Finland Electricity Demand and Generation Mix
Finland demand was 10,519 MW in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00). Wind was the largest source in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00), at 53% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Finland is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00), demand in Finland was 10,519 MW, against a day-ahead forecast of 10,282 MW.
- Wind supplied 53.0% of Finland's generation in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00).
- The day-ahead price in Finland averaged EUR 17.21/MWh for delivery on 2026-10-29 (29 October 2026).
- Installed generating capacity in Finland was 26.3 GW in 2026, as reported to ENTSO-E.
- Demand in Finland totalled 84.6 TWh in 2025.
- Nuclear supplied 39.4% of Finland's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 14:00 EET (UTC+02:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 14:00 EET (UTC+02:00)| Source | Output | Share |
|---|---|---|
| Wind | 5,712 MW | 53.0% |
| Nuclear | 2,309 MW | 21.4% |
| Hydro | 1,742 MW | 16.2% |
| Bioenergy | 622 MW | 5.8% |
| Other | 230 MW | 2.1% |
| Solar | 59 MW | 0.5% |
| Other fossil | 57 MW | 0.5% |
| Storage | 33 MW | 0.3% |
| Gas | 9 MW | 0.1% |
| Other renewables | 7 MW | 0.1% |
| Oil | 4 MW | 0.0% |
| Coal | 0 MW | 0.0% |
| Total from these sources | 10,784 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Day-Ahead Price
Delivery day 2026-10-29 (29 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Finland and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-29.
Last 30 Days, Hourly
Times in UTCShow the data table (687 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-29T22:00Z | 8,488 MW |
| 2026-09-29T23:00Z | 8,085 MW |
| 2026-09-30T00:00Z | 7,952 MW |
| 2026-09-30T01:00Z | 7,954 MW |
| 2026-09-30T02:00Z | 8,070 MW |
| 2026-09-30T03:00Z | 8,396 MW |
| 2026-09-30T04:00Z | 8,612 MW |
| 2026-09-30T05:00Z | 8,834 MW |
| 2026-09-30T06:00Z | 8,954 MW |
| 2026-09-30T07:00Z | 8,780 MW |
| 2026-09-30T08:00Z | 8,803 MW |
| 2026-09-30T09:00Z | 8,899 MW |
| 2026-09-30T10:00Z | 8,861 MW |
| 2026-09-30T11:00Z | 8,767 MW |
| 2026-09-30T12:00Z | 8,613 MW |
| 2026-09-30T13:00Z | 8,525 MW |
| 2026-09-30T14:00Z | 8,401 MW |
| 2026-09-30T15:00Z | 8,282 MW |
| 2026-09-30T16:00Z | 8,671 MW |
| 2026-09-30T17:00Z | 8,683 MW |
| 2026-09-30T18:00Z | 8,586 MW |
| 2026-09-30T19:00Z | 8,576 MW |
| 2026-09-30T20:00Z | 8,615 MW |
| 2026-09-30T21:00Z | 8,793 MW |
| 2026-09-30T22:00Z | 8,761 MW |
| 2026-09-30T23:00Z | 8,937 MW |
| 2026-10-01T00:00Z | 8,958 MW |
| 2026-10-01T01:00Z | 8,938 MW |
| 2026-10-01T02:00Z | 9,142 MW |
| 2026-10-01T03:00Z | 9,582 MW |
| 2026-10-01T04:00Z | 9,788 MW |
| 2026-10-01T05:00Z | 9,941 MW |
| 2026-10-01T06:00Z | 10,067 MW |
| 2026-10-01T07:00Z | 10,075 MW |
| 2026-10-01T08:00Z | 9,706 MW |
| 2026-10-01T09:00Z | 9,524 MW |
| 2026-10-01T10:00Z | 9,512 MW |
| 2026-10-01T11:00Z | 9,654 MW |
| 2026-10-01T12:00Z | 9,583 MW |
| 2026-10-01T13:00Z | 9,494 MW |
| 2026-10-01T14:00Z | 9,348 MW |
| 2026-10-01T15:00Z | 9,320 MW |
| 2026-10-01T16:00Z | 9,667 MW |
| 2026-10-01T17:00Z | 9,742 MW |
| 2026-10-01T18:00Z | 9,674 MW |
| 2026-10-01T19:00Z | 9,522 MW |
| 2026-10-01T20:00Z | 9,328 MW |
| 2026-10-01T21:00Z | 8,978 MW |
| 2026-10-01T22:00Z | 8,434 MW |
| 2026-10-01T23:00Z | 8,116 MW |
| 2026-10-02T00:00Z | 8,060 MW |
| 2026-10-02T01:00Z | 7,980 MW |
| 2026-10-02T02:00Z | 8,099 MW |
| 2026-10-02T03:00Z | 8,719 MW |
| 2026-10-02T04:00Z | 8,925 MW |
| 2026-10-02T05:00Z | 9,100 MW |
| 2026-10-02T06:00Z | 9,178 MW |
| 2026-10-02T07:00Z | 9,118 MW |
| 2026-10-02T08:00Z | 9,159 MW |
| 2026-10-02T09:00Z | 9,116 MW |
| 2026-10-02T10:00Z | 8,963 MW |
| 2026-10-02T11:00Z | 9,187 MW |
| 2026-10-02T12:00Z | 9,093 MW |
| 2026-10-02T13:00Z | 8,836 MW |
| 2026-10-02T14:00Z | 8,684 MW |
| 2026-10-02T15:00Z | 8,588 MW |
| 2026-10-02T16:00Z | 8,944 MW |
| 2026-10-02T17:00Z | 8,967 MW |
| 2026-10-02T18:00Z | 8,852 MW |
| 2026-10-02T19:00Z | 8,899 MW |
| 2026-10-02T20:00Z | 8,483 MW |
| 2026-10-02T21:00Z | 8,062 MW |
| 2026-10-02T22:00Z | 7,704 MW |
| 2026-10-02T23:00Z | 7,811 MW |
| 2026-10-03T00:00Z | 7,675 MW |
| 2026-10-03T01:00Z | 7,444 MW |
| 2026-10-03T02:00Z | 7,455 MW |
| 2026-10-03T03:00Z | 7,547 MW |
| 2026-10-03T04:00Z | 7,629 MW |
| 2026-10-03T05:00Z | 7,923 MW |
| 2026-10-03T06:00Z | 8,197 MW |
| 2026-10-03T07:00Z | 8,515 MW |
| 2026-10-03T08:00Z | 8,653 MW |
| 2026-10-03T09:00Z | 8,689 MW |
| 2026-10-03T10:00Z | 8,949 MW |
| 2026-10-03T11:00Z | 9,001 MW |
| 2026-10-03T12:00Z | 8,968 MW |
| 2026-10-03T13:00Z | 8,978 MW |
| 2026-10-03T14:00Z | 9,142 MW |
| 2026-10-03T15:00Z | 9,363 MW |
| 2026-10-03T16:00Z | 9,491 MW |
| 2026-10-03T17:00Z | 9,297 MW |
| 2026-10-03T18:00Z | 9,153 MW |
| 2026-10-03T19:00Z | 8,990 MW |
| 2026-10-03T20:00Z | 8,802 MW |
| 2026-10-03T21:00Z | 8,511 MW |
| 2026-10-03T22:00Z | 8,349 MW |
| 2026-10-03T23:00Z | 8,135 MW |
| 2026-10-04T00:00Z | 7,973 MW |
| 2026-10-04T01:00Z | 7,879 MW |
| 2026-10-04T02:00Z | 7,917 MW |
| 2026-10-04T03:00Z | 7,942 MW |
| 2026-10-04T04:00Z | 7,859 MW |
| 2026-10-04T05:00Z | 7,914 MW |
| 2026-10-04T06:00Z | 8,111 MW |
| 2026-10-04T07:00Z | 8,212 MW |
| 2026-10-04T08:00Z | 8,266 MW |
| 2026-10-04T09:00Z | 8,413 MW |
| 2026-10-04T10:00Z | 8,441 MW |
| 2026-10-04T11:00Z | 8,577 MW |
| 2026-10-04T12:00Z | 8,447 MW |
| 2026-10-04T13:00Z | 8,335 MW |
| 2026-10-04T14:00Z | 8,355 MW |
| 2026-10-04T15:00Z | 8,717 MW |
| 2026-10-04T16:00Z | 9,064 MW |
| 2026-10-04T17:00Z | 9,252 MW |
| 2026-10-04T18:00Z | 9,095 MW |
| 2026-10-04T19:00Z | 9,059 MW |
| 2026-10-04T20:00Z | 9,120 MW |
| 2026-10-04T21:00Z | 8,973 MW |
| 2026-10-04T22:00Z | 8,901 MW |
| 2026-10-04T23:00Z | 8,754 MW |
| 2026-10-05T00:00Z | 8,606 MW |
| 2026-10-05T01:00Z | 8,630 MW |
| 2026-10-05T02:00Z | 8,800 MW |
| 2026-10-05T03:00Z | 9,296 MW |
| 2026-10-05T04:00Z | 9,587 MW |
| 2026-10-05T05:00Z | 9,695 MW |
| 2026-10-05T06:00Z | 9,758 MW |
| 2026-10-05T07:00Z | 9,680 MW |
| 2026-10-05T08:00Z | 9,855 MW |
| 2026-10-05T09:00Z | 9,900 MW |
| 2026-10-05T10:00Z | 9,941 MW |
| 2026-10-05T11:00Z | 10,021 MW |
| 2026-10-05T12:00Z | 9,802 MW |
| 2026-10-05T13:00Z | 9,780 MW |
| 2026-10-05T14:00Z | 9,842 MW |
| 2026-10-05T15:00Z | 9,971 MW |
| 2026-10-05T16:00Z | 10,224 MW |
| 2026-10-05T17:00Z | 10,034 MW |
| 2026-10-05T18:00Z | 9,624 MW |
| 2026-10-05T19:00Z | 9,538 MW |
| 2026-10-05T20:00Z | 9,256 MW |
| 2026-10-05T21:00Z | 8,830 MW |
| 2026-10-05T22:00Z | 8,535 MW |
| 2026-10-05T23:00Z | 8,415 MW |
| 2026-10-06T00:00Z | 8,323 MW |
| 2026-10-06T01:00Z | 8,341 MW |
| 2026-10-06T02:00Z | 8,544 MW |
| 2026-10-06T03:00Z | 9,166 MW |
| 2026-10-06T04:00Z | 9,408 MW |
| 2026-10-06T05:00Z | 9,534 MW |
| 2026-10-06T06:00Z | 9,797 MW |
| 2026-10-06T07:00Z | 9,842 MW |
| 2026-10-06T08:00Z | 9,799 MW |
| 2026-10-06T09:00Z | 9,682 MW |
| 2026-10-06T10:00Z | 9,638 MW |
| 2026-10-06T11:00Z | 9,624 MW |
| 2026-10-06T12:00Z | 9,583 MW |
| 2026-10-06T13:00Z | 9,541 MW |
| 2026-10-06T14:00Z | 9,572 MW |
| 2026-10-06T15:00Z | 9,677 MW |
| 2026-10-06T16:00Z | 10,152 MW |
| 2026-10-06T17:00Z | 10,097 MW |
| 2026-10-06T18:00Z | 9,614 MW |
| 2026-10-06T19:00Z | 9,466 MW |
| 2026-10-06T20:00Z | 9,274 MW |
| 2026-10-06T21:00Z | 8,916 MW |
| 2026-10-06T22:00Z | 8,866 MW |
| 2026-10-06T23:00Z | 8,684 MW |
| 2026-10-07T00:00Z | 8,483 MW |
| 2026-10-07T01:00Z | 8,442 MW |
| 2026-10-07T02:00Z | 8,651 MW |
| 2026-10-07T03:00Z | 9,482 MW |
| 2026-10-07T04:00Z | 9,987 MW |
| 2026-10-07T05:00Z | 10,287 MW |
| 2026-10-07T06:00Z | 10,277 MW |
| 2026-10-07T07:00Z | 10,052 MW |
| 2026-10-07T08:00Z | 9,832 MW |
| 2026-10-07T09:00Z | 9,962 MW |
| 2026-10-07T10:00Z | 9,860 MW |
| 2026-10-07T11:00Z | 9,811 MW |
| 2026-10-07T12:00Z | 9,675 MW |
| 2026-10-07T13:00Z | 9,618 MW |
| 2026-10-07T14:00Z | 9,624 MW |
| 2026-10-07T15:00Z | 9,528 MW |
| 2026-10-07T16:00Z | 10,013 MW |
| 2026-10-07T17:00Z | 10,011 MW |
| 2026-10-07T18:00Z | 9,648 MW |
| 2026-10-07T19:00Z | 9,606 MW |
| 2026-10-07T20:00Z | 9,205 MW |
| 2026-10-07T21:00Z | 8,848 MW |
| 2026-10-07T22:00Z | 8,708 MW |
| 2026-10-07T23:00Z | 8,484 MW |
| 2026-10-08T00:00Z | 8,272 MW |
| 2026-10-08T01:00Z | 8,068 MW |
| 2026-10-08T02:00Z | 8,239 MW |
| 2026-10-08T03:00Z | 8,842 MW |
| 2026-10-08T04:00Z | 9,092 MW |
| 2026-10-08T05:00Z | 9,082 MW |
| 2026-10-08T06:00Z | 9,131 MW |
| 2026-10-08T07:00Z | 9,113 MW |
| 2026-10-08T08:00Z | 9,061 MW |
| 2026-10-08T09:00Z | 8,959 MW |
| 2026-10-08T10:00Z | 8,919 MW |
| 2026-10-08T11:00Z | 8,864 MW |
| 2026-10-08T12:00Z | 8,950 MW |
| 2026-10-08T13:00Z | 8,949 MW |
| 2026-10-08T14:00Z | 8,949 MW |
| 2026-10-08T15:00Z | 9,207 MW |
| 2026-10-08T16:00Z | 9,371 MW |
| 2026-10-08T17:00Z | 9,314 MW |
| 2026-10-08T18:00Z | 8,980 MW |
| 2026-10-08T19:00Z | 9,039 MW |
| 2026-10-08T20:00Z | 9,130 MW |
| 2026-10-08T21:00Z | 9,026 MW |
| 2026-10-08T22:00Z | 9,052 MW |
| 2026-10-08T23:00Z | 9,119 MW |
| 2026-10-09T00:00Z | 9,071 MW |
| 2026-10-09T01:00Z | 9,161 MW |
| 2026-10-09T02:00Z | 9,468 MW |
| 2026-10-09T03:00Z | 10,089 MW |
| 2026-10-09T04:00Z | 10,416 MW |
| 2026-10-09T05:00Z | 10,635 MW |
| 2026-10-09T06:00Z | 10,806 MW |
| 2026-10-09T07:00Z | 10,814 MW |
| 2026-10-09T08:00Z | 10,883 MW |
| 2026-10-09T09:00Z | 10,808 MW |
| 2026-10-09T10:00Z | 10,695 MW |
| 2026-10-09T11:00Z | 10,740 MW |
| 2026-10-09T12:00Z | 10,792 MW |
| 2026-10-09T13:00Z | 10,604 MW |
| 2026-10-09T14:00Z | 10,511 MW |
| 2026-10-09T15:00Z | 10,678 MW |
| 2026-10-09T16:00Z | 10,876 MW |
| 2026-10-09T17:00Z | 10,703 MW |
| 2026-10-09T18:00Z | 10,418 MW |
| 2026-10-09T19:00Z | 10,325 MW |
| 2026-10-09T20:00Z | 10,067 MW |
| 2026-10-09T21:00Z | 9,718 MW |
| 2026-10-09T22:00Z | 9,692 MW |
| 2026-10-09T23:00Z | 9,479 MW |
| 2026-10-10T00:00Z | 9,431 MW |
| 2026-10-10T01:00Z | 9,381 MW |
| 2026-10-10T02:00Z | 9,425 MW |
| 2026-10-10T03:00Z | 9,721 MW |
| 2026-10-10T04:00Z | 9,844 MW |
| 2026-10-10T05:00Z | 9,837 MW |
| 2026-10-10T06:00Z | 10,040 MW |
| 2026-10-10T07:00Z | 10,272 MW |
| 2026-10-10T08:00Z | 10,323 MW |
| 2026-10-10T09:00Z | 10,251 MW |
| 2026-10-10T10:00Z | 10,177 MW |
| 2026-10-10T11:00Z | 10,118 MW |
| 2026-10-10T12:00Z | 10,117 MW |
| 2026-10-10T13:00Z | 9,924 MW |
| 2026-10-10T14:00Z | 9,684 MW |
| 2026-10-10T15:00Z | 9,871 MW |
| 2026-10-10T16:00Z | 10,001 MW |
| 2026-10-10T17:00Z | 9,856 MW |
| 2026-10-10T18:00Z | 9,597 MW |
| 2026-10-10T19:00Z | 9,549 MW |
| 2026-10-10T20:00Z | 9,421 MW |
| 2026-10-10T21:00Z | 9,222 MW |
| 2026-10-10T22:00Z | 9,105 MW |
| 2026-10-10T23:00Z | 8,876 MW |
| 2026-10-11T00:00Z | 8,753 MW |
| 2026-10-11T01:00Z | 8,661 MW |
| 2026-10-11T02:00Z | 8,612 MW |
| 2026-10-11T03:00Z | 8,682 MW |
| 2026-10-11T04:00Z | 8,910 MW |
| 2026-10-11T05:00Z | 9,070 MW |
| 2026-10-11T06:00Z | 9,233 MW |
| 2026-10-11T07:00Z | 9,141 MW |
| 2026-10-11T08:00Z | 9,167 MW |
| 2026-10-11T09:00Z | 9,170 MW |
| 2026-10-11T10:00Z | 9,099 MW |
| 2026-10-11T11:00Z | 9,037 MW |
| 2026-10-11T12:00Z | 9,022 MW |
| 2026-10-11T13:00Z | 9,070 MW |
| 2026-10-11T14:00Z | 9,091 MW |
| 2026-10-11T15:00Z | 9,571 MW |
| 2026-10-11T16:00Z | 9,916 MW |
| 2026-10-11T17:00Z | 9,863 MW |
| 2026-10-11T18:00Z | 9,822 MW |
| 2026-10-11T19:00Z | 9,825 MW |
| 2026-10-11T20:00Z | 9,419 MW |
| 2026-10-11T21:00Z | 9,164 MW |
| 2026-10-11T22:00Z | 8,848 MW |
| 2026-10-11T23:00Z | 8,824 MW |
| 2026-10-12T00:00Z | 8,706 MW |
| 2026-10-12T01:00Z | 8,794 MW |
| 2026-10-12T02:00Z | 8,990 MW |
| 2026-10-12T03:00Z | 9,627 MW |
| 2026-10-12T04:00Z | 10,035 MW |
| 2026-10-12T05:00Z | 10,088 MW |
| 2026-10-12T06:00Z | 10,118 MW |
| 2026-10-12T07:00Z | 9,728 MW |
| 2026-10-12T08:00Z | 9,533 MW |
| 2026-10-12T09:00Z | 9,443 MW |
| 2026-10-12T10:00Z | 9,339 MW |
| 2026-10-12T11:00Z | 9,226 MW |
| 2026-10-12T12:00Z | 8,958 MW |
| 2026-10-12T13:00Z | 9,083 MW |
| 2026-10-12T14:00Z | 9,168 MW |
| 2026-10-12T15:00Z | 9,469 MW |
| 2026-10-12T16:00Z | 9,996 MW |
| 2026-10-12T17:00Z | 10,065 MW |
| 2026-10-12T18:00Z | 10,017 MW |
| 2026-10-12T19:00Z | 9,890 MW |
| 2026-10-12T20:00Z | 9,630 MW |
| 2026-10-12T21:00Z | 9,339 MW |
| 2026-10-12T22:00Z | 9,224 MW |
| 2026-10-12T23:00Z | 9,053 MW |
| 2026-10-13T00:00Z | 8,914 MW |
| 2026-10-13T01:00Z | 8,949 MW |
| 2026-10-13T02:00Z | 9,209 MW |
| 2026-10-13T03:00Z | 9,806 MW |
| 2026-10-13T04:00Z | 10,110 MW |
| 2026-10-13T05:00Z | 10,145 MW |
| 2026-10-13T06:00Z | 10,126 MW |
| 2026-10-13T07:00Z | 9,833 MW |
| 2026-10-13T08:00Z | 9,377 MW |
| 2026-10-13T09:00Z | 9,288 MW |
| 2026-10-13T10:00Z | 9,249 MW |
| 2026-10-13T11:00Z | 9,263 MW |
| 2026-10-13T12:00Z | 9,253 MW |
| 2026-10-13T13:00Z | 9,222 MW |
| 2026-10-13T14:00Z | 9,295 MW |
| 2026-10-13T15:00Z | 9,632 MW |
| 2026-10-13T16:00Z | 10,149 MW |
| 2026-10-13T17:00Z | 10,646 MW |
| 2026-10-13T18:00Z | 10,723 MW |
| 2026-10-13T19:00Z | 10,672 MW |
| 2026-10-13T20:00Z | 10,277 MW |
| 2026-10-13T21:00Z | 9,946 MW |
| 2026-10-13T22:00Z | 9,543 MW |
| 2026-10-13T23:00Z | 9,404 MW |
| 2026-10-14T00:00Z | 9,154 MW |
| 2026-10-14T01:00Z | 8,984 MW |
| 2026-10-14T02:00Z | 9,103 MW |
| 2026-10-14T03:00Z | 9,505 MW |
| 2026-10-14T04:00Z | 9,717 MW |
| 2026-10-14T05:00Z | 9,979 MW |
| 2026-10-14T06:00Z | 10,013 MW |
| 2026-10-14T07:00Z | 9,879 MW |
| 2026-10-14T08:00Z | 9,856 MW |
| 2026-10-14T09:00Z | 9,792 MW |
| 2026-10-14T10:00Z | 9,954 MW |
| 2026-10-14T11:00Z | 9,926 MW |
| 2026-10-14T12:00Z | 9,812 MW |
| 2026-10-14T13:00Z | 9,715 MW |
| 2026-10-14T14:00Z | 9,625 MW |
| 2026-10-14T15:00Z | 9,785 MW |
| 2026-10-14T16:00Z | 9,980 MW |
| 2026-10-14T17:00Z | 9,671 MW |
| 2026-10-14T18:00Z | 9,305 MW |
| 2026-10-14T19:00Z | 9,062 MW |
| 2026-10-14T20:00Z | 8,614 MW |
| 2026-10-14T21:00Z | 8,418 MW |
| 2026-10-14T22:00Z | 8,237 MW |
| 2026-10-14T23:00Z | 8,384 MW |
| 2026-10-15T00:00Z | 8,591 MW |
| 2026-10-15T01:00Z | 8,775 MW |
| 2026-10-15T02:00Z | 9,003 MW |
| 2026-10-15T03:00Z | 9,524 MW |
| 2026-10-15T04:00Z | 9,808 MW |
| 2026-10-15T05:00Z | 9,892 MW |
| 2026-10-15T06:00Z | 10,045 MW |
| 2026-10-15T07:00Z | 10,191 MW |
| 2026-10-15T08:00Z | 10,443 MW |
| 2026-10-15T09:00Z | 10,609 MW |
| 2026-10-15T10:00Z | 10,512 MW |
| 2026-10-15T11:00Z | 10,477 MW |
| 2026-10-15T12:00Z | 10,436 MW |
| 2026-10-15T13:00Z | 10,450 MW |
| 2026-10-15T14:00Z | 10,476 MW |
| 2026-10-15T15:00Z | 10,695 MW |
| 2026-10-15T16:00Z | 10,783 MW |
| 2026-10-15T17:00Z | 10,619 MW |
| 2026-10-15T18:00Z | 10,210 MW |
| 2026-10-15T19:00Z | 10,174 MW |
| 2026-10-15T20:00Z | 9,801 MW |
| 2026-10-15T21:00Z | 9,338 MW |
| 2026-10-15T22:00Z | 9,082 MW |
| 2026-10-15T23:00Z | 8,923 MW |
| 2026-10-16T00:00Z | 8,970 MW |
| 2026-10-16T01:00Z | 8,916 MW |
| 2026-10-16T02:00Z | 8,986 MW |
| 2026-10-16T03:00Z | 9,399 MW |
| 2026-10-16T04:00Z | 9,761 MW |
| 2026-10-16T05:00Z | 9,898 MW |
| 2026-10-16T06:00Z | 9,761 MW |
| 2026-10-16T07:00Z | 9,519 MW |
| 2026-10-16T08:00Z | 9,538 MW |
| 2026-10-16T09:00Z | 9,273 MW |
| 2026-10-16T10:00Z | 9,211 MW |
| 2026-10-16T11:00Z | 9,124 MW |
| 2026-10-16T12:00Z | 9,173 MW |
| 2026-10-16T13:00Z | 8,989 MW |
| 2026-10-16T14:00Z | 9,122 MW |
| 2026-10-16T15:00Z | 9,599 MW |
| 2026-10-16T16:00Z | 9,520 MW |
| 2026-10-16T17:00Z | 9,355 MW |
| 2026-10-16T18:00Z | 9,001 MW |
| 2026-10-16T19:00Z | 8,869 MW |
| 2026-10-16T20:00Z | 8,482 MW |
| 2026-10-16T21:00Z | 8,165 MW |
| 2026-10-16T22:00Z | 7,996 MW |
| 2026-10-16T23:00Z | 7,877 MW |
| 2026-10-17T00:00Z | 7,991 MW |
| 2026-10-17T01:00Z | 8,117 MW |
| 2026-10-17T02:00Z | 8,419 MW |
| 2026-10-17T03:00Z | 8,561 MW |
| 2026-10-17T04:00Z | 8,736 MW |
| 2026-10-17T05:00Z | 8,794 MW |
| 2026-10-17T06:00Z | 8,927 MW |
| 2026-10-17T07:00Z | 9,034 MW |
| 2026-10-17T08:00Z | 8,927 MW |
| 2026-10-17T09:00Z | 8,857 MW |
| 2026-10-17T10:00Z | 8,744 MW |
| 2026-10-17T11:00Z | 8,727 MW |
| 2026-10-17T12:00Z | 8,777 MW |
| 2026-10-17T13:00Z | 8,821 MW |
| 2026-10-17T14:00Z | 8,931 MW |
| 2026-10-17T15:00Z | 9,662 MW |
| 2026-10-17T16:00Z | 9,920 MW |
| 2026-10-17T17:00Z | 9,872 MW |
| 2026-10-17T18:00Z | 9,644 MW |
| 2026-10-17T19:00Z | 9,746 MW |
| 2026-10-17T20:00Z | 9,629 MW |
| 2026-10-17T21:00Z | 9,437 MW |
| 2026-10-17T22:00Z | 9,136 MW |
| 2026-10-17T23:00Z | 9,174 MW |
| 2026-10-18T00:00Z | 9,166 MW |
| 2026-10-18T01:00Z | 8,925 MW |
| 2026-10-18T02:00Z | 8,870 MW |
| 2026-10-18T03:00Z | 8,977 MW |
| 2026-10-18T04:00Z | 9,024 MW |
| 2026-10-18T05:00Z | 9,111 MW |
| 2026-10-18T06:00Z | 9,363 MW |
| 2026-10-18T07:00Z | 9,492 MW |
| 2026-10-18T08:00Z | 9,256 MW |
| 2026-10-18T09:00Z | 9,053 MW |
| 2026-10-18T10:00Z | 8,950 MW |
| 2026-10-18T11:00Z | 8,837 MW |
| 2026-10-18T12:00Z | 8,725 MW |
| 2026-10-18T13:00Z | 8,671 MW |
| 2026-10-18T14:00Z | 8,698 MW |
| 2026-10-18T15:00Z | 9,053 MW |
| 2026-10-18T16:00Z | 9,304 MW |
| 2026-10-18T17:00Z | 9,196 MW |
| 2026-10-18T18:00Z | 9,116 MW |
| 2026-10-18T19:00Z | 9,361 MW |
| 2026-10-18T20:00Z | 9,537 MW |
| 2026-10-18T21:00Z | 9,762 MW |
| 2026-10-18T22:00Z | 9,844 MW |
| 2026-10-18T23:00Z | 9,837 MW |
| 2026-10-19T00:00Z | 10,060 MW |
| 2026-10-19T01:00Z | 10,432 MW |
| 2026-10-19T02:00Z | 10,813 MW |
| 2026-10-19T03:00Z | 11,246 MW |
| 2026-10-19T04:00Z | 11,539 MW |
| 2026-10-19T05:00Z | 11,692 MW |
| 2026-10-19T06:00Z | 11,741 MW |
| 2026-10-19T07:00Z | 11,889 MW |
| 2026-10-19T08:00Z | 11,348 MW |
| 2026-10-19T09:00Z | 10,924 MW |
| 2026-10-19T10:00Z | 10,701 MW |
| 2026-10-19T11:00Z | 10,732 MW |
| 2026-10-19T12:00Z | 10,787 MW |
| 2026-10-19T13:00Z | 10,876 MW |
| 2026-10-19T14:00Z | 10,991 MW |
| 2026-10-19T15:00Z | 11,514 MW |
| 2026-10-19T16:00Z | 11,763 MW |
| 2026-10-19T17:00Z | 11,767 MW |
| 2026-10-19T18:00Z | 11,463 MW |
| 2026-10-19T19:00Z | 11,417 MW |
| 2026-10-19T20:00Z | 11,263 MW |
| 2026-10-19T21:00Z | 10,880 MW |
| 2026-10-19T22:00Z | 10,862 MW |
| 2026-10-19T23:00Z | 10,690 MW |
| 2026-10-20T00:00Z | 10,508 MW |
| 2026-10-20T01:00Z | 10,470 MW |
| 2026-10-20T02:00Z | 10,506 MW |
| 2026-10-20T03:00Z | 10,936 MW |
| 2026-10-20T04:00Z | 11,125 MW |
| 2026-10-20T05:00Z | 11,091 MW |
| 2026-10-20T06:00Z | 10,872 MW |
| 2026-10-20T07:00Z | 10,580 MW |
| 2026-10-20T08:00Z | 10,412 MW |
| 2026-10-20T09:00Z | 9,985 MW |
| 2026-10-20T10:00Z | 9,780 MW |
| 2026-10-20T11:00Z | 9,666 MW |
| 2026-10-20T12:00Z | 9,478 MW |
| 2026-10-20T13:00Z | 9,458 MW |
| 2026-10-20T14:00Z | 9,539 MW |
| 2026-10-20T15:00Z | 10,091 MW |
| 2026-10-20T16:00Z | 10,366 MW |
| 2026-10-20T17:00Z | 10,439 MW |
| 2026-10-20T18:00Z | 10,235 MW |
| 2026-10-20T19:00Z | 10,333 MW |
| 2026-10-20T20:00Z | 10,054 MW |
| 2026-10-20T21:00Z | 9,879 MW |
| 2026-10-20T22:00Z | 10,024 MW |
| 2026-10-20T23:00Z | 9,947 MW |
| 2026-10-21T00:00Z | 9,767 MW |
| 2026-10-21T01:00Z | 9,596 MW |
| 2026-10-21T02:00Z | 9,707 MW |
| 2026-10-21T03:00Z | 10,255 MW |
| 2026-10-21T04:00Z | 10,500 MW |
| 2026-10-21T05:00Z | 10,589 MW |
| 2026-10-21T06:00Z | 10,651 MW |
| 2026-10-21T07:00Z | 10,819 MW |
| 2026-10-21T08:00Z | 10,556 MW |
| 2026-10-21T09:00Z | 10,381 MW |
| 2026-10-21T10:00Z | 9,997 MW |
| 2026-10-21T11:00Z | 9,872 MW |
| 2026-10-21T12:00Z | 9,836 MW |
| 2026-10-21T13:00Z | 9,807 MW |
| 2026-10-21T14:00Z | 10,228 MW |
| 2026-10-21T15:00Z | 10,962 MW |
| 2026-10-21T16:00Z | 11,288 MW |
| 2026-10-21T17:00Z | 11,214 MW |
| 2026-10-21T18:00Z | 10,918 MW |
| 2026-10-21T19:00Z | 10,901 MW |
| 2026-10-21T20:00Z | 10,614 MW |
| 2026-10-21T21:00Z | 10,516 MW |
| 2026-10-21T22:00Z | 10,219 MW |
| 2026-10-21T23:00Z | 10,144 MW |
| 2026-10-22T00:00Z | 9,969 MW |
| 2026-10-22T01:00Z | 9,843 MW |
| 2026-10-22T02:00Z | 9,856 MW |
| 2026-10-22T03:00Z | 10,518 MW |
| 2026-10-22T04:00Z | 10,803 MW |
| 2026-10-22T05:00Z | 10,833 MW |
| 2026-10-22T06:00Z | 10,951 MW |
| 2026-10-22T07:00Z | 10,865 MW |
| 2026-10-22T08:00Z | 10,717 MW |
| 2026-10-22T09:00Z | 10,604 MW |
| 2026-10-22T10:00Z | 10,483 MW |
| 2026-10-22T11:00Z | 10,425 MW |
| 2026-10-22T12:00Z | 10,271 MW |
| 2026-10-22T13:00Z | 10,160 MW |
| 2026-10-22T14:00Z | 10,229 MW |
| 2026-10-22T15:00Z | 10,680 MW |
| 2026-10-22T16:00Z | 10,822 MW |
| 2026-10-22T17:00Z | 10,587 MW |
| 2026-10-22T18:00Z | 10,388 MW |
| 2026-10-22T19:00Z | 10,428 MW |
| 2026-10-22T20:00Z | 10,110 MW |
| 2026-10-22T21:00Z | 9,785 MW |
| 2026-10-22T22:00Z | 9,740 MW |
| 2026-10-22T23:00Z | 9,657 MW |
| 2026-10-23T00:00Z | 9,544 MW |
| 2026-10-23T01:00Z | 9,391 MW |
| 2026-10-23T02:00Z | 9,543 MW |
| 2026-10-23T03:00Z | 10,060 MW |
| 2026-10-23T04:00Z | 10,339 MW |
| 2026-10-23T05:00Z | 10,344 MW |
| 2026-10-23T06:00Z | 10,352 MW |
| 2026-10-23T07:00Z | 10,246 MW |
| 2026-10-23T08:00Z | 10,417 MW |
| 2026-10-23T09:00Z | 10,229 MW |
| 2026-10-23T10:00Z | 10,145 MW |
| 2026-10-23T11:00Z | 10,045 MW |
| 2026-10-23T12:00Z | 9,717 MW |
| 2026-10-23T13:00Z | 9,642 MW |
| 2026-10-23T14:00Z | 9,885 MW |
| 2026-10-23T15:00Z | 10,307 MW |
| 2026-10-23T16:00Z | 10,400 MW |
| 2026-10-23T17:00Z | 10,370 MW |
| 2026-10-23T18:00Z | 10,065 MW |
| 2026-10-23T19:00Z | 10,017 MW |
| 2026-10-23T20:00Z | 9,679 MW |
| 2026-10-23T21:00Z | 9,502 MW |
| 2026-10-23T22:00Z | 9,116 MW |
| 2026-10-23T23:00Z | 9,035 MW |
| 2026-10-24T00:00Z | 8,869 MW |
| 2026-10-24T01:00Z | 8,801 MW |
| 2026-10-24T02:00Z | 8,841 MW |
| 2026-10-24T03:00Z | 8,871 MW |
| 2026-10-24T04:00Z | 9,021 MW |
| 2026-10-24T05:00Z | 8,951 MW |
| 2026-10-24T06:00Z | 8,991 MW |
| 2026-10-24T07:00Z | 9,139 MW |
| 2026-10-24T08:00Z | 9,243 MW |
| 2026-10-24T09:00Z | 9,193 MW |
| 2026-10-24T10:00Z | 9,290 MW |
| 2026-10-24T11:00Z | 9,356 MW |
| 2026-10-24T12:00Z | 9,264 MW |
| 2026-10-24T13:00Z | 9,268 MW |
| 2026-10-24T14:00Z | 9,454 MW |
| 2026-10-24T15:00Z | 9,874 MW |
| 2026-10-24T16:00Z | 10,110 MW |
| 2026-10-24T17:00Z | 9,952 MW |
| 2026-10-24T18:00Z | 9,964 MW |
| 2026-10-24T19:00Z | 10,084 MW |
| 2026-10-24T20:00Z | 10,051 MW |
| 2026-10-24T21:00Z | 9,639 MW |
| 2026-10-24T22:00Z | 9,289 MW |
| 2026-10-24T23:00Z | 9,182 MW |
| 2026-10-25T00:00Z | 9,155 MW |
| 2026-10-25T01:00Z | 9,038 MW |
| 2026-10-25T02:00Z | 9,182 MW |
| 2026-10-25T03:00Z | 9,175 MW |
| 2026-10-25T04:00Z | 9,368 MW |
| 2026-10-25T05:00Z | 9,471 MW |
| 2026-10-25T06:00Z | 9,571 MW |
| 2026-10-25T07:00Z | 9,769 MW |
| 2026-10-25T08:00Z | 9,897 MW |
| 2026-10-25T09:00Z | 10,064 MW |
| 2026-10-25T10:00Z | 10,052 MW |
| 2026-10-25T11:00Z | 9,968 MW |
| 2026-10-25T12:00Z | 9,850 MW |
| 2026-10-25T13:00Z | 9,694 MW |
| 2026-10-25T14:00Z | 9,844 MW |
| 2026-10-25T15:00Z | 10,234 MW |
| 2026-10-25T16:00Z | 10,424 MW |
| 2026-10-25T17:00Z | 10,321 MW |
| 2026-10-25T18:00Z | 10,075 MW |
| 2026-10-25T19:00Z | 9,807 MW |
| 2026-10-25T20:00Z | 9,794 MW |
| 2026-10-25T21:00Z | 9,553 MW |
| 2026-10-25T22:00Z | 9,196 MW |
| 2026-10-25T23:00Z | 8,884 MW |
| 2026-10-26T00:00Z | 8,818 MW |
| 2026-10-26T01:00Z | 8,827 MW |
| 2026-10-26T02:00Z | 8,949 MW |
| 2026-10-26T03:00Z | 9,111 MW |
| 2026-10-26T04:00Z | 9,803 MW |
| 2026-10-26T05:00Z | 10,218 MW |
| 2026-10-26T06:00Z | 10,467 MW |
| 2026-10-26T07:00Z | 10,627 MW |
| 2026-10-26T08:00Z | 10,757 MW |
| 2026-10-26T09:00Z | 10,693 MW |
| 2026-10-26T10:00Z | 10,596 MW |
| 2026-10-26T11:00Z | 10,544 MW |
| 2026-10-26T12:00Z | 10,523 MW |
| 2026-10-26T13:00Z | 10,409 MW |
| 2026-10-26T14:00Z | 10,522 MW |
| 2026-10-26T15:00Z | 10,711 MW |
| 2026-10-26T16:00Z | 10,638 MW |
| 2026-10-26T17:00Z | 10,629 MW |
| 2026-10-26T18:00Z | 10,435 MW |
| 2026-10-26T19:00Z | 10,130 MW |
| 2026-10-26T20:00Z | 10,057 MW |
| 2026-10-26T21:00Z | 9,794 MW |
| 2026-10-26T22:00Z | 9,355 MW |
| 2026-10-26T23:00Z | 9,193 MW |
| 2026-10-27T00:00Z | 8,891 MW |
| 2026-10-27T01:00Z | 8,809 MW |
| 2026-10-27T02:00Z | 8,882 MW |
| 2026-10-27T03:00Z | 8,940 MW |
| 2026-10-27T04:00Z | 9,572 MW |
| 2026-10-27T05:00Z | 10,012 MW |
| 2026-10-27T06:00Z | 10,209 MW |
| 2026-10-27T07:00Z | 10,238 MW |
| 2026-10-27T08:00Z | 10,378 MW |
| 2026-10-27T09:00Z | 10,543 MW |
| 2026-10-27T10:00Z | 10,563 MW |
| 2026-10-27T11:00Z | 10,428 MW |
| 2026-10-27T12:00Z | 10,152 MW |
| 2026-10-27T13:00Z | 10,094 MW |
| 2026-10-27T14:00Z | 10,417 MW |
| 2026-10-27T15:00Z | 10,627 MW |
| 2026-10-27T16:00Z | 10,657 MW |
| 2026-10-27T17:00Z | 10,676 MW |
| 2026-10-27T18:00Z | 10,617 MW |
| 2026-10-27T19:00Z | 10,220 MW |
| 2026-10-27T20:00Z | 10,063 MW |
| 2026-10-27T21:00Z | 9,946 MW |
| 2026-10-27T22:00Z | 9,554 MW |
| 2026-10-27T23:00Z | 9,442 MW |
| 2026-10-28T00:00Z | 9,345 MW |
| 2026-10-28T01:00Z | 9,382 MW |
| 2026-10-28T02:00Z | 9,311 MW |
| 2026-10-28T03:00Z | 9,453 MW |
| 2026-10-28T04:00Z | 10,057 MW |
| 2026-10-28T05:00Z | 10,482 MW |
| 2026-10-28T06:00Z | 10,664 MW |
| 2026-10-28T07:00Z | 10,844 MW |
| 2026-10-28T08:00Z | 10,814 MW |
| 2026-10-28T09:00Z | 10,793 MW |
| 2026-10-28T10:00Z | 10,723 MW |
| 2026-10-28T11:00Z | 10,736 MW |
| 2026-10-28T12:00Z | 10,519 MW |
Show the data table (687 rows)
| Hour starting (UTC) | Wind | Nuclear | Hydro | Bioenergy | Other |
|---|---|---|---|---|---|
| 2026-09-29T22:00Z | 3,249 MW | 1,642 MW | 1,820 MW | 671 MW | 219 MW |
| 2026-09-29T23:00Z | 2,766 MW | 1,643 MW | 1,791 MW | 670 MW | 219 MW |
| 2026-09-30T00:00Z | 2,316 MW | 1,642 MW | 1,821 MW | 690 MW | 228 MW |
| 2026-09-30T01:00Z | 1,918 MW | 1,643 MW | 1,836 MW | 744 MW | 222 MW |
| 2026-09-30T02:00Z | 1,380 MW | 1,643 MW | 2,018 MW | 822 MW | 229 MW |
| 2026-09-30T03:00Z | 899 MW | 1,643 MW | 2,166 MW | 871 MW | 244 MW |
| 2026-09-30T04:00Z | 602 MW | 1,643 MW | 2,239 MW | 923 MW | 239 MW |
| 2026-09-30T05:00Z | 352 MW | 1,642 MW | 2,153 MW | 1,035 MW | 236 MW |
| 2026-09-30T06:00Z | 175 MW | 1,642 MW | 2,091 MW | 1,056 MW | 236 MW |
| 2026-09-30T07:00Z | 66 MW | 1,644 MW | 2,074 MW | 1,055 MW | 234 MW |
| 2026-09-30T08:00Z | 4 MW | 1,644 MW | 2,081 MW | 1,018 MW | 222 MW |
| 2026-09-30T09:00Z | 0 MW | 1,644 MW | 2,065 MW | 977 MW | 220 MW |
| 2026-09-30T10:00Z | 1 MW | 1,644 MW | 2,019 MW | 961 MW | 217 MW |
| 2026-09-30T11:00Z | 0 MW | 1,627 MW | 1,987 MW | 898 MW | 210 MW |
| 2026-09-30T12:00Z | 0 MW | 1,628 MW | 2,010 MW | 975 MW | 215 MW |
| 2026-09-30T13:00Z | 6 MW | 1,634 MW | 2,120 MW | 1,041 MW | 208 MW |
| 2026-09-30T14:00Z | 28 MW | 1,669 MW | 2,154 MW | 1,076 MW | 202 MW |
| 2026-09-30T15:00Z | 62 MW | 1,704 MW | 2,215 MW | 1,089 MW | 205 MW |
| 2026-09-30T16:00Z | 107 MW | 1,713 MW | 2,209 MW | 1,099 MW | 209 MW |
| 2026-09-30T17:00Z | 268 MW | 1,716 MW | 2,203 MW | 1,092 MW | 210 MW |
| 2026-09-30T18:00Z | 529 MW | 1,735 MW | 2,174 MW | 1,030 MW | 227 MW |
| 2026-09-30T19:00Z | 894 MW | 1,743 MW | 2,129 MW | 956 MW | 221 MW |
| 2026-09-30T20:00Z | 1,517 MW | 1,755 MW | 1,958 MW | 905 MW | 224 MW |
| 2026-09-30T21:00Z | 2,072 MW | 1,774 MW | 1,737 MW | 848 MW | 216 MW |
| 2026-09-30T22:00Z | 2,710 MW | 1,785 MW | 1,675 MW | 706 MW | 210 MW |
| 2026-09-30T23:00Z | 3,206 MW | 1,797 MW | 1,603 MW | 696 MW | 206 MW |
| 2026-10-01T00:00Z | 3,602 MW | 1,798 MW | 1,596 MW | 707 MW | 198 MW |
| 2026-10-01T01:00Z | 3,549 MW | 1,795 MW | 1,602 MW | 713 MW | 201 MW |
| 2026-10-01T02:00Z | 3,631 MW | 1,755 MW | 1,594 MW | 711 MW | 196 MW |
| 2026-10-01T03:00Z | 3,971 MW | 1,748 MW | 1,721 MW | 703 MW | 194 MW |
| 2026-10-01T04:00Z | 3,941 MW | 1,748 MW | 1,929 MW | 733 MW | 194 MW |
| 2026-10-01T05:00Z | 3,884 MW | 1,748 MW | 1,923 MW | 758 MW | 222 MW |
| 2026-10-01T06:00Z | 3,765 MW | 1,762 MW | 1,860 MW | 786 MW | 208 MW |
| 2026-10-01T07:00Z | 3,260 MW | 1,790 MW | 1,847 MW | 817 MW | 189 MW |
| 2026-10-01T08:00Z | 2,046 MW | 1,800 MW | 1,852 MW | 827 MW | 197 MW |
| 2026-10-01T09:00Z | 1,578 MW | 1,799 MW | 1,703 MW | 825 MW | 192 MW |
| 2026-10-01T10:00Z | 1,665 MW | 1,798 MW | 1,724 MW | 818 MW | 192 MW |
| 2026-10-01T11:00Z | 1,848 MW | 1,800 MW | 1,675 MW | 798 MW | 180 MW |
| 2026-10-01T12:00Z | 1,954 MW | 1,798 MW | 1,715 MW | 807 MW | 174 MW |
| 2026-10-01T13:00Z | 2,173 MW | 1,788 MW | 1,718 MW | 844 MW | 157 MW |
| 2026-10-01T14:00Z | 2,550 MW | 1,780 MW | 1,753 MW | 854 MW | 169 MW |
| 2026-10-01T15:00Z | 2,895 MW | 1,780 MW | 1,853 MW | 872 MW | 183 MW |
| 2026-10-01T16:00Z | 3,202 MW | 1,779 MW | 1,917 MW | 866 MW | 172 MW |
| 2026-10-01T17:00Z | 3,503 MW | 1,780 MW | 1,961 MW | 861 MW | 175 MW |
| 2026-10-01T18:00Z | 3,747 MW | 1,780 MW | 1,729 MW | 857 MW | 170 MW |
| 2026-10-01T19:00Z | 3,627 MW | 1,779 MW | 1,592 MW | 852 MW | 168 MW |
| 2026-10-01T20:00Z | 3,522 MW | 1,780 MW | 1,566 MW | 844 MW | 178 MW |
| 2026-10-01T21:00Z | 3,249 MW | 1,780 MW | 1,609 MW | 856 MW | 181 MW |
| 2026-10-01T22:00Z | 3,395 MW | 1,779 MW | 1,606 MW | 834 MW | 179 MW |
| 2026-10-01T23:00Z | 3,159 MW | 1,780 MW | 1,654 MW | 836 MW | 178 MW |
| 2026-10-02T00:00Z | 3,137 MW | 1,780 MW | 1,618 MW | 845 MW | 177 MW |
| 2026-10-02T01:00Z | 2,752 MW | 1,780 MW | 1,504 MW | 849 MW | 178 MW |
| 2026-10-02T02:00Z | 2,636 MW | 1,785 MW | 1,503 MW | 863 MW | 177 MW |
| 2026-10-02T03:00Z | 2,638 MW | 1,799 MW | 1,725 MW | 874 MW | 174 MW |
| 2026-10-02T04:00Z | 2,658 MW | 1,800 MW | 1,990 MW | 893 MW | 159 MW |
| 2026-10-02T05:00Z | 2,490 MW | 1,800 MW | 2,108 MW | 918 MW | 165 MW |
| 2026-10-02T06:00Z | 2,145 MW | 1,799 MW | 2,058 MW | 926 MW | 161 MW |
| 2026-10-02T07:00Z | 1,673 MW | 1,797 MW | 2,087 MW | 949 MW | 166 MW |
| 2026-10-02T08:00Z | 1,408 MW | 1,797 MW | 2,080 MW | 931 MW | 171 MW |
| 2026-10-02T09:00Z | 1,358 MW | 1,798 MW | 2,103 MW | 930 MW | 161 MW |
| 2026-10-02T10:00Z | 1,292 MW | 1,793 MW | 2,085 MW | 940 MW | 166 MW |
| 2026-10-02T11:00Z | 1,379 MW | 1,792 MW | 2,116 MW | 945 MW | 163 MW |
| 2026-10-02T12:00Z | 1,554 MW | 1,794 MW | 2,205 MW | 926 MW | 163 MW |
| 2026-10-02T13:00Z | 1,616 MW | 1,801 MW | 2,216 MW | 928 MW | 181 MW |
| 2026-10-02T14:00Z | 1,792 MW | 1,805 MW | 2,220 MW | 931 MW | 181 MW |
| 2026-10-02T15:00Z | 1,913 MW | 1,800 MW | 2,271 MW | 956 MW | 184 MW |
| 2026-10-02T16:00Z | 2,458 MW | 1,804 MW | 2,266 MW | 997 MW | 185 MW |
| 2026-10-02T17:00Z | 3,002 MW | 1,813 MW | 2,238 MW | 1,010 MW | 182 MW |
| 2026-10-02T18:00Z | 3,173 MW | 1,828 MW | 2,101 MW | 978 MW | 167 MW |
| 2026-10-02T19:00Z | 3,229 MW | 1,833 MW | 1,925 MW | 929 MW | 159 MW |
| 2026-10-02T20:00Z | 3,077 MW | 1,834 MW | 1,860 MW | 880 MW | 178 MW |
| 2026-10-02T21:00Z | 2,919 MW | 1,833 MW | 1,905 MW | 850 MW | 182 MW |
| 2026-10-02T22:00Z | 2,897 MW | 1,830 MW | 1,908 MW | 863 MW | 189 MW |
| 2026-10-02T23:00Z | 2,845 MW | 1,832 MW | 1,859 MW | 851 MW | 185 MW |
| 2026-10-03T00:00Z | 2,811 MW | 1,832 MW | 1,820 MW | 837 MW | 194 MW |
| 2026-10-03T01:00Z | 2,933 MW | 1,833 MW | 1,809 MW | 845 MW | 197 MW |
| 2026-10-03T02:00Z | 2,968 MW | 1,836 MW | 1,812 MW | 855 MW | 191 MW |
| 2026-10-03T03:00Z | 2,890 MW | 1,841 MW | 1,826 MW | 863 MW | 196 MW |
| 2026-10-03T04:00Z | 2,766 MW | 1,842 MW | 1,882 MW | 876 MW | 197 MW |
| 2026-10-03T05:00Z | 2,905 MW | 1,841 MW | 1,881 MW | 880 MW | 204 MW |
| 2026-10-03T06:00Z | 2,775 MW | 1,838 MW | 1,926 MW | 889 MW | 199 MW |
| 2026-10-03T07:00Z | 2,717 MW | 1,762 MW | 1,922 MW | 885 MW | 196 MW |
| 2026-10-03T08:00Z | 2,636 MW | 1,793 MW | 1,905 MW | 897 MW | 184 MW |
| 2026-10-03T09:00Z | 2,747 MW | 1,808 MW | 1,860 MW | 891 MW | 186 MW |
| 2026-10-03T10:00Z | 2,804 MW | 1,829 MW | 1,833 MW | 878 MW | 192 MW |
| 2026-10-03T11:00Z | 2,753 MW | 1,828 MW | 1,851 MW | 877 MW | 194 MW |
| 2026-10-03T12:00Z | 2,989 MW | 1,761 MW | 1,835 MW | 868 MW | 191 MW |
| 2026-10-03T13:00Z | 3,063 MW | 1,753 MW | 1,845 MW | 869 MW | 188 MW |
| 2026-10-03T14:00Z | 3,428 MW | 1,708 MW | 1,856 MW | 866 MW | 192 MW |
| 2026-10-03T15:00Z | 3,762 MW | 1,734 MW | 1,857 MW | 876 MW | 186 MW |
| 2026-10-03T16:00Z | 4,122 MW | 1,800 MW | 1,863 MW | 874 MW | 191 MW |
| 2026-10-03T17:00Z | 4,163 MW | 1,833 MW | 1,842 MW | 884 MW | 192 MW |
| 2026-10-03T18:00Z | 4,394 MW | 1,830 MW | 1,808 MW | 874 MW | 193 MW |
| 2026-10-03T19:00Z | 4,567 MW | 1,854 MW | 1,808 MW | 884 MW | 195 MW |
| 2026-10-03T20:00Z | 4,178 MW | 1,862 MW | 1,807 MW | 881 MW | 194 MW |
| 2026-10-03T21:00Z | 3,991 MW | 1,861 MW | 1,791 MW | 866 MW | 203 MW |
| 2026-10-03T22:00Z | 3,732 MW | 1,861 MW | 1,798 MW | 860 MW | 213 MW |
| 2026-10-03T23:00Z | 3,543 MW | 1,861 MW | 1,787 MW | 851 MW | 215 MW |
| 2026-10-04T00:00Z | 3,370 MW | 1,861 MW | 1,796 MW | 843 MW | 214 MW |
| 2026-10-04T01:00Z | 3,096 MW | 1,861 MW | 1,791 MW | 846 MW | 211 MW |
| 2026-10-04T02:00Z | 2,807 MW | 1,861 MW | 1,777 MW | 848 MW | 208 MW |
| 2026-10-04T03:00Z | 2,422 MW | 1,862 MW | 1,802 MW | 859 MW | 209 MW |
| 2026-10-04T04:00Z | 2,105 MW | 1,861 MW | 1,852 MW | 863 MW | 218 MW |
| 2026-10-04T05:00Z | 1,997 MW | 1,861 MW | 1,864 MW | 873 MW | 200 MW |
| 2026-10-04T06:00Z | 1,935 MW | 1,860 MW | 1,890 MW | 881 MW | 203 MW |
| 2026-10-04T07:00Z | 1,687 MW | 1,844 MW | 1,964 MW | 912 MW | 207 MW |
| 2026-10-04T08:00Z | 1,423 MW | 1,850 MW | 1,928 MW | 917 MW | 203 MW |
| 2026-10-04T09:00Z | 1,277 MW | 1,811 MW | 1,845 MW | 908 MW | 206 MW |
| 2026-10-04T10:00Z | 1,128 MW | 1,747 MW | 1,842 MW | 912 MW | 216 MW |
| 2026-10-04T11:00Z | 1,057 MW | 1,806 MW | 1,825 MW | 908 MW | 216 MW |
| 2026-10-04T12:00Z | 1,155 MW | 1,805 MW | 1,833 MW | 910 MW | 206 MW |
| 2026-10-04T13:00Z | 1,511 MW | 1,844 MW | 1,862 MW | 912 MW | 213 MW |
| 2026-10-04T14:00Z | 1,758 MW | 1,861 MW | 1,867 MW | 922 MW | 218 MW |
| 2026-10-04T15:00Z | 2,155 MW | 1,875 MW | 1,840 MW | 942 MW | 207 MW |
| 2026-10-04T16:00Z | 2,826 MW | 1,874 MW | 1,821 MW | 946 MW | 206 MW |
| 2026-10-04T17:00Z | 3,230 MW | 1,875 MW | 1,744 MW | 934 MW | 206 MW |
| 2026-10-04T18:00Z | 3,850 MW | 1,878 MW | 1,684 MW | 924 MW | 208 MW |
| 2026-10-04T19:00Z | 4,096 MW | 1,887 MW | 1,716 MW | 904 MW | 216 MW |
| 2026-10-04T20:00Z | 4,149 MW | 1,891 MW | 1,754 MW | 911 MW | 220 MW |
| 2026-10-04T21:00Z | 3,974 MW | 1,891 MW | 1,758 MW | 899 MW | 216 MW |
| 2026-10-04T22:00Z | 4,179 MW | 1,891 MW | 1,753 MW | 886 MW | 212 MW |
| 2026-10-04T23:00Z | 4,211 MW | 1,891 MW | 1,706 MW | 891 MW | 194 MW |
| 2026-10-05T00:00Z | 4,070 MW | 1,891 MW | 1,655 MW | 897 MW | 180 MW |
| 2026-10-05T01:00Z | 4,018 MW | 1,891 MW | 1,723 MW | 894 MW | 196 MW |
| 2026-10-05T02:00Z | 4,103 MW | 1,890 MW | 1,741 MW | 892 MW | 215 MW |
| 2026-10-05T03:00Z | 4,225 MW | 1,890 MW | 1,826 MW | 901 MW | 212 MW |
| 2026-10-05T04:00Z | 4,066 MW | 1,879 MW | 1,936 MW | 910 MW | 213 MW |
| 2026-10-05T05:00Z | 3,859 MW | 1,837 MW | 1,992 MW | 921 MW | 215 MW |
| 2026-10-05T06:00Z | 3,465 MW | 1,760 MW | 2,004 MW | 910 MW | 214 MW |
| 2026-10-05T07:00Z | 3,135 MW | 1,805 MW | 1,991 MW | 918 MW | 234 MW |
| 2026-10-05T08:00Z | 3,138 MW | 1,837 MW | 1,942 MW | 928 MW | 219 MW |
| 2026-10-05T09:00Z | 3,406 MW | 1,838 MW | 1,878 MW | 942 MW | 212 MW |
| 2026-10-05T10:00Z | 3,735 MW | 1,767 MW | 1,819 MW | 936 MW | 200 MW |
| 2026-10-05T11:00Z | 3,756 MW | 1,816 MW | 1,762 MW | 934 MW | 196 MW |
| 2026-10-05T12:00Z | 4,176 MW | 1,823 MW | 1,770 MW | 927 MW | 199 MW |
| 2026-10-05T13:00Z | 4,712 MW | 1,884 MW | 1,747 MW | 934 MW | 213 MW |
| 2026-10-05T14:00Z | 5,098 MW | 1,892 MW | 1,763 MW | 925 MW | 212 MW |
| 2026-10-05T15:00Z | 5,627 MW | 1,902 MW | 1,745 MW | 907 MW | 214 MW |
| 2026-10-05T16:00Z | 5,793 MW | 1,912 MW | 1,703 MW | 904 MW | 212 MW |
| 2026-10-05T17:00Z | 5,997 MW | 1,916 MW | 1,613 MW | 891 MW | 214 MW |
| 2026-10-05T18:00Z | 6,196 MW | 1,917 MW | 1,587 MW | 884 MW | 212 MW |
| 2026-10-05T19:00Z | 6,013 MW | 1,927 MW | 1,497 MW | 872 MW | 211 MW |
| 2026-10-05T20:00Z | 5,697 MW | 1,935 MW | 1,439 MW | 879 MW | 214 MW |
| 2026-10-05T21:00Z | 5,208 MW | 1,946 MW | 1,408 MW | 878 MW | 210 MW |
| 2026-10-05T22:00Z | 4,184 MW | 1,954 MW | 1,390 MW | 879 MW | 211 MW |
| 2026-10-05T23:00Z | 3,177 MW | 1,964 MW | 1,465 MW | 866 MW | 201 MW |
| 2026-10-06T00:00Z | 3,087 MW | 1,975 MW | 1,579 MW | 867 MW | 211 MW |
| 2026-10-06T01:00Z | 3,631 MW | 1,984 MW | 1,483 MW | 856 MW | 197 MW |
| 2026-10-06T02:00Z | 4,031 MW | 1,994 MW | 1,358 MW | 823 MW | 199 MW |
| 2026-10-06T03:00Z | 4,963 MW | 2,005 MW | 1,401 MW | 808 MW | 193 MW |
| 2026-10-06T04:00Z | 5,852 MW | 2,008 MW | 1,458 MW | 797 MW | 198 MW |
| 2026-10-06T05:00Z | 5,773 MW | 2,004 MW | 1,433 MW | 760 MW | 200 MW |
| 2026-10-06T06:00Z | 5,786 MW | 1,996 MW | 1,384 MW | 759 MW | 194 MW |
| 2026-10-06T07:00Z | 5,652 MW | 1,845 MW | 1,439 MW | 752 MW | 160 MW |
| 2026-10-06T08:00Z | 5,481 MW | 1,949 MW | 1,382 MW | 739 MW | 135 MW |
| 2026-10-06T09:00Z | 5,563 MW | 1,769 MW | 1,400 MW | 723 MW | 138 MW |
| 2026-10-06T10:00Z | 5,637 MW | 1,829 MW | 1,335 MW | 714 MW | 136 MW |
| 2026-10-06T11:00Z | 5,446 MW | 1,859 MW | 1,319 MW | 704 MW | 152 MW |
| 2026-10-06T12:00Z | 5,679 MW | 1,765 MW | 1,363 MW | 722 MW | 155 MW |
| 2026-10-06T13:00Z | 5,823 MW | 1,758 MW | 1,338 MW | 724 MW | 181 MW |
| 2026-10-06T14:00Z | 5,999 MW | 1,830 MW | 1,363 MW | 744 MW | 176 MW |
| 2026-10-06T15:00Z | 6,064 MW | 1,840 MW | 1,489 MW | 770 MW | 195 MW |
| 2026-10-06T16:00Z | 6,743 MW | 1,874 MW | 1,496 MW | 775 MW | 201 MW |
| 2026-10-06T17:00Z | 6,618 MW | 1,868 MW | 1,533 MW | 785 MW | 187 MW |
| 2026-10-06T18:00Z | 6,312 MW | 1,865 MW | 1,527 MW | 787 MW | 189 MW |
| 2026-10-06T19:00Z | 5,875 MW | 1,905 MW | 1,527 MW | 789 MW | 201 MW |
| 2026-10-06T20:00Z | 5,395 MW | 1,942 MW | 1,489 MW | 792 MW | 208 MW |
| 2026-10-06T21:00Z | 4,584 MW | 1,957 MW | 1,463 MW | 805 MW | 207 MW |
| 2026-10-06T22:00Z | 4,825 MW | 1,963 MW | 1,387 MW | 783 MW | 207 MW |
| 2026-10-06T23:00Z | 4,993 MW | 1,963 MW | 1,387 MW | 744 MW | 209 MW |
| 2026-10-07T00:00Z | 4,916 MW | 1,963 MW | 1,416 MW | 684 MW | 197 MW |
| 2026-10-07T01:00Z | 4,994 MW | 1,963 MW | 1,487 MW | 662 MW | 209 MW |
| 2026-10-07T02:00Z | 4,927 MW | 1,963 MW | 1,538 MW | 633 MW | 210 MW |
| 2026-10-07T03:00Z | 5,176 MW | 1,963 MW | 1,563 MW | 652 MW | 200 MW |
| 2026-10-07T04:00Z | 5,411 MW | 1,963 MW | 1,635 MW | 608 MW | 195 MW |
| 2026-10-07T05:00Z | 5,280 MW | 1,962 MW | 1,757 MW | 623 MW | 150 MW |
| 2026-10-07T06:00Z | 5,008 MW | 1,961 MW | 1,834 MW | 628 MW | 140 MW |
| 2026-10-07T07:00Z | 4,735 MW | 1,965 MW | 1,893 MW | 640 MW | 149 MW |
| 2026-10-07T08:00Z | 4,846 MW | 1,965 MW | 1,925 MW | 654 MW | 159 MW |
| 2026-10-07T09:00Z | 4,941 MW | 1,924 MW | 1,829 MW | 657 MW | 190 MW |
| 2026-10-07T10:00Z | 4,870 MW | 1,882 MW | 1,826 MW | 655 MW | 195 MW |
| 2026-10-07T11:00Z | 4,797 MW | 1,763 MW | 1,842 MW | 639 MW | 190 MW |
| 2026-10-07T12:00Z | 5,096 MW | 1,838 MW | 1,858 MW | 652 MW | 187 MW |
| 2026-10-07T13:00Z | 4,766 MW | 1,870 MW | 1,900 MW | 662 MW | 189 MW |
| 2026-10-07T14:00Z | 4,684 MW | 1,892 MW | 1,918 MW | 648 MW | 188 MW |
| 2026-10-07T15:00Z | 4,666 MW | 1,904 MW | 2,106 MW | 661 MW | 194 MW |
| 2026-10-07T16:00Z | 5,046 MW | 1,911 MW | 2,097 MW | 671 MW | 202 MW |
| 2026-10-07T17:00Z | 4,735 MW | 1,917 MW | 2,018 MW | 640 MW | 200 MW |
| 2026-10-07T18:00Z | 4,608 MW | 1,922 MW | 2,022 MW | 625 MW | 210 MW |
| 2026-10-07T19:00Z | 4,516 MW | 1,928 MW | 1,984 MW | 631 MW | 215 MW |
| 2026-10-07T20:00Z | 4,181 MW | 1,933 MW | 1,940 MW | 650 MW | 215 MW |
| 2026-10-07T21:00Z | 3,642 MW | 1,939 MW | 1,909 MW | 657 MW | 210 MW |
| 2026-10-07T22:00Z | 3,376 MW | 1,941 MW | 1,808 MW | 659 MW | 213 MW |
| 2026-10-07T23:00Z | 2,832 MW | 1,944 MW | 1,838 MW | 671 MW | 226 MW |
| 2026-10-08T00:00Z | 2,291 MW | 1,949 MW | 1,893 MW | 700 MW | 214 MW |
| 2026-10-08T01:00Z | 1,978 MW | 1,954 MW | 2,016 MW | 713 MW | 221 MW |
| 2026-10-08T02:00Z | 1,735 MW | 1,960 MW | 2,040 MW | 755 MW | 222 MW |
| 2026-10-08T03:00Z | 1,648 MW | 1,955 MW | 2,125 MW | 778 MW | 216 MW |
| 2026-10-08T04:00Z | 1,543 MW | 1,941 MW | 2,183 MW | 819 MW | 226 MW |
| 2026-10-08T05:00Z | 1,527 MW | 1,940 MW | 2,146 MW | 842 MW | 196 MW |
| 2026-10-08T06:00Z | 1,561 MW | 1,940 MW | 2,132 MW | 850 MW | 177 MW |
| 2026-10-08T07:00Z | 1,365 MW | 1,921 MW | 2,154 MW | 842 MW | 208 MW |
| 2026-10-08T08:00Z | 896 MW | 1,876 MW | 2,168 MW | 836 MW | 211 MW |
| 2026-10-08T09:00Z | 630 MW | 1,855 MW | 2,213 MW | 820 MW | 208 MW |
| 2026-10-08T10:00Z | 590 MW | 1,853 MW | 2,207 MW | 823 MW | 213 MW |
| 2026-10-08T11:00Z | 582 MW | 1,852 MW | 2,201 MW | 828 MW | 213 MW |
| 2026-10-08T12:00Z | 701 MW | 1,852 MW | 2,222 MW | 819 MW | 202 MW |
| 2026-10-08T13:00Z | 960 MW | 1,852 MW | 2,171 MW | 824 MW | 203 MW |
| 2026-10-08T14:00Z | 1,402 MW | 1,857 MW | 2,173 MW | 810 MW | 208 MW |
| 2026-10-08T15:00Z | 1,772 MW | 1,856 MW | 2,174 MW | 807 MW | 209 MW |
| 2026-10-08T16:00Z | 2,095 MW | 1,856 MW | 2,196 MW | 792 MW | 213 MW |
| 2026-10-08T17:00Z | 2,270 MW | 1,855 MW | 2,240 MW | 776 MW | 219 MW |
| 2026-10-08T18:00Z | 2,454 MW | 1,857 MW | 2,136 MW | 748 MW | 222 MW |
| 2026-10-08T19:00Z | 2,649 MW | 1,860 MW | 2,060 MW | 707 MW | 226 MW |
| 2026-10-08T20:00Z | 2,772 MW | 1,887 MW | 1,942 MW | 667 MW | 224 MW |
| 2026-10-08T21:00Z | 2,810 MW | 1,952 MW | 1,784 MW | 662 MW | 223 MW |
| 2026-10-08T22:00Z | 3,070 MW | 1,985 MW | 1,817 MW | 650 MW | 219 MW |
| 2026-10-08T23:00Z | 3,365 MW | 2,005 MW | 1,820 MW | 643 MW | 218 MW |
| 2026-10-09T00:00Z | 3,715 MW | 2,017 MW | 1,798 MW | 643 MW | 218 MW |
| 2026-10-09T01:00Z | 4,247 MW | 2,026 MW | 1,714 MW | 650 MW | 217 MW |
| 2026-10-09T02:00Z | 4,723 MW | 2,037 MW | 1,670 MW | 649 MW | 205 MW |
| 2026-10-09T03:00Z | 5,028 MW | 2,048 MW | 1,773 MW | 650 MW | 200 MW |
| 2026-10-09T04:00Z | 5,360 MW | 2,054 MW | 1,784 MW | 650 MW | 183 MW |
| 2026-10-09T05:00Z | 5,560 MW | 2,054 MW | 1,797 MW | 655 MW | 197 MW |
| 2026-10-09T06:00Z | 5,578 MW | 2,053 MW | 1,733 MW | 656 MW | 200 MW |
| 2026-10-09T07:00Z | 5,751 MW | 2,054 MW | 1,706 MW | 658 MW | 199 MW |
| 2026-10-09T08:00Z | 6,004 MW | 2,054 MW | 1,732 MW | 660 MW | 188 MW |
| 2026-10-09T09:00Z | 6,287 MW | 2,053 MW | 1,730 MW | 653 MW | 180 MW |
| 2026-10-09T10:00Z | 6,573 MW | 2,055 MW | 1,730 MW | 655 MW | 176 MW |
| 2026-10-09T11:00Z | 6,835 MW | 2,056 MW | 1,732 MW | 653 MW | 165 MW |
| 2026-10-09T12:00Z | 6,704 MW | 2,054 MW | 1,750 MW | 649 MW | 164 MW |
| 2026-10-09T13:00Z | 6,670 MW | 2,056 MW | 1,869 MW | 645 MW | 160 MW |
| 2026-10-09T14:00Z | 6,837 MW | 2,056 MW | 1,884 MW | 649 MW | 135 MW |
| 2026-10-09T15:00Z | 7,436 MW | 2,053 MW | 1,903 MW | 649 MW | 130 MW |
| 2026-10-09T16:00Z | 7,397 MW | 2,055 MW | 1,952 MW | 671 MW | 128 MW |
| 2026-10-09T17:00Z | 6,848 MW | 2,060 MW | 1,947 MW | 690 MW | 142 MW |
| 2026-10-09T18:00Z | 6,675 MW | 2,066 MW | 1,917 MW | 686 MW | 165 MW |
| 2026-10-09T19:00Z | 6,623 MW | 2,072 MW | 1,881 MW | 695 MW | 172 MW |
| 2026-10-09T20:00Z | 6,777 MW | 2,077 MW | 1,834 MW | 703 MW | 181 MW |
| 2026-10-09T21:00Z | 6,716 MW | 2,083 MW | 1,732 MW | 704 MW | 197 MW |
| 2026-10-09T22:00Z | 7,292 MW | 2,087 MW | 1,791 MW | 712 MW | 209 MW |
| 2026-10-09T23:00Z | 7,273 MW | 2,094 MW | 1,785 MW | 712 MW | 211 MW |
| 2026-10-10T00:00Z | 7,057 MW | 2,099 MW | 1,768 MW | 721 MW | 219 MW |
| 2026-10-10T01:00Z | 6,588 MW | 2,104 MW | 1,698 MW | 725 MW | 225 MW |
| 2026-10-10T02:00Z | 6,222 MW | 2,110 MW | 1,813 MW | 734 MW | 221 MW |
| 2026-10-10T03:00Z | 6,091 MW | 2,115 MW | 1,813 MW | 727 MW | 215 MW |
| 2026-10-10T04:00Z | 5,501 MW | 2,116 MW | 1,812 MW | 722 MW | 222 MW |
| 2026-10-10T05:00Z | 5,206 MW | 2,117 MW | 1,779 MW | 717 MW | 228 MW |
| 2026-10-10T06:00Z | 4,693 MW | 2,119 MW | 1,830 MW | 712 MW | 233 MW |
| 2026-10-10T07:00Z | 4,609 MW | 2,120 MW | 1,863 MW | 707 MW | 200 MW |
| 2026-10-10T08:00Z | 4,303 MW | 2,119 MW | 1,919 MW | 703 MW | 188 MW |
| 2026-10-10T09:00Z | 3,759 MW | 2,120 MW | 1,909 MW | 708 MW | 188 MW |
| 2026-10-10T10:00Z | 3,339 MW | 2,122 MW | 1,905 MW | 717 MW | 181 MW |
| 2026-10-10T11:00Z | 3,145 MW | 2,122 MW | 1,931 MW | 704 MW | 174 MW |
| 2026-10-10T12:00Z | 3,124 MW | 2,123 MW | 1,958 MW | 710 MW | 175 MW |
| 2026-10-10T13:00Z | 2,887 MW | 2,123 MW | 2,041 MW | 747 MW | 180 MW |
| 2026-10-10T14:00Z | 2,565 MW | 2,122 MW | 2,191 MW | 782 MW | 189 MW |
| 2026-10-10T15:00Z | 2,801 MW | 2,122 MW | 2,193 MW | 803 MW | 196 MW |
| 2026-10-10T16:00Z | 2,943 MW | 2,123 MW | 2,199 MW | 798 MW | 203 MW |
| 2026-10-10T17:00Z | 2,921 MW | 2,123 MW | 2,211 MW | 805 MW | 208 MW |
| 2026-10-10T18:00Z | 2,971 MW | 2,123 MW | 2,180 MW | 790 MW | 211 MW |
| 2026-10-10T19:00Z | 2,908 MW | 2,123 MW | 2,181 MW | 764 MW | 209 MW |
| 2026-10-10T20:00Z | 2,787 MW | 2,122 MW | 2,129 MW | 754 MW | 211 MW |
| 2026-10-10T21:00Z | 2,757 MW | 2,119 MW | 2,077 MW | 749 MW | 205 MW |
| 2026-10-10T22:00Z | 2,753 MW | 2,119 MW | 1,986 MW | 755 MW | 190 MW |
| 2026-10-10T23:00Z | 2,730 MW | 2,119 MW | 1,927 MW | 754 MW | 188 MW |
| 2026-10-11T00:00Z | 2,856 MW | 2,119 MW | 1,952 MW | 751 MW | 191 MW |
| 2026-10-11T01:00Z | 2,823 MW | 2,120 MW | 1,977 MW | 765 MW | 193 MW |
| 2026-10-11T02:00Z | 2,737 MW | 2,120 MW | 2,064 MW | 777 MW | 206 MW |
| 2026-10-11T03:00Z | 2,755 MW | 2,120 MW | 2,079 MW | 799 MW | 208 MW |
| 2026-10-11T04:00Z | 2,817 MW | 2,120 MW | 2,115 MW | 804 MW | 205 MW |
| 2026-10-11T05:00Z | 2,844 MW | 2,120 MW | 2,060 MW | 802 MW | 197 MW |
| 2026-10-11T06:00Z | 2,590 MW | 2,121 MW | 2,111 MW | 794 MW | 203 MW |
| 2026-10-11T07:00Z | 2,028 MW | 2,120 MW | 2,159 MW | 791 MW | 212 MW |
| 2026-10-11T08:00Z | 1,604 MW | 2,123 MW | 2,221 MW | 805 MW | 198 MW |
| 2026-10-11T09:00Z | 1,590 MW | 2,120 MW | 2,217 MW | 794 MW | 194 MW |
| 2026-10-11T10:00Z | 1,512 MW | 2,121 MW | 2,201 MW | 795 MW | 195 MW |
| 2026-10-11T11:00Z | 1,487 MW | 2,120 MW | 2,187 MW | 794 MW | 203 MW |
| 2026-10-11T12:00Z | 1,577 MW | 2,122 MW | 2,181 MW | 797 MW | 202 MW |
| 2026-10-11T13:00Z | 1,669 MW | 2,121 MW | 2,249 MW | 791 MW | 219 MW |
| 2026-10-11T14:00Z | 2,018 MW | 2,121 MW | 2,317 MW | 791 MW | 226 MW |
| 2026-10-11T15:00Z | 2,621 MW | 2,120 MW | 2,272 MW | 791 MW | 227 MW |
| 2026-10-11T16:00Z | 3,511 MW | 2,120 MW | 2,179 MW | 703 MW | 221 MW |
| 2026-10-11T17:00Z | 3,868 MW | 2,120 MW | 2,105 MW | 575 MW | 211 MW |
| 2026-10-11T18:00Z | 4,028 MW | 2,120 MW | 2,110 MW | 570 MW | 199 MW |
| 2026-10-11T19:00Z | 3,866 MW | 2,120 MW | 2,131 MW | 572 MW | 198 MW |
| 2026-10-11T20:00Z | 3,758 MW | 2,119 MW | 2,132 MW | 563 MW | 201 MW |
| 2026-10-11T21:00Z | 3,638 MW | 2,119 MW | 2,198 MW | 551 MW | 198 MW |
| 2026-10-11T22:00Z | 3,600 MW | 2,120 MW | 2,230 MW | 533 MW | 206 MW |
| 2026-10-11T23:00Z | 3,616 MW | 2,120 MW | 2,183 MW | 538 MW | 205 MW |
| 2026-10-12T00:00Z | 3,503 MW | 2,119 MW | 2,185 MW | 541 MW | 215 MW |
| 2026-10-12T01:00Z | 3,630 MW | 2,120 MW | 2,191 MW | 548 MW | 224 MW |
| 2026-10-12T02:00Z | 3,852 MW | 2,120 MW | 2,102 MW | 549 MW | 224 MW |
| 2026-10-12T03:00Z | 4,055 MW | 2,121 MW | 2,071 MW | 591 MW | 240 MW |
| 2026-10-12T04:00Z | 4,098 MW | 2,120 MW | 1,975 MW | 669 MW | 245 MW |
| 2026-10-12T05:00Z | 4,070 MW | 2,119 MW | 1,910 MW | 707 MW | 241 MW |
| 2026-10-12T06:00Z | 3,735 MW | 2,121 MW | 1,843 MW | 729 MW | 248 MW |
| 2026-10-12T07:00Z | 2,786 MW | 2,121 MW | 1,822 MW | 782 MW | 249 MW |
| 2026-10-12T08:00Z | 1,872 MW | 2,119 MW | 1,969 MW | 895 MW | 258 MW |
| 2026-10-12T09:00Z | 1,459 MW | 2,119 MW | 2,050 MW | 918 MW | 258 MW |
| 2026-10-12T10:00Z | 1,262 MW | 2,119 MW | 2,059 MW | 942 MW | 250 MW |
| 2026-10-12T11:00Z | 1,254 MW | 2,119 MW | 2,111 MW | 928 MW | 243 MW |
| 2026-10-12T12:00Z | 1,339 MW | 2,120 MW | 2,258 MW | 879 MW | 235 MW |
| 2026-10-12T13:00Z | 1,473 MW | 2,119 MW | 2,340 MW | 879 MW | 223 MW |
| 2026-10-12T14:00Z | 1,829 MW | 2,119 MW | 2,355 MW | 880 MW | 226 MW |
| 2026-10-12T15:00Z | 2,770 MW | 2,118 MW | 2,285 MW | 817 MW | 225 MW |
| 2026-10-12T16:00Z | 3,739 MW | 2,119 MW | 2,216 MW | 775 MW | 216 MW |
| 2026-10-12T17:00Z | 3,967 MW | 2,120 MW | 2,179 MW | 753 MW | 211 MW |
| 2026-10-12T18:00Z | 3,806 MW | 2,120 MW | 2,180 MW | 685 MW | 208 MW |
| 2026-10-12T19:00Z | 3,595 MW | 2,121 MW | 2,227 MW | 655 MW | 203 MW |
| 2026-10-12T20:00Z | 3,422 MW | 2,120 MW | 2,253 MW | 701 MW | 209 MW |
| 2026-10-12T21:00Z | 3,264 MW | 2,121 MW | 2,201 MW | 674 MW | 212 MW |
| 2026-10-12T22:00Z | 3,224 MW | 2,120 MW | 2,121 MW | 643 MW | 215 MW |
| 2026-10-12T23:00Z | 3,171 MW | 2,120 MW | 2,139 MW | 627 MW | 208 MW |
| 2026-10-13T00:00Z | 2,915 MW | 2,121 MW | 2,145 MW | 646 MW | 187 MW |
| 2026-10-13T01:00Z | 3,119 MW | 2,121 MW | 2,123 MW | 665 MW | 194 MW |
| 2026-10-13T02:00Z | 2,846 MW | 2,120 MW | 2,078 MW | 703 MW | 213 MW |
| 2026-10-13T03:00Z | 2,915 MW | 2,119 MW | 2,042 MW | 753 MW | 220 MW |
| 2026-10-13T04:00Z | 2,913 MW | 2,119 MW | 2,065 MW | 856 MW | 223 MW |
| 2026-10-13T05:00Z | 2,971 MW | 2,118 MW | 2,074 MW | 900 MW | 211 MW |
| 2026-10-13T06:00Z | 2,711 MW | 2,117 MW | 2,183 MW | 898 MW | 238 MW |
| 2026-10-13T07:00Z | 1,686 MW | 2,116 MW | 2,201 MW | 892 MW | 241 MW |
| 2026-10-13T08:00Z | 806 MW | 2,117 MW | 2,235 MW | 923 MW | 232 MW |
| 2026-10-13T09:00Z | 547 MW | 2,117 MW | 2,193 MW | 936 MW | 225 MW |
| 2026-10-13T10:00Z | 579 MW | 2,123 MW | 2,122 MW | 880 MW | 230 MW |
| 2026-10-13T11:00Z | 658 MW | 2,122 MW | 2,161 MW | 918 MW | 225 MW |
| 2026-10-13T12:00Z | 661 MW | 2,118 MW | 2,336 MW | 940 MW | 214 MW |
| 2026-10-13T13:00Z | 705 MW | 2,119 MW | 2,347 MW | 1,003 MW | 217 MW |
| 2026-10-13T14:00Z | 896 MW | 2,118 MW | 2,356 MW | 939 MW | 223 MW |
| 2026-10-13T15:00Z | 1,658 MW | 2,118 MW | 2,321 MW | 919 MW | 212 MW |
| 2026-10-13T16:00Z | 2,755 MW | 2,119 MW | 2,261 MW | 902 MW | 212 MW |
| 2026-10-13T17:00Z | 3,563 MW | 2,118 MW | 2,083 MW | 769 MW | 207 MW |
| 2026-10-13T18:00Z | 4,300 MW | 2,118 MW | 2,045 MW | 706 MW | 204 MW |
| 2026-10-13T19:00Z | 4,741 MW | 2,119 MW | 2,009 MW | 659 MW | 205 MW |
| 2026-10-13T20:00Z | 4,953 MW | 2,120 MW | 1,962 MW | 639 MW | 207 MW |
| 2026-10-13T21:00Z | 4,803 MW | 2,120 MW | 1,901 MW | 623 MW | 203 MW |
| 2026-10-13T22:00Z | 4,624 MW | 2,120 MW | 1,943 MW | 604 MW | 203 MW |
| 2026-10-13T23:00Z | 4,536 MW | 2,120 MW | 1,972 MW | 608 MW | 210 MW |
| 2026-10-14T00:00Z | 4,609 MW | 2,120 MW | 2,005 MW | 607 MW | 222 MW |
| 2026-10-14T01:00Z | 4,538 MW | 2,120 MW | 2,061 MW | 598 MW | 224 MW |
| 2026-10-14T02:00Z | 4,442 MW | 2,121 MW | 2,103 MW | 600 MW | 222 MW |
| 2026-10-14T03:00Z | 4,674 MW | 2,121 MW | 2,137 MW | 609 MW | 224 MW |
| 2026-10-14T04:00Z | 4,825 MW | 2,121 MW | 2,174 MW | 636 MW | 222 MW |
| 2026-10-14T05:00Z | 4,763 MW | 2,121 MW | 2,165 MW | 635 MW | 232 MW |
| 2026-10-14T06:00Z | 4,475 MW | 2,122 MW | 2,099 MW | 602 MW | 245 MW |
| 2026-10-14T07:00Z | 4,279 MW | 2,122 MW | 2,126 MW | 581 MW | 243 MW |
| 2026-10-14T08:00Z | 4,033 MW | 2,121 MW | 2,160 MW | 588 MW | 228 MW |
| 2026-10-14T09:00Z | 3,791 MW | 2,120 MW | 2,137 MW | 579 MW | 233 MW |
| 2026-10-14T10:00Z | 3,521 MW | 2,120 MW | 1,998 MW | 565 MW | 237 MW |
| 2026-10-14T11:00Z | 3,339 MW | 2,121 MW | 2,096 MW | 577 MW | 237 MW |
| 2026-10-14T12:00Z | 3,188 MW | 2,121 MW | 2,258 MW | 611 MW | 231 MW |
| 2026-10-14T13:00Z | 3,056 MW | 2,121 MW | 2,215 MW | 615 MW | 222 MW |
| 2026-10-14T14:00Z | 2,962 MW | 2,121 MW | 2,260 MW | 639 MW | 219 MW |
| 2026-10-14T15:00Z | 2,990 MW | 2,121 MW | 2,335 MW | 686 MW | 212 MW |
| 2026-10-14T16:00Z | 3,050 MW | 2,122 MW | 2,262 MW | 708 MW | 222 MW |
| 2026-10-14T17:00Z | 2,911 MW | 2,121 MW | 2,262 MW | 712 MW | 226 MW |
| 2026-10-14T18:00Z | 2,619 MW | 2,121 MW | 2,240 MW | 697 MW | 216 MW |
| 2026-10-14T19:00Z | 2,391 MW | 2,120 MW | 2,276 MW | 673 MW | 221 MW |
| 2026-10-14T20:00Z | 2,388 MW | 2,121 MW | 2,249 MW | 700 MW | 214 MW |
| 2026-10-14T21:00Z | 2,265 MW | 2,122 MW | 2,148 MW | 682 MW | 217 MW |
| 2026-10-14T22:00Z | 2,244 MW | 2,121 MW | 2,105 MW | 657 MW | 218 MW |
| 2026-10-14T23:00Z | 2,179 MW | 2,121 MW | 1,919 MW | 644 MW | 216 MW |
| 2026-10-15T00:00Z | 1,987 MW | 2,122 MW | 1,756 MW | 626 MW | 205 MW |
| 2026-10-15T01:00Z | 1,983 MW | 2,122 MW | 1,764 MW | 612 MW | 202 MW |
| 2026-10-15T02:00Z | 2,259 MW | 2,122 MW | 1,912 MW | 612 MW | 200 MW |
| 2026-10-15T03:00Z | 2,794 MW | 2,121 MW | 2,009 MW | 616 MW | 208 MW |
| 2026-10-15T04:00Z | 3,460 MW | 2,121 MW | 2,070 MW | 622 MW | 210 MW |
| 2026-10-15T05:00Z | 3,898 MW | 2,120 MW | 2,072 MW | 628 MW | 211 MW |
| 2026-10-15T06:00Z | 3,805 MW | 2,120 MW | 2,019 MW | 630 MW | 216 MW |
| 2026-10-15T07:00Z | 4,565 MW | 2,120 MW | 1,991 MW | 627 MW | 218 MW |
| 2026-10-15T08:00Z | 5,000 MW | 2,119 MW | 1,963 MW | 619 MW | 212 MW |
| 2026-10-15T09:00Z | 5,398 MW | 1,920 MW | 1,901 MW | 627 MW | 214 MW |
| 2026-10-15T10:00Z | 5,848 MW | 2,003 MW | 1,803 MW | 601 MW | 216 MW |
| 2026-10-15T11:00Z | 6,049 MW | 2,123 MW | 1,778 MW | 614 MW | 210 MW |
| 2026-10-15T12:00Z | 6,489 MW | 2,121 MW | 1,789 MW | 617 MW | 204 MW |
| 2026-10-15T13:00Z | 6,737 MW | 2,123 MW | 1,844 MW | 621 MW | 215 MW |
| 2026-10-15T14:00Z | 6,918 MW | 2,123 MW | 1,772 MW | 613 MW | 213 MW |
| 2026-10-15T15:00Z | 6,833 MW | 2,122 MW | 1,733 MW | 607 MW | 216 MW |
| 2026-10-15T16:00Z | 6,901 MW | 2,121 MW | 1,694 MW | 609 MW | 229 MW |
| 2026-10-15T17:00Z | 6,539 MW | 2,122 MW | 1,653 MW | 612 MW | 238 MW |
| 2026-10-15T18:00Z | 5,986 MW | 2,122 MW | 1,651 MW | 614 MW | 237 MW |
| 2026-10-15T19:00Z | 5,982 MW | 2,122 MW | 1,615 MW | 611 MW | 228 MW |
| 2026-10-15T20:00Z | 6,243 MW | 2,122 MW | 1,589 MW | 609 MW | 222 MW |
| 2026-10-15T21:00Z | 6,283 MW | 2,122 MW | 1,584 MW | 610 MW | 215 MW |
| 2026-10-15T22:00Z | 6,101 MW | 2,122 MW | 1,527 MW | 616 MW | 215 MW |
| 2026-10-15T23:00Z | 6,018 MW | 2,122 MW | 1,473 MW | 627 MW | 216 MW |
| 2026-10-16T00:00Z | 6,105 MW | 2,122 MW | 1,482 MW | 630 MW | 217 MW |
| 2026-10-16T01:00Z | 6,077 MW | 2,122 MW | 1,476 MW | 629 MW | 217 MW |
| 2026-10-16T02:00Z | 5,827 MW | 2,123 MW | 1,530 MW | 640 MW | 220 MW |
| 2026-10-16T03:00Z | 6,059 MW | 2,124 MW | 1,502 MW | 642 MW | 216 MW |
| 2026-10-16T04:00Z | 6,232 MW | 2,122 MW | 1,657 MW | 636 MW | 211 MW |
| 2026-10-16T05:00Z | 5,797 MW | 2,121 MW | 1,810 MW | 633 MW | 205 MW |
| 2026-10-16T06:00Z | 4,573 MW | 2,122 MW | 2,009 MW | 633 MW | 214 MW |
| 2026-10-16T07:00Z | 3,704 MW | 2,120 MW | 2,149 MW | 648 MW | 224 MW |
| 2026-10-16T08:00Z | 3,139 MW | 2,121 MW | 2,159 MW | 647 MW | 224 MW |
| 2026-10-16T09:00Z | 2,705 MW | 2,122 MW | 2,206 MW | 640 MW | 214 MW |
| 2026-10-16T10:00Z | 2,546 MW | 2,121 MW | 2,198 MW | 651 MW | 222 MW |
| 2026-10-16T11:00Z | 2,324 MW | 2,120 MW | 2,184 MW | 664 MW | 233 MW |
| 2026-10-16T12:00Z | 2,373 MW | 2,120 MW | 2,173 MW | 672 MW | 220 MW |
| 2026-10-16T13:00Z | 2,580 MW | 2,120 MW | 2,202 MW | 651 MW | 218 MW |
| 2026-10-16T14:00Z | 3,360 MW | 2,120 MW | 2,165 MW | 656 MW | 218 MW |
| 2026-10-16T15:00Z | 3,678 MW | 2,120 MW | 2,120 MW | 673 MW | 221 MW |
| 2026-10-16T16:00Z | 3,628 MW | 2,120 MW | 2,112 MW | 693 MW | 220 MW |
| 2026-10-16T17:00Z | 3,387 MW | 2,120 MW | 2,099 MW | 704 MW | 217 MW |
| 2026-10-16T18:00Z | 3,095 MW | 2,120 MW | 2,043 MW | 729 MW | 212 MW |
| 2026-10-16T19:00Z | 2,678 MW | 2,119 MW | 2,072 MW | 727 MW | 213 MW |
| 2026-10-16T20:00Z | 2,244 MW | 2,120 MW | 2,096 MW | 723 MW | 216 MW |
| 2026-10-16T21:00Z | 1,945 MW | 2,120 MW | 2,086 MW | 737 MW | 214 MW |
| 2026-10-16T22:00Z | 1,703 MW | 2,120 MW | 2,050 MW | 738 MW | 220 MW |
| 2026-10-16T23:00Z | 1,583 MW | 2,120 MW | 2,003 MW | 748 MW | 220 MW |
| 2026-10-17T00:00Z | 1,692 MW | 2,120 MW | 1,960 MW | 749 MW | 224 MW |
| 2026-10-17T01:00Z | 1,854 MW | 2,121 MW | 1,852 MW | 757 MW | 225 MW |
| 2026-10-17T02:00Z | 1,954 MW | 2,120 MW | 1,825 MW | 761 MW | 221 MW |
| 2026-10-17T03:00Z | 2,009 MW | 2,120 MW | 1,821 MW | 735 MW | 218 MW |
| 2026-10-17T04:00Z | 2,069 MW | 2,120 MW | 1,834 MW | 730 MW | 224 MW |
| 2026-10-17T05:00Z | 2,102 MW | 2,121 MW | 1,825 MW | 737 MW | 222 MW |
| 2026-10-17T06:00Z | 2,363 MW | 2,121 MW | 1,761 MW | 768 MW | 213 MW |
| 2026-10-17T07:00Z | 2,429 MW | 2,118 MW | 1,807 MW | 771 MW | 220 MW |
| 2026-10-17T08:00Z | 2,038 MW | 2,119 MW | 1,879 MW | 773 MW | 216 MW |
| 2026-10-17T09:00Z | 1,914 MW | 2,120 MW | 2,002 MW | 792 MW | 222 MW |
| 2026-10-17T10:00Z | 1,635 MW | 2,120 MW | 2,044 MW | 826 MW | 218 MW |
| 2026-10-17T11:00Z | 1,543 MW | 2,120 MW | 2,025 MW | 837 MW | 226 MW |
| 2026-10-17T12:00Z | 1,493 MW | 2,119 MW | 2,009 MW | 831 MW | 231 MW |
| 2026-10-17T13:00Z | 1,489 MW | 2,120 MW | 2,072 MW | 821 MW | 231 MW |
| 2026-10-17T14:00Z | 1,630 MW | 2,120 MW | 2,142 MW | 821 MW | 234 MW |
| 2026-10-17T15:00Z | 2,313 MW | 2,116 MW | 2,051 MW | 805 MW | 228 MW |
| 2026-10-17T16:00Z | 2,945 MW | 2,116 MW | 2,054 MW | 775 MW | 232 MW |
| 2026-10-17T17:00Z | 3,386 MW | 2,116 MW | 1,976 MW | 781 MW | 235 MW |
| 2026-10-17T18:00Z | 3,719 MW | 2,116 MW | 1,947 MW | 785 MW | 236 MW |
| 2026-10-17T19:00Z | 3,878 MW | 2,116 MW | 1,946 MW | 784 MW | 240 MW |
| 2026-10-17T20:00Z | 3,743 MW | 2,116 MW | 1,967 MW | 782 MW | 239 MW |
| 2026-10-17T21:00Z | 3,598 MW | 2,112 MW | 1,943 MW | 785 MW | 242 MW |
| 2026-10-17T22:00Z | 3,454 MW | 2,113 MW | 2,065 MW | 792 MW | 235 MW |
| 2026-10-17T23:00Z | 3,596 MW | 2,112 MW | 2,061 MW | 795 MW | 239 MW |
| 2026-10-18T00:00Z | 3,483 MW | 2,111 MW | 2,009 MW | 820 MW | 243 MW |
| 2026-10-18T01:00Z | 3,259 MW | 2,112 MW | 2,041 MW | 807 MW | 244 MW |
| 2026-10-18T02:00Z | 2,950 MW | 2,111 MW | 2,067 MW | 809 MW | 246 MW |
| 2026-10-18T03:00Z | 2,956 MW | 2,112 MW | 2,051 MW | 822 MW | 249 MW |
| 2026-10-18T04:00Z | 2,691 MW | 2,112 MW | 2,104 MW | 848 MW | 255 MW |
| 2026-10-18T05:00Z | 2,413 MW | 2,113 MW | 2,141 MW | 882 MW | 255 MW |
| 2026-10-18T06:00Z | 2,105 MW | 2,112 MW | 2,175 MW | 901 MW | 244 MW |
| 2026-10-18T07:00Z | 1,698 MW | 2,112 MW | 2,158 MW | 873 MW | 238 MW |
| 2026-10-18T08:00Z | 903 MW | 2,111 MW | 2,178 MW | 859 MW | 232 MW |
| 2026-10-18T09:00Z | 391 MW | 2,111 MW | 2,185 MW | 827 MW | 224 MW |
| 2026-10-18T10:00Z | 296 MW | 2,111 MW | 2,192 MW | 826 MW | 212 MW |
| 2026-10-18T11:00Z | 304 MW | 2,110 MW | 2,136 MW | 830 MW | 176 MW |
| 2026-10-18T12:00Z | 325 MW | 2,110 MW | 2,205 MW | 828 MW | 177 MW |
| 2026-10-18T13:00Z | 386 MW | 2,111 MW | 2,219 MW | 864 MW | 208 MW |
| 2026-10-18T14:00Z | 533 MW | 2,110 MW | 2,224 MW | 883 MW | 234 MW |
| 2026-10-18T15:00Z | 837 MW | 2,111 MW | 2,232 MW | 905 MW | 242 MW |
| 2026-10-18T16:00Z | 1,054 MW | 2,110 MW | 2,233 MW | 944 MW | 246 MW |
| 2026-10-18T17:00Z | 1,141 MW | 2,110 MW | 2,202 MW | 925 MW | 253 MW |
| 2026-10-18T18:00Z | 1,158 MW | 2,110 MW | 2,189 MW | 907 MW | 257 MW |
| 2026-10-18T19:00Z | 1,441 MW | 2,110 MW | 2,166 MW | 885 MW | 257 MW |
| 2026-10-18T20:00Z | 2,312 MW | 2,110 MW | 2,109 MW | 845 MW | 242 MW |
| 2026-10-18T21:00Z | 2,974 MW | 2,109 MW | 2,096 MW | 804 MW | 229 MW |
| 2026-10-18T22:00Z | 3,110 MW | 2,109 MW | 2,016 MW | 757 MW | 217 MW |
| 2026-10-18T23:00Z | 3,611 MW | 2,109 MW | 1,940 MW | 768 MW | 206 MW |
| 2026-10-19T00:00Z | 4,272 MW | 2,107 MW | 1,893 MW | 809 MW | 210 MW |
| 2026-10-19T01:00Z | 4,672 MW | 2,107 MW | 1,798 MW | 808 MW | 209 MW |
| 2026-10-19T02:00Z | 4,737 MW | 2,107 MW | 1,783 MW | 818 MW | 211 MW |
| 2026-10-19T03:00Z | 5,718 MW | 2,108 MW | 1,876 MW | 829 MW | 212 MW |
| 2026-10-19T04:00Z | 6,185 MW | 2,108 MW | 1,926 MW | 868 MW | 218 MW |
| 2026-10-19T05:00Z | 6,134 MW | 2,110 MW | 1,893 MW | 876 MW | 218 MW |
| 2026-10-19T06:00Z | 6,234 MW | 2,112 MW | 1,894 MW | 855 MW | 196 MW |
| 2026-10-19T07:00Z | 5,767 MW | 2,109 MW | 1,927 MW | 818 MW | 197 MW |
| 2026-10-19T08:00Z | 5,380 MW | 2,108 MW | 1,927 MW | 874 MW | 193 MW |
| 2026-10-19T09:00Z | 5,025 MW | 2,106 MW | 1,890 MW | 886 MW | 197 MW |
| 2026-10-19T10:00Z | 5,068 MW | 2,109 MW | 1,789 MW | 880 MW | 207 MW |
| 2026-10-19T11:00Z | 5,423 MW | 2,111 MW | 1,702 MW | 867 MW | 229 MW |
| 2026-10-19T12:00Z | 5,766 MW | 2,111 MW | 1,675 MW | 873 MW | 232 MW |
| 2026-10-19T13:00Z | 5,953 MW | 2,110 MW | 1,835 MW | 885 MW | 231 MW |
| 2026-10-19T14:00Z | 6,403 MW | 2,110 MW | 1,924 MW | 875 MW | 236 MW |
| 2026-10-19T15:00Z | 6,954 MW | 2,109 MW | 1,890 MW | 878 MW | 241 MW |
| 2026-10-19T16:00Z | 7,271 MW | 2,108 MW | 1,878 MW | 884 MW | 233 MW |
| 2026-10-19T17:00Z | 6,999 MW | 2,103 MW | 1,860 MW | 875 MW | 242 MW |
| 2026-10-19T18:00Z | 7,039 MW | 2,105 MW | 1,843 MW | 867 MW | 245 MW |
| 2026-10-19T19:00Z | 6,963 MW | 2,106 MW | 1,847 MW | 876 MW | 239 MW |
| 2026-10-19T20:00Z | 6,586 MW | 2,106 MW | 1,848 MW | 887 MW | 236 MW |
| 2026-10-19T21:00Z | 6,456 MW | 2,106 MW | 1,848 MW | 901 MW | 225 MW |
| 2026-10-19T22:00Z | 6,406 MW | 2,108 MW | 1,769 MW | 906 MW | 227 MW |
| 2026-10-19T23:00Z | 6,225 MW | 2,108 MW | 1,697 MW | 909 MW | 228 MW |
| 2026-10-20T00:00Z | 5,811 MW | 2,107 MW | 1,726 MW | 911 MW | 227 MW |
| 2026-10-20T01:00Z | 5,723 MW | 2,115 MW | 1,771 MW | 908 MW | 224 MW |
| 2026-10-20T02:00Z | 5,566 MW | 2,116 MW | 1,792 MW | 921 MW | 221 MW |
| 2026-10-20T03:00Z | 5,203 MW | 2,117 MW | 1,978 MW | 954 MW | 222 MW |
| 2026-10-20T04:00Z | 4,781 MW | 2,116 MW | 2,119 MW | 1,009 MW | 228 MW |
| 2026-10-20T05:00Z | 4,499 MW | 2,116 MW | 2,168 MW | 1,047 MW | 235 MW |
| 2026-10-20T06:00Z | 3,947 MW | 1,807 MW | 2,201 MW | 1,073 MW | 233 MW |
| 2026-10-20T07:00Z | 3,304 MW | 1,770 MW | 2,219 MW | 1,070 MW | 239 MW |
| 2026-10-20T08:00Z | 2,636 MW | 1,820 MW | 2,221 MW | 1,083 MW | 227 MW |
| 2026-10-20T09:00Z | 1,987 MW | 1,913 MW | 2,237 MW | 1,063 MW | 222 MW |
| 2026-10-20T10:00Z | 1,835 MW | 2,083 MW | 2,228 MW | 1,048 MW | 224 MW |
| 2026-10-20T11:00Z | 1,590 MW | 2,092 MW | 2,208 MW | 1,040 MW | 225 MW |
| 2026-10-20T12:00Z | 1,322 MW | 2,088 MW | 2,210 MW | 1,009 MW | 232 MW |
| 2026-10-20T13:00Z | 1,227 MW | 2,088 MW | 2,287 MW | 1,005 MW | 234 MW |
| 2026-10-20T14:00Z | 1,418 MW | 2,089 MW | 2,287 MW | 985 MW | 235 MW |
| 2026-10-20T15:00Z | 2,099 MW | 2,089 MW | 2,285 MW | 981 MW | 238 MW |
| 2026-10-20T16:00Z | 2,888 MW | 2,089 MW | 2,258 MW | 965 MW | 231 MW |
| 2026-10-20T17:00Z | 3,562 MW | 2,088 MW | 2,197 MW | 955 MW | 243 MW |
| 2026-10-20T18:00Z | 4,101 MW | 2,089 MW | 2,099 MW | 919 MW | 235 MW |
| 2026-10-20T19:00Z | 4,192 MW | 2,089 MW | 2,077 MW | 881 MW | 219 MW |
| 2026-10-20T20:00Z | 3,997 MW | 2,089 MW | 2,069 MW | 910 MW | 232 MW |
| 2026-10-20T21:00Z | 3,520 MW | 2,089 MW | 2,103 MW | 932 MW | 225 MW |
| 2026-10-20T22:00Z | 3,116 MW | 2,089 MW | 2,122 MW | 894 MW | 225 MW |
| 2026-10-20T23:00Z | 2,958 MW | 2,089 MW | 2,042 MW | 882 MW | 225 MW |
| 2026-10-21T00:00Z | 2,803 MW | 2,088 MW | 2,041 MW | 859 MW | 219 MW |
| 2026-10-21T01:00Z | 2,702 MW | 2,088 MW | 2,112 MW | 826 MW | 228 MW |
| 2026-10-21T02:00Z | 2,892 MW | 2,088 MW | 2,163 MW | 803 MW | 229 MW |
| 2026-10-21T03:00Z | 3,091 MW | 2,089 MW | 2,195 MW | 840 MW | 224 MW |
| 2026-10-21T04:00Z | 3,524 MW | 2,088 MW | 2,244 MW | 855 MW | 230 MW |
| 2026-10-21T05:00Z | 3,786 MW | 2,088 MW | 2,143 MW | 864 MW | 235 MW |
| 2026-10-21T06:00Z | 3,985 MW | 2,087 MW | 2,044 MW | 823 MW | 192 MW |
| 2026-10-21T07:00Z | 3,745 MW | 2,087 MW | 2,066 MW | 689 MW | 180 MW |
| 2026-10-21T08:00Z | 3,471 MW | 2,086 MW | 2,097 MW | 659 MW | 166 MW |
| 2026-10-21T09:00Z | 2,763 MW | 2,088 MW | 2,118 MW | 669 MW | 203 MW |
| 2026-10-21T10:00Z | 2,233 MW | 2,090 MW | 2,225 MW | 663 MW | 235 MW |
| 2026-10-21T11:00Z | 1,967 MW | 2,091 MW | 2,247 MW | 650 MW | 228 MW |
| 2026-10-21T12:00Z | 1,883 MW | 2,090 MW | 2,248 MW | 658 MW | 229 MW |
| 2026-10-21T13:00Z | 2,386 MW | 2,090 MW | 2,408 MW | 672 MW | 232 MW |
| 2026-10-21T14:00Z | 3,433 MW | 2,090 MW | 2,302 MW | 704 MW | 231 MW |
| 2026-10-21T15:00Z | 4,904 MW | 2,090 MW | 2,231 MW | 690 MW | 235 MW |
| 2026-10-21T16:00Z | 5,626 MW | 2,090 MW | 2,015 MW | 661 MW | 234 MW |
| 2026-10-21T17:00Z | 5,959 MW | 2,089 MW | 1,911 MW | 665 MW | 230 MW |
| 2026-10-21T18:00Z | 6,084 MW | 2,089 MW | 1,871 MW | 653 MW | 225 MW |
| 2026-10-21T19:00Z | 6,060 MW | 2,090 MW | 1,887 MW | 661 MW | 236 MW |
| 2026-10-21T20:00Z | 5,683 MW | 2,089 MW | 1,888 MW | 657 MW | 227 MW |
| 2026-10-21T21:00Z | 5,120 MW | 2,090 MW | 1,850 MW | 659 MW | 221 MW |
| 2026-10-21T22:00Z | 5,427 MW | 2,089 MW | 1,794 MW | 637 MW | 214 MW |
| 2026-10-21T23:00Z | 5,530 MW | 2,089 MW | 1,750 MW | 646 MW | 220 MW |
| 2026-10-22T00:00Z | 5,199 MW | 2,089 MW | 1,759 MW | 650 MW | 229 MW |
| 2026-10-22T01:00Z | 4,867 MW | 2,089 MW | 1,770 MW | 649 MW | 227 MW |
| 2026-10-22T02:00Z | 4,694 MW | 2,089 MW | 1,866 MW | 643 MW | 217 MW |
| 2026-10-22T03:00Z | 4,624 MW | 2,089 MW | 1,937 MW | 636 MW | 182 MW |
| 2026-10-22T04:00Z | 4,433 MW | 2,089 MW | 2,031 MW | 639 MW | 172 MW |
| 2026-10-22T05:00Z | 4,485 MW | 2,089 MW | 2,001 MW | 599 MW | 179 MW |
| 2026-10-22T06:00Z | 4,278 MW | 2,090 MW | 1,926 MW | 615 MW | 194 MW |
| 2026-10-22T07:00Z | 4,193 MW | 2,091 MW | 1,901 MW | 589 MW | 174 MW |
| 2026-10-22T08:00Z | 4,009 MW | 2,091 MW | 1,956 MW | 576 MW | 174 MW |
| 2026-10-22T09:00Z | 3,806 MW | 2,088 MW | 2,000 MW | 572 MW | 169 MW |
| 2026-10-22T10:00Z | 3,464 MW | 2,088 MW | 2,009 MW | 593 MW | 171 MW |
| 2026-10-22T11:00Z | 3,371 MW | 2,088 MW | 2,024 MW | 580 MW | 175 MW |
| 2026-10-22T12:00Z | 3,539 MW | 2,088 MW | 2,062 MW | 602 MW | 181 MW |
| 2026-10-22T13:00Z | 3,850 MW | 2,089 MW | 2,075 MW | 624 MW | 180 MW |
| 2026-10-22T14:00Z | 4,392 MW | 2,089 MW | 2,106 MW | 628 MW | 177 MW |
| 2026-10-22T15:00Z | 5,225 MW | 2,089 MW | 2,107 MW | 624 MW | 176 MW |
| 2026-10-22T16:00Z | 5,311 MW | 2,090 MW | 2,104 MW | 653 MW | 178 MW |
| 2026-10-22T17:00Z | 5,330 MW | 2,090 MW | 2,075 MW | 630 MW | 175 MW |
| 2026-10-22T18:00Z | 5,315 MW | 2,089 MW | 2,058 MW | 618 MW | 182 MW |
| 2026-10-22T19:00Z | 5,227 MW | 2,090 MW | 2,031 MW | 634 MW | 183 MW |
| 2026-10-22T20:00Z | 5,254 MW | 2,090 MW | 2,031 MW | 630 MW | 177 MW |
| 2026-10-22T21:00Z | 5,027 MW | 2,090 MW | 2,000 MW | 631 MW | 174 MW |
| 2026-10-22T22:00Z | 5,280 MW | 2,091 MW | 1,981 MW | 631 MW | 176 MW |
| 2026-10-22T23:00Z | 5,271 MW | 2,090 MW | 1,977 MW | 623 MW | 176 MW |
| 2026-10-23T00:00Z | 5,112 MW | 2,089 MW | 1,979 MW | 625 MW | 177 MW |
| 2026-10-23T01:00Z | 4,830 MW | 2,089 MW | 1,997 MW | 620 MW | 178 MW |
| 2026-10-23T02:00Z | 4,776 MW | 2,088 MW | 2,041 MW | 629 MW | 177 MW |
| 2026-10-23T03:00Z | 4,497 MW | 2,090 MW | 2,169 MW | 639 MW | 175 MW |
| 2026-10-23T04:00Z | 4,348 MW | 2,089 MW | 2,231 MW | 638 MW | 173 MW |
| 2026-10-23T05:00Z | 4,370 MW | 2,089 MW | 2,251 MW | 662 MW | 199 MW |
| 2026-10-23T06:00Z | 4,320 MW | 2,089 MW | 2,259 MW | 670 MW | 208 MW |
| 2026-10-23T07:00Z | 4,195 MW | 2,089 MW | 2,235 MW | 641 MW | 218 MW |
| 2026-10-23T08:00Z | 4,025 MW | 2,088 MW | 2,216 MW | 631 MW | 220 MW |
| 2026-10-23T09:00Z | 3,545 MW | 2,088 MW | 2,154 MW | 663 MW | 230 MW |
| 2026-10-23T10:00Z | 3,119 MW | 2,088 MW | 2,213 MW | 658 MW | 227 MW |
| 2026-10-23T11:00Z | 2,919 MW | 2,087 MW | 2,256 MW | 651 MW | 209 MW |
| 2026-10-23T12:00Z | 2,847 MW | 2,086 MW | 2,333 MW | 659 MW | 216 MW |
| 2026-10-23T13:00Z | 3,483 MW | 2,083 MW | 2,374 MW | 662 MW | 213 MW |
| 2026-10-23T14:00Z | 4,534 MW | 2,083 MW | 2,380 MW | 661 MW | 224 MW |
| 2026-10-23T15:00Z | 5,425 MW | 2,083 MW | 2,262 MW | 654 MW | 227 MW |
| 2026-10-23T16:00Z | 5,702 MW | 2,083 MW | 2,237 MW | 656 MW | 233 MW |
| 2026-10-23T17:00Z | 5,853 MW | 2,083 MW | 2,223 MW | 644 MW | 232 MW |
| 2026-10-23T18:00Z | 5,989 MW | 2,083 MW | 2,192 MW | 640 MW | 223 MW |
| 2026-10-23T19:00Z | 5,718 MW | 2,083 MW | 2,116 MW | 633 MW | 217 MW |
| 2026-10-23T20:00Z | 5,220 MW | 2,082 MW | 2,177 MW | 623 MW | 223 MW |
| 2026-10-23T21:00Z | 4,982 MW | 2,082 MW | 2,168 MW | 624 MW | 219 MW |
| 2026-10-23T22:00Z | 4,578 MW | 2,080 MW | 2,045 MW | 623 MW | 215 MW |
| 2026-10-23T23:00Z | 4,203 MW | 2,079 MW | 2,068 MW | 625 MW | 222 MW |
| 2026-10-24T00:00Z | 3,839 MW | 2,082 MW | 2,072 MW | 629 MW | 225 MW |
| 2026-10-24T01:00Z | 3,509 MW | 2,083 MW | 2,147 MW | 621 MW | 226 MW |
| 2026-10-24T02:00Z | 3,248 MW | 2,083 MW | 2,097 MW | 624 MW | 223 MW |
| 2026-10-24T03:00Z | 2,941 MW | 2,083 MW | 2,135 MW | 625 MW | 225 MW |
| 2026-10-24T04:00Z | 2,706 MW | 2,082 MW | 2,139 MW | 629 MW | 221 MW |
| 2026-10-24T05:00Z | 2,638 MW | 2,081 MW | 2,223 MW | 624 MW | 226 MW |
| 2026-10-24T06:00Z | 2,511 MW | 2,081 MW | 2,251 MW | 625 MW | 232 MW |
| 2026-10-24T07:00Z | 2,338 MW | 2,081 MW | 2,208 MW | 640 MW | 231 MW |
| 2026-10-24T08:00Z | 2,054 MW | 2,082 MW | 2,189 MW | 641 MW | 224 MW |
| 2026-10-24T09:00Z | 1,727 MW | 2,081 MW | 2,220 MW | 635 MW | 220 MW |
| 2026-10-24T10:00Z | 1,449 MW | 2,081 MW | 2,185 MW | 647 MW | 219 MW |
| 2026-10-24T11:00Z | 1,303 MW | 2,081 MW | 2,163 MW | 669 MW | 214 MW |
| 2026-10-24T12:00Z | 1,394 MW | 2,082 MW | 2,177 MW | 667 MW | 224 MW |
| 2026-10-24T13:00Z | 1,531 MW | 2,082 MW | 2,159 MW | 695 MW | 228 MW |
| 2026-10-24T14:00Z | 1,841 MW | 2,074 MW | 2,218 MW | 714 MW | 229 MW |
| 2026-10-24T15:00Z | 2,249 MW | 2,074 MW | 2,202 MW | 713 MW | 228 MW |
| 2026-10-24T16:00Z | 2,646 MW | 2,075 MW | 2,101 MW | 712 MW | 230 MW |
| 2026-10-24T17:00Z | 3,091 MW | 2,075 MW | 2,046 MW | 704 MW | 231 MW |
| 2026-10-24T18:00Z | 3,243 MW | 2,075 MW | 1,903 MW | 702 MW | 228 MW |
| 2026-10-24T19:00Z | 3,745 MW | 2,079 MW | 1,805 MW | 701 MW | 233 MW |
| 2026-10-24T20:00Z | 3,983 MW | 2,079 MW | 1,773 MW | 700 MW | 236 MW |
| 2026-10-24T21:00Z | 4,069 MW | 2,074 MW | 1,818 MW | 716 MW | 234 MW |
| 2026-10-24T22:00Z | 4,478 MW | 2,075 MW | 1,827 MW | 720 MW | 232 MW |
| 2026-10-24T23:00Z | 4,786 MW | 2,077 MW | 1,817 MW | 724 MW | 233 MW |
| 2026-10-25T00:00Z | 4,767 MW | 2,078 MW | 1,754 MW | 723 MW | 236 MW |
| 2026-10-25T01:00Z | 4,652 MW | 2,078 MW | 1,740 MW | 722 MW | 231 MW |
| 2026-10-25T02:00Z | 4,569 MW | 2,078 MW | 1,583 MW | 716 MW | 234 MW |
| 2026-10-25T03:00Z | 4,777 MW | 2,078 MW | 1,575 MW | 709 MW | 234 MW |
| 2026-10-25T04:00Z | 4,977 MW | 2,077 MW | 1,595 MW | 699 MW | 234 MW |
| 2026-10-25T05:00Z | 5,187 MW | 2,078 MW | 1,563 MW | 698 MW | 230 MW |
| 2026-10-25T06:00Z | 5,241 MW | 2,078 MW | 1,540 MW | 698 MW | 231 MW |
| 2026-10-25T07:00Z | 5,554 MW | 2,076 MW | 1,570 MW | 708 MW | 227 MW |
| 2026-10-25T08:00Z | 5,467 MW | 2,076 MW | 1,580 MW | 704 MW | 227 MW |
| 2026-10-25T09:00Z | 5,319 MW | 2,079 MW | 1,590 MW | 702 MW | 228 MW |
| 2026-10-25T10:00Z | 4,919 MW | 2,081 MW | 1,632 MW | 699 MW | 229 MW |
| 2026-10-25T11:00Z | 4,829 MW | 2,082 MW | 1,642 MW | 701 MW | 227 MW |
| 2026-10-25T12:00Z | 4,948 MW | 2,081 MW | 1,685 MW | 702 MW | 224 MW |
| 2026-10-25T13:00Z | 5,099 MW | 2,081 MW | 1,754 MW | 703 MW | 229 MW |
| 2026-10-25T14:00Z | 5,350 MW | 2,081 MW | 1,836 MW | 703 MW | 229 MW |
| 2026-10-25T15:00Z | 5,763 MW | 2,081 MW | 1,871 MW | 704 MW | 231 MW |
| 2026-10-25T16:00Z | 5,781 MW | 2,081 MW | 1,778 MW | 704 MW | 221 MW |
| 2026-10-25T17:00Z | 5,955 MW | 2,081 MW | 1,770 MW | 710 MW | 225 MW |
| 2026-10-25T18:00Z | 5,835 MW | 2,081 MW | 1,757 MW | 710 MW | 229 MW |
| 2026-10-25T19:00Z | 5,806 MW | 2,080 MW | 1,723 MW | 705 MW | 199 MW |
| 2026-10-25T20:00Z | 5,613 MW | 2,080 MW | 1,719 MW | 699 MW | 178 MW |
| 2026-10-25T21:00Z | 5,596 MW | 2,079 MW | 1,709 MW | 688 MW | 184 MW |
| 2026-10-25T22:00Z | 5,398 MW | 2,079 MW | 1,641 MW | 695 MW | 208 MW |
| 2026-10-25T23:00Z | 5,943 MW | 2,080 MW | 1,640 MW | 694 MW | 219 MW |
| 2026-10-26T00:00Z | 5,962 MW | 2,079 MW | 1,585 MW | 691 MW | 220 MW |
| 2026-10-26T01:00Z | 5,955 MW | 2,078 MW | 1,553 MW | 686 MW | 223 MW |
| 2026-10-26T02:00Z | 5,767 MW | 2,077 MW | 1,550 MW | 689 MW | 222 MW |
| 2026-10-26T03:00Z | 5,772 MW | 2,077 MW | 1,568 MW | 684 MW | 229 MW |
| 2026-10-26T04:00Z | 5,953 MW | 2,076 MW | 1,614 MW | 687 MW | 220 MW |
| 2026-10-26T05:00Z | 6,504 MW | 2,076 MW | 1,660 MW | 681 MW | 176 MW |
| 2026-10-26T06:00Z | 6,107 MW | 2,077 MW | 1,690 MW | 672 MW | 184 MW |
| 2026-10-26T07:00Z | 6,006 MW | 2,079 MW | 1,641 MW | 665 MW | 176 MW |
| 2026-10-26T08:00Z | 5,785 MW | 2,075 MW | 1,782 MW | 671 MW | 170 MW |
| 2026-10-26T09:00Z | 5,751 MW | 2,074 MW | 1,768 MW | 672 MW | 181 MW |
| 2026-10-26T10:00Z | 5,615 MW | 2,073 MW | 1,757 MW | 662 MW | 208 MW |
| 2026-10-26T11:00Z | 5,790 MW | 2,071 MW | 1,733 MW | 666 MW | 217 MW |
| 2026-10-26T12:00Z | 5,684 MW | 2,069 MW | 1,758 MW | 661 MW | 228 MW |
| 2026-10-26T13:00Z | 6,016 MW | 2,066 MW | 1,852 MW | 658 MW | 228 MW |
| 2026-10-26T14:00Z | 6,369 MW | 2,067 MW | 1,915 MW | 657 MW | 223 MW |
| 2026-10-26T15:00Z | 6,687 MW | 2,067 MW | 1,934 MW | 661 MW | 208 MW |
| 2026-10-26T16:00Z | 6,648 MW | 2,068 MW | 1,970 MW | 667 MW | 216 MW |
| 2026-10-26T17:00Z | 6,640 MW | 2,067 MW | 1,915 MW | 673 MW | 221 MW |
| 2026-10-26T18:00Z | 6,638 MW | 2,068 MW | 1,861 MW | 663 MW | 220 MW |
| 2026-10-26T19:00Z | 6,414 MW | 2,067 MW | 1,834 MW | 659 MW | 223 MW |
| 2026-10-26T20:00Z | 6,357 MW | 2,067 MW | 1,900 MW | 640 MW | 218 MW |
| 2026-10-26T21:00Z | 6,192 MW | 2,065 MW | 1,972 MW | 639 MW | 222 MW |
| 2026-10-26T22:00Z | 6,160 MW | 2,064 MW | 1,833 MW | 639 MW | 226 MW |
| 2026-10-26T23:00Z | 6,018 MW | 2,065 MW | 1,717 MW | 649 MW | 225 MW |
| 2026-10-27T00:00Z | 5,964 MW | 2,065 MW | 1,726 MW | 649 MW | 223 MW |
| 2026-10-27T01:00Z | 5,892 MW | 2,066 MW | 1,653 MW | 646 MW | 224 MW |
| 2026-10-27T02:00Z | 5,898 MW | 2,069 MW | 1,647 MW | 649 MW | 224 MW |
| 2026-10-27T03:00Z | 5,857 MW | 2,072 MW | 1,675 MW | 644 MW | 225 MW |
| 2026-10-27T04:00Z | 6,325 MW | 2,072 MW | 1,793 MW | 650 MW | 224 MW |
| 2026-10-27T05:00Z | 6,447 MW | 2,073 MW | 1,929 MW | 648 MW | 223 MW |
| 2026-10-27T06:00Z | 6,122 MW | 2,072 MW | 1,967 MW | 643 MW | 222 MW |
| 2026-10-27T07:00Z | 5,860 MW | 2,071 MW | 1,923 MW | 631 MW | 228 MW |
| 2026-10-27T08:00Z | 5,746 MW | 2,070 MW | 1,877 MW | 635 MW | 231 MW |
| 2026-10-27T09:00Z | 5,882 MW | 2,069 MW | 1,821 MW | 635 MW | 232 MW |
| 2026-10-27T10:00Z | 5,656 MW | 2,072 MW | 1,818 MW | 636 MW | 243 MW |
| 2026-10-27T11:00Z | 5,937 MW | 2,070 MW | 1,845 MW | 639 MW | 244 MW |
| 2026-10-27T12:00Z | 6,087 MW | 2,068 MW | 1,897 MW | 654 MW | 227 MW |
| 2026-10-27T13:00Z | 6,461 MW | 2,069 MW | 1,869 MW | 642 MW | 224 MW |
| 2026-10-27T14:00Z | 6,629 MW | 2,068 MW | 1,900 MW | 637 MW | 227 MW |
| 2026-10-27T15:00Z | 7,014 MW | 2,068 MW | 1,879 MW | 646 MW | 226 MW |
| 2026-10-27T16:00Z | 7,339 MW | 2,089 MW | 1,894 MW | 656 MW | 220 MW |
| 2026-10-27T17:00Z | 7,353 MW | 2,124 MW | 1,820 MW | 643 MW | 224 MW |
| 2026-10-27T18:00Z | 7,264 MW | 2,163 MW | 1,791 MW | 640 MW | 230 MW |
| 2026-10-27T19:00Z | 6,973 MW | 2,187 MW | 1,627 MW | 644 MW | 227 MW |
| 2026-10-27T20:00Z | 7,052 MW | 2,187 MW | 1,562 MW | 649 MW | 223 MW |
| 2026-10-27T21:00Z | 6,752 MW | 2,188 MW | 1,532 MW | 651 MW | 222 MW |
| 2026-10-27T22:00Z | 6,203 MW | 2,188 MW | 1,432 MW | 640 MW | 214 MW |
| 2026-10-27T23:00Z | 6,150 MW | 2,189 MW | 1,455 MW | 656 MW | 211 MW |
| 2026-10-28T00:00Z | 6,164 MW | 2,201 MW | 1,460 MW | 664 MW | 217 MW |
| 2026-10-28T01:00Z | 5,656 MW | 2,221 MW | 1,433 MW | 661 MW | 221 MW |
| 2026-10-28T02:00Z | 6,013 MW | 2,240 MW | 1,425 MW | 656 MW | 222 MW |
| 2026-10-28T03:00Z | 5,851 MW | 2,249 MW | 1,374 MW | 653 MW | 226 MW |
| 2026-10-28T04:00Z | 6,122 MW | 2,252 MW | 1,491 MW | 648 MW | 229 MW |
| 2026-10-28T05:00Z | 6,129 MW | 2,251 MW | 1,560 MW | 659 MW | 234 MW |
| 2026-10-28T06:00Z | 6,539 MW | 2,251 MW | 1,580 MW | 636 MW | 230 MW |
| 2026-10-28T07:00Z | 6,565 MW | 2,249 MW | 1,501 MW | 636 MW | 224 MW |
| 2026-10-28T08:00Z | 6,471 MW | 2,251 MW | 1,481 MW | 643 MW | 213 MW |
| 2026-10-28T09:00Z | 6,379 MW | 2,273 MW | 1,501 MW | 643 MW | 227 MW |
| 2026-10-28T10:00Z | 6,337 MW | 2,292 MW | 1,539 MW | 635 MW | 234 MW |
| 2026-10-28T11:00Z | 5,856 MW | 2,300 MW | 1,663 MW | 633 MW | 230 MW |
| 2026-10-28T12:00Z | 5,712 MW | 2,309 MW | 1,742 MW | 622 MW | 230 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00Z.
Installed Capacity
Annual figure for 2026| Wind | |
|---|---|
| Nuclear | |
| Hydro | |
| Bioenergy | |
| Gas | |
| Solar | |
| Coal | |
| Oil | |
| Other fossil | |
| Other | |
| Other renewables | |
| Storage |
Total installed capacity in Finland: 26.3 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Helsinki time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Helsinki time) | Demand |
|---|---|
| 2025-09-23 | 215 GWh |
| 2025-09-24 | 213 GWh |
| 2025-09-25 | 209 GWh |
| 2025-09-26 | 204 GWh |
| 2025-09-27 | 190 GWh |
| 2025-09-28 | 192 GWh |
| 2025-09-29 | 214 GWh |
| 2025-09-30 | 218 GWh |
| 2025-10-01 | 215 GWh |
| 2025-10-02 | 218 GWh |
| 2025-10-03 | 235 GWh |
| 2025-10-04 | 224 GWh |
| 2025-10-05 | 215 GWh |
| 2025-10-06 | 210 GWh |
| 2025-10-07 | 208 GWh |
| 2025-10-08 | 213 GWh |
| 2025-10-09 | 215 GWh |
| 2025-10-10 | 226 GWh |
| 2025-10-11 | 218 GWh |
| 2025-10-12 | 219 GWh |
| 2025-10-13 | 225 GWh |
| 2025-10-14 | 212 GWh |
| 2025-10-15 | 221 GWh |
| 2025-10-16 | 237 GWh |
| 2025-10-17 | 229 GWh |
| 2025-10-18 | 234 GWh |
| 2025-10-19 | 236 GWh |
| 2025-10-20 | 235 GWh |
| 2025-10-21 | 241 GWh |
| 2025-10-22 | 247 GWh |
| 2025-10-23 | 240 GWh |
| 2025-10-24 | 227 GWh |
| 2025-10-25 | 228 GWh |
| 2025-10-26 | 232 GWh |
| 2025-10-27 | 234 GWh |
| 2025-10-28 | 230 GWh |
| 2025-10-29 | 226 GWh |
| 2025-10-30 | 237 GWh |
| 2025-10-31 | 233 GWh |
| 2025-11-01 | 222 GWh |
| 2025-11-02 | 231 GWh |
| 2025-11-03 | 234 GWh |
| 2025-11-04 | 243 GWh |
| 2025-11-05 | 235 GWh |
| 2025-11-06 | 236 GWh |
| 2025-11-07 | 230 GWh |
| 2025-11-08 | 224 GWh |
| 2025-11-09 | 229 GWh |
| 2025-11-10 | 240 GWh |
| 2025-11-11 | 244 GWh |
| 2025-11-12 | 254 GWh |
| 2025-11-13 | 252 GWh |
| 2025-11-14 | 263 GWh |
| 2025-11-15 | 270 GWh |
| 2025-11-16 | 246 GWh |
| 2025-11-17 | 258 GWh |
| 2025-11-18 | 269 GWh |
| 2025-11-19 | 279 GWh |
| 2025-11-20 | 274 GWh |
| 2025-11-21 | 263 GWh |
| 2025-11-22 | 283 GWh |
| 2025-11-23 | 250 GWh |
| 2025-11-24 | 250 GWh |
| 2025-11-25 | 263 GWh |
| 2025-11-26 | 296 GWh |
| 2025-11-27 | 300 GWh |
| 2025-11-28 | 277 GWh |
| 2025-11-29 | 254 GWh |
| 2025-11-30 | 248 GWh |
| 2025-12-01 | 260 GWh |
| 2025-12-02 | 265 GWh |
| 2025-12-03 | 266 GWh |
| 2025-12-04 | 254 GWh |
| 2025-12-05 | 245 GWh |
| 2025-12-06 | 253 GWh |
| 2025-12-07 | 256 GWh |
| 2025-12-08 | 268 GWh |
| 2025-12-09 | 253 GWh |
| 2025-12-10 | 265 GWh |
| 2025-12-11 | 262 GWh |
| 2025-12-12 | 282 GWh |
| 2025-12-13 | 288 GWh |
| 2025-12-14 | 291 GWh |
| 2025-12-15 | 282 GWh |
| 2025-12-16 | 258 GWh |
| 2025-12-17 | 265 GWh |
| 2025-12-18 | 274 GWh |
| 2025-12-19 | 266 GWh |
| 2025-12-20 | 252 GWh |
| 2025-12-21 | 250 GWh |
| 2025-12-22 | 260 GWh |
| 2025-12-23 | 278 GWh |
| 2025-12-24 | 260 GWh |
| 2025-12-25 | 237 GWh |
| 2025-12-26 | 240 GWh |
| 2025-12-27 | 242 GWh |
| 2025-12-28 | 261 GWh |
| 2025-12-29 | 287 GWh |
| 2025-12-30 | 300 GWh |
| 2025-12-31 | 306 GWh |
| 2026-01-01 | 314 GWh |
| 2026-01-02 | 318 GWh |
| 2026-01-03 | 307 GWh |
| 2026-01-04 | 314 GWh |
| 2026-01-05 | 324 GWh |
| 2026-01-06 | 312 GWh |
| 2026-01-07 | 322 GWh |
| 2026-01-08 | 352 GWh |
| 2026-01-09 | 354 GWh |
| 2026-01-10 | 341 GWh |
| 2026-01-11 | 312 GWh |
| 2026-01-12 | 315 GWh |
| 2026-01-13 | 306 GWh |
| 2026-01-14 | 313 GWh |
| 2026-01-15 | 308 GWh |
| 2026-01-16 | 305 GWh |
| 2026-01-17 | 292 GWh |
| 2026-01-18 | 257 GWh |
| 2026-01-19 | 266 GWh |
| 2026-01-20 | 271 GWh |
| 2026-01-21 | 283 GWh |
| 2026-01-22 | 296 GWh |
| 2026-01-23 | 308 GWh |
| 2026-01-24 | 300 GWh |
| 2026-01-25 | 295 GWh |
| 2026-01-26 | 301 GWh |
| 2026-01-27 | 299 GWh |
| 2026-01-28 | 310 GWh |
| 2026-01-29 | 319 GWh |
| 2026-01-30 | 330 GWh |
| 2026-01-31 | 340 GWh |
| 2026-02-01 | 347 GWh |
| 2026-02-02 | 343 GWh |
| 2026-02-03 | 338 GWh |
| 2026-02-04 | 328 GWh |
| 2026-02-05 | 337 GWh |
| 2026-02-06 | 331 GWh |
| 2026-02-07 | 318 GWh |
| 2026-02-08 | 313 GWh |
| 2026-02-09 | 306 GWh |
| 2026-02-10 | 299 GWh |
| 2026-02-11 | 300 GWh |
| 2026-02-12 | 311 GWh |
| 2026-02-13 | 329 GWh |
| 2026-02-14 | 330 GWh |
| 2026-02-15 | 315 GWh |
| 2026-02-16 | 319 GWh |
| 2026-02-17 | 318 GWh |
| 2026-02-18 | 309 GWh |
| 2026-02-19 | 308 GWh |
| 2026-02-20 | 328 GWh |
| 2026-02-21 | 301 GWh |
| 2026-02-22 | 286 GWh |
| 2026-02-23 | 300 GWh |
| 2026-02-24 | 298 GWh |
| 2026-02-25 | 314 GWh |
| 2026-02-26 | 300 GWh |
| 2026-02-27 | 278 GWh |
| 2026-02-28 | 254 GWh |
| 2026-03-01 | 253 GWh |
| 2026-03-02 | 269 GWh |
| 2026-03-03 | 303 GWh |
| 2026-03-04 | 292 GWh |
| 2026-03-05 | 272 GWh |
| 2026-03-06 | 285 GWh |
| 2026-03-07 | 268 GWh |
| 2026-03-08 | 259 GWh |
| 2026-03-09 | 264 GWh |
| 2026-03-10 | 269 GWh |
| 2026-03-11 | 267 GWh |
| 2026-03-12 | 276 GWh |
| 2026-03-13 | 274 GWh |
| 2026-03-14 | 251 GWh |
| 2026-03-15 | 233 GWh |
| 2026-03-16 | 267 GWh |
| 2026-03-17 | 272 GWh |
| 2026-03-18 | 279 GWh |
| 2026-03-19 | 274 GWh |
| 2026-03-20 | 264 GWh |
| 2026-03-21 | 255 GWh |
| 2026-03-22 | 246 GWh |
| 2026-03-23 | 265 GWh |
| 2026-03-24 | 266 GWh |
| 2026-03-25 | 261 GWh |
| 2026-03-26 | 264 GWh |
| 2026-03-27 | 255 GWh |
| 2026-03-28 | 256 GWh |
| 2026-03-29 | 240 GWh |
| 2026-03-30 | 268 GWh |
| 2026-03-31 | 246 GWh |
| 2026-04-01 | 264 GWh |
| 2026-04-02 | 254 GWh |
| 2026-04-03 | 240 GWh |
| 2026-04-04 | 254 GWh |
| 2026-04-05 | 248 GWh |
| 2026-04-06 | 252 GWh |
| 2026-04-07 | 262 GWh |
| 2026-04-08 | 250 GWh |
| 2026-04-09 | 253 GWh |
| 2026-04-10 | 247 GWh |
| 2026-04-11 | 230 GWh |
| 2026-04-12 | 218 GWh |
| 2026-04-13 | 221 GWh |
| 2026-04-14 | 223 GWh |
| 2026-04-15 | 216 GWh |
| 2026-04-16 | 219 GWh |
| 2026-04-17 | 221 GWh |
| 2026-04-18 | 217 GWh |
| 2026-04-19 | 215 GWh |
| 2026-04-20 | 221 GWh |
| 2026-04-21 | 220 GWh |
| 2026-04-22 | 234 GWh |
| 2026-04-23 | 242 GWh |
| 2026-04-24 | 243 GWh |
| 2026-04-25 | 242 GWh |
| 2026-04-26 | 245 GWh |
| 2026-04-27 | 254 GWh |
| 2026-04-28 | 254 GWh |
| 2026-04-29 | 234 GWh |
| 2026-04-30 | 226 GWh |
| 2026-05-01 | 216 GWh |
| 2026-05-02 | 207 GWh |
| 2026-05-03 | 197 GWh |
| 2026-05-04 | 212 GWh |
| 2026-05-05 | 225 GWh |
| 2026-05-06 | 223 GWh |
| 2026-05-07 | 214 GWh |
| 2026-05-08 | 214 GWh |
| 2026-05-09 | 213 GWh |
| 2026-05-10 | 205 GWh |
| 2026-05-11 | 213 GWh |
| 2026-05-12 | 211 GWh |
| 2026-05-13 | 213 GWh |
| 2026-05-14 | 225 GWh |
| 2026-05-15 | 208 GWh |
| 2026-05-16 | 197 GWh |
| 2026-05-17 | 199 GWh |
| 2026-05-18 | 202 GWh |
| 2026-05-19 | 206 GWh |
| 2026-05-20 | 203 GWh |
| 2026-05-21 | 204 GWh |
| 2026-05-22 | 208 GWh |
| 2026-05-23 | 200 GWh |
| 2026-05-24 | 201 GWh |
| 2026-05-25 | 215 GWh |
| 2026-05-26 | 213 GWh |
| 2026-05-27 | 225 GWh |
| 2026-05-28 | 229 GWh |
| 2026-05-29 | 219 GWh |
| 2026-05-30 | 199 GWh |
| 2026-05-31 | 194 GWh |
| 2026-06-01 | 203 GWh |
| 2026-06-02 | 201 GWh |
| 2026-06-03 | 202 GWh |
| 2026-06-04 | 209 GWh |
| 2026-06-05 | 207 GWh |
| 2026-06-06 | 190 GWh |
| 2026-06-07 | 198 GWh |
| 2026-06-08 | 202 GWh |
| 2026-06-09 | 201 GWh |
| 2026-06-10 | 209 GWh |
| 2026-06-11 | 205 GWh |
| 2026-06-12 | 208 GWh |
| 2026-06-13 | 201 GWh |
| 2026-06-14 | 200 GWh |
| 2026-06-15 | 205 GWh |
| 2026-06-16 | 201 GWh |
| 2026-06-17 | 206 GWh |
| 2026-06-18 | 197 GWh |
| 2026-06-19 | 181 GWh |
| 2026-06-20 | 179 GWh |
| 2026-06-21 | 176 GWh |
| 2026-06-22 | 194 GWh |
| 2026-06-23 | 196 GWh |
| 2026-06-24 | 195 GWh |
| 2026-06-25 | 202 GWh |
| 2026-06-26 | 202 GWh |
| 2026-06-27 | 193 GWh |
| 2026-06-28 | 189 GWh |
| 2026-06-29 | 204 GWh |
| 2026-06-30 | 208 GWh |
| 2026-07-01 | 203 GWh |
| 2026-07-02 | 202 GWh |
| 2026-07-03 | 206 GWh |
| 2026-07-04 | 196 GWh |
| 2026-07-05 | 194 GWh |
| 2026-07-06 | 211 GWh |
| 2026-07-07 | 210 GWh |
| 2026-07-08 | 214 GWh |
| 2026-07-09 | 207 GWh |
| 2026-07-10 | 203 GWh |
| 2026-07-11 | 198 GWh |
| 2026-07-12 | 196 GWh |
| 2026-07-13 | 203 GWh |
| 2026-07-14 | 196 GWh |
| 2026-07-15 | 198 GWh |
| 2026-07-16 | 197 GWh |
| 2026-07-17 | 202 GWh |
| 2026-07-18 | 190 GWh |
| 2026-07-19 | 186 GWh |
| 2026-07-20 | 194 GWh |
| 2026-07-21 | 198 GWh |
| 2026-07-22 | 201 GWh |
| 2026-07-23 | 202 GWh |
| 2026-07-24 | 198 GWh |
| 2026-07-25 | 195 GWh |
| 2026-07-26 | 192 GWh |
| 2026-07-27 | 200 GWh |
| 2026-07-28 | 208 GWh |
| 2026-07-29 | 204 GWh |
| 2026-07-30 | 210 GWh |
| 2026-07-31 | 209 GWh |
| 2026-08-01 | 197 GWh |
| 2026-08-02 | 197 GWh |
| 2026-08-03 | 208 GWh |
| 2026-08-04 | 211 GWh |
| 2026-08-05 | 214 GWh |
| 2026-08-06 | 219 GWh |
| 2026-08-07 | 220 GWh |
| 2026-08-08 | 207 GWh |
| 2026-08-09 | 205 GWh |
| 2026-08-10 | 217 GWh |
| 2026-08-11 | 222 GWh |
| 2026-08-12 | 214 GWh |
| 2026-08-13 | 209 GWh |
| 2026-08-14 | 215 GWh |
| 2026-08-15 | 201 GWh |
| 2026-08-16 | 202 GWh |
| 2026-08-17 | 213 GWh |
| 2026-08-18 | 209 GWh |
| 2026-08-19 | 202 GWh |
| 2026-08-20 | 210 GWh |
| 2026-08-21 | 208 GWh |
| 2026-08-22 | 196 GWh |
| 2026-08-23 | 206 GWh |
| 2026-08-24 | 213 GWh |
| 2026-08-25 | 206 GWh |
| 2026-08-26 | 207 GWh |
| 2026-08-27 | 206 GWh |
| 2026-08-28 | 210 GWh |
| 2026-08-29 | 202 GWh |
| 2026-08-30 | 198 GWh |
| 2026-08-31 | 204 GWh |
| 2026-09-01 | 203 GWh |
| 2026-09-02 | 204 GWh |
| 2026-09-03 | 204 GWh |
| 2026-09-04 | 203 GWh |
| 2026-09-05 | 203 GWh |
| 2026-09-06 | 205 GWh |
| 2026-09-07 | 215 GWh |
| 2026-09-08 | 212 GWh |
| 2026-09-09 | 195 GWh |
| 2026-09-10 | 205 GWh |
| 2026-09-11 | 205 GWh |
| 2026-09-12 | 193 GWh |
| 2026-09-13 | 201 GWh |
| 2026-09-14 | 202 GWh |
| 2026-09-15 | 196 GWh |
| 2026-09-16 | 198 GWh |
| 2026-09-17 | 209 GWh |
| 2026-09-18 | 207 GWh |
| 2026-09-19 | 205 GWh |
| 2026-09-20 | 197 GWh |
| 2026-09-21 | 208 GWh |
| 2026-09-22 | 201 GWh |
| 2026-09-23 | 207 GWh |
| 2026-09-24 | 203 GWh |
| 2026-09-25 | 210 GWh |
| 2026-09-26 | 199 GWh |
| 2026-09-27 | 193 GWh |
| 2026-09-28 | 220 GWh |
| 2026-09-29 | 212 GWh |
| 2026-09-30 | 205 GWh |
| 2026-10-01 | 227 GWh |
| 2026-10-02 | 210 GWh |
| 2026-10-03 | 203 GWh |
| 2026-10-04 | 202 GWh |
| 2026-10-05 | 228 GWh |
| 2026-10-06 | 224 GWh |
| 2026-10-07 | 229 GWh |
| 2026-10-08 | 214 GWh |
| 2026-10-09 | 246 GWh |
| 2026-10-10 | 236 GWh |
| 2026-10-11 | 220 GWh |
| 2026-10-12 | 227 GWh |
| 2026-10-13 | 232 GWh |
| 2026-10-14 | 230 GWh |
| 2026-10-15 | 237 GWh |
| 2026-10-16 | 222 GWh |
| 2026-10-17 | 213 GWh |
| 2026-10-18 | 218 GWh |
| 2026-10-19 | 264 GWh |
| 2026-10-20 | 248 GWh |
| 2026-10-21 | 248 GWh |
| 2026-10-22 | 250 GWh |
| 2026-10-23 | 240 GWh |
| 2026-10-24 | 224 GWh |
| 2026-10-25 | 242 GWh |
| 2026-10-26 | 241 GWh |
| 2026-10-27 | 239 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Helsinki local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 71.2 TWh | 65.6 TWh | Nuclear 38.3% | 300 |
| 2025 | 84.6 TWh | 79.4 TWh | Nuclear 39.4% | 365 |
| 2024 | 82.0 TWh | 77.6 TWh | Nuclear 40.0% | 366 |
| 2023 (partial) | 78.8 TWh | 73.8 TWh | Nuclear 44.2% | 364 |
| 2022 | 79.2 TWh | 63.6 TWh | Nuclear 37.9% | 365 |
| 2021 | 84.7 TWh | 63.7 TWh | Nuclear 35.5% | 365 |
| 2020 | 78.4 TWh | 60.9 TWh | Nuclear 36.7% | 366 |
| 2019 | 83.4 TWh | 60.2 TWh | Nuclear 38.1% | 365 |
| 2018 (partial) | 85.4 TWh | 63.3 TWh | Nuclear 34.5% | 364 |
| 2017 (partial) | 81.8 TWh | 60.7 TWh | Nuclear 34.9% | 360 |
| 2016 (partial) | 80.6 TWh | 62.0 TWh | Nuclear 34.7% | 353 |
| 2015 (partial) | 77.2 TWh | 47.5 TWh | Nuclear 33.2% | 350 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Estonia | Finland exports | 605 GWh |
| Sweden South-Central (SE3) | Finland imports | 502 GWh |
| Sweden North (SE1) | Finland imports | 435 GWh |
| Norway North (NO4) | Finland imports | 36.4 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Latest Grid Alerts
Newest alert 20 October 2026- Day ahead price The day ahead price in Finland averaged EUR 64.07/MWh for 20 October 2026, 2.5 times its 90 day median of EUR 25.79/MWh. All alerts that day
- Day ahead price Finland had a day ahead price averaging EUR 77.39/MWh for 18 October 2026, 3.1 times its own 90 day median (EUR 25.25/MWh). All alerts that day
- Day ahead price The day ahead price in Finland averaged EUR 115.18/MWh for 13 October 2026, 5 times its 90 day median of EUR 23.08/MWh. All alerts that day
Follow this grid: RSS feed of Finland alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Finland, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Finland Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/fi/
World Power Monitor. Finland Electricity Demand and Generation Mix. Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/fi/
@misc{wpm_zones_fi_2026,
title = {{Finland Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/fi/}
} Permalink: https://worldpowermonitor.com/zones/fi/
The Copy buttons add today's date as the access date.