CAISO Electricity Demand and Generation Mix
CAISO demand was 31,470 MW in the hour starting 15 Sept 2026, 08:00 PDT (UTC-07:00). Gas was the largest source in the hour starting 14 Sept 2026, 22:00 PDT (UTC-07:00), at 32% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- CAISO is a regional transmission organization and balancing authority in the United States, part of the EIA California region.
- In the hour starting 15 Sept 2026, 08:00 PDT (UTC-07:00), demand in CAISO was 31,470 MW, against a day-ahead forecast of 26,448 MW.
- Gas supplied 32.1% of CAISO's generation in the hour starting 14 Sept 2026, 22:00 PDT (UTC-07:00).
- Demand in CAISO totalled 224 TWh in 2025.
- Gas supplied 42.0% of CAISO's generation in 2025.
- The highest daily demand in CAISO from 2019 onward was 965 GWh, on 2026-09-09 (9 September 2026).
- The highest hourly demand in CAISO since 2026-06-16 (16 June 2026) was 49,959 MW, in the hour starting 9 Sept 2026, 17:00 PDT (UTC-07:00).
- Solar's highest share of CAISO's daily generation from 2019 onward was 48.2%, on 2026-06-29 (29 June 2026).
- Wind's highest share of CAISO's daily generation from 2019 onward was 34.2%, on 2026-05-17 (17 May 2026).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 15 Sept 2026, 08:00 PDT (UTC-07:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T15:00:00Z.
Generation by Source
Latest hour with generation by source: 14 Sept 2026, 22:00 PDT (UTC-07:00)| Source | Output | Share |
|---|---|---|
| Gas | 7,119 MW | 32.1% |
| Other | 4,882 MW | 22.0% |
| Wind | 3,816 MW | 17.2% |
| Hydro | 3,291 MW | 14.8% |
| Nuclear | 2,262 MW | 10.2% |
| Geothermal | 783 MW | 3.5% |
| Oil | 18 MW | 0.1% |
| Coal | 0 MW | 0.0% |
| Solar | -55 MW | own use |
| Total from these sources | 22,171 MW | |
| Net interchange | -8,411 MW | net imports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when CAISO exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T05:00:00Z.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-16T17:00Z | 31,271 MW |
| 2026-08-16T18:00Z | 31,451 MW |
| 2026-08-16T19:00Z | 31,102 MW |
| 2026-08-16T20:00Z | 30,118 MW |
| 2026-08-16T21:00Z | 30,819 MW |
| 2026-08-16T22:00Z | 32,571 MW |
| 2026-08-16T23:00Z | 33,732 MW |
| 2026-08-17T00:00Z | 35,408 MW |
| 2026-08-17T01:00Z | 36,252 MW |
| 2026-08-17T02:00Z | 35,495 MW |
| 2026-08-17T03:00Z | 34,998 MW |
| 2026-08-17T04:00Z | 33,886 MW |
| 2026-08-17T05:00Z | 31,504 MW |
| 2026-08-17T06:00Z | 29,197 MW |
| 2026-08-17T07:00Z | 27,944 MW |
| 2026-08-17T08:00Z | 26,350 MW |
| 2026-08-17T09:00Z | 25,523 MW |
| 2026-08-17T10:00Z | 25,203 MW |
| 2026-08-17T11:00Z | 24,964 MW |
| 2026-08-17T12:00Z | 25,441 MW |
| 2026-08-17T13:00Z | 26,988 MW |
| 2026-08-17T14:00Z | 30,016 MW |
| 2026-08-17T15:00Z | 35,202 MW |
| 2026-08-17T16:00Z | 36,344 MW |
| 2026-08-17T17:00Z | 36,612 MW |
| 2026-08-17T18:00Z | 36,742 MW |
| 2026-08-17T19:00Z | 35,770 MW |
| 2026-08-17T20:00Z | 35,911 MW |
| 2026-08-17T21:00Z | 35,605 MW |
| 2026-08-17T22:00Z | 37,359 MW |
| 2026-08-17T23:00Z | 38,307 MW |
| 2026-08-18T00:00Z | 39,537 MW |
| 2026-08-18T01:00Z | 40,140 MW |
| 2026-08-18T02:00Z | 38,482 MW |
| 2026-08-18T03:00Z | 37,528 MW |
| 2026-08-18T04:00Z | 35,961 MW |
| 2026-08-18T05:00Z | 33,359 MW |
| 2026-08-18T06:00Z | 30,830 MW |
| 2026-08-18T07:00Z | 29,287 MW |
| 2026-08-18T08:00Z | 27,814 MW |
| 2026-08-18T09:00Z | 27,100 MW |
| 2026-08-18T10:00Z | 26,624 MW |
| 2026-08-18T11:00Z | 26,221 MW |
| 2026-08-18T12:00Z | 26,527 MW |
| 2026-08-18T13:00Z | 27,611 MW |
| 2026-08-18T14:00Z | 31,170 MW |
| 2026-08-18T15:00Z | 36,469 MW |
| 2026-08-18T16:00Z | 36,651 MW |
| 2026-08-18T17:00Z | 36,712 MW |
| 2026-08-18T18:00Z | 35,956 MW |
| 2026-08-18T19:00Z | 35,095 MW |
| 2026-08-18T20:00Z | 34,585 MW |
| 2026-08-18T21:00Z | 36,377 MW |
| 2026-08-18T22:00Z | 37,612 MW |
| 2026-08-18T23:00Z | 39,506 MW |
| 2026-08-19T00:00Z | 40,380 MW |
| 2026-08-19T01:00Z | 40,942 MW |
| 2026-08-19T02:00Z | 39,800 MW |
| 2026-08-19T03:00Z | 38,558 MW |
| 2026-08-19T04:00Z | 36,909 MW |
| 2026-08-19T05:00Z | 34,162 MW |
| 2026-08-19T06:00Z | 31,964 MW |
| 2026-08-19T07:00Z | 30,582 MW |
| 2026-08-19T08:00Z | 29,296 MW |
| 2026-08-19T09:00Z | 28,025 MW |
| 2026-08-19T10:00Z | 27,525 MW |
| 2026-08-19T11:00Z | 27,061 MW |
| 2026-08-19T12:00Z | 27,358 MW |
| 2026-08-19T13:00Z | 28,147 MW |
| 2026-08-19T14:00Z | 32,152 MW |
| 2026-08-19T15:00Z | 36,559 MW |
| 2026-08-19T16:00Z | 37,705 MW |
| 2026-08-19T17:00Z | 37,537 MW |
| 2026-08-19T18:00Z | 36,994 MW |
| 2026-08-19T19:00Z | 37,031 MW |
| 2026-08-19T20:00Z | 36,909 MW |
| 2026-08-19T21:00Z | 37,709 MW |
| 2026-08-19T22:00Z | 39,422 MW |
| 2026-08-19T23:00Z | 40,575 MW |
| 2026-08-20T00:00Z | 41,539 MW |
| 2026-08-20T01:00Z | 41,524 MW |
| 2026-08-20T02:00Z | 40,383 MW |
| 2026-08-20T03:00Z | 39,043 MW |
| 2026-08-20T04:00Z | 37,843 MW |
| 2026-08-20T05:00Z | 34,913 MW |
| 2026-08-20T06:00Z | 32,205 MW |
| 2026-08-20T07:00Z | 30,195 MW |
| 2026-08-20T08:00Z | 28,696 MW |
| 2026-08-20T09:00Z | 27,677 MW |
| 2026-08-20T10:00Z | 26,955 MW |
| 2026-08-20T11:00Z | 27,031 MW |
| 2026-08-20T12:00Z | 27,272 MW |
| 2026-08-20T13:00Z | 28,018 MW |
| 2026-08-20T14:00Z | 30,411 MW |
| 2026-08-20T15:00Z | 35,276 MW |
| 2026-08-20T16:00Z | 37,083 MW |
| 2026-08-20T17:00Z | 37,509 MW |
| 2026-08-20T18:00Z | 36,544 MW |
| 2026-08-20T19:00Z | 36,642 MW |
| 2026-08-20T20:00Z | 36,776 MW |
| 2026-08-20T21:00Z | 37,484 MW |
| 2026-08-20T22:00Z | 39,577 MW |
| 2026-08-20T23:00Z | 41,322 MW |
| 2026-08-21T00:00Z | 40,564 MW |
| 2026-08-21T01:00Z | 40,205 MW |
| 2026-08-21T02:00Z | 39,279 MW |
| 2026-08-21T03:00Z | 38,568 MW |
| 2026-08-21T04:00Z | 37,356 MW |
| 2026-08-21T05:00Z | 34,674 MW |
| 2026-08-21T06:00Z | 32,670 MW |
| 2026-08-21T07:00Z | 30,776 MW |
| 2026-08-21T08:00Z | 29,395 MW |
| 2026-08-21T09:00Z | 28,296 MW |
| 2026-08-21T10:00Z | 27,991 MW |
| 2026-08-21T11:00Z | 27,051 MW |
| 2026-08-21T12:00Z | 27,396 MW |
| 2026-08-21T13:00Z | 28,334 MW |
| 2026-08-21T14:00Z | 32,163 MW |
| 2026-08-21T15:00Z | 37,700 MW |
| 2026-08-21T16:00Z | 39,421 MW |
| 2026-08-21T17:00Z | 39,363 MW |
| 2026-08-21T18:00Z | 39,204 MW |
| 2026-08-21T19:00Z | 38,495 MW |
| 2026-08-21T20:00Z | 37,583 MW |
| 2026-08-21T21:00Z | 38,295 MW |
| 2026-08-21T22:00Z | 39,704 MW |
| 2026-08-21T23:00Z | 40,493 MW |
| 2026-08-22T00:00Z | 41,084 MW |
| 2026-08-22T01:00Z | 41,101 MW |
| 2026-08-22T02:00Z | 39,622 MW |
| 2026-08-22T03:00Z | 38,844 MW |
| 2026-08-22T04:00Z | 37,411 MW |
| 2026-08-22T05:00Z | 34,882 MW |
| 2026-08-22T06:00Z | 32,933 MW |
| 2026-08-22T07:00Z | 31,076 MW |
| 2026-08-22T08:00Z | 29,397 MW |
| 2026-08-22T09:00Z | 27,747 MW |
| 2026-08-22T10:00Z | 26,779 MW |
| 2026-08-22T11:00Z | 25,959 MW |
| 2026-08-22T12:00Z | 26,260 MW |
| 2026-08-22T13:00Z | 26,120 MW |
| 2026-08-22T14:00Z | 28,153 MW |
| 2026-08-22T15:00Z | 33,342 MW |
| 2026-08-22T16:00Z | 34,957 MW |
| 2026-08-22T17:00Z | 35,119 MW |
| 2026-08-22T18:00Z | 35,076 MW |
| 2026-08-22T19:00Z | 34,565 MW |
| 2026-08-22T20:00Z | 34,477 MW |
| 2026-08-22T21:00Z | 35,051 MW |
| 2026-08-22T22:00Z | 36,976 MW |
| 2026-08-22T23:00Z | 38,258 MW |
| 2026-08-23T00:00Z | 39,241 MW |
| 2026-08-23T01:00Z | 39,418 MW |
| 2026-08-23T02:00Z | 38,469 MW |
| 2026-08-23T03:00Z | 37,371 MW |
| 2026-08-23T04:00Z | 36,072 MW |
| 2026-08-23T05:00Z | 34,210 MW |
| 2026-08-23T06:00Z | 31,786 MW |
| 2026-08-23T07:00Z | 30,115 MW |
| 2026-08-23T08:00Z | 28,181 MW |
| 2026-08-23T09:00Z | 26,751 MW |
| 2026-08-23T10:00Z | 25,707 MW |
| 2026-08-23T11:00Z | 25,043 MW |
| 2026-08-23T12:00Z | 24,629 MW |
| 2026-08-23T13:00Z | 24,490 MW |
| 2026-08-23T14:00Z | 27,144 MW |
| 2026-08-23T15:00Z | 33,016 MW |
| 2026-08-23T16:00Z | 34,151 MW |
| 2026-08-23T17:00Z | 34,729 MW |
| 2026-08-23T18:00Z | 34,980 MW |
| 2026-08-23T19:00Z | 35,016 MW |
| 2026-08-23T20:00Z | 34,871 MW |
| 2026-08-23T21:00Z | 36,890 MW |
| 2026-08-23T22:00Z | 39,000 MW |
| 2026-08-23T23:00Z | 40,318 MW |
| 2026-08-24T00:00Z | 41,434 MW |
| 2026-08-24T01:00Z | 41,881 MW |
| 2026-08-24T02:00Z | 40,532 MW |
| 2026-08-24T03:00Z | 39,235 MW |
| 2026-08-24T04:00Z | 37,399 MW |
| 2026-08-24T05:00Z | 34,852 MW |
| 2026-08-24T06:00Z | 32,114 MW |
| 2026-08-24T07:00Z | 30,021 MW |
| 2026-08-24T08:00Z | 28,360 MW |
| 2026-08-24T09:00Z | 27,560 MW |
| 2026-08-24T10:00Z | 27,413 MW |
| 2026-08-24T11:00Z | 27,722 MW |
| 2026-08-24T12:00Z | 27,957 MW |
| 2026-08-24T13:00Z | 28,682 MW |
| 2026-08-24T14:00Z | 30,944 MW |
| 2026-08-24T15:00Z | 36,071 MW |
| 2026-08-24T16:00Z | 38,454 MW |
| 2026-08-24T17:00Z | 39,129 MW |
| 2026-08-24T18:00Z | 40,032 MW |
| 2026-08-24T19:00Z | 39,699 MW |
| 2026-08-24T20:00Z | 40,413 MW |
| 2026-08-24T21:00Z | 40,958 MW |
| 2026-08-24T22:00Z | 42,342 MW |
| 2026-08-24T23:00Z | 43,632 MW |
| 2026-08-25T00:00Z | 44,110 MW |
| 2026-08-25T01:00Z | 44,159 MW |
| 2026-08-25T02:00Z | 42,473 MW |
| 2026-08-25T03:00Z | 41,385 MW |
| 2026-08-25T04:00Z | 39,069 MW |
| 2026-08-25T05:00Z | 36,211 MW |
| 2026-08-25T06:00Z | 33,548 MW |
| 2026-08-25T07:00Z | 31,768 MW |
| 2026-08-25T08:00Z | 30,529 MW |
| 2026-08-25T09:00Z | 29,778 MW |
| 2026-08-25T10:00Z | 29,682 MW |
| 2026-08-25T11:00Z | 29,185 MW |
| 2026-08-25T12:00Z | 28,415 MW |
| 2026-08-25T13:00Z | 29,845 MW |
| 2026-08-25T14:00Z | 33,149 MW |
| 2026-08-25T15:00Z | 37,796 MW |
| 2026-08-25T16:00Z | 38,872 MW |
| 2026-08-25T17:00Z | 39,215 MW |
| 2026-08-25T18:00Z | 38,686 MW |
| 2026-08-25T19:00Z | 38,747 MW |
| 2026-08-25T20:00Z | 39,409 MW |
| 2026-08-25T21:00Z | 40,581 MW |
| 2026-08-25T22:00Z | 42,613 MW |
| 2026-08-25T23:00Z | 44,013 MW |
| 2026-08-26T00:00Z | 44,411 MW |
| 2026-08-26T01:00Z | 43,755 MW |
| 2026-08-26T02:00Z | 42,365 MW |
| 2026-08-26T03:00Z | 41,868 MW |
| 2026-08-26T04:00Z | 40,096 MW |
| 2026-08-26T05:00Z | 37,054 MW |
| 2026-08-26T06:00Z | 34,380 MW |
| 2026-08-26T07:00Z | 32,344 MW |
| 2026-08-26T08:00Z | 30,563 MW |
| 2026-08-26T09:00Z | 29,355 MW |
| 2026-08-26T10:00Z | 28,778 MW |
| 2026-08-26T11:00Z | 28,511 MW |
| 2026-08-26T12:00Z | 28,419 MW |
| 2026-08-26T13:00Z | 29,537 MW |
| 2026-08-26T14:00Z | 33,648 MW |
| 2026-08-26T15:00Z | 37,893 MW |
| 2026-08-26T16:00Z | 39,845 MW |
| 2026-08-26T17:00Z | 38,925 MW |
| 2026-08-26T18:00Z | 39,880 MW |
| 2026-08-26T19:00Z | 39,974 MW |
| 2026-08-26T20:00Z | 40,202 MW |
| 2026-08-26T21:00Z | 41,763 MW |
| 2026-08-26T22:00Z | 43,981 MW |
| 2026-08-26T23:00Z | 45,609 MW |
| 2026-08-27T00:00Z | 46,832 MW |
| 2026-08-27T01:00Z | 45,466 MW |
| 2026-08-27T02:00Z | 44,476 MW |
| 2026-08-27T03:00Z | 43,615 MW |
| 2026-08-27T04:00Z | 41,748 MW |
| 2026-08-27T05:00Z | 39,031 MW |
| 2026-08-27T06:00Z | 36,100 MW |
| 2026-08-27T07:00Z | 34,001 MW |
| 2026-08-27T08:00Z | 32,900 MW |
| 2026-08-27T09:00Z | 31,399 MW |
| 2026-08-27T10:00Z | 30,852 MW |
| 2026-08-27T11:00Z | 29,935 MW |
| 2026-08-27T12:00Z | 30,073 MW |
| 2026-08-27T13:00Z | 31,938 MW |
| 2026-08-27T14:00Z | 34,515 MW |
| 2026-08-27T15:00Z | 37,553 MW |
| 2026-08-27T16:00Z | 39,825 MW |
| 2026-08-27T17:00Z | 41,439 MW |
| 2026-08-27T18:00Z | 42,348 MW |
| 2026-08-27T19:00Z | 41,278 MW |
| 2026-08-27T20:00Z | 41,882 MW |
| 2026-08-27T21:00Z | 43,660 MW |
| 2026-08-27T22:00Z | 44,296 MW |
| 2026-08-27T23:00Z | 44,253 MW |
| 2026-08-28T00:00Z | 43,828 MW |
| 2026-08-28T01:00Z | 42,035 MW |
| 2026-08-28T02:00Z | 40,844 MW |
| 2026-08-28T03:00Z | 40,480 MW |
| 2026-08-28T04:00Z | 39,209 MW |
| 2026-08-28T05:00Z | 36,994 MW |
| 2026-08-28T06:00Z | 34,600 MW |
| 2026-08-28T07:00Z | 32,513 MW |
| 2026-08-28T08:00Z | 31,064 MW |
| 2026-08-28T09:00Z | 30,245 MW |
| 2026-08-28T10:00Z | 29,948 MW |
| 2026-08-28T11:00Z | 30,080 MW |
| 2026-08-28T12:00Z | 29,778 MW |
| 2026-08-28T13:00Z | 31,130 MW |
| 2026-08-28T14:00Z | 34,123 MW |
| 2026-08-28T15:00Z | 38,069 MW |
| 2026-08-28T16:00Z | 40,973 MW |
| 2026-08-28T17:00Z | 41,358 MW |
| 2026-08-28T18:00Z | 42,061 MW |
| 2026-08-28T19:00Z | 42,850 MW |
| 2026-08-28T20:00Z | 43,171 MW |
| 2026-08-28T21:00Z | 42,886 MW |
| 2026-08-28T22:00Z | 42,704 MW |
| 2026-08-28T23:00Z | 42,434 MW |
| 2026-08-29T00:00Z | 41,909 MW |
| 2026-08-29T01:00Z | 41,262 MW |
| 2026-08-29T02:00Z | 40,391 MW |
| 2026-08-29T03:00Z | 39,319 MW |
| 2026-08-29T04:00Z | 38,196 MW |
| 2026-08-29T05:00Z | 36,324 MW |
| 2026-08-29T06:00Z | 34,227 MW |
| 2026-08-29T07:00Z | 32,118 MW |
| 2026-08-29T08:00Z | 30,327 MW |
| 2026-08-29T09:00Z | 29,286 MW |
| 2026-08-29T10:00Z | 29,064 MW |
| 2026-08-29T11:00Z | 27,920 MW |
| 2026-08-29T12:00Z | 27,847 MW |
| 2026-08-29T13:00Z | 27,466 MW |
| 2026-08-29T14:00Z | 29,073 MW |
| 2026-08-29T15:00Z | 34,005 MW |
| 2026-08-29T16:00Z | 36,217 MW |
| 2026-08-29T17:00Z | 36,220 MW |
| 2026-08-29T18:00Z | 35,739 MW |
| 2026-08-29T19:00Z | 35,980 MW |
| 2026-08-29T20:00Z | 35,811 MW |
| 2026-08-29T21:00Z | 36,008 MW |
| 2026-08-29T22:00Z | 37,873 MW |
| 2026-08-29T23:00Z | 39,330 MW |
| 2026-08-30T00:00Z | 39,897 MW |
| 2026-08-30T01:00Z | 39,383 MW |
| 2026-08-30T02:00Z | 38,066 MW |
| 2026-08-30T03:00Z | 36,929 MW |
| 2026-08-30T04:00Z | 35,609 MW |
| 2026-08-30T05:00Z | 33,603 MW |
| 2026-08-30T06:00Z | 31,574 MW |
| 2026-08-30T07:00Z | 29,969 MW |
| 2026-08-30T08:00Z | 28,501 MW |
| 2026-08-30T09:00Z | 27,226 MW |
| 2026-08-30T10:00Z | 26,061 MW |
| 2026-08-30T11:00Z | 25,252 MW |
| 2026-08-30T12:00Z | 24,895 MW |
| 2026-08-30T13:00Z | 24,744 MW |
| 2026-08-30T14:00Z | 25,954 MW |
| 2026-08-30T15:00Z | 31,058 MW |
| 2026-08-30T16:00Z | 33,213 MW |
| 2026-08-30T17:00Z | 33,222 MW |
| 2026-08-30T18:00Z | 33,721 MW |
| 2026-08-30T19:00Z | 33,366 MW |
| 2026-08-30T20:00Z | 32,834 MW |
| 2026-08-30T21:00Z | 33,317 MW |
| 2026-08-30T22:00Z | 34,501 MW |
| 2026-08-30T23:00Z | 35,887 MW |
| 2026-08-31T00:00Z | 37,127 MW |
| 2026-08-31T01:00Z | 37,665 MW |
| 2026-08-31T02:00Z | 36,330 MW |
| 2026-08-31T03:00Z | 35,002 MW |
| 2026-08-31T04:00Z | 33,775 MW |
| 2026-08-31T05:00Z | 31,511 MW |
| 2026-08-31T06:00Z | 29,312 MW |
| 2026-08-31T07:00Z | 28,048 MW |
| 2026-08-31T08:00Z | 26,608 MW |
| 2026-08-31T09:00Z | 25,907 MW |
| 2026-08-31T10:00Z | 25,563 MW |
| 2026-08-31T11:00Z | 24,933 MW |
| 2026-08-31T12:00Z | 25,790 MW |
| 2026-08-31T13:00Z | 27,350 MW |
| 2026-08-31T14:00Z | 28,873 MW |
| 2026-08-31T15:00Z | 31,900 MW |
| 2026-08-31T16:00Z | 34,306 MW |
| 2026-08-31T17:00Z | 35,271 MW |
| 2026-08-31T18:00Z | 36,284 MW |
| 2026-08-31T19:00Z | 37,267 MW |
| 2026-08-31T20:00Z | 37,298 MW |
| 2026-08-31T21:00Z | 36,433 MW |
| 2026-08-31T22:00Z | 35,493 MW |
| 2026-08-31T23:00Z | 34,964 MW |
| 2026-09-01T00:00Z | 35,568 MW |
| 2026-09-01T01:00Z | 35,589 MW |
| 2026-09-01T02:00Z | 34,720 MW |
| 2026-09-01T03:00Z | 33,995 MW |
| 2026-09-01T04:00Z | 32,477 MW |
| 2026-09-01T05:00Z | 30,410 MW |
| 2026-09-01T06:00Z | 28,505 MW |
| 2026-09-01T07:00Z | 27,055 MW |
| 2026-09-01T08:00Z | 25,489 MW |
| 2026-09-01T09:00Z | 24,861 MW |
| 2026-09-01T10:00Z | 24,728 MW |
| 2026-09-01T11:00Z | 24,535 MW |
| 2026-09-01T12:00Z | 25,177 MW |
| 2026-09-01T13:00Z | 26,358 MW |
| 2026-09-01T14:00Z | 28,161 MW |
| 2026-09-01T15:00Z | 30,901 MW |
| 2026-09-01T16:00Z | 33,264 MW |
| 2026-09-01T17:00Z | 33,253 MW |
| 2026-09-01T18:00Z | 32,592 MW |
| 2026-09-01T19:00Z | 32,681 MW |
| 2026-09-01T20:00Z | 32,989 MW |
| 2026-09-01T21:00Z | 32,457 MW |
| 2026-09-01T22:00Z | 32,106 MW |
| 2026-09-01T23:00Z | 32,970 MW |
| 2026-09-02T00:00Z | 32,840 MW |
| 2026-09-02T01:00Z | 32,987 MW |
| 2026-09-02T02:00Z | 32,545 MW |
| 2026-09-02T03:00Z | 32,255 MW |
| 2026-09-02T04:00Z | 31,240 MW |
| 2026-09-02T05:00Z | 29,282 MW |
| 2026-09-02T06:00Z | 27,215 MW |
| 2026-09-02T07:00Z | 26,418 MW |
| 2026-09-02T08:00Z | 24,843 MW |
| 2026-09-02T09:00Z | 23,961 MW |
| 2026-09-02T10:00Z | 23,158 MW |
| 2026-09-02T11:00Z | 23,261 MW |
| 2026-09-02T12:00Z | 24,093 MW |
| 2026-09-02T13:00Z | 25,621 MW |
| 2026-09-02T14:00Z | 27,406 MW |
| 2026-09-02T15:00Z | 30,803 MW |
| 2026-09-02T16:00Z | 31,575 MW |
| 2026-09-02T17:00Z | 32,228 MW |
| 2026-09-02T18:00Z | 32,794 MW |
| 2026-09-02T19:00Z | 32,447 MW |
| 2026-09-02T20:00Z | 31,982 MW |
| 2026-09-02T21:00Z | 31,986 MW |
| 2026-09-02T22:00Z | 31,930 MW |
| 2026-09-02T23:00Z | 32,835 MW |
| 2026-09-03T00:00Z | 33,069 MW |
| 2026-09-03T01:00Z | 32,408 MW |
| 2026-09-03T02:00Z | 32,296 MW |
| 2026-09-03T03:00Z | 32,122 MW |
| 2026-09-03T04:00Z | 31,127 MW |
| 2026-09-03T05:00Z | 29,205 MW |
| 2026-09-03T06:00Z | 27,375 MW |
| 2026-09-03T07:00Z | 26,050 MW |
| 2026-09-03T08:00Z | 24,810 MW |
| 2026-09-03T09:00Z | 23,813 MW |
| 2026-09-03T10:00Z | 23,846 MW |
| 2026-09-03T11:00Z | 23,683 MW |
| 2026-09-03T12:00Z | 24,288 MW |
| 2026-09-03T13:00Z | 25,735 MW |
| 2026-09-03T14:00Z | 27,349 MW |
| 2026-09-03T15:00Z | 30,422 MW |
| 2026-09-03T16:00Z | 31,841 MW |
| 2026-09-03T17:00Z | 32,444 MW |
| 2026-09-03T18:00Z | 32,659 MW |
| 2026-09-03T19:00Z | 32,312 MW |
| 2026-09-03T20:00Z | 32,164 MW |
| 2026-09-03T21:00Z | 32,977 MW |
| 2026-09-03T22:00Z | 33,166 MW |
| 2026-09-03T23:00Z | 33,720 MW |
| 2026-09-04T00:00Z | 33,309 MW |
| 2026-09-04T01:00Z | 32,563 MW |
| 2026-09-04T02:00Z | 32,040 MW |
| 2026-09-04T03:00Z | 31,755 MW |
| 2026-09-04T04:00Z | 30,938 MW |
| 2026-09-04T05:00Z | 29,062 MW |
| 2026-09-04T06:00Z | 27,318 MW |
| 2026-09-04T07:00Z | 26,169 MW |
| 2026-09-04T08:00Z | 25,032 MW |
| 2026-09-04T09:00Z | 24,352 MW |
| 2026-09-04T10:00Z | 23,871 MW |
| 2026-09-04T11:00Z | 23,966 MW |
| 2026-09-04T12:00Z | 24,755 MW |
| 2026-09-04T13:00Z | 25,809 MW |
| 2026-09-04T14:00Z | 27,858 MW |
| 2026-09-04T15:00Z | 31,274 MW |
| 2026-09-04T16:00Z | 32,184 MW |
| 2026-09-04T17:00Z | 31,799 MW |
| 2026-09-04T18:00Z | 32,124 MW |
| 2026-09-04T19:00Z | 31,724 MW |
| 2026-09-04T20:00Z | 31,446 MW |
| 2026-09-04T21:00Z | 31,657 MW |
| 2026-09-04T22:00Z | 32,000 MW |
| 2026-09-04T23:00Z | 32,424 MW |
| 2026-09-05T00:00Z | 31,976 MW |
| 2026-09-05T01:00Z | 31,548 MW |
| 2026-09-05T02:00Z | 31,211 MW |
| 2026-09-05T03:00Z | 30,972 MW |
| 2026-09-05T04:00Z | 30,185 MW |
| 2026-09-05T05:00Z | 28,607 MW |
| 2026-09-05T06:00Z | 26,946 MW |
| 2026-09-05T07:00Z | 25,848 MW |
| 2026-09-05T08:00Z | 24,570 MW |
| 2026-09-05T09:00Z | 23,519 MW |
| 2026-09-05T10:00Z | 22,778 MW |
| 2026-09-05T11:00Z | 22,536 MW |
| 2026-09-05T12:00Z | 22,474 MW |
| 2026-09-05T13:00Z | 22,804 MW |
| 2026-09-05T14:00Z | 23,896 MW |
| 2026-09-05T15:00Z | 26,878 MW |
| 2026-09-05T16:00Z | 28,595 MW |
| 2026-09-05T17:00Z | 29,051 MW |
| 2026-09-05T18:00Z | 29,762 MW |
| 2026-09-05T19:00Z | 29,547 MW |
| 2026-09-05T20:00Z | 29,424 MW |
| 2026-09-05T21:00Z | 29,740 MW |
| 2026-09-05T22:00Z | 30,020 MW |
| 2026-09-05T23:00Z | 30,721 MW |
| 2026-09-06T00:00Z | 31,388 MW |
| 2026-09-06T01:00Z | 31,791 MW |
| 2026-09-06T02:00Z | 31,590 MW |
| 2026-09-06T03:00Z | 31,258 MW |
| 2026-09-06T04:00Z | 30,610 MW |
| 2026-09-06T05:00Z | 29,022 MW |
| 2026-09-06T06:00Z | 27,433 MW |
| 2026-09-06T07:00Z | 26,229 MW |
| 2026-09-06T08:00Z | 25,025 MW |
| 2026-09-06T09:00Z | 23,965 MW |
| 2026-09-06T10:00Z | 23,275 MW |
| 2026-09-06T11:00Z | 22,938 MW |
| 2026-09-06T12:00Z | 22,876 MW |
| 2026-09-06T13:00Z | 22,953 MW |
| 2026-09-06T14:00Z | 23,757 MW |
| 2026-09-06T15:00Z | 24,886 MW |
| 2026-09-06T16:00Z | 24,809 MW |
| 2026-09-06T17:00Z | 25,581 MW |
| 2026-09-06T18:00Z | 26,468 MW |
| 2026-09-06T19:00Z | 27,041 MW |
| 2026-09-06T20:00Z | 27,362 MW |
| 2026-09-06T21:00Z | 27,250 MW |
| 2026-09-06T22:00Z | 25,998 MW |
| 2026-09-06T23:00Z | 26,778 MW |
| 2026-09-07T00:00Z | 28,004 MW |
| 2026-09-07T01:00Z | 28,727 MW |
| 2026-09-07T02:00Z | 29,495 MW |
| 2026-09-07T03:00Z | 29,605 MW |
| 2026-09-07T04:00Z | 29,313 MW |
| 2026-09-07T05:00Z | 28,036 MW |
| 2026-09-07T06:00Z | 26,605 MW |
| 2026-09-07T07:00Z | 25,709 MW |
| 2026-09-07T08:00Z | 24,747 MW |
| 2026-09-07T09:00Z | 24,035 MW |
| 2026-09-07T10:00Z | 23,694 MW |
| 2026-09-07T11:00Z | 23,889 MW |
| 2026-09-07T12:00Z | 23,767 MW |
| 2026-09-07T13:00Z | 24,000 MW |
| 2026-09-07T14:00Z | 24,516 MW |
| 2026-09-07T15:00Z | 27,636 MW |
| 2026-09-07T16:00Z | 29,774 MW |
| 2026-09-07T17:00Z | 31,409 MW |
| 2026-09-07T18:00Z | 32,472 MW |
| 2026-09-07T19:00Z | 32,954 MW |
| 2026-09-07T20:00Z | 32,354 MW |
| 2026-09-07T21:00Z | 32,506 MW |
| 2026-09-07T22:00Z | 32,357 MW |
| 2026-09-07T23:00Z | 34,559 MW |
| 2026-09-08T00:00Z | 36,484 MW |
| 2026-09-08T01:00Z | 36,667 MW |
| 2026-09-08T02:00Z | 36,156 MW |
| 2026-09-08T03:00Z | 35,332 MW |
| 2026-09-08T04:00Z | 34,067 MW |
| 2026-09-08T05:00Z | 31,864 MW |
| 2026-09-08T06:00Z | 29,356 MW |
| 2026-09-08T07:00Z | 28,214 MW |
| 2026-09-08T08:00Z | 26,920 MW |
| 2026-09-08T09:00Z | 26,103 MW |
| 2026-09-08T10:00Z | 25,752 MW |
| 2026-09-08T11:00Z | 25,738 MW |
| 2026-09-08T12:00Z | 26,360 MW |
| 2026-09-08T13:00Z | 28,028 MW |
| 2026-09-08T14:00Z | 30,987 MW |
| 2026-09-08T15:00Z | 36,852 MW |
| 2026-09-08T16:00Z | 39,013 MW |
| 2026-09-08T17:00Z | 39,202 MW |
| 2026-09-08T18:00Z | 38,815 MW |
| 2026-09-08T19:00Z | 38,103 MW |
| 2026-09-08T20:00Z | 37,530 MW |
| 2026-09-08T21:00Z | 38,701 MW |
| 2026-09-08T22:00Z | 40,191 MW |
| 2026-09-08T23:00Z | 42,038 MW |
| 2026-09-09T00:00Z | 43,073 MW |
| 2026-09-09T01:00Z | 42,966 MW |
| 2026-09-09T02:00Z | 42,334 MW |
| 2026-09-09T03:00Z | 41,465 MW |
| 2026-09-09T04:00Z | 39,703 MW |
| 2026-09-09T05:00Z | 37,239 MW |
| 2026-09-09T06:00Z | 34,927 MW |
| 2026-09-09T07:00Z | 32,156 MW |
| 2026-09-09T08:00Z | 30,880 MW |
| 2026-09-09T09:00Z | 29,927 MW |
| 2026-09-09T10:00Z | 30,569 MW |
| 2026-09-09T11:00Z | 30,450 MW |
| 2026-09-09T12:00Z | 30,013 MW |
| 2026-09-09T13:00Z | 30,271 MW |
| 2026-09-09T14:00Z | 33,311 MW |
| 2026-09-09T15:00Z | 38,193 MW |
| 2026-09-09T16:00Z | 41,123 MW |
| 2026-09-09T17:00Z | 42,850 MW |
| 2026-09-09T18:00Z | 44,312 MW |
| 2026-09-09T19:00Z | 45,573 MW |
| 2026-09-09T20:00Z | 46,169 MW |
| 2026-09-09T21:00Z | 46,497 MW |
| 2026-09-09T22:00Z | 48,400 MW |
| 2026-09-09T23:00Z | 49,442 MW |
| 2026-09-10T00:00Z | 49,959 MW |
| 2026-09-10T01:00Z | 48,969 MW |
| 2026-09-10T02:00Z | 47,400 MW |
| 2026-09-10T03:00Z | 46,105 MW |
| 2026-09-10T04:00Z | 44,283 MW |
| 2026-09-10T05:00Z | 40,650 MW |
| 2026-09-10T06:00Z | 37,334 MW |
| 2026-09-10T07:00Z | 35,378 MW |
| 2026-09-10T08:00Z | 33,553 MW |
| 2026-09-10T09:00Z | 32,315 MW |
| 2026-09-10T10:00Z | 32,428 MW |
| 2026-09-10T11:00Z | 32,192 MW |
| 2026-09-10T12:00Z | 31,814 MW |
| 2026-09-10T13:00Z | 32,400 MW |
| 2026-09-10T14:00Z | 34,863 MW |
| 2026-09-10T15:00Z | 40,368 MW |
| 2026-09-10T16:00Z | 42,650 MW |
| 2026-09-10T17:00Z | 43,684 MW |
| 2026-09-10T18:00Z | 43,641 MW |
| 2026-09-10T19:00Z | 43,902 MW |
| 2026-09-10T20:00Z | 44,985 MW |
| 2026-09-10T21:00Z | 45,665 MW |
| 2026-09-10T22:00Z | 47,402 MW |
| 2026-09-10T23:00Z | 47,981 MW |
| 2026-09-11T00:00Z | 47,418 MW |
| 2026-09-11T01:00Z | 46,663 MW |
| 2026-09-11T02:00Z | 45,091 MW |
| 2026-09-11T03:00Z | 43,518 MW |
| 2026-09-11T04:00Z | 41,584 MW |
| 2026-09-11T05:00Z | 38,336 MW |
| 2026-09-11T06:00Z | 35,363 MW |
| 2026-09-11T07:00Z | 33,666 MW |
| 2026-09-11T08:00Z | 31,674 MW |
| 2026-09-11T09:00Z | 29,943 MW |
| 2026-09-11T10:00Z | 29,132 MW |
| 2026-09-11T11:00Z | 29,414 MW |
| 2026-09-11T12:00Z | 29,284 MW |
| 2026-09-11T13:00Z | 30,498 MW |
| 2026-09-11T14:00Z | 32,712 MW |
| 2026-09-11T15:00Z | 37,396 MW |
| 2026-09-11T16:00Z | 38,524 MW |
| 2026-09-11T17:00Z | 39,304 MW |
| 2026-09-11T18:00Z | 40,001 MW |
| 2026-09-11T19:00Z | 39,852 MW |
| 2026-09-11T20:00Z | 40,649 MW |
| 2026-09-11T21:00Z | 40,978 MW |
| 2026-09-11T22:00Z | 41,734 MW |
| 2026-09-11T23:00Z | 42,312 MW |
| 2026-09-12T00:00Z | 42,523 MW |
| 2026-09-12T01:00Z | 41,606 MW |
| 2026-09-12T02:00Z | 39,951 MW |
| 2026-09-12T03:00Z | 38,705 MW |
| 2026-09-12T04:00Z | 37,128 MW |
| 2026-09-12T05:00Z | 34,936 MW |
| 2026-09-12T06:00Z | 32,379 MW |
| 2026-09-12T07:00Z | 30,983 MW |
| 2026-09-12T08:00Z | 29,106 MW |
| 2026-09-12T09:00Z | 27,515 MW |
| 2026-09-12T10:00Z | 26,399 MW |
| 2026-09-12T11:00Z | 25,814 MW |
| 2026-09-12T12:00Z | 25,838 MW |
| 2026-09-12T13:00Z | 26,172 MW |
| 2026-09-12T14:00Z | 27,511 MW |
| 2026-09-12T15:00Z | 32,147 MW |
| 2026-09-12T16:00Z | 32,821 MW |
| 2026-09-12T17:00Z | 33,567 MW |
| 2026-09-12T18:00Z | 33,815 MW |
| 2026-09-12T19:00Z | 33,959 MW |
| 2026-09-12T20:00Z | 34,602 MW |
| 2026-09-12T21:00Z | 34,859 MW |
| 2026-09-12T22:00Z | 35,181 MW |
| 2026-09-12T23:00Z | 36,194 MW |
| 2026-09-13T00:00Z | 36,455 MW |
| 2026-09-13T01:00Z | 35,839 MW |
| 2026-09-13T02:00Z | 34,622 MW |
| 2026-09-13T03:00Z | 33,660 MW |
| 2026-09-13T04:00Z | 32,583 MW |
| 2026-09-13T05:00Z | 30,950 MW |
| 2026-09-13T06:00Z | 29,332 MW |
| 2026-09-13T07:00Z | 27,908 MW |
| 2026-09-13T08:00Z | 26,429 MW |
| 2026-09-13T09:00Z | 25,229 MW |
| 2026-09-13T10:00Z | 24,493 MW |
| 2026-09-13T11:00Z | 24,036 MW |
| 2026-09-13T12:00Z | 24,066 MW |
| 2026-09-13T13:00Z | 24,041 MW |
| 2026-09-13T14:00Z | 24,591 MW |
| 2026-09-13T15:00Z | 28,357 MW |
| 2026-09-13T16:00Z | 30,087 MW |
| 2026-09-13T17:00Z | 30,475 MW |
| 2026-09-13T18:00Z | 30,487 MW |
| 2026-09-13T19:00Z | 30,269 MW |
| 2026-09-13T20:00Z | 31,188 MW |
| 2026-09-13T21:00Z | 30,840 MW |
| 2026-09-13T22:00Z | 31,093 MW |
| 2026-09-13T23:00Z | 31,942 MW |
| 2026-09-14T00:00Z | 32,854 MW |
| 2026-09-14T01:00Z | 33,211 MW |
| 2026-09-14T02:00Z | 32,914 MW |
| 2026-09-14T03:00Z | 32,280 MW |
| 2026-09-14T04:00Z | 31,183 MW |
| 2026-09-14T05:00Z | 29,176 MW |
| 2026-09-14T06:00Z | 27,869 MW |
| 2026-09-14T07:00Z | 26,046 MW |
| 2026-09-14T08:00Z | 25,114 MW |
| 2026-09-14T09:00Z | 24,321 MW |
| 2026-09-14T10:00Z | 24,042 MW |
| 2026-09-14T11:00Z | 24,029 MW |
| 2026-09-14T12:00Z | 24,900 MW |
| 2026-09-14T13:00Z | 26,521 MW |
| 2026-09-14T14:00Z | 28,202 MW |
| 2026-09-14T15:00Z | 32,162 MW |
| 2026-09-14T16:00Z | 33,676 MW |
| 2026-09-14T17:00Z | 33,184 MW |
| 2026-09-14T18:00Z | 33,560 MW |
| 2026-09-14T19:00Z | 33,491 MW |
| 2026-09-14T20:00Z | 32,186 MW |
| 2026-09-14T21:00Z | 32,635 MW |
| 2026-09-14T22:00Z | 33,276 MW |
| 2026-09-14T23:00Z | 34,353 MW |
| 2026-09-15T00:00Z | 34,826 MW |
| 2026-09-15T01:00Z | 34,849 MW |
| 2026-09-15T02:00Z | 33,908 MW |
| 2026-09-15T03:00Z | 33,027 MW |
| 2026-09-15T04:00Z | 31,951 MW |
| 2026-09-15T05:00Z | 29,769 MW |
| 2026-09-15T06:00Z | 27,820 MW |
| 2026-09-15T07:00Z | 26,769 MW |
| 2026-09-15T08:00Z | 25,244 MW |
| 2026-09-15T09:00Z | 24,393 MW |
| 2026-09-15T10:00Z | 23,965 MW |
| 2026-09-15T11:00Z | 23,645 MW |
| 2026-09-15T12:00Z | 24,575 MW |
| 2026-09-15T13:00Z | 26,310 MW |
| 2026-09-15T14:00Z | 27,835 MW |
| 2026-09-15T15:00Z | 31,470 MW |
| 2026-09-15T16:00Z | n/a |
| Hour starting (UTC) | Gas | Solar | Wind | Hydro | Nuclear |
|---|---|---|---|---|---|
| 2026-08-16T17:00Z | 3,317 MW | 19,771 MW | 528 MW | 986 MW | 2,233 MW |
| 2026-08-16T18:00Z | 3,418 MW | 20,538 MW | 612 MW | 847 MW | 2,237 MW |
| 2026-08-16T19:00Z | 3,575 MW | 20,385 MW | 900 MW | 844 MW | 2,241 MW |
| 2026-08-16T20:00Z | 3,966 MW | 19,722 MW | 1,113 MW | 867 MW | 2,243 MW |
| 2026-08-16T21:00Z | 4,693 MW | 19,183 MW | 1,290 MW | 934 MW | 2,236 MW |
| 2026-08-16T22:00Z | 5,863 MW | 18,367 MW | 2,315 MW | 1,078 MW | 2,236 MW |
| 2026-08-16T23:00Z | 7,320 MW | 17,011 MW | 1,863 MW | 2,145 MW | 2,235 MW |
| 2026-08-17T00:00Z | 9,434 MW | 14,270 MW | 2,080 MW | 2,656 MW | 2,236 MW |
| 2026-08-17T01:00Z | 10,654 MW | 6,091 MW | 3,403 MW | 3,729 MW | 2,243 MW |
| 2026-08-17T02:00Z | 11,185 MW | 399 MW | 3,415 MW | 4,040 MW | 2,240 MW |
| 2026-08-17T03:00Z | 11,306 MW | -73 MW | 4,225 MW | 3,901 MW | 2,240 MW |
| 2026-08-17T04:00Z | 11,483 MW | -68 MW | 3,869 MW | 3,716 MW | 2,245 MW |
| 2026-08-17T05:00Z | 11,496 MW | -64 MW | 2,666 MW | 3,475 MW | 2,249 MW |
| 2026-08-17T06:00Z | 11,618 MW | -64 MW | 2,670 MW | 3,284 MW | 2,247 MW |
| 2026-08-17T07:00Z | 11,255 MW | -63 MW | 2,525 MW | 3,080 MW | 2,243 MW |
| 2026-08-17T08:00Z | 11,135 MW | -64 MW | 2,378 MW | 2,685 MW | 2,243 MW |
| 2026-08-17T09:00Z | 11,024 MW | -64 MW | 2,464 MW | 2,675 MW | 2,243 MW |
| 2026-08-17T10:00Z | 11,019 MW | -63 MW | 2,159 MW | 2,673 MW | 2,243 MW |
| 2026-08-17T11:00Z | 10,845 MW | -62 MW | 2,265 MW | 2,648 MW | 2,243 MW |
| 2026-08-17T12:00Z | 11,040 MW | -62 MW | 2,336 MW | 2,948 MW | 2,244 MW |
| 2026-08-17T13:00Z | 10,809 MW | 1,149 MW | 2,051 MW | 3,213 MW | 2,241 MW |
| 2026-08-17T14:00Z | 9,241 MW | 9,421 MW | 1,391 MW | 2,466 MW | 2,241 MW |
| 2026-08-17T15:00Z | 8,646 MW | 16,504 MW | 995 MW | 1,703 MW | 2,246 MW |
| 2026-08-17T16:00Z | 8,539 MW | 18,653 MW | 1,065 MW | 1,369 MW | 2,249 MW |
| 2026-08-17T17:00Z | 8,407 MW | 19,749 MW | 1,140 MW | 1,285 MW | 2,251 MW |
| 2026-08-17T18:00Z | 8,691 MW | 20,140 MW | 1,270 MW | 1,150 MW | 2,249 MW |
| 2026-08-17T19:00Z | 9,074 MW | 20,038 MW | 1,403 MW | 1,145 MW | 2,248 MW |
| 2026-08-17T20:00Z | 9,728 MW | 20,078 MW | 1,701 MW | 1,300 MW | 2,249 MW |
| 2026-08-17T21:00Z | 10,687 MW | 19,290 MW | 2,192 MW | 1,671 MW | 2,244 MW |
| 2026-08-17T22:00Z | 11,472 MW | 18,784 MW | 2,425 MW | 1,939 MW | 2,239 MW |
| 2026-08-17T23:00Z | 12,255 MW | 17,203 MW | 2,293 MW | 2,865 MW | 2,241 MW |
| 2026-08-18T00:00Z | 13,817 MW | 14,561 MW | 2,114 MW | 3,460 MW | 2,236 MW |
| 2026-08-18T01:00Z | 14,270 MW | 6,298 MW | 2,297 MW | 4,185 MW | 2,234 MW |
| 2026-08-18T02:00Z | 14,407 MW | 416 MW | 3,086 MW | 4,543 MW | 2,244 MW |
| 2026-08-18T03:00Z | 13,985 MW | -70 MW | 3,813 MW | 4,354 MW | 2,246 MW |
| 2026-08-18T04:00Z | 13,788 MW | -66 MW | 4,241 MW | 3,991 MW | 2,250 MW |
| 2026-08-18T05:00Z | 13,652 MW | -62 MW | 4,566 MW | 3,616 MW | 2,253 MW |
| 2026-08-18T06:00Z | 13,402 MW | -64 MW | 4,584 MW | 3,433 MW | 2,256 MW |
| 2026-08-18T07:00Z | 12,798 MW | -62 MW | 4,595 MW | 3,213 MW | 2,258 MW |
| 2026-08-18T08:00Z | 11,589 MW | -61 MW | 4,791 MW | 2,757 MW | 2,252 MW |
| 2026-08-18T09:00Z | 11,033 MW | -61 MW | 5,036 MW | 2,490 MW | 2,243 MW |
| 2026-08-18T10:00Z | 10,281 MW | -61 MW | 5,177 MW | 2,451 MW | 2,246 MW |
| 2026-08-18T11:00Z | 10,306 MW | -60 MW | 4,992 MW | 2,502 MW | 2,250 MW |
| 2026-08-18T12:00Z | 10,618 MW | -61 MW | 4,584 MW | 2,551 MW | 2,251 MW |
| 2026-08-18T13:00Z | 10,797 MW | 1,102 MW | 4,354 MW | 2,596 MW | 2,246 MW |
| 2026-08-18T14:00Z | 8,435 MW | 9,299 MW | 4,043 MW | 2,336 MW | 2,242 MW |
| 2026-08-18T15:00Z | 7,325 MW | 16,756 MW | 3,892 MW | 1,764 MW | 2,249 MW |
| 2026-08-18T16:00Z | 7,357 MW | 18,882 MW | 2,869 MW | 1,346 MW | 2,255 MW |
| 2026-08-18T17:00Z | 7,687 MW | 20,019 MW | 2,066 MW | 1,304 MW | 2,259 MW |
| 2026-08-18T18:00Z | 8,031 MW | 20,373 MW | 1,573 MW | 1,239 MW | 2,259 MW |
| 2026-08-18T19:00Z | 8,102 MW | 20,001 MW | 1,395 MW | 1,260 MW | 2,255 MW |
| 2026-08-18T20:00Z | 8,741 MW | 19,628 MW | 1,500 MW | 1,320 MW | 2,251 MW |
| 2026-08-18T21:00Z | 10,551 MW | 19,365 MW | 1,735 MW | 1,613 MW | 2,247 MW |
| 2026-08-18T22:00Z | 11,341 MW | 17,694 MW | 2,034 MW | 2,305 MW | 2,249 MW |
| 2026-08-18T23:00Z | 12,088 MW | 17,314 MW | 2,634 MW | 3,122 MW | 2,251 MW |
| 2026-08-19T00:00Z | 12,601 MW | 13,532 MW | 3,056 MW | 3,947 MW | 2,254 MW |
| 2026-08-19T01:00Z | 14,012 MW | 5,689 MW | 3,332 MW | 4,537 MW | 2,255 MW |
| 2026-08-19T02:00Z | 14,504 MW | 492 MW | 4,149 MW | 4,581 MW | 2,252 MW |
| 2026-08-19T03:00Z | 13,774 MW | -27 MW | 4,716 MW | 4,456 MW | 2,252 MW |
| 2026-08-19T04:00Z | 13,638 MW | -39 MW | 5,010 MW | 4,309 MW | 2,255 MW |
| 2026-08-19T05:00Z | 13,618 MW | -39 MW | 5,470 MW | 4,157 MW | 2,258 MW |
| 2026-08-19T06:00Z | 13,214 MW | -58 MW | 5,562 MW | 3,687 MW | 2,258 MW |
| 2026-08-19T07:00Z | 12,521 MW | -51 MW | 5,324 MW | 2,838 MW | 2,256 MW |
| 2026-08-19T08:00Z | 11,605 MW | -49 MW | 5,179 MW | 2,942 MW | 2,252 MW |
| 2026-08-19T09:00Z | 10,557 MW | 4 MW | 2,479 MW | 2,638 MW | 2,254 MW |
| 2026-08-19T10:00Z | 10,281 MW | 44 MW | 1,557 MW | 2,451 MW | 2,255 MW |
| 2026-08-19T11:00Z | 10,306 MW | -51 MW | 4,603 MW | 2,137 MW | 2,257 MW |
| 2026-08-19T12:00Z | 10,618 MW | -52 MW | 4,455 MW | 2,156 MW | 2,260 MW |
| 2026-08-19T13:00Z | 10,797 MW | 992 MW | 4,093 MW | 2,445 MW | 2,259 MW |
| 2026-08-19T14:00Z | 8,435 MW | 9,268 MW | 3,165 MW | 1,955 MW | 2,259 MW |
| 2026-08-19T15:00Z | 7,325 MW | 17,152 MW | 2,762 MW | 1,188 MW | 2,261 MW |
| 2026-08-19T16:00Z | 7,357 MW | 19,342 MW | 1,866 MW | 968 MW | 2,264 MW |
| 2026-08-19T17:00Z | 7,687 MW | 20,519 MW | 890 MW | 957 MW | 2,260 MW |
| 2026-08-19T18:00Z | 8,031 MW | 20,852 MW | 505 MW | 930 MW | 2,251 MW |
| 2026-08-19T19:00Z | 8,102 MW | 20,781 MW | 432 MW | 1,020 MW | 2,251 MW |
| 2026-08-19T20:00Z | 8,741 MW | 20,243 MW | 748 MW | 1,211 MW | 2,251 MW |
| 2026-08-19T21:00Z | 10,551 MW | 19,622 MW | 1,529 MW | 1,798 MW | 2,250 MW |
| 2026-08-19T22:00Z | 11,341 MW | 18,558 MW | 1,865 MW | 2,525 MW | 2,250 MW |
| 2026-08-19T23:00Z | 12,088 MW | 17,461 MW | 1,990 MW | 3,130 MW | 2,250 MW |
| 2026-08-20T00:00Z | 12,601 MW | 14,707 MW | 2,435 MW | 3,724 MW | 2,251 MW |
| 2026-08-20T01:00Z | 15,755 MW | 6,429 MW | 2,136 MW | 4,358 MW | 2,254 MW |
| 2026-08-20T02:00Z | 16,744 MW | 505 MW | 2,799 MW | 4,533 MW | 2,250 MW |
| 2026-08-20T03:00Z | 16,064 MW | -22 MW | 3,745 MW | 4,274 MW | 2,250 MW |
| 2026-08-20T04:00Z | 15,566 MW | -16 MW | 3,948 MW | 4,151 MW | 2,253 MW |
| 2026-08-20T05:00Z | 14,995 MW | -14 MW | 4,125 MW | 4,337 MW | 2,257 MW |
| 2026-08-20T06:00Z | 14,690 MW | -14 MW | 4,267 MW | 3,869 MW | 2,254 MW |
| 2026-08-20T07:00Z | 14,656 MW | -12 MW | 3,720 MW | 2,791 MW | 2,254 MW |
| 2026-08-20T08:00Z | 14,262 MW | -12 MW | 3,391 MW | 2,444 MW | 2,257 MW |
| 2026-08-20T09:00Z | 13,726 MW | -12 MW | 3,125 MW | 2,196 MW | 2,257 MW |
| 2026-08-20T10:00Z | 13,924 MW | -18 MW | 2,617 MW | 2,206 MW | 2,255 MW |
| 2026-08-20T11:00Z | 13,772 MW | -34 MW | 2,347 MW | 2,404 MW | 2,254 MW |
| 2026-08-20T12:00Z | 13,399 MW | -36 MW | 2,030 MW | 2,421 MW | 2,256 MW |
| 2026-08-20T13:00Z | 13,767 MW | 381 MW | 2,024 MW | 2,617 MW | 2,256 MW |
| 2026-08-20T14:00Z | 12,493 MW | 6,268 MW | 1,756 MW | 2,285 MW | 2,257 MW |
| 2026-08-20T15:00Z | 11,601 MW | 13,646 MW | 1,444 MW | 1,538 MW | 2,257 MW |
| 2026-08-20T16:00Z | 10,717 MW | 17,107 MW | 1,186 MW | 1,142 MW | 2,258 MW |
| 2026-08-20T17:00Z | 10,901 MW | 17,821 MW | 1,088 MW | 1,078 MW | 2,260 MW |
| 2026-08-20T18:00Z | 11,300 MW | 18,123 MW | 1,076 MW | 1,158 MW | 2,255 MW |
| 2026-08-20T19:00Z | 11,485 MW | 18,900 MW | 1,318 MW | 1,231 MW | 2,252 MW |
| 2026-08-20T20:00Z | 11,762 MW | 18,490 MW | 1,059 MW | 1,461 MW | 2,250 MW |
| 2026-08-20T21:00Z | 12,431 MW | 18,230 MW | 1,387 MW | 1,990 MW | 2,250 MW |
| 2026-08-20T22:00Z | 13,979 MW | 17,275 MW | 1,922 MW | 2,478 MW | 2,250 MW |
| 2026-08-20T23:00Z | 15,078 MW | 16,507 MW | 2,286 MW | 3,203 MW | 2,251 MW |
| 2026-08-21T00:00Z | 16,381 MW | 12,539 MW | 2,268 MW | 3,945 MW | 2,252 MW |
| 2026-08-21T01:00Z | 17,319 MW | 5,194 MW | 2,051 MW | 4,384 MW | 2,252 MW |
| 2026-08-21T02:00Z | 17,789 MW | 303 MW | 2,451 MW | 4,740 MW | 2,253 MW |
| 2026-08-21T03:00Z | 17,266 MW | -47 MW | 2,783 MW | 4,732 MW | 2,253 MW |
| 2026-08-21T04:00Z | 16,855 MW | -40 MW | 2,861 MW | 4,477 MW | 2,253 MW |
| 2026-08-21T05:00Z | 16,616 MW | -40 MW | 3,426 MW | 4,333 MW | 2,255 MW |
| 2026-08-21T06:00Z | 16,021 MW | -40 MW | 3,713 MW | 3,777 MW | 2,257 MW |
| 2026-08-21T07:00Z | 15,445 MW | -40 MW | 3,434 MW | 2,812 MW | 2,255 MW |
| 2026-08-21T08:00Z | 14,565 MW | -39 MW | 3,669 MW | 2,311 MW | 2,257 MW |
| 2026-08-21T09:00Z | 13,930 MW | -40 MW | 3,523 MW | 2,185 MW | 2,257 MW |
| 2026-08-21T10:00Z | 13,946 MW | -41 MW | 3,038 MW | 2,200 MW | 2,254 MW |
| 2026-08-21T11:00Z | 13,876 MW | -41 MW | 2,616 MW | 2,263 MW | 2,254 MW |
| 2026-08-21T12:00Z | 14,268 MW | -41 MW | 2,197 MW | 2,398 MW | 2,257 MW |
| 2026-08-21T13:00Z | 15,315 MW | 715 MW | 1,945 MW | 2,353 MW | 2,258 MW |
| 2026-08-21T14:00Z | 13,705 MW | 7,752 MW | 1,726 MW | 2,226 MW | 2,259 MW |
| 2026-08-21T15:00Z | 12,141 MW | 16,467 MW | 1,479 MW | 1,704 MW | 2,258 MW |
| 2026-08-21T16:00Z | 11,580 MW | 18,972 MW | 1,409 MW | 1,480 MW | 2,258 MW |
| 2026-08-21T17:00Z | 10,929 MW | 19,919 MW | 1,394 MW | 1,508 MW | 2,258 MW |
| 2026-08-21T18:00Z | 11,552 MW | 20,285 MW | 1,611 MW | 1,373 MW | 2,260 MW |
| 2026-08-21T19:00Z | 11,085 MW | 20,022 MW | 2,376 MW | 1,393 MW | 2,260 MW |
| 2026-08-21T20:00Z | 11,414 MW | 19,324 MW | 2,670 MW | 1,584 MW | 2,259 MW |
| 2026-08-21T21:00Z | 12,795 MW | 18,511 MW | 2,319 MW | 2,034 MW | 2,255 MW |
| 2026-08-21T22:00Z | 13,350 MW | 17,690 MW | 3,352 MW | 2,405 MW | 2,253 MW |
| 2026-08-21T23:00Z | 14,586 MW | 16,569 MW | 3,906 MW | 2,921 MW | 2,252 MW |
| 2026-08-22T00:00Z | 15,405 MW | 12,150 MW | 3,940 MW | 3,626 MW | 2,254 MW |
| 2026-08-22T01:00Z | 16,947 MW | 4,596 MW | 3,681 MW | 4,407 MW | 2,254 MW |
| 2026-08-22T02:00Z | 16,956 MW | 232 MW | 4,285 MW | 4,728 MW | 2,255 MW |
| 2026-08-22T03:00Z | 16,047 MW | -46 MW | 4,524 MW | 4,744 MW | 2,255 MW |
| 2026-08-22T04:00Z | 15,178 MW | -41 MW | 4,408 MW | 4,457 MW | 2,256 MW |
| 2026-08-22T05:00Z | 14,204 MW | -38 MW | 4,032 MW | 4,162 MW | 2,255 MW |
| 2026-08-22T06:00Z | 14,302 MW | -39 MW | 3,786 MW | 3,819 MW | 2,258 MW |
| 2026-08-22T07:00Z | 14,528 MW | -39 MW | 3,785 MW | 2,976 MW | 2,260 MW |
| 2026-08-22T08:00Z | 13,856 MW | -38 MW | 3,805 MW | 2,356 MW | 2,262 MW |
| 2026-08-22T09:00Z | 12,972 MW | -38 MW | 3,581 MW | 1,968 MW | 2,261 MW |
| 2026-08-22T10:00Z | 12,563 MW | -38 MW | 3,240 MW | 1,649 MW | 2,261 MW |
| 2026-08-22T11:00Z | 12,101 MW | -37 MW | 3,107 MW | 1,800 MW | 2,256 MW |
| 2026-08-22T12:00Z | 11,908 MW | -37 MW | 2,952 MW | 1,899 MW | 2,255 MW |
| 2026-08-22T13:00Z | 11,327 MW | 847 MW | 2,728 MW | 1,898 MW | 2,256 MW |
| 2026-08-22T14:00Z | 7,891 MW | 8,516 MW | 2,502 MW | 1,706 MW | 2,259 MW |
| 2026-08-22T15:00Z | 6,324 MW | 16,714 MW | 2,141 MW | 1,120 MW | 2,261 MW |
| 2026-08-22T16:00Z | 6,651 MW | 19,216 MW | 1,653 MW | 1,084 MW | 2,261 MW |
| 2026-08-22T17:00Z | 6,588 MW | 20,242 MW | 1,125 MW | 1,100 MW | 2,258 MW |
| 2026-08-22T18:00Z | 6,404 MW | 20,512 MW | 983 MW | 992 MW | 2,258 MW |
| 2026-08-22T19:00Z | 6,350 MW | 20,615 MW | 1,060 MW | 953 MW | 2,258 MW |
| 2026-08-22T20:00Z | 6,884 MW | 20,458 MW | 1,142 MW | 988 MW | 2,259 MW |
| 2026-08-22T21:00Z | 7,494 MW | 20,217 MW | 1,434 MW | 1,080 MW | 2,257 MW |
| 2026-08-22T22:00Z | 7,966 MW | 19,255 MW | 1,776 MW | 1,277 MW | 2,254 MW |
| 2026-08-22T23:00Z | 9,700 MW | 17,343 MW | 2,213 MW | 1,829 MW | 2,257 MW |
| 2026-08-23T00:00Z | 10,795 MW | 13,266 MW | 2,738 MW | 3,141 MW | 2,258 MW |
| 2026-08-23T01:00Z | 12,130 MW | 5,242 MW | 3,458 MW | 3,978 MW | 2,257 MW |
| 2026-08-23T02:00Z | 12,784 MW | 247 MW | 4,128 MW | 4,211 MW | 2,258 MW |
| 2026-08-23T03:00Z | 12,432 MW | -45 MW | 3,975 MW | 4,139 MW | 2,257 MW |
| 2026-08-23T04:00Z | 12,047 MW | -40 MW | 3,970 MW | 4,036 MW | 2,258 MW |
| 2026-08-23T05:00Z | 11,501 MW | -37 MW | 3,962 MW | 3,648 MW | 2,258 MW |
| 2026-08-23T06:00Z | 11,447 MW | -37 MW | 3,428 MW | 3,069 MW | 2,259 MW |
| 2026-08-23T07:00Z | 10,910 MW | -36 MW | 3,070 MW | 2,655 MW | 2,261 MW |
| 2026-08-23T08:00Z | 10,760 MW | -37 MW | 2,834 MW | 2,031 MW | 2,263 MW |
| 2026-08-23T09:00Z | 10,352 MW | -36 MW | 2,657 MW | 1,912 MW | 2,263 MW |
| 2026-08-23T10:00Z | 9,826 MW | -37 MW | 2,266 MW | 1,915 MW | 2,261 MW |
| 2026-08-23T11:00Z | 9,562 MW | -37 MW | 1,881 MW | 1,877 MW | 2,262 MW |
| 2026-08-23T12:00Z | 9,515 MW | -37 MW | 1,631 MW | 1,888 MW | 2,263 MW |
| 2026-08-23T13:00Z | 8,431 MW | 692 MW | 1,412 MW | 1,820 MW | 2,263 MW |
| 2026-08-23T14:00Z | 5,781 MW | 8,649 MW | 1,002 MW | 1,736 MW | 2,261 MW |
| 2026-08-23T15:00Z | 4,769 MW | 16,620 MW | 1,250 MW | 952 MW | 2,259 MW |
| 2026-08-23T16:00Z | 4,654 MW | 18,785 MW | 1,620 MW | 471 MW | 2,259 MW |
| 2026-08-23T17:00Z | 4,407 MW | 19,617 MW | 1,920 MW | 470 MW | 2,257 MW |
| 2026-08-23T18:00Z | 4,657 MW | 20,297 MW | 1,888 MW | 370 MW | 2,255 MW |
| 2026-08-23T19:00Z | 5,099 MW | 20,493 MW | 1,771 MW | 377 MW | 2,255 MW |
| 2026-08-23T20:00Z | 5,845 MW | 20,275 MW | 1,467 MW | 548 MW | 2,256 MW |
| 2026-08-23T21:00Z | 7,432 MW | 19,241 MW | 1,607 MW | 1,307 MW | 2,258 MW |
| 2026-08-23T22:00Z | 9,648 MW | 18,164 MW | 1,718 MW | 1,819 MW | 2,256 MW |
| 2026-08-23T23:00Z | 11,288 MW | 16,384 MW | 1,881 MW | 2,897 MW | 2,252 MW |
| 2026-08-24T00:00Z | 12,977 MW | 12,352 MW | 2,275 MW | 3,977 MW | 2,254 MW |
| 2026-08-24T01:00Z | 14,519 MW | 4,612 MW | 2,333 MW | 4,360 MW | 2,256 MW |
| 2026-08-24T02:00Z | 15,184 MW | 406 MW | 2,538 MW | 4,597 MW | 2,258 MW |
| 2026-08-24T03:00Z | 14,379 MW | -61 MW | 2,983 MW | 4,617 MW | 2,259 MW |
| 2026-08-24T04:00Z | 14,260 MW | -56 MW | 2,807 MW | 4,495 MW | 2,259 MW |
| 2026-08-24T05:00Z | 14,354 MW | -52 MW | 2,716 MW | 4,289 MW | 2,259 MW |
| 2026-08-24T06:00Z | 13,997 MW | -52 MW | 2,653 MW | 3,287 MW | 2,259 MW |
| 2026-08-24T07:00Z | 13,710 MW | -52 MW | 2,678 MW | 2,733 MW | 2,258 MW |
| 2026-08-24T08:00Z | 13,650 MW | -52 MW | 2,465 MW | 2,242 MW | 2,260 MW |
| 2026-08-24T09:00Z | 13,130 MW | -51 MW | 2,097 MW | 2,104 MW | 2,260 MW |
| 2026-08-24T10:00Z | 13,098 MW | -51 MW | 1,674 MW | 2,037 MW | 2,262 MW |
| 2026-08-24T11:00Z | 13,368 MW | -51 MW | 1,463 MW | 2,027 MW | 2,261 MW |
| 2026-08-24T12:00Z | 13,412 MW | -51 MW | 2,013 MW | 1,971 MW | 2,260 MW |
| 2026-08-24T13:00Z | 13,490 MW | 387 MW | 2,427 MW | 1,716 MW | 2,259 MW |
| 2026-08-24T14:00Z | 13,077 MW | 5,363 MW | 2,184 MW | 1,622 MW | 2,258 MW |
| 2026-08-24T15:00Z | 12,347 MW | 12,465 MW | 1,995 MW | 932 MW | 2,259 MW |
| 2026-08-24T16:00Z | 11,941 MW | 16,525 MW | 1,892 MW | 710 MW | 2,259 MW |
| 2026-08-24T17:00Z | 11,481 MW | 18,295 MW | 1,926 MW | 740 MW | 2,258 MW |
| 2026-08-24T18:00Z | 11,359 MW | 19,434 MW | 1,916 MW | 614 MW | 2,257 MW |
| 2026-08-24T19:00Z | 10,977 MW | 19,946 MW | 1,647 MW | 610 MW | 2,256 MW |
| 2026-08-24T20:00Z | 11,914 MW | 19,725 MW | 1,305 MW | 1,284 MW | 2,254 MW |
| 2026-08-24T21:00Z | 13,567 MW | 18,958 MW | 1,263 MW | 1,719 MW | 2,252 MW |
| 2026-08-24T22:00Z | 15,058 MW | 18,141 MW | 1,344 MW | 2,463 MW | 2,254 MW |
| 2026-08-24T23:00Z | 15,794 MW | 17,151 MW | 1,393 MW | 3,236 MW | 2,257 MW |
| 2026-08-25T00:00Z | 16,829 MW | 13,452 MW | 1,657 MW | 3,868 MW | 2,258 MW |
| 2026-08-25T01:00Z | 17,971 MW | 5,242 MW | 1,780 MW | 4,379 MW | 2,258 MW |
| 2026-08-25T02:00Z | 18,454 MW | 265 MW | 1,796 MW | 4,350 MW | 2,257 MW |
| 2026-08-25T03:00Z | 18,486 MW | -58 MW | 2,202 MW | 4,548 MW | 2,257 MW |
| 2026-08-25T04:00Z | 18,403 MW | -51 MW | 2,525 MW | 4,084 MW | 2,259 MW |
| 2026-08-25T05:00Z | 17,599 MW | -48 MW | 2,866 MW | 3,686 MW | 2,259 MW |
| 2026-08-25T06:00Z | 16,606 MW | -49 MW | 3,056 MW | 3,096 MW | 2,259 MW |
| 2026-08-25T07:00Z | 15,888 MW | -47 MW | 3,267 MW | 2,619 MW | 2,257 MW |
| 2026-08-25T08:00Z | 15,080 MW | -48 MW | 3,678 MW | 2,431 MW | 2,258 MW |
| 2026-08-25T09:00Z | 14,573 MW | -47 MW | 4,024 MW | 2,321 MW | 2,255 MW |
| 2026-08-25T10:00Z | 14,310 MW | -47 MW | 3,639 MW | 2,305 MW | 2,254 MW |
| 2026-08-25T11:00Z | 14,149 MW | -48 MW | 3,645 MW | 2,273 MW | 2,255 MW |
| 2026-08-25T12:00Z | 14,295 MW | -48 MW | 3,162 MW | 2,175 MW | 2,260 MW |
| 2026-08-25T13:00Z | 14,215 MW | 690 MW | 2,640 MW | 2,272 MW | 2,261 MW |
| 2026-08-25T14:00Z | 13,006 MW | 7,615 MW | 1,865 MW | 2,360 MW | 2,261 MW |
| 2026-08-25T15:00Z | 11,783 MW | 15,515 MW | 1,197 MW | 1,722 MW | 2,262 MW |
| 2026-08-25T16:00Z | 11,332 MW | 18,353 MW | 864 MW | 1,382 MW | 2,260 MW |
| 2026-08-25T17:00Z | 10,982 MW | 19,826 MW | 736 MW | 1,355 MW | 2,257 MW |
| 2026-08-25T18:00Z | 11,128 MW | 19,929 MW | 691 MW | 1,230 MW | 2,257 MW |
| 2026-08-25T19:00Z | 11,995 MW | 19,969 MW | 760 MW | 1,447 MW | 2,255 MW |
| 2026-08-25T20:00Z | 13,025 MW | 19,067 MW | 1,185 MW | 1,622 MW | 2,252 MW |
| 2026-08-25T21:00Z | 15,002 MW | 17,215 MW | 1,851 MW | 1,893 MW | 2,253 MW |
| 2026-08-25T22:00Z | 16,857 MW | 16,721 MW | 2,751 MW | 2,316 MW | 2,255 MW |
| 2026-08-25T23:00Z | 17,810 MW | 15,612 MW | 3,282 MW | 3,266 MW | 2,255 MW |
| 2026-08-26T00:00Z | 18,524 MW | 12,230 MW | 3,149 MW | 3,785 MW | 2,254 MW |
| 2026-08-26T01:00Z | 19,422 MW | 4,689 MW | 3,551 MW | 3,837 MW | 2,254 MW |
| 2026-08-26T02:00Z | 19,324 MW | 130 MW | 3,981 MW | 4,171 MW | 2,255 MW |
| 2026-08-26T03:00Z | 18,680 MW | -68 MW | 3,846 MW | 4,477 MW | 2,256 MW |
| 2026-08-26T04:00Z | 18,311 MW | -64 MW | 3,955 MW | 4,212 MW | 2,260 MW |
| 2026-08-26T05:00Z | 17,167 MW | -62 MW | 4,236 MW | 4,053 MW | 2,262 MW |
| 2026-08-26T06:00Z | 15,380 MW | -61 MW | 5,158 MW | 3,362 MW | 2,263 MW |
| 2026-08-26T07:00Z | 14,576 MW | -60 MW | 4,824 MW | 2,601 MW | 2,262 MW |
| 2026-08-26T08:00Z | 14,043 MW | -61 MW | 4,806 MW | 2,480 MW | 2,260 MW |
| 2026-08-26T09:00Z | 13,701 MW | -60 MW | 4,176 MW | 2,226 MW | 2,257 MW |
| 2026-08-26T10:00Z | 13,827 MW | -60 MW | 3,554 MW | 2,064 MW | 2,257 MW |
| 2026-08-26T11:00Z | 13,990 MW | -60 MW | 2,900 MW | 1,937 MW | 2,258 MW |
| 2026-08-26T12:00Z | 14,262 MW | -60 MW | 2,325 MW | 2,152 MW | 2,260 MW |
| 2026-08-26T13:00Z | 15,106 MW | 647 MW | 2,121 MW | 2,385 MW | 2,262 MW |
| 2026-08-26T14:00Z | 13,799 MW | 7,547 MW | 1,576 MW | 2,313 MW | 2,260 MW |
| 2026-08-26T15:00Z | 11,600 MW | 15,534 MW | 1,111 MW | 1,954 MW | 2,257 MW |
| 2026-08-26T16:00Z | 11,508 MW | 18,271 MW | 983 MW | 1,839 MW | 2,256 MW |
| 2026-08-26T17:00Z | 11,291 MW | 18,658 MW | 1,003 MW | 1,737 MW | 2,254 MW |
| 2026-08-26T18:00Z | 12,596 MW | 19,588 MW | 1,512 MW | 1,631 MW | 2,253 MW |
| 2026-08-26T19:00Z | 13,762 MW | 19,191 MW | 1,349 MW | 1,299 MW | 2,253 MW |
| 2026-08-26T20:00Z | 14,948 MW | 18,455 MW | 837 MW | 1,703 MW | 2,250 MW |
| 2026-08-26T21:00Z | 16,961 MW | 17,190 MW | 1,209 MW | 2,025 MW | 2,249 MW |
| 2026-08-26T22:00Z | 17,736 MW | 16,124 MW | 1,805 MW | 2,440 MW | 2,250 MW |
| 2026-08-26T23:00Z | 17,454 MW | 14,999 MW | 2,614 MW | 3,409 MW | 2,252 MW |
| 2026-08-27T00:00Z | 17,873 MW | 11,980 MW | 3,620 MW | 3,826 MW | 2,256 MW |
| 2026-08-27T01:00Z | 18,976 MW | 4,514 MW | 3,525 MW | 4,041 MW | 2,259 MW |
| 2026-08-27T02:00Z | 19,560 MW | 100 MW | 3,549 MW | 4,387 MW | 2,260 MW |
| 2026-08-27T03:00Z | 18,885 MW | -63 MW | 3,298 MW | 4,369 MW | 2,258 MW |
| 2026-08-27T04:00Z | 19,137 MW | -62 MW | 3,336 MW | 3,922 MW | 2,258 MW |
| 2026-08-27T05:00Z | 18,480 MW | -61 MW | 3,152 MW | 3,673 MW | 2,260 MW |
| 2026-08-27T06:00Z | 17,801 MW | -63 MW | 3,182 MW | 3,229 MW | 2,261 MW |
| 2026-08-27T07:00Z | 17,398 MW | -62 MW | 3,473 MW | 2,614 MW | 2,262 MW |
| 2026-08-27T08:00Z | 16,656 MW | -61 MW | 3,353 MW | 2,561 MW | 2,263 MW |
| 2026-08-27T09:00Z | 16,216 MW | -61 MW | 2,922 MW | 2,558 MW | 2,262 MW |
| 2026-08-27T10:00Z | 15,543 MW | -60 MW | 2,727 MW | 2,533 MW | 2,260 MW |
| 2026-08-27T11:00Z | 15,425 MW | -60 MW | 2,374 MW | 2,570 MW | 2,262 MW |
| 2026-08-27T12:00Z | 16,009 MW | -61 MW | 2,023 MW | 2,586 MW | 2,262 MW |
| 2026-08-27T13:00Z | 16,802 MW | 491 MW | 1,859 MW | 2,718 MW | 2,258 MW |
| 2026-08-27T14:00Z | 16,960 MW | 4,456 MW | 1,206 MW | 2,616 MW | 2,257 MW |
| 2026-08-27T15:00Z | 16,530 MW | 8,676 MW | 761 MW | 2,304 MW | 2,254 MW |
| 2026-08-27T16:00Z | 16,840 MW | 10,875 MW | 717 MW | 2,248 MW | 2,252 MW |
| 2026-08-27T17:00Z | 17,615 MW | 12,691 MW | 1,129 MW | 2,055 MW | 2,250 MW |
| 2026-08-27T18:00Z | 18,004 MW | 13,428 MW | 1,517 MW | 2,115 MW | 2,250 MW |
| 2026-08-27T19:00Z | 18,446 MW | 12,241 MW | 2,282 MW | 2,083 MW | 2,253 MW |
| 2026-08-27T20:00Z | 18,786 MW | 11,603 MW | 3,159 MW | 2,374 MW | 2,249 MW |
| 2026-08-27T21:00Z | 19,355 MW | 10,737 MW | 4,019 MW | 2,700 MW | 2,248 MW |
| 2026-08-27T22:00Z | 19,780 MW | 9,331 MW | 3,980 MW | 3,184 MW | 2,247 MW |
| 2026-08-27T23:00Z | 19,580 MW | 7,117 MW | 3,867 MW | 3,470 MW | 2,248 MW |
| 2026-08-28T00:00Z | 19,854 MW | 4,145 MW | 4,922 MW | 3,735 MW | 2,250 MW |
| 2026-08-28T01:00Z | 19,181 MW | 1,253 MW | 5,204 MW | 4,074 MW | 2,250 MW |
| 2026-08-28T02:00Z | 18,862 MW | -7 MW | 4,293 MW | 4,130 MW | 2,253 MW |
| 2026-08-28T03:00Z | 18,693 MW | -56 MW | 2,789 MW | 4,412 MW | 2,255 MW |
| 2026-08-28T04:00Z | 18,877 MW | -51 MW | 1,980 MW | 4,257 MW | 2,256 MW |
| 2026-08-28T05:00Z | 18,645 MW | -50 MW | 1,404 MW | 3,497 MW | 2,257 MW |
| 2026-08-28T06:00Z | 18,173 MW | -51 MW | 944 MW | 2,889 MW | 2,256 MW |
| 2026-08-28T07:00Z | 18,011 MW | -50 MW | 745 MW | 2,713 MW | 2,256 MW |
| 2026-08-28T08:00Z | 17,585 MW | -50 MW | 708 MW | 2,883 MW | 2,256 MW |
| 2026-08-28T09:00Z | 17,030 MW | -51 MW | 822 MW | 2,686 MW | 2,256 MW |
| 2026-08-28T10:00Z | 16,749 MW | -52 MW | 1,036 MW | 2,596 MW | 2,256 MW |
| 2026-08-28T11:00Z | 16,638 MW | -51 MW | 1,113 MW | 2,681 MW | 2,255 MW |
| 2026-08-28T12:00Z | 16,334 MW | -52 MW | 1,037 MW | 2,805 MW | 2,255 MW |
| 2026-08-28T13:00Z | 16,831 MW | 414 MW | 871 MW | 2,920 MW | 2,254 MW |
| 2026-08-28T14:00Z | 16,011 MW | 5,506 MW | 915 MW | 3,024 MW | 2,254 MW |
| 2026-08-28T15:00Z | 15,706 MW | 11,490 MW | 900 MW | 2,507 MW | 2,255 MW |
| 2026-08-28T16:00Z | 15,788 MW | 14,910 MW | 907 MW | 2,431 MW | 2,255 MW |
| 2026-08-28T17:00Z | 15,717 MW | 15,902 MW | 1,033 MW | 2,255 MW | 2,251 MW |
| 2026-08-28T18:00Z | 15,801 MW | 15,979 MW | 1,145 MW | 2,061 MW | 2,249 MW |
| 2026-08-28T19:00Z | 16,049 MW | 16,020 MW | 1,182 MW | 2,189 MW | 2,250 MW |
| 2026-08-28T20:00Z | 16,047 MW | 16,554 MW | 1,689 MW | 2,369 MW | 2,249 MW |
| 2026-08-28T21:00Z | 16,318 MW | 15,751 MW | 2,516 MW | 2,527 MW | 2,246 MW |
| 2026-08-28T22:00Z | 16,762 MW | 14,317 MW | 3,094 MW | 2,804 MW | 2,246 MW |
| 2026-08-28T23:00Z | 17,263 MW | 12,057 MW | 3,410 MW | 2,836 MW | 2,249 MW |
| 2026-08-29T00:00Z | 17,471 MW | 8,135 MW | 3,441 MW | 2,997 MW | 2,251 MW |
| 2026-08-29T01:00Z | 17,523 MW | 2,695 MW | 3,325 MW | 3,425 MW | 2,251 MW |
| 2026-08-29T02:00Z | 17,320 MW | 38 MW | 3,704 MW | 3,389 MW | 2,251 MW |
| 2026-08-29T03:00Z | 16,658 MW | -49 MW | 3,976 MW | 3,506 MW | 2,253 MW |
| 2026-08-29T04:00Z | 17,004 MW | -43 MW | 3,340 MW | 3,205 MW | 2,257 MW |
| 2026-08-29T05:00Z | 16,450 MW | -44 MW | 2,775 MW | 3,004 MW | 2,260 MW |
| 2026-08-29T06:00Z | 15,569 MW | -43 MW | 2,755 MW | 2,539 MW | 2,258 MW |
| 2026-08-29T07:00Z | 13,898 MW | -42 MW | 2,558 MW | 2,102 MW | 2,256 MW |
| 2026-08-29T08:00Z | 13,122 MW | -42 MW | 2,927 MW | 1,967 MW | 2,254 MW |
| 2026-08-29T09:00Z | 12,242 MW | -42 MW | 3,723 MW | 1,854 MW | 2,256 MW |
| 2026-08-29T10:00Z | 11,281 MW | -42 MW | 4,492 MW | 1,662 MW | 2,257 MW |
| 2026-08-29T11:00Z | 9,571 MW | -43 MW | 5,040 MW | 1,690 MW | 2,256 MW |
| 2026-08-29T12:00Z | 9,193 MW | -43 MW | 4,852 MW | 1,759 MW | 2,255 MW |
| 2026-08-29T13:00Z | 8,785 MW | 488 MW | 4,454 MW | 1,785 MW | 2,256 MW |
| 2026-08-29T14:00Z | 6,002 MW | 6,192 MW | 3,963 MW | 1,370 MW | 2,256 MW |
| 2026-08-29T15:00Z | 5,342 MW | 12,942 MW | 3,697 MW | 715 MW | 2,256 MW |
| 2026-08-29T16:00Z | 5,648 MW | 15,473 MW | 3,595 MW | 637 MW | 2,258 MW |
| 2026-08-29T17:00Z | 5,643 MW | 16,874 MW | 3,592 MW | 673 MW | 2,258 MW |
| 2026-08-29T18:00Z | 5,599 MW | 18,154 MW | 3,496 MW | 634 MW | 2,257 MW |
| 2026-08-29T19:00Z | 5,925 MW | 18,012 MW | 3,200 MW | 293 MW | 2,256 MW |
| 2026-08-29T20:00Z | 6,237 MW | 17,142 MW | 3,260 MW | 317 MW | 2,256 MW |
| 2026-08-29T21:00Z | 6,672 MW | 17,389 MW | 3,327 MW | 655 MW | 2,253 MW |
| 2026-08-29T22:00Z | 7,135 MW | 17,396 MW | 3,800 MW | 827 MW | 2,252 MW |
| 2026-08-29T23:00Z | 7,528 MW | 17,301 MW | 4,512 MW | 1,769 MW | 2,253 MW |
| 2026-08-30T00:00Z | 9,103 MW | 13,594 MW | 4,713 MW | 2,492 MW | 2,255 MW |
| 2026-08-30T01:00Z | 11,365 MW | 4,250 MW | 4,525 MW | 3,179 MW | 2,257 MW |
| 2026-08-30T02:00Z | 11,621 MW | 90 MW | 4,968 MW | 3,400 MW | 2,257 MW |
| 2026-08-30T03:00Z | 11,522 MW | -44 MW | 5,033 MW | 3,352 MW | 2,258 MW |
| 2026-08-30T04:00Z | 11,517 MW | -38 MW | 4,610 MW | 3,221 MW | 2,260 MW |
| 2026-08-30T05:00Z | 11,289 MW | -35 MW | 4,458 MW | 2,991 MW | 2,260 MW |
| 2026-08-30T06:00Z | 10,875 MW | -35 MW | 4,487 MW | 2,423 MW | 2,265 MW |
| 2026-08-30T07:00Z | 9,501 MW | -35 MW | 4,934 MW | 1,994 MW | 2,264 MW |
| 2026-08-30T08:00Z | 9,239 MW | -35 MW | 4,997 MW | 1,777 MW | 2,262 MW |
| 2026-08-30T09:00Z | 8,906 MW | -35 MW | 4,634 MW | 1,735 MW | 2,262 MW |
| 2026-08-30T10:00Z | 7,933 MW | -37 MW | 4,385 MW | 1,765 MW | 2,261 MW |
| 2026-08-30T11:00Z | 7,467 MW | -37 MW | 3,950 MW | 1,697 MW | 2,261 MW |
| 2026-08-30T12:00Z | 7,403 MW | -37 MW | 3,678 MW | 1,690 MW | 2,258 MW |
| 2026-08-30T13:00Z | 6,921 MW | 472 MW | 3,246 MW | 1,792 MW | 2,257 MW |
| 2026-08-30T14:00Z | 4,157 MW | 6,635 MW | 2,728 MW | 1,049 MW | 2,258 MW |
| 2026-08-30T15:00Z | 3,092 MW | 14,709 MW | 2,450 MW | 340 MW | 2,261 MW |
| 2026-08-30T16:00Z | 2,862 MW | 17,853 MW | 2,132 MW | 271 MW | 2,263 MW |
| 2026-08-30T17:00Z | 2,954 MW | 18,322 MW | 1,702 MW | 290 MW | 2,264 MW |
| 2026-08-30T18:00Z | 3,259 MW | 19,113 MW | 1,163 MW | 133 MW | 2,264 MW |
| 2026-08-30T19:00Z | 3,190 MW | 19,183 MW | 1,148 MW | 137 MW | 2,259 MW |
| 2026-08-30T20:00Z | 3,021 MW | 18,703 MW | 1,589 MW | 122 MW | 2,259 MW |
| 2026-08-30T21:00Z | 3,571 MW | 18,435 MW | 2,038 MW | 179 MW | 2,258 MW |
| 2026-08-30T22:00Z | 4,043 MW | 18,049 MW | 2,635 MW | 422 MW | 2,257 MW |
| 2026-08-30T23:00Z | 5,685 MW | 17,489 MW | 3,139 MW | 1,185 MW | 2,254 MW |
| 2026-08-31T00:00Z | 7,551 MW | 13,217 MW | 3,120 MW | 2,053 MW | 2,255 MW |
| 2026-08-31T01:00Z | 9,393 MW | 4,350 MW | 3,356 MW | 2,648 MW | 2,255 MW |
| 2026-08-31T02:00Z | 10,601 MW | 104 MW | 3,630 MW | 2,776 MW | 2,258 MW |
| 2026-08-31T03:00Z | 10,756 MW | -73 MW | 3,403 MW | 3,269 MW | 2,260 MW |
| 2026-08-31T04:00Z | 10,835 MW | -65 MW | 3,273 MW | 3,181 MW | 2,263 MW |
| 2026-08-31T05:00Z | 10,801 MW | -61 MW | 3,015 MW | 2,888 MW | 2,261 MW |
| 2026-08-31T06:00Z | 10,496 MW | -62 MW | 3,342 MW | 2,585 MW | 2,260 MW |
| 2026-08-31T07:00Z | 10,887 MW | -62 MW | 3,469 MW | 2,020 MW | 2,261 MW |
| 2026-08-31T08:00Z | 10,618 MW | -61 MW | 3,416 MW | 1,744 MW | 2,260 MW |
| 2026-08-31T09:00Z | 10,106 MW | -61 MW | 3,334 MW | 1,719 MW | 2,261 MW |
| 2026-08-31T10:00Z | 9,795 MW | -61 MW | 2,958 MW | 1,744 MW | 2,261 MW |
| 2026-08-31T11:00Z | 9,878 MW | -61 MW | 2,857 MW | 1,719 MW | 2,260 MW |
| 2026-08-31T12:00Z | 9,786 MW | -61 MW | 3,359 MW | 1,775 MW | 2,258 MW |
| 2026-08-31T13:00Z | 10,059 MW | 374 MW | 3,549 MW | 2,014 MW | 2,259 MW |
| 2026-08-31T14:00Z | 8,219 MW | 6,925 MW | 2,796 MW | 1,883 MW | 2,261 MW |
| 2026-08-31T15:00Z | 5,673 MW | 15,272 MW | 2,287 MW | 904 MW | 2,262 MW |
| 2026-08-31T16:00Z | 5,279 MW | 18,398 MW | 2,084 MW | 788 MW | 2,254 MW |
| 2026-08-31T17:00Z | 4,924 MW | 19,729 MW | 2,116 MW | 805 MW | 2,250 MW |
| 2026-08-31T18:00Z | 5,031 MW | 20,313 MW | 2,576 MW | 651 MW | 2,251 MW |
| 2026-08-31T19:00Z | 4,542 MW | 20,450 MW | 3,383 MW | 664 MW | 2,252 MW |
| 2026-08-31T20:00Z | 4,211 MW | 20,286 MW | 4,288 MW | 661 MW | 2,252 MW |
| 2026-08-31T21:00Z | 4,002 MW | 20,173 MW | 4,397 MW | 706 MW | 2,252 MW |
| 2026-08-31T22:00Z | 4,263 MW | 19,518 MW | 4,499 MW | 876 MW | 2,251 MW |
| 2026-08-31T23:00Z | 5,121 MW | 17,480 MW | 4,354 MW | 1,796 MW | 2,250 MW |
| 2026-09-01T00:00Z | 7,068 MW | 13,567 MW | 4,762 MW | 2,353 MW | 2,251 MW |
| 2026-09-01T01:00Z | 8,451 MW | 4,572 MW | 4,347 MW | 3,408 MW | 2,252 MW |
| 2026-09-01T02:00Z | 8,995 MW | 208 MW | 4,470 MW | 3,723 MW | 2,252 MW |
| 2026-09-01T03:00Z | 9,426 MW | -53 MW | 4,215 MW | 3,783 MW | 2,251 MW |
| 2026-09-01T04:00Z | 9,435 MW | -64 MW | 3,308 MW | 3,330 MW | 2,252 MW |
| 2026-09-01T05:00Z | 9,088 MW | -60 MW | 3,368 MW | 2,971 MW | 2,254 MW |
| 2026-09-01T06:00Z | 9,370 MW | -60 MW | 3,098 MW | 2,866 MW | 2,256 MW |
| 2026-09-01T07:00Z | 9,177 MW | -60 MW | 2,932 MW | 2,015 MW | 2,256 MW |
| 2026-09-01T08:00Z | 9,012 MW | -60 MW | 3,251 MW | 1,879 MW | 2,256 MW |
| 2026-09-01T09:00Z | 8,720 MW | -60 MW | 3,073 MW | 1,793 MW | 2,258 MW |
| 2026-09-01T10:00Z | 8,274 MW | -59 MW | 2,549 MW | 1,776 MW | 2,258 MW |
| 2026-09-01T11:00Z | 8,349 MW | -60 MW | 2,420 MW | 1,765 MW | 2,258 MW |
| 2026-09-01T12:00Z | 8,267 MW | -59 MW | 2,030 MW | 1,855 MW | 2,255 MW |
| 2026-09-01T13:00Z | 8,698 MW | 501 MW | 1,724 MW | 1,971 MW | 2,249 MW |
| 2026-09-01T14:00Z | 6,099 MW | 8,011 MW | 1,719 MW | 1,778 MW | 2,249 MW |
| 2026-09-01T15:00Z | 3,376 MW | 16,699 MW | 1,889 MW | 806 MW | 2,248 MW |
| 2026-09-01T16:00Z | 2,415 MW | 19,172 MW | 1,922 MW | 500 MW | 2,248 MW |
| 2026-09-01T17:00Z | 2,062 MW | 20,174 MW | 1,694 MW | 495 MW | 2,248 MW |
| 2026-09-01T18:00Z | 1,840 MW | 20,411 MW | 1,653 MW | 374 MW | 2,248 MW |
| 2026-09-01T19:00Z | 1,915 MW | 20,471 MW | 1,844 MW | 365 MW | 2,244 MW |
| 2026-09-01T20:00Z | 1,993 MW | 20,373 MW | 2,457 MW | 454 MW | 2,238 MW |
| 2026-09-01T21:00Z | 2,006 MW | 19,840 MW | 3,421 MW | 514 MW | 2,237 MW |
| 2026-09-01T22:00Z | 2,021 MW | 19,180 MW | 3,510 MW | 529 MW | 2,238 MW |
| 2026-09-01T23:00Z | 2,746 MW | 17,988 MW | 3,440 MW | 1,066 MW | 2,240 MW |
| 2026-09-02T00:00Z | 3,921 MW | 14,232 MW | 3,234 MW | 1,970 MW | 2,242 MW |
| 2026-09-02T01:00Z | 5,470 MW | 4,509 MW | 3,110 MW | 3,562 MW | 2,242 MW |
| 2026-09-02T02:00Z | 5,777 MW | 53 MW | 2,990 MW | 3,796 MW | 2,243 MW |
| 2026-09-02T03:00Z | 5,894 MW | -68 MW | 2,888 MW | 4,181 MW | 2,244 MW |
| 2026-09-02T04:00Z | 5,822 MW | -61 MW | 2,890 MW | 3,982 MW | 2,245 MW |
| 2026-09-02T05:00Z | 5,562 MW | -60 MW | 2,950 MW | 3,845 MW | 2,248 MW |
| 2026-09-02T06:00Z | 5,524 MW | -59 MW | 2,852 MW | 3,569 MW | 2,247 MW |
| 2026-09-02T07:00Z | 5,568 MW | -59 MW | 3,119 MW | 2,832 MW | 2,246 MW |
| 2026-09-02T08:00Z | 5,813 MW | -59 MW | 3,275 MW | 2,460 MW | 2,246 MW |
| 2026-09-02T09:00Z | 5,631 MW | -59 MW | 3,206 MW | 2,437 MW | 2,245 MW |
| 2026-09-02T10:00Z | 5,680 MW | -59 MW | 2,845 MW | 2,141 MW | 2,244 MW |
| 2026-09-02T11:00Z | 5,711 MW | -58 MW | 2,919 MW | 2,102 MW | 2,244 MW |
| 2026-09-02T12:00Z | 5,773 MW | -58 MW | 2,768 MW | 2,107 MW | 2,243 MW |
| 2026-09-02T13:00Z | 5,902 MW | 597 MW | 2,696 MW | 2,332 MW | 2,244 MW |
| 2026-09-02T14:00Z | 4,428 MW | 8,122 MW | 2,549 MW | 1,624 MW | 2,245 MW |
| 2026-09-02T15:00Z | 3,057 MW | 16,566 MW | 2,385 MW | 472 MW | 2,244 MW |
| 2026-09-02T16:00Z | 2,689 MW | 18,769 MW | 2,024 MW | 317 MW | 2,246 MW |
| 2026-09-02T17:00Z | 2,304 MW | 19,886 MW | 2,179 MW | 332 MW | 2,246 MW |
| 2026-09-02T18:00Z | 2,056 MW | 19,834 MW | 2,630 MW | 342 MW | 2,248 MW |
| 2026-09-02T19:00Z | 1,809 MW | 19,132 MW | 3,164 MW | 367 MW | 2,245 MW |
| 2026-09-02T20:00Z | 1,761 MW | 18,897 MW | 3,355 MW | 348 MW | 2,240 MW |
| 2026-09-02T21:00Z | 1,791 MW | 18,897 MW | 3,830 MW | 362 MW | 2,240 MW |
| 2026-09-02T22:00Z | 1,816 MW | 17,730 MW | 4,720 MW | 512 MW | 2,239 MW |
| 2026-09-02T23:00Z | 1,932 MW | 16,817 MW | 4,991 MW | 879 MW | 2,240 MW |
| 2026-09-03T00:00Z | 2,660 MW | 13,787 MW | 4,778 MW | 1,848 MW | 2,243 MW |
| 2026-09-03T01:00Z | 4,180 MW | 4,437 MW | 4,295 MW | 3,429 MW | 2,244 MW |
| 2026-09-03T02:00Z | 5,030 MW | 77 MW | 4,077 MW | 3,723 MW | 2,246 MW |
| 2026-09-03T03:00Z | 5,210 MW | -37 MW | 3,877 MW | 3,706 MW | 2,246 MW |
| 2026-09-03T04:00Z | 5,343 MW | -28 MW | 3,824 MW | 3,640 MW | 2,249 MW |
| 2026-09-03T05:00Z | 5,021 MW | -24 MW | 4,013 MW | 3,342 MW | 2,253 MW |
| 2026-09-03T06:00Z | 4,746 MW | -23 MW | 4,350 MW | 3,055 MW | 2,254 MW |
| 2026-09-03T07:00Z | 4,910 MW | -23 MW | 4,364 MW | 2,992 MW | 2,242 MW |
| 2026-09-03T08:00Z | 4,919 MW | -23 MW | 4,649 MW | 2,427 MW | 2,239 MW |
| 2026-09-03T09:00Z | 4,904 MW | -23 MW | 4,715 MW | 2,291 MW | 2,235 MW |
| 2026-09-03T10:00Z | 4,805 MW | -23 MW | 5,280 MW | 2,276 MW | 2,239 MW |
| 2026-09-03T11:00Z | 4,827 MW | -22 MW | 5,260 MW | 2,269 MW | 2,243 MW |
| 2026-09-03T12:00Z | 4,948 MW | -22 MW | 4,708 MW | 2,404 MW | 2,244 MW |
| 2026-09-03T13:00Z | 4,980 MW | 518 MW | 4,453 MW | 2,490 MW | 2,244 MW |
| 2026-09-03T14:00Z | 3,901 MW | 7,449 MW | 3,680 MW | 1,914 MW | 2,246 MW |
| 2026-09-03T15:00Z | 1,967 MW | 15,180 MW | 3,603 MW | 522 MW | 2,248 MW |
| 2026-09-03T16:00Z | 1,924 MW | 17,865 MW | 3,286 MW | 244 MW | 2,247 MW |
| 2026-09-03T17:00Z | 1,702 MW | 19,494 MW | 2,895 MW | 247 MW | 2,248 MW |
| 2026-09-03T18:00Z | 1,827 MW | 19,785 MW | 2,397 MW | 111 MW | 2,248 MW |
| 2026-09-03T19:00Z | 1,966 MW | 19,778 MW | 2,632 MW | 181 MW | 2,248 MW |
| 2026-09-03T20:00Z | 1,990 MW | 19,399 MW | 3,153 MW | 139 MW | 2,249 MW |
| 2026-09-03T21:00Z | 2,040 MW | 19,278 MW | 3,980 MW | 213 MW | 2,247 MW |
| 2026-09-03T22:00Z | 1,979 MW | 18,644 MW | 4,965 MW | 382 MW | 2,244 MW |
| 2026-09-03T23:00Z | 2,487 MW | 17,107 MW | 4,821 MW | 1,257 MW | 2,242 MW |
| 2026-09-04T00:00Z | 3,045 MW | 13,405 MW | 4,745 MW | 2,327 MW | 2,242 MW |
| 2026-09-04T01:00Z | 4,155 MW | 4,078 MW | 4,168 MW | 3,866 MW | 2,243 MW |
| 2026-09-04T02:00Z | 4,661 MW | 67 MW | 3,715 MW | 4,128 MW | 2,245 MW |
| 2026-09-04T03:00Z | 4,802 MW | -67 MW | 3,695 MW | 4,245 MW | 2,247 MW |
| 2026-09-04T04:00Z | 4,839 MW | -61 MW | 3,295 MW | 4,020 MW | 2,248 MW |
| 2026-09-04T05:00Z | 4,968 MW | -60 MW | 2,761 MW | 3,929 MW | 2,248 MW |
| 2026-09-04T06:00Z | 5,404 MW | -61 MW | 2,648 MW | 3,906 MW | 2,246 MW |
| 2026-09-04T07:00Z | 6,166 MW | -60 MW | 2,850 MW | 3,586 MW | 2,246 MW |
| 2026-09-04T08:00Z | 6,348 MW | -60 MW | 2,944 MW | 3,155 MW | 2,248 MW |
| 2026-09-04T09:00Z | 6,174 MW | -60 MW | 3,590 MW | 2,883 MW | 2,246 MW |
| 2026-09-04T10:00Z | 5,943 MW | -60 MW | 4,021 MW | 2,681 MW | 2,243 MW |
| 2026-09-04T11:00Z | 5,964 MW | -59 MW | 4,156 MW | 2,689 MW | 2,244 MW |
| 2026-09-04T12:00Z | 6,051 MW | -59 MW | 4,055 MW | 2,826 MW | 2,246 MW |
| 2026-09-04T13:00Z | 6,234 MW | 466 MW | 4,112 MW | 2,911 MW | 2,247 MW |
| 2026-09-04T14:00Z | 5,199 MW | 7,359 MW | 3,574 MW | 1,995 MW | 2,248 MW |
| 2026-09-04T15:00Z | 3,540 MW | 15,990 MW | 3,085 MW | 775 MW | 2,247 MW |
| 2026-09-04T16:00Z | 2,796 MW | 18,768 MW | 2,727 MW | 231 MW | 2,246 MW |
| 2026-09-04T17:00Z | 1,995 MW | 20,231 MW | 2,357 MW | 149 MW | 2,245 MW |
| 2026-09-04T18:00Z | 1,782 MW | 20,438 MW | 1,831 MW | -16 MW | 2,246 MW |
| 2026-09-04T19:00Z | 1,817 MW | 20,448 MW | 1,806 MW | 23 MW | 2,245 MW |
| 2026-09-04T20:00Z | 1,838 MW | 20,229 MW | 2,513 MW | 32 MW | 2,245 MW |
| 2026-09-04T21:00Z | 1,928 MW | 19,849 MW | 3,338 MW | 48 MW | 2,244 MW |
| 2026-09-04T22:00Z | 2,359 MW | 18,866 MW | 2,615 MW | 106 MW | 2,243 MW |
| 2026-09-04T23:00Z | 2,775 MW | 17,415 MW | 2,970 MW | 877 MW | 2,242 MW |
| 2026-09-05T00:00Z | 4,079 MW | 12,335 MW | 3,580 MW | 1,959 MW | 2,241 MW |
| 2026-09-05T01:00Z | 5,369 MW | 3,349 MW | 3,491 MW | 3,620 MW | 2,238 MW |
| 2026-09-05T02:00Z | 5,563 MW | -3 MW | 2,685 MW | 3,946 MW | 2,237 MW |
| 2026-09-05T03:00Z | 5,589 MW | -67 MW | 2,475 MW | 3,998 MW | 2,237 MW |
| 2026-09-05T04:00Z | 5,610 MW | -62 MW | 2,475 MW | 3,696 MW | 2,239 MW |
| 2026-09-05T05:00Z | 5,709 MW | -60 MW | 2,482 MW | 3,636 MW | 2,240 MW |
| 2026-09-05T06:00Z | 5,761 MW | -60 MW | 2,457 MW | 3,595 MW | 2,240 MW |
| 2026-09-05T07:00Z | 5,836 MW | -61 MW | 2,478 MW | 3,170 MW | 2,234 MW |
| 2026-09-05T08:00Z | 5,901 MW | -61 MW | 2,506 MW | 2,881 MW | 2,232 MW |
| 2026-09-05T09:00Z | 6,066 MW | -60 MW | 2,430 MW | 2,740 MW | 2,235 MW |
| 2026-09-05T10:00Z | 5,968 MW | -60 MW | 2,039 MW | 2,542 MW | 2,238 MW |
| 2026-09-05T11:00Z | 5,953 MW | -59 MW | 1,819 MW | 2,333 MW | 2,238 MW |
| 2026-09-05T12:00Z | 6,047 MW | -60 MW | 1,501 MW | 2,297 MW | 2,240 MW |
| 2026-09-05T13:00Z | 6,068 MW | 309 MW | 1,281 MW | 2,211 MW | 2,240 MW |
| 2026-09-05T14:00Z | 4,427 MW | 6,366 MW | 1,066 MW | 1,553 MW | 2,240 MW |
| 2026-09-05T15:00Z | 2,486 MW | 14,368 MW | 811 MW | 678 MW | 2,240 MW |
| 2026-09-05T16:00Z | 2,159 MW | 16,732 MW | 759 MW | 474 MW | 2,242 MW |
| 2026-09-05T17:00Z | 1,839 MW | 17,797 MW | 871 MW | 431 MW | 2,240 MW |
| 2026-09-05T18:00Z | 2,082 MW | 17,797 MW | 1,164 MW | 285 MW | 2,232 MW |
| 2026-09-05T19:00Z | 2,325 MW | 17,386 MW | 1,286 MW | 274 MW | 2,228 MW |
| 2026-09-05T20:00Z | 2,192 MW | 16,971 MW | 1,723 MW | 322 MW | 2,225 MW |
| 2026-09-05T21:00Z | 2,370 MW | 16,053 MW | 2,001 MW | 334 MW | 2,227 MW |
| 2026-09-05T22:00Z | 2,694 MW | 14,714 MW | 2,578 MW | 623 MW | 2,229 MW |
| 2026-09-05T23:00Z | 3,707 MW | 13,395 MW | 2,956 MW | 1,479 MW | 2,227 MW |
| 2026-09-06T00:00Z | 5,510 MW | 10,341 MW | 2,531 MW | 2,074 MW | 2,226 MW |
| 2026-09-06T01:00Z | 6,360 MW | 3,218 MW | 1,811 MW | 3,739 MW | 2,226 MW |
| 2026-09-06T02:00Z | 6,529 MW | -17 MW | 1,502 MW | 4,251 MW | 2,227 MW |
| 2026-09-06T03:00Z | 7,038 MW | -62 MW | 1,629 MW | 4,051 MW | 2,232 MW |
| 2026-09-06T04:00Z | 7,226 MW | -59 MW | 1,724 MW | 3,943 MW | 2,234 MW |
| 2026-09-06T05:00Z | 7,402 MW | -58 MW | 1,858 MW | 4,028 MW | 2,233 MW |
| 2026-09-06T06:00Z | 7,528 MW | -58 MW | 1,936 MW | 3,647 MW | 2,231 MW |
| 2026-09-06T07:00Z | 8,267 MW | -58 MW | 1,850 MW | 2,875 MW | 2,227 MW |
| 2026-09-06T08:00Z | 8,282 MW | -59 MW | 1,697 MW | 2,501 MW | 2,230 MW |
| 2026-09-06T09:00Z | 7,853 MW | -59 MW | 1,569 MW | 2,398 MW | 2,233 MW |
| 2026-09-06T10:00Z | 7,649 MW | -60 MW | 1,729 MW | 2,277 MW | 2,240 MW |
| 2026-09-06T11:00Z | 7,362 MW | -59 MW | 1,814 MW | 2,259 MW | 2,243 MW |
| 2026-09-06T12:00Z | 7,392 MW | -59 MW | 1,493 MW | 2,295 MW | 2,246 MW |
| 2026-09-06T13:00Z | 7,366 MW | 156 MW | 1,417 MW | 2,169 MW | 2,240 MW |
| 2026-09-06T14:00Z | 6,908 MW | 2,937 MW | 1,565 MW | 1,852 MW | 2,236 MW |
| 2026-09-06T15:00Z | 5,919 MW | 6,897 MW | 1,333 MW | 1,290 MW | 2,238 MW |
| 2026-09-06T16:00Z | 5,530 MW | 8,444 MW | 837 MW | 1,157 MW | 2,236 MW |
| 2026-09-06T17:00Z | 5,084 MW | 9,872 MW | 723 MW | 873 MW | 2,228 MW |
| 2026-09-06T18:00Z | 5,314 MW | 10,995 MW | 896 MW | 617 MW | 2,225 MW |
| 2026-09-06T19:00Z | 5,041 MW | 11,950 MW | 1,076 MW | 1,015 MW | 2,223 MW |
| 2026-09-06T20:00Z | 4,855 MW | 11,932 MW | 1,221 MW | 1,033 MW | 2,228 MW |
| 2026-09-06T21:00Z | 5,002 MW | 11,261 MW | 1,588 MW | 1,034 MW | 2,235 MW |
| 2026-09-06T22:00Z | 5,337 MW | 9,134 MW | 1,749 MW | 1,092 MW | 2,241 MW |
| 2026-09-06T23:00Z | 6,098 MW | 8,180 MW | 1,585 MW | 1,463 MW | 2,243 MW |
| 2026-09-07T00:00Z | 6,954 MW | 6,793 MW | 1,625 MW | 2,180 MW | 2,229 MW |
| 2026-09-07T01:00Z | 6,917 MW | 1,927 MW | 1,935 MW | 2,941 MW | 2,235 MW |
| 2026-09-07T02:00Z | 6,892 MW | 69 MW | 2,168 MW | 3,072 MW | 2,243 MW |
| 2026-09-07T03:00Z | 7,088 MW | 32 MW | 1,957 MW | 3,077 MW | 2,239 MW |
| 2026-09-07T04:00Z | 7,127 MW | 37 MW | 2,227 MW | 2,941 MW | 2,237 MW |
| 2026-09-07T05:00Z | 7,156 MW | 34 MW | 2,202 MW | 2,762 MW | 2,241 MW |
| 2026-09-07T06:00Z | 7,132 MW | 34 MW | 1,877 MW | 2,508 MW | 2,238 MW |
| 2026-09-07T07:00Z | 6,836 MW | 34 MW | 1,610 MW | 2,363 MW | 2,240 MW |
| 2026-09-07T08:00Z | 6,654 MW | 33 MW | 1,554 MW | 2,285 MW | 2,244 MW |
| 2026-09-07T09:00Z | 6,470 MW | 32 MW | 1,812 MW | 2,232 MW | 2,245 MW |
| 2026-09-07T10:00Z | 6,170 MW | 31 MW | 1,873 MW | 2,173 MW | 2,239 MW |
| 2026-09-07T11:00Z | 6,156 MW | 32 MW | 1,664 MW | 1,918 MW | 2,237 MW |
| 2026-09-07T12:00Z | 6,107 MW | 32 MW | 1,443 MW | 1,904 MW | 2,240 MW |
| 2026-09-07T13:00Z | 6,301 MW | 270 MW | 1,129 MW | 1,906 MW | 2,240 MW |
| 2026-09-07T14:00Z | 5,408 MW | 3,684 MW | 845 MW | 1,494 MW | 2,244 MW |
| 2026-09-07T15:00Z | 4,760 MW | 10,052 MW | 691 MW | 761 MW | 2,244 MW |
| 2026-09-07T16:00Z | 4,178 MW | 13,325 MW | 668 MW | 339 MW | 2,243 MW |
| 2026-09-07T17:00Z | 4,020 MW | 15,210 MW | 543 MW | 297 MW | 2,243 MW |
| 2026-09-07T18:00Z | 4,190 MW | 16,090 MW | 548 MW | 139 MW | 2,242 MW |
| 2026-09-07T19:00Z | 4,367 MW | 16,852 MW | 667 MW | 178 MW | 2,232 MW |
| 2026-09-07T20:00Z | 4,150 MW | 16,867 MW | 743 MW | 189 MW | 2,229 MW |
| 2026-09-07T21:00Z | 4,696 MW | 16,202 MW | 801 MW | 527 MW | 2,232 MW |
| 2026-09-07T22:00Z | 5,595 MW | 14,567 MW | 1,337 MW | 1,118 MW | 2,232 MW |
| 2026-09-07T23:00Z | 7,380 MW | 12,442 MW | 2,171 MW | 2,015 MW | 2,235 MW |
| 2026-09-08T00:00Z | 9,163 MW | 10,052 MW | 2,674 MW | 2,736 MW | 2,238 MW |
| 2026-09-08T01:00Z | 10,802 MW | 2,796 MW | 3,049 MW | 3,752 MW | 2,242 MW |
| 2026-09-08T02:00Z | 10,809 MW | 17 MW | 3,004 MW | 3,879 MW | 2,244 MW |
| 2026-09-08T03:00Z | 11,112 MW | -66 MW | 2,418 MW | 3,903 MW | 2,236 MW |
| 2026-09-08T04:00Z | 11,161 MW | -61 MW | 1,674 MW | 3,513 MW | 2,241 MW |
| 2026-09-08T05:00Z | 10,887 MW | -59 MW | 1,253 MW | 3,409 MW | 2,243 MW |
| 2026-09-08T06:00Z | 10,778 MW | -59 MW | 1,143 MW | 2,982 MW | 2,242 MW |
| 2026-09-08T07:00Z | 10,922 MW | -59 MW | 1,013 MW | 2,748 MW | 2,241 MW |
| 2026-09-08T08:00Z | 10,874 MW | -59 MW | 836 MW | 2,568 MW | 2,241 MW |
| 2026-09-08T09:00Z | 11,069 MW | -58 MW | 774 MW | 2,381 MW | 2,242 MW |
| 2026-09-08T10:00Z | 10,922 MW | -59 MW | 718 MW | 2,463 MW | 2,238 MW |
| 2026-09-08T11:00Z | 10,843 MW | -58 MW | 743 MW | 2,436 MW | 2,237 MW |
| 2026-09-08T12:00Z | 11,170 MW | -59 MW | 679 MW | 2,486 MW | 2,240 MW |
| 2026-09-08T13:00Z | 11,674 MW | 305 MW | 656 MW | 2,525 MW | 2,243 MW |
| 2026-09-08T14:00Z | 11,079 MW | 5,983 MW | 567 MW | 2,176 MW | 2,244 MW |
| 2026-09-08T15:00Z | 10,267 MW | 15,333 MW | 448 MW | 1,347 MW | 2,244 MW |
| 2026-09-08T16:00Z | 10,455 MW | 17,225 MW | 442 MW | 1,043 MW | 2,242 MW |
| 2026-09-08T17:00Z | 10,367 MW | 18,194 MW | 301 MW | 724 MW | 2,242 MW |
| 2026-09-08T18:00Z | 10,532 MW | 18,061 MW | 337 MW | 695 MW | 2,243 MW |
| 2026-09-08T19:00Z | 10,896 MW | 17,187 MW | 372 MW | 824 MW | 2,236 MW |
| 2026-09-08T20:00Z | 10,900 MW | 16,698 MW | 533 MW | 943 MW | 2,233 MW |
| 2026-09-08T21:00Z | 12,411 MW | 15,867 MW | 670 MW | 1,409 MW | 2,233 MW |
| 2026-09-08T22:00Z | 14,332 MW | 13,417 MW | 1,063 MW | 2,204 MW | 2,235 MW |
| 2026-09-08T23:00Z | 16,076 MW | 11,538 MW | 1,378 MW | 3,120 MW | 2,235 MW |
| 2026-09-09T00:00Z | 17,138 MW | 8,005 MW | 1,714 MW | 3,802 MW | 2,237 MW |
| 2026-09-09T01:00Z | 17,231 MW | 1,631 MW | 1,663 MW | 4,085 MW | 2,236 MW |
| 2026-09-09T02:00Z | 17,798 MW | -19 MW | 1,408 MW | 4,000 MW | 2,240 MW |
| 2026-09-09T03:00Z | 18,504 MW | -50 MW | 1,001 MW | 4,260 MW | 2,241 MW |
| 2026-09-09T04:00Z | 18,553 MW | -44 MW | 1,344 MW | 4,275 MW | 2,241 MW |
| 2026-09-09T05:00Z | 18,126 MW | -43 MW | 1,236 MW | 3,991 MW | 2,242 MW |
| 2026-09-09T06:00Z | 17,577 MW | -42 MW | 1,059 MW | 3,535 MW | 2,242 MW |
| 2026-09-09T07:00Z | 16,041 MW | -42 MW | 1,171 MW | 2,739 MW | 2,239 MW |
| 2026-09-09T08:00Z | 16,110 MW | -42 MW | 1,077 MW | 2,374 MW | 2,234 MW |
| 2026-09-09T09:00Z | 16,320 MW | -41 MW | 810 MW | 2,086 MW | 2,230 MW |
| 2026-09-09T10:00Z | 16,690 MW | -41 MW | 1,573 MW | 1,950 MW | 2,229 MW |
| 2026-09-09T11:00Z | 16,301 MW | -42 MW | 2,061 MW | 1,938 MW | 2,230 MW |
| 2026-09-09T12:00Z | 15,941 MW | -43 MW | 1,857 MW | 1,989 MW | 2,230 MW |
| 2026-09-09T13:00Z | 16,080 MW | 140 MW | 1,152 MW | 2,698 MW | 2,229 MW |
| 2026-09-09T14:00Z | 16,308 MW | 4,578 MW | 460 MW | 2,345 MW | 2,230 MW |
| 2026-09-09T15:00Z | 16,120 MW | 11,146 MW | 288 MW | 1,647 MW | 2,230 MW |
| 2026-09-09T16:00Z | 15,976 MW | 14,480 MW | 302 MW | 1,360 MW | 2,229 MW |
| 2026-09-09T17:00Z | 15,870 MW | 15,654 MW | 360 MW | 1,042 MW | 2,230 MW |
| 2026-09-09T18:00Z | 16,842 MW | 17,040 MW | 437 MW | 629 MW | 2,230 MW |
| 2026-09-09T19:00Z | 17,632 MW | 17,840 MW | 478 MW | 846 MW | 2,225 MW |
| 2026-09-09T20:00Z | 18,342 MW | 18,014 MW | 572 MW | 1,312 MW | 2,223 MW |
| 2026-09-09T21:00Z | 19,083 MW | 16,997 MW | 856 MW | 1,856 MW | 2,222 MW |
| 2026-09-09T22:00Z | 20,150 MW | 17,114 MW | 911 MW | 2,714 MW | 2,223 MW |
| 2026-09-09T23:00Z | 20,810 MW | 16,139 MW | 779 MW | 3,372 MW | 2,225 MW |
| 2026-09-10T00:00Z | 21,350 MW | 11,637 MW | 1,543 MW | 3,805 MW | 2,226 MW |
| 2026-09-10T01:00Z | 22,120 MW | 2,762 MW | 1,700 MW | 4,103 MW | 2,230 MW |
| 2026-09-10T02:00Z | 22,233 MW | -9 MW | 2,390 MW | 4,009 MW | 2,232 MW |
| 2026-09-10T03:00Z | 21,997 MW | -68 MW | 2,724 MW | 3,988 MW | 2,233 MW |
| 2026-09-10T04:00Z | 21,537 MW | -62 MW | 2,622 MW | 4,097 MW | 2,233 MW |
| 2026-09-10T05:00Z | 21,087 MW | -60 MW | 2,611 MW | 3,884 MW | 2,231 MW |
| 2026-09-10T06:00Z | 19,630 MW | -60 MW | 2,575 MW | 3,292 MW | 2,228 MW |
| 2026-09-10T07:00Z | 17,086 MW | -59 MW | 2,689 MW | 3,291 MW | 2,224 MW |
| 2026-09-10T08:00Z | 16,412 MW | -60 MW | 2,754 MW | 3,073 MW | 2,224 MW |
| 2026-09-10T09:00Z | 15,709 MW | -60 MW | 2,865 MW | 2,626 MW | 2,224 MW |
| 2026-09-10T10:00Z | 15,217 MW | -60 MW | 3,146 MW | 2,547 MW | 2,226 MW |
| 2026-09-10T11:00Z | 14,994 MW | -59 MW | 3,310 MW | 2,499 MW | 2,226 MW |
| 2026-09-10T12:00Z | 14,568 MW | -59 MW | 3,429 MW | 2,360 MW | 2,227 MW |
| 2026-09-10T13:00Z | 14,522 MW | 215 MW | 3,431 MW | 2,546 MW | 2,228 MW |
| 2026-09-10T14:00Z | 13,446 MW | 5,325 MW | 3,100 MW | 2,298 MW | 2,231 MW |
| 2026-09-10T15:00Z | 11,664 MW | 13,610 MW | 2,586 MW | 1,961 MW | 2,229 MW |
| 2026-09-10T16:00Z | 10,876 MW | 17,715 MW | 2,278 MW | 1,988 MW | 2,226 MW |
| 2026-09-10T17:00Z | 11,200 MW | 18,822 MW | 2,026 MW | 1,904 MW | 2,225 MW |
| 2026-09-10T18:00Z | 12,061 MW | 19,318 MW | 1,789 MW | 1,807 MW | 2,220 MW |
| 2026-09-10T19:00Z | 13,429 MW | 19,159 MW | 1,917 MW | 1,546 MW | 2,218 MW |
| 2026-09-10T20:00Z | 14,897 MW | 18,855 MW | 2,414 MW | 1,834 MW | 2,218 MW |
| 2026-09-10T21:00Z | 15,053 MW | 18,125 MW | 3,312 MW | 2,241 MW | 2,217 MW |
| 2026-09-10T22:00Z | 15,983 MW | 17,189 MW | 4,088 MW | 2,591 MW | 2,219 MW |
| 2026-09-10T23:00Z | 16,442 MW | 15,465 MW | 4,487 MW | 2,916 MW | 2,223 MW |
| 2026-09-11T00:00Z | 17,345 MW | 10,690 MW | 4,998 MW | 3,703 MW | 2,225 MW |
| 2026-09-11T01:00Z | 18,075 MW | 2,537 MW | 4,982 MW | 3,885 MW | 2,225 MW |
| 2026-09-11T02:00Z | 17,929 MW | -13 MW | 4,815 MW | 4,015 MW | 2,228 MW |
| 2026-09-11T03:00Z | 17,142 MW | -37 MW | 4,818 MW | 4,150 MW | 2,231 MW |
| 2026-09-11T04:00Z | 16,597 MW | -30 MW | 5,420 MW | 3,912 MW | 2,239 MW |
| 2026-09-11T05:00Z | 14,825 MW | -45 MW | 6,186 MW | 3,553 MW | 2,241 MW |
| 2026-09-11T06:00Z | 13,417 MW | -58 MW | 6,460 MW | 3,076 MW | 2,242 MW |
| 2026-09-11T07:00Z | 12,145 MW | -57 MW | 6,268 MW | 2,366 MW | 2,242 MW |
| 2026-09-11T08:00Z | 11,477 MW | -57 MW | 6,191 MW | 2,061 MW | 2,238 MW |
| 2026-09-11T09:00Z | 10,578 MW | -57 MW | 5,993 MW | 2,005 MW | 2,239 MW |
| 2026-09-11T10:00Z | 9,789 MW | -58 MW | 6,338 MW | 1,954 MW | 2,239 MW |
| 2026-09-11T11:00Z | 10,219 MW | -58 MW | 6,257 MW | 1,938 MW | 2,239 MW |
| 2026-09-11T12:00Z | 9,601 MW | -58 MW | 6,316 MW | 1,944 MW | 2,241 MW |
| 2026-09-11T13:00Z | 10,038 MW | 209 MW | 5,999 MW | 1,973 MW | 2,243 MW |
| 2026-09-11T14:00Z | 9,063 MW | 5,979 MW | 5,719 MW | 1,726 MW | 2,244 MW |
| 2026-09-11T15:00Z | 7,223 MW | 15,267 MW | 5,172 MW | 1,414 MW | 2,244 MW |
| 2026-09-11T16:00Z | 6,706 MW | 18,934 MW | 5,219 MW | 1,075 MW | 2,242 MW |
| 2026-09-11T17:00Z | 6,511 MW | 19,823 MW | 4,836 MW | 1,049 MW | 2,242 MW |
| 2026-09-11T18:00Z | 6,868 MW | 20,304 MW | 4,572 MW | 1,031 MW | 2,241 MW |
| 2026-09-11T19:00Z | 6,979 MW | 20,257 MW | 4,751 MW | 968 MW | 2,238 MW |
| 2026-09-11T20:00Z | 7,568 MW | 20,066 MW | 4,926 MW | 878 MW | 2,233 MW |
| 2026-09-11T21:00Z | 8,020 MW | 19,685 MW | 5,297 MW | 1,205 MW | 2,228 MW |
| 2026-09-11T22:00Z | 9,461 MW | 18,902 MW | 5,390 MW | 1,647 MW | 2,226 MW |
| 2026-09-11T23:00Z | 11,086 MW | 17,069 MW | 5,179 MW | 2,106 MW | 2,230 MW |
| 2026-09-12T00:00Z | 12,701 MW | 11,928 MW | 5,075 MW | 2,931 MW | 2,234 MW |
| 2026-09-12T01:00Z | 13,405 MW | 2,735 MW | 4,820 MW | 3,342 MW | 2,237 MW |
| 2026-09-12T02:00Z | 13,482 MW | -53 MW | 4,974 MW | 3,324 MW | 2,239 MW |
| 2026-09-12T03:00Z | 13,266 MW | -64 MW | 5,217 MW | 3,118 MW | 2,243 MW |
| 2026-09-12T04:00Z | 13,416 MW | -59 MW | 5,778 MW | 2,993 MW | 2,244 MW |
| 2026-09-12T05:00Z | 13,402 MW | -58 MW | 5,666 MW | 3,045 MW | 2,239 MW |
| 2026-09-12T06:00Z | 12,752 MW | -58 MW | 5,630 MW | 2,952 MW | 2,115 MW |
| 2026-09-12T07:00Z | 12,284 MW | -57 MW | 5,887 MW | 2,502 MW | 1,814 MW |
| 2026-09-12T08:00Z | 11,324 MW | -56 MW | 5,858 MW | 2,291 MW | 1,576 MW |
| 2026-09-12T09:00Z | 11,027 MW | -57 MW | 5,142 MW | 2,127 MW | 1,565 MW |
| 2026-09-12T10:00Z | 10,507 MW | -57 MW | 4,588 MW | 2,098 MW | 1,567 MW |
| 2026-09-12T11:00Z | 10,261 MW | -57 MW | 4,546 MW | 2,091 MW | 1,567 MW |
| 2026-09-12T12:00Z | 9,853 MW | -57 MW | 4,461 MW | 2,223 MW | 1,568 MW |
| 2026-09-12T13:00Z | 9,578 MW | 246 MW | 3,831 MW | 2,223 MW | 1,572 MW |
| 2026-09-12T14:00Z | 6,852 MW | 6,740 MW | 3,552 MW | 1,212 MW | 1,572 MW |
| 2026-09-12T15:00Z | 5,247 MW | 15,931 MW | 3,426 MW | 728 MW | 1,572 MW |
| 2026-09-12T16:00Z | 4,948 MW | 18,709 MW | 2,715 MW | 706 MW | 1,571 MW |
| 2026-09-12T17:00Z | 4,966 MW | 19,670 MW | 2,381 MW | 460 MW | 1,570 MW |
| 2026-09-12T18:00Z | 4,733 MW | 20,126 MW | 2,341 MW | 251 MW | 1,570 MW |
| 2026-09-12T19:00Z | 5,124 MW | 20,020 MW | 2,705 MW | 596 MW | 1,567 MW |
| 2026-09-12T20:00Z | 5,469 MW | 20,230 MW | 2,867 MW | 86 MW | 1,565 MW |
| 2026-09-12T21:00Z | 5,533 MW | 19,737 MW | 3,024 MW | 250 MW | 1,562 MW |
| 2026-09-12T22:00Z | 5,927 MW | 18,922 MW | 3,364 MW | 799 MW | 1,565 MW |
| 2026-09-12T23:00Z | 6,644 MW | 17,272 MW | 3,592 MW | 1,073 MW | 1,572 MW |
| 2026-09-13T00:00Z | 8,201 MW | 11,686 MW | 3,834 MW | 2,162 MW | 1,569 MW |
| 2026-09-13T01:00Z | 8,798 MW | 2,556 MW | 4,064 MW | 2,656 MW | 1,567 MW |
| 2026-09-13T02:00Z | 9,127 MW | -26 MW | 4,276 MW | 2,579 MW | 1,564 MW |
| 2026-09-13T03:00Z | 8,990 MW | -68 MW | 4,356 MW | 2,638 MW | 1,566 MW |
| 2026-09-13T04:00Z | 8,984 MW | -60 MW | 3,981 MW | 2,621 MW | 1,570 MW |
| 2026-09-13T05:00Z | 9,198 MW | -58 MW | 4,000 MW | 2,579 MW | 1,572 MW |
| 2026-09-13T06:00Z | 9,332 MW | -59 MW | 4,496 MW | 2,318 MW | 1,577 MW |
| 2026-09-13T07:00Z | 9,073 MW | -58 MW | 4,316 MW | 2,425 MW | 1,579 MW |
| 2026-09-13T08:00Z | 8,911 MW | -57 MW | 4,420 MW | 2,151 MW | 1,579 MW |
| 2026-09-13T09:00Z | 8,465 MW | -58 MW | 4,253 MW | 2,165 MW | 1,575 MW |
| 2026-09-13T10:00Z | 8,104 MW | -58 MW | 3,991 MW | 1,801 MW | 1,572 MW |
| 2026-09-13T11:00Z | 7,829 MW | -57 MW | 3,669 MW | 1,811 MW | 1,574 MW |
| 2026-09-13T12:00Z | 7,681 MW | -57 MW | 3,091 MW | 1,794 MW | 1,577 MW |
| 2026-09-13T13:00Z | 7,279 MW | 242 MW | 2,912 MW | 2,068 MW | 1,578 MW |
| 2026-09-13T14:00Z | 4,758 MW | 6,690 MW | 2,647 MW | 1,451 MW | 1,580 MW |
| 2026-09-13T15:00Z | 1,736 MW | 15,929 MW | 2,537 MW | 537 MW | 1,579 MW |
| 2026-09-13T16:00Z | 1,446 MW | 18,869 MW | 2,653 MW | 280 MW | 1,577 MW |
| 2026-09-13T17:00Z | 1,421 MW | 19,768 MW | 2,803 MW | 134 MW | 1,577 MW |
| 2026-09-13T18:00Z | 1,233 MW | 20,224 MW | 3,399 MW | 135 MW | 1,579 MW |
| 2026-09-13T19:00Z | 1,199 MW | 20,006 MW | 4,208 MW | 118 MW | 1,580 MW |
| 2026-09-13T20:00Z | 1,158 MW | 20,113 MW | 4,880 MW | 99 MW | 1,581 MW |
| 2026-09-13T21:00Z | 1,295 MW | 19,901 MW | 4,896 MW | 139 MW | 1,579 MW |
| 2026-09-13T22:00Z | 1,582 MW | 18,957 MW | 5,464 MW | 260 MW | 1,578 MW |
| 2026-09-13T23:00Z | 2,211 MW | 17,451 MW | 4,971 MW | 416 MW | 1,579 MW |
| 2026-09-14T00:00Z | 3,669 MW | 12,051 MW | 4,882 MW | 1,718 MW | 1,578 MW |
| 2026-09-14T01:00Z | 4,502 MW | 2,599 MW | 5,438 MW | 2,877 MW | 1,580 MW |
| 2026-09-14T02:00Z | 4,765 MW | -54 MW | 5,375 MW | 2,899 MW | 1,580 MW |
| 2026-09-14T03:00Z | 4,940 MW | -66 MW | 5,241 MW | 2,962 MW | 1,581 MW |
| 2026-09-14T04:00Z | 5,120 MW | -63 MW | 5,011 MW | 2,924 MW | 1,579 MW |
| 2026-09-14T05:00Z | 5,334 MW | -60 MW | 4,958 MW | 2,766 MW | 1,612 MW |
| 2026-09-14T06:00Z | 5,453 MW | -62 MW | 5,319 MW | 2,604 MW | 1,712 MW |
| 2026-09-14T07:00Z | 5,540 MW | -60 MW | 5,253 MW | 2,205 MW | 1,974 MW |
| 2026-09-14T08:00Z | 5,257 MW | -60 MW | 5,045 MW | 2,003 MW | 2,200 MW |
| 2026-09-14T09:00Z | 5,025 MW | -61 MW | 5,760 MW | 2,065 MW | 2,241 MW |
| 2026-09-14T10:00Z | 5,026 MW | -61 MW | 5,479 MW | 1,759 MW | 2,256 MW |
| 2026-09-14T11:00Z | 5,013 MW | -60 MW | 4,970 MW | 1,766 MW | 2,256 MW |
| 2026-09-14T12:00Z | 5,114 MW | -60 MW | 4,801 MW | 1,931 MW | 2,258 MW |
| 2026-09-14T13:00Z | 5,772 MW | 231 MW | 4,454 MW | 2,054 MW | 2,260 MW |
| 2026-09-14T14:00Z | 4,909 MW | 6,572 MW | 3,639 MW | 1,451 MW | 2,261 MW |
| 2026-09-14T15:00Z | 3,254 MW | 15,985 MW | 2,591 MW | 1,001 MW | 2,262 MW |
| 2026-09-14T16:00Z | 2,886 MW | 19,035 MW | 1,639 MW | 738 MW | 2,264 MW |
| 2026-09-14T17:00Z | 2,556 MW | 19,740 MW | 1,696 MW | 701 MW | 2,263 MW |
| 2026-09-14T18:00Z | 2,577 MW | 20,045 MW | 1,933 MW | 677 MW | 2,264 MW |
| 2026-09-14T19:00Z | 2,593 MW | 20,125 MW | 2,176 MW | 366 MW | 2,264 MW |
| 2026-09-14T20:00Z | 2,531 MW | 19,646 MW | 1,778 MW | 360 MW | 2,263 MW |
| 2026-09-14T21:00Z | 2,602 MW | 19,277 MW | 1,643 MW | 630 MW | 2,261 MW |
| 2026-09-14T22:00Z | 3,336 MW | 18,353 MW | 2,125 MW | 1,077 MW | 2,264 MW |
| 2026-09-14T23:00Z | 4,215 MW | 17,212 MW | 2,338 MW | 1,669 MW | 2,261 MW |
| 2026-09-15T00:00Z | 5,722 MW | 11,797 MW | 3,046 MW | 2,494 MW | 2,262 MW |
| 2026-09-15T01:00Z | 6,620 MW | 2,354 MW | 3,833 MW | 3,444 MW | 2,262 MW |
| 2026-09-15T02:00Z | 6,794 MW | -54 MW | 3,750 MW | 3,468 MW | 2,258 MW |
| 2026-09-15T03:00Z | 6,993 MW | -62 MW | 3,570 MW | 3,298 MW | 2,257 MW |
| 2026-09-15T04:00Z | 7,021 MW | -57 MW | 3,172 MW | 3,378 MW | 2,261 MW |
| 2026-09-15T05:00Z | 7,119 MW | -55 MW | 3,816 MW | 3,291 MW | 2,262 MW |
| 2026-09-15T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T16:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T16:00Z.
Day by Day
Daily totals, Pacific time dates, through 2026-09-13| Date (Pacific time) | Demand |
|---|---|
| 2025-08-11 | 769 GWh |
| 2025-08-12 | 760 GWh |
| 2025-08-13 | 749 GWh |
| 2025-08-14 | 733 GWh |
| 2025-08-15 | 717 GWh |
| 2025-08-16 | 665 GWh |
| 2025-08-17 | 640 GWh |
| 2025-08-18 | 694 GWh |
| 2025-08-19 | 736 GWh |
| 2025-08-20 | 782 GWh |
| 2025-08-21 | 835 GWh |
| 2025-08-22 | 845 GWh |
| 2025-08-23 | 776 GWh |
| 2025-08-24 | 755 GWh |
| 2025-08-25 | 801 GWh |
| 2025-08-26 | 780 GWh |
| 2025-08-27 | 779 GWh |
| 2025-08-28 | 750 GWh |
| 2025-08-29 | 764 GWh |
| 2025-08-30 | 743 GWh |
| 2025-08-31 | 748 GWh |
| 2025-09-01 | 777 GWh |
| 2025-09-02 | 827 GWh |
| 2025-09-03 | 830 GWh |
| 2025-09-04 | 803 GWh |
| 2025-09-05 | 753 GWh |
| 2025-09-06 | 699 GWh |
| 2025-09-07 | 690 GWh |
| 2025-09-08 | 738 GWh |
| 2025-09-09 | 712 GWh |
| 2025-09-10 | 697 GWh |
| 2025-09-11 | 677 GWh |
| 2025-09-12 | 675 GWh |
| 2025-09-13 | 636 GWh |
| 2025-09-14 | 625 GWh |
| 2025-09-15 | 726 GWh |
| 2025-09-16 | 781 GWh |
| 2025-09-17 | 791 GWh |
| 2025-09-18 | 743 GWh |
| 2025-09-19 | 718 GWh |
| 2025-09-20 | 678 GWh |
| 2025-09-21 | 643 GWh |
| 2025-09-22 | 720 GWh |
| 2025-09-23 | 771 GWh |
| 2025-09-24 | 755 GWh |
| 2025-09-25 | 700 GWh |
| 2025-09-26 | 677 GWh |
| 2025-09-27 | 629 GWh |
| 2025-09-28 | 609 GWh |
| 2025-09-29 | 665 GWh |
| 2025-09-30 | 664 GWh |
| 2025-10-01 | 667 GWh |
| 2025-10-02 | 661 GWh |
| 2025-10-03 | 639 GWh |
| 2025-10-04 | 564 GWh |
| 2025-10-05 | 563 GWh |
| 2025-10-06 | 625 GWh |
| 2025-10-07 | 636 GWh |
| 2025-10-08 | 632 GWh |
| 2025-10-09 | 621 GWh |
| 2025-10-10 | 626 GWh |
| 2025-10-11 | 575 GWh |
| 2025-10-12 | 546 GWh |
| 2025-10-13 | 593 GWh |
| 2025-10-14 | 594 GWh |
| 2025-10-15 | 579 GWh |
| 2025-10-16 | 579 GWh |
| 2025-10-17 | 579 GWh |
| 2025-10-18 | 560 GWh |
| 2025-10-19 | 553 GWh |
| 2025-10-20 | 603 GWh |
| 2025-10-21 | 608 GWh |
| 2025-10-22 | 609 GWh |
| 2025-10-23 | 596 GWh |
| 2025-10-24 | 594 GWh |
| 2025-10-25 | 567 GWh |
| 2025-10-26 | 543 GWh |
| 2025-10-27 | 593 GWh |
| 2025-10-28 | 607 GWh |
| 2025-10-29 | 624 GWh |
| 2025-10-30 | 617 GWh |
| 2025-10-31 | 598 GWh |
| 2025-11-01 | 550 GWh |
| 2025-11-02 | 564 GWh |
| 2025-11-03 | 585 GWh |
| 2025-11-04 | 594 GWh |
| 2025-11-05 | 599 GWh |
| 2025-11-06 | 597 GWh |
| 2025-11-07 | 600 GWh |
| 2025-11-08 | 563 GWh |
| 2025-11-09 | 553 GWh |
| 2025-11-10 | 613 GWh |
| 2025-11-11 | 604 GWh |
| 2025-11-12 | 604 GWh |
| 2025-11-13 | 601 GWh |
| 2025-11-14 | 581 GWh |
| 2025-11-15 | 544 GWh |
| 2025-11-16 | 532 GWh |
| 2025-11-17 | 577 GWh |
| 2025-11-18 | 567 GWh |
| 2025-11-19 | 578 GWh |
| 2025-11-20 | 603 GWh |
| 2025-11-21 | 566 GWh |
| 2025-11-22 | 535 GWh |
| 2025-11-23 | 517 GWh |
| 2025-11-24 | 576 GWh |
| 2025-11-25 | 589 GWh |
| 2025-11-26 | 597 GWh |
| 2025-11-27 | 552 GWh |
| 2025-11-28 | 556 GWh |
| 2025-11-29 | 551 GWh |
| 2025-11-30 | 551 GWh |
| 2025-12-01 | 605 GWh |
| 2025-12-02 | 606 GWh |
| 2025-12-03 | 617 GWh |
| 2025-12-04 | 616 GWh |
| 2025-12-05 | 613 GWh |
| 2025-12-06 | 582 GWh |
| 2025-12-07 | 569 GWh |
| 2025-12-08 | 628 GWh |
| 2025-12-09 | 641 GWh |
| 2025-12-10 | 639 GWh |
| 2025-12-11 | 638 GWh |
| 2025-12-12 | 628 GWh |
| 2025-12-13 | 593 GWh |
| 2025-12-14 | 588 GWh |
| 2025-12-15 | 639 GWh |
| 2025-12-16 | 636 GWh |
| 2025-12-17 | 626 GWh |
| 2025-12-18 | 609 GWh |
| 2025-12-19 | 612 GWh |
| 2025-12-20 | 575 GWh |
| 2025-12-21 | 556 GWh |
| 2025-12-22 | 597 GWh |
| 2025-12-23 | 603 GWh |
| 2025-12-24 | 570 GWh |
| 2025-12-25 | 534 GWh |
| 2025-12-26 | 546 GWh |
| 2025-12-27 | 541 GWh |
| 2025-12-28 | 550 GWh |
| 2025-12-29 | 587 GWh |
| 2025-12-30 | 597 GWh |
| 2025-12-31 | 577 GWh |
| 2026-01-01 | 532 GWh |
| 2026-01-02 | 558 GWh |
| 2026-01-03 | 541 GWh |
| 2026-01-04 | 570 GWh |
| 2026-01-05 | 601 GWh |
| 2026-01-06 | 595 GWh |
| 2026-01-07 | 591 GWh |
| 2026-01-08 | 608 GWh |
| 2026-01-09 | 622 GWh |
| 2026-01-10 | 578 GWh |
| 2026-01-11 | 561 GWh |
| 2026-01-12 | 604 GWh |
| 2026-01-13 | 601 GWh |
| 2026-01-14 | 602 GWh |
| 2026-01-15 | 608 GWh |
| 2026-01-16 | 598 GWh |
| 2026-01-17 | 559 GWh |
| 2026-01-18 | 544 GWh |
| 2026-01-19 | 581 GWh |
| 2026-01-20 | 612 GWh |
| 2026-01-21 | 608 GWh |
| 2026-01-22 | 607 GWh |
| 2026-01-23 | 593 GWh |
| 2026-01-24 | 563 GWh |
| 2026-01-25 | 566 GWh |
| 2026-01-26 | 601 GWh |
| 2026-01-27 | 609 GWh |
| 2026-01-28 | 604 GWh |
| 2026-01-29 | 603 GWh |
| 2026-01-30 | 588 GWh |
| 2026-01-31 | 554 GWh |
| 2026-02-01 | 538 GWh |
| 2026-02-02 | 574 GWh |
| 2026-02-03 | 589 GWh |
| 2026-02-04 | 594 GWh |
| 2026-02-05 | 576 GWh |
| 2026-02-06 | 574 GWh |
| 2026-02-07 | 535 GWh |
| 2026-02-08 | 520 GWh |
| 2026-02-09 | 575 GWh |
| 2026-02-10 | 589 GWh |
| 2026-02-11 | 588 GWh |
| 2026-02-12 | 567 GWh |
| 2026-02-13 | 561 GWh |
| 2026-02-14 | 541 GWh |
| 2026-02-15 | 528 GWh |
| 2026-02-16 | 604 GWh |
| 2026-02-17 | 628 GWh |
| 2026-02-18 | 610 GWh |
| 2026-02-19 | 634 GWh |
| 2026-02-20 | 619 GWh |
| 2026-02-21 | 562 GWh |
| 2026-02-22 | 532 GWh |
| 2026-02-23 | 587 GWh |
| 2026-02-24 | 595 GWh |
| 2026-02-25 | 595 GWh |
| 2026-02-26 | 579 GWh |
| 2026-02-27 | 593 GWh |
| 2026-02-28 | 563 GWh |
| 2026-03-01 | 547 GWh |
| 2026-03-02 | 577 GWh |
| 2026-03-03 | 565 GWh |
| 2026-03-04 | 570 GWh |
| 2026-03-05 | 561 GWh |
| 2026-03-06 | 558 GWh |
| 2026-03-07 | 525 GWh |
| 2026-03-08 | 500 GWh |
| 2026-03-09 | 566 GWh |
| 2026-03-10 | 574 GWh |
| 2026-03-11 | 573 GWh |
| 2026-03-12 | 603 GWh |
| 2026-03-13 | 611 GWh |
| 2026-03-14 | 548 GWh |
| 2026-03-15 | 531 GWh |
| 2026-03-16 | 619 GWh |
| 2026-03-17 | 666 GWh |
| 2026-03-18 | 695 GWh |
| 2026-03-19 | 695 GWh |
| 2026-03-20 | 708 GWh |
| 2026-03-21 | 618 GWh |
| 2026-03-22 | 561 GWh |
| 2026-03-23 | 628 GWh |
| 2026-03-24 | 636 GWh |
| 2026-03-25 | 630 GWh |
| 2026-03-26 | 623 GWh |
| 2026-03-27 | 611 GWh |
| 2026-03-28 | 563 GWh |
| 2026-03-29 | 553 GWh |
| 2026-03-30 | 612 GWh |
| 2026-03-31 | 611 GWh |
| 2026-04-01 | 601 GWh |
| 2026-04-02 | 587 GWh |
| 2026-04-03 | 564 GWh |
| 2026-04-04 | 541 GWh |
| 2026-04-05 | 531 GWh |
| 2026-04-06 | 595 GWh |
| 2026-04-07 | 594 GWh |
| 2026-04-08 | 605 GWh |
| 2026-04-09 | 617 GWh |
| 2026-04-10 | 608 GWh |
| 2026-04-11 | 557 GWh |
| 2026-04-12 | 536 GWh |
| 2026-04-13 | 568 GWh |
| 2026-04-14 | 556 GWh |
| 2026-04-15 | 571 GWh |
| 2026-04-16 | 566 GWh |
| 2026-04-17 | 556 GWh |
| 2026-04-18 | 528 GWh |
| 2026-04-19 | 519 GWh |
| 2026-04-20 | 581 GWh |
| 2026-04-21 | 590 GWh |
| 2026-04-22 | 565 GWh |
| 2026-04-23 | 555 GWh |
| 2026-04-24 | 559 GWh |
| 2026-04-25 | 544 GWh |
| 2026-04-26 | 514 GWh |
| 2026-04-27 | 537 GWh |
| 2026-04-28 | 542 GWh |
| 2026-04-29 | 557 GWh |
| 2026-04-30 | 570 GWh |
| 2026-05-01 | 589 GWh |
| 2026-05-02 | 557 GWh |
| 2026-05-03 | 533 GWh |
| 2026-05-04 | 589 GWh |
| 2026-05-05 | 594 GWh |
| 2026-05-06 | 581 GWh |
| 2026-05-07 | 601 GWh |
| 2026-05-08 | 609 GWh |
| 2026-05-09 | 570 GWh |
| 2026-05-10 | 562 GWh |
| 2026-05-11 | 652 GWh |
| 2026-05-12 | 640 GWh |
| 2026-05-13 | 608 GWh |
| 2026-05-14 | 616 GWh |
| 2026-05-15 | 624 GWh |
| 2026-05-16 | 558 GWh |
| 2026-05-17 | 519 GWh |
| 2026-05-18 | 582 GWh |
| 2026-05-19 | 631 GWh |
| 2026-05-20 | 656 GWh |
| 2026-05-21 | 664 GWh |
| 2026-05-22 | 641 GWh |
| 2026-05-23 | 577 GWh |
| 2026-05-24 | 554 GWh |
| 2026-05-25 | 561 GWh |
| 2026-05-26 | 589 GWh |
| 2026-05-27 | 599 GWh |
| 2026-05-28 | 591 GWh |
| 2026-05-29 | 604 GWh |
| 2026-05-30 | 550 GWh |
| 2026-05-31 | 548 GWh |
| 2026-06-01 | 641 GWh |
| 2026-06-02 | 649 GWh |
| 2026-06-03 | 668 GWh |
| 2026-06-04 | 678 GWh |
| 2026-06-05 | 687 GWh |
| 2026-06-06 | 608 GWh |
| 2026-06-07 | 569 GWh |
| 2026-06-08 | 632 GWh |
| 2026-06-09 | 664 GWh |
| 2026-06-10 | 727 GWh |
| 2026-06-11 | 767 GWh |
| 2026-06-12 | 769 GWh |
| 2026-06-13 | 717 GWh |
| 2026-06-14 | 672 GWh |
| 2026-06-15 | 737 GWh |
| 2026-06-16 | 732 GWh |
| 2026-06-17 | 712 GWh |
| 2026-06-18 | 681 GWh |
| 2026-06-19 | 652 GWh |
| 2026-06-20 | 594 GWh |
| 2026-06-21 | 585 GWh |
| 2026-06-22 | 675 GWh |
| 2026-06-23 | 697 GWh |
| 2026-06-24 | 691 GWh |
| 2026-06-25 | 690 GWh |
| 2026-06-26 | 668 GWh |
| 2026-06-27 | 607 GWh |
| 2026-06-28 | 570 GWh |
| 2026-06-29 | 649 GWh |
| 2026-06-30 | 663 GWh |
| 2026-07-01 | 655 GWh |
| 2026-07-02 | 666 GWh |
| 2026-07-03 | 653 GWh |
| 2026-07-04 | 648 GWh |
| 2026-07-05 | 653 GWh |
| 2026-07-06 | 712 GWh |
| 2026-07-07 | 718 GWh |
| 2026-07-08 | 727 GWh |
| 2026-07-09 | 744 GWh |
| 2026-07-10 | 741 GWh |
| 2026-07-11 | 695 GWh |
| 2026-07-12 | 691 GWh |
| 2026-07-13 | 773 GWh |
| 2026-07-14 | 838 GWh |
| 2026-07-15 | 865 GWh |
| 2026-07-16 | 812 GWh |
| 2026-07-17 | 778 GWh |
| 2026-07-18 | 743 GWh |
| 2026-07-19 | 732 GWh |
| 2026-07-20 | 795 GWh |
| 2026-07-21 | 839 GWh |
| 2026-07-22 | 823 GWh |
| 2026-07-23 | 820 GWh |
| 2026-07-24 | 827 GWh |
| 2026-07-25 | 772 GWh |
| 2026-07-26 | 746 GWh |
| 2026-07-27 | 804 GWh |
| 2026-07-28 | 792 GWh |
| 2026-07-29 | 792 GWh |
| 2026-07-30 | 810 GWh |
| 2026-07-31 | 822 GWh |
| 2026-08-01 | 795 GWh |
| 2026-08-02 | 791 GWh |
| 2026-08-03 | 857 GWh |
| 2026-08-04 | 836 GWh |
| 2026-08-05 | 824 GWh |
| 2026-08-06 | 833 GWh |
| 2026-08-07 | 844 GWh |
| 2026-08-08 | 805 GWh |
| 2026-08-09 | 801 GWh |
| 2026-08-10 | 858 GWh |
| 2026-08-11 | 819 GWh |
| 2026-08-12 | 810 GWh |
| 2026-08-13 | 764 GWh |
| 2026-08-14 | 748 GWh |
| 2026-08-15 | 703 GWh |
| 2026-08-16 | 713 GWh |
| 2026-08-17 | 796 GWh |
| 2026-08-18 | 814 GWh |
| 2026-08-19 | 838 GWh |
| 2026-08-20 | 828 GWh |
| 2026-08-21 | 848 GWh |
| 2026-08-22 | 796 GWh |
| 2026-08-23 | 802 GWh |
| 2026-08-24 | 870 GWh |
| 2026-08-25 | 886 GWh |
| 2026-08-26 | 906 GWh |
| 2026-08-27 | 910 GWh |
| 2026-08-28 | 897 GWh |
| 2026-08-29 | 815 GWh |
| 2026-08-30 | 754 GWh |
| 2026-08-31 | 764 GWh |
| 2026-09-01 | 718 GWh |
| 2026-09-02 | 705 GWh |
| 2026-09-03 | 708 GWh |
| 2026-09-04 | 700 GWh |
| 2026-09-05 | 665 GWh |
| 2026-09-06 | 627 GWh |
| 2026-09-07 | 720 GWh |
| 2026-09-08 | 850 GWh |
| 2026-09-09 | 965 GWh |
| 2026-09-10 | 963 GWh |
| 2026-09-11 | 874 GWh |
| 2026-09-12 | 760 GWh |
| 2026-09-13 | 695 GWh |
| 2026-09-14 | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 167 TWh | 119 TWh | Solar 33.3% | 256 |
| 2025 | 224 TWh | 186 TWh | Gas 42.0% | 365 |
| 2024 | 224 TWh | 191 TWh | Gas 44.5% | 366 |
| 2023 | 218 TWh | 184 TWh | Gas 47.7% | 365 |
| 2022 | 224 TWh | 170 TWh | Gas 48.7% | 365 |
| 2021 | 219 TWh | 159 TWh | Gas 49.8% | 365 |
| 2020 | 218 TWh | 139 TWh | Gas 53.1% | 366 |
| 2019 | 214 TWh | 150 TWh | Gas 43.4% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 965 GWh | 2026-09-09 (9 September 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 49,959 MW | 9 Sept 2026, 17:00 PDT (UTC-07:00) |
| Highest solar share of a day's generation, 2019 onward | 48.2% | 2026-06-29 (29 June 2026) |
| Highest wind share of a day's generation, 2019 onward | 34.2% | 2026-05-17 (17 May 2026) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Power Flows With Neighbours
Net totals, 2026-08-16 (16 August 2026) to 2026-09-14 (14 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| LDWP | CAISO imports | 776 GWh |
| NEVP | CAISO imports | 737 GWh |
| AZPS | CAISO imports | 672 GWh |
| SRP | CAISO imports | 459 GWh |
| BPA | CAISO imports | 327 GWh |
| BANC | CAISO imports | 219 GWh |
| CEN | CAISO exports | 191 GWh |
| TIDC | CAISO exports | 170 GWh |
| IID | CAISO imports | 88.6 GWh |
| PACW | CAISO imports | 11.5 GWh |
| WALC | CAISO exports | 6.62 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-14.