Latvia Electricity Demand and Generation Mix
Latvia demand was 1,078 MW in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00). Hydro was the largest source in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00), at 50% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Latvia is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00), demand in Latvia was 1,078 MW, against a day-ahead forecast of 1,065 MW.
- Hydro supplied 49.6% of Latvia's generation in the hour starting 28 Oct 2026, 14:00 EET (UTC+02:00).
- The day-ahead price in Latvia averaged EUR 286.14/MWh for delivery on 2026-10-29 (29 October 2026).
- Installed generating capacity in Latvia was 4.26 GW in 2026, as reported to ENTSO-E.
- Demand in Latvia totalled 7.20 TWh in 2025.
- Hydro supplied 50.8% of Latvia's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 14:00 EET (UTC+02:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 14:00 EET (UTC+02:00)| Source | Output | Share |
|---|---|---|
| Hydro | 360 MW | 49.6% |
| Solar | 184 MW | 25.3% |
| Gas | 76 MW | 10.5% |
| Bioenergy | 40 MW | 5.5% |
| Wind | 38 MW | 5.2% |
| Other | 28 MW | 3.9% |
| Total from these sources | 726 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Storage is shown as Latvia reports it: the platform has published zero for every day since 1 September 2026 (the last non zero daily total was on 31 August 2026). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00:00Z.
Day-Ahead Price
Delivery day 2026-10-29 (29 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Latvia and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-29.
Last 30 Days, Hourly
Times in UTCShow the data table (687 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-29T22:00Z | 705 MW |
| 2026-09-29T23:00Z | 717 MW |
| 2026-09-30T00:00Z | 686 MW |
| 2026-09-30T01:00Z | 685 MW |
| 2026-09-30T02:00Z | 718 MW |
| 2026-09-30T03:00Z | 761 MW |
| 2026-09-30T04:00Z | 831 MW |
| 2026-09-30T05:00Z | 900 MW |
| 2026-09-30T06:00Z | 900 MW |
| 2026-09-30T07:00Z | 956 MW |
| 2026-09-30T08:00Z | 974 MW |
| 2026-09-30T09:00Z | 1,054 MW |
| 2026-09-30T10:00Z | 1,053 MW |
| 2026-09-30T11:00Z | 1,025 MW |
| 2026-09-30T12:00Z | 948 MW |
| 2026-09-30T13:00Z | 903 MW |
| 2026-09-30T14:00Z | 855 MW |
| 2026-09-30T15:00Z | 865 MW |
| 2026-09-30T16:00Z | 879 MW |
| 2026-09-30T17:00Z | 875 MW |
| 2026-09-30T18:00Z | 859 MW |
| 2026-09-30T19:00Z | 832 MW |
| 2026-09-30T20:00Z | 757 MW |
| 2026-09-30T21:00Z | 692 MW |
| 2026-09-30T22:00Z | 700 MW |
| 2026-09-30T23:00Z | 692 MW |
| 2026-10-01T00:00Z | 671 MW |
| 2026-10-01T01:00Z | 712 MW |
| 2026-10-01T02:00Z | 751 MW |
| 2026-10-01T03:00Z | 761 MW |
| 2026-10-01T04:00Z | 851 MW |
| 2026-10-01T05:00Z | 909 MW |
| 2026-10-01T06:00Z | 983 MW |
| 2026-10-01T07:00Z | 979 MW |
| 2026-10-01T08:00Z | 979 MW |
| 2026-10-01T09:00Z | 960 MW |
| 2026-10-01T10:00Z | 1,062 MW |
| 2026-10-01T11:00Z | 1,051 MW |
| 2026-10-01T12:00Z | 1,051 MW |
| 2026-10-01T13:00Z | 1,002 MW |
| 2026-10-01T14:00Z | 911 MW |
| 2026-10-01T15:00Z | 864 MW |
| 2026-10-01T16:00Z | 890 MW |
| 2026-10-01T17:00Z | 942 MW |
| 2026-10-01T18:00Z | 907 MW |
| 2026-10-01T19:00Z | 855 MW |
| 2026-10-01T20:00Z | 772 MW |
| 2026-10-01T21:00Z | 722 MW |
| 2026-10-01T22:00Z | 653 MW |
| 2026-10-01T23:00Z | 702 MW |
| 2026-10-02T00:00Z | 670 MW |
| 2026-10-02T01:00Z | 613 MW |
| 2026-10-02T02:00Z | 635 MW |
| 2026-10-02T03:00Z | 737 MW |
| 2026-10-02T04:00Z | 829 MW |
| 2026-10-02T05:00Z | 927 MW |
| 2026-10-02T06:00Z | 1,025 MW |
| 2026-10-02T07:00Z | 1,060 MW |
| 2026-10-02T08:00Z | 1,041 MW |
| 2026-10-02T09:00Z | 1,061 MW |
| 2026-10-02T10:00Z | 1,138 MW |
| 2026-10-02T11:00Z | 1,047 MW |
| 2026-10-02T12:00Z | 1,031 MW |
| 2026-10-02T13:00Z | 1,004 MW |
| 2026-10-02T14:00Z | 927 MW |
| 2026-10-02T15:00Z | 862 MW |
| 2026-10-02T16:00Z | 885 MW |
| 2026-10-02T17:00Z | 945 MW |
| 2026-10-02T18:00Z | 902 MW |
| 2026-10-02T19:00Z | 835 MW |
| 2026-10-02T20:00Z | 781 MW |
| 2026-10-02T21:00Z | 732 MW |
| 2026-10-02T22:00Z | 684 MW |
| 2026-10-02T23:00Z | 685 MW |
| 2026-10-03T00:00Z | 642 MW |
| 2026-10-03T01:00Z | 631 MW |
| 2026-10-03T02:00Z | 638 MW |
| 2026-10-03T03:00Z | 668 MW |
| 2026-10-03T04:00Z | 648 MW |
| 2026-10-03T05:00Z | 735 MW |
| 2026-10-03T06:00Z | 808 MW |
| 2026-10-03T07:00Z | 815 MW |
| 2026-10-03T08:00Z | 779 MW |
| 2026-10-03T09:00Z | 770 MW |
| 2026-10-03T10:00Z | 794 MW |
| 2026-10-03T11:00Z | 874 MW |
| 2026-10-03T12:00Z | 933 MW |
| 2026-10-03T13:00Z | 863 MW |
| 2026-10-03T14:00Z | 789 MW |
| 2026-10-03T15:00Z | 773 MW |
| 2026-10-03T16:00Z | 799 MW |
| 2026-10-03T17:00Z | 832 MW |
| 2026-10-03T18:00Z | 804 MW |
| 2026-10-03T19:00Z | 753 MW |
| 2026-10-03T20:00Z | 699 MW |
| 2026-10-03T21:00Z | 674 MW |
| 2026-10-03T22:00Z | 633 MW |
| 2026-10-03T23:00Z | 598 MW |
| 2026-10-04T00:00Z | 601 MW |
| 2026-10-04T01:00Z | 598 MW |
| 2026-10-04T02:00Z | 661 MW |
| 2026-10-04T03:00Z | 649 MW |
| 2026-10-04T04:00Z | 577 MW |
| 2026-10-04T05:00Z | 676 MW |
| 2026-10-04T06:00Z | 812 MW |
| 2026-10-04T07:00Z | 854 MW |
| 2026-10-04T08:00Z | 857 MW |
| 2026-10-04T09:00Z | 920 MW |
| 2026-10-04T10:00Z | 932 MW |
| 2026-10-04T11:00Z | 934 MW |
| 2026-10-04T12:00Z | 879 MW |
| 2026-10-04T13:00Z | 790 MW |
| 2026-10-04T14:00Z | 805 MW |
| 2026-10-04T15:00Z | 807 MW |
| 2026-10-04T16:00Z | 854 MW |
| 2026-10-04T17:00Z | 889 MW |
| 2026-10-04T18:00Z | 824 MW |
| 2026-10-04T19:00Z | 770 MW |
| 2026-10-04T20:00Z | 692 MW |
| 2026-10-04T21:00Z | 639 MW |
| 2026-10-04T22:00Z | 655 MW |
| 2026-10-04T23:00Z | 662 MW |
| 2026-10-05T00:00Z | 631 MW |
| 2026-10-05T01:00Z | 637 MW |
| 2026-10-05T02:00Z | 666 MW |
| 2026-10-05T03:00Z | 753 MW |
| 2026-10-05T04:00Z | 863 MW |
| 2026-10-05T05:00Z | 961 MW |
| 2026-10-05T06:00Z | 1,022 MW |
| 2026-10-05T07:00Z | 1,007 MW |
| 2026-10-05T08:00Z | 1,001 MW |
| 2026-10-05T09:00Z | 1,044 MW |
| 2026-10-05T10:00Z | 1,072 MW |
| 2026-10-05T11:00Z | 1,085 MW |
| 2026-10-05T12:00Z | 1,056 MW |
| 2026-10-05T13:00Z | 1,022 MW |
| 2026-10-05T14:00Z | 972 MW |
| 2026-10-05T15:00Z | 979 MW |
| 2026-10-05T16:00Z | 992 MW |
| 2026-10-05T17:00Z | 977 MW |
| 2026-10-05T18:00Z | 924 MW |
| 2026-10-05T19:00Z | 863 MW |
| 2026-10-05T20:00Z | 775 MW |
| 2026-10-05T21:00Z | 704 MW |
| 2026-10-05T22:00Z | 710 MW |
| 2026-10-05T23:00Z | 656 MW |
| 2026-10-06T00:00Z | 599 MW |
| 2026-10-06T01:00Z | 610 MW |
| 2026-10-06T02:00Z | 647 MW |
| 2026-10-06T03:00Z | 765 MW |
| 2026-10-06T04:00Z | 883 MW |
| 2026-10-06T05:00Z | 986 MW |
| 2026-10-06T06:00Z | 985 MW |
| 2026-10-06T07:00Z | 1,003 MW |
| 2026-10-06T08:00Z | 1,022 MW |
| 2026-10-06T09:00Z | 1,008 MW |
| 2026-10-06T10:00Z | 1,024 MW |
| 2026-10-06T11:00Z | 949 MW |
| 2026-10-06T12:00Z | 905 MW |
| 2026-10-06T13:00Z | 932 MW |
| 2026-10-06T14:00Z | 919 MW |
| 2026-10-06T15:00Z | 899 MW |
| 2026-10-06T16:00Z | 907 MW |
| 2026-10-06T17:00Z | 947 MW |
| 2026-10-06T18:00Z | 913 MW |
| 2026-10-06T19:00Z | 833 MW |
| 2026-10-06T20:00Z | 746 MW |
| 2026-10-06T21:00Z | 714 MW |
| 2026-10-06T22:00Z | 677 MW |
| 2026-10-06T23:00Z | 685 MW |
| 2026-10-07T00:00Z | 702 MW |
| 2026-10-07T01:00Z | 721 MW |
| 2026-10-07T02:00Z | 683 MW |
| 2026-10-07T03:00Z | 761 MW |
| 2026-10-07T04:00Z | 849 MW |
| 2026-10-07T05:00Z | 985 MW |
| 2026-10-07T06:00Z | 1,063 MW |
| 2026-10-07T07:00Z | 1,096 MW |
| 2026-10-07T08:00Z | 1,053 MW |
| 2026-10-07T09:00Z | 1,042 MW |
| 2026-10-07T10:00Z | 1,071 MW |
| 2026-10-07T11:00Z | 1,071 MW |
| 2026-10-07T12:00Z | 1,063 MW |
| 2026-10-07T13:00Z | 1,089 MW |
| 2026-10-07T14:00Z | 988 MW |
| 2026-10-07T15:00Z | 917 MW |
| 2026-10-07T16:00Z | 920 MW |
| 2026-10-07T17:00Z | 944 MW |
| 2026-10-07T18:00Z | 889 MW |
| 2026-10-07T19:00Z | 821 MW |
| 2026-10-07T20:00Z | 748 MW |
| 2026-10-07T21:00Z | 709 MW |
| 2026-10-07T22:00Z | 684 MW |
| 2026-10-07T23:00Z | 653 MW |
| 2026-10-08T00:00Z | 732 MW |
| 2026-10-08T01:00Z | 749 MW |
| 2026-10-08T02:00Z | 772 MW |
| 2026-10-08T03:00Z | 845 MW |
| 2026-10-08T04:00Z | 900 MW |
| 2026-10-08T05:00Z | 972 MW |
| 2026-10-08T06:00Z | 931 MW |
| 2026-10-08T07:00Z | 888 MW |
| 2026-10-08T08:00Z | 932 MW |
| 2026-10-08T09:00Z | 935 MW |
| 2026-10-08T10:00Z | 1,021 MW |
| 2026-10-08T11:00Z | 981 MW |
| 2026-10-08T12:00Z | 991 MW |
| 2026-10-08T13:00Z | 988 MW |
| 2026-10-08T14:00Z | 949 MW |
| 2026-10-08T15:00Z | 904 MW |
| 2026-10-08T16:00Z | 900 MW |
| 2026-10-08T17:00Z | 881 MW |
| 2026-10-08T18:00Z | 871 MW |
| 2026-10-08T19:00Z | 791 MW |
| 2026-10-08T20:00Z | 772 MW |
| 2026-10-08T21:00Z | 717 MW |
| 2026-10-08T22:00Z | 655 MW |
| 2026-10-08T23:00Z | 669 MW |
| 2026-10-09T00:00Z | 669 MW |
| 2026-10-09T01:00Z | 699 MW |
| 2026-10-09T02:00Z | 753 MW |
| 2026-10-09T03:00Z | 804 MW |
| 2026-10-09T04:00Z | 910 MW |
| 2026-10-09T05:00Z | 1,004 MW |
| 2026-10-09T06:00Z | 1,013 MW |
| 2026-10-09T07:00Z | 1,025 MW |
| 2026-10-09T08:00Z | 1,011 MW |
| 2026-10-09T09:00Z | 1,022 MW |
| 2026-10-09T10:00Z | 1,127 MW |
| 2026-10-09T11:00Z | 1,098 MW |
| 2026-10-09T12:00Z | 1,044 MW |
| 2026-10-09T13:00Z | 999 MW |
| 2026-10-09T14:00Z | 965 MW |
| 2026-10-09T15:00Z | 930 MW |
| 2026-10-09T16:00Z | 912 MW |
| 2026-10-09T17:00Z | 900 MW |
| 2026-10-09T18:00Z | 846 MW |
| 2026-10-09T19:00Z | 768 MW |
| 2026-10-09T20:00Z | 747 MW |
| 2026-10-09T21:00Z | 744 MW |
| 2026-10-09T22:00Z | 728 MW |
| 2026-10-09T23:00Z | 677 MW |
| 2026-10-10T00:00Z | 659 MW |
| 2026-10-10T01:00Z | 674 MW |
| 2026-10-10T02:00Z | 720 MW |
| 2026-10-10T03:00Z | 744 MW |
| 2026-10-10T04:00Z | 731 MW |
| 2026-10-10T05:00Z | 784 MW |
| 2026-10-10T06:00Z | 812 MW |
| 2026-10-10T07:00Z | 828 MW |
| 2026-10-10T08:00Z | 798 MW |
| 2026-10-10T09:00Z | 781 MW |
| 2026-10-10T10:00Z | 850 MW |
| 2026-10-10T11:00Z | 858 MW |
| 2026-10-10T12:00Z | 852 MW |
| 2026-10-10T13:00Z | 833 MW |
| 2026-10-10T14:00Z | 798 MW |
| 2026-10-10T15:00Z | 848 MW |
| 2026-10-10T16:00Z | 887 MW |
| 2026-10-10T17:00Z | 884 MW |
| 2026-10-10T18:00Z | 816 MW |
| 2026-10-10T19:00Z | 767 MW |
| 2026-10-10T20:00Z | 742 MW |
| 2026-10-10T21:00Z | 666 MW |
| 2026-10-10T22:00Z | 633 MW |
| 2026-10-10T23:00Z | 639 MW |
| 2026-10-11T00:00Z | 601 MW |
| 2026-10-11T01:00Z | 611 MW |
| 2026-10-11T02:00Z | 620 MW |
| 2026-10-11T03:00Z | 623 MW |
| 2026-10-11T04:00Z | 611 MW |
| 2026-10-11T05:00Z | 682 MW |
| 2026-10-11T06:00Z | 751 MW |
| 2026-10-11T07:00Z | 840 MW |
| 2026-10-11T08:00Z | 885 MW |
| 2026-10-11T09:00Z | 942 MW |
| 2026-10-11T10:00Z | 1,013 MW |
| 2026-10-11T11:00Z | 1,053 MW |
| 2026-10-11T12:00Z | 938 MW |
| 2026-10-11T13:00Z | 919 MW |
| 2026-10-11T14:00Z | 850 MW |
| 2026-10-11T15:00Z | 808 MW |
| 2026-10-11T16:00Z | 828 MW |
| 2026-10-11T17:00Z | 888 MW |
| 2026-10-11T18:00Z | 857 MW |
| 2026-10-11T19:00Z | 779 MW |
| 2026-10-11T20:00Z | 727 MW |
| 2026-10-11T21:00Z | 730 MW |
| 2026-10-11T22:00Z | 750 MW |
| 2026-10-11T23:00Z | 758 MW |
| 2026-10-12T00:00Z | 694 MW |
| 2026-10-12T01:00Z | 691 MW |
| 2026-10-12T02:00Z | 740 MW |
| 2026-10-12T03:00Z | 783 MW |
| 2026-10-12T04:00Z | 829 MW |
| 2026-10-12T05:00Z | 887 MW |
| 2026-10-12T06:00Z | 985 MW |
| 2026-10-12T07:00Z | 993 MW |
| 2026-10-12T08:00Z | 1,058 MW |
| 2026-10-12T09:00Z | 1,106 MW |
| 2026-10-12T10:00Z | 1,146 MW |
| 2026-10-12T11:00Z | 1,165 MW |
| 2026-10-12T12:00Z | 974 MW |
| 2026-10-12T13:00Z | 942 MW |
| 2026-10-12T14:00Z | 915 MW |
| 2026-10-12T15:00Z | 931 MW |
| 2026-10-12T16:00Z | 943 MW |
| 2026-10-12T17:00Z | 950 MW |
| 2026-10-12T18:00Z | 927 MW |
| 2026-10-12T19:00Z | 851 MW |
| 2026-10-12T20:00Z | 782 MW |
| 2026-10-12T21:00Z | 798 MW |
| 2026-10-12T22:00Z | 667 MW |
| 2026-10-12T23:00Z | 714 MW |
| 2026-10-13T00:00Z | 732 MW |
| 2026-10-13T01:00Z | 763 MW |
| 2026-10-13T02:00Z | 761 MW |
| 2026-10-13T03:00Z | 782 MW |
| 2026-10-13T04:00Z | 886 MW |
| 2026-10-13T05:00Z | 931 MW |
| 2026-10-13T06:00Z | 986 MW |
| 2026-10-13T07:00Z | 1,065 MW |
| 2026-10-13T08:00Z | 1,078 MW |
| 2026-10-13T09:00Z | 1,170 MW |
| 2026-10-13T10:00Z | 1,190 MW |
| 2026-10-13T11:00Z | 1,108 MW |
| 2026-10-13T12:00Z | 1,050 MW |
| 2026-10-13T13:00Z | 1,005 MW |
| 2026-10-13T14:00Z | 963 MW |
| 2026-10-13T15:00Z | 950 MW |
| 2026-10-13T16:00Z | 954 MW |
| 2026-10-13T17:00Z | 1,025 MW |
| 2026-10-13T18:00Z | 942 MW |
| 2026-10-13T19:00Z | 873 MW |
| 2026-10-13T20:00Z | 804 MW |
| 2026-10-13T21:00Z | 738 MW |
| 2026-10-13T22:00Z | 697 MW |
| 2026-10-13T23:00Z | 686 MW |
| 2026-10-14T00:00Z | 747 MW |
| 2026-10-14T01:00Z | 745 MW |
| 2026-10-14T02:00Z | 766 MW |
| 2026-10-14T03:00Z | 869 MW |
| 2026-10-14T04:00Z | 980 MW |
| 2026-10-14T05:00Z | 938 MW |
| 2026-10-14T06:00Z | 1,033 MW |
| 2026-10-14T07:00Z | 1,141 MW |
| 2026-10-14T08:00Z | 1,179 MW |
| 2026-10-14T09:00Z | 1,141 MW |
| 2026-10-14T10:00Z | 1,144 MW |
| 2026-10-14T11:00Z | 1,100 MW |
| 2026-10-14T12:00Z | 1,035 MW |
| 2026-10-14T13:00Z | 1,000 MW |
| 2026-10-14T14:00Z | 951 MW |
| 2026-10-14T15:00Z | 969 MW |
| 2026-10-14T16:00Z | 943 MW |
| 2026-10-14T17:00Z | 912 MW |
| 2026-10-14T18:00Z | 831 MW |
| 2026-10-14T19:00Z | 770 MW |
| 2026-10-14T20:00Z | 757 MW |
| 2026-10-14T21:00Z | 685 MW |
| 2026-10-14T22:00Z | 685 MW |
| 2026-10-14T23:00Z | 706 MW |
| 2026-10-15T00:00Z | 790 MW |
| 2026-10-15T01:00Z | 739 MW |
| 2026-10-15T02:00Z | 719 MW |
| 2026-10-15T03:00Z | 803 MW |
| 2026-10-15T04:00Z | 911 MW |
| 2026-10-15T05:00Z | 945 MW |
| 2026-10-15T06:00Z | 981 MW |
| 2026-10-15T07:00Z | 1,083 MW |
| 2026-10-15T08:00Z | 1,107 MW |
| 2026-10-15T09:00Z | 1,122 MW |
| 2026-10-15T10:00Z | 1,122 MW |
| 2026-10-15T11:00Z | 1,200 MW |
| 2026-10-15T12:00Z | 1,107 MW |
| 2026-10-15T13:00Z | 996 MW |
| 2026-10-15T14:00Z | 968 MW |
| 2026-10-15T15:00Z | 928 MW |
| 2026-10-15T16:00Z | 983 MW |
| 2026-10-15T17:00Z | 1,008 MW |
| 2026-10-15T18:00Z | 940 MW |
| 2026-10-15T19:00Z | 872 MW |
| 2026-10-15T20:00Z | 784 MW |
| 2026-10-15T21:00Z | 734 MW |
| 2026-10-15T22:00Z | 696 MW |
| 2026-10-15T23:00Z | 748 MW |
| 2026-10-16T00:00Z | 789 MW |
| 2026-10-16T01:00Z | 741 MW |
| 2026-10-16T02:00Z | 710 MW |
| 2026-10-16T03:00Z | 822 MW |
| 2026-10-16T04:00Z | 837 MW |
| 2026-10-16T05:00Z | 882 MW |
| 2026-10-16T06:00Z | 984 MW |
| 2026-10-16T07:00Z | 1,025 MW |
| 2026-10-16T08:00Z | 1,104 MW |
| 2026-10-16T09:00Z | 1,078 MW |
| 2026-10-16T10:00Z | 1,035 MW |
| 2026-10-16T11:00Z | 1,029 MW |
| 2026-10-16T12:00Z | 974 MW |
| 2026-10-16T13:00Z | 928 MW |
| 2026-10-16T14:00Z | 907 MW |
| 2026-10-16T15:00Z | 889 MW |
| 2026-10-16T16:00Z | 878 MW |
| 2026-10-16T17:00Z | 886 MW |
| 2026-10-16T18:00Z | 844 MW |
| 2026-10-16T19:00Z | 831 MW |
| 2026-10-16T20:00Z | 785 MW |
| 2026-10-16T21:00Z | 787 MW |
| 2026-10-16T22:00Z | 705 MW |
| 2026-10-16T23:00Z | 653 MW |
| 2026-10-17T00:00Z | 663 MW |
| 2026-10-17T01:00Z | 634 MW |
| 2026-10-17T02:00Z | 643 MW |
| 2026-10-17T03:00Z | 677 MW |
| 2026-10-17T04:00Z | 756 MW |
| 2026-10-17T05:00Z | 781 MW |
| 2026-10-17T06:00Z | 871 MW |
| 2026-10-17T07:00Z | 913 MW |
| 2026-10-17T08:00Z | 940 MW |
| 2026-10-17T09:00Z | 1,025 MW |
| 2026-10-17T10:00Z | 990 MW |
| 2026-10-17T11:00Z | 924 MW |
| 2026-10-17T12:00Z | 906 MW |
| 2026-10-17T13:00Z | 882 MW |
| 2026-10-17T14:00Z | 852 MW |
| 2026-10-17T15:00Z | 848 MW |
| 2026-10-17T16:00Z | 877 MW |
| 2026-10-17T17:00Z | 813 MW |
| 2026-10-17T18:00Z | 815 MW |
| 2026-10-17T19:00Z | 783 MW |
| 2026-10-17T20:00Z | 743 MW |
| 2026-10-17T21:00Z | 672 MW |
| 2026-10-17T22:00Z | 678 MW |
| 2026-10-17T23:00Z | 674 MW |
| 2026-10-18T00:00Z | 761 MW |
| 2026-10-18T01:00Z | 742 MW |
| 2026-10-18T02:00Z | 670 MW |
| 2026-10-18T03:00Z | 683 MW |
| 2026-10-18T04:00Z | 715 MW |
| 2026-10-18T05:00Z | 729 MW |
| 2026-10-18T06:00Z | 815 MW |
| 2026-10-18T07:00Z | 890 MW |
| 2026-10-18T08:00Z | 889 MW |
| 2026-10-18T09:00Z | 839 MW |
| 2026-10-18T10:00Z | 811 MW |
| 2026-10-18T11:00Z | 818 MW |
| 2026-10-18T12:00Z | 808 MW |
| 2026-10-18T13:00Z | 814 MW |
| 2026-10-18T14:00Z | 821 MW |
| 2026-10-18T15:00Z | 847 MW |
| 2026-10-18T16:00Z | 809 MW |
| 2026-10-18T17:00Z | 837 MW |
| 2026-10-18T18:00Z | 875 MW |
| 2026-10-18T19:00Z | 850 MW |
| 2026-10-18T20:00Z | 797 MW |
| 2026-10-18T21:00Z | 694 MW |
| 2026-10-18T22:00Z | 641 MW |
| 2026-10-18T23:00Z | 623 MW |
| 2026-10-19T00:00Z | 709 MW |
| 2026-10-19T01:00Z | 695 MW |
| 2026-10-19T02:00Z | 660 MW |
| 2026-10-19T03:00Z | 777 MW |
| 2026-10-19T04:00Z | 853 MW |
| 2026-10-19T05:00Z | 974 MW |
| 2026-10-19T06:00Z | 1,071 MW |
| 2026-10-19T07:00Z | 1,092 MW |
| 2026-10-19T08:00Z | 1,054 MW |
| 2026-10-19T09:00Z | 1,062 MW |
| 2026-10-19T10:00Z | 1,083 MW |
| 2026-10-19T11:00Z | 1,032 MW |
| 2026-10-19T12:00Z | 1,029 MW |
| 2026-10-19T13:00Z | 1,061 MW |
| 2026-10-19T14:00Z | 996 MW |
| 2026-10-19T15:00Z | 949 MW |
| 2026-10-19T16:00Z | 977 MW |
| 2026-10-19T17:00Z | 971 MW |
| 2026-10-19T18:00Z | 935 MW |
| 2026-10-19T19:00Z | 843 MW |
| 2026-10-19T20:00Z | 788 MW |
| 2026-10-19T21:00Z | 751 MW |
| 2026-10-19T22:00Z | 711 MW |
| 2026-10-19T23:00Z | 674 MW |
| 2026-10-20T00:00Z | 661 MW |
| 2026-10-20T01:00Z | 689 MW |
| 2026-10-20T02:00Z | 790 MW |
| 2026-10-20T03:00Z | 891 MW |
| 2026-10-20T04:00Z | 855 MW |
| 2026-10-20T05:00Z | 967 MW |
| 2026-10-20T06:00Z | 1,079 MW |
| 2026-10-20T07:00Z | 1,091 MW |
| 2026-10-20T08:00Z | 1,090 MW |
| 2026-10-20T09:00Z | 1,095 MW |
| 2026-10-20T10:00Z | 1,086 MW |
| 2026-10-20T11:00Z | 1,146 MW |
| 2026-10-20T12:00Z | 1,060 MW |
| 2026-10-20T13:00Z | 1,056 MW |
| 2026-10-20T14:00Z | 941 MW |
| 2026-10-20T15:00Z | 981 MW |
| 2026-10-20T16:00Z | 1,062 MW |
| 2026-10-20T17:00Z | 983 MW |
| 2026-10-20T18:00Z | 922 MW |
| 2026-10-20T19:00Z | 896 MW |
| 2026-10-20T20:00Z | 874 MW |
| 2026-10-20T21:00Z | 812 MW |
| 2026-10-20T22:00Z | 740 MW |
| 2026-10-20T23:00Z | 716 MW |
| 2026-10-21T00:00Z | 743 MW |
| 2026-10-21T01:00Z | 796 MW |
| 2026-10-21T02:00Z | 808 MW |
| 2026-10-21T03:00Z | 864 MW |
| 2026-10-21T04:00Z | 878 MW |
| 2026-10-21T05:00Z | 964 MW |
| 2026-10-21T06:00Z | 1,029 MW |
| 2026-10-21T07:00Z | n/a |
| 2026-10-21T08:00Z | 2,104 MW |
| 2026-10-21T09:00Z | 993 MW |
| 2026-10-21T10:00Z | 1,003 MW |
| 2026-10-21T11:00Z | 1,042 MW |
| 2026-10-21T12:00Z | 1,023 MW |
| 2026-10-21T13:00Z | 964 MW |
| 2026-10-21T14:00Z | 832 MW |
| 2026-10-21T15:00Z | 858 MW |
| 2026-10-21T16:00Z | 935 MW |
| 2026-10-21T17:00Z | 956 MW |
| 2026-10-21T18:00Z | 890 MW |
| 2026-10-21T19:00Z | 849 MW |
| 2026-10-21T20:00Z | 797 MW |
| 2026-10-21T21:00Z | 723 MW |
| 2026-10-21T22:00Z | 741 MW |
| 2026-10-21T23:00Z | 690 MW |
| 2026-10-22T00:00Z | 720 MW |
| 2026-10-22T01:00Z | 803 MW |
| 2026-10-22T02:00Z | 839 MW |
| 2026-10-22T03:00Z | 821 MW |
| 2026-10-22T04:00Z | 916 MW |
| 2026-10-22T05:00Z | 976 MW |
| 2026-10-22T06:00Z | 992 MW |
| 2026-10-22T07:00Z | 1,116 MW |
| 2026-10-22T08:00Z | 1,198 MW |
| 2026-10-22T09:00Z | 1,152 MW |
| 2026-10-22T10:00Z | 1,149 MW |
| 2026-10-22T11:00Z | 1,109 MW |
| 2026-10-22T12:00Z | 1,084 MW |
| 2026-10-22T13:00Z | 976 MW |
| 2026-10-22T14:00Z | 926 MW |
| 2026-10-22T15:00Z | 951 MW |
| 2026-10-22T16:00Z | 962 MW |
| 2026-10-22T17:00Z | 964 MW |
| 2026-10-22T18:00Z | 955 MW |
| 2026-10-22T19:00Z | 882 MW |
| 2026-10-22T20:00Z | 820 MW |
| 2026-10-22T21:00Z | 769 MW |
| 2026-10-22T22:00Z | 639 MW |
| 2026-10-22T23:00Z | 662 MW |
| 2026-10-23T00:00Z | 728 MW |
| 2026-10-23T01:00Z | 723 MW |
| 2026-10-23T02:00Z | 669 MW |
| 2026-10-23T03:00Z | 744 MW |
| 2026-10-23T04:00Z | 844 MW |
| 2026-10-23T05:00Z | 923 MW |
| 2026-10-23T06:00Z | 936 MW |
| 2026-10-23T07:00Z | 963 MW |
| 2026-10-23T08:00Z | 1,054 MW |
| 2026-10-23T09:00Z | 1,013 MW |
| 2026-10-23T10:00Z | 1,114 MW |
| 2026-10-23T11:00Z | 1,111 MW |
| 2026-10-23T12:00Z | 1,052 MW |
| 2026-10-23T13:00Z | 1,021 MW |
| 2026-10-23T14:00Z | 912 MW |
| 2026-10-23T15:00Z | 982 MW |
| 2026-10-23T16:00Z | 983 MW |
| 2026-10-23T17:00Z | 958 MW |
| 2026-10-23T18:00Z | 879 MW |
| 2026-10-23T19:00Z | 826 MW |
| 2026-10-23T20:00Z | 754 MW |
| 2026-10-23T21:00Z | 734 MW |
| 2026-10-23T22:00Z | 721 MW |
| 2026-10-23T23:00Z | 699 MW |
| 2026-10-24T00:00Z | 710 MW |
| 2026-10-24T01:00Z | 724 MW |
| 2026-10-24T02:00Z | 798 MW |
| 2026-10-24T03:00Z | 803 MW |
| 2026-10-24T04:00Z | 789 MW |
| 2026-10-24T05:00Z | 800 MW |
| 2026-10-24T06:00Z | 918 MW |
| 2026-10-24T07:00Z | 971 MW |
| 2026-10-24T08:00Z | 944 MW |
| 2026-10-24T09:00Z | 931 MW |
| 2026-10-24T10:00Z | 941 MW |
| 2026-10-24T11:00Z | 959 MW |
| 2026-10-24T12:00Z | 907 MW |
| 2026-10-24T13:00Z | 883 MW |
| 2026-10-24T14:00Z | 864 MW |
| 2026-10-24T15:00Z | 871 MW |
| 2026-10-24T16:00Z | 868 MW |
| 2026-10-24T17:00Z | 910 MW |
| 2026-10-24T18:00Z | 873 MW |
| 2026-10-24T19:00Z | 818 MW |
| 2026-10-24T20:00Z | 754 MW |
| 2026-10-24T21:00Z | 736 MW |
| 2026-10-24T22:00Z | 705 MW |
| 2026-10-24T23:00Z | 679 MW |
| 2026-10-25T00:00Z | 657 MW |
| 2026-10-25T01:00Z | 686 MW |
| 2026-10-25T02:00Z | 672 MW |
| 2026-10-25T03:00Z | 688 MW |
| 2026-10-25T04:00Z | 745 MW |
| 2026-10-25T05:00Z | 729 MW |
| 2026-10-25T06:00Z | 812 MW |
| 2026-10-25T07:00Z | 876 MW |
| 2026-10-25T08:00Z | 861 MW |
| 2026-10-25T09:00Z | 885 MW |
| 2026-10-25T10:00Z | 893 MW |
| 2026-10-25T11:00Z | 929 MW |
| 2026-10-25T12:00Z | 874 MW |
| 2026-10-25T13:00Z | 889 MW |
| 2026-10-25T14:00Z | 844 MW |
| 2026-10-25T15:00Z | 927 MW |
| 2026-10-25T16:00Z | 958 MW |
| 2026-10-25T17:00Z | 915 MW |
| 2026-10-25T18:00Z | 901 MW |
| 2026-10-25T19:00Z | 855 MW |
| 2026-10-25T20:00Z | 776 MW |
| 2026-10-25T21:00Z | 727 MW |
| 2026-10-25T22:00Z | 685 MW |
| 2026-10-25T23:00Z | 716 MW |
| 2026-10-26T00:00Z | 701 MW |
| 2026-10-26T01:00Z | 646 MW |
| 2026-10-26T02:00Z | 676 MW |
| 2026-10-26T03:00Z | 702 MW |
| 2026-10-26T04:00Z | 795 MW |
| 2026-10-26T05:00Z | 914 MW |
| 2026-10-26T06:00Z | 1,008 MW |
| 2026-10-26T07:00Z | 1,044 MW |
| 2026-10-26T08:00Z | 1,055 MW |
| 2026-10-26T09:00Z | 1,039 MW |
| 2026-10-26T10:00Z | 1,015 MW |
| 2026-10-26T11:00Z | 1,058 MW |
| 2026-10-26T12:00Z | 1,090 MW |
| 2026-10-26T13:00Z | 1,029 MW |
| 2026-10-26T14:00Z | 1,036 MW |
| 2026-10-26T15:00Z | 1,060 MW |
| 2026-10-26T16:00Z | 1,041 MW |
| 2026-10-26T17:00Z | 1,026 MW |
| 2026-10-26T18:00Z | 1,029 MW |
| 2026-10-26T19:00Z | 919 MW |
| 2026-10-26T20:00Z | 852 MW |
| 2026-10-26T21:00Z | 829 MW |
| 2026-10-26T22:00Z | 709 MW |
| 2026-10-26T23:00Z | 731 MW |
| 2026-10-27T00:00Z | 771 MW |
| 2026-10-27T01:00Z | 749 MW |
| 2026-10-27T02:00Z | 717 MW |
| 2026-10-27T03:00Z | 702 MW |
| 2026-10-27T04:00Z | 726 MW |
| 2026-10-27T05:00Z | 789 MW |
| 2026-10-27T06:00Z | 1,000 MW |
| 2026-10-27T07:00Z | 1,062 MW |
| 2026-10-27T08:00Z | 1,079 MW |
| 2026-10-27T09:00Z | 1,169 MW |
| 2026-10-27T10:00Z | 1,073 MW |
| 2026-10-27T11:00Z | 1,059 MW |
| 2026-10-27T12:00Z | 1,030 MW |
| 2026-10-27T13:00Z | 992 MW |
| 2026-10-27T14:00Z | 941 MW |
| 2026-10-27T15:00Z | 1,064 MW |
| 2026-10-27T16:00Z | 1,054 MW |
| 2026-10-27T17:00Z | 1,024 MW |
| 2026-10-27T18:00Z | 989 MW |
| 2026-10-27T19:00Z | 944 MW |
| 2026-10-27T20:00Z | 890 MW |
| 2026-10-27T21:00Z | 784 MW |
| 2026-10-27T22:00Z | 704 MW |
| 2026-10-27T23:00Z | 734 MW |
| 2026-10-28T00:00Z | 706 MW |
| 2026-10-28T01:00Z | 631 MW |
| 2026-10-28T02:00Z | 602 MW |
| 2026-10-28T03:00Z | 678 MW |
| 2026-10-28T04:00Z | 780 MW |
| 2026-10-28T05:00Z | 845 MW |
| 2026-10-28T06:00Z | 985 MW |
| 2026-10-28T07:00Z | 1,091 MW |
| 2026-10-28T08:00Z | 1,104 MW |
| 2026-10-28T09:00Z | 1,179 MW |
| 2026-10-28T10:00Z | 1,145 MW |
| 2026-10-28T11:00Z | 1,168 MW |
| 2026-10-28T12:00Z | 1,078 MW |
Show the data table (687 rows)
| Hour starting (UTC) | Hydro | Solar | Wind | Gas | Bioenergy |
|---|---|---|---|---|---|
| 2026-09-29T22:00Z | 410 MW | 0 MW | 10 MW | 0 MW | 22 MW |
| 2026-09-29T23:00Z | 412 MW | 0 MW | 4 MW | 0 MW | 22 MW |
| 2026-09-30T00:00Z | 501 MW | 0 MW | 10 MW | 0 MW | 23 MW |
| 2026-09-30T01:00Z | 500 MW | 0 MW | 18 MW | 0 MW | 22 MW |
| 2026-09-30T02:00Z | 539 MW | 1 MW | 8 MW | 0 MW | 23 MW |
| 2026-09-30T03:00Z | 555 MW | 1 MW | 2 MW | 1 MW | 27 MW |
| 2026-09-30T04:00Z | 731 MW | 43 MW | 10 MW | 2 MW | 39 MW |
| 2026-09-30T05:00Z | 740 MW | 114 MW | 10 MW | 1 MW | 45 MW |
| 2026-09-30T06:00Z | 542 MW | 193 MW | 3 MW | 2 MW | 54 MW |
| 2026-09-30T07:00Z | 487 MW | 297 MW | 2 MW | 0 MW | 33 MW |
| 2026-09-30T08:00Z | 393 MW | 378 MW | 3 MW | 0 MW | 29 MW |
| 2026-09-30T09:00Z | 372 MW | 425 MW | 0 MW | 0 MW | 35 MW |
| 2026-09-30T10:00Z | 297 MW | 379 MW | 0 MW | 0 MW | 31 MW |
| 2026-09-30T11:00Z | 289 MW | 323 MW | 0 MW | 0 MW | 28 MW |
| 2026-09-30T12:00Z | 281 MW | 225 MW | 0 MW | 1 MW | 29 MW |
| 2026-09-30T13:00Z | 264 MW | 134 MW | 2 MW | 0 MW | 33 MW |
| 2026-09-30T14:00Z | 284 MW | 42 MW | 7 MW | 1 MW | 29 MW |
| 2026-09-30T15:00Z | 607 MW | 7 MW | 31 MW | 5 MW | 54 MW |
| 2026-09-30T16:00Z | 680 MW | 3 MW | 53 MW | 6 MW | 58 MW |
| 2026-09-30T17:00Z | 673 MW | 0 MW | 44 MW | 6 MW | 48 MW |
| 2026-09-30T18:00Z | 572 MW | 0 MW | 24 MW | 6 MW | 31 MW |
| 2026-09-30T19:00Z | 464 MW | 0 MW | 15 MW | 7 MW | 24 MW |
| 2026-09-30T20:00Z | 474 MW | 0 MW | 22 MW | 0 MW | 18 MW |
| 2026-09-30T21:00Z | 475 MW | 0 MW | 57 MW | 0 MW | 20 MW |
| 2026-09-30T22:00Z | 427 MW | 0 MW | 60 MW | 0 MW | 21 MW |
| 2026-09-30T23:00Z | 428 MW | 2 MW | 56 MW | 0 MW | 15 MW |
| 2026-10-01T00:00Z | 400 MW | 0 MW | 47 MW | 0 MW | 16 MW |
| 2026-10-01T01:00Z | 430 MW | 0 MW | 42 MW | 0 MW | 15 MW |
| 2026-10-01T02:00Z | 494 MW | 0 MW | 47 MW | 0 MW | 11 MW |
| 2026-10-01T03:00Z | 586 MW | 20 MW | 44 MW | 0 MW | 18 MW |
| 2026-10-01T04:00Z | 591 MW | 63 MW | 57 MW | 0 MW | 33 MW |
| 2026-10-01T05:00Z | 585 MW | 204 MW | 59 MW | 0 MW | 38 MW |
| 2026-10-01T06:00Z | 296 MW | 393 MW | 33 MW | 0 MW | 35 MW |
| 2026-10-01T07:00Z | 291 MW | 599 MW | 17 MW | 1 MW | 27 MW |
| 2026-10-01T08:00Z | 203 MW | 749 MW | 10 MW | 0 MW | 28 MW |
| 2026-10-01T09:00Z | 203 MW | 802 MW | 8 MW | 0 MW | 30 MW |
| 2026-10-01T10:00Z | 203 MW | 794 MW | 14 MW | 0 MW | 31 MW |
| 2026-10-01T11:00Z | 205 MW | 731 MW | 12 MW | 0 MW | 21 MW |
| 2026-10-01T12:00Z | 206 MW | 580 MW | 9 MW | 1 MW | 17 MW |
| 2026-10-01T13:00Z | 294 MW | 374 MW | 18 MW | 0 MW | 15 MW |
| 2026-10-01T14:00Z | 416 MW | 123 MW | 23 MW | 0 MW | 17 MW |
| 2026-10-01T15:00Z | 522 MW | 15 MW | 26 MW | 0 MW | 35 MW |
| 2026-10-01T16:00Z | 539 MW | 13 MW | 57 MW | 1 MW | 34 MW |
| 2026-10-01T17:00Z | 540 MW | 1 MW | 74 MW | 0 MW | 28 MW |
| 2026-10-01T18:00Z | 451 MW | 1 MW | 82 MW | 0 MW | 21 MW |
| 2026-10-01T19:00Z | 310 MW | 2 MW | 94 MW | 0 MW | 15 MW |
| 2026-10-01T20:00Z | 312 MW | 0 MW | 111 MW | 0 MW | 14 MW |
| 2026-10-01T21:00Z | 290 MW | 1 MW | 107 MW | 0 MW | 15 MW |
| 2026-10-01T22:00Z | 259 MW | 0 MW | 88 MW | 0 MW | 15 MW |
| 2026-10-01T23:00Z | 260 MW | 0 MW | 68 MW | 0 MW | 14 MW |
| 2026-10-02T00:00Z | 270 MW | 3 MW | 61 MW | 0 MW | 14 MW |
| 2026-10-02T01:00Z | 230 MW | 0 MW | 51 MW | 0 MW | 15 MW |
| 2026-10-02T02:00Z | 230 MW | 0 MW | 46 MW | 0 MW | 16 MW |
| 2026-10-02T03:00Z | 459 MW | 2 MW | 39 MW | 0 MW | 17 MW |
| 2026-10-02T04:00Z | 661 MW | 90 MW | 49 MW | 0 MW | 31 MW |
| 2026-10-02T05:00Z | 671 MW | 308 MW | 35 MW | 0 MW | 37 MW |
| 2026-10-02T06:00Z | 559 MW | 567 MW | 21 MW | 0 MW | 29 MW |
| 2026-10-02T07:00Z | 517 MW | 749 MW | 15 MW | 0 MW | 22 MW |
| 2026-10-02T08:00Z | 442 MW | 902 MW | 15 MW | 0 MW | 19 MW |
| 2026-10-02T09:00Z | 388 MW | 978 MW | 15 MW | 0 MW | 19 MW |
| 2026-10-02T10:00Z | 325 MW | 855 MW | 18 MW | 0 MW | 28 MW |
| 2026-10-02T11:00Z | 270 MW | 788 MW | 20 MW | 0 MW | 37 MW |
| 2026-10-02T12:00Z | 380 MW | 710 MW | 19 MW | 1 MW | 51 MW |
| 2026-10-02T13:00Z | 434 MW | 445 MW | 20 MW | 0 MW | 68 MW |
| 2026-10-02T14:00Z | 525 MW | 138 MW | 23 MW | 0 MW | 61 MW |
| 2026-10-02T15:00Z | 641 MW | 9 MW | 35 MW | 0 MW | 81 MW |
| 2026-10-02T16:00Z | 642 MW | 1 MW | 48 MW | 0 MW | 53 MW |
| 2026-10-02T17:00Z | 622 MW | 1 MW | 82 MW | 0 MW | 39 MW |
| 2026-10-02T18:00Z | 644 MW | 0 MW | 89 MW | 0 MW | 14 MW |
| 2026-10-02T19:00Z | 469 MW | 0 MW | 99 MW | 0 MW | 16 MW |
| 2026-10-02T20:00Z | 235 MW | 0 MW | 86 MW | 0 MW | 12 MW |
| 2026-10-02T21:00Z | 231 MW | 0 MW | 86 MW | 0 MW | 15 MW |
| 2026-10-02T22:00Z | 260 MW | 0 MW | 78 MW | 0 MW | 15 MW |
| 2026-10-02T23:00Z | 260 MW | 0 MW | 90 MW | 0 MW | 14 MW |
| 2026-10-03T00:00Z | 269 MW | 1 MW | 91 MW | 0 MW | 15 MW |
| 2026-10-03T01:00Z | 307 MW | 0 MW | 81 MW | 0 MW | 13 MW |
| 2026-10-03T02:00Z | 274 MW | 0 MW | 66 MW | 0 MW | 12 MW |
| 2026-10-03T03:00Z | 530 MW | 3 MW | 59 MW | 0 MW | 14 MW |
| 2026-10-03T04:00Z | 561 MW | 89 MW | 64 MW | 1 MW | 17 MW |
| 2026-10-03T05:00Z | 434 MW | 300 MW | 52 MW | 0 MW | 20 MW |
| 2026-10-03T06:00Z | 309 MW | 514 MW | 43 MW | 0 MW | 17 MW |
| 2026-10-03T07:00Z | 230 MW | 659 MW | 33 MW | 0 MW | 15 MW |
| 2026-10-03T08:00Z | 114 MW | 702 MW | 15 MW | 1 MW | 16 MW |
| 2026-10-03T09:00Z | 113 MW | 713 MW | 13 MW | 0 MW | 15 MW |
| 2026-10-03T10:00Z | 114 MW | 637 MW | 6 MW | 0 MW | 14 MW |
| 2026-10-03T11:00Z | 146 MW | 566 MW | 17 MW | 0 MW | 14 MW |
| 2026-10-03T12:00Z | 233 MW | 419 MW | 22 MW | 0 MW | 29 MW |
| 2026-10-03T13:00Z | 236 MW | 245 MW | 21 MW | 0 MW | 24 MW |
| 2026-10-03T14:00Z | 341 MW | 66 MW | 17 MW | 0 MW | 28 MW |
| 2026-10-03T15:00Z | 541 MW | 6 MW | 20 MW | 0 MW | 29 MW |
| 2026-10-03T16:00Z | 642 MW | 1 MW | 24 MW | 1 MW | 29 MW |
| 2026-10-03T17:00Z | 644 MW | 2 MW | 39 MW | 0 MW | 22 MW |
| 2026-10-03T18:00Z | 638 MW | 0 MW | 53 MW | 0 MW | 16 MW |
| 2026-10-03T19:00Z | 469 MW | 8 MW | 60 MW | 0 MW | 17 MW |
| 2026-10-03T20:00Z | 402 MW | 1 MW | 64 MW | 0 MW | 17 MW |
| 2026-10-03T21:00Z | 403 MW | 3 MW | 67 MW | 0 MW | 15 MW |
| 2026-10-03T22:00Z | 275 MW | 10 MW | 58 MW | 0 MW | 14 MW |
| 2026-10-03T23:00Z | 228 MW | 7 MW | 56 MW | 0 MW | 15 MW |
| 2026-10-04T00:00Z | 281 MW | 0 MW | 39 MW | 0 MW | 14 MW |
| 2026-10-04T01:00Z | 286 MW | 0 MW | 35 MW | 0 MW | 15 MW |
| 2026-10-04T02:00Z | 383 MW | 0 MW | 47 MW | 0 MW | 16 MW |
| 2026-10-04T03:00Z | 385 MW | 0 MW | 39 MW | 0 MW | 15 MW |
| 2026-10-04T04:00Z | 468 MW | 56 MW | 32 MW | 0 MW | 18 MW |
| 2026-10-04T05:00Z | 461 MW | 162 MW | 33 MW | 0 MW | 16 MW |
| 2026-10-04T06:00Z | 404 MW | 290 MW | 37 MW | 0 MW | 16 MW |
| 2026-10-04T07:00Z | 461 MW | 440 MW | 38 MW | 0 MW | 16 MW |
| 2026-10-04T08:00Z | 446 MW | 568 MW | 52 MW | 0 MW | 14 MW |
| 2026-10-04T09:00Z | 338 MW | 635 MW | 67 MW | 0 MW | 10 MW |
| 2026-10-04T10:00Z | 250 MW | 608 MW | 84 MW | 0 MW | 14 MW |
| 2026-10-04T11:00Z | 345 MW | 504 MW | 92 MW | 0 MW | 14 MW |
| 2026-10-04T12:00Z | 398 MW | 392 MW | 76 MW | 0 MW | 16 MW |
| 2026-10-04T13:00Z | 443 MW | 225 MW | 66 MW | 0 MW | 13 MW |
| 2026-10-04T14:00Z | 591 MW | 49 MW | 56 MW | 0 MW | 20 MW |
| 2026-10-04T15:00Z | 627 MW | 1 MW | 80 MW | 0 MW | 35 MW |
| 2026-10-04T16:00Z | 625 MW | 0 MW | 70 MW | 0 MW | 37 MW |
| 2026-10-04T17:00Z | 601 MW | 0 MW | 81 MW | 0 MW | 21 MW |
| 2026-10-04T18:00Z | 325 MW | 0 MW | 79 MW | 0 MW | 15 MW |
| 2026-10-04T19:00Z | 237 MW | 0 MW | 80 MW | 0 MW | 13 MW |
| 2026-10-04T20:00Z | 255 MW | 0 MW | 97 MW | 0 MW | 13 MW |
| 2026-10-04T21:00Z | 257 MW | 0 MW | 100 MW | 0 MW | 14 MW |
| 2026-10-04T22:00Z | 294 MW | 0 MW | 92 MW | 0 MW | 13 MW |
| 2026-10-04T23:00Z | 284 MW | 0 MW | 96 MW | 0 MW | 12 MW |
| 2026-10-05T00:00Z | 294 MW | 0 MW | 98 MW | 0 MW | 12 MW |
| 2026-10-05T01:00Z | 276 MW | 0 MW | 101 MW | 0 MW | 12 MW |
| 2026-10-05T02:00Z | 335 MW | 0 MW | 100 MW | 0 MW | 12 MW |
| 2026-10-05T03:00Z | 354 MW | 2 MW | 104 MW | 0 MW | 14 MW |
| 2026-10-05T04:00Z | 502 MW | 38 MW | 118 MW | 0 MW | 14 MW |
| 2026-10-05T05:00Z | 548 MW | 117 MW | 147 MW | 0 MW | 16 MW |
| 2026-10-05T06:00Z | 439 MW | 208 MW | 151 MW | 0 MW | 25 MW |
| 2026-10-05T07:00Z | 422 MW | 264 MW | 165 MW | 1 MW | 34 MW |
| 2026-10-05T08:00Z | 393 MW | 263 MW | 173 MW | 1 MW | 27 MW |
| 2026-10-05T09:00Z | 305 MW | 231 MW | 171 MW | 1 MW | 26 MW |
| 2026-10-05T10:00Z | 352 MW | 173 MW | 177 MW | 0 MW | 13 MW |
| 2026-10-05T11:00Z | 368 MW | 99 MW | 146 MW | 0 MW | 15 MW |
| 2026-10-05T12:00Z | 375 MW | 66 MW | 158 MW | 0 MW | 13 MW |
| 2026-10-05T13:00Z | 248 MW | 29 MW | 135 MW | 0 MW | 14 MW |
| 2026-10-05T14:00Z | 327 MW | 10 MW | 153 MW | 0 MW | 12 MW |
| 2026-10-05T15:00Z | 397 MW | 0 MW | 159 MW | 0 MW | 14 MW |
| 2026-10-05T16:00Z | 380 MW | 1 MW | 167 MW | 0 MW | 18 MW |
| 2026-10-05T17:00Z | 360 MW | 1 MW | 147 MW | 0 MW | 16 MW |
| 2026-10-05T18:00Z | 385 MW | 0 MW | 139 MW | 0 MW | 13 MW |
| 2026-10-05T19:00Z | 325 MW | 0 MW | 124 MW | 0 MW | 13 MW |
| 2026-10-05T20:00Z | 329 MW | 0 MW | 127 MW | 0 MW | 12 MW |
| 2026-10-05T21:00Z | 324 MW | 0 MW | 134 MW | 0 MW | 14 MW |
| 2026-10-05T22:00Z | 156 MW | 0 MW | 136 MW | 0 MW | 12 MW |
| 2026-10-05T23:00Z | 151 MW | 0 MW | 134 MW | 0 MW | 12 MW |
| 2026-10-06T00:00Z | 151 MW | 0 MW | 134 MW | 0 MW | 12 MW |
| 2026-10-06T01:00Z | 210 MW | 0 MW | 133 MW | 0 MW | 12 MW |
| 2026-10-06T02:00Z | 249 MW | 3 MW | 125 MW | 0 MW | 12 MW |
| 2026-10-06T03:00Z | 335 MW | 0 MW | 137 MW | 0 MW | 12 MW |
| 2026-10-06T04:00Z | 474 MW | 25 MW | 153 MW | 0 MW | 12 MW |
| 2026-10-06T05:00Z | 476 MW | 94 MW | 163 MW | 0 MW | 14 MW |
| 2026-10-06T06:00Z | 297 MW | 215 MW | 169 MW | 0 MW | 26 MW |
| 2026-10-06T07:00Z | 291 MW | 320 MW | 155 MW | 0 MW | 22 MW |
| 2026-10-06T08:00Z | 294 MW | 341 MW | 117 MW | 0 MW | 22 MW |
| 2026-10-06T09:00Z | 289 MW | 388 MW | 113 MW | 0 MW | 16 MW |
| 2026-10-06T10:00Z | 115 MW | 397 MW | 79 MW | 0 MW | 15 MW |
| 2026-10-06T11:00Z | 114 MW | 366 MW | 95 MW | 0 MW | 12 MW |
| 2026-10-06T12:00Z | 115 MW | 357 MW | 102 MW | 0 MW | 15 MW |
| 2026-10-06T13:00Z | 118 MW | 302 MW | 129 MW | 0 MW | 17 MW |
| 2026-10-06T14:00Z | 266 MW | 84 MW | 149 MW | 0 MW | 30 MW |
| 2026-10-06T15:00Z | 360 MW | 5 MW | 155 MW | 0 MW | 47 MW |
| 2026-10-06T16:00Z | 598 MW | 1 MW | 142 MW | 0 MW | 58 MW |
| 2026-10-06T17:00Z | 601 MW | 0 MW | 161 MW | 1 MW | 51 MW |
| 2026-10-06T18:00Z | 580 MW | 0 MW | 155 MW | 0 MW | 38 MW |
| 2026-10-06T19:00Z | 502 MW | 0 MW | 135 MW | 1 MW | 35 MW |
| 2026-10-06T20:00Z | 414 MW | 1 MW | 123 MW | 0 MW | 32 MW |
| 2026-10-06T21:00Z | 435 MW | 2 MW | 134 MW | 0 MW | 27 MW |
| 2026-10-06T22:00Z | 374 MW | 0 MW | 136 MW | 0 MW | 27 MW |
| 2026-10-06T23:00Z | 402 MW | 0 MW | 133 MW | 1 MW | 48 MW |
| 2026-10-07T00:00Z | 405 MW | 0 MW | 108 MW | 13 MW | 41 MW |
| 2026-10-07T01:00Z | 494 MW | 0 MW | 92 MW | 30 MW | 42 MW |
| 2026-10-07T02:00Z | 500 MW | 1 MW | 83 MW | 37 MW | 34 MW |
| 2026-10-07T03:00Z | 511 MW | 2 MW | 78 MW | 62 MW | 41 MW |
| 2026-10-07T04:00Z | 593 MW | 73 MW | 74 MW | 62 MW | 41 MW |
| 2026-10-07T05:00Z | 457 MW | 358 MW | 69 MW | 62 MW | 66 MW |
| 2026-10-07T06:00Z | 305 MW | 605 MW | 44 MW | 62 MW | 45 MW |
| 2026-10-07T07:00Z | 312 MW | 792 MW | 27 MW | 33 MW | 32 MW |
| 2026-10-07T08:00Z | 220 MW | 879 MW | 22 MW | 32 MW | 30 MW |
| 2026-10-07T09:00Z | 146 MW | 892 MW | 25 MW | 32 MW | 35 MW |
| 2026-10-07T10:00Z | 146 MW | 864 MW | 25 MW | 32 MW | 30 MW |
| 2026-10-07T11:00Z | 152 MW | 771 MW | 21 MW | 33 MW | 48 MW |
| 2026-10-07T12:00Z | 155 MW | 586 MW | 16 MW | 33 MW | 84 MW |
| 2026-10-07T13:00Z | 173 MW | 343 MW | 13 MW | 32 MW | 109 MW |
| 2026-10-07T14:00Z | 511 MW | 67 MW | 17 MW | 33 MW | 54 MW |
| 2026-10-07T15:00Z | 741 MW | 8 MW | 26 MW | 61 MW | 59 MW |
| 2026-10-07T16:00Z | 815 MW | 30 MW | 21 MW | 61 MW | 48 MW |
| 2026-10-07T17:00Z | 819 MW | 4 MW | 20 MW | 62 MW | 46 MW |
| 2026-10-07T18:00Z | 811 MW | 0 MW | 10 MW | 63 MW | 31 MW |
| 2026-10-07T19:00Z | 523 MW | 0 MW | 1 MW | 62 MW | 25 MW |
| 2026-10-07T20:00Z | 402 MW | 0 MW | 4 MW | 62 MW | 22 MW |
| 2026-10-07T21:00Z | 401 MW | 0 MW | 5 MW | 62 MW | 22 MW |
| 2026-10-07T22:00Z | 199 MW | 0 MW | 10 MW | 19 MW | 22 MW |
| 2026-10-07T23:00Z | 206 MW | 0 MW | 23 MW | 1 MW | 23 MW |
| 2026-10-08T00:00Z | 219 MW | 0 MW | 36 MW | 1 MW | 22 MW |
| 2026-10-08T01:00Z | 274 MW | 0 MW | 45 MW | 0 MW | 21 MW |
| 2026-10-08T02:00Z | 319 MW | 0 MW | 73 MW | 0 MW | 23 MW |
| 2026-10-08T03:00Z | 321 MW | 1 MW | 92 MW | 1 MW | 20 MW |
| 2026-10-08T04:00Z | 370 MW | 51 MW | 132 MW | 1 MW | 31 MW |
| 2026-10-08T05:00Z | 433 MW | 208 MW | 148 MW | 0 MW | 35 MW |
| 2026-10-08T06:00Z | 291 MW | 435 MW | 111 MW | 0 MW | 31 MW |
| 2026-10-08T07:00Z | 203 MW | 679 MW | 68 MW | 1 MW | 36 MW |
| 2026-10-08T08:00Z | 198 MW | 812 MW | 43 MW | 1 MW | 48 MW |
| 2026-10-08T09:00Z | 113 MW | 843 MW | 37 MW | 1 MW | 43 MW |
| 2026-10-08T10:00Z | 24 MW | 817 MW | 37 MW | 0 MW | 56 MW |
| 2026-10-08T11:00Z | 111 MW | 674 MW | 50 MW | 0 MW | 37 MW |
| 2026-10-08T12:00Z | 115 MW | 478 MW | 62 MW | 0 MW | 37 MW |
| 2026-10-08T13:00Z | 115 MW | 229 MW | 57 MW | 1 MW | 28 MW |
| 2026-10-08T14:00Z | 206 MW | 44 MW | 89 MW | 1 MW | 28 MW |
| 2026-10-08T15:00Z | 339 MW | 10 MW | 133 MW | 0 MW | 43 MW |
| 2026-10-08T16:00Z | 431 MW | 11 MW | 139 MW | 1 MW | 45 MW |
| 2026-10-08T17:00Z | 380 MW | 2 MW | 145 MW | 1 MW | 38 MW |
| 2026-10-08T18:00Z | 277 MW | 0 MW | 138 MW | 1 MW | 25 MW |
| 2026-10-08T19:00Z | 188 MW | 0 MW | 137 MW | 1 MW | 21 MW |
| 2026-10-08T20:00Z | 205 MW | 0 MW | 136 MW | 1 MW | 17 MW |
| 2026-10-08T21:00Z | 193 MW | 0 MW | 132 MW | 1 MW | 15 MW |
| 2026-10-08T22:00Z | 213 MW | 0 MW | 135 MW | 1 MW | 14 MW |
| 2026-10-08T23:00Z | 219 MW | 0 MW | 137 MW | 1 MW | 13 MW |
| 2026-10-09T00:00Z | 222 MW | 0 MW | 134 MW | 0 MW | 15 MW |
| 2026-10-09T01:00Z | 159 MW | 0 MW | 140 MW | 0 MW | 12 MW |
| 2026-10-09T02:00Z | 151 MW | 0 MW | 129 MW | 0 MW | 11 MW |
| 2026-10-09T03:00Z | 157 MW | 0 MW | 161 MW | 0 MW | 15 MW |
| 2026-10-09T04:00Z | 324 MW | 21 MW | 165 MW | 0 MW | 28 MW |
| 2026-10-09T05:00Z | 334 MW | 76 MW | 162 MW | 0 MW | 14 MW |
| 2026-10-09T06:00Z | 373 MW | 146 MW | 129 MW | 1 MW | 12 MW |
| 2026-10-09T07:00Z | 368 MW | 255 MW | 131 MW | 5 MW | 16 MW |
| 2026-10-09T08:00Z | 288 MW | 294 MW | 141 MW | 31 MW | 19 MW |
| 2026-10-09T09:00Z | 342 MW | 279 MW | 151 MW | 30 MW | 17 MW |
| 2026-10-09T10:00Z | 419 MW | 258 MW | 151 MW | 53 MW | 10 MW |
| 2026-10-09T11:00Z | 379 MW | 195 MW | 164 MW | 154 MW | 14 MW |
| 2026-10-09T12:00Z | 222 MW | 119 MW | 158 MW | 265 MW | 14 MW |
| 2026-10-09T13:00Z | 209 MW | 63 MW | 182 MW | 378 MW | 17 MW |
| 2026-10-09T14:00Z | 218 MW | 21 MW | 190 MW | 357 MW | 19 MW |
| 2026-10-09T15:00Z | 334 MW | 6 MW | 181 MW | 114 MW | 30 MW |
| 2026-10-09T16:00Z | 199 MW | 2 MW | 182 MW | 1 MW | 35 MW |
| 2026-10-09T17:00Z | 156 MW | 0 MW | 189 MW | 1 MW | 31 MW |
| 2026-10-09T18:00Z | 156 MW | 0 MW | 191 MW | 0 MW | 20 MW |
| 2026-10-09T19:00Z | 156 MW | 0 MW | 190 MW | 0 MW | 18 MW |
| 2026-10-09T20:00Z | 154 MW | 0 MW | 187 MW | 0 MW | 12 MW |
| 2026-10-09T21:00Z | 148 MW | 0 MW | 186 MW | 1 MW | 11 MW |
| 2026-10-09T22:00Z | 153 MW | 0 MW | 166 MW | 1 MW | 13 MW |
| 2026-10-09T23:00Z | 155 MW | 0 MW | 166 MW | 0 MW | 14 MW |
| 2026-10-10T00:00Z | 286 MW | 0 MW | 150 MW | 0 MW | 14 MW |
| 2026-10-10T01:00Z | 287 MW | 0 MW | 139 MW | 0 MW | 13 MW |
| 2026-10-10T02:00Z | 318 MW | 0 MW | 116 MW | 0 MW | 14 MW |
| 2026-10-10T03:00Z | 315 MW | 0 MW | 103 MW | 0 MW | 13 MW |
| 2026-10-10T04:00Z | 330 MW | 33 MW | 96 MW | 0 MW | 14 MW |
| 2026-10-10T05:00Z | 262 MW | 150 MW | 87 MW | 1 MW | 14 MW |
| 2026-10-10T06:00Z | 344 MW | 242 MW | 63 MW | 0 MW | 14 MW |
| 2026-10-10T07:00Z | 263 MW | 286 MW | 53 MW | 0 MW | 14 MW |
| 2026-10-10T08:00Z | 340 MW | 270 MW | 51 MW | 1 MW | 14 MW |
| 2026-10-10T09:00Z | 55 MW | 256 MW | 47 MW | 1 MW | 16 MW |
| 2026-10-10T10:00Z | 25 MW | 200 MW | 67 MW | 1 MW | 16 MW |
| 2026-10-10T11:00Z | 24 MW | 171 MW | 105 MW | 0 MW | 15 MW |
| 2026-10-10T12:00Z | 60 MW | 121 MW | 131 MW | 0 MW | 14 MW |
| 2026-10-10T13:00Z | 167 MW | 100 MW | 177 MW | 0 MW | 16 MW |
| 2026-10-10T14:00Z | 228 MW | 20 MW | 195 MW | 0 MW | 27 MW |
| 2026-10-10T15:00Z | 545 MW | 6 MW | 194 MW | 1 MW | 22 MW |
| 2026-10-10T16:00Z | 547 MW | 1 MW | 162 MW | 0 MW | 28 MW |
| 2026-10-10T17:00Z | 493 MW | 6 MW | 154 MW | 0 MW | 20 MW |
| 2026-10-10T18:00Z | 496 MW | 30 MW | 128 MW | 1 MW | 14 MW |
| 2026-10-10T19:00Z | 400 MW | 12 MW | 105 MW | 0 MW | 15 MW |
| 2026-10-10T20:00Z | 335 MW | 0 MW | 93 MW | 0 MW | 17 MW |
| 2026-10-10T21:00Z | 265 MW | 0 MW | 72 MW | 0 MW | 18 MW |
| 2026-10-10T22:00Z | 70 MW | 9 MW | 61 MW | 1 MW | 16 MW |
| 2026-10-10T23:00Z | 156 MW | 13 MW | 64 MW | 0 MW | 17 MW |
| 2026-10-11T00:00Z | 155 MW | 13 MW | 68 MW | 0 MW | 18 MW |
| 2026-10-11T01:00Z | 152 MW | 0 MW | 61 MW | 1 MW | 18 MW |
| 2026-10-11T02:00Z | 238 MW | 0 MW | 54 MW | 0 MW | 21 MW |
| 2026-10-11T03:00Z | 246 MW | 0 MW | 49 MW | 0 MW | 22 MW |
| 2026-10-11T04:00Z | 246 MW | 22 MW | 55 MW | 1 MW | 26 MW |
| 2026-10-11T05:00Z | 245 MW | 105 MW | 70 MW | 1 MW | 45 MW |
| 2026-10-11T06:00Z | 247 MW | 222 MW | 57 MW | 0 MW | 64 MW |
| 2026-10-11T07:00Z | 244 MW | 323 MW | 50 MW | 0 MW | 38 MW |
| 2026-10-11T08:00Z | 161 MW | 394 MW | 39 MW | 1 MW | 27 MW |
| 2026-10-11T09:00Z | 66 MW | 441 MW | 32 MW | 1 MW | 21 MW |
| 2026-10-11T10:00Z | 91 MW | 362 MW | 28 MW | 0 MW | 20 MW |
| 2026-10-11T11:00Z | 178 MW | 297 MW | 20 MW | 1 MW | 15 MW |
| 2026-10-11T12:00Z | 184 MW | 211 MW | 14 MW | 1 MW | 16 MW |
| 2026-10-11T13:00Z | 325 MW | 118 MW | 21 MW | 1 MW | 21 MW |
| 2026-10-11T14:00Z | 356 MW | 34 MW | 32 MW | 0 MW | 30 MW |
| 2026-10-11T15:00Z | 446 MW | 6 MW | 28 MW | 0 MW | 49 MW |
| 2026-10-11T16:00Z | 444 MW | 2 MW | 33 MW | 0 MW | 55 MW |
| 2026-10-11T17:00Z | 445 MW | 1 MW | 50 MW | 0 MW | 50 MW |
| 2026-10-11T18:00Z | 362 MW | 1 MW | 39 MW | 1 MW | 48 MW |
| 2026-10-11T19:00Z | 352 MW | 0 MW | 24 MW | 0 MW | 28 MW |
| 2026-10-11T20:00Z | 207 MW | 0 MW | 20 MW | 0 MW | 23 MW |
| 2026-10-11T21:00Z | 65 MW | 0 MW | 14 MW | 0 MW | 19 MW |
| 2026-10-11T22:00Z | 186 MW | 0 MW | 8 MW | 0 MW | 18 MW |
| 2026-10-11T23:00Z | 188 MW | 0 MW | 14 MW | 1 MW | 17 MW |
| 2026-10-12T00:00Z | 275 MW | 0 MW | 20 MW | 1 MW | 12 MW |
| 2026-10-12T01:00Z | 324 MW | 0 MW | 37 MW | 1 MW | 13 MW |
| 2026-10-12T02:00Z | 362 MW | 0 MW | 41 MW | 0 MW | 17 MW |
| 2026-10-12T03:00Z | 363 MW | 0 MW | 39 MW | 2 MW | 21 MW |
| 2026-10-12T04:00Z | 376 MW | 24 MW | 49 MW | 16 MW | 40 MW |
| 2026-10-12T05:00Z | 356 MW | 126 MW | 36 MW | 34 MW | 46 MW |
| 2026-10-12T06:00Z | 340 MW | 224 MW | 53 MW | 45 MW | 47 MW |
| 2026-10-12T07:00Z | 306 MW | 364 MW | 44 MW | 62 MW | 44 MW |
| 2026-10-12T08:00Z | 296 MW | 423 MW | 10 MW | 63 MW | 37 MW |
| 2026-10-12T09:00Z | 160 MW | 451 MW | 6 MW | 63 MW | 31 MW |
| 2026-10-12T10:00Z | 160 MW | 416 MW | 8 MW | 63 MW | 37 MW |
| 2026-10-12T11:00Z | 158 MW | 331 MW | 6 MW | 63 MW | 44 MW |
| 2026-10-12T12:00Z | 165 MW | 240 MW | 9 MW | 67 MW | 31 MW |
| 2026-10-12T13:00Z | 301 MW | 126 MW | 12 MW | 114 MW | 38 MW |
| 2026-10-12T14:00Z | 321 MW | 19 MW | 13 MW | 140 MW | 36 MW |
| 2026-10-12T15:00Z | 516 MW | 7 MW | 32 MW | 143 MW | 43 MW |
| 2026-10-12T16:00Z | 662 MW | 9 MW | 53 MW | 143 MW | 46 MW |
| 2026-10-12T17:00Z | 741 MW | 13 MW | 51 MW | 144 MW | 47 MW |
| 2026-10-12T18:00Z | 671 MW | 23 MW | 67 MW | 143 MW | 37 MW |
| 2026-10-12T19:00Z | 450 MW | 0 MW | 54 MW | 142 MW | 33 MW |
| 2026-10-12T20:00Z | 430 MW | 0 MW | 34 MW | 113 MW | 27 MW |
| 2026-10-12T21:00Z | 446 MW | 0 MW | 37 MW | 82 MW | 31 MW |
| 2026-10-12T22:00Z | 159 MW | 0 MW | 25 MW | 63 MW | 29 MW |
| 2026-10-12T23:00Z | 158 MW | 0 MW | 28 MW | 63 MW | 26 MW |
| 2026-10-13T00:00Z | 157 MW | 0 MW | 23 MW | 64 MW | 31 MW |
| 2026-10-13T01:00Z | 261 MW | 0 MW | 17 MW | 63 MW | 29 MW |
| 2026-10-13T02:00Z | 262 MW | 0 MW | 19 MW | 63 MW | 31 MW |
| 2026-10-13T03:00Z | 266 MW | 1 MW | 31 MW | 75 MW | 37 MW |
| 2026-10-13T04:00Z | 494 MW | 22 MW | 35 MW | 135 MW | 55 MW |
| 2026-10-13T05:00Z | 507 MW | 90 MW | 48 MW | 144 MW | 51 MW |
| 2026-10-13T06:00Z | 294 MW | 199 MW | 49 MW | 146 MW | 63 MW |
| 2026-10-13T07:00Z | 204 MW | 288 MW | 21 MW | 152 MW | 44 MW |
| 2026-10-13T08:00Z | 205 MW | 343 MW | 9 MW | 154 MW | 34 MW |
| 2026-10-13T09:00Z | 117 MW | 366 MW | 5 MW | 154 MW | 33 MW |
| 2026-10-13T10:00Z | 117 MW | 338 MW | 1 MW | 153 MW | 31 MW |
| 2026-10-13T11:00Z | 117 MW | 286 MW | 0 MW | 152 MW | 31 MW |
| 2026-10-13T12:00Z | 203 MW | 215 MW | 0 MW | 152 MW | 33 MW |
| 2026-10-13T13:00Z | 297 MW | 114 MW | 1 MW | 152 MW | 44 MW |
| 2026-10-13T14:00Z | 446 MW | 26 MW | 0 MW | 152 MW | 38 MW |
| 2026-10-13T15:00Z | 510 MW | 2 MW | 2 MW | 157 MW | 59 MW |
| 2026-10-13T16:00Z | 565 MW | 26 MW | 4 MW | 157 MW | 42 MW |
| 2026-10-13T17:00Z | 564 MW | 6 MW | 10 MW | 153 MW | 52 MW |
| 2026-10-13T18:00Z | 450 MW | 3 MW | 11 MW | 105 MW | 33 MW |
| 2026-10-13T19:00Z | 318 MW | 0 MW | 12 MW | 63 MW | 34 MW |
| 2026-10-13T20:00Z | 313 MW | 0 MW | 30 MW | 63 MW | 27 MW |
| 2026-10-13T21:00Z | 308 MW | 4 MW | 28 MW | 45 MW | 25 MW |
| 2026-10-13T22:00Z | 333 MW | 5 MW | 39 MW | 0 MW | 23 MW |
| 2026-10-13T23:00Z | 347 MW | 0 MW | 50 MW | 0 MW | 21 MW |
| 2026-10-14T00:00Z | 351 MW | 0 MW | 70 MW | 0 MW | 19 MW |
| 2026-10-14T01:00Z | 214 MW | 0 MW | 96 MW | 0 MW | 19 MW |
| 2026-10-14T02:00Z | 157 MW | 0 MW | 98 MW | 0 MW | 16 MW |
| 2026-10-14T03:00Z | 201 MW | 1 MW | 130 MW | 0 MW | 14 MW |
| 2026-10-14T04:00Z | 182 MW | 12 MW | 155 MW | 0 MW | 17 MW |
| 2026-10-14T05:00Z | 147 MW | 58 MW | 149 MW | 0 MW | 23 MW |
| 2026-10-14T06:00Z | 150 MW | 108 MW | 138 MW | 0 MW | 21 MW |
| 2026-10-14T07:00Z | 88 MW | 182 MW | 139 MW | 0 MW | 21 MW |
| 2026-10-14T08:00Z | 61 MW | 238 MW | 126 MW | 0 MW | 20 MW |
| 2026-10-14T09:00Z | 58 MW | 264 MW | 107 MW | 0 MW | 24 MW |
| 2026-10-14T10:00Z | 66 MW | 251 MW | 103 MW | 0 MW | 22 MW |
| 2026-10-14T11:00Z | 60 MW | 197 MW | 103 MW | 0 MW | 29 MW |
| 2026-10-14T12:00Z | 62 MW | 141 MW | 107 MW | 0 MW | 27 MW |
| 2026-10-14T13:00Z | 153 MW | 61 MW | 99 MW | 0 MW | 40 MW |
| 2026-10-14T14:00Z | 190 MW | 13 MW | 65 MW | 0 MW | 41 MW |
| 2026-10-14T15:00Z | 473 MW | 2 MW | 117 MW | 0 MW | 52 MW |
| 2026-10-14T16:00Z | 479 MW | 0 MW | 91 MW | 0 MW | 53 MW |
| 2026-10-14T17:00Z | 427 MW | 4 MW | 77 MW | 0 MW | 40 MW |
| 2026-10-14T18:00Z | 517 MW | 0 MW | 74 MW | 0 MW | 38 MW |
| 2026-10-14T19:00Z | 492 MW | 12 MW | 73 MW | 5 MW | 39 MW |
| 2026-10-14T20:00Z | 381 MW | 0 MW | 44 MW | 25 MW | 33 MW |
| 2026-10-14T21:00Z | 186 MW | 10 MW | 37 MW | 59 MW | 31 MW |
| 2026-10-14T22:00Z | 177 MW | 0 MW | 40 MW | 85 MW | 28 MW |
| 2026-10-14T23:00Z | 158 MW | 0 MW | 25 MW | 104 MW | 28 MW |
| 2026-10-15T00:00Z | 157 MW | 0 MW | 22 MW | 106 MW | 24 MW |
| 2026-10-15T01:00Z | 158 MW | 2 MW | 22 MW | 119 MW | 29 MW |
| 2026-10-15T02:00Z | 158 MW | 1 MW | 10 MW | 119 MW | 29 MW |
| 2026-10-15T03:00Z | 265 MW | 0 MW | 15 MW | 135 MW | 33 MW |
| 2026-10-15T04:00Z | 356 MW | 28 MW | 14 MW | 148 MW | 45 MW |
| 2026-10-15T05:00Z | 441 MW | 91 MW | 30 MW | 149 MW | 49 MW |
| 2026-10-15T06:00Z | 294 MW | 197 MW | 24 MW | 151 MW | 63 MW |
| 2026-10-15T07:00Z | 205 MW | 343 MW | 12 MW | 150 MW | 68 MW |
| 2026-10-15T08:00Z | 118 MW | 441 MW | 1 MW | 150 MW | 64 MW |
| 2026-10-15T09:00Z | 27 MW | 487 MW | 3 MW | 143 MW | 64 MW |
| 2026-10-15T10:00Z | 34 MW | 433 MW | 5 MW | 143 MW | 43 MW |
| 2026-10-15T11:00Z | 138 MW | 388 MW | 1 MW | 143 MW | 31 MW |
| 2026-10-15T12:00Z | 204 MW | 307 MW | 2 MW | 141 MW | 35 MW |
| 2026-10-15T13:00Z | 221 MW | 143 MW | 5 MW | 145 MW | 45 MW |
| 2026-10-15T14:00Z | 487 MW | 14 MW | 5 MW | 147 MW | 41 MW |
| 2026-10-15T15:00Z | 597 MW | 8 MW | 8 MW | 153 MW | 48 MW |
| 2026-10-15T16:00Z | 623 MW | 2 MW | 28 MW | 154 MW | 40 MW |
| 2026-10-15T17:00Z | 647 MW | 2 MW | 56 MW | 156 MW | 41 MW |
| 2026-10-15T18:00Z | 585 MW | 2 MW | 62 MW | 156 MW | 38 MW |
| 2026-10-15T19:00Z | 495 MW | 1 MW | 61 MW | 147 MW | 40 MW |
| 2026-10-15T20:00Z | 274 MW | 0 MW | 72 MW | 141 MW | 44 MW |
| 2026-10-15T21:00Z | 282 MW | 1 MW | 80 MW | 141 MW | 33 MW |
| 2026-10-15T22:00Z | 205 MW | 0 MW | 83 MW | 137 MW | 31 MW |
| 2026-10-15T23:00Z | 189 MW | 0 MW | 86 MW | 135 MW | 29 MW |
| 2026-10-16T00:00Z | 187 MW | 0 MW | 94 MW | 142 MW | 27 MW |
| 2026-10-16T01:00Z | 217 MW | 0 MW | 91 MW | 143 MW | 25 MW |
| 2026-10-16T02:00Z | 213 MW | 0 MW | 96 MW | 144 MW | 29 MW |
| 2026-10-16T03:00Z | 270 MW | 3 MW | 113 MW | 146 MW | 30 MW |
| 2026-10-16T04:00Z | 377 MW | 28 MW | 135 MW | 153 MW | 40 MW |
| 2026-10-16T05:00Z | 386 MW | 187 MW | 168 MW | 154 MW | 55 MW |
| 2026-10-16T06:00Z | 315 MW | 373 MW | 136 MW | 149 MW | 49 MW |
| 2026-10-16T07:00Z | 260 MW | 580 MW | 104 MW | 143 MW | 38 MW |
| 2026-10-16T08:00Z | 118 MW | 657 MW | 88 MW | 135 MW | 30 MW |
| 2026-10-16T09:00Z | 98 MW | 672 MW | 73 MW | 124 MW | 31 MW |
| 2026-10-16T10:00Z | 55 MW | 615 MW | 74 MW | 105 MW | 31 MW |
| 2026-10-16T11:00Z | 63 MW | 518 MW | 80 MW | 106 MW | 37 MW |
| 2026-10-16T12:00Z | 109 MW | 391 MW | 70 MW | 134 MW | 34 MW |
| 2026-10-16T13:00Z | 319 MW | 176 MW | 68 MW | 137 MW | 45 MW |
| 2026-10-16T14:00Z | 338 MW | 16 MW | 74 MW | 138 MW | 55 MW |
| 2026-10-16T15:00Z | 531 MW | 12 MW | 101 MW | 147 MW | 64 MW |
| 2026-10-16T16:00Z | 534 MW | 1 MW | 108 MW | 150 MW | 58 MW |
| 2026-10-16T17:00Z | 511 MW | 7 MW | 118 MW | 156 MW | 39 MW |
| 2026-10-16T18:00Z | 507 MW | 0 MW | 121 MW | 152 MW | 40 MW |
| 2026-10-16T19:00Z | 416 MW | 3 MW | 121 MW | 152 MW | 36 MW |
| 2026-10-16T20:00Z | 343 MW | 0 MW | 100 MW | 153 MW | 35 MW |
| 2026-10-16T21:00Z | 319 MW | 0 MW | 92 MW | 96 MW | 32 MW |
| 2026-10-16T22:00Z | 324 MW | 0 MW | 92 MW | 0 MW | 34 MW |
| 2026-10-16T23:00Z | 400 MW | 0 MW | 87 MW | 6 MW | 31 MW |
| 2026-10-17T00:00Z | 353 MW | 0 MW | 84 MW | 53 MW | 30 MW |
| 2026-10-17T01:00Z | 372 MW | 0 MW | 87 MW | 70 MW | 30 MW |
| 2026-10-17T02:00Z | 345 MW | 8 MW | 77 MW | 105 MW | 29 MW |
| 2026-10-17T03:00Z | 270 MW | 3 MW | 67 MW | 143 MW | 32 MW |
| 2026-10-17T04:00Z | 283 MW | 17 MW | 71 MW | 100 MW | 38 MW |
| 2026-10-17T05:00Z | 234 MW | 107 MW | 76 MW | 75 MW | 45 MW |
| 2026-10-17T06:00Z | 161 MW | 229 MW | 56 MW | 65 MW | 38 MW |
| 2026-10-17T07:00Z | 112 MW | 378 MW | 34 MW | 65 MW | 32 MW |
| 2026-10-17T08:00Z | 23 MW | 486 MW | 13 MW | 64 MW | 34 MW |
| 2026-10-17T09:00Z | 22 MW | 520 MW | 3 MW | 64 MW | 29 MW |
| 2026-10-17T10:00Z | 24 MW | 495 MW | 2 MW | 64 MW | 27 MW |
| 2026-10-17T11:00Z | 28 MW | 411 MW | 2 MW | 64 MW | 27 MW |
| 2026-10-17T12:00Z | 203 MW | 289 MW | 26 MW | 63 MW | 28 MW |
| 2026-10-17T13:00Z | 377 MW | 115 MW | 33 MW | 65 MW | 33 MW |
| 2026-10-17T14:00Z | 414 MW | 12 MW | 47 MW | 85 MW | 43 MW |
| 2026-10-17T15:00Z | 601 MW | 1 MW | 48 MW | 109 MW | 52 MW |
| 2026-10-17T16:00Z | 565 MW | 2 MW | 76 MW | 144 MW | 49 MW |
| 2026-10-17T17:00Z | 664 MW | 0 MW | 87 MW | 149 MW | 45 MW |
| 2026-10-17T18:00Z | 587 MW | 0 MW | 79 MW | 150 MW | 53 MW |
| 2026-10-17T19:00Z | 442 MW | 0 MW | 90 MW | 147 MW | 32 MW |
| 2026-10-17T20:00Z | 239 MW | 0 MW | 88 MW | 140 MW | 29 MW |
| 2026-10-17T21:00Z | 166 MW | 0 MW | 105 MW | 76 MW | 28 MW |
| 2026-10-17T22:00Z | 26 MW | 2 MW | 98 MW | 2 MW | 23 MW |
| 2026-10-17T23:00Z | 25 MW | 0 MW | 135 MW | 1 MW | 21 MW |
| 2026-10-18T00:00Z | 64 MW | 0 MW | 129 MW | 1 MW | 21 MW |
| 2026-10-18T01:00Z | 53 MW | 0 MW | 117 MW | 1 MW | 16 MW |
| 2026-10-18T02:00Z | 53 MW | 1 MW | 114 MW | 0 MW | 13 MW |
| 2026-10-18T03:00Z | 63 MW | 0 MW | 120 MW | 1 MW | 19 MW |
| 2026-10-18T04:00Z | 235 MW | 9 MW | 116 MW | 0 MW | 22 MW |
| 2026-10-18T05:00Z | 239 MW | 122 MW | 131 MW | 1 MW | 34 MW |
| 2026-10-18T06:00Z | 154 MW | 302 MW | 137 MW | 1 MW | 29 MW |
| 2026-10-18T07:00Z | 146 MW | 506 MW | 130 MW | 1 MW | 19 MW |
| 2026-10-18T08:00Z | 151 MW | 666 MW | 157 MW | 1 MW | 17 MW |
| 2026-10-18T09:00Z | 142 MW | 709 MW | 126 MW | 1 MW | 21 MW |
| 2026-10-18T10:00Z | 117 MW | 730 MW | 107 MW | 1 MW | 31 MW |
| 2026-10-18T11:00Z | 51 MW | 677 MW | 113 MW | 1 MW | 40 MW |
| 2026-10-18T12:00Z | 61 MW | 484 MW | 122 MW | 1 MW | 42 MW |
| 2026-10-18T13:00Z | 70 MW | 242 MW | 133 MW | 0 MW | 42 MW |
| 2026-10-18T14:00Z | 276 MW | 33 MW | 124 MW | 0 MW | 53 MW |
| 2026-10-18T15:00Z | 391 MW | 10 MW | 124 MW | 1 MW | 57 MW |
| 2026-10-18T16:00Z | 510 MW | 7 MW | 155 MW | 2 MW | 54 MW |
| 2026-10-18T17:00Z | 484 MW | 3 MW | 211 MW | 9 MW | 54 MW |
| 2026-10-18T18:00Z | 353 MW | 8 MW | 186 MW | 19 MW | 31 MW |
| 2026-10-18T19:00Z | 225 MW | 8 MW | 183 MW | 37 MW | 32 MW |
| 2026-10-18T20:00Z | 182 MW | 0 MW | 187 MW | 68 MW | 30 MW |
| 2026-10-18T21:00Z | 66 MW | 2 MW | 171 MW | 98 MW | 28 MW |
| 2026-10-18T22:00Z | 114 MW | 2 MW | 161 MW | 142 MW | 27 MW |
| 2026-10-18T23:00Z | 117 MW | 0 MW | 152 MW | 145 MW | 30 MW |
| 2026-10-19T00:00Z | 308 MW | 0 MW | 135 MW | 145 MW | 33 MW |
| 2026-10-19T01:00Z | 361 MW | 0 MW | 133 MW | 146 MW | 28 MW |
| 2026-10-19T02:00Z | 370 MW | 1 MW | 114 MW | 154 MW | 34 MW |
| 2026-10-19T03:00Z | 579 MW | 4 MW | 89 MW | 156 MW | 34 MW |
| 2026-10-19T04:00Z | 536 MW | 40 MW | 106 MW | 157 MW | 51 MW |
| 2026-10-19T05:00Z | 532 MW | 194 MW | 132 MW | 157 MW | 51 MW |
| 2026-10-19T06:00Z | 382 MW | 453 MW | 134 MW | 156 MW | 42 MW |
| 2026-10-19T07:00Z | 312 MW | 611 MW | 114 MW | 156 MW | 39 MW |
| 2026-10-19T08:00Z | 270 MW | 692 MW | 65 MW | 148 MW | 38 MW |
| 2026-10-19T09:00Z | 377 MW | 750 MW | 57 MW | 0 MW | 52 MW |
| 2026-10-19T10:00Z | 286 MW | 700 MW | 64 MW | 0 MW | 60 MW |
| 2026-10-19T11:00Z | 185 MW | 620 MW | 35 MW | 20 MW | 58 MW |
| 2026-10-19T12:00Z | 110 MW | 543 MW | 29 MW | 64 MW | 54 MW |
| 2026-10-19T13:00Z | 229 MW | 245 MW | 26 MW | 110 MW | 47 MW |
| 2026-10-19T14:00Z | 532 MW | 19 MW | 41 MW | 143 MW | 53 MW |
| 2026-10-19T15:00Z | 648 MW | 15 MW | 93 MW | 150 MW | 68 MW |
| 2026-10-19T16:00Z | 672 MW | 2 MW | 117 MW | 150 MW | 64 MW |
| 2026-10-19T17:00Z | 632 MW | 0 MW | 110 MW | 150 MW | 39 MW |
| 2026-10-19T18:00Z | 442 MW | 0 MW | 119 MW | 150 MW | 41 MW |
| 2026-10-19T19:00Z | 355 MW | 3 MW | 117 MW | 155 MW | 36 MW |
| 2026-10-19T20:00Z | 192 MW | 0 MW | 89 MW | 156 MW | 33 MW |
| 2026-10-19T21:00Z | 184 MW | 0 MW | 88 MW | 153 MW | 29 MW |
| 2026-10-19T22:00Z | 194 MW | 0 MW | 82 MW | 152 MW | 29 MW |
| 2026-10-19T23:00Z | 255 MW | 0 MW | 72 MW | 152 MW | 32 MW |
| 2026-10-20T00:00Z | 347 MW | 0 MW | 52 MW | 152 MW | 31 MW |
| 2026-10-20T01:00Z | 402 MW | 0 MW | 56 MW | 155 MW | 30 MW |
| 2026-10-20T02:00Z | 444 MW | 1 MW | 46 MW | 156 MW | 30 MW |
| 2026-10-20T03:00Z | 452 MW | 1 MW | 57 MW | 155 MW | 29 MW |
| 2026-10-20T04:00Z | 613 MW | 20 MW | 78 MW | 155 MW | 42 MW |
| 2026-10-20T05:00Z | 559 MW | 164 MW | 105 MW | 109 MW | 51 MW |
| 2026-10-20T06:00Z | 386 MW | 361 MW | 91 MW | 75 MW | 51 MW |
| 2026-10-20T07:00Z | 124 MW | 510 MW | 68 MW | 75 MW | 41 MW |
| 2026-10-20T08:00Z | 117 MW | 570 MW | 51 MW | 76 MW | 33 MW |
| 2026-10-20T09:00Z | 114 MW | 599 MW | 49 MW | 95 MW | 32 MW |
| 2026-10-20T10:00Z | 113 MW | 543 MW | 50 MW | 96 MW | 29 MW |
| 2026-10-20T11:00Z | 114 MW | 438 MW | 41 MW | 91 MW | 36 MW |
| 2026-10-20T12:00Z | 139 MW | 283 MW | 51 MW | 84 MW | 34 MW |
| 2026-10-20T13:00Z | 297 MW | 99 MW | 59 MW | 84 MW | 35 MW |
| 2026-10-20T14:00Z | 452 MW | 7 MW | 63 MW | 90 MW | 48 MW |
| 2026-10-20T15:00Z | 565 MW | 0 MW | 95 MW | 111 MW | 59 MW |
| 2026-10-20T16:00Z | 466 MW | 1 MW | 107 MW | 114 MW | 49 MW |
| 2026-10-20T17:00Z | 317 MW | 1 MW | 121 MW | 114 MW | 36 MW |
| 2026-10-20T18:00Z | 265 MW | 0 MW | 129 MW | 105 MW | 25 MW |
| 2026-10-20T19:00Z | 315 MW | 3 MW | 152 MW | 64 MW | 18 MW |
| 2026-10-20T20:00Z | 253 MW | 0 MW | 161 MW | 56 MW | 14 MW |
| 2026-10-20T21:00Z | 210 MW | 0 MW | 159 MW | 4 MW | 17 MW |
| 2026-10-20T22:00Z | 204 MW | 4 MW | 144 MW | 0 MW | 18 MW |
| 2026-10-20T23:00Z | 203 MW | 1 MW | 139 MW | 0 MW | 25 MW |
| 2026-10-21T00:00Z | 246 MW | 0 MW | 143 MW | 0 MW | 15 MW |
| 2026-10-21T01:00Z | 247 MW | 0 MW | 147 MW | 0 MW | 14 MW |
| 2026-10-21T02:00Z | 246 MW | 0 MW | 159 MW | 0 MW | 18 MW |
| 2026-10-21T03:00Z | 245 MW | 8 MW | 157 MW | 0 MW | 16 MW |
| 2026-10-21T04:00Z | 302 MW | 6 MW | 151 MW | 0 MW | 24 MW |
| 2026-10-21T05:00Z | 332 MW | 146 MW | 177 MW | 0 MW | 23 MW |
| 2026-10-21T06:00Z | 244 MW | 306 MW | 190 MW | 0 MW | 25 MW |
| 2026-10-21T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-21T08:00Z | 264 MW | 633 MW | 245 MW | 0 MW | 34 MW |
| 2026-10-21T09:00Z | 86 MW | 617 MW | 117 MW | 0 MW | 28 MW |
| 2026-10-21T10:00Z | 99 MW | 593 MW | 102 MW | 0 MW | 35 MW |
| 2026-10-21T11:00Z | 196 MW | 496 MW | 126 MW | 0 MW | 35 MW |
| 2026-10-21T12:00Z | 223 MW | 325 MW | 132 MW | 0 MW | 26 MW |
| 2026-10-21T13:00Z | 338 MW | 107 MW | 162 MW | 0 MW | 28 MW |
| 2026-10-21T14:00Z | 466 MW | 2 MW | 152 MW | 0 MW | 48 MW |
| 2026-10-21T15:00Z | 525 MW | 0 MW | 145 MW | 0 MW | 42 MW |
| 2026-10-21T16:00Z | 505 MW | 0 MW | 154 MW | 0 MW | 40 MW |
| 2026-10-21T17:00Z | 339 MW | 7 MW | 182 MW | 0 MW | 24 MW |
| 2026-10-21T18:00Z | 192 MW | 0 MW | 191 MW | 0 MW | 21 MW |
| 2026-10-21T19:00Z | 151 MW | 0 MW | 194 MW | 0 MW | 18 MW |
| 2026-10-21T20:00Z | 129 MW | 0 MW | 185 MW | 0 MW | 16 MW |
| 2026-10-21T21:00Z | 58 MW | 0 MW | 174 MW | 0 MW | 18 MW |
| 2026-10-21T22:00Z | 28 MW | 0 MW | 171 MW | 0 MW | 13 MW |
| 2026-10-21T23:00Z | 113 MW | 0 MW | 158 MW | 0 MW | 15 MW |
| 2026-10-22T00:00Z | 153 MW | 0 MW | 162 MW | 0 MW | 14 MW |
| 2026-10-22T01:00Z | 153 MW | 0 MW | 166 MW | 0 MW | 12 MW |
| 2026-10-22T02:00Z | 289 MW | 0 MW | 166 MW | 0 MW | 13 MW |
| 2026-10-22T03:00Z | 357 MW | 0 MW | 164 MW | 0 MW | 14 MW |
| 2026-10-22T04:00Z | 392 MW | 14 MW | 177 MW | 0 MW | 17 MW |
| 2026-10-22T05:00Z | 521 MW | 81 MW | 196 MW | 0 MW | 20 MW |
| 2026-10-22T06:00Z | 296 MW | 149 MW | 191 MW | 0 MW | 27 MW |
| 2026-10-22T07:00Z | 294 MW | 250 MW | 190 MW | 0 MW | 25 MW |
| 2026-10-22T08:00Z | 289 MW | 321 MW | 169 MW | 0 MW | 20 MW |
| 2026-10-22T09:00Z | 199 MW | 316 MW | 149 MW | 0 MW | 13 MW |
| 2026-10-22T10:00Z | 26 MW | 311 MW | 171 MW | 0 MW | 15 MW |
| 2026-10-22T11:00Z | 27 MW | 304 MW | 186 MW | 0 MW | 21 MW |
| 2026-10-22T12:00Z | 193 MW | 218 MW | 163 MW | 0 MW | 28 MW |
| 2026-10-22T13:00Z | 206 MW | 71 MW | 143 MW | 0 MW | 45 MW |
| 2026-10-22T14:00Z | 454 MW | 3 MW | 163 MW | 0 MW | 40 MW |
| 2026-10-22T15:00Z | 564 MW | 0 MW | 182 MW | 3 MW | 43 MW |
| 2026-10-22T16:00Z | 551 MW | 0 MW | 186 MW | 19 MW | 26 MW |
| 2026-10-22T17:00Z | 418 MW | 0 MW | 189 MW | 32 MW | 24 MW |
| 2026-10-22T18:00Z | 353 MW | 0 MW | 175 MW | 42 MW | 20 MW |
| 2026-10-22T19:00Z | 338 MW | 10 MW | 177 MW | 20 MW | 17 MW |
| 2026-10-22T20:00Z | 212 MW | 0 MW | 160 MW | 59 MW | 18 MW |
| 2026-10-22T21:00Z | 264 MW | 0 MW | 160 MW | 67 MW | 20 MW |
| 2026-10-22T22:00Z | 125 MW | 7 MW | 147 MW | 70 MW | 24 MW |
| 2026-10-22T23:00Z | 203 MW | 0 MW | 161 MW | 69 MW | 31 MW |
| 2026-10-23T00:00Z | 223 MW | 0 MW | 135 MW | 69 MW | 32 MW |
| 2026-10-23T01:00Z | 223 MW | 0 MW | 141 MW | 69 MW | 38 MW |
| 2026-10-23T02:00Z | 227 MW | 0 MW | 121 MW | 69 MW | 31 MW |
| 2026-10-23T03:00Z | 371 MW | 5 MW | 123 MW | 69 MW | 37 MW |
| 2026-10-23T04:00Z | 425 MW | 18 MW | 122 MW | 69 MW | 45 MW |
| 2026-10-23T05:00Z | 560 MW | 58 MW | 150 MW | 69 MW | 66 MW |
| 2026-10-23T06:00Z | 512 MW | 86 MW | 147 MW | 70 MW | 67 MW |
| 2026-10-23T07:00Z | 446 MW | 125 MW | 136 MW | 69 MW | 45 MW |
| 2026-10-23T08:00Z | 295 MW | 148 MW | 134 MW | 69 MW | 33 MW |
| 2026-10-23T09:00Z | 236 MW | 164 MW | 123 MW | 70 MW | 33 MW |
| 2026-10-23T10:00Z | 256 MW | 126 MW | 99 MW | 69 MW | 29 MW |
| 2026-10-23T11:00Z | 342 MW | 119 MW | 83 MW | 70 MW | 25 MW |
| 2026-10-23T12:00Z | 336 MW | 64 MW | 62 MW | 71 MW | 30 MW |
| 2026-10-23T13:00Z | 270 MW | 23 MW | 59 MW | 80 MW | 33 MW |
| 2026-10-23T14:00Z | 330 MW | 27 MW | 62 MW | 84 MW | 43 MW |
| 2026-10-23T15:00Z | 396 MW | 9 MW | 54 MW | 64 MW | 39 MW |
| 2026-10-23T16:00Z | 414 MW | 1 MW | 65 MW | 63 MW | 33 MW |
| 2026-10-23T17:00Z | 408 MW | 0 MW | 70 MW | 63 MW | 38 MW |
| 2026-10-23T18:00Z | 323 MW | 3 MW | 70 MW | 63 MW | 29 MW |
| 2026-10-23T19:00Z | 321 MW | 0 MW | 42 MW | 62 MW | 28 MW |
| 2026-10-23T20:00Z | 193 MW | 0 MW | 55 MW | 60 MW | 23 MW |
| 2026-10-23T21:00Z | 151 MW | 0 MW | 57 MW | 37 MW | 22 MW |
| 2026-10-23T22:00Z | 37 MW | 0 MW | 51 MW | 0 MW | 14 MW |
| 2026-10-23T23:00Z | 36 MW | 0 MW | 51 MW | 0 MW | 11 MW |
| 2026-10-24T00:00Z | 125 MW | 0 MW | 68 MW | 0 MW | 13 MW |
| 2026-10-24T01:00Z | 125 MW | 0 MW | 68 MW | 0 MW | 13 MW |
| 2026-10-24T02:00Z | 226 MW | 0 MW | 50 MW | 0 MW | 9 MW |
| 2026-10-24T03:00Z | 251 MW | 7 MW | 75 MW | 0 MW | 14 MW |
| 2026-10-24T04:00Z | 229 MW | 10 MW | 95 MW | 0 MW | 16 MW |
| 2026-10-24T05:00Z | 222 MW | 72 MW | 120 MW | 0 MW | 20 MW |
| 2026-10-24T06:00Z | 223 MW | 190 MW | 131 MW | 0 MW | 27 MW |
| 2026-10-24T07:00Z | 237 MW | 312 MW | 128 MW | 0 MW | 32 MW |
| 2026-10-24T08:00Z | 250 MW | 383 MW | 125 MW | 0 MW | 34 MW |
| 2026-10-24T09:00Z | 207 MW | 413 MW | 131 MW | 0 MW | 23 MW |
| 2026-10-24T10:00Z | 312 MW | 436 MW | 114 MW | 0 MW | 16 MW |
| 2026-10-24T11:00Z | 312 MW | 387 MW | 121 MW | 0 MW | 10 MW |
| 2026-10-24T12:00Z | 295 MW | 280 MW | 127 MW | 0 MW | 13 MW |
| 2026-10-24T13:00Z | 352 MW | 112 MW | 154 MW | 0 MW | 18 MW |
| 2026-10-24T14:00Z | 411 MW | 13 MW | 167 MW | 0 MW | 26 MW |
| 2026-10-24T15:00Z | 545 MW | 2 MW | 193 MW | 0 MW | 27 MW |
| 2026-10-24T16:00Z | 528 MW | 0 MW | 199 MW | 0 MW | 28 MW |
| 2026-10-24T17:00Z | 491 MW | 13 MW | 208 MW | 0 MW | 20 MW |
| 2026-10-24T18:00Z | 387 MW | 0 MW | 203 MW | 0 MW | 24 MW |
| 2026-10-24T19:00Z | 226 MW | 0 MW | 184 MW | 0 MW | 15 MW |
| 2026-10-24T20:00Z | 89 MW | 0 MW | 178 MW | 0 MW | 17 MW |
| 2026-10-24T21:00Z | 84 MW | 0 MW | 159 MW | 0 MW | 14 MW |
| 2026-10-24T22:00Z | 24 MW | 11 MW | 118 MW | 0 MW | 12 MW |
| 2026-10-24T23:00Z | 24 MW | 8 MW | 117 MW | 0 MW | 13 MW |
| 2026-10-25T00:00Z | 63 MW | 0 MW | 138 MW | 0 MW | 12 MW |
| 2026-10-25T01:00Z | 56 MW | 0 MW | 134 MW | 0 MW | 11 MW |
| 2026-10-25T02:00Z | 137 MW | 0 MW | 137 MW | 0 MW | 10 MW |
| 2026-10-25T03:00Z | 169 MW | 0 MW | 134 MW | 0 MW | 7 MW |
| 2026-10-25T04:00Z | 171 MW | 9 MW | 146 MW | 0 MW | 6 MW |
| 2026-10-25T05:00Z | 190 MW | 41 MW | 138 MW | 0 MW | 7 MW |
| 2026-10-25T06:00Z | 306 MW | 140 MW | 139 MW | 0 MW | 7 MW |
| 2026-10-25T07:00Z | 314 MW | 221 MW | 163 MW | 0 MW | 7 MW |
| 2026-10-25T08:00Z | 254 MW | 295 MW | 178 MW | 0 MW | 7 MW |
| 2026-10-25T09:00Z | 160 MW | 333 MW | 201 MW | 0 MW | 7 MW |
| 2026-10-25T10:00Z | 163 MW | 295 MW | 183 MW | 0 MW | 7 MW |
| 2026-10-25T11:00Z | 187 MW | 210 MW | 200 MW | 0 MW | 6 MW |
| 2026-10-25T12:00Z | 192 MW | 110 MW | 218 MW | 0 MW | 6 MW |
| 2026-10-25T13:00Z | 394 MW | 35 MW | 236 MW | 0 MW | 6 MW |
| 2026-10-25T14:00Z | 500 MW | 1 MW | 232 MW | 0 MW | 21 MW |
| 2026-10-25T15:00Z | 500 MW | 0 MW | 230 MW | 0 MW | 9 MW |
| 2026-10-25T16:00Z | 484 MW | 0 MW | 213 MW | 0 MW | 8 MW |
| 2026-10-25T17:00Z | 313 MW | 0 MW | 206 MW | 0 MW | 9 MW |
| 2026-10-25T18:00Z | 222 MW | 0 MW | 190 MW | 0 MW | 8 MW |
| 2026-10-25T19:00Z | 220 MW | 0 MW | 177 MW | 0 MW | 7 MW |
| 2026-10-25T20:00Z | 163 MW | 0 MW | 178 MW | 0 MW | 7 MW |
| 2026-10-25T21:00Z | 65 MW | 0 MW | 172 MW | 0 MW | 8 MW |
| 2026-10-25T22:00Z | 55 MW | 0 MW | 162 MW | 0 MW | 9 MW |
| 2026-10-25T23:00Z | 116 MW | 0 MW | 160 MW | 0 MW | 6 MW |
| 2026-10-26T00:00Z | 116 MW | 0 MW | 155 MW | 0 MW | 6 MW |
| 2026-10-26T01:00Z | 183 MW | 0 MW | 158 MW | 0 MW | 6 MW |
| 2026-10-26T02:00Z | 201 MW | 0 MW | 155 MW | 0 MW | 7 MW |
| 2026-10-26T03:00Z | 202 MW | 0 MW | 142 MW | 0 MW | 6 MW |
| 2026-10-26T04:00Z | 264 MW | 0 MW | 156 MW | 0 MW | 9 MW |
| 2026-10-26T05:00Z | 309 MW | 26 MW | 154 MW | 0 MW | 16 MW |
| 2026-10-26T06:00Z | 454 MW | 68 MW | 171 MW | 0 MW | 14 MW |
| 2026-10-26T07:00Z | 411 MW | 129 MW | 161 MW | 0 MW | 25 MW |
| 2026-10-26T08:00Z | 362 MW | 154 MW | 127 MW | 0 MW | 30 MW |
| 2026-10-26T09:00Z | 348 MW | 176 MW | 109 MW | 0 MW | 23 MW |
| 2026-10-26T10:00Z | 366 MW | 190 MW | 90 MW | 0 MW | 15 MW |
| 2026-10-26T11:00Z | 366 MW | 155 MW | 106 MW | 0 MW | 12 MW |
| 2026-10-26T12:00Z | 486 MW | 119 MW | 125 MW | 0 MW | 13 MW |
| 2026-10-26T13:00Z | 510 MW | 57 MW | 114 MW | 0 MW | 21 MW |
| 2026-10-26T14:00Z | 528 MW | 31 MW | 128 MW | 0 MW | 24 MW |
| 2026-10-26T15:00Z | 528 MW | 9 MW | 111 MW | 0 MW | 19 MW |
| 2026-10-26T16:00Z | 647 MW | 2 MW | 117 MW | 0 MW | 14 MW |
| 2026-10-26T17:00Z | 571 MW | 3 MW | 125 MW | 0 MW | 10 MW |
| 2026-10-26T18:00Z | 479 MW | 0 MW | 130 MW | 0 MW | 8 MW |
| 2026-10-26T19:00Z | 284 MW | 0 MW | 131 MW | 0 MW | 11 MW |
| 2026-10-26T20:00Z | 134 MW | 0 MW | 126 MW | 0 MW | 13 MW |
| 2026-10-26T21:00Z | 96 MW | 0 MW | 125 MW | 0 MW | 13 MW |
| 2026-10-26T22:00Z | 117 MW | 10 MW | 128 MW | 0 MW | 24 MW |
| 2026-10-26T23:00Z | 42 MW | 0 MW | 131 MW | 0 MW | 10 MW |
| 2026-10-27T00:00Z | 45 MW | 0 MW | 119 MW | 0 MW | 15 MW |
| 2026-10-27T01:00Z | 174 MW | 4 MW | 110 MW | 0 MW | 13 MW |
| 2026-10-27T02:00Z | 261 MW | 0 MW | 117 MW | 0 MW | 13 MW |
| 2026-10-27T03:00Z | 265 MW | 0 MW | 96 MW | 0 MW | 15 MW |
| 2026-10-27T04:00Z | 263 MW | 3 MW | 99 MW | 0 MW | 19 MW |
| 2026-10-27T05:00Z | 359 MW | 85 MW | 111 MW | 0 MW | 28 MW |
| 2026-10-27T06:00Z | 386 MW | 256 MW | 102 MW | 0 MW | 34 MW |
| 2026-10-27T07:00Z | 196 MW | 369 MW | 79 MW | 0 MW | 22 MW |
| 2026-10-27T08:00Z | 41 MW | 455 MW | 71 MW | 0 MW | 16 MW |
| 2026-10-27T09:00Z | 45 MW | 383 MW | 61 MW | 0 MW | 15 MW |
| 2026-10-27T10:00Z | 138 MW | 445 MW | 66 MW | 0 MW | 16 MW |
| 2026-10-27T11:00Z | 306 MW | 348 MW | 73 MW | 0 MW | 16 MW |
| 2026-10-27T12:00Z | 309 MW | 286 MW | 75 MW | 0 MW | 17 MW |
| 2026-10-27T13:00Z | 310 MW | 83 MW | 93 MW | 0 MW | 22 MW |
| 2026-10-27T14:00Z | 311 MW | 7 MW | 97 MW | 0 MW | 27 MW |
| 2026-10-27T15:00Z | 469 MW | 0 MW | 141 MW | 1 MW | 36 MW |
| 2026-10-27T16:00Z | 451 MW | 3 MW | 178 MW | 13 MW | 30 MW |
| 2026-10-27T17:00Z | 403 MW | 2 MW | 171 MW | 32 MW | 18 MW |
| 2026-10-27T18:00Z | 339 MW | 1 MW | 178 MW | 36 MW | 13 MW |
| 2026-10-27T19:00Z | 262 MW | 1 MW | 169 MW | 39 MW | 13 MW |
| 2026-10-27T20:00Z | 121 MW | 1 MW | 163 MW | 38 MW | 13 MW |
| 2026-10-27T21:00Z | 60 MW | 0 MW | 155 MW | 39 MW | 13 MW |
| 2026-10-27T22:00Z | 64 MW | 0 MW | 161 MW | 50 MW | 13 MW |
| 2026-10-27T23:00Z | 61 MW | 0 MW | 170 MW | 67 MW | 16 MW |
| 2026-10-28T00:00Z | 77 MW | 0 MW | 162 MW | 68 MW | 18 MW |
| 2026-10-28T01:00Z | 144 MW | 1 MW | 155 MW | 67 MW | 22 MW |
| 2026-10-28T02:00Z | 197 MW | 0 MW | 133 MW | 67 MW | 31 MW |
| 2026-10-28T03:00Z | 307 MW | 0 MW | 123 MW | 67 MW | 29 MW |
| 2026-10-28T04:00Z | 345 MW | 1 MW | 105 MW | 67 MW | 31 MW |
| 2026-10-28T05:00Z | 523 MW | 83 MW | 132 MW | 68 MW | 50 MW |
| 2026-10-28T06:00Z | 576 MW | 206 MW | 124 MW | 68 MW | 49 MW |
| 2026-10-28T07:00Z | 485 MW | 268 MW | 92 MW | 74 MW | 55 MW |
| 2026-10-28T08:00Z | 396 MW | 328 MW | 68 MW | 74 MW | 56 MW |
| 2026-10-28T09:00Z | 354 MW | 359 MW | 64 MW | 74 MW | 35 MW |
| 2026-10-28T10:00Z | 350 MW | 352 MW | 51 MW | 75 MW | 37 MW |
| 2026-10-28T11:00Z | 343 MW | 302 MW | 46 MW | 75 MW | 59 MW |
| 2026-10-28T12:00Z | 360 MW | 184 MW | 38 MW | 76 MW | 40 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T12:00Z.
Installed Capacity
Annual figure for 2026| Hydro | |
|---|---|
| Gas | |
| Solar | |
| Bioenergy | |
| Wind | |
| Storage |
Total installed capacity in Latvia: 4.26 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Riga time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Riga time) | Demand |
|---|---|
| 2025-09-23 | 19.0 GWh |
| 2025-09-24 | 19.6 GWh |
| 2025-09-25 | 19.5 GWh |
| 2025-09-26 | 19.2 GWh |
| 2025-09-27 | 17.2 GWh |
| 2025-09-28 | 17.4 GWh |
| 2025-09-29 | 20.0 GWh |
| 2025-09-30 | 20.9 GWh |
| 2025-10-01 | 20.8 GWh |
| 2025-10-02 | 20.8 GWh |
| 2025-10-03 | 20.8 GWh |
| 2025-10-04 | 18.7 GWh |
| 2025-10-05 | 18.4 GWh |
| 2025-10-06 | 20.7 GWh |
| 2025-10-07 | 20.6 GWh |
| 2025-10-08 | 20.7 GWh |
| 2025-10-09 | 20.9 GWh |
| 2025-10-10 | 20.8 GWh |
| 2025-10-11 | 18.4 GWh |
| 2025-10-12 | 18.4 GWh |
| 2025-10-13 | 20.8 GWh |
| 2025-10-14 | 21.2 GWh |
| 2025-10-15 | 21.4 GWh |
| 2025-10-16 | 21.3 GWh |
| 2025-10-17 | 20.8 GWh |
| 2025-10-18 | 19.0 GWh |
| 2025-10-19 | 18.6 GWh |
| 2025-10-20 | 21.0 GWh |
| 2025-10-21 | 21.6 GWh |
| 2025-10-22 | 21.4 GWh |
| 2025-10-23 | 21.4 GWh |
| 2025-10-24 | 20.9 GWh |
| 2025-10-25 | 18.9 GWh |
| 2025-10-26 | 19.0 GWh |
| 2025-10-27 | 21.0 GWh |
| 2025-10-28 | 21.5 GWh |
| 2025-10-29 | 21.4 GWh |
| 2025-10-30 | 21.7 GWh |
| 2025-10-31 | 21.1 GWh |
| 2025-11-01 | 18.9 GWh |
| 2025-11-02 | 18.7 GWh |
| 2025-11-03 | 21.0 GWh |
| 2025-11-04 | 21.8 GWh |
| 2025-11-05 | 21.5 GWh |
| 2025-11-06 | 21.6 GWh |
| 2025-11-07 | 21.3 GWh |
| 2025-11-08 | 20.2 GWh |
| 2025-11-09 | 19.1 GWh |
| 2025-11-10 | 21.8 GWh |
| 2025-11-11 | 22.3 GWh |
| 2025-11-12 | 22.5 GWh |
| 2025-11-13 | 22.4 GWh |
| 2025-11-14 | 21.7 GWh |
| 2025-11-15 | 20.1 GWh |
| 2025-11-16 | 19.7 GWh |
| 2025-11-17 | 20.4 GWh |
| 2025-11-18 | 19.9 GWh |
| 2025-11-19 | 23.0 GWh |
| 2025-11-20 | 23.3 GWh |
| 2025-11-21 | 23.3 GWh |
| 2025-11-22 | 20.9 GWh |
| 2025-11-23 | 20.6 GWh |
| 2025-11-24 | 23.8 GWh |
| 2025-11-25 | 24.0 GWh |
| 2025-11-26 | 24.4 GWh |
| 2025-11-27 | 24.4 GWh |
| 2025-11-28 | 24.1 GWh |
| 2025-11-29 | 21.7 GWh |
| 2025-11-30 | 20.8 GWh |
| 2025-12-01 | 23.1 GWh |
| 2025-12-02 | 23.5 GWh |
| 2025-12-03 | 23.8 GWh |
| 2025-12-04 | 23.5 GWh |
| 2025-12-05 | 22.8 GWh |
| 2025-12-06 | 20.7 GWh |
| 2025-12-07 | 20.2 GWh |
| 2025-12-08 | 23.2 GWh |
| 2025-12-09 | 23.1 GWh |
| 2025-12-10 | 23.4 GWh |
| 2025-12-11 | 23.2 GWh |
| 2025-12-12 | 22.5 GWh |
| 2025-12-13 | 21.6 GWh |
| 2025-12-14 | 21.6 GWh |
| 2025-12-15 | 23.1 GWh |
| 2025-12-16 | 22.6 GWh |
| 2025-12-17 | 23.3 GWh |
| 2025-12-18 | 23.4 GWh |
| 2025-12-19 | 22.9 GWh |
| 2025-12-20 | 20.7 GWh |
| 2025-12-21 | 20.1 GWh |
| 2025-12-22 | 21.8 GWh |
| 2025-12-23 | 22.6 GWh |
| 2025-12-24 | 20.9 GWh |
| 2025-12-25 | 19.3 GWh |
| 2025-12-26 | 18.9 GWh |
| 2025-12-27 | 19.6 GWh |
| 2025-12-28 | 19.9 GWh |
| 2025-12-29 | 21.9 GWh |
| 2025-12-30 | 22.5 GWh |
| 2025-12-31 | 21.3 GWh |
| 2026-01-01 | 20.1 GWh |
| 2026-01-02 | 20.7 GWh |
| 2026-01-03 | 20.1 GWh |
| 2026-01-04 | 20.5 GWh |
| 2026-01-05 | 23.6 GWh |
| 2026-01-06 | 24.6 GWh |
| 2026-01-07 | 25.0 GWh |
| 2026-01-08 | 26.2 GWh |
| 2026-01-09 | 26.0 GWh |
| 2026-01-10 | 23.5 GWh |
| 2026-01-11 | 22.9 GWh |
| 2026-01-12 | 26.0 GWh |
| 2026-01-13 | 26.6 GWh |
| 2026-01-14 | 27.1 GWh |
| 2026-01-15 | 26.9 GWh |
| 2026-01-16 | 26.6 GWh |
| 2026-01-17 | 24.7 GWh |
| 2026-01-18 | 23.8 GWh |
| 2026-01-19 | 26.9 GWh |
| 2026-01-20 | 28.2 GWh |
| 2026-01-21 | 28.6 GWh |
| 2026-01-22 | 26.6 GWh |
| 2026-01-23 | 26.0 GWh |
| 2026-01-24 | 24.2 GWh |
| 2026-01-25 | 24.1 GWh |
| 2026-01-26 | 26.6 GWh |
| 2026-01-27 | 26.8 GWh |
| 2026-01-28 | 27.2 GWh |
| 2026-01-29 | 27.0 GWh |
| 2026-01-30 | 27.5 GWh |
| 2026-01-31 | 25.8 GWh |
| 2026-02-01 | 25.6 GWh |
| 2026-02-02 | 27.5 GWh |
| 2026-02-03 | 27.2 GWh |
| 2026-02-04 | 28.3 GWh |
| 2026-02-05 | 27.8 GWh |
| 2026-02-06 | 26.5 GWh |
| 2026-02-07 | 23.7 GWh |
| 2026-02-08 | 23.5 GWh |
| 2026-02-09 | 27.4 GWh |
| 2026-02-10 | 28.2 GWh |
| 2026-02-11 | 27.3 GWh |
| 2026-02-12 | 26.8 GWh |
| 2026-02-13 | 26.6 GWh |
| 2026-02-14 | 24.2 GWh |
| 2026-02-15 | 24.1 GWh |
| 2026-02-16 | 26.3 GWh |
| 2026-02-17 | 27.1 GWh |
| 2026-02-18 | 27.3 GWh |
| 2026-02-19 | 26.9 GWh |
| 2026-02-20 | 26.2 GWh |
| 2026-02-21 | 23.5 GWh |
| 2026-02-22 | 22.4 GWh |
| 2026-02-23 | 25.5 GWh |
| 2026-02-24 | 25.3 GWh |
| 2026-02-25 | 25.0 GWh |
| 2026-02-26 | 25.1 GWh |
| 2026-02-27 | 24.3 GWh |
| 2026-02-28 | 21.1 GWh |
| 2026-03-01 | 20.5 GWh |
| 2026-03-02 | 23.3 GWh |
| 2026-03-03 | 23.8 GWh |
| 2026-03-04 | 23.1 GWh |
| 2026-03-05 | 22.6 GWh |
| 2026-03-06 | 22.5 GWh |
| 2026-03-07 | 20.3 GWh |
| 2026-03-08 | 19.4 GWh |
| 2026-03-09 | 21.5 GWh |
| 2026-03-10 | 21.8 GWh |
| 2026-03-11 | 22.0 GWh |
| 2026-03-12 | 22.3 GWh |
| 2026-03-13 | 21.8 GWh |
| 2026-03-14 | 19.7 GWh |
| 2026-03-15 | 19.0 GWh |
| 2026-03-16 | 22.4 GWh |
| 2026-03-17 | 22.3 GWh |
| 2026-03-18 | 22.9 GWh |
| 2026-03-19 | 22.8 GWh |
| 2026-03-20 | 21.8 GWh |
| 2026-03-21 | 20.0 GWh |
| 2026-03-22 | 19.6 GWh |
| 2026-03-23 | 21.6 GWh |
| 2026-03-24 | 22.0 GWh |
| 2026-03-25 | 22.1 GWh |
| 2026-03-26 | 21.9 GWh |
| 2026-03-27 | 21.5 GWh |
| 2026-03-28 | 19.6 GWh |
| 2026-03-29 | 18.7 GWh |
| 2026-03-30 | 21.7 GWh |
| 2026-03-31 | 21.5 GWh |
| 2026-04-01 | 22.0 GWh |
| 2026-04-02 | 21.0 GWh |
| 2026-04-03 | 18.9 GWh |
| 2026-04-04 | 19.7 GWh |
| 2026-04-05 | 18.0 GWh |
| 2026-04-06 | 19.4 GWh |
| 2026-04-07 | 21.8 GWh |
| 2026-04-08 | 21.6 GWh |
| 2026-04-09 | 21.6 GWh |
| 2026-04-10 | 21.3 GWh |
| 2026-04-11 | 19.0 GWh |
| 2026-04-12 | 18.1 GWh |
| 2026-04-13 | 20.6 GWh |
| 2026-04-14 | 20.7 GWh |
| 2026-04-15 | 20.2 GWh |
| 2026-04-16 | 21.1 GWh |
| 2026-04-17 | 20.5 GWh |
| 2026-04-18 | 18.5 GWh |
| 2026-04-19 | 18.4 GWh |
| 2026-04-20 | 20.3 GWh |
| 2026-04-21 | 20.7 GWh |
| 2026-04-22 | 20.9 GWh |
| 2026-04-23 | 21.0 GWh |
| 2026-04-24 | 20.7 GWh |
| 2026-04-25 | 19.4 GWh |
| 2026-04-26 | 19.0 GWh |
| 2026-04-27 | 21.0 GWh |
| 2026-04-28 | 21.2 GWh |
| 2026-04-29 | 21.2 GWh |
| 2026-04-30 | 21.3 GWh |
| 2026-05-01 | 18.8 GWh |
| 2026-05-02 | 18.0 GWh |
| 2026-05-03 | 17.4 GWh |
| 2026-05-04 | 17.2 GWh |
| 2026-05-05 | 19.1 GWh |
| 2026-05-06 | 19.8 GWh |
| 2026-05-07 | 20.6 GWh |
| 2026-05-08 | 19.8 GWh |
| 2026-05-09 | 17.9 GWh |
| 2026-05-10 | 17.4 GWh |
| 2026-05-11 | 19.3 GWh |
| 2026-05-12 | 19.9 GWh |
| 2026-05-13 | 21.0 GWh |
| 2026-05-14 | 19.8 GWh |
| 2026-05-15 | 19.0 GWh |
| 2026-05-16 | 17.4 GWh |
| 2026-05-17 | 17.1 GWh |
| 2026-05-18 | 19.7 GWh |
| 2026-05-19 | 20.4 GWh |
| 2026-05-20 | 20.1 GWh |
| 2026-05-21 | 19.7 GWh |
| 2026-05-22 | 19.6 GWh |
| 2026-05-23 | 17.2 GWh |
| 2026-05-24 | 16.8 GWh |
| 2026-05-25 | 19.2 GWh |
| 2026-05-26 | 19.3 GWh |
| 2026-05-27 | 19.4 GWh |
| 2026-05-28 | 19.4 GWh |
| 2026-05-29 | 18.8 GWh |
| 2026-05-30 | 16.6 GWh |
| 2026-05-31 | 16.7 GWh |
| 2026-06-01 | 19.0 GWh |
| 2026-06-02 | 19.4 GWh |
| 2026-06-03 | 19.8 GWh |
| 2026-06-04 | 19.8 GWh |
| 2026-06-05 | 19.9 GWh |
| 2026-06-06 | 17.6 GWh |
| 2026-06-07 | 16.8 GWh |
| 2026-06-08 | 19.6 GWh |
| 2026-06-09 | 20.1 GWh |
| 2026-06-10 | 19.7 GWh |
| 2026-06-11 | 20.5 GWh |
| 2026-06-12 | 19.5 GWh |
| 2026-06-13 | 17.8 GWh |
| 2026-06-14 | 17.4 GWh |
| 2026-06-15 | 19.5 GWh |
| 2026-06-16 | 19.9 GWh |
| 2026-06-17 | 20.0 GWh |
| 2026-06-18 | 19.7 GWh |
| 2026-06-19 | 19.3 GWh |
| 2026-06-20 | 17.7 GWh |
| 2026-06-21 | 17.6 GWh |
| 2026-06-22 | 17.4 GWh |
| 2026-06-23 | 15.2 GWh |
| 2026-06-24 | 14.8 GWh |
| 2026-06-25 | 17.9 GWh |
| 2026-06-26 | 18.4 GWh |
| 2026-06-27 | 18.1 GWh |
| 2026-06-28 | 17.5 GWh |
| 2026-06-29 | 20.0 GWh |
| 2026-06-30 | 19.8 GWh |
| 2026-07-01 | 20.2 GWh |
| 2026-07-02 | 19.8 GWh |
| 2026-07-03 | 19.5 GWh |
| 2026-07-04 | 17.2 GWh |
| 2026-07-05 | 16.6 GWh |
| 2026-07-06 | 18.8 GWh |
| 2026-07-07 | 19.1 GWh |
| 2026-07-08 | 19.6 GWh |
| 2026-07-09 | 19.5 GWh |
| 2026-07-10 | 19.1 GWh |
| 2026-07-11 | 17.6 GWh |
| 2026-07-12 | 17.1 GWh |
| 2026-07-13 | 19.4 GWh |
| 2026-07-14 | 19.8 GWh |
| 2026-07-15 | 19.6 GWh |
| 2026-07-16 | 19.8 GWh |
| 2026-07-17 | 19.7 GWh |
| 2026-07-18 | 17.7 GWh |
| 2026-07-19 | 17.0 GWh |
| 2026-07-20 | 20.0 GWh |
| 2026-07-21 | 19.5 GWh |
| 2026-07-22 | 19.3 GWh |
| 2026-07-23 | 19.4 GWh |
| 2026-07-24 | 19.0 GWh |
| 2026-07-25 | 17.2 GWh |
| 2026-07-26 | 17.2 GWh |
| 2026-07-27 | 19.4 GWh |
| 2026-07-28 | 18.9 GWh |
| 2026-07-29 | 19.2 GWh |
| 2026-07-30 | 19.6 GWh |
| 2026-07-31 | 20.1 GWh |
| 2026-08-01 | 18.1 GWh |
| 2026-08-02 | 17.3 GWh |
| 2026-08-03 | 19.6 GWh |
| 2026-08-04 | 20.0 GWh |
| 2026-08-05 | 20.8 GWh |
| 2026-08-06 | 21.4 GWh |
| 2026-08-07 | 20.6 GWh |
| 2026-08-08 | 18.3 GWh |
| 2026-08-09 | 17.9 GWh |
| 2026-08-10 | 20.6 GWh |
| 2026-08-11 | 20.6 GWh |
| 2026-08-12 | 19.9 GWh |
| 2026-08-13 | 20.2 GWh |
| 2026-08-14 | 20.3 GWh |
| 2026-08-15 | 18.5 GWh |
| 2026-08-16 | 18.0 GWh |
| 2026-08-17 | 20.2 GWh |
| 2026-08-18 | 20.1 GWh |
| 2026-08-19 | 20.2 GWh |
| 2026-08-20 | 20.6 GWh |
| 2026-08-21 | 20.0 GWh |
| 2026-08-22 | 18.3 GWh |
| 2026-08-23 | 14.7 GWh |
| 2026-08-24 | 19.0 GWh |
| 2026-08-25 | 19.9 GWh |
| 2026-08-26 | 20.5 GWh |
| 2026-08-27 | 20.6 GWh |
| 2026-08-28 | 20.5 GWh |
| 2026-08-29 | 18.5 GWh |
| 2026-08-30 | 18.0 GWh |
| 2026-08-31 | 20.3 GWh |
| 2026-09-01 | 19.7 GWh |
| 2026-09-02 | 19.4 GWh |
| 2026-09-03 | 19.1 GWh |
| 2026-09-04 | 19.4 GWh |
| 2026-09-05 | 17.5 GWh |
| 2026-09-06 | 17.0 GWh |
| 2026-09-07 | 19.3 GWh |
| 2026-09-08 | 19.8 GWh |
| 2026-09-09 | n/a |
| 2026-09-10 | 21.0 GWh |
| 2026-09-11 | 19.5 GWh |
| 2026-09-12 | 17.7 GWh |
| 2026-09-13 | 17.2 GWh |
| 2026-09-14 | 20.4 GWh |
| 2026-09-15 | 19.1 GWh |
| 2026-09-16 | 19.7 GWh |
| 2026-09-17 | 20.2 GWh |
| 2026-09-18 | 19.4 GWh |
| 2026-09-19 | 18.3 GWh |
| 2026-09-20 | 17.8 GWh |
| 2026-09-21 | 20.1 GWh |
| 2026-09-22 | 20.2 GWh |
| 2026-09-23 | 20.6 GWh |
| 2026-09-24 | 21.2 GWh |
| 2026-09-25 | 21.3 GWh |
| 2026-09-26 | 19.1 GWh |
| 2026-09-27 | 17.6 GWh |
| 2026-09-28 | 20.6 GWh |
| 2026-09-29 | 21.2 GWh |
| 2026-09-30 | 20.4 GWh |
| 2026-10-01 | 20.9 GWh |
| 2026-10-02 | 21.0 GWh |
| 2026-10-03 | 18.1 GWh |
| 2026-10-04 | 18.3 GWh |
| 2026-10-05 | 21.3 GWh |
| 2026-10-06 | 20.6 GWh |
| 2026-10-07 | 21.6 GWh |
| 2026-10-08 | 20.8 GWh |
| 2026-10-09 | 21.3 GWh |
| 2026-10-10 | 18.8 GWh |
| 2026-10-11 | 18.8 GWh |
| 2026-10-12 | 21.5 GWh |
| 2026-10-13 | 22.2 GWh |
| 2026-10-14 | 22.1 GWh |
| 2026-10-15 | 22.2 GWh |
| 2026-10-16 | 21.1 GWh |
| 2026-10-17 | 19.5 GWh |
| 2026-10-18 | 18.8 GWh |
| 2026-10-19 | 21.6 GWh |
| 2026-10-20 | 22.4 GWh |
| 2026-10-21 | n/a |
| 2026-10-22 | 22.5 GWh |
| 2026-10-23 | 21.3 GWh |
| 2026-10-24 | 20.2 GWh |
| 2026-10-25 | 20.2 GWh |
| 2026-10-26 | 22.0 GWh |
| 2026-10-27 | 22.0 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Riga local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 6.21 TWh | 5.53 TWh | Hydro 38.6% | 298 |
| 2025 | 7.20 TWh | 5.80 TWh | Hydro 50.8% | 365 |
| 2024 | 6.98 TWh | 5.91 TWh | Hydro 54.1% | 366 |
| 2023 | 6.47 TWh | 5.69 TWh | Hydro 65.2% | 365 |
| 2022 | 6.81 TWh | 4.50 TWh | Hydro 59.0% | 365 |
| 2021 | 7.31 TWh | 5.52 TWh | Hydro 47.2% | 365 |
| 2020 | 7.06 TWh | 5.43 TWh | Hydro 46.2% | 366 |
| 2019 | 7.23 TWh | 6.06 TWh | Gas 45.0% | 365 |
| 2018 | 7.34 TWh | 6.40 TWh | Gas 40.9% | 365 |
| 2017 | 7.22 TWh | 7.17 TWh | Hydro 57.9% | 365 |
| 2016 | 7.21 TWh | 6.13 TWh | Hydro 39.4% | 366 |
| 2015 (partial) | 7.05 TWh | 4.89 TWh | Gas 41.2% | 364 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Latest Grid Alerts
Newest alert 19 October 2026- Day ahead price Latvia had a day ahead price averaging EUR 199.87/MWh for 19 October 2026, 2.4 times its own 90 day median (EUR 82.95/MWh). All alerts that day
- Day ahead price The day ahead price in Latvia averaged EUR 176.84/MWh for 16 October 2026, 2.3 times its 90 day median of EUR 78.52/MWh. All alerts that day
- Day ahead price Latvia had a day ahead price averaging EUR 201.97/MWh for 15 October 2026, 2.6 times its own 90 day median (EUR 78.52/MWh). All alerts that day
Follow this grid: RSS feed of Latvia alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Latvia, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Latvia Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/lv/
World Power Monitor. Latvia Electricity Demand and Generation Mix. Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/lv/
@misc{wpm_zones_lv_2026,
title = {{Latvia Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 12:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/lv/}
} Permalink: https://worldpowermonitor.com/zones/lv/
The Copy buttons add today's date as the access date.