North Macedonia Electricity Demand and Generation Mix
North Macedonia demand was 838 MW in the hour starting 27 Oct 2026, 23:00 CET (UTC+01:00). Hydro was the largest source in the hour starting 27 Oct 2026, 23:00 CET (UTC+01:00), at 44% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- North Macedonia is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 27 Oct 2026, 23:00 CET (UTC+01:00), demand in North Macedonia was 838 MW, against a day-ahead forecast of 807 MW.
- Hydro supplied 43.9% of North Macedonia's generation in the hour starting 27 Oct 2026, 23:00 CET (UTC+01:00).
- The day-ahead price in North Macedonia averaged EUR 325.80/MWh for delivery on 2026-10-29 (29 October 2026).
- Installed generating capacity in North Macedonia was 2.21 GW in 2026, as reported to ENTSO-E.
- Demand in North Macedonia totalled 5.66 TWh in 2023.
- Coal supplied 47.6% of North Macedonia's generation in 2023.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 27 Oct 2026, 23:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27T22:00:00Z.
Generation by Source
Latest hour with generation by source: 27 Oct 2026, 23:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Hydro | 364 MW | 43.9% |
| Gas | 233 MW | 28.2% |
| Coal | 133 MW | 16.0% |
| Wind | 86 MW | 10.4% |
| Solar | 13 MW | 1.5% |
| Oil | 0 MW | 0.0% |
| Total from these sources | 829 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27T22:00:00Z.
Day-Ahead Price
Delivery day 2026-10-29 (29 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for North Macedonia and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-29.
Last 30 Days, Hourly
Times in UTCShow the data table (696 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-28T23:00Z | 488 MW |
| 2026-09-29T00:00Z | 485 MW |
| 2026-09-29T01:00Z | 474 MW |
| 2026-09-29T02:00Z | 454 MW |
| 2026-09-29T03:00Z | 472 MW |
| 2026-09-29T04:00Z | 495 MW |
| 2026-09-29T05:00Z | 438 MW |
| 2026-09-29T06:00Z | 298 MW |
| 2026-09-29T07:00Z | 180 MW |
| 2026-09-29T08:00Z | 198 MW |
| 2026-09-29T09:00Z | 197 MW |
| 2026-09-29T10:00Z | 179 MW |
| 2026-09-29T11:00Z | 196 MW |
| 2026-09-29T12:00Z | 330 MW |
| 2026-09-29T13:00Z | 480 MW |
| 2026-09-29T14:00Z | 579 MW |
| 2026-09-29T15:00Z | 647 MW |
| 2026-09-29T16:00Z | 661 MW |
| 2026-09-29T17:00Z | 685 MW |
| 2026-09-29T18:00Z | 701 MW |
| 2026-09-29T19:00Z | 682 MW |
| 2026-09-29T20:00Z | 701 MW |
| 2026-09-29T21:00Z | 639 MW |
| 2026-09-29T22:00Z | 554 MW |
| 2026-09-29T23:00Z | 490 MW |
| 2026-09-30T00:00Z | 490 MW |
| 2026-09-30T01:00Z | 472 MW |
| 2026-09-30T02:00Z | 446 MW |
| 2026-09-30T03:00Z | 466 MW |
| 2026-09-30T04:00Z | 489 MW |
| 2026-09-30T05:00Z | 459 MW |
| 2026-09-30T06:00Z | 328 MW |
| 2026-09-30T07:00Z | 139 MW |
| 2026-09-30T08:00Z | 128 MW |
| 2026-09-30T09:00Z | 104 MW |
| 2026-09-30T10:00Z | 103 MW |
| 2026-09-30T11:00Z | 269 MW |
| 2026-09-30T12:00Z | 307 MW |
| 2026-09-30T13:00Z | 292 MW |
| 2026-09-30T14:00Z | 418 MW |
| 2026-09-30T15:00Z | 579 MW |
| 2026-09-30T16:00Z | 634 MW |
| 2026-09-30T17:00Z | 655 MW |
| 2026-09-30T18:00Z | 678 MW |
| 2026-09-30T19:00Z | 668 MW |
| 2026-09-30T20:00Z | 697 MW |
| 2026-09-30T21:00Z | 635 MW |
| 2026-09-30T22:00Z | 555 MW |
| 2026-09-30T23:00Z | 488 MW |
| 2026-10-01T00:00Z | 480 MW |
| 2026-10-01T01:00Z | 467 MW |
| 2026-10-01T02:00Z | 447 MW |
| 2026-10-01T03:00Z | 472 MW |
| 2026-10-01T04:00Z | 495 MW |
| 2026-10-01T05:00Z | 430 MW |
| 2026-10-01T06:00Z | 279 MW |
| 2026-10-01T07:00Z | 117 MW |
| 2026-10-01T08:00Z | 60 MW |
| 2026-10-01T09:00Z | 11 MW |
| 2026-10-01T10:00Z | 40 MW |
| 2026-10-01T11:00Z | 6 MW |
| 2026-10-01T12:00Z | 80 MW |
| 2026-10-01T13:00Z | 173 MW |
| 2026-10-01T14:00Z | 363 MW |
| 2026-10-01T15:00Z | 575 MW |
| 2026-10-01T16:00Z | 648 MW |
| 2026-10-01T17:00Z | 680 MW |
| 2026-10-01T18:00Z | 694 MW |
| 2026-10-01T19:00Z | 702 MW |
| 2026-10-01T20:00Z | 713 MW |
| 2026-10-01T21:00Z | 647 MW |
| 2026-10-01T22:00Z | 558 MW |
| 2026-10-01T23:00Z | 490 MW |
| 2026-10-02T00:00Z | 479 MW |
| 2026-10-02T01:00Z | 464 MW |
| 2026-10-02T02:00Z | 442 MW |
| 2026-10-02T03:00Z | 458 MW |
| 2026-10-02T04:00Z | 496 MW |
| 2026-10-02T05:00Z | 441 MW |
| 2026-10-02T06:00Z | 291 MW |
| 2026-10-02T07:00Z | 111 MW |
| 2026-10-02T08:00Z | 25 MW |
| 2026-10-02T09:00Z | 34 MW |
| 2026-10-02T10:00Z | 55 MW |
| 2026-10-02T11:00Z | 3 MW |
| 2026-10-02T12:00Z | 64 MW |
| 2026-10-02T13:00Z | 182 MW |
| 2026-10-02T14:00Z | 390 MW |
| 2026-10-02T15:00Z | 580 MW |
| 2026-10-02T16:00Z | 644 MW |
| 2026-10-02T17:00Z | 675 MW |
| 2026-10-02T18:00Z | 694 MW |
| 2026-10-02T19:00Z | 675 MW |
| 2026-10-02T20:00Z | 700 MW |
| 2026-10-02T21:00Z | 651 MW |
| 2026-10-02T22:00Z | 574 MW |
| 2026-10-02T23:00Z | 513 MW |
| 2026-10-03T00:00Z | 475 MW |
| 2026-10-03T01:00Z | 450 MW |
| 2026-10-03T02:00Z | 442 MW |
| 2026-10-03T03:00Z | 463 MW |
| 2026-10-03T04:00Z | 469 MW |
| 2026-10-03T05:00Z | 396 MW |
| 2026-10-03T06:00Z | 230 MW |
| 2026-10-03T07:00Z | 77 MW |
| 2026-10-03T08:00Z | 21 MW |
| 2026-10-03T09:00Z | 13 MW |
| 2026-10-03T10:00Z | 32 MW |
| 2026-10-03T11:00Z | 43 MW |
| 2026-10-03T12:00Z | 92 MW |
| 2026-10-03T13:00Z | 160 MW |
| 2026-10-03T14:00Z | 344 MW |
| 2026-10-03T15:00Z | 558 MW |
| 2026-10-03T16:00Z | 641 MW |
| 2026-10-03T17:00Z | 664 MW |
| 2026-10-03T18:00Z | 679 MW |
| 2026-10-03T19:00Z | 661 MW |
| 2026-10-03T20:00Z | 687 MW |
| 2026-10-03T21:00Z | 639 MW |
| 2026-10-03T22:00Z | 564 MW |
| 2026-10-03T23:00Z | 502 MW |
| 2026-10-04T00:00Z | 459 MW |
| 2026-10-04T01:00Z | 443 MW |
| 2026-10-04T02:00Z | 439 MW |
| 2026-10-04T03:00Z | 454 MW |
| 2026-10-04T04:00Z | 468 MW |
| 2026-10-04T05:00Z | 390 MW |
| 2026-10-04T06:00Z | 239 MW |
| 2026-10-04T07:00Z | 104 MW |
| 2026-10-04T08:00Z | 63 MW |
| 2026-10-04T09:00Z | 18 MW |
| 2026-10-04T10:00Z | 3 MW |
| 2026-10-04T11:00Z | 10 MW |
| 2026-10-04T12:00Z | 67 MW |
| 2026-10-04T13:00Z | 182 MW |
| 2026-10-04T14:00Z | 372 MW |
| 2026-10-04T15:00Z | 595 MW |
| 2026-10-04T16:00Z | 684 MW |
| 2026-10-04T17:00Z | 735 MW |
| 2026-10-04T18:00Z | 758 MW |
| 2026-10-04T19:00Z | 748 MW |
| 2026-10-04T20:00Z | 715 MW |
| 2026-10-04T21:00Z | 627 MW |
| 2026-10-04T22:00Z | 549 MW |
| 2026-10-04T23:00Z | 487 MW |
| 2026-10-05T00:00Z | 466 MW |
| 2026-10-05T01:00Z | 454 MW |
| 2026-10-05T02:00Z | 458 MW |
| 2026-10-05T03:00Z | 483 MW |
| 2026-10-05T04:00Z | 544 MW |
| 2026-10-05T05:00Z | 494 MW |
| 2026-10-05T06:00Z | 326 MW |
| 2026-10-05T07:00Z | 152 MW |
| 2026-10-05T08:00Z | 83 MW |
| 2026-10-05T09:00Z | 36 MW |
| 2026-10-05T10:00Z | 6 MW |
| 2026-10-05T11:00Z | 61 MW |
| 2026-10-05T12:00Z | 97 MW |
| 2026-10-05T13:00Z | 190 MW |
| 2026-10-05T14:00Z | 388 MW |
| 2026-10-05T15:00Z | 603 MW |
| 2026-10-05T16:00Z | 679 MW |
| 2026-10-05T17:00Z | 710 MW |
| 2026-10-05T18:00Z | 734 MW |
| 2026-10-05T19:00Z | 726 MW |
| 2026-10-05T20:00Z | 752 MW |
| 2026-10-05T21:00Z | 682 MW |
| 2026-10-05T22:00Z | 588 MW |
| 2026-10-05T23:00Z | 522 MW |
| 2026-10-06T00:00Z | 507 MW |
| 2026-10-06T01:00Z | 494 MW |
| 2026-10-06T02:00Z | 475 MW |
| 2026-10-06T03:00Z | 498 MW |
| 2026-10-06T04:00Z | 540 MW |
| 2026-10-06T05:00Z | 510 MW |
| 2026-10-06T06:00Z | 350 MW |
| 2026-10-06T07:00Z | 174 MW |
| 2026-10-06T08:00Z | 80 MW |
| 2026-10-06T09:00Z | 20 MW |
| 2026-10-06T10:00Z | 17 MW |
| 2026-10-06T11:00Z | 52 MW |
| 2026-10-06T12:00Z | 114 MW |
| 2026-10-06T13:00Z | 214 MW |
| 2026-10-06T14:00Z | 396 MW |
| 2026-10-06T15:00Z | 609 MW |
| 2026-10-06T16:00Z | 679 MW |
| 2026-10-06T17:00Z | 712 MW |
| 2026-10-06T18:00Z | 738 MW |
| 2026-10-06T19:00Z | 733 MW |
| 2026-10-06T20:00Z | 770 MW |
| 2026-10-06T21:00Z | 698 MW |
| 2026-10-06T22:00Z | 604 MW |
| 2026-10-06T23:00Z | 532 MW |
| 2026-10-07T00:00Z | 522 MW |
| 2026-10-07T01:00Z | 505 MW |
| 2026-10-07T02:00Z | 484 MW |
| 2026-10-07T03:00Z | 508 MW |
| 2026-10-07T04:00Z | 553 MW |
| 2026-10-07T05:00Z | 520 MW |
| 2026-10-07T06:00Z | 375 MW |
| 2026-10-07T07:00Z | 211 MW |
| 2026-10-07T08:00Z | 119 MW |
| 2026-10-07T09:00Z | 72 MW |
| 2026-10-07T10:00Z | 45 MW |
| 2026-10-07T11:00Z | 132 MW |
| 2026-10-07T12:00Z | 214 MW |
| 2026-10-07T13:00Z | 315 MW |
| 2026-10-07T14:00Z | 463 MW |
| 2026-10-07T15:00Z | 615 MW |
| 2026-10-07T16:00Z | 682 MW |
| 2026-10-07T17:00Z | 717 MW |
| 2026-10-07T18:00Z | 741 MW |
| 2026-10-07T19:00Z | 738 MW |
| 2026-10-07T20:00Z | 765 MW |
| 2026-10-07T21:00Z | 696 MW |
| 2026-10-07T22:00Z | 595 MW |
| 2026-10-07T23:00Z | 526 MW |
| 2026-10-08T00:00Z | 520 MW |
| 2026-10-08T01:00Z | 507 MW |
| 2026-10-08T02:00Z | 482 MW |
| 2026-10-08T03:00Z | 509 MW |
| 2026-10-08T04:00Z | 550 MW |
| 2026-10-08T05:00Z | 542 MW |
| 2026-10-08T06:00Z | 410 MW |
| 2026-10-08T07:00Z | 239 MW |
| 2026-10-08T08:00Z | 135 MW |
| 2026-10-08T09:00Z | 75 MW |
| 2026-10-08T10:00Z | 40 MW |
| 2026-10-08T11:00Z | 147 MW |
| 2026-10-08T12:00Z | 249 MW |
| 2026-10-08T13:00Z | 379 MW |
| 2026-10-08T14:00Z | 564 MW |
| 2026-10-08T15:00Z | 671 MW |
| 2026-10-08T16:00Z | 695 MW |
| 2026-10-08T17:00Z | 718 MW |
| 2026-10-08T18:00Z | 735 MW |
| 2026-10-08T19:00Z | 725 MW |
| 2026-10-08T20:00Z | 746 MW |
| 2026-10-08T21:00Z | 681 MW |
| 2026-10-08T22:00Z | 588 MW |
| 2026-10-08T23:00Z | 525 MW |
| 2026-10-09T00:00Z | 514 MW |
| 2026-10-09T01:00Z | 495 MW |
| 2026-10-09T02:00Z | 472 MW |
| 2026-10-09T03:00Z | 487 MW |
| 2026-10-09T04:00Z | 523 MW |
| 2026-10-09T05:00Z | 488 MW |
| 2026-10-09T06:00Z | 422 MW |
| 2026-10-09T07:00Z | 427 MW |
| 2026-10-09T08:00Z | 453 MW |
| 2026-10-09T09:00Z | 336 MW |
| 2026-10-09T10:00Z | 307 MW |
| 2026-10-09T11:00Z | 443 MW |
| 2026-10-09T12:00Z | 462 MW |
| 2026-10-09T13:00Z | 498 MW |
| 2026-10-09T14:00Z | 586 MW |
| 2026-10-09T15:00Z | 658 MW |
| 2026-10-09T16:00Z | 671 MW |
| 2026-10-09T17:00Z | 680 MW |
| 2026-10-09T18:00Z | 685 MW |
| 2026-10-09T19:00Z | 665 MW |
| 2026-10-09T20:00Z | 686 MW |
| 2026-10-09T21:00Z | 650 MW |
| 2026-10-09T22:00Z | 578 MW |
| 2026-10-09T23:00Z | 509 MW |
| 2026-10-10T00:00Z | 473 MW |
| 2026-10-10T01:00Z | 453 MW |
| 2026-10-10T02:00Z | 449 MW |
| 2026-10-10T03:00Z | 462 MW |
| 2026-10-10T04:00Z | 488 MW |
| 2026-10-10T05:00Z | 446 MW |
| 2026-10-10T06:00Z | 315 MW |
| 2026-10-10T07:00Z | 156 MW |
| 2026-10-10T08:00Z | 79 MW |
| 2026-10-10T09:00Z | 42 MW |
| 2026-10-10T10:00Z | 43 MW |
| 2026-10-10T11:00Z | 138 MW |
| 2026-10-10T12:00Z | 198 MW |
| 2026-10-10T13:00Z | 298 MW |
| 2026-10-10T14:00Z | 456 MW |
| 2026-10-10T15:00Z | 586 MW |
| 2026-10-10T16:00Z | 608 MW |
| 2026-10-10T17:00Z | 599 MW |
| 2026-10-10T18:00Z | 614 MW |
| 2026-10-10T19:00Z | 604 MW |
| 2026-10-10T20:00Z | 619 MW |
| 2026-10-10T21:00Z | 591 MW |
| 2026-10-10T22:00Z | 533 MW |
| 2026-10-10T23:00Z | 478 MW |
| 2026-10-11T00:00Z | 442 MW |
| 2026-10-11T01:00Z | 421 MW |
| 2026-10-11T02:00Z | 414 MW |
| 2026-10-11T03:00Z | 421 MW |
| 2026-10-11T04:00Z | 436 MW |
| 2026-10-11T05:00Z | 446 MW |
| 2026-10-11T06:00Z | 491 MW |
| 2026-10-11T07:00Z | 576 MW |
| 2026-10-11T08:00Z | 600 MW |
| 2026-10-11T09:00Z | 554 MW |
| 2026-10-11T10:00Z | 480 MW |
| 2026-10-11T11:00Z | 502 MW |
| 2026-10-11T12:00Z | 517 MW |
| 2026-10-11T13:00Z | 543 MW |
| 2026-10-11T14:00Z | 571 MW |
| 2026-10-11T15:00Z | 631 MW |
| 2026-10-11T16:00Z | 664 MW |
| 2026-10-11T17:00Z | 667 MW |
| 2026-10-11T18:00Z | 665 MW |
| 2026-10-11T19:00Z | 653 MW |
| 2026-10-11T20:00Z | 627 MW |
| 2026-10-11T21:00Z | 575 MW |
| 2026-10-11T22:00Z | 516 MW |
| 2026-10-11T23:00Z | 454 MW |
| 2026-10-12T00:00Z | 426 MW |
| 2026-10-12T01:00Z | 410 MW |
| 2026-10-12T02:00Z | 394 MW |
| 2026-10-12T03:00Z | 403 MW |
| 2026-10-12T04:00Z | 411 MW |
| 2026-10-12T05:00Z | 402 MW |
| 2026-10-12T06:00Z | 387 MW |
| 2026-10-12T07:00Z | 263 MW |
| 2026-10-12T08:00Z | 156 MW |
| 2026-10-12T09:00Z | 57 MW |
| 2026-10-12T10:00Z | 43 MW |
| 2026-10-12T11:00Z | 184 MW |
| 2026-10-12T12:00Z | 313 MW |
| 2026-10-12T13:00Z | 354 MW |
| 2026-10-12T14:00Z | 508 MW |
| 2026-10-12T15:00Z | 613 MW |
| 2026-10-12T16:00Z | 653 MW |
| 2026-10-12T17:00Z | 671 MW |
| 2026-10-12T18:00Z | 682 MW |
| 2026-10-12T19:00Z | 671 MW |
| 2026-10-12T20:00Z | 701 MW |
| 2026-10-12T21:00Z | 629 MW |
| 2026-10-12T22:00Z | 541 MW |
| 2026-10-12T23:00Z | 465 MW |
| 2026-10-13T00:00Z | 442 MW |
| 2026-10-13T01:00Z | 428 MW |
| 2026-10-13T02:00Z | 408 MW |
| 2026-10-13T03:00Z | 441 MW |
| 2026-10-13T04:00Z | 510 MW |
| 2026-10-13T05:00Z | 582 MW |
| 2026-10-13T06:00Z | 645 MW |
| 2026-10-13T07:00Z | 668 MW |
| 2026-10-13T08:00Z | 716 MW |
| 2026-10-13T09:00Z | 736 MW |
| 2026-10-13T10:00Z | 748 MW |
| 2026-10-13T11:00Z | 828 MW |
| 2026-10-13T12:00Z | 824 MW |
| 2026-10-13T13:00Z | 800 MW |
| 2026-10-13T14:00Z | 817 MW |
| 2026-10-13T15:00Z | 845 MW |
| 2026-10-13T16:00Z | 834 MW |
| 2026-10-13T17:00Z | 839 MW |
| 2026-10-13T18:00Z | 821 MW |
| 2026-10-13T19:00Z | 790 MW |
| 2026-10-13T20:00Z | 805 MW |
| 2026-10-13T21:00Z | 740 MW |
| 2026-10-13T22:00Z | 633 MW |
| 2026-10-13T23:00Z | 547 MW |
| 2026-10-14T00:00Z | 538 MW |
| 2026-10-14T01:00Z | 510 MW |
| 2026-10-14T02:00Z | 486 MW |
| 2026-10-14T03:00Z | 505 MW |
| 2026-10-14T04:00Z | 597 MW |
| 2026-10-14T05:00Z | 675 MW |
| 2026-10-14T06:00Z | 745 MW |
| 2026-10-14T07:00Z | 669 MW |
| 2026-10-14T08:00Z | 596 MW |
| 2026-10-14T09:00Z | 554 MW |
| 2026-10-14T10:00Z | 485 MW |
| 2026-10-14T11:00Z | 545 MW |
| 2026-10-14T12:00Z | 541 MW |
| 2026-10-14T13:00Z | 559 MW |
| 2026-10-14T14:00Z | 625 MW |
| 2026-10-14T15:00Z | 767 MW |
| 2026-10-14T16:00Z | 801 MW |
| 2026-10-14T17:00Z | 812 MW |
| 2026-10-14T18:00Z | 833 MW |
| 2026-10-14T19:00Z | 818 MW |
| 2026-10-14T20:00Z | 847 MW |
| 2026-10-14T21:00Z | 790 MW |
| 2026-10-14T22:00Z | 676 MW |
| 2026-10-14T23:00Z | 587 MW |
| 2026-10-15T00:00Z | 567 MW |
| 2026-10-15T01:00Z | 533 MW |
| 2026-10-15T02:00Z | 553 MW |
| 2026-10-15T03:00Z | 597 MW |
| 2026-10-15T04:00Z | 642 MW |
| 2026-10-15T05:00Z | 640 MW |
| 2026-10-15T06:00Z | 522 MW |
| 2026-10-15T07:00Z | 384 MW |
| 2026-10-15T08:00Z | 298 MW |
| 2026-10-15T09:00Z | 263 MW |
| 2026-10-15T10:00Z | 260 MW |
| 2026-10-15T11:00Z | 414 MW |
| 2026-10-15T12:00Z | 571 MW |
| 2026-10-15T13:00Z | 641 MW |
| 2026-10-15T14:00Z | 659 MW |
| 2026-10-15T15:00Z | 774 MW |
| 2026-10-15T16:00Z | 818 MW |
| 2026-10-15T17:00Z | 822 MW |
| 2026-10-15T18:00Z | 833 MW |
| 2026-10-15T19:00Z | 835 MW |
| 2026-10-15T20:00Z | 867 MW |
| 2026-10-15T21:00Z | 789 MW |
| 2026-10-15T22:00Z | 674 MW |
| 2026-10-15T23:00Z | 591 MW |
| 2026-10-16T00:00Z | 571 MW |
| 2026-10-16T01:00Z | 547 MW |
| 2026-10-16T02:00Z | 520 MW |
| 2026-10-16T03:00Z | 543 MW |
| 2026-10-16T04:00Z | 588 MW |
| 2026-10-16T05:00Z | 594 MW |
| 2026-10-16T06:00Z | 499 MW |
| 2026-10-16T07:00Z | 375 MW |
| 2026-10-16T08:00Z | 369 MW |
| 2026-10-16T09:00Z | 449 MW |
| 2026-10-16T10:00Z | 462 MW |
| 2026-10-16T11:00Z | 512 MW |
| 2026-10-16T12:00Z | 576 MW |
| 2026-10-16T13:00Z | 653 MW |
| 2026-10-16T14:00Z | 743 MW |
| 2026-10-16T15:00Z | 845 MW |
| 2026-10-16T16:00Z | 866 MW |
| 2026-10-16T17:00Z | 856 MW |
| 2026-10-16T18:00Z | 865 MW |
| 2026-10-16T19:00Z | 848 MW |
| 2026-10-16T20:00Z | 875 MW |
| 2026-10-16T21:00Z | 828 MW |
| 2026-10-16T22:00Z | 727 MW |
| 2026-10-16T23:00Z | 637 MW |
| 2026-10-17T00:00Z | 625 MW |
| 2026-10-17T01:00Z | 568 MW |
| 2026-10-17T02:00Z | 588 MW |
| 2026-10-17T03:00Z | 600 MW |
| 2026-10-17T04:00Z | 648 MW |
| 2026-10-17T05:00Z | 619 MW |
| 2026-10-17T06:00Z | 486 MW |
| 2026-10-17T07:00Z | 350 MW |
| 2026-10-17T08:00Z | 332 MW |
| 2026-10-17T09:00Z | 282 MW |
| 2026-10-17T10:00Z | 263 MW |
| 2026-10-17T11:00Z | 450 MW |
| 2026-10-17T12:00Z | 524 MW |
| 2026-10-17T13:00Z | 518 MW |
| 2026-10-17T14:00Z | 669 MW |
| 2026-10-17T15:00Z | 793 MW |
| 2026-10-17T16:00Z | 836 MW |
| 2026-10-17T17:00Z | 817 MW |
| 2026-10-17T18:00Z | 816 MW |
| 2026-10-17T19:00Z | 799 MW |
| 2026-10-17T20:00Z | 808 MW |
| 2026-10-17T21:00Z | 777 MW |
| 2026-10-17T22:00Z | 712 MW |
| 2026-10-17T23:00Z | 672 MW |
| 2026-10-18T00:00Z | 614 MW |
| 2026-10-18T01:00Z | 567 MW |
| 2026-10-18T02:00Z | 567 MW |
| 2026-10-18T03:00Z | 585 MW |
| 2026-10-18T04:00Z | 618 MW |
| 2026-10-18T05:00Z | 613 MW |
| 2026-10-18T06:00Z | 618 MW |
| 2026-10-18T07:00Z | 640 MW |
| 2026-10-18T08:00Z | 691 MW |
| 2026-10-18T09:00Z | 615 MW |
| 2026-10-18T10:00Z | 522 MW |
| 2026-10-18T11:00Z | 502 MW |
| 2026-10-18T12:00Z | 565 MW |
| 2026-10-18T13:00Z | 634 MW |
| 2026-10-18T14:00Z | 716 MW |
| 2026-10-18T15:00Z | 830 MW |
| 2026-10-18T16:00Z | 857 MW |
| 2026-10-18T17:00Z | 873 MW |
| 2026-10-18T18:00Z | 882 MW |
| 2026-10-18T19:00Z | 861 MW |
| 2026-10-18T20:00Z | 840 MW |
| 2026-10-18T21:00Z | 760 MW |
| 2026-10-18T22:00Z | 660 MW |
| 2026-10-18T23:00Z | 574 MW |
| 2026-10-19T00:00Z | 557 MW |
| 2026-10-19T01:00Z | 531 MW |
| 2026-10-19T02:00Z | 514 MW |
| 2026-10-19T03:00Z | 546 MW |
| 2026-10-19T04:00Z | 603 MW |
| 2026-10-19T05:00Z | 672 MW |
| 2026-10-19T06:00Z | 566 MW |
| 2026-10-19T07:00Z | 388 MW |
| 2026-10-19T08:00Z | 298 MW |
| 2026-10-19T09:00Z | 202 MW |
| 2026-10-19T10:00Z | 155 MW |
| 2026-10-19T11:00Z | 199 MW |
| 2026-10-19T12:00Z | 254 MW |
| 2026-10-19T13:00Z | 359 MW |
| 2026-10-19T14:00Z | 539 MW |
| 2026-10-19T15:00Z | 712 MW |
| 2026-10-19T16:00Z | 760 MW |
| 2026-10-19T17:00Z | 772 MW |
| 2026-10-19T18:00Z | 796 MW |
| 2026-10-19T19:00Z | 794 MW |
| 2026-10-19T20:00Z | 826 MW |
| 2026-10-19T21:00Z | 767 MW |
| 2026-10-19T22:00Z | 679 MW |
| 2026-10-19T23:00Z | 601 MW |
| 2026-10-20T00:00Z | 588 MW |
| 2026-10-20T01:00Z | 559 MW |
| 2026-10-20T02:00Z | 538 MW |
| 2026-10-20T03:00Z | 562 MW |
| 2026-10-20T04:00Z | 620 MW |
| 2026-10-20T05:00Z | 672 MW |
| 2026-10-20T06:00Z | 567 MW |
| 2026-10-20T07:00Z | 379 MW |
| 2026-10-20T08:00Z | 263 MW |
| 2026-10-20T09:00Z | 187 MW |
| 2026-10-20T10:00Z | 151 MW |
| 2026-10-20T11:00Z | 238 MW |
| 2026-10-20T12:00Z | 304 MW |
| 2026-10-20T13:00Z | 363 MW |
| 2026-10-20T14:00Z | 544 MW |
| 2026-10-20T15:00Z | 727 MW |
| 2026-10-20T16:00Z | 789 MW |
| 2026-10-20T17:00Z | 790 MW |
| 2026-10-20T18:00Z | 801 MW |
| 2026-10-20T19:00Z | 793 MW |
| 2026-10-20T20:00Z | 828 MW |
| 2026-10-20T21:00Z | 768 MW |
| 2026-10-20T22:00Z | 676 MW |
| 2026-10-20T23:00Z | 593 MW |
| 2026-10-21T00:00Z | 581 MW |
| 2026-10-21T01:00Z | 552 MW |
| 2026-10-21T02:00Z | 523 MW |
| 2026-10-21T03:00Z | 548 MW |
| 2026-10-21T04:00Z | 606 MW |
| 2026-10-21T05:00Z | 629 MW |
| 2026-10-21T06:00Z | 566 MW |
| 2026-10-21T07:00Z | 408 MW |
| 2026-10-21T08:00Z | 356 MW |
| 2026-10-21T09:00Z | 321 MW |
| 2026-10-21T10:00Z | 314 MW |
| 2026-10-21T11:00Z | 421 MW |
| 2026-10-21T12:00Z | 590 MW |
| 2026-10-21T13:00Z | 642 MW |
| 2026-10-21T14:00Z | 721 MW |
| 2026-10-21T15:00Z | 785 MW |
| 2026-10-21T16:00Z | 784 MW |
| 2026-10-21T17:00Z | 783 MW |
| 2026-10-21T18:00Z | 794 MW |
| 2026-10-21T19:00Z | 774 MW |
| 2026-10-21T20:00Z | 795 MW |
| 2026-10-21T21:00Z | 750 MW |
| 2026-10-21T22:00Z | 659 MW |
| 2026-10-21T23:00Z | 582 MW |
| 2026-10-22T00:00Z | 572 MW |
| 2026-10-22T01:00Z | 532 MW |
| 2026-10-22T02:00Z | 506 MW |
| 2026-10-22T03:00Z | 519 MW |
| 2026-10-22T04:00Z | 566 MW |
| 2026-10-22T05:00Z | 603 MW |
| 2026-10-22T06:00Z | 569 MW |
| 2026-10-22T07:00Z | 495 MW |
| 2026-10-22T08:00Z | 475 MW |
| 2026-10-22T09:00Z | 420 MW |
| 2026-10-22T10:00Z | 331 MW |
| 2026-10-22T11:00Z | 412 MW |
| 2026-10-22T12:00Z | 487 MW |
| 2026-10-22T13:00Z | 510 MW |
| 2026-10-22T14:00Z | 624 MW |
| 2026-10-22T15:00Z | 724 MW |
| 2026-10-22T16:00Z | 739 MW |
| 2026-10-22T17:00Z | 724 MW |
| 2026-10-22T18:00Z | 732 MW |
| 2026-10-22T19:00Z | 716 MW |
| 2026-10-22T20:00Z | 742 MW |
| 2026-10-22T21:00Z | 720 MW |
| 2026-10-22T22:00Z | 637 MW |
| 2026-10-22T23:00Z | 568 MW |
| 2026-10-23T00:00Z | 530 MW |
| 2026-10-23T01:00Z | 486 MW |
| 2026-10-23T02:00Z | 456 MW |
| 2026-10-23T03:00Z | 466 MW |
| 2026-10-23T04:00Z | 476 MW |
| 2026-10-23T05:00Z | 456 MW |
| 2026-10-23T06:00Z | 406 MW |
| 2026-10-23T07:00Z | 365 MW |
| 2026-10-23T08:00Z | 332 MW |
| 2026-10-23T09:00Z | 279 MW |
| 2026-10-23T10:00Z | 269 MW |
| 2026-10-23T11:00Z | 345 MW |
| 2026-10-23T12:00Z | 334 MW |
| 2026-10-23T13:00Z | 345 MW |
| 2026-10-23T14:00Z | 503 MW |
| 2026-10-23T15:00Z | 680 MW |
| 2026-10-23T16:00Z | 716 MW |
| 2026-10-23T17:00Z | 704 MW |
| 2026-10-23T18:00Z | 711 MW |
| 2026-10-23T19:00Z | 705 MW |
| 2026-10-23T20:00Z | 761 MW |
| 2026-10-23T21:00Z | 735 MW |
| 2026-10-23T22:00Z | 653 MW |
| 2026-10-23T23:00Z | 580 MW |
| 2026-10-24T00:00Z | 546 MW |
| 2026-10-24T01:00Z | 512 MW |
| 2026-10-24T02:00Z | 540 MW |
| 2026-10-24T03:00Z | 564 MW |
| 2026-10-24T04:00Z | 591 MW |
| 2026-10-24T05:00Z | 568 MW |
| 2026-10-24T06:00Z | 513 MW |
| 2026-10-24T07:00Z | 438 MW |
| 2026-10-24T08:00Z | 345 MW |
| 2026-10-24T09:00Z | 251 MW |
| 2026-10-24T10:00Z | 167 MW |
| 2026-10-24T11:00Z | 215 MW |
| 2026-10-24T12:00Z | 287 MW |
| 2026-10-24T13:00Z | 398 MW |
| 2026-10-24T14:00Z | 567 MW |
| 2026-10-24T15:00Z | 719 MW |
| 2026-10-24T16:00Z | 738 MW |
| 2026-10-24T17:00Z | 736 MW |
| 2026-10-24T18:00Z | 744 MW |
| 2026-10-24T19:00Z | 726 MW |
| 2026-10-24T20:00Z | 752 MW |
| 2026-10-24T21:00Z | 731 MW |
| 2026-10-24T22:00Z | 656 MW |
| 2026-10-24T23:00Z | 576 MW |
| 2026-10-25T00:00Z | 525 MW |
| 2026-10-25T01:00Z | 497 MW |
| 2026-10-25T02:00Z | 537 MW |
| 2026-10-25T03:00Z | 533 MW |
| 2026-10-25T04:00Z | 552 MW |
| 2026-10-25T05:00Z | 554 MW |
| 2026-10-25T06:00Z | 565 MW |
| 2026-10-25T07:00Z | 630 MW |
| 2026-10-25T08:00Z | 678 MW |
| 2026-10-25T09:00Z | 613 MW |
| 2026-10-25T10:00Z | 580 MW |
| 2026-10-25T11:00Z | 614 MW |
| 2026-10-25T12:00Z | 727 MW |
| 2026-10-25T13:00Z | 800 MW |
| 2026-10-25T14:00Z | 804 MW |
| 2026-10-25T15:00Z | 858 MW |
| 2026-10-25T16:00Z | 895 MW |
| 2026-10-25T17:00Z | 833 MW |
| 2026-10-25T18:00Z | 828 MW |
| 2026-10-25T19:00Z | 822 MW |
| 2026-10-25T20:00Z | 796 MW |
| 2026-10-25T21:00Z | 765 MW |
| 2026-10-25T22:00Z | 680 MW |
| 2026-10-25T23:00Z | 612 MW |
| 2026-10-26T00:00Z | 544 MW |
| 2026-10-26T01:00Z | 539 MW |
| 2026-10-26T02:00Z | 528 MW |
| 2026-10-26T03:00Z | 501 MW |
| 2026-10-26T04:00Z | 531 MW |
| 2026-10-26T05:00Z | 571 MW |
| 2026-10-26T06:00Z | 571 MW |
| 2026-10-26T07:00Z | 603 MW |
| 2026-10-26T08:00Z | 720 MW |
| 2026-10-26T09:00Z | 772 MW |
| 2026-10-26T10:00Z | 746 MW |
| 2026-10-26T11:00Z | 765 MW |
| 2026-10-26T12:00Z | 873 MW |
| 2026-10-26T13:00Z | 878 MW |
| 2026-10-26T14:00Z | 814 MW |
| 2026-10-26T15:00Z | 871 MW |
| 2026-10-26T16:00Z | 902 MW |
| 2026-10-26T17:00Z | 846 MW |
| 2026-10-26T18:00Z | 841 MW |
| 2026-10-26T19:00Z | 826 MW |
| 2026-10-26T20:00Z | 812 MW |
| 2026-10-26T21:00Z | 835 MW |
| 2026-10-26T22:00Z | 785 MW |
| 2026-10-26T23:00Z | 684 MW |
| 2026-10-27T00:00Z | 600 MW |
| 2026-10-27T01:00Z | 584 MW |
| 2026-10-27T02:00Z | 560 MW |
| 2026-10-27T03:00Z | 546 MW |
| 2026-10-27T04:00Z | 586 MW |
| 2026-10-27T05:00Z | 578 MW |
| 2026-10-27T06:00Z | 556 MW |
| 2026-10-27T07:00Z | 524 MW |
| 2026-10-27T08:00Z | 487 MW |
| 2026-10-27T09:00Z | 497 MW |
| 2026-10-27T10:00Z | 494 MW |
| 2026-10-27T11:00Z | 558 MW |
| 2026-10-27T12:00Z | 723 MW |
| 2026-10-27T13:00Z | 826 MW |
| 2026-10-27T14:00Z | 855 MW |
| 2026-10-27T15:00Z | 930 MW |
| 2026-10-27T16:00Z | 935 MW |
| 2026-10-27T17:00Z | 905 MW |
| 2026-10-27T18:00Z | 900 MW |
| 2026-10-27T19:00Z | 895 MW |
| 2026-10-27T20:00Z | 877 MW |
| 2026-10-27T21:00Z | 889 MW |
| 2026-10-27T22:00Z | 838 MW |
Show the data table (696 rows)
| Hour starting (UTC) | Hydro | Gas | Coal | Wind | Solar |
|---|---|---|---|---|---|
| 2026-09-28T23:00Z | 0 MW | 191 MW | 141 MW | 19 MW | 19 MW |
| 2026-09-29T00:00Z | 0 MW | 169 MW | 141 MW | 31 MW | 0 MW |
| 2026-09-29T01:00Z | 0 MW | 180 MW | 141 MW | 34 MW | 0 MW |
| 2026-09-29T02:00Z | 0 MW | 180 MW | 141 MW | 39 MW | 0 MW |
| 2026-09-29T03:00Z | 0 MW | 180 MW | 140 MW | 37 MW | 0 MW |
| 2026-09-29T04:00Z | 18 MW | 230 MW | 137 MW | 45 MW | 5 MW |
| 2026-09-29T05:00Z | 39 MW | 230 MW | 138 MW | 44 MW | 26 MW |
| 2026-09-29T06:00Z | 0 MW | 200 MW | 141 MW | 38 MW | 87 MW |
| 2026-09-29T07:00Z | 0 MW | 7 MW | 140 MW | 24 MW | 129 MW |
| 2026-09-29T08:00Z | 34 MW | 0 MW | 139 MW | 12 MW | 94 MW |
| 2026-09-29T09:00Z | 59 MW | 0 MW | 137 MW | 4 MW | 77 MW |
| 2026-09-29T10:00Z | 59 MW | 0 MW | 136 MW | 1 MW | 63 MW |
| 2026-09-29T11:00Z | 11 MW | 0 MW | 139 MW | 1 MW | 52 MW |
| 2026-09-29T12:00Z | 21 MW | 0 MW | 139 MW | 1 MW | 42 MW |
| 2026-09-29T13:00Z | 86 MW | 0 MW | 141 MW | 1 MW | 40 MW |
| 2026-09-29T14:00Z | 246 MW | 100 MW | 142 MW | 8 MW | 12 MW |
| 2026-09-29T15:00Z | 273 MW | 224 MW | 139 MW | 12 MW | 5 MW |
| 2026-09-29T16:00Z | 285 MW | 227 MW | 146 MW | 23 MW | 36 MW |
| 2026-09-29T17:00Z | 298 MW | 228 MW | 146 MW | 17 MW | 38 MW |
| 2026-09-29T18:00Z | 290 MW | 229 MW | 141 MW | 16 MW | 37 MW |
| 2026-09-29T19:00Z | 282 MW | 230 MW | 138 MW | 19 MW | 19 MW |
| 2026-09-29T20:00Z | 240 MW | 230 MW | 138 MW | 22 MW | 19 MW |
| 2026-09-29T21:00Z | 108 MW | 230 MW | 141 MW | 38 MW | 19 MW |
| 2026-09-29T22:00Z | 90 MW | 51 MW | 141 MW | 28 MW | 19 MW |
| 2026-09-29T23:00Z | 0 MW | 0 MW | 139 MW | 7 MW | 0 MW |
| 2026-09-30T00:00Z | 0 MW | 0 MW | 139 MW | 1 MW | 0 MW |
| 2026-09-30T01:00Z | 0 MW | 0 MW | 140 MW | 4 MW | 0 MW |
| 2026-09-30T02:00Z | 0 MW | 0 MW | 142 MW | 5 MW | 0 MW |
| 2026-09-30T03:00Z | 2 MW | 0 MW | 139 MW | 14 MW | 0 MW |
| 2026-09-30T04:00Z | 95 MW | 0 MW | 141 MW | 21 MW | 0 MW |
| 2026-09-30T05:00Z | 142 MW | 0 MW | 141 MW | 27 MW | 25 MW |
| 2026-09-30T06:00Z | 112 MW | 0 MW | 141 MW | 34 MW | 87 MW |
| 2026-09-30T07:00Z | 17 MW | 0 MW | 141 MW | 24 MW | 116 MW |
| 2026-09-30T08:00Z | 0 MW | 0 MW | 138 MW | 10 MW | 53 MW |
| 2026-09-30T09:00Z | 17 MW | 0 MW | 141 MW | 5 MW | 59 MW |
| 2026-09-30T10:00Z | 20 MW | 0 MW | 141 MW | 7 MW | 28 MW |
| 2026-09-30T11:00Z | 26 MW | 0 MW | 141 MW | 8 MW | 48 MW |
| 2026-09-30T12:00Z | 59 MW | 0 MW | 140 MW | 10 MW | 42 MW |
| 2026-09-30T13:00Z | 60 MW | 0 MW | 140 MW | 14 MW | 43 MW |
| 2026-09-30T14:00Z | 69 MW | 80 MW | 139 MW | 8 MW | 31 MW |
| 2026-09-30T15:00Z | 240 MW | 215 MW | 141 MW | 6 MW | 9 MW |
| 2026-09-30T16:00Z | 276 MW | 227 MW | 139 MW | 6 MW | 38 MW |
| 2026-09-30T17:00Z | 288 MW | 229 MW | 140 MW | 13 MW | 39 MW |
| 2026-09-30T18:00Z | 294 MW | 206 MW | 139 MW | 32 MW | 38 MW |
| 2026-09-30T19:00Z | 239 MW | 199 MW | 140 MW | 34 MW | 19 MW |
| 2026-09-30T20:00Z | 252 MW | 208 MW | 139 MW | 23 MW | 19 MW |
| 2026-09-30T21:00Z | 200 MW | 231 MW | 142 MW | 7 MW | 19 MW |
| 2026-09-30T22:00Z | 0 MW | 54 MW | 140 MW | 6 MW | 19 MW |
| 2026-09-30T23:00Z | 0 MW | 0 MW | 140 MW | 6 MW | 19 MW |
| 2026-10-01T00:00Z | 0 MW | 0 MW | 140 MW | 8 MW | 0 MW |
| 2026-10-01T01:00Z | 0 MW | 0 MW | 141 MW | 19 MW | 0 MW |
| 2026-10-01T02:00Z | 0 MW | 0 MW | 140 MW | 31 MW | 0 MW |
| 2026-10-01T03:00Z | 2 MW | 0 MW | 141 MW | 37 MW | 0 MW |
| 2026-10-01T04:00Z | 113 MW | 0 MW | 141 MW | 53 MW | 1 MW |
| 2026-10-01T05:00Z | 104 MW | 0 MW | 138 MW | 46 MW | 22 MW |
| 2026-10-01T06:00Z | 35 MW | 0 MW | 139 MW | 29 MW | 85 MW |
| 2026-10-01T07:00Z | 0 MW | 0 MW | 140 MW | 11 MW | 131 MW |
| 2026-10-01T08:00Z | 0 MW | 0 MW | 139 MW | 2 MW | 11 MW |
| 2026-10-01T09:00Z | 0 MW | 0 MW | 142 MW | 1 MW | 18 MW |
| 2026-10-01T10:00Z | 0 MW | 0 MW | 143 MW | 1 MW | 13 MW |
| 2026-10-01T11:00Z | 0 MW | 0 MW | 141 MW | 1 MW | 7 MW |
| 2026-10-01T12:00Z | 0 MW | 0 MW | 139 MW | 1 MW | 62 MW |
| 2026-10-01T13:00Z | 0 MW | 0 MW | 141 MW | 0 MW | 120 MW |
| 2026-10-01T14:00Z | 78 MW | 35 MW | 142 MW | 1 MW | 80 MW |
| 2026-10-01T15:00Z | 249 MW | 195 MW | 141 MW | 7 MW | 23 MW |
| 2026-10-01T16:00Z | 267 MW | 226 MW | 140 MW | 23 MW | 36 MW |
| 2026-10-01T17:00Z | 329 MW | 229 MW | 142 MW | 11 MW | 38 MW |
| 2026-10-01T18:00Z | 314 MW | 230 MW | 140 MW | 20 MW | 37 MW |
| 2026-10-01T19:00Z | 285 MW | 229 MW | 142 MW | 21 MW | 19 MW |
| 2026-10-01T20:00Z | 229 MW | 230 MW | 137 MW | 17 MW | 19 MW |
| 2026-10-01T21:00Z | 189 MW | 230 MW | 142 MW | 9 MW | 4 MW |
| 2026-10-01T22:00Z | 71 MW | 55 MW | 140 MW | 3 MW | 0 MW |
| 2026-10-01T23:00Z | 39 MW | 0 MW | 140 MW | 6 MW | 0 MW |
| 2026-10-02T00:00Z | 33 MW | 0 MW | 141 MW | 10 MW | 0 MW |
| 2026-10-02T01:00Z | 33 MW | 0 MW | 141 MW | 18 MW | 0 MW |
| 2026-10-02T02:00Z | 27 MW | 0 MW | 141 MW | 27 MW | 0 MW |
| 2026-10-02T03:00Z | 59 MW | 0 MW | 142 MW | 46 MW | 0 MW |
| 2026-10-02T04:00Z | 162 MW | 0 MW | 140 MW | 63 MW | 1 MW |
| 2026-10-02T05:00Z | 169 MW | 0 MW | 141 MW | 65 MW | 26 MW |
| 2026-10-02T06:00Z | 0 MW | 0 MW | 141 MW | 55 MW | 89 MW |
| 2026-10-02T07:00Z | 0 MW | 0 MW | 141 MW | 55 MW | 131 MW |
| 2026-10-02T08:00Z | 0 MW | 0 MW | 142 MW | 42 MW | 74 MW |
| 2026-10-02T09:00Z | 0 MW | 0 MW | 144 MW | 32 MW | 76 MW |
| 2026-10-02T10:00Z | 0 MW | 0 MW | 142 MW | 25 MW | 98 MW |
| 2026-10-02T11:00Z | 1 MW | 0 MW | 140 MW | 21 MW | 103 MW |
| 2026-10-02T12:00Z | 0 MW | 0 MW | 142 MW | 23 MW | 131 MW |
| 2026-10-02T13:00Z | 0 MW | 0 MW | 140 MW | 23 MW | 123 MW |
| 2026-10-02T14:00Z | 119 MW | 0 MW | 139 MW | 32 MW | 74 MW |
| 2026-10-02T15:00Z | 196 MW | 0 MW | 139 MW | 29 MW | 22 MW |
| 2026-10-02T16:00Z | 293 MW | 0 MW | 141 MW | 17 MW | 33 MW |
| 2026-10-02T17:00Z | 328 MW | 0 MW | 142 MW | 23 MW | 38 MW |
| 2026-10-02T18:00Z | 335 MW | 0 MW | 141 MW | 8 MW | 37 MW |
| 2026-10-02T19:00Z | 303 MW | 0 MW | 138 MW | 9 MW | 19 MW |
| 2026-10-02T20:00Z | 319 MW | 0 MW | 137 MW | 12 MW | 19 MW |
| 2026-10-02T21:00Z | 295 MW | 0 MW | 138 MW | 16 MW | 19 MW |
| 2026-10-02T22:00Z | 132 MW | 0 MW | 138 MW | 17 MW | 19 MW |
| 2026-10-02T23:00Z | 79 MW | 0 MW | 141 MW | 23 MW | 19 MW |
| 2026-10-03T00:00Z | 30 MW | 0 MW | 137 MW | 34 MW | 19 MW |
| 2026-10-03T01:00Z | 24 MW | 0 MW | 141 MW | 43 MW | 17 MW |
| 2026-10-03T02:00Z | 36 MW | 0 MW | 141 MW | 51 MW | 0 MW |
| 2026-10-03T03:00Z | 33 MW | 0 MW | 140 MW | 60 MW | 0 MW |
| 2026-10-03T04:00Z | 92 MW | 0 MW | 138 MW | 63 MW | 1 MW |
| 2026-10-03T05:00Z | 60 MW | 0 MW | 141 MW | 59 MW | 27 MW |
| 2026-10-03T06:00Z | 12 MW | 0 MW | 141 MW | 54 MW | 88 MW |
| 2026-10-03T07:00Z | 0 MW | 0 MW | 141 MW | 42 MW | 83 MW |
| 2026-10-03T08:00Z | 0 MW | 0 MW | 139 MW | 28 MW | 142 MW |
| 2026-10-03T09:00Z | 0 MW | 0 MW | 141 MW | 24 MW | 65 MW |
| 2026-10-03T10:00Z | 0 MW | 0 MW | 141 MW | 17 MW | 56 MW |
| 2026-10-03T11:00Z | 0 MW | 0 MW | 139 MW | 13 MW | 54 MW |
| 2026-10-03T12:00Z | 0 MW | 0 MW | 138 MW | 12 MW | 60 MW |
| 2026-10-03T13:00Z | 0 MW | 0 MW | 142 MW | 13 MW | 96 MW |
| 2026-10-03T14:00Z | 43 MW | 0 MW | 141 MW | 16 MW | 77 MW |
| 2026-10-03T15:00Z | 248 MW | 0 MW | 139 MW | 18 MW | 20 MW |
| 2026-10-03T16:00Z | 332 MW | 0 MW | 141 MW | 30 MW | 38 MW |
| 2026-10-03T17:00Z | 336 MW | 0 MW | 139 MW | 18 MW | 39 MW |
| 2026-10-03T18:00Z | 339 MW | 0 MW | 138 MW | 9 MW | 38 MW |
| 2026-10-03T19:00Z | 297 MW | 0 MW | 141 MW | 18 MW | 19 MW |
| 2026-10-03T20:00Z | 303 MW | 0 MW | 141 MW | 14 MW | 19 MW |
| 2026-10-03T21:00Z | 298 MW | 0 MW | 139 MW | 8 MW | 19 MW |
| 2026-10-03T22:00Z | 221 MW | 0 MW | 138 MW | 3 MW | 19 MW |
| 2026-10-03T23:00Z | 170 MW | 0 MW | 136 MW | 0 MW | 19 MW |
| 2026-10-04T00:00Z | 125 MW | 0 MW | 138 MW | 2 MW | 0 MW |
| 2026-10-04T01:00Z | 27 MW | 0 MW | 138 MW | 4 MW | 0 MW |
| 2026-10-04T02:00Z | 47 MW | 0 MW | 137 MW | 8 MW | 0 MW |
| 2026-10-04T03:00Z | 77 MW | 0 MW | 138 MW | 9 MW | 0 MW |
| 2026-10-04T04:00Z | 143 MW | 0 MW | 139 MW | 21 MW | 3 MW |
| 2026-10-04T05:00Z | 188 MW | 0 MW | 138 MW | 37 MW | 26 MW |
| 2026-10-04T06:00Z | 18 MW | 0 MW | 140 MW | 36 MW | 87 MW |
| 2026-10-04T07:00Z | 0 MW | 0 MW | 140 MW | 20 MW | 130 MW |
| 2026-10-04T08:00Z | 0 MW | 0 MW | 141 MW | 8 MW | 100 MW |
| 2026-10-04T09:00Z | 0 MW | 0 MW | 142 MW | 2 MW | 82 MW |
| 2026-10-04T10:00Z | 0 MW | 0 MW | 138 MW | 1 MW | 79 MW |
| 2026-10-04T11:00Z | 0 MW | 0 MW | 140 MW | 0 MW | 62 MW |
| 2026-10-04T12:00Z | 0 MW | 0 MW | 139 MW | 0 MW | 113 MW |
| 2026-10-04T13:00Z | 0 MW | 0 MW | 140 MW | 0 MW | 120 MW |
| 2026-10-04T14:00Z | 47 MW | 0 MW | 139 MW | 1 MW | 76 MW |
| 2026-10-04T15:00Z | 297 MW | 0 MW | 139 MW | 2 MW | 20 MW |
| 2026-10-04T16:00Z | 366 MW | 0 MW | 139 MW | 3 MW | 38 MW |
| 2026-10-04T17:00Z | 375 MW | 0 MW | 141 MW | 5 MW | 39 MW |
| 2026-10-04T18:00Z | 409 MW | 0 MW | 139 MW | 5 MW | 37 MW |
| 2026-10-04T19:00Z | 417 MW | 0 MW | 139 MW | 6 MW | 19 MW |
| 2026-10-04T20:00Z | 365 MW | 0 MW | 140 MW | 7 MW | 19 MW |
| 2026-10-04T21:00Z | 305 MW | 43 MW | 140 MW | 3 MW | 19 MW |
| 2026-10-04T22:00Z | 213 MW | 167 MW | 141 MW | 1 MW | 19 MW |
| 2026-10-04T23:00Z | 136 MW | 226 MW | 137 MW | 0 MW | 19 MW |
| 2026-10-05T00:00Z | 57 MW | 228 MW | 141 MW | 0 MW | 0 MW |
| 2026-10-05T01:00Z | 56 MW | 229 MW | 140 MW | 1 MW | 0 MW |
| 2026-10-05T02:00Z | 83 MW | 229 MW | 139 MW | 6 MW | 0 MW |
| 2026-10-05T03:00Z | 131 MW | 230 MW | 139 MW | 14 MW | 0 MW |
| 2026-10-05T04:00Z | 186 MW | 231 MW | 139 MW | 32 MW | 11 MW |
| 2026-10-05T05:00Z | 211 MW | 229 MW | 136 MW | 38 MW | 25 MW |
| 2026-10-05T06:00Z | 70 MW | 215 MW | 137 MW | 33 MW | 66 MW |
| 2026-10-05T07:00Z | 60 MW | 150 MW | 140 MW | 24 MW | 100 MW |
| 2026-10-05T08:00Z | 1 MW | 150 MW | 138 MW | 13 MW | 107 MW |
| 2026-10-05T09:00Z | 0 MW | 150 MW | 138 MW | 9 MW | 73 MW |
| 2026-10-05T10:00Z | 0 MW | 150 MW | 140 MW | 5 MW | 71 MW |
| 2026-10-05T11:00Z | 0 MW | 150 MW | 139 MW | 3 MW | 82 MW |
| 2026-10-05T12:00Z | 0 MW | 150 MW | 139 MW | 2 MW | 92 MW |
| 2026-10-05T13:00Z | 0 MW | 150 MW | 138 MW | 1 MW | 78 MW |
| 2026-10-05T14:00Z | 73 MW | 207 MW | 138 MW | 2 MW | 48 MW |
| 2026-10-05T15:00Z | 232 MW | 228 MW | 139 MW | 4 MW | 12 MW |
| 2026-10-05T16:00Z | 292 MW | 227 MW | 141 MW | 4 MW | 37 MW |
| 2026-10-05T17:00Z | 330 MW | 226 MW | 139 MW | 4 MW | 33 MW |
| 2026-10-05T18:00Z | 342 MW | 227 MW | 138 MW | 2 MW | 38 MW |
| 2026-10-05T19:00Z | 352 MW | 229 MW | 139 MW | 1 MW | 19 MW |
| 2026-10-05T20:00Z | 348 MW | 228 MW | 140 MW | 0 MW | 9 MW |
| 2026-10-05T21:00Z | 305 MW | 228 MW | 139 MW | 0 MW | 0 MW |
| 2026-10-05T22:00Z | 239 MW | 227 MW | 138 MW | 0 MW | 0 MW |
| 2026-10-05T23:00Z | 155 MW | 227 MW | 138 MW | 0 MW | 0 MW |
| 2026-10-06T00:00Z | 120 MW | 228 MW | 138 MW | 0 MW | 0 MW |
| 2026-10-06T01:00Z | 110 MW | 229 MW | 141 MW | 3 MW | 0 MW |
| 2026-10-06T02:00Z | 65 MW | 230 MW | 140 MW | 10 MW | 0 MW |
| 2026-10-06T03:00Z | 142 MW | 230 MW | 139 MW | 10 MW | 0 MW |
| 2026-10-06T04:00Z | 222 MW | 230 MW | 139 MW | 13 MW | 1 MW |
| 2026-10-06T05:00Z | 247 MW | 230 MW | 139 MW | 11 MW | 19 MW |
| 2026-10-06T06:00Z | 138 MW | 229 MW | 138 MW | 14 MW | 64 MW |
| 2026-10-06T07:00Z | 1 MW | 164 MW | 137 MW | 17 MW | 102 MW |
| 2026-10-06T08:00Z | 0 MW | 145 MW | 137 MW | 14 MW | 92 MW |
| 2026-10-06T09:00Z | 0 MW | 145 MW | 137 MW | 11 MW | 77 MW |
| 2026-10-06T10:00Z | 0 MW | 143 MW | 139 MW | 6 MW | 76 MW |
| 2026-10-06T11:00Z | 0 MW | 145 MW | 139 MW | 3 MW | 77 MW |
| 2026-10-06T12:00Z | 0 MW | 145 MW | 140 MW | 1 MW | 89 MW |
| 2026-10-06T13:00Z | 0 MW | 155 MW | 140 MW | 0 MW | 76 MW |
| 2026-10-06T14:00Z | 148 MW | 224 MW | 142 MW | 1 MW | 46 MW |
| 2026-10-06T15:00Z | 242 MW | 207 MW | 138 MW | 6 MW | 10 MW |
| 2026-10-06T16:00Z | 330 MW | 229 MW | 140 MW | 8 MW | 37 MW |
| 2026-10-06T17:00Z | 335 MW | 226 MW | 135 MW | 8 MW | 39 MW |
| 2026-10-06T18:00Z | 310 MW | 226 MW | 138 MW | 16 MW | 37 MW |
| 2026-10-06T19:00Z | 317 MW | 226 MW | 141 MW | 18 MW | 19 MW |
| 2026-10-06T20:00Z | 331 MW | 227 MW | 139 MW | 11 MW | 1 MW |
| 2026-10-06T21:00Z | 310 MW | 227 MW | 137 MW | 7 MW | 0 MW |
| 2026-10-06T22:00Z | 206 MW | 230 MW | 139 MW | 9 MW | 0 MW |
| 2026-10-06T23:00Z | 127 MW | 227 MW | 140 MW | 7 MW | 0 MW |
| 2026-10-07T00:00Z | 74 MW | 228 MW | 136 MW | 5 MW | 0 MW |
| 2026-10-07T01:00Z | 73 MW | 228 MW | 135 MW | 5 MW | 0 MW |
| 2026-10-07T02:00Z | 73 MW | 229 MW | 135 MW | 3 MW | 0 MW |
| 2026-10-07T03:00Z | 90 MW | 229 MW | 135 MW | 2 MW | 0 MW |
| 2026-10-07T04:00Z | 185 MW | 228 MW | 138 MW | 2 MW | 1 MW |
| 2026-10-07T05:00Z | 188 MW | 227 MW | 133 MW | 1 MW | 26 MW |
| 2026-10-07T06:00Z | 128 MW | 218 MW | 136 MW | 0 MW | 69 MW |
| 2026-10-07T07:00Z | 0 MW | 156 MW | 134 MW | 0 MW | 100 MW |
| 2026-10-07T08:00Z | 0 MW | 140 MW | 134 MW | 0 MW | 103 MW |
| 2026-10-07T09:00Z | 0 MW | 140 MW | 134 MW | 0 MW | 83 MW |
| 2026-10-07T10:00Z | 0 MW | 140 MW | 134 MW | 0 MW | 78 MW |
| 2026-10-07T11:00Z | 0 MW | 140 MW | 135 MW | 1 MW | 71 MW |
| 2026-10-07T12:00Z | 12 MW | 147 MW | 137 MW | 3 MW | 88 MW |
| 2026-10-07T13:00Z | 45 MW | 165 MW | 136 MW | 7 MW | 95 MW |
| 2026-10-07T14:00Z | 185 MW | 205 MW | 134 MW | 10 MW | 55 MW |
| 2026-10-07T15:00Z | 295 MW | 198 MW | 135 MW | 16 MW | 15 MW |
| 2026-10-07T16:00Z | 350 MW | 223 MW | 136 MW | 26 MW | 30 MW |
| 2026-10-07T17:00Z | 346 MW | 224 MW | 135 MW | 40 MW | 35 MW |
| 2026-10-07T18:00Z | 365 MW | 225 MW | 136 MW | 36 MW | 18 MW |
| 2026-10-07T19:00Z | 313 MW | 226 MW | 138 MW | 29 MW | 16 MW |
| 2026-10-07T20:00Z | 337 MW | 226 MW | 138 MW | 21 MW | 0 MW |
| 2026-10-07T21:00Z | 307 MW | 227 MW | 138 MW | 16 MW | 0 MW |
| 2026-10-07T22:00Z | 127 MW | 228 MW | 139 MW | 20 MW | 0 MW |
| 2026-10-07T23:00Z | 89 MW | 227 MW | 138 MW | 20 MW | 0 MW |
| 2026-10-08T00:00Z | 66 MW | 228 MW | 138 MW | 19 MW | 0 MW |
| 2026-10-08T01:00Z | 41 MW | 229 MW | 140 MW | 13 MW | 0 MW |
| 2026-10-08T02:00Z | 64 MW | 229 MW | 140 MW | 7 MW | 0 MW |
| 2026-10-08T03:00Z | 130 MW | 229 MW | 140 MW | 7 MW | 0 MW |
| 2026-10-08T04:00Z | 180 MW | 229 MW | 142 MW | 7 MW | 0 MW |
| 2026-10-08T05:00Z | 200 MW | 230 MW | 142 MW | 6 MW | 15 MW |
| 2026-10-08T06:00Z | 142 MW | 230 MW | 140 MW | 4 MW | 64 MW |
| 2026-10-08T07:00Z | 18 MW | 197 MW | 141 MW | 2 MW | 93 MW |
| 2026-10-08T08:00Z | 0 MW | 154 MW | 137 MW | 5 MW | 102 MW |
| 2026-10-08T09:00Z | 0 MW | 140 MW | 138 MW | 9 MW | 77 MW |
| 2026-10-08T10:00Z | 0 MW | 140 MW | 139 MW | 10 MW | 75 MW |
| 2026-10-08T11:00Z | 0 MW | 140 MW | 140 MW | 14 MW | 66 MW |
| 2026-10-08T12:00Z | 6 MW | 161 MW | 139 MW | 17 MW | 43 MW |
| 2026-10-08T13:00Z | 68 MW | 226 MW | 140 MW | 23 MW | 34 MW |
| 2026-10-08T14:00Z | 237 MW | 227 MW | 139 MW | 26 MW | 29 MW |
| 2026-10-08T15:00Z | 295 MW | 226 MW | 139 MW | 32 MW | 9 MW |
| 2026-10-08T16:00Z | 326 MW | 226 MW | 140 MW | 30 MW | 35 MW |
| 2026-10-08T17:00Z | 313 MW | 226 MW | 140 MW | 39 MW | 19 MW |
| 2026-10-08T18:00Z | 286 MW | 225 MW | 144 MW | 42 MW | 18 MW |
| 2026-10-08T19:00Z | 284 MW | 225 MW | 144 MW | 36 MW | 0 MW |
| 2026-10-08T20:00Z | 294 MW | 226 MW | 143 MW | 43 MW | 0 MW |
| 2026-10-08T21:00Z | 285 MW | 227 MW | 139 MW | 32 MW | 0 MW |
| 2026-10-08T22:00Z | 213 MW | 227 MW | 138 MW | 23 MW | 0 MW |
| 2026-10-08T23:00Z | 108 MW | 226 MW | 139 MW | 24 MW | 0 MW |
| 2026-10-09T00:00Z | 60 MW | 227 MW | 139 MW | 17 MW | 0 MW |
| 2026-10-09T01:00Z | 43 MW | 227 MW | 140 MW | 12 MW | 0 MW |
| 2026-10-09T02:00Z | 56 MW | 227 MW | 141 MW | 9 MW | 0 MW |
| 2026-10-09T03:00Z | 155 MW | 228 MW | 141 MW | 3 MW | 0 MW |
| 2026-10-09T04:00Z | 176 MW | 228 MW | 139 MW | 2 MW | 1 MW |
| 2026-10-09T05:00Z | 170 MW | 217 MW | 142 MW | 2 MW | 18 MW |
| 2026-10-09T06:00Z | 168 MW | 197 MW | 140 MW | 2 MW | 38 MW |
| 2026-10-09T07:00Z | 207 MW | 213 MW | 139 MW | 1 MW | 22 MW |
| 2026-10-09T08:00Z | 277 MW | 226 MW | 139 MW | 1 MW | 34 MW |
| 2026-10-09T09:00Z | 114 MW | 225 MW | 140 MW | 1 MW | 44 MW |
| 2026-10-09T10:00Z | 43 MW | 216 MW | 139 MW | 1 MW | 40 MW |
| 2026-10-09T11:00Z | 153 MW | 223 MW | 133 MW | 7 MW | 28 MW |
| 2026-10-09T12:00Z | 224 MW | 226 MW | 130 MW | 2 MW | 30 MW |
| 2026-10-09T13:00Z | 191 MW | 212 MW | 136 MW | 0 MW | 27 MW |
| 2026-10-09T14:00Z | 260 MW | 226 MW | 136 MW | 1 MW | 13 MW |
| 2026-10-09T15:00Z | 295 MW | 226 MW | 135 MW | 6 MW | 5 MW |
| 2026-10-09T16:00Z | 296 MW | 224 MW | 135 MW | 6 MW | 37 MW |
| 2026-10-09T17:00Z | 281 MW | 225 MW | 142 MW | 3 MW | 39 MW |
| 2026-10-09T18:00Z | 274 MW | 225 MW | 141 MW | 4 MW | 38 MW |
| 2026-10-09T19:00Z | 290 MW | 195 MW | 140 MW | 2 MW | 19 MW |
| 2026-10-09T20:00Z | 298 MW | 209 MW | 142 MW | 1 MW | 19 MW |
| 2026-10-09T21:00Z | 282 MW | 226 MW | 141 MW | 4 MW | 0 MW |
| 2026-10-09T22:00Z | 207 MW | 226 MW | 141 MW | 4 MW | 0 MW |
| 2026-10-09T23:00Z | 144 MW | 226 MW | 139 MW | 2 MW | 0 MW |
| 2026-10-10T00:00Z | 78 MW | 227 MW | 141 MW | 3 MW | 0 MW |
| 2026-10-10T01:00Z | 76 MW | 227 MW | 142 MW | 4 MW | 0 MW |
| 2026-10-10T02:00Z | 77 MW | 227 MW | 140 MW | 2 MW | 0 MW |
| 2026-10-10T03:00Z | 106 MW | 227 MW | 139 MW | 0 MW | 0 MW |
| 2026-10-10T04:00Z | 130 MW | 226 MW | 141 MW | 0 MW | 1 MW |
| 2026-10-10T05:00Z | 189 MW | 225 MW | 139 MW | 0 MW | 19 MW |
| 2026-10-10T06:00Z | 100 MW | 55 MW | 139 MW | 0 MW | 62 MW |
| 2026-10-10T07:00Z | 69 MW | 0 MW | 139 MW | 0 MW | 103 MW |
| 2026-10-10T08:00Z | 55 MW | 0 MW | 135 MW | 2 MW | 65 MW |
| 2026-10-10T09:00Z | 55 MW | 0 MW | 135 MW | 5 MW | 70 MW |
| 2026-10-10T10:00Z | 54 MW | 0 MW | 138 MW | 12 MW | 73 MW |
| 2026-10-10T11:00Z | 71 MW | 0 MW | 134 MW | 19 MW | 78 MW |
| 2026-10-10T12:00Z | 71 MW | 0 MW | 136 MW | 29 MW | 62 MW |
| 2026-10-10T13:00Z | 110 MW | 0 MW | 135 MW | 44 MW | 46 MW |
| 2026-10-10T14:00Z | 228 MW | 46 MW | 136 MW | 56 MW | 18 MW |
| 2026-10-10T15:00Z | 285 MW | 205 MW | 135 MW | 63 MW | 3 MW |
| 2026-10-10T16:00Z | 344 MW | 207 MW | 134 MW | 65 MW | 37 MW |
| 2026-10-10T17:00Z | 321 MW | 198 MW | 136 MW | 67 MW | 38 MW |
| 2026-10-10T18:00Z | 294 MW | 198 MW | 137 MW | 71 MW | 37 MW |
| 2026-10-10T19:00Z | 268 MW | 199 MW | 138 MW | 69 MW | 19 MW |
| 2026-10-10T20:00Z | 258 MW | 204 MW | 132 MW | 75 MW | 19 MW |
| 2026-10-10T21:00Z | 211 MW | 225 MW | 134 MW | 71 MW | 19 MW |
| 2026-10-10T22:00Z | 69 MW | 55 MW | 136 MW | 71 MW | 19 MW |
| 2026-10-10T23:00Z | 28 MW | 0 MW | 135 MW | 64 MW | 19 MW |
| 2026-10-11T00:00Z | 18 MW | 0 MW | 135 MW | 58 MW | 0 MW |
| 2026-10-11T01:00Z | 17 MW | 0 MW | 136 MW | 56 MW | 0 MW |
| 2026-10-11T02:00Z | 16 MW | 0 MW | 136 MW | 68 MW | 0 MW |
| 2026-10-11T03:00Z | 17 MW | 0 MW | 135 MW | 68 MW | 0 MW |
| 2026-10-11T04:00Z | 41 MW | 0 MW | 135 MW | 69 MW | 0 MW |
| 2026-10-11T05:00Z | 63 MW | 0 MW | 136 MW | 70 MW | 1 MW |
| 2026-10-11T06:00Z | 127 MW | 0 MW | 135 MW | 50 MW | 3 MW |
| 2026-10-11T07:00Z | 167 MW | 0 MW | 135 MW | 39 MW | 16 MW |
| 2026-10-11T08:00Z | 165 MW | 0 MW | 134 MW | 24 MW | 41 MW |
| 2026-10-11T09:00Z | 160 MW | 0 MW | 136 MW | 13 MW | 32 MW |
| 2026-10-11T10:00Z | 104 MW | 0 MW | 134 MW | 17 MW | 50 MW |
| 2026-10-11T11:00Z | 63 MW | 0 MW | 134 MW | 27 MW | 35 MW |
| 2026-10-11T12:00Z | 73 MW | 0 MW | 135 MW | 28 MW | 45 MW |
| 2026-10-11T13:00Z | 154 MW | 0 MW | 135 MW | 37 MW | 18 MW |
| 2026-10-11T14:00Z | 153 MW | 35 MW | 135 MW | 27 MW | 21 MW |
| 2026-10-11T15:00Z | 260 MW | 195 MW | 134 MW | 19 MW | 6 MW |
| 2026-10-11T16:00Z | 340 MW | 193 MW | 134 MW | 14 MW | 5 MW |
| 2026-10-11T17:00Z | 330 MW | 193 MW | 133 MW | 13 MW | 25 MW |
| 2026-10-11T18:00Z | 325 MW | 194 MW | 134 MW | 14 MW | 25 MW |
| 2026-10-11T19:00Z | 283 MW | 194 MW | 134 MW | 5 MW | 19 MW |
| 2026-10-11T20:00Z | 248 MW | 195 MW | 135 MW | 21 MW | 19 MW |
| 2026-10-11T21:00Z | 223 MW | 196 MW | 134 MW | 36 MW | 19 MW |
| 2026-10-11T22:00Z | 151 MW | 196 MW | 134 MW | 70 MW | 0 MW |
| 2026-10-11T23:00Z | 72 MW | 196 MW | 136 MW | 99 MW | 0 MW |
| 2026-10-12T00:00Z | 24 MW | 196 MW | 140 MW | 108 MW | 0 MW |
| 2026-10-12T01:00Z | 17 MW | 196 MW | 138 MW | 108 MW | 0 MW |
| 2026-10-12T02:00Z | 17 MW | 197 MW | 139 MW | 109 MW | 0 MW |
| 2026-10-12T03:00Z | 39 MW | 197 MW | 138 MW | 110 MW | 0 MW |
| 2026-10-12T04:00Z | 116 MW | 197 MW | 138 MW | 112 MW | 0 MW |
| 2026-10-12T05:00Z | 180 MW | 197 MW | 138 MW | 110 MW | 5 MW |
| 2026-10-12T06:00Z | 164 MW | 196 MW | 139 MW | 108 MW | 25 MW |
| 2026-10-12T07:00Z | 73 MW | 195 MW | 139 MW | 105 MW | 73 MW |
| 2026-10-12T08:00Z | 0 MW | 194 MW | 138 MW | 101 MW | 52 MW |
| 2026-10-12T09:00Z | 24 MW | 193 MW | 140 MW | 92 MW | 26 MW |
| 2026-10-12T10:00Z | 0 MW | 181 MW | 139 MW | 93 MW | 37 MW |
| 2026-10-12T11:00Z | 9 MW | 192 MW | 140 MW | 96 MW | 31 MW |
| 2026-10-12T12:00Z | 81 MW | 205 MW | 138 MW | 91 MW | 19 MW |
| 2026-10-12T13:00Z | 153 MW | 211 MW | 140 MW | 91 MW | 16 MW |
| 2026-10-12T14:00Z | 216 MW | 192 MW | 140 MW | 94 MW | 13 MW |
| 2026-10-12T15:00Z | 305 MW | 193 MW | 140 MW | 93 MW | 4 MW |
| 2026-10-12T16:00Z | 333 MW | 205 MW | 140 MW | 95 MW | 35 MW |
| 2026-10-12T17:00Z | 368 MW | 225 MW | 140 MW | 100 MW | 37 MW |
| 2026-10-12T18:00Z | 362 MW | 226 MW | 142 MW | 101 MW | 36 MW |
| 2026-10-12T19:00Z | 311 MW | 226 MW | 140 MW | 104 MW | 19 MW |
| 2026-10-12T20:00Z | 320 MW | 227 MW | 139 MW | 102 MW | 19 MW |
| 2026-10-12T21:00Z | 278 MW | 227 MW | 139 MW | 100 MW | 19 MW |
| 2026-10-12T22:00Z | 227 MW | 230 MW | 138 MW | 103 MW | 0 MW |
| 2026-10-12T23:00Z | 123 MW | 228 MW | 138 MW | 104 MW | 0 MW |
| 2026-10-13T00:00Z | 76 MW | 228 MW | 136 MW | 101 MW | 0 MW |
| 2026-10-13T01:00Z | 54 MW | 228 MW | 135 MW | 104 MW | 0 MW |
| 2026-10-13T02:00Z | 66 MW | 207 MW | 137 MW | 103 MW | 0 MW |
| 2026-10-13T03:00Z | 118 MW | 195 MW | 139 MW | 99 MW | 0 MW |
| 2026-10-13T04:00Z | 197 MW | 212 MW | 140 MW | 98 MW | 0 MW |
| 2026-10-13T05:00Z | 217 MW | 214 MW | 139 MW | 104 MW | 2 MW |
| 2026-10-13T06:00Z | 274 MW | 217 MW | 139 MW | 106 MW | 12 MW |
| 2026-10-13T07:00Z | 322 MW | 218 MW | 139 MW | 103 MW | 23 MW |
| 2026-10-13T08:00Z | 334 MW | 219 MW | 141 MW | 106 MW | 12 MW |
| 2026-10-13T09:00Z | 256 MW | 219 MW | 138 MW | 107 MW | 15 MW |
| 2026-10-13T10:00Z | 204 MW | 221 MW | 139 MW | 107 MW | 12 MW |
| 2026-10-13T11:00Z | 256 MW | 220 MW | 140 MW | 108 MW | 14 MW |
| 2026-10-13T12:00Z | 330 MW | 218 MW | 139 MW | 107 MW | 8 MW |
| 2026-10-13T13:00Z | 389 MW | 219 MW | 141 MW | 111 MW | 10 MW |
| 2026-10-13T14:00Z | 389 MW | 220 MW | 140 MW | 111 MW | 4 MW |
| 2026-10-13T15:00Z | 388 MW | 220 MW | 139 MW | 110 MW | 1 MW |
| 2026-10-13T16:00Z | 429 MW | 221 MW | 140 MW | 112 MW | 19 MW |
| 2026-10-13T17:00Z | 422 MW | 220 MW | 138 MW | 113 MW | 19 MW |
| 2026-10-13T18:00Z | 397 MW | 220 MW | 136 MW | 113 MW | 19 MW |
| 2026-10-13T19:00Z | 400 MW | 231 MW | 135 MW | 113 MW | 11 MW |
| 2026-10-13T20:00Z | 396 MW | 231 MW | 136 MW | 113 MW | 15 MW |
| 2026-10-13T21:00Z | 355 MW | 231 MW | 137 MW | 113 MW | 15 MW |
| 2026-10-13T22:00Z | 260 MW | 231 MW | 137 MW | 113 MW | 0 MW |
| 2026-10-13T23:00Z | 153 MW | 231 MW | 136 MW | 113 MW | 0 MW |
| 2026-10-14T00:00Z | 103 MW | 231 MW | 134 MW | 113 MW | 0 MW |
| 2026-10-14T01:00Z | 66 MW | 231 MW | 136 MW | 113 MW | 0 MW |
| 2026-10-14T02:00Z | 60 MW | 230 MW | 135 MW | 113 MW | 0 MW |
| 2026-10-14T03:00Z | 101 MW | 217 MW | 136 MW | 113 MW | 0 MW |
| 2026-10-14T04:00Z | 194 MW | 214 MW | 136 MW | 112 MW | 0 MW |
| 2026-10-14T05:00Z | 238 MW | 216 MW | 136 MW | 110 MW | 3 MW |
| 2026-10-14T06:00Z | 280 MW | 216 MW | 136 MW | 110 MW | 17 MW |
| 2026-10-14T07:00Z | 276 MW | 217 MW | 135 MW | 110 MW | 27 MW |
| 2026-10-14T08:00Z | 256 MW | 220 MW | 136 MW | 110 MW | 25 MW |
| 2026-10-14T09:00Z | 253 MW | 231 MW | 136 MW | 111 MW | 45 MW |
| 2026-10-14T10:00Z | 212 MW | 230 MW | 136 MW | 111 MW | 43 MW |
| 2026-10-14T11:00Z | 189 MW | 230 MW | 134 MW | 111 MW | 56 MW |
| 2026-10-14T12:00Z | 147 MW | 229 MW | 136 MW | 110 MW | 44 MW |
| 2026-10-14T13:00Z | 165 MW | 229 MW | 135 MW | 110 MW | 25 MW |
| 2026-10-14T14:00Z | 272 MW | 228 MW | 135 MW | 111 MW | 42 MW |
| 2026-10-14T15:00Z | 310 MW | 220 MW | 136 MW | 108 MW | 8 MW |
| 2026-10-14T16:00Z | 422 MW | 219 MW | 136 MW | 111 MW | 29 MW |
| 2026-10-14T17:00Z | 431 MW | 219 MW | 134 MW | 111 MW | 31 MW |
| 2026-10-14T18:00Z | 429 MW | 221 MW | 136 MW | 111 MW | 30 MW |
| 2026-10-14T19:00Z | 420 MW | 232 MW | 133 MW | 111 MW | 19 MW |
| 2026-10-14T20:00Z | 430 MW | 233 MW | 137 MW | 111 MW | 19 MW |
| 2026-10-14T21:00Z | 389 MW | 234 MW | 133 MW | 111 MW | 16 MW |
| 2026-10-14T22:00Z | 289 MW | 233 MW | 132 MW | 110 MW | 0 MW |
| 2026-10-14T23:00Z | 182 MW | 234 MW | 134 MW | 111 MW | 0 MW |
| 2026-10-15T00:00Z | 136 MW | 220 MW | 136 MW | 111 MW | 0 MW |
| 2026-10-15T01:00Z | 114 MW | 234 MW | 135 MW | 107 MW | 0 MW |
| 2026-10-15T02:00Z | 110 MW | 234 MW | 135 MW | 104 MW | 0 MW |
| 2026-10-15T03:00Z | 135 MW | 214 MW | 135 MW | 110 MW | 0 MW |
| 2026-10-15T04:00Z | 193 MW | 214 MW | 134 MW | 110 MW | 0 MW |
| 2026-10-15T05:00Z | 253 MW | 216 MW | 133 MW | 103 MW | 17 MW |
| 2026-10-15T06:00Z | 208 MW | 212 MW | 133 MW | 107 MW | 75 MW |
| 2026-10-15T07:00Z | 105 MW | 189 MW | 135 MW | 109 MW | 123 MW |
| 2026-10-15T08:00Z | 64 MW | 150 MW | 140 MW | 110 MW | 88 MW |
| 2026-10-15T09:00Z | 89 MW | 140 MW | 141 MW | 110 MW | 62 MW |
| 2026-10-15T10:00Z | 135 MW | 140 MW | 143 MW | 111 MW | 59 MW |
| 2026-10-15T11:00Z | 159 MW | 155 MW | 140 MW | 110 MW | 53 MW |
| 2026-10-15T12:00Z | 225 MW | 225 MW | 139 MW | 110 MW | 35 MW |
| 2026-10-15T13:00Z | 273 MW | 228 MW | 139 MW | 110 MW | 34 MW |
| 2026-10-15T14:00Z | 305 MW | 229 MW | 141 MW | 108 MW | 12 MW |
| 2026-10-15T15:00Z | 316 MW | 211 MW | 139 MW | 107 MW | 3 MW |
| 2026-10-15T16:00Z | 366 MW | 211 MW | 141 MW | 109 MW | 37 MW |
| 2026-10-15T17:00Z | 375 MW | 216 MW | 138 MW | 106 MW | 39 MW |
| 2026-10-15T18:00Z | 374 MW | 220 MW | 132 MW | 107 MW | 38 MW |
| 2026-10-15T19:00Z | 368 MW | 231 MW | 133 MW | 102 MW | 19 MW |
| 2026-10-15T20:00Z | 398 MW | 231 MW | 137 MW | 89 MW | 19 MW |
| 2026-10-15T21:00Z | 380 MW | 233 MW | 133 MW | 93 MW | 19 MW |
| 2026-10-15T22:00Z | 285 MW | 234 MW | 133 MW | 94 MW | 10 MW |
| 2026-10-15T23:00Z | 231 MW | 234 MW | 133 MW | 90 MW | 0 MW |
| 2026-10-16T00:00Z | 175 MW | 234 MW | 134 MW | 78 MW | 0 MW |
| 2026-10-16T01:00Z | 165 MW | 233 MW | 138 MW | 72 MW | 0 MW |
| 2026-10-16T02:00Z | 199 MW | 234 MW | 135 MW | 59 MW | 0 MW |
| 2026-10-16T03:00Z | 211 MW | 218 MW | 136 MW | 59 MW | 0 MW |
| 2026-10-16T04:00Z | 263 MW | 217 MW | 139 MW | 57 MW | 0 MW |
| 2026-10-16T05:00Z | 306 MW | 218 MW | 137 MW | 57 MW | 9 MW |
| 2026-10-16T06:00Z | 283 MW | 218 MW | 136 MW | 42 MW | 39 MW |
| 2026-10-16T07:00Z | 236 MW | 201 MW | 140 MW | 41 MW | 88 MW |
| 2026-10-16T08:00Z | 102 MW | 219 MW | 140 MW | 77 MW | 63 MW |
| 2026-10-16T09:00Z | 148 MW | 230 MW | 137 MW | 88 MW | 32 MW |
| 2026-10-16T10:00Z | 146 MW | 230 MW | 138 MW | 98 MW | 30 MW |
| 2026-10-16T11:00Z | 120 MW | 228 MW | 137 MW | 98 MW | 29 MW |
| 2026-10-16T12:00Z | 128 MW | 226 MW | 139 MW | 94 MW | 17 MW |
| 2026-10-16T13:00Z | 274 MW | 208 MW | 139 MW | 102 MW | 26 MW |
| 2026-10-16T14:00Z | 306 MW | 211 MW | 133 MW | 107 MW | 13 MW |
| 2026-10-16T15:00Z | 316 MW | 214 MW | 134 MW | 51 MW | 2 MW |
| 2026-10-16T16:00Z | 418 MW | 220 MW | 134 MW | 66 MW | 35 MW |
| 2026-10-16T17:00Z | 411 MW | 222 MW | 136 MW | 63 MW | 36 MW |
| 2026-10-16T18:00Z | 394 MW | 223 MW | 134 MW | 78 MW | 35 MW |
| 2026-10-16T19:00Z | 383 MW | 233 MW | 133 MW | 72 MW | 17 MW |
| 2026-10-16T20:00Z | 419 MW | 233 MW | 135 MW | 69 MW | 17 MW |
| 2026-10-16T21:00Z | 418 MW | 235 MW | 133 MW | 70 MW | 0 MW |
| 2026-10-16T22:00Z | 279 MW | 235 MW | 133 MW | 80 MW | 0 MW |
| 2026-10-16T23:00Z | 219 MW | 234 MW | 134 MW | 78 MW | 0 MW |
| 2026-10-17T00:00Z | 184 MW | 212 MW | 133 MW | 90 MW | 0 MW |
| 2026-10-17T01:00Z | 142 MW | 200 MW | 133 MW | 89 MW | 0 MW |
| 2026-10-17T02:00Z | 151 MW | 233 MW | 132 MW | 83 MW | 0 MW |
| 2026-10-17T03:00Z | 151 MW | 202 MW | 135 MW | 79 MW | 0 MW |
| 2026-10-17T04:00Z | 178 MW | 195 MW | 135 MW | 72 MW | 0 MW |
| 2026-10-17T05:00Z | 223 MW | 214 MW | 133 MW | 68 MW | 11 MW |
| 2026-10-17T06:00Z | 223 MW | 211 MW | 134 MW | 62 MW | 60 MW |
| 2026-10-17T07:00Z | 118 MW | 199 MW | 133 MW | 65 MW | 94 MW |
| 2026-10-17T08:00Z | 86 MW | 145 MW | 137 MW | 72 MW | 56 MW |
| 2026-10-17T09:00Z | 123 MW | 143 MW | 134 MW | 66 MW | 46 MW |
| 2026-10-17T10:00Z | 93 MW | 143 MW | 133 MW | 64 MW | 66 MW |
| 2026-10-17T11:00Z | 95 MW | 160 MW | 134 MW | 66 MW | 70 MW |
| 2026-10-17T12:00Z | 153 MW | 228 MW | 136 MW | 72 MW | 78 MW |
| 2026-10-17T13:00Z | 156 MW | 202 MW | 134 MW | 85 MW | 64 MW |
| 2026-10-17T14:00Z | 273 MW | 207 MW | 134 MW | 83 MW | 35 MW |
| 2026-10-17T15:00Z | 374 MW | 211 MW | 134 MW | 77 MW | 6 MW |
| 2026-10-17T16:00Z | 392 MW | 215 MW | 142 MW | 66 MW | 37 MW |
| 2026-10-17T17:00Z | 383 MW | 200 MW | 142 MW | 65 MW | 39 MW |
| 2026-10-17T18:00Z | 388 MW | 195 MW | 141 MW | 62 MW | 38 MW |
| 2026-10-17T19:00Z | 389 MW | 202 MW | 141 MW | 59 MW | 19 MW |
| 2026-10-17T20:00Z | 399 MW | 203 MW | 143 MW | 48 MW | 19 MW |
| 2026-10-17T21:00Z | 345 MW | 203 MW | 142 MW | 43 MW | 19 MW |
| 2026-10-17T22:00Z | 302 MW | 232 MW | 140 MW | 44 MW | 0 MW |
| 2026-10-17T23:00Z | 255 MW | 233 MW | 141 MW | 47 MW | 0 MW |
| 2026-10-18T00:00Z | 185 MW | 233 MW | 143 MW | 45 MW | 0 MW |
| 2026-10-18T01:00Z | 144 MW | 233 MW | 142 MW | 45 MW | 0 MW |
| 2026-10-18T02:00Z | 146 MW | 233 MW | 141 MW | 44 MW | 0 MW |
| 2026-10-18T03:00Z | 147 MW | 214 MW | 140 MW | 51 MW | 0 MW |
| 2026-10-18T04:00Z | 185 MW | 213 MW | 143 MW | 54 MW | 0 MW |
| 2026-10-18T05:00Z | 230 MW | 213 MW | 138 MW | 63 MW | 6 MW |
| 2026-10-18T06:00Z | 263 MW | 215 MW | 136 MW | 65 MW | 26 MW |
| 2026-10-18T07:00Z | 243 MW | 217 MW | 136 MW | 58 MW | 89 MW |
| 2026-10-18T08:00Z | 178 MW | 212 MW | 138 MW | 57 MW | 59 MW |
| 2026-10-18T09:00Z | 177 MW | 212 MW | 136 MW | 68 MW | 77 MW |
| 2026-10-18T10:00Z | 159 MW | 212 MW | 134 MW | 72 MW | 62 MW |
| 2026-10-18T11:00Z | 153 MW | 212 MW | 134 MW | 76 MW | 59 MW |
| 2026-10-18T12:00Z | 47 MW | 180 MW | 142 MW | 76 MW | 63 MW |
| 2026-10-18T13:00Z | 134 MW | 225 MW | 137 MW | 80 MW | 44 MW |
| 2026-10-18T14:00Z | 376 MW | 227 MW | 137 MW | 70 MW | 27 MW |
| 2026-10-18T15:00Z | 401 MW | 228 MW | 140 MW | 61 MW | 4 MW |
| 2026-10-18T16:00Z | 403 MW | 229 MW | 139 MW | 62 MW | 37 MW |
| 2026-10-18T17:00Z | 403 MW | 229 MW | 139 MW | 73 MW | 39 MW |
| 2026-10-18T18:00Z | 403 MW | 230 MW | 138 MW | 76 MW | 38 MW |
| 2026-10-18T19:00Z | 399 MW | 231 MW | 139 MW | 80 MW | 19 MW |
| 2026-10-18T20:00Z | 386 MW | 231 MW | 140 MW | 81 MW | 19 MW |
| 2026-10-18T21:00Z | 325 MW | 233 MW | 139 MW | 75 MW | 19 MW |
| 2026-10-18T22:00Z | 273 MW | 233 MW | 138 MW | 81 MW | 19 MW |
| 2026-10-18T23:00Z | 197 MW | 233 MW | 137 MW | 78 MW | 10 MW |
| 2026-10-19T00:00Z | 174 MW | 209 MW | 141 MW | 79 MW | 0 MW |
| 2026-10-19T01:00Z | 121 MW | 204 MW | 184 MW | 79 MW | 0 MW |
| 2026-10-19T02:00Z | 76 MW | 234 MW | 205 MW | 76 MW | 0 MW |
| 2026-10-19T03:00Z | 84 MW | 215 MW | 217 MW | 78 MW | 0 MW |
| 2026-10-19T04:00Z | 123 MW | 214 MW | 220 MW | 81 MW | 0 MW |
| 2026-10-19T05:00Z | 182 MW | 214 MW | 219 MW | 83 MW | 9 MW |
| 2026-10-19T06:00Z | 203 MW | 218 MW | 218 MW | 78 MW | 51 MW |
| 2026-10-19T07:00Z | 140 MW | 216 MW | 220 MW | 81 MW | 103 MW |
| 2026-10-19T08:00Z | 24 MW | 192 MW | 218 MW | 83 MW | 84 MW |
| 2026-10-19T09:00Z | 0 MW | 185 MW | 217 MW | 94 MW | 67 MW |
| 2026-10-19T10:00Z | 0 MW | 183 MW | 214 MW | 100 MW | 68 MW |
| 2026-10-19T11:00Z | 17 MW | 183 MW | 214 MW | 98 MW | 73 MW |
| 2026-10-19T12:00Z | 16 MW | 190 MW | 213 MW | 98 MW | 82 MW |
| 2026-10-19T13:00Z | 63 MW | 190 MW | 216 MW | 87 MW | 92 MW |
| 2026-10-19T14:00Z | 158 MW | 196 MW | 216 MW | 74 MW | 46 MW |
| 2026-10-19T15:00Z | 228 MW | 197 MW | 213 MW | 71 MW | 5 MW |
| 2026-10-19T16:00Z | 309 MW | 197 MW | 214 MW | 54 MW | 37 MW |
| 2026-10-19T17:00Z | 310 MW | 198 MW | 213 MW | 51 MW | 39 MW |
| 2026-10-19T18:00Z | 315 MW | 200 MW | 213 MW | 42 MW | 38 MW |
| 2026-10-19T19:00Z | 319 MW | 201 MW | 213 MW | 41 MW | 19 MW |
| 2026-10-19T20:00Z | 321 MW | 201 MW | 220 MW | 42 MW | 19 MW |
| 2026-10-19T21:00Z | 296 MW | 224 MW | 214 MW | 43 MW | 19 MW |
| 2026-10-19T22:00Z | 196 MW | 215 MW | 208 MW | 42 MW | 19 MW |
| 2026-10-19T23:00Z | 118 MW | 225 MW | 208 MW | 34 MW | 19 MW |
| 2026-10-20T00:00Z | 90 MW | 232 MW | 213 MW | 20 MW | 0 MW |
| 2026-10-20T01:00Z | 60 MW | 232 MW | 211 MW | 11 MW | 0 MW |
| 2026-10-20T02:00Z | 63 MW | 234 MW | 210 MW | 10 MW | 0 MW |
| 2026-10-20T03:00Z | 113 MW | 215 MW | 214 MW | 8 MW | 0 MW |
| 2026-10-20T04:00Z | 208 MW | 215 MW | 217 MW | 8 MW | 0 MW |
| 2026-10-20T05:00Z | 292 MW | 217 MW | 216 MW | 3 MW | 9 MW |
| 2026-10-20T06:00Z | 243 MW | 218 MW | 210 MW | 1 MW | 51 MW |
| 2026-10-20T07:00Z | 186 MW | 204 MW | 203 MW | 0 MW | 109 MW |
| 2026-10-20T08:00Z | 84 MW | 189 MW | 202 MW | 0 MW | 96 MW |
| 2026-10-20T09:00Z | 86 MW | 183 MW | 192 MW | 2 MW | 72 MW |
| 2026-10-20T10:00Z | 39 MW | 182 MW | 185 MW | 5 MW | 69 MW |
| 2026-10-20T11:00Z | 90 MW | 202 MW | 152 MW | 10 MW | 77 MW |
| 2026-10-20T12:00Z | 107 MW | 185 MW | 141 MW | 13 MW | 90 MW |
| 2026-10-20T13:00Z | 212 MW | 185 MW | 140 MW | 17 MW | 76 MW |
| 2026-10-20T14:00Z | 269 MW | 190 MW | 138 MW | 30 MW | 46 MW |
| 2026-10-20T15:00Z | 361 MW | 203 MW | 135 MW | 49 MW | 5 MW |
| 2026-10-20T16:00Z | 385 MW | 212 MW | 140 MW | 64 MW | 37 MW |
| 2026-10-20T17:00Z | 381 MW | 227 MW | 140 MW | 73 MW | 39 MW |
| 2026-10-20T18:00Z | 386 MW | 218 MW | 139 MW | 67 MW | 38 MW |
| 2026-10-20T19:00Z | 398 MW | 230 MW | 138 MW | 67 MW | 19 MW |
| 2026-10-20T20:00Z | 398 MW | 231 MW | 138 MW | 62 MW | 19 MW |
| 2026-10-20T21:00Z | 395 MW | 232 MW | 137 MW | 63 MW | 19 MW |
| 2026-10-20T22:00Z | 266 MW | 231 MW | 135 MW | 51 MW | 19 MW |
| 2026-10-20T23:00Z | 187 MW | 230 MW | 134 MW | 49 MW | 19 MW |
| 2026-10-21T00:00Z | 170 MW | 231 MW | 137 MW | 44 MW | 0 MW |
| 2026-10-21T01:00Z | 126 MW | 231 MW | 138 MW | 35 MW | 0 MW |
| 2026-10-21T02:00Z | 133 MW | 231 MW | 133 MW | 29 MW | 0 MW |
| 2026-10-21T03:00Z | 145 MW | 220 MW | 134 MW | 30 MW | 10 MW |
| 2026-10-21T04:00Z | 221 MW | 213 MW | 135 MW | 27 MW | 16 MW |
| 2026-10-21T05:00Z | 225 MW | 216 MW | 132 MW | 29 MW | 7 MW |
| 2026-10-21T06:00Z | 266 MW | 205 MW | 134 MW | 38 MW | 38 MW |
| 2026-10-21T07:00Z | 235 MW | 178 MW | 135 MW | 31 MW | 81 MW |
| 2026-10-21T08:00Z | 221 MW | 205 MW | 136 MW | 29 MW | 48 MW |
| 2026-10-21T09:00Z | 133 MW | 207 MW | 138 MW | 31 MW | 50 MW |
| 2026-10-21T10:00Z | 95 MW | 201 MW | 138 MW | 35 MW | 44 MW |
| 2026-10-21T11:00Z | 195 MW | 185 MW | 138 MW | 46 MW | 23 MW |
| 2026-10-21T12:00Z | 283 MW | 224 MW | 139 MW | 54 MW | 15 MW |
| 2026-10-21T13:00Z | 344 MW | 224 MW | 140 MW | 63 MW | 14 MW |
| 2026-10-21T14:00Z | 331 MW | 225 MW | 141 MW | 75 MW | 9 MW |
| 2026-10-21T15:00Z | 353 MW | 225 MW | 140 MW | 74 MW | 1 MW |
| 2026-10-21T16:00Z | 360 MW | 226 MW | 137 MW | 75 MW | 35 MW |
| 2026-10-21T17:00Z | 358 MW | 226 MW | 145 MW | 76 MW | 36 MW |
| 2026-10-21T18:00Z | 330 MW | 227 MW | 144 MW | 84 MW | 35 MW |
| 2026-10-21T19:00Z | 327 MW | 220 MW | 143 MW | 80 MW | 19 MW |
| 2026-10-21T20:00Z | 329 MW | 198 MW | 142 MW | 87 MW | 19 MW |
| 2026-10-21T21:00Z | 323 MW | 198 MW | 142 MW | 83 MW | 19 MW |
| 2026-10-21T22:00Z | 161 MW | 228 MW | 143 MW | 83 MW | 0 MW |
| 2026-10-21T23:00Z | 71 MW | 227 MW | 144 MW | 75 MW | 0 MW |
| 2026-10-22T00:00Z | 0 MW | 227 MW | 143 MW | 79 MW | 0 MW |
| 2026-10-22T01:00Z | 0 MW | 218 MW | 142 MW | 79 MW | 0 MW |
| 2026-10-22T02:00Z | 16 MW | 213 MW | 141 MW | 75 MW | 0 MW |
| 2026-10-22T03:00Z | 75 MW | 181 MW | 140 MW | 81 MW | 0 MW |
| 2026-10-22T04:00Z | 205 MW | 178 MW | 136 MW | 70 MW | 0 MW |
| 2026-10-22T05:00Z | 215 MW | 183 MW | 142 MW | 62 MW | 7 MW |
| 2026-10-22T06:00Z | 236 MW | 175 MW | 141 MW | 56 MW | 33 MW |
| 2026-10-22T07:00Z | 136 MW | 216 MW | 136 MW | 45 MW | 92 MW |
| 2026-10-22T08:00Z | 107 MW | 216 MW | 139 MW | 29 MW | 58 MW |
| 2026-10-22T09:00Z | 99 MW | 224 MW | 137 MW | 20 MW | 60 MW |
| 2026-10-22T10:00Z | 44 MW | 223 MW | 138 MW | 13 MW | 27 MW |
| 2026-10-22T11:00Z | 0 MW | 222 MW | 137 MW | 12 MW | 44 MW |
| 2026-10-22T12:00Z | 97 MW | 223 MW | 140 MW | 11 MW | 43 MW |
| 2026-10-22T13:00Z | 221 MW | 191 MW | 138 MW | 16 MW | 59 MW |
| 2026-10-22T14:00Z | 263 MW | 193 MW | 136 MW | 20 MW | 50 MW |
| 2026-10-22T15:00Z | 315 MW | 194 MW | 132 MW | 22 MW | 3 MW |
| 2026-10-22T16:00Z | 358 MW | 196 MW | 137 MW | 27 MW | 37 MW |
| 2026-10-22T17:00Z | 343 MW | 196 MW | 134 MW | 24 MW | 39 MW |
| 2026-10-22T18:00Z | 319 MW | 197 MW | 133 MW | 21 MW | 38 MW |
| 2026-10-22T19:00Z | 318 MW | 197 MW | 134 MW | 20 MW | 19 MW |
| 2026-10-22T20:00Z | 326 MW | 197 MW | 134 MW | 18 MW | 19 MW |
| 2026-10-22T21:00Z | 331 MW | 198 MW | 134 MW | 16 MW | 19 MW |
| 2026-10-22T22:00Z | 127 MW | 228 MW | 135 MW | 28 MW | 19 MW |
| 2026-10-22T23:00Z | 70 MW | 228 MW | 134 MW | 31 MW | 10 MW |
| 2026-10-23T00:00Z | 64 MW | 228 MW | 133 MW | 79 MW | 0 MW |
| 2026-10-23T01:00Z | 18 MW | 229 MW | 137 MW | 101 MW | 0 MW |
| 2026-10-23T02:00Z | 19 MW | 219 MW | 135 MW | 109 MW | 0 MW |
| 2026-10-23T03:00Z | 101 MW | 203 MW | 135 MW | 110 MW | 0 MW |
| 2026-10-23T04:00Z | 117 MW | 187 MW | 132 MW | 110 MW | 0 MW |
| 2026-10-23T05:00Z | 141 MW | 187 MW | 136 MW | 106 MW | 5 MW |
| 2026-10-23T06:00Z | 145 MW | 218 MW | 133 MW | 109 MW | 27 MW |
| 2026-10-23T07:00Z | 81 MW | 208 MW | 136 MW | 110 MW | 77 MW |
| 2026-10-23T08:00Z | 110 MW | 228 MW | 135 MW | 107 MW | 53 MW |
| 2026-10-23T09:00Z | 112 MW | 215 MW | 136 MW | 101 MW | 37 MW |
| 2026-10-23T10:00Z | 78 MW | 175 MW | 142 MW | 100 MW | 55 MW |
| 2026-10-23T11:00Z | 80 MW | 175 MW | 142 MW | 96 MW | 57 MW |
| 2026-10-23T12:00Z | 103 MW | 214 MW | 143 MW | 85 MW | 71 MW |
| 2026-10-23T13:00Z | 39 MW | 192 MW | 141 MW | 76 MW | 65 MW |
| 2026-10-23T14:00Z | 220 MW | 195 MW | 136 MW | 72 MW | 42 MW |
| 2026-10-23T15:00Z | 274 MW | 197 MW | 136 MW | 65 MW | 3 MW |
| 2026-10-23T16:00Z | 295 MW | 215 MW | 135 MW | 64 MW | 37 MW |
| 2026-10-23T17:00Z | 310 MW | 208 MW | 134 MW | 55 MW | 39 MW |
| 2026-10-23T18:00Z | 296 MW | 211 MW | 131 MW | 54 MW | 37 MW |
| 2026-10-23T19:00Z | 296 MW | 229 MW | 132 MW | 53 MW | 19 MW |
| 2026-10-23T20:00Z | 295 MW | 218 MW | 136 MW | 53 MW | 19 MW |
| 2026-10-23T21:00Z | 191 MW | 230 MW | 134 MW | 36 MW | 19 MW |
| 2026-10-23T22:00Z | 237 MW | 230 MW | 136 MW | 17 MW | 19 MW |
| 2026-10-23T23:00Z | 173 MW | 231 MW | 135 MW | 6 MW | 10 MW |
| 2026-10-24T00:00Z | 121 MW | 231 MW | 134 MW | 1 MW | 0 MW |
| 2026-10-24T01:00Z | 121 MW | 56 MW | 133 MW | 1 MW | 0 MW |
| 2026-10-24T02:00Z | 130 MW | 0 MW | 133 MW | 2 MW | 0 MW |
| 2026-10-24T03:00Z | 148 MW | 0 MW | 134 MW | 2 MW | 0 MW |
| 2026-10-24T04:00Z | 199 MW | 0 MW | 137 MW | 3 MW | 0 MW |
| 2026-10-24T05:00Z | 201 MW | 0 MW | 134 MW | 6 MW | 5 MW |
| 2026-10-24T06:00Z | 225 MW | 0 MW | 133 MW | 2 MW | 15 MW |
| 2026-10-24T07:00Z | 158 MW | 0 MW | 134 MW | 0 MW | 24 MW |
| 2026-10-24T08:00Z | 138 MW | 0 MW | 137 MW | 0 MW | 20 MW |
| 2026-10-24T09:00Z | 65 MW | 0 MW | 133 MW | 2 MW | 51 MW |
| 2026-10-24T10:00Z | 16 MW | 0 MW | 134 MW | 4 MW | 64 MW |
| 2026-10-24T11:00Z | 16 MW | 0 MW | 132 MW | 8 MW | 87 MW |
| 2026-10-24T12:00Z | 16 MW | 0 MW | 135 MW | 10 MW | 81 MW |
| 2026-10-24T13:00Z | 53 MW | 0 MW | 133 MW | 12 MW | 82 MW |
| 2026-10-24T14:00Z | 237 MW | 0 MW | 133 MW | 21 MW | 29 MW |
| 2026-10-24T15:00Z | 312 MW | 0 MW | 134 MW | 28 MW | 2 MW |
| 2026-10-24T16:00Z | 352 MW | 0 MW | 135 MW | 32 MW | 37 MW |
| 2026-10-24T17:00Z | 335 MW | 0 MW | 138 MW | 43 MW | 39 MW |
| 2026-10-24T18:00Z | 307 MW | 0 MW | 140 MW | 49 MW | 37 MW |
| 2026-10-24T19:00Z | 314 MW | 0 MW | 139 MW | 42 MW | 19 MW |
| 2026-10-24T20:00Z | 308 MW | 0 MW | 142 MW | 42 MW | 19 MW |
| 2026-10-24T21:00Z | 306 MW | 0 MW | 139 MW | 42 MW | 19 MW |
| 2026-10-24T22:00Z | 226 MW | 85 MW | 139 MW | 42 MW | 19 MW |
| 2026-10-24T23:00Z | 141 MW | 200 MW | 138 MW | 38 MW | 0 MW |
| 2026-10-25T00:00Z | 108 MW | 228 MW | 138 MW | 31 MW | 0 MW |
| 2026-10-25T01:00Z | 93 MW | 229 MW | 141 MW | 22 MW | 0 MW |
| 2026-10-25T02:00Z | 30 MW | 230 MW | 137 MW | 23 MW | 0 MW |
| 2026-10-25T03:00Z | 82 MW | 230 MW | 138 MW | 21 MW | 0 MW |
| 2026-10-25T04:00Z | 81 MW | 212 MW | 141 MW | 20 MW | 0 MW |
| 2026-10-25T05:00Z | 131 MW | 200 MW | 141 MW | 22 MW | 7 MW |
| 2026-10-25T06:00Z | 153 MW | 185 MW | 138 MW | 23 MW | 14 MW |
| 2026-10-25T07:00Z | 158 MW | 199 MW | 138 MW | 21 MW | 15 MW |
| 2026-10-25T08:00Z | 196 MW | 218 MW | 139 MW | 8 MW | 34 MW |
| 2026-10-25T09:00Z | 135 MW | 221 MW | 141 MW | 6 MW | 44 MW |
| 2026-10-25T10:00Z | 52 MW | 225 MW | 140 MW | 8 MW | 43 MW |
| 2026-10-25T11:00Z | 30 MW | 224 MW | 139 MW | 8 MW | 37 MW |
| 2026-10-25T12:00Z | 102 MW | 225 MW | 138 MW | 5 MW | 17 MW |
| 2026-10-25T13:00Z | 301 MW | 226 MW | 141 MW | 8 MW | 8 MW |
| 2026-10-25T14:00Z | 371 MW | 226 MW | 141 MW | 7 MW | 5 MW |
| 2026-10-25T15:00Z | 372 MW | 226 MW | 137 MW | 8 MW | 0 MW |
| 2026-10-25T16:00Z | 372 MW | 212 MW | 137 MW | 6 MW | 5 MW |
| 2026-10-25T17:00Z | 371 MW | 208 MW | 136 MW | 9 MW | 25 MW |
| 2026-10-25T18:00Z | 371 MW | 198 MW | 136 MW | 14 MW | 25 MW |
| 2026-10-25T19:00Z | 353 MW | 207 MW | 134 MW | 8 MW | 19 MW |
| 2026-10-25T20:00Z | 339 MW | 228 MW | 139 MW | 4 MW | 19 MW |
| 2026-10-25T21:00Z | 307 MW | 216 MW | 141 MW | 2 MW | 19 MW |
| 2026-10-25T22:00Z | 261 MW | 199 MW | 140 MW | 10 MW | 0 MW |
| 2026-10-25T23:00Z | 220 MW | 199 MW | 138 MW | 8 MW | 0 MW |
| 2026-10-26T00:00Z | 189 MW | 199 MW | 140 MW | 7 MW | 0 MW |
| 2026-10-26T01:00Z | 99 MW | 199 MW | 139 MW | 3 MW | 0 MW |
| 2026-10-26T02:00Z | 70 MW | 203 MW | 140 MW | 3 MW | 0 MW |
| 2026-10-26T03:00Z | 56 MW | 229 MW | 140 MW | 2 MW | 0 MW |
| 2026-10-26T04:00Z | 142 MW | 212 MW | 139 MW | 0 MW | 0 MW |
| 2026-10-26T05:00Z | 200 MW | 200 MW | 141 MW | 8 MW | 6 MW |
| 2026-10-26T06:00Z | 203 MW | 184 MW | 141 MW | 15 MW | 15 MW |
| 2026-10-26T07:00Z | 219 MW | 181 MW | 139 MW | 15 MW | 26 MW |
| 2026-10-26T08:00Z | 153 MW | 219 MW | 139 MW | 27 MW | 22 MW |
| 2026-10-26T09:00Z | 155 MW | 220 MW | 136 MW | 62 MW | 24 MW |
| 2026-10-26T10:00Z | 117 MW | 220 MW | 139 MW | 87 MW | 21 MW |
| 2026-10-26T11:00Z | 117 MW | 214 MW | 142 MW | 106 MW | 15 MW |
| 2026-10-26T12:00Z | 223 MW | 227 MW | 141 MW | 111 MW | 9 MW |
| 2026-10-26T13:00Z | 329 MW | 216 MW | 141 MW | 110 MW | 9 MW |
| 2026-10-26T14:00Z | 329 MW | 216 MW | 144 MW | 110 MW | 9 MW |
| 2026-10-26T15:00Z | 329 MW | 216 MW | 144 MW | 113 MW | 2 MW |
| 2026-10-26T16:00Z | 362 MW | 216 MW | 143 MW | 108 MW | 2 MW |
| 2026-10-26T17:00Z | 338 MW | 217 MW | 143 MW | 107 MW | 21 MW |
| 2026-10-26T18:00Z | 328 MW | 215 MW | 144 MW | 110 MW | 21 MW |
| 2026-10-26T19:00Z | 318 MW | 213 MW | 142 MW | 104 MW | 19 MW |
| 2026-10-26T20:00Z | 300 MW | 231 MW | 142 MW | 99 MW | 19 MW |
| 2026-10-26T21:00Z | 321 MW | 230 MW | 139 MW | 106 MW | 0 MW |
| 2026-10-26T22:00Z | 315 MW | 231 MW | 138 MW | 109 MW | 0 MW |
| 2026-10-26T23:00Z | 245 MW | 233 MW | 138 MW | 103 MW | 0 MW |
| 2026-10-27T00:00Z | 163 MW | 233 MW | 138 MW | 103 MW | 0 MW |
| 2026-10-27T01:00Z | 110 MW | 234 MW | 136 MW | 104 MW | 0 MW |
| 2026-10-27T02:00Z | 99 MW | 235 MW | 136 MW | 106 MW | 0 MW |
| 2026-10-27T03:00Z | 78 MW | 234 MW | 134 MW | 106 MW | 0 MW |
| 2026-10-27T04:00Z | 149 MW | 215 MW | 135 MW | 105 MW | 0 MW |
| 2026-10-27T05:00Z | 249 MW | 216 MW | 135 MW | 96 MW | 9 MW |
| 2026-10-27T06:00Z | 201 MW | 216 MW | 136 MW | 91 MW | 54 MW |
| 2026-10-27T07:00Z | 98 MW | 218 MW | 133 MW | 100 MW | 73 MW |
| 2026-10-27T08:00Z | 75 MW | 219 MW | 133 MW | 101 MW | 26 MW |
| 2026-10-27T09:00Z | 101 MW | 219 MW | 136 MW | 103 MW | 26 MW |
| 2026-10-27T10:00Z | 80 MW | 207 MW | 135 MW | 104 MW | 41 MW |
| 2026-10-27T11:00Z | 75 MW | 217 MW | 136 MW | 104 MW | 43 MW |
| 2026-10-27T12:00Z | 143 MW | 219 MW | 136 MW | 99 MW | 38 MW |
| 2026-10-27T13:00Z | 271 MW | 219 MW | 142 MW | 101 MW | 26 MW |
| 2026-10-27T14:00Z | 336 MW | 216 MW | 145 MW | 103 MW | 21 MW |
| 2026-10-27T15:00Z | 362 MW | 217 MW | 141 MW | 103 MW | 1 MW |
| 2026-10-27T16:00Z | 368 MW | 217 MW | 140 MW | 100 MW | 30 MW |
| 2026-10-27T17:00Z | 366 MW | 217 MW | 139 MW | 95 MW | 30 MW |
| 2026-10-27T18:00Z | 367 MW | 216 MW | 136 MW | 95 MW | 23 MW |
| 2026-10-27T19:00Z | 368 MW | 216 MW | 137 MW | 88 MW | 13 MW |
| 2026-10-27T20:00Z | 367 MW | 233 MW | 137 MW | 80 MW | 12 MW |
| 2026-10-27T21:00Z | 368 MW | 233 MW | 137 MW | 78 MW | 13 MW |
| 2026-10-27T22:00Z | 364 MW | 233 MW | 133 MW | 86 MW | 13 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27T22:00Z.
Installed Capacity
Annual figure for 2026| Coal | |
|---|---|
| Hydro | |
| Gas | |
| Oil | |
| Solar | |
| Wind | |
| Bioenergy |
Total installed capacity in North Macedonia: 2.21 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Skopje time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Skopje time) | Demand |
|---|---|
| 2025-09-23 | n/a |
| 2025-09-24 | n/a |
| 2025-09-25 | 10.9 GWh |
| 2025-09-26 | 11.7 GWh |
| 2025-09-27 | 11.4 GWh |
| 2025-09-28 | 12.3 GWh |
| 2025-09-29 | 11.4 GWh |
| 2025-09-30 | 9.88 GWh |
| 2025-10-01 | 11.8 GWh |
| 2025-10-02 | 16.7 GWh |
| 2025-10-03 | 16.9 GWh |
| 2025-10-04 | 14.7 GWh |
| 2025-10-05 | 15.4 GWh |
| 2025-10-06 | 17.3 GWh |
| 2025-10-07 | 16.9 GWh |
| 2025-10-08 | 17.6 GWh |
| 2025-10-09 | 12.5 GWh |
| 2025-10-10 | 13.4 GWh |
| 2025-10-11 | 12.7 GWh |
| 2025-10-12 | 15.0 GWh |
| 2025-10-13 | 14.6 GWh |
| 2025-10-14 | 14.6 GWh |
| 2025-10-15 | 14.4 GWh |
| 2025-10-16 | 16.8 GWh |
| 2025-10-17 | 17.8 GWh |
| 2025-10-18 | 16.7 GWh |
| 2025-10-19 | 15.4 GWh |
| 2025-10-20 | 14.6 GWh |
| 2025-10-21 | 15.3 GWh |
| 2025-10-22 | 16.5 GWh |
| 2025-10-23 | 13.5 GWh |
| 2025-10-24 | 12.3 GWh |
| 2025-10-25 | 13.6 GWh |
| 2025-10-26 | 18.2 GWh |
| 2025-10-27 | 14.0 GWh |
| 2025-10-28 | 15.8 GWh |
| 2025-10-29 | 14.3 GWh |
| 2025-10-30 | 15.2 GWh |
| 2025-10-31 | 15.1 GWh |
| 2025-11-01 | 13.8 GWh |
| 2025-11-02 | 13.6 GWh |
| 2025-11-03 | 14.8 GWh |
| 2025-11-04 | 17.1 GWh |
| 2025-11-05 | 16.1 GWh |
| 2025-11-06 | 17.4 GWh |
| 2025-11-07 | 16.5 GWh |
| 2025-11-08 | 15.3 GWh |
| 2025-11-09 | 15.4 GWh |
| 2025-11-10 | 15.8 GWh |
| 2025-11-11 | 14.8 GWh |
| 2025-11-12 | 14.6 GWh |
| 2025-11-13 | 15.7 GWh |
| 2025-11-14 | n/a |
| 2025-11-15 | 16.3 GWh |
| 2025-11-16 | n/a |
| 2025-11-17 | 14.7 GWh |
| 2025-11-18 | 18.3 GWh |
| 2025-11-19 | 18.5 GWh |
| 2025-11-20 | 16.0 GWh |
| 2025-11-21 | 15.6 GWh |
| 2025-11-22 | 14.3 GWh |
| 2025-11-23 | 15.9 GWh |
| 2025-11-24 | 15.7 GWh |
| 2025-11-25 | 17.8 GWh |
| 2025-11-26 | 18.3 GWh |
| 2025-11-27 | 19.3 GWh |
| 2025-11-28 | 19.8 GWh |
| 2025-11-29 | 18.2 GWh |
| 2025-11-30 | 17.8 GWh |
| 2025-12-01 | 16.3 GWh |
| 2025-12-02 | 19.2 GWh |
| 2025-12-03 | 20.1 GWh |
| 2025-12-04 | 18.8 GWh |
| 2025-12-05 | 19.4 GWh |
| 2025-12-06 | 17.2 GWh |
| 2025-12-07 | 16.1 GWh |
| 2025-12-08 | 15.2 GWh |
| 2025-12-09 | 16.7 GWh |
| 2025-12-10 | 18.6 GWh |
| 2025-12-11 | 18.3 GWh |
| 2025-12-12 | 17.5 GWh |
| 2025-12-13 | 18.4 GWh |
| 2025-12-14 | 20.3 GWh |
| 2025-12-15 | 20.4 GWh |
| 2025-12-16 | 22.9 GWh |
| 2025-12-17 | 24.0 GWh |
| 2025-12-18 | 24.1 GWh |
| 2025-12-19 | 22.8 GWh |
| 2025-12-20 | 23.5 GWh |
| 2025-12-21 | 25.3 GWh |
| 2025-12-22 | 25.8 GWh |
| 2025-12-23 | 25.6 GWh |
| 2025-12-24 | 24.5 GWh |
| 2025-12-25 | 24.8 GWh |
| 2025-12-26 | 24.4 GWh |
| 2025-12-27 | 20.7 GWh |
| 2025-12-28 | 22.8 GWh |
| 2025-12-29 | 22.6 GWh |
| 2025-12-30 | 23.6 GWh |
| 2025-12-31 | 23.8 GWh |
| 2026-01-01 | 23.2 GWh |
| 2026-01-02 | 25.4 GWh |
| 2026-01-03 | 22.5 GWh |
| 2026-01-04 | 20.1 GWh |
| 2026-01-05 | 18.8 GWh |
| 2026-01-06 | 18.6 GWh |
| 2026-01-07 | 16.7 GWh |
| 2026-01-08 | 19.7 GWh |
| 2026-01-09 | 22.3 GWh |
| 2026-01-10 | 22.4 GWh |
| 2026-01-11 | 22.7 GWh |
| 2026-01-12 | 22.4 GWh |
| 2026-01-13 | 24.6 GWh |
| 2026-01-14 | 22.0 GWh |
| 2026-01-15 | 21.1 GWh |
| 2026-01-16 | 22.4 GWh |
| 2026-01-17 | 23.2 GWh |
| 2026-01-18 | 21.3 GWh |
| 2026-01-19 | 21.1 GWh |
| 2026-01-20 | 22.8 GWh |
| 2026-01-21 | 27.0 GWh |
| 2026-01-22 | 25.7 GWh |
| 2026-01-23 | 24.0 GWh |
| 2026-01-24 | 22.9 GWh |
| 2026-01-25 | 21.2 GWh |
| 2026-01-26 | 21.2 GWh |
| 2026-01-27 | 20.2 GWh |
| 2026-01-28 | 21.4 GWh |
| 2026-01-29 | 21.8 GWh |
| 2026-01-30 | 18.0 GWh |
| 2026-01-31 | 17.0 GWh |
| 2026-02-01 | 21.2 GWh |
| 2026-02-02 | 21.0 GWh |
| 2026-02-03 | 19.9 GWh |
| 2026-02-04 | 19.6 GWh |
| 2026-02-05 | 18.4 GWh |
| 2026-02-06 | 19.8 GWh |
| 2026-02-07 | 15.2 GWh |
| 2026-02-08 | 16.6 GWh |
| 2026-02-09 | 18.0 GWh |
| 2026-02-10 | 17.9 GWh |
| 2026-02-11 | 16.9 GWh |
| 2026-02-12 | 17.3 GWh |
| 2026-02-13 | 16.1 GWh |
| 2026-02-14 | 17.9 GWh |
| 2026-02-15 | 16.6 GWh |
| 2026-02-16 | 15.8 GWh |
| 2026-02-17 | 19.2 GWh |
| 2026-02-18 | 16.5 GWh |
| 2026-02-19 | 17.3 GWh |
| 2026-02-20 | 18.6 GWh |
| 2026-02-21 | 16.4 GWh |
| 2026-02-22 | 17.1 GWh |
| 2026-02-23 | 17.1 GWh |
| 2026-02-24 | 17.0 GWh |
| 2026-02-25 | 14.0 GWh |
| 2026-02-26 | 14.0 GWh |
| 2026-02-27 | 14.5 GWh |
| 2026-02-28 | 14.7 GWh |
| 2026-03-01 | 14.9 GWh |
| 2026-03-02 | 15.1 GWh |
| 2026-03-03 | 13.9 GWh |
| 2026-03-04 | 14.1 GWh |
| 2026-03-05 | 16.1 GWh |
| 2026-03-06 | 13.4 GWh |
| 2026-03-07 | 13.6 GWh |
| 2026-03-08 | 14.3 GWh |
| 2026-03-09 | 13.7 GWh |
| 2026-03-10 | 13.0 GWh |
| 2026-03-11 | 13.6 GWh |
| 2026-03-12 | 13.2 GWh |
| 2026-03-13 | 12.7 GWh |
| 2026-03-14 | 12.4 GWh |
| 2026-03-15 | 13.1 GWh |
| 2026-03-16 | 12.6 GWh |
| 2026-03-17 | 15.0 GWh |
| 2026-03-18 | 18.3 GWh |
| 2026-03-19 | 18.8 GWh |
| 2026-03-20 | 14.8 GWh |
| 2026-03-21 | 14.9 GWh |
| 2026-03-22 | 15.2 GWh |
| 2026-03-23 | 15.0 GWh |
| 2026-03-24 | 16.7 GWh |
| 2026-03-25 | 12.8 GWh |
| 2026-03-26 | 12.7 GWh |
| 2026-03-27 | 15.5 GWh |
| 2026-03-28 | 13.7 GWh |
| 2026-03-29 | 10.9 GWh |
| 2026-03-30 | 12.9 GWh |
| 2026-03-31 | 17.2 GWh |
| 2026-04-01 | 19.1 GWh |
| 2026-04-02 | 18.9 GWh |
| 2026-04-03 | 14.9 GWh |
| 2026-04-04 | 11.7 GWh |
| 2026-04-05 | 11.4 GWh |
| 2026-04-06 | 11.2 GWh |
| 2026-04-07 | 8.84 GWh |
| 2026-04-08 | n/a |
| 2026-04-09 | n/a |
| 2026-04-10 | n/a |
| 2026-04-11 | 13.0 GWh |
| 2026-04-12 | 8.96 GWh |
| 2026-04-13 | 8.28 GWh |
| 2026-04-14 | 8.58 GWh |
| 2026-04-15 | 13.7 GWh |
| 2026-04-16 | 11.2 GWh |
| 2026-04-17 | n/a |
| 2026-04-18 | 8.84 GWh |
| 2026-04-19 | 8.15 GWh |
| 2026-04-20 | 9.00 GWh |
| 2026-04-21 | 13.6 GWh |
| 2026-04-22 | 14.2 GWh |
| 2026-04-23 | 10.6 GWh |
| 2026-04-24 | 9.80 GWh |
| 2026-04-25 | 10.1 GWh |
| 2026-04-26 | 10.6 GWh |
| 2026-04-27 | 8.75 GWh |
| 2026-04-28 | 8.12 GWh |
| 2026-04-29 | n/a |
| 2026-04-30 | 11.9 GWh |
| 2026-05-01 | 11.4 GWh |
| 2026-05-02 | 10.9 GWh |
| 2026-05-03 | 9.40 GWh |
| 2026-05-04 | 8.08 GWh |
| 2026-05-05 | n/a |
| 2026-05-06 | n/a |
| 2026-05-07 | 9.90 GWh |
| 2026-05-08 | 11.7 GWh |
| 2026-05-09 | 9.64 GWh |
| 2026-05-10 | 8.13 GWh |
| 2026-05-11 | 7.19 GWh |
| 2026-05-12 | 6.51 GWh |
| 2026-05-13 | 7.95 GWh |
| 2026-05-14 | 7.58 GWh |
| 2026-05-15 | 6.78 GWh |
| 2026-05-16 | 8.48 GWh |
| 2026-05-17 | 7.98 GWh |
| 2026-05-18 | 7.23 GWh |
| 2026-05-19 | 12.6 GWh |
| 2026-05-20 | 7.20 GWh |
| 2026-05-21 | 6.81 GWh |
| 2026-05-22 | 8.32 GWh |
| 2026-05-23 | 8.51 GWh |
| 2026-05-24 | n/a |
| 2026-05-25 | 7.34 GWh |
| 2026-05-26 | n/a |
| 2026-05-27 | 7.18 GWh |
| 2026-05-28 | 6.85 GWh |
| 2026-05-29 | 6.19 GWh |
| 2026-05-30 | 6.25 GWh |
| 2026-05-31 | n/a |
| 2026-06-01 | 6.78 GWh |
| 2026-06-02 | 7.33 GWh |
| 2026-06-03 | 6.94 GWh |
| 2026-06-04 | 7.12 GWh |
| 2026-06-05 | 7.16 GWh |
| 2026-06-06 | 7.00 GWh |
| 2026-06-07 | 7.47 GWh |
| 2026-06-08 | n/a |
| 2026-06-09 | n/a |
| 2026-06-10 | 7.81 GWh |
| 2026-06-11 | 7.22 GWh |
| 2026-06-12 | 5.77 GWh |
| 2026-06-13 | 7.26 GWh |
| 2026-06-14 | 7.76 GWh |
| 2026-06-15 | 6.81 GWh |
| 2026-06-16 | 7.78 GWh |
| 2026-06-17 | 8.36 GWh |
| 2026-06-18 | 7.56 GWh |
| 2026-06-19 | 7.49 GWh |
| 2026-06-20 | n/a |
| 2026-06-21 | 7.76 GWh |
| 2026-06-22 | 8.62 GWh |
| 2026-06-23 | n/a |
| 2026-06-24 | n/a |
| 2026-06-25 | 8.45 GWh |
| 2026-06-26 | 8.63 GWh |
| 2026-06-27 | 8.66 GWh |
| 2026-06-28 | 8.41 GWh |
| 2026-06-29 | 8.90 GWh |
| 2026-06-30 | 9.81 GWh |
| 2026-07-01 | 8.82 GWh |
| 2026-07-02 | 7.19 GWh |
| 2026-07-03 | 6.38 GWh |
| 2026-07-04 | 5.66 GWh |
| 2026-07-05 | 5.84 GWh |
| 2026-07-06 | 6.76 GWh |
| 2026-07-07 | 7.86 GWh |
| 2026-07-08 | 8.13 GWh |
| 2026-07-09 | 6.99 GWh |
| 2026-07-10 | 7.30 GWh |
| 2026-07-11 | 7.52 GWh |
| 2026-07-12 | 7.34 GWh |
| 2026-07-13 | 6.55 GWh |
| 2026-07-14 | 7.44 GWh |
| 2026-07-15 | 9.78 GWh |
| 2026-07-16 | 10.3 GWh |
| 2026-07-17 | 9.55 GWh |
| 2026-07-18 | 9.76 GWh |
| 2026-07-19 | 9.67 GWh |
| 2026-07-20 | 9.76 GWh |
| 2026-07-21 | 8.60 GWh |
| 2026-07-22 | 7.37 GWh |
| 2026-07-23 | 7.44 GWh |
| 2026-07-24 | 10.3 GWh |
| 2026-07-25 | 7.00 GWh |
| 2026-07-26 | 8.00 GWh |
| 2026-07-27 | 9.62 GWh |
| 2026-07-28 | 7.82 GWh |
| 2026-07-29 | 8.38 GWh |
| 2026-07-30 | 8.98 GWh |
| 2026-07-31 | 8.67 GWh |
| 2026-08-01 | 7.95 GWh |
| 2026-08-02 | n/a |
| 2026-08-03 | 7.82 GWh |
| 2026-08-04 | 8.56 GWh |
| 2026-08-05 | 9.48 GWh |
| 2026-08-06 | 11.7 GWh |
| 2026-08-07 | 11.3 GWh |
| 2026-08-08 | 10.4 GWh |
| 2026-08-09 | 10.3 GWh |
| 2026-08-10 | 11.4 GWh |
| 2026-08-11 | 11.9 GWh |
| 2026-08-12 | 12.0 GWh |
| 2026-08-13 | 13.0 GWh |
| 2026-08-14 | 11.9 GWh |
| 2026-08-15 | 9.86 GWh |
| 2026-08-16 | 9.19 GWh |
| 2026-08-17 | 10.5 GWh |
| 2026-08-18 | 11.4 GWh |
| 2026-08-19 | 10.9 GWh |
| 2026-08-20 | 12.1 GWh |
| 2026-08-21 | 12.9 GWh |
| 2026-08-22 | 12.6 GWh |
| 2026-08-23 | 12.3 GWh |
| 2026-08-24 | 13.0 GWh |
| 2026-08-25 | 13.0 GWh |
| 2026-08-26 | 13.5 GWh |
| 2026-08-27 | 13.2 GWh |
| 2026-08-28 | 11.2 GWh |
| 2026-08-29 | 11.2 GWh |
| 2026-08-30 | 10.4 GWh |
| 2026-08-31 | 12.3 GWh |
| 2026-09-01 | 12.5 GWh |
| 2026-09-02 | 12.2 GWh |
| 2026-09-03 | 10.4 GWh |
| 2026-09-04 | 9.54 GWh |
| 2026-09-05 | 9.02 GWh |
| 2026-09-06 | 8.22 GWh |
| 2026-09-07 | 8.57 GWh |
| 2026-09-08 | 8.13 GWh |
| 2026-09-09 | 9.63 GWh |
| 2026-09-10 | 10.5 GWh |
| 2026-09-11 | 10.5 GWh |
| 2026-09-12 | 10.8 GWh |
| 2026-09-13 | 7.98 GWh |
| 2026-09-14 | 8.44 GWh |
| 2026-09-15 | 10.6 GWh |
| 2026-09-16 | 10.2 GWh |
| 2026-09-17 | 9.25 GWh |
| 2026-09-18 | 9.51 GWh |
| 2026-09-19 | 9.61 GWh |
| 2026-09-20 | 10.5 GWh |
| 2026-09-21 | 10.7 GWh |
| 2026-09-22 | 7.62 GWh |
| 2026-09-23 | 7.36 GWh |
| 2026-09-24 | 8.14 GWh |
| 2026-09-25 | 13.7 GWh |
| 2026-09-26 | 13.6 GWh |
| 2026-09-27 | 11.5 GWh |
| 2026-09-28 | 9.74 GWh |
| 2026-09-29 | 11.2 GWh |
| 2026-09-30 | 10.5 GWh |
| 2026-10-01 | 9.62 GWh |
| 2026-10-02 | 9.60 GWh |
| 2026-10-03 | 9.32 GWh |
| 2026-10-04 | 9.64 GWh |
| 2026-10-05 | 10.2 GWh |
| 2026-10-06 | 10.5 GWh |
| 2026-10-07 | 11.1 GWh |
| 2026-10-08 | 11.4 GWh |
| 2026-10-09 | 12.7 GWh |
| 2026-10-10 | 9.81 GWh |
| 2026-10-11 | 12.9 GWh |
| 2026-10-12 | 10.3 GWh |
| 2026-10-13 | 16.3 GWh |
| 2026-10-14 | 15.5 GWh |
| 2026-10-15 | 14.5 GWh |
| 2026-10-16 | 15.3 GWh |
| 2026-10-17 | 14.5 GWh |
| 2026-10-18 | 16.4 GWh |
| 2026-10-19 | 13.0 GWh |
| 2026-10-20 | 13.3 GWh |
| 2026-10-21 | 14.5 GWh |
| 2026-10-22 | 14.0 GWh |
| 2026-10-23 | 12.3 GWh |
| 2026-10-24 | 12.9 GWh |
| 2026-10-25 | 16.9 GWh |
| 2026-10-26 | 17.3 GWh |
| 2026-10-27 | 16.8 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Skopje local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 3.53 TWh | 3.08 TWh | Coal 41.7% | 300 |
| 2025 (partial) | 4.40 TWh | 4.06 TWh | Coal 51.7% | 362 |
| 2024 (partial) | 5.01 TWh | 4.31 TWh | Coal 50.9% | 351 |
| 2023 | 5.66 TWh | 5.49 TWh | Coal 47.6% | 365 |
| 2022 | 6.35 TWh | 4.81 TWh | Coal 55.3% | 365 |
| 2021 | 7.21 TWh | 4.73 TWh | Coal 43.8% | 365 |
| 2020 | 6.91 TWh | 4.60 TWh | Coal 55.3% | 366 |
| 2019 | 6.25 TWh | 5.16 TWh | Coal 63.9% | 365 |
| 2018 | 6.62 TWh | 4.91 TWh | Coal 55.7% | 365 |
| 2017 | 5.95 TWh | 4.93 TWh | Coal 66.3% | 365 |
| 2016 (partial) | 6.36 TWh | 3.12 TWh | Coal 50.2% | 358 |
| 2015 (partial) | 7.03 TWh | n/a | n/a | 332 |
A year is partial when ENTSO-E has not published every day; 2023 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Greece | North Macedonia imports | 280 GWh |
| Serbia | North Macedonia exports | 153 GWh |
| Bulgaria | North Macedonia imports | 10.8 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Latest Grid Alerts
Newest alert 20 October 2026- Day ahead price North Macedonia had a day ahead price averaging EUR 306.44/MWh for 20 October 2026, 2.1 times its own 90 day median (EUR 146.93/MWh). All alerts that day
- Net imports North Macedonia imported a net 11.0 GWh on 2 October 2026, the 3rd highest daily net imports in 307 days of loaded history and 115% of its demand that day. All alerts that day
- Net imports Net imports into North Macedonia reached 11.3 GWh on 1 October 2026 (118% of demand), the 2nd highest daily net imports in 306 days of loaded history. All alerts that day
Follow this grid: RSS feed of North Macedonia alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-10-27 (27 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for North Macedonia, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). North Macedonia Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/mk/
World Power Monitor. North Macedonia Electricity Demand and Generation Mix. Data as of 2026-10-27 22:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/mk/
@misc{wpm_zones_mk_2026,
title = {{North Macedonia Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-27 22:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/mk/}
} Permalink: https://worldpowermonitor.com/zones/mk/
The Copy buttons add today's date as the access date.