Italy Centre-South Electricity Demand and Generation Mix
Italy Centre-South demand was 5,764 MW in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00). Solar was the largest source in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00), at 58% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Italy Centre-South is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00), demand in Italy Centre-South was 5,764 MW, against a day-ahead forecast of 5,640 MW.
- Solar supplied 58.3% of Italy Centre-South's generation in the hour starting 28 Oct 2026, 12:00 CET (UTC+01:00).
- The day-ahead price in Italy Centre-South averaged EUR 277.26/MWh for delivery on 2026-10-28 (28 October 2026).
- Demand in Italy Centre-South totalled 48.0 TWh in 2025.
- Gas supplied 46.1% of Italy Centre-South's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 28 Oct 2026, 12:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00:00Z.
Generation by Source
Latest hour with generation by source: 28 Oct 2026, 12:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Solar | 2,658 MW | 58.3% |
| Gas | 1,174 MW | 25.7% |
| Wind | 319 MW | 7.0% |
| Other | 222 MW | 4.9% |
| Hydro | 120 MW | 2.6% |
| Bioenergy | 69 MW | 1.5% |
| Coal | 1 MW | 0.0% |
| Oil | 0 MW | 0.0% |
| Total from these sources | 4,563 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Oil is shown as Italy Centre-South reports it: the platform has published zero for every day since 25 September 2026 (the last non zero daily total was on 24 September 2026). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00:00Z.
Day-Ahead Price
Delivery day 2026-10-28 (28 October 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Italy Centre-South and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28.
Last 30 Days, Hourly
Times in UTCShow the data table (685 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-29T23:00Z | 4,133 MW |
| 2026-09-30T00:00Z | 3,960 MW |
| 2026-09-30T01:00Z | 3,892 MW |
| 2026-09-30T02:00Z | 3,968 MW |
| 2026-09-30T03:00Z | 4,219 MW |
| 2026-09-30T04:00Z | 4,883 MW |
| 2026-09-30T05:00Z | 5,494 MW |
| 2026-09-30T06:00Z | 5,990 MW |
| 2026-09-30T07:00Z | 6,140 MW |
| 2026-09-30T08:00Z | 6,290 MW |
| 2026-09-30T09:00Z | 6,253 MW |
| 2026-09-30T10:00Z | 6,057 MW |
| 2026-09-30T11:00Z | 5,886 MW |
| 2026-09-30T12:00Z | 6,105 MW |
| 2026-09-30T13:00Z | 6,064 MW |
| 2026-09-30T14:00Z | 6,178 MW |
| 2026-09-30T15:00Z | 6,343 MW |
| 2026-09-30T16:00Z | 6,467 MW |
| 2026-09-30T17:00Z | 6,902 MW |
| 2026-09-30T18:00Z | 6,431 MW |
| 2026-09-30T19:00Z | 5,824 MW |
| 2026-09-30T20:00Z | 5,084 MW |
| 2026-09-30T21:00Z | 4,593 MW |
| 2026-09-30T22:00Z | 4,124 MW |
| 2026-09-30T23:00Z | 3,890 MW |
| 2026-10-01T00:00Z | 3,692 MW |
| 2026-10-01T01:00Z | 3,577 MW |
| 2026-10-01T02:00Z | 3,588 MW |
| 2026-10-01T03:00Z | 3,863 MW |
| 2026-10-01T04:00Z | 4,506 MW |
| 2026-10-01T05:00Z | 5,204 MW |
| 2026-10-01T06:00Z | 5,681 MW |
| 2026-10-01T07:00Z | 5,898 MW |
| 2026-10-01T08:00Z | 5,906 MW |
| 2026-10-01T09:00Z | 5,852 MW |
| 2026-10-01T10:00Z | 5,816 MW |
| 2026-10-01T11:00Z | 5,581 MW |
| 2026-10-01T12:00Z | 5,714 MW |
| 2026-10-01T13:00Z | 5,746 MW |
| 2026-10-01T14:00Z | 5,650 MW |
| 2026-10-01T15:00Z | 5,898 MW |
| 2026-10-01T16:00Z | 6,137 MW |
| 2026-10-01T17:00Z | 6,515 MW |
| 2026-10-01T18:00Z | 6,224 MW |
| 2026-10-01T19:00Z | 5,665 MW |
| 2026-10-01T20:00Z | 5,123 MW |
| 2026-10-01T21:00Z | 4,475 MW |
| 2026-10-01T22:00Z | 4,137 MW |
| 2026-10-01T23:00Z | 3,897 MW |
| 2026-10-02T00:00Z | 3,717 MW |
| 2026-10-02T01:00Z | 3,648 MW |
| 2026-10-02T02:00Z | 3,663 MW |
| 2026-10-02T03:00Z | 3,933 MW |
| 2026-10-02T04:00Z | 4,550 MW |
| 2026-10-02T05:00Z | 5,198 MW |
| 2026-10-02T06:00Z | 5,713 MW |
| 2026-10-02T07:00Z | 5,982 MW |
| 2026-10-02T08:00Z | 5,936 MW |
| 2026-10-02T09:00Z | 5,858 MW |
| 2026-10-02T10:00Z | 5,876 MW |
| 2026-10-02T11:00Z | 5,838 MW |
| 2026-10-02T12:00Z | 5,754 MW |
| 2026-10-02T13:00Z | 5,987 MW |
| 2026-10-02T14:00Z | 6,098 MW |
| 2026-10-02T15:00Z | 6,046 MW |
| 2026-10-02T16:00Z | 6,249 MW |
| 2026-10-02T17:00Z | 6,572 MW |
| 2026-10-02T18:00Z | 6,278 MW |
| 2026-10-02T19:00Z | 5,730 MW |
| 2026-10-02T20:00Z | 5,232 MW |
| 2026-10-02T21:00Z | 4,723 MW |
| 2026-10-02T22:00Z | 4,275 MW |
| 2026-10-02T23:00Z | 4,063 MW |
| 2026-10-03T00:00Z | 3,856 MW |
| 2026-10-03T01:00Z | 3,776 MW |
| 2026-10-03T02:00Z | 3,690 MW |
| 2026-10-03T03:00Z | 3,892 MW |
| 2026-10-03T04:00Z | 4,192 MW |
| 2026-10-03T05:00Z | 4,477 MW |
| 2026-10-03T06:00Z | 4,924 MW |
| 2026-10-03T07:00Z | 5,176 MW |
| 2026-10-03T08:00Z | 5,302 MW |
| 2026-10-03T09:00Z | 5,250 MW |
| 2026-10-03T10:00Z | 5,053 MW |
| 2026-10-03T11:00Z | 4,787 MW |
| 2026-10-03T12:00Z | 4,785 MW |
| 2026-10-03T13:00Z | 4,817 MW |
| 2026-10-03T14:00Z | 5,021 MW |
| 2026-10-03T15:00Z | 5,205 MW |
| 2026-10-03T16:00Z | 5,375 MW |
| 2026-10-03T17:00Z | 6,019 MW |
| 2026-10-03T18:00Z | 5,688 MW |
| 2026-10-03T19:00Z | 5,182 MW |
| 2026-10-03T20:00Z | 4,805 MW |
| 2026-10-03T21:00Z | 4,417 MW |
| 2026-10-03T22:00Z | 4,435 MW |
| 2026-10-03T23:00Z | 4,369 MW |
| 2026-10-04T00:00Z | 4,236 MW |
| 2026-10-04T01:00Z | 4,170 MW |
| 2026-10-04T02:00Z | 4,187 MW |
| 2026-10-04T03:00Z | 4,213 MW |
| 2026-10-04T04:00Z | 4,362 MW |
| 2026-10-04T05:00Z | 4,404 MW |
| 2026-10-04T06:00Z | 4,786 MW |
| 2026-10-04T07:00Z | 5,269 MW |
| 2026-10-04T08:00Z | 5,425 MW |
| 2026-10-04T09:00Z | 5,350 MW |
| 2026-10-04T10:00Z | 5,293 MW |
| 2026-10-04T11:00Z | 4,955 MW |
| 2026-10-04T12:00Z | 4,742 MW |
| 2026-10-04T13:00Z | 4,882 MW |
| 2026-10-04T14:00Z | 4,998 MW |
| 2026-10-04T15:00Z | 5,215 MW |
| 2026-10-04T16:00Z | 5,538 MW |
| 2026-10-04T17:00Z | 6,065 MW |
| 2026-10-04T18:00Z | 5,984 MW |
| 2026-10-04T19:00Z | 5,627 MW |
| 2026-10-04T20:00Z | 5,212 MW |
| 2026-10-04T21:00Z | 4,905 MW |
| 2026-10-04T22:00Z | 4,559 MW |
| 2026-10-04T23:00Z | 4,252 MW |
| 2026-10-05T00:00Z | 4,185 MW |
| 2026-10-05T01:00Z | 4,126 MW |
| 2026-10-05T02:00Z | 4,202 MW |
| 2026-10-05T03:00Z | 4,423 MW |
| 2026-10-05T04:00Z | 5,162 MW |
| 2026-10-05T05:00Z | 5,674 MW |
| 2026-10-05T06:00Z | 5,965 MW |
| 2026-10-05T07:00Z | 6,337 MW |
| 2026-10-05T08:00Z | 6,521 MW |
| 2026-10-05T09:00Z | 6,595 MW |
| 2026-10-05T10:00Z | 6,470 MW |
| 2026-10-05T11:00Z | 6,287 MW |
| 2026-10-05T12:00Z | 6,424 MW |
| 2026-10-05T13:00Z | 6,492 MW |
| 2026-10-05T14:00Z | 6,202 MW |
| 2026-10-05T15:00Z | 6,128 MW |
| 2026-10-05T16:00Z | 6,371 MW |
| 2026-10-05T17:00Z | 6,884 MW |
| 2026-10-05T18:00Z | 6,600 MW |
| 2026-10-05T19:00Z | 6,074 MW |
| 2026-10-05T20:00Z | 5,491 MW |
| 2026-10-05T21:00Z | 4,997 MW |
| 2026-10-05T22:00Z | 4,540 MW |
| 2026-10-05T23:00Z | 4,268 MW |
| 2026-10-06T00:00Z | 4,120 MW |
| 2026-10-06T01:00Z | 4,102 MW |
| 2026-10-06T02:00Z | 4,070 MW |
| 2026-10-06T03:00Z | 4,330 MW |
| 2026-10-06T04:00Z | 5,037 MW |
| 2026-10-06T05:00Z | 5,614 MW |
| 2026-10-06T06:00Z | 6,207 MW |
| 2026-10-06T07:00Z | 6,421 MW |
| 2026-10-06T08:00Z | 6,584 MW |
| 2026-10-06T09:00Z | 6,587 MW |
| 2026-10-06T10:00Z | 6,518 MW |
| 2026-10-06T11:00Z | 6,448 MW |
| 2026-10-06T12:00Z | 6,400 MW |
| 2026-10-06T13:00Z | 6,385 MW |
| 2026-10-06T14:00Z | 6,257 MW |
| 2026-10-06T15:00Z | 6,200 MW |
| 2026-10-06T16:00Z | 6,440 MW |
| 2026-10-06T17:00Z | 6,905 MW |
| 2026-10-06T18:00Z | 6,549 MW |
| 2026-10-06T19:00Z | 6,019 MW |
| 2026-10-06T20:00Z | 5,463 MW |
| 2026-10-06T21:00Z | 4,978 MW |
| 2026-10-06T22:00Z | 4,511 MW |
| 2026-10-06T23:00Z | 4,283 MW |
| 2026-10-07T00:00Z | 4,164 MW |
| 2026-10-07T01:00Z | 4,042 MW |
| 2026-10-07T02:00Z | 4,117 MW |
| 2026-10-07T03:00Z | 4,409 MW |
| 2026-10-07T04:00Z | 5,126 MW |
| 2026-10-07T05:00Z | 5,694 MW |
| 2026-10-07T06:00Z | 6,305 MW |
| 2026-10-07T07:00Z | 6,336 MW |
| 2026-10-07T08:00Z | 6,238 MW |
| 2026-10-07T09:00Z | 6,331 MW |
| 2026-10-07T10:00Z | 6,879 MW |
| 2026-10-07T11:00Z | 6,005 MW |
| 2026-10-07T12:00Z | 6,191 MW |
| 2026-10-07T13:00Z | 6,056 MW |
| 2026-10-07T14:00Z | 6,112 MW |
| 2026-10-07T15:00Z | 6,194 MW |
| 2026-10-07T16:00Z | 6,498 MW |
| 2026-10-07T17:00Z | 6,812 MW |
| 2026-10-07T18:00Z | 6,560 MW |
| 2026-10-07T19:00Z | 6,053 MW |
| 2026-10-07T20:00Z | 5,499 MW |
| 2026-10-07T21:00Z | 4,927 MW |
| 2026-10-07T22:00Z | 4,425 MW |
| 2026-10-07T23:00Z | 4,078 MW |
| 2026-10-08T00:00Z | 3,969 MW |
| 2026-10-08T01:00Z | 3,827 MW |
| 2026-10-08T02:00Z | 3,661 MW |
| 2026-10-08T03:00Z | 3,949 MW |
| 2026-10-08T04:00Z | 4,608 MW |
| 2026-10-08T05:00Z | 5,246 MW |
| 2026-10-08T06:00Z | 5,675 MW |
| 2026-10-08T07:00Z | 6,079 MW |
| 2026-10-08T08:00Z | 6,441 MW |
| 2026-10-08T09:00Z | 6,519 MW |
| 2026-10-08T10:00Z | 6,439 MW |
| 2026-10-08T11:00Z | 5,913 MW |
| 2026-10-08T12:00Z | 5,907 MW |
| 2026-10-08T13:00Z | 5,799 MW |
| 2026-10-08T14:00Z | 5,665 MW |
| 2026-10-08T15:00Z | 5,761 MW |
| 2026-10-08T16:00Z | 6,133 MW |
| 2026-10-08T17:00Z | 6,573 MW |
| 2026-10-08T18:00Z | 6,209 MW |
| 2026-10-08T19:00Z | 5,685 MW |
| 2026-10-08T20:00Z | 5,228 MW |
| 2026-10-08T21:00Z | 4,853 MW |
| 2026-10-08T22:00Z | 4,289 MW |
| 2026-10-08T23:00Z | 3,744 MW |
| 2026-10-09T00:00Z | 3,558 MW |
| 2026-10-09T01:00Z | 3,472 MW |
| 2026-10-09T02:00Z | 3,441 MW |
| 2026-10-09T03:00Z | 3,567 MW |
| 2026-10-09T04:00Z | 4,121 MW |
| 2026-10-09T05:00Z | 4,836 MW |
| 2026-10-09T06:00Z | 5,498 MW |
| 2026-10-09T07:00Z | 6,207 MW |
| 2026-10-09T08:00Z | 6,454 MW |
| 2026-10-09T09:00Z | 6,542 MW |
| 2026-10-09T10:00Z | 6,205 MW |
| 2026-10-09T11:00Z | 6,020 MW |
| 2026-10-09T12:00Z | 6,268 MW |
| 2026-10-09T13:00Z | 6,252 MW |
| 2026-10-09T14:00Z | 6,076 MW |
| 2026-10-09T15:00Z | 6,080 MW |
| 2026-10-09T16:00Z | 6,590 MW |
| 2026-10-09T17:00Z | 6,940 MW |
| 2026-10-09T18:00Z | 6,413 MW |
| 2026-10-09T19:00Z | 5,837 MW |
| 2026-10-09T20:00Z | 5,371 MW |
| 2026-10-09T21:00Z | 4,694 MW |
| 2026-10-09T22:00Z | 4,566 MW |
| 2026-10-09T23:00Z | 4,264 MW |
| 2026-10-10T00:00Z | 4,027 MW |
| 2026-10-10T01:00Z | 3,954 MW |
| 2026-10-10T02:00Z | 3,987 MW |
| 2026-10-10T03:00Z | 4,028 MW |
| 2026-10-10T04:00Z | 4,456 MW |
| 2026-10-10T05:00Z | 4,763 MW |
| 2026-10-10T06:00Z | 5,068 MW |
| 2026-10-10T07:00Z | 5,500 MW |
| 2026-10-10T08:00Z | 5,669 MW |
| 2026-10-10T09:00Z | 5,848 MW |
| 2026-10-10T10:00Z | 5,947 MW |
| 2026-10-10T11:00Z | 5,813 MW |
| 2026-10-10T12:00Z | 5,500 MW |
| 2026-10-10T13:00Z | 5,411 MW |
| 2026-10-10T14:00Z | 5,342 MW |
| 2026-10-10T15:00Z | 5,399 MW |
| 2026-10-10T16:00Z | 5,756 MW |
| 2026-10-10T17:00Z | 6,204 MW |
| 2026-10-10T18:00Z | 5,829 MW |
| 2026-10-10T19:00Z | 5,312 MW |
| 2026-10-10T20:00Z | 4,991 MW |
| 2026-10-10T21:00Z | 4,555 MW |
| 2026-10-10T22:00Z | 4,172 MW |
| 2026-10-10T23:00Z | 3,805 MW |
| 2026-10-11T00:00Z | 3,562 MW |
| 2026-10-11T01:00Z | 3,439 MW |
| 2026-10-11T02:00Z | 3,246 MW |
| 2026-10-11T03:00Z | 3,331 MW |
| 2026-10-11T04:00Z | 3,454 MW |
| 2026-10-11T05:00Z | 3,472 MW |
| 2026-10-11T06:00Z | 3,970 MW |
| 2026-10-11T07:00Z | 4,365 MW |
| 2026-10-11T08:00Z | 4,494 MW |
| 2026-10-11T09:00Z | 4,604 MW |
| 2026-10-11T10:00Z | 4,659 MW |
| 2026-10-11T11:00Z | 4,433 MW |
| 2026-10-11T12:00Z | 4,230 MW |
| 2026-10-11T13:00Z | 4,457 MW |
| 2026-10-11T14:00Z | 4,545 MW |
| 2026-10-11T15:00Z | 4,789 MW |
| 2026-10-11T16:00Z | 5,195 MW |
| 2026-10-11T17:00Z | 5,813 MW |
| 2026-10-11T18:00Z | 5,712 MW |
| 2026-10-11T19:00Z | 5,302 MW |
| 2026-10-11T20:00Z | 4,929 MW |
| 2026-10-11T21:00Z | 4,594 MW |
| 2026-10-11T22:00Z | 4,339 MW |
| 2026-10-11T23:00Z | 4,095 MW |
| 2026-10-12T00:00Z | 3,975 MW |
| 2026-10-12T01:00Z | 3,875 MW |
| 2026-10-12T02:00Z | 3,936 MW |
| 2026-10-12T03:00Z | 4,254 MW |
| 2026-10-12T04:00Z | 4,979 MW |
| 2026-10-12T05:00Z | 5,536 MW |
| 2026-10-12T06:00Z | 5,931 MW |
| 2026-10-12T07:00Z | 6,277 MW |
| 2026-10-12T08:00Z | 6,271 MW |
| 2026-10-12T09:00Z | 6,165 MW |
| 2026-10-12T10:00Z | 6,071 MW |
| 2026-10-12T11:00Z | 5,900 MW |
| 2026-10-12T12:00Z | 6,001 MW |
| 2026-10-12T13:00Z | 5,842 MW |
| 2026-10-12T14:00Z | 5,612 MW |
| 2026-10-12T15:00Z | 5,774 MW |
| 2026-10-12T16:00Z | 6,144 MW |
| 2026-10-12T17:00Z | 6,440 MW |
| 2026-10-12T18:00Z | 6,048 MW |
| 2026-10-12T19:00Z | 5,517 MW |
| 2026-10-12T20:00Z | 4,816 MW |
| 2026-10-12T21:00Z | 4,126 MW |
| 2026-10-12T22:00Z | 3,845 MW |
| 2026-10-12T23:00Z | 3,963 MW |
| 2026-10-13T00:00Z | 3,939 MW |
| 2026-10-13T01:00Z | 3,767 MW |
| 2026-10-13T02:00Z | 3,606 MW |
| 2026-10-13T03:00Z | 3,685 MW |
| 2026-10-13T04:00Z | 4,230 MW |
| 2026-10-13T05:00Z | 4,910 MW |
| 2026-10-13T06:00Z | 5,475 MW |
| 2026-10-13T07:00Z | 5,712 MW |
| 2026-10-13T08:00Z | 5,660 MW |
| 2026-10-13T09:00Z | 5,523 MW |
| 2026-10-13T10:00Z | 5,473 MW |
| 2026-10-13T11:00Z | 5,383 MW |
| 2026-10-13T12:00Z | 5,482 MW |
| 2026-10-13T13:00Z | 5,561 MW |
| 2026-10-13T14:00Z | 5,480 MW |
| 2026-10-13T15:00Z | 5,592 MW |
| 2026-10-13T16:00Z | 5,610 MW |
| 2026-10-13T17:00Z | 6,167 MW |
| 2026-10-13T18:00Z | 5,731 MW |
| 2026-10-13T19:00Z | 5,255 MW |
| 2026-10-13T20:00Z | 4,768 MW |
| 2026-10-13T21:00Z | 4,435 MW |
| 2026-10-13T22:00Z | 3,987 MW |
| 2026-10-13T23:00Z | 3,643 MW |
| 2026-10-14T00:00Z | 3,544 MW |
| 2026-10-14T01:00Z | 3,450 MW |
| 2026-10-14T02:00Z | 3,512 MW |
| 2026-10-14T03:00Z | 3,858 MW |
| 2026-10-14T04:00Z | 4,607 MW |
| 2026-10-14T05:00Z | 5,281 MW |
| 2026-10-14T06:00Z | 5,680 MW |
| 2026-10-14T07:00Z | 5,767 MW |
| 2026-10-14T08:00Z | 5,784 MW |
| 2026-10-14T09:00Z | 5,613 MW |
| 2026-10-14T10:00Z | 5,469 MW |
| 2026-10-14T11:00Z | 5,285 MW |
| 2026-10-14T12:00Z | 5,386 MW |
| 2026-10-14T13:00Z | 5,493 MW |
| 2026-10-14T14:00Z | 5,608 MW |
| 2026-10-14T15:00Z | 5,746 MW |
| 2026-10-14T16:00Z | 5,857 MW |
| 2026-10-14T17:00Z | 5,959 MW |
| 2026-10-14T18:00Z | 5,762 MW |
| 2026-10-14T19:00Z | 5,262 MW |
| 2026-10-14T20:00Z | 4,778 MW |
| 2026-10-14T21:00Z | 4,237 MW |
| 2026-10-14T22:00Z | 3,724 MW |
| 2026-10-14T23:00Z | 3,702 MW |
| 2026-10-15T00:00Z | 3,376 MW |
| 2026-10-15T01:00Z | 3,265 MW |
| 2026-10-15T02:00Z | 3,342 MW |
| 2026-10-15T03:00Z | 3,643 MW |
| 2026-10-15T04:00Z | 4,344 MW |
| 2026-10-15T05:00Z | 4,897 MW |
| 2026-10-15T06:00Z | 5,502 MW |
| 2026-10-15T07:00Z | 5,793 MW |
| 2026-10-15T08:00Z | 5,702 MW |
| 2026-10-15T09:00Z | 5,703 MW |
| 2026-10-15T10:00Z | 5,588 MW |
| 2026-10-15T11:00Z | 5,527 MW |
| 2026-10-15T12:00Z | 5,634 MW |
| 2026-10-15T13:00Z | 5,640 MW |
| 2026-10-15T14:00Z | 5,686 MW |
| 2026-10-15T15:00Z | 5,686 MW |
| 2026-10-15T16:00Z | 5,882 MW |
| 2026-10-15T17:00Z | 6,247 MW |
| 2026-10-15T18:00Z | 5,942 MW |
| 2026-10-15T19:00Z | 5,403 MW |
| 2026-10-15T20:00Z | 4,809 MW |
| 2026-10-15T21:00Z | 4,385 MW |
| 2026-10-15T22:00Z | 3,937 MW |
| 2026-10-15T23:00Z | 3,828 MW |
| 2026-10-16T00:00Z | 3,420 MW |
| 2026-10-16T01:00Z | 3,345 MW |
| 2026-10-16T02:00Z | 3,377 MW |
| 2026-10-16T03:00Z | 3,642 MW |
| 2026-10-16T04:00Z | 4,333 MW |
| 2026-10-16T05:00Z | 5,014 MW |
| 2026-10-16T06:00Z | 5,639 MW |
| 2026-10-16T07:00Z | 6,010 MW |
| 2026-10-16T08:00Z | 5,946 MW |
| 2026-10-16T09:00Z | 5,889 MW |
| 2026-10-16T10:00Z | 5,630 MW |
| 2026-10-16T11:00Z | 5,432 MW |
| 2026-10-16T12:00Z | 5,548 MW |
| 2026-10-16T13:00Z | 5,595 MW |
| 2026-10-16T14:00Z | 5,505 MW |
| 2026-10-16T15:00Z | 5,596 MW |
| 2026-10-16T16:00Z | 6,041 MW |
| 2026-10-16T17:00Z | 6,343 MW |
| 2026-10-16T18:00Z | 6,045 MW |
| 2026-10-16T19:00Z | 5,481 MW |
| 2026-10-16T20:00Z | 4,882 MW |
| 2026-10-16T21:00Z | 4,360 MW |
| 2026-10-16T22:00Z | 4,008 MW |
| 2026-10-16T23:00Z | 4,141 MW |
| 2026-10-17T00:00Z | 3,617 MW |
| 2026-10-17T01:00Z | 3,555 MW |
| 2026-10-17T02:00Z | 3,573 MW |
| 2026-10-17T03:00Z | 3,709 MW |
| 2026-10-17T04:00Z | 4,029 MW |
| 2026-10-17T05:00Z | 4,310 MW |
| 2026-10-17T06:00Z | 4,550 MW |
| 2026-10-17T07:00Z | 4,872 MW |
| 2026-10-17T08:00Z | 4,965 MW |
| 2026-10-17T09:00Z | 5,032 MW |
| 2026-10-17T10:00Z | 4,932 MW |
| 2026-10-17T11:00Z | 4,737 MW |
| 2026-10-17T12:00Z | 4,667 MW |
| 2026-10-17T13:00Z | 4,723 MW |
| 2026-10-17T14:00Z | 4,738 MW |
| 2026-10-17T15:00Z | 4,872 MW |
| 2026-10-17T16:00Z | 5,284 MW |
| 2026-10-17T17:00Z | 5,670 MW |
| 2026-10-17T18:00Z | 5,505 MW |
| 2026-10-17T19:00Z | 5,004 MW |
| 2026-10-17T20:00Z | 4,526 MW |
| 2026-10-17T21:00Z | 4,094 MW |
| 2026-10-17T22:00Z | 4,002 MW |
| 2026-10-17T23:00Z | 3,863 MW |
| 2026-10-18T00:00Z | 3,654 MW |
| 2026-10-18T01:00Z | 3,570 MW |
| 2026-10-18T02:00Z | 3,530 MW |
| 2026-10-18T03:00Z | 3,575 MW |
| 2026-10-18T04:00Z | 3,828 MW |
| 2026-10-18T05:00Z | 3,965 MW |
| 2026-10-18T06:00Z | 4,445 MW |
| 2026-10-18T07:00Z | 4,835 MW |
| 2026-10-18T08:00Z | 5,051 MW |
| 2026-10-18T09:00Z | 5,070 MW |
| 2026-10-18T10:00Z | 4,945 MW |
| 2026-10-18T11:00Z | 4,815 MW |
| 2026-10-18T12:00Z | 4,437 MW |
| 2026-10-18T13:00Z | 4,379 MW |
| 2026-10-18T14:00Z | 4,876 MW |
| 2026-10-18T15:00Z | 4,946 MW |
| 2026-10-18T16:00Z | 5,287 MW |
| 2026-10-18T17:00Z | 5,686 MW |
| 2026-10-18T18:00Z | 5,605 MW |
| 2026-10-18T19:00Z | 5,219 MW |
| 2026-10-18T20:00Z | 4,829 MW |
| 2026-10-18T21:00Z | 4,509 MW |
| 2026-10-18T22:00Z | 3,980 MW |
| 2026-10-18T23:00Z | 3,752 MW |
| 2026-10-19T00:00Z | 3,636 MW |
| 2026-10-19T01:00Z | 3,534 MW |
| 2026-10-19T02:00Z | 3,598 MW |
| 2026-10-19T03:00Z | 3,895 MW |
| 2026-10-19T04:00Z | 4,701 MW |
| 2026-10-19T05:00Z | 5,450 MW |
| 2026-10-19T06:00Z | 5,745 MW |
| 2026-10-19T07:00Z | 5,857 MW |
| 2026-10-19T08:00Z | 5,667 MW |
| 2026-10-19T09:00Z | 5,592 MW |
| 2026-10-19T10:00Z | 5,576 MW |
| 2026-10-19T11:00Z | 5,273 MW |
| 2026-10-19T12:00Z | 5,448 MW |
| 2026-10-19T13:00Z | 5,450 MW |
| 2026-10-19T14:00Z | 5,521 MW |
| 2026-10-19T15:00Z | 5,724 MW |
| 2026-10-19T16:00Z | 5,847 MW |
| 2026-10-19T17:00Z | 6,271 MW |
| 2026-10-19T18:00Z | 5,964 MW |
| 2026-10-19T19:00Z | 5,457 MW |
| 2026-10-19T20:00Z | 4,873 MW |
| 2026-10-19T21:00Z | 4,371 MW |
| 2026-10-19T22:00Z | 4,081 MW |
| 2026-10-19T23:00Z | 4,005 MW |
| 2026-10-20T00:00Z | 3,751 MW |
| 2026-10-20T01:00Z | 3,634 MW |
| 2026-10-20T02:00Z | 3,753 MW |
| 2026-10-20T03:00Z | 4,043 MW |
| 2026-10-20T04:00Z | 4,681 MW |
| 2026-10-20T05:00Z | 5,286 MW |
| 2026-10-20T06:00Z | 5,808 MW |
| 2026-10-20T07:00Z | 6,135 MW |
| 2026-10-20T08:00Z | 6,044 MW |
| 2026-10-20T09:00Z | 5,997 MW |
| 2026-10-20T10:00Z | 5,831 MW |
| 2026-10-20T11:00Z | 5,633 MW |
| 2026-10-20T12:00Z | 5,691 MW |
| 2026-10-20T13:00Z | 5,850 MW |
| 2026-10-20T14:00Z | 5,844 MW |
| 2026-10-20T15:00Z | 5,741 MW |
| 2026-10-20T16:00Z | 5,949 MW |
| 2026-10-20T17:00Z | 6,252 MW |
| 2026-10-20T18:00Z | 5,937 MW |
| 2026-10-20T19:00Z | 5,439 MW |
| 2026-10-20T20:00Z | 4,862 MW |
| 2026-10-20T21:00Z | 4,593 MW |
| 2026-10-20T22:00Z | 4,173 MW |
| 2026-10-20T23:00Z | 4,038 MW |
| 2026-10-21T00:00Z | 3,904 MW |
| 2026-10-21T01:00Z | 3,853 MW |
| 2026-10-21T02:00Z | 3,729 MW |
| 2026-10-21T03:00Z | 4,098 MW |
| 2026-10-21T04:00Z | 4,779 MW |
| 2026-10-21T05:00Z | 5,432 MW |
| 2026-10-21T06:00Z | 5,925 MW |
| 2026-10-21T07:00Z | 6,320 MW |
| 2026-10-21T08:00Z | 6,508 MW |
| 2026-10-21T09:00Z | 6,786 MW |
| 2026-10-21T10:00Z | 6,350 MW |
| 2026-10-21T11:00Z | 6,104 MW |
| 2026-10-21T12:00Z | 6,083 MW |
| 2026-10-21T13:00Z | 6,134 MW |
| 2026-10-21T14:00Z | 5,968 MW |
| 2026-10-21T15:00Z | 5,659 MW |
| 2026-10-21T16:00Z | 5,864 MW |
| 2026-10-21T17:00Z | 6,311 MW |
| 2026-10-21T18:00Z | 6,053 MW |
| 2026-10-21T19:00Z | 5,506 MW |
| 2026-10-21T20:00Z | 4,921 MW |
| 2026-10-21T21:00Z | 4,492 MW |
| 2026-10-21T22:00Z | 4,111 MW |
| 2026-10-21T23:00Z | 3,897 MW |
| 2026-10-22T00:00Z | 3,703 MW |
| 2026-10-22T01:00Z | 3,584 MW |
| 2026-10-22T02:00Z | 3,539 MW |
| 2026-10-22T03:00Z | 3,768 MW |
| 2026-10-22T04:00Z | 4,444 MW |
| 2026-10-22T05:00Z | 5,214 MW |
| 2026-10-22T06:00Z | 5,721 MW |
| 2026-10-22T07:00Z | 6,123 MW |
| 2026-10-22T08:00Z | 5,960 MW |
| 2026-10-22T09:00Z | 5,851 MW |
| 2026-10-22T10:00Z | 5,708 MW |
| 2026-10-22T11:00Z | 5,451 MW |
| 2026-10-22T12:00Z | 5,537 MW |
| 2026-10-22T13:00Z | 5,485 MW |
| 2026-10-22T14:00Z | 5,592 MW |
| 2026-10-22T15:00Z | 5,465 MW |
| 2026-10-22T16:00Z | 5,887 MW |
| 2026-10-22T17:00Z | 6,231 MW |
| 2026-10-22T18:00Z | 5,916 MW |
| 2026-10-22T19:00Z | 5,511 MW |
| 2026-10-22T20:00Z | 5,023 MW |
| 2026-10-22T21:00Z | 4,572 MW |
| 2026-10-22T22:00Z | 3,950 MW |
| 2026-10-22T23:00Z | 3,705 MW |
| 2026-10-23T00:00Z | 3,576 MW |
| 2026-10-23T01:00Z | 3,531 MW |
| 2026-10-23T02:00Z | 3,560 MW |
| 2026-10-23T03:00Z | 3,770 MW |
| 2026-10-23T04:00Z | 4,310 MW |
| 2026-10-23T05:00Z | 4,942 MW |
| 2026-10-23T06:00Z | 5,581 MW |
| 2026-10-23T07:00Z | 5,963 MW |
| 2026-10-23T08:00Z | 6,071 MW |
| 2026-10-23T09:00Z | 6,079 MW |
| 2026-10-23T10:00Z | 5,922 MW |
| 2026-10-23T11:00Z | 5,590 MW |
| 2026-10-23T12:00Z | 5,592 MW |
| 2026-10-23T13:00Z | 5,671 MW |
| 2026-10-23T14:00Z | 5,738 MW |
| 2026-10-23T15:00Z | 5,623 MW |
| 2026-10-23T16:00Z | 5,910 MW |
| 2026-10-23T17:00Z | 6,207 MW |
| 2026-10-23T18:00Z | 5,834 MW |
| 2026-10-23T19:00Z | 5,326 MW |
| 2026-10-23T20:00Z | 4,804 MW |
| 2026-10-23T21:00Z | 4,418 MW |
| 2026-10-23T22:00Z | 4,067 MW |
| 2026-10-23T23:00Z | 3,773 MW |
| 2026-10-24T00:00Z | 3,588 MW |
| 2026-10-24T01:00Z | 3,488 MW |
| 2026-10-24T02:00Z | 3,572 MW |
| 2026-10-24T03:00Z | 3,783 MW |
| 2026-10-24T04:00Z | 4,177 MW |
| 2026-10-24T05:00Z | 4,630 MW |
| 2026-10-24T06:00Z | 4,952 MW |
| 2026-10-24T07:00Z | 5,409 MW |
| 2026-10-24T08:00Z | 5,351 MW |
| 2026-10-24T09:00Z | 5,106 MW |
| 2026-10-24T10:00Z | 5,074 MW |
| 2026-10-24T11:00Z | 4,885 MW |
| 2026-10-24T12:00Z | 5,118 MW |
| 2026-10-24T13:00Z | 4,864 MW |
| 2026-10-24T14:00Z | 4,750 MW |
| 2026-10-24T15:00Z | 4,910 MW |
| 2026-10-24T16:00Z | 5,325 MW |
| 2026-10-24T17:00Z | 5,457 MW |
| 2026-10-24T18:00Z | 5,359 MW |
| 2026-10-24T19:00Z | 5,015 MW |
| 2026-10-24T20:00Z | 4,587 MW |
| 2026-10-24T21:00Z | 4,184 MW |
| 2026-10-24T22:00Z | 3,874 MW |
| 2026-10-24T23:00Z | 3,785 MW |
| 2026-10-25T00:00Z | 3,732 MW |
| 2026-10-25T01:00Z | 3,479 MW |
| 2026-10-25T02:00Z | 3,412 MW |
| 2026-10-25T03:00Z | 3,433 MW |
| 2026-10-25T04:00Z | 3,611 MW |
| 2026-10-25T05:00Z | 3,753 MW |
| 2026-10-25T06:00Z | 4,155 MW |
| 2026-10-25T07:00Z | 4,568 MW |
| 2026-10-25T08:00Z | 4,766 MW |
| 2026-10-25T09:00Z | 4,622 MW |
| 2026-10-25T10:00Z | 4,545 MW |
| 2026-10-25T11:00Z | 4,685 MW |
| 2026-10-25T12:00Z | 4,538 MW |
| 2026-10-25T13:00Z | 4,369 MW |
| 2026-10-25T14:00Z | 4,412 MW |
| 2026-10-25T15:00Z | 4,429 MW |
| 2026-10-25T16:00Z | 4,889 MW |
| 2026-10-25T17:00Z | 5,202 MW |
| 2026-10-25T18:00Z | 5,474 MW |
| 2026-10-25T19:00Z | 5,272 MW |
| 2026-10-25T20:00Z | 4,771 MW |
| 2026-10-25T21:00Z | 4,408 MW |
| 2026-10-25T22:00Z | 4,004 MW |
| 2026-10-25T23:00Z | 3,888 MW |
| 2026-10-26T00:00Z | 3,940 MW |
| 2026-10-26T01:00Z | 3,814 MW |
| 2026-10-26T02:00Z | 3,749 MW |
| 2026-10-26T03:00Z | 3,718 MW |
| 2026-10-26T04:00Z | 4,143 MW |
| 2026-10-26T05:00Z | 4,844 MW |
| 2026-10-26T06:00Z | 5,513 MW |
| 2026-10-26T07:00Z | 5,919 MW |
| 2026-10-26T08:00Z | 6,011 MW |
| 2026-10-26T09:00Z | 5,766 MW |
| 2026-10-26T10:00Z | 5,718 MW |
| 2026-10-26T11:00Z | 5,580 MW |
| 2026-10-26T12:00Z | 5,563 MW |
| 2026-10-26T13:00Z | 5,687 MW |
| 2026-10-26T14:00Z | 5,615 MW |
| 2026-10-26T15:00Z | 5,590 MW |
| 2026-10-26T16:00Z | 5,957 MW |
| 2026-10-26T17:00Z | 6,226 MW |
| 2026-10-26T18:00Z | 6,354 MW |
| 2026-10-26T19:00Z | 6,059 MW |
| 2026-10-26T20:00Z | 5,470 MW |
| 2026-10-26T21:00Z | 4,848 MW |
| 2026-10-26T22:00Z | 4,331 MW |
| 2026-10-26T23:00Z | 3,744 MW |
| 2026-10-27T00:00Z | 3,564 MW |
| 2026-10-27T01:00Z | 3,512 MW |
| 2026-10-27T02:00Z | 3,487 MW |
| 2026-10-27T03:00Z | 3,576 MW |
| 2026-10-27T04:00Z | 3,906 MW |
| 2026-10-27T05:00Z | 4,515 MW |
| 2026-10-27T06:00Z | 5,420 MW |
| 2026-10-27T07:00Z | 5,762 MW |
| 2026-10-27T08:00Z | 5,955 MW |
| 2026-10-27T09:00Z | 5,742 MW |
| 2026-10-27T10:00Z | 5,721 MW |
| 2026-10-27T11:00Z | 5,731 MW |
| 2026-10-27T12:00Z | 5,653 MW |
| 2026-10-27T13:00Z | 5,790 MW |
| 2026-10-27T14:00Z | 5,903 MW |
| 2026-10-27T15:00Z | 5,963 MW |
| 2026-10-27T16:00Z | 6,258 MW |
| 2026-10-27T17:00Z | 6,464 MW |
| 2026-10-27T18:00Z | 6,639 MW |
| 2026-10-27T19:00Z | 6,322 MW |
| 2026-10-27T20:00Z | 5,731 MW |
| 2026-10-27T21:00Z | 5,096 MW |
| 2026-10-27T22:00Z | 4,548 MW |
| 2026-10-27T23:00Z | 4,261 MW |
| 2026-10-28T00:00Z | 4,165 MW |
| 2026-10-28T01:00Z | 3,994 MW |
| 2026-10-28T02:00Z | 3,979 MW |
| 2026-10-28T03:00Z | 4,013 MW |
| 2026-10-28T04:00Z | 4,320 MW |
| 2026-10-28T05:00Z | 4,978 MW |
| 2026-10-28T06:00Z | 5,628 MW |
| 2026-10-28T07:00Z | 6,081 MW |
| 2026-10-28T08:00Z | 6,033 MW |
| 2026-10-28T09:00Z | 5,928 MW |
| 2026-10-28T10:00Z | 5,778 MW |
| 2026-10-28T11:00Z | 5,764 MW |
Show the data table (685 rows)
| Hour starting (UTC) | Gas | Solar | Wind | Other | Hydro |
|---|---|---|---|---|---|
| 2026-09-29T23:00Z | 1,659 MW | 0 MW | 43 MW | 198 MW | 148 MW |
| 2026-09-30T00:00Z | 1,668 MW | 0 MW | 62 MW | 200 MW | 134 MW |
| 2026-09-30T01:00Z | 1,706 MW | 0 MW | 79 MW | 201 MW | 135 MW |
| 2026-09-30T02:00Z | 1,682 MW | 0 MW | 95 MW | 202 MW | 135 MW |
| 2026-09-30T03:00Z | 1,750 MW | 0 MW | 116 MW | 202 MW | 142 MW |
| 2026-09-30T04:00Z | 1,838 MW | 0 MW | 135 MW | 198 MW | 160 MW |
| 2026-09-30T05:00Z | 2,059 MW | 174 MW | 133 MW | 198 MW | 206 MW |
| 2026-09-30T06:00Z | 2,094 MW | 1,188 MW | 91 MW | 198 MW | 243 MW |
| 2026-09-30T07:00Z | 1,960 MW | 2,399 MW | 63 MW | 191 MW | 196 MW |
| 2026-09-30T08:00Z | 1,162 MW | 3,181 MW | 78 MW | 184 MW | 202 MW |
| 2026-09-30T09:00Z | 883 MW | 3,532 MW | 108 MW | 186 MW | 199 MW |
| 2026-09-30T10:00Z | 880 MW | 3,593 MW | 100 MW | 192 MW | 130 MW |
| 2026-09-30T11:00Z | 811 MW | 3,653 MW | 87 MW | 194 MW | 130 MW |
| 2026-09-30T12:00Z | 844 MW | 3,498 MW | 89 MW | 197 MW | 132 MW |
| 2026-09-30T13:00Z | 905 MW | 3,073 MW | 122 MW | 193 MW | 132 MW |
| 2026-09-30T14:00Z | 1,420 MW | 2,274 MW | 129 MW | 191 MW | 151 MW |
| 2026-09-30T15:00Z | 2,557 MW | 1,112 MW | 190 MW | 194 MW | 161 MW |
| 2026-09-30T16:00Z | 2,872 MW | 256 MW | 228 MW | 202 MW | 210 MW |
| 2026-09-30T17:00Z | 3,015 MW | 103 MW | 206 MW | 209 MW | 250 MW |
| 2026-09-30T18:00Z | 2,825 MW | 2 MW | 144 MW | 209 MW | 222 MW |
| 2026-09-30T19:00Z | 2,588 MW | 0 MW | 104 MW | 208 MW | 171 MW |
| 2026-09-30T20:00Z | 2,524 MW | 0 MW | 63 MW | 206 MW | 149 MW |
| 2026-09-30T21:00Z | 2,175 MW | 0 MW | 63 MW | 206 MW | 141 MW |
| 2026-09-30T22:00Z | 1,478 MW | 0 MW | 24 MW | 216 MW | 134 MW |
| 2026-09-30T23:00Z | 1,399 MW | 0 MW | 23 MW | 214 MW | 133 MW |
| 2026-10-01T00:00Z | 1,454 MW | 0 MW | 31 MW | 213 MW | 134 MW |
| 2026-10-01T01:00Z | 1,557 MW | 0 MW | 31 MW | 212 MW | 151 MW |
| 2026-10-01T02:00Z | 1,565 MW | 0 MW | 40 MW | 213 MW | 133 MW |
| 2026-10-01T03:00Z | 1,584 MW | 0 MW | 47 MW | 210 MW | 134 MW |
| 2026-10-01T04:00Z | 1,492 MW | 0 MW | 49 MW | 213 MW | 134 MW |
| 2026-10-01T05:00Z | 1,566 MW | 171 MW | 45 MW | 217 MW | 220 MW |
| 2026-10-01T06:00Z | 1,532 MW | 1,162 MW | 35 MW | 216 MW | 288 MW |
| 2026-10-01T07:00Z | 1,421 MW | 2,359 MW | 27 MW | 213 MW | 242 MW |
| 2026-10-01T08:00Z | 861 MW | 3,140 MW | 28 MW | 210 MW | 236 MW |
| 2026-10-01T09:00Z | 673 MW | 3,515 MW | 31 MW | 205 MW | 221 MW |
| 2026-10-01T10:00Z | 670 MW | 3,639 MW | 31 MW | 203 MW | 132 MW |
| 2026-10-01T11:00Z | 673 MW | 3,573 MW | 61 MW | 205 MW | 134 MW |
| 2026-10-01T12:00Z | 674 MW | 3,355 MW | 88 MW | 202 MW | 148 MW |
| 2026-10-01T13:00Z | 685 MW | 2,799 MW | 138 MW | 205 MW | 130 MW |
| 2026-10-01T14:00Z | 1,280 MW | 1,847 MW | 221 MW | 205 MW | 129 MW |
| 2026-10-01T15:00Z | 2,546 MW | 829 MW | 343 MW | 209 MW | 171 MW |
| 2026-10-01T16:00Z | 3,083 MW | 128 MW | 391 MW | 212 MW | 233 MW |
| 2026-10-01T17:00Z | 3,259 MW | 0 MW | 345 MW | 220 MW | 268 MW |
| 2026-10-01T18:00Z | 3,251 MW | 0 MW | 343 MW | 219 MW | 256 MW |
| 2026-10-01T19:00Z | 3,165 MW | 0 MW | 426 MW | 219 MW | 162 MW |
| 2026-10-01T20:00Z | 2,768 MW | 0 MW | 409 MW | 218 MW | 132 MW |
| 2026-10-01T21:00Z | 1,959 MW | 0 MW | 325 MW | 217 MW | 128 MW |
| 2026-10-01T22:00Z | 1,484 MW | 0 MW | 228 MW | 215 MW | 143 MW |
| 2026-10-01T23:00Z | 1,365 MW | 0 MW | 178 MW | 212 MW | 143 MW |
| 2026-10-02T00:00Z | 1,360 MW | 0 MW | 224 MW | 213 MW | 133 MW |
| 2026-10-02T01:00Z | 1,364 MW | 0 MW | 240 MW | 218 MW | 131 MW |
| 2026-10-02T02:00Z | 1,373 MW | 0 MW | 240 MW | 221 MW | 132 MW |
| 2026-10-02T03:00Z | 1,421 MW | 0 MW | 206 MW | 225 MW | 137 MW |
| 2026-10-02T04:00Z | 1,475 MW | 0 MW | 194 MW | 224 MW | 172 MW |
| 2026-10-02T05:00Z | 1,495 MW | 144 MW | 157 MW | 227 MW | 211 MW |
| 2026-10-02T06:00Z | 1,432 MW | 1,103 MW | 95 MW | 227 MW | 246 MW |
| 2026-10-02T07:00Z | 1,381 MW | 2,252 MW | 86 MW | 225 MW | 184 MW |
| 2026-10-02T08:00Z | 954 MW | 3,005 MW | 98 MW | 224 MW | 183 MW |
| 2026-10-02T09:00Z | 688 MW | 3,309 MW | 95 MW | 223 MW | 183 MW |
| 2026-10-02T10:00Z | 681 MW | 3,415 MW | 136 MW | 217 MW | 144 MW |
| 2026-10-02T11:00Z | 620 MW | 3,329 MW | 178 MW | 218 MW | 135 MW |
| 2026-10-02T12:00Z | 478 MW | 3,023 MW | 188 MW | 219 MW | 131 MW |
| 2026-10-02T13:00Z | 959 MW | 2,748 MW | 178 MW | 218 MW | 136 MW |
| 2026-10-02T14:00Z | 1,881 MW | 2,037 MW | 162 MW | 219 MW | 129 MW |
| 2026-10-02T15:00Z | 2,581 MW | 887 MW | 233 MW | 223 MW | 158 MW |
| 2026-10-02T16:00Z | 3,180 MW | 126 MW | 318 MW | 227 MW | 234 MW |
| 2026-10-02T17:00Z | 3,296 MW | 0 MW | 237 MW | 231 MW | 239 MW |
| 2026-10-02T18:00Z | 3,306 MW | 0 MW | 184 MW | 231 MW | 215 MW |
| 2026-10-02T19:00Z | 2,909 MW | 0 MW | 124 MW | 233 MW | 184 MW |
| 2026-10-02T20:00Z | 2,684 MW | 0 MW | 168 MW | 230 MW | 132 MW |
| 2026-10-02T21:00Z | 2,002 MW | 0 MW | 211 MW | 228 MW | 140 MW |
| 2026-10-02T22:00Z | 1,200 MW | 0 MW | 246 MW | 229 MW | 144 MW |
| 2026-10-02T23:00Z | 1,056 MW | 0 MW | 313 MW | 230 MW | 132 MW |
| 2026-10-03T00:00Z | 957 MW | 0 MW | 315 MW | 231 MW | 131 MW |
| 2026-10-03T01:00Z | 994 MW | 0 MW | 322 MW | 230 MW | 132 MW |
| 2026-10-03T02:00Z | 995 MW | 0 MW | 261 MW | 230 MW | 130 MW |
| 2026-10-03T03:00Z | 1,035 MW | 0 MW | 197 MW | 231 MW | 145 MW |
| 2026-10-03T04:00Z | 1,095 MW | 0 MW | 154 MW | 228 MW | 135 MW |
| 2026-10-03T05:00Z | 1,092 MW | 148 MW | 116 MW | 232 MW | 205 MW |
| 2026-10-03T06:00Z | 1,068 MW | 1,122 MW | 75 MW | 226 MW | 169 MW |
| 2026-10-03T07:00Z | 844 MW | 2,405 MW | 39 MW | 223 MW | 130 MW |
| 2026-10-03T08:00Z | 638 MW | 3,148 MW | 27 MW | 225 MW | 132 MW |
| 2026-10-03T09:00Z | 117 MW | 3,570 MW | 28 MW | 222 MW | 141 MW |
| 2026-10-03T10:00Z | 11 MW | 3,675 MW | 60 MW | 219 MW | 122 MW |
| 2026-10-03T11:00Z | 11 MW | 3,525 MW | 117 MW | 218 MW | 122 MW |
| 2026-10-03T12:00Z | 11 MW | 3,263 MW | 155 MW | 218 MW | 124 MW |
| 2026-10-03T13:00Z | 12 MW | 2,906 MW | 165 MW | 215 MW | 137 MW |
| 2026-10-03T14:00Z | 15 MW | 2,179 MW | 177 MW | 218 MW | 131 MW |
| 2026-10-03T15:00Z | 282 MW | 941 MW | 196 MW | 222 MW | 142 MW |
| 2026-10-03T16:00Z | 1,189 MW | 106 MW | 214 MW | 229 MW | 209 MW |
| 2026-10-03T17:00Z | 1,376 MW | 0 MW | 158 MW | 231 MW | 244 MW |
| 2026-10-03T18:00Z | 1,406 MW | 0 MW | 95 MW | 234 MW | 224 MW |
| 2026-10-03T19:00Z | 1,414 MW | 0 MW | 56 MW | 233 MW | 160 MW |
| 2026-10-03T20:00Z | 1,427 MW | 0 MW | 39 MW | 231 MW | 129 MW |
| 2026-10-03T21:00Z | 1,277 MW | 0 MW | 34 MW | 231 MW | 135 MW |
| 2026-10-03T22:00Z | 685 MW | 0 MW | 26 MW | 229 MW | 148 MW |
| 2026-10-03T23:00Z | 736 MW | 0 MW | 24 MW | 227 MW | 136 MW |
| 2026-10-04T00:00Z | 740 MW | 0 MW | 29 MW | 229 MW | 133 MW |
| 2026-10-04T01:00Z | 741 MW | 0 MW | 34 MW | 229 MW | 130 MW |
| 2026-10-04T02:00Z | 742 MW | 0 MW | 25 MW | 229 MW | 130 MW |
| 2026-10-04T03:00Z | 744 MW | 0 MW | 24 MW | 227 MW | 135 MW |
| 2026-10-04T04:00Z | 743 MW | 0 MW | 20 MW | 227 MW | 146 MW |
| 2026-10-04T05:00Z | 739 MW | 141 MW | 18 MW | 229 MW | 181 MW |
| 2026-10-04T06:00Z | 737 MW | 1,096 MW | 16 MW | 226 MW | 166 MW |
| 2026-10-04T07:00Z | 607 MW | 2,358 MW | 8 MW | 219 MW | 129 MW |
| 2026-10-04T08:00Z | 302 MW | 3,169 MW | 3 MW | 224 MW | 128 MW |
| 2026-10-04T09:00Z | 11 MW | 3,407 MW | 13 MW | 220 MW | 129 MW |
| 2026-10-04T10:00Z | 11 MW | 3,512 MW | 56 MW | 216 MW | 144 MW |
| 2026-10-04T11:00Z | 11 MW | 3,499 MW | 103 MW | 217 MW | 136 MW |
| 2026-10-04T12:00Z | 11 MW | 3,293 MW | 106 MW | 217 MW | 130 MW |
| 2026-10-04T13:00Z | 29 MW | 2,935 MW | 126 MW | 217 MW | 127 MW |
| 2026-10-04T14:00Z | 314 MW | 2,138 MW | 163 MW | 216 MW | 126 MW |
| 2026-10-04T15:00Z | 1,388 MW | 935 MW | 198 MW | 214 MW | 134 MW |
| 2026-10-04T16:00Z | 1,720 MW | 109 MW | 206 MW | 218 MW | 191 MW |
| 2026-10-04T17:00Z | 1,935 MW | 0 MW | 134 MW | 222 MW | 244 MW |
| 2026-10-04T18:00Z | 1,861 MW | 0 MW | 61 MW | 222 MW | 222 MW |
| 2026-10-04T19:00Z | 1,982 MW | 0 MW | 27 MW | 221 MW | 158 MW |
| 2026-10-04T20:00Z | 1,816 MW | 0 MW | 22 MW | 219 MW | 124 MW |
| 2026-10-04T21:00Z | 1,421 MW | 0 MW | 22 MW | 218 MW | 127 MW |
| 2026-10-04T22:00Z | 1,085 MW | 0 MW | 29 MW | 219 MW | 141 MW |
| 2026-10-04T23:00Z | 1,088 MW | 0 MW | 30 MW | 214 MW | 140 MW |
| 2026-10-05T00:00Z | 1,100 MW | 0 MW | 34 MW | 221 MW | 127 MW |
| 2026-10-05T01:00Z | 1,117 MW | 0 MW | 46 MW | 228 MW | 126 MW |
| 2026-10-05T02:00Z | 1,216 MW | 0 MW | 67 MW | 224 MW | 127 MW |
| 2026-10-05T03:00Z | 1,337 MW | 0 MW | 69 MW | 224 MW | 141 MW |
| 2026-10-05T04:00Z | 1,477 MW | 0 MW | 82 MW | 224 MW | 163 MW |
| 2026-10-05T05:00Z | 1,559 MW | 125 MW | 88 MW | 225 MW | 214 MW |
| 2026-10-05T06:00Z | 1,505 MW | 1,015 MW | 46 MW | 225 MW | 258 MW |
| 2026-10-05T07:00Z | 1,431 MW | 2,051 MW | 15 MW | 225 MW | 201 MW |
| 2026-10-05T08:00Z | 1,050 MW | 2,579 MW | 20 MW | 221 MW | 189 MW |
| 2026-10-05T09:00Z | 934 MW | 2,993 MW | 47 MW | 219 MW | 189 MW |
| 2026-10-05T10:00Z | 655 MW | 3,165 MW | 93 MW | 217 MW | 144 MW |
| 2026-10-05T11:00Z | 736 MW | 2,712 MW | 111 MW | 218 MW | 128 MW |
| 2026-10-05T12:00Z | 884 MW | 2,409 MW | 134 MW | 214 MW | 130 MW |
| 2026-10-05T13:00Z | 907 MW | 1,681 MW | 139 MW | 214 MW | 129 MW |
| 2026-10-05T14:00Z | 1,658 MW | 1,109 MW | 182 MW | 214 MW | 129 MW |
| 2026-10-05T15:00Z | 3,036 MW | 447 MW | 179 MW | 217 MW | 133 MW |
| 2026-10-05T16:00Z | 3,600 MW | 40 MW | 176 MW | 221 MW | 226 MW |
| 2026-10-05T17:00Z | 3,630 MW | 0 MW | 99 MW | 226 MW | 239 MW |
| 2026-10-05T18:00Z | 3,459 MW | 0 MW | 12 MW | 224 MW | 222 MW |
| 2026-10-05T19:00Z | 3,511 MW | 0 MW | 2 MW | 225 MW | 162 MW |
| 2026-10-05T20:00Z | 3,367 MW | 0 MW | 4 MW | 223 MW | 143 MW |
| 2026-10-05T21:00Z | 2,964 MW | 0 MW | 4 MW | 223 MW | 148 MW |
| 2026-10-05T22:00Z | 2,353 MW | 0 MW | 9 MW | 223 MW | 130 MW |
| 2026-10-05T23:00Z | 2,228 MW | 0 MW | 9 MW | 222 MW | 131 MW |
| 2026-10-06T00:00Z | 2,321 MW | 0 MW | 6 MW | 222 MW | 131 MW |
| 2026-10-06T01:00Z | 2,179 MW | 0 MW | 15 MW | 221 MW | 148 MW |
| 2026-10-06T02:00Z | 2,276 MW | 0 MW | 11 MW | 222 MW | 133 MW |
| 2026-10-06T03:00Z | 2,333 MW | 0 MW | 11 MW | 222 MW | 132 MW |
| 2026-10-06T04:00Z | 2,634 MW | 0 MW | 20 MW | 221 MW | 133 MW |
| 2026-10-06T05:00Z | 2,640 MW | 44 MW | 32 MW | 225 MW | 195 MW |
| 2026-10-06T06:00Z | 2,619 MW | 368 MW | 28 MW | 224 MW | 266 MW |
| 2026-10-06T07:00Z | 2,508 MW | 966 MW | 11 MW | 223 MW | 185 MW |
| 2026-10-06T08:00Z | 2,225 MW | 1,390 MW | 4 MW | 221 MW | 182 MW |
| 2026-10-06T09:00Z | 1,590 MW | 1,460 MW | 8 MW | 222 MW | 181 MW |
| 2026-10-06T10:00Z | 1,033 MW | 1,518 MW | 18 MW | 217 MW | 128 MW |
| 2026-10-06T11:00Z | 1,118 MW | 1,343 MW | 35 MW | 216 MW | 143 MW |
| 2026-10-06T12:00Z | 1,142 MW | 1,106 MW | 52 MW | 218 MW | 132 MW |
| 2026-10-06T13:00Z | 1,498 MW | 728 MW | 67 MW | 218 MW | 130 MW |
| 2026-10-06T14:00Z | 2,200 MW | 443 MW | 50 MW | 219 MW | 130 MW |
| 2026-10-06T15:00Z | 3,547 MW | 262 MW | 44 MW | 224 MW | 133 MW |
| 2026-10-06T16:00Z | 4,032 MW | 29 MW | 23 MW | 227 MW | 217 MW |
| 2026-10-06T17:00Z | 4,211 MW | 0 MW | 14 MW | 231 MW | 298 MW |
| 2026-10-06T18:00Z | 4,198 MW | 0 MW | 35 MW | 229 MW | 248 MW |
| 2026-10-06T19:00Z | 3,957 MW | 0 MW | 46 MW | 228 MW | 162 MW |
| 2026-10-06T20:00Z | 3,560 MW | 0 MW | 45 MW | 225 MW | 133 MW |
| 2026-10-06T21:00Z | 3,170 MW | 0 MW | 51 MW | 226 MW | 135 MW |
| 2026-10-06T22:00Z | 2,379 MW | 0 MW | 47 MW | 226 MW | 147 MW |
| 2026-10-06T23:00Z | 2,205 MW | 0 MW | 59 MW | 225 MW | 133 MW |
| 2026-10-07T00:00Z | 2,289 MW | 0 MW | 92 MW | 224 MW | 128 MW |
| 2026-10-07T01:00Z | 2,183 MW | 0 MW | 186 MW | 227 MW | 129 MW |
| 2026-10-07T02:00Z | 2,222 MW | 0 MW | 180 MW | 228 MW | 129 MW |
| 2026-10-07T03:00Z | 2,341 MW | 0 MW | 106 MW | 225 MW | 141 MW |
| 2026-10-07T04:00Z | 2,802 MW | 0 MW | 74 MW | 221 MW | 144 MW |
| 2026-10-07T05:00Z | 3,093 MW | 81 MW | 64 MW | 223 MW | 193 MW |
| 2026-10-07T06:00Z | 2,923 MW | 524 MW | 39 MW | 224 MW | 245 MW |
| 2026-10-07T07:00Z | 2,669 MW | 997 MW | 28 MW | 224 MW | 184 MW |
| 2026-10-07T08:00Z | 2,204 MW | 1,536 MW | 60 MW | 224 MW | 195 MW |
| 2026-10-07T09:00Z | 2,015 MW | 1,834 MW | 94 MW | 222 MW | 188 MW |
| 2026-10-07T10:00Z | 1,989 MW | 2,175 MW | 112 MW | 219 MW | 127 MW |
| 2026-10-07T11:00Z | 1,946 MW | 2,119 MW | 157 MW | 221 MW | 125 MW |
| 2026-10-07T12:00Z | 2,048 MW | 2,020 MW | 264 MW | 216 MW | 129 MW |
| 2026-10-07T13:00Z | 2,317 MW | 1,587 MW | 364 MW | 218 MW | 126 MW |
| 2026-10-07T14:00Z | 2,627 MW | 1,329 MW | 275 MW | 219 MW | 143 MW |
| 2026-10-07T15:00Z | 3,292 MW | 484 MW | 248 MW | 217 MW | 150 MW |
| 2026-10-07T16:00Z | 3,484 MW | 35 MW | 358 MW | 223 MW | 213 MW |
| 2026-10-07T17:00Z | 3,488 MW | 0 MW | 495 MW | 226 MW | 222 MW |
| 2026-10-07T18:00Z | 3,212 MW | 0 MW | 549 MW | 224 MW | 227 MW |
| 2026-10-07T19:00Z | 3,233 MW | 0 MW | 570 MW | 225 MW | 149 MW |
| 2026-10-07T20:00Z | 3,122 MW | 0 MW | 701 MW | 226 MW | 130 MW |
| 2026-10-07T21:00Z | 2,612 MW | 0 MW | 756 MW | 224 MW | 130 MW |
| 2026-10-07T22:00Z | 2,130 MW | 0 MW | 866 MW | 223 MW | 147 MW |
| 2026-10-07T23:00Z | 1,955 MW | 0 MW | 845 MW | 223 MW | 142 MW |
| 2026-10-08T00:00Z | 1,953 MW | 0 MW | 660 MW | 225 MW | 131 MW |
| 2026-10-08T01:00Z | 1,936 MW | 0 MW | 552 MW | 226 MW | 131 MW |
| 2026-10-08T02:00Z | 1,986 MW | 0 MW | 580 MW | 227 MW | 141 MW |
| 2026-10-08T03:00Z | 2,011 MW | 0 MW | 894 MW | 228 MW | 150 MW |
| 2026-10-08T04:00Z | 2,315 MW | 0 MW | 1,094 MW | 228 MW | 150 MW |
| 2026-10-08T05:00Z | 2,379 MW | 31 MW | 1,022 MW | 229 MW | 205 MW |
| 2026-10-08T06:00Z | 2,493 MW | 283 MW | 1,021 MW | 226 MW | 252 MW |
| 2026-10-08T07:00Z | 2,431 MW | 791 MW | 773 MW | 225 MW | 186 MW |
| 2026-10-08T08:00Z | 2,116 MW | 1,328 MW | 628 MW | 225 MW | 185 MW |
| 2026-10-08T09:00Z | 2,058 MW | 1,382 MW | 481 MW | 220 MW | 174 MW |
| 2026-10-08T10:00Z | 1,891 MW | 1,859 MW | 505 MW | 220 MW | 139 MW |
| 2026-10-08T11:00Z | 1,706 MW | 1,794 MW | 756 MW | 221 MW | 136 MW |
| 2026-10-08T12:00Z | 1,725 MW | 1,654 MW | 1,082 MW | 223 MW | 140 MW |
| 2026-10-08T13:00Z | 1,481 MW | 1,702 MW | 1,447 MW | 223 MW | 138 MW |
| 2026-10-08T14:00Z | 1,718 MW | 1,305 MW | 1,165 MW | 223 MW | 145 MW |
| 2026-10-08T15:00Z | 3,106 MW | 470 MW | 1,176 MW | 222 MW | 174 MW |
| 2026-10-08T16:00Z | 3,395 MW | 22 MW | 1,194 MW | 225 MW | 229 MW |
| 2026-10-08T17:00Z | 3,312 MW | 0 MW | 1,046 MW | 229 MW | 224 MW |
| 2026-10-08T18:00Z | 3,427 MW | 0 MW | 1,004 MW | 230 MW | 229 MW |
| 2026-10-08T19:00Z | 3,343 MW | 0 MW | 960 MW | 231 MW | 170 MW |
| 2026-10-08T20:00Z | 3,046 MW | 0 MW | 621 MW | 229 MW | 151 MW |
| 2026-10-08T21:00Z | 2,515 MW | 0 MW | 354 MW | 227 MW | 141 MW |
| 2026-10-08T22:00Z | 1,882 MW | 0 MW | 442 MW | 228 MW | 135 MW |
| 2026-10-08T23:00Z | 1,687 MW | 0 MW | 479 MW | 225 MW | 148 MW |
| 2026-10-09T00:00Z | 1,662 MW | 0 MW | 576 MW | 225 MW | 144 MW |
| 2026-10-09T01:00Z | 1,678 MW | 0 MW | 413 MW | 224 MW | 134 MW |
| 2026-10-09T02:00Z | 1,660 MW | 0 MW | 376 MW | 224 MW | 133 MW |
| 2026-10-09T03:00Z | 1,715 MW | 0 MW | 430 MW | 226 MW | 153 MW |
| 2026-10-09T04:00Z | 1,837 MW | 0 MW | 593 MW | 227 MW | 160 MW |
| 2026-10-09T05:00Z | 1,817 MW | 42 MW | 506 MW | 224 MW | 208 MW |
| 2026-10-09T06:00Z | 1,841 MW | 498 MW | 702 MW | 225 MW | 254 MW |
| 2026-10-09T07:00Z | 1,791 MW | 1,321 MW | 601 MW | 221 MW | 230 MW |
| 2026-10-09T08:00Z | 1,694 MW | 1,659 MW | 676 MW | 224 MW | 214 MW |
| 2026-10-09T09:00Z | 1,618 MW | 1,523 MW | 759 MW | 220 MW | 206 MW |
| 2026-10-09T10:00Z | 1,470 MW | 1,582 MW | 914 MW | 219 MW | 144 MW |
| 2026-10-09T11:00Z | 1,407 MW | 1,825 MW | 428 MW | 218 MW | 151 MW |
| 2026-10-09T12:00Z | 1,522 MW | 1,941 MW | 330 MW | 216 MW | 164 MW |
| 2026-10-09T13:00Z | 1,718 MW | 1,723 MW | 377 MW | 214 MW | 145 MW |
| 2026-10-09T14:00Z | 2,747 MW | 1,221 MW | 427 MW | 218 MW | 151 MW |
| 2026-10-09T15:00Z | 3,548 MW | 478 MW | 419 MW | 223 MW | 218 MW |
| 2026-10-09T16:00Z | 3,663 MW | 163 MW | 484 MW | 228 MW | 256 MW |
| 2026-10-09T17:00Z | 3,687 MW | 81 MW | 591 MW | 230 MW | 240 MW |
| 2026-10-09T18:00Z | 3,633 MW | 0 MW | 588 MW | 229 MW | 239 MW |
| 2026-10-09T19:00Z | 3,634 MW | 0 MW | 402 MW | 232 MW | 157 MW |
| 2026-10-09T20:00Z | 3,466 MW | 0 MW | 189 MW | 230 MW | 163 MW |
| 2026-10-09T21:00Z | 2,461 MW | 0 MW | 157 MW | 229 MW | 148 MW |
| 2026-10-09T22:00Z | 2,177 MW | 0 MW | 182 MW | 228 MW | 148 MW |
| 2026-10-09T23:00Z | 2,137 MW | 0 MW | 138 MW | 228 MW | 163 MW |
| 2026-10-10T00:00Z | 2,152 MW | 0 MW | 41 MW | 228 MW | 170 MW |
| 2026-10-10T01:00Z | 2,100 MW | 0 MW | 87 MW | 228 MW | 159 MW |
| 2026-10-10T02:00Z | 1,993 MW | 0 MW | 219 MW | 229 MW | 160 MW |
| 2026-10-10T03:00Z | 1,998 MW | 0 MW | 256 MW | 231 MW | 162 MW |
| 2026-10-10T04:00Z | 2,093 MW | 0 MW | 289 MW | 228 MW | 195 MW |
| 2026-10-10T05:00Z | 2,060 MW | 19 MW | 353 MW | 231 MW | 245 MW |
| 2026-10-10T06:00Z | 1,982 MW | 231 MW | 267 MW | 235 MW | 213 MW |
| 2026-10-10T07:00Z | 1,592 MW | 618 MW | 150 MW | 229 MW | 166 MW |
| 2026-10-10T08:00Z | 1,311 MW | 886 MW | 206 MW | 226 MW | 132 MW |
| 2026-10-10T09:00Z | 1,055 MW | 909 MW | 209 MW | 224 MW | 138 MW |
| 2026-10-10T10:00Z | 1,082 MW | 977 MW | 216 MW | 222 MW | 147 MW |
| 2026-10-10T11:00Z | 1,054 MW | 1,128 MW | 203 MW | 221 MW | 141 MW |
| 2026-10-10T12:00Z | 1,009 MW | 1,417 MW | 139 MW | 221 MW | 133 MW |
| 2026-10-10T13:00Z | 1,013 MW | 1,537 MW | 153 MW | 213 MW | 134 MW |
| 2026-10-10T14:00Z | 1,535 MW | 1,133 MW | 241 MW | 221 MW | 200 MW |
| 2026-10-10T15:00Z | 2,505 MW | 466 MW | 166 MW | 222 MW | 230 MW |
| 2026-10-10T16:00Z | 2,810 MW | 53 MW | 105 MW | 228 MW | 261 MW |
| 2026-10-10T17:00Z | 2,840 MW | 0 MW | 92 MW | 223 MW | 266 MW |
| 2026-10-10T18:00Z | 2,853 MW | 0 MW | 139 MW | 231 MW | 225 MW |
| 2026-10-10T19:00Z | 2,823 MW | 0 MW | 84 MW | 235 MW | 200 MW |
| 2026-10-10T20:00Z | 2,825 MW | 0 MW | 71 MW | 231 MW | 171 MW |
| 2026-10-10T21:00Z | 2,236 MW | 0 MW | 88 MW | 226 MW | 170 MW |
| 2026-10-10T22:00Z | 548 MW | 0 MW | 144 MW | 212 MW | 151 MW |
| 2026-10-10T23:00Z | 386 MW | 0 MW | 196 MW | 200 MW | 163 MW |
| 2026-10-11T00:00Z | 386 MW | 0 MW | 224 MW | 193 MW | 143 MW |
| 2026-10-11T01:00Z | 386 MW | 0 MW | 265 MW | 193 MW | 142 MW |
| 2026-10-11T02:00Z | 123 MW | 0 MW | 370 MW | 192 MW | 149 MW |
| 2026-10-11T03:00Z | 30 MW | 0 MW | 412 MW | 192 MW | 166 MW |
| 2026-10-11T04:00Z | 30 MW | 0 MW | 415 MW | 194 MW | 159 MW |
| 2026-10-11T05:00Z | 30 MW | 74 MW | 425 MW | 194 MW | 179 MW |
| 2026-10-11T06:00Z | 29 MW | 949 MW | 413 MW | 195 MW | 177 MW |
| 2026-10-11T07:00Z | 24 MW | 2,223 MW | 437 MW | 196 MW | 162 MW |
| 2026-10-11T08:00Z | 13 MW | 3,094 MW | 641 MW | 192 MW | 157 MW |
| 2026-10-11T09:00Z | 10 MW | 3,557 MW | 642 MW | 194 MW | 142 MW |
| 2026-10-11T10:00Z | 10 MW | 3,655 MW | 659 MW | 193 MW | 142 MW |
| 2026-10-11T11:00Z | 11 MW | 3,670 MW | 649 MW | 192 MW | 140 MW |
| 2026-10-11T12:00Z | 16 MW | 3,519 MW | 335 MW | 193 MW | 160 MW |
| 2026-10-11T13:00Z | 107 MW | 2,779 MW | 234 MW | 191 MW | 143 MW |
| 2026-10-11T14:00Z | 284 MW | 1,695 MW | 119 MW | 191 MW | 136 MW |
| 2026-10-11T15:00Z | 849 MW | 603 MW | 56 MW | 192 MW | 189 MW |
| 2026-10-11T16:00Z | 1,326 MW | 53 MW | 38 MW | 195 MW | 234 MW |
| 2026-10-11T17:00Z | 1,424 MW | 0 MW | 60 MW | 197 MW | 265 MW |
| 2026-10-11T18:00Z | 1,407 MW | 0 MW | 70 MW | 201 MW | 241 MW |
| 2026-10-11T19:00Z | 1,568 MW | 0 MW | 112 MW | 204 MW | 188 MW |
| 2026-10-11T20:00Z | 1,813 MW | 0 MW | 200 MW | 203 MW | 146 MW |
| 2026-10-11T21:00Z | 1,927 MW | 0 MW | 333 MW | 202 MW | 160 MW |
| 2026-10-11T22:00Z | 1,954 MW | 0 MW | 339 MW | 203 MW | 142 MW |
| 2026-10-11T23:00Z | 1,901 MW | 0 MW | 307 MW | 199 MW | 141 MW |
| 2026-10-12T00:00Z | 1,966 MW | 0 MW | 252 MW | 202 MW | 144 MW |
| 2026-10-12T01:00Z | 1,963 MW | 0 MW | 299 MW | 205 MW | 160 MW |
| 2026-10-12T02:00Z | 2,018 MW | 0 MW | 300 MW | 201 MW | 149 MW |
| 2026-10-12T03:00Z | 2,033 MW | 0 MW | 251 MW | 203 MW | 147 MW |
| 2026-10-12T04:00Z | 2,144 MW | 0 MW | 319 MW | 197 MW | 159 MW |
| 2026-10-12T05:00Z | 2,214 MW | 24 MW | 292 MW | 194 MW | 213 MW |
| 2026-10-12T06:00Z | 2,215 MW | 326 MW | 161 MW | 194 MW | 217 MW |
| 2026-10-12T07:00Z | 2,146 MW | 1,353 MW | 114 MW | 193 MW | 191 MW |
| 2026-10-12T08:00Z | 1,681 MW | 2,322 MW | 103 MW | 188 MW | 158 MW |
| 2026-10-12T09:00Z | 1,288 MW | 2,776 MW | 106 MW | 188 MW | 146 MW |
| 2026-10-12T10:00Z | 1,185 MW | 2,777 MW | 95 MW | 188 MW | 148 MW |
| 2026-10-12T11:00Z | 1,132 MW | 2,664 MW | 64 MW | 177 MW | 156 MW |
| 2026-10-12T12:00Z | 1,103 MW | 2,848 MW | 156 MW | 179 MW | 150 MW |
| 2026-10-12T13:00Z | 1,237 MW | 2,314 MW | 373 MW | 177 MW | 144 MW |
| 2026-10-12T14:00Z | 1,839 MW | 1,516 MW | 669 MW | 177 MW | 149 MW |
| 2026-10-12T15:00Z | 2,533 MW | 651 MW | 1,043 MW | 181 MW | 190 MW |
| 2026-10-12T16:00Z | 2,719 MW | 40 MW | 823 MW | 189 MW | 272 MW |
| 2026-10-12T17:00Z | 2,995 MW | 0 MW | 547 MW | 193 MW | 256 MW |
| 2026-10-12T18:00Z | 3,024 MW | 0 MW | 686 MW | 196 MW | 212 MW |
| 2026-10-12T19:00Z | 2,940 MW | 0 MW | 608 MW | 196 MW | 190 MW |
| 2026-10-12T20:00Z | 2,687 MW | 0 MW | 520 MW | 197 MW | 157 MW |
| 2026-10-12T21:00Z | 1,978 MW | 0 MW | 546 MW | 194 MW | 138 MW |
| 2026-10-12T22:00Z | 1,090 MW | 0 MW | 788 MW | 194 MW | 140 MW |
| 2026-10-12T23:00Z | 1,069 MW | 0 MW | 973 MW | 193 MW | 141 MW |
| 2026-10-13T00:00Z | 1,123 MW | 0 MW | 916 MW | 190 MW | 153 MW |
| 2026-10-13T01:00Z | 1,126 MW | 0 MW | 1,095 MW | 190 MW | 161 MW |
| 2026-10-13T02:00Z | 1,015 MW | 0 MW | 1,252 MW | 191 MW | 145 MW |
| 2026-10-13T03:00Z | 964 MW | 0 MW | 1,295 MW | 194 MW | 152 MW |
| 2026-10-13T04:00Z | 1,096 MW | 0 MW | 1,435 MW | 193 MW | 184 MW |
| 2026-10-13T05:00Z | 1,084 MW | 89 MW | 1,368 MW | 192 MW | 229 MW |
| 2026-10-13T06:00Z | 1,022 MW | 1,045 MW | 1,321 MW | 198 MW | 231 MW |
| 2026-10-13T07:00Z | 921 MW | 2,439 MW | 1,373 MW | 205 MW | 149 MW |
| 2026-10-13T08:00Z | 281 MW | 3,355 MW | 1,382 MW | 211 MW | 146 MW |
| 2026-10-13T09:00Z | 223 MW | 3,803 MW | 871 MW | 218 MW | 148 MW |
| 2026-10-13T10:00Z | 188 MW | 3,934 MW | 646 MW | 217 MW | 144 MW |
| 2026-10-13T11:00Z | 198 MW | 3,892 MW | 598 MW | 217 MW | 144 MW |
| 2026-10-13T12:00Z | 265 MW | 3,680 MW | 591 MW | 215 MW | 158 MW |
| 2026-10-13T13:00Z | 246 MW | 3,183 MW | 823 MW | 213 MW | 142 MW |
| 2026-10-13T14:00Z | 436 MW | 2,166 MW | 1,280 MW | 216 MW | 147 MW |
| 2026-10-13T15:00Z | 885 MW | 797 MW | 1,383 MW | 218 MW | 190 MW |
| 2026-10-13T16:00Z | 1,148 MW | 46 MW | 1,202 MW | 218 MW | 271 MW |
| 2026-10-13T17:00Z | 1,227 MW | 0 MW | 1,307 MW | 222 MW | 275 MW |
| 2026-10-13T18:00Z | 1,150 MW | 0 MW | 1,502 MW | 224 MW | 225 MW |
| 2026-10-13T19:00Z | 1,077 MW | 0 MW | 1,565 MW | 225 MW | 160 MW |
| 2026-10-13T20:00Z | 1,024 MW | 0 MW | 1,535 MW | 224 MW | 143 MW |
| 2026-10-13T21:00Z | 1,028 MW | 0 MW | 1,472 MW | 221 MW | 147 MW |
| 2026-10-13T22:00Z | 658 MW | 0 MW | 1,429 MW | 223 MW | 160 MW |
| 2026-10-13T23:00Z | 517 MW | 0 MW | 1,422 MW | 223 MW | 154 MW |
| 2026-10-14T00:00Z | 546 MW | 0 MW | 1,544 MW | 222 MW | 142 MW |
| 2026-10-14T01:00Z | 503 MW | 0 MW | 1,623 MW | 221 MW | 141 MW |
| 2026-10-14T02:00Z | 582 MW | 0 MW | 1,634 MW | 220 MW | 143 MW |
| 2026-10-14T03:00Z | 650 MW | 0 MW | 1,614 MW | 224 MW | 144 MW |
| 2026-10-14T04:00Z | 922 MW | 0 MW | 1,627 MW | 222 MW | 191 MW |
| 2026-10-14T05:00Z | 987 MW | 85 MW | 1,731 MW | 222 MW | 214 MW |
| 2026-10-14T06:00Z | 920 MW | 1,005 MW | 1,680 MW | 224 MW | 264 MW |
| 2026-10-14T07:00Z | 709 MW | 2,168 MW | 932 MW | 222 MW | 203 MW |
| 2026-10-14T08:00Z | 275 MW | 3,164 MW | 608 MW | 221 MW | 200 MW |
| 2026-10-14T09:00Z | 191 MW | 3,638 MW | 618 MW | 219 MW | 211 MW |
| 2026-10-14T10:00Z | 194 MW | 3,739 MW | 633 MW | 215 MW | 150 MW |
| 2026-10-14T11:00Z | 200 MW | 3,616 MW | 583 MW | 212 MW | 136 MW |
| 2026-10-14T12:00Z | 223 MW | 3,279 MW | 562 MW | 212 MW | 140 MW |
| 2026-10-14T13:00Z | 496 MW | 2,782 MW | 573 MW | 212 MW | 141 MW |
| 2026-10-14T14:00Z | 1,584 MW | 1,802 MW | 583 MW | 211 MW | 149 MW |
| 2026-10-14T15:00Z | 2,652 MW | 564 MW | 922 MW | 215 MW | 187 MW |
| 2026-10-14T16:00Z | 2,862 MW | 22 MW | 1,111 MW | 217 MW | 259 MW |
| 2026-10-14T17:00Z | 2,815 MW | 0 MW | 1,194 MW | 220 MW | 262 MW |
| 2026-10-14T18:00Z | 2,877 MW | 0 MW | 1,190 MW | 220 MW | 223 MW |
| 2026-10-14T19:00Z | 2,880 MW | 0 MW | 1,169 MW | 225 MW | 170 MW |
| 2026-10-14T20:00Z | 2,178 MW | 0 MW | 1,208 MW | 223 MW | 138 MW |
| 2026-10-14T21:00Z | 1,375 MW | 0 MW | 1,172 MW | 221 MW | 141 MW |
| 2026-10-14T22:00Z | 1,337 MW | 0 MW | 1,114 MW | 221 MW | 150 MW |
| 2026-10-14T23:00Z | 1,324 MW | 0 MW | 1,028 MW | 215 MW | 155 MW |
| 2026-10-15T00:00Z | 1,328 MW | 0 MW | 938 MW | 211 MW | 141 MW |
| 2026-10-15T01:00Z | 1,332 MW | 0 MW | 854 MW | 211 MW | 141 MW |
| 2026-10-15T02:00Z | 1,360 MW | 0 MW | 791 MW | 213 MW | 141 MW |
| 2026-10-15T03:00Z | 1,369 MW | 0 MW | 739 MW | 213 MW | 146 MW |
| 2026-10-15T04:00Z | 1,550 MW | 0 MW | 621 MW | 213 MW | 184 MW |
| 2026-10-15T05:00Z | 1,958 MW | 73 MW | 544 MW | 216 MW | 230 MW |
| 2026-10-15T06:00Z | 2,120 MW | 980 MW | 457 MW | 214 MW | 274 MW |
| 2026-10-15T07:00Z | 1,794 MW | 2,308 MW | 231 MW | 213 MW | 241 MW |
| 2026-10-15T08:00Z | 1,061 MW | 3,117 MW | 161 MW | 211 MW | 198 MW |
| 2026-10-15T09:00Z | 517 MW | 3,455 MW | 394 MW | 209 MW | 196 MW |
| 2026-10-15T10:00Z | 442 MW | 3,447 MW | 207 MW | 205 MW | 149 MW |
| 2026-10-15T11:00Z | 435 MW | 3,438 MW | 40 MW | 204 MW | 153 MW |
| 2026-10-15T12:00Z | 439 MW | 3,278 MW | 34 MW | 199 MW | 149 MW |
| 2026-10-15T13:00Z | 751 MW | 2,872 MW | 99 MW | 200 MW | 141 MW |
| 2026-10-15T14:00Z | 1,439 MW | 1,909 MW | 98 MW | 206 MW | 139 MW |
| 2026-10-15T15:00Z | 2,681 MW | 725 MW | 70 MW | 210 MW | 207 MW |
| 2026-10-15T16:00Z | 2,797 MW | 46 MW | 94 MW | 214 MW | 329 MW |
| 2026-10-15T17:00Z | 2,986 MW | 0 MW | 65 MW | 219 MW | 320 MW |
| 2026-10-15T18:00Z | 2,993 MW | 0 MW | 32 MW | 220 MW | 273 MW |
| 2026-10-15T19:00Z | 2,986 MW | 0 MW | 32 MW | 224 MW | 184 MW |
| 2026-10-15T20:00Z | 2,943 MW | 0 MW | 49 MW | 218 MW | 138 MW |
| 2026-10-15T21:00Z | 2,562 MW | 0 MW | 76 MW | 217 MW | 150 MW |
| 2026-10-15T22:00Z | 2,115 MW | 0 MW | 105 MW | 215 MW | 151 MW |
| 2026-10-15T23:00Z | 2,048 MW | 0 MW | 139 MW | 212 MW | 140 MW |
| 2026-10-16T00:00Z | 2,048 MW | 0 MW | 135 MW | 213 MW | 141 MW |
| 2026-10-16T01:00Z | 1,758 MW | 0 MW | 228 MW | 214 MW | 142 MW |
| 2026-10-16T02:00Z | 1,615 MW | 0 MW | 242 MW | 216 MW | 155 MW |
| 2026-10-16T03:00Z | 1,797 MW | 0 MW | 219 MW | 216 MW | 145 MW |
| 2026-10-16T04:00Z | 1,843 MW | 0 MW | 200 MW | 220 MW | 170 MW |
| 2026-10-16T05:00Z | 1,479 MW | 56 MW | 208 MW | 220 MW | 211 MW |
| 2026-10-16T06:00Z | 1,476 MW | 818 MW | 207 MW | 220 MW | 261 MW |
| 2026-10-16T07:00Z | 1,382 MW | 2,122 MW | 155 MW | 218 MW | 225 MW |
| 2026-10-16T08:00Z | 637 MW | 3,042 MW | 186 MW | 217 MW | 196 MW |
| 2026-10-16T09:00Z | 139 MW | 3,439 MW | 273 MW | 213 MW | 196 MW |
| 2026-10-16T10:00Z | 28 MW | 3,525 MW | 284 MW | 211 MW | 143 MW |
| 2026-10-16T11:00Z | 28 MW | 3,499 MW | 303 MW | 209 MW | 141 MW |
| 2026-10-16T12:00Z | 29 MW | 3,379 MW | 309 MW | 209 MW | 154 MW |
| 2026-10-16T13:00Z | 181 MW | 2,947 MW | 546 MW | 211 MW | 144 MW |
| 2026-10-16T14:00Z | 1,338 MW | 1,968 MW | 683 MW | 213 MW | 138 MW |
| 2026-10-16T15:00Z | 2,431 MW | 672 MW | 961 MW | 217 MW | 181 MW |
| 2026-10-16T16:00Z | 2,907 MW | 24 MW | 864 MW | 221 MW | 249 MW |
| 2026-10-16T17:00Z | 2,929 MW | 0 MW | 883 MW | 225 MW | 300 MW |
| 2026-10-16T18:00Z | 2,983 MW | 0 MW | 843 MW | 225 MW | 299 MW |
| 2026-10-16T19:00Z | 2,948 MW | 0 MW | 599 MW | 227 MW | 181 MW |
| 2026-10-16T20:00Z | 2,852 MW | 0 MW | 546 MW | 218 MW | 136 MW |
| 2026-10-16T21:00Z | 2,254 MW | 0 MW | 451 MW | 216 MW | 139 MW |
| 2026-10-16T22:00Z | 1,728 MW | 0 MW | 402 MW | 215 MW | 154 MW |
| 2026-10-16T23:00Z | 1,729 MW | 0 MW | 338 MW | 214 MW | 138 MW |
| 2026-10-17T00:00Z | 1,712 MW | 0 MW | 285 MW | 212 MW | 139 MW |
| 2026-10-17T01:00Z | 1,761 MW | 0 MW | 289 MW | 212 MW | 139 MW |
| 2026-10-17T02:00Z | 1,748 MW | 0 MW | 278 MW | 213 MW | 148 MW |
| 2026-10-17T03:00Z | 1,779 MW | 0 MW | 244 MW | 214 MW | 144 MW |
| 2026-10-17T04:00Z | 1,836 MW | 0 MW | 198 MW | 225 MW | 170 MW |
| 2026-10-17T05:00Z | 1,831 MW | 47 MW | 134 MW | 231 MW | 210 MW |
| 2026-10-17T06:00Z | 1,733 MW | 587 MW | 75 MW | 231 MW | 211 MW |
| 2026-10-17T07:00Z | 1,418 MW | 1,429 MW | 38 MW | 230 MW | 150 MW |
| 2026-10-17T08:00Z | 884 MW | 2,511 MW | 34 MW | 226 MW | 142 MW |
| 2026-10-17T09:00Z | 666 MW | 3,074 MW | 17 MW | 223 MW | 140 MW |
| 2026-10-17T10:00Z | 596 MW | 3,132 MW | 5 MW | 219 MW | 134 MW |
| 2026-10-17T11:00Z | 678 MW | 3,207 MW | 7 MW | 218 MW | 140 MW |
| 2026-10-17T12:00Z | 758 MW | 2,953 MW | 17 MW | 215 MW | 156 MW |
| 2026-10-17T13:00Z | 910 MW | 2,608 MW | 34 MW | 221 MW | 147 MW |
| 2026-10-17T14:00Z | 1,385 MW | 1,628 MW | 32 MW | 219 MW | 140 MW |
| 2026-10-17T15:00Z | 2,006 MW | 524 MW | 25 MW | 224 MW | 203 MW |
| 2026-10-17T16:00Z | 2,130 MW | 20 MW | 24 MW | 228 MW | 257 MW |
| 2026-10-17T17:00Z | 2,145 MW | 0 MW | 16 MW | 232 MW | 262 MW |
| 2026-10-17T18:00Z | 2,123 MW | 0 MW | 15 MW | 224 MW | 244 MW |
| 2026-10-17T19:00Z | 2,148 MW | 0 MW | 13 MW | 232 MW | 152 MW |
| 2026-10-17T20:00Z | 2,204 MW | 0 MW | 11 MW | 229 MW | 140 MW |
| 2026-10-17T21:00Z | 2,045 MW | 0 MW | 12 MW | 233 MW | 140 MW |
| 2026-10-17T22:00Z | 1,175 MW | 0 MW | 18 MW | 231 MW | 141 MW |
| 2026-10-17T23:00Z | 1,111 MW | 0 MW | 30 MW | 229 MW | 158 MW |
| 2026-10-18T00:00Z | 1,110 MW | 0 MW | 35 MW | 227 MW | 150 MW |
| 2026-10-18T01:00Z | 1,111 MW | 0 MW | 35 MW | 227 MW | 144 MW |
| 2026-10-18T02:00Z | 1,116 MW | 0 MW | 39 MW | 227 MW | 142 MW |
| 2026-10-18T03:00Z | 1,114 MW | 0 MW | 32 MW | 230 MW | 155 MW |
| 2026-10-18T04:00Z | 1,114 MW | 0 MW | 20 MW | 227 MW | 173 MW |
| 2026-10-18T05:00Z | 1,110 MW | 55 MW | 20 MW | 228 MW | 227 MW |
| 2026-10-18T06:00Z | 842 MW | 820 MW | 21 MW | 230 MW | 196 MW |
| 2026-10-18T07:00Z | 527 MW | 1,807 MW | 7 MW | 227 MW | 149 MW |
| 2026-10-18T08:00Z | 678 MW | 2,714 MW | 8 MW | 224 MW | 142 MW |
| 2026-10-18T09:00Z | 354 MW | 2,944 MW | 14 MW | 223 MW | 128 MW |
| 2026-10-18T10:00Z | 607 MW | 2,887 MW | 8 MW | 220 MW | 130 MW |
| 2026-10-18T11:00Z | 712 MW | 3,058 MW | 13 MW | 220 MW | 126 MW |
| 2026-10-18T12:00Z | 619 MW | 2,901 MW | 37 MW | 219 MW | 126 MW |
| 2026-10-18T13:00Z | 816 MW | 2,479 MW | 55 MW | 219 MW | 142 MW |
| 2026-10-18T14:00Z | 1,183 MW | 1,703 MW | 71 MW | 222 MW | 140 MW |
| 2026-10-18T15:00Z | 1,961 MW | 562 MW | 97 MW | 225 MW | 204 MW |
| 2026-10-18T16:00Z | 2,156 MW | 19 MW | 87 MW | 234 MW | 252 MW |
| 2026-10-18T17:00Z | 2,160 MW | 0 MW | 54 MW | 236 MW | 257 MW |
| 2026-10-18T18:00Z | 2,214 MW | 0 MW | 31 MW | 237 MW | 230 MW |
| 2026-10-18T19:00Z | 2,211 MW | 0 MW | 35 MW | 236 MW | 153 MW |
| 2026-10-18T20:00Z | 2,184 MW | 0 MW | 22 MW | 234 MW | 155 MW |
| 2026-10-18T21:00Z | 2,033 MW | 0 MW | 22 MW | 235 MW | 152 MW |
| 2026-10-18T22:00Z | 1,844 MW | 0 MW | 27 MW | 238 MW | 139 MW |
| 2026-10-18T23:00Z | 1,772 MW | 0 MW | 31 MW | 234 MW | 142 MW |
| 2026-10-19T00:00Z | 1,818 MW | 0 MW | 28 MW | 231 MW | 157 MW |
| 2026-10-19T01:00Z | 1,818 MW | 0 MW | 36 MW | 232 MW | 150 MW |
| 2026-10-19T02:00Z | 1,791 MW | 0 MW | 55 MW | 232 MW | 143 MW |
| 2026-10-19T03:00Z | 1,828 MW | 0 MW | 58 MW | 236 MW | 144 MW |
| 2026-10-19T04:00Z | 1,948 MW | 0 MW | 58 MW | 236 MW | 188 MW |
| 2026-10-19T05:00Z | 2,286 MW | 47 MW | 60 MW | 237 MW | 213 MW |
| 2026-10-19T06:00Z | 2,263 MW | 830 MW | 36 MW | 234 MW | 264 MW |
| 2026-10-19T07:00Z | 2,022 MW | 2,110 MW | 20 MW | 232 MW | 222 MW |
| 2026-10-19T08:00Z | 1,597 MW | 3,037 MW | 10 MW | 227 MW | 187 MW |
| 2026-10-19T09:00Z | 1,369 MW | 3,486 MW | 8 MW | 225 MW | 181 MW |
| 2026-10-19T10:00Z | 1,048 MW | 3,605 MW | 8 MW | 221 MW | 124 MW |
| 2026-10-19T11:00Z | 914 MW | 3,518 MW | 7 MW | 222 MW | 121 MW |
| 2026-10-19T12:00Z | 1,627 MW | 3,324 MW | 12 MW | 221 MW | 128 MW |
| 2026-10-19T13:00Z | 2,069 MW | 2,841 MW | 25 MW | 220 MW | 127 MW |
| 2026-10-19T14:00Z | 2,724 MW | 1,825 MW | 34 MW | 222 MW | 125 MW |
| 2026-10-19T15:00Z | 3,619 MW | 577 MW | 55 MW | 225 MW | 166 MW |
| 2026-10-19T16:00Z | 3,737 MW | 14 MW | 39 MW | 229 MW | 247 MW |
| 2026-10-19T17:00Z | 3,784 MW | 0 MW | 12 MW | 232 MW | 273 MW |
| 2026-10-19T18:00Z | 3,840 MW | 0 MW | 5 MW | 231 MW | 215 MW |
| 2026-10-19T19:00Z | 3,780 MW | 0 MW | 9 MW | 230 MW | 196 MW |
| 2026-10-19T20:00Z | 3,436 MW | 0 MW | 17 MW | 228 MW | 127 MW |
| 2026-10-19T21:00Z | 3,306 MW | 0 MW | 20 MW | 227 MW | 138 MW |
| 2026-10-19T22:00Z | 2,946 MW | 0 MW | 27 MW | 226 MW | 136 MW |
| 2026-10-19T23:00Z | 2,802 MW | 0 MW | 38 MW | 226 MW | 125 MW |
| 2026-10-20T00:00Z | 2,797 MW | 0 MW | 50 MW | 225 MW | 128 MW |
| 2026-10-20T01:00Z | 2,760 MW | 0 MW | 86 MW | 226 MW | 128 MW |
| 2026-10-20T02:00Z | 2,775 MW | 0 MW | 158 MW | 227 MW | 141 MW |
| 2026-10-20T03:00Z | 2,822 MW | 0 MW | 115 MW | 227 MW | 144 MW |
| 2026-10-20T04:00Z | 2,968 MW | 0 MW | 125 MW | 224 MW | 166 MW |
| 2026-10-20T05:00Z | 2,985 MW | 45 MW | 172 MW | 223 MW | 202 MW |
| 2026-10-20T06:00Z | 2,958 MW | 772 MW | 103 MW | 224 MW | 246 MW |
| 2026-10-20T07:00Z | 2,766 MW | 2,056 MW | 56 MW | 226 MW | 198 MW |
| 2026-10-20T08:00Z | 2,075 MW | 2,837 MW | 45 MW | 222 MW | 193 MW |
| 2026-10-20T09:00Z | 1,808 MW | 3,238 MW | 68 MW | 222 MW | 185 MW |
| 2026-10-20T10:00Z | 1,766 MW | 3,352 MW | 91 MW | 220 MW | 129 MW |
| 2026-10-20T11:00Z | 1,714 MW | 3,116 MW | 165 MW | 220 MW | 133 MW |
| 2026-10-20T12:00Z | 1,697 MW | 2,402 MW | 219 MW | 221 MW | 137 MW |
| 2026-10-20T13:00Z | 2,001 MW | 1,568 MW | 166 MW | 222 MW | 132 MW |
| 2026-10-20T14:00Z | 2,483 MW | 782 MW | 145 MW | 220 MW | 133 MW |
| 2026-10-20T15:00Z | 3,149 MW | 232 MW | 105 MW | 218 MW | 172 MW |
| 2026-10-20T16:00Z | 3,276 MW | 3 MW | 136 MW | 227 MW | 226 MW |
| 2026-10-20T17:00Z | 3,390 MW | 0 MW | 159 MW | 227 MW | 241 MW |
| 2026-10-20T18:00Z | 3,390 MW | 0 MW | 161 MW | 228 MW | 210 MW |
| 2026-10-20T19:00Z | 3,283 MW | 0 MW | 192 MW | 228 MW | 162 MW |
| 2026-10-20T20:00Z | 2,982 MW | 0 MW | 254 MW | 226 MW | 149 MW |
| 2026-10-20T21:00Z | 2,224 MW | 0 MW | 417 MW | 225 MW | 132 MW |
| 2026-10-20T22:00Z | 1,290 MW | 0 MW | 557 MW | 225 MW | 127 MW |
| 2026-10-20T23:00Z | 1,233 MW | 0 MW | 709 MW | 226 MW | 142 MW |
| 2026-10-21T00:00Z | 1,218 MW | 0 MW | 805 MW | 226 MW | 146 MW |
| 2026-10-21T01:00Z | 1,316 MW | 0 MW | 676 MW | 225 MW | 136 MW |
| 2026-10-21T02:00Z | 1,348 MW | 0 MW | 486 MW | 226 MW | 133 MW |
| 2026-10-21T03:00Z | 1,350 MW | 0 MW | 525 MW | 226 MW | 139 MW |
| 2026-10-21T04:00Z | 1,630 MW | 0 MW | 533 MW | 226 MW | 155 MW |
| 2026-10-21T05:00Z | 2,028 MW | 3 MW | 448 MW | 225 MW | 202 MW |
| 2026-10-21T06:00Z | 2,188 MW | 183 MW | 754 MW | 224 MW | 284 MW |
| 2026-10-21T07:00Z | 2,149 MW | 691 MW | 440 MW | 217 MW | 242 MW |
| 2026-10-21T08:00Z | 2,115 MW | 1,386 MW | 478 MW | 209 MW | 226 MW |
| 2026-10-21T09:00Z | 2,019 MW | 1,976 MW | 831 MW | 192 MW | 211 MW |
| 2026-10-21T10:00Z | 1,877 MW | 1,631 MW | 1,115 MW | 190 MW | 175 MW |
| 2026-10-21T11:00Z | 1,806 MW | 1,368 MW | 991 MW | 192 MW | 163 MW |
| 2026-10-21T12:00Z | 1,792 MW | 1,464 MW | 1,215 MW | 193 MW | 160 MW |
| 2026-10-21T13:00Z | 2,174 MW | 1,090 MW | 1,353 MW | 190 MW | 197 MW |
| 2026-10-21T14:00Z | 2,415 MW | 925 MW | 1,118 MW | 191 MW | 218 MW |
| 2026-10-21T15:00Z | 2,538 MW | 340 MW | 1,095 MW | 195 MW | 252 MW |
| 2026-10-21T16:00Z | 2,713 MW | 13 MW | 1,273 MW | 196 MW | 286 MW |
| 2026-10-21T17:00Z | 2,263 MW | 0 MW | 1,451 MW | 195 MW | 296 MW |
| 2026-10-21T18:00Z | 2,219 MW | 0 MW | 1,462 MW | 197 MW | 261 MW |
| 2026-10-21T19:00Z | 2,287 MW | 0 MW | 1,484 MW | 198 MW | 192 MW |
| 2026-10-21T20:00Z | 2,220 MW | 0 MW | 1,534 MW | 196 MW | 194 MW |
| 2026-10-21T21:00Z | 1,876 MW | 0 MW | 1,529 MW | 192 MW | 194 MW |
| 2026-10-21T22:00Z | 1,040 MW | 0 MW | 1,409 MW | 192 MW | 170 MW |
| 2026-10-21T23:00Z | 756 MW | 0 MW | 1,379 MW | 191 MW | 175 MW |
| 2026-10-22T00:00Z | 931 MW | 0 MW | 1,280 MW | 192 MW | 180 MW |
| 2026-10-22T01:00Z | 1,129 MW | 0 MW | 1,213 MW | 192 MW | 193 MW |
| 2026-10-22T02:00Z | 1,140 MW | 0 MW | 1,125 MW | 193 MW | 189 MW |
| 2026-10-22T03:00Z | 1,176 MW | 0 MW | 953 MW | 193 MW | 173 MW |
| 2026-10-22T04:00Z | 1,390 MW | 0 MW | 750 MW | 191 MW | 170 MW |
| 2026-10-22T05:00Z | 1,523 MW | 28 MW | 582 MW | 190 MW | 237 MW |
| 2026-10-22T06:00Z | 1,517 MW | 562 MW | 634 MW | 187 MW | 333 MW |
| 2026-10-22T07:00Z | 1,326 MW | 1,751 MW | 874 MW | 185 MW | 262 MW |
| 2026-10-22T08:00Z | 825 MW | 2,577 MW | 804 MW | 185 MW | 215 MW |
| 2026-10-22T09:00Z | 369 MW | 3,098 MW | 830 MW | 185 MW | 219 MW |
| 2026-10-22T10:00Z | 232 MW | 3,159 MW | 650 MW | 185 MW | 166 MW |
| 2026-10-22T11:00Z | 192 MW | 3,068 MW | 709 MW | 184 MW | 158 MW |
| 2026-10-22T12:00Z | 300 MW | 2,843 MW | 733 MW | 184 MW | 149 MW |
| 2026-10-22T13:00Z | 472 MW | 2,281 MW | 903 MW | 184 MW | 150 MW |
| 2026-10-22T14:00Z | 1,461 MW | 1,291 MW | 863 MW | 187 MW | 148 MW |
| 2026-10-22T15:00Z | 2,850 MW | 362 MW | 803 MW | 189 MW | 206 MW |
| 2026-10-22T16:00Z | 3,245 MW | 7 MW | 648 MW | 188 MW | 263 MW |
| 2026-10-22T17:00Z | 3,310 MW | 0 MW | 466 MW | 191 MW | 243 MW |
| 2026-10-22T18:00Z | 3,306 MW | 0 MW | 322 MW | 198 MW | 207 MW |
| 2026-10-22T19:00Z | 3,302 MW | 0 MW | 206 MW | 197 MW | 182 MW |
| 2026-10-22T20:00Z | 3,280 MW | 0 MW | 160 MW | 192 MW | 162 MW |
| 2026-10-22T21:00Z | 2,512 MW | 0 MW | 176 MW | 195 MW | 163 MW |
| 2026-10-22T22:00Z | 1,860 MW | 0 MW | 68 MW | 193 MW | 150 MW |
| 2026-10-22T23:00Z | 1,765 MW | 0 MW | 31 MW | 192 MW | 148 MW |
| 2026-10-23T00:00Z | 1,809 MW | 0 MW | 36 MW | 194 MW | 146 MW |
| 2026-10-23T01:00Z | 1,810 MW | 0 MW | 63 MW | 194 MW | 150 MW |
| 2026-10-23T02:00Z | 1,810 MW | 0 MW | 32 MW | 196 MW | 155 MW |
| 2026-10-23T03:00Z | 1,709 MW | 0 MW | 22 MW | 196 MW | 153 MW |
| 2026-10-23T04:00Z | 1,868 MW | 0 MW | 16 MW | 200 MW | 169 MW |
| 2026-10-23T05:00Z | 1,907 MW | 34 MW | 23 MW | 202 MW | 229 MW |
| 2026-10-23T06:00Z | 2,012 MW | 679 MW | 16 MW | 202 MW | 277 MW |
| 2026-10-23T07:00Z | 1,943 MW | 1,775 MW | 8 MW | 203 MW | 242 MW |
| 2026-10-23T08:00Z | 1,172 MW | 2,684 MW | 36 MW | 202 MW | 199 MW |
| 2026-10-23T09:00Z | 1,191 MW | 3,166 MW | 119 MW | 197 MW | 193 MW |
| 2026-10-23T10:00Z | 1,073 MW | 3,481 MW | 288 MW | 195 MW | 130 MW |
| 2026-10-23T11:00Z | 756 MW | 3,455 MW | 413 MW | 196 MW | 136 MW |
| 2026-10-23T12:00Z | 1,062 MW | 3,193 MW | 499 MW | 194 MW | 147 MW |
| 2026-10-23T13:00Z | 1,522 MW | 2,713 MW | 560 MW | 192 MW | 136 MW |
| 2026-10-23T14:00Z | 1,914 MW | 1,453 MW | 614 MW | 193 MW | 139 MW |
| 2026-10-23T15:00Z | 3,027 MW | 360 MW | 545 MW | 201 MW | 201 MW |
| 2026-10-23T16:00Z | 3,049 MW | 5 MW | 556 MW | 204 MW | 255 MW |
| 2026-10-23T17:00Z | 2,941 MW | 0 MW | 570 MW | 206 MW | 251 MW |
| 2026-10-23T18:00Z | 3,090 MW | 0 MW | 683 MW | 207 MW | 203 MW |
| 2026-10-23T19:00Z | 3,055 MW | 0 MW | 891 MW | 208 MW | 182 MW |
| 2026-10-23T20:00Z | 2,677 MW | 0 MW | 1,155 MW | 205 MW | 165 MW |
| 2026-10-23T21:00Z | 1,749 MW | 0 MW | 1,352 MW | 203 MW | 154 MW |
| 2026-10-23T22:00Z | 1,053 MW | 0 MW | 1,433 MW | 200 MW | 140 MW |
| 2026-10-23T23:00Z | 985 MW | 0 MW | 1,393 MW | 196 MW | 136 MW |
| 2026-10-24T00:00Z | 984 MW | 0 MW | 1,311 MW | 198 MW | 129 MW |
| 2026-10-24T01:00Z | 980 MW | 0 MW | 1,216 MW | 198 MW | 134 MW |
| 2026-10-24T02:00Z | 976 MW | 0 MW | 1,121 MW | 199 MW | 140 MW |
| 2026-10-24T03:00Z | 989 MW | 0 MW | 937 MW | 201 MW | 160 MW |
| 2026-10-24T04:00Z | 1,097 MW | 0 MW | 1,103 MW | 205 MW | 167 MW |
| 2026-10-24T05:00Z | 1,099 MW | 22 MW | 1,168 MW | 203 MW | 204 MW |
| 2026-10-24T06:00Z | 1,102 MW | 528 MW | 1,022 MW | 204 MW | 203 MW |
| 2026-10-24T07:00Z | 767 MW | 1,247 MW | 1,132 MW | 201 MW | 160 MW |
| 2026-10-24T08:00Z | 529 MW | 1,541 MW | 930 MW | 201 MW | 139 MW |
| 2026-10-24T09:00Z | 18 MW | 1,731 MW | 1,055 MW | 197 MW | 129 MW |
| 2026-10-24T10:00Z | 15 MW | 1,971 MW | 1,206 MW | 194 MW | 125 MW |
| 2026-10-24T11:00Z | 12 MW | 1,933 MW | 1,209 MW | 192 MW | 139 MW |
| 2026-10-24T12:00Z | 15 MW | 2,071 MW | 1,356 MW | 193 MW | 141 MW |
| 2026-10-24T13:00Z | 113 MW | 1,606 MW | 1,343 MW | 195 MW | 130 MW |
| 2026-10-24T14:00Z | 604 MW | 882 MW | 1,239 MW | 198 MW | 130 MW |
| 2026-10-24T15:00Z | 914 MW | 372 MW | 1,190 MW | 203 MW | 185 MW |
| 2026-10-24T16:00Z | 1,004 MW | 4 MW | 974 MW | 204 MW | 262 MW |
| 2026-10-24T17:00Z | 1,071 MW | 0 MW | 571 MW | 204 MW | 255 MW |
| 2026-10-24T18:00Z | 1,076 MW | 0 MW | 299 MW | 202 MW | 195 MW |
| 2026-10-24T19:00Z | 1,080 MW | 0 MW | 436 MW | 202 MW | 180 MW |
| 2026-10-24T20:00Z | 961 MW | 0 MW | 883 MW | 200 MW | 153 MW |
| 2026-10-24T21:00Z | 694 MW | 0 MW | 992 MW | 195 MW | 141 MW |
| 2026-10-24T22:00Z | 731 MW | 0 MW | 909 MW | 109 MW | 133 MW |
| 2026-10-24T23:00Z | 732 MW | 0 MW | 650 MW | 108 MW | 132 MW |
| 2026-10-25T00:00Z | 730 MW | 0 MW | 482 MW | 108 MW | 138 MW |
| 2026-10-25T01:00Z | 728 MW | 0 MW | 459 MW | 110 MW | 130 MW |
| 2026-10-25T02:00Z | 737 MW | 0 MW | 459 MW | 109 MW | 138 MW |
| 2026-10-25T03:00Z | 738 MW | 0 MW | 450 MW | 109 MW | 133 MW |
| 2026-10-25T04:00Z | 738 MW | 0 MW | 454 MW | 110 MW | 135 MW |
| 2026-10-25T05:00Z | 735 MW | 37 MW | 429 MW | 108 MW | 177 MW |
| 2026-10-25T06:00Z | 652 MW | 772 MW | 296 MW | 108 MW | 169 MW |
| 2026-10-25T07:00Z | 714 MW | 1,691 MW | 169 MW | 108 MW | 134 MW |
| 2026-10-25T08:00Z | 555 MW | 2,492 MW | 87 MW | 108 MW | 134 MW |
| 2026-10-25T09:00Z | 111 MW | 2,899 MW | 100 MW | 108 MW | 132 MW |
| 2026-10-25T10:00Z | 15 MW | 3,201 MW | 106 MW | 107 MW | 125 MW |
| 2026-10-25T11:00Z | 15 MW | 3,112 MW | 93 MW | 106 MW | 121 MW |
| 2026-10-25T12:00Z | 78 MW | 2,516 MW | 119 MW | 105 MW | 140 MW |
| 2026-10-25T13:00Z | 240 MW | 2,254 MW | 131 MW | 105 MW | 142 MW |
| 2026-10-25T14:00Z | 902 MW | 1,545 MW | 78 MW | 112 MW | 122 MW |
| 2026-10-25T15:00Z | 1,533 MW | 432 MW | 26 MW | 136 MW | 125 MW |
| 2026-10-25T16:00Z | 1,890 MW | 9 MW | 19 MW | 161 MW | 170 MW |
| 2026-10-25T17:00Z | 1,920 MW | 0 MW | 32 MW | 186 MW | 240 MW |
| 2026-10-25T18:00Z | 1,932 MW | 0 MW | 45 MW | 187 MW | 231 MW |
| 2026-10-25T19:00Z | 1,922 MW | 0 MW | 114 MW | 170 MW | 201 MW |
| 2026-10-25T20:00Z | 1,937 MW | 0 MW | 159 MW | 149 MW | 171 MW |
| 2026-10-25T21:00Z | 1,825 MW | 0 MW | 167 MW | 118 MW | 136 MW |
| 2026-10-25T22:00Z | 1,733 MW | 0 MW | 202 MW | 111 MW | 133 MW |
| 2026-10-25T23:00Z | 1,444 MW | 0 MW | 124 MW | 196 MW | 136 MW |
| 2026-10-26T00:00Z | 1,642 MW | 0 MW | 59 MW | 195 MW | 145 MW |
| 2026-10-26T01:00Z | 1,454 MW | 0 MW | 72 MW | 195 MW | 130 MW |
| 2026-10-26T02:00Z | 1,425 MW | 0 MW | 93 MW | 196 MW | 130 MW |
| 2026-10-26T03:00Z | 1,558 MW | 0 MW | 174 MW | 198 MW | 135 MW |
| 2026-10-26T04:00Z | 1,682 MW | 0 MW | 307 MW | 198 MW | 148 MW |
| 2026-10-26T05:00Z | 1,856 MW | 19 MW | 422 MW | 204 MW | 151 MW |
| 2026-10-26T06:00Z | 1,856 MW | 632 MW | 565 MW | 202 MW | 200 MW |
| 2026-10-26T07:00Z | 1,777 MW | 1,817 MW | 498 MW | 201 MW | 180 MW |
| 2026-10-26T08:00Z | 1,383 MW | 2,864 MW | 662 MW | 203 MW | 139 MW |
| 2026-10-26T09:00Z | 548 MW | 3,132 MW | 912 MW | 207 MW | 143 MW |
| 2026-10-26T10:00Z | 399 MW | 3,252 MW | 990 MW | 223 MW | 141 MW |
| 2026-10-26T11:00Z | 377 MW | 3,378 MW | 885 MW | 222 MW | 129 MW |
| 2026-10-26T12:00Z | 400 MW | 3,224 MW | 1,004 MW | 224 MW | 120 MW |
| 2026-10-26T13:00Z | 1,176 MW | 2,333 MW | 1,127 MW | 225 MW | 141 MW |
| 2026-10-26T14:00Z | 2,550 MW | 1,203 MW | 1,273 MW | 226 MW | 134 MW |
| 2026-10-26T15:00Z | 3,403 MW | 337 MW | 1,069 MW | 228 MW | 129 MW |
| 2026-10-26T16:00Z | 3,628 MW | 4 MW | 777 MW | 229 MW | 140 MW |
| 2026-10-26T17:00Z | 3,657 MW | 0 MW | 502 MW | 232 MW | 203 MW |
| 2026-10-26T18:00Z | 3,654 MW | 0 MW | 389 MW | 234 MW | 205 MW |
| 2026-10-26T19:00Z | 3,610 MW | 0 MW | 332 MW | 235 MW | 165 MW |
| 2026-10-26T20:00Z | 3,546 MW | 0 MW | 284 MW | 234 MW | 143 MW |
| 2026-10-26T21:00Z | 3,488 MW | 0 MW | 327 MW | 231 MW | 130 MW |
| 2026-10-26T22:00Z | 2,384 MW | 0 MW | 369 MW | 229 MW | 135 MW |
| 2026-10-26T23:00Z | 1,613 MW | 0 MW | 391 MW | 228 MW | 150 MW |
| 2026-10-27T00:00Z | 1,566 MW | 0 MW | 363 MW | 227 MW | 128 MW |
| 2026-10-27T01:00Z | 1,574 MW | 0 MW | 305 MW | 229 MW | 124 MW |
| 2026-10-27T02:00Z | 1,555 MW | 0 MW | 337 MW | 230 MW | 124 MW |
| 2026-10-27T03:00Z | 1,589 MW | 0 MW | 298 MW | 229 MW | 139 MW |
| 2026-10-27T04:00Z | 1,747 MW | 0 MW | 309 MW | 227 MW | 136 MW |
| 2026-10-27T05:00Z | 1,783 MW | 18 MW | 329 MW | 226 MW | 136 MW |
| 2026-10-27T06:00Z | 1,747 MW | 662 MW | 281 MW | 228 MW | 172 MW |
| 2026-10-27T07:00Z | 1,587 MW | 1,966 MW | 207 MW | 224 MW | 169 MW |
| 2026-10-27T08:00Z | 1,283 MW | 2,933 MW | 288 MW | 223 MW | 135 MW |
| 2026-10-27T09:00Z | 912 MW | 3,344 MW | 411 MW | 220 MW | 130 MW |
| 2026-10-27T10:00Z | 528 MW | 3,423 MW | 440 MW | 219 MW | 124 MW |
| 2026-10-27T11:00Z | 478 MW | 3,409 MW | 527 MW | 219 MW | 113 MW |
| 2026-10-27T12:00Z | 475 MW | 3,235 MW | 695 MW | 222 MW | 127 MW |
| 2026-10-27T13:00Z | 930 MW | 2,726 MW | 801 MW | 223 MW | 131 MW |
| 2026-10-27T14:00Z | 2,019 MW | 1,608 MW | 828 MW | 220 MW | 121 MW |
| 2026-10-27T15:00Z | 2,428 MW | 402 MW | 757 MW | 219 MW | 144 MW |
| 2026-10-27T16:00Z | 2,834 MW | 3 MW | 734 MW | 225 MW | 162 MW |
| 2026-10-27T17:00Z | 2,845 MW | 0 MW | 780 MW | 229 MW | 224 MW |
| 2026-10-27T18:00Z | 2,776 MW | 0 MW | 928 MW | 227 MW | 225 MW |
| 2026-10-27T19:00Z | 2,818 MW | 0 MW | 947 MW | 229 MW | 170 MW |
| 2026-10-27T20:00Z | 2,694 MW | 0 MW | 902 MW | 229 MW | 123 MW |
| 2026-10-27T21:00Z | 1,967 MW | 0 MW | 803 MW | 225 MW | 125 MW |
| 2026-10-27T22:00Z | 1,474 MW | 0 MW | 709 MW | 226 MW | 138 MW |
| 2026-10-27T23:00Z | 1,566 MW | 0 MW | 845 MW | 226 MW | 126 MW |
| 2026-10-28T00:00Z | 1,563 MW | 0 MW | 1,128 MW | 224 MW | 123 MW |
| 2026-10-28T01:00Z | 1,497 MW | 0 MW | 1,350 MW | 225 MW | 132 MW |
| 2026-10-28T02:00Z | 1,642 MW | 0 MW | 1,286 MW | 223 MW | 149 MW |
| 2026-10-28T03:00Z | 1,687 MW | 0 MW | 1,068 MW | 224 MW | 139 MW |
| 2026-10-28T04:00Z | 1,740 MW | 0 MW | 1,003 MW | 225 MW | 131 MW |
| 2026-10-28T05:00Z | 1,858 MW | 125 MW | 953 MW | 224 MW | 135 MW |
| 2026-10-28T06:00Z | 1,864 MW | 681 MW | 978 MW | 223 MW | 169 MW |
| 2026-10-28T07:00Z | 1,785 MW | 1,766 MW | 1,039 MW | 226 MW | 220 MW |
| 2026-10-28T08:00Z | 1,285 MW | 2,609 MW | 1,090 MW | 225 MW | 183 MW |
| 2026-10-28T09:00Z | 1,282 MW | 3,035 MW | 577 MW | 221 MW | 180 MW |
| 2026-10-28T10:00Z | 1,362 MW | 3,091 MW | 421 MW | 222 MW | 172 MW |
| 2026-10-28T11:00Z | 1,174 MW | 2,658 MW | 319 MW | 222 MW | 120 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-28T11:00Z.
Day by Day
Daily totals, Europe/Rome time dates, through 2026-10-27Show the data table (400 rows)
| Date (Europe/Rome time) | Demand |
|---|---|
| 2025-09-23 | 139 GWh |
| 2025-09-24 | 142 GWh |
| 2025-09-25 | 133 GWh |
| 2025-09-26 | 126 GWh |
| 2025-09-27 | 115 GWh |
| 2025-09-28 | 111 GWh |
| 2025-09-29 | 121 GWh |
| 2025-09-30 | 121 GWh |
| 2025-10-01 | 125 GWh |
| 2025-10-02 | 128 GWh |
| 2025-10-03 | 122 GWh |
| 2025-10-04 | 112 GWh |
| 2025-10-05 | 111 GWh |
| 2025-10-06 | 125 GWh |
| 2025-10-07 | 128 GWh |
| 2025-10-08 | 126 GWh |
| 2025-10-09 | 119 GWh |
| 2025-10-10 | 122 GWh |
| 2025-10-11 | 107 GWh |
| 2025-10-12 | 110 GWh |
| 2025-10-13 | 121 GWh |
| 2025-10-14 | 120 GWh |
| 2025-10-15 | 124 GWh |
| 2025-10-16 | 124 GWh |
| 2025-10-17 | 118 GWh |
| 2025-10-18 | 115 GWh |
| 2025-10-19 | 110 GWh |
| 2025-10-20 | 124 GWh |
| 2025-10-21 | 124 GWh |
| 2025-10-22 | 120 GWh |
| 2025-10-23 | 121 GWh |
| 2025-10-24 | 114 GWh |
| 2025-10-25 | 104 GWh |
| 2025-10-26 | 104 GWh |
| 2025-10-27 | 111 GWh |
| 2025-10-28 | 120 GWh |
| 2025-10-29 | 122 GWh |
| 2025-10-30 | 121 GWh |
| 2025-10-31 | 118 GWh |
| 2025-11-01 | 109 GWh |
| 2025-11-02 | 103 GWh |
| 2025-11-03 | 122 GWh |
| 2025-11-04 | 116 GWh |
| 2025-11-05 | 112 GWh |
| 2025-11-06 | 116 GWh |
| 2025-11-07 | 116 GWh |
| 2025-11-08 | 112 GWh |
| 2025-11-09 | 112 GWh |
| 2025-11-10 | 108 GWh |
| 2025-11-11 | 118 GWh |
| 2025-11-12 | 124 GWh |
| 2025-11-13 | 127 GWh |
| 2025-11-14 | 130 GWh |
| 2025-11-15 | 120 GWh |
| 2025-11-16 | 109 GWh |
| 2025-11-17 | 132 GWh |
| 2025-11-18 | 127 GWh |
| 2025-11-19 | 131 GWh |
| 2025-11-20 | 136 GWh |
| 2025-11-21 | 129 GWh |
| 2025-11-22 | 118 GWh |
| 2025-11-23 | 110 GWh |
| 2025-11-24 | 145 GWh |
| 2025-11-25 | 149 GWh |
| 2025-11-26 | 139 GWh |
| 2025-11-27 | 136 GWh |
| 2025-11-28 | 138 GWh |
| 2025-11-29 | 120 GWh |
| 2025-11-30 | 120 GWh |
| 2025-12-01 | 145 GWh |
| 2025-12-02 | 145 GWh |
| 2025-12-03 | 147 GWh |
| 2025-12-04 | 144 GWh |
| 2025-12-05 | 146 GWh |
| 2025-12-06 | 128 GWh |
| 2025-12-07 | 121 GWh |
| 2025-12-08 | 118 GWh |
| 2025-12-09 | 145 GWh |
| 2025-12-10 | 146 GWh |
| 2025-12-11 | 146 GWh |
| 2025-12-12 | 145 GWh |
| 2025-12-13 | 124 GWh |
| 2025-12-14 | 116 GWh |
| 2025-12-15 | 143 GWh |
| 2025-12-16 | 151 GWh |
| 2025-12-17 | 149 GWh |
| 2025-12-18 | 137 GWh |
| 2025-12-19 | 135 GWh |
| 2025-12-20 | 122 GWh |
| 2025-12-21 | 117 GWh |
| 2025-12-22 | 130 GWh |
| 2025-12-23 | 132 GWh |
| 2025-12-24 | 122 GWh |
| 2025-12-25 | 106 GWh |
| 2025-12-26 | 115 GWh |
| 2025-12-27 | 120 GWh |
| 2025-12-28 | 113 GWh |
| 2025-12-29 | 135 GWh |
| 2025-12-30 | 134 GWh |
| 2025-12-31 | 126 GWh |
| 2026-01-01 | 113 GWh |
| 2026-01-02 | 139 GWh |
| 2026-01-03 | 128 GWh |
| 2026-01-04 | 118 GWh |
| 2026-01-05 | 135 GWh |
| 2026-01-06 | 127 GWh |
| 2026-01-07 | 146 GWh |
| 2026-01-08 | 160 GWh |
| 2026-01-09 | 161 GWh |
| 2026-01-10 | 140 GWh |
| 2026-01-11 | 124 GWh |
| 2026-01-12 | 149 GWh |
| 2026-01-13 | 149 GWh |
| 2026-01-14 | 147 GWh |
| 2026-01-15 | 141 GWh |
| 2026-01-16 | 144 GWh |
| 2026-01-17 | 129 GWh |
| 2026-01-18 | 116 GWh |
| 2026-01-19 | 147 GWh |
| 2026-01-20 | 156 GWh |
| 2026-01-21 | 149 GWh |
| 2026-01-22 | 142 GWh |
| 2026-01-23 | 141 GWh |
| 2026-01-24 | 130 GWh |
| 2026-01-25 | 126 GWh |
| 2026-01-26 | 148 GWh |
| 2026-01-27 | 146 GWh |
| 2026-01-28 | 160 GWh |
| 2026-01-29 | 149 GWh |
| 2026-01-30 | 147 GWh |
| 2026-01-31 | 131 GWh |
| 2026-02-01 | 122 GWh |
| 2026-02-02 | 141 GWh |
| 2026-02-03 | 149 GWh |
| 2026-02-04 | 150 GWh |
| 2026-02-05 | 147 GWh |
| 2026-02-06 | 151 GWh |
| 2026-02-07 | 132 GWh |
| 2026-02-08 | 123 GWh |
| 2026-02-09 | 136 GWh |
| 2026-02-10 | 138 GWh |
| 2026-02-11 | 151 GWh |
| 2026-02-12 | 155 GWh |
| 2026-02-13 | 142 GWh |
| 2026-02-14 | 132 GWh |
| 2026-02-15 | 119 GWh |
| 2026-02-16 | 148 GWh |
| 2026-02-17 | 145 GWh |
| 2026-02-18 | 146 GWh |
| 2026-02-19 | 149 GWh |
| 2026-02-20 | 143 GWh |
| 2026-02-21 | 126 GWh |
| 2026-02-22 | 117 GWh |
| 2026-02-23 | 139 GWh |
| 2026-02-24 | 139 GWh |
| 2026-02-25 | 134 GWh |
| 2026-02-26 | 131 GWh |
| 2026-02-27 | 132 GWh |
| 2026-02-28 | 123 GWh |
| 2026-03-01 | 123 GWh |
| 2026-03-02 | 135 GWh |
| 2026-03-03 | 132 GWh |
| 2026-03-04 | 135 GWh |
| 2026-03-05 | 137 GWh |
| 2026-03-06 | 137 GWh |
| 2026-03-07 | 127 GWh |
| 2026-03-08 | 119 GWh |
| 2026-03-09 | 129 GWh |
| 2026-03-10 | 134 GWh |
| 2026-03-11 | 132 GWh |
| 2026-03-12 | 131 GWh |
| 2026-03-13 | 127 GWh |
| 2026-03-14 | 127 GWh |
| 2026-03-15 | 113 GWh |
| 2026-03-16 | 137 GWh |
| 2026-03-17 | 139 GWh |
| 2026-03-18 | 133 GWh |
| 2026-03-19 | 136 GWh |
| 2026-03-20 | 135 GWh |
| 2026-03-21 | 129 GWh |
| 2026-03-22 | 114 GWh |
| 2026-03-23 | 136 GWh |
| 2026-03-24 | 135 GWh |
| 2026-03-25 | 134 GWh |
| 2026-03-26 | 143 GWh |
| 2026-03-27 | 137 GWh |
| 2026-03-28 | 120 GWh |
| 2026-03-29 | 104 GWh |
| 2026-03-30 | 128 GWh |
| 2026-03-31 | 145 GWh |
| 2026-04-01 | 146 GWh |
| 2026-04-02 | 141 GWh |
| 2026-04-03 | 128 GWh |
| 2026-04-04 | 108 GWh |
| 2026-04-05 | 99.6 GWh |
| 2026-04-06 | 100 GWh |
| 2026-04-07 | 116 GWh |
| 2026-04-08 | 119 GWh |
| 2026-04-09 | 120 GWh |
| 2026-04-10 | 123 GWh |
| 2026-04-11 | 114 GWh |
| 2026-04-12 | 108 GWh |
| 2026-04-13 | 117 GWh |
| 2026-04-14 | 122 GWh |
| 2026-04-15 | 125 GWh |
| 2026-04-16 | 120 GWh |
| 2026-04-17 | 113 GWh |
| 2026-04-18 | 105 GWh |
| 2026-04-19 | 93.8 GWh |
| 2026-04-20 | 114 GWh |
| 2026-04-21 | 128 GWh |
| 2026-04-22 | 127 GWh |
| 2026-04-23 | 117 GWh |
| 2026-04-24 | 115 GWh |
| 2026-04-25 | 104 GWh |
| 2026-04-26 | 99.7 GWh |
| 2026-04-27 | 115 GWh |
| 2026-04-28 | 115 GWh |
| 2026-04-29 | 120 GWh |
| 2026-04-30 | 118 GWh |
| 2026-05-01 | 94.4 GWh |
| 2026-05-02 | 98.4 GWh |
| 2026-05-03 | 93.3 GWh |
| 2026-05-04 | 117 GWh |
| 2026-05-05 | 123 GWh |
| 2026-05-06 | 122 GWh |
| 2026-05-07 | 122 GWh |
| 2026-05-08 | 125 GWh |
| 2026-05-09 | 111 GWh |
| 2026-05-10 | 107 GWh |
| 2026-05-11 | 118 GWh |
| 2026-05-12 | 121 GWh |
| 2026-05-13 | 125 GWh |
| 2026-05-14 | 119 GWh |
| 2026-05-15 | 124 GWh |
| 2026-05-16 | 112 GWh |
| 2026-05-17 | 93.7 GWh |
| 2026-05-18 | 114 GWh |
| 2026-05-19 | 117 GWh |
| 2026-05-20 | 128 GWh |
| 2026-05-21 | 120 GWh |
| 2026-05-22 | 116 GWh |
| 2026-05-23 | 104 GWh |
| 2026-05-24 | 96.5 GWh |
| 2026-05-25 | 118 GWh |
| 2026-05-26 | 125 GWh |
| 2026-05-27 | 130 GWh |
| 2026-05-28 | 133 GWh |
| 2026-05-29 | 130 GWh |
| 2026-05-30 | 112 GWh |
| 2026-05-31 | 102 GWh |
| 2026-06-01 | 116 GWh |
| 2026-06-02 | 117 GWh |
| 2026-06-03 | 131 GWh |
| 2026-06-04 | 131 GWh |
| 2026-06-05 | 131 GWh |
| 2026-06-06 | 117 GWh |
| 2026-06-07 | 107 GWh |
| 2026-06-08 | 132 GWh |
| 2026-06-09 | 136 GWh |
| 2026-06-10 | 139 GWh |
| 2026-06-11 | 135 GWh |
| 2026-06-12 | 135 GWh |
| 2026-06-13 | 122 GWh |
| 2026-06-14 | 108 GWh |
| 2026-06-15 | 128 GWh |
| 2026-06-16 | 135 GWh |
| 2026-06-17 | 145 GWh |
| 2026-06-18 | 148 GWh |
| 2026-06-19 | 144 GWh |
| 2026-06-20 | 136 GWh |
| 2026-06-21 | 125 GWh |
| 2026-06-22 | 145 GWh |
| 2026-06-23 | 150 GWh |
| 2026-06-24 | 154 GWh |
| 2026-06-25 | 153 GWh |
| 2026-06-26 | 155 GWh |
| 2026-06-27 | 146 GWh |
| 2026-06-28 | 139 GWh |
| 2026-06-29 | 161 GWh |
| 2026-06-30 | 169 GWh |
| 2026-07-01 | 174 GWh |
| 2026-07-02 | 156 GWh |
| 2026-07-03 | 152 GWh |
| 2026-07-04 | 133 GWh |
| 2026-07-05 | 121 GWh |
| 2026-07-06 | 147 GWh |
| 2026-07-07 | 153 GWh |
| 2026-07-08 | 156 GWh |
| 2026-07-09 | 158 GWh |
| 2026-07-10 | 160 GWh |
| 2026-07-11 | 149 GWh |
| 2026-07-12 | 133 GWh |
| 2026-07-13 | 162 GWh |
| 2026-07-14 | 175 GWh |
| 2026-07-15 | 177 GWh |
| 2026-07-16 | 179 GWh |
| 2026-07-17 | 186 GWh |
| 2026-07-18 | 163 GWh |
| 2026-07-19 | 156 GWh |
| 2026-07-20 | 181 GWh |
| 2026-07-21 | 182 GWh |
| 2026-07-22 | 172 GWh |
| 2026-07-23 | 169 GWh |
| 2026-07-24 | 157 GWh |
| 2026-07-25 | 130 GWh |
| 2026-07-26 | 132 GWh |
| 2026-07-27 | 166 GWh |
| 2026-07-28 | 177 GWh |
| 2026-07-29 | 181 GWh |
| 2026-07-30 | 188 GWh |
| 2026-07-31 | 185 GWh |
| 2026-08-01 | 171 GWh |
| 2026-08-02 | 153 GWh |
| 2026-08-03 | 171 GWh |
| 2026-08-04 | 177 GWh |
| 2026-08-05 | 179 GWh |
| 2026-08-06 | 172 GWh |
| 2026-08-07 | 169 GWh |
| 2026-08-08 | 149 GWh |
| 2026-08-09 | 137 GWh |
| 2026-08-10 | 154 GWh |
| 2026-08-11 | 154 GWh |
| 2026-08-12 | 149 GWh |
| 2026-08-13 | 142 GWh |
| 2026-08-14 | 137 GWh |
| 2026-08-15 | 124 GWh |
| 2026-08-16 | 131 GWh |
| 2026-08-17 | 143 GWh |
| 2026-08-18 | 135 GWh |
| 2026-08-19 | 143 GWh |
| 2026-08-20 | 146 GWh |
| 2026-08-21 | 145 GWh |
| 2026-08-22 | 135 GWh |
| 2026-08-23 | 120 GWh |
| 2026-08-24 | 150 GWh |
| 2026-08-25 | 157 GWh |
| 2026-08-26 | 162 GWh |
| 2026-08-27 | 165 GWh |
| 2026-08-28 | 169 GWh |
| 2026-08-29 | 155 GWh |
| 2026-08-30 | 150 GWh |
| 2026-08-31 | 172 GWh |
| 2026-09-01 | 177 GWh |
| 2026-09-02 | 174 GWh |
| 2026-09-03 | 171 GWh |
| 2026-09-04 | 168 GWh |
| 2026-09-05 | 150 GWh |
| 2026-09-06 | 141 GWh |
| 2026-09-07 | 172 GWh |
| 2026-09-08 | 173 GWh |
| 2026-09-09 | 172 GWh |
| 2026-09-10 | 166 GWh |
| 2026-09-11 | 151 GWh |
| 2026-09-12 | 129 GWh |
| 2026-09-13 | 119 GWh |
| 2026-09-14 | 139 GWh |
| 2026-09-15 | 143 GWh |
| 2026-09-16 | 142 GWh |
| 2026-09-17 | 148 GWh |
| 2026-09-18 | 149 GWh |
| 2026-09-19 | 127 GWh |
| 2026-09-20 | 119 GWh |
| 2026-09-21 | 145 GWh |
| 2026-09-22 | 146 GWh |
| 2026-09-23 | 134 GWh |
| 2026-09-24 | 137 GWh |
| 2026-09-25 | 137 GWh |
| 2026-09-26 | 118 GWh |
| 2026-09-27 | 111 GWh |
| 2026-09-28 | 133 GWh |
| 2026-09-29 | 131 GWh |
| 2026-09-30 | 132 GWh |
| 2026-10-01 | 124 GWh |
| 2026-10-02 | 127 GWh |
| 2026-10-03 | 114 GWh |
| 2026-10-04 | 119 GWh |
| 2026-10-05 | 136 GWh |
| 2026-10-06 | 136 GWh |
| 2026-10-07 | 135 GWh |
| 2026-10-08 | 129 GWh |
| 2026-10-09 | 128 GWh |
| 2026-10-10 | 122 GWh |
| 2026-10-11 | 105 GWh |
| 2026-10-12 | 128 GWh |
| 2026-10-13 | 119 GWh |
| 2026-10-14 | 120 GWh |
| 2026-10-15 | 119 GWh |
| 2026-10-16 | 121 GWh |
| 2026-10-17 | 109 GWh |
| 2026-10-18 | 109 GWh |
| 2026-10-19 | 121 GWh |
| 2026-10-20 | 125 GWh |
| 2026-10-21 | 129 GWh |
| 2026-10-22 | 122 GWh |
| 2026-10-23 | 122 GWh |
| 2026-10-24 | 111 GWh |
| 2026-10-25 | 108 GWh |
| 2026-10-26 | 124 GWh |
| 2026-10-27 | 125 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27. Daily totals are summed by World Power Monitor from complete Europe/Rome local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 40.8 TWh | 25.6 TWh | Gas 41.0% | 300 |
| 2025 | 48.0 TWh | 28.1 TWh | Gas 46.1% | 365 |
| 2024 (partial) | 49.3 TWh | 27.2 TWh | Gas 45.1% | 365 |
| 2023 | 49.1 TWh | 25.8 TWh | Gas 27.4% | 365 |
| 2022 | 50.7 TWh | 30.2 TWh | Gas 34.3% | 365 |
| 2021 | 49.9 TWh | 31.4 TWh | Gas 38.1% | 365 |
| 2020 | 42.8 TWh | 26.8 TWh | Gas 39.9% | 366 |
| 2019 | 45.6 TWh | 29.1 TWh | Gas 42.5% | 365 |
| 2018 | 44.5 TWh | 30.2 TWh | Coal 29.2% | 365 |
| 2017 | 46.3 TWh | 32.8 TWh | Coal 27.5% | 365 |
| 2016 | 45.2 TWh | 30.7 TWh | Other 30.0% | 366 |
| 2015 | 46.4 TWh | 29.4 TWh | Other 34.4% | 365 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Power Flows With Neighbours
Net totals, 2026-09-28 (28 September 2026) to 2026-10-27 (27 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Italy South | Italy Centre-South imports | 1.08 TWh |
| Italy Sardinia | Italy Centre-South imports | 311 GWh |
| Italy Centre-North | Italy Centre-South exports | 199 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-27.
Latest Grid Alerts
Newest alert 25 October 2026- Net imports Italy Centre-South imported a net 54.0 GWh on 25 October 2026, the 3rd highest daily net imports in 397 days of loaded history and 50% of its demand that day. All alerts that day
- Net imports Italy Centre-South imported a net 55.2 GWh on 5 October 2026, the highest daily net imports in 377 days of loaded history and 40% of its demand that day. All alerts that day
- Net imports Net imports into Italy Centre-South reached 54.1 GWh on 4 October 2026 (46% of demand), the highest daily net imports in 376 days of loaded history. All alerts that day
Follow this grid: RSS feed of Italy Centre-South alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-10-28 (28 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Italy Centre-South, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Italy Centre-South Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/it-csud/
World Power Monitor. Italy Centre-South Electricity Demand and Generation Mix. Data as of 2026-10-28 11:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/it-csud/
@misc{wpm_zones_it_csud_2026,
title = {{Italy Centre-South Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-28 11:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/it-csud/}
} Permalink: https://worldpowermonitor.com/zones/it-csud/
The Copy buttons add today's date as the access date.