Georgia Demand Forecast Accuracy: Error, Bias and Worst Miss, 30 September to 28 October 2026
The day-ahead demand forecast for Georgia was off by 2.5% on average (mean absolute percentage error) over 563 hours from 30 September to 28 October 2026, and 88% of hours landed within 5% of the reading. Its bias was -0.2%: it ran close to balanced on average. The largest miss was 440 MW (26.2%) too low at 16 Oct 2026, 05:00 (UTC+04:00). Dates and times are local (Asia/Tbilisi).
This grid has 563 compared hours out of the 688 in its 30 day window, because the forecast or the demand reading is missing for the rest. Treat the figures as a shorter sample.
Key Facts
- The day-ahead demand forecast for Georgia was off by 2.5% on average (mean absolute percentage error) over 563 hours from 30 September to 28 October 2026, and 88% of hours landed within 5% of the reading. Its bias was -0.2%: it ran close to balanced on average. The largest miss was 440 MW (26.2%) too low at 16 Oct 2026, 05:00 (UTC+04:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Georgia came 19 (1 is the smallest error).
- On average the forecast differed from reported demand by 40 MW, against average demand of 1,545 MW.
- The forecast was above reported demand in 47% of compared hours.
Forecast Error at a Glance
563 hours from 30 September to 28 October 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-4 MW per hour on average): the forecast ran close to balanced on average. The worst miss was 440 MW (26.2%) too low at 16 Oct 2026, 05:00 (UTC+04:00): forecast 1,240 MW, reported 1,680 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 28 Oct 2026, 15:00 (UTC+04:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 21 Oct, 16:00 | 1,712 MW | 1,690 MW |
| 21 Oct, 17:00 | n/a | 1,760 MW |
| 21 Oct, 18:00 | n/a | 1,895 MW |
| 21 Oct, 19:00 | n/a | 1,915 MW |
| 21 Oct, 20:00 | n/a | 1,885 MW |
| 21 Oct, 21:00 | n/a | 1,830 MW |
| 21 Oct, 22:00 | n/a | 1,740 MW |
| 21 Oct, 23:00 | n/a | 1,600 MW |
| 22 Oct, 00:00 | 1,505 MW | 1,505 MW |
| 22 Oct, 01:00 | 1,414 MW | 1,390 MW |
| 22 Oct, 02:00 | 1,357 MW | 1,305 MW |
| 22 Oct, 03:00 | 1,267 MW | 1,290 MW |
| 22 Oct, 04:00 | 1,306 MW | 1,265 MW |
| 22 Oct, 05:00 | 1,301 MW | 1,280 MW |
| 22 Oct, 06:00 | 1,307 MW | 1,310 MW |
| 22 Oct, 07:00 | 1,364 MW | 1,370 MW |
| 22 Oct, 08:00 | 1,496 MW | 1,510 MW |
| 22 Oct, 09:00 | 1,632 MW | 1,660 MW |
| 22 Oct, 10:00 | 1,721 MW | 1,740 MW |
| 22 Oct, 11:00 | 1,722 MW | 1,765 MW |
| 22 Oct, 12:00 | 1,717 MW | 1,760 MW |
| 22 Oct, 13:00 | 1,687 MW | 1,710 MW |
| 22 Oct, 14:00 | 1,725 MW | 1,735 MW |
| 22 Oct, 15:00 | 1,760 MW | 1,745 MW |
| 22 Oct, 16:00 | n/a | 1,760 MW |
| 22 Oct, 17:00 | n/a | 1,780 MW |
| 22 Oct, 18:00 | n/a | 1,900 MW |
| 22 Oct, 19:00 | n/a | 1,920 MW |
| 22 Oct, 20:00 | n/a | 1,900 MW |
| 22 Oct, 21:00 | n/a | 1,870 MW |
| 22 Oct, 22:00 | n/a | 1,765 MW |
| 22 Oct, 23:00 | n/a | 1,645 MW |
| 23 Oct, 00:00 | 1,416 MW | 1,515 MW |
| 23 Oct, 01:00 | 1,368 MW | 1,435 MW |
| 23 Oct, 02:00 | 1,309 MW | 1,350 MW |
| 23 Oct, 03:00 | 1,277 MW | 1,325 MW |
| 23 Oct, 04:00 | 1,259 MW | 1,295 MW |
| 23 Oct, 05:00 | 1,260 MW | 1,310 MW |
| 23 Oct, 06:00 | 1,295 MW | 1,315 MW |
| 23 Oct, 07:00 | 1,341 MW | 1,360 MW |
| 23 Oct, 08:00 | 1,493 MW | 1,495 MW |
| 23 Oct, 09:00 | 1,591 MW | 1,630 MW |
| 23 Oct, 10:00 | 1,621 MW | 1,715 MW |
| 23 Oct, 11:00 | 1,611 MW | 1,735 MW |
| 23 Oct, 12:00 | 1,615 MW | 1,700 MW |
| 23 Oct, 13:00 | 1,579 MW | 1,655 MW |
| 23 Oct, 14:00 | 1,641 MW | 1,625 MW |
| 23 Oct, 15:00 | 1,664 MW | 1,645 MW |
| 23 Oct, 16:00 | 1,701 MW | 1,680 MW |
| 23 Oct, 17:00 | 1,756 MW | 1,715 MW |
| 23 Oct, 18:00 | 1,863 MW | 1,825 MW |
| 23 Oct, 19:00 | 1,885 MW | 1,865 MW |
| 23 Oct, 20:00 | 1,839 MW | 1,835 MW |
| 23 Oct, 21:00 | 1,792 MW | 1,780 MW |
| 23 Oct, 22:00 | 1,715 MW | 1,695 MW |
| 23 Oct, 23:00 | 1,608 MW | 1,605 MW |
| 24 Oct, 00:00 | 1,504 MW | 1,485 MW |
| 24 Oct, 01:00 | 1,402 MW | 1,390 MW |
| 24 Oct, 02:00 | 1,348 MW | 1,335 MW |
| 24 Oct, 03:00 | 1,324 MW | 1,315 MW |
| 24 Oct, 04:00 | 1,284 MW | 1,290 MW |
| 24 Oct, 05:00 | 1,293 MW | 1,285 MW |
| 24 Oct, 06:00 | 1,330 MW | 1,290 MW |
| 24 Oct, 07:00 | 1,341 MW | 1,320 MW |
| 24 Oct, 08:00 | 1,437 MW | 1,440 MW |
| 24 Oct, 09:00 | 1,573 MW | 1,560 MW |
| 24 Oct, 10:00 | 1,638 MW | 1,610 MW |
| 24 Oct, 11:00 | 1,658 MW | 1,615 MW |
| 24 Oct, 12:00 | 1,631 MW | 1,605 MW |
| 24 Oct, 13:00 | 1,597 MW | 1,570 MW |
| 24 Oct, 14:00 | 1,598 MW | 1,590 MW |
| 24 Oct, 15:00 | 1,621 MW | 1,610 MW |
| 24 Oct, 16:00 | 1,657 MW | 1,630 MW |
| 24 Oct, 17:00 | 1,699 MW | 1,660 MW |
| 24 Oct, 18:00 | 1,834 MW | 1,760 MW |
| 24 Oct, 19:00 | 1,874 MW | 1,800 MW |
| 24 Oct, 20:00 | 1,832 MW | 1,790 MW |
| 24 Oct, 21:00 | 1,796 MW | 1,750 MW |
| 24 Oct, 22:00 | 1,710 MW | 1,660 MW |
| 24 Oct, 23:00 | 1,621 MW | 1,540 MW |
| 25 Oct, 00:00 | 1,524 MW | 1,470 MW |
| 25 Oct, 01:00 | 1,428 MW | 1,375 MW |
| 25 Oct, 02:00 | 1,351 MW | 1,340 MW |
| 25 Oct, 03:00 | 1,326 MW | 1,310 MW |
| 25 Oct, 04:00 | 1,305 MW | 1,290 MW |
| 25 Oct, 05:00 | 1,308 MW | 1,285 MW |
| 25 Oct, 06:00 | 1,307 MW | 1,280 MW |
| 25 Oct, 07:00 | 1,341 MW | 1,305 MW |
| 25 Oct, 08:00 | 1,405 MW | 1,380 MW |
| 25 Oct, 09:00 | 1,498 MW | 1,500 MW |
| 25 Oct, 10:00 | 1,594 MW | 1,560 MW |
| 25 Oct, 11:00 | 1,622 MW | 1,570 MW |
| 25 Oct, 12:00 | 1,650 MW | 1,560 MW |
| 25 Oct, 13:00 | 1,659 MW | 1,545 MW |
| 25 Oct, 14:00 | 1,666 MW | 1,565 MW |
| 25 Oct, 15:00 | 1,688 MW | 1,580 MW |
| 25 Oct, 16:00 | 1,692 MW | 1,600 MW |
| 25 Oct, 17:00 | 1,722 MW | 1,630 MW |
| 25 Oct, 18:00 | 1,834 MW | 1,740 MW |
| 25 Oct, 19:00 | 1,858 MW | 1,780 MW |
| 25 Oct, 20:00 | 1,859 MW | 1,770 MW |
| 25 Oct, 21:00 | 1,803 MW | 1,730 MW |
| 25 Oct, 22:00 | 1,721 MW | 1,650 MW |
| 25 Oct, 23:00 | 1,612 MW | 1,530 MW |
| 26 Oct, 00:00 | 1,489 MW | 1,430 MW |
| 26 Oct, 01:00 | 1,410 MW | 1,350 MW |
| 26 Oct, 02:00 | 1,347 MW | 1,320 MW |
| 26 Oct, 03:00 | 1,305 MW | 1,290 MW |
| 26 Oct, 04:00 | 1,291 MW | 1,260 MW |
| 26 Oct, 05:00 | 1,293 MW | 1,270 MW |
| 26 Oct, 06:00 | 1,313 MW | 1,295 MW |
| 26 Oct, 07:00 | 1,390 MW | 1,360 MW |
| 26 Oct, 08:00 | 1,526 MW | 1,490 MW |
| 26 Oct, 09:00 | 1,659 MW | 1,600 MW |
| 26 Oct, 10:00 | 1,726 MW | 1,660 MW |
| 26 Oct, 11:00 | 1,737 MW | 1,695 MW |
| 26 Oct, 12:00 | 1,709 MW | 1,680 MW |
| 26 Oct, 13:00 | 1,674 MW | 1,660 MW |
| 26 Oct, 14:00 | 1,703 MW | 1,670 MW |
| 26 Oct, 15:00 | 1,727 MW | 1,680 MW |
| 26 Oct, 16:00 | 1,733 MW | 1,710 MW |
| 26 Oct, 17:00 | 1,759 MW | 1,740 MW |
| 26 Oct, 18:00 | 1,854 MW | 1,835 MW |
| 26 Oct, 19:00 | 1,897 MW | 1,890 MW |
| 26 Oct, 20:00 | 1,859 MW | 1,865 MW |
| 26 Oct, 21:00 | 1,822 MW | 1,820 MW |
| 26 Oct, 22:00 | 1,737 MW | 1,735 MW |
| 26 Oct, 23:00 | 1,619 MW | 1,645 MW |
| 27 Oct, 00:00 | 1,496 MW | 1,500 MW |
| 27 Oct, 01:00 | 1,384 MW | 1,420 MW |
| 27 Oct, 02:00 | 1,322 MW | 1,360 MW |
| 27 Oct, 03:00 | 1,284 MW | 1,315 MW |
| 27 Oct, 04:00 | 1,263 MW | 1,310 MW |
| 27 Oct, 05:00 | 1,274 MW | 1,310 MW |
| 27 Oct, 06:00 | 1,318 MW | 1,325 MW |
| 27 Oct, 07:00 | 1,385 MW | 1,400 MW |
| 27 Oct, 08:00 | 1,526 MW | 1,530 MW |
| 27 Oct, 09:00 | 1,660 MW | 1,670 MW |
| 27 Oct, 10:00 | 1,736 MW | 1,725 MW |
| 27 Oct, 11:00 | 1,705 MW | 1,740 MW |
| 27 Oct, 12:00 | 1,674 MW | 1,725 MW |
| 27 Oct, 13:00 | 1,625 MW | 1,680 MW |
| 27 Oct, 14:00 | 1,645 MW | 1,690 MW |
| 27 Oct, 15:00 | 1,677 MW | 1,710 MW |
| 27 Oct, 16:00 | 1,716 MW | 1,720 MW |
| 27 Oct, 17:00 | 1,770 MW | 1,755 MW |
| 27 Oct, 18:00 | 1,862 MW | 1,860 MW |
| 27 Oct, 19:00 | 1,888 MW | 1,915 MW |
| 27 Oct, 20:00 | 1,853 MW | 1,895 MW |
| 27 Oct, 21:00 | 1,825 MW | 1,835 MW |
| 27 Oct, 22:00 | 1,753 MW | 1,755 MW |
| 27 Oct, 23:00 | 1,639 MW | 1,645 MW |
| 28 Oct, 00:00 | 1,518 MW | 1,510 MW |
| 28 Oct, 01:00 | 1,411 MW | 1,395 MW |
| 28 Oct, 02:00 | 1,349 MW | 1,335 MW |
| 28 Oct, 03:00 | 1,324 MW | 1,295 MW |
| 28 Oct, 04:00 | 1,305 MW | 1,275 MW |
| 28 Oct, 05:00 | 1,307 MW | 1,285 MW |
| 28 Oct, 06:00 | 1,334 MW | 1,330 MW |
| 28 Oct, 07:00 | 1,402 MW | 1,395 MW |
| 28 Oct, 08:00 | 1,549 MW | 1,540 MW |
| 28 Oct, 09:00 | 1,703 MW | 1,680 MW |
| 28 Oct, 10:00 | 1,771 MW | 1,735 MW |
| 28 Oct, 11:00 | 1,788 MW | 1,725 MW |
| 28 Oct, 12:00 | 1,768 MW | 1,695 MW |
| 28 Oct, 13:00 | 1,739 MW | 1,660 MW |
| 28 Oct, 14:00 | 1,771 MW | 1,690 MW |
| 28 Oct, 15:00 | 1,788 MW | 1,715 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (563 of 688 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Georgia Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/ge/
World Power Monitor. Georgia Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-10-28. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/ge/
@misc{wpm_forecast_accuracy_ge_2026,
title = {{Georgia Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/ge/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/ge/
The Copy buttons add today's date as the access date.