GWh |
| 2025-10-26 | 133 GWh |
| 2025-10-27 | 146 GWh |
| 2025-10-28 | 153 GWh |
| 2025-10-29 | 147 GWh |
| 2025-10-30 | 150 GWh |
| 2025-10-31 | 146 GWh |
| 2025-11-01 | 130 GWh |
| 2025-11-02 | 120 GWh |
| 2025-11-03 | 146 GWh |
| 2025-11-04 | 157 GWh |
| 2025-11-05 | 157 GWh |
| 2025-11-06 | 160 GWh |
| 2025-11-07 | 163 GWh |
| 2025-11-08 | 146 GWh |
| 2025-11-09 | 133 GWh |
| 2025-11-10 | 162 GWh |
| 2025-11-11 | 161 GWh |
| 2025-11-12 | 162 GWh |
| 2025-11-13 | 161 GWh |
| 2025-11-14 | 162 GWh |
| 2025-11-15 | 149 GWh |
| 2025-11-16 | 138 GWh |
| 2025-11-17 | 159 GWh |
| 2025-11-18 | 167 GWh |
| 2025-11-19 | 170 GWh |
| 2025-11-20 | 168 GWh |
| 2025-11-21 | 162 GWh |
| 2025-11-22 | 153 GWh |
| 2025-11-23 | 144 GWh |
| 2025-11-24 | 163 GWh |
| 2025-11-25 | 167 GWh |
| 2025-11-26 | 168 GWh |
| 2025-11-27 | 173 GWh |
| 2025-11-28 | 174 GWh |
| 2025-11-29 | 159 GWh |
| 2025-11-30 | 142 GWh |
| 2025-12-01 | 151 GWh |
| 2025-12-02 | 168 GWh |
| 2025-12-03 | 171 GWh |
| 2025-12-04 | 167 GWh |
| 2025-12-05 | 170 GWh |
| 2025-12-06 | 153 GWh |
| 2025-12-07 | 145 GWh |
| 2025-12-08 | 171 GWh |
| 2025-12-09 | 174 GWh |
| 2025-12-10 | 171 GWh |
| 2025-12-11 | 172 GWh |
| 2025-12-12 | 172 GWh |
| 2025-12-13 | 158 GWh |
| 2025-12-14 | 149 GWh |
| 2025-12-15 | 172 GWh |
| 2025-12-16 | 177 GWh |
| 2025-12-17 | 177 GWh |
| 2025-12-18 | 176 GWh |
| 2025-12-19 | 166 GWh |
| 2025-12-20 | 160 GWh |
| 2025-12-21 | 149 GWh |
| 2025-12-22 | 169 GWh |
| 2025-12-23 | 170 GWh |
| 2025-12-24 | 159 GWh |
| 2025-12-25 | 133 GWh |
| 2025-12-26 | 135 GWh |
| 2025-12-27 | 143 GWh |
| 2025-12-28 | 141 GWh |
| 2025-12-29 | 153 GWh |
| 2025-12-30 | 158 GWh |
| 2025-12-31 | 154 GWh |
| 2026-01-01 | 130 GWh |
| 2026-01-02 | 139 GWh |
| 2026-01-03 | 146 GWh |
| 2026-01-04 | 144 GWh |
| 2026-01-05 | 162 GWh |
| 2026-01-06 | 151 GWh |
| 2026-01-07 | 152 GWh |
| 2026-01-08 | 179 GWh |
| 2026-01-09 | 178 GWh |
| 2026-01-10 | 168 GWh |
| 2026-01-11 | 161 GWh |
| 2026-01-12 | 187 GWh |
| 2026-01-13 | 193 GWh |
| 2026-01-14 | 190 GWh |
| 2026-01-15 | 187 GWh |
| 2026-01-16 | 188 GWh |
| 2026-01-17 | 171 GWh |
| 2026-01-18 | 161 GWh |
| 2026-01-19 | 188 GWh |
| 2026-01-20 | 189 GWh |
| 2026-01-21 | 195 GWh |
| 2026-01-22 | 192 GWh |
| 2026-01-23 | 187 GWh |
| 2026-01-24 | 168 GWh |
| 2026-01-25 | 154 GWh |
| 2026-01-26 | 179 GWh |
| 2026-01-27 | 182 GWh |
| 2026-01-28 | 175 GWh |
| 2026-01-29 | 173 GWh |
| 2026-01-30 | 175 GWh |
| 2026-01-31 | 169 GWh |
| 2026-02-01 | 154 GWh |
| 2026-02-02 | 182 GWh |
| 2026-02-03 | 185 GWh |
| 2026-02-04 | 183 GWh |
| 2026-02-05 | 181 GWh |
| 2026-02-06 | 176 GWh |
| 2026-02-07 | 163 GWh |
| 2026-02-08 | 148 GWh |
| 2026-02-09 | 179 GWh |
| 2026-02-10 | 182 GWh |
| 2026-02-11 | 175 GWh |
| 2026-02-12 | 171 GWh |
| 2026-02-13 | 171 GWh |
| 2026-02-14 | 147 GWh |
| 2026-02-15 | 148 GWh |
| 2026-02-16 | 169 GWh |
| 2026-02-17 | 183 GWh |
| 2026-02-18 | 177 GWh |
| 2026-02-19 | 175 GWh |
| 2026-02-20 | 174 GWh |
| 2026-02-21 | 169 GWh |
| 2026-02-22 | 149 GWh |
| 2026-02-23 | 173 GWh |
| 2026-02-24 | 174 GWh |
| 2026-02-25 | 167 GWh |
| 2026-02-26 | 164 GWh |
| 2026-02-27 | 161 GWh |
| 2026-02-28 | 153 GWh |
| 2026-03-01 | 135 GWh |
| 2026-03-02 | 166 GWh |
| 2026-03-03 | 157 GWh |
| 2026-03-04 | 153 GWh |
| 2026-03-05 | 153 GWh |
| 2026-03-06 | 147 GWh |
| 2026-03-07 | 134 GWh |
| 2026-03-08 | 124 GWh |
| 2026-03-09 | 141 GWh |
| 2026-03-10 | 143 GWh |
| 2026-03-11 | 144 GWh |
| 2026-03-12 | 147 GWh |
| 2026-03-13 | 142 GWh |
| 2026-03-14 | 132 GWh |
| 2026-03-15 | 121 GWh |
| 2026-03-16 | 143 GWh |
| 2026-03-17 | 145 GWh |
| 2026-03-18 | 146 GWh |
| 2026-03-19 | 158 GWh |
| 2026-03-20 | 155 GWh |
| 2026-03-21 | 140 GWh |
| 2026-03-22 | 129 GWh |
| 2026-03-23 | 151 GWh |
| 2026-03-24 | 147 GWh |
| 2026-03-25 | 143 GWh |
| 2026-03-26 | 145 GWh |
| 2026-03-27 | 152 GWh |
| 2026-03-28 | 147 GWh |
| 2026-03-29 | 129 GWh |
| 2026-03-30 | 156 GWh |
| 2026-03-31 | 158 GWh |
| 2026-04-01 | 147 GWh |
| 2026-04-02 | 161 GWh |
| 2026-04-03 | 153 GWh |
| 2026-04-04 | 128 GWh |
| 2026-04-05 | 108 GWh |
| 2026-04-06 | 131 GWh |
| 2026-04-07 | 134 GWh |
| 2026-04-08 | 142 GWh |
| 2026-04-09 | 144 GWh |
| 2026-04-10 | 125 GWh |
| 2026-04-11 | 124 GWh |
| 2026-04-12 | 97.2 GWh |
| 2026-04-13 | 103 GWh |
| 2026-04-14 | 123 GWh |
| 2026-04-15 | 131 GWh |
| 2026-04-16 | 131 GWh |
| 2026-04-17 | 132 GWh |
| 2026-04-18 | 121 GWh |
| 2026-04-19 | 105 GWh |
| 2026-04-20 | 133 GWh |
| 2026-04-21 | 143 GWh |
| 2026-04-22 | 142 GWh |
| 2026-04-23 | 131 GWh |
| 2026-04-24 | 132 GWh |
| 2026-04-25 | 118 GWh |
| 2026-04-26 | 103 GWh |
| 2026-04-27 | 124 GWh |
| 2026-04-28 | 128 GWh |
| 2026-04-29 | 137 GWh |
| 2026-04-30 | 148 GWh |
| 2026-05-01 | 119 GWh |
| 2026-05-02 | 119 GWh |
| 2026-05-03 | 105 GWh |
| 2026-05-04 | 125 GWh |
| 2026-05-05 | 125 GWh |
| 2026-05-06 | 124 GWh |
| 2026-05-07 | 132 GWh |
| 2026-05-08 | 131 GWh |
| 2026-05-09 | 131 GWh |
| 2026-05-10 | 109 GWh |
| 2026-05-11 | 124 GWh |
| 2026-05-12 | 131 GWh |
| 2026-05-13 | 136 GWh |
| 2026-05-14 | 127 GWh |
| 2026-05-15 | 122 GWh |
| 2026-05-16 | 114 GWh |
| 2026-05-17 | 111 GWh |
| 2026-05-18 | 123 GWh |
| 2026-05-19 | 126 GWh |
| 2026-05-20 | 130 GWh |
| 2026-05-21 | 134 GWh |
| 2026-05-22 | 132 GWh |
| 2026-05-23 | 112 GWh |
| 2026-05-24 | 97.9 GWh |
| 2026-05-25 | 120 GWh |
| 2026-05-26 | 121 GWh |
| 2026-05-27 | 126 GWh |
| 2026-05-28 | 126 GWh |
| 2026-05-29 | 120 GWh |
| 2026-05-30 | 112 GWh |
| 2026-05-31 | 101 GWh |
| 2026-06-01 | 106 GWh |
| 2026-06-02 | 129 GWh |
| 2026-06-03 | 126 GWh |
| 2026-06-04 | 131 GWh |
| 2026-06-05 | 127 GWh |
| 2026-06-06 | 119 GWh |
| 2026-06-07 | 107 GWh |
| 2026-06-08 | 123 GWh |
| 2026-06-09 | 128 GWh |
| 2026-06-10 | 131 GWh |
| 2026-06-11 | 135 GWh |
| 2026-06-12 | 138 GWh |
| 2026-06-13 | 114 GWh |
| 2026-06-14 | 104 GWh |
| 2026-06-15 | 124 GWh |
| 2026-06-16 | 123 GWh |
| 2026-06-17 | 129 GWh |
| 2026-06-18 | 126 GWh |
| 2026-06-19 | 126 GWh |
| 2026-06-20 | 119 GWh |
| 2026-06-21 | 111 GWh |
| 2026-06-22 | 136 GWh |
| 2026-06-23 | 144 GWh |
| 2026-06-24 | 139 GWh |
| 2026-06-25 | 141 GWh |
| 2026-06-26 | 143 GWh |
| 2026-06-27 | 130 GWh |
| 2026-06-28 | 121 GWh |
| 2026-06-29 | 150 GWh |
| 2026-06-30 | 160 GWh |
| 2026-07-01 | 154 GWh |
| 2026-07-02 | 150 GWh |
| 2026-07-03 | 147 GWh |
| 2026-07-04 | 121 GWh |
| 2026-07-05 | 108 GWh |
| 2026-07-06 | 131 GWh |
| 2026-07-07 | 141 GWh |
| 2026-07-08 | 147 GWh |
| 2026-07-09 | 136 GWh |
| 2026-07-10 | 135 GWh |
| 2026-07-11 | 120 GWh |
| 2026-07-12 | 114 GWh |
| 2026-07-13 | 133 GWh |
| 2026-07-14 | 136 GWh |
| 2026-07-15 | 142 GWh |
| 2026-07-16 | 147 GWh |
| 2026-07-17 | 146 GWh |
| 2026-07-18 | 135 GWh |
| 2026-07-19 | 125 GWh |
| 2026-07-20 | 140 GWh |
| 2026-07-21 | 140 GWh |
| 2026-07-22 | 145 GWh |
| 2026-07-23 | 128 GWh |
| 2026-07-24 | 128 GWh |
| 2026-07-25 | 114 GWh |
| 2026-07-26 | 101 GWh |
| 2026-07-27 | 131 GWh |
| 2026-07-28 | 131 GWh |
| 2026-07-29 | 129 GWh |
| 2026-07-30 | 134 GWh |
| 2026-07-31 | 136 GWh |
| 2026-08-01 | 124 GWh |
| 2026-08-02 | 115 GWh |
| 2026-08-03 | 137 GWh |
| 2026-08-04 | 140 GWh |
| 2026-08-05 | 145 GWh |
| 2026-08-06 | 149 GWh |
| 2026-08-07 | 146 GWh |
| 2026-08-08 | 130 GWh |
| 2026-08-09 | 113 GWh |
| 2026-08-10 | 130 GWh |
| 2026-08-11 | 137 GWh |
| 2026-08-12 | n/a |
| 2026-08-13 | 130 GWh |
| 2026-08-14 | 127 GWh |
| 2026-08-15 | 106 GWh |
| 2026-08-16 | 103 GWh |
| 2026-08-17 | 128 GWh |
| 2026-08-18 | 136 GWh |
| 2026-08-19 | 136 GWh |
| 2026-08-20 | 136 GWh |
| 2026-08-21 | 141 GWh |
| 2026-08-22 | 128 GWh |
| 2026-08-23 | 114 GWh |
| 2026-08-24 | 135 GWh |
| 2026-08-25 | 141 GWh |
| 2026-08-26 | 145 GWh |
| 2026-08-27 | 142 GWh |
| 2026-08-28 | 130 GWh |
| 2026-08-29 | 114 GWh |
| 2026-08-30 | 110 GWh |
| 2026-08-31 | 132 GWh |
| 2026-09-01 | 140 GWh |
| 2026-09-02 | 137 GWh |
| 2026-09-03 | 137 GWh |
| 2026-09-04 | 135 GWh |
| 2026-09-05 | 122 GWh |
| 2026-09-06 | 109 GWh |
| 2026-09-07 | 125 GWh |
| 2026-09-08 | 130 GWh |
| 2026-09-09 | 131 GWh |
| 2026-09-10 | 136 GWh |
| 2026-09-11 | 139 GWh |
| 2026-09-12 | 131 GWh |
| 2026-09-13 | 112 GWh |
| 2026-09-14 | 126 GWh |
| 2026-09-15 | 131 GWh |
| 2026-09-16 | 128 GWh |
| 2026-09-17 | 128 GWh |
| 2026-09-18 | 131 GWh |
| 2026-09-19 | 117 GWh |
| 2026-09-20 | 105 GWh |
| 2026-09-21 | 132 GWh |
| 2026-09-22 | 132 GWh |
| 2026-09-23 | 136 GWh |
| 2026-09-24 | 131 GWh |
| 2026-09-25 | 134 GWh |
| 2026-09-26 | 122 GWh |
| 2026-09-27 | 106 GWh |
| 2026-09-28 | 128 GWh |
| 2026-09-29 | 132 GWh |
| 2026-09-30 | 130 GWh |
| 2026-10-01 | 128 GWh |
| 2026-10-02 | n/a |
| 2026-10-03 | 117 GWh |
| 2026-10-04 | 104 GWh |
| 2026-10-05 | 127 GWh |
| 2026-10-06 | 132 GWh |
| 2026-10-07 | 134 GWh |
| 2026-10-08 | 132 GWh |
| 2026-10-09 | 137 GWh |
| 2026-10-10 | 122 GWh |
| 2026-10-11 | 115 GWh |
| 2026-10-12 | 144 GWh |
| 2026-10-13 | 146 GWh |
| 2026-10-14 | 137 GWh |
| 2026-10-15 | 148 GWh |
| 2026-10-16 | 145 GWh |
| 2026-10-17 | 139 GWh |
| 2026-10-18 | 123 GWh |
| 2026-10-19 | 144 GWh |
| 2026-10-20 | 143 GWh |
| 2026-10-21 | 142 GWh |
| 2026-10-22 | 154 GWh |
| 2026-10-23 | 151 GWh |
| 2026-10-24 | 131 GWh |
| 2026-10-25 | n/a |
| 2026-10-26 | 146 GWh |
| 2026-10-27 | 155 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Bucharest local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 41.3 TWh | 36.1 TWh | Hydro 27.3% | 298 |
| 2025 | 53.6 TWh | 47.3 TWh | Hydro 25.5% | 365 |
| 2024 (partial) | 54.1 TWh | 51.0 TWh | Hydro 27.8% | 365 |
| 2023 (partial) | 52.1 TWh | 56.0 TWh | Hydro 32.5% | 361 |
| 2022 (partial) | 55.7 TWh | 54.9 TWh | Hydro 25.5% | 363 |
| 2021 (partial) | 50.7 TWh | 49.0 TWh | Hydro 30.2% | 306 |
| 2020 | 58.1 TWh | 55.4 TWh | Hydro 27.8% | 366 |
| 2019 | 59.9 TWh | 58.5 TWh | Hydro 26.8% | 365 |
| 2018 (partial) | 55.8 TWh | 59.3 TWh | Hydro 27.9% | 355 |
| 2017 (partial) | 58.4 TWh | 61.2 TWh | Coal 27.2% | 356 |
| 2016 | 58.4 TWh | 63.3 TWh | Hydro 28.7% | 366 |
| 2015 (partial) | 56.9 TWh | 63.8 TWh | Coal 28.3% | 361 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Bulgaria | Romania imports | 452 GWh |
| Hungary | Romania imports | 157 GWh |
| Serbia | Romania exports | 88.0 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Latest Grid Alerts
Newest alert 26 October 2026- Net imports Net imports into Romania reached 41.8 GWh on 26 October 2026 (29% of demand), the highest daily net imports in 394 days of loaded history. All alerts that day
- Net imports Net imports into Romania reached 38.5 GWh on 17 October 2026 (28% of demand), the highest daily net imports in 386 days of loaded history. All alerts that day
- Net imports Net imports into Romania reached 32.0 GWh on 6 October 2026 (24% of demand), the 2nd highest daily net imports in 375 days of loaded history. All alerts that day
Follow this grid: RSS feed of Romania alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Romania, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Romania Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/ro/
World Power Monitor. Romania Electricity Demand and Generation Mix. Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/ro/
@misc{wpm_zones_ro_2026,
title = {{Romania Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/ro/}
} Permalink: https://worldpowermonitor.com/zones/ro/
The Copy buttons add today's date as the access date.